HomeMy WebLinkAboutPermitDocuSign Envelope ID: 815EB5CB-F17F-4D13-B778-446C34052E93
September 25, 2023
Jon Fowler, Project Manager
Streamline General Construction, LLC
1006 208th Ave E
Lake Tapps, WA 98391
Armondo Pavone
Mayor
Parks and Recreation Maryjane Van Cleave, Interim Administrator
PERMISSION FOR RIGHT-OF-ENTRY TO CEDAR RIVER TRAIL EXTENSION
Mr. Fowler:
The City of Renton Parks and Recreation Department hereby permits employees of Streamline
General Construction, LLC (Permittee) to enter the Cedar River Trail Extension for the purpose
of replacing a domestic water valve box, subject to the terms specified below and the details in
Exhibit "A." The 12" high-pressure water line provides water to the main Boeing plant. The valve
box will be used to check water pressure periodically.
Permittee's Representations
Purpose of Permittee's work:
•Replacement of a domestic water valve box that is part of a 12" high-pressure water line
provides water to the main Boeing plant. The valve box will be used to check water
pressure periodically.
Permittee will perform work as follows:
•Secure the area around the work site with cautionary signage;
•Place two (2) 'Caution' signs along the Cedar River Trail approximately 200ft. in advance
of the work site, one on either side of the work site;
•As a precaution one (1) flagger will be present next to the Cedar River Trail when
mobilizing the Track Hoe.
•Permittee is responsible to obtain all required permits and other reports and
documentation necessary or required for the project.
Permittee will adhere to the following:
•Permittee members must wear identifiable, bright-colored vests;
•Permittee will minimize impacts to flora and fauna to the maximum extent possible, and
will replace any damaged vegetation that results from this maintenance project;
•Permittee will restore any damage of the Cedar River Trail to its original condition.
Conditions of Right-of-Entry
1.A copy of this Permit must be in your possession when on-site at the job location.
1055 South Grady Way, Renton, WA 98057 • rentonwa.gov
PAG-23-006
DocuSign Envelope ID: 815EB5CB-F17F-4D13-B778-446C34052E93
ROE Cedar River Trail Extension, The Boeing Company
Page 2 of 3
September 25, 2023
2.It is understood and agreed by the Permittee that the performance of any work under this
Permit shall constitute an acceptance of all provisions and an agreement to adhere to all
of Permittee's Representations stated above.
3.The term of this Permit shall begin Saturday, September 30, 2023, and shall terminate at
midnight on Wednesday, October 4, 2023. The City retains the right to terminate this
Permit at any time it sees fit, and for any reasons it desires.
4.Prior to start and to confirm start date, Permittee shall communicate no less than two (2)
days prior with Dana Appel, Parks Maintenance Supervisor, at (425) 766-6202 or Steve
Brown, Parks Maintenance Manager, at (425) 430-6618.
5.At no time shall Permittee in any way represent themselves as an employee, officer, or
agent of the City.
6.There shall be no entry onto the subject properties, nor onto any private property, except
via public roads, without the permission of the affected owner(s).
7.Vehicles shall be kept on public roads.
8.Overnight use of the subject properties is not allowed unless approved by the City.
9.Permittee shall notify City Park staff of any unusual or unauthorized activities noted while
on the Trail.
10.Any negative physical impact to City properties will be restored and/or corrected to the
satisfaction of the Administrator of the Community Services Department.
11.Permittee shall in no way obstruct or impede access to the subject properties. In addition,
Permittee shall take action to ensure that all work in relation to this Permit is conducted in
a safe and prudent manner.
12.Permittee must be insured for damage resulting from liability of Permittee or any of
Permittee's agents or employees with General Liability insurance with minimum policy
limits of $1,000,000 for each occurrence/$2,000,000 aggregate for the Term of this
Agreement. Permittee shall be required to furnish to City proof of insurance in the forms
and amounts satisfactory to City upon the City's request.
