Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRS_Traffic Impact Analysis_Logan Six_230924_v3.pdfKH #090222307
Kimley-Horn and Associates, Inc.
2828 Colby Avenue
Suite 200
Everett, WA 98201
425.708.8275
Logan Six
Updated Traffic Impact Analysis
Jurisdiction: City of Renton
September 2023
09/07/23
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | i
TABLE OF CONTENTS
1.DEVELOPMENT IDENTIFICATION ................................................................................1
2.METHODOLOGY ..............................................................................................................1
3.TRIP GENERATION ..........................................................................................................4
4.TRIP DISTRIBUTION ........................................................................................................5
5.INTERSECTION LEVEL OF SERVICE ANALYSIS .........................................................8
5.1 Turning Movement Calculations ...................................................................................8
5.2 Level of Service Calculations ...................................................................................... 15
6.CRASH DATA .................................................................................................................. 16
7.ADDITIONAL CONCERNS ............................................................................................. 18
8.TRANSPORTATION IMPACT FEES .............................................................................. 18
9.CONCLUSIONS ............................................................................................................... 18
LIST OF FIGURES
Figure 1: Site Vicinity Map .........................................................................................................2
Figure 2: Development Trip Distribution – AM Peak-Hour .........................................................6
Figure 3: Development Trip Distribution – PM Peak-Hour ..........................................................7
Figure 4: Existing Turning Movements – AM Peak-Hour ............................................................9
Figure 5: Existing Turning Movements – PM Peak-Hour .......................................................... 10
Figure 6: 2024 Baseline Turning Movements – AM Peak-Hour ................................................ 11
Figure 7: 2024 Baseline Turning Movements – PM Peak-Hour ................................................. 12
Figure 8: 2024 Future with Development Turning Movements – AM Peak-Hour ...................... 13
Figure 9: 2024 Future with Development Turning Movements – PM Peak-Hour ....................... 14
LIST OF TABLES
Table 1: Level of Service Criteria ................................................................................................3
Table 2: Trip Generation Summary .............................................................................................4
Table 3: Level of Service Summary .......................................................................................... 15
Table 4: 5-Year Collision Data Summary .................................................................................. 16
Table 5: 5-Year Collision Rate Calculation ............................................................................... 17
ATTACHMENTS
Trip Generation Calculations ...................................................................................................... A
AM Counts and Turning Movement Calculations ....................................................................... B
PM Counts and Turning Movement Calculations ....................................................................... C
AM Level of Service Calculations .............................................................................................. D
PM Level of Service Calculations .............................................................................................. E
Collision Data ............................................................................................................................ F
Travel Routes ............................................................................................................................. G
Site Plan ................................................................................................................................. H
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 1
1.DEVELOPMENT IDENTIFICATION
Kimley-Horn and Associates, Inc. (KH) has been retained to provide an updated traffic impact
analysis for Logan Six development to address recent City comments. This report is intended to
provide the City of Renton with the necessary traffic generation, trip distribution and intersection
analysis to facilitate their review of the development and to address the additional comments. The
Logan Six development is located on the east side of Logan Avenue N, between N 3rd Street and
N 4th Street. A site vicinity map is included in Figure 1. The development is currently proposed to
consist of 97 mid-rise apartment units with 4,860 square-feet (SF) of commercial space. The site
is currently undeveloped. The site will gain access to the road system through two new accesses,
one proposed onto N 3rd Street and one onto N 4th Street. There is no interconnectivity between
these two garage accesses. There will be a total of 125 vehicle parking spaces provided, 108 on-
site (83 in the southern garage and 25 in the northern garage) and 17 concomitant agreement stalls
on the adjacent parcel on the southeast corner of the development.
Matthew Palmer, responsible for this report and traffic analysis, is a licensed professional engineer
(Civil) in the State of Washington and member of the Washington State section of ITE.
2.METHODOLOGY
The analysis contained in this report is based on the City of Renton Policy Guidelines for Traffic
Impact Analysis for New Development. Additionally, the accesses to N 3rd Street and N 4th Street
has been analyzed under the future with development conditions. The level of service analysis has
been performed in accordance with the Highway Capacity Manual 6th Edition (HCM). Congestion
is generally measured in terms of level of service (LOS). Road facilities and intersections are rated
between LOS A and LOS F, with LOS A being free flow and LOS F being forced flow or over-
capacity conditions. A summary of the level of service criteria is included in Table 1.
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEMAIN AVE SMAPLE VALLEY HWYBRONSONWAY SSITE
N 6TH ST
BURNETT AVE N169
405405
900900
900
167167
169
N E S U N S E T B L V D
RAINIER AVE NAIRPORT WAY
S 3RD ST
S 2ND ST
169
167
900
900
RENTON AVE S
405
LEGEND
SITE VICINITY MAPDEVELOPMENT SITE
FIGURE 1
#X
STUDY INTERSECTIONS
#2
#1 #11
#5
#12
#6
#8
#7
#9#3
#4 #10
#13
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 3
Table 1: Level of Service Criteria
Level of 1
Service
Expected
Delay
Intersection Control Delay
(Seconds per Vehicle)
Unsignalized
Intersections
Signalized
Intersections
A Little/No Delay <10 <10
B Short Delays >10 and <15 >10 and <20
C Average Delays >15 and <25 >20 and <35
D Long Delays >25 and <35 >35 and <55
E Very Long Delays >35 and <50 >55 and <80
F Extreme Delays2 >50 >80
Per the City of Renton’s Transportation Element, the acceptable level of service is LOS D except
along the following specific corridors, Carr Road, Logan Avenue, Rainier Avenue, Grady Way,
SR-900 and SR-515, and the Renton Urban Center and Center Village, where the acceptable level
of service is LOS E.
The level of service at two-way stop-controlled intersections is based on the average delay for the
stopped approach with the highest delay. The level of service at all-way stop-controlled
intersections and signalized intersections is based on the average delay for all vehicles. The level
of service analysis for unsignalized and signalized intersections has been performed utilizing the
Synchro 11 software.
The trip generation calculations for the development are based on average trip generation rates
published in the Institute of Transportation Engineers (ITE)Trip Generation Manual, 11th Edition
(2021).
1 Source:Highway Capacity Manual, 6th Edition.
LOS A: Free-flow traffic conditions, with minimal delay to stopped vehicles (no vehicle is delayed longer
than one cycle at signalized intersection).
LOS B: Generally stable traffic flow conditions.
LOS C: Occasional back-ups may develop, but delay to vehicles is short term and still tolerable.
LOS D: During short periods of the peak hour, delays to approaching vehicles may be substantial but are
tolerable during times of less demand (i.e. vehicles delayed one cycle or less at signal).
LOS E: Intersections operate at or near capacity, with long queues developing on all approaches and long
delays.
LOS F: Jammed conditions on all approaches with excessively long delays and vehicles unable to move at
times.
2 When demand volume exceeds the capacity of the lane, extreme delays will be encountered with queuing which may
cause severe congestion affecting other traffic movements in the intersection.
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 4
3.TRIP GENERATION
Trip generation calculations for the Logan Six development have been performed utilizing data
published in the Institute of Transportation Engineers (ITE)Trip Generation Manual, 11th Edition
(2021). The average trip generation rates for the following ITE Land Use Codes (LUC) have been
utilized in the trip generation calculations:
·LUC 221, Multifamily Housing (Mid-Rise) – 97 apartments units
·LUC 822, Strip Retail Plaza (<40k) – 4,860 SF
ITE Land Use Code 221 has been utilized for the 97 proposed apartments since they will include
6 stories, which meets the criteria of ITE Land Use Code 221. As the commercial space will be
either office or retail use, the higher trip generation use, retail, has been conservatively used. The
trip generation of the Logan Six development is summarized in Table 2.
Table 2: Trip Generation Summary
Land Use Units/Size
Average
Daily
Trips
AM Peak-Hour Trips PM Peak-Hour Trips
Inbound Outbound Total Inbound Outbound Total
ITE LUC 221,
Multifamily
Mid-rise
97 Units 440 8 28 36 23 15 38
ITE LUC 822,
Strip Retail Plaza
(<40k)
4,860 SF 265 7 4 11 16 16 32
TOTAL NEW TRIPS 705 15 32 47 39 31 70
The Logan Six development is anticipated to generate approximately 705 new average daily trips
with 47 new AM peak-hour trips and 70 new PM peak-hour trips. The trip generation calculations
are included in the attachments.
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 5
4.TRIP DISTRIBUTION
The Logan Six development is proposed to have two accesses, one on the north side of the
development onto N 4th Street and one on the south side of the parcel onto N 3rd Street. The
distribution of trips is based on prior projects in the site vicinity and comments from City staff. It
is anticipated that 30% of the trips generated by the development will travel to and from the north,
fifteen percent along Logan Avenue N and fifteen percent along Park Avenue N. Approximately
35% of the trips generated by the development will travel to and from the east utilizing N 3rd Street
(eastbound one-way) and N 4th Street (westbound one-way). The remaining 35% of the trips
generated by the development are anticipated to travel to and from the south and west along Airport
Way. A detailed trip distribution for the AM and PM peak-hours are shown in Figure 2 and Figure
3 respectively.
The City is currently planning on putting c-curbing along N 3rd Street between the two lanes across
the development’s south garage access separating those two lanes effectively prohibiting left-turns
into the southern garage from the southern lane. Therefore, trips coming from the south along
Logan Avenue N will have to turn onto N 3rd Street, pass the garage, take a left-turn onto Burnett
Avenue N or Williams Avenue N, a left onto N 4th Street, left onto Logan Avenue N, and then a
left onto N 3rd Street to turn into the southern garage. It is important to note that the southern and
northern garages are not connected internally.
Currently, both the north and south garage will be utilized by residents and
employees/management for commercial uses, and all of the guest/commercial customers will
utilize the concomitant agreement stalls located on the southeast side of the development. As ITE
does not separate employee/customer or resident/guest trips, all of the residential trips were
assumed to utilize the parking garages and all of the commercial trips were assumed to utilize the
concomitant agreement stalls. Additionally, as the southern garage account for approximately
2/3rds of the total parking stalls, approximately 2/3rds of the residential trips were routed to/from
the southern garage and 1/3rd of the residential trips were routed to/from the northern garage.
900900
900
167167
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEN E S U N S E T B L V D
AIRPORT WAY
S 3RD ST
S 2ND ST
MAIN AVE SMAPLE VALLEY HWYBRONSONWAY S167
900
900
SITE
RENTON AVE S
N 6TH ST
BURNETT AVE N#2
#1 #11
#13
#12
#6
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST
#12 N SITE ACCESS @
N 4TH ST
#6 BURNETT AVE N @
N 4TH ST #13 BURNETT AVE N @
COMMERCIAL DWY
#5
169
405405
169169
405
*NOTE: RETURN TRIPS
WILL UTILIZE
N 4TH ST
611
247
35
LOCAL
LOCAL
LOCAL
10
3
701
15 21065
35*
11
247
5
1
1
3 5
5
15
21065
2
3
7 1
10
1
1 355
3
2517
68
2
1
355
2
5 10615
10 3701
4
2 7110
5
210615
405
900
900
167
169
DEVELOPMENT
TRIP DISTRIBUTION
AM PEAK-HOUR
FIGURE 2
TRIP DISTRIBUTION %
DAILY TRAFFIC
AM PEAK HOUR TRIPSAM PEAK
AWDT
XX
LEGEND
5
210515
17
2
090
0121100
0
0
6000
0
0 0000
4
3
00150
0
0
2000
0
0
00017
14
02 05
21
000190
0
6
12 304132
2
900900
900
167167
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEN E S U N S E T B L V D
AIRPORT WAY
S 3RD ST
S 2ND ST
MAIN AVE SMAPLE VALLEY HWYBRONSONWAY S167
900
900
SITE
RENTON AVE S
N 6TH ST
BURNETT AVE N#2
#1 #11
#13
#12
#6
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST
#12 N SITE ACCESS @
N 4TH ST
#6 BURNETT AVE N @
N 4TH ST #13 BURNETT AVE N @
COMMERCIAL DWY
#5
169
405405
169169
405
LEGEND
XX
AWDT
PEAKPM PM PEAK HOUR TRIPS
DAILY TRAFFIC
TRIP DISTRIBUTION %
FIGURE 3
DEVELOPMENT
TRIP DISTRIBUTION
PM PEAK-HOUR
15 1066
5
10 714
3
470
310
15
1065
6
5
352
1
8
17625
10
5 352
2
10
7 1
3
4
5 1066
15
5
3 5
1
1
13
247
11
35*
5
106615
4 703
10
LOCAL
LOCAL
LOCAL
35
247
11 14
*NOTE: RETURN TRIPS
WILL UTILIZE
N 4TH ST
15 1056
4211100
0
0
14000
0
0 0000
11
8
00220
0
0
8000
0
0
00022
7
06 05
26
000100
0
16
19
26
7
050
0 808148
8
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 8
5.INTERSECTION LEVEL OF SERVICE ANALYSIS
Per instructions from the City staff, the following intersections have been analyzed:
1.Logan Avenue N at N 3rd Street – Signalized
2.Logan Avenue N at N 4th Street – Signalized
3.Logan Avenue N at N 6th Street – Signalized
4.Logan Avenue N at N 8th Street – Signalized
5.Burnett Avenue N at N 3rd Street – Two-Way Stop Controlled
6.Burnett Avenue N at N 4th Street – Two-Way Stop Controlled
7.Park Avenue N at N 3rd Street – Signalized
8.Park Avenue N at N 4th Street – Signalized
9.Park Avenue N at N 6th Street – Signalized
10.Park Avenue N at N 8th Street – Signalized
11.South Site Access at N 3rd Street – Two-way Stop Controlled
12.North Site Access at N 4th Street – Two-way Stop Controlled
13.Burnett Avenue N at Commercial Parking Lot – Two-way Stop Controlled
As the site accesses will not exist during the existing and baseline (future without development)
conditions, they have only been analyzed during the future with development conditions.
5.1 Turning Movement Calculations
The existing AM and PM peak-hour turning movements at the study intersections were collected
by the independent count firm Traffic Data Gathering in September 2022 and February 2023.
Volumes at Burnett Avenue N at the Commercial Parking Lot volumes were extrapolated based
on the north leg of Burnett Avenue N at N 3rd Street due to the proximity to the intersection.
Additionally, 5 trips were added to each of the movements to/from the commercial driveway to
represent trips that may currently be using the driveway. The existing turning movements at the
study intersections are shown in Figure 4.
The future analysis has been performed for the year 2024, which represents when the development
is expected to be constructed and occupied. The 2024 baseline turning movements have been
calculated by applying a 1.5% annually compounding growth rate and trips from 2 pipeline
developments, Southport West, and Topgolf Phase II, per the City of Renton comments, to the
existing turning movements. The 2024 baseline turning movements at the study intersection are
shown in Figure 5. The 2024 future with development turning movements at the study intersections
have been calculated by adding the development’s trips to the 2024 baseline turning movements.
The 2024 future with development turning movements are shown in Figure 6.
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEMAIN AVE SMAPLE VALLEY HWYBRONSONWAY SSITE
N 6TH ST
BURNETT AVE N169
405405
169169
405
#2
#1 #5
#12
#6
#8
#7
#9#3
#4 #10
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#3 LOGAN AVE N @
N 6TH ST
#4 LOGAN AVE N @
N 8TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST #12 N SITE ACCESS @
N 4TH ST
#7 PARK AVE N @
N 3RD ST
#8 PARK AVE N @
N 4TH ST
#9 PARKAVE N @
N 6TH ST
#10 PARKAVE N @
N 8TH ST
#6 BURNETT AVE N @
N 4TH ST
#11
#13 BURNETT AVE N @
COMMERCIAL DWY
#13
LEGEND
AM PEAK HOUR TRIPS
FIGURE 4
XXX EXISTING
TURNING MOVEMENTS
AM PEAK-HOUR1683110
0
0
44893141
3
11 0585
400
8
08240
0
0
916900
0
0
62291027
421
10
0811960
359
79
0290240
0
02943288
8
34
2036835711
9
23
54291716
6
48
57629229
8
8 371724
25
5
53176795
35
23
23136935
53
33
1203791024
49
71700
0
0
71905
445
26496 037
353
0932585245
5
432
0
000
0000
0
0
476
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEMAIN AVE SMAPLE VALLEY HWYBRONSONWAY SSITE
N 6TH ST
BURNETT AVE N169
405405
169169
405
#2
#1 #5
#12
#6
#8
#7
#9#3
#4 #10
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#3 LOGAN AVE N @
N 6TH ST
#4 LOGAN AVE N @
N 8TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST #12 N SITE ACCESS @
N 4TH ST
#7 PARK AVE N @
N 3RD ST
#8 PARK AVE N @
N 4TH ST
#9 PARKAVE N @
N 6TH ST
#10 PARKAVE N @
N 8TH ST
#6 BURNETT AVE N @
N 4TH ST
#11
#13 BURNETT AVE N @
COMMERCIAL DWY
#13
LEGEND
PM PEAK HOUR TRIPS
FIGURE 5
XXX EXISTING
TURNING MOVEMENTS
PM PEAK-HOUR903048
337
0931661,16120
0
0
784931374
8
45 01182
356
3
011140
0
0
15627100
0
0
36214031
792
31
03835629
299
44
0197350
0
012781741
2
64
1318102612
16
61
21719252
5
104
131749717
10
17 4317350
7
8
22164136
51
75
12600
0
0
252607
791
25 722453274
91
75
522762063
64
37 000
0
0
858
378
0
000
0 5185335
5
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEMAIN AVE SMAPLE VALLEY HWYBRONSONWAY SSITE
N 6TH ST
BURNETT AVE N169
405405
169169
405
#2
#1 #5
#12
#6
#8
#7
#9#3
#4 #10
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#3 LOGAN AVE N @
N 6TH ST
#4 LOGAN AVE N @
N 8TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST #12 N SITE ACCESS @
N 4TH ST
#7 PARK AVE N @
N 3RD ST
#8 PARK AVE N @
N 4TH ST
#9 PARKAVE N @
N 6TH ST
#10 PARKAVE N @
N 8TH ST
#6 BURNETT AVE N @
N 4TH ST
#11
#13 BURNETT AVE N @
COMMERCIAL DWY
#13
LEGEND
AM PEAK HOUR TRIPS
FIGURE 6
2024 BASELINE
TURNING MOVEMENTS
AM PEAK-HOUR
XXX0585
420
8
08240
0
01689110
0
0
4741,16741
3
11
1008900
0
0
63435046
427
10
01093369
364
80
0453240
0
02947188
8
35
2069255811
9
23
3113734
25
5
54896896
36
23
23179936
54
33
1225441024
50
71700
0
0
71905
471
26 54621716
6
49
58849229
8
8535 038
372
01,168000
0
0
502
459
0
000
0 585245
5
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEMAIN AVE SMAPLE VALLEY HWYBRONSONWAY SSITE
N 6TH ST
BURNETT AVE N169
405405
169169
405
#2
#1 #5
#12
#6
#8
#7
#9#3
#4 #10
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#3 LOGAN AVE N @
N 6TH ST
#4 LOGAN AVE N @
N 8TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST #12 N SITE ACCESS @
N 4TH ST
#7 PARK AVE N @
N 3RD ST
#8 PARK AVE N @
N 4TH ST
#9 PARKAVE N @
N 6TH ST
#10 PARKAVE N @
N 8TH ST
#6 BURNETT AVE N @
N 4TH ST
#11
#13 BURNETT AVE N @
COMMERCIAL DWY
#13
LEGEND
PM PEAK HOUR TRIPS
FIGURE 7
2024 BASELINE
TURNING MOVEMENTS
PM PEAK-HOUR
XXX01182
383
3
011140
0
0681,40720
0
0
8231,014384
8
46
16740500
0
0
37250047
816
32
05277438
308
45
0248360
0
0121,000742
2
66
1358892712
16
63
4475360
7
8
22764140
53
77
744003376
94
77
543352165
66
3812600
0
0
262707
830
26 22931254
5
107
135816718
10
181,125049
363
01,0145195345
5
405
0
000
0000
0
0
899
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEMAIN AVE SMAPLE VALLEY HWYBRONSONWAY SSITE
N 6TH ST
BURNETT AVE N169
405405
169169
405
#2
#1 #5
#12
#6
#8
#7
#9#3
#4 #10
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#3 LOGAN AVE N @
N 6TH ST
#4 LOGAN AVE N @
N 8TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST #12 N SITE ACCESS @
N 4TH ST
#7 PARK AVE N @
N 3RD ST
#8 PARK AVE N @
N 4TH ST
#9 PARKAVE N @
N 6TH ST
#10 PARKAVE N @
N 8TH ST
#6 BURNETT AVE N @
N 4TH ST
#11
#13 BURNETT AVE N @
COMMERCIAL DWY
#13
LEGEND
AM PEAK HOUR TRIPS
FIGURE 8
2024 WITH DEVELOPMENT
TURNING MOVEMENTS
AM PEAK-HOUR
XXX
#11 S SITE ACCESS @
N 3RD ST #12 N SITE ACCESS @
N 4TH ST
2890210
0
0
4801,16741
3
11 0585
424
11
08390
0
0 0190
0
6
514
476
2
090
0
1008900
0
0
63435051
438
10
01093569
369
80
0458240
0
02947388
8
35
2069305811
9
23
54641716
6
49
60852229
8
8 3115734
25
5
54946896
36
23
23180936
54
34
1255461024
50
73700
0
0
719022
485
26 537043
393
01,168889377
7
TRAFFIC IMPACT STUDY
CITY OF RENTON
KH #090222307
LOGAN SIX PARK AVE NN 8TH STGARDEN AVE NLOGAN AVE NN 4TH ST
N 3RD ST
N E 3 R D S TSUNSET BLVD NEMAIN AVE SMAPLE VALLEY HWYBRONSONWAY SSITE
N 6TH ST
BURNETT AVE N169
405405
169169
405
#2
#1 #5
#12
#6
#8
#7
#9#3
#4 #10
#1 LOGAN AVE N @
N 3RD ST
#2 LOGAN AVE N @
N 4TH ST
#3 LOGAN AVE N @
N 6TH ST
#4 LOGAN AVE N @
N 8TH ST
#5 BURNETT AVE N @
N 3RD ST
#11 S SITE ACCESS @
N 3RD ST #12 N SITE ACCESS @
N 4TH ST
#7 PARK AVE N @
N 3RD ST
#8 PARK AVE N @
N 4TH ST
#9 PARKAVE N @
N 6TH ST
#10 PARKAVE N @
N 8TH ST
#6 BURNETT AVE N @
N 4TH ST
#11
#13 BURNETT AVE N @
COMMERCIAL DWY
#13
LEGEND
PM PEAK HOUR TRIPS
FIGURE 9
2024 WITH DEVELOPMENT
TURNING MOVEMENTS
PM PEAK-HOUR
XXX891,41820
0
0
8371,014384
8
46 01182
394
11
011360
0
0 0100
0
16
918
431
7
050
0
16740500
0
0
37250051
827
32
05278038
321
45
0252360
0
0121,006742
2
66
1358942712
16
63
22935254
5
109
137819718
10
18 4481360
7
8
22804140
53
77
744023376
94
81
573362165
66
3820600
0
0
2627029
837
261,131054
389
01,0141319134813
13
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 15
5.2 Level of Service Calculations
The 2022 existing level of service calculations have been performed utilizing the existing
channelization, existing intersection control and peak-hour factors and heavy vehicle factors from
the 2022 turning movement counts. The 2024 baseline and 2024 future with development level of
service analysis does not include any changes to the existing channelization or control. The level
of service summary is included in Table 3.
Table 3: Level of Service Summary
Intersections Approach Peak-
Hour
Existing
Conditions
2024
Baseline
Conditions
2024 Future with
Development
Conditions
LOS Delay LOS Delay LOS Delay
1.Logan Avenue N
at N 3rd Street Intersection AM A 3.0 sec A 3.1 sec A 3.9 sec
PM A 9.2 sec A 9.8 sec B 10.2 sec
2.Logan Avenue N
at N 4th Street Intersection AM A 9.8 sec B 11.0 sec B 11.4 sec
PM A 9.3 sec B 10.1 sec B 10.5 sec
3. Logan Avenue N
at N 6th Street Intersection AM B 17.7 sec D 36.5 sec D 37.4 sec
PM B 17.1 sec B 19.3 sec B 19.5 sec
4. Logan Avenue N
at N 8th Street Intersection AM B 17.3 sec C 30.9 sec C 31.9 sec
PM D 36.2 sec E 63.3 sec E 65.1 sec
5. Burnett Avenue N
at N 3rd Street TWSC AM B 13.1 sec B 13.4 sec B 13.7 sec
PM C 16.7 sec C 17.4 sec C 18.7 sec
6. Burnett Avenue N
At N 4th Street TWSC AM B 11.1 sec B 11.2 sec B 11.3 sec
PM B 11.1 sec B 11.3 sec B 11.4 sec
7. Park Avenue N
at N 3rd Street Intersection AM B 10.1 sec B 11.2 sec B 11.3 sec
PM B 12.9 sec B 14.3 sec B 14.3 sec
8. Park Avenue N
at N 4th Street Intersection AM A 8.2 sec A 9.2 sec A 9.2 sec
PM A 7.7 sec A 8.3 sec A 8.4 sec
9. Park Avenue N
at N 6th Street Intersection AM B 17.2 sec B 17.1 sec B 17.1 sec
PM B 15.4 sec B 15.9 sec B 16.0 sec
10.Park Avenue N
at N 8th Street Intersection AM B 12.9 sec B 14.1 sec B 14.2 sec
PM B 16.0 sec B 16.3 sec B 16.3 sec
11.South Site Access
at N 3rd Street TWSC AM ------------B 10.5 sec
PM ------------B 12.7 sec
12.North Site Access
at N 4th Street TWSC AM ------------A 9.9 sec
PM ------------A 9.8 sec
13.Burnett Avenue N
at Commercial
Driveway
TWSC
AM A 8.6 sec A 8.6 sec A 8.7 sec
PM A 8.7 sec A 8.7 sec A 8.9 sec
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 16
The analysis shows that the study intersections currently operate at LOS D or better in both the
AM and PM peak-hours. In the 2024 baseline and 2024 future with development conditions, all of
the study intersection are anticipated to operate at LOS D or better in both the AM and PM peak-
hours with the exception of Logan Avenue N at N 8th Street during the PM peak-hour which will
operate at an acceptable LOS E during the 2024 baseline and 2024 future with development
conditions. The site accesses are anticipated to operate at acceptable LOS B or better under the
2024 future with development conditions. The level of service calculations are included in the
attachments.
6.CRASH DATA
Collision data provided by the WSDOT for January 1, 2017, through December 2021 is
summarized in Table 4.
Table 4: 5-Year Collision Data Summary
Intersection
Collision Type
Total
Collisions
Collisions
Per YearRear-
End
Entering
at Angle
Opp.
Dir.Sideswipe Same
Dir.
Ped. /
Cyclist
Fixed
Object/
Other
Logan Avenue N
at N 3rd Street 4 2 5 0 0 0 0 11 2.2
Logan Avenue N
at N 4th Street 3 6 0 0 0 0 0 9 1.8
Logan Avenue N
at N 6th Street 1 0 0 2 0 0 0 3 0.6
Logan Avenue N
at N 8th Street 3 3 0 0 0 0 0 6 1.2
Burnett Avenue N
at N 3rd Street 1 3 0 1 0 0 0 5 1.0
Burnett Avenue N
At N 4th Street 0 2 0 0 0 0 0 2 0.4
Park Avenue N
at N 3rd Street 1 17 7 0 3 0 0 28 5.6
Park Avenue N
at N 4th Street 1 24 0 1 10 1 0 37 7.4
Park Avenue N
at N 6th Street 1 1 0 0 0 1 0 3 0.6
Park Avenue N
at N 8th Street 0 3 3 0 0 2 2 10 2.0
South Site Access
at N 3rd Street 0 0 0 0 0 0 1 1 0.2
The 5-year collision rate has been calculated using PM peak-hour volumes and the industry
standard K-factor of 10 for conversion to ADT. The 5-year collision rates are summarized in Table
5.
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 17
Table 5: 5-Year Collision Rate Calculation
Intersection
PM Peak-Hour
Intersection
Vol.
K-Factor Total
Collisions
Collision
Rate3
Logan Avenue N
at N 3rd Street 3,038 10 11 0.20
Logan Avenue N
at N 4th Street 2,219 10 9 0.22
Logan Avenue N
at N 6th Street 1,963 10 3 0.08
Logan Avenue N
at N 8th Street 1,834 10 6 0.18
Burnett Avenue N
at N 3rd Street 892 10 5 0.31
Burnett Avenue N
At N 4th Street 405 10 2 0.27
Park Avenue N
at N 3rd Street 1,531 10 28 1.00
Park Avenue N
at N 4th Street 1,043 10 37 1.94
Park Avenue N
at N 6th Street 855 10 3 0.19
Park Avenue N
at N 8th Street 1,101 10 10 0.50
Further safety analysis may be performed if intersection collision frequencies are higher than 5
collision per year for unsignalized intersection, higher than 10 collisions per year for signalized
intersections, or collision rates per million entering vehicles being greater than 1.0. As the collision
rate at the intersections of Park Avenue N at N 3rd Street and Park Avenue at N 4th Street is over
1.0 but the frequency is less than 10 collisions per year, further collision analysis may be
warranted. It is important to note that no fatality collisions were reported at the study intersections.
At the intersection of Park Avenue N at N 3rd Street, the most common collision type was “entering
at angle” followed by “opposite direction” collisions. Per the collision reports, all of the entering
at angle collisions were due to a vehicle traveling east/west through the intersection colliding with
a vehicle traveling north/south through the intersection due to one or more of the vehicles
disregarding the traffic signal. All of the opposite direction collisions were between a vehicle
making a southbound left-turn colliding with a vehicle traveling from the south to the north. Of
the 28 collisions, 9 occurred in 2017, 5 occurred in 2018, 5 occurred in 2019, 5 occurred in 2020
and 4 occurred in 2021.
3 The collision rate is based on Million Entering Vehicles.
Updated Traffic Impact Analysis
Logan Six KH #090222307
kimley-horn.com 2828 Colby Avenue Ste. 200, Everett, WA 98201 (425) 708 8275 Page | 18
At the intersection of Park Avenue N at N 4th Street, the most common collision type was “entering
at angle” followed by “same direction” collisions. Per the collision reports, a majority of these
collisions were due to a vehicle traveling east/west through the intersection colliding with a vehicle
traveling north/south through the intersection due to one or more of the vehicles disregarding the
traffic signal. All of the same direction collisions were between vehicles traveling west along N
4th Street with an improper turn or inattention listed as the contributing circumstance. All of the
collisions at this intersection are spread equally between the years, with 6 collisions during 2017,
9 collisions during 2018, 7 collisions during 2019, 6 collisions during 2020 and 9 collisions during
2021.
7.ADDITIONAL CONCERNS
Per discussions with City Staff, the surrounding neighborhoods are concerned about cut-through
trips from the development utilizing neighborhood streets instead of arterial/primary roadways.
Based on the directions from Google Maps, although cutting through the local neighborhoods is
an option, the primary route suggested during the PM peak-hours is along N 3rd Street/N 4th Street
and Park Avenue or Logan Avenue to travel to destinations to/from the south. Directions to/from
City Hall and the intersection of S Grady Way at Rainier Avenue S from the site were looked at.
Additionally, the level of service analysis at intersections along this route performed as a part of
this report suggest that there is minimal delays along these primary arterial routes described above.
Therefore, it is not anticipated that a large number, if any, cut-through trips would likely occur
through the adjacent neighborhoods.
8.TRANSPORTATION IMPACT FEES
The transportation impact fees for the Logan Six are based on the current impact fees and could
increase when the fees are actually paid. The current traffic impact fees for 2022 are $8,031.94 per
Net New PM peak-hour vehicle trip for the residential units and $29.88 per SF for the retail space.
Per the trip generation section earlier in the TIA, the development will generate 38 net new
residential PM peak-hour trips for a mitigation fee of $305,213.72. The mitigation fee for the retail
space is $145,216.80 (4,860 SF x $29.88/SF). Therefore, the total traffic mitigation fees for the
Logan Six development are $450,430.52.
9.CONCLUSIONS
The Logan Six is proposed to consist of 97 apartments with 4,860 SF of commercial space. The
site is currently vacant. The development is anticipated to generate 705 new average daily trips
with 47 new AM peak-hour trips and 70 new PM peak-hour trips. All of the study intersections
currently operate at LOS D or better and will operate at LOS D or better except for the intersection
of Logan Avenue N at N 8th Street which will operate at an acceptable LOS E during both the 2024
baseline and 2024 future with development conditions. The current transportation impact
mitigation fees total $450,430.52; however, the actual fee will be determined when a complete
building permit application is filed.
A
Trip Generation Calculations
Logan Six
KH #090222307
Trip Generation for: Weekday
(a.k.a.): Average Weekday Daily Trips (AWDT)
NET EXTERNAL TRIPS BY TYPE
IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS
Gross Trips Internal
Crossover TOTAL PASS-BY DIVERTED LINK NEW PASS-BY
DIVERTED
LINK NEW
LAND USES VARIABLE
ITE
LU
code
Trip
Rate
%
IN
%
OUT
In+Out
(Total)
% of
Gross
Trips
Trips
In+Out
(Total)
In+Out
(Total)
% of
Ext.
Trips
In+Out
(Total)
% of
Ext.
Trips
In+Out
(Total)
In+Out
(Total)In Out In Out In Out
Multifamily (Mid-Rise) 97 units 221 4.54 50%50% 440 0%0 440 0%0 0%0 440 0 0 0 0 220 220
Strip Retail Plaza (<40k) 4.860 KSF 822 54.45 50%50% 265 0%0 265 0%0 0%0 265 0 0 0 0 133 132
Total 705 0 705 0 0 705 0 0 0 0 353 352
A-1
Logan Six
KH #090222307
Trip Generation for: Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 7 and 9 AM
(a.k.a.): Weekday AM Peak Hour
NET EXTERNAL TRIPS BY TYPE
IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS
Gross Trips Internal
Crossover TOTAL PASS-BY DIVERTED LINK NEW PASS-BY
DIVERTED
LINK NEW
LAND USES VARIABLE
ITE
LU
code
Trip
Rate
%
IN
%
OUT
In+Out
(Total)
% of
Gross
Trips
Trips
In+Out
(Total)
In+Out
(Total)
% of
Ext.
Trips
In+Out
(Total)
% of
Ext.
