Loading...
HomeMy WebLinkAbout105103610 Amazon roundabout - PRELIM_COR signed_231013CO COCO DITCH DITCH DITCHSDx SDx SDx SDxSDx SDx SDx SDx SDx SDx SDx SDxSSx SSx SSx SSx SSx SSx SSx SSx SSxSSxSSxSSxSSxSSxSSxSSx SSx SSx SSx SSx SSx SSx SSx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx WxWxWxWxWxWx WxWxWxWxWxGxGxGxGxG x Gx Gx Gx Gx Gx Gx Gx Gx UGPx UGPx UGPx UGPx UGPxUGPxUGPxUGPx UGPxUGPx UGPx UGPxUGPxU G P x UGPx UGPx UGPx UGPx UGPx Gx Gx Gx Gx Gx Gx Gx Gx GxGxGxGxGx FOxFOxFOx FOx FOx FOx FOx FOx FOx FO x FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGT x UGTxUGTxUGTxUGTxUGTxGx Gx Gx Gx Gx Gx Gx Gx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPxOHPxOHPxOHPxOHPxOHPx 317312-165549 25 kVA 120/240V (A) 317309-165661 45 kVA 208V (ABC) 317315-165662 317320-165551 ℄℄ ℄ ℄ 317322-165560 25 kVA 120/240V (A) EAR 13 ROW 60' 317315-165598 4/0CU ABCN317319-165523 4/3 10 kVA 120/240V (C) SLAG3618 317317-165584 15 kVA 120/240V (B) SLAG7034 ROW 60' 317317-165561 4/2 SLAG7033 90° R=48" CUST. PROVIDED 4' X 4' WORKPIT PSE PROVIDED & CUSTOMER INSTALLED 1-2" SCH'L 80 DISCONTINUOUS PVC CONDUIT ±25' IN CUST. PROVIDED TRENCH ±10'±15'CUST. PROVIDED 6' X 6' WORKPIT W/ 6" BEDDING OF 5/8" CRUSHED ROCK PSE INSTALL 1-RUN 1Ø PRI. 12KV1/0 UG JKT CABLE ±35' (AØEJN511) SITE PLAN N Vicinity Map 47.4658, -122.2274 Owner / Developer Contact Info officeATTN: Amazon.com Services, LLC 410 Terry Avenue North Seattle, WA 98109 Shane Walker 253-228-1753 OVERHEAD CIRCUIT MAP SCALE: 6" = 1 MILE CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE EAR-13 10/18/2023 108 106 110 1 -- 109 106 110 Superior ORDER#NOTIF# PWR PROJECT PHASE FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: N/A 200A N/A 7KW 65A 0.6% 1.5% E-Mail: Cell Phone: Project Manager Contact Information: Manager:Jenny Chau 253-208-9480 jenny.chau@pse.com SCALE: 1" = 50'105103610THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) 105103610 UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP Jenny Chau 253-208-9480 6/1/23 Ray Reynolds 253-262-7409 6/1/23 N/A N/A N/A Ray Reynolds -6/1/23 RW-_____Renton AMAZON ROUNDABOUT 1Ø PRIMARY L/E 1602 RAYMOND AVE SW # LIGHTING, RENTON WA 98055 N/A N/A N/A 105103610 AS NOTED 1 OF 1 KING N/A N/A CSPSKEPM SW-19-23-5 N/A N/A 2305E075 2305E076 2305E075NW EAR-13 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 513826924 CIRCUIT FEET ADDED: 35' Perm. Service CONDUIT ONE-LINE NOT TO SCALE UNDERGOUND MAP NOT TO SCALE SITE SPECIFIC NOTES J01 EXISTING 317315-165662: - EXISTING VAULT TO REMAIN - INSTALL (1) L/B ELBOW 6041.1000, ELB10J V01 NEW 317312-165549:3-19A -INSTALL 36" X 42" 38" UNISTRUT HH & GNDS 6045.1010, MINU1SR -SET ___KVA, 120/240V PM XFMR (MID:6247000) -INSTALL L/B ELBOW 6041.1000, ELB10J -INSTALL CABLE # -INSTALL GRID # - CONNECT CUSTOMER OWNED, INSTALLED, AND MAINTAINED 3-RUNS OF 3/0 CABLE. M01 NEW: PSE METER DEPT TO INSTALL 200A METER SPAN SPECIFIC NOTES SEE SITE PLAN, TABLES, AND ONE-LINES FOR INSTALL. SCALE: NONE UNISTRUT MP DETAIL TOP VIEW SIDE VIEW EXCAVATION: 4-2/3 CUBIC YARDS Rock Crushed 6" 3'-6" 2" 6' 6' 48"42" 36" 38" 42" Struts FRONT FRONTCommunications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS (MID 9995692). 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 PRIMARY TRENCH DETAIL Installed at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 25kVA 120/240v 6247000 V01 317312-165549 104354563514244178 PSE Locates Req'd Developer Locates Req'd Yes No No YesFlagging Req'd Outages Req'd POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: VAULTS & WORK PITS. -PROVIDE A 4' X 4' WORK PIT AT J01. -PROVIDE A 6' X 6' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V01. TRENCHING & CONDUIT. -INSTALL ±90' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM V01 TO M01. -REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS. JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Design As Built Actual Amount Installed (Conduit & Cable) J01 V01 2"1 25'X 2 0 0 0 52.4 54.7 PRI 12KV 1/0 UG 35'EJN511 COOLING 5' MIN 5' MIN 10' MIN 5' MIN FINS ACCESS CONCRETE PAD MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT CURB OR EDGE OF PAVEMENT CURB OR EDGE OF PAVEMENT 5' MIN ROAD OR PARKING AREA TYP. PAD & TRANS- FORMER 1.5' MIN DOOR ACCESS DOOR REQUIRED WORK SPACE AREA Not to scale 1.5' MIN 3' MIN 3' MIN 3' MIN 10' MIN3' MIN J-BOX B-FLY DETAIL (J01) SCALE: NONE Exist 4" (317315-165662) Exist 4" (?) Prop 2" (V01) FAULT CURRENT TABLE 1Ø PM TRANSFORMERS (240/120V) 120V WINDINGS 240V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 25KVA 0.8 2.23 9,300 AMPS 1.70 6,100 AMPS Meter Set 3002307223514244235 CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS -1 V01 3 3/0 - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE CABLE ONE-LINE NOT TO SCALE Vault & Equipment Table Work Locatio n Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-CompleteLBDC V01 317312-165549 MINU1SR (3'x3.5'x3.167') PAD-1P-07-120/2 40-25 (25 kVA)1 1 ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. PREL I M I N A R Y NOT F O R C O N S T R U C T I O N CUSTOMER APPROVAL I approve the location of the trench, including road crossings, and all electrical equipment as shown on print. ________________________ Customer's Signature ________________________ Print Name/Date JOB SITE JOB SITE Michael S. Sippo Michael S. Sippo 10/13/23