Loading...
HomeMy WebLinkAbout2023.05.25.NEUD.Stair Pressurization Report- 5516 1st Ave S Seattle, WA 98108 Vancouver, WA 98661 Phone (206) 621-1810 Phone (503) 235-8924 Fax (206) 343-9820 Fax (503) 235-8925 2501 SE Columbia Way, Ste. #230 Sunset Terrace Stairwell Pressurization TEST, ADJUST & BALANCE Revision Date:Revision Number:- 05/25/23Project Completion Date: Renton, WA 98056 CERTIFIED REPORT CT-1646-23 Report Title Project: Sunset Terrace Stairwell Pressurization Renton, WA 98056 NEI Job#: CT-1646-23 Engineer: Abossein Engineering LLC Contractor: Oak Hill Builds TAB Firm: Neudorfer Engineers Inc 5516 1st Avenue South Seattle, WA 98108 Test Engineer: Architect:- 5516 1st Ave S Seattle, WA 98108 Vancouver, WA 98661 Phone (206) 621-1810 Phone (503) 235-8924 Fax (206) 343-9820 Fax (503) 235-8925 CERTIFIED REPORTCERTIFIED TEST: Tony Amort 2501 SE Columbia Way, Ste. #230 If Integra Testing fails to comply with the specifications for any reason other than equipment malfunction or inadequacy which prevents proper balancing of the systems,Integra Testing’s Quality Control Team will investigate and,if warranted, will provide supervisory personnel to assist in the rebalancing of the air or hydronic system(s).The rebalancing of any of the air or hydronic systems will be provided at no additional cost to the building owner.Reported items documented outside of design tolerances with reason are not included in this warranty.If a complaint issue is due to a mechanical equipment failure,control or maintenance related issue,the return trip may be subject to a service charge which is not covered under this warranty.Third party adjustments made to the system prior to invocation of warranty also voids this warranty. This Guaranty is valid for one year from the date of submission of a test and balance report and may only be invoked in writing by the building owner, architect, or engineer of record. The Guaranty is limited to the terms and conditions as stated herein. Response to complaints will be provided within 10 business days of initial complaint. Pursuant to the agreement between Integra Testing Services,LLC and/or its subsidiaries (“Integra Testing”)and Client,all systems shall be tested,adjusted, and balanced in accordance with the project plans and specifications and to the optimum performance capabilities of the equipment.Testing and balancing shall be done in accordance with the standards published by the Associated Air Balance Council (AABC)and/or the National Environmental Balancing Bureau (NEBB). Submitted and Certified by: NEBB TAB Firm: Neudorfer Engineers Inc Certification No: 3856 Expiration Date: December 31, 2023 Certification Date: May 25, 2023 (Date completed) Signed and Sealed by: NEBB Supervisor: William C. Neudorfer Noted deficiencies are not Neudorfer Engineers responsibility to repair.Prior to issuance of this report, Deficiency Reports are forwarded to our contracted agent. Warranty is limited to one year from the date of substantial completion.Within that time,any discrepancies,ambiguities,or omissions found in this report will be retested, adjusted, or balanced as needed. A written notification will be required. Significant /Noteworthy Remarks are noted on the General Remarks and General Field Notes pages. Other remarks are noted on individual test sheets. CERTIFICATION The data presented in this report is a record of system measurements and final adjustments that have been obtained in accordance with the current edition of the NEBB Procedural Standards for Testing,Adjusting,and Balancing of Environmental Systems.Any variances from design quantities which exceed NEBB tolerances are noted in the