HomeMy WebLinkAboutC-1952_19805-108 Ave SE RENTON, WA, USA-COST ESTIMATE1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
•
•
Section I: Project Information
•
•
•
Section II: Bond Quantities Worksheets
•
•Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))
•Section II.b TRANSPORTATION (Street and Site Improvements)
•Section II.c DRAINAGE (Drainage and Stormwater Facilities):
•Section II.d WATER - ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON
•Section II.e SANITARY SEWER - ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON
•
•
•
•
•
•
Section III. Bond Worksheet
•
BOND QUANTITY WORKSHEET INSTRUCTIONS
This worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial
submittal to project close-out approval.
Submit this workbook, in its entirety, as follows:
The following forms are to be completed by the engineer/developer/applicant as applicable to the project:
The Bond Worksheet form will auto-calculate and auto-populate from the information provided in Section I and Section II.
This section includes all pertinent information for the project
Section II contains a separate spreadsheet TAB for each of the following specialties:
(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part
of the Technical Information Report (TIR).
(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close-out submittal.
This section must be completed in its entirety
Information from this section auto-populates to all other relevant areas of the workbook
This section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close-out
submittals to release the permit bond on a project.
All unit prices include labor, equipment, materials, overhead, profit, and taxes.
Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right-of-Way (ROW), Future Public Improvements and Private
Improvements.
The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the
project with the exception of the maintenance period reduction.
Excel will auto-calculate and auto-populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need
completing.
Additional items not included in the lists can be added under the "write-in" sections. Provide a complete description, cost estimate and unit of measure
for each write-in item.
Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the
form. Stormwater facilities (public and private) are required to be included in the bond amount.
Page 1 of 1
Ref 8-H Bond Quantity Worksheet INSTRUCTIONS
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date Prepared:
Name:
PE Registration No:
Firm Name:
Firm Address:
Phone No.
Email Address:
Project Name: Project Owner:
CED Plan # (LUA):Phone:
CED Permit # (C):Address:
Site Address:
Street Intersection:Addt'l Project Owner:
Parcel #(s):Phone:
Address:
Clearing and grading greater than or equal to 5,000 board feet of timber?
Yes/No:NO Water Service Provided by:
If Yes, Provide Forest Practice Permit #:Sewer Service Provided by:
10.1%
Total Estimated Construction Costs E
A + B + C + D 945,923.32$
Estimated Civil Construction Permit - Construction Costs2
Stormwater (Drainage)C 660,999.66$
As outlined in City Ordinance No. 4345, 50% of the plan review and inspection fees are to be paid at Permit Submittal. The balance is due at Permit Issuance.
Significant changes or additional review cycles (beyond 3 cycles) during the review process may result in adjustments to the final review fees.
Roadway (Erosion Control + Transportation)D 284,923.66$
Water A -$
Wastewater (Sanitary Sewer)B -$
Abbreviated Legal
Description:
THE NORTH 2 1/2 ACRES OF THE SOUTH EAST QUARTER OF THE
SOUTHEAST QUARTER OF NORTHWEST QUARTER IN SECTION 5,
TOWNSHIP 22 NORTH, RANGE 5 EAST 5, W.M IN KING COUNTY
WASHINGTON.
