HomeMy WebLinkAboutRS_Topgolf_TIR_210908_v7February 20, 2020
Revised April 21, 2020
Revised June 3, 2020
Revised August 7, 2020
Revised July 9, 2021
Revised August 10, 2021
Revised September 8, 2021
Prepared for:
City of Renton
1055 South Grady Way, 6th Floor
Renton, WA 98057
Reviewed by:
Jenelle Taflin, P.E., LEED AP
Principal
jtaflin@navixeng.com
TECHNICAL INFORMATION
REPORT
TOPGOLF RENTON
RENTON, WASHINGTON
NAVIX Topgolf Renton – Renton, WA 1
Table of Contents
PROJECT OVERVIEW ................................................................................................... 4
DESIGN CRITERIA ..................................................................................................... 4
EXISTING CONDITIONS ............................................................................................ 4
PRE-DEVELOPMENT STORMWATER RUNOFF ...................................................... 5
PROPOSED CONDITIONS ......................................................................................... 7
POST-DEVELOPMENT STORMWATER RUNOFF .................................................... 8
SITE LOCATION ....................................................................................................... 18
DRAINAGE BASIN, SUBBASINS, AND SITE CHARACTERISTICS......................... 19
DRAINAGE BASIN ................................................................................................. 19
SUBBASINS........................................................................................................... 19
SOILS ........................................................................................................................ 20
CONDITIONS AND REQUIREMENTS SUMMARY ...................................................... 21
CORE REQUIREMENTS .......................................................................................... 21
Core Requirement #1: Discharge at the Natural Location ...................................... 21
Core Requirement #2: Offsite Analysis .................................................................. 21
Core Requirement #3: Flow Control Facilities ........................................................ 21
Core Requirement #4: Conveyance System .......................................................... 22
Core Requirement #5: Erosion and Sediment Control ........................................... 22
Core Requirement #6: Maintenance and Operations ............................................. 23
Core Requirement #7: Financial Guarantees and Liability ..................................... 23
Core Requirement #8: Water Quality ..................................................................... 23
Core Requirement #9: On-Site BMPs .................................................................... 23
SPECIAL REQUIREMENTS ...................................................................................... 24
Special Requirement #1: Other Adopted Area-Specific Requirements .................. 24
Special Requirement #2: Flood Hazard Area Delineation ...................................... 24
Special Requirement #3: Flood Protection Facilities .............................................. 24
Special Requirement #4: Source Control ............................................................... 24
Special Requirement #5: Oil Control ...................................................................... 25
Special Requirement #6: Aquifer Protection Area .................................................. 25
TASK 1: STUDY AREA DEFINITION AND MAPS..................................................... 26
TASK 2: RESOURCE REVIEW ................................................................................. 27
NAVIX Topgolf Renton – Renton, WA 2
TASK 3: FIELD INSPECTION ................................................................................... 28
UPSTREAM ANALYSIS ......................................................................................... 28
DOWNSTREAM ANALYSIS .................................................................................. 28
TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS
............................................................................................................................... 47
TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS .................... 47
FLOW CONTROL, LID, AND WATER QUALITY FACILITIES ANALYSIS AND DESIGN
...................................................................................................................................... 48
EXISTING SITE HYDROLOGY ................................................................................. 48
DEVELOPED SITE HYDROLOGY ............................................................................ 50
ON-SITE STORMWATER BMPS .............................................................................. 52
FLOW CONTROL SYSTEM ...................................................................................... 54
WATER QUALITY SYSTEM ...................................................................................... 54
CONVEYANCE SYSTEM ANALYSIS AND DESIGN .................................................... 67
CONVEYANCE CALCULATIONS ............................................................................. 67
SPILL CONTROL ...................................................................................................... 72
OUTFIELD BASIN PUMP .......................................................................................... 72
PUMP SYSTEMS DESIGN CRITERIA ...................................................................... 73
SPECIAL REPORTS AND STUDIES ............................................................................ 74
OTHER PERMITS ......................................................................................................... 74
CSWPPP ANALYSIS AND DESIGN ............................................................................. 75
ESC Plan Analysis and Design (Part A) .................................................................... 75
Erosion Risk Assessment ...................................................................................... 75
Construction Sequence and Procedure ................................................................. 75
Trapping Sediment ................................................................................................. 75
Wet Weather TESC Operating Plan ....................................................................... 76
SWPPS Plan Design (Part B) .................................................................................... 76
BOND QUANTITIES AND FACILITIES SUMMARY...................................................... 83
OPERATION AND MAINTENANCE GUIDELINES ....................................................... 84
NAVIX Topgolf Renton – Renton, WA 3
APPENDIX
APPENDIX A - EXHIBITS
APPENDIX B - SPECIAL REPORTS AND STUDIES
APPENDIX C - CSWPPP WORKSHEETS
APPENDIX D - WWHM MODELS
APPENDIX E - TESC SEDIMENT POND SIZING
APPENDIX F - BOND QUANTITY WORKSHEET
APPENDIX G – FACILITY SUMMARY SHEET
APPENDIX H - OUTFIELD PRODUCT MATERIAL DATA AND MAINTENANCE
INSTRUCTIONS
APPENDIX I – PUMP DESIGN AND CALCULATIONS
APPENDIX J – CONVENYANCE CALCULATIONS
APPENDIX K – LEACHABLE METALS ROOF COVENANT
NAVIX Topgolf Renton – Renton, WA 4
PROJECT OVERVIEW
DESIGN CRITERIA
The stormwater management facilities have been designed to meet the 2017 City of Renton
Surface Water Design Manual (SWDM) with reference to the 2016 King County Surface Water
Design Manual.
2017 MANUAL REQUIREMENTS
Duration Analysis: Peak Rate Flow Control Standard
(match existing conditions for the 2-,
10-, and 100-year peak storm events)
Water Quality Menu: Enhanced WQ
Downstream Analysis: ¼ mile
Since the project proposes more than 2,000 SF of new plus replaced impervious area, a Full
Drainage Review will be required. This project is subject to all nine core requirements and all six
special requirements listed in the 2017 City of Renton SWDM.
EXISTING CONDITIONS
The proposed project is located at 780 Logan Avenue North in Renton, Washington (King County)
and consists of a single parcel, #20100602900006, totaling approximately 13.68 acres. The site is
currently vacant and is comprised of grassy areas throughout with some pavement areas associated
with previous site development. There are no trees on-site and there are no known critical areas,
other than a small portion at the southeastern corner of the site that is within Zone 2 of the Aquifer
Protection Area. This zone prohibits the use of open facilities for stormwater control or otherwise,
which are not being proposed as part of the development. See Figure 1 below for the Existing
Conditions Map.
