HomeMy WebLinkAboutChange Order - 2CITY OF RENTON Community Services Department CONTRACT CHANGE ORDER AGREEMENT DATE 10/ϰ/2023 CONTRACT:North Highlands - Boiler Replacement CAG #22 - 410 CONTRACTOR:Copper Mechanical CHANGE ORDER:2 SUMMARY OF PROPOSED CHANGE: Reason/Justification: DESCRIPTION: Item Qty. Description Unit Price Amount No.w/ WSST 2 1 Additional Work 22,834.00$ 22,834.00$ Total this Change Order: 22,834.00$ ORIGINAL CONTRACT CURRENT CONTRACT NET CHANGE REVISED CONTRACT AMOUNT (W/ WSST) AMOUNT THIS ORDER (W/ WSST) TOTAL AFTER CHANGE Additional Calendar Days: (xx calendar days) (written #) calendar days - Extension of Time. Completion Date is December 31st, 2023. SIGNATURES: Contractor:Date: Project Manager:Date Approved By:Date: (position of appoval authority) Additional work required; Exhaust Flume, Emergency Shut Switch for Boiler, and changing the configuration of the Boiler System from a Primary to Primary/Secondary Loop. The payment specified and agreed to in this change order includes every claim by the contractor for any extra payment with respect to the work described in this change order. The work covered by this change order must be performed under the same terms and conditions as that included in the original agreement. All of the other terms of the original agreement remain in effect. 135,006.03$ 167,840.03$ 22,834.00$ 190,674.03$ 10.4.23Matt Esteb_ PM 10/4/2023          CAG-22-410, CO #2-23