CHANGE ORDER # 13
AIRPORT:Renton Municipal Airport DATE: 04-23-15
LOCATION:Renton,Washington GRANT#:3-53-0055-024
CONTRACTOR: ICON Materials
This change order was prepared in accordance with FAA Program Guidance Letter 12-03.A price
analysis was prepared and it is recommended that the FAA accept the analysis as evidence of cost
reasonableness.
You are requested to perform the following described work upon receipt of an approved copy of this
document or as directed by the Engineer:
Item# Description Unit Unit Price Quantity Amount
Bid Item 1-21 (Ductbank, 3-Way
1 3-Inch) LF $63.00 175 $11,025.00
Bid Item 1-27 (Temporary
2 Erosion Control Force Account) FA $5,000.00 -1 -$5,000.00
3 Bid Item 2-16 (Quarry Spalls) TON $40.00 230 $9,200.00
4 Bid Item 2-24 (L-824C Cable) LF $2.00 688 $1,376.00
Bid Item 2-25 (Electric Conduit,
5 One 2-Inch) LF $10.00 824 $8,240.00
Bid Item 2-28 (Demolish L-824
6 5kV Cable) LF $1.00 795 $795.00
Bid Item 2-31 (Conduit
Schedule 40 PVC, 3-Way, 3-
7 Inch) LF $60.00 284 $17,040.00
Bid Item 2-34 (Asphalt
Pavement Sawcutting 4 to 10
8 Inch Depth) LF $2.00 -132 -$264.00
Bid Item 2-35 (Asphalt/PCC
Pavement Sawcutting 10 to 14
9 Inch Depth) LF $10.00 750 $7,500.00
Bid Item 2-41 (Unsuitable
10 Excavation) CY $25.00 780 $19,500.00
Bid Item 2-42 (Imported Borrow
11 Material) CY $36.00 -315 -$11,340.00
12 Bid Item 2-44 (Straw Wattles) LF $3.00 -300 -$900.00
Bid Item 2-45 (Temporary
13 Erosion Control Force Account) FA $5,000.00 -1 -$5,000.00
Bid Item 2-48(Bituminous
14 Surface Course) TON $92.00 36.47 $3,355.24
Bid Item 2-50(Bituminous Tack
15 Coat) TON $900.00 0.80 $720.00
Bid Item 2-51 (Preformed
16 Pavement Marking) SF $15.00 -1 -$15.00
Bid Item 2-52 (Painted
17 Pavement Marking) SF $5.00 1,832 $9,160.00
Bid Item 2-53 (Pavement
18 Marking Removal) SF $3.00 2,330 $6,690.00
Bid Item 3-9(12-Inch DI Storm
19 Drain Pipe) LF $85.00 100 $8,500.00
H:!DOCl23Ap!1O!OO7 Renton n1V8&Srgnage\ South, btydrienThange Orders\CO 13.docx
Bid Item 3-10(Storm Drain Pipe
20 Removal) LF $28.00 127 $3,556.00
Bid Item 3-11 (Slotted Drain
21 System, 12-Inch) LF $185.00 329 $9,695.00
22 Bid Item 3-15(Quarry Spalls) TON $45.00 76 $3,420.00
23 Bid Item 3-19(L-824C Cable) LF $2.00 875 $1,750.00
Bid Item 3-20(Electrical
24 Conduit, One 2-Inch) LF $10.00 40 $400.00
Bid Item 3-23(Demolish L-824
25 5kV Cable) LF $1.00 1,025 $1,025.00
Bid Item 3-26(Asphalt
Pavement Sawcutting 4 to 10
26 Inch Depth) LF $2.00 -40 -$80.00
Bid Item 3-27(Asphalt/PCC
Pavement Sawcutting 10 to 14
27 Inch Depth) LF $10.00 -176 -$1,760.00
Bid Item 3-28(Asphalt
Pavement Removal and
28 Disposal 4 to 10 Inch Depth) SY $11.00 204 $2,244.00
Bid Item 3-32 (Unsuitable
29 Excavation) CY $25.00 692 $17,300.00
Bid Item 3-34(Temporary
30 Erosion Control Force Account) FA $5,000.00 -1 -$5,000.00
Bid Item 3-36(Bituminous
31 Surface Course) TON $85.00 383.56 $32,602.60
Bid Item 3-37(Bituminous Base
32 Course) TON $83.00 158.90 $13,188.70
Bid Item 3-38(Bituminous Tack
33 Coat) TON $900.00 -1.36 -$1,224.00
Bid Item 3-40(Painted
34 Pavement Marking) SF $5.00 2,267 $11,335.00
Bid Item 4-13(18-Inch DI Storm
35 Drain Pipe) LF $125.00 20 $2,500.00
Bid Item 4-15(Slotted Drain
36 System, 12-Inch) LF $185.00 133 $24,605.00
Bid Item 4-16(Slotted Drain
37 System, 18-Inch) LF $220.00 92 $20,240.00
38 Bid Item 4-19(Quarry Spalls) TON $45.00 -160 -$7,200.00
Bid Item 4-21 (WSDOT
Standard Type 1 Catch Basin,
39 Aircraft Rated) EA $2,900.00 1 $2,900.00
Bid Item 4-23(WSDOT
Standard Type 2-48"Catch
40 Basin,Aircraft Rated) EA $5,400.00 -1 -$5,400.00