NAVIX Topgolf Renton – Renton, WA 5
Figure 1: Existing Conditions Map
The site is bound by North 8th Street to the north, Logan Avenue North to the west, Park Avenue
North to the east, and office buildings with parking structures to the south. It is zoned UC-C, Urban
Center Design District C. All adjacent properties surrounding the site are similarly zoned as UC-C.
Per the Geotechnical Engineering Report by GeoEngineers, Inc., dated October 29, 2019, on-site
soils are comprised of relatively shallow fill overlying alluvial deposits, which consist of very soft to
stiff silt with varying sand content and very loose to dense sand with varying silt content.
Groundwater was observed as shallow as 4 feet from existing ground surface. The site will not be
conducive to stormwater management by means of infiltration.
PRE-DEVELOPMENT STORMWATER RUNOFF
The project site is divided into two on-site storm drainage sub-basins and one off-site tributary sub-
basin as shown in Figure 2 below. Please see further below for a general description of the two on-
site basins and the off-site tributary basin.
Existing public storm
conveyance system
Existing public storm
conveyance system
Existing Boeing 10-80 private
storm conveyance system
Existing Boeing 10-80 building to remain
Existing public storm
conveyance system
NAVIX Topgolf Renton – Renton, WA 6
Figure 2: Existing Sub-Basins Map
West Basin: Drainage from the western portion of project site (West Basin) is conveyed through
existing on-site swales and closed conveyance pipes to the basin’s connection point to the existing
municipal conveyance system in N 8th Street. From there, the stormwater runoff flows westerly to
the intersection of N 8th St and Logan Ave N. The runoff is then conveyed southerly to an existing
stormwater detention vault located under Logan Ave N, directly west of the project site. The runoff
leaves the detention vault and is conveyed northeasterly to the conveyance system convergence
point located at the intersection of Logan Ave N and Park Ave N. After this, the runoff enters a
drainage ditch and flows to the eastern side of Gene Coulon Memorial Beach Park where it enters a
stream. The runoff eventually outfalls to Lake Washington. See downstream analysis section of this
report for more details.
East Basin: Drainage from the eastern portion of project site (East Basin) is conveyed through
existing on-site swales and closed conveyance pipes to the basin’s connection to the existing
municipal conveyance system in Park Avenue N. The stormwater runoff is conveyed northwesterly
to the conveyance system convergence point located at the intersection of Logan Ave N and Park
NAVIX Topgolf Renton – Renton, WA 7
Ave N, where it combines with the runoff from the western portion of the project site. See
downstream analysis section of this report for more details.
Off-Site Basin: Off-site runoff from the Boeing property to the south enters the project site from
the Boeing 10-80 office building area and the adjacent off-site parcel to the southeast as shown in
Figure 3 below as the Boeing Basin. Runoff is conveyed by an existing 18-inch storm drainage pipe
that enters the eastern portion of the project site. As it traverses northeasterly across the property,
it combines with the runoff from the eastern on-site basin and connects to the existing municipal
conveyance system within Park Avenue N as described above. This off-site conveyance system will
be rerouted as described in the Proposed Conditions section below.
Figure 3: Existing Off-Site Conveyance Systems
PROPOSED CONDITIONS
The proposed project will consist of a Topgolf recreational facility with multiple hitting bays, a
surface parking lot, and associated underground utilities. The project will also include a mixed-use
development within the excess acreage to the east that will be developed as part of Phase 2 of
overall site development.
NAVIX Topgolf Renton – Renton, WA 8
Main access to the Topgolf portion of the site will be provided by two driveways off Logan Avenue
North. Access to the mixed-use development component will likely be from a driveway off North
8th Street and a driveway off Park Avenue North. The two developments will be connected via an
on-site drive aisle along the south side of the site. No additional right-of-way improvements are
anticipated. See Figure 4 below for the Developed Conditions Map.
Figure 4: Developed Conditions Map
POST-DEVELOPMENT STORMWATER RUNOFF
Stormwater will be managed on-site in accordance with the standards of the 2017 City of
Renton SWDM. Per the Flow Control Application Map, the project site falls within the ‘Peak
Rate Flow Control Standard – Matching Existing’ area. Per this standard, flow control is not
required if the proposed developed condition will not generate more than 0.15-cfs increase in
the 100-year peak flow under existing site conditions. The existing site condition for the project
site is the previous Boeing development, which had roughly 95% impervious surface coverage
as confirmed by the City of Renton. Because the proposed Topgolf development will decrease
the impervious surface coverage to less than 85%, the proposed developed condition will not
generate more than a 0.15-cfs increase in the 100-year peak flow. See WWHM input and
output for the previously developed Boeing site and developed conditions as proposed in this
report in Appendix D. Flow control, therefore, is not required. Water quality treatment,
however, will be provided to clean the stormwater runoff before it is discharged to the City’s
municipal storm conveyance system.
Flows from the two existing western and eastern basins will be maintained as close to the
existing conditions as possible as described further below.
NAVIX Topgolf Renton – Renton, WA 9
West Basin: For the West Basin, runoff from the proposed western parking lot area will be
conveyed to the existing municipal conveyance system within Logan Ave N, which is the existing
downstream discharge point for runoff from the West Basin. Prior to discharge from the site,
pollution-generating runoff from the parking lot area will be directed to a Biopod Biofilter unit to
receive enhanced water quality treatment. Runoff from the proposed building roof and the
western portion of the outfield area will be conveyed to the existing municipal system in N 8th
St. The discharge point in N 8th St is upstream of the municipal system and the connection for
the treated western parking lot area in Logan Ave N.
To match the tributary areas of the western and eastern basins exactly, runoff from the
proposed outfield, which straddles the western and eastern basin boundary, would need to be
precisely split. Splitting the outfield runoff presents considerable complexity, such as the need
for multiple, separate stormwater pumps to route the stormwater runoff collected in the
outfield targets. To avoid having to split the outfield runoff, runoff from most of the outfield
area will be routed to the East Basin to its connection point in Park Avenue N.
