HomeMy WebLinkAbout7945.04 E 2023 1020Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 1020 Date Fri 10/20/2023 Weather 65°F Cloudy Arrival/Departure Time(s) 10:30AM; 10:45AM Travel Time (hr) 0.75 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206 793 8569 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe northern vault access road subgrade. Vault Access Road Subgrade ESNW rep observed the contractor had exposed the subgrade for the vault access road. ESNW rep used a ½” steel T-probe to probe the subgrade and observed it to be saturated in large areas. ESNW rep recommends over-excavating approximately 12”, placing a layer of woven geotextile fabric and backfilling 12” of 1 ¼” minus crushed rock. At one localized area in the northern end of the road, ESNW rep recommends placing 18” of crushed rock. As requested, ESNW rep will return on Monday the 23rd to observe the repairs and subgrade conditions. Report ID 7945.04 E 2023 1020 Page 2 of 3 Earth Solutions NW, LLC Report ID 7945.04 E 2023 1020 Page 3 of 3 Earth Solutions NW, LLC Over Excavation