Test-Adjust-Balance Report Project Summary. Warranty Project:Sunset Terrace Stairwell Pressurization Renton, WA 98056 Warranty of Services: Warranty Procedures: Voided Warranty and Additional Charges: Document Archiving An electronic file of all test documents will be kept on file until the end of the Warranty period.During that time an electronic copy of the test data will be provided a no charge.Any additional hard /bound copies requested will be subject to a fee. For all warranty items,Neudorfer Engineers requires written request.The written request should be specific on the areas of concern,such rooms,or equipment,and the type of issue the occupants are experiencing. Once written notification is received,Neudorfer Engineers will schedule a Technician.It is recommended that an Owner or A/E Representative be on site at that time. If a complaint issue is due to a mechanical equipment failure,control or maintenance related,the return trip maybe subject to a service charge,not covered under warranty.Neudorfer Engineers reserves the right to resolve any TAB issue.If a third party or competing Test &Balance Commissioning firm test or adjust any equipment,all project warranty is voided.(This is typical standard for the Mechanical industry,as Manufacture,Mechanical and Control Contractor voids all warranty when a competing firm tests or manipulates their systems.)Any return trips to the job site are subject to a service charge and a purchase order will be required before returning to the job site. Neudorfer Engineers,Inc.warrants that the air balancing,evaluated during this performance evaluation are operating at the specified levels as documented within this report.At and only this time,and makes no other warranties,stated or implied,concerning the continued performance,operation or safety in the use of this equipment past this time.Neudorfer Engineers warrants the air balancing for 1 year from the date of substantial completion.Neudorfer Engineers reserves the right to correct errors or omissions in the collections of data. Terms and Abbreviations Project:Sunset Terrace Stairwell Pressurization Renton, WA 98056 AC or ACU Air Conditioner or Air Conditioning Unit Dia.Diameter Act.Actual Disch.Discharge ACCU Air Cooled Condensing Unit DNL Data Not Listed Address Equipment designation number given mechanical cooling. Arr Arrangement EDC Electric Duct Coil AVG Average Economizer Controls and components that allow an Amps Amperage air handler to logically utilize outdoor air AP Access Point for cooling as opposed to the use of APP.Application EDH Electric Duct Heater BHP Brake Horsepower EF Exhaust Fan BTU British Thermal Units EG Exhaust Grille BTUH British Thermal Units per Hour EMCS Energy Management Control System CAV Constant Air Volume ERU Energy Recovery Unit CBV Calbirated Balancing Valve E.S.P.External Static Pressure (Circuit Setter)Evap.Evaporator CC Cooling Coil EWT Entering Water Temperature CD Ceiling Diffuser FCU Fan Coil Unit CFLA Correct Full Load Amperage FD Fire Damper CFM Cubic Feet per Minute FH Fume Hood CH Chiller FLA Full Load Amperage: Maximum CHWS Chilled Water Supply amperage a motor can draw. CHWR Chilled Water Return Flow Hood Instrument that captures air and Coeff.Coefficient converts the reading to CFM. CP Circulating Pump FPB Fan Powered Box CR Ceiling Register FPM Feet per Minute CRAC Computer Room Air Conditioner FR Field Report CRU Computer Room Unit FT Foot, Feet CT Cooling Tower FTU Fan Terminal Unit CU Condenser Unit GPM Gallons per Minute CUH Cabinet Unit Heater HC Heating Coil CWS Condenser Water Supply HD Pressure Difference across the entering CWR Condenser Water Return and leaving side