East Basin: For the East Basin, in addition to receiving runoff from the outfield area as
described above, stormwater runoff from the proposed mixed-use development area and from
the proposed eastern parking lot area will be routed to the discharge point at the City municipal
conveyance system in Park Avenue N. Pollution-generating runoff from the parking lot area will
be directed to a Biopod Biofilter unit to receive enhanced water quality treatment prior to
discharge.
Please see Figure 5 below for the storm drainage sub-basins in the proposed condition. To
avoid additional stormwater pumps for the outfield runoff, roughly 1.74 acres of additional area
is being routed to the East Basin as compared to the existing condition. However, the municipal
conveyance system has sufficient capacity to handle the flow from this additional 1.74 acres of
tributary area as described in the Conveyance Analysis section further in this report.
NAVIX Topgolf Renton – Renton, WA 10
Figure 5: Proposed Sub-Basins Map
Off-Site Conveyance System: As mentioned, there is an existing 18-inch storm drainage pipe that
traverses the eastern portion of project site from the Boeing property to the south. Please see
Figure 6 below for the proposed reroute of this existing off-site storm drainage conveyance system.
NAVIX Topgolf Renton – Renton, WA 11
Figure 6: Boeing Storm Drainage Re-Route Map
See below for the Technical Information Report Worksheet, provided in accordance to the 2017 City
of Renton SWDM.
NAVIX Topgolf Renton – Renton, WA 12
NAVIX Topgolf Renton – Renton, WA 13
NAVIX Topgolf Renton – Renton, WA 14
NAVIX Topgolf Renton – Renton, WA 15
NAVIX Topgolf Renton – Renton, WA 16
NAVIX Topgolf Renton – Renton, WA 17
NAVIX Topgolf Renton – Renton, WA 18
SITE LOCATION
Figure 7: Vicinity Map
Location: 780 Logan Ave N, Renton, Washington 98057
Section, Township, Range: SEC. 08, TOWNSHIP 23N, RANGE 05E, W.M.
Parcel/Tax Lot: 0886610010
Size: 13.68 acres (Full parcel); 11.44 acres (Topgolf area of disturbance only)
City, County, State: Renton, King County, Washington
Governing Agency: City of Renton
PROJECT
SITE
NAVIX Topgolf Renton – Renton, WA 19
DRAINAGE BASIN, SUBBASINS, AND SITE CHARACTERISTICS
DRAINAGE BASIN
The project site is located within the East Lake Washington – Renton drainage basin. There are no
special stormwater management requirements for this drainage basin. See Figure 8 below for the a
map of the drainage basin.
SUBBASINS
Two site sub-basins are present in the existing conditions.
Figure 8: Drainage Basin Map
PROJECT
SITE
NAVIX Topgolf Renton – Renton, WA 20
SOILS
Per the Geotechnical Engineering Report by GeoEngineers, Inc., dated October 29, 2019, the on-site
soils consist of relatively shallow fill overlying alluvial deposits. The fill was encountered in each of
the borings. The fill was observed below the pavement or topsoil, and generally consisted of loose
to dense sand with varying silt and gravel content. A thin layer of stiff sandy silt with occasional
gravel was encountered within the fill at boring B-1. The thickness of fill ranged from 4 feet up to
approximately 5 feet. Alluvium was observed below the fill. The alluvium typically consists of very
soft to stiff silt with varying sand content and very loose to dense sand with varying silt content.
Thin layers of peat were observed within the alluvium layer at various boring locations. The
alluvium soil observed at the site includes two sub-layers; upper loose to medium dense alluvium,
and lower medium dense to dense alluvium.
Groundwater was observed on-site and is located at depths of approximately 4 feet to 12.5 feet
below the existing ground surface, which corresponds to approximately Elevations 17.5 feet to 25
feet based on NAVD 88 vertical datum. Based on this, the geotechnical engineer suggests a design
groundwater elevation of 25 feet.
Per the Geotechnical Engineering Report and Geotechnical Infiltration Feasibility Evaluation, the
feasibility of infiltration was assessed at the site through review of near surface soil conditions and
groundwater levels. Due to a relatively shallow groundwater table, at approximately 4 feet below
grade, and the presence of low permeability silt soils near the ground surface, the use of small- or
large-scale infiltration facilities is not feasible at this site. See Special Reports and Studies in
Appendix B and section on on-site stormwater management BMP’s further below for additional
discussion.
NAVIX Topgolf Renton – Renton, WA 21
CONDITIONS AND REQUIREMENTS SUMMARY
As required by the 2017 City of Renton SWDM, this project is subject to a Full Drainage Review.
Therefore, the storm drainage design for this project is required to comply with, or explain
exemptions for, all nine (9) Core Requirements as well as all six (6) Special Requirements. The
applicable requirements have been met as follows:
CORE REQUIREMENTS
Core Requirement #1: Discharge at the Natural Location
All surface and storm water runoff from a project must be discharged at the natural location so as
not to be diverted onto or away from downstream properties. The manner in which runoff is
discharged from the project site must not create a significant adverse impact to downhill properties
or drainage systems.
Response: Runoff will be collected on-site and discharged to one of two existing municipal
conveyance systems, to which the site currently discharges. No downstream impacts are
anticipated.
Core Requirement #2: Offsite Analysis
All proposed projects must submit an offsite analysis report that assesses potential offsite drainage
impacts associated with development of the project site and propose appropriate mitigations of
those impacts. The initial permit submittal shall include, at a minimum, a Level 1 downstream
analysis as described in Section 1.2.2.1 of the 2016 Manual.
Response: A Level 1 Downstream Analysis was completed for this project. See the Offsite Analysis
section for details.
Core Requirement #3: Flow Control Facilities
All proposed projects, including redevelopment projects, must provide onsite flow control facilities
to mitigate the impacts of storm and surface water runoff generated by new impervious surface,
new pervious surface, and replaced impervious surface targeted for flow mitigation as specified in
the following sections. Flow control facilities must be provided and designed to perform as
specified by the area-specific flow control facility requirement in Section 1.2.3.1 and in accordance
with the applicable flow control facility implementation requirements in Section 1.2.3.2.
Response: Stormwater will be managed on-site in accordance with the standards of the 2017 City of
Renton SWDM. Per the Flow Control Application Map, the project site falls within the ‘Peak Rate
Flow Control Standard – Matching Existing’ area. Per this standard, flow control is not required if the
proposed developed condition will not generate more than 0.15-cfs increase in the 100-year peak
flow under existing site conditions. The existing site condition for the project site is the previous
Boeing development, which had roughly 95% impervious surface coverage as confirmed by the City
of Renton. Because the proposed Topgolf development will decrease the impervious surface
NAVIX Topgolf Renton – Renton, WA 22
coverage to less than 85%, the proposed developed condition will not generate more than a 0.15-cfs
increase in the 100-year peak flow. Flow control, therefore, is not required.
