Date: July 27, 2023
Re: City of Renton, RapidRide I Line
To: Michael Sippo, PE, Civil Engineer III, City of Renton
From: Janine Robinson, King County Metro
Cc: Jennifer Ash, King County Metro; Stephanie Forman, Forman &
Associates; John McKenzie/PE, Angela Villers, PE,Erika Shook,
Jacobs Engineering Group Inc.
Subject: RapidRide I Line Civil Construction Permit No. C21001128
Alternative Fee Calculation Request
King County Metro (Metro) has updated its 04/10/23 request for an alternate
fee calculation by adding the roadway lighting for the project into the
estimated cost as requested by the City. The attached spreadsheet provides
a proposed alternative fee calculation including the roadway lighting.
Thank you for your consideration. We look forward to working with you to
complete these improvements.
Attachment:
A – Proposed Alternate Fee Calculation
2
Attachment A
Item
Erosion
Control/Staging/Mobilization
Transportation (Streets,
sidewalks, bike/ pedestrian,
signal and station foundations,
roadway lighting, required Drainage/Stormwater Water Sanitary Sewer Total
RENTON TRANSIT CENTER 3,912$ 8,000$ -$ -$ -$ 11,912$
S 2ND ST 2,407$ 550$ -$ -$ -$ 2,957$
S 3RD ST 2,709$ 550$ -$ -$ -$ 3,259$
RAINIER AVE S 6,921$ 11,850$ -$ -$ -$ 18,771$
RAINIER AVE S/S 7TH ST/SHATTUCK AVE S/LAKE AVE S 1,204$ -$ -$ -$ -$ 1,204$
S GRADY WAY/TALBOT RD S 1,917,522$ 3,793,544$ 614,430$ 181,778$ -$ 6,507,274$
TALBOT RD S/BENSON DR S 41,610$ 12,313$ -$ 570$ -$ 54,493$
TALBOT RD S & S 23RD ST 84,427$ 120,761$ 9,517$ 2,570$ -$ 217,275$
TALBOT RD S & S 32ND ST 65,383$ 126,252$ -$ -$ -$ 191,635$
TALBOT RD S & S 37TH ST 192,155$ 335,676$ 37,629$ 37,629$ -$ 603,089$
TALBOT RD S & VALLEY MEDICAL CENTER 220,131$ 222,396$ 51,300$ -$ -$ 493,827$
S/SE CARR RD & WELLS AVE S/MILL AVE S 42,512$ 26,728$ -$ -$ -$ 69,240$
SE CARR RD & 105TH AVE SE 332,359$ 419,025$ 14,400$ -$ -$ 765,784$
108TH AVE SE & SE 180TH ST 195,071$ 175,294$ 7,000$ -$ -$ 377,365$
108TH AVE SE & SE 186TH ST 225,983$ 222,053$ 5,400$ -$ -$ 453,436$
108TH AVE SE & SE 192ND ST 83,915$ 48,333$ 28,745$ -$ -$ 160,993$
Total 3,418,221$ 5,523,325$ 768,421$ 222,547$ -$ 9,932,514$
Includes sales tax where applicable
Includes retaining walls and equipment and architectural foundations and pavements
Base Fee 16,500.00$
Exclusions 4% over >300,000 385,300.56$
Station Architectural, Electrical, Lighting & Signage equipment Subtotal 401,800.56$
Signal equipment (cabinets, signal heads, poles, TSP and EV
detection equipment)Tech fee 5% 20,090.03$
Soos Creek water utility improvements Total 421,890.59$
1st half billed 282,938.38$
Remainder 138,952.21$