Trips
In+Out
(Total)
In+Out
(Total)In Out In Out In Out
Multifamily (Mid-Rise) 97 units 221 0.37 23%77% 36 0% 0 36 0% 0 0% 0 36 0 0 0 0 8 28
Strip Retail Plaza (<40k) 4.860 KSF 822 2.36 60%40% 11 0% 0 11 0% 0 0% 0 11 0 0 0 0 7 4
Total 47 0 47 0 0 47 0 0 0 0 15 32
A-2
Logan Six
KH #090222307
Trip Generation for: Weekday, Peak Hour of Adjacent Street Traffic, One Hour between 4 and 6 PM
(a.k.a.): Weekday PM Peak Hour
NET EXTERNAL TRIPS BY TYPE
IN BOTH DIRECTIONS DIRECTIONAL ASSIGNMENTS
Gross Trips Internal
Crossover TOTAL PASS-BY DIVERTED LINK NEW PASS-BY
DIVERTED
LINK NEW
LAND USES VARIABLE
ITE
LU
code
Trip
Rate
%
IN
%
OUT
In+Out
(Total)
% of
Gross
Trips
Trips
In+Out
(Total)
In+Out
(Total)
% of
Ext.
Trips
In+Out
(Total)
% of
Ext.
Trips
In+Out
(Total)
In+Out
(Total)In Out In Out In Out
Multifamily (Mid-Rise) 97 units 221 0.39 61%39% 38 0% 0 38 0% 0 0% 0 38 0 0 0 0 23 15
Strip Retail Plaza (<40k) 4.860 KSF 822 6.59 50%50% 32 0% 0 32 0% 0 0% 0 32 0 0 0 0 16 16
Total 70 0 70 0 0 70 0 0 0 0 39 31
A-3
B
AM Counts and Turning Movement Calculations
Right 11
PHF HV 448
0.91 7.4%Right
0.88 5.9%
0.75 0.0%
#N/A #N/A
0.94 6.8%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
4
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Logan Avenue NPeak Hour
Volume
PHF
HV
N 3rd Street
Peds Crossing North Leg = 1
NB
Total
9321683110
Logan Avenue N @ N 3rd Street
WB Approach Logan Avenue NParking Lot
U-Turn Left Thru
0
5
1
0
467
EB Approach
8:00 AM - 9:00 AM
0.94
6.8%
2246
NB ApproachBicycles = 0EB Total = 15Heavy Vehicles = 0NB Total = 1383
Renton, WA
WB
Total
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 50
0
0
0
Bicycles = 0WB Total = 0Peds Crossing East Leg= 4U-Turn
EB
Total Heavy Vehicles = 0Intersection
PEAK HOUR SUMMARY
931
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 102
842Approach
SB Approach
3
Bicycles = 0
Peds Crossing West Leg = 1Peds Crossing South Leg = 2Intersection
SB Total = 848
Right Thru Left U-Turn
B-1
PHF HV
0.90 7.8%
0.90 6.9%
0.74 3.8%
0.95 6.7%
PHF = Peak Hour Factor
HV = Heavy VehiclesLogan Avenue NCount Period
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Thru Left U-Turn
SB Total = 496
HV = 34
Peds Xing E Leg= 2N 4th Street
37 Right
WB Total = 390353 Left
HV = 15Bicycles = 00.95
6.7%Logan Avenue NApproach0932
HV
0 EB
Total
Volume
0 U-Turn
PHF
Peak Hour
Intersection
NB ApproachU-Turn Thru
SB ApproachNB Total = 932
WB ApproachHV = 73
Bicycles = 0
496 0 0
Logan Avenue N @ N 4th Street
Renton, WA
TURNING MOVEMENTS DIAGRAM
PEAK HOUR SUMMARY
Bicycles = 0
Peds Xing N Leg = 0
849
SB
Total
Peds Xing S Leg = 0
Right
0
Intersection
8:00 AM - 9:00 AM
1818
NB
Total
969
B-2
Right 23
PHF HV 203
0.92 8.1%Right
0.88 5.5%
0.77 39.5%
0.69 24.0%
0.92 8.7%
PHF = Peak Hour Factor
HV = Heavy Vehicles
9
Bicycles = 0
Peds Crossing West Leg = 15Peds Crossing South Leg = 12Intersection
SB Total = 469
Right Thru Left U-Turn
PEAK HOUR SUMMARY
683
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 76
490Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 26
8
8
34
Bicycles = 0WB Total = 50Peds Crossing East Leg= 19U-Turn
EB
Total Heavy Vehicles = 12Intersection
Logan Avenue N @ N 6th Street
WB Approach Logan Avenue NN 6th Street
U-Turn Left Thru
1
72
11
0
241
EB Approach
8:00 AM - 9:00 AM
0.92
8.7%
1505
NB ApproachBicycles = 0EB Total = 43Heavy Vehicles = 17NB Total = 943
Renton, WA
WB
Total
0
56
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Logan Avenue NPeak Hour
Volume
PHF
HV
N 6th Street
Peds Crossing North Leg = 10
NB
Total
7022943280
B-3
Right 8
PHF HV 57
0.95 7.6%Right
0.87 3.8%
0.78 4.0%
0.92 14.3%
0.96 6.5%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
22
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Logan Avenue NPeak Hour
Volume
PHF
HV
N 8th Street
Peds Crossing North Leg = 19
NB
Total
6545429170
Logan Avenue N @ N 8th Street
WB Approach Logan Avenue NN 8th Street
U-Turn Left Thru
0
45
9
0
70
EB Approach
8:00 AM - 9:00 AM
0.96
6.5%
1254
NB ApproachBicycles = 0EB Total = 25Heavy Vehicles = 1NB Total = 708
Renton, WA
WB
Total
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 17
16
6
48
Bicycles = 0WB Total = 70Peds Crossing East Leg= 23U-Turn
EB
Total Heavy Vehicles = 10Intersection
PEAK HOUR SUMMARY
629
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 54
485Approach
SB Approach
8
Bicycles = 1
Peds Crossing West Leg = 63Peds Crossing South Leg = 32Intersection
SB Total = 451
Right Thru Left U-Turn
B-4
Right 26
PHF HV 7
0.81 7.7%Right
0.50 0.0%
0.89 4.4%
#N/A #N/A
0.90 4.5%
PHF = Peak Hour Factor
HV = Heavy Vehicles
445
Bicycles = 0
Peds Crossing West Leg = 1Peds Crossing South Leg = 1Intersection
SB Total = 8
Right Thru Left U-Turn
PEAK HOUR SUMMARY
19
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 2
33Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 0
0
0
0
Bicycles = 0WB Total = 0Peds Crossing East Leg= 0U-Turn
EB
Total Heavy Vehicles = 0Intersection
Burnett Avenue N @ N 3rd Street
WB Approach Burnett Avenue NN 3rd Street
U-Turn Left Thru
0
0
5
0
453
EB Approach
8:00 AM - 9:00 AM
0.90
4.5%
510
NB ApproachBicycles = 0EB Total = 476Heavy Vehicles = 21NB Total = 26
Renton, WA
WB
Total
0
0
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Burnett Avenue NPeak Hour
Volume
PHF
HV
N 3rd Street
Peds Crossing North Leg = 1
NB
Total
241700
B-5
Right 0
PHF HV 0
0.67 12.5%Right
0.65 0.0%
#N/A #N/A
0.93 5.1%
0.96 5.5%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
Bicycles = 0
Peds Crossing West Leg = 0Peds Crossing South Leg = 2Intersection
SB Total = 13
Right Thru Left U-Turn
PEAK HOUR SUMMARY
8
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 4
13Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 0
5
400
8
Bicycles = 0WB Total = 413Peds Crossing East Leg= 1U-Turn
EB
Total Heavy Vehicles = 21Intersection
Burnett Avenue N @ N 4th Street
WB Approach Burnett Avenue NN 4th Street
U-Turn Left Thru
0
432
0
0
0
EB Approach
7:00 AM - 8:00 AM
0.96
5.5%
458
NB ApproachBicycles = 0EB Total = 0Heavy Vehicles = 0NB Total = 32
Renton, WA
WB
Total
0
24
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Burnett Avenue NPeak Hour
Volume
PHF
HV
N 4th Street
Peds Crossing North Leg = 0
NB
Total
130580
B-6
Right 10
PHF HV 62
0.92 3.4%Right
0.63 6.3%
0.89 3.9%
#N/A #N/A
0.86 4.1%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
0
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Park Avenue NPeak Hour
Volume
PHF
HV
N 3rd Street
Peds Crossing North Leg = 13
NB
Total
318916900
Park Avenue N @ N 3rd Street
WB Approach Park Avenue NN 3rd Street
U-Turn Left Thru
0
0
27
0
574
EB Approach
8:00 AM - 9:00 AM
0.86
4.1%
971
NB ApproachBicycles = 0EB Total = 458Heavy Vehicles = 18NB Total = 353
Renton, WA
WB
Total
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 10
0
0
0
Bicycles = 0WB Total = 0Peds Crossing East Leg= 9U-Turn
EB
Total Heavy Vehicles = 0Intersection
PEAK HOUR SUMMARY
291
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 12
79Approach
SB Approach
421
Bicycles = 0
Peds Crossing West Leg = 7Peds Crossing South Leg = 2Intersection
SB Total = 160
Right Thru Left U-Turn
B-7
Right 0
PHF HV 0
0.86 3.5%Right
0.83 8.0%
#N/A #N/A
0.69 4.4%
0.79 4.5%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
24
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Park Avenue NPeak Hour
Volume
PHF
HV
N 4th Street
Peds Crossing North Leg = 4
NB
Total
350081190
Park Avenue N @ N 4th Street
WB Approach Park Avenue NN 4th Street
U-Turn Left Thru
0
402
0
0
0
EB Approach
8:00 AM - 9:00 AM
0.79
4.5%
912
NB ApproachBicycles = 0EB Total = 0Heavy Vehicles = 0NB Total = 314
Renton, WA
WB
Total
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 8
60
359
79
Bicycles = 0WB Total = 498Peds Crossing East Leg= 8U-Turn
EB
Total Heavy Vehicles = 22Intersection
PEAK HOUR SUMMARY
290
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 11
160Approach
SB Approach
0
Bicycles = 0
Peds Crossing West Leg = 14Peds Crossing South Leg = 58Intersection
SB Total = 100
Right Thru Left U-Turn
B-8
Right 23
PHF HV 5
0.93 3.1%Right
0.70 6.8%
0.81 9.2%
0.71 8.8%
0.93 5.4%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
67
Date Time
Tue 2/28/2023 7:00 AM - 9:00 AM
Park Avenue NPeak Hour
Volume
PHF
HV
N 6th Street
Peds Crossing North Leg = 7
NB
Total
416371720
Park Avenue N @ N 6th Street
WB Approach Park Avenue NN 6th Street
U-Turn Left Thru
0
164
95
0
43
EB Approach
7:15 AM - 8:15 AM
0.93
5.4%
722
NB ApproachBicycles = 0EB Total = 153Heavy Vehicles = 14NB Total = 389
Renton, WA
WB
Total
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 10
4
25
5
Bicycles = 0WB Total = 34Peds Crossing East Leg= 1U-Turn
EB
Total Heavy Vehicles = 3Intersection
PEAK HOUR SUMMARY
317
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 12
99Approach
SB Approach
35
Bicycles = 0
Peds Crossing West Leg = 3Peds Crossing South Leg = 1Intersection
SB Total = 146
Right Thru Left U-Turn
B-9
Right 7
PHF HV 120
0.80 3.3%Right
0.84 4.8%
0.77 8.8%
0.84 5.0%
0.89 4.3%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
10
Date Time
Wed 3/1/2023 7:00 AM - 9:00 AM
Park Avenue NPeak Hour
Volume
PHF
HV
N 8th Street
Peds Crossing North Leg = 0
NB
Total
4392213691
Park Avenue N @ N 8th Street
WB Approach Park Avenue NN 8th Street
U-Turn Left Thru
0
72
24
0
191
EB Approach
7:45 AM - 8:45 AM
0.89
4.3%
878
NB ApproachBicycles = 0EB Total = 80Heavy Vehicles = 7NB Total = 509
Renton, WA
WB
Total
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 8
35
53
33
Bicycles = 0WB Total = 121Peds Crossing East Leg= 8U-Turn
EB
Total Heavy Vehicles = 6Intersection
PEAK HOUR SUMMARY
379
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 17
176Approach
SB Approach
49
Bicycles = 0
Peds Crossing West Leg = 7Peds Crossing South Leg = 3Intersection
SB Total = 168
Right Thru Left U-Turn
B-10
1 Logan Ave @ N 3rd St
Synchro ID: 1
Existing 848 1,780 932
Average Weekday 1 831 16 1 931 0
AM Peak Hour
1 Logan Avenue N 0
Year: 2/28/23 5 0 0 0
4 0 -
Data Source:TDG 20 Parking Lot 2,246 N 3rd Street 467
North
1 16 |
15 3 3 467
11 Logan Avenue N 448
11 831 0 4 931 448
842 2,225 1,383
Future without Project 908 2,076 1,168
Average Weekday 1 891 16 1 1,167 0
AM Peak Hour
1 Logan Avenue N 0
Year:2024 5 0 0 0
Growth Rate =1.5%4 0 -
Years of Growth =1 20 Parking Lot 2,568 N 3rd Street 493
North
Total Growth = 1.0150 1 16 |
15 3 3 493
11 Logan Avenue N 474
11 891 0 4 1,167 474
902 2,547 1,645
Total Project Trips 23 23 0
Average Weekday 0 11 12 0 0 0
AM Peak Hour
0 Logan Avenue N 0
0 0 0 0
0 0 -
0 Parking Lot 29 N 3rd Street 18
North
0 12 |
0 0 0 18
0 Logan Avenue N 6
0 11 0 0 0 6
11 17 6
Future with Project 931 2,099 1,168
Average Weekday 1 902 28 1 1,167 0
AM Peak Hour
1 Logan Avenue N 0
5 0 0 0
4 0 -
20 Parking Lot 2,597 N 3rd Street 511
North
1 28 |
15 3 3 511
11 Logan Avenue N 480
11 902 0 4 1,167 480
913 2,564 1,651
Total Pipeline Project Trips 48 270 222
Average Weekday 0 48 0 0 222 0
AM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 0
0 0 -
0 Parking Lot 289 N 3rd Street 19
North
0 0 |
0 0 0 19
0 Logan Avenue N 19
0 48 0 0 222 19
48 289 241
Topgolf Phase II
B-11
2 Logan Ave @ N 4th St
Synchro ID: 2
Existing 496 1,465 969
Average Weekday 0 496 0 0 932 37
AM Peak Hour
0 Logan Avenue N 37
Year: 2/28/23 0 0 0 390
0 353 -
Data Source:TDG 0 --- 1,818 N 4th Street 390
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 496 353 0 932 0
849 1,781 932
Future without Project 535 1,741 1,206
Average Weekday 0 535 0 0 1,168 38
AM Peak Hour
0 Logan Avenue N 38
Year:2024 0 0 0 410
Growth Rate =1.5%0 372 -
Years of Growth =1 0 --- 2,113 N 4th Street 410
North
Total Growth = 1.0150 0 0 |
0 0 0 0
0 Logan Avenue N 0
0 535 372 0 1,168 0
907 2,075 1,168
Total Project Trips 2 7 5
Average Weekday 0 2 0 0 0 5
AM Peak Hour
0 Logan Avenue N 5
0 0 0 26
0 21 -
0 --- 28 N 4th Street 26
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 2 21 0 0 0
23 23 0
Future with Project 537 1,748 1,211
Average Weekday 0 537 0 0 1,168 43
AM Peak Hour
0 Logan Avenue N 43
0 0 0 436
0 393 -
0 --- 2,141 N 4th Street 436
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 537 393 0 1,168 0
930 2,098 1,168
Total Pipeline Project Trips 32 254 222
Average Weekday 0 32 0 0 222 0
AM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 14
0 14 -
0 --- 268 N 4th Street 14
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 32 14 0 222 0
46 268 222
Topgolf Phase II
B-12
3 Logan Ave @ N 6th St
Synchro ID: 3
Existing 469 1,171 702
Average Weekday 8 432 29 11 683 8
AM Peak Hour
8 Logan Avenue N 8
Year: 2/28/23 73 8 8 50
57 34 -
Data Source:TDG 116 N 6th Street 1,505 N 6th Street 291
North
11 29 |
43 9 9 241
23 Logan Avenue N 203
23 432 34 57 683 203
489 1,432 943
Future without Project 508 1,452 944
Average Weekday 8 471 29 11 925 8
AM Peak Hour
8 Logan Avenue N 8
Year:2024 74 8 8 51
Growth Rate =1.5%58 35 -
Years of Growth =1 117 N 6th Street 1,791 N 6th Street 295
North
Total Growth = 1.0150 11 29 |
43 9 9 244
23 Logan Avenue N 206
23 471 35 58 925 206
529 1,718 1,189
Total Project Trips 2 7 5
Average Weekday 0 2 0 0 5 0
AM Peak Hour
0 Logan Avenue N 0
0 0 0 0
0 0 -
0 N 6th Street 7 N 6th Street 0
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 2 0 0 5 0
2 7 5
Future with Project 510 1,459 949
Average Weekday 8 473 29 11 930 8
AM Peak Hour
8 Logan Avenue N 8
74 8 8 51
58 35 -
117 N 6th Street 1,798 N 6th Street 295
North
11 29 |
43 9 9 244
23 Logan Avenue N 206
23 473 35 58 930 206
531 1,725 1,194
Total Pipeline Project Trips 33 265 232
Average Weekday 0 33 0 0 232 0
AM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 6th Street 265 N 6th Street 0
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 33 0 0 232 0
33 265 232
Topgolf Phase II
B-13
4 Logan Ave @ N 8th St
Synchro ID: 4
Existing 451 1,105 654
Average Weekday 17 429 5 9 629 16
AM Peak Hour
17 Logan Avenue N 16
Year: 2/28/23 45 6 6 70
22 48 -
Data Source:TDG 70 N 8th Street 1,254 N 8th Street 140
North
9 5 |
25 8 8 70
8 Logan Avenue N 57
8 429 48 22 629 57
485 1,193 708
Future without Project 484 1,358 874
Average Weekday 17 462 5 9 849 16
AM Peak Hour
17 Logan Avenue N 16
Year:2024 45 6 6 71
Growth Rate =1.5%22 49 -
Years of Growth =1 70 N 8th Street 1,509 N 8th Street 142
North
Total Growth = 1.0150 9 5 |
25 8 8 71
8 Logan Avenue N 58
8 462 49 22 849 58
519 1,448 929
Total Project Trips 2 5 3
Average Weekday 0 2 0 0 3 0
AM Peak Hour
0 Logan Avenue N 0
0 0 0 0
0 0 -
0 N 8th Street 7 N 8th Street 2
North
0 0 |
0 0 0 2
0 Logan Avenue N 2
0 2 0 0 3 2
2 7 5
Future with Project 486 1,363 877
Average Weekday 17 464 5 9 852 16
AM Peak Hour
17 Logan Avenue N 16
45 6 6 71
22 49 -
70 N 8th Street 1,516 N 8th Street 144
North
9 5 |
25 8 8 73
8 Logan Avenue N 60
8 464 49 22 852 60
521 1,455 934
Total Pipeline Project Trips 27 238 211
Average Weekday 0 27 0 0 211 0
AM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 8th Street 238 N 8th Street 0
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 27 0 0 211 0
27 238 211
Topgolf Phase II
B-14
5 Burnett Ave @ N 3rd St
Synchro ID: 5
Existing 8 32 24
Average Weekday 0 7 1 5 19 0
AM Peak Hour
0 Burnett Avenue N 0
Year: 2/28/23 0 0 0 0
0 0 -
Data Source:TDG 476 N 3rd Street 510 N 3rd Street 453
North
5 1 |
476 445 445 453
26 Burnett Avenue N 7
26 7 0 0 19 7
33 59 26
Future without Project 8 32 24
Average Weekday 0 7 1 5 19 0
AM Peak Hour
0 Burnett Avenue N 0
Year:2024 0 0 0 0
Growth Rate =1.5%0 0 -
Years of Growth =1 502 N 3rd Street 536 N 3rd Street 479
North
Total Growth = 1.0150 5 1 |
502 471 471 479
26 Burnett Avenue N 7
26 7 0 0 19 7
33 59 26
Total Project Trips 2 19 17
Average Weekday 0 0 2 17 0 0
AM Peak Hour
0 Burnett Avenue N 0
0 0 0 0
0 0 -
31 N 3rd Street 33 N 3rd Street 16
North
17 2 |
31 14 14 16
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Future with Project 10 51 41
Average Weekday 0 7 3 22 19 0
AM Peak Hour
0 Burnett Avenue N 0
0 0 0 0
0 0 -
533 N 3rd Street 569 N 3rd Street 495
North
22 3 |
533 485 485 495
26 Burnett Avenue N 7
26 7 0 0 19 7
33 59 26
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 Burnett Avenue N 0
Southport West 0 0 0 0
0 0 -
19 N 3rd Street 19 N 3rd Street 19
North
0 0 |
19 19 19 19
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
B-15
6 Burnett Ave @ N 4th St
Synchro ID: 6
Existing 13 26 13
Average Weekday 8 5 0 0 8 5
AM Peak Hour
8 Burnett Avenue N 5
Year: 2/28/23 432 400 400 413
24 8 -
Data Source:TDG 432 N 4th Street 458 N 4th Street 413
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 5 8 24 8 0
13 45 32
Future without Project 13 26 13
Average Weekday 8 5 0 0 8 5
AM Peak Hour
8 Burnett Avenue N 5
Year:2024 452 420 420 433
Growth Rate =1.5%24 8 -
Years of Growth =1 452 N 4th Street 478 N 4th Street 433
North
Total Growth = 1.0150 0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 5 8 24 8 0
13 45 32
Total Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 Burnett Avenue N 0
19 4 4 7
15 3 -
19 N 4th Street 22 N 4th Street 7
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 0 3 15 0 0
3 18 15
Future with Project 13 26 13
Average Weekday 8 5 0 0 8 5
AM Peak Hour
8 Burnett Avenue N 5
471 424 424 440
39 11 -
471 N 4th Street 500 N 4th Street 440
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 5 11 39 8 0
16 63 47
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 Burnett Avenue N 0
Southport West 14 14 14 14
0 0 -
14 N 4th Street 14 N 4th Street 14
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
B-16
7 Park Ave @ N 3rd St
Synchro ID: 7
Existing 160 478 318
Average Weekday 0 69 91 27 291 0
AM Peak Hour
0 Park Avenue N 0
Year: 2/28/23 0 0 0 0
0 0 -
Data Source:TDG 458 N 3rd Street 971 N 3rd Street 574
North
27 91 |
458 421 421 574
10 Park Avenue N 62
10 69 0 0 291 62
79 432 353
Future without Project 189 670 481
Average Weekday 0 89 100 46 435 0
AM Peak Hour
0 Park Avenue N 0
Year:2024 0 0 0 0
Growth Rate =1.5%0 0 -
Years of Growth =1 483 N 3rd Street 1,170 N 3rd Street 590
North
Total Growth = 1.0150 46 100 |
483 427 427 590
10 Park Avenue N 63
10 89 0 0 435 63
99 597 498
Total Project Trips 0 5 5
Average Weekday 0 0 0 5 0 0
AM Peak Hour
0 Park Avenue N 0
0 0 0 0
0 0 -
16 N 3rd Street 16 N 3rd Street 11
North
5 0 |
16 11 11 11
0 Park Avenue N 0
0 0 0 0 0 0
0 0 0
Future with Project 189 675 486
Average Weekday 0 89 100 51 435 0
AM Peak Hour
0 Park Avenue N 0
0 0 0 0
0 0 -
499 N 3rd Street 1,186 N 3rd Street 601
North
51 100 |
499 438 438 601
10 Park Avenue N 63
10 89 0 0 435 63
99 597 498
Total Pipeline Project Trips 27 186 159
Average Weekday 0 19 8 19 140 0
AM Peak Hour
0 Park Avenue N 0
Southport West 0 0 0 0
0 0 -
19 N 3rd Street 186 N 3rd Street 8
North
19 8 |
19 0 0 8
0 Park Avenue N 0
0 19 0 0 140 0
19 159 140
Topgolf Phase II
B-17
8 Park Ave @ N 4th St
Synchro ID: 8
Existing 100 450 350
Average Weekday 19 81 0 0 290 60
AM Peak Hour
19 Park Avenue N 60
Year: 2/28/23 402 359 359 498
24 79 -
Data Source:TDG 402 N 4th Street 912 N 4th Street 498
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 81 79 24 290 0
160 474 314
Future without Project 142 664 522
Average Weekday 33 109 0 0 453 69
AM Peak Hour
33 Park Avenue N 69
Year:2024 421 364 364 513
Growth Rate =1.5%24 80 -
Years of Growth =1 421 N 4th Street 1,132 N 4th Street 513
North
Total Growth = 1.0150 0 0 |
0 0 0 0
0 Park Avenue N 0
0 109 80 24 453 0
189 666 477
Total Project Trips 2 7 5
Average Weekday 2 0 0 0 5 0
AM Peak Hour
2 Park Avenue N 0
7 5 5 5
0 0 -
7 N 4th Street 12 N 4th Street 5
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 0 0 0 5 0
0 5 5
Future with Project 144 671 527
Average Weekday 35 109 0 0 458 69
AM Peak Hour
35 Park Avenue N 69
428 369 369 518
24 80 -
428 N 4th Street 1,144 N 4th Street 518
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 109 80 24 458 0
189 671 482
Total Pipeline Project Trips 41 208 167
Average Weekday 14 27 0 0 159 8
AM Peak Hour
14 Park Avenue N 8
Southport West 14 0 0 8
0 0 -
14 N 4th Street 208 N 4th Street 8
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 27 0 0 159 0
27 186 159
Topgolf Phase II
B-18
9 Park Ave @ N 6th St
Synchro ID: 9
Existing 146 562 416
Average Weekday 72 71 3 95 317 4
AM Peak Hour
72 Park Avenue N 4
Year: 2/28/23 164 25 25 34
67 5 -
Data Source:TDG 317 N 6th Street 722 N 6th Street 77
North
95 3 |
153 35 35 43
23 Park Avenue N 5
23 71 5 67 317 5
99 488 389
Future without Project 189 778 589
Average Weekday 73 113 3 96 489 4
AM Peak Hour
73 Park Avenue N 4
Year:2024 166 25 25 34
Growth Rate =1.5%68 5 -
Years of Growth =1 321 N 6th Street 940 N 6th Street 78
North
Total Growth = 1.0150 96 3 |
155 36 36 44
23 Park Avenue N 5
23 113 5 68 489 5
141 703 562
Total Project Trips 2 7 5
Average Weekday 0 2 0 0 5 0
AM Peak Hour
0 Park Avenue N 0
0 0 0 0
0 0 -
0 N 6th Street 7 N 6th Street 0
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 2 0 0 5 0
2 7 5
Future with Project 191 785 594
Average Weekday 73 115 3 96 494 4
AM Peak Hour
73 Park Avenue N 4
166 25 25 34
68 5 -
321 N 6th Street 947 N 6th Street 78
North
96 3 |
155 36 36 44
23 Park Avenue N 5
23 115 5 68 494 5
143 710 567
Total Pipeline Project Trips 41 208 167
Average Weekday 0 41 0 0 167 0
AM Peak Hour
0 Park Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 6th Street 208 N 6th Street 0
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 41 0 0 167 0
41 208 167
Topgolf Phase II
B-19
10 Park Ave @ N 8th St
Synchro ID: 10
Existing 168 606 438
Average Weekday 9 136 23 24 379 35
AM Peak Hour
9 Park Avenue N 35
Year: 3/1/23 72 53 53 121
10 33 -
Data Source:TDG 152 N 8th Street 878 N 8th Street 313
North
24 23 |
80 49 49 192
7 Park Avenue N 120
7 136 33 10 379 120
176 685 509
Future without Project 211 815 604
Average Weekday 9 179 23 24 544 36
AM Peak Hour
9 Park Avenue N 36
Year:2024 73 54 54 123
Growth Rate =1.5%10 33 -
Years of Growth =1 154 N 8th Street 1,091 N 8th Street 318
North
Total Growth = 1.0150 24 23 |
81 50 50 195
7 Park Avenue N 122
7 179 33 10 544 122
219 895 676
Total Project Trips 1 3 2
Average Weekday 0 1 0 0 2 0
AM Peak Hour
0 Park Avenue N 0
0 0 0 1
0 1 -
0 N 8th Street 7 N 8th Street 4
North
0 0 |
0 0 0 3
0 Park Avenue N 3
0 1 1 0 2 3
2 7 5
Future with Project 212 818 606
Average Weekday 9 180 23 24 546 36
AM Peak Hour
9 Park Avenue N 36
73 54 54 124
10 34 -
154 N 8th Street 1,098 N 8th Street 322
North
24 23 |
81 50 50 198
7 Park Avenue N 125
7 180 34 10 546 125
221 902 681
Total Pipeline Project Trips 41 200 159
Average Weekday 0 41 0 0 159 0
AM Peak Hour
0 Park Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 8th Street 200 N 8th Street 0
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 41 0 0 159 0
41 200 159
Topgolf Phase II
B-20
11 S Access @ N 3rd Street
Synchro ID: 11
Existing 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
Year: 2/28/23 0 0 0 0
0 0 -
Data Source:TDG 476 N 3rd Street 476 N 3rd Street 476
North
0 0 |
476 476 476 476
0 ---0
0 0 0 0 0 0
0 0 0
Future without Project 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
Year:2024 0 0 0 0
Growth Rate =1.5%0 0 -
Years of Growth =1 502 N 3rd Street 502 N 3rd Street 502
North
Total Growth = 1.0150 0 0 |
502 502 502 502
0 ---0
0 0 0 0 0 0
0 0 0
Total Project Trips 19 25 6
Average Weekday 0 0 19 6 0 0
AM Peak Hour
0 South Site Access 0
0 0 0 0
0 0 -
18 N 3rd Street 37 N 3rd Street 31
North
6 19 |
18 12 12 31
0 ---0
0 0 0 0 0 0
0 0 0
Future with Project 19 25 6
Average Weekday 0 0 19 6 0 0
AM Peak Hour
0 South Site Access 0
0 0 0 0
0 0 -
520 N 3rd Street 539 N 3rd Street 533
North
6 19 |
520 514 514 533
0 ---0
0 0 0 0 0 0
0 0 0
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
Southport West 0 0 0 0
0 0 -
19 N 3rd Street 19 N 3rd Street 19
North
0 0 |
19 19 19 19
0 ---0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
Volume extrapolated from west
leg of Burnett Avenue N at N
3rd Street.
B-21
12 N Access @ N 4th St
Synchro ID: 12
Existing 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
Year: 9/8/22 432 432 432 432
0 0 -
Data Source:TDG 432 N 4th Street 432 N 4th Street 432
North
0 0 |
0 0 0 0
0 ---0
0 0 0 0 0 0
0 0 0
Future without Project 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
Year:2024 459 459 459 459
Growth Rate =1.5%0 0 -
Years of Growth =2 459 N 4th Street 459 N 4th Street 459
North
Total Growth = 1.0302 0 0 |
0 0 0 0
0 ---0
0 0 0 0 0 0
0 0 0
Total Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
26 17 17 19
9 2 -
26 N 4th Street 28 N 4th Street 19
North
0 0 |
0 0 0 0
0 North Site Access 0
0 0 2 9 0 0
2 11 9
Future with Project 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
485 476 476 478
9 2 -
485 N 4th Street 487 N 4th Street 478
North
0 0 |
0 0 0 0
0 N Site Access 0
0 0 2 9 0 0
2 11 9
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 ---0
Southport West 14 14 14 14
0 0 -
14 N 4th Street 14 N 4th Street 14
North
0 0 |
0 0 0 0
0 ---0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
Volume extrapolated from west
leg of Burnett Avenue N at N
4th Street.
B-22
13 Burnett Ave N @ Parking Lot
Synchro ID: 13
Existing 13 42 29
Average Weekday 5 8 0 5 24 0
AM Peak Hour
5 Burnett Avenue N 0
Year: 2/28/23 10 0 0 0
5 0 -
Data Source:TDG 20 Commercial Parking Lot 52 --- 0
North
5 0 |
10 0 0 0
5 Burnett Avenue N 0
5 8 0 5 24 0
13 42 29
Future without Project 13 42 29
Average Weekday 5 8 0 5 24 0
AM Peak Hour
5 Burnett Avenue N 0
Year:2024 10 0 0 0
Growth Rate =1.5%5 0 -
Years of Growth =1 20 Commercial Parking Lot 52 --- 0
North
Total Growth = 1.0150 5 0 |
10 0 0 0
5 Burnett Avenue N 0
5 8 0 5 24 0
13 42 29
Total Project Trips 3 18 15
Average Weekday 3 0 0 2 13 0
AM Peak Hour
3 Burnett Avenue N 0
7 0 0 0
4 0 -
11 Commercial Parking Lot 24 --- 0
North
2 0 |
4 0 0 0
2 Burnett Avenue N 0
2 0 0 4 13 0
2 19 17
Future with Project 16 60 44
Average Weekday 8 8 0 7 37 0
AM Peak Hour
8 Burnett Avenue N 0
17 0 0 0
9 0 -
31 Commercial Parking Lot 76 --- 0
North
7 0 |
14 0 0 0
7 Burnett Avenue N 0
7 8 0 9 37 0
15 61 46
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
AM Peak Hour
0 Burnett Avenue N 0
Southport West 0 0 0 0
0 0 -
0 Commercial Parking Lot 0 --- 0
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
Volume extrapolated from north
leg of Burnett Avenue N at N
3rd Street. Conservatively, 5
trips have been added to/from
the commercial parking lot
approaches.