In the western portion of the site that includes the new Topgolf building and adjacent parking lot
areas, stormwater runoff from the pollution-generating parking lot area will be routed to a Biopod
Biofilter unit for water quality treatment prior to discharging to the municipal conveyance system in
Logan Avenue N. The building roof area and western portion of the outfield surface will be routed to
the existing municipal conveyance system in N 8th St.
In the eastern portion of the site that includes the outfield area, the mixed-use development area,
and the surface parking lot to the southeast, stormwater runoff from the pollution-generating
parking lot area will be routed to a Biopod Biofilter unit prior to discharge to the existing municipal
conveyance system in Park Avenue N. See flow control section of this report for additional
information.
Core Requirement #4: Conveyance System
All engineered conveyance system elements for proposed projects must be analyzed, designed, and
constructed to provide a minimum level of protection against overtopping, flooding, erosion, and
structural failure as specified in Sections 1.2.4.1, 1.2.4.2, and 1.2.4.3 of the 2016 King County
Surface Water Design Manual.
Response: Spill control requirements will be met per section 1.2.4.3.G by installation of a tee section
at SDCB#5 and SDCB#20 per section 4.2.1.1.A. Please see the Conveyance System Analysis and
Design section of this report for more information.
Core Requirement #5: Erosion and Sediment Control
All proposed projects that will clear, grade, or otherwise disturb the site must provide erosion and
sediment controls to prevent, to the maximum extent practicable, the transport of sediment from
the project site to downstream drainage facilities, water resources, and adjacent properties. All
proposed projects that will conduct construction activities onsite or offsite must provide
stormwater pollution prevention and spill controls to prevent, reduce, or eliminate the discharge of
pollutants to onsite or adjacent stormwater systems or watercourses. To prevent sediment
transport and pollutant discharges as well as other impacts related to land-disturbing and
construction activities, Erosion and Sediment Control (ESC) measures and Stormwater Pollution
Prevention and Spill Control (SWPPS) measures that are appropriate to the project site must be
applied through a comprehensive Construction Stormwater Pollution Prevention (CSWPP) plan as
described in Sections 1.2.5.1 and 1.2.5.3 and shall perform as described in Section 1.2.5.2. In
addition, these measures, both temporary and permanent, shall be implemented consistent with
the requirements in Section 1.2.5.3 that apply to the proposed project.
Response: Construction stormwater pollution prevention measures are an integral part of the
project construction documents. These measures will include methods to reduce erosion of on-site
site soils and to prevent sediment from inadvertently leaving the project site, such as silt fencing,
inlet protection, and marking clearing limits. Erosion and sediment control measures will be
NAVIX Topgolf Renton – Renton, WA 23
designed in conformance with the 2017 City of Renton Surface Water Design Manual standards.
Please see the CSWPPP Analysis and Design section of this report for more information.
Core Requirement #6: Maintenance and Operations
Maintenance and operation of all drainage facilities is the responsibility of the applicant or property
owner, except those facilities for which King County is granted an easement, tract, or right-of-way
and officially assumes maintenance and operation. Drainage facilities must be maintained and
operated in compliance with Appendix A, or other maintenance standards as approved by the City.
Response: Please see the Operation and Maintenance Guidelines section of this report for more
information.
Core Requirement #7: Financial Guarantees and Liability
All drainage facilities constructed or modified for projects (except flow control facilities to be
privately maintained) must comply with the financial guarantee requirements and the liability
requirements of the City. There are two types of financial guarantees for projects constructing or
modifying drainage facilities; the drainage facilities restoration and site stabilization guarantee, and
the drainage defect and maintenance guarantee.
Response: A Bond Quantity worksheet is provided as an appendix to this report.
Core Requirement #8: Water Quality
All proposed projects, including redevelopment projects, must provide water quality (WQ) facilities
to treat the runoff from new and replaced pollution-generating impervious surfaces and pollution-
generating pervious surfaces targeted for treatment. These facilities shall be selected from one of
the area-specific WQ menus described in Section 1.2.8.1 and implemented according to the
applicable WQ implementation requirements in Section 1.2.8.2.
Response: This site is subject to Enhanced Water Quality Treatment, which will be provided by
means of a BioPod Biofilter Unit in each of the site sub-basins. The BioPod Biofilter Unit has Ecology
GULD approval to provide enhanced treatment for the offline water quality flow rate as determined
by WWHM2012. Please see the Flow Control, LID, And Water Quality Facilities Analysis and Design
section of this report for detailed modeling inputs and calculations.
Core Requirement #9: On-Site BMPs
All proposed projects, including redevelopment projects, must provide onsite flow control BMPs to
mitigate the impacts of storm and surface water runoff generated by new impervious surface, new
pervious surface, existing impervious surfaces, and replaced impervious surface targeted for
mitigation as specified in the following sections. Flow control BMPs must be selected and applied
according to the basic requirements, procedures, and provisions detailed in this section and the
design specifications for each BMP in Appendix C, Section C.2.
Flow control BMPs are methods and designs for dispersing, infiltrating, or otherwise reducing or
preventing development-related increases in runoff at or near the sources of those increases. Flow
control BMPs include, but are not limited to, preservation and use of native vegetated surfaces to
NAVIX Topgolf Renton – Renton, WA 24
fully disperse runoff; use of other pervious surfaces to disperse runoff; roof downspout infiltration;
permeable pavements; bioretention; limited infiltration systems; and reduction of development
footprint.
Response: Soil amendment is proposed to meet on-site BMPs requirement. Please see the Flow
Control, LID, And Water Quality Facilities Analysis and Design section of this report for more
information.
SPECIAL REQUIREMENTS
Special Requirement #1: Other Adopted Area-Specific Requirements
The drainage requirements of adopted MDPs, BPs, SCPs, LMPs, HMPs, SDFPs shall be applied in
addition to the drainage requirements of the 2016 Manual unless otherwise specified in the
adopted regulation. Where conflicts occur between the two, the drainage requirements of the
adopted area-specific regulation shall supersede those in the 2016 Manual.
Response: There are no known adopted area-specific requirements that apply to the proposed
development.
