HomeMy WebLinkAbout105103610 Amazon roundabout - PRELIM_COR signed_231013CO
COCO
DITCH DITCH DITCHSDx
SDx SDx
SDxSDx SDx SDx SDx SDx SDx SDx
SDxSSx SSx SSx SSx SSx SSx SSx SSx
SSxSSxSSxSSxSSxSSxSSxSSx SSx SSx SSx SSx SSx SSx SSx
Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx Wx WxWxWxWxWxWx
WxWxWxWxWxGxGxGxGxG
x Gx Gx Gx Gx Gx Gx Gx Gx
UGPx UGPx UGPx UGPx
UGPxUGPxUGPxUGPx
UGPxUGPx UGPx
UGPxUGPxU
G
P
x
UGPx UGPx UGPx UGPx UGPx
Gx Gx Gx Gx Gx Gx Gx Gx GxGxGxGxGx
FOxFOxFOx FOx FOx FOx FOx FOx FOx
FO
x
FOx FOx FOx FOx FOx FOx
FOx
FOx FOx FOx
FOx FOx FOx FOx FOx
FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOx FOxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGTxUGT
x
UGTxUGTxUGTxUGTxUGTxGx Gx Gx Gx Gx Gx Gx Gx
OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPx OHPxOHPxOHPxOHPxOHPxOHPx
317312-165549
25 kVA 120/240V (A)
317309-165661
45 kVA 208V (ABC)
317315-165662
317320-165551
℄℄
℄
℄
317322-165560
25 kVA 120/240V (A)
EAR
13
ROW 60'
317315-165598
4/0CU ABCN317319-165523 4/3
10 kVA 120/240V (C)
SLAG3618
317317-165584
15 kVA 120/240V (B)
SLAG7034
ROW 60'
317317-165561 4/2
SLAG7033
90°
R=48"
CUST. PROVIDED
4' X 4' WORKPIT
PSE PROVIDED & CUSTOMER INSTALLED
1-2" SCH'L 80 DISCONTINUOUS PVC
CONDUIT ±25' IN CUST. PROVIDED TRENCH
±10'±15'CUST. PROVIDED
6' X 6' WORKPIT
W/ 6" BEDDING OF 5/8" CRUSHED ROCK
PSE INSTALL 1-RUN 1Ø PRI. 12KV1/0 UG
JKT CABLE ±35'
(AØEJN511)
SITE PLAN
N
Vicinity Map
47.4658, -122.2274
Owner / Developer Contact Info
officeATTN:
Amazon.com Services, LLC
410 Terry Avenue North
Seattle, WA 98109
Shane Walker 253-228-1753
OVERHEAD CIRCUIT MAP
SCALE: 6" = 1 MILE
CIRCUIT LOADING TABLE
AS OF
EXIST. PEAK LOAD
EST. NEW LOAD
TOTAL
CIRCUIT:
A PHASE B PHASE C PHASE
EAR-13
10/18/2023
108 106 110
1 --
109 106 110
Superior
ORDER#NOTIF#
PWR
PROJECT PHASE
FOREMAN (CHECK BOX WHEN COMPLETED)
PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition.
Grid, Cable, and Switch numbers INSTALLED & VERIFIED.
Field Changes RED-LINED on As-built.
Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE.
Foreman's Signature _______________________________________________
Print Name ___________________________________ Date ______________
Material VERIFIED and CHANGES noted on Paperwork.
Total PRIMARY Cable noted on As-built.
Company ID#'s RECORDED in correct location on As-built.
Deviations noted on the As-built and their reason.
I certify that the work performed meets PSE's standards and procedures
and that all quality requirements are met.
