HomeMy WebLinkAbout39 _C_Hazardous_Materials_Statement_230927_v1
Western Washington Division Eastern Washington Division
165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922
Phone: (425) 392-0250 Phone: (509) 674-7433
www.EncompassES.net
Date: September 13th, 2023
To: City of Renton, Department of Community and Economic Development
From: Encompass Engineering & Surveying on behalf of Lavina Wadhwani
Re: Hazardous Materials Management Statement for the Index Avenue Townhomes
_____________________________________________________________________________________
APPLICANT
Lavina Wadhwani
10655 NE 4th Street Suite #707
Bellevue, WA 98005
lavinaw@veerarchitecture.com
SITE ADDRESS
511 Airport Way, Renton, WA 98057
HAZARDOUS MATERIALS MANAGEMENT STATEMENT
To Whom It May Concern,
I, the undersigned property owner of Parcel No. 722930-0580, understand that the City has requested a
Hazard Materials Management Statement. This letter addresses that requirement but may need to be
updated by the contractor once one has been chosen for the project.
1. Fueling of Construction Vehicles and Storage of Hazardous Materials: It is anticipated that Track
hoes, back hoes, dozers, vibratory rollers and loaders may all be present on site at some point
during construction. It is not anticipated that Construction vehicles will need to be refueled while
on site. Gas-powered hand-held construction equipment such as chain saws and cut-off saws may
require refueling during the construction process. If emergency refueling of larger equipment is
needed, it may be accomplished using portable fuel tanks carried in the pickup bed of the
construction foreman’s truck or by the contractor’s service truck. Care will be taken at all time
during refueling to ensure that no fuel is spilled. In an emergency, fuel spill containment kits will
be available to limit any unintended fuel spills and the Department of Ecology will be contacted
in case of a spill. Gas -powered hand-held construction equipment will be refueled using portable
gas containers meeting current DOE standards. Said gas containers will typically be stored in the
bed of the construction foreman’s truck or within an approved location within a construction
equipment shed. It is not anticipated that any other Hazardous materials, with the possible
exception of painting supplies during home construction, will be stored on site during
construction.
2. Construction Debris: All construction created during construction will be removed from the site
Index Ave Townhomes
Hazardous Materials Management Statement
09-13-2023
Page 2 of 2
and disposed of in an approved method at an appropriate disposal site.
Sincerely,
Lavina Wadhwani
Applicant