Loading...
HomeMy WebLinkAboutAddendum No.3 Public Works Department Addendum No.3\ Monroe Ave NE Infiltration Facility CAG-23-316 ADDENDUM No. 3 Date of Addendum Issue: October 5, 2023 Due Date for Bids: 2:00 pm on October 17, 2023 To: ALL PLAN HOLDERS AND/OR PROSPECTIVE BIDDERS The following changes, additions, and/or deletions are hereby made a part of the project bid documents for the Monroe Ave NE Infiltration Facility Project and shall have the same effect as if set forth therein. Bidders shall acknowledge receipt and acceptance of this Addendum No. 3 by signing the addendum and submitting with the bid. Failure to acknowledge receipt of this addendum may result in your bid proposal being disqualified. 03 – Scope & Instructions to Bidders DELETE Addendum No. 1 Scope & Instructions to Bidders (03 Scope & Instructions to Bidders_Add1) and REPLACE with the updated attached document (03 Scope & Instructions to Bidders _Add3). Revisions to the Scope & Instructions to Bidders are indicated via track changes in the document and are included with this Addendum. Updates include the following: 1. The 5th bullet of the list of materials after the second paragraph is revised as follows: The work involved under the terms of the contract documents shall be full and complete project construction, as shown on the plans and as described in the project specifications to include but not be limited to: • Construction surveying, staking, and production of as-built plans, • Traffic control, • Installing and maintaining adequate Temporary Erosion and Sediment Control measures, • Installing approximately 42,300 CY of non-infiltration material, • Installing approximately 27,10058,100 SY of geotextile fabric, • Installing approximately 1,400 Tons of crushed surfacing top course, • Installing approximately 35,600 Tons of select borrow, • Installing approximately 84,100 Tons of infiltration gravel, • Installing approximately 10,000 SF of gravity block wall, • Installing approximately 400 Tons of hot mix asphalt, • Installing additional backfill to grade site to designed elevations, • Trench excavation, including dewatering, shoring, removal of any existing unsuitable material, and disposal of excavated material, Public Works Department Addendum No.3\ • Installing new storm system of approximately 640 linear feet of 24-inch and 36-inch diameter storm sewer pipe, including 19 catch basins, • Installing stormwater infiltration facility, • Installing stormwater flow splitter vault, infiltration chamber manifold vault, hydrodynamic separator vault, treatment vault, and • Trench backfill with suitable material and compaction to required standards, • Installing concrete curbs and gutters, rolled curbs, concrete sidewalks and driveway entrances, • Installing chain link fence and gates, • Performing landscape and property restoration. 2. INCREASE the working days to the following: A total of 283 320 working days is allowed for completion of the project. 05 – Call for Bids DELETE Addendum No. 2 Call for Bids (05 Call for Bids_Add2) and REPLACE with the updated attached document (05 Call for Bids _Add3). Revisions to the Call for Bids are indicated via track changes in the document and are included with this Addendum. Updates include the following: 1. INCREASE the working days from 283 days to 320 working days. 2. INCREASE the geotextile fabric quantity from 27,100 SY to 58,100 SY (5th bullet in the material list). 