of a pump. DAT Discharge Air Temperature Heater O.L.Thermal overload protection for motors DB Dry Bulb located at the motor starter (starter heaters) DD Direct Drive HEPA High Efficiency Particulate Arrestance DDC Direct Digital Controls: EMS Control HOA Hand / Off / Auto Switch System for the HVAC HP Horsepower Delta (Δ) Difference, net decrease or increase HRC Heat Recovery Coil Des.Design HUH Hydronic Unit Heater Terms and Abbreviations Project:Sunset Terrace Stairwell Pressurization Renton, WA 98056 HVAC Heating Ventilation and Air Conditioning SAT Supply Air Temperature HWS Heating Water Supply S.F.Service Factor HWR Heating Water Return Schedule Design data obtained from the HX Heat Exchanger (sched)mechanical prints' schedule of HZ Hertz, cycle per second equipment. I.D.Inside Diameter SCR Silcon Controlled Rectifier in.inches Speed Controller in.w.g.inches of water gauge SF Supply Fan Kfactor Correction factor to the free area need to SFD Smoke/Fire Damper calculate CFM.SP Static Pressure KW Kilowatts Spec(s)Specifications LAT Leaving Air Temperature sq.ft.square feet LWG Low Wall Grille Submittals Submitted data on equipment LWR Low Wall Register (subs)capabilities. LWT Leaving Water Temperature Suct.Suction MAU Make-up Air Hangling Unit SWG Sidewall Grille MAX Maximum Flow Requirements for DDC SWR Sidewall Register MBH Mega BTUs per hour (1MBH=1,000BTUH)TAB Test; Adjust; and Balance MIN Minimum Flow Requirements for DDC Tach Tachometer N/A Not Available Tech Technician N/S Not Shown or Specified TSP Total Static Pressure: Difference OA Outside Air between the entering and leaving OBD Opposed Blade Damper static pressure of a fan. O.D.Outside Diameter TP Traverse or Test Point PD Pressure Drop. TU Terminal Unit PH Phase UH Unit Heater PHC Preheat Coil VAV Variable Air Volume; box that Prim.Primary contains a motorized damper that PSI Pounds per Square Inch modulates airflow. RA Return Air VD Volume Damper RAT Return Air Temperature VFD Variable Frequency Drive RF Return Fan Velgrid Instrument that reads used to read RH Relative Humidity velocity in feet per minute. RHC Reheat Coil VP Velocity Pressure RPM Revolutions per Minute VVT Variable Volume Terminal RTU Roof Top Unit W.C.Water Column RVA Rotating Vane Anemometer -reads W.G.Water Gauge air velocity in feet per minute WB Wet Bulb SA Supply Air 2715 Sunset Lane NE, Renton, WA 98056 Page 1 of 2 N NEUDORFER ENGINEERS, LLC. Consulting Engineers 5516 1st Avenue South Seattle, Washington 98108 (206) 621-1810 Fax (206) 343-9820 Sunset Terrace Stair 1 Pressurization Confidence Testing SPF-1 Certification Given RED ฀ YELLOW ฀ WHITE X CONFIDENCE TEST X REPAIRS ฀ Occupancy Address:2715 Sunset Lane NE Renton WA 98056 Occupancy Name:Sunset Terrace Building Owner:iCAP Equity Phone Number:(425) 278-9023 Responsible Person:Jami Stevenson Phone Number: Building Owner Address:3535 Factoria Blvd SE #500 Bellevue, WA 98006 Date of Inspection:5/25/23 Inspection Frequency/Type:New Construction Testers Name (Please Print):Antonio Amort NEBB Certification Number:21988 Central station monitoring?Yes X No ฀ Monitoring Company Name:Fire Protection Inc. Primary Component:System Make:Honeywell System Model:Gamewell E3 Series System Location:Level 1 Identification Number: PROBLEMS FOUND: (If additional room is needed, please add a separate sheet) CORRECTIONS MADE: Date Corrected: __________Corrected By: ______________________________ (If additional room is needed, please add a separate sheet) This certifies that this fire and life safety system has been properly inspected for reliability to cover the Items listed in this report and is consistent with Bellevue Fire Department Fire