41 Bid Item 4-26(L-824C Cable) LF $2.00 625 $1,250.00
Bid Item 4-27(Electrical
42 Conduit, One 2-Inch) LF $10.00 90 $900.00
Bid Item 4-30(Demolish L-824
43 5kV Cable) LF $1.00 925 $925.00
Bid Item 4-34(Asphalt
Pavement Sawcutting 4 to 10
44 Inch Depth) LF $2.00 -1,325 -$2,650.00
Bid Item 4-35(Asphalt/PCC
Pavement Sawcutting 10 to 14
45 Inch Depth) LF $10.00 793 $7,930.00
Bid Item 4-41 (Unsuitable
46 Excavation) CY $35.00 -100 -$3,500.00
11\DOC123ApI1O\OO7 Renton TIN&signage\south Taxiway Construction\Change Orders\CO 13.docx
Bid Item 4-42(Imported Borrow
47 Material) CY $35.00 -450 -$15,750.00
48 Bid Item 4-44 (Straw Wattles) LF $3.00 -200 -$600.00
Bid Item 4-45(Geotextile
49 Encased Check Dam) EA $100.00 -2 -$200.00
Bid Item 4-46(Temporary
50 Erosion Control Force Account) FA $5,000.00 -1 -$5,000.00
Bid Item 4-47(Cement-Treated
51 Base Course) SY $24.00 -29 -$696.00
Bid Item 4-48(Bituminous
52 Surface Course) TON $83.00 549.74 $45,628.42
Bid Item 4-49(Bituminous Base
53 Course) TON $81.00 140.20 $11,356.20
Bid Item 4-51 (Bituminous Tack
54 Coat) TON $900.00 1.49 $1,341.00
Bid Item 4-53(Painted
55 Pavement Marking) SF $4.30 1,960 $8,428.00
Bid Item 4-54(Pavement
56 Marking Removal) SF $3.00 1,846 $5,538.00
57 Bid Item 4-55(Hydroseeding) AC. $4,500.00 0.39 $1,755.00
58 Bid Item 5-15(Quarry Spalls) TON $45.00 -160 -$7,200.00
Bid Item 5-16(WSDOT •
59 Standard Type 1 Catch Basin) EA $2,200.00 -1 -$2,200.00
Bid Item 5-18(WSDOT
Standard Type 2-48"Catch
60 Basin) EA $4,000.00 1 $4,000.00
61 Bid Item 5-21 (L-824 C Cable) LF $2.00 782 $1,564.00
Bid Item 5-22 (Electrical
62 Conduit, One 2-Inch) LF $9.50 500 $4,750.00
Bid Item 5-26(Demolish L-824
63 5kV Cable) LF $1.00 625 $625.00
Bid Item 5-30(Asphalt
Pavement Sawcutting 4 to 10
64 Inch Depth) LF $2.00 -1,254 -$2,508.00
Bid Item 5-31 (Asphalt/PCC
Pavement Sawcutting 10 to 14
65 Inch Depth) LF $10.00 1,407 $14,070.00
Bid Item 5-38(Unsuitable
66 Excavation) CY $25.00 30 $750.00
67 Bid Item 5-40(Straw Wattles) LF $6.00 -100 -$600.00
Bid Item 5-41 (Temporary
68 Erosion Control Force Account) FA $5,000.00 -1 -$5,000.00
Bid Item 5-43(Bituminous
69 Surface Course) TON $84.00 -202.61 -$17,019.24
Bid Item 5-44(Bituminous Base
70 Course) TON $80.00 298.47 $23,877.60
Bid Item 5-45(Portland Cement
71 Concrete Pavement) SY $210.00 -56 -$11,760.00
Bid Item 5-46(Bituminous Tack
72 Coat) TON $900.00 1.83 $1,647.00
Bid Item 5-47(Preformed
73 Pavement Marking) SF $15.00 -183 -$2,745.00
Bid Item 5-48(Painted
74 Pavement Marking) SF $5.00 1,842 $9,210.00
Bid Item 5-49(Pavement
75 Marking Removal) SF $3.00 2,859 $8,577.00
76 Bid Item 5-50(Hydroseeding) AC $4,700.00 2.21 $10,387.00
H\DOC!23Ap\1O OO7 Renton TWB&signage\south Taxiway Construction\Change Orders\CO 13.docx
Bid Item 6-7 (Construction
77 Survey) LS $4,500.00 -1 -$4,500.00
Bid Item 6-9(Temporary
78 Erosion Control Force Account) FA $5,000.00 -1 -$5,000.00
Bid Item 6-12(Haul Route
79 Pavement Repair) LS $100.00 -1 -$100.00
Bid Item 6-13(Haul Road -
80 Repair Force Account) FA $75,000.00 0.7161 -$53,707.50
Bid Item 6-15 (Removal of
Existing Pipe and
81 Appurtenances) LS $30.00 -70 -$2,100.00
Item CO-8-5 (Asphalt
82 Sawcutting) LF $3.85 -420 -$1,617.00
Item CO-8-6 (Asphalt Pavement
83 Grinding and Disposal) SY $3.75 2,960 $11,100.00
Item CO-8-10 (Pavement
84 Preparation) SY $13.00 -108 -$1,404.00
Item CO-8-11 (HMA Cl. 1/2-Inch
85 PG 64-22) TON $78.00 -153.29 -$11,956.62
Item CO-8-12 (Bituminous Tack
86 Coat) TON $900.00 -3.15 -$2,835.00
Item CO-8-13 (Removing Conc. _
87 Curb and Gutter) LF $12.00 -370 -$4,440.00
Item CO-8-14(Cement Conc.
