Minor Franchise Permit: MFP23005057
IVR Number: 23005057
Permit Information
Permit Name: Comcast Cable Franchise Permit
Address/Location:10/04/2023Application Date:0823059129Parcel Number: 420 SUNSET BLVD N
Permit Type:10/18/2023Issue Date:Franchise
Permit Work Class:10/17/2024Expiration Date:Minor Utility
Job Number: JB0001387736Franchise Type:Cable
Description: Comcast JB0001387736 UPGRADE EXISTING 24"X36" VAULT TO 25TA VAULT PER DETAIL 1 ON SHEET 4. TIE IN
CABLE LOCATION. REMOVE EXISTING LANDSCAPE & TRENCH (3) 4" CONDUITS @ 3' DEPTH. PULL CABLE
THROUGH. SET UP BORE PIT & BORE (3) 4" CONDUITS @ 5' DEPTH. PULL CABLE THROUGH. PROOF & PULL
CABLE THROUGH EXISTING RISER ON POLE. POTHOLE ALL EXISTING UTILITIES. RESTORATION PER CITY OF
RENTON STANDARDS.
Contacts
Name Address PhoneTypeBilling
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
ApplicantX
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contact
Jessamin Santos
Comcast
410 Valley Ave NW, Suite 12 Bldg C
Puyallup, WA 98371
B: (206) 401-2188Contact
David Standring
Cannon Construction LLC
406 Porter Way
Milton, WA 98354
B: (253)
922-2787x286
Contractor
Business License Number: 20838Construction Contractor: CANNOCL791JK
HONIG MOLLY 9810 130TH AVE NE
KIRKLAND , WA 98033
Owner
Laurie Dietz
Comcast - Billing
1701 John F. Kennedy Blvd.
Philadelphia, PA 19103
H: (425) 741-5733Specialized
Billing
General Conditions & Signature
Permission is hereby given for the work described on this permit according to the conditions hereon and according to the
approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton.
Ÿ
This permit and plans must be posted at the job site at all times.Ÿ
I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to
Renton Trench Restoration and Street Overlay Requirements.
Ÿ
Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY
work in the Right of Way.
Ÿ
Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ
In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010)
(Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission
pipeline company prior to performing any construction or excavation activities. This requirement to consult with the
transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122.
Ÿ
(Date)(Signature)
Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES
DEPARTMENT OF COMMUNITY
AND ECONOMIC DEVELOPMENT
Page 1 of 1 | Published: 1/2/2019
Planning Division | 1055 South Grady Way, 6th Floor | Renton, WA 98057 | 425-430-7200
Email: franchisepermits@rentonwa.gov Website: rentonwa.gov
FRANCHISE PERMIT APPLICATION
Published: 1/2/2019
TO THE APPLICANT: Submit an electronic copy of the plans with the Franchise Permit Application and the Site
Specific Traffic Control Application to franchisepermits@rentonwa.gov. Permit cost is $630.00. Inspection fee
for trenching more than 60 lineal feet or installation of 6 or more poles will be billed at $60.00 per hour.
Franchise Agency:
Franchise Job Number: Phone:
Contact Name: Email:
Job Site Address: Project Name:
Description of Work:
Please check all that apply:
☐New Construction ☐Repair/Relocate ☐Underground ☐Overhead ☐Sidewalk ☐Street
☐Open Trench ☐ Bore # of feet:
Contractor Name: Phone:
State Contractors License #: City of Renton Business License #:
“I certify that I am the owner or applicant’s authorized agent and do hereby agree to abide to the terms and conditions set forth
under this permit and shall comply with the City of Renton’s Trench Restoration and Street Overlay Requirements. ”
Signature Date
INSPECTIONS SHALL BE REQUESTED 24 HOURS PRIOR TO COMMENCEMENT OF ALL WORK BY CALLING THE
INSPECTION LINE AT 425-430-7203 OR BY GOING TO MYBUILDINGPERMIT.COM
Jobs are required to be called in for job start, re-inspection and project final. Re-inspection fees are billed at
$125/hour. All Pre-Construction meetings shall be scheduled at a maximum of 14 days prior to the job start date.
Plan Review/Development Engineering Date Approved as submitted
Pre-Construction Meeting required
Site Construction Inspector Date Approved with comments or redlines
Camera inspection of utilities required
Development Engineering Manager Date
Comcast Cable Communications Management
JB0001387736
Jessamin Santos
206-401-2188
jessamin_santos@comcast.com
420 SUNSET BLVD N RENTON, WA 98057 WSDOT I405 & SUNSET BLVD N
WRECK OUT EXISTING VAULT. PLACE NEW VAULT. DRILL NEW CONDUIT. TIE IN AT EXISTING POLE.
285
Cannon Construction LLC - David Standring 253-922-2787
601590363 20838
10/4/2023
MFP23005057
Scott Warlick 10/18/2023
POTHOLE ALL EXISTING UTILITIES RESTORATION PER CITY OF RENTON STANDARDS
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1.Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2.The following items are all required for submittal of the TCP Application:
☐Electronic Copy of the TCP Application
☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
-Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3.Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
JB0001387736
420 SUNSET BLVD N RENTON, WA 98057
Cannon
Jessamin Santos 206-401-2188
410 Valley Ave NW, Suite 12, Bldg C Puyallup
WRECK OUT EXISTING VAULT & PLACE NEW VAULT. DRILL NEW CONDUITS. PULL CABLE UP RISER OF EXISTING POLE.