Code standards, and that Discrepancies are noted and have been reported to the building Owner/Manager for corrective action. Signature of Tester:__________________________Phone #(206) 715-5085 Testing Agency:Neudorfer Engineers, LLC. Mailing Address:5516 1st Avenue South, Seattle Washington Building Representative (signature) _____________________________________________________ 2715 Sunset Lane NE, Renton, WA 98056 Page 2 of 2 Measurements Taken Floor Pressure (inches) Floor Pressure (inches) Floor Door Force (Pounds) Floor Door Force (Pounds) *See attached sheet for pressure measurements. General Do stair shafts have flush? CFM __________Yes ฀ No X Were measurements taken from atmospheric pressure?Yes X No ฀ Were measurements taken from shaft and the main occupied area?Yes X No ฀ What was static pressure? 0.16”-0.20” in. H2O Do elevator shaft pressures measure 0.10 in H2O, in 100% automatic sprinklered building? Yes ฀ No X All doors operate correctly?Yes X No ฀ System can be operated manually?Yes X No ฀ Does life safety core type building have 0.05 in H2O between pressurized core and tenant area? Yes X No ฀ Are gaskets in good condition on stair and elevator doors?Yes X No ฀ Do all dampers, controls work properly on shaft pressurization system?Yes X No ฀ Do stair shaft pressures measure 0.10 in H2O?Yes X No ฀ Additional Measurements, Calculations and Comments: 2715 Sunset Lane NE, Renton, WA 98056 Page 1 of 2 N NEUDORFER ENGINEERS, LLC. Consulting Engineers 5516 1st Avenue South Seattle, Washington 98108 (206) 621-1810 Fax (206) 343-9820 Sunset Terrace Stair 2 Pressurization Confidence Testing SPF-2 Certification Given RED ฀ YELLOW ฀ WHITE X CONFIDENCE TEST X REPAIRS ฀ Occupancy Address:2715 Sunset Lane NE Renton WA 98056 Occupancy Name:Sunset Terrace Building Owner:iCAP Equity Phone Number:(425) 278-9023 Responsible Person:Jami Stevenson Phone Number: Building Owner Address:3535 Factoria Blvd SE #500 Bellevue, WA 98006 Date of Inspection:5/25/23 Inspection Frequency/Type:New Construction Testers Name (Please Print):Antonio Amort NEBB Certification Number:21988 Central station monitoring?Yes X No ฀ Monitoring Company Name:Fire Protection Inc. Primary Component:System Make:Honeywell System Model:Gamewell E3 Series System Location:Level 1 Identification Number: PROBLEMS FOUND: (If additional room is needed, please add a separate sheet) CORRECTIONS MADE: Date Corrected: __________Corrected By: ______________________________ (If additional room is needed, please add a separate sheet) This certifies that this fire and life safety system has been properly inspected for reliability to cover the Items listed in this report and is consistent with Bellevue Fire Department Fire Code standards, and that Discrepancies are noted and have been reported to the building Owner/Manager for corrective action. Signature of Tester:__________________________Phone #(206) 715-5085 Testing Agency:Neudorfer Engineers, LLC. Mailing Address:5516 1st Avenue South, Seattle Washington Building Representative (signature) _____________________________________________________ 2715 Sunset Lane NE, Renton, WA 98056 Page 2 of 2 Measurements Taken Floor Pressure (inches) Floor Pressure (inches) Floor Door Force (Pounds) Floor Door Force (Pounds) *See attached sheet for pressure measurements. General Do stair shafts have flush? CFM __________Yes ฀ No X Were measurements taken from atmospheric pressure?Yes X No ฀ Were measurements taken from shaft and the main occupied area?Yes X No ฀ What was static pressure? 