B-23
C
PM Counts and Turning Movement Calculations
Right 45
PHF HV 784
0.94 1.8%Right
0.94 2.0%
0.55 1.8%
#N/A #N/A
0.97 1.9%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
37
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Logan Avenue NPeak Hour
Volume
PHF
HV
N 3rd Street
Peds Crossing North Leg = 0
NB
Total
93566116120
Logan Avenue N @ N 3rd Street
WB Approach Logan Avenue NParking Lot
U-Turn Left Thru
0
39
4
0
858
EB Approach
4:45 PM - 5:45 PM
0.97
1.9%
3038
NB ApproachBicycles = 0EB Total = 57Heavy Vehicles = 1NB Total = 1752
Renton, WA
WB
Total
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 25
0
0
0
Bicycles = 0WB Total = 0Peds Crossing East Leg= 10U-Turn
EB
Total Heavy Vehicles = 0Intersection
PEAK HOUR SUMMARY
931
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 31
1206Approach
SB Approach
8
Bicycles = 0
Peds Crossing West Leg = 1Peds Crossing South Leg = 5Intersection
SB Total = 1229
Right Thru Left U-Turn
C-1
PHF HV
0.92 2.1%
0.97 2.1%
0.89 1.6%
0.97 2.0%
PHF = Peak Hour Factor
HV = Heavy Vehicles
Logan Avenue N @ N 4th Street
Renton, WA
TURNING MOVEMENTS DIAGRAM
PEAK HOUR SUMMARY
Bicycles = 0
Peds Xing N Leg = 0
1240
SB
Total
Peds Xing S Leg = 0
Right
0
Intersection
4:45 PM - 5:45 PM
2219
NB
Total
97990300
Intersection
NB ApproachU-Turn Thru
SB ApproachNB Total = 931
WB ApproachHV = 20
Bicycles = 0Logan Avenue NApproach0931
HV
0 EB
Total
Volume
0 U-Turn
PHF
Peak Hour
Peds Xing E Leg= 3N 4th Street
48 Right
WB Total = 385337 Left
HV = 6Bicycles = 00.97
2.0%Logan Avenue NCount Period
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Thru Left U-Turn
SB Total = 903
HV = 19
C-2
Right 61
PHF HV 131
0.96 2.0%Right
0.92 1.8%
0.89 11.2%
0.84 9.3%
0.98 2.7%
PHF = Peak Hour Factor
HV = Heavy Vehicles
16
Bicycles = 4
Peds Crossing West Leg = 7Peds Crossing South Leg = 8Intersection
SB Total = 800
Right Thru Left U-Turn
PEAK HOUR SUMMARY
810
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 19
906Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 14
41
2
64
Bicycles = 1WB Total = 107Peds Crossing East Leg= 14U-Turn
EB
Total Heavy Vehicles = 10Intersection
Logan Avenue N @ N 6th Street
WB Approach Logan Avenue NN 6th Street
U-Turn Left Thru
0
35
12
0
159
EB Approach
5:00 PM - 6:00 PM
0.98
2.7%
1963
NB ApproachBicycles = 5EB Total = 89Heavy Vehicles = 10NB Total = 967
Renton, WA
WB
Total
0
26
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Logan Avenue NPeak Hour
Volume
PHF
HV
N 6th Street
Peds Crossing North Leg = 3
NB
Total
8631278170
C-3
Right 17
PHF HV 131
0.97 1.5%Right
0.92 1.8%
0.65 2.3%
0.88 0.0%
0.95 1.5%
PHF = Peak Hour Factor
HV = Heavy Vehicles
10
Bicycles = 12
Peds Crossing West Leg = 30Peds Crossing South Leg = 11Intersection
SB Total = 742
Right Thru Left U-Turn
PEAK HOUR SUMMARY
749
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 1
Heavy Vehicles = 13
840Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 13
52
5
104
Bicycles = 0WB Total = 161Peds Crossing East Leg= 30U-Turn
EB
Total Heavy Vehicles = 0Intersection
Logan Avenue N @ N 8th Street
WB Approach Logan Avenue NN 8th Street
U-Turn Left Thru
0
14
17
0
162
EB Approach
5:00 PM - 6:00 PM
0.95
1.5%
1834
NB ApproachBicycles = 0EB Total = 44Heavy Vehicles = 1NB Total = 887
Renton, WA
WB
Total
0
7
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Logan Avenue NPeak Hour
Volume
PHF
HV
N 8th Street
Peds Crossing North Leg = 9
NB
Total
8182171920
C-4
Right 25
PHF HV 25
0.58 3.9%Right
0.90 5.6%
0.95 2.2%
#N/A #N/A
0.92 2.4%
PHF = Peak Hour Factor
HV = Heavy Vehicles
791
Bicycles = 0
Peds Crossing West Leg = 21Peds Crossing South Leg = 2Intersection
SB Total = 18
Right Thru Left U-Turn
PEAK HOUR SUMMARY
26
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 2
31Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 1
0
0
0
Bicycles = 0WB Total = 0Peds Crossing East Leg= 0U-Turn
EB
Total Heavy Vehicles = 0Intersection
Burnett Avenue N @ N 3rd Street
WB Approach Burnett Avenue NN 3rd Street
U-Turn Left Thru
0
0
7
0
828
EB Approach
4:00 PM - 5:00 PM
0.92
2.4%
892
NB ApproachBicycles = 0EB Total = 823Heavy Vehicles = 18NB Total = 51
Renton, WA
WB
Total
0
0
Date Time
Wed 9/14/2022 4:00 PM - 6:00 PM
Burnett Avenue NPeak Hour
Volume
PHF
HV
N 3rd Street
Peds Crossing North Leg = 5
NB
Total
3312600
C-5
Right 0
PHF HV 0
0.78 4.0%Right
0.68 0.0%
#N/A #N/A
0.86 1.4%
0.89 1.5%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
Bicycles = 0
Peds Crossing West Leg = 0Peds Crossing South Leg = 0Intersection
SB Total = 19
Right Thru Left U-Turn
PEAK HOUR SUMMARY
11
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 1
14Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 0
2
356
3
Bicycles = 0WB Total = 361Peds Crossing East Leg= 1U-Turn
EB
Total Heavy Vehicles = 5Intersection
Burnett Avenue N @ N 4th Street
WB Approach Burnett Avenue NN 4th Street
U-Turn Left Thru
0
378
0
0
0
EB Approach
4:45 PM - 5:45 PM
0.89
1.5%
405
NB ApproachBicycles = 0EB Total = 0Heavy Vehicles = 0NB Total = 25
Renton, WA
WB
Total
0
14
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Burnett Avenue NPeak Hour
Volume
PHF
HV
N 4th Street
Peds Crossing North Leg = 0
NB
Total
1301180
C-6
Right 31
PHF HV 36
0.92 4.0%Right
0.90 1.9%
0.89 1.5%
#N/A #N/A
0.97 2.0%
PHF = Peak Hour Factor
HV = Heavy Vehicles
792
Bicycles = 0
Peds Crossing West Leg = 5Peds Crossing South Leg = 2Intersection
SB Total = 427
Right Thru Left U-Turn
PEAK HOUR SUMMARY
214
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 10
302Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 8
0
0
0
Bicycles = 0WB Total = 0Peds Crossing East Leg= 2U-Turn
EB
Total Heavy Vehicles = 0Intersection
Park Avenue N @ N 3rd Street
WB Approach Park Avenue NN 3rd Street
U-Turn Left Thru
0
0
31
0
984
EB Approach
4:30 PM - 5:30 PM
0.97
2.0%
1531
NB ApproachBicycles = 0EB Total = 854Heavy Vehicles = 13NB Total = 250
Renton, WA
WB
Total
0
0
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Park Avenue NPeak Hour
Volume
PHF
HV
N 3rd Street
Peds Crossing North Leg = 1
NB
Total
24515627100
C-7
Right 0
PHF HV 0
0.91 3.9%Right
0.90 1.1%
#N/A #N/A
0.81 1.9%
0.92 2.0%
PHF = Peak Hour Factor
HV = Heavy Vehicles
0
Bicycles = 0
Peds Crossing West Leg = 7Peds Crossing South Leg = 3Intersection
SB Total = 439
Right Thru Left U-Turn
PEAK HOUR SUMMARY
197
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 1
Heavy Vehicles = 9
427Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 5
29
299
44
Bicycles = 0WB Total = 372Peds Crossing East Leg= 2U-Turn
EB
Total Heavy Vehicles = 7Intersection
Park Avenue N @ N 4th Street
WB Approach Park Avenue NN 4th Street
U-Turn Left Thru
0
390
0
0
0
EB Approach
4:45 PM - 5:45 PM
0.92
2.0%
1043
NB ApproachBicycles = 0EB Total = 0Heavy Vehicles = 0NB Total = 232
Renton, WA
WB
Total
0
35
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Park Avenue NPeak Hour
Volume
PHF
HV
N 4th Street
Peds Crossing North Leg = 1
NB
Total
2260383560
C-8
Right 75
PHF HV 2
0.91 2.3%Right
0.93 3.1%
0.92 3.4%
0.63 0.0%
0.93 2.9%
PHF = Peak Hour Factor
HV = Heavy Vehicles
51
Bicycles = 0
Peds Crossing West Leg = 0Peds Crossing South Leg = 0Intersection
SB Total = 356
Right Thru Left U-Turn
PEAK HOUR SUMMARY
216
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 0
Heavy Vehicles = 5
400Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 11
0
7
8
Bicycles = 2WB Total = 15Peds Crossing East Leg= 1U-Turn
EB
Total Heavy Vehicles = 0Intersection
Park Avenue N @ N 6th Street
WB Approach Park Avenue NN 6th Street
U-Turn Left Thru
0
46
136
0
57
EB Approach
4:30 PM - 5:30 PM
0.93
2.9%
855
NB ApproachBicycles = 0EB Total = 262Heavy Vehicles = 9NB Total = 222
Renton, WA
WB
Total
0
4
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Park Avenue NPeak Hour
Volume
PHF
HV
N 6th Street
Peds Crossing North Leg = 0
NB
Total
3524317350
C-9
Right 37
PHF HV 52
0.90 2.3%Right
0.87 2.3%
0.85 1.8%
0.91 0.4%
0.94 1.8%
PHF = Peak Hour Factor
HV = Heavy Vehicles
64
Bicycles = 0
Peds Crossing West Leg = 14Peds Crossing South Leg = 4Intersection
SB Total = 349
Right Thru Left U-Turn
PEAK HOUR SUMMARY
276
SB
Total
TURNING MOVEMENTS DIAGRAM
Bicycles = 2
Heavy Vehicles = 8
357Approach
SB Approach
U-Turn
Left
Thru
Right
Thru
Left
Count Period
Heavy Vehicles = 8
74
91
75
Bicycles = 0WB Total = 240Peds Crossing East Leg= 0U-Turn
EB
Total Heavy Vehicles = 1Intersection
Park Avenue N @ N 8th Street
WB Approach Park Avenue NN 8th Street
U-Turn Left Thru
0
143
63
0
187
EB Approach
4:45 PM - 5:45 PM
0.94
1.8%
1101
NB ApproachBicycles = 0EB Total = 164Heavy Vehicles = 3NB Total = 348
Renton, WA
WB
Total
0
20
Date Time
Thu 9/8/2022 4:00 PM - 6:00 PM
Park Avenue NPeak Hour
Volume
PHF
HV
N 8th Street
Peds Crossing North Leg = 2
NB
Total
41471245321
C-10
1 Logan Ave @ N 3rd St
Synchro ID: 1
Existing 1,229 2,164 935
Average Weekday 2 1,161 66 4 931 0
PM Peak Hour
2 Logan Avenue N 0
Year: 9/8/22 39 0 0 0
37 0 -
Data Source:TDG 96 Parking Lot 3,038 N 3rd Street 858
North
4 66 |
57 8 8 858
45 Logan Avenue N 784
45 1,161 0 37 931 784
1,206 2,958 1,752
Future without Project 1,477 2,495 1,018
Average Weekday 2 1,407 68 4 1,014 0
PM Peak Hour
2 Logan Avenue N 0
Year:2024 40 0 0 0
Growth Rate =1.5%38 0 -
Years of Growth =2 98 Parking Lot 3,410 N 3rd Street 899
North
Total Growth = 1.0302 4 68 |
58 8 8 899
46 Logan Avenue N 823
46 1,407 0 38 1,014 823
1,453 3,328 1,875
Total Project Trips 32 32 0
Average Weekday 0 11 21 0 0 0
PM Peak Hour
0 Logan Avenue N 0
0 0 0 0
0 0 -
0 Parking Lot 46 N 3rd Street 35
North
0 21 |
0 0 0 35
0 Logan Avenue N 14
0 11 0 0 0 14
11 25 14
Future with Project 1,509 2,527 1,018
Average Weekday 2 1,418 89 4 1,014 0
PM Peak Hour
2 Logan Avenue N 0
40 0 0 0
38 0 -
98 Parking Lot 3,456 N 3rd Street 934
North
4 89 |
58 8 8 934
46 Logan Avenue N 837
46 1,418 0 38 1,014 837
1,464 3,353 1,889
Total Pipeline Project Trips 211 266 55
Average Weekday 0 211 0 0 55 0
PM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 0
0 0 -
0 Parking Lot 281 N 3rd Street 15
North
0 0 |
0 0 0 15
0 Logan Avenue N 15
0 211 0 0 55 15
211 281 70
Topgolf Phase II
C-11
2 Logan Ave @ N 4th St
Synchro ID: 2
Existing 903 1,882 979
Average Weekday 0 903 0 0 931 48
PM Peak Hour
0 Logan Avenue N 48
Year: 9/8/22 0 0 0 385
0 337 -
Data Source:TDG 0 --- 2,219 N 4th Street 385
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 903 337 0 931 0
1,240 2,171 931
Future without Project 1,125 2,188 1,063
Average Weekday 0 1,125 0 0 1,014 49
PM Peak Hour
0 Logan Avenue N 49
Year:2024 0 0 0 412
Growth Rate =1.5%0 363 -
Years of Growth =2 0 --- 2,551 N 4th Street 412
North
Total Growth = 1.0302 0 0 |
0 0 0 0
0 Logan Avenue N 0
0 1,125 363 0 1,014 0
1,488 2,502 1,014
Total Project Trips 6 11 5
Average Weekday 0 6 0 0 0 5
PM Peak Hour
0 Logan Avenue N 5
0 0 0 31
0 26 -
0 --- 37 N 4th Street 31
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 6 26 0 0 0
32 32 0
Future with Project 1,131 2,199 1,068
Average Weekday 0 1,131 0 0 1,014 54
PM Peak Hour
0 Logan Avenue N 54
0 0 0 443
0 389 -
0 --- 2,588 N 4th Street 443
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 1,131 389 0 1,014 0
1,520 2,534 1,014
Total Pipeline Project Trips 195 250 55
Average Weekday 0 195 0 0 55 0
PM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 16
0 16 -
0 --- 266 N 4th Street 16
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 195 16 0 55 0
211 266 55
Topgolf Phase II
C-12
3 Logan Ave @ N 6th St
Synchro ID: 3
Existing 800 1,663 863
Average Weekday 7 781 12 12 810 41
PM Peak Hour
7 Logan Avenue N 41
Year: 9/8/22 35 2 2 107
26 64 -
Data Source:TDG 124 N 6th Street 1,963 N 6th Street 266
North
12 12 |
89 16 16 159
61 Logan Avenue N 131
61 781 64 26 810 131
906 1,873 967
Future without Project 1,019 1,962 943
Average Weekday 7 1,000 12 12 889 42
PM Peak Hour
7 Logan Avenue N 42
Year:2024 36 2 2 110
Growth Rate =1.5%27 66 -
Years of Growth =2 127 N 6th Street 2,271 N 6th Street 273
North
Total Growth = 1.0302 12 12 |
91 16 16 163
63 Logan Avenue N 135
63 1,000 66 27 889 135
1,129 2,180 1,051
Total Project Trips 6 11 5
Average Weekday 0 6 0 0 5 0
PM Peak Hour
0 Logan Avenue N 0
0 0 0 0
0 0 -
0 N 6th Street 11 N 6th Street 0
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 6 0 0 5 0
6 11 5
Future with Project 1,025 1,973 948
Average Weekday 7 1,006 12 12 894 42
PM Peak Hour
7 Logan Avenue N 42
36 2 2 110
27 66 -
127 N 6th Street 2,282 N 6th Street 273
North
12 12 |
91 16 16 163
63 Logan Avenue N 135
63 1,006 66 27 894 135
1,135 2,191 1,056
Total Pipeline Project Trips 195 250 55
Average Weekday 0 195 0 0 55 0
PM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 6th Street 250 N 6th Street 0
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 195 0 0 55 0
195 250 55
Topgolf Phase II
C-13
4 Logan Ave @ N 8th St
Synchro ID: 4
Existing 742 1,560 818
Average Weekday 2 719 21 17 749 52
PM Peak Hour
2 Logan Avenue N 52
Year: 9/8/22 14 5 5 161
7 104 -
Data Source:TDG 58 N 8th Street 1,834 N 8th Street 323
North
17 21 |
44 10 10 162
17 Logan Avenue N 131
17 719 104 7 749 131
840 1,727 887
Future without Project 955 1,843 888
Average Weekday 2 931 22 18 816 54
PM Peak Hour
2 Logan Avenue N 54
Year:2024 14 5 5 166
Growth Rate =1.5%7 107 -
Years of Growth =2 60 N 8th Street 2,125 N 8th Street 333
North
Total Growth = 1.0302 18 22 |
46 10 10 167
18 Logan Avenue N 135
18 931 107 7 816 135
1,056 2,014 958
Total Project Trips 4 7 3
Average Weekday 0 4 0 0 3 0
PM Peak Hour
0 Logan Avenue N 0
0 0 0 2
0 2 -
0 N 8th Street 11 N 8th Street 4
North
0 0 |
0 0 0 2
0 Logan Avenue N 2
0 4 2 0 3 2
6 11 5
Future with Project 959 1,850 891
Average Weekday 2 935 22 18 819 54
PM Peak Hour
2 Logan Avenue N 54
14 5 5 168
7 109 -
60 N 8th Street 2,136 N 8th Street 337
North
18 22 |
46 10 10 169
18 Logan Avenue N 137
18 935 109 7 819 137
1,062 2,025 963
Total Pipeline Project Trips 190 234 44
Average Weekday 0 190 0 0 44 0
PM Peak Hour
0 Logan Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 8th Street 234 N 8th Street 0
North
0 0 |
0 0 0 0
0 Logan Avenue N 0
0 190 0 0 44 0
190 234 44
Topgolf Phase II
C-14
5 Burnett Ave @ N 3rd St
Synchro ID: 5
Existing 18 51 33
Average Weekday 0 6 12 7 26 0
PM Peak Hour
0 Burnett Avenue N 0
Year: 9/8/22 0 0 0 0
0 0 -
Data Source:TDG 823 N 3rd Street 892 N 3rd Street 828
North
7 12 |
823 791 791 828
25 Burnett Avenue N 25
25 6 0 0 26 25
31 82 51
Future without Project 18 52 34
Average Weekday 0 6 12 7 27 0
PM Peak Hour
0 Burnett Avenue N 0
Year:2024 0 0 0 0
Growth Rate =1.5%0 0 -
Years of Growth =2 863 N 3rd Street 934 N 3rd Street 868
North
Total Growth = 1.0302 7 12 |
863 830 830 868
26 Burnett Avenue N 26
26 6 0 0 27 26
32 85 53
Total Project Trips 8 30 22
Average Weekday 0 0 8 22 0 0
PM Peak Hour
0 Burnett Avenue N 0
0 0 0 0
0 0 -
29 N 3rd Street 37 N 3rd Street 15
North
22 8 |
29 7 7 15
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Future with Project 26 82 56
Average Weekday 0 6 20 29 27 0
PM Peak Hour
0 Burnett Avenue N 0
0 0 0 0
0 0 -
892 N 3rd Street 971 N 3rd Street 883
North
29 20 |
892 837 837 883
26 Burnett Avenue N 26
26 6 0 0 27 26
32 85 53
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 Burnett Avenue N 0
Southport West 0 0 0 0
0 0 -
15 N 3rd Street 15 N 3rd Street 15
North
0 0 |
15 15 15 15
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
C-15
6 Burnett Ave @ N 4th St
Synchro ID: 6
Existing 19 32 13
Average Weekday 8 11 0 0 11 2
PM Peak Hour
8 Burnett Avenue N 2
Year: 9/8/22 378 356 356 361
14 3 -
Data Source:TDG 378 N 4th Street 405 N 4th Street 361
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 11 3 14 11 0
14 39 25
Future without Project 19 32 13
Average Weekday 8 11 0 0 11 2
PM Peak Hour
8 Burnett Avenue N 2
Year:2024 405 383 383 388
Growth Rate =1.5%14 3 -
Years of Growth =2 405 N 4th Street 432 N 4th Street 388
North
Total Growth = 1.0302 0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 11 3 14 11 0
14 39 25
Total Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 Burnett Avenue N 0
33 11 11 19
22 8 -
33 N 4th Street 41 N 4th Street 19
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 0 8 22 0 0
8 30 22
Future with Project 19 32 13
Average Weekday 8 11 0 0 11 2
PM Peak Hour
8 Burnett Avenue N 2
438 394 394 407
36 11 -
438 N 4th Street 473 N 4th Street 407
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 11 11 36 11 0
22 69 47
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 Burnett Avenue N 0
Southport West 16 16 16 16
0 0 -
16 N 4th Street 16 N 4th Street 16
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
C-16
7 Park Ave @ N 3rd St
Synchro ID: 7
Existing 427 672 245
Average Weekday 0 271 156 31 214 0
PM Peak Hour
0 Park Avenue N 0
Year: 9/8/22 0 0 0 0
0 0 -
Data Source:TDG 854 N 3rd Street 1,531 N 3rd Street 984
North
31 156 |
854 792 792 984
31 Park Avenue N 36
31 271 0 0 214 36
302 552 250
Future without Project 572 869 297
Average Weekday 0 405 167 47 250 0
PM Peak Hour
0 Park Avenue N 0
Year:2024 0 0 0 0
Growth Rate =1.5%0 0 -
Years of Growth =2 895 N 3rd Street 1,754 N 3rd Street 1,020
North
Total Growth = 1.0302 47 167 |
895 816 816 1,020
32 Park Avenue N 37
32 405 0 0 250 37
437 724 287
Total Project Trips 0 4 4
Average Weekday 0 0 0 4 0 0
PM Peak Hour
0 Park Avenue N 0
0 0 0 0
0 0 -
15 N 3rd Street 15 N 3rd Street 11
North
4 0 |
15 11 11 11
0 Park Avenue N 0
0 0 0 0 0 0
0 0 0
Future with Project 572 873 301
Average Weekday 0 405 167 51 250 0
PM Peak Hour
0 Park Avenue N 0
0 0 0 0
0 0 -
910 N 3rd Street 1,769 N 3rd Street 1,031
North
51 167 |
910 827 827 1,031
32 Park Avenue N 37
32 405 0 0 250 37
437 724 287
Total Pipeline Project Trips 132 177 45
Average Weekday 0 126 6 15 30 0
PM Peak Hour
0 Park Avenue N 0
Southport West 0 0 0 0
0 0 -
15 N 3rd Street 177 N 3rd Street 6
North
15 6 |
15 0 0 6
0 Park Avenue N 0
0 126 0 0 30 0
126 156 30
Topgolf Phase II
C-17
8 Park Ave @ N 4th St
Synchro ID: 8
Existing 439 665 226
Average Weekday 56 383 0 0 197 29
PM Peak Hour
56 Park Avenue N 29
Year: 9/8/22 390 299 299 372
35 44 -
Data Source:TDG 390 N 4th Street 1,043 N 4th Street 372
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 383 44 35 197 0
427 659 232
Future without Project 601 887 286
Average Weekday 74 527 0 0 248 38
PM Peak Hour
74 Park Avenue N 38
Year:2024 418 308 308 391
Growth Rate =1.5%36 45 -
Years of Growth =2 418 N 4th Street 1,276 N 4th Street 391
North
Total Growth = 1.0302 0 0 |
0 0 0 0
0 Park Avenue N 0
0 527 45 36 248 0
572 856 284
Total Project Trips 6 10 4
Average Weekday 6 0 0 0 4 0
PM Peak Hour
6 Park Avenue N 0
19 13 13 13
0 0 -
19 N 4th Street 23 N 4th Street 13
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 0 0 0 4 0
0 4 4
Future with Project 607 897 290
Average Weekday 80 527 0 0 252 38
PM Peak Hour
80 Park Avenue N 38
437 321 321 404
36 45 -
437 N 4th Street 1,299 N 4th Street 404
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 527 45 36 252 0
572 860 288
Total Pipeline Project Trips 148 201 53
Average Weekday 16 132 0 0 45 8
PM Peak Hour
16 Park Avenue N 8
Southport West 16 0 0 8
0 0 -
16 N 4th Street 201 N 4th Street 8
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 132 0 0 45 0
132 177 45
Topgolf Phase II
C-18
9 Park Ave @ N 6th St
Synchro ID: 9
Existing 356 708 352
Average Weekday 35 317 4 136 216 0
PM Peak Hour
35 Park Avenue N 0
Year: 9/8/22 46 7 7 15
4 8 -
Data Source:TDG 308 N 6th Street 855 N 6th Street 72
North
136 4 |
262 51 51 57
75 Park Avenue N 2
75 317 8 4 216 2
400 622 222
Future without Project 515 931 416
Average Weekday 36 475 4 140 276 0
PM Peak Hour
36 Park Avenue N 0
Year:2024 47 7 7 15
Growth Rate =1.5%4 8 -
Years of Growth =2 317 N 6th Street 1,082 N 6th Street 74
North
Total Growth = 1.0302 140 4 |
270 53 53 59
77 Park Avenue N 2
77 475 8 4 276 2
560 842 282
Total Project Trips 6 10 4
Average Weekday 0 6 0 0 4 0
PM Peak Hour
0 Park Avenue N 0
0 0 0 0
0 0 -
0 N 6th Street 10 N 6th Street 0
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 6 0 0 4 0
6 10 4
Future with Project 521 941 420
Average Weekday 36 481 4 140 280 0
PM Peak Hour
36 Park Avenue N 0
47 7 7 15
4 8 -
317 N 6th Street 1,092 N 6th Street 74
North
140 4 |
270 53 53 59
77 Park Avenue N 2
77 481 8 4 280 2
566 852 286
Total Pipeline Project Trips 148 201 53
Average Weekday 0 148 0 0 53 0
PM Peak Hour
0 Park Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 6th Street 201 N 6th Street 0
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 148 0 0 53 0
148 201 53
Topgolf Phase II
C-19
10 Park Ave @ N 8th St
Synchro ID: 10
Existing 349 762 413
Average Weekday 32 245 72 63 276 74
PM Peak Hour
32 Park Avenue N 74
Year: 9/8/22 143 91 91 240
20 75 -
Data Source:TDG 307 N 8th Street 1,101 N 8th Street 428
North
63 72 |
164 64 64 188
37 Park Avenue N 52
37 245 75 20 276 52
357 705 348
Future without Project 507 983 476
Average Weekday 33 400 74 65 335 76
PM Peak Hour
33 Park Avenue N 76
Year:2024 148 94 94 247
Growth Rate =1.5%21 77 -
Years of Growth =2 317 N 8th Street 1,333 N 8th Street 441
North
Total Growth = 1.0302 65 74 |
169 66 66 194
38 Park Avenue N 54
38 400 77 21 335 54
515 925 410
Total Project Trips 2 3 1
Average Weekday 0 2 0 0 1 0
PM Peak Hour
0 Park Avenue N 0
0 0 0 4
0 4 -
0 N 8th Street 10 N 8th Street 7
North
0 0 |
0 0 0 3
0 Park Avenue N 3
0 2 4 0 1 3
6 10 4
Future with Project 509 986 477
Average Weekday 33 402 74 65 336 76
PM Peak Hour
33 Park Avenue N 76
148 94 94 251
21 81 -
317 N 8th Street 1,343 N 8th Street 448
North
65 74 |
169 66 66 197
38 Park Avenue N 57
38 402 81 21 336 57
521 935 414
Total Pipeline Project Trips 148 199 51
Average Weekday 0 148 0 0 51 0
PM Peak Hour
0 Park Avenue N 0
Southport West 0 0 0 0
0 0 -
0 N 8th Street 199 N 8th Street 0
North
0 0 |
0 0 0 0
0 Park Avenue N 0
0 148 0 0 51 0
148 199 51
Topgolf Phase II
C-20
11 S Access @ N 3rd Street
Synchro ID: 11
Existing 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
Year: 9/8/22 0 0 0 0
0 0 -
Data Source:TDG 858 N 3rd Street 858 N 3rd Street 858
North
0 0 |
858 858 858 858
0 ---0
0 0 0 0 0 0
0 0 0
Future without Project 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
Year:2024 0 0 0 0
Growth Rate =1.5%0 0 -
Years of Growth =2 899 N 3rd Street 899 N 3rd Street 899
North
Total Growth = 1.0302 0 0 |
899 899 899 899
0 ---0
0 0 0 0 0 0
0 0 0
Total Project Trips 10 26 16
Average Weekday 0 0 10 16 0 0
PM Peak Hour
0 South Site Access 0
0 0 0 0
0 0 -
35 N 3rd Street 45 N 3rd Street 29
North
16 10 |
35 19 19 29
0 ---0
0 0 0 0 0 0
0 0 0
Future with Project 10 26 16
Average Weekday 0 0 10 16 0 0
PM Peak Hour
0 South Site Access 0
0 0 0 0
0 0 -
934 N 3rd Street 944 N 3rd Street 928
North
16 10 |
934 918 918 928
0 ---0
0 0 0 0 0 0
0 0 0
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
Southport West 0 0 0 0
0 0 -
15 N 3rd Street 15 N 3rd Street 15
North
0 0 |
15 15 15 15
0 ---0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
C-21
12 N Access @ N 4th St
Synchro ID: 12
Existing 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
Year: 9/8/22 378 378 378 378
0 0 -
Data Source:TDG 378 N 4th Street 378 N 4th Street 378
North
0 0 |
0 0 0 0
0 ---0
0 0 0 0 0 0
0 0 0
Future without Project 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
Year:2024 405 405 405 405
Growth Rate =1.5%0 0 -
Years of Growth =2 405 N 4th Street 405 N 4th Street 405
North
Total Growth = 1.0302 0 0 |
0 0 0 0
0 ---0
0 0 0 0 0 0
0 0 0
Total Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
31 26 26 33
5 7 -
31 N 4th Street 38 N 4th Street 33
North
0 0 |
0 0 0 0
0 North Site Access 0
0 0 7 5 0 0
7 12 5
Future with Project 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
436 431 431 438
5 7 -
436 N 4th Street 443 N 4th Street 438
North
0 0 |
0 0 0 0
0 N Site Access 0
0 0 7 5 0 0
7 12 5
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 ---0
Southport West 16 16 16 16
0 0 -
16 N 4th Street 16 N 4th Street 16
North
0 0 |
0 0 0 0
0 ---0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
Volume extrapolated from west
leg of Burnett Avenue N at N
4th Street.
C-22
13 Burnett Ave N @ Parking Lot
Synchro ID: 13
Existing 23 61 38
Average Weekday 5 18 0 5 33 0
PM Peak Hour
5 Burnett Avenue N 0
Year: 9/8/22 10 0 0 0
5 0 -
Data Source:TDG 20 Commercial Parking Lot 71 --- 0
North
5 0 |
10 0 0 0
5 Burnett Avenue N 0
5 18 0 5 33 0
23 61 38
Future without Project 24 63 39
Average Weekday 5 19 0 5 34 0
PM Peak Hour
5 Burnett Avenue N 0
Year:2024 10 0 0 0
Growth Rate =1.5%5 0 -
Years of Growth =2 20 Commercial Parking Lot 73 --- 0
North
Total Growth = 1.0302 5 0 |
10 0 0 0
5 Burnett Avenue N 0
5 19 0 5 34 0
24 63 39
Total Project Trips 8 30 22
Average Weekday 8 0 0 8 14 0
PM Peak Hour
8 Burnett Avenue N 0
16 0 0 0
8 0 -
32 Commercial Parking Lot 46 --- 0
North
8 0 |
16 0 0 0
8 Burnett Avenue N 0
8 0 0 8 14 0
8 30 22
Future with Project 32 93 61
Average Weekday 13 19 0 13 48 0
PM Peak Hour
13 Burnett Avenue N 0
26 0 0 0
13 0 -
52 Commercial Parking Lot 119 --- 0
North
13 0 |
26 0 0 0
13 Burnett Avenue N 0
13 19 0 13 48 0
32 93 61
Total Pipeline Project Trips 0 0 0
Average Weekday 0 0 0 0 0 0
PM Peak Hour
0 Burnett Avenue N 0
Southport West 0 0 0 0
0 0 -
0 Commercial Parking Lot 0 --- 0
North
0 0 |
0 0 0 0
0 Burnett Avenue N 0
0 0 0 0 0 0
0 0 0
Topgolf Phase II
Volume extrapolated from north
leg of Burnett Avenue N at N
3rd Street. Conservatively, 5
trips have been added to/from
the commercial parking lot
approaches.