MFP23005057
Monday - Friday 8:00AM - 3:00PM
Scott Warlick CED 10/18/2023
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
Jessamin Santos
10/04/2023
RAMPR
AM
P
I-405 FWYSUNS
E
T
B
L
V
D
N
E
GRA
N
D
E
Y
W
A
Y
N
E
RO
W
ROW
RO
W
ROW
ROW
ROW
ROW
ROWROWROW
ROW ROW
ROW
ROW ROW
ROW
ROW
ROWROWROWROWROWROW
ROW
ROW
ROWROWROWROW
ROW
ROW
ROW
ROWROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW ROW
ROW ROW
ROW ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROWROWROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROW
ROWROW
ROWROW
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP EOP
EOP
EOP
EOP
EOP
S/W
S/W
S/W
S/WS/W
S/WS/W
S/W
S/WS/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/WS/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/WEOPEOPEOPEOPEOPEOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOP EOPEOP
EOP EOP EOPEOPEOP EOP EOPEOP
EOPEOPEOPEOP EOPEOP
EOP
EOP
EOP
EOP
EOP EOP EOPEOP EOPEOP EOPEOPU U
U
U
UUUUUUU U U
U UU
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOP
EOP
EOP EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
FL
FL
FL
FL FL FL FLFL
FLFLFLFL FLFLFL
FL
FL
FL
FL
FL
FL
FL
FL
FL
FL
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOP
EOP
EOP
EOP
EOPEOPEOPEOPEOPFLFLFLFL
FLFLFL
FLFLFL
FLFL
FL
FL
FL
FL
FLFL
FLFLFLFLFLFL FLFLFLFLFLFLFLFLFL FL FL
FL
FL
FL
FL
FL
FLFLFLFL
FL
FL
FL
FL
FLFLFLFL
FLFLFLFLFLFLFLEOP
EOPEOPEOPEOP
EOPEOPEOPEOPEOPEOP
EOP EOP EOP
EOP
EOP EOP
EOP EOP EOP EOP EOP EOP
EOP EOPEOP EOPEOPEOPEOPEOP
EOP
EOP
EOPFLFLFLFLFLFLFL FLFLFLFLFLFL
FL FL
FL
FL
FL
FL FL FLEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP EOPEOP EOP
FLFLFLFL FLFLFL FLFLFLFL
FL
FL
FL
FL
FL
FLFL
FLFLFLFL
FLFL
FL
FLFL
FLFLFLFL
FLFLFLFLEOP
EOP EOPEOP EOP EOPEOP EOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOP
EOP
EOPEOP
EOP
EOP
EOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFL
FL
FL FL
FL
FL FL
FL FLFLFL FLFL FLFLFL FL FLFLFLFLFLEOP
EOP EOPEOPEOPEOPEOP
EOP
EOP
EOP EOP
EOP
EOP
EOP
EOP
EOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP EOPEOPEOP
EOP
EOP EOPS/W
S/W
S/W
S/WS/W
S/W
S/W
S/W
S/W
S/W
S/W
S/WS/W
S/W
S/W S/W S/W
S/W
S/W
S/W S/WS/WS/WS/W S/W S/W S/WS/WS/W
S/WS/W
S/W
S/W
S/W
S/W S/WS/W S/W S/W S/WS/WS/WS/W
FL
FL
FL
FLFL
FL
FL
FL
FL
FL
FL
FL
FL FLFL FLFL FLFL FLFLFL FLEOP
EOP
EOP EOPEOP
EOP EOP EOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP EOPEOP EOP EOP EOPEOPEOPEOPEOP
EOP
EOP
EO
P
EO
P
EOP
EOP
EOP
EOP
EOP
EOPEOP
EOP
EOP
EOPEOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOPEOPEOP
EO
P
EO
P
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOPEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
S/W
S/W
S/WS/WS/WS/WS/WS/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/WS/W
S/W
S/WS/W
S/WS/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/WS/WS/W
S/WS/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/WS/W
S/WS/WS/WS/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
SUNSE
T
B
L
V
D
N
ELANDSCAPE LANDSCAPELANDSCAPE
LANDSCAPE EOPEOPEOPLANDSCAPE EOPEOPEOPEOPLANDSCAPERAMPSHOULDERLANDSCAPEASPHALTMEDIAN
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOPEOP
EOP
ASPHALTMEDIAN
ASPHALTMEDIAN
HOUS
ER
W
AY BY
PA
S
S HOUSER WAY BYPASSASPHALTMEDIAN
SUN
S
E
T
B
L
V
D
N
GRANDEY
WAY
NE
12
12
11
12
12
11
12
12
12
12
12
12
1212
12
12
12
12
11
12
12
ASPHALTMEDIAN
12
12
12
12
12
12
12
12
12
12
12
462
402
474
469
433
459
505
454
466
404
478
420
410
0
0
409
455
458
473
408
509
470
406
411
451
501
410
11
12
SUNSE
T
B
L
V
D
N
ASPHALTMEDIAN
B = 20
0'XXXWT
WORK AREA
WT
L = 160'
WORK AREA XR2-1
R2-1
18'
F
AS
FLAGGER
PEDESTRIANSPOTTER
FLAGGER/SPOTTER TO DIRECT AND
ASSIST PEDESTRIANS AROUND
WORK AREA
SUNSET BLVD NPEDESTRIANSPOTTER
TRAFFIC CONTROL PLAN
THE DESIGNED TRAFFIC CONTROLS CONTAINED WITHIN
THIS TCP WILL NOT BE IMPLEMENTED UNTIL APPROVED
BY THE PUBLIC AUTHORITY HAVING JURISDICTION
DISCLAIMER
All traffic control setups, sign spacing, and procedures will conform to the
specifications stated in the federal Manual on Uniform Traffic Control Devices
(M.U.T.C.D)
Cities and various municipalities may have also adopted specialized guidelines
for traffic control within their jurisdiction. It is the responsibility of the on-site
traffic control personnel to verify if any special conditions exist.
