Loading...
HomeMy WebLinkAbout7945.04 E 2023 1019Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 1019 Date Thu 10/19/2023 Weather 65°F Cloudy Arrival/Departure Time(s) 10:30AM; 2PM, 2:45PM; 4:15PM Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to test the compaction of the HMA paving onsite. Asphalt Compaction ESNW rep was onsite to test the compaction of pavement onsite. Rep observed the paving contractor place a 2” lift of HMA. The asphalt was compacted with good effort using a vibrating drum roller. ESNW rep took compaction tests and observed adequate compaction of at least 92% of the modified proctor at the tested locations. Please see map and table below. Test Number Test Location Elevation Rice Value (pcf) Test Density (pcf) % of Rice Value 197 Road A -2" 154.4 143.2 93 198 Road A -2" 154.4 141.8 92 199 Road A -2" 154.4 142.9 93 200 Road A -2" 154.4 143.3 93 201 Road A -2" 154.4 144.2 93 202 Alley 3 -2" 154.4 144.7 94 203 Alley 3 -2" 154.4 142.3 92 204 Alley 3 -2" 154.4 143.7 93 205 Alley 3 -2" 154.4 142.7 92 206 Alley 3 -2" 154.4 144.1 93 207 Alley 3 -2" 154.4 142.4 92 208 Alley 3 -2" 154.4 144.5 94 209 40th St SG 154.4 145.2 94 210 40th St SG 154.4 143.9 93 211 40th St SG 154.4 144.4 94 212 40th St SG 154.4 142.8 92 213 40th St SG 154.4 142.9 93 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 Report ID 7945.04 E 2023 1019 Page 2 of 3 Earth Solutions NW, LLC 197 198 199 200 201 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 202 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 202 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 205 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 204 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 203 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 206 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 207 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 208 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 209 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 210 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 211 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 212 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 213 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 214 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 215 214 40th St SG 154.4 144.2 93 215 40th St SG 154.4 143.6 93 Report ID 7945.04 E 2023 1019 Page 3 of 3 Earth Solutions NW, LLC