13.Permittee shall defend, indemnify, and save harmless the City, its officers, agents, and
employees from and against any and all claims (whether valid or alleged), demands,
actions, suits, damages, losses, judgments, liabilities, environmental response or
remediation costs, expenses and other costs, including but not limited to, court costs and
reasonable attorney's fees incurred by City on account of any such claims, demands, or
liabilities, and from loss of any kind or nature arising out of, resulting from, or in connection
with this Permit. Permittee's obligation shall apply whether or not there is concurrent,
active, or passive negligence on the part of the City, its agents, officers, or employees,
except where the City is solely negligent. It is further specifically and expressly
understood that the indemnification provided constitutes Permittee's waiver of
immunity under the Industrial Insurance Act. RCW Title 51 1 solely for the purposes
of this indemnification. The parties have mutually negotiated and agreed to this waiver.
The provisions of this section shall survive the expiration or termination of this license.
1055 South Grady Way, Renton, WA 98057 • rentonwa.gov
DocuSign Envelope ID: 815EB5CB-F17F-4D13-B778-446C34052E93
ROE Cedar River Trail Extension, The Boeing Company
Page 3 of 3
September 25, 2023
14.Nothing in this Permit shall be construed to grant Permittee an easement by implication,
prescription, or any other operation of law, or to extend the term of the Permit past its
expiration date as stated herein.
15.Permittee must make all necessary precautions and coordinate all efforts with City Parks
and Trails Division staff to ensure the safety and security of the park at all times.
16.Permittee shall provide City with as-built drawings and final photos in electronic form:
1.New valve box(es) size and model (even if replaced in kind)
2.Updates to horizontal and vertical changes to lines and structures
3.Updates to grading in the work area
If you have any further questions, please contact Cailin Hunsaker, Parks and Trails Director, at
(425)430-6606 or e-mail chunsaker@rentonwa.gov.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement for the permit
term described in Section 3.
CITY OF RENTON
MARYJANE VAN CLEAVE Interim
Administrator
Parks and Recreation Department 10/2/2023 I
11:18 AM PDT
Date
Approved as to Legal Form:
Approved by Cheryl Beyer via 9/22/2023 email
Cheryl Beyer
Senior Assistant City Attorney
clb 9-22-23 2798
cc: Cailfn Hunsaker, Parks and Trails Director
Steve Brown, Parks Maintenance Manager
Dana Appel, Parks Maintenance Supervisor
1055 South Grady Way, Renton, WA 98057 • rentonwa.gov
STREAMLINE GEN. CONST., LLC
JON
9/26/2023
Date
DocuSign Envelope ID: 815EB5CB-F17F-4D13-B778-446C34052E93 'oad Box Replacement '!iiii!!1 111 � ll!oio..� lll""'lll '"-111 111 -..i '"""' IYI v vvv , ,
� ' Start: 9/30/2023 CehLrAfr UNfr=li'ol'\, LU Complete: 10/4/2023 STREAGC9□9J
SGC Project Manager: Jon Fowler 253-797-6857
SGC Foreman: Luke Cadle 425-301-7863
Scope of Work
•Private utility locate with GPR
•Coordination of 811 utility locates
•Install temp fence and trail signage (2ea CAUTION signs at 200' in
each direction)
•S0G Track Hoe excavation
•Stockpile soil on grass (approximately 8 yards)
•Provide and install (2) new road boxes
•Backfill and compact in 8" lifts to 1' below finished grade
•Supply and install 1' of topsoil
•Supply and install sod
•Final grade will correct current sunken area
•There will be no work in the roadway, parking area, or on
the pathway near the work site. The parking area will be utilized before
business hours to unload the track hoe from the equipment trailer. The
track hoe will be brought into the work area via the opening at the NW
corner of the parking lot. Dirt removal and delivery will be via a trailer
(prior to business hours) backed to the parking area wall. The hoe will
put material into or scope material out of the trailer to minimize impact.
The business owner has been contacted and informed of activities. We
will have one support vehicle in the parking lot during the day and all
others will be parked off-site on Boeing property.