Special Requirement #2: Flood Hazard Area Delineation
Floodplains and floodways are subject to inundation during extreme events. The 100-year
floodplains are delineated in order to minimize flooding impacts to new development and to
prevent aggravation of existing flooding problems by new development. Regulations and
restrictions concerning development within a 100-year floodplain are found in the Sensitive Areas
Ordinance.
Response: Per the most current FIRM Map, shown in the 100-year flood/overflow condition section
of this report, the project site does not lie within the 100-year floodplain.
Special Requirement #3: Flood Protection Facilities
Developing sites protected by levees and revetments require a high level of confidence in their
structural integrity and performance. Proper analysis, design, and construction are necessary to
protect against the potentially catastrophic consequences if such facilities should fail.
Response: The project site does not contain levees, revetments, or berm protection.
Special Requirement #4: Source Control
Water quality source controls prevent rainfall and runoff water from coming into contact with
pollutants, thereby reducing the likelihood that pollutants will enter public waterways and violate
water quality standards and County stormwater discharge permit limits. The County may require
mandatory source controls at any time through formal code enforcement if complaints or studies
reveal water quality violations or problems.
NAVIX Topgolf Renton – Renton, WA 25
Response: All applicable non-structural Source Control BMPs will be implemented as outlined in the
2017 City of Renton Surface Water Design Manual and the 2016 King County Stormwater Pollution
Prevention Manual. These include Required Best Management Practices for all Properties with
Commercial Activities, Storage of Solid Wastes and Food Wastes (Including Cooking Grease),
Cleaning or Washing of Food Service Areas and Equipment, Landscaping Activities, Vehicle and
Equipment Parking and Storage, and Sidewalk Maintenance.
Roof cover over the dumpster area will be implemented as a structural source control measure.
Special Requirement #5: Oil Control
Projects proposing to develop or redevelop a high-use site must provide oil controls in addition to
any other water quality controls. Such sites typically generate high concentrations of oil due to high
traffic turnover or the frequent transfer of oil.
Response: A high-use site is defined in the 2016 KCSWDM as “a commercial or industrial site that
has an expected average daily traffic (ADT) count equal to or greater than 100 vehicles per 1,000
square feet of gross building area”. Per the email from the Transpo Group located in Appendix B,
the project is not considered high-use; therefore, oil control in not proposed.
Special Requirement #6: Aquifer Protection Area
If a proposed project is located within an aquifer protection area, the project is required to
determine and delineate applicable components on the project’s site improvement plan.
Response: A small portion at the southeastern corner of the site is within Zone 2 of the Aquifer
Protection Area. This zone may require open facilities and conveyance systems to have a liner in
accordance with the design criteria in Section 6.2.4. and Section 1.2.4.3. respectively of the 2017
SWDM. No open facilities are being proposed as part of the development.
NAVIX Topgolf Renton – Renton, WA 26
OFFSITE ANALYSIS
TASK 1: STUDY AREA DEFINITION AND MAPS
Available resources such as the survey and topographic maps were utilized to prepare the
downstream analysis. The study area extended beyond the required 1/4-mile downstream of the
project site. The two conveyance systems impacted by this development have been investigated.
Figure 9 shows the general location of the critical areas relative to the proposed project site as
designated on the City of Renton Critical Areas Map. No sensitive/critical areas are located on-site,
aside from a small portion at the southeastern corner of the site is within Zone 2 of the Aquifer
Protection Area. This zone may require open facilities and conveyance systems to have a liner in
accordance with the design criteria in Section 6.2.4. and Section 1.2.4.3. respectively of the 2017
SWDM. No open facilities are being proposed as part of the development.
Figure 9: Critical Areas Map
PROJECT
SITE
NAVIX Topgolf Renton – Renton, WA 27
TASK 2: RESOURCE REVIEW
The following resources were reviewed for existing/potential problems within the study area:
Site Survey
FEMA F.I.R.M.
City of Renton Critical Areas Map
King County iMap Floodplain
Reported Drainage Complaints
Current DOE 303(d) List
A review of drainage complaints from the last 10 years within one-quarter mile of the project site,
as supplied by King County, indicates that no drainage complaints have been filed as indicated
below in Figure 10. Therefore, no drainage or water quality concerns appear to impact or be
impacted by the development of this site.
Figure 10: Drainage Complaints Map
PROJECT
SITE
Drainage
complaint
area, typical
NAVIX Topgolf Renton – Renton, WA 28
TASK 3: FIELD INSPECTION
UPSTREAM ANALYSIS
The project site does not receive additional runoff from upstream properties. The adjacent
properties flow away from the project site’s property lines.
DOWNSTREAM ANALYSIS
A formal downstream analysis has been completed in accordance with the 2017 City of Renton’s
SWDM. The downstream analysis was completed on April 19, 2018. The temperature was
approximately 60 degrees and was sunny. The project site consists of two drainage sub-basins,
which flow to a convergence point, and into one discharge point on Lake Washington. Below is a
description of each of the site drainage sub-basins.
Figure 11: Downstream Flow Paths
NAVIX Topgolf Renton – Renton, WA 29
Conveyance System 1
# Photo Description
1
View from SW corner of
site looking east.
Drainage from western
side of project site is
conveyed through pipes
and swales on the south
side of the site in a
westerly direction.
2
View from SW corner of
site looking north.
Drainage from pipes that
follow the southwest
side of the site is
conveyed into an open-
grate catch basin at the
SW corner of the site.
NAVIX Topgolf Renton – Renton, WA 30
3
View from SW corner of
site looking north.
Drainage from open-
grate catch basin is
conveyed through pipes
in a northerly direction
to N 8th St. Swale
drainage is conveyed to
a wetland located on the
northern end of the site.
4
View from N 8th St
looking southwest.
Drainage from on-site
swales ponding at the
northern end of the site.
NAVIX Topgolf Renton – Renton, WA 31
5
View from drainage
connection point on N
8th St looking west.
Drainage from the
eastern half of site is
conveyed into an open-
grate catch basin located
in the shoulder of the
east-bound travel lane of
N 8th St.
6
View from NW corner of
the site looking
northwest into the
intersection of Logan
Ave N and N 8th St.
Drainage from open-
grate catch basin located
on the south side of N 8th
St is conveyed to a solid-
lid manhole in the
intersection of Logan
Ave N and N 8th St.
NAVIX Topgolf Renton – Renton, WA 32
7
View from intersection
of Logan Ave N and N 8th
St looking south.
