HomeMy WebLinkAboutPost-Installed Anchors.City of Renton Gene Coulon Memorial Beach Park (T).C21005257.2023-06-06.M7221137.0020POST-INSTALLED ANCHORS REPORT
Report Number:M7221137.0020
Service Date:06/06/23 20225 Cedar Valley Rd Ste 110
Report Date:06/07/23 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Craig Williams
Reported To:American Construction Company
Contractor:American Construction
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, Aaron
McMahill
(1) American Construction Co Inc, John Blair (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________
(1) WSP USA Inc, Garth Nelson, P.E. Barry Tuttle
Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not
necessarily indicative of the properties of other apparently similar or identical materials.
DM010, 04-29-22 Rev.3 Page 1 of 1
Permit No.: C21005257
GENERAL INFORMATION
Aaron with American Construction requested Terracon be on site for adhesive anchor observation of the adhesive anchors
being installed by American Construction. Results of observations performed today were reported to Aaron with American
Construction.
The construction documents referenced for this observation included: Approved plans and documents.
Anchor System Information
The following adhesive types were used during today’s observation:
Adhesive
No.ICC Report Adhesive Lot No.Exp. Date Time Until
Full Cure Referenced
1 3814 Hilt Hit-RE 500 V3 15177710 1/31/24 4 hrs 1/C-9 on S-13 & Email
from Garth Nelson E.O.R.
Anchor Installation
Anchor installation was observed utilizing the adhesive(s), noted above, as follows: (2) Water line Support Anchors
Adhesive
No.
Time
Installed Locations Quantity Anchor Size
& Type
Length &
Embedment
Spacing &
Edge
Distance
Status*
1 1000 North and South bridge
abutments
8 3/4" All-
Thread
6.5" & 5"Per plan &
16"
Complies
* See below for more information
Holes were cleaned prior to installation by compressed air, brush. Ambient Temperature during observation was 74° F.
COMPLIANCE STATEMENT
Based on our observations and testing, the above noted items appear to be in general accordance with the project
documents.