TRAFFIC CONTROL ADDITIONAL NOTES
- Will coordinate with any businesses that will be affected by construction
- Temporary "NO PARKING" signs to be placed at least 72 hours prior to work
- Driveway access will be maintained unless otherwise noted
- Sidewalk of 4' width will be maintained for pedestrian access unless
otherwise noted, spotter on site to escort pedestrians through work zone
- All work will stop while pedestrians are escorted through work zones
- Signs within roadway will be protected by channelization devices
- All traffic control devices used for night work must be retroreflective
FLAGGERSPOTTERLEGEND
Work Vehicle Truck Mounted Attenuator Work Area
Flagger Spotter Traffic Safety Cone/Drum
WT WT
SIGN SPACING = X (FEET)
FREEWAYS & EXPRESSWAYS 50/70 MPH 1500' +/-(OR AS PER MUTCO)
RURAL HIGHWAYS 60/65 MPH 800' +/-
RURAL ROADS 45/55 MPH 500' +/-
RURAL ROADS & URBAN ARTERIALS 35/40 MPH 350' +/-
RURAL ROADS & URBAN ARTERIALS
RESIDENTAL & BUSINESS DISTRICTS
URBAN STREETS 25 MPH OR LESS 100' +/-
25/30 MPH 200' +/-
ALL SIGNS ARE 48"x48" BLACK ON ORANGE UNLESS OTHERWISE DESIGNATED
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE INTERCHANGE RAMPS, AT GRADE
INTERSECTIONS AND DRIVEWAYS.
(2) THE SPACING MAY BE REDUCED IN URBAN AREAS TO FIT ROADWAY CONDITIONS.
SPEED 25 30 35 45 50 55
155 200 250 360 425 495 570
LONGITUDINAL BUFFER SPACE = B
LENGTH
40
305
60 65 70
780 840
10 105 150 205 270 450 500 550 ---
11 115 160 225 295 495 550 605 660 --
12 125 180 245 320 540 600 660 720 780 840
LANE
WIDTH 25 30 35 40 45 50 55 60 65 70
MINIMUM TAPER LENGTH IN FEET = L
POSTED SPEED LIMIT (MPH)
/
PM CONTACT INFORMATION:
DRAWN BY:
PROJECT MANAGER:
N
S
EW
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCSilas Schroeder
(P): (253) 709-3302
(E): sschroeder@teamcannon.comJB0001387736WSDOT I405 & SUNSET BLVD420 SUNSET BLVD NRENTON, WA 98057FORCED RELOCATES17-050
10/04/2023
SS
AM
TRAFFIC CONTROL
1 1
WORK TYPE:UNDERGROUND WORK
MFP23005057
WORK AREA
PROJECT MAP:
POLE INFORMATION:
POLE COUNT =
POLES THAT NEED PERMIT =
POLES THAT NEED MAKE READY =
TRANSMISSION =
DISTRIBUTION =
0
0
0
0
0
CANNON COMPANIES
SAFETY | QUALITY | INTEGRITY | TEAMWORK
Connecting The Future Since 1985
SITE ADDRESS:
420 SUNSET BLVD N
RENTON, WA 98057
CONTACTS:
CANNON COMPANIES
Silas Schroeder - (253) 709-3302 - sschroeder@teamcannon.com
COMCAST COMMUNICATION
Danny Cooley - (253)-215-7020 - Danny_Cooley@comcast.com
SCOPE OF WORK:
JB0001387736
WSDOT I405 & SUNSET BLVD N
SHEET INDEX
1 -COVER
2 -GENERAL NOTES
3 -LEGEND
4 -DETAILS
5-6 -CONSTRUCTION PLAN
7 -BORE PROFILE
-UPGRADE EXISTING 24"X36" VAULT TO 25TA VAULT PER DETAIL 1 ON SHEET 4. TIE IN
CABLE LOCATION.
-REMOVE EXISTING LANDSCAPE & TRENCH (3) 4" CONDUITS @ 3' DEPTH. PULL CABLE
THROUGH.
-SET UP BORE-PIT & BORE (3) 4" CONDUITS @ 5' DEPTH. PULL CABLE THROUGH.
-PROOF & PULL CABLE THROUGH EXISTING RISER ON POLE.
N
S
EW
*ALL FOOTAGES AND MATERIALS ARE ESTIMATEDBILL OF MATERIALS*:
NEW AERIAL =
OVERLASH =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
RISER =
TOTAL ROW FOOTAGE =
FT.
FT.
FT.
FT.
FT.
FT.
ROW FOOTAGES*:
NEW BUILDING PATHWAY =
EXISTING BUILDING PATHWAY =
NEW UNDERGROUND =
EXISTING UNDERGROUND =
TOTAL SITE FOOTAGE =
FT.
FT.
FT.
FT.
FT.
SITE FOOTAGES*:
TOTAL PROJECT FOOTAGE = FT.
0
0
308
0
(1)25
333
0
0
0
0
0
333
FT + 20% STORAGE = FTCABLE333400
Forced RelocatesForced Relocates
FT + 20% STORAGE = FTCABLE333400
MFP23005057
STANDARD
1. THE LOCATIONS OF UTILITIES SHOWN ON THE PLANS ARE APPROXIMATE. ALL UTILITY LOCATIONS SHALL BE VERIFIED PRIOR TO CONSTRUCTION.