C-23
D
AM Level of Service Calculations
Logan Six Existing Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 3 11 0 0 0 4 931 448 16 831 1
Future Volume (vph) 1 3 11 0 0 0 4 931 448 16 831 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 180 0 235 0
Storage Lanes 0 1 0 0 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.98 0.97 1.00
Frt 0.850 0.850
Flt Protected 0.988 0.950 0.950
Satd. Flow (prot) 0 1754 1509 0 0 0 1687 3374 1509 1687 3374 0
Flt Permitted 0.988 0.314 0.275
Satd. Flow (perm) 0 1754 1486 0 0 0 558 3374 1470 488 3374 0
Right Turn on Red Yes Yes No Yes
Satd. Flow (RTOR) 53
Link Speed (mph) 30 30 30 30
Link Distance (ft) 236 189 756 511
Travel Time (s) 5.4 4.3 17.2 11.6
Confl. Peds. (#/hr) 1 2 2 1 1 4 4 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 4 12 0 0 0 4 990 477 17 885 0
Turn Type Perm NA Perm pm+pt NA Perm pm+pt NA
Protected Phases 4 1 6 5 2
Permitted Phases 4 4 6 6 2
Detector Phase 4 4 4 1 6 6 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 10.0 23.0 23.0 10.0 32.0
Total Split (s) 55.0 55.0 55.0 35.0 55.0 55.0 35.0 55.0
Total Split (%) 37.9% 37.9% 37.9% 24.1% 37.9% 37.9% 24.1% 37.9%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes
Recall Mode None None None None Min Min None Min
Act Effct Green (s) 6.1 6.1 47.8 50.9 50.9 48.2 51.1
Actuated g/C Ratio 0.11 0.11 0.83 0.89 0.89 0.84 0.89
v/c Ratio 0.02 0.06 0.01 0.33 0.37 0.03 0.29
Control Delay 32.2 0.5 1.8 2.9 4.0 1.6 2.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 32.2 0.5 1.8 2.9 4.0 1.6 2.6
LOS C A A A A A A
Approach Delay 8.5 3.2 2.6
Approach LOS A A A
D-1
Logan Six Existing Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 1 0 0 0 0 1 0
Queue Length 95th (ft) 11 0 2 149 175 4 122
Internal Link Dist (ft) 156 109 676 431
Turn Bay Length (ft)180 235
Base Capacity (vph) 1511 1287 1108 2994 1304 1088 3003
Starvation Cap Reductn 0 0 0 0 0 0 169
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.00 0.01 0.00 0.33 0.37 0.02 0.31
Intersection Summary
Area Type: Other
Cycle Length: 145
Actuated Cycle Length: 57.4
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.37
Intersection Signal Delay: 3.0 Intersection LOS: A
Intersection Capacity Utilization 50.0% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: Logan Avenue N & Parking Lot/N 3rd Street
D-2
Logan Six Existing Conditions
2: Logan Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 353 37 932 0 0 496
Future Volume (vph) 353 37 932 0 0 496
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.97 1.00 0.95 1.00 1.00 0.95
Ped Bike Factor
Frt 0.850
Flt Protected 0.950
Satd. Flow (prot) 3273 1509 3374 0 0 3374
Flt Permitted 0.950
Satd. Flow (perm) 3273 1509 3374 0 0 3374
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 39
Link Speed (mph) 30 30 30
Link Distance (ft) 120 511 1321
Travel Time (s) 2.7 11.6 30.0
Confl. Peds. (#/hr)2 2
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 372 39 981 0 0 522
Turn Type Prot Perm NA NA
Protected Phases 3 6 2
Permitted Phases 3
Detector Phase 3 3 6 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0
Minimum Split (s) 27.0 27.0 23.0 23.0
Total Split (s) 35.0 35.0 55.0 55.0
Total Split (%) 38.9% 38.9% 61.1% 61.1%
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Recall Mode None None Min Min
Act Effct Green (s) 10.8 10.8 20.7 20.7
Actuated g/C Ratio 0.26 0.26 0.49 0.49
v/c Ratio 0.44 0.09 0.59 0.31
Control Delay 15.8 6.6 9.3 6.9
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 15.8 6.6 9.3 6.9
LOS B A A A
Approach Delay 14.9 9.3 6.9
Approach LOS B A A
Queue Length 50th (ft) 36 0 73 32
Queue Length 95th (ft) 82 18 139 66
Internal Link Dist (ft) 40 431 1241
D-3
Logan Six Existing Conditions
2: Logan Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group WBL WBR NBT NBR SBL SBT
Turn Bay Length (ft)
Base Capacity (vph) 2421 1126 3315 3315
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.15 0.03 0.30 0.16
Intersection Summary
Area Type: Other
Cycle Length: 90
Actuated Cycle Length: 41.9
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.59
Intersection Signal Delay: 9.8 Intersection LOS: A
Intersection Capacity Utilization 44.2% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: Logan Avenue N & N 4th Street
D-4
Logan Six Existing Conditions
3: Logan Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 11 9 23 34 8 8 57 683 203 29 432 8
Future Volume (vph) 11 9 23 34 8 8 57 683 203 29 432 8
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 250 295 140 0 230 0 135 0
Storage Lanes 1 1 1 1 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95
Ped Bike Factor 0.98 0.97 0.98 0.97 0.98 0.96 0.99 1.00
Frt 0.850 0.850 0.850 0.997
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1656 1743 1482 1656 1743 1482 1656 1743 1482 1656 3299 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1629 1743 1437 1625 1743 1440 1625 1743 1422 1639 3299 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 109 109 131 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1173 1272 1321 1309
Travel Time (s) 26.7 28.9 30.0 29.8
Confl. Peds. (#/hr) 10 12 12 10 15 19 19 15
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9%
Shared Lane Traffic (%)
Lane Group Flow (vph) 12 10 25 37 9 9 62 742 221 32 479 0
Turn Type Prot NA Perm Prot NA Perm Prot NA Perm Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 8
Detector Phase 5 2 2 1 6 6 3 8 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 28.0 28.0 10.0 27.0 27.0 10.0 29.0 29.0 10.0 30.0
Total Split (s) 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0
Total Split (%) 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min Min None Min Min None Min
Act Effct Green (s) 6.3 6.2 6.2 7.2 8.5 8.5 8.0 31.6 31.6 7.0 27.9
Actuated g/C Ratio 0.11 0.11 0.11 0.13 0.15 0.15 0.14 0.56 0.56 0.12 0.49
v/c Ratio 0.07 0.05 0.10 0.18 0.03 0.03 0.26 0.76 0.26 0.16 0.29
Control Delay 29.5 29.6 0.8 28.8 25.1 0.1 28.5 22.8 6.3 28.9 12.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.5 29.6 0.8 28.8 25.1 0.1 28.5 22.8 6.3 28.9 12.5
LOS C C A C C A C C A C B
Approach Delay 14.2 23.5 19.6 13.5
Approach LOS B C B B
D-5
Logan Six Existing Conditions
3: Logan Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 3 2 0 9 2 0 14 88 7 8 46
Queue Length 95th (ft) 21 18 0 42 17 0 60 #589 72 38 121
Internal Link Dist (ft) 1093 1192 1241 1229
Turn Bay Length (ft) 250 295 140 230 135
Base Capacity (vph) 616 974 851 616 974 852 616 974 852 616 1844
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.01 0.03 0.06 0.01 0.01 0.10 0.76 0.26 0.05 0.26
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 56.6
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.76
Intersection Signal Delay: 17.7 Intersection LOS: B
Intersection Capacity Utilization 63.9% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: Logan Avenue N & N 6th Street
D-6
Logan Six Existing Conditions
4: Logan Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 9 8 8 48 6 16 22 629 57 5 429 17
Future Volume (vph) 9 8 8 48 6 16 22 629 57 5 429 17
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 105 0 0 0 0 0 0 0
Storage Lanes 1 1 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.94 0.92 0.94 0.94 0.95 1.00 0.99 1.00
Frt 0.850 0.889 0.988 0.994
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1687 3374 1509 1687 2819 0 1687 1748 0 1687 1758 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1587 3374 1395 1578 2819 0 1598 1748 0 1666 1758 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 116 17 4 2
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1154 1202 1309 1978
Travel Time (s) 26.2 27.3 29.8 45.0
Confl. Peds. (#/hr) 19 32 32 19 63 23 23 63
Confl. Bikes (#/hr)1
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 9 8 8 50 23 0 23 714 0 5 465 0
Turn Type Prot NA Perm Prot NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2
Detector Phase 5 2 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 11.0 24.0 24.0 11.0 25.0 10.0 30.0 10.0 28.0
Total Split (s) 26.0 36.0 36.0 26.0 36.0 25.0 35.0 25.0 35.0
Total Split (%) 21.3% 29.5% 29.5% 21.3% 29.5% 20.5% 28.7% 20.5% 28.7%
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min None Min None Min
Act Effct Green (s) 5.2 5.1 5.1 6.1 10.3 5.5 31.1 5.1 30.9
Actuated g/C Ratio 0.09 0.09 0.09 0.11 0.18 0.10 0.56 0.09 0.55
v/c Ratio 0.06 0.03 0.03 0.27 0.04 0.14 0.74 0.03 0.48
Control Delay 29.0 28.4 0.2 30.0 14.3 29.5 19.1 28.8 12.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.0 28.4 0.2 30.0 14.3 29.5 19.1 28.8 12.5
LOS C C A C B C B C B
Approach Delay 19.6 25.1 19.4 12.7
D-7
Logan Six Existing Conditions
4: Logan Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B C B B
Queue Length 50th (ft) 3 1 0 16 1 8 180 2 94
Queue Length 95th (ft) 17 8 0 51 11 30 #508 12 250
Internal Link Dist (ft) 1074 1122 1229 1898
Turn Bay Length (ft) 105
Base Capacity (vph) 619 1859 820 619 1560 619 971 619 969
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.00 0.01 0.08 0.01 0.04 0.74 0.01 0.48
Intersection Summary
Area Type: Other
Cycle Length: 122
Actuated Cycle Length: 56
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.74
Intersection Signal Delay: 17.3 Intersection LOS: B
Intersection Capacity Utilization 58.3% ICU Level of Service B
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 4: Logan Avenue N & N 8th Street
D-8
Logan Six Existing Conditions
5: Burnett Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 445 26 0 0 0 0 19 7 1 7 0
Future Vol, veh/h 5 445 26 0 0 0 0 19 7 1 7 0
Conflicting Peds, #/hr 1 0 1 1 0 1 1 0 0 0 0 1
Sign Control Free Free Free Stop Stop Stop Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5
Mvmt Flow 6 494 29 0 0 0 0 21 8 1 8 0
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 1 0 0 - 523 263 271 537 -
Stage 1 - - - - 522 - 1 1 -
Stage 2 - - - - 1 - 270 536 -
Critical Hdwy 4.2 - - - 6.6 7 7.6 6.6 -
Critical Hdwy Stg 1 - - - - 5.6 - - - -
Critical Hdwy Stg 2 - - - - - - 6.6 5.6 -
Follow-up Hdwy 2.25 - - - 4.05 3.35 3.55 4.05 -
Pot Cap-1 Maneuver 1599 - - 0 451 726 652 442 0
Stage 1 - - - 0 522 - - - 0
Stage 2 - - - 0 - - 704 514 0
Platoon blocked, % - -
Mov Cap-1 Maneuver 1597 - - - 448 725 619 439 -
Mov Cap-2 Maneuver - - - - 448 - 619 439 -
Stage 1 - - - - 519 - - - -
Stage 2 - - - - - - 665 511 -
Approach EB NB SB
HCM Control Delay, s 0.1 12.7 13.1
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBRSBLn1
Capacity (veh/h) 499 1597 - - 456
HCM Lane V/C Ratio 0.058 0.003 - - 0.019
HCM Control Delay (s) 12.7 7.3 0 - 13.1
HCM Lane LOS B A A - B
HCM 95th %tile Q(veh) 0.2 0 - - 0.1
D-9
Logan Six Existing Conditions
6: Burnett Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 8 400 5 24 8 0 0 5 8
Future Vol, veh/h 0 0 0 8 400 5 24 8 0 0 5 8
Conflicting Peds, #/hr 0 0 2 2 0 0 0 0 1 1 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - 0 - 0 - - - - - -
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 6 6 6 6 6 6 6 6 6 6 6 6
Mvmt Flow 0 0 0 8 417 5 25 8 0 0 5 8
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 2 0 0 229 440 - - 435 209
Stage 1 - - - 2 2 - - 433 -
Stage 2 - - - 227 438 - - 2 -
Critical Hdwy 4.22 - - 7.62 6.62 - - 6.62 7.02
Critical Hdwy Stg 1 - - - - - - - 5.62 -
Critical Hdwy Stg 2 - - - 6.62 5.62 - - - -
Follow-up Hdwy 2.26 - - 3.56 4.06 - - 4.06 3.36
Pot Cap-1 Maneuver 1590 - - 696 501 0 0 504 785
Stage 1 - - - - - 0 0 570 -
Stage 2 - - - 744 567 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver 1587 - - 679 497 - - 500 785
Mov Cap-2 Maneuver - - - 679 497 - - 500 -
Stage 1 - - - - - - - 567 -
Stage 2 - - - 726 564 - - - -
Approach WB NB SB
HCM Control Delay, s 0.1 11.1 10.7
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBRSBLn1
Capacity (veh/h) 622 1587 - - 644
HCM Lane V/C Ratio 0.054 0.005 - - 0.021
HCM Control Delay (s) 11.1 7.3 - - 10.7
HCM Lane LOS B A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0.1
D-10
Logan Six Existing Conditions
7: Park Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 27 421 10 0 0 0 0 291 62 91 69 0
Future Volume (vph) 27 421 10 0 0 0 0 291 62 91 69 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00
Ped Bike Factor 0.99 1.00 1.00 1.00
Frt 0.996 0.974
Flt Protected 0.950 0.972
Satd. Flow (prot) 1736 3456 0 0 0 0 0 3368 0 0 3374 0
Flt Permitted 0.950 0.661
Satd. Flow (perm) 1712 3456 0 0 0 0 0 3368 0 0 2288 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 4 39
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1226 1509 471 662
Travel Time (s) 27.9 34.3 10.7 15.0
Confl. Peds. (#/hr) 13 2 2 13 7 9 9 7
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Heavy Vehicles (%) 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 31 502 0 0 0 0 0 410 0 0 186 0
Turn Type Perm NA NA pm+pt NA
Protected Phases 6 8 7 4
Permitted Phases 6 4
Detector Phase 6 6 8 7 4
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 5.0 10.0
Minimum Split (s) 25.0 25.0 24.0 9.0 24.0
Total Split (s) 26.0 26.0 26.0 14.0 26.0
Total Split (%) 39.4% 39.4%39.4% 21.2% 39.4%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 0.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Recall Mode None None Min None None
Act Effct Green (s) 12.0 12.0 11.0 11.0
Actuated g/C Ratio 0.34 0.34 0.31 0.31
v/c Ratio 0.05 0.42 0.38 0.26
Control Delay 8.1 10.1 10.1 10.7
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.1 10.1 10.1 10.7
LOS A B B B
Approach Delay 10.0 10.1 10.7
Approach LOS A B B
Queue Length 50th (ft) 4 34 25 12
Queue Length 95th (ft) 14 65 57 32
Internal Link Dist (ft) 1146 1429 391 582
D-11
Logan Six Existing Conditions
7: Park Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph) 986 1993 1957 2168
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.03 0.25 0.21 0.09
Intersection Summary
Area Type: Other
Cycle Length: 66
Actuated Cycle Length: 35.1
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.42
Intersection Signal Delay: 10.1 Intersection LOS: B
Intersection Capacity Utilization 48.0% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 7: Park Avenue N & N 3rd Street
D-12
Logan Six Existing Conditions
8: Park Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 79 359 60 24 290 0 0 81 19
Future Volume (vph) 0 0 0 79 359 60 24 290 0 0 81 19
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.91 0.91 1.00 0.95 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 0.99 0.98 1.00 0.99
Frt 0.850 0.972
Flt Protected 0.991 0.996
Satd. Flow (prot) 0 0 0 0 4896 1538 0 3424 0 0 3323 0
Flt Permitted 0.991 0.923
Satd. Flow (perm) 0 0 0 0 4845 1514 0 3170 0 0 3323 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)83 24
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1194 1450 662 1307
Travel Time (s) 27.1 33.0 15.0 29.7
Confl. Peds. (#/hr) 4 58 58 4 14 8 8 14
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 554 76 0 397 0 0 127 0
Turn Type Perm NA Perm pm+pt NA NA
Protected Phases 2 3 8 4
Permitted Phases 2 2 8
Detector Phase 2 2 2 3 8 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 9.0 26.0 24.0
Total Split (s)30.0 30.0 30.0 19.0 26.0 30.0
Total Split (%) 38.0% 38.0% 38.0% 24.1% 32.9% 38.0%
Yellow Time (s)4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s)1.0 1.0 1.0 0.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0
Total Lost Time (s)5.0 5.0 5.0 5.0
Lead/Lag Lead Lag
Lead-Lag Optimize?Yes Yes
Recall Mode Min Min Min None Min Min
Act Effct Green (s)10.4 10.4 9.1 9.1
Actuated g/C Ratio 0.35 0.35 0.31 0.31
v/c Ratio 0.33 0.13 0.41 0.12
Control Delay 7.8 2.8 10.0 7.1
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 7.8 2.8 10.0 7.1
LOS A A B A
Approach Delay 7.2 10.0 7.1
Approach LOS A B A
Queue Length 50th (ft)20 0 22 5
Queue Length 95th (ft)36 11 47 16
Internal Link Dist (ft) 1114 1370 582 1227
D-13
Logan Six Existing Conditions
8: Park Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph)4137 1304 3170 2841
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.13 0.06 0.13 0.04
Intersection Summary
Area Type: Other
Cycle Length: 79
Actuated Cycle Length: 29.7
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 8.2 Intersection LOS: A
Intersection Capacity Utilization 33.8% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 8: Park Avenue N & N 4th Street
D-14
Logan Six Existing Conditions
9: Park Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 95 35 23 5 25 4 67 317 5 3 71 72
Future Volume (vph) 95 35 23 5 25 4 67 317 5 3 71 72
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 0 0 0 100 0 170 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 0.98 0.99 1.00 1.00 0.99 1.00 1.00 0.99
Frt 0.940 0.981 0.998 0.925
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1719 3213 0 1719 1768 0 1719 3430 0 1719 3149 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1691 3213 0 1715 1768 0 1708 3430 0 1716 3149 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1272 822 1307 1301
Travel Time (s) 28.9 18.7 29.7 29.6
Confl. Peds. (#/hr) 7 1 1 7 3 1 1 3
Confl. Bikes (#/hr)2
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
Shared Lane Traffic (%)
Lane Group Flow (vph) 102 63 0 5 31 0 72 346 0 3 153 0
Turn Type Prot NA Prot NA Prot NA Prot NA
Protected Phases 1 6 5 2 3 8 7 4
Permitted Phases
Detector Phase 1 6 5 2 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 10.0 27.0 10.0 27.0 9.5 26.0 9.5 26.0
Total Split (s) 25.0 65.0 25.0 35.0 25.0 45.0 25.0 65.0
Total Split (%) 13.9% 36.1% 13.9% 19.4% 13.9% 25.0% 13.9% 36.1%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 9.1 14.7 5.7 6.1 8.6 18.8 5.2 10.7
Actuated g/C Ratio 0.19 0.31 0.12 0.13 0.18 0.39 0.11 0.22
v/c Ratio 0.31 0.06 0.02 0.14 0.23 0.26 0.02 0.22
Control Delay 23.3 14.5 24.8 24.6 22.9 12.4 25.0 20.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 23.3 14.5 24.8 24.6 22.9 12.4 25.0 20.4
LOS C B C C C B C C
Approach Delay 19.9 24.6 14.2 20.5
D-15
Logan Six Existing Conditions
9: Park Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B C B C
Queue Length 50th (ft) 28 6 1 9 20 32 1 21
Queue Length 95th (ft) 71 23 11 32 56 86 8 48
Internal Link Dist (ft) 1192 742 1227 1221
Turn Bay Length (ft) 100 100 170
Base Capacity (vph) 806 3195 806 1758 806 3411 806 3132
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.13 0.02 0.01 0.02 0.09 0.10 0.00 0.05
Intersection Summary
Area Type: Other
Cycle Length: 180
Actuated Cycle Length: 47.9
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.31
Intersection Signal Delay: 17.2 Intersection LOS: B
Intersection Capacity Utilization 37.2% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 9: Park Avenue N & N 6th Street
D-16
Logan Six Existing Conditions
10: Park Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 24 49 7 33 53 35 10 379 120 23 136 9
Future Volume (vph) 24 49 7 33 53 35 10 379 120 23 136 9
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 155 0 95 0 125 0 125 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 0.98 0.99 0.99 1.00
Frt 0.981 0.941 0.964 0.991
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1736 3396 0 1736 3266 0 1736 3314 0 1736 3432 0
Flt Permitted 0.690 0.704 0.950 0.950
Satd. Flow (perm) 1261 3396 0 1274 3266 0 1702 3314 0 1713 3432 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 7 39 23 3
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1202 1521 1301 849
Travel Time (s) 27.3 34.6 29.6 19.3
Confl. Peds. (#/hr) 3 3 7 8 8 7
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Heavy Vehicles (%) 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 27 63 0 37 99 0 11 561 0 26 163 0
Turn Type pm+pt NA pm+pt NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6
Detector Phase 5 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 35.0 55.0 35.0 55.0 65.0 85.0 35.0 55.0
Total Split (%) 16.7% 26.2% 16.7% 26.2% 31.0% 40.5% 16.7% 26.2%
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 9.5 7.5 9.7 7.6 6.8 15.7 7.4 17.5
Actuated g/C Ratio 0.24 0.19 0.24 0.19 0.17 0.39 0.18 0.43
v/c Ratio 0.07 0.10 0.09 0.15 0.04 0.43 0.08 0.11
Control Delay 13.8 18.8 13.8 14.5 22.7 12.3 21.8 8.9
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 13.8 18.8 13.8 14.5 22.7 12.3 21.8 8.9
LOS B B B B C B C A
Approach Delay 17.3 14.3 12.5 10.7
Approach LOS B B B B
D-17
Logan Six Existing Conditions
10: Park Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 4 3 5 4 2 22 3 5
Queue Length 95th (ft) 22 25 27 29 16 126 28 40
Internal Link Dist (ft) 1122 1441 1221 769
Turn Bay Length (ft) 155 95 125 125
Base Capacity (vph) 1392 3192 1392 3072 1723 3314 1392 3226
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.02 0.03 0.03 0.01 0.17 0.02 0.05
Intersection Summary
Area Type: Other
Cycle Length: 210
Actuated Cycle Length: 40.3
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.43
Intersection Signal Delay: 12.9 Intersection LOS: B
Intersection Capacity Utilization 35.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 10: Park Avenue N & N 8th Street
D-18
Logan Six Existing Conditions
11: N 3rd Street & South Site Access AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 476 0 0 0 0
Future Vol, veh/h 0 476 0 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 517 0 0 0 0
Major/Minor Major1 Minor2
Conflicting Flow All 0 0 259 -
Stage 1 - - 0 -
Stage 2 - - 259 -
Critical Hdwy 4.14 - 6.84 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 708 0
Stage 1 - - - 0
Stage 2 - - 761 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 708 -
Mov Cap-2 Maneuver - - 708 -
Stage 1 - - - -
Stage 2 - - 761 -
Approach EB SB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt EBL EBT SBLn1
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 - 0
HCM Lane LOS A - A
HCM 95th %tile Q(veh) - - -
D-19
Logan Six Existing Conditions
12: North Site Access & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 432 0 0
Future Vol, veh/h 0 0 0 432 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 470 0 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 188 -
Stage 1 - - 0 -
Stage 2 - - 188 -
Critical Hdwy 5.34 - 5.74 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 6.04 -
Follow-up Hdwy 3.12 - 3.82 -
Pot Cap-1 Maneuver - - 770 0
Stage 1 - - - 0
Stage 2 - - 758 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 770 -
Mov Cap-2 Maneuver - - 770 -
Stage 1 - - - -
Stage 2 - - 758 -
Approach WB NB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 0 -
HCM Lane LOS A A -
HCM 95th %tile Q(veh) - - -
D-20
Logan Six Existing Conditions
13: Burnett Avenue N & Commercial Parking Lot AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 2.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 5 24 8 5
Future Vol, veh/h 5 5 5 24 8 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 5 5 5 26 9 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 48 12 14 0 - 0
Stage 1 12 - - - - -
Stage 2 36 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 962 1069 1604 - - -
Stage 1 1011 - - - - -
Stage 2 986 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 959 1069 1604 - - -
Mov Cap-2 Maneuver 959 - - - - -
Stage 1 1008 - - - - -
Stage 2 986 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.6 1.3 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1604 - 1011 - -
HCM Lane V/C Ratio 0.003 - 0.011 - -
HCM Control Delay (s) 7.3 0 8.6 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
D-21
Logan Six 2024 Baseline Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 3 11 0 0 0 4 1167 474 16 891 1
Future Volume (vph) 1 3 11 0 0 0 4 1167 474 16 891 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 180 0 235 0
Storage Lanes 0 1 0 0 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.98 0.97 1.00
Frt 0.850 0.850
Flt Protected 0.988 0.950 0.950
Satd. Flow (prot) 0 1754 1509 0 0 0 1687 3374 1509 1687 3374 0
Flt Permitted 0.988 0.293 0.204
Satd. Flow (perm) 0 1754 1486 0 0 0 520 3374 1470 362 3374 0
Right Turn on Red Yes Yes No Yes
Satd. Flow (RTOR) 53
Link Speed (mph) 30 30 30 30
Link Distance (ft) 236 189 756 511
Travel Time (s) 5.4 4.3 17.2 11.6
Confl. Peds. (#/hr) 1 2 2 1 1 4 4 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 4 12 0 0 0 4 1241 504 17 949 0
Turn Type Perm NA Perm pm+pt NA Perm pm+pt NA
Protected Phases 4 1 6 5 2
Permitted Phases 4 4 6 6 2
Detector Phase 4 4 4 1 6 6 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 10.0 23.0 23.0 10.0 32.0
Total Split (s) 55.0 55.0 55.0 35.0 55.0 55.0 35.0 55.0
Total Split (%) 37.9% 37.9% 37.9% 24.1% 37.9% 37.9% 24.1% 37.9%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes
Recall Mode None None None None Min Min None Min
Act Effct Green (s) 5.8 5.8 61.2 63.6 63.6 61.5 63.8
Actuated g/C Ratio 0.08 0.08 0.86 0.89 0.89 0.86 0.90
v/c Ratio 0.03 0.07 0.01 0.41 0.38 0.04 0.31
Control Delay 35.0 0.8 1.5 3.1 3.9 1.6 2.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 35.0 0.8 1.5 3.1 3.9 1.6 2.5
LOS C A A A A A A
Approach Delay 9.4 3.3 2.5
Approach LOS A A A
D-22
Logan Six 2024 Baseline Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 1 0 0 0 0 1 0
Queue Length 95th (ft) 12 0 2 206 188 4 133
Internal Link Dist (ft) 156 109 676 431
Turn Bay Length (ft)180 235
Base Capacity (vph) 1257 1079 956 3017 1314 886 3026
Starvation Cap Reductn 0 0 0 0 0 0 179
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.00 0.01 0.00 0.41 0.38 0.02 0.33
Intersection Summary
Area Type: Other
Cycle Length: 145
Actuated Cycle Length: 71.1
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 3.1 Intersection LOS: A
Intersection Capacity Utilization 51.6% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: Logan Avenue N & Parking Lot/N 3rd Street
D-23
Logan Six 2024 Baseline Conditions
2: Logan Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 372 38 1168 0 0 535
Future Volume (vph) 372 38 1168 0 0 535
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.97 1.00 0.95 1.00 1.00 0.95
Ped Bike Factor
Frt 0.850
Flt Protected 0.950
Satd. Flow (prot) 3273 1509 3374 0 0 3374
Flt Permitted 0.950
Satd. Flow (perm) 3273 1509 3374 0 0 3374
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 40
Link Speed (mph) 30 30 30
Link Distance (ft) 120 511 1321
Travel Time (s) 2.7 11.6 30.0
Confl. Peds. (#/hr)2 2
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 392 40 1229 0 0 563
Turn Type Prot Perm NA NA
Protected Phases 3 6 2
Permitted Phases 3
Detector Phase 3 3 6 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0
Minimum Split (s) 27.0 27.0 23.0 23.0
Total Split (s) 35.0 35.0 55.0 55.0
Total Split (%) 38.9% 38.9% 61.1% 61.1%
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Recall Mode None None Min Min
Act Effct Green (s) 12.6 12.6 28.7 28.7
Actuated g/C Ratio 0.24 0.24 0.55 0.55
v/c Ratio 0.49 0.10 0.66 0.30
Control Delay 20.6 8.0 10.1 6.7
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 20.6 8.0 10.1 6.7
LOS C A B A
Approach Delay 19.4 10.1 6.7
Approach LOS B B A
Queue Length 50th (ft) 50 0 114 40
Queue Length 95th (ft) 112 21 213 79
Internal Link Dist (ft) 40 431 1241
D-24
Logan Six 2024 Baseline Conditions
2: Logan Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group WBL WBR NBT NBR SBL SBT
Turn Bay Length (ft)
Base Capacity (vph) 1991 933 3089 3089
Starvation Cap Reductn 0 0 52 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.20 0.04 0.40 0.18
Intersection Summary
Area Type: Other
Cycle Length: 90
Actuated Cycle Length: 51.8
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.66
Intersection Signal Delay: 11.0 Intersection LOS: B
Intersection Capacity Utilization 51.2% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: Logan Avenue N & N 4th Street
D-25
Logan Six 2024 Baseline Conditions
3: Logan Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 11 9 23 35 8 8 58 925 206 29 471 8
Future Volume (vph) 11 9 23 35 8 8 58 925 206 29 471 8
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 250 295 140 0 230 0 135 0
Storage Lanes 1 1 1 1 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95
Ped Bike Factor 0.98 0.97 0.98 0.97 0.98 0.96 0.99 1.00
Frt 0.850 0.850 0.850 0.997
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1656 1743 1482 1656 1743 1482 1656 1743 1482 1656 3299 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1629 1743 1437 1625 1743 1440 1627 1743 1422 1644 3299 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 109 109 109 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1173 1272 1321 1309
Travel Time (s) 26.7 28.9 30.0 29.8
Confl. Peds. (#/hr) 10 12 12 10 15 19 19 15
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9%
Shared Lane Traffic (%)
Lane Group Flow (vph) 12 10 25 38 9 9 63 1005 224 32 521 0
Turn Type Prot NA Perm Prot NA Perm Prot NA Perm Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 8
Detector Phase 5 2 2 1 6 6 3 8 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 28.0 28.0 10.0 27.0 27.0 10.0 29.0 29.0 10.0 30.0
Total Split (s) 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0
Total Split (%) 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min Min None Min Min None Min
Act Effct Green (s) 6.3 6.2 6.2 7.2 8.5 8.5 8.1 31.6 31.6 7.0 27.9
Actuated g/C Ratio 0.11 0.11 0.11 0.13 0.15 0.15 0.14 0.56 0.56 0.12 0.49
v/c Ratio 0.07 0.05 0.10 0.18 0.03 0.03 0.27 1.03 0.27 0.16 0.32
Control Delay 29.6 29.7 0.8 28.9 25.0 0.1 28.5 57.8 7.3 28.9 12.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.6 29.7 0.8 28.9 25.0 0.1 28.5 57.8 7.3 28.9 12.7
LOS C C A C C A C E A C B
Approach Delay 14.3 23.6 47.6 13.6
Approach LOS B C D B
D-26
Logan Six 2024 Baseline Conditions
3: Logan Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 3 2 0 9 2 0 15 162 9 8 51
Queue Length 95th (ft) 21 18 0 43 17 0 61 #868 83 38 133
Internal Link Dist (ft) 1093 1192 1241 1229
Turn Bay Length (ft) 250 295 140 230 135
Base Capacity (vph) 616 974 850 616 974 852 616 974 842 616 1843
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.01 0.03 0.06 0.01 0.01 0.10 1.03 0.27 0.05 0.28
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 56.6
Natural Cycle: 120
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 1.03
Intersection Signal Delay: 36.5 Intersection LOS: D
Intersection Capacity Utilization 73.5% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: Logan Avenue N & N 6th Street
D-27
Logan Six 2024 Baseline Conditions
4: Logan Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 9 8 8 49 6 16 22 849 58 5 462 17
Future Volume (vph) 9 8 8 49 6 16 22 849 58 5 462 17
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 105 0 0 0 0 0 0 0
Storage Lanes 1 1 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.94 0.92 0.94 0.94 0.95 1.00 0.99 1.00
Frt 0.850 0.889 0.990 0.995
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1687 3374 1509 1687 2819 0 1687 1753 0 1687 1760 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1587 3374 1395 1578 2819 0 1602 1753 0 1672 1760 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 116 17 3 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1154 1202 1309 1978
Travel Time (s) 26.2 27.3 29.8 45.0
Confl. Peds. (#/hr) 19 32 32 19 63 23 23 63
Confl. Bikes (#/hr)1
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 9 8 8 51 23 0 23 944 0 5 499 0
Turn Type Prot NA Perm Prot NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2
Detector Phase 5 2 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 11.0 24.0 24.0 11.0 25.0 10.0 30.0 10.0 28.0
Total Split (s) 26.0 36.0 36.0 26.0 36.0 25.0 35.0 25.0 35.0
Total Split (%) 21.3% 29.5% 29.5% 21.3% 29.5% 20.5% 28.7% 20.5% 28.7%
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min None Min None Min
Act Effct Green (s) 5.2 5.1 5.1 6.1 10.3 5.5 31.1 5.1 30.8
Actuated g/C Ratio 0.09 0.09 0.09 0.11 0.18 0.10 0.56 0.09 0.55
v/c Ratio 0.06 0.03 0.03 0.28 0.04 0.14 0.97 0.03 0.51
Control Delay 29.1 28.4 0.2 30.1 14.3 29.5 41.2 28.8 13.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.1 28.4 0.2 30.1 14.3 29.5 41.2 28.8 13.1
LOS C C A C B C D C B
Approach Delay 19.6 25.2 40.9 13.2
D-28
Logan Six 2024 Baseline Conditions
4: Logan Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B C D B
Queue Length 50th (ft) 3 1 0 17 1 8 ~332 2 104
Queue Length 95th (ft) 17 8 0 52 11 30 #749 12 276
Internal Link Dist (ft) 1074 1122 1229 1898
Turn Bay Length (ft) 105
Base Capacity (vph) 619 1858 820 619 1560 619 973 619 970
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.00 0.01 0.08 0.01 0.04 0.97 0.01 0.51
Intersection Summary
Area Type: Other