19805 108TH AVENUE SE, RENTON, WA 98055
2215 MORRIS AVE S, Renton, WA 98055
106TH AVE SE AND 198TH STREET SE
19-000075
19-000029
2023-09-20
Prepared by:
FOR APPROVALProject Phase 1
avnash@mainlandeng.com
AVNASH BANWAIT
41773
MAINLAND ENGINEERING CONSULTANTS CORPORATION
8363 128 Street Surrey, BC, Canada
604 543 8044
2 All prices include labor, equipment, materials, overhead, profit, and taxes. City of Renton Sales Tax is:
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
PROJECT INFORMATION
SOOS CREEK WATER & SEWER
SOOS CREEK WATER & SEWER
1 Select the current project status/phase from the following options:
For Approval - Preliminary Data Enclosed, pending approval from the City;
For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City;
Project Closeout - Final Costs and Quantities Enclosed for Project Close-out Submittal
Engineer Stamp Required
(all cost estimates must have original wet stamp and signature)
Clearing and Grading Utility Providers
N/A
Project Location and Description Project Owner Information
MADUENO SHORT PLAT
052205-9078
JASWANT DHALIWAL
Page 1 of 1
Ref 8-H Bond Quantity Worksheet SECTION I PROJECT INFORMATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Unit
Reference #Price Unit Quantity Cost
Backfill & compaction-embankment ESC-1 7.50$ CY
Check dams, 4" minus rock ESC-2 SWDM 5.4.6.3 90.00$ Each 3 270.00
Catch Basin Protection ESC-3 145.00$ Each 15 2,175.00
Crushed surfacing 1 1/4" minus ESC-4 WSDOT 9-03.9(3)110.00$ CY 300 33,000.00
Ditching ESC-5 10.50$ CY
Excavation-bulk ESC-6 2.30$ CY
Fence, silt ESC-7 SWDM 5.4.3.1 5.00$ LF 1500 7,500.00
Fence, Temporary (NGPE)ESC-8 1.75$ LF
Geotextile Fabric ESC-9 3.00$ SY 300 900.00
Hay Bale Silt Trap ESC-10 0.60$ Each 100 60.00
Hydroseeding ESC-11 SWDM 5.4.2.4 0.90$ SY
Interceptor Swale / Dike ESC-12 1.15$ LF 430 494.50
Jute Mesh ESC-13 SWDM 5.4.2.2 4.00$ SY
Level Spreader ESC-14 2.00$ LF
Mulch, by hand, straw, 3" deep ESC-15 SWDM 5.4.2.1 2.90$ SY
Mulch, by machine, straw, 2" deep ESC-16 SWDM 5.4.2.1 2.30$ SY 6000 13,800.00
Piping, temporary, CPP, 6"ESC-17 13.75$ LF
Piping, temporary, CPP, 8"ESC-18 16.00$ LF
Piping, temporary, CPP, 12"ESC-19 20.50$ LF
Plastic covering, 6mm thick, sandbagged ESC-20 SWDM 5.4.2.3 4.60$ SY 300 1,380.00
Rip Rap, machine placed; slopes ESC-21 WSDOT 9-13.1(2)51.00$ CY
Rock Construction Entrance, 50'x15'x1'ESC-22 SWDM 5.4.4.1 2,050.00$ Each
Rock Construction Entrance, 100'x15'x1'ESC-23 SWDM 5.4.4.1 3,675.00$ Each 1 3,675.00
Sediment pond riser assembly ESC-24 SWDM 5.4.5.2 2,525.00$ Each 1 2,525.00
Sediment trap, 5' high berm ESC-25 SWDM 5.4.5.1 22.00$ LF
Sed. trap, 5' high, riprapped spillway berm section ESC-26 SWDM 5.4.5.1 80.00$ LF
Seeding, by hand ESC-27 SWDM 5.4.2.4 1.15$ SY 6000 6,900.00
Sodding, 1" deep, level ground ESC-28 SWDM 5.4.2.5 9.20$ SY
Sodding, 1" deep, sloped ground ESC-29 SWDM 5.4.2.5 11.50$ SY
TESC Supervisor ESC-30 125.00$ HR 40 5,000.00
Water truck, dust control ESC-31 SWDM 5.4.7 160.00$ HR 20 3,200.00
Unit
Reference #Price Unit Quantity Cost
EROSION/SEDIMENT SUBTOTAL:80,879.50
SALES TAX @ 10.1%8,168.83
EROSION/SEDIMENT TOTAL:89,048.33
(A)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR EROSION & SEDIMENT CONTROL
Description No.
