HomeMy WebLinkAbout7945.04 E 2023 1005Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 1005 Date Thu 10/5/2023 Weather Overcast, 50’s Arrival/Departure Time(s) 7:30am to 9:00am Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Steven K. Hartwig | 206-677-1806 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. As requested, ESNW rep was on site to observe an overexcavation and proof roll of the onsite roadway subgrade and to observe sidewalk subgrade. Overexcavation and Proof Roll Observations ESNW rep. observed the contractor excavate approximately 6-inches of loose and saturated material from two separate previously observed sections of the onsite roadway. ESNW rep. used a ½-inch steel T-probe to observe the overexcavation subgrade. The subgrade was observed to be dense to very dense. ESNW rep. then observed the contractor use a loaded dump truck to proof roll the two overexcavated sections of the onsite roadway. The proof rolled areas were observed to be firm and unyielding and considered suitable for the proposed roadway. Sidewalk Subgrade Observation ESNW rep. used a ½-inch steel T-probe to observe a section of sidewalk subgrade that was previously observed to be loose and saturated. The sidewalk subgrade was observed to be medium dense to dense and is considered suitable for the proposed sidewalk. Report ID 7945.04 E 2023 1005 Page 2 of 3 Earth Solutions NW, LLC (Overexcavation in the onsite roadway) (Sidewalk subgrade) Report ID 7945.04 E 2023 1005 Page 3 of 3 Earth Solutions NW, LLC Area Probed Overexcavated Areas