THE CONTRACTOR, AT HIS OWN EXPENSE, SHALL MAKE EXCAVATIONS AND BORINGS AHEAD OF THE WORK, AS NECESSARY, TO DETERMINE
THE EXACT LOCATIONS OF UTILITIES AND UNDERGROUND STRUCTURES. IT IS UNDERSTOOD THAT THERE WILL BE INTERFERING UTILITIES AND
OTHER UNDERGROUND PIPES, DRAINS OR STRUCTURES ENCOUNTERED THAT ARE NOT SHOWN OR AREAS SHOWN INCORRECTLY ON THE
PLANS OR THAT HAVE NOT BEEN PREVIOUSLY DISCOVERED IN THE FIELD. THE CONTRACTOR AGREES THIS IS A NORMAL AND USUAL
OCCURRENCE IN THE CONSTRUCTION OF UNDERGROUND IMPROVEMENTS. FURTHERMORE, CONTRACTORS UNDERSTAND AND AGREE THAT
WORK IN SOME CASES PROPOSED PATH MAYBE IN CLOSE PROXIMITY TO SAID UTILITIES AND UNDERGROUND PIPES, DRAINS AND STRUCTURES
NOT SHOWN ON THE PLANS WHICH MAY REQUIRE A CHANGE IN OPERATIONS AND MAY CAUSE SLOUGHING OF THE TRENCH, ADDITIONAL
TRAFFIC CONTROL, ADDITIONAL PAVEMENT AND BACKFILL COSTS AND TIME. THE CONTRACTOR AGREES THAT A REASONABLE NUMBER OF
THESE OCCURRENCES IS USUAL AND ORDINARY, AND ARE REFLECTED IN THE BID AND PLAN OF OPERATION. THE CONTRACTORS AGREES TO
PROVIDE FOR THESE CONFLICTS AND AGREES TO PROVIDE FOR A REASONABLE AMOUNT OF TIME FOR DESIGN CHANGES AND/OR UTILITY
RELOCATIONS DUE TO SAID CONFLICTS.
2. CALL THE UTILITIES UNDERGROUND LOCATION CENTER AT 811
3. INSPECTIONS - THE CONTRACTOR SHALL NOTIFY LOCAL JURISDICTIONS FOR REQUIRED INSPECTION SERVICES.
4. EXCESS WATER - SHOULD WATER BE ENCOUNTERED DURING CONSTRUCTION, IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO DEWATER,
AS PER LOCAL JURISDICTIONS STANDARD SPECIFICATIONS, BEFORE CONSTRUCTION CONTINUES.
5. NO SILT LADEN WATER IS TO BE DISCHARGED FROM THE SITE WITHOUT PASSING THROUGH AN EROSION CONTROL SYSTEM.
6. THE CONTRACTOR SHALL SCHEDULE AND CONTROL HIS/HER WORK SO AS TO COMPLY WITH ALL APPLICABLE ORDINANCES TO PREVENT ANY
HAZARDS TO PUBLIC SAFETY, HEALTH AND WELFARE.
7. ALL STREETS SHALL BE KEPT FREE OF DIRT AND DEBRIS ON A CONTINUOUS BASIS.
8. AN APPROVED COPY OF THESE PLANS WILL BE ON THE JOB SITE WHENEVER CONSTRUCTION IS IN PROGRESS.
9. THE CONTRACTOR SHALL BE SOLELY AND COMPLETELY RESPONSIBLE FOR THE CONDITIONS OF THE JOB SITE, INCLUDING SAFETY OF ALL
PERSONS AND PROPERTY DURING THE PERFORMANCE OF THE WORK. THIS REQUIREMENT WILL APPLY CONTINUOUSLY AND NOT BE LIMITED
TO NORMAL WORKING HOURS.
10. PEDESTRIAN AND VEHICULAR ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED AT ALL TIMES EXCEPT WHERE PRIOR WRITTEN
APPROVAL FROM THE PROPERTY OWNER HAS BEEN OBTAINED.
11. BARRICADE OPEN DEPRESSIONS AND HOLES OCCURRING AS PART OF THIS WORK, AND POST WARNING LIGHTS ON ADJACENT PROPERTIES
WITH PUBLIC ACCESS. OPERATE WARNING LIGHTS DURING HOURS FROM DUSK TO DAWN EACH DAY AND AS OTHERWISE REQUIRED.
12. PROTECT STRUCTURES, UTILITIES, PAVEMENTS, AND OTHER FACILITIES FROM DAMAGE CAUSED BY SETTLEMENT, LATERAL MOVEMENT,
UNDERMINING WASHOUT AND OTHER HAZARDS CREATED BY OPERATIONS UNDER THIS SECTION.
TRAFFIC CONTROL
1. THE CONTRACTOR IS ADVISED THAT ALL LANE CLOSURES SHALL BE KEPT TO A MINIMUM. LOCAL JURISDICTIONS WILL APPROVE ONLY THOSE
LANE AND ROADWAY CLOSURES DETERMINED TO BE NECESSARY FOR THE CONTRACTOR TO ACCOMPLISH A SPECIFIC TASK. NO LANE OR
ROADWAY CLOSURES WILL BE PERMITTED WITHOUT PRIOR APPROVALS.
2. THE CONTRACTOR SHALL KEEP ALL TRAFFIC LANES AND SHOULDERS CLEAR OF EQUIPMENT AND MATERIALS DURING NON-WORKING HOURS.
EQUIPMENT AND MATERIALS SHALL NOT BE STORED ON THE STREETS. THE CONTRACTOR'S EMPLOYEES AND AGENTS SHALL NOT PARK
PRIVATE VEHICLES ALONG THE ROADWAY OR MEDIAN.