88 Traffic Curb and Gutter) LF $41.75 -370 -$15,447.50
Item CO-8-16(Raised
Pavement Marker(WSDOT
89 Type 1Y)) HUND $660.00 -8.84 -$5,381.90
Item CO-8-17 (Fire Hydrant
90 Raised Pavement Marker) EA $11.00 4 $44.00
91 Item CO-8-18 (Paint Striping) LF $0.50 7,975 $3,987.50
Item CO-8-19 (Painted Stop
92 Line) LF $5.00 10 $50.00
Item CO-9-5 (Asphalt
93 Sawcutting) LF $3.85 -80 -$308.00
Item CO-9-8 (Adjust Catch
94 Basin) EA $700.00 -1 -$700.00
Item CO-9-9 (Adjust Valve Box
95 and Cleanouts) EA $450.00 -1 -$450.00
Item CO-9-10 (Pavement
96 Preparation) SY $13.00 -200 -$2,600.00
Item CO-9-11 (HMA Cl.'/z-Inch
97 PG 64-22) TON $80.00 2.91 $232.80
Item CO-9-13 (Fire Hydrant
98 Raised Pavement Marker) EA $11.00 -4 -$44.00
99 Item CO-9-14 (Paint Striping) LF $0.50 3000 $1,500.00
Item CO-9-15 (Painted Stop
100 Line) LF $5.00 14 $70.00
Item CO-9-16 (Painted
101 Crosswalk Line) SF $35.00 -64 -$2,240.00
Item CO-12-13 (Premium for
102 Week-end Work) LS $18,880.29 -1 -$18,880.29
Subtotal $177,032.51
State Sales Tax(9.5%) $16,818.60
This Change Order Total $193,850.60
1-1':DoC423A0104007 Renton TW B&Sionagei'South Taxiway Construction\Change Orders\CO 13.docx
Previous Change Order Amount $701,559.03
Original Contract Amount $5,460,424.21
Revised Contract Total $6,355,833.95
r
Recommended by:
AZ-edsf7 :
u'x Date: 4./Y / 22/C-
ngi er, eid Middle /n,,Incc..
Approved by: Ute'` Date:047/6
Denis Law, Mayor - Cit of Renton
Accepted by: ��-� xf) Date:
ontractmr, ICON Materials
Accepted by: / / f1tr"40���//i
e•e` Aviation Administrat' �~ �, <.:.
CHANGE ORDER # 13 , Attest: ,_ [[ � 7 ';z/I (
Jason Seth, A€y lVjft'
AIP PROJECT NO. 3-53-0055-024 %.
AIRPORT Renton Municipal Airport LOCATION Renton, WX't''r'1l 11100
JUSTIFICATION FOR CHANGE
This justification for change was prepared in accordance with FAA Program Guidance
Letter 12-03
1. Brief description of the proposed contract change(s) and locations(s).
This change order adjusts the original contract bid item quantities to match the actual
quantities installed.
2. Reason(s) for the change(s) (Continue on reverse if necessary).
Quantity reconciliation to reflect actual quantities used.
3. Justifications for unit prices or total cost:
All items are at original contract unit bid prices.
4. The sponsor's share of this cost is available from: City Funds
5. If this is a supplemental agreement involving more than $2,000, is the cost estimate based
on the latest wage rate decision? Yes a No NA X
6. Has consent of surety been obtained? Yes Not Necessary X
7. Will this change affect the insurance coverage? Yes No X
H 0OC23Ap\1O OO Renton nn-&&signage\ South Taxiway Construction\Change Orders\CO 13.docx
8. If yes, will the policies be extended? Yes No X
9. Has this Change Order been discussed with FAA Officials?
Yes X No When 01/23/15 With Whom Peter Doyle
H tDOCl23Ap\1O;007 Renton rwe&Signage\South Taxiway Construction\Change Orders\CO 13.docx