LRC:
% V. Drop:
% Flicker:
Sq. Footage:
Panel Size:
Heat Type:
Est. Demand:
N/A
200A
N/A
7KW
65A
0.6%
1.5%
E-Mail:
Cell Phone:
Project Manager Contact Information:
Manager:Jenny Chau
253-208-9480
jenny.chau@pse.com
SCALE: 1" = 50'105103610THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES
CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG
For contacts below dial 1-888-CALL PSE (225-5773)
105103610
UTILITIES
CONTACT
PHONE#
COUNTY
1/4 SEC
U-MAP NO (POWER)
OP MAP
Emer Sect Gas Wk Ctr POWER WK CTR
PLAT MAP
JOINT FACILITIES ARRANGEMENTS
DRAWN BY
CHECKED BY
APPROVED BY
FOREMAN #1
FOREMAN #2
MAPPING
INCIDENT MAOP
Gas Order Elect Order
SCALE PAGE
ENGR - POWER
ENGR - GAS
FUNCTION
PROJECT MGR
PERMITREAL ESTATE/EASEMENT
2
1
REV#
3
DATE DESCRIPTIONBY
CONTACT PHONE NO DATE
OH CKT MAP CIRCUIT NOUG CKT MAP
Jenny Chau 253-208-9480 6/1/23
Ray Reynolds 253-262-7409 6/1/23
N/A N/A N/A
Ray Reynolds -6/1/23
RW-_____Renton
AMAZON ROUNDABOUT
1Ø PRIMARY L/E
1602 RAYMOND AVE SW # LIGHTING, RENTON WA 98055
N/A N/A
N/A 105103610
AS NOTED 1 OF 1
KING N/A N/A CSPSKEPM
SW-19-23-5 N/A N/A
2305E075 2305E076 2305E075NW EAR-13
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A
N/A N/A N/A
N/A N/A N/A
N/A N/A N/A
513826924
CIRCUIT FEET ADDED: 35'
Perm. Service
CONDUIT ONE-LINE
NOT TO SCALE
UNDERGOUND MAP
NOT TO SCALE
SITE SPECIFIC NOTES
J01 EXISTING 317315-165662:
- EXISTING VAULT TO REMAIN
- INSTALL (1) L/B ELBOW 6041.1000, ELB10J
V01 NEW 317312-165549:3-19A
-INSTALL 36" X 42" 38" UNISTRUT HH & GNDS 6045.1010, MINU1SR
-SET ___KVA, 120/240V PM XFMR (MID:6247000)
-INSTALL L/B ELBOW 6041.1000, ELB10J
-INSTALL CABLE #
-INSTALL GRID #
- CONNECT CUSTOMER OWNED, INSTALLED, AND MAINTAINED 3-RUNS OF 3/0 CABLE.
M01 NEW:
PSE METER DEPT TO INSTALL 200A METER
SPAN SPECIFIC NOTES
SEE SITE PLAN, TABLES, AND ONE-LINES FOR INSTALL.
SCALE: NONE
UNISTRUT MP DETAIL
TOP VIEW
SIDE
VIEW
EXCAVATION:
4-2/3 CUBIC YARDS
Rock
Crushed
6"
3'-6"
2"
6'
6'
48"42"
36"
38"
42"
Struts
FRONT
FRONTCommunications
Primary Power
Cables or Conduit
Excavated Dirt Pile
ROADSIDE
Final Grade
24" Min
12" Min
Separation
36"
Min
Cover
48"
Max
Backfill
(No rocks over 10" diameter)
Separation
12" Min
Gas
4" Sand Bedding
32" Typical
(Power, Gas, and
Communications)
JOINT TRENCH DETAIL
Primary-Mainline Gas & Communications (NTS)
Separation
12" Min
6" or 12" Min Sand Shading after Compaction
- A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter.
Trench and backfill requirements for primary electric line extension trenches (No PSE gas)
- A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter.
FLOW DIRECTION
LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL,
SECURE WITH PEA GRAVEL BAGS (MID 9995692).
6'
3'
8"
TECHNIQUES FOR EROSION AND SEDIMENT CONTROL
SILT FENCE DETAIL
Not to Scale 0150.3200
PRIMARY TRENCH DETAIL
Installed at site:
Grid Number:
kVA Rating:
TRANSFORMER INSTALLATION (PM)
Company ID#:
Primary phase connected to:
Tested Secondary Voltage
Material ID#:
Foreman to redline the following information
25kVA 120/240v
6247000
V01
317312-165549
104354563514244178
PSE Locates Req'd
Developer Locates Req'd Yes
No
No
YesFlagging Req'd
Outages Req'd
POWER GENERAL NOTES - COMMERCIAL PROJECT
8.
EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and
restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over
PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer
will provide any and all shoring or they will side slope the trench to 1:1.
All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from
this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy.
All switching arrangements and/or outage arrangements are to be made with the Project Manager at least
three (3) working days in advance.
Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing
work to get the underground facilities located.
STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk,
etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager.
SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction
materials which would restrict construction and/or equipment access, before work can begin.
Roads shall be paved or have a compacted , crushed rock base in place.
CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from
combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard
posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water,
storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or
as required by your local municipality.
All work is to be done in accordance with local municipal and county permit requirements as applicable.
Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits
and crossings from the individual unit's meter base to the designated connection point on private property.
Inclement weather conditions may cause delays in construction times and dates.
1.
2.
3.
4.
5.
6.
7.
9.
11.
10.
CUSTOMER DEVELOPMENT NOTES:
A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING
ANY SITE WORK.
CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION
PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY.
**DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL**
CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING:
VAULTS & WORK PITS.
-PROVIDE A 4' X 4' WORK PIT AT J01.
-PROVIDE A 6' X 6' WORK PIT & 6" BEDDING OF 5/8" CRUSHED ROCK AT V01.
TRENCHING & CONDUIT.
-INSTALL ±90' OF 1-3" SCH'L 80 GREY PVC CONDUIT FROM V01 TO M01.
-REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS.
JOB SITE READINESS.
-JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO
CONSTRUCTION DATE.
-ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL
MUNICIPALITY.
-ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE
COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE.
-REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS,
VAULTS & TRENCH AT ALL TIMES.
-REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO
COMPLETE BACKFILLING.
- IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED.
-PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT.
-IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP
AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION
BEGINS .
Primary Cable & Conduit Table (Foreman to Complete)
LOCATION CONDUIT PRIMARY CABLE
QTY OF LUBE (gal.)AS BUILT
INFORMATION
From To Size
(in)
Qty
Design
Length
(ft)
Actual
Length
(ft)
TYPE BENDS PULL
(lbs)
PULL
Rev
(lbs)
Cable
Size
Design
Length
(ft)
Actual
Length
(ft)
CABLE NUMBERS MANUFACTURING INFORMATION
DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Design As Built
Actual Amount
Installed
(Conduit & Cable)
J01 V01 2"1 25'X 2 0 0 0 52.4 54.7
PRI
12KV
1/0 UG
35'EJN511
COOLING
5' MIN
5' MIN
10' MIN
5'
MIN
FINS
ACCESS
CONCRETE PAD
MINIMUM CLEARANCES FOR PADMOUNT TRANSFORMER AND VAULT
CURB OR EDGE OF PAVEMENT
CURB OR EDGE OF PAVEMENT
5' MIN
ROAD OR
PARKING AREA
TYP. PAD
& TRANS-
FORMER
1.5' MIN
DOOR
ACCESS
DOOR
REQUIRED
WORK SPACE
AREA
Not to scale
1.5' MIN
3'
MIN
3' MIN
3' MIN
10' MIN3'
MIN
J-BOX B-FLY DETAIL (J01)
SCALE: NONE
Exist 4" (317315-165662)
Exist 4" (?)
Prop 2" (V01)
FAULT CURRENT TABLE
1Ø PM TRANSFORMERS (240/120V)
120V WINDINGS 240V WINDINGS
LOCATION SIZE R/X MIN.
%Z
FAULT
CURRENT
MIN.
%Z
FAULT
CURRENT
V01 25KVA 0.8 2.23 9,300 AMPS 1.70 6,100 AMPS
Meter Set 3002307223514244235
CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE
BLDG.# OF
METERS SOURCE # OF RUNS WIRE SIZE REMARKS
-1 V01 3 3/0 -
ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE
CABLE ONE-LINE
NOT TO SCALE
Vault & Equipment Table
Work
Locatio
n
Grid
Number
Vault Size
& Cover
Type & Size
Equipment
In Vault
Primary Bushings Transformer
ID Numbers
(Company ID)
ASBUILT
INFORMATION
Foreman-CompleteLBDC
V01 317312-165549 MINU1SR
(3'x3.5'x3.167')
PAD-1P-07-120/2
40-25 (25 kVA)1 1
ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION
STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.)
EROSION & SEDIMENT CONTROL REQUIREMENTS
NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES
(LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING
0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL
EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE
& ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS.
PREL
I
M
I
N
A
R
Y
NOT F
O
R
C
O
N
S
T
R
U
C
T
I
O
N
CUSTOMER APPROVAL
I approve the location of the trench, including road crossings,
and all electrical equipment as shown on print.
________________________
Customer's Signature
________________________
Print Name/Date
JOB SITE
JOB SITE
Michael S. Sippo
Michael S. Sippo 10/13/23