(A)
WRITE-IN-ITEMS
Page 1 of 1
Ref 8-H Bond Quantity Worksheet SECTION II.a EROSION_CONTROL
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
GENERAL ITEMS
Backfill & Compaction- embankment GI-1 7.00$ CY
Backfill & Compaction- trench GI-2 10.25$ CY
Clear/Remove Brush, by hand (SY)GI-3 1.15$ SY
Bollards - fixed GI-4 275.00$ Each
Bollards - removable GI-5 520.00$ Each
Clearing/Grubbing/Tree Removal GI-6 11,475.00$ Acre 0.2 2,295.00 0.57 6,540.75 1.4 16,065.00
Excavation - bulk GI-7 2.30$ CY
Excavation - Trench GI-8 5.75$ CY
Fencing, cedar, 6' high GI-9 23.00$ LF
Fencing, chain link, 4'GI-10 44.00$ LF
Fencing, chain link, vinyl coated, 6' high GI-11 23.00$ LF
Fencing, chain link, gate, vinyl coated, 20' GI-12 1,600.00$ Each
Fill & compact - common barrow GI-13 28.75$ CY
Fill & compact - gravel base GI-14 31.00$ CY
Fill & compact - screened topsoil GI-15 44.75$ CY
Gabion, 12" deep, stone filled mesh GI-16 74.50$ SY
Gabion, 18" deep, stone filled mesh GI-17 103.25$ SY
Gabion, 36" deep, stone filled mesh GI-18 172.00$ SY
Grading, fine, by hand GI-19 2.90$ SY
Grading, fine, with grader GI-20 2.30$ SY
Monuments, 3' Long GI-21 1,025.00$ Each
Sensitive Areas Sign GI-22 8.00$ Each
Sodding, 1" deep, sloped ground GI-23 9.25$ SY
Surveying, line & grade GI-24 975.00$ Day
Surveying, lot location/lines GI-25 2,050.00$ Acre 1.9 3,895.00 0.57 1,168.50 1.65 3,382.50
Topsoil Type A (imported)GI-26 32.75$ CY
Traffic control crew ( 2 flaggers )GI-27 137.75$ HR
Trail, 4" chipped wood GI-28 9.15$ SY
Trail, 4" crushed cinder GI-29 10.25$ SY
Trail, 4" top course GI-30 13.75$ SY
Conduit, 2"GI-31 5.75$ LF
Wall, retaining, concrete GI-32 63.00$ SF
Wall, rockery GI-33 17.25$ SF
SUBTOTAL THIS PAGE:6,190.00 7,709.25 19,447.50
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 1 of 3
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
ROAD IMPROVEMENT/PAVEMENT/SURFACING
AC Grinding, 4' wide machine < 1000sy RI-1 34.50$ SY
AC Grinding, 4' wide machine 1000-2000sy RI-2 18.25$ SY
AC Grinding, 4' wide machine > 2000sy RI-3 11.50$ SY
AC Removal/Disposal RI-4 40.00$ SY
Barricade, Type III ( Permanent )RI-5 64.25$ LF
Guard Rail RI-6 34.50$ LF
Curb & Gutter, rolled RI-7 19.50$ LF
Curb & Gutter, vertical RI-8 14.25$ LF 230 3,277.50 1170 16,672.50
Curb and Gutter, demolition and disposal RI-9 20.50$ LF
Curb, extruded asphalt RI-10 6.25$ LF
Curb, extruded concrete RI-11 8.00$ LF
Sawcut, asphalt, 3" depth RI-12 3.00$ LF