SITE PREPARATION
1. SOD AND LAWN TO BE REMOVED SHALL BE CUT TO A NEAT VERTICAL LINE 6" MINIMUM BEYOND THE TRENCH LINE. SOD SHALL BE EITHER
REMOVED FROM THE SITE, OR CAREFULLY STOCKPILED FOR REUSE.
2. SAW CUT PAVEMENT TO A NEAT VERTICAL LINE 8" TO 12" MINIMUM BEYOND THE TRENCH LINE. REPLACE PAVEMENT WITH LIKE MATERIAL
(I.E., ASPHALT WITH ASPHALT, CONCRETE WITH CONCRETE).
3. EXCEPT AS NOTED HEREIN, ALL MATERIAL REMOVED SHALL BE TAKEN FROM THE SITE AND DISPOSED OF BY THE CONTRACTOR.
TRENCH EXCAVATION AND BACKFILL
1. TRENCH BACKFILL - WHERE MATERIAL EXCAVATED FROM TRENCHES IS UNSUITABLE FOR BACKFILL, THE CONTRACTOR SHALL BACKFILL WITH
BANK RUN GRAVEL OR MAY ELECT TO USE CDF IN LIEU OF THE COMPACTION/PROCTOR PROCESS. STONEWAY MIX 351 IS ACCEPTABLE IN ALL
LOCATIONS. QUICK SETTING MIX 1004 IS ACCEPTABLE IN NON-TRAFFIC AREAS. MIX 1121 IS TO BE USED IN TRAFFIC-BEARING LOCATIONS.
2. COMPACTION, WHEN NECESSARY, SHALL BE PERFORMED IN ACCORDANCE WITH LOCAL JURISDICTION REQUIREMENTS.
UTILITY DUCT
1. BURIED DUCT SHALL BE SCHEDULE 80 PVC OR EQUIVALENT, UNLESS NOTED OTHERWISE. MINIMUM CONDUIT COVER SHALL BE 36" WITH A
MINIMUM SLOPE OF 1/2 % TO VAULT.
2. THOROUGHLY CLEAN CONDUIT BEFORE USING OR LAYING. DURING CONSTRUCTION AND AFTER THE DUCT LINE IS COMPLETED, PLUG ENDS OF
CONDUITS TO PREVENT WATER WASHING INTO CONDUIT OR MANHOLES, TAKE PARTICULAR CARE TO KEEP CONDUITS CLEAR OF CONCRETE,
DIRT AND ANY OTHER SUBSTANCE DURING THE COURSE OF CONSTRUCTION.
3. AFTER DUCT PLACEMENT HAS BEEN COMPLETED, PROOF AND CLEAN DEBRIS FROM EACH DUCT, ITS ENTIRE LENGTH. INSTALL PULL ROPE AND
PLACE WATERTIGHT COMPRESSION PLUGS AT BOTH ENDS. ANY CONDUITS CONTAINING FIBER CABLE WILL REQUIRE SIMPLEX COMPRESSION
PLUGS SEALING THE CONDUITS AROUND THE CABLE.
4. OUTSIDE INNERDUCT SHALL BE 1-1/4" OPTIC-GUARD NON-METALLIC FLEXIBLE, IN COLOR SUCH AS RED OR ORANGE, WITH PULL ROPES AND
PLUGS. EXPOSED INNERDUCT INSIDE OF BUILDINGS SHALL BE PLENUM-RATED.
CEMENT CONCRETE PAVEMENT
1. ALL CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED ACCORDING TO THE STANDARD SPECIFICATIONS OF
EACH JURISDICTION.
ASPHALT CONCRETE PAVEMENT
1. ALL ASPHALT CONCRETE PAVEMENT REMOVED OR DAMAGED BY THIS WORK SHALL BE REPLACED WITH CLASS B ASPHALT CONCRETE
ACCORDING TO THE REQUIREMENTS OF EACH JURISDICTION.
GRAVEL AREAS
1. ALL GRAVEL AREAS DAMAGED OR REMOVED BY THIS WORK SHALL BE REPLACED WITH CRUSHED SURFACING TOP COURSE IN ACCORDANCE
WITH THE REQUIREMENTS OF EACH JURISDICTION.
SITE RESTORATION
1. ALL DISTURBED OR DAMAGED AREAS SHALL BE RESTORED TO A CONDITION EQUAL TO, OR BETTER THAN, THAT WHICH EXISTED PRIOR TO
PLACEMENT OF THE CONDUIT AND STRUCTURES.
2. VEGETATION REMOVED FOR THIS WORK SHALL BE REPLACED WITH IN-KIND PLANT MATERIAL AND SHALL BE PROPERLY PLANTED AND
WATERED IN TO ENSURE ITS SURVIVAL.
3. SITE RESTORATION SHALL INCLUDE REPLACING EXISTING CABLING AND PULL ROPES IN EXISTING CONDUITS AS THEY EXISTED PRIOR TO
CONSTRUCTION.
WATER QUALITY
1. CONSTRUCTION ACTIVITIES OCCURRING ADJACENT TO STORM DRAINAGE STRUCTURES SHALL COMPLY WITH THE STATE OF WASHINGTON'S
WATER QUALITY STANDARDS
2. THE CONTRACTOR SHALL LIMIT THE USE OF PETROLEUM PRODUCTS ON THE SITE.
DIRECTIONAL BORING
1. WHEN BORING ROADWAYS, INSTALL (1) 4" SCHEDULE 40 PVC CONDUIT WITH PULL ROPES AND PLUGS.
2. PROTECT EXISTING UTILITIES -- COORDINATE WITH LOCAL JURISDICTIONS TO POTHOLE AS REQUIRED TO LOCATE EXISTING UTILITIES.