Drainage from manhole
located in the
intersection of Logan
Ave N and N 8th St is
conveyed to an open-
grate catch basin located
on the east side of Logan
Ave N.
8
View from Logan Ave N
looking west.
Drainage from open-
grate catch basin on N
Logan Ave is conveyed in
a westerly direction
through an open-grate
catch basin to an existing
detention vault located
beneath Logan Ave N,
adjacent to the site.
NAVIX Topgolf Renton – Renton, WA 33
9
View from Logan Ave N
looking north.
Drainage from vault is
conveyed in a northerly
direction along the
western side of Logan
Ave N.
10
View from Logan Ave N
at the intersection of
Logan Ave N and N 8th St
looking north.
Drainage from vault is
conveyed in a northerly
direction to a solid-lid
manhole on the western
side of Logan Ave N.
NAVIX Topgolf Renton – Renton, WA 34
11
View from Logan Ave N
looking north.
Drainage from solid-lid
manhole is conveyed
along Logan Ave N to a
solid-lid manhole located
at the bus-stop exit at
the intersection of Logan
Ave N and N 10th St.
12
View from intersection
of Logan Ave N and N
10th St looking north.
Drainage from solid-lid
manhole is conveyed in a
northerly direction to a
solid-lid manhole located
in the intersection of
Logan Ave N and N 10th
St.
Storm Drainage Manhole
NAVIX Topgolf Renton – Renton, WA 35
13
View from Logan Ave N
looking northeast.
Drainage from solid-lid
manhole at the
intersection of Logan
Ave N and N 10th St is
conveyed in a
northeasterly direction
to a solid-lid manhole
located in the center of
Logan Ave N.
14
View from Logan Ave N
looking northeast.
Drainage from solid-lid
manhole is conveyed in a
northeasterly direction
to a solid-lid manhole
located in the south-
bound lane of Logan Ave
N.
NAVIX Topgolf Renton – Renton, WA 36
15
View from Logan Ave N
looking northeast
toward the intersection
of Logan Ave N and Park
Ave N.
Drainage from solid-lid
manhole is conveyed in a
northeasterly direction
to a solid-lid manhole
located in the south-
bound lane of Logan Ave
N.
16
View from Logan Ave N
looking southeast
towards the intersection
of Logan Ave N and Park
Ave N.
Drainage from solid-lid
manhole from the south-
bound lane of Logan Ave
N is conveyed in a
northeasterly direction
to the conveyance
system convergence
point, a solid-lid
manhole, northeast of
the intersection of Logan
Ave N and Park Ave N.
Conveyance System
Convergence Point
NAVIX Topgolf Renton – Renton, WA 37
17
View from Lake
Washington Blvd N
looking northwest.
Drainage from
conveyance system
convergence point
conveys to a ditch
system along the
northwest side of Lake
Washington Blvd where
it travels under the
railway through 84”, 48”,
and 48” concrete pipes.
Flow was directed into
the 48” pipes because of
sediment build-up in the
84” pipe.
18
View from Coulon Beach
Park Rd looking west.
Drainage from Lake
Washington Blvd N ditch
is conveyed into a
stream and flows
underneath a bridge
located west of the
intersection of the
railway and Coulon
Beach Park Dr.
NAVIX Topgolf Renton – Renton, WA 38
19
View from Coulon Beach
Park Dr drainage ditch
looking north.
Drainage conveyed
under the bridge located
west of the intersection
of the railway and
Coulon Beach Park Dr
goes through another
drainage area located on
the northern side of the
bridge.
20
View from Coulon Beach
Park Dr drainage ditch
looking south.
Drainage from the
stream located on the
southwest side of Coulon
Beach Park Dr
underneath Coulon
Beach Park Rd is
conveyed through two
66” concrete pipes and
one 72” pipe. Flow was
diverted into the middle
66” pipe because of
sediment build up in the
outside pipes.
66” Concrete Pipe
66” Concrete Pipe
72” Concrete Pipe
NAVIX Topgolf Renton – Renton, WA 39
21
View from Coulon Beach
Park Dr drainage ditch
looking north.
Drainage is conveyed
underneath Coulon
Beach Park Rd into a
stream that runs along
the northeast side of
Coulon Beach Park.
22
View from northeast side
of Coulon Beach Park
looking southeast.
Drainage is conveyed in
a northwesterly
direction through a
stream along the
northeast side of Coulon
Beach Park.
NAVIX Topgolf Renton – Renton, WA 40
23
View from bridge that
connects Coulon Beach
Park to an adjacent
parking lot looking
northwest.
Drainage is conveyed
through the stream and
is discharged into Lake
Washington. At the
discharge point, the
stream is approximately
16 feet wide and 1.5 feet
deep.
NAVIX Topgolf Renton – Renton, WA 41
Conveyance System 2
# Photo Description
24
View from the south-
central location of site
looking south.
Drainage from western
half of project site is
conveyed through pipes
and swales located on
the south side of the site
in a northerly direction.
25
View along existing fence
of south-central location
of site looking north.
Drainage from project
site is conveyed to an
open-grate catch basin
located adjacent to an
existing fence.
NAVIX Topgolf Renton – Renton, WA 42
26
View from center of site
looking north.
Drainage from open-
grate catch basin
adjacent to existing
fence is conveyed in a
northerly direction to an
open-grate catch basin
located in the center of
the site.
27
View from center of site
looking north.
Drainage from open-
grate catch basin in
center of the site is
conveyed in a northerly
direction to a solid-lid
manhole located in the
center of the site.
NAVIX Topgolf Renton – Renton, WA 43
28
View from center of site
looking north.
Drainage from solid-lid
manhole in center of the
site is conveyed in a
northerly direction to an
open-grate catch basin
located in the center of
the site.
29
View from north central
portion of site looking
north.
Drainage from open-
grate catch basin in
center of the site is
conveyed in a northerly
direction to an elevated
manhole located in the
north central portion of
the site. From here, it is
directed easterly to an
existing storm drain
manhole that is part of
the municipal
conveyance system in
Park Avenue N.
NAVIX Topgolf Renton – Renton, WA 44
30
View of existing storm
drain manhole that is
part of the municipal
conveyance system in
Park Avenue N looking
north.
Drainage from this
manhole is conveyed
north in an existing 24-
inch municipal
conveyance pipe.
31
View from intersection
of Dick Sporting Good’s
parking entrance and
Park Ave N looking
north.