09 – Schedule of Prices DELETE Addendum No. 1 schedule of prices (09 Schedule of Prices_Add1) and REPLACE with the updated attached document (09 Schedule of Prices _Add3). Updates include the following: 1. INCREASE quantity of bid item A9 “Non-Woven Geotextile Fabric” to 51,800 SY 2. ADD BID ITEM B7 MIRAFI FW402 WOVEN GEOTEXTILE FABRIC – 6,300 SY 3. INCREASE quantity of bid item D12 “Root Barrier” to 575 LF Public Works Department Addendum No.3\ 20 – Special Provisions DELETE Addendum No. 1 special provisions (20 Special Provisions_Add1) and REPLACE with the updated attached plans (20 Special Provisions _Add3). The special provisions revisions are indicated via track changes in the document and included with this Addendum. Updates include the following: 1. The Working Days in Section 1-08.5 of the Special Provisions in the current bid set is revised as follows: This project shall be physically completed within 283320 working days. 2. The table in Section 1-09.14(2)A7 of the Special Provisions in the current bid set is revised as follows: Items to be Removed Approximate Quantity of Work Sidewalk 20.0 SY Existing Chain Link W/ Wood Slat Privacy Fence 65.0 LF Curb and gutter 90.0 LF Sawcutting 140.0 LF De-energizing and removing Existing Luminaire 1 EA 3. Section 1-09.14(2)A9 shall be revised as follows: 1-09.14(2)A9 Non-Woven Geotextile Fabric (Bid Item A9) – Square Yard Measurement and payment will be per WSDOT Standard Specification 2-12. Non-Woven Geotextile Fabric shall be Non-Woven Geotextile for Underground Drainage, Moderate Survivability Class C Per WSDOT 9-33.2(1) Tables 1 and 2. The payment for “Non-Woven Geotextile Fabric” per square yard shall be full compensation for furnishing and installing the geotextile fabric; including but not limited to seam jointing tape, and all necessary work to complete the installation as shown in the Plans. 4. Section 1-09.14(2)B7 MIRAFI FW402 Woven Geotextile Fabric (BID Item B7) – Square Yard has been added to Special Provisions as follows: 1-09.14(2)B7 MIRAFI FW402 Woven Geotextile Fabric (Bid Item B7) – Square Yard Measurement and Payment for “MIRAFI FW402 Woven Geotextile Fabric” will be per Square Yard, per WSDOT Standard Specification 2-12. See Special Provisions 2-12 for description and approved equal material requirements. Public Works Department Addendum No.3\ 5. The following bullet point has been added to Section 2-02.1 of the Special Provisions in the current bid set as follows: • De-energizing and Removing Existing Luminaire – 1 EA 6. Section 2-02.3(5) Removing Luminaire has been added to the special provisions as follows: Add the following new section: 2-02.3(5) Removing Luminaire Where shown on the plans, the Contractor shall de-energize and remove the existing luminaire including the luminaire footing, and shall backfill the footing hole with gravel borrow. The Contractor shall deliver the existing luminaire to the City of Renton Maintenance Facility. The Contractor shall coordinate with the Engineer to de-energize the existing luminaire. 7. The second sentence of Section 2-03.3(14)F of the Special Provisions in the current bid set has been revised as follows: Infiltration Gravel shall be placed and compacted according to the Plans. 8. A new sentence has been added to Section 2-03.3(14)F of the Special Provisions in the current bid set as follows: The contractor shall facilitate access and grant the City the right to have an inspector present at the site of production of the Infiltration Gravel to observe and validate that the Infiltration Gravel is being produced to the required standard. The Contractor shall alert the City no less than 48-hours prior to the start of production of the Infiltration Gravel material. 9. The new Section 2-12 Construction Geosynthetic has been added to the Special Provisions as follows: 2-12 CONSTRUCTION GEOSYNTHETIC 2-12.2 Materials This Section is supplemented with the following: MIRAFI FW402, or approved equal, shall be used as a Woven Geotextile for Underground Drainage as indicated in the plans. To be approved equal to MIRAFI FW402, the Woven Geotextile for Underground Drainage shall be woven monofilament polypropylene (non-slit tape) and conform to the properties as indicated in Tables 1 and 2 below. Public Works Department Addendum No.3\ TABLE 1 GEOTEXTILE FOR UNDERGROUND DRAINAGE STRENGTH PROPERTIES FOR SURVIVABILITY Geotextile Property Test Method Requirement Mechanical Grab Tensile Strength ASTM D 4632 200 lb min. Grab Tensile Elongation ASTM D 4632 < 50% Seam Breaking Strength ASTM D 4632 220 lb min. Puncture