FIRE PROTECTION
1. ALL INSTALLED BACKBOARDS SHALL BE PAINTED WITH FIRE-RESISTANT PAINT.
2. ALL FIRE SEALED DUCT ENDS AND CORES SHALL BE 2 HOUR FIRE-RATED. ALL FIRE SEAL IN EXISTING LOCATIONS SHALL BE REPAIRED OR
REPLACED UPON DUCT OR CABLE PLACEMENT.
AERIAL INSTALLATION
1. ALL AERIAL CONSTRUCTION IS TO BE PERFORMED TO INDUSTRY ACCEPTABLE STANDARDS.
2. ALL NEW AERIAL (AND EXISTING) CABLE HEIGHTS OF ATTACHMENT TO BE DOCUMENTED AT TIME OF CONSTRUCTION.
3. 6.35 MM STRAND TO BE USED WITH STANDARD 1/4" POLE LINE HARDWARE UNLESS OTHERWISE SPECIFIED. BOND STRAND TO POWER MAIN
WHERE APPLICABLE.
4. ALL ANCHORS TO BE USED WILL BE 3/4" SCREW TYPE.
5. IT IS THE CONTRACTOR'S RESPONSIBILITY TO MAINTAIN AND FOLLOW ALL NESC CODES ALONG WITH APPLICABLE LOCAL AND REGIONAL
GOVERNING AUTHORITIES. ANY DISCREPANCIES BETWEEN THESE AUTHORITIES AND OR THE CONSTRUCTION PERMITS IS TO BE VALIDATED
WITH THE DESIGNER OR ENGINEER PRIOR TO CONSTRUCTION.
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001387736WSDOT I405 & SUNSET BLVD420 SUNSET BLVD NRENTON, WA 98057FORCED RELOCATES17-050
10/04/2023
SILAS SCHROEDER
ALEX MCCOY
GENERAL NOTES
2 7
SCALE:
NO
SCALE
MFP23005057
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001387736WSDOT I405 & SUNSET BLVD420 SUNSET BLVD NRENTON, WA 98057FORCED RELOCATES17-050
10/04/2023
SILAS SCHROEDER
ALEX MCCOY
LEGEND
3 7
SCALE:
NO
SCALE
MARK-UP NOTATIONSSYMBOLSLINE TYPES HATCH PATTERNS
LANE LINE
CENTER LINE / STATION LINE
FOG LINE
EDGE OF PAVEMENT
RIGHT OF WAY
SIDEWALK
FENCE
GUARD RAIL
POWER
TRAFFIC SIGNAL
COMMUNICATION
TELECOMMUNICATION
SEWER MAIN
SIDE SEWER
DRAIN MAIN
DRAINAGE DITCH
GAS
OIL
STEAM
WATER
UNKNOWN UTILITY
STRAW WATTLES
TRAFFIC CONES
PROPOSED NEW CONDUIT
PROPOSED NEW STRUCTURE
PROPOSED NEW AERIAL STRAND
FL FL
EOP EOP
ROW ROW
S/W S/W
U U U U
P P
TS TS
C C
T T
S S
SS SS
D D
DD DD
G G
OIL OIL
ST ST
W W
UNK UNK
EXISTING CONDUIT/INFRASTRUCTURE
EXISTING AERIAL
UTILITY POLE (EXIST / NEW)
STREET LIGHT
CROSS WALK SIGNAL
SHRUBBERY
TREE
CATCH BASIN
CATCH BASIN W/ SOCK
MANHOLE
UTILITY VALVE
WATER METER
UTILITY RISER (EXIST / NEW)
CB
CB
V
M
CW
SL
R
FIRE HYDRANTFH
MH
17X30 VAULT
24X36 VAULT
36X48 VAULT
4X4 VAULT
25-TA VAULT
233-LA
444-LA
253-TA VAULT
35-TA VAULT
UNK VAULT (SIZE MAY VARY)
DH
TH
DOG HOUSE
TIGER HOUSE
P PEDESTAL
EXISTING SPLICE CASE
DISTANCE STATIONSTA 0+00
CONSTRUCTION NOTE CALLOUT#
DISTANCE DIMENSION
A
#
CROSS SECTION SYMBOL
CROSS SECTION NAME
CROSS SECTION PAGE
WORK BEING DONE1LOCATION PHOTO NOTE CALLOUT
PHOTO LOCATOR/ORIENTATION
CONCRETE ASPHALT
CONCRETE PANELS
LANDSCAPE
LIMITS OF RESTORATION
#
NEW SPLICE CASE
NEW STORAGE
FOOTAGE NOTE
FOOTAGE NOTE OVER(339')
339'
MULTIPLE SHEETS CALLOUT
GRAVEL
BRICK/COBBLE
200'
PARCEL LINES
BOREPIT
BOREPIT (SIZE MAY VARY)
N
S
EW
BUILDING OUTLINE
UTILITY POTHOLE
STREET SIGN
NORTH ARROW
LANE DIRECTION INDICATOR
#
POLE ANCHOR/GUY PROPOSED
CROSSWALK
R
POLE # CALLOUT#
CAB CABINET
NEW COAX TAP
BUS STOP LOCATION
MFP23005057
6" MINIMUM DEPTH
3/4" MINUS WASHED
GRAVEL
UTILITY VAULT 25-TA
EXISTING GRADE PROPOSED CONDUIT
ADJUSTABLE FRAME AND COVER
(NOTE: 25-TA H20 TRAFFIC SUITABLE IN OFF
STREET LOCATIONS WHERE NOT SUBJECTED TO
HIGH DENSITY TRAFFIC)
UTILITY VAULT
NO. 25-TA
NON-SKID LID
62.5"
27"
30"
25-TA HANDHOLE W/OPEN BOTTOM
STANDARD DETAIL1 TRENCH - SOFT SURFACE
STANDARD DETAIL
PROPOSED CONDUIT6"-12"
18"
18"
36"
EXISTING SOFT
SURFACE MAGNETIC LOCATOR TAPE
(ENTIRE TRENCH LENGTH)
BACKFILL COMPACTED TO
95% OF MAXIMUM
RELATIVE DENSITY OR
STONEWAY MIX 1004.