Cycle Length: 122
Actuated Cycle Length: 56
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.97
Intersection Signal Delay: 30.9 Intersection LOS: C
Intersection Capacity Utilization 69.9% ICU Level of Service C
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 4: Logan Avenue N & N 8th Street
D-29
Logan Six 2024 Baseline Conditions
5: Burnett Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0.9
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 471 26 0 0 0 0 19 7 1 7 0
Future Vol, veh/h 5 471 26 0 0 0 0 19 7 1 7 0
Conflicting Peds, #/hr 1 0 1 1 0 1 1 0 0 0 0 1
Sign Control Free Free Free Stop Stop Stop Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5
Mvmt Flow 6 523 29 0 0 0 0 21 8 1 8 0
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 1 0 0 - 552 277 285 566 -
Stage 1 - - - - 551 - 1 1 -
Stage 2 - - - - 1 - 284 565 -
Critical Hdwy 4.2 - - - 6.6 7 7.6 6.6 -
Critical Hdwy Stg 1 - - - - 5.6 - - - -
Critical Hdwy Stg 2 - - - - - - 6.6 5.6 -
Follow-up Hdwy 2.25 - - - 4.05 3.35 3.55 4.05 -
Pot Cap-1 Maneuver 1599 - - 0 434 711 637 426 0
Stage 1 - - - 0 506 - - - 0
Stage 2 - - - 0 - - 691 499 0
Platoon blocked, % - -
Mov Cap-1 Maneuver 1597 - - - 431 710 604 423 -
Mov Cap-2 Maneuver - - - - 431 - 604 423 -
Stage 1 - - - - 503 - - - -
Stage 2 - - - - - - 651 496 -
Approach EB NB SB
HCM Control Delay, s 0.1 12.9 13.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBRSBLn1
Capacity (veh/h) 482 1597 - - 439
HCM Lane V/C Ratio 0.06 0.003 - - 0.02
HCM Control Delay (s) 12.9 7.3 0 - 13.4
HCM Lane LOS B A A - B
HCM 95th %tile Q(veh) 0.2 0 - - 0.1
D-30
Logan Six 2024 Baseline Conditions
6: Burnett Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 1.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 8 420 5 24 8 0 0 5 8
Future Vol, veh/h 0 0 0 8 420 5 24 8 0 0 5 8
Conflicting Peds, #/hr 0 0 2 2 0 0 0 0 1 1 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - 0 - 0 - - - - - -
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 6 6 6 6 6 6 6 6 6 6 6 6
Mvmt Flow 0 0 0 8 438 5 25 8 0 0 5 8
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 2 0 0 240 461 - - 456 219
Stage 1 - - - 2 2 - - 454 -
Stage 2 - - - 238 459 - - 2 -
Critical Hdwy 4.22 - - 7.62 6.62 - - 6.62 7.02
Critical Hdwy Stg 1 - - - - - - - 5.62 -
Critical Hdwy Stg 2 - - - 6.62 5.62 - - - -
Follow-up Hdwy 2.26 - - 3.56 4.06 - - 4.06 3.36
Pot Cap-1 Maneuver 1590 - - 684 487 0 0 490 773
Stage 1 - - - - - 0 0 558 -
Stage 2 - - - 733 555 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver 1587 - - 668 484 - - 487 773
Mov Cap-2 Maneuver - - - 668 484 - - 487 -
Stage 1 - - - - - - - 555 -
Stage 2 - - - 715 552 - - - -
Approach WB NB SB
HCM Control Delay, s 0.1 11.2 10.8
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBRSBLn1
Capacity (veh/h) 610 1587 - - 631
HCM Lane V/C Ratio 0.055 0.005 - - 0.021
HCM Control Delay (s) 11.2 7.3 - - 10.8
HCM Lane LOS B A - - B
HCM 95th %tile Q(veh) 0.2 0 - - 0.1
D-31
Logan Six 2024 Baseline Conditions
7: Park Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 46 427 10 0 0 0 0 435 63 100 89 0
Future Volume (vph) 46 427 10 0 0 0 0 435 63 100 89 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00
Ped Bike Factor 0.99 1.00 1.00 1.00
Frt 0.996 0.981
Flt Protected 0.950 0.974
Satd. Flow (prot) 1736 3456 0 0 0 0 0 3396 0 0 3381 0
Flt Permitted 0.950 0.627
Satd. Flow (perm) 1712 3456 0 0 0 0 0 3396 0 0 2172 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 4 25
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1226 1509 471 662
Travel Time (s) 27.9 34.3 10.7 15.0
Confl. Peds. (#/hr) 13 2 2 13 7 9 9 7
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Heavy Vehicles (%) 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 53 509 0 0 0 0 0 579 0 0 219 0
Turn Type Perm NA NA pm+pt NA
Protected Phases 6 8 7 4
Permitted Phases 6 4
Detector Phase 6 6 8 7 4
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 5.0 10.0
Minimum Split (s) 25.0 25.0 24.0 9.0 24.0
Total Split (s) 26.0 26.0 26.0 14.0 26.0
Total Split (%) 39.4% 39.4%39.4% 21.2% 39.4%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 0.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Recall Mode None None Min None None
Act Effct Green (s) 12.6 12.6 13.2 13.2
Actuated g/C Ratio 0.33 0.33 0.35 0.35
v/c Ratio 0.09 0.44 0.48 0.29
Control Delay 10.0 11.7 11.1 10.6
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.0 11.7 11.1 10.6
LOS B B B B
Approach Delay 11.5 11.1 10.6
Approach LOS B B B
Queue Length 50th (ft) 7 39 42 15
Queue Length 95th (ft) 25 81 85 38
Internal Link Dist (ft) 1146 1429 391 582
D-32
Logan Six 2024 Baseline Conditions
7: Park Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph) 920 1860 1837 1941
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.06 0.27 0.32 0.11
Intersection Summary
Area Type: Other
Cycle Length: 66
Actuated Cycle Length: 38.1
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.48
Intersection Signal Delay: 11.2 Intersection LOS: B
Intersection Capacity Utilization 51.1% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 7: Park Avenue N & N 3rd Street
D-33
Logan Six 2024 Baseline Conditions
8: Park Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 80 364 69 24 453 0 0 109 33
Future Volume (vph) 0 0 0 80 364 69 24 453 0 0 109 33
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.91 0.91 1.00 0.95 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 0.99 0.98 1.00 0.99
Frt 0.850 0.965
Flt Protected 0.991 0.998
Satd. Flow (prot) 0 0 0 0 4896 1538 0 3431 0 0 3295 0
Flt Permitted 0.991 0.933
Satd. Flow (perm) 0 0 0 0 4845 1514 0 3206 0 0 3295 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)87 42
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1194 1450 662 1307
Travel Time (s) 27.1 33.0 15.0 29.7
Confl. Peds. (#/hr) 4 58 58 4 14 8 8 14
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 562 87 0 603 0 0 180 0
Turn Type Perm NA Perm pm+pt NA NA
Protected Phases 2 3 8 4
Permitted Phases 2 2 8
Detector Phase 2 2 2 3 8 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 9.0 26.0 24.0
Total Split (s)30.0 30.0 30.0 19.0 26.0 30.0
Total Split (%) 38.0% 38.0% 38.0% 24.1% 32.9% 38.0%
Yellow Time (s)4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s)1.0 1.0 1.0 0.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0
Total Lost Time (s)5.0 5.0 5.0 5.0
Lead/Lag Lead Lag
Lead-Lag Optimize?Yes Yes
Recall Mode Min Min Min None Min Min
Act Effct Green (s)11.2 11.2 12.1 12.1
Actuated g/C Ratio 0.33 0.33 0.36 0.36
v/c Ratio 0.35 0.16 0.52 0.15
Control Delay 9.5 3.7 10.6 6.4
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 9.5 3.7 10.6 6.4
LOS A A B A
Approach Delay 8.7 10.6 6.4
Approach LOS A B A
Queue Length 50th (ft)26 0 42 7
Queue Length 95th (ft)47 15 72 20
Internal Link Dist (ft) 1114 1370 582 1227
D-34
Logan Six 2024 Baseline Conditions
8: Park Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph)3726 1184 3206 2544
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.15 0.07 0.19 0.07
Intersection Summary
Area Type: Other
Cycle Length: 79
Actuated Cycle Length: 33.6
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.52
Intersection Signal Delay: 9.2 Intersection LOS: A
Intersection Capacity Utilization 47.6% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 8: Park Avenue N & N 4th Street
D-35
Logan Six 2024 Baseline Conditions
9: Park Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 96 36 23 5 25 4 68 489 5 3 113 73
Future Volume (vph) 96 36 23 5 25 4 68 489 5 3 113 73
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 0 0 0 100 0 170 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 0.98 0.99 1.00 1.00 0.99 1.00 1.00 0.99
Frt 0.941 0.981 0.999 0.941
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1719 3217 0 1719 1768 0 1719 3434 0 1719 3211 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1691 3217 0 1715 1768 0 1709 3434 0 1717 3211 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1272 822 1307 1301
Travel Time (s) 28.9 18.7 29.7 29.6
Confl. Peds. (#/hr) 7 1 1 7 3 1 1 3
Confl. Bikes (#/hr)2
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
Shared Lane Traffic (%)
Lane Group Flow (vph) 103 64 0 5 31 0 73 531 0 3 200 0
Turn Type Prot NA Prot NA Prot NA Prot NA
Protected Phases 1 6 5 2 3 8 7 4
Permitted Phases
Detector Phase 1 6 5 2 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 10.0 27.0 10.0 27.0 9.5 26.0 9.5 26.0
Total Split (s) 25.0 65.0 25.0 35.0 25.0 45.0 25.0 65.0
Total Split (%) 13.9% 36.1% 13.9% 19.4% 13.9% 25.0% 13.9% 36.1%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 9.3 15.3 5.6 6.2 8.8 21.5 5.2 12.9
Actuated g/C Ratio 0.18 0.30 0.11 0.12 0.17 0.42 0.10 0.25
v/c Ratio 0.33 0.07 0.03 0.14 0.24 0.37 0.02 0.25
Control Delay 25.1 15.8 27.4 26.8 24.7 12.7 27.7 20.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 25.1 15.8 27.4 26.8 24.7 12.7 27.7 20.1
LOS C B C C C B C C
Approach Delay 21.5 26.8 14.2 20.2
D-36
Logan Six 2024 Baseline Conditions
9: Park Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS C C B C
Queue Length 50th (ft) 29 6 2 9 20 53 1 28
Queue Length 95th (ft) 80 26 12 35 62 133 9 62
Internal Link Dist (ft) 1192 742 1227 1221
Turn Bay Length (ft) 100 100 170
Base Capacity (vph) 751 3131 751 1720 751 3342 751 3125
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.14 0.02 0.01 0.02 0.10 0.16 0.00 0.06
Intersection Summary
Area Type: Other
Cycle Length: 180
Actuated Cycle Length: 50.9
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.37
Intersection Signal Delay: 17.1 Intersection LOS: B
Intersection Capacity Utilization 41.8% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 9: Park Avenue N & N 6th Street
D-37
Logan Six 2024 Baseline Conditions
10: Park Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 24 50 7 33 54 36 10 544 122 23 179 9
Future Volume (vph) 24 50 7 33 54 36 10 544 122 23 179 9
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 155 0 95 0 125 0 125 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 0.98 0.99 0.99 1.00
Frt 0.981 0.941 0.973 0.993
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1736 3396 0 1736 3266 0 1736 3353 0 1736 3441 0
Flt Permitted 0.688 0.607 0.950 0.950
Satd. Flow (perm) 1257 3396 0 1098 3266 0 1704 3353 0 1718 3441 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 7 40 15 2
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1202 1521 1301 849
Travel Time (s) 27.3 34.6 29.6 19.3
Confl. Peds. (#/hr) 3 3 7 8 8 7
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Heavy Vehicles (%) 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 27 64 0 37 101 0 11 748 0 26 211 0
Turn Type pm+pt NA pm+pt NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6
Detector Phase 5 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 35.0 55.0 35.0 55.0 65.0 85.0 35.0 55.0
Total Split (%) 16.7% 26.2% 16.7% 26.2% 31.0% 40.5% 16.7% 26.2%
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 11.2 7.7 12.5 10.2 6.9 20.4 7.5 22.4
Actuated g/C Ratio 0.23 0.16 0.26 0.21 0.14 0.42 0.16 0.47
v/c Ratio 0.07 0.12 0.10 0.14 0.04 0.52 0.10 0.13
Control Delay 16.1 22.8 16.1 16.0 27.0 13.8 26.3 9.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 16.1 22.8 16.1 16.0 27.0 13.8 26.3 9.2
LOS B C B B C B C A
Approach Delay 20.8 16.0 14.0 11.1
Approach LOS C B B B
D-38
Logan Six 2024 Baseline Conditions
10: Park Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 4 7 6 5 3 72 6 17
Queue Length 95th (ft) 25 28 31 33 19 180 32 50
Internal Link Dist (ft) 1122 1441 1221 769
Turn Bay Length (ft) 155 95 125 125
Base Capacity (vph) 1202 3059 1202 2946 1667 3353 1202 3100
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.02 0.03 0.03 0.01 0.22 0.02 0.07
Intersection Summary
Area Type: Other
Cycle Length: 210
Actuated Cycle Length: 48.1
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.52
Intersection Signal Delay: 14.1 Intersection LOS: B
Intersection Capacity Utilization 35.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 10: Park Avenue N & N 8th Street
D-39
Logan Six 2024 Baseline Conditions
11: N 3rd Street & South Site Access AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 502 0 0 0 0
Future Vol, veh/h 0 502 0 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 546 0 0 0 0
Major/Minor Major1 Minor2
Conflicting Flow All 0 0 273 -
Stage 1 - - 0 -
Stage 2 - - 273 -
Critical Hdwy 4.14 - 6.84 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 694 0
Stage 1 - - - 0
Stage 2 - - 748 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 694 -
Mov Cap-2 Maneuver - - 694 -
Stage 1 - - - -
Stage 2 - - 748 -
Approach EB SB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt EBL EBT SBLn1
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 - 0
HCM Lane LOS A - A
HCM 95th %tile Q(veh) - - -
D-40
Logan Six 2024 Baseline Conditions
12: North Site Access & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 459 0 0
Future Vol, veh/h 0 0 0 459 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 499 0 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 200 -
Stage 1 - - 0 -
Stage 2 - - 200 -
Critical Hdwy 5.34 - 5.74 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 6.04 -
Follow-up Hdwy 3.12 - 3.82 -
Pot Cap-1 Maneuver - - 760 0
Stage 1 - - - 0
Stage 2 - - 748 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 760 -
Mov Cap-2 Maneuver - - 760 -
Stage 1 - - - -
Stage 2 - - 748 -
Approach WB NB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 0 -
HCM Lane LOS A A -
HCM 95th %tile Q(veh) - - -
D-41
Logan Six 2024 Baseline Conditions
13: Burnett Avenue N & Commercial Parking Lot AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 2.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 5 24 8 5
Future Vol, veh/h 5 5 5 24 8 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 5 5 5 26 9 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 48 12 14 0 - 0
Stage 1 12 - - - - -
Stage 2 36 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 962 1069 1604 - - -
Stage 1 1011 - - - - -
Stage 2 986 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 959 1069 1604 - - -
Mov Cap-2 Maneuver 959 - - - - -
Stage 1 1008 - - - - -
Stage 2 986 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.6 1.3 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1604 - 1011 - -
HCM Lane V/C Ratio 0.003 - 0.011 - -
HCM Control Delay (s) 7.3 0 8.6 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
D-42
Logan Six 2024 Future with Development Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 1 3 11 0 0 0 4 1167 480 28 902 1
Future Volume (vph) 1 3 11 0 0 0 4 1167 480 28 902 1
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 180 0 235 0
Storage Lanes 0 1 0 0 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.98 0.97 1.00
Frt 0.850 0.850
Flt Protected 0.988 0.950 0.950
Satd. Flow (prot) 0 1754 1509 0 0 0 1687 3374 1509 1687 3374 0
Flt Permitted 0.988 0.295 0.198
Satd. Flow (perm) 0 1754 1486 0 0 0 524 3374 1470 352 3374 0
Right Turn on Red Yes Yes No Yes
Satd. Flow (RTOR) 53
Link Speed (mph) 30 30 30 30
Link Distance (ft) 236 189 756 511
Travel Time (s) 5.4 4.3 17.2 11.6
Confl. Peds. (#/hr) 1 2 2 1 1 4 4 1
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 4 12 0 0 0 4 1241 511 30 961 0
Turn Type Perm NA Perm pm+pt NA Perm pm+pt NA
Protected Phases 4 1 6 5 2
Permitted Phases 4 4 6 6 2
Detector Phase 4 4 4 1 6 6 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 10.0 23.0 23.0 10.0 32.0
Total Split (s) 55.0 55.0 55.0 35.0 55.0 55.0 35.0 55.0
Total Split (%) 37.9% 37.9% 37.9% 24.1% 37.9% 37.9% 24.1% 37.9%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes
Recall Mode None None None None Min Min None Min
Act Effct Green (s) 5.8 5.8 62.9 64.4 64.4 64.6 66.7
Actuated g/C Ratio 0.08 0.08 0.85 0.87 0.87 0.87 0.90
v/c Ratio 0.03 0.07 0.01 0.42 0.40 0.07 0.32
Control Delay 36.2 0.8 1.8 4.3 5.3 1.6 2.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 36.2 0.8 1.8 4.3 5.3 1.6 2.5
LOS D A A A A A A
Approach Delay 9.7 4.6 2.5
Approach LOS A A A
D-43
Logan Six 2024 Future with Development Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 2 0 0 0 0 1 0
Queue Length 95th (ft) 11 0 2 211 198 6 136
Internal Link Dist (ft) 156 109 676 431
Turn Bay Length (ft)180 235
Base Capacity (vph) 1209 1040 942 2931 1277 861 3035
Starvation Cap Reductn 0 0 0 0 0 0 161
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.00 0.01 0.00 0.42 0.40 0.03 0.33
Intersection Summary
Area Type: Other
Cycle Length: 145
Actuated Cycle Length: 74.1
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.42
Intersection Signal Delay: 3.9 Intersection LOS: A
Intersection Capacity Utilization 52.0% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 1: Logan Avenue N & Parking Lot/N 3rd Street
D-44
Logan Six 2024 Future with Development Conditions
2: Logan Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 393 43 1168 0 0 537
Future Volume (vph) 393 43 1168 0 0 537
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.97 1.00 0.95 1.00 1.00 0.95
Ped Bike Factor
Frt 0.850
Flt Protected 0.950
Satd. Flow (prot) 3273 1509 3374 0 0 3374
Flt Permitted 0.950
Satd. Flow (perm) 3273 1509 3374 0 0 3374
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 45
Link Speed (mph) 30 30 30
Link Distance (ft) 120 511 1321
Travel Time (s) 2.7 11.6 30.0
Confl. Peds. (#/hr)2 2
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 414 45 1229 0 0 565
Turn Type Prot Perm NA NA
Protected Phases 3 6 2
Permitted Phases 3
Detector Phase 3 3 6 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0
Minimum Split (s) 27.0 27.0 23.0 23.0
Total Split (s) 35.0 35.0 55.0 55.0
Total Split (%) 38.9% 38.9% 61.1% 61.1%
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Recall Mode None None Min Min
Act Effct Green (s) 13.0 13.0 28.9 28.9
Actuated g/C Ratio 0.25 0.25 0.55 0.55
v/c Ratio 0.51 0.11 0.66 0.30
Control Delay 20.8 7.7 10.4 6.9
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 20.8 7.7 10.4 6.9
LOS C A B A
Approach Delay 19.5 10.4 6.9
Approach LOS B B A
Queue Length 50th (ft) 54 0 117 41
Queue Length 95th (ft) 120 23 218 82
Internal Link Dist (ft) 40 431 1241
D-45
Logan Six 2024 Future with Development Conditions
2: Logan Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group WBL WBR NBT NBR SBL SBT
Turn Bay Length (ft)
Base Capacity (vph) 1967 925 3063 3063
Starvation Cap Reductn 0 0 56 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.21 0.05 0.41 0.18
Intersection Summary
Area Type: Other
Cycle Length: 90
Actuated Cycle Length: 52.5
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.66
Intersection Signal Delay: 11.4 Intersection LOS: B
Intersection Capacity Utilization 51.8% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: Logan Avenue N & N 4th Street
D-46
Logan Six 2024 Future with Development Conditions
3: Logan Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 11 9 23 35 8 8 58 930 206 29 473 8
Future Volume (vph) 11 9 23 35 8 8 58 930 206 29 473 8
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 250 295 140 0 230 0 135 0
Storage Lanes 1 1 1 1 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95
Ped Bike Factor 0.98 0.97 0.98 0.97 0.98 0.96 0.99 1.00
Frt 0.850 0.850 0.850 0.997
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1656 1743 1482 1656 1743 1482 1656 1743 1482 1656 3299 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1629 1743 1437 1625 1743 1440 1627 1743 1422 1644 3299 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 109 109 109 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1173 1272 1321 1309
Travel Time (s) 26.7 28.9 30.0 29.8
Confl. Peds. (#/hr) 10 12 12 10 15 19 19 15
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Heavy Vehicles (%) 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9% 9%
Shared Lane Traffic (%)
Lane Group Flow (vph) 12 10 25 38 9 9 63 1011 224 32 523 0
Turn Type Prot NA Perm Prot NA Perm Prot NA Perm Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 8
Detector Phase 5 2 2 1 6 6 3 8 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 28.0 28.0 10.0 27.0 27.0 10.0 29.0 29.0 10.0 30.0
Total Split (s) 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0
Total Split (%) 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min Min None Min Min None Min
Act Effct Green (s) 6.3 6.2 6.2 7.2 8.5 8.5 8.1 31.6 31.6 7.0 27.9
Actuated g/C Ratio 0.11 0.11 0.11 0.13 0.15 0.15 0.14 0.56 0.56 0.12 0.49
v/c Ratio 0.07 0.05 0.10 0.18 0.03 0.03 0.27 1.04 0.27 0.16 0.32
Control Delay 29.6 29.7 0.8 28.9 25.0 0.1 28.5 59.6 7.3 28.9 12.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.6 29.7 0.8 28.9 25.0 0.1 28.5 59.6 7.3 28.9 12.7
LOS C C A C C A C E A C B
Approach Delay 14.3 23.6 49.0 13.7
Approach LOS B C D B
D-47
Logan Six 2024 Future with Development Conditions
3: Logan Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 3 2 0 9 2 0 15 164 9 8 51
Queue Length 95th (ft) 21 18 0 43 17 0 61 #875 83 38 134
Internal Link Dist (ft) 1093 1192 1241 1229
Turn Bay Length (ft) 250 295 140 230 135
Base Capacity (vph) 616 974 850 616 974 852 616 974 842 616 1843
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.01 0.03 0.06 0.01 0.01 0.10 1.04 0.27 0.05 0.28
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 56.6
Natural Cycle: 120
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 1.04
Intersection Signal Delay: 37.4 Intersection LOS: D
Intersection Capacity Utilization 73.8% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: Logan Avenue N & N 6th Street
D-48
Logan Six 2024 Future with Development Conditions
4: Logan Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 9 8 8 49 6 16 22 852 60 5 464 17
Future Volume (vph) 9 8 8 49 6 16 22 852 60 5 464 17
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 105 0 0 0 0 0 0 0
Storage Lanes 1 1 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.94 0.92 0.94 0.94 0.95 1.00 0.99 1.00
Frt 0.850 0.889 0.990 0.995
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1687 3374 1509 1687 2819 0 1687 1753 0 1687 1760 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1587 3374 1395 1578 2819 0 1603 1753 0 1672 1760 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 116 17 3 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1154 1202 1309 1978
Travel Time (s) 26.2 27.3 29.8 45.0
Confl. Peds. (#/hr) 19 32 32 19 63 23 23 63
Confl. Bikes (#/hr)1
Peak Hour Factor 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96 0.96
Heavy Vehicles (%) 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7% 7%
Shared Lane Traffic (%)
Lane Group Flow (vph) 9 8 8 51 23 0 23 951 0 5 501 0
Turn Type Prot NA Perm Prot NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2
Detector Phase 5 2 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 11.0 24.0 24.0 11.0 25.0 10.0 30.0 10.0 28.0
Total Split (s) 26.0 36.0 36.0 26.0 36.0 25.0 35.0 25.0 35.0
Total Split (%) 21.3% 29.5% 29.5% 21.3% 29.5% 20.5% 28.7% 20.5% 28.7%
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min None Min None Min
Act Effct Green (s) 5.2 5.1 5.1 6.1 10.3 5.5 31.1 5.1 30.8
Actuated g/C Ratio 0.09 0.09 0.09 0.11 0.18 0.10 0.56 0.09 0.55
v/c Ratio 0.06 0.03 0.03 0.28 0.04 0.14 0.98 0.03 0.52
Control Delay 29.1 28.4 0.2 30.1 14.3 29.5 42.7 28.8 13.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 29.1 28.4 0.2 30.1 14.3 29.5 42.7 28.8 13.1
LOS C C A C B C D C B
Approach Delay 19.6 25.2 42.4 13.3
D-49
Logan Six 2024 Future with Development Conditions
4: Logan Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B C D B
Queue Length 50th (ft) 3 1 0 17 1 8 ~368 2 105
Queue Length 95th (ft) 17 8 0 52 11 30 #757 12 278
Internal Link Dist (ft) 1074 1122 1229 1898
Turn Bay Length (ft) 105
Base Capacity (vph) 619 1858 820 619 1560 619 973 619 970
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.00 0.01 0.08 0.01 0.04 0.98 0.01 0.52
Intersection Summary
Area Type: Other
Cycle Length: 122
Actuated Cycle Length: 56
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.98
Intersection Signal Delay: 31.9 Intersection LOS: C
Intersection Capacity Utilization 70.2% ICU Level of Service C
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 4: Logan Avenue N & N 8th Street
D-50
Logan Six 2024 Future with Development Conditions
5: Burnett Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 22 485 26 0 0 0 0 19 7 3 7 0
Future Vol, veh/h 22 485 26 0 0 0 0 19 7 3 7 0
Conflicting Peds, #/hr 1 0 1 1 0 1 1 0 0 0 0 1
Sign Control Free Free Free Stop Stop Stop Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 90 90 90 90 90 90 90 90 90 90 90 90
Heavy Vehicles, % 5 5 5 5 5 5 5 5 5 5 5 5
Mvmt Flow 24 539 29 0 0 0 0 21 8 3 8 0
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 1 0 0 - 604 285 329 618 -
Stage 1 - - - - 603 - 1 1 -
Stage 2 - - - - 1 - 328 617 -
Critical Hdwy 4.2 - - - 6.6 7 7.6 6.6 -
Critical Hdwy Stg 1 - - - - 5.6 - - - -
Critical Hdwy Stg 2 - - - - - - 6.6 5.6 -
Follow-up Hdwy 2.25 - - - 4.05 3.35 3.55 4.05 -
Pot Cap-1 Maneuver 1599 - - 0 405 703 593 397 0
Stage 1 - - - 0 479 - - - 0
Stage 2 - - - 0 - - 651 472 0
Platoon blocked, % - -
Mov Cap-1 Maneuver 1597 - - - 395 702 553 387 -
Mov Cap-2 Maneuver - - - - 395 - 553 387 -
Stage 1 - - - - 468 - - - -
Stage 2 - - - - - - 601 461 -
Approach EB NB SB
HCM Control Delay, s 0.4 13.6 13.7
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 EBL EBT EBRSBLn1
Capacity (veh/h) 448 1597 - - 425
HCM Lane V/C Ratio 0.064 0.015 - - 0.026
HCM Control Delay (s) 13.6 7.3 0.1 - 13.7
HCM Lane LOS B A A - B
HCM 95th %tile Q(veh) 0.2 0 - - 0.1
D-51
Logan Six 2024 Future with Development Conditions
6: Burnett Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 1.5
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 11 424 5 39 8 0 0 5 8
Future Vol, veh/h 0 0 0 11 424 5 39 8 0 0 5 8
Conflicting Peds, #/hr 0 0 2 2 0 0 0 0 1 1 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - 0 - 0 - - - - - -
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 96 96 96 96 96 96 96 96 96 96 96 96
Heavy Vehicles, % 6 6 6 6 6 6 6 6 6 6 6 6
Mvmt Flow 0 0 0 11 442 5 41 8 0 0 5 8
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 2 0 0 248 471 - - 466 221
Stage 1 - - - 2 2 - - 464 -
Stage 2 - - - 246 469 - - 2 -
Critical Hdwy 4.22 - - 7.62 6.62 - - 6.62 7.02
Critical Hdwy Stg 1 - - - - - - - 5.62 -
Critical Hdwy Stg 2 - - - 6.62 5.62 - - - -
Follow-up Hdwy 2.26 - - 3.56 4.06 - - 4.06 3.36
Pot Cap-1 Maneuver 1590 - - 675 481 0 0 484 771
Stage 1 - - - - - 0 0 552 -
Stage 2 - - - 725 549 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver 1587 - - 657 477 - - 480 771
Mov Cap-2 Maneuver - - - 657 477 - - 480 -
Stage 1 - - - - - - - 548 -
Stage 2 - - - 705 545 - - - -
Approach WB NB SB
HCM Control Delay, s 0.2 11.3 10.9
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBRSBLn1
Capacity (veh/h) 617 1587 - - 625
HCM Lane V/C Ratio 0.079 0.007 - - 0.022
HCM Control Delay (s) 11.3 7.3 - - 10.9
HCM Lane LOS B A - - B
HCM 95th %tile Q(veh) 0.3 0 - - 0.1
D-52
Logan Six 2024 Future with Development Conditions
7: Park Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 51 438 10 0 0 0 0 435 63 100 89 0
Future Volume (vph) 51 438 10 0 0 0 0 435 63 100 89 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00
Ped Bike Factor 0.99 1.00 1.00 1.00
Frt 0.997 0.981
Flt Protected 0.950 0.974
Satd. Flow (prot) 1736 3460 0 0 0 0 0 3396 0 0 3381 0
Flt Permitted 0.950 0.627
Satd. Flow (perm) 1712 3460 0 0 0 0 0 3396 0 0 2172 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 4 25
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1226 1509 471 662
Travel Time (s) 27.9 34.3 10.7 15.0
Confl. Peds. (#/hr) 13 2 2 13 7 9 9 7
Peak Hour Factor 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86 0.86
Heavy Vehicles (%) 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 59 521 0 0 0 0 0 579 0 0 219 0
Turn Type Perm NA NA pm+pt NA
Protected Phases 6 8 7 4
Permitted Phases 6 4
Detector Phase 6 6 8 7 4
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 5.0 10.0
Minimum Split (s) 25.0 25.0 24.0 9.0 24.0
Total Split (s) 26.0 26.0 26.0 14.0 26.0
Total Split (%) 39.4% 39.4%39.4% 21.2% 39.4%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 0.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Recall Mode None None Min None None
Act Effct Green (s) 12.7 12.7 13.2 13.2
Actuated g/C Ratio 0.33 0.33 0.35 0.35
v/c Ratio 0.10 0.45 0.49 0.29
Control Delay 10.1 11.7 11.2 10.6
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.1 11.7 11.2 10.6
LOS B B B B
Approach Delay 11.6 11.2 10.6
Approach LOS B B B
Queue Length 50th (ft) 8 40 43 15
Queue Length 95th (ft) 27 83 85 38
Internal Link Dist (ft) 1146 1429 391 582
D-53
Logan Six 2024 Future with Development Conditions
7: Park Avenue N & N 3rd Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph) 918 1857 1832 1936
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.06 0.28 0.32 0.11
Intersection Summary
Area Type: Other
Cycle Length: 66
Actuated Cycle Length: 38.2
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.49
Intersection Signal Delay: 11.3 Intersection LOS: B
Intersection Capacity Utilization 51.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 7: Park Avenue N & N 3rd Street
D-54
Logan Six 2024 Future with Development Conditions
8: Park Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 80 369 69 24 458 0 0 109 35
Future Volume (vph) 0 0 0 80 369 69 24 458 0 0 109 35
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.91 0.91 1.00 0.95 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 0.99 0.98 1.00 0.99
Frt 0.850 0.964
Flt Protected 0.991 0.998
Satd. Flow (prot) 0 0 0 0 4896 1538 0 3431 0 0 3291 0
Flt Permitted 0.991 0.933
Satd. Flow (perm) 0 0 0 0 4846 1514 0 3206 0 0 3291 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)87 44
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1194 1450 662 1307
Travel Time (s) 27.1 33.0 15.0 29.7
Confl. Peds. (#/hr) 4 58 58 4 14 8 8 14
Peak Hour Factor 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79 0.79
Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 568 87 0 610 0 0 182 0
Turn Type Perm NA Perm pm+pt NA NA
Protected Phases 2 3 8 4
Permitted Phases 2 2 8
Detector Phase 2 2 2 3 8 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 9.0 26.0 24.0
Total Split (s)30.0 30.0 30.0 19.0 26.0 30.0
Total Split (%) 38.0% 38.0% 38.0% 24.1% 32.9% 38.0%
Yellow Time (s)4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s)1.0 1.0 1.0 0.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0
Total Lost Time (s)5.0 5.0 5.0 5.0
Lead/Lag Lead Lag
Lead-Lag Optimize?Yes Yes
Recall Mode Min Min Min None Min Min
Act Effct Green (s)11.3 11.3 12.4 12.4
Actuated g/C Ratio 0.33 0.33 0.36 0.36
v/c Ratio 0.35 0.16 0.52 0.15
Control Delay 9.6 3.7 10.5 6.3
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 9.6 3.7 10.5 6.3
LOS A A B A
Approach Delay 8.8 10.5 6.3
Approach LOS A B A
Queue Length 50th (ft)26 0 43 8
Queue Length 95th (ft)48 15 73 20
Internal Link Dist (ft) 1114 1370 582 1227
D-55
Logan Six 2024 Future with Development Conditions
8: Park Avenue N & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph)3677 1170 3206 2508
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.15 0.07 0.19 0.07
Intersection Summary
Area Type: Other
Cycle Length: 79
Actuated Cycle Length: 34
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.52
Intersection Signal Delay: 9.2 Intersection LOS: A
Intersection Capacity Utilization 47.7% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 8: Park Avenue N & N 4th Street
D-56
Logan Six 2024 Future with Development Conditions
9: Park Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 96 36 23 5 25 4 68 494 5 3 115 73
Future Volume (vph) 96 36 23 5 25 4 68 494 5 3 115 73
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 0 0 0 100 0 170 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 0.98 0.99 1.00 1.00 0.99 1.00 1.00 0.99
Frt 0.941 0.981 0.999 0.942
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1719 3217 0 1719 1768 0 1719 3434 0 1719 3214 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1691 3217 0 1715 1768 0 1709 3434 0 1717 3214 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1272 822 1307 1301
Travel Time (s) 28.9 18.7 29.7 29.6
Confl. Peds. (#/hr) 7 1 1 7 3 1 1 3
Confl. Bikes (#/hr)2