Resistance ASTM D 4833 495 lb min. Trapezoidal Tear ASTM D 4533 80 lb min Endurance UV Resistance ASTM D 4355 50% strength retained min. after 500 hours in a zenon arc device TABLE 2 GEOTEXTILE FOR UNDERGROUND DRAINAGE FILTRATION PROPERTIES Geotextile Property Test Method Requirement Hydraulics / Filtration Permittivity ASTM D 4491 1.0 – 2.5 sec-1 min. Water Flow Rate ASTM D 4491 140 - 200 gpm/ft2 min Percent Open Area (POA) CW-02215 10% min. Apparent Opening Size (AOS) ASTM D 4751 40 US Std. Sieve max. 10. Section 6-03.3 of the Special Provisions in the current bid set is supplemented as follows: Section 6-03.3 is supplemented with the following: Steel fabricators for the grated vault lid shall be included in the certification requirements in this section. Grated vault lid support assembly members shall be considered fracture critical. 11. The third paragraph of Section 8-20.1 of the Special Provisions in the current bid set is revised as follows: Currently there is an existing luminaire in the location of the temporary access road driveway entrance. In order to access the site from Monroe Ave, the existing luminaire will shall need to be de-energized and removed including existing footing (included in Removal of Structures and Obstructions) and the removed luminaire will shall be returned to City of Renton Maintenance Facility. Coordinate luminaire replacement and delivery with Eric Cutshall with the City of Renton at 425-430-7423. 12. The following new sentence has been added to Section 8-20.1 of the Special Provisions in the current bid set as follows: The Contractor shall coordinate with Engineer to re-energize the new luminaire. 13. The header between section 8-24.2 Materials and 8-24.3(2) Gravity Block Wall in the Special Provisions has been removed as follows: Public Works Department Addendum No.3\ 8-24.2 Materials Section 8-24.2 is supplemented as follows: Gravity block wall blocks shall be rectangular prisms with dimensions 2’-5 ½” by 2’-5 ½” by 4’-11”, except for special blocks which shall be as dimensioned in the Plans. All dimensions shall be ±1/2”. Gravity block wall blocks shall be cast with Class 3000 concrete, conforming to the air content requirements of Section 6-02.3(2)A. Commercial concrete shall not be used. Gravity block wall blocks will be accepted based on visual inspection, and conformance to Section 6-02.3(9) and the specified concrete strength and air content requirements. Gravity Block Wall Blocks shall have an interlocking system integrated into their form. 8-12.3 Construction Requirements 8-24.3(2) Gravity Block Wall Section 8-24.3(2) is supplemented as follows: Submittals The Contractor shall submit working drawings of the gravity block wall to the Engineer for approval in accordance with Section 6-01.9. The working drawings shall include, but not be limited to, the following: 14. The first paragraph under header Gravity Block Wall Erection under Section 8-24.3(2) of the Special Provisions in the current bid set is revised as follows: The Gravity Block Wall shall be installed as a method of separation between the Infiltration Gravel and Non-Infiltration Material Incl. Haul. The Gravity Block Wall is to be installed in tandem with the placement and compaction of the Infiltration Gravel and Non-Infiltration Material Incl. Haul. The Gravity Block Wall shall not be installed as indicated on the Plansmore than 4-feet above the adjacent fill to be placed by the Contractor. 15. The table in Section 9-03.16 of the Special Provisions in the current bid set is revised as follows: AASHTO Grading Passing No. 3 No. 4 Sieve Size Min. Max. Min. Max. 2-1/2" 99 100 2" 90 100 99 100 1-1/2" 35 70 90 100 1" 0 15 20 55 3/4” 0 15 1/2" 0 5 3/8” 0 5 No. 100 0 01.0 0 01.0 Public Works Department Addendum No.3\ 21B – Construction Plans (Plans) DELETE plans (21B – CONSTRUCTIONPLANS_ADD1) and REPLACE with the updated attached plans (21B_CONSTRUCTIONPLANS_ADD3). The plan revisions are indicated by clouding on the sheets included with this Addendum. Updates include the following: 1. Drawing No. C001: Cover Sheet Index of Sheets has been updated to include new Sheet S600. 