• The Clean Economy Strategy 2.0 draft plan is now final and ready for public
comment. The plan will serve as a roadmap to reduce greenhouse gas emissions,
enhance environmental sustainability, and help the community prepare for climate
change. The plan is available for review online at RentonCES.Konveio.com. A hybrid
briefing and public hearing will be held at the Planning Commission meeting on
October 4 at 6:00 p.m. The public comment period will remain open through
October 4, 2023. Questions should be directed to Katie Buchl-Morales, kbuchl-
morales@RentonWA.gov.
• Water Shortage Response Plan Activation & Conservation: The City of Seattle Public
Utilities (SPU) has activated the voluntary stage of its Water Shortage Contingency
Plan and is requesting customers to reduce water use. Water supply reservoirs in
their Cedar River and Tolt watersheds are significantly lower than normal due to an
early snowpack melt-off this past spring, an extended period of warm weather, and
lower-than-normal rainfall during the year. The City of Renton’s wholesale water
supply contract with SPU, and our participation in the Saving Water Partnership
requires we activate the voluntary state of our water shortage response plan.
While Renton is not anticipating any water shortage from our own water supply
sources, we encourage everyone to reduce water use in support of the regional
water conservation effort. Approximately 40% of Renton is served by Water
Districts that purchase water from Seattle.
For tips on how you can conserve water, visit:
https://www.rentonwa.gov/city_hall/public_works/utility_systems/water_utility_e
ngineering/water_conservation
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Valerie O’Halloran, Council President
Members of Renton City Council
Page 2 of 2
Monday, September 25 through Thursday, September 28, 7:00 a.m. to 4:00
p.m. Crack seal work will be done on South Grady Way between Main Avenue
South and Rainier Avenue South. Work will be done on both eastbound lanes.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on NE 12th Street and Jefferson Avenue NE for utility
installation. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Intermittent west bound lane closure on South Grady Way at Williams Avenue
South for construction work. Questions may be directed to Tom Main, 206-999-
1833.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Road closure on Kirkland Avenue NE between NE Sunset Boulevard and NE 12th
Street for utility installation. Detour route will be provided. Questions may be
directed to Brad Stocco, 425-282-2373.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on Lincoln Avenue NE at the 4100 block. Questions may
be directed to Kip Braaten, 206-503-1749.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on Park Avenue between North 3rd Street and North
4th Street for construction work. Questions may be directed to Pat Decaro, 425-
207-6013.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on westbound Park Avenue North at Logan Avenue
North for construction work. Questions may be directed to Joel McCann, 425-
757-9595.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Intermittent lane closure on NE Sunset Boulevard between Edmonds Avenue NE
and Kirkland Avenue NE for construction work. Questions may be directed to
Brad Stocco, 425-282-2373.
Monday, September 25 through Friday, September 29, 8:00 a.m. to 3:00 p.m.
Intermittent lane closures on Williams Avenue South at South Grady Way for
construction work. Questions may be directed to Tom Main, 206-999-1833.
Ongoing Street Closure through October 4, 2023 (City of Renton Resolution No.
4446). FULL STREET CLOSURE on Sunset Lane NE between NE 10th Street and
Harrington Place NE in support the Solera Development Project (LUA20-000305).