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5% 5%
Shared Lane Traffic (%)
Lane Group Flow (vph) 103 64 0 5 31 0 73 536 0 3 202 0
Turn Type Prot NA Prot NA Prot NA Prot NA
Protected Phases 1 6 5 2 3 8 7 4
Permitted Phases
Detector Phase 1 6 5 2 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 10.0 27.0 10.0 27.0 9.5 26.0 9.5 26.0
Total Split (s) 25.0 65.0 25.0 35.0 25.0 45.0 25.0 65.0
Total Split (%) 13.9% 36.1% 13.9% 19.4% 13.9% 25.0% 13.9% 36.1%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 9.4 15.3 5.6 6.2 8.8 21.6 5.2 13.0
Actuated g/C Ratio 0.18 0.30 0.11 0.12 0.17 0.42 0.10 0.25
v/c Ratio 0.33 0.07 0.03 0.14 0.25 0.37 0.02 0.25
Control Delay 25.1 15.9 27.4 26.9 24.8 12.8 27.7 20.0
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 25.1 15.9 27.4 26.9 24.8 12.8 27.7 20.0
LOS C B C C C B C C
Approach Delay 21.6 26.9 14.2 20.2
D-57
Logan Six 2024 Future with Development Conditions
9: Park Avenue N & N 6th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS C C B C
Queue Length 50th (ft) 29 6 2 9 20 54 1 28
Queue Length 95th (ft) 80 26 12 35 62 134 9 62
Internal Link Dist (ft) 1192 742 1227 1221
Turn Bay Length (ft) 100 100 170
Base Capacity (vph) 750 3129 750 1720 750 3340 750 3126
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.14 0.02 0.01 0.02 0.10 0.16 0.00 0.06
Intersection Summary
Area Type: Other
Cycle Length: 180
Actuated Cycle Length: 51
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.37
Intersection Signal Delay: 17.1 Intersection LOS: B
Intersection Capacity Utilization 42.0% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 9: Park Avenue N & N 6th Street
D-58
Logan Six 2024 Future with Development Conditions
10: Park Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 24 50 7 34 54 36 10 546 125 23 180 9
Future Volume (vph) 24 50 7 34 54 36 10 546 125 23 180 9
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 155 0 95 0 125 0 125 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 0.98 0.99 0.99 1.00
Frt 0.981 0.941 0.972 0.993
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1736 3396 0 1736 3266 0 1736 3349 0 1736 3441 0
Flt Permitted 0.688 0.601 0.950 0.950
Satd. Flow (perm) 1257 3396 0 1087 3266 0 1704 3349 0 1719 3441 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 7 40 15 2
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1202 1521 1301 849
Travel Time (s) 27.3 34.6 29.6 19.3
Confl. Peds. (#/hr) 3 3 7 8 8 7
Peak Hour Factor 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89 0.89
Heavy Vehicles (%) 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4% 4%
Shared Lane Traffic (%)
Lane Group Flow (vph) 27 64 0 38 101 0 11 753 0 26 212 0
Turn Type pm+pt NA pm+pt NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6
Detector Phase 5 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 35.0 55.0 35.0 55.0 65.0 85.0 35.0 55.0
Total Split (%) 16.7% 26.2% 16.7% 26.2% 31.0% 40.5% 16.7% 26.2%
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 11.3 7.7 12.6 10.2 6.9 20.8 7.5 22.8
Actuated g/C Ratio 0.23 0.16 0.26 0.21 0.14 0.43 0.15 0.47
v/c Ratio 0.07 0.12 0.10 0.14 0.04 0.52 0.10 0.13
Control Delay 16.5 23.1 16.4 16.2 27.5 13.7 26.7 9.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 16.5 23.1 16.4 16.2 27.5 13.7 26.7 9.2
LOS B C B B C B C A
Approach Delay 21.2 16.3 13.9 11.1
Approach LOS C B B B
D-59
Logan Six 2024 Future with Development Conditions
10: Park Avenue N & N 8th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis - AM.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 4 7 6 5 3 73 6 17
Queue Length 95th (ft) 25 29 32 33 19 181 32 50
Internal Link Dist (ft) 1122 1441 1221 769
Turn Bay Length (ft) 155 95 125 125
Base Capacity (vph) 1196 3046 1196 2933 1659 3349 1196 3086
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.02 0.03 0.03 0.01 0.22 0.02 0.07
Intersection Summary
Area Type: Other
Cycle Length: 210
Actuated Cycle Length: 48.6
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.52
Intersection Signal Delay: 14.2 Intersection LOS: B
Intersection Capacity Utilization 35.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 10: Park Avenue N & N 8th Street
D-60
Logan Six 2024 Future with Development Conditions
11: N 3rd Street & South Site Access AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0.4
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 6 514 0 0 19 0
Future Vol, veh/h 6 514 0 0 19 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 7 559 0 0 21 0
Major/Minor Major1 Minor2
Conflicting Flow All 0 0 294 -
Stage 1 - - 0 -
Stage 2 - - 294 -
Critical Hdwy 4.14 - 6.84 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 673 0
Stage 1 - - - 0
Stage 2 - - 730 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 673 -
Mov Cap-2 Maneuver - - 673 -
Stage 1 - - - -
Stage 2 - - 730 -
Approach EB SB
HCM Control Delay, s 10.5
HCM LOS B
Minor Lane/Major Mvmt EBL EBT SBLn1
Capacity (veh/h) - - 673
HCM Lane V/C Ratio - - 0.031
HCM Control Delay (s) - - 10.5
HCM Lane LOS - - B
HCM 95th %tile Q(veh) - - 0.1
D-61
Logan Six 2024 Future with Development Conditions
12: North Site Access & N 4th Street AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 0.2
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 2 476 9 0
Future Vol, veh/h 0 0 2 476 9 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 2 517 10 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 211 -
Stage 1 - - 0 -
Stage 2 - - 211 -
Critical Hdwy 5.34 - 5.74 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 6.04 -
Follow-up Hdwy 3.12 - 3.82 -
Pot Cap-1 Maneuver - - 751 0
Stage 1 - - - 0
Stage 2 - - 738 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 751 -
Mov Cap-2 Maneuver - - 751 -
Stage 1 - - - -
Stage 2 - - 738 -
Approach WB NB
HCM Control Delay, s 9.9
HCM LOS A
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 751 - -
HCM Lane V/C Ratio 0.013 - -
HCM Control Delay (s) 9.9 - -
HCM Lane LOS A - -
HCM 95th %tile Q(veh) 0 - -
D-62
Logan Six 2024 Future with Development Conditions
13: Burnett Avenue N & Commercial Parking Lot AM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis - AM.syn
Intersection
Int Delay, s/veh 2.4
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 7 9 37 8 8
Future Vol, veh/h 7 7 9 37 8 8
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 8 8 10 40 9 9
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 74 14 18 0 - 0
Stage 1 14 - - - - -
Stage 2 60 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 930 1066 1599 - - -
Stage 1 1009 - - - - -
Stage 2 963 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 924 1066 1599 - - -
Mov Cap-2 Maneuver 924 - - - - -
Stage 1 1003 - - - - -
Stage 2 963 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.7 1.4 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1599 - 990 - -
HCM Lane V/C Ratio 0.006 - 0.015 - -
HCM Control Delay (s) 7.3 0 8.7 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
D-63
E
PM Level of Service Calculations
Logan Six Existing Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 8 45 0 0 0 37 931 784 66 1161 2
Future Volume (vph) 4 8 45 0 0 0 37 931 784 66 1161 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 180 0 235 0
Storage Lanes 0 1 0 0 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 0.98 0.95 1.00
Frt 0.850 0.850
Flt Protected 0.984 0.950 0.950
Satd. Flow (prot) 0 1833 1583 0 0 0 1770 3539 1583 1770 3539 0
Flt Permitted 0.984 0.211 0.263
Satd. Flow (perm) 0 1833 1550 0 0 0 393 3539 1508 490 3539 0
Right Turn on Red Yes Yes No Yes
Satd. Flow (RTOR) 53
Link Speed (mph) 30 30 30 30
Link Distance (ft) 236 189 756 511
Travel Time (s) 5.4 4.3 17.2 11.6
Confl. Peds. (#/hr) 5 5 1 10 10 1
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 12 46 0 0 0 38 960 808 68 1199 0
Turn Type Perm NA Perm pm+pt NA Perm pm+pt NA
Protected Phases 4 1 6 5 2
Permitted Phases 4 4 6 6 2
Detector Phase 4 4 4 1 6 6 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 10.0 23.0 23.0 10.0 32.0
Total Split (s) 55.0 55.0 55.0 35.0 55.0 55.0 35.0 55.0
Total Split (%) 37.9% 37.9% 37.9% 24.1% 37.9% 37.9% 24.1% 37.9%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes
Recall Mode None None None None Min Min None Min
Act Effct Green (s) 6.2 6.2 59.9 56.4 56.4 62.6 59.4
Actuated g/C Ratio 0.08 0.08 0.76 0.72 0.72 0.80 0.75
v/c Ratio 0.08 0.27 0.09 0.38 0.75 0.14 0.45
Control Delay 34.9 13.4 2.6 6.7 16.5 2.5 6.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.1
Total Delay 34.9 13.4 2.6 6.7 16.5 2.5 6.3
LOS C B A A B A A
Approach Delay 17.9 11.0 6.1
Approach LOS B B A
Queue Length 50th (ft) 6 0 3 104 262 5 137
E-1
Logan Six Existing Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 21 27 8 155 #572 12 197
Internal Link Dist (ft) 156 109 676 431
Turn Bay Length (ft)180 235
Base Capacity (vph) 1170 1009 851 2537 1081 894 2670
Starvation Cap Reductn 0 0 0 0 0 0 475
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.05 0.04 0.38 0.75 0.08 0.55
Intersection Summary
Area Type: Other
Cycle Length: 145
Actuated Cycle Length: 78.7
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.75
Intersection Signal Delay: 9.2 Intersection LOS: A
Intersection Capacity Utilization 72.8% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: Logan Avenue N & Parking Lot/N 3rd Street
E-2
Logan Six Existing Conditions
2: Logan Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 337 48 931 0 0 903
Future Volume (vph) 337 48 931 0 0 903
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.97 1.00 0.95 1.00 1.00 0.95
Ped Bike Factor
Frt 0.850
Flt Protected 0.950
Satd. Flow (prot) 3433 1583 3539 0 0 3539
Flt Permitted 0.950
Satd. Flow (perm) 3433 1583 3539 0 0 3539
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 49
Link Speed (mph) 30 30 30
Link Distance (ft) 120 511 1321
Travel Time (s) 2.7 11.6 30.0
Confl. Peds. (#/hr)3 3
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 347 49 960 0 0 931
Turn Type Prot Perm NA NA
Protected Phases 3 6 2
Permitted Phases 3
Detector Phase 3 3 6 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0
Minimum Split (s) 27.0 27.0 23.0 23.0
Total Split (s) 35.0 35.0 55.0 55.0
Total Split (%) 38.9% 38.9% 61.1% 61.1%
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Recall Mode None None Min Min
Act Effct Green (s) 10.0 10.0 19.6 19.6
Actuated g/C Ratio 0.25 0.25 0.49 0.49
v/c Ratio 0.40 0.11 0.55 0.53
Control Delay 14.8 6.1 8.5 8.3
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 14.8 6.1 8.5 8.3
LOS B A A A
Approach Delay 13.7 8.5 8.3
Approach LOS B A A
Queue Length 50th (ft) 31 0 66 63
Queue Length 95th (ft) 72 19 123 118
Internal Link Dist (ft) 40 431 1241
Turn Bay Length (ft)
E-3
Logan Six Existing Conditions
2: Logan Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group WBL WBR NBT NBR SBL SBT
Base Capacity (vph) 2653 1234 3529 3529
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.13 0.04 0.27 0.26
Intersection Summary
Area Type: Other
Cycle Length: 90
Actuated Cycle Length: 39.8
Natural Cycle: 50
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.55
Intersection Signal Delay: 9.3 Intersection LOS: A
Intersection Capacity Utilization 43.7% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: Logan Avenue N & N 4th Street
E-4
Logan Six Existing Conditions
3: Logan Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 12 16 61 64 2 41 26 810 131 12 781 7
Future Volume (vph) 12 16 61 64 2 41 26 810 131 12 781 7
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 250 295 140 0 230 0 135 0
Storage Lanes 1 1 1 1 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.97 0.99 0.98 0.99 0.97 0.99 1.00
Frt 0.850 0.850 0.850 0.999
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1752 1845 1568 1752 1845 1568 1752 1845 1568 1752 3500 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1744 1845 1523 1731 1845 1540 1743 1845 1517 1741 3500 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 109 109 109 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1173 1272 1321 1309
Travel Time (s) 26.7 28.9 30.0 29.8
Confl. Peds. (#/hr) 3 8 8 3 7 14 14 7
Confl. Bikes (#/hr) 5 1 4
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Heavy Vehicles (%) 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 12 16 62 65 2 42 27 827 134 12 804 0
Turn Type Prot NA Perm Prot NA Perm Prot NA Perm Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 8
Detector Phase 5 2 2 1 6 6 3 8 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 28.0 28.0 10.0 27.0 27.0 10.0 29.0 29.0 10.0 30.0
Total Split (s) 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0
Total Split (%) 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min Min None Min Min None Min
Act Effct Green (s) 6.2 6.4 6.4 8.0 11.9 11.9 6.7 33.0 33.0 6.2 30.7
Actuated g/C Ratio 0.10 0.11 0.11 0.14 0.20 0.20 0.11 0.56 0.56 0.10 0.52
v/c Ratio 0.07 0.08 0.24 0.27 0.01 0.11 0.14 0.80 0.15 0.07 0.44
Control Delay 30.6 30.4 4.4 29.8 23.5 0.5 30.3 22.7 4.4 30.6 13.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 30.6 30.4 4.4 29.8 23.5 0.5 30.3 22.7 4.4 30.6 13.1
LOS C C A C C A C C A C B
Approach Delay 12.5 18.4 20.4 13.4
E-5
Logan Six Existing Conditions
3: Logan Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B B C B
Queue Length 50th (ft) 4 5 0 21 1 0 9 241 4 4 87
Queue Length 95th (ft) 21 25 12 63 7 0 35 #662 39 21 209
Internal Link Dist (ft) 1093 1192 1241 1229
Turn Bay Length (ft) 250 295 140 230 135
Base Capacity (vph) 619 978 859 619 978 868 619 1029 895 619 1857
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.02 0.07 0.11 0.00 0.05 0.04 0.80 0.15 0.02 0.43
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 59.1
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 17.1 Intersection LOS: B
Intersection Capacity Utilization 64.8% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: Logan Avenue N & N 6th Street
E-6
Logan Six Existing Conditions
4: Logan Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 17 10 17 104 5 52 7 749 131 21 719 2
Future Volume (vph) 17 10 17 104 5 52 7 749 131 21 719 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 105 0 0 0 0 0 0 0
Storage Lanes 1 1 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.97 0.97 0.98 0.96 0.98 0.99 0.99 1.00
Frt 0.850 0.862 0.978
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 3539 1583 1770 2916 0 1770 1807 0 1770 1862 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1723 3539 1530 1731 2916 0 1740 1807 0 1748 1862 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 116 55 7
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1154 1202 1309 1978
Travel Time (s) 26.2 27.3 29.8 45.0
Confl. Peds. (#/hr) 9 11 11 9 30 30 30 30
Confl. Bikes (#/hr)1 12
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Shared Lane Traffic (%)
Lane Group Flow (vph) 18 11 18 109 60 0 7 926 0 22 759 0
Turn Type Prot NA Perm Prot NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2
Detector Phase 5 2 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 11.0 24.0 24.0 11.0 25.0 10.0 30.0 10.0 28.0
Total Split (s) 26.0 36.0 36.0 26.0 36.0 25.0 35.0 25.0 35.0
Total Split (%) 21.3% 29.5% 29.5% 21.3% 29.5% 20.5% 28.7% 20.5% 28.7%
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min None Min None Min
Act Effct Green (s) 5.3 5.1 5.1 7.9 14.3 5.1 30.7 5.4 30.9
Actuated g/C Ratio 0.09 0.08 0.08 0.13 0.24 0.08 0.51 0.09 0.51
v/c Ratio 0.11 0.04 0.08 0.47 0.08 0.05 1.00 0.14 0.79
Control Delay 30.8 29.9 0.6 33.1 8.9 30.4 49.9 30.9 23.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 30.8 29.9 0.6 33.1 8.9 30.4 49.9 30.9 23.2
LOS C C A C A C D C C
Approach Delay 19.1 24.5 49.8 23.4
Approach LOS B C D C
E-7
Logan Six Existing Conditions
4: Logan Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 6 2 0 37 0 2 ~317 8 209
Queue Length 95th (ft) 27 10 0 92 17 15 #782 31 #570
Internal Link Dist (ft) 1074 1122 1229 1898
Turn Bay Length (ft) 105
Base Capacity (vph) 603 1809 839 603 1518 603 927 603 958
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.03 0.01 0.02 0.18 0.04 0.01 1.00 0.04 0.79
Intersection Summary
Area Type: Other
Cycle Length: 122
Actuated Cycle Length: 60.1
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 1.00
Intersection Signal Delay: 36.2 Intersection LOS: D
Intersection Capacity Utilization 70.3% ICU Level of Service C
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 4: Logan Avenue N & N 8th Street
E-8
Logan Six Existing Conditions
5: Burnett Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 791 25 0 0 0 0 26 25 12 6 0
Future Vol, veh/h 7 791 25 0 0 0 0 26 25 12 6 0
Conflicting Peds, #/hr 5 0 2 2 0 5 21 0 0 0 0 21
Sign Control Free Free Free Stop Stop Stop Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 860 27 0 0 0 0 28 27 13 7 0
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 5 0 0 - 897 446 465 910 -
Stage 1 - - - - 892 - 5 5 -
Stage 2 - - - - 5 - 460 905 -
Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 -
Critical Hdwy Stg 1 - - - - 5.54 - - - -
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 -
Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 -
Pot Cap-1 Maneuver 1615 - - 0 278 560 481 273 0
Stage 1 - - - 0 358 - - - 0
Stage 2 - - - 0 - - 551 353 0
Platoon blocked, % - -
Mov Cap-1 Maneuver 1607 - - - 273 559 416 268 -
Mov Cap-2 Maneuver - - - - 273 - 416 268 -
Stage 1 - - - - 354 - - - -
Stage 2 - - - - - - 478 349 -
Approach EB NB SB
HCM Control Delay, s 0.1 16.7 15.9
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBRSBLn1
Capacity (veh/h) 364 1607 - - 351
HCM Lane V/C Ratio 0.152 0.005 - - 0.056
HCM Control Delay (s) 16.7 7.3 0 - 15.9
HCM Lane LOS C A A - C
HCM 95th %tile Q(veh) 0.5 0 - - 0.2
E-9
Logan Six Existing Conditions
6: Burnett Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.2
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 3 356 2 14 11 0 0 11 8
Future Vol, veh/h 0 0 0 3 356 2 14 11 0 0 11 8
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 1 1 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - 0 - 0 - - - - - -
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 0 3 400 2 16 12 0 0 12 9
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 0 0 0 212 408 - - 406 200
Stage 1 - - - 0 0 - - 406 -
Stage 2 - - - 212 408 - - 0 -
Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94
Critical Hdwy Stg 1 - - - - - - - 5.54 -
Critical Hdwy Stg 2 - - - 6.54 5.54 - - - -
Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32
Pot Cap-1 Maneuver - - - 726 531 0 0 533 808
Stage 1 - - - - - 0 0 596 -
Stage 2 - - - 770 595 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 705 531 - - 533 808
Mov Cap-2 Maneuver - - - 705 531 - - 533 -
Stage 1 - - - - - - - 596 -
Stage 2 - - - 746 595 - - - -
Approach WB NB SB
HCM Control Delay, s 11.1 11
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBRSBLn1
Capacity (veh/h) 616 - - - 622
HCM Lane V/C Ratio 0.046 - - - 0.034
HCM Control Delay (s) 11.1 - - - 11
HCM Lane LOS B - - - B
HCM 95th %tile Q(veh) 0.1 - - - 0.1
E-10
Logan Six Existing Conditions
7: Park Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 31 792 31 0 0 0 0 214 36 156 271 0
Future Volume (vph) 31 792 31 0 0 0 0 214 36 156 271 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00
Ped Bike Factor 1.00 1.00 1.00 1.00
Frt 0.994 0.978
Flt Protected 0.950 0.982
Satd. Flow (prot) 1770 3516 0 0 0 0 0 3454 0 0 3476 0
Flt Permitted 0.950 0.757
Satd. Flow (perm) 1768 3516 0 0 0 0 0 3454 0 0 2678 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 6 29
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1226 1509 471 662
Travel Time (s) 27.9 34.3 10.7 15.0
Confl. Peds. (#/hr) 1 2 2 1 5 2 2 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 32 848 0 0 0 0 0 258 0 0 440 0
Turn Type Perm NA NA pm+pt NA
Protected Phases 6 8 7 4
Permitted Phases 6 4
Detector Phase 6 6 8 7 4
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 5.0 10.0
Minimum Split (s) 25.0 25.0 24.0 9.0 24.0
Total Split (s) 26.0 26.0 26.0 14.0 26.0
Total Split (%) 39.4% 39.4%39.4% 21.2% 39.4%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 0.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Recall Mode None None Min None None
Act Effct Green (s) 16.9 16.9 13.8 13.8
Actuated g/C Ratio 0.39 0.39 0.32 0.32
v/c Ratio 0.05 0.61 0.23 0.51
Control Delay 9.2 13.0 10.3 14.6
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 9.2 13.0 10.3 14.6
LOS A B B B
Approach Delay 12.8 10.3 14.6
Approach LOS B B B
Queue Length 50th (ft) 4 77 22 46
Queue Length 95th (ft) 19 153 43 82
Internal Link Dist (ft) 1146 1429 391 582
Turn Bay Length (ft)
E-11
Logan Six Existing Conditions
7: Park Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 840 1675 1658 2159
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.04 0.51 0.16 0.20
Intersection Summary
Area Type: Other
Cycle Length: 66
Actuated Cycle Length: 43
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.61
Intersection Signal Delay: 12.9 Intersection LOS: B
Intersection Capacity Utilization 58.9% ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 7: Park Avenue N & N 3rd Street
E-12
Logan Six Existing Conditions
8: Park Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 44 299 29 35 197 0 0 383 56
Future Volume (vph) 0 0 0 44 299 29 35 197 0 0 383 56
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.91 0.91 1.00 0.95 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 1.00 1.00
Frt 0.850 0.981
Flt Protected 0.994 0.993
Satd. Flow (prot) 0 0 0 0 5055 1583 0 3514 0 0 3463 0
Flt Permitted 0.994 0.833
Satd. Flow (perm) 0 0 0 0 5053 1563 0 2947 0 0 3463 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)83 21
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1194 1450 662 1307
Travel Time (s) 27.1 33.0 15.0 29.7
Confl. Peds. (#/hr) 1 3 3 1 7 2 2 7
Confl. Bikes (#/hr)1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 373 32 0 252 0 0 477 0
Turn Type Perm NA Perm pm+pt NA NA
Protected Phases 2 3 8 4
Permitted Phases 2 2 8
Detector Phase 2 2 2 3 8 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 9.0 26.0 24.0
Total Split (s)30.0 30.0 30.0 19.0 26.0 30.0
Total Split (%) 38.0% 38.0% 38.0% 24.1% 32.9% 38.0%
Yellow Time (s)4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s)1.0 1.0 1.0 0.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0
Total Lost Time (s)5.0 5.0 5.0 5.0
Lead/Lag Lead Lag
Lead-Lag Optimize?Yes Yes
Recall Mode Min Min Min None Min Min
Act Effct Green (s)8.0 8.0 8.9 8.9
Actuated g/C Ratio 0.30 0.30 0.33 0.33
v/c Ratio 0.25 0.06 0.26 0.41
Control Delay 8.0 0.9 7.5 8.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 8.0 0.9 7.5 8.0
LOS A A A A
Approach Delay 7.4 7.5 8.0
Approach LOS A A A
Queue Length 50th (ft)12 0 11 22
Queue Length 95th (ft)27 3 27 46
Internal Link Dist (ft) 1114 1370 582 1227
E-13
Logan Six Existing Conditions
8: Park Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph)4637 1441 2947 3180
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.08 0.02 0.09 0.15
Intersection Summary
Area Type: Other
Cycle Length: 79
Actuated Cycle Length: 27.1
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.41
Intersection Signal Delay: 7.7 Intersection LOS: A
Intersection Capacity Utilization 42.3% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 8: Park Avenue N & N 4th Street
E-14
Logan Six Existing Conditions
9: Park Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 136 51 75 8 7 0 4 216 2 4 317 35
Future Volume (vph) 136 51 75 8 7 0 4 216 2 4 317 35
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 0 0 0 100 0 170 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 1.00
Frt 0.911 0.999 0.985
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1752 3193 0 1752 1845 0 1752 3501 0 1752 3452 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1752 3193 0 1752 1845 0 1752 3501 0 1749 3452 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1272 822 1307 1301
Travel Time (s) 28.9 18.7 29.7 29.6
Confl. Peds. (#/hr)1 1
Confl. Bikes (#/hr)2
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 146 136 0 9 8 0 4 234 0 4 379 0
Turn Type Prot NA Prot NA Prot NA Prot NA
Protected Phases 1 6 5 2 3 8 7 4
Permitted Phases
Detector Phase 1 6 5 2 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 10.0 27.0 10.0 27.0 9.5 26.0 9.5 26.0
Total Split (s) 25.0 65.0 25.0 35.0 25.0 45.0 25.0 65.0
Total Split (%) 13.9% 36.1% 13.9% 19.4% 13.9% 25.0% 13.9% 36.1%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 10.0 18.6 5.3 5.0 5.9 12.5 4.8 12.4
Actuated g/C Ratio 0.22 0.42 0.12 0.11 0.13 0.28 0.11 0.28
v/c Ratio 0.37 0.10 0.04 0.04 0.02 0.24 0.02 0.39
Control Delay 19.4 11.8 22.5 22.6 22.0 14.0 23.0 15.4
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 19.4 11.8 22.5 22.6 22.0 14.0 23.0 15.4
LOS B B C C C B C B
Approach Delay 15.7 22.5 14.2 15.5
E-15
Logan Six Existing Conditions
9: Park Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B C B B
Queue Length 50th (ft) 28 8 2 2 1 21 1 36
Queue Length 95th (ft) 92 42 15 14 9 60 9 96
Internal Link Dist (ft) 1192 742 1227 1221
Turn Bay Length (ft) 100 100 170
Base Capacity (vph) 816 3170 816 1832 816 3476 816 3427
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.18 0.04 0.01 0.00 0.00 0.07 0.00 0.11
Intersection Summary
Area Type: Other
Cycle Length: 180
Actuated Cycle Length: 44.5
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.39
Intersection Signal Delay: 15.4 Intersection LOS: B
Intersection Capacity Utilization 32.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 9: Park Avenue N & N 6th Street
E-16
Logan Six Existing Conditions
10: Park Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 63 64 37 75 91 74 20 276 52 72 245 32
Future Volume (vph) 63 64 37 75 91 74 20 276 52 72 245 32
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 155 0 95 0 125 0 125 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 0.99 0.99 0.97 1.00 0.99
Frt 0.945 0.933 0.976 0.983
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 3313 0 1770 3274 0 1770 3447 0 1770 3455 0
Flt Permitted 0.641 0.676 0.950 0.950
Satd. Flow (perm) 1188 3313 0 1244 3274 0 1712 3447 0 1770 3455 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 39 79 12 6
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1202 1521 1301 849
Travel Time (s) 27.3 34.6 29.6 19.3
Confl. Peds. (#/hr) 2 4 4 2 14 14
Confl. Bikes (#/hr)2
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Shared Lane Traffic (%)
Lane Group Flow (vph) 67 107 0 80 176 0 21 349 0 77 295 0
Turn Type pm+pt NA pm+pt NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6
Detector Phase 5 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 35.0 55.0 35.0 55.0 65.0 85.0 35.0 55.0
Total Split (%) 16.7% 26.2% 16.7% 26.2% 31.0% 40.5% 16.7% 26.2%
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 13.9 8.1 14.1 8.2 7.0 12.4 8.9 20.0
Actuated g/C Ratio 0.28 0.16 0.29 0.17 0.14 0.25 0.18 0.41
v/c Ratio 0.15 0.19 0.18 0.29 0.08 0.40 0.24 0.21
Control Delay 13.1 16.3 13.3 14.8 24.6 19.1 23.6 11.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 13.1 16.3 13.3 14.8 24.6 19.1 23.6 11.6
LOS B B B B C B C B
Approach Delay 15.1 14.4 19.4 14.1
Approach LOS B B B B
E-17
Logan Six Existing Conditions
10: Park Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 13 10 16 14 6 47 21 26
Queue Length 95th (ft) 39 32 45 43 26 93 60 74
Internal Link Dist (ft) 1122 1441 1221 769
Turn Bay Length (ft) 155 95 125 125
Base Capacity (vph) 1138 3076 1138 3043 1751 3447 1138 3205
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.06 0.03 0.07 0.06 0.01 0.10 0.07 0.09
Intersection Summary
Area Type: Other
Cycle Length: 210
Actuated Cycle Length: 49.2
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.40
Intersection Signal Delay: 16.0 Intersection LOS: B
Intersection Capacity Utilization 39.5% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 10: Park Avenue N & N 8th Street
E-18
Logan Six Existing Conditions
11: N 3rd Street & South Site Access PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 0
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 858 0 0 0 0
Future Vol, veh/h 0 858 0 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 933 0 0 0 0
Major/Minor Major1 Minor2
Conflicting Flow All 0 0 467 -
Stage 1 - - 0 -
Stage 2 - - 467 -
Critical Hdwy 4.14 - 6.84 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 525 0
Stage 1 - - - 0
Stage 2 - - 597 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 525 -
Mov Cap-2 Maneuver - - 525 -
Stage 1 - - - -
Stage 2 - - 597 -
Approach EB SB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt EBL EBT SBLn1
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 - 0
HCM Lane LOS A - A
HCM 95th %tile Q(veh) - - -
E-19
Logan Six Existing Conditions
12: North Site Access & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 378 0 0
Future Vol, veh/h 0 0 0 378 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 411 0 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 164 -
Stage 1 - - 0 -
Stage 2 - - 164 -
Critical Hdwy 5.34 - 5.74 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 6.04 -
Follow-up Hdwy 3.12 - 3.82 -
Pot Cap-1 Maneuver - - 791 0
Stage 1 - - - 0
Stage 2 - - 780 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 791 -
Mov Cap-2 Maneuver - - 791 -
Stage 1 - - - -
Stage 2 - - 780 -
Approach WB NB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 0 -
HCM Lane LOS A A -
HCM 95th %tile Q(veh) - - -
E-20
Logan Six Existing Conditions
13: Burnett Avenue N & Commercial Parking Lot PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 5 33 18 5
Future Vol, veh/h 5 5 5 33 18 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 5 5 5 36 20 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 69 23 25 0 - 0
Stage 1 23 - - - - -
Stage 2 46 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 936 1054 1589 - - -
Stage 1 1000 - - - - -
Stage 2 976 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 933 1054 1589 - - -
Mov Cap-2 Maneuver 933 - - - - -
Stage 1 997 - - - - -
Stage 2 976 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.7 1 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1589 - 990 - -
HCM Lane V/C Ratio 0.003 - 0.011 - -
HCM Control Delay (s) 7.3 0 8.7 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
E-21
Logan Six 2024 Baseline Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 8 46 0 0 0 38 1014 823 68 1407 2
Future Volume (vph) 4 8 46 0 0 0 38 1014 823 68 1407 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 180 0 235 0
Storage Lanes 0 1 0 0 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 0.98 0.95 1.00
Frt 0.850 0.850
Flt Protected 0.984 0.950 0.950
Satd. Flow (prot) 0 1833 1583 0 0 0 1770 3539 1583 1770 3539 0
Flt Permitted 0.984 0.147 0.238
Satd. Flow (perm) 0 1833 1550 0 0 0 274 3539 1508 443 3539 0
Right Turn on Red Yes Yes No Yes
Satd. Flow (RTOR) 53
Link Speed (mph) 30 30 30 30
Link Distance (ft) 236 189 756 511
Travel Time (s) 5.4 4.3 17.2 11.6
Confl. Peds. (#/hr) 5 5 1 10 10 1
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 12 47 0 0 0 39 1045 848 70 1453 0
Turn Type Perm NA Perm pm+pt NA Perm pm+pt NA
Protected Phases 4 1 6 5 2
Permitted Phases 4 4 6 6 2
Detector Phase 4 4 4 1 6 6 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 10.0 23.0 23.0 10.0 32.0
Total Split (s) 55.0 55.0 55.0 35.0 55.0 55.0 35.0 55.0
Total Split (%) 37.9% 37.9% 37.9% 24.1% 37.9% 37.9% 24.1% 37.9%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes
Recall Mode None None None None Min Min None Min
Act Effct Green (s) 6.2 6.2 59.7 56.2 56.2 61.5 58.6
Actuated g/C Ratio 0.08 0.08 0.77 0.72 0.72 0.79 0.75
v/c Ratio 0.08 0.27 0.12 0.41 0.78 0.15 0.55
Control Delay 34.4 13.6 2.9 6.8 17.8 2.7 7.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.2
Total Delay 34.4 13.6 2.9 6.8 17.8 2.7 7.5
LOS C B A A B A A
Approach Delay 17.8 11.5 7.2
Approach LOS B B A
Queue Length 50th (ft) 5 0 3 114 285 5 186
E-22
Logan Six 2024 Baseline Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 21 28 8 169 #609 13 269
Internal Link Dist (ft) 156 109 676 431
Turn Bay Length (ft)180 235
Base Capacity (vph) 1179 1016 802 2550 1086 876 2661
Starvation Cap Reductn 0 0 0 0 0 0 405
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.05 0.05 0.41 0.78 0.08 0.64
Intersection Summary
Area Type: Other
Cycle Length: 145
Actuated Cycle Length: 78