Drainage is conveyed
down Park Ave N in a
northerly direction.
NAVIX Topgolf Renton – Renton, WA 45
32
View from intersection
of Park Ave N and N 10th
St looking east.
Drainage from system is
conveyed in a northerly
direction to a solid-lid
manhole located in the
intersection of Park Ave
N and N 10th St.
33
View from intersection
of Park Ave N and N 10th
St looking northeast.
Drainage from solid-lid
manhole is conveyed in
an easterly direction to a
solid-lid manhole located
in the intersection of
Park Ave N and N 10th St.
NAVIX Topgolf Renton – Renton, WA 46
34
View from intersection
of Park Ave N and N 10th
Pl looking northeast.
Drainage from solid-lid
manhole is conveyed in a
northerly direction to a
solid-lid manhole located
at the intersection of
Park Ave N and N 10th Pl.
35
View from Logan Ave N
looking southeast
towards the intersection
of Logan Ave N and Park
Ave N.
Drainage from solid-lid
manhole at the
intersection of Park Ave
N and N 10th Pl is
conveyed in a
northeasterly direction
to the conveyance
system convergence
point, a solid-lid
manhole, northeast of
the intersection of Logan
Ave N and Park Ave N.
Refer to conveyance
system 1 for
continuation.
Conveyance System
Convergence Point
NAVIX Topgolf Renton – Renton, WA 47
TASK 4: DRAINAGE SYSTEM DESCRIPTION AND PROBLEM DESCRIPTIONS
There are no known problems with the drainage paths around the site. No downstream impacts
from the proposed project are anticipated. To confirm conveyance capacity, analysis of the existing
municipal conveyance system is provided in the Conveyance System Analysis and Design section of
this report.
TASK 5: MITIGATION OF EXISTING OR POTENTIAL PROBLEMS
No existing or potential problems were identified as discussed in Task 4 above; therefore, mitigation
is not warranted. Maintenance of the existing municipal conveyance pipes that appear to have
varying degrees of collected debris may be warranted, but this does not appear to be creating
drainage issues upstream.
NAVIX Topgolf Renton – Renton, WA 48
FLOW CONTROL, LID, AND WATER QUALITY FACILITIES
ANALYSIS AND DESIGN
EXISTING SITE HYDROLOGY
The project site is approximately 13.68 acres (596,016 SF) and consists of a vacant lot. Runoff from
the existing site is generated from two on-site sub-basins, the West Basin and East Basin, and one
partially on-site basin, the Boeing Basin. The pre-developed conditions are shown in Tables 1a, 1b,
and 1c.
Table 1a: On-Site Areas (West Basin)
Existing Conditions
Area (AC) Description
5.91 Pervious
1.76 Impervious
7.67 Total On-site Area (West Basin)
Table 1b: On-Site Areas (East Basin)
Existing Conditions
Area (AC) Description
4.52 Pervious
0.56 Impervious
5.08 Total On-site Area (East Basin)
Table 1c: Partially On-site Areas (Boeing Basin)
Existing Conditions
Area (AC) Description
0.97 Pervious
1.30 Impervious
2.27 Total Area (East Basin)
The on-site portion of the Boeing Basin is approximate 0.93 acres (40,410 SF) and is approximately
3% impervious. The offsite portion of the Boeing Basin is approximately 1.34 acres (58,501 SF) and
is 95% impervious. The pre-existing conditions of the on-site and offsite portions of the Boeing
Basin are shown in Tables 1d and 1e.
NAVIX Topgolf Renton – Renton, WA 49
Table 1d: On-Site Areas (Boeing Basin)
Existing Conditions
Area (AC) Description
0.90 Pervious
0.03 Impervious
0.93 Total On-site Area (Boeing Basin)
Table 1e: Offsite Areas (Boeing Basin)
Existing Conditions
Area (AC) Description
0.07 Pervious
1.27 Impervious
1.34 Total Offsite Areas (Boeing Basin)
Because this site was previously developed by Boeing, on-site areas are also compared to the
previous conditions of the site under the previous Boeing use. As confirmed by the City of Renton,
Boeing had developed approximately 95% impervious areas on-site. The previously developed
Boeing conditions for the on-site areas are shown in Tables 1f and Table 1g. WWHM inputs and
outputs for the previously developed Boeing conditions can be found in Appendix D.
Table 1f: On-Site Areas Under Previous Boeing Development (West Basin)
Existing Conditions
Area (AC) Description
0.38 Pervious
7.29 Impervious
7.67 Total On-site Area (West Basin)
Table 1g: On-Site Areas Under Previous Boeing Development (East Basin)
Existing Conditions
Area (AC) Description
0.25 Pervious
4.83 Impervious
5.08 Total On-site Area (East Basin)
The previously developed Boeing conditions for the on-site portion of the Boeing Basin were 95%
impervious and are shown in Table 1h. The previously developed Boeing conditions for the offsite
portion of the Boeing Basin are the same as the pre-developed conditions and are shown in Table
1e above.
NAVIX Topgolf Renton – Renton, WA 50
Table 1h: On-Site Areas Under Previous Boeing Development
(On-Site Portion of Boeing Basin)
Existing Conditions
Area (AC) Description
0.88 Pervious
0.05 Impervious
0.93 Total On-site Area (Boeing Basin)
DEVELOPED SITE HYDROLOGY
The developed surface conditions areas are noted in Tables 2a and 2b. See Figure 12 and 13 for the
Developed Conditions Map.
Table 2a: On-Site Proposed Areas (West Basin)
Developed Conditions
Area (AC) Description
0.59 Building (Roof Area)
2.72 Pavement/Sidewalk/Plaza
1.19 Field (Impervious)
1.44 Pervious
5.94 Total On-site Area (West Basin)
Table 2b: On-Site Proposed Areas (East Basin)
Developed Conditions
Area (AC) Description
1.45 Phase 2 (Mixed Use)
2.23 Pavement/Sidewalk
3.14 Field (Impervious)
0.92 Pervious
7.74 Total On-site Area (East Basin)
NAVIX Topgolf Renton – Renton, WA 51
Figure 12: Developed Conditions Map (West Basin)
Figure 13: Developed Conditions Map (East Basin)
NAVIX Topgolf Renton – Renton, WA 52
ON-SITE STORMWATER BMPS
This project is electing to use the List No. 2 option for selection of large lot on-site stormwater
BMPs.
