Loading...
HomeMy WebLinkAbout7945.04 E 2023 0921Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 www.esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 0921 Date Thu 9/21/2023 Weather 63°F, sunny Arrival/Departure Time(s) 11:45AM/12:30PM Travel Time (hr) 0.75 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Ryan Sanderson | 206.565.4683 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe and test compaction of sidewalk backfill. While onsite, the following was observed: Compaction Testing: ESNW rep observed contractor in the process of raising the existing grade of planned sidewalk subgrade on the Western side of Road A separating Lots 17 through 29 and lots 30 through 40. ESNW rep observed contractor compacting aapproximately 8-inch lifts of a Brown Gravely Silt. Compaction testing indicated contractor had achieved at least 95% compaction where tested (See table and figure 1) Test Number Test Location Elevation Reference Proctor Maximum Dry Density (pcf) Test Moisture (%) Test Dry Density (pcf) % of MDD 150 Sidewalk Fill -3' 9 128.5 13.3 124.6 97 151 Sidewalk Fill SG 9 128.5 11.6 121.7 95 Table 1) Compaction tests Report ID 7945.04 E 2023 0921 Page 2 of 2 Earth Solutions NW, LLC Figure 1) map of compaction tests 150 151