0.17”-0.20” in. H2O Do elevator shaft pressures measure 0.10 in H2O, in 100% automatic sprinklered building? Yes ฀ No X All doors operate correctly?Yes X No ฀ System can be operated manually?Yes X No ฀ Does life safety core type building have 0.05 in H2O between pressurized core and tenant area? Yes X No ฀ Are gaskets in good condition on stair and elevator doors?Yes X No ฀ Do all dampers, controls work properly on shaft pressurization system?Yes X No ฀ Do stair shaft pressures measure 0.10 in H2O?Yes X No ฀ Additional Measurements, Calculations and Comments: Fan UnitPROJECT:LOCATION:Sunset Terrace Stair Pressurization RENTON, WA CT-1646-23PROJECT #: DATE:CONTACT: AUTHOR: 5/25/2023Tony Amort Tested By:Tony Amort Date:5/25/2023 SYSTEM/UNIT: SF-1 Log:SF-1 5/25/2023 Tony Amort The Amps and Volts were recorded from the VFD. Unit Data Fan Manufacturer ILG Fan Model Number CFS18QD8363 Fan Serial Number 091321M645210 Fan Rotation Clockwise Fan Discharge Bottom Vertical Drive Type Belt Drive Test Data Motor RPM Actual 801 RPM Motor VFD Hertz 27.0 Hz Motor Volts T1-T2 94 Volts Motor Amps T1 5.48 Amps Motor Data Motor Manufacturer Baldor Motor Frame 184T Motor HP 5 HP Motor RPM 1750 RPM Motor Rated Volts 230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor Full Load Amps 13.2/6.6 Amps Motor Service Factor 1.15 Nominal Efficiency 89.50 % Power Factor 0.80 Sheave Data Motor Sheave MFG Not Listed Motor Sheave Diam.5 OD Motor Sheave Bore 1 in. Motor Sheave Type Adjustable Adj Mtr Sheave Pos Middle Fan Sheave Diam.9.25 OD Fan Sheave Bore 1 in. Number of Belts 2 Belt Size A64 Sheave Center Line 22.50 in. Motor to Extend 3.00 in. Motor to Retract 4.00 in. Neudorfer Engineers Fan UnitPROJECT:LOCATION:Sunset Terrace Stair Pressurization RENTON, WA CT-1646-23PROJECT #: DATE:CONTACT: AUTHOR: 5/25/2023Tony Amort Tested By:Tony Amort Date:5/25/2023 SYSTEM/UNIT: SF-2 Log:SF-2 5/25/2023 Tony Amort The Amps and Volts were recorded from the VFD. Unit Data Fan Manufacturer ILG Fan Model Number CFS18QD8363 Fan Serial Number 091321M645210 Fan Rotation Clockwise Fan Discharge Bottom Vertical Drive Type Belt Drive Test Data Motor RPM Actual 747 RPM Motor Volts T1-T2 88 Volts Motor Amps T1 5.40 Amps Motor Data Motor Manufacturer Baldor Motor Frame 184T Motor HP 5 HP Motor RPM 1750 RPM Motor Rated Volts 230/460 Volts Motor Phase 3 Motor Hertz 60 Hz Motor Full Load Amps 13.2/6.6 Amps Motor Service Factor 1.15 Nominal Efficiency 89.50 % Power Factor 0.80 Sheave Data Motor Sheave MFG Not Listed Motor Sheave Diam.5 OD Motor Sheave Bore 1 in. Motor Sheave Type Adjustable Adj Mtr Sheave Pos Middle Fan Sheave Diam.9.25 OD Fan Sheave Bore 1 in. Number of Belts 2 Belt Size A64 Sheave Center Line 22.50 in. Motor to Extend 3.00 in. Motor to Retract 4.00 in. Neudorfer Engineers Date: 5/25/23 R 7 6 5 4 3 2 1 P1 P2 HZ 27 Hz 25 Hz ATM = Atmosphere Door force indicates the force measured at the stairwell doors. A calibrated Shortridge ADM was used to measure pressure. All pressures were measured in inches of water column. Notes Notes: Notes: See attached sheets for fan operating data. Event Level Pressurization Fans Panel Speed Reference Floor Reference to Atmosphere SPF-1 - Fan VFD speeds and control program speed reference SPF-2 - Fire Zone NA means the data was not applicable. 0.18" / 25 lbs 0.18" / 27 lbs 0.16" / 22 lbs 0.18" / 24 lbs 0.16" / 30 lbs // 0.16" (Outside Egress)0.17" / NA 0.17" / 24 lbs - 0.18" / 25 lbs 0.19" / 27 lbs 0.19" / 25 lbs 0.20" / 25 lbs 0.19" / 25 lbs 0.20" / 28 lbs 0.19" / 25 lbs 0.20" / 27 lbs 0.16" / 25 lbs 0.18" / 25 lbs 0.21" / 22 lbs (Atmosphere)- +0.10'' to 0.35" W.C. / Door Force +0.10'' to 0.35" W.C. / Door Force Technician(s): Tony Amort / Alex Lorenzo Project: Sunset Terrace Stairwell 1 and 2 Pressurization - General Alarm Floor Stair 1 / SPF-1 Stair 2 / SPF-2