Loading...
HomeMy WebLinkAboutEx_12_Transportation_ConcurrencyDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT M E M O R A N D U M DATE: May 26, 2023 TO: Alex Morganroth, Senior Planner FROM: Brianne Bannwarth, Development Engineering Director SUBJECT: Traffic Concurrency Test Harmony Ridge; LUA23-000143 15509 116th Ave SE (APN 2023059067) The applicant is requesting Preliminary Plat approval, Environmental (SEPA) Review, a lot line adjustment, and a street modification for a phased subdivision project consisting of 22 total lots, including 21 lots intended for new single-family homes and one lot reserved for the existing church, school, and associated surface parking currently developed on the site. The subject parcel is located at 15509 116th Ave SE (APN 2023059067) and is approximately 6.27 acres in size. The site has a Comprehensive Plan Land Use of Designation of Residential Medium Density (MD) and a zoning designation of Residential-8 (R-8) dwelling units per net acre (du/ac). The applicant is proposing a phased subdivision. Phase 1 of the subdivision would separate the church, school and associated parking from the rest of the site by creating a new 46,129 sq. ft. lot. The remaining portion of the parent site would total approximately 226,988 sq. ft. in area and would be subdivided into 21 new single-family lots as part of Phase 2. The individual single-family lots would range in size from 5,001 to 5,866 sq. ft. The proposal also includes four (4) tracts including three (3) tree retention tracts and one stormwater tract to be created during Phase 2 of the subdivision. Access to the lots is proposed via two new public residential access streets (Road A and Road B) off of 116th Ave SE, including a cul-de-sac. Only Road A would have direct access to 116th Ave SE. Twelve of the lots would utilize a new public alley off of Road A. Street fron tage improvements are proposed along the entire length of the site fronting 116th Ave SE, including in front of the future church parcel. The applicant has proposed the retention of 63 trees out of the 404 trees located on the site. According to COR Maps, a moderate coal mine hazard and sensitive slopes hazard are located on the site. DocuSign Envelope ID: 88ED493A-1813-4C83-AC0E-63CD05982755 Transportation Concurrency Test – Harmony Ridge Page 2 of 3 May 26, 2023 The proposed development would generate approximately 240 net new average weekday daily trips. During the weekday AM peak hour, the project would generate approximately 18 net new trips (5 inbound and 13 outbound). During the weekday PM peak hour, the project would generate approximately 23 net new trips (14 inbound and 9 outbound). The proposed project passes the City of Renton Traffic Concurrency Test per RMC 4-6-070.D as follows: Traffic Concurrency Test Criteria Pass Implementation of citywide Transportation Plan Yes Within allowed growth levels Yes Project subject to transportation mitigation or impact fees Yes Site specific street improvements to be completed by project Yes Traffic Concurrency Test Passes Evaluation of Test Criteria Implementation of citywide Transportation Plan: The City’s investment in completion of the forecast traffic improvements is greater than 100% of the scheduled expenditure through 2023. Within allowed growth levels: The citywide traffic concurrency trip capacity for concurrency with the city adopted model for 2023 is 1,862 trips. The trip balance provides sufficient capacity to accommodate approximately 23 trips from this project. A resulting 1,839 trips are remaining. Project subject to transportation mitigation or impact fees: The project will be subject to transportation impact fees at time of building permit issuances for the project. Site specific street improvements to be completed by project: The project will be required to complete frontage street improvements prior to occupancy. Any additional off-site improvements identified through SEPA or land use approval will also be completed prior to final plat approval. Background Information on Traffic Concurrency Test for Renton The City of Renton Traffic Concurrency requirements for proposed development projects are covered under Renton Municipal Code (RMC) 4-6-070. The specific concurrency test requirement is covered in RMC 4-6-070.D, which is listed for reference: DocuSign Envelope ID: 88ED493A-1813-4C83-AC0E-63CD05982755 Transportation Concurrency Test – Harmony Ridge Page 3 of 3 May 26, 2023 D. CONCURRENCY REVIEW PROCESS: 1. Test Required: A concurrency test shall be conducted by the Department for each nonexempt development activity. The concurrency test shall determine consistency with the adopted Citywide Level of Service Index and Concurrency Management System established in the Transportation Element of the Renton Comprehensive Plan, according to rules and procedures established by the Department. The Department shall issue an initial concurrency test result describing the outcome of the concurrency test. 2. Written Finding Required: Prior to approval of any nonexempt development activity permit application, a written finding of concurrency shall be made by the City as part of the development permit approval. The finding of concurrency shall be made by the decision maker with the authority to approve the accompanying development permits required for a development activity. A written finding of concurrency shall apply only to the specific land uses, densities, intensities, and development project described in the application and development permit. 3. Failure of Test: If no reconsideration is requested, or if upon reconsideration a project fails the concurrency test, the project application shall be denied by the decision maker with the authority to approve the accompanying development activity permit application. The Concurrency Management System established in the Transportation Element on page XI -65 of the Comprehensive Plan states the following: Based upon the test of the citywide Transportation Plan, consideration of growth levels included in the LOS-tested Transportation Plan, payment of a Transportation Mitigation Fee, and an application of site-specific mitigation, development will have met City of Renton concurrency requirements. DocuSign Envelope ID: 88ED493A-1813-4C83-AC0E-63CD05982755