Loading...
HomeMy WebLinkAbout1_Renton Alternative Fee Calculation_07-27-2023 inc Attachment A Date: July 27, 2023 Re: City of Renton, RapidRide I Line To: Michael Sippo, PE, Civil Engineer III, City of Renton From: Janine Robinson, King County Metro Cc: Jennifer Ash, King County Metro; Stephanie Forman, Forman & Associates; John McKenzie/PE, Angela Villers, PE,Erika Shook, Jacobs Engineering Group Inc. Subject: RapidRide I Line Civil Construction Permit No. C21001128 Alternative Fee Calculation Request King County Metro (Metro) has updated its 04/10/23 request for an alternate fee calculation by adding the roadway lighting for the project into the estimated cost as requested by the City. The attached spreadsheet provides a proposed alternative fee calculation including the roadway lighting. Thank you for your consideration. We look forward to working with you to complete these improvements. Attachment: A – Proposed Alternate Fee Calculation 2 Attachment A Item Erosion Control/Staging/Mobilization Transportation (Streets, sidewalks, bike/ pedestrian, signal and station foundations, roadway lighting, required Drainage/Stormwater Water Sanitary Sewer Total RENTON TRANSIT CENTER 3,912$ 8,000$ -$ -$ -$ 11,912$ S 2ND ST 2,407$ 550$ -$ -$ -$ 2,957$ S 3RD ST 2,709$ 550$ -$ -$ -$ 3,259$ RAINIER AVE S 6,921$ 11,850$ -$ -$ -$ 18,771$ RAINIER AVE S/S 7TH ST/SHATTUCK AVE S/LAKE AVE S 1,204$ -$ -$ -$ -$ 1,204$ S GRADY WAY/TALBOT RD S 1,917,522$ 3,793,544$ 614,430$ 181,778$ -$ 6,507,274$ TALBOT RD S/BENSON DR S 41,610$ 12,313$ -$ 570$ -$ 54,493$ TALBOT RD S & S 23RD ST 84,427$ 120,761$ 9,517$ 2,570$ -$ 217,275$ TALBOT RD S & S 32ND ST 65,383$ 126,252$ -$ -$ -$ 191,635$ TALBOT RD S & S 37TH ST 192,155$ 335,676$ 37,629$ 37,629$ -$ 603,089$ TALBOT RD S & VALLEY MEDICAL CENTER 220,131$ 222,396$ 51,300$ -$ -$ 493,827$ S/SE CARR RD & WELLS AVE S/MILL AVE S 42,512$ 26,728$ -$ -$ -$ 69,240$ SE CARR RD & 105TH AVE SE 332,359$ 419,025$ 14,400$ -$ -$ 765,784$ 108TH AVE SE & SE 180TH ST 195,071$ 175,294$ 7,000$ -$ -$ 377,365$ 108TH AVE SE & SE 186TH ST 225,983$ 222,053$ 5,400$ -$ -$ 453,436$ 108TH AVE SE & SE 192ND ST 83,915$ 48,333$ 28,745$ -$ -$ 160,993$ Total 3,418,221$ 5,523,325$ 768,421$ 222,547$ -$ 9,932,514$ Includes sales tax where applicable Includes retaining walls and equipment and architectural foundations and pavements Base Fee 16,500.00$ Exclusions 4% over >300,000 385,300.56$ Station Architectural, Electrical, Lighting & Signage equipment Subtotal 401,800.56$ Signal equipment (cabinets, signal heads, poles, TSP and EV detection equipment)Tech fee 5% 20,090.03$ Soos Creek water utility improvements Total 421,890.59$ 1st half billed 282,938.38$ Remainder 138,952.21$