Sawcut, concrete, per 1" depth RI-13 5.00$ LF 260 1,300.00
Sealant, asphalt RI-14 2.25$ LF
Shoulder, gravel, 4" thick RI-15 17.25$ SY
Sidewalk, 4" thick RI-16 43.50$ SY 140 6,090.00 260 11,310.00
Sidewalk, 4" thick, demolition and disposal RI-17 37.00$ SY
Sidewalk, 5" thick RI-18 47.00$ SY 70 3,290.00
Sidewalk, 5" thick, demolition and disposal RI-19 46.00$ SY
Sign, Handicap RI-20 97.00$ Each
Striping, per stall RI-21 8.00$ Each
Striping, thermoplastic, ( for crosswalk )RI-22 3.50$ SF
Striping, 4" reflectorized line RI-23 0.55$ LF
Additional 2.5" Crushed Surfacing RI-24 4.15$ SY
HMA 1/2" Overlay 1.5" RI-25 16.00$ SY 320 5,120.00
HMA 1/2" Overlay 2"RI-26 20.75$ SY
HMA Road, 2", 4" rock, First 2500 SY RI-27 32.25$ SY
HMA Road, 2", 4" rock, Qty. over 2500SY RI-28 24.00$ SY 365 8,760.00 1635 39,240.00
HMA Road, 4", 6" rock, First 2500 SY RI-29 51.75$ SY
HMA Road, 4", 6" rock, Qty. over 2500 SY RI-30 42.50$ SY
HMA Road, 4", 4.5" ATB RI-31 43.50$ SY
Gravel Road, 4" rock, First 2500 SY RI-32 17.25$ SY
Gravel Road, 4" rock, Qty. over 2500 SY RI-33 11.50$ SY
Thickened Edge RI-34 10.00$ LF
SUBTOTAL THIS PAGE:27,837.50 67,222.50
(B)(C)(D)(E)
Page 2 of 3
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR STREET AND SITE IMPROVEMENTS
Quantity Remaining
(Bond Reduction)
(B)(C)
PARKING LOT SURFACING No.
2" AC, 2" top course rock & 4" borrow PL-1 24.00$ SY
2" AC, 1.5" top course & 2.5" base course PL-2 32.00$ SY
4" select borrow PL-3 5.75$ SY
1.5" top course rock & 2.5" base course PL-4 16.00$ SY
SUBTOTAL PARKING LOT SURFACING:
(B)(C)(D)(E)
LANDSCAPING & VEGETATION No.
Street Trees LA-1
Median Landscaping LA-2
Right-of-Way Landscaping LA-3
Wetland Landscaping LA-4
SUBTOTAL LANDSCAPING & VEGETATION:
(B)(C)(D)(E)
TRAFFIC & LIGHTING No.
Signs TR-1 250.00$ 1 250.00 5 1,250.00
Street Light System ( # of Poles)TR-2 6,000.00$ 2 12,000.00 6 36,000.00
Traffic Signal TR-3
Traffic Signal Modification TR-4
SUBTOTAL TRAFFIC & LIGHTING:12,250.00 37,250.00
(B)(C)(D)(E)
WRITE-IN-ITEMS
SUBTOTAL WRITE-IN ITEMS:
STREET AND SITE IMPROVEMENTS SUBTOTAL:46,277.50 112,181.75 19,447.50
SALES TAX @ 10.1%4,674.03 11,330.36 1,964.20
STREET AND SITE IMPROVEMENTS TOTAL:50,951.53 123,512.11 21,411.70
(B)(C)(D)(E)
Page 3 of 3
Ref 8-H Bond Quantity Worksheet SECTION II.b TRANSPORTATION
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
DRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.)