SURFACE RESTORATION
CONTRACTOR TO VERIFY
SPECIFICATION WITH LOCAL
JURISDICTION
2
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001387736WSDOT I405 & SUNSET BLVD420 SUNSET BLVD NRENTON, WA 98057FORCED RELOCATES17-050
10/04/2023
SILAS SCHROEDER
ALEX MCCOY
DETAILS
4 7
60" MIN COVER
(1) 4" DUCT
EXISTING
GRADE
TYPICAL BORE
STANDARD DETAIL3
3'3'
EX 2.5" THK
CONCRETE
SLOPE 2H:1V
BRIDGE COLUMN
36" MIN CLEARANCE
60" MIN COVER
ELEV. 88.43'
EXISTING
GRADE
12'
BORE CROSSING @ SOUTHEAST COLUMN
STANDARD DETAIL
3'
(1) 4" DUCT
4
MFP23005057
I-405 FWYEOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
D
D
D
D
D
D
D
D
D
D
D
D
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
C
C
C
C
C
C
C
C
C
C
C
C
C
U
U
U
U
UUUUUUU U
U
U
U UEOP
EOP
EOP
EOP EOPEO
P
EOP
EOP
EOP
EOP
FL
FL
FL EOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPFLFLFLFLFLFLFLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLFLEOP
EOP
EOP
S/WD
S/W S/W
FL
FL
FL
FL
LANDSCAPE
ASPHALT
MEDIAN
EOP
EOP
EOPEOP
SUN
S
E
T
B
L
V
D
N
12
12
1212
12
12
11
12
12
W
W
W
W
W
W
W
W WS
S
S
S
S
S
S
S
S
S
S
S
S
CB
MH
P
P
P
P
CAB
M
CAB
SL
T
T
T
T
T
T
T
T
T
T
T
G
G
G
G
G
G
G
G
G
G
G
G
4X4 B
O
R
E
P
I
T
℄
℄
NEW18'
PPP PPPR25'R25'
11
12 STA 17+50STA 18+00STA 18+50STA 19+00STA 19+
5
0
STA
2
0
+
0
0
P
12'
11'
7'
SUN
S
E
T
B
L
V
D
N
285'
1
2
3
3
FUTURE
BRIDGE
FOOTINGSTA 19+19
1R
2R
11'
20'
5'5'
7'
4'
6'
4'
6'MATCHLINESHEET 6CONSTRUCTION NOTES:
UPGRADE EXISTING 24"X36" VAULT TO 25TA
VAULT PER DETAIL 1 ON SHEET 4. TIE IN CABLE
LOCATION.
REMOVE EXISTING LANDSCAPE & BORE (3) 4"
CONDUITS @ 3' DEPTH. PULL CABLE THROUGH.
SET UP BORE-PIT & BORE (3) 4" CONDUITS @ 5'
DEPTH. PULL CABLE THROUGH.
PROOF & PULL CABLE THROUGH EXISTING
RISER ON POLE.
1
2
3
RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF RENTON'S
SPECIFICATIONS.
RESTORE SIDEWALK PANELS PER CITY OF
RENTON'S SPECIFICATIONS.
1R
4
2R
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001387736WSDOT I405 & SUNSET BLVD420 SUNSET BLVD NRENTON, WA 98057FORCED RELOCATES17-050
10/04/2023
SILAS SCHROEDER
ALEX MCCOY
CONSTRUCTION PLAN
5 7
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
POTHOLE DISCLAIMER
POTHOLING WILL BE PERFORMED IN
SOFT SURFACES WHEN APPLICABLE TO
REDUCE HARD SURFACE RESTORATION.
PATCH POTHOLE LOCATIONS PER
LOCAL JURISDICTION SPECIFICATIONS
LOCATION
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
SW CHARLESTOWN ST & 49TH AVE SW
SCALE:
0 10'20'
N
S
EW
MFP23005057
ROW
ROW
ROW
ROWROWROWROWROWROW
ROW
ROW
ROW
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
D
D
D
D
D
D
D
D
D
D
D
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
S/W
C
C
C
C
C
C
C
C
C
C
C
EOP
EOP
EOP
EOP
EOP
FL
FL
FL
FL
FL
FLFLFLFLEOPEOPEOPEOPEOPEOPEOPEOPFLFLFLFLEOPEOPEOPEOPFLFLFLFLFLFLFLFLEOP
EOP
EOP
EOPEOP
EOP
EOP
EOP
EOP
S/W
S/W
S/W
S/W
S/W
SUNSE
T
B
L
V
D
N
E
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
EOP
ASPHALT
MEDIAN
12
11
12
12
12
469
473
501
W
W
W
W
W
S
S
S
S
S
S
S
S
S
S
S
D
D
D
D
D
D
CB
MH
SSSSSMH
SL
T
T
T
T
T T
P
G
G
G
G
G
G
G
G
CB
4X4 BO
R
E
P
I
T
℄STA 15+00STA 15+50STA 16+00STA 16+50STA 17+00STA 17+50
10'
4'
6'
11'
21'
(285')
11'2
3
3
ASPHALT
MEDIAN STA 16+27STA 16+22
1R
5'
5'
R25'
7'MATCHLINESHEET 5CONSTRUCTION NOTES:
UPGRADE EXISTING 24"X36" VAULT TO 25TA
VAULT PER DETAIL 1 ON SHEET 4. TIE IN CABLE
LOCATION.
