HomeMy WebLinkAboutStructural Steel Observations.City of Renton Gene Coulon Memorial Beach Park (T).C21005257.2022-11-28.M7221137.0005STRUCTURAL STEEL OBSERVATIONS REPORT
Report Number:M7221137.0005
Service Date:11/28/22 20225 Cedar Valley Rd Ste 110
Report Date:11/29/22 Lynnwood, WA 98036-6365
425-742-9360
Client Project
City of Renton WA City of Renton Gene Coulon Memorial Beach Park (T)
Attn: Alan J. Wyatt 1201 Lake Washington Blvd N
1055 S Grady Way Renton, WA
Renton, WA 98057-3232
Project Number: M7221137
Services: Special Inspections / Materials Testing
Mayes/Terracon Rep.: Danielle Candelaria
Reported To:City of Renton
Contractor:American Construction Company Inc
Report Distribution:
(1) City of Renton WA, Alan J. Wyatt (1) American Construction Co Inc, John Blair
(1) Mayes Testing Engineers, Inc, Belinda Rix (1) Mayes Testing Engineers, Inc, Jim Kay Reviewed By:____________________________________
(1) WSP USA Inc, Garth Nelson, P.E. Dennis Sanborn
Senior Project Field Manager
The tests were performed in general accordance with applicable ASTM, AASHTO, or DOT test methods. This report is exclusively for the use of the client indicated above and shall not be reproduced except in full without the written consent of our company. Test results transmitted herein are only applicable to the actual samples tested at the location(s) referenced and are not
necessarily indicative of the properties of other apparently similar or identical materials.
DM010, 04-29-22 Rev.3 Page 1 of 1
Permit No.: C21005257
GENERAL INFORMATION
Arrived on site for visual inspection of welded headed rebar dowels to piles.
Visually inspected completed welding for conformance with the approved WPS, AWS D1.4, detail 2/S-9, and city
of Renton specifications certified welding was performed by Rob Ball.
Visually inspected completed welding on (3) piles at the North abutment, East, West, and Center piles.
(4) of the welds at the West and Center piles were not in conformance with the approved detail for length. Spoke
with Aaron from American Construction about the issue, the issue is being addressed.
Welding continued at the south side abutment at the East, West, and Center piles.
COMPLIANCE STATEMENT
Preliminary Observation(s)
Welding in progress.