Access Road, R/D D-1 30.00$ SY
* (CBs include frame and lid)
Beehive D-2 103.00$ Each
Through-curb Inlet Framework D-3 460.00$ Each
CB Type I D-4 1,725.00$ Each
CB Type IL D-5 2,000.00$ Each
CB Type II, 48" diameter D-6 3,500.00$ Each 9 31,500.00 7 24,500.00 2 7,000.00
for additional depth over 4' D-7 550.00$ FT
CB Type II, 54" diameter D-8 4,075.00$ Each
for additional depth over 4'D-9 570.00$ FT
CB Type II, 60" diameter D-10 4,225.00$ Each
for additional depth over 4'D-11 690.00$ FT
CB Type II, 72" diameter D-12 6,900.00$ Each
for additional depth over 4'D-13 975.00$ FT
CB Type II, 96" diameter D-14 16,000.00$ Each
for additional depth over 4'D-15 1,050.00$ FT
Trash Rack, 12"D-16 400.00$ Each
Trash Rack, 15"D-17 470.00$ Each
Trash Rack, 18"D-18 550.00$ Each
Trash Rack, 21"D-19 630.00$ Each
Cleanout, PVC, 4"D-20 170.00$ Each
Cleanout, PVC, 6"D-21 195.00$ Each 11 2,145.00
Cleanout, PVC, 8"D-22 230.00$ Each
Culvert, PVC, 4" D-23 11.50$ LF
Culvert, PVC, 6" D-24 15.00$ LF
Culvert, PVC, 8" D-25 17.00$ LF
Culvert, PVC, 12" D-26 26.00$ LF
Culvert, PVC, 15" D-27 40.00$ LF
Culvert, PVC, 18" D-28 47.00$ LF
Culvert, PVC, 24"D-29 65.00$ LF
Culvert, PVC, 30" D-30 90.00$ LF
Culvert, PVC, 36" D-31 150.00$ LF
Culvert, CMP, 8"D-32 22.00$ LF
Culvert, CMP, 12"D-33 33.00$ LF
SUBTOTAL THIS PAGE:31,500.00 24,500.00 9,145.00
(B)(C)(D)(E)
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Page 1 of 5
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, CMP, 15"D-34 40.00$ LF
Culvert, CMP, 18"D-35 47.00$ LF
Culvert, CMP, 24"D-36 64.00$ LF
Culvert, CMP, 30"D-37 90.00$ LF
Culvert, CMP, 36"D-38 150.00$ LF
Culvert, CMP, 48"D-39 218.00$ LF
Culvert, CMP, 60"D-40 310.00$ LF
Culvert, CMP, 72"D-41 400.00$ LF
Culvert, Concrete, 8"D-42 48.00$ LF
Culvert, Concrete, 12"D-43 55.00$ LF
Culvert, Concrete, 15"D-44 89.00$ LF
Culvert, Concrete, 18"D-45 100.00$ LF
Culvert, Concrete, 24"D-46 120.00$ LF
Culvert, Concrete, 30"D-47 145.00$ LF
Culvert, Concrete, 36"D-48 175.00$ LF
Culvert, Concrete, 42"D-49 200.00$ LF
Culvert, Concrete, 48"D-50 235.00$ LF
Culvert, CPE Triple Wall, 6" D-51 16.00$ LF
Culvert, CPE Triple Wall, 8" D-52 18.00$ LF
Culvert, CPE Triple Wall, 12" D-53 27.00$ LF
Culvert, CPE Triple Wall, 15" D-54 40.00$ LF
Culvert, CPE Triple Wall, 18" D-55 47.00$ LF
Culvert, CPE Triple Wall, 24" D-56 64.00$ LF
Culvert, CPE Triple Wall, 30" D-57 90.00$ LF
Culvert, CPE Triple Wall, 36" D-58 149.00$ LF
Culvert, LCPE, 6"D-59 69.00$ LF
Culvert, LCPE, 8"D-60 83.00$ LF
Culvert, LCPE, 12"D-61 96.00$ LF
Culvert, LCPE, 15"D-62 110.00$ LF
Culvert, LCPE, 18"D-63 124.00$ LF
Culvert, LCPE, 24"D-64 138.00$ LF
Culvert, LCPE, 30"D-65 151.00$ LF
Culvert, LCPE, 36"D-66 165.00$ LF
Culvert, LCPE, 48"D-67 179.00$ LF
Culvert, LCPE, 54"D-68 193.00$ LF
SUBTOTAL THIS PAGE:
(B)(C)(D)(E)
Page 2 of 5
