HomeMy WebLinkAbout7945.04 S 2023 0928Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 7945.04 Page 1 of 3 Report ID 7945.04 S 2023 0928
Date Thu 9/28/2023 Weather Overcast, 50’s
Arrival/Departure Time(s) 11:00am to 11:15am Travel Time (hr) 1.0
Project Name Canopy Property
Location 4130 Lincoln Ave NE, Renton
ESNW Rep., CESCL No., Phone No. & Report Statement
Steven K. Hartwig, ECO-3-9182305, (206) 677-1806
“This report is true, accurate, and complete to the best of my knowledge and belief.”
Client Info/Contact Century Communities | Stacia Bloom
Permit No(s). WAR311273
Reviewed By MLP
Initials/Date
N/A
Field Supervisor Project Manager Initials/Date
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying
with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole
responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
Type of visit: Weekly Monthly Post–Storm Event
Precipitation since last inspection (approximate): 0.42 inches
Precipitation in last 24 hours (approximate): 0.42 inches
Phase of active construction (check all that apply):
Pre-construction Clearing, demolition, or grading Infrastructure or roads
Concrete pours Vertical construction Utilities
Off-site improvements Site temporarily stabilized Final stabilization
Was water quality sampling part of this inspection? Yes No
If “Yes”:
• Record results in the table below.
• Hanna Turbidity Meter No. 28
Monitoring
Point Monitoring Location Turbidity
(NTU) pH Description of
Discharge Notes
MP-1 Beehive on Lincoln Ave NE - - - Discharge piped from vault to
beehive along Lincoln Ave.
Report ID 7945.04 S 2023 0928 Page 2 of 3
Earth Solutions NW, LLC
Erosion Control BMPs
(13 Elements)
Overall
Condition
(Good; Fair; Poor)
Needs
Repair?
(Yes; No)
Comments
1. Preserve Vegetation; Mark Clearing Limits
• Buffer Zones around Sensitive Areas
• Silt Fence G N -Site perimeter marked by silt fence, high visibility
fence, traffic cones and chain-link fence.
-Wall in at NE perimeter of site.
2. Establish Construction Access
• Fabric; Quarry Spalls
• Wheel Wash
• Sweeper Truck
G N
-Stabilized construction entrance off of Lincoln Ave
NE using quarry spalls.
-Little to no track-out visible at time of visit; Continue
to utilize sweeper truck often.
3. Control Flow Rates
• Stormwater Vault or Facility
• Straw Wattles • Check Dams
G N -Stormwater vaults at NW corner of site.
4. Install Sediment Controls
• Silt Fence
• Straw Bale Barriers • Vegetation • Straw
• Sediment Ponds, Traps & Filters
• Treatment
• Water Truck
F N
-Silt fence installed where needed for sediment
control. New silt fence installed at NW corner of
site.
-Curbs partially in throughout site roads; on-site roads partially paved.
-Recommend utilizing water truck often on site roads
to prevent dust buildup as needed.
5. Stabilize Soils
• Nets & Blankets
• Mulch, Bark & Rock • Hydroseeding; Grass
• Plastic Sheeting
• Stockpiles
F N
-Lots of exposed soils are being actively worked at
time of visit.
-Cover any stockpiles with plastic sheeting if
unworked 2+ days.
6. Protect Slopes
• Benching; Track-Walking • Pipe Slope Drains • Plastic Sheeting; Anchors
G N
-Slopes actively worked during time of visit; Cover
slopes with plastic sheeting if unworked for 2+ days.
-New plastic sheeting installed on mid-tier
slopes; Rest of slopes are hydroseeded.
7. Protect Drain Inlets
• Catch Basin Inserts G N -Catch basins installed throughout site roads.
8. Stabilize Channels and Outlets
• Channel Lining
• Check Dam
• Outlet Protection • Nets and Blankets
- - N/A
9. Control Pollutants • Chemical Storage Area Covered
• Concrete Handling
G N -Storage shack on-site.
10. Control Dewatering G N -Water from vault piped to beehive on Lincoln Ave
NE when needed.
11. Maintain BMPs F N -Maintain BMPs.
12. Maintain SWPPP & Site Logbook G N -Available upon request.
13. Protect Low-Impact Development (LID BMPs)
• Bioretention Rain Garden Facilities • Permeable Pavement - - N/A
Do existing BMPs need to be modified or removed, or do other BMPs need to be installed? Yes No
List the action items in the table below:
Element
# Description and Location Action Required Completion
Date
4 New silt fence installed at NW corner of site near elevation low
spot. N/A 9/28/2023
5 New plastic sheeting installed on mid-level tier slopes. N/A 9/28/2023
Report ID 7945.04 S 2023 0928 Page 3 of 3
Earth Solutions NW, LLC
BMP LEGEND
CONSTRUCTION ENTRANCE
CHAINLINK FENCE
STORMWATER VAULT
MONITORING POINT
STOCKPILE
PLASTIC SHEETING
HIGH VISBILITY FENCE
CUTBACK CURB
HYDROSEED
SILT FENCE