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.78
Intersection Signal Delay: 9.8 Intersection LOS: A
Intersection Capacity Utilization 75.3% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: Logan Avenue N & Parking Lot/N 3rd Street
E-23
Logan Six 2024 Baseline Conditions
2: Logan Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 363 49 1014 0 0 1125
Future Volume (vph) 363 49 1014 0 0 1125
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.97 1.00 0.95 1.00 1.00 0.95
Ped Bike Factor
Frt 0.850
Flt Protected 0.950
Satd. Flow (prot) 3433 1583 3539 0 0 3539
Flt Permitted 0.950
Satd. Flow (perm) 3433 1583 3539 0 0 3539
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 51
Link Speed (mph) 30 30 30
Link Distance (ft) 120 511 1321
Travel Time (s) 2.7 11.6 30.0
Confl. Peds. (#/hr)3 3
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 374 51 1045 0 0 1160
Turn Type Prot Perm NA NA
Protected Phases 3 6 2
Permitted Phases 3
Detector Phase 3 3 6 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0
Minimum Split (s) 27.0 27.0 23.0 23.0
Total Split (s) 35.0 35.0 55.0 55.0
Total Split (%) 38.9% 38.9% 61.1% 61.1%
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Recall Mode None None Min Min
Act Effct Green (s) 11.3 11.3 24.9 24.9
Actuated g/C Ratio 0.24 0.24 0.53 0.53
v/c Ratio 0.45 0.12 0.55 0.61
Control Delay 18.1 6.9 8.5 9.2
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 18.1 6.9 8.5 9.2
LOS B A A A
Approach Delay 16.8 8.5 9.2
Approach LOS B A A
Queue Length 50th (ft) 41 0 81 93
Queue Length 95th (ft) 95 22 152 176
Internal Link Dist (ft) 40 431 1241
Turn Bay Length (ft)
E-24
Logan Six 2024 Baseline Conditions
2: Logan Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group WBL WBR NBT NBR SBL SBT
Base Capacity (vph) 2298 1076 3377 3377
Starvation Cap Reductn 0 0 22 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.16 0.05 0.31 0.34
Intersection Summary
Area Type: Other
Cycle Length: 90
Actuated Cycle Length: 46.7
Natural Cycle: 55
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.61
Intersection Signal Delay: 10.1 Intersection LOS: B
Intersection Capacity Utilization 49.8% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: Logan Avenue N & N 4th Street
E-25
Logan Six 2024 Baseline Conditions
3: Logan Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 12 16 63 66 2 42 27 889 135 12 1000 7
Future Volume (vph) 12 16 63 66 2 42 27 889 135 12 1000 7
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 250 295 140 0 230 0 135 0
Storage Lanes 1 1 1 1 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.97 0.99 0.98 1.00 0.97 0.99 1.00
Frt 0.850 0.850 0.850 0.999
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1752 1845 1568 1752 1845 1568 1752 1845 1568 1752 3500 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1744 1845 1523 1731 1845 1540 1745 1845 1517 1742 3500 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 109 109 109 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1173 1272 1321 1309
Travel Time (s) 26.7 28.9 30.0 29.8
Confl. Peds. (#/hr) 3 8 8 3 7 14 14 7
Confl. Bikes (#/hr) 5 1 4
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Heavy Vehicles (%) 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 12 16 64 67 2 43 28 907 138 12 1027 0
Turn Type Prot NA Perm Prot NA Perm Prot NA Perm Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 8
Detector Phase 5 2 2 1 6 6 3 8 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 28.0 28.0 10.0 27.0 27.0 10.0 29.0 29.0 10.0 30.0
Total Split (s) 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0
Total Split (%) 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min Min None Min Min None Min
Act Effct Green (s) 6.2 6.4 6.4 8.1 11.9 11.9 6.8 33.7 33.7 6.2 31.5
Actuated g/C Ratio 0.10 0.11 0.11 0.14 0.20 0.20 0.11 0.56 0.56 0.10 0.53
v/c Ratio 0.07 0.08 0.25 0.28 0.01 0.11 0.14 0.87 0.15 0.07 0.56
Control Delay 31.2 31.1 4.7 30.5 24.0 0.5 31.0 27.2 4.4 31.2 14.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 31.2 31.1 4.7 30.5 24.0 0.5 31.0 27.2 4.4 31.2 14.5
LOS C C A C C A C C A C B
Approach Delay 12.8 18.9 24.4 14.7
E-26
Logan Six 2024 Baseline Conditions
3: Logan Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B B C B
Queue Length 50th (ft) 4 5 0 22 1 0 9 288 5 4 123
Queue Length 95th (ft) 21 25 13 65 7 0 36 #749 40 21 286
Internal Link Dist (ft) 1093 1192 1241 1229
Turn Bay Length (ft) 250 295 140 230 135
Base Capacity (vph) 613 969 852 613 969 861 613 1037 901 613 1840
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.02 0.08 0.11 0.00 0.05 0.05 0.87 0.15 0.02 0.56
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 59.9
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.87
Intersection Signal Delay: 19.3 Intersection LOS: B
Intersection Capacity Utilization 69.0% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: Logan Avenue N & N 6th Street
E-27
Logan Six 2024 Baseline Conditions
4: Logan Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 18 10 18 107 5 54 7 816 135 22 931 2
Future Volume (vph) 18 10 18 107 5 54 7 816 135 22 931 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 105 0 0 0 0 0 0 0
Storage Lanes 1 1 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.97 0.97 0.98 0.96 0.99 0.99 0.99 1.00
Frt 0.850 0.862 0.979
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 3539 1583 1770 2915 0 1770 1809 0 1770 1862 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1723 3539 1530 1731 2915 0 1748 1809 0 1750 1862 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 116 57 6
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1154 1202 1309 1978
Travel Time (s) 26.2 27.3 29.8 45.0
Confl. Peds. (#/hr) 9 11 11 9 30 30 30 30
Confl. Bikes (#/hr)1 12
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Shared Lane Traffic (%)
Lane Group Flow (vph) 19 11 19 113 62 0 7 1001 0 23 982 0
Turn Type Prot NA Perm Prot NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2
Detector Phase 5 2 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 11.0 24.0 24.0 11.0 25.0 10.0 30.0 10.0 28.0
Total Split (s) 26.0 36.0 36.0 26.0 36.0 25.0 35.0 25.0 35.0
Total Split (%) 21.3% 29.5% 29.5% 21.3% 29.5% 20.5% 28.7% 20.5% 28.7%
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min None Min None Min
Act Effct Green (s) 5.4 5.2 5.2 8.1 14.4 5.2 31.0 5.5 33.0
Actuated g/C Ratio 0.09 0.08 0.08 0.13 0.23 0.08 0.50 0.09 0.53
v/c Ratio 0.12 0.04 0.08 0.49 0.09 0.05 1.11 0.15 1.00
Control Delay 32.8 31.7 0.7 35.4 9.2 32.3 87.7 32.9 48.2
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 32.8 31.7 0.7 35.4 9.2 32.3 87.7 32.9 48.2
LOS C C A D A C F C D
Approach Delay 20.1 26.1 87.3 47.9
Approach LOS C C F D
E-28
Logan Six 2024 Baseline Conditions
4: Logan Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 7 2 0 39 0 2 ~423 8 ~398
Queue Length 95th (ft) 28 10 0 95 17 15 #867 32 #810
Internal Link Dist (ft) 1074 1122 1229 1898
Turn Bay Length (ft) 105
Base Capacity (vph) 585 1755 817 585 1474 585 900 585 984
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.03 0.01 0.02 0.19 0.04 0.01 1.11 0.04 1.00
Intersection Summary
Area Type: Other
Cycle Length: 122
Actuated Cycle Length: 62.4
Natural Cycle: 110
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 1.11
Intersection Signal Delay: 63.3 Intersection LOS: E
Intersection Capacity Utilization 76.7% ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 4: Logan Avenue N & N 8th Street
E-29
Logan Six 2024 Baseline Conditions
5: Burnett Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.4
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 7 830 26 0 0 0 0 27 26 12 6 0
Future Vol, veh/h 7 830 26 0 0 0 0 27 26 12 6 0
Conflicting Peds, #/hr 5 0 2 2 0 5 21 0 0 0 0 21
Sign Control Free Free Free Stop Stop Stop Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 8 902 28 0 0 0 0 29 28 13 7 0
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 5 0 0 - 939 467 487 953 -
Stage 1 - - - - 934 - 5 5 -
Stage 2 - - - - 5 - 482 948 -
Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 -
Critical Hdwy Stg 1 - - - - 5.54 - - - -
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 -
Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 -
Pot Cap-1 Maneuver 1615 - - 0 263 542 464 258 0
Stage 1 - - - 0 343 - - - 0
Stage 2 - - - 0 - - 534 338 0
Platoon blocked, % - -
Mov Cap-1 Maneuver 1607 - - - 259 541 397 254 -
Mov Cap-2 Maneuver - - - - 259 - 397 254 -
Stage 1 - - - - 339 - - - -
Stage 2 - - - - - - 458 334 -
Approach EB NB SB
HCM Control Delay, s 0.1 17.4 16.4
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBRSBLn1
Capacity (veh/h) 348 1607 - - 334
HCM Lane V/C Ratio 0.166 0.005 - - 0.059
HCM Control Delay (s) 17.4 7.3 0 - 16.4
HCM Lane LOS C A A - C
HCM 95th %tile Q(veh) 0.6 0 - - 0.2
E-30
Logan Six 2024 Baseline Conditions
6: Burnett Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.1
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 3 383 2 14 11 0 0 11 8
Future Vol, veh/h 0 0 0 3 383 2 14 11 0 0 11 8
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 1 1 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - 0 - 0 - - - - - -
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 0 3 430 2 16 12 0 0 12 9
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 0 0 0 227 438 - - 436 215
Stage 1 - - - 0 0 - - 436 -
Stage 2 - - - 227 438 - - 0 -
Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94
Critical Hdwy Stg 1 - - - - - - - 5.54 -
Critical Hdwy Stg 2 - - - 6.54 5.54 - - - -
Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32
Pot Cap-1 Maneuver - - - 709 511 0 0 512 790
Stage 1 - - - - - 0 0 578 -
Stage 2 - - - 755 577 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 688 511 - - 512 790
Mov Cap-2 Maneuver - - - 688 511 - - 512 -
Stage 1 - - - - - - - 578 -
Stage 2 - - - 730 577 - - - -
Approach WB NB SB
HCM Control Delay, s 11.3 11.2
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBRSBLn1
Capacity (veh/h) 597 - - - 601
HCM Lane V/C Ratio 0.047 - - - 0.036
HCM Control Delay (s) 11.3 - - - 11.2
HCM Lane LOS B - - - B
HCM 95th %tile Q(veh) 0.1 - - - 0.1
E-31
Logan Six 2024 Baseline Conditions
7: Park Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 47 816 32 0 0 0 0 250 37 167 405 0
Future Volume (vph) 47 816 32 0 0 0 0 250 37 167 405 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00
Ped Bike Factor 1.00 1.00 1.00 1.00
Frt 0.994 0.981
Flt Protected 0.950 0.986
Satd. Flow (prot) 1770 3516 0 0 0 0 0 3466 0 0 3490 0
Flt Permitted 0.950 0.768
Satd. Flow (perm) 1768 3516 0 0 0 0 0 3466 0 0 2717 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 6 25
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1226 1509 471 662
Travel Time (s) 27.9 34.3 10.7 15.0
Confl. Peds. (#/hr) 1 2 2 1 5 2 2 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 48 874 0 0 0 0 0 296 0 0 590 0
Turn Type Perm NA NA pm+pt NA
Protected Phases 6 8 7 4
Permitted Phases 6 4
Detector Phase 6 6 8 7 4
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 5.0 10.0
Minimum Split (s) 25.0 25.0 24.0 9.0 24.0
Total Split (s) 26.0 26.0 26.0 14.0 26.0
Total Split (%) 39.4% 39.4%39.4% 21.2% 39.4%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 0.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Recall Mode None None Min None None
Act Effct Green (s) 18.0 18.0 16.4 16.4
Actuated g/C Ratio 0.39 0.39 0.35 0.35
v/c Ratio 0.07 0.64 0.24 0.62
Control Delay 10.2 14.6 10.5 16.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.2 14.6 10.5 16.0
LOS B B B B
Approach Delay 14.4 10.5 16.0
Approach LOS B B B
Queue Length 50th (ft) 8 97 27 71
Queue Length 95th (ft) 25 161 49 113
Internal Link Dist (ft) 1146 1429 391 582
Turn Bay Length (ft)
E-32
Logan Six 2024 Baseline Conditions
7: Park Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 773 1540 1529 2019
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.06 0.57 0.19 0.29
Intersection Summary
Area Type: Other
Cycle Length: 66
Actuated Cycle Length: 46.7
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.64
Intersection Signal Delay: 14.3 Intersection LOS: B
Intersection Capacity Utilization 63.3% ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 7: Park Avenue N & N 3rd Street
E-33
Logan Six 2024 Baseline Conditions
8: Park Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 45 308 38 36 248 0 0 527 74
Future Volume (vph) 0 0 0 45 308 38 36 248 0 0 527 74
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.91 0.91 1.00 0.95 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 1.00 1.00
Frt 0.850 0.982
Flt Protected 0.994 0.994
Satd. Flow (prot) 0 0 0 0 5055 1583 0 3518 0 0 3467 0
Flt Permitted 0.994 0.833
Satd. Flow (perm) 0 0 0 0 5053 1563 0 2947 0 0 3467 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)83 20
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1194 1450 662 1307
Travel Time (s) 27.1 33.0 15.0 29.7
Confl. Peds. (#/hr) 1 3 3 1 7 2 2 7
Confl. Bikes (#/hr)1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 384 41 0 309 0 0 653 0
Turn Type Perm NA Perm pm+pt NA NA
Protected Phases 2 3 8 4
Permitted Phases 2 2 8
Detector Phase 2 2 2 3 8 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 9.0 26.0 24.0
Total Split (s)30.0 30.0 30.0 19.0 26.0 30.0
Total Split (%) 38.0% 38.0% 38.0% 24.1% 32.9% 38.0%
Yellow Time (s)4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s)1.0 1.0 1.0 0.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0
Total Lost Time (s)5.0 5.0 5.0 5.0
Lead/Lag Lead Lag
Lead-Lag Optimize?Yes Yes
Recall Mode Min Min Min None Min Min
Act Effct Green (s)8.7 8.7 11.6 11.6
Actuated g/C Ratio 0.28 0.28 0.38 0.38
v/c Ratio 0.27 0.08 0.28 0.49
Control Delay 9.4 1.7 7.4 8.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 9.4 1.7 7.4 8.5
LOS A A A A
Approach Delay 8.7 7.4 8.5
Approach LOS A A A
Queue Length 50th (ft)15 0 15 34
Queue Length 95th (ft)37 7 37 74
Internal Link Dist (ft) 1114 1370 582 1227
E-34
Logan Six 2024 Baseline Conditions
8: Park Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph)4212 1316 2947 2893
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.09 0.03 0.10 0.23
Intersection Summary
Area Type: Other
Cycle Length: 79
Actuated Cycle Length: 30.6
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.49
Intersection Signal Delay: 8.3 Intersection LOS: A
Intersection Capacity Utilization 47.6% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 8: Park Avenue N & N 4th Street
E-35
Logan Six 2024 Baseline Conditions
9: Park Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 140 53 77 8 7 0 4 276 2 4 475 36
Future Volume (vph) 140 53 77 8 7 0 4 276 2 4 475 36
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 0 0 0 100 0 170 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 1.00
Frt 0.911 0.999 0.989
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1752 3193 0 1752 1845 0 1752 3501 0 1752 3466 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1752 3193 0 1752 1845 0 1752 3501 0 1749 3466 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1272 822 1307 1301
Travel Time (s) 28.9 18.7 29.7 29.6
Confl. Peds. (#/hr)1 1
Confl. Bikes (#/hr)2
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 151 140 0 9 8 0 4 299 0 4 550 0
Turn Type Prot NA Prot NA Prot NA Prot NA
Protected Phases 1 6 5 2 3 8 7 4
Permitted Phases
Detector Phase 1 6 5 2 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 10.0 27.0 10.0 27.0 9.5 26.0 9.5 26.0
Total Split (s) 25.0 65.0 25.0 35.0 25.0 45.0 25.0 65.0
Total Split (%) 13.9% 36.1% 13.9% 19.4% 13.9% 25.0% 13.9% 36.1%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 11.2 19.9 5.3 5.0 5.9 16.9 4.9 16.7
Actuated g/C Ratio 0.22 0.40 0.11 0.10 0.12 0.34 0.10 0.33
v/c Ratio 0.39 0.11 0.05 0.04 0.02 0.25 0.02 0.48
Control Delay 21.8 13.7 26.0 26.1 25.5 13.6 26.5 15.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 21.8 13.7 26.0 26.1 25.5 13.6 26.5 15.7
LOS C B C C C B C B
Approach Delay 17.9 26.1 13.7 15.8
E-36
Logan Six 2024 Baseline Conditions
9: Park Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B C B B
Queue Length 50th (ft) 35 11 2 2 1 29 1 58
Queue Length 95th (ft) 107 48 17 16 10 76 10 143
Internal Link Dist (ft) 1192 742 1227 1221
Turn Bay Length (ft) 100 100 170
Base Capacity (vph) 727 3095 727 1789 727 3394 727 3360
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.21 0.05 0.01 0.00 0.01 0.09 0.01 0.16
Intersection Summary
Area Type: Other
Cycle Length: 180
Actuated Cycle Length: 50.1
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.48
Intersection Signal Delay: 15.9 Intersection LOS: B
Intersection Capacity Utilization 37.0% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 9: Park Avenue N & N 6th Street
E-37
Logan Six 2024 Baseline Conditions
10: Park Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 65 66 38 77 94 76 21 335 54 74 400 33
Future Volume (vph) 65 66 38 77 94 76 21 335 54 74 400 33
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 155 0 95 0 125 0 125 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 0.99 0.99 0.97 1.00 1.00
Frt 0.945 0.933 0.979 0.989
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 3313 0 1770 3274 0 1770 3459 0 1770 3484 0
Flt Permitted 0.638 0.682 0.950 0.950
Satd. Flow (perm) 1183 3313 0 1255 3274 0 1724 3459 0 1770 3484 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 40 81 10 4
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1202 1521 1301 849
Travel Time (s) 27.3 34.6 29.6 19.3
Confl. Peds. (#/hr) 2 4 4 2 14 14
Confl. Bikes (#/hr)2
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Shared Lane Traffic (%)
Lane Group Flow (vph) 69 110 0 82 181 0 22 413 0 79 461 0
Turn Type pm+pt NA pm+pt NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6
Detector Phase 5 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 35.0 55.0 35.0 55.0 65.0 85.0 35.0 55.0
Total Split (%) 16.7% 26.2% 16.7% 26.2% 31.0% 40.5% 16.7% 26.2%
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 14.4 8.3 14.5 8.4 7.1 14.0 9.2 21.9
Actuated g/C Ratio 0.28 0.16 0.28 0.16 0.14 0.27 0.18 0.43
v/c Ratio 0.16 0.19 0.19 0.30 0.09 0.44 0.25 0.31
Control Delay 14.2 17.3 14.4 15.7 26.1 19.5 25.0 12.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 14.2 17.3 14.4 15.7 26.1 19.5 25.0 12.1
LOS B B B B C B C B
Approach Delay 16.1 15.3 19.8 14.0
Approach LOS B B B B
E-38
Logan Six 2024 Baseline Conditions
10: Park Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 14 11 17 15 7 60 23 44
Queue Length 95th (ft) 43 34 49 46 28 112 65 116
Internal Link Dist (ft) 1122 1441 1221 769
Turn Bay Length (ft) 155 95 125 125
Base Capacity (vph) 1103 2990 1103 2959 1729 3459 1103 3141
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.06 0.04 0.07 0.06 0.01 0.12 0.07 0.15
Intersection Summary
Area Type: Other
Cycle Length: 210
Actuated Cycle Length: 51.5
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.44
Intersection Signal Delay: 16.3 Intersection LOS: B
Intersection Capacity Utilization 42.4% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 10: Park Avenue N & N 8th Street
E-39
Logan Six 2024 Baseline Conditions
11: N 3rd Street & South Site Access PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 0
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 0 899 0 0 0 0
Future Vol, veh/h 0 899 0 0 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 977 0 0 0 0
Major/Minor Major1 Minor2
Conflicting Flow All 0 0 489 -
Stage 1 - - 0 -
Stage 2 - - 489 -
Critical Hdwy 4.14 - 6.84 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 508 0
Stage 1 - - - 0
Stage 2 - - 582 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 508 -
Mov Cap-2 Maneuver - - 508 -
Stage 1 - - - -
Stage 2 - - 582 -
Approach EB SB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt EBL EBT SBLn1
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 - 0
HCM Lane LOS A - A
HCM 95th %tile Q(veh) - - -
E-40
Logan Six 2024 Baseline Conditions
12: North Site Access & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 0
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 405 0 0
Future Vol, veh/h 0 0 0 405 0 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 0 440 0 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 176 -
Stage 1 - - 0 -
Stage 2 - - 176 -
Critical Hdwy 5.34 - 5.74 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 6.04 -
Follow-up Hdwy 3.12 - 3.82 -
Pot Cap-1 Maneuver - - 780 0
Stage 1 - - - 0
Stage 2 - - 769 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 780 -
Mov Cap-2 Maneuver - - 780 -
Stage 1 - - - -
Stage 2 - - 769 -
Approach WB NB
HCM Control Delay, s 0 0
HCM LOS A
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) - - -
HCM Lane V/C Ratio - - -
HCM Control Delay (s) 0 0 -
HCM Lane LOS A A -
HCM 95th %tile Q(veh) - - -
E-41
Logan Six 2024 Baseline Conditions
13: Burnett Avenue N & Commercial Parking Lot PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.7
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 5 5 5 34 19 5
Future Vol, veh/h 5 5 5 34 19 5
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 5 5 5 37 21 5
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 71 24 26 0 - 0
Stage 1 24 - - - - -
Stage 2 47 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 933 1052 1588 - - -
Stage 1 999 - - - - -
Stage 2 975 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 930 1052 1588 - - -
Mov Cap-2 Maneuver 930 - - - - -
Stage 1 996 - - - - -
Stage 2 975 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.7 0.9 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1588 - 987 - -
HCM Lane V/C Ratio 0.003 - 0.011 - -
HCM Control Delay (s) 7.3 0 8.7 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0 - -
E-42
Logan Six 2024 Future with Development Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 4 8 46 0 0 0 38 1014 837 89 1418 2
Future Volume (vph) 4 8 46 0 0 0 38 1014 837 89 1418 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 0 0 0 0 180 0 235 0
Storage Lanes 0 1 0 0 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 0.98 0.95 1.00
Frt 0.850 0.850
Flt Protected 0.984 0.950 0.950
Satd. Flow (prot) 0 1833 1583 0 0 0 1770 3539 1583 1770 3539 0
Flt Permitted 0.984 0.145 0.235
Satd. Flow (perm) 0 1833 1550 0 0 0 270 3539 1508 438 3539 0
Right Turn on Red Yes Yes No Yes
Satd. Flow (RTOR) 53
Link Speed (mph) 30 30 30 30
Link Distance (ft) 236 189 756 511
Travel Time (s) 5.4 4.3 17.2 11.6
Confl. Peds. (#/hr) 5 5 1 10 10 1
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 12 47 0 0 0 39 1045 863 92 1464 0
Turn Type Perm NA Perm pm+pt NA Perm pm+pt NA
Protected Phases 4 1 6 5 2
Permitted Phases 4 4 6 6 2
Detector Phase 4 4 4 1 6 6 5 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 10.0 23.0 23.0 10.0 32.0
Total Split (s) 55.0 55.0 55.0 35.0 55.0 55.0 35.0 55.0
Total Split (%) 37.9% 37.9% 37.9% 24.1% 37.9% 37.9% 24.1% 37.9%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize?Yes Yes Yes Yes Yes
Recall Mode None None None None Min Min None Min
Act Effct Green (s) 6.2 6.2 59.2 55.6 55.6 61.6 58.5
Actuated g/C Ratio 0.08 0.08 0.76 0.71 0.71 0.79 0.75
v/c Ratio 0.08 0.27 0.12 0.41 0.80 0.20 0.55
Control Delay 34.8 13.7 2.9 7.0 19.2 2.9 7.3
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.2
Total Delay 34.8 13.7 2.9 7.0 19.2 2.9 7.5
LOS C B A A B A A
Approach Delay 18.0 12.3 7.2
Approach LOS B B A
Queue Length 50th (ft) 6 0 3 116 302 7 190
E-43
Logan Six 2024 Future with Development Conditions
1: Logan Avenue N & Parking Lot/N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 95th (ft) 22 28 8 175 #637 16 272
Internal Link Dist (ft) 156 109 676 431
Turn Bay Length (ft)180 235
Base Capacity (vph) 1181 1018 802 2530 1078 875 2660
Starvation Cap Reductn 0 0 0 0 0 0 411
Spillback Cap Reductn 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0
Reduced v/c Ratio 0.01 0.05 0.05 0.41 0.80 0.11 0.65
Intersection Summary
Area Type: Other
Cycle Length: 145
Actuated Cycle Length: 77.8
Natural Cycle: 90
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.80
Intersection Signal Delay: 10.2 Intersection LOS: B
Intersection Capacity Utilization 76.9% ICU Level of Service D
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 1: Logan Avenue N & Parking Lot/N 3rd Street
E-44
Logan Six 2024 Future with Development Conditions
2: Logan Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group WBL WBR NBT NBR SBL SBT
Lane Configurations
Traffic Volume (vph) 389 54 1014 0 0 1131
Future Volume (vph) 389 54 1014 0 0 1131
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900
Lane Util. Factor 0.97 1.00 0.95 1.00 1.00 0.95
Ped Bike Factor
Frt 0.850
Flt Protected 0.950
Satd. Flow (prot) 3433 1583 3539 0 0 3539
Flt Permitted 0.950
Satd. Flow (perm) 3433 1583 3539 0 0 3539
Right Turn on Red Yes Yes
Satd. Flow (RTOR) 56
Link Speed (mph) 30 30 30
Link Distance (ft) 120 511 1321
Travel Time (s) 2.7 11.6 30.0
Confl. Peds. (#/hr)3 3
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 401 56 1045 0 0 1166
Turn Type Prot Perm NA NA
Protected Phases 3 6 2
Permitted Phases 3
Detector Phase 3 3 6 2
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0
Minimum Split (s) 27.0 27.0 23.0 23.0
Total Split (s) 35.0 35.0 55.0 55.0
Total Split (%) 38.9% 38.9% 61.1% 61.1%
Yellow Time (s) 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0
Lead/Lag
Lead-Lag Optimize?
Recall Mode None None Min Min
Act Effct Green (s) 11.8 11.8 25.1 25.1
Actuated g/C Ratio 0.25 0.25 0.53 0.53
v/c Ratio 0.47 0.13 0.56 0.62
Control Delay 18.4 6.8 8.7 9.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 18.4 6.8 8.7 9.5
LOS B A A A
Approach Delay 17.0 8.7 9.5
Approach LOS B A A
Queue Length 50th (ft) 45 0 83 98
Queue Length 95th (ft) 103 23 157 183
Internal Link Dist (ft) 40 431 1241
Turn Bay Length (ft)
E-45
Logan Six 2024 Future with Development Conditions
2: Logan Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group WBL WBR NBT NBR SBL SBT
Base Capacity (vph) 2273 1067 3349 3349
Starvation Cap Reductn 0 0 29 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.18 0.05 0.31 0.35
Intersection Summary
Area Type: Other
Cycle Length: 90
Actuated Cycle Length: 47.4
Natural Cycle: 55
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.62
Intersection Signal Delay: 10.5 Intersection LOS: B
Intersection Capacity Utilization 50.7% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 2: Logan Avenue N & N 4th Street
E-46
Logan Six 2024 Future with Development Conditions
3: Logan Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 12 16 63 66 2 42 27 894 135 12 1006 7
Future Volume (vph) 12 16 63 66 2 42 27 894 135 12 1006 7
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 250 295 140 0 230 0 135 0
Storage Lanes 1 1 1 1 1 1 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.97 0.99 0.98 1.00 0.97 0.99 1.00
Frt 0.850 0.850 0.850 0.999
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1752 1845 1568 1752 1845 1568 1752 1845 1568 1752 3500 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1744 1845 1523 1731 1845 1540 1745 1845 1517 1742 3500 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 109 109 109 1
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1173 1272 1321 1309
Travel Time (s) 26.7 28.9 30.0 29.8
Confl. Peds. (#/hr) 3 8 8 3 7 14 14 7
Confl. Bikes (#/hr) 5 1 4
Peak Hour Factor 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98 0.98
Heavy Vehicles (%) 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 12 16 64 67 2 43 28 912 138 12 1034 0
Turn Type Prot NA Perm Prot NA Perm Prot NA Perm Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6 8
Detector Phase 5 2 2 1 6 6 3 8 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 10.0 28.0 28.0 10.0 27.0 27.0 10.0 29.0 29.0 10.0 30.0
Total Split (s) 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0 35.0 25.0 35.0
Total Split (%) 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2% 29.2% 20.8% 29.2%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lag Lead Lag Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min Min None Min Min None Min
Act Effct Green (s) 6.2 6.4 6.4 8.1 11.9 11.9 6.8 33.7 33.7 6.2 31.5
Actuated g/C Ratio 0.10 0.11 0.11 0.14 0.20 0.20 0.11 0.56 0.56 0.10 0.53
v/c Ratio 0.07 0.08 0.25 0.28 0.01 0.11 0.14 0.88 0.15 0.07 0.56
Control Delay 31.2 31.1 4.7 30.5 24.0 0.5 31.0 27.6 4.4 31.2 14.5
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 31.2 31.1 4.7 30.5 24.0 0.5 31.0 27.6 4.4 31.2 14.5
LOS C C A C C A C C A C B
Approach Delay 12.8 18.9 24.7 14.7
E-47
Logan Six 2024 Future with Development Conditions
3: Logan Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B B C B
Queue Length 50th (ft) 4 5 0 22 1 0 9 291 5 4 124
Queue Length 95th (ft) 21 25 13 65 7 0 36 #755 40 21 289
Internal Link Dist (ft) 1093 1192 1241 1229
Turn Bay Length (ft) 250 295 140 230 135
Base Capacity (vph) 613 969 852 613 969 861 613 1037 901 613 1840
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.02 0.02 0.08 0.11 0.00 0.05 0.05 0.88 0.15 0.02 0.56
Intersection Summary
Area Type: Other
Cycle Length: 120
Actuated Cycle Length: 59.9
Natural Cycle: 100
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.88
Intersection Signal Delay: 19.5 Intersection LOS: B
Intersection Capacity Utilization 69.2% ICU Level of Service C
Analysis Period (min) 15
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 3: Logan Avenue N & N 6th Street
E-48
Logan Six 2024 Future with Development Conditions
4: Logan Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 18 10 18 109 5 54 7 819 137 22 935 2
Future Volume (vph) 18 10 18 109 5 54 7 819 137 22 935 2
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 105 0 0 0 0 0 0 0
Storage Lanes 1 1 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 1.00 1.00 0.95 0.95 1.00 1.00 1.00 1.00 1.00 1.00
Ped Bike Factor 0.97 0.97 0.98 0.96 0.99 0.99 0.99 1.00
Frt 0.850 0.862 0.979
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 3539 1583 1770 2915 0 1770 1809 0 1770 1862 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1723 3539 1530 1731 2915 0 1748 1809 0 1750 1862 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 116 57 7
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1154 1202 1309 1978
Travel Time (s) 26.2 27.3 29.8 45.0
Confl. Peds. (#/hr) 9 11 11 9 30 30 30 30
Confl. Bikes (#/hr)1 12
Peak Hour Factor 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95 0.95
Shared Lane Traffic (%)
Lane Group Flow (vph) 19 11 19 115 62 0 7 1006 0 23 986 0
Turn Type Prot NA Perm Prot NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2
Detector Phase 5 2 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 11.0 24.0 24.0 11.0 25.0 10.0 30.0 10.0 28.0
Total Split (s) 26.0 36.0 36.0 26.0 36.0 25.0 35.0 25.0 35.0
Total Split (%) 21.3% 29.5% 29.5% 21.3% 29.5% 20.5% 28.7% 20.5% 28.7%
Yellow Time (s) 5.0 5.0 5.0 5.0 5.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0 6.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min Min None Min None Min None Min
Act Effct Green (s) 5.4 5.2 5.2 8.1 14.4 5.2 30.9 5.5 33.0
Actuated g/C Ratio 0.09 0.08 0.08 0.13 0.23 0.08 0.50 0.09 0.53
v/c Ratio 0.12 0.04 0.08 0.50 0.09 0.05 1.12 0.15 1.00
Control Delay 32.8 31.8 0.7 35.5 9.2 32.4 90.1 33.0 49.6
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 32.8 31.8 0.7 35.5 9.2 32.4 90.1 33.0 49.6
LOS C C A D A C F C D
Approach Delay 20.1 26.3 89.7 49.2
Approach LOS C C F D
E-49
Logan Six 2024 Future with Development Conditions
4: Logan Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 7 2 0 39 0 2 ~427 8 ~401
Queue Length 95th (ft) 28 10 0 97 17 15 #873 32 #816
Internal Link Dist (ft) 1074 1122 1229 1898
Turn Bay Length (ft) 105
Base Capacity (vph) 584 1754 816 584 1473 584 899 584 983
Starvation Cap Reductn 0 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.03 0.01 0.02 0.20 0.04 0.01 1.12 0.04 1.00
Intersection Summary
Area Type: Other
Cycle Length: 122
Actuated Cycle Length: 62.4
Natural Cycle: 110
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 1.12
Intersection Signal Delay: 65.1 Intersection LOS: E
Intersection Capacity Utilization 77.0% ICU Level of Service D
Analysis Period (min) 15
~ Volume exceeds capacity, queue is theoretically infinite.
Queue shown is maximum after two cycles.
# 95th percentile volume exceeds capacity, queue may be longer.
Queue shown is maximum after two cycles.