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
DRAINAGE (Continued)
Culvert, LCPE, 60"D-69 206.00$ LF
Culvert, LCPE, 72"D-70 220.00$ LF
Culvert, HDPE, 6"D-71 48.00$ LF
Culvert, HDPE, 8"D-72 60.00$ LF
Culvert, HDPE, 12"D-73 85.00$ LF
Culvert, HDPE, 15"D-74 122.00$ LF
Culvert, HDPE, 18"D-75 158.00$ LF
Culvert, HDPE, 24"D-76 254.00$ LF
Culvert, HDPE, 30"D-77 317.00$ LF
Culvert, HDPE, 36"D-78 380.00$ LF
Culvert, HDPE, 48"D-79 443.00$ LF
Culvert, HDPE, 54"D-80 506.00$ LF
Culvert, HDPE, 60"D-81 570.00$ LF
Culvert, HDPE, 72"D-82 632.00$ LF
Pipe, Polypropylene, 6"D-83 96.00$ LF 500 48,000.00
Pipe, Polypropylene, 8"D-84 100.00$ LF 40 4,000.00 60 6,000.00 50 5,000.00
Pipe, Polypropylene, 12"D-85 100.00$ LF 530 53,000.00 690 69,000.00
Pipe, Polypropylene, 15"D-86 103.00$ LF
Pipe, Polypropylene, 18"D-87 106.00$ LF
Pipe, Polypropylene, 24"D-88 119.00$ LF
Pipe, Polypropylene, 30"D-89 136.00$ LF
Pipe, Polypropylene, 36"D-90 185.00$ LF
Pipe, Polypropylene, 48"D-91 260.00$ LF
Pipe, Polypropylene, 54"D-92 381.00$ LF
Pipe, Polypropylene, 60"D-93 504.00$ LF
Pipe, Polypropylene, 72"D-94 625.00$ LF
Culvert, DI, 6"D-95 70.00$ LF
Culvert, DI, 8"D-96 101.00$ LF
Culvert, DI, 12"D-97 121.00$ LF
Culvert, DI, 15"D-98 148.00$ LF
Culvert, DI, 18"D-99 175.00$ LF
Culvert, DI, 24"D-100 200.00$ LF
Culvert, DI, 30"D-101 227.00$ LF
Culvert, DI, 36"D-102 252.00$ LF
Culvert, DI, 48"D-103 279.00$ LF
Culvert, DI, 54"D-104 305.00$ LF
Culvert, DI, 60"D-105 331.00$ LF
Culvert, DI, 72"D-106 357.00$ LF
SUBTOTAL THIS PAGE:57,000.00 75,000.00 53,000.00
(B)(C)(D)(E)
Page 3 of 5
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
Specialty Drainage Items
Ditching SD-1 10.90$ CY 20 218.00
Flow Dispersal Trench (1,436 base+)SD-3 32.00$ LF
French Drain (3' depth)SD-4 30.00$ LF
Geotextile, laid in trench, polypropylene SD-5 3.40$ SY
Mid-tank Access Riser, 48" dia, 6' deep SD-6 2,300.00$ Each
Pond Overflow Spillway SD-7 18.25$ SY
Restrictor/Oil Separator, 12"SD-8 1,320.00$ Each
Restrictor/Oil Separator, 15"SD-9 1,550.00$ Each
Restrictor/Oil Separator, 18"SD-10 1,950.00$ Each
Riprap, placed SD-11 48.20$ CY
Tank End Reducer (36" diameter)SD-12 1,375.00$ Each
Infiltration pond testing SD-13 143.00$ HR
Permeable Pavement SD-14
Permeable Concrete Sidewalk SD-15
Culvert, Box __ ft x __ ft SD-16
SUBTOTAL SPECIALTY DRAINAGE ITEMS:218.00
(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)
Detention Pond SF-1 Each
Detention Tank SF-2 Each
Detention Vault SF-3 350,000.00$ Each 1 350,000.00
Infiltration Pond SF-4 Each
Infiltration Tank SF-5 Each
Infiltration Vault SF-6 Each
Infiltration Trenches SF-7 Each
Basic Biofiltration Swale SF-8 Each
Wet Biofiltration Swale SF-9 Each
Wetpond SF-10 Each
Wetvault SF-11 Each
Sand Filter SF-12 Each
Sand Filter Vault SF-13 Each
Linear Sand Filter SF-14 Each