2. Drawing No. C004: Infiltration gravel geotextile has been updated to include placing non-woven geotextile within the infiltration gravel at each lift height. Geotextile between the Select Borrow and the Infiltration Gravel and the infiltration Gravel and the native expose slope has been updated to be MIRAFI FW402 or approved equal woven geotextile. 3. Drawing No. C004: MIRAFI FW402 Geotextile linetype has been added to the Legend. 4. Drawing No. C201: Construction Note #8 has been revised to read: “INSTALL TEMPORARY SECURITY CHAIN LINK FENCE”. 5. Drawing No. C202: Construction Note #8 has been revised to read: “INSTALL TEMPORARY SECURITY CHAIN LINK FENCE”. 6. Drawing No. C204: Construction Note #8 has been revised to read: “MAINTAIN TEMPORARY SECURITY CHAIN LINK FENCE”. 7. Drawing No. C302: Infiltration gravel geotextile has been updated to include placing non-woven geotextile within the infiltration gravel at each lift height. Geotextile between the Select Borrow and the Infiltration Gravel and the infiltration Gravel and the native expose slope has been updated to be MIRAFI FW402 or approved equal woven geotextile. 8. Drawing No. C302: Construction Note #4 has been revised to read: “INSTALL GEOTEXTILE FABRIC MIRAFI FW402 OR APPROVED EQUAL PER SPECIAL PROVISIONS 2-12 AND BACKFILL EXCAVATED AREA WITH INFILTRATION GRAVEL PER SPECIAL PROVISIONS 2-03 AND COMPACT PER WDSOT STD. SPEC 2- 03.3(14)C, METHOD A.” 9. Drawing No. C302: Construction Note #14 has been added which reads: “INSTALL GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FOR UNDERGROUND DRAINAGE, Public Works Department Addendum No.3\ MODERATE SURVIVABILITY CLASS C PER WSDOT 9-33.2(1) IN 23-FT WIDE SECTIONS WITH 2-FT MINIMUM OVERLAP, WITH TAPED SEAMS, AT EACH 2-FT LIFT, IN STAGGERED ROWS WITH A 15-FT CLEAR SPACE BETWEEN EACH 23-FT WIDE GEOTEXTILE SECTION, AS DIRECTED BY ENGINEER.” 10. Drawing No. C302: MIRAFI FW402 Geotextile linetype has been added to the Legend. 11. Drawing No. C501: Construction Note #7 has been revised to read: “COORDINATE DE-ENERGIZING AND REMOVAL OF EXISTING UTILITY WITH ENGINEER PRIOR TO CONSTRUCTION. LIGHT POLE MUST BE REPLACED WITH NEW POLE PER COR STD PLAN 117.1 AND PLACED ON CONCRETE PAD PER COR STD PLAN 120. EXISTING LUMINAIRE TO BE DELIVERED TO COR MAINTENANCE FACILITY. NEW ROADWAY LUMINAIRE ARM TO BE 6-FT IN LENGTH.” 12. Drawing No. C502: Construction Note #7 has been revised to read: “COORDINATE DE-ENERGIZING AND REMOVAL OF EXISTING UTILITY WITH ENGINEER PRIOR TO CONSTRUCTION. LIGHT POLE MUST BE REPLACED WITH NEW POLE PER COR STD PLAN 117.1 AND PLACED ON CONCRETE PAD PER COR STD PLAN 120. EXISTING LUMINAIRE TO BE DELIVERED TO COR MAINTENANCE FACILITY. NEW ROADWAY LUMINAIRE ARM TO BE 6-FT IN LENGTH.” 13. Drawing No. S600: Sheet S600 is a new sheet that has been added. 14. Drawing No. S601: Construction Note #6 has been revised to read: “STEEL SHALL BE GALVANIZED ACCORDING TO AASHTO M 111. GALVANIZE AFTER FABRICATION OF WELDED ASSEMBLIES.” 15. Drawing No. S601: Construction Note #8 has been revised to read: “GALVANIZED SURFACES ALTERED OR DAMAGED DURING CONSTRUCTION OR HANDLING SHALL BE REPAIRED ACCORDING TO ASTM A 780 AND AASHTO M 111. 16. Drawing No. S602: Welding symbol was previously shown reversed in View D. This has been revised in View D. 17. Drawing No. S605: Rebar reinforcing has been updated in the Foundation Elevation and Foundation Section. Public Works Department Addendum No.3\ ALL OTHER REQUIREMENTS OF THE CONTRACT DOCUMENTS REMAIN IN EFFECT Sincerely, Jared McDonald, PE Civil Engineer III (Project Manager) City of Renton All Bidders must sign this Addendum No. 3 in the space provided below and attach the signed Addendum No. 3 to the Formal Bid Proposal Signature: __________________________________ Title:_______________________ Company: __________________________________ Date:_______________________