HomeMy WebLinkAboutBurnett Project - Addendum No 1Burnett Avenues S Sidewalk & Utilities Replacement Project Addendum No. 1
Page 1 of 1
BURNETT AVENUE S SIDEWALK & UTILITIES REPLACEMENT PROJECT
CITY PROJECT NO. 4244
ADDENDUM NO. 1
DATE OF ADDENDUM ISSUE: September 22, 2023
BID DUE DATE: September 26, 2023
DATE OF BID OPENING: September 26, 2023
NOTE TO ALL PLANHOLDERS:
This Addendum No. 1, containing the following revisions, additions, deletions, and/or clarifications, is
hereby made a part of the Plans and Contract Provisions (Contract Documents) for the above-named
project. Bidders shall take this Addendum into consideration when preparing and submitting their bids.
Bidders shall acknowledge receipt and acceptance of this Addendum No. 1 in the space provided on the
Proposal Signature Page or by signing in the space provided below and submitting the signed addendum
with the bid package. Failure to provide this written acknowledge may result in disqualification of the Bidder’s
submittal.
SCHEDULE OF PRICES
1. DELETE Page 1 of Schedule of Prices (Schedule A – Roadway Improvements) and REPLACE with
attached Proposal (Page 18 of 285). Revisions include:
• Revise Bid Item A12 Item Description to “Hot Mix Asphalt Overlay HMA Cl. ½ Inch PG 58H-
22, Including Planing of Bituminous Pavement”
ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT.
Sincerely,
Jonathan Chavez, P.E.
Civil Engineer III
City of Renton
Receipt acknowledged, and conditions agreed to this _____ day of ________, 2023
Bidder _______________________________
Signature
WATER UTILITY
jchavez 09/21/2023
ADDENDUM 1
(Page 1 of 2)
SCHEDULE OF PRICES
Burnett Ave S Sidewalk & Utility Replacement Project
SCHEDULE A - ROADWAY IMPROVEMENTS
ALL ENTRIES SHALL BE WRITTEN IN INK OR TYPED TO VALIDATE BID
Note: Unit prices for all items, all extensions, and total amount of bid shall be shown. Enter unit prices in numerical figures
only in dollars and cents to two (2) decimal places (including whole dollar amounts). All figures must be clearly legible. Bids
with illegible figures in the Unit Price column will be regarded nonresponsive and rejected. Where conflict occurs between
the unit price and the total amount specified for any item, the unit price shall prevail, and totals shall be corrected to
conform thereto.
Item
No.
Spec.
Section
Item Description Quantity Unit Unit Price* Extension
A1 1-04 Minor Change 1 EST $25,000
A2 1-05 Roadway Surveying 1 LS
A3 1-05 Record Drawings 1 LS
A4 1-07 SPCC Plan 1 LS
A5 1-09 Mobilization 1 LS
A6 1-10 Project Temporary Traffic Control 1 LS
A7 2-01 Clearing and Grubbing 1 LS
A8 2-02 Removal of Structures and Obstructions 1 LS
A9 2-02 Remove, Salvage and Reinstall Existing Fence
Panels
1 LS
A10 2-05 Tree Protection 1 LS
A11 4-04 Crushed Surfacing Top Course 85 TN
A12 5-04 Hot Mix Asphalt Overlay HMA Cl. 1/2 Inch PG
58H-22
70 TN
A13 8-01 Erosion Control & Water Pollution Prevention 1 LS
A14 8-02 Topsoil Type A 6 CY
A15 8-02 Seeded Lawn Installation 61 SY
ADDENDUM 1
(Page 2 of 2)
, Including Planing of Bituminous Pavement