Proprietary Facility SF-15 Each
Bioretention Facility SF-16 Each
SUBTOTAL STORMWATER FACILITIES:350,000.00
(B)(C)(D)(E)
Page 4 of 5
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Quantity Remaining
(Bond Reduction)
(B)(C)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR DRAINAGE AND STORMWATER FACILITIES
WRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)
WI-1
WI-2
WI-3
WI-4
WI-5
WI-6
WI-7
WI-8
WI-9
WI-10
WI-11
WI-12
WI-13
WI-14
WI-15
SUBTOTAL WRITE-IN ITEMS:
DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:88,500.00 99,500.00 412,363.00
SALES TAX @ 10.1%8,938.50 10,049.50 41,648.66
DRAINAGE AND STORMWATER FACILITIES TOTAL:97,438.50 109,549.50 454,011.66
(B)(C)(D)(E)
Page 5 of 5
Ref 8-H Bond Quantity Worksheet SECTION II.c DRAINAGE
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Connection to Existing Watermain W-1 3,400.00$ Each
Ductile Iron Watermain, CL 52, 4 Inch Diameter W-2 58.00$ LF
Ductile Iron Watermain, CL 52, 6 Inch Diameter W-3 65.00$ LF
Ductile Iron Watermain, CL 52, 8 Inch Diameter W-4 75.00$ LF
Ductile Iron Watermain, CL 52, 10 Inch Diameter W-5 80.00$ LF
Ductile Iron Watermain, CL 52, 12 Inch Diameter W-6 145.00$ LF
Gate Valve, 4 inch Diameter W-7 1,225.00$ Each
Gate Valve, 6 inch Diameter W-8 1,350.00$ Each
Gate Valve, 8 Inch Diameter W-9 1,550.00$ Each
Gate Valve, 10 Inch Diameter W-10 2,100.00$ Each
Gate Valve, 12 Inch Diameter W-11 2,500.00$ Each
Fire Hydrant Assembly W-12 5,000.00$ Each
Permanent Blow-Off Assembly W-13 1,950.00$ Each
Air-Vac Assembly, 2-Inch Diameter W-14 3,050.00$ Each
Air-Vac Assembly, 1-Inch Diameter W-15 1,725.00$ Each
Compound Meter Assembly 3-inch Diameter W-16 9,200.00$ Each
Compound Meter Assembly 4-inch Diameter W-17 10,500.00$ Each
Compound Meter Assembly 6-inch Diameter W-18 11,500.00$ Each
Pressure Reducing Valve Station 8-inch to 10-inch W-19 23,000.00$ Each
WATER SUBTOTAL:
SALES TAX @ 10.1%
WATER TOTAL:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR WATER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 1 of 1
Ref 8-H Bond Quantity Worksheet SECTION II.d WATER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
CED Permit #:19-000075
Existing Future Public Private
Right-of-Way Improvements Improvements
(D) (E)
Description No. Unit Price Unit Quant.Cost Quant.Cost Quant.Cost Quant.Cost
Clean Outs SS-1 1,150.00$ Each
Grease Interceptor, 500 gallon SS-2 9,200.00$ Each
Grease Interceptor, 1000 gallon SS-3 11,500.00$ Each
Grease Interceptor, 1500 gallon SS-4 17,200.00$ Each
Side Sewer Pipe, PVC. 4 Inch Diameter SS-5 92.00$ LF
Side Sewer Pipe, PVC. 6 Inch Diameter SS-6 110.00$ LF
Sewer Pipe, PVC, 8 inch Diameter SS-7 120.00$ LF
Sewer Pipe, PVC, 12 Inch Diameter SS-8 144.00$ LF
Sewer Pipe, DI, 8 inch Diameter SS-9 130.00$ LF
