HomeMy WebLinkAbout7945.04 E 2023 1003Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 1003 Date Tue 10/3/2023 Weather 65°F Clear Arrival/Departure Time(s) 11:30AM; 1PM Travel Time (hr)1.0 Project Name Canopy Property Location 413 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe proof roll of roads onsite, and probe sidewalk subgrade. Proof roll While onsite, ESNW rep observed the contractor use a fully loaded dump truck to slowly drive over roads onsite. During the proof roll, ESNW rep observed some deflection on road A, and alley 2. ESNW rep recommends the contractor over excavate approximately 12” from current grade. It is recommended that an ESNW rep is present before backfill is placed to probe the subgrade. Fabric and 1 ¼” minus crushed rock should be used for backfill once subgrade is observed by ESNW rep. Sidewalk Subgrade ESNW rep used a ½” steel T-probe to probe the subgrade of the sidewalk. ESNW rep observed the subgrade to be saturated, and in need of over excavation. Rep recommends the contractor excavate approximately 12” from the current grade to place 12” of crushed rock. ESNW rep will return to observe over excavation. Report ID 7945.04 E 2023 1003 Page 2 of 2 Earth Solutions NW, LLC Over Excavation Over Excavation Sidewalk in need of Over Excavation