REMOVE EXISTING LANDSCAPE & BORE (3) 4"
CONDUITS @ 3' DEPTH. PULL CABLE THROUGH.
SET UP BORE-PIT & BORE (3) 4" CONDUITS @ 5'
DEPTH. PULL CABLE THROUGH.
PROOF & PULL CABLE THROUGH EXISTING
RISER ON POLE.
1
2
3
RESTORATION NOTES:
RESTORE LANDSCAPE PER CITY OF RENTON'S
SPECIFICATIONS.
RESTORE SIDEWALK PANELS PER CITY OF
RENTON'S SPECIFICATIONS.
1R
4
2R
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001387736WSDOT I405 & SUNSET BLVD420 SUNSET BLVD NRENTON, WA 98057FORCED RELOCATES17-050
10/04/2023
SILAS SCHROEDER
ALEX MCCOY
CONSTRUCTION PLAN
6 7
PROPOSED PATH DISCLAIMERS
1. PROPOSED PATHWAY MAY CHANGE AT TIME OF
CONSTRUCTION DUE TO UTILITY LOCATIONS AND
INSPECTOR REQUIREMENTS
2. UNKNOWN UTILITY DEPTH TO BE VERIFIED IN FIELD
DURING TIME OF CONSTRUCTION WHEN TRENCHING
DRAINAGE SYSTEM DISCLAIMER
EXISTING DRAINAGE SYSTEM (GRATE INLET, DITCH, ETC.)
SHALL BE PROTECTED AND FUNCTIONAL THROUGHOUT
THE CONSTRUCTION PROJECT. IF ANY PARTS OF THE
SYSTEM ARE IMPACTED BY CONSTRUCTION ACTIVITIES,
THEY SHALL BE RESTORED TO THE ORIGINAL CONDITIONS.
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
POTHOLE DISCLAIMER
POTHOLING WILL BE PERFORMED IN
SOFT SURFACES WHEN APPLICABLE TO
REDUCE HARD SURFACE RESTORATION.
PATCH POTHOLE LOCATIONS PER
LOCAL JURISDICTION SPECIFICATIONS
LOCATION
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
SW CHARLESTOWN ST & 49TH AVE SW
SCALE:
0 10'20'
N
S
EW
MFP23005057
STA 18+50STA 18+880
5
10
15
20
25
30
0 5 10 15 20 35 40 45 55 60 65 70 75 80 85 90 95 100 105 110 115 120 125 130 135 140 145 150 155 160 165 170 175 180 185 190 195 200 205 210 215 220 225 230 235 240 245 250 255 260 265 270 275 280 285 290 295 300
(3) PROPOSED 4"
CONDUITS (3) PROPOSED
4" CONDUITS
BORE-PITBORE-PIT STA 17+00STA 17+50STA 18+00STA 19+00STA 19+19STA 16+27STA 16+503025 50
~~
SEE DETAIL #4 ON
SHEET 4 FOR
BRIDGE FOOTING
DETAIL
SCALE:
HORIZONTAL:
VERTICAL:
1" = 5'
1" = 5'
N
S
EW
/
DATE:
DRAWN BY:
PROJECT MANAGER:
CODE:PROJECT REVISIONSREVDESCRIPTION OF CHANGEDATEBYQCJB0001387736WSDOT I405 & SUNSET BLVD420 SUNSET BLVD NRENTON, WA 98057FORCED RELOCATES17-050
09/29/2023
SILAS SCHROEDER
ALEX MCCOY
BORE/TRENCH PROFILE
11 12UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
136TH PL NE & NE 20TH ST
UTILITY LOCATION DISCLAIMER
ALL LOCATIONS OF UTILITY SHOWN ARE APPROXIMATE.
LOCATIONS OF ALL UTILITIES TO BE VERIFIED PRIOR TO
CONSTRUCTION. CALL UTILITY UNDERGROUND LOCATION
CENTER AT 1-800-424-5555
UTILITY NOTE
WHEN CROSSING EXISTING SEWER, STORM MAIN,
WATER, AND GAS UTILITIES, PROPOSED CONDUIT MUST
MAINTAIN A MINIMUM OF 12" ABOVE AND 18" BELOW
VERTICAL CLEARANCE (MEASURED FROM OUTSIDE EDGE
OUTSIDE EDGE
WHEN PARALLEL TO GAS UTILITIES PROPOSED CONDUIT
MUST MAINTAIN A MINIMUM OF 3' HORIZONTAL
CLEARANCE. WHEN PARALLEL TO ALL OTHER UTILITIES
PROPOSED CONDUIT MUST MAINTAIN A MINIMUM OF 5'
HORIZONTAL CLEARANCE.
STATION START
STATIONING STARTS AT THE INTERSECTION OF10+00
BRONSON WAY NE & SUNSET BLVD NE.
/7 7
MFP23005057