Sewer Pipe, DI, 12 Inch Diameter SS-10 150.00$ LF
Manhole, 48 Inch Diameter SS-11 6,900.00$ Each
Manhole, 54 Inch Diameter SS-13 6,800.00$ Each
Manhole, 60 Inch Diameter SS-15 7,600.00$ Each
Manhole, 72 Inch Diameter SS-17 10,600.00$ Each
Manhole, 96 Inch Diameter SS-19 16,000.00$ Each
Pipe, C-900, 12 Inch Diameter SS-21 205.00$ LF
Outside Drop SS-24 1,700.00$ LS
Inside Drop SS-25 1,150.00$ LS
Sewer Pipe, PVC, ____ Inch Diameter SS-26
Lift Station (Entire System)SS-27 LS
SANITARY SEWER SUBTOTAL:
SALES TAX @ 10.1%
SANITARY SEWER TOTAL:
(B)(C)(D)(E)
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
FOR SANITARY SEWER
Quantity Remaining
(Bond Reduction)
(B)(C)
Page 1 of 1
Ref 8-H Bond Quantity Worksheet SECTION II.e SANITARY SEWER
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21
1055 South Grady Way – 6 th Floor | Renton, WA 98057 (425) 430-7200
Date:
Name:Project Name:
PE Registration No:CED Plan # (LUA):
Firm Name:CED Permit # (C):
Firm Address:Site Address:
Phone No.Parcel #(s):
Email Address:Project Phase:
Site Restoration/Erosion Sediment Control Subtotal (a)
Existing Right-of-Way Improvements Subtotal (b)(b)50,951.53$
Future Public Improvements Subtotal (c)123,512.11$
Stormwater & Drainage Facilities (Public & Private) Subtotal (d)(d)660,999.66$
(e)
(f)
Site Restoration
Existing Right-of-Way and Storm Drainage Improvements
Maintenance Bond 167,092.66$
Bond Reduction2
Construction Permit Bond Amount 3
Minimum Bond Amount is $10,000.00
1 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.
2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% will
cover all remaining items to be constructed.
3 Required Bond Amounts are subject to review and modification by Development Engineering.
* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.
** Note: All prices include labor, equipment, materials, overhead, profit, and taxes.
EST1
((b) + (c) + (d)) x 20%
-$
MAINTENANCE BOND */**
(after final acceptance of construction)
89,048.33$
50,951.53$
737,426.95$
89,048.33$
-$
660,999.66$
-$
826,475.28$
P
(a) x 100%
SITE IMPROVEMENT BOND QUANTITY WORKSHEET
BOND CALCULATIONS
2023-09-20
AVNASH BANWAIT
41773
MAINLAND ENGINEERING CONSULTANTS CORPORATION
R
((b x 150%) + (d x 100%))
S
(e) x 150% + (f) x 100%
Bond Reduction: Existing Right-of-Way Improvements (Quantity
Remaining)2
Bond Reduction: Stormwater & Drainage Facilities (Quantity
Remaining)2
T
(P +R - S)
Prepared by:Project Information
CONSTRUCTION BOND AMOUNT */**
(prior to permit issuance)
604 543 8044
avnash@mainlandeng.com
MADUENO SHORT PLAT
19-000029
19805 108TH AVENUE SE, RENTON, WA 98055
052205-9078
FOR APPROVAL
19-000075
8363 128 Street Surrey, BC, Canada
Page 1 of 1
Ref 8-H Bond Quantity Worksheet SECTION III. BOND WORKSHEET
Unit Prices Updated: 01/07/2022
Version: 01/07/2022
Printed 2023-09-21