Splits and Phases: 4: Logan Avenue N & N 8th Street
E-50
Logan Six 2024 Future with Development Conditions
5: Burnett Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.8
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 29 837 26 0 0 0 0 27 26 20 6 0
Future Vol, veh/h 29 837 26 0 0 0 0 27 26 20 6 0
Conflicting Peds, #/hr 5 0 2 2 0 5 21 0 0 0 0 21
Sign Control Free Free Free Stop Stop Stop Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - - - - - - - - - -
Veh in Median Storage, # - 0 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 92 92 92 92 92 92 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 32 910 28 0 0 0 0 29 28 22 7 0
Major/Minor Major1 Minor1 Minor2
Conflicting Flow All 5 0 0 - 995 471 539 1009 -
Stage 1 - - - - 990 - 5 5 -
Stage 2 - - - - 5 - 534 1004 -
Critical Hdwy 4.14 - - - 6.54 6.94 7.54 6.54 -
Critical Hdwy Stg 1 - - - - 5.54 - - - -
Critical Hdwy Stg 2 - - - - - - 6.54 5.54 -
Follow-up Hdwy 2.22 - - - 4.02 3.32 3.52 4.02 -
Pot Cap-1 Maneuver 1615 - - 0 243 539 426 239 0
Stage 1 - - - 0 323 - - - 0
Stage 2 - - - 0 - - 498 318 0
Platoon blocked, % - -
Mov Cap-1 Maneuver 1607 - - - 231 538 351 227 -
Mov Cap-2 Maneuver - - - - 231 - 351 227 -
Stage 1 - - - - 309 - - - -
Stage 2 - - - - - - 409 304 -
Approach EB NB SB
HCM Control Delay, s 0.3 18.7 17.7
HCM LOS C C
Minor Lane/Major Mvmt NBLn1 EBL EBT EBRSBLn1
Capacity (veh/h) 321 1607 - - 312
HCM Lane V/C Ratio 0.179 0.02 - - 0.091
HCM Control Delay (s) 18.7 7.3 0.1 - 17.7
HCM Lane LOS C A A - C
HCM 95th %tile Q(veh) 0.6 0.1 - - 0.3
E-51
Logan Six 2024 Future with Development Conditions
6: Burnett Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 1.6
Movement EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Vol, veh/h 0 0 0 11 394 2 36 11 0 0 11 8
Future Vol, veh/h 0 0 0 11 394 2 36 11 0 0 11 8
Conflicting Peds, #/hr 0 0 0 0 0 0 0 0 1 1 0 0
Sign Control Stop Stop Stop Free Free Free Stop Stop Stop Stop Stop Stop
RT Channelized - - None - - None - - None - - None
Storage Length - - - 0 - 0 - - - - - -
Veh in Median Storage, # - 1 - - 0 - - 0 - - 0 -
Grade, % - 0 - - 0 - - 0 - - 0 -
Peak Hour Factor 89 89 89 89 89 89 89 89 89 89 89 89
Heavy Vehicles, % 2 2 2 2 2 2 2 2 2 2 2 2
Mvmt Flow 0 0 0 12 443 2 40 12 0 0 12 9
Major/Minor Major2 Minor1 Minor2
Conflicting Flow All 0 0 0 252 469 - - 467 222
Stage 1 - - - 0 0 - - 467 -
Stage 2 - - - 252 469 - - 0 -
Critical Hdwy 4.14 - - 7.54 6.54 - - 6.54 6.94
Critical Hdwy Stg 1 - - - - - - - 5.54 -
Critical Hdwy Stg 2 - - - 6.54 5.54 - - - -
Follow-up Hdwy 2.22 - - 3.52 4.02 - - 4.02 3.32
Pot Cap-1 Maneuver - - - 681 491 0 0 492 782
Stage 1 - - - - - 0 0 560 -
Stage 2 - - - 730 559 0 0 - -
Platoon blocked, % - -
Mov Cap-1 Maneuver - - - 661 491 - - 492 782
Mov Cap-2 Maneuver - - - 661 491 - - 492 -
Stage 1 - - - - - - - 560 -
Stage 2 - - - 706 559 - - - -
Approach WB NB SB
HCM Control Delay, s 11.4 11.4
HCM LOS B B
Minor Lane/Major Mvmt NBLn1 WBL WBT WBRSBLn1
Capacity (veh/h) 611 - - - 583
HCM Lane V/C Ratio 0.086 - - - 0.037
HCM Control Delay (s) 11.4 - - - 11.4
HCM Lane LOS B - - - B
HCM 95th %tile Q(veh) 0.3 - - - 0.1
E-52
Logan Six 2024 Future with Development Conditions
7: Park Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 51 827 32 0 0 0 0 250 37 167 405 0
Future Volume (vph) 51 827 32 0 0 0 0 250 37 167 405 0
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 0.95 0.95 1.00
Ped Bike Factor 1.00 1.00 1.00 1.00
Frt 0.994 0.981
Flt Protected 0.950 0.986
Satd. Flow (prot) 1770 3516 0 0 0 0 0 3466 0 0 3490 0
Flt Permitted 0.950 0.768
Satd. Flow (perm) 1768 3516 0 0 0 0 0 3466 0 0 2717 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 6 25
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1226 1509 471 662
Travel Time (s) 27.9 34.3 10.7 15.0
Confl. Peds. (#/hr) 1 2 2 1 5 2 2 5
Peak Hour Factor 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97 0.97
Shared Lane Traffic (%)
Lane Group Flow (vph) 53 886 0 0 0 0 0 296 0 0 590 0
Turn Type Perm NA NA pm+pt NA
Protected Phases 6 8 7 4
Permitted Phases 6 4
Detector Phase 6 6 8 7 4
Switch Phase
Minimum Initial (s) 10.0 10.0 10.0 5.0 10.0
Minimum Split (s) 25.0 25.0 24.0 9.0 24.0
Total Split (s) 26.0 26.0 26.0 14.0 26.0
Total Split (%) 39.4% 39.4%39.4% 21.2% 39.4%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 2.0 2.0 2.0 0.0 2.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0
Total Lost Time (s) 6.0 6.0 6.0 6.0
Lead/Lag Lag Lead
Lead-Lag Optimize?Yes Yes
Recall Mode None None Min None None
Act Effct Green (s) 18.1 18.1 16.4 16.4
Actuated g/C Ratio 0.39 0.39 0.35 0.35
v/c Ratio 0.08 0.65 0.24 0.62
Control Delay 10.3 14.7 10.5 16.0
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 10.3 14.7 10.5 16.0
LOS B B B B
Approach Delay 14.5 10.5 16.0
Approach LOS B B B
Queue Length 50th (ft) 9 99 27 71
Queue Length 95th (ft) 27 164 49 113
Internal Link Dist (ft) 1146 1429 391 582
Turn Bay Length (ft)
E-53
Logan Six 2024 Future with Development Conditions
7: Park Avenue N & N 3rd Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Base Capacity (vph) 770 1535 1523 2011
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.07 0.58 0.19 0.29
Intersection Summary
Area Type: Other
Cycle Length: 66
Actuated Cycle Length: 46.8
Natural Cycle: 60
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.65
Intersection Signal Delay: 14.3 Intersection LOS: B
Intersection Capacity Utilization 63.6% ICU Level of Service B
Analysis Period (min) 15
Splits and Phases: 7: Park Avenue N & N 3rd Street
E-54
Logan Six 2024 Future with Development Conditions
8: Park Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 0 0 0 45 321 38 36 252 0 0 527 80
Future Volume (vph) 0 0 0 45 321 38 36 252 0 0 527 80
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Lane Util. Factor 1.00 1.00 1.00 0.91 0.91 1.00 0.95 0.95 1.00 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 1.00 1.00
Frt 0.850 0.980
Flt Protected 0.994 0.994
Satd. Flow (prot) 0 0 0 0 5055 1583 0 3518 0 0 3459 0
Flt Permitted 0.994 0.833
Satd. Flow (perm) 0 0 0 0 5053 1563 0 2947 0 0 3459 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR)83 22
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1194 1450 662 1307
Travel Time (s) 27.1 33.0 15.0 29.7
Confl. Peds. (#/hr) 1 3 3 1 7 2 2 7
Confl. Bikes (#/hr)1
Peak Hour Factor 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92 0.92
Shared Lane Traffic (%)
Lane Group Flow (vph) 0 0 0 0 398 41 0 313 0 0 660 0
Turn Type Perm NA Perm pm+pt NA NA
Protected Phases 2 3 8 4
Permitted Phases 2 2 8
Detector Phase 2 2 2 3 8 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 29.0 29.0 29.0 9.0 26.0 24.0
Total Split (s)30.0 30.0 30.0 19.0 26.0 30.0
Total Split (%) 38.0% 38.0% 38.0% 24.1% 32.9% 38.0%
Yellow Time (s)4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s)1.0 1.0 1.0 0.0 1.0 1.0
Lost Time Adjust (s)0.0 0.0 0.0 0.0
Total Lost Time (s)5.0 5.0 5.0 5.0
Lead/Lag Lead Lag
Lead-Lag Optimize?Yes Yes
Recall Mode Min Min Min None Min Min
Act Effct Green (s)8.8 8.8 11.7 11.7
Actuated g/C Ratio 0.29 0.29 0.38 0.38
v/c Ratio 0.28 0.08 0.28 0.50
Control Delay 9.5 1.7 7.4 8.5
Queue Delay 0.0 0.0 0.0 0.0
Total Delay 9.5 1.7 7.4 8.5
LOS A A A A
Approach Delay 8.8 7.4 8.5
Approach LOS A A A
Queue Length 50th (ft)16 0 15 34
Queue Length 95th (ft)39 7 38 75
Internal Link Dist (ft) 1114 1370 582 1227
E-55
Logan Six 2024 Future with Development Conditions
8: Park Avenue N & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Turn Bay Length (ft)
Base Capacity (vph)4187 1309 2947 2870
Starvation Cap Reductn 0 0 0 0
Spillback Cap Reductn 0 0 0 0
Storage Cap Reductn 0 0 0 0
Reduced v/c Ratio 0.10 0.03 0.11 0.23
Intersection Summary
Area Type: Other
Cycle Length: 79
Actuated Cycle Length: 30.8
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.50
Intersection Signal Delay: 8.4 Intersection LOS: A
Intersection Capacity Utilization 48.0% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 8: Park Avenue N & N 4th Street
E-56
Logan Six 2024 Future with Development Conditions
9: Park Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 140 53 77 8 7 0 4 280 2 4 481 36
Future Volume (vph) 140 53 77 8 7 0 4 280 2 4 481 36
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 100 0 0 0 100 0 170 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 1.00 1.00 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 1.00
Frt 0.911 0.999 0.989
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1752 3193 0 1752 1845 0 1752 3501 0 1752 3466 0
Flt Permitted 0.950 0.950 0.950 0.950
Satd. Flow (perm) 1752 3193 0 1752 1845 0 1752 3501 0 1749 3466 0
Right Turn on Red No No No No
Satd. Flow (RTOR)
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1272 822 1307 1301
Travel Time (s) 28.9 18.7 29.7 29.6
Confl. Peds. (#/hr)1 1
Confl. Bikes (#/hr)2
Peak Hour Factor 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93 0.93
Heavy Vehicles (%) 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3% 3%
Shared Lane Traffic (%)
Lane Group Flow (vph) 151 140 0 9 8 0 4 303 0 4 556 0
Turn Type Prot NA Prot NA Prot NA Prot NA
Protected Phases 1 6 5 2 3 8 7 4
Permitted Phases
Detector Phase 1 6 5 2 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 4.0 5.0 4.0 4.0 4.0 4.0 4.0
Minimum Split (s) 10.0 27.0 10.0 27.0 9.5 26.0 9.5 26.0
Total Split (s) 25.0 65.0 25.0 35.0 25.0 45.0 25.0 65.0
Total Split (%) 13.9% 36.1% 13.9% 19.4% 13.9% 25.0% 13.9% 36.1%
Yellow Time (s) 4.0 4.0 4.0 4.0 4.0 4.0 4.0 4.0
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 11.2 19.9 5.3 5.0 5.9 17.0 4.9 16.9
Actuated g/C Ratio 0.22 0.40 0.11 0.10 0.12 0.34 0.10 0.34
v/c Ratio 0.39 0.11 0.05 0.04 0.02 0.26 0.02 0.48
Control Delay 21.9 13.8 26.2 26.3 25.5 13.6 26.5 15.7
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 21.9 13.8 26.2 26.3 25.5 13.6 26.5 15.7
LOS C B C C C B C B
Approach Delay 18.0 26.3 13.8 15.8
E-57
Logan Six 2024 Future with Development Conditions
9: Park Avenue N & N 6th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Approach LOS B C B B
Queue Length 50th (ft) 35 11 2 2 1 30 1 59
Queue Length 95th (ft) 107 48 17 16 10 77 10 145
Internal Link Dist (ft) 1192 742 1227 1221
Turn Bay Length (ft) 100 100 170
Base Capacity (vph) 725 3093 725 1787 725 3392 725 3358
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.21 0.05 0.01 0.00 0.01 0.09 0.01 0.17
Intersection Summary
Area Type: Other
Cycle Length: 180
Actuated Cycle Length: 50.3
Natural Cycle: 75
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.48
Intersection Signal Delay: 16.0 Intersection LOS: B
Intersection Capacity Utilization 37.2% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 9: Park Avenue N & N 6th Street
E-58
Logan Six 2024 Future with Development Conditions
10: Park Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Lane Configurations
Traffic Volume (vph) 65 66 38 81 94 76 21 336 57 74 402 33
Future Volume (vph) 65 66 38 81 94 76 21 336 57 74 402 33
Ideal Flow (vphpl) 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900 1900
Storage Length (ft) 155 0 95 0 125 0 125 0
Storage Lanes 1 0 1 0 1 0 1 0
Taper Length (ft) 25 25 25 25
Lane Util. Factor 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95 1.00 0.95 0.95
Ped Bike Factor 1.00 0.99 0.99 0.99 0.97 1.00 1.00
Frt 0.945 0.933 0.978 0.989
Flt Protected 0.950 0.950 0.950 0.950
Satd. Flow (prot) 1770 3313 0 1770 3274 0 1770 3455 0 1770 3484 0
Flt Permitted 0.638 0.674 0.950 0.950
Satd. Flow (perm) 1183 3313 0 1241 3274 0 1724 3455 0 1770 3484 0
Right Turn on Red Yes Yes Yes Yes
Satd. Flow (RTOR) 40 81 11 4
Link Speed (mph) 30 30 30 30
Link Distance (ft) 1202 1521 1301 849
Travel Time (s) 27.3 34.6 29.6 19.3
Confl. Peds. (#/hr) 2 4 4 2 14 14
Confl. Bikes (#/hr)2
Peak Hour Factor 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94 0.94
Shared Lane Traffic (%)
Lane Group Flow (vph) 69 110 0 86 181 0 22 418 0 79 463 0
Turn Type pm+pt NA pm+pt NA Prot NA Prot NA
Protected Phases 5 2 1 6 3 8 7 4
Permitted Phases 2 6
Detector Phase 5 2 1 6 3 8 7 4
Switch Phase
Minimum Initial (s) 5.0 5.0 5.0 5.0 5.0 5.0 5.0 5.0
Minimum Split (s) 9.5 22.5 9.5 22.5 9.5 22.5 9.5 22.5
Total Split (s) 35.0 55.0 35.0 55.0 65.0 85.0 35.0 55.0
Total Split (%) 16.7% 26.2% 16.7% 26.2% 31.0% 40.5% 16.7% 26.2%
Yellow Time (s) 3.5 3.5 3.5 3.5 3.5 3.5 3.5 3.5
All-Red Time (s) 1.0 1.0 1.0 1.0 1.0 1.0 1.0 1.0
Lost Time Adjust (s) 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Lost Time (s) 4.5 4.5 4.5 4.5 4.5 4.5 4.5 4.5
Lead/Lag Lead Lag Lead Lag Lead Lag Lead Lag
Lead-Lag Optimize? Yes Yes Yes Yes Yes Yes Yes Yes
Recall Mode None Min None Min None Min None Min
Act Effct Green (s) 14.2 8.2 14.7 8.4 7.1 14.1 9.2 22.0
Actuated g/C Ratio 0.28 0.16 0.28 0.16 0.14 0.27 0.18 0.43
v/c Ratio 0.16 0.20 0.19 0.30 0.09 0.44 0.25 0.31
Control Delay 14.3 17.5 14.5 15.7 26.2 19.4 25.1 12.1
Queue Delay 0.0 0.0 0.0 0.0 0.0 0.0 0.0 0.0
Total Delay 14.3 17.5 14.5 15.7 26.2 19.4 25.1 12.1
LOS B B B B C B C B
Approach Delay 16.2 15.3 19.8 14.0
Approach LOS B B B B
E-59
Logan Six 2024 Future with Development Conditions
10: Park Avenue N & N 8th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]Lanes, Volumes, Timings
Intersection LOS Analysis.syn
Lane Group EBL EBT EBR WBL WBT WBR NBL NBT NBR SBL SBT SBR
Queue Length 50th (ft) 14 11 18 15 7 61 23 44
Queue Length 95th (ft) 43 34 51 46 28 113 65 116
Internal Link Dist (ft) 1122 1441 1221 769
Turn Bay Length (ft) 155 95 125 125
Base Capacity (vph) 1102 2985 1102 2954 1729 3455 1102 3136
Starvation Cap Reductn 0 0 0 0 0 0 0 0
Spillback Cap Reductn 0 0 0 0 0 0 0 0
Storage Cap Reductn 0 0 0 0 0 0 0 0
Reduced v/c Ratio 0.06 0.04 0.08 0.06 0.01 0.12 0.07 0.15
Intersection Summary
Area Type: Other
Cycle Length: 210
Actuated Cycle Length: 51.6
Natural Cycle: 65
Control Type: Actuated-Uncoordinated
Maximum v/c Ratio: 0.44
Intersection Signal Delay: 16.3 Intersection LOS: B
Intersection Capacity Utilization 42.5% ICU Level of Service A
Analysis Period (min) 15
Splits and Phases: 10: Park Avenue N & N 8th Street
E-60
Logan Six 2024 Future with Development Conditions
11: N 3rd Street & South Site Access PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 0.1
Movement EBL EBT WBT WBR SBL SBR
Lane Configurations
Traffic Vol, veh/h 16 918 0 0 10 0
Future Vol, veh/h 16 918 0 0 10 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # - 0 0 - 0 -
Grade, % - 0 0 - 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 17 998 0 0 11 0
Major/Minor Major1 Minor2
Conflicting Flow All 0 0 533 -
Stage 1 - - 0 -
Stage 2 - - 533 -
Critical Hdwy 4.14 - 6.84 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 5.84 -
Follow-up Hdwy 2.22 - 3.52 -
Pot Cap-1 Maneuver - - 477 0
Stage 1 - - - 0
Stage 2 - - 553 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 477 -
Mov Cap-2 Maneuver - - 477 -
Stage 1 - - - -
Stage 2 - - 553 -
Approach EB SB
HCM Control Delay, s 12.7
HCM LOS B
Minor Lane/Major Mvmt EBL EBT SBLn1
Capacity (veh/h) - - 477
HCM Lane V/C Ratio - - 0.023
HCM Control Delay (s) - - 12.7
HCM Lane LOS - - B
HCM 95th %tile Q(veh) - - 0.1
E-61
Logan Six 2024 Future with Development Conditions
12: North Site Access & N 4th Street PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 0.1
Movement EBT EBR WBL WBT NBL NBR
Lane Configurations
Traffic Vol, veh/h 0 0 7 431 5 0
Future Vol, veh/h 0 0 7 431 5 0
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Free Free Free Free Stop Stop
RT Channelized - None - None - None
Storage Length - - - - 0 -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 0 0 8 468 5 0
Major/Minor Major2 Minor1
Conflicting Flow All 0 0 203 -
Stage 1 - - 0 -
Stage 2 - - 203 -
Critical Hdwy 5.34 - 5.74 -
Critical Hdwy Stg 1 - - - -
Critical Hdwy Stg 2 - - 6.04 -
Follow-up Hdwy 3.12 - 3.82 -
Pot Cap-1 Maneuver - - 758 0
Stage 1 - - - 0
Stage 2 - - 745 0
Platoon blocked, % -
Mov Cap-1 Maneuver - - 758 -
Mov Cap-2 Maneuver - - 758 -
Stage 1 - - - -
Stage 2 - - 745 -
Approach WB NB
HCM Control Delay, s 9.8
HCM LOS A
Minor Lane/Major Mvmt NBLn1 WBL WBT
Capacity (veh/h) 758 - -
HCM Lane V/C Ratio 0.007 - -
HCM Control Delay (s) 9.8 - -
HCM Lane LOS A - -
HCM 95th %tile Q(veh) 0 - -
E-62
Logan Six 2024 Future with Development Conditions
13: Burnett Avenue N & Commercial Parking Lot PM Peak-Hour
Kimley-Horn and Associates, Inc [SPF 090222307]HCM 6th TWSC
Intersection LOS Analysis.syn
Intersection
Int Delay, s/veh 2.8
Movement EBL EBR NBL NBT SBT SBR
Lane Configurations
Traffic Vol, veh/h 13 13 13 48 19 13
Future Vol, veh/h 13 13 13 48 19 13
Conflicting Peds, #/hr 0 0 0 0 0 0
Sign Control Stop Stop Free Free Free Free
RT Channelized - None - None - None
Storage Length 0 - - - - -
Veh in Median Storage, # 0 - - 0 0 -
Grade, % 0 - - 0 0 -
Peak Hour Factor 92 92 92 92 92 92
Heavy Vehicles, % 2 2 2 2 2 2
Mvmt Flow 14 14 14 52 21 14
Major/Minor Minor2 Major1 Major2
Conflicting Flow All 108 28 35 0 - 0
Stage 1 28 - - - - -
Stage 2 80 - - - - -
Critical Hdwy 6.42 6.22 4.12 - - -
Critical Hdwy Stg 1 5.42 - - - - -
Critical Hdwy Stg 2 5.42 - - - - -
Follow-up Hdwy 3.518 3.318 2.218 - - -
Pot Cap-1 Maneuver 889 1047 1576 - - -
Stage 1 995 - - - - -
Stage 2 943 - - - - -
Platoon blocked, % - - -
Mov Cap-1 Maneuver 881 1047 1576 - - -
Mov Cap-2 Maneuver 881 - - - - -
Stage 1 986 - - - - -
Stage 2 943 - - - - -
Approach EB NB SB
HCM Control Delay, s 8.9 1.6 0
HCM LOS A
Minor Lane/Major Mvmt NBL NBT EBLn1 SBT SBR
Capacity (veh/h) 1576 - 957 - -
HCM Lane V/C Ratio 0.009 - 0.03 - -
HCM Control Delay (s) 7.3 0 8.9 - -
HCM Lane LOS A A A - -
HCM 95th %tile Q(veh) 0 - 0.1 - -
E-63
F
Collision Data
Collision Data 2017-2021
PRIMARY TRAFFICWAY
INTERSECTING
TRAFFICWAY/
REFERENCE POINT
NAME
DIST
FROM
REF
POINT
MI
or
FT
COMP
DIR
FROM
REF
POINT
REPORT
NUMBER DATE TIME MOST SEVERE INJURY TYPE
#
I
N
J
#
F
A
T
#
V
E
H
#
P
E
D
S
#
BI
K
E
S FIRST COLLISION TYPE / OBJECT STRUCK
LOGAN AVE N N 3RD ST 0 EB98668 2021-12-07 15:00 No Apparent Injury 0 0 2 0 0 Entering at angle
LOGAN AVE N N 3RD ST 0 E644654 2017-01-23 10:05 No Apparent Injury 0 0 2 0 0 Entering at angle
LOGAN AVE N N 3RD ST 0 EB21433 2021-04-12 22:27 Possible Injury 2 0 2 0 0 From opposite direction - one left turn - one straight
LOGAN AVE N N 3RD ST 0 EC05568 2021-12-08 16:30 Possible Injury 1 0 2 0 0 From opposite direction - one left turn - one straight
LOGAN AVE N N 3RD ST 0 E923530 2019-05-16 12:46 Possible Injury 3 0 2 0 0 From opposite direction - one left turn - one straight
LOGAN AVE N N 3RD ST 0 E952575 2019-08-15 13:11 No Apparent Injury 0 0 2 0 0 From opposite direction - one left turn - one straight
LOGAN AVE N N 3RD ST 0 E868420 2018-11-30 14:30 Suspected Minor Injury 2 0 2 0 0 From opposite direction - one left turn - one straight
LOGAN AVE N N 3RD ST 53 F NE E669136 2017-05-08 16:13 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - both moving - rear-end
LOGAN AVE N N 3RD ST 0 E835269 2018-09-02 14:16 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - one stopped - rear-end
LOGAN AVE N N 3RD ST 330 F N E927701 2019-05-30 17:59 No Apparent Injury 0 0 3 0 0 From same direction - both going straight - one stopped - rear-end
LOGAN AVE N N 3RD ST 206 F N E796205 2018-05-08 14:15 No Apparent Injury 0 0 3 0 0 From same direction - both going straight - one stopped - rear-end
LOGAN AVE N N 4TH ST 0 EB79913 2021-10-18 10:27 No Apparent Injury 0 0 2 0 0 Entering at angle
LOGAN AVE N N 4TH ST 0 EA00999 2020-01-06 17:40 No Apparent Injury 0 0 2 0 0 Entering at angle
LOGAN AVE N N 4TH ST 0 EA53356 2020-07-25 13:53 No Apparent Injury 0 0 2 0 0 Entering at angle
LOGAN AVE N N 4TH ST 0 E852733 2018-10-24 9:01 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - both moving - rear-end
LOGAN AVE N N 4TH ST 0 E648825 2017-02-28 13:22 Possible Injury 1 0 3 0 0 From same direction - both going straight - one stopped - rear-end
LOGAN AVE N N 4TH ST 0 EA86200 2020-11-19 13:20 Possible Injury 1 0 2 0 0 From same direction - both going straight - one stopped - rear-end
N 4TH ST LOGAN AVE N 0 EB47841 2021-07-06 19:54 Possible Injury 1 0 2 0 0 Entering at angle
N 4TH ST LOGAN AVE N 0 E813582 2018-07-01 11:20 Suspected Minor Injury 4 0 2 0 0 Entering at angle
N 4TH ST LOGAN AVE N 0 E863697 2018-11-22 20:32 Possible Injury 1 0 2 0 0 Entering at angle
LOGAN AVE N N 6TH ST 0 EB11503 2021-03-02 17:27 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - both moving - sideswipe
LOGAN AVE N N 6TH ST 100 F S E949871 2019-08-06 18:50 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - both moving - sideswipe
N 6TH ST LOGAN AVE N 0 EA38879 2020-06-08 23:45 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - one stopped - rear-end
LOGAN AVE N N 8TH ST 0 E902334 2019-03-14 19:34 Possible Injury 5 0 2 0 0 Entering at angle
LOGAN AVE N N 8TH ST 0 E719182 2017-10-03 10:05 Possible Injury 2 0 2 0 0 From same direction - both going straight - one stopped - rear-end
LOGAN AVE N N 8TH ST 100 F S E800751 2018-05-18 7:57 Possible Injury 1 0 2 0 0 From same direction - both going straight - one stopped - rear-end
LOGAN AVE N N 8TH ST 60 F N E838351 2018-09-15 13:06 Possible Injury 2 0 2 0 0 From same direction - both going straight - one stopped - rear-end
N 8TH ST LOGAN AVE N 0 E710595 2017-09-05 12:50 No Apparent Injury 0 0 2 0 0 Entering at angle
N 8TH ST LOGAN AVE N 0 E715249 2017-09-20 11:52 No Apparent Injury 0 0 2 0 0 Entering at angle
N 3RD ST BURNETT AVE N 0 E751104 2017-12-22 12:58 Possible Injury 1 0 2 0 0 Entering at angle
N 3RD ST BURNETT AVE N 0 E759826 2018-01-16 12:14 No Apparent Injury 0 0 2 0 0 Entering at angle
N 3RD ST BURNETT AVE N 0 E755840 2018-01-06 11:18 Suspected Minor Injury 1 0 2 0 0 Entering at angle
N 3RD ST BURNETT AVE N 116 F W E678140 2017-05-31 20:52 Possible Injury 1 0 1 0 0 Fence
N 3RD ST BURNETT AVE N 0 E946512 2019-07-23 18:48 Possible Injury 1 0 2 0 0 From same direction - both going straight - both moving - rear-end
N 3RD ST BURNETT AVE N 0 EB66452 2021-09-10 19:48 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - both moving - sideswipe
N 4TH ST BURNETT AVE N 0 E662802 2017-03-29 13:25 No Apparent Injury 0 0 2 0 0 Entering at angle
N 4TH ST BURNETT AVE N 0 E647088 2017-02-28 18:53 Suspected Minor Injury 2 0 2 0 0 Entering at angle
PARK AVE N N 3RD ST 0 EB46195 2021-06-18 23:06 Possible Injury 1 0 2 0 0 Entering at angle
PARK AVE N N 3RD ST 0 EA34497 2020-05-11 15:45 Suspected Minor Injury 2 0 3 0 0 Entering at angle
PARK AVE N N 3RD ST 0 EA55822 2020-08-06 17:14 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 3RD ST 0 EA91163 2020-12-20 18:40 Possible Injury 1 0 2 0 0 Entering at angle
PARK AVE N N 3RD ST 0 E981599 2019-11-11 14:30 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 3RD ST 0 E936620 2019-07-03 23:25 Possible Injury 2 0 2 0 0 Entering at angle
F-1
Collision Data 2017-2021
PRIMARY TRAFFICWAY
INTERSECTING
TRAFFICWAY/
REFERENCE POINT
NAME
DIST
FROM
REF
POINT
MI
or
FT
COMP
DIR
FROM
REF
POINT
REPORT
NUMBER DATE TIME MOST SEVERE INJURY TYPE
#
I
N
J
#
F
A
T
#
V
E
H
#
P
E
D
S
#
BI
K
E
S FIRST COLLISION TYPE / OBJECT STRUCK
PARK AVE N N 3RD ST 0 E952757 2019-08-21 12:35 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 3RD ST 0 E854925 2018-10-30 22:51 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 3RD ST 0 EB72417 2021-09-23 15:45 No Apparent Injury 0 0 2 0 0 From opposite direction - one left turn - one straight
PARK AVE N N 3RD ST 0 EB65282 2021-09-02 16:11 Possible Injury 1 0 2 0 0 From opposite direction - one left turn - one straight
PARK AVE N N 3RD ST 0 E660603 2017-04-05 23:11 Possible Injury 1 0 2 0 0 From opposite direction - one left turn - one straight
PARK AVE N N 3RD ST 0 EA51006 2020-07-26 17:50 Suspected Minor Injury 1 0 2 0 0 From opposite direction - one left turn - one straight
PARK AVE N N 3RD ST 0 E975463 2019-10-26 9:51 Possible Injury 2 0 2 0 0 From opposite direction - one left turn - one straight
PARK AVE N N 3RD ST 0 E874184 2018-12-18 17:04 No Apparent Injury 0 0 2 0 0 From opposite direction - one left turn - one straight
N 3RD ST PARK AVE N 0 E687651 2017-07-03 20:45 Possible Injury 1 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E740286 2017-11-20 12:05 Possible Injury 1 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E648172 2017-03-04 17:33 No Apparent Injury 0 0 3 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E703703 2017-08-11 12:20 Possible Injury 1 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E662799 2017-04-05 14:40 Possible Injury 1 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 EA73941 2020-10-17 9:50 No Apparent Injury 0 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E938350 2019-07-08 18:44 Possible Injury 2 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E824289 2018-08-01 14:58 No Apparent Injury 0 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E779937 2018-03-17 11:05 No Apparent Injury 0 0 2 0 0 Entering at angle
N 3RD ST PARK AVE N 0 E690833 2017-07-08 14:56 No Apparent Injury 0 0 2 0 0 From opposite direction - one left turn - one straight
N 3RD ST PARK AVE N 48 F W E678615 2017-06-06 08:52 No Apparent Injury 0 0 3 0 0 From same direction - both going straight - one stopped - rear-end
N 3RD ST PARK AVE N 0 EB31299 2021-04-18 13:27 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 3RD ST PARK AVE N 0 E743117 2017-11-27 13:33 Suspected Serious Injury 1 0 2 0 0 From same direction - one left turn - one straight
N 3RD ST PARK AVE N 0 E784353 2018-03-27 18:06 No Apparent Injury 0 0 2 0 0 From same direction - one right turn - one straight
PARK AVE N N 4TH ST 0 EB66162 2021-09-09 18:57 Suspected Minor Injury 4 0 3 0 0 Entering at angle
PARK AVE N N 4TH ST 0 EB95653 2021-11-24 10:35 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 EB63736 2021-08-31 16:10 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 EB38217 2021-06-11 07:08 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 EB14181 2021-03-10 10:28 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 E744142 2017-11-25 04:40 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 E703179 2017-08-19 21:31 Possible Injury 1 0 3 0 0 Entering at angle
PARK AVE N N 4TH ST 0 EA22778 2020-03-03 5:07 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 EA25076 2020-03-16 16:35 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 E898375 2019-03-01 19:00 Possible Injury 2 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 E951930 2019-08-19 19:50 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 E787560 2018-04-08 19:03 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 E838364 2018-09-12 16:58 Suspected Minor Injury 1 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 0 E796203 2018-05-01 9:51 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 4TH ST 90 F S E828343 2018-08-14 6:50 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - one stopped - rear-end
PARK AVE N N 4TH ST 0 E906619 2019-03-30 18:50 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
PARK AVE N N 4TH ST 0 EA08895 2020-01-21 7:20 Suspected Minor Injury 1 0 1 1 0 Vehicle turning right hits pedestrian
N 4TH ST PARK AVE N 0 EB46025 2021-07-06 13:25 Possible Injury 2 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 EB48963 2021-07-12 10:32 Possible Injury 1 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 EB70286 2021-09-21 06:50 No Apparent Injury 0 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 EB35787 2021-06-01 10:15 No Apparent Injury 0 0 2 0 0 Entering at angle
F-2
Collision Data 2017-2021
PRIMARY TRAFFICWAY
INTERSECTING
TRAFFICWAY/
REFERENCE POINT
NAME
DIST
FROM
REF
POINT
MI
or
FT
COMP
DIR
FROM
REF
POINT
REPORT
NUMBER DATE TIME MOST SEVERE INJURY TYPE
#
I
N
J
#
F
A
T
#
V
E
H
#
P
E
D
S
#
BI
K
E
S FIRST COLLISION TYPE / OBJECT STRUCK
N 4TH ST PARK AVE N 0 E685837 2017-06-24 09:11 Suspected Minor Injury 2 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 E936917 2019-07-04 22:15 Possible Injury 5 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 E945816 2019-07-30 9:45 No Apparent Injury 0 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 E797774 2018-05-11 0:40 No Apparent Injury 0 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 E840525 2018-09-08 16:08 Possible Injury 1 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 0 E795850 2018-05-07 13:12 No Apparent Injury 0 0 2 0 0 Entering at angle
N 4TH ST PARK AVE N 44 F E E944560 2019-07-26 19:55 Possible Injury 1 0 2 0 0 From same direction - both going straight - both moving - sideswipe
N 4TH ST PARK AVE N 0 E632035 2017-01-14 14:35 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 E677712 2017-06-04 12:15 Suspected Minor Injury 2 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 E645437 2017-02-22 05:55 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 EA12703 2020-01-24 12:40 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 EA38467 2020-06-08 7:18 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 EA79549 2020-11-05 11:05 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 E884949 2019-01-21 12:00 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 E782345 2018-03-17 22:40 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
N 4TH ST PARK AVE N 0 E871986 2018-12-06 12:51 No Apparent Injury 0 0 2 0 0 From same direction - one left turn - one straight
PARK AVE N N 6TH ST 0 EA54637 2020-08-07 14:45 No Apparent Injury 0 0 2 0 0 Entering at angle
PARK AVE N N 6TH ST 0 E772466 2018-02-22 11:00 No Apparent Injury 0 0 2 0 0 From same direction - both going straight - one stopped - rear-end
N 6TH ST PARK AVE N 0 E913875 2019-04-22 8:41 Suspected Serious Injury 1 0 1 1 0 Vehicle turning right hits pedestrian
PARK AVE N N 8TH ST 0 E788158 2018-04-09 17:00 No Apparent Injury 0 0 2 0 0 From opposite direction - all others
PARK AVE N N 8TH ST 0 EA70830 2020-10-10 9:46 No Apparent Injury 0 0 1 0 0 Signal Pole
PARK AVE N N 8TH ST 0 E847889 2018-10-09 5:42 Suspected Minor Injury 1 0 1 1 0 Vehicle turning right hits pedestrian
N 8TH ST PARK AVE N 0 EB37848 2021-06-03 15:05 Possible Injury 2 0 2 0 0 Entering at angle
N 8TH ST PARK AVE N 0 EA61439 2020-09-06 16:10 Possible Injury 4 0 2 0 0 Entering at angle
N 8TH ST PARK AVE N 0 E912510 2019-04-19 18:29 No Apparent Injury 0 0 2 0 0 Entering at angle
N 8TH ST PARK AVE N 0 EC00069 2021-12-10 14:53 Possible Injury 3 0 2 0 0 From opposite direction - one left turn - one straight
N 8TH ST PARK AVE N 0 E757679 2018-01-04 16:20 Possible Injury 2 0 2 0 0 From opposite direction - one left turn - one straight
N 8TH ST PARK AVE N 0 EA68180 2020-09-27 14:45 Suspected Minor Injury 1 0 1 0 0 Signal Pole
N 8TH ST PARK AVE N 0 E926126 2019-05-30 17:08 Possible Injury 1 0 1 1 0 Vehicle turning left hits pedestrian
F-3
F-4
G
Travel Routes
G-1
G-2
G-3
G-4
H
Site Plan
H-1