The following tables list the evaluated on-site BMPs and reasons for infeasibility.
Part I
BMP Feasible
(Yes/No)
Explanation
Full Dispersion No A minimum forested or native vegetation flow path length of 100
feet cannot be achieved.
Part 2
BMP Feasible
(Yes/No)
Explanation
Full Infiltration
of Roof Runoff No Per the geotechnical engineering report, due to a relatively
shallow groundwater table, at approximately 4 feet below grade,
and the presence of low permeability silt soils near the ground
surface, the use of infiltration facilities is not feasible at this site.
Part 3
BMP Feasible
(Yes/No)
Explanation
Full Infiltration No Per the geotechnical engineering report, due to a relatively
shallow groundwater table, at approximately 4 feet below grade,
and the presence of low permeability silt soils near the ground
surface, the use of infiltration facilities is not feasible at this site.
Limited
Infiltration
No Per the geotechnical engineering report, due to a relatively
shallow groundwater table, at approximately 4 feet below grade,
and the presence of low permeability silt soils near the ground
surface, the use of infiltration facilities is not feasible at this site.
Bioretention No Per the geotechnical engineering report and infiltration feasibility
evaluation, due to a relatively shallow groundwater table, at
approximately 4 feet below grade, and the presence of low
permeability silt soils near the ground surface, the use of
infiltration facilities is not feasible at this site.
Permeable
Pavement
No Per the geotechnical engineering report and infiltration feasibility
evaluation, due to a relatively shallow groundwater table, at
approximately 4 feet below grade, and the presence of low
permeability silt soils near the ground surface, the use of
infiltration facilities is not feasible at this site.
NAVIX Topgolf Renton – Renton, WA 53
Part 4
BMP Feasible
(Yes/No)
Explanation
Basic Dispersion No For splash blocks, a vegetated flow path of at least 50 feet
in length from the downspout to the downstream
property line, structure, stream, wetland, slope over 15
percent, or other impervious surface is not achievable.
A minimum 3-foot length of rock pad and 50-foot flow
path OR a dispersion trench and 25-foot flow path for
every 700 sq. ft. of drainage area (within applicable
setbacks) cannot be achieved.
For trenches, a vegetated flow path of at least 25 feet
between the outlet of the trench and any property line,
structure, stream, wetland, or impervious surface is not
achievable.
For flat to moderately sloped areas, at least a 10-foot-wide
vegetation buffer for dispersion of the adjacent 20 feet of
contributing surface cannot be achieved.
Part 5
BMP Feasible
(Yes/No)
Explanation
Reduced
Impervious
Surface Credit
No A reduction in impervious surface below established norms that
must be assured through covenant and/or alternative design
cannot be achieved.
Native Growth
Retention Credit
No The site does not currently contain any native vegetated areas;
therefore, native growth retention credit is unattainable.
Part 6
BMP Feasible
(Yes/No)
Explanation
Soil Amendment Yes On-site disturbed areas that result in lawn or landscaping will be
amended with compost or replaced with topsoil meeting Post-
Construction Soil Quality and Depth requirements.
NAVIX Topgolf Renton – Renton, WA 54
Part 7
BMP Feasible
(Yes/No)
Explanation
Perforated Pipe
Connection No Per the geotechnical engineering report, due to a relatively
shallow groundwater table, at approximately 4 feet below grade,
and the presence of low permeability silt soils near the ground
surface, the use of infiltration is not feasible at this site.
FLOW CONTROL SYSTEM
Stormwater will be managed on-site in accordance with the standards of the 2017 City of Renton
SWDM. Per the Flow Control Application Map, the project site falls within the ‘Peak Rate Flow
Control Standard – Matching Existing’ area. Per this standard, flow control is not required if the
proposed developed condition will not generate more than 0.15-cfs increase in the 100-year peak
flow under existing site conditions. The existing site condition for the project site is the previous
Boeing development, which had roughly 95% impervious surface coverage as confirmed by the City
of Renton. Because the proposed Topgolf development will decrease the impervious surface
coverage to less than 85%, the proposed developed condition will not generate more than a 0.15-
cfs increase in the 100-year peak flow as compared to the existing site condition. Flow control,
therefore, is not required.
In the western portion of the site that includes the new Topgolf building and adjacent parking lot
areas, stormwater runoff from the pollution-generating parking lot area will be routed to a Biopod
Biofilter unit for water quality treatment prior to discharging to the municipal conveyance system in
Logan Avenue N. The building roof area and western portion of the outfield surface will be routed
to the existing municipal conveyance system in N 8th St.
In the eastern portion of the site that includes the outfield area, the mixed-use development area,
and the surface parking lot to the southeast, stormwater runoff from the pollution-generating
parking lot area will be routed to a Biopod Biofilter unit prior to discharge to the existing municipal
conveyance system in Park Avenue N.
WATER QUALITY SYSTEM
The proposed development is subject to Enhanced Water Quality Treatment. The water quality
design flow for projects that do not require detention is equal to 91% of the developed water
quality volume as determined using WWHM2012.
In the western portion of the site that includes the new Topgolf building and adjacent parking lot
areas, stormwater runoff from the pollution-generating parking lot area will be routed to a Biopod
Biofilter unit for water quality treatment prior to discharging to the municipal conveyance system in
Park Ave N. The building roof area and western portion of the outfield surface will be routed to the
existing municipal conveyance system in N 8th St.
NAVIX Topgolf Renton – Renton, WA 55
and the surface parking lot to the southeast, stormwater runoff from the pollution-generating
parking lot area will be routed to a Biopod Biofilter unit prior to discharge to the existing municipal
conveyance system in Park Avenue N. The outfield is turf and does not use pesticides or fertilizer
and is, therefore, not considered pollution generating impervious surface. Outfield material product
data and maintenance instructions are included in Appendix H .
See Figure 14 below for the locations of the proposed water quality facilities.
Figure 14: Water Quality Systems
The BioPod Biofiltration Units are sized using 91% of the 24-hour runoff volume as estimated by
WWHM2012. Per the Department of Ecology’s GULD approval (see GULD approval below), the
BioPod Biofiltration Units treat the 15-minute water quality flow rate as calculated by WWHM2012.
However, per the 2017 SWDM Section 6.2.1, WWHM water quality flow rates require a
modification factor per Table 6.2.1.A. Therefore, from regional isopluvials in Figure 3.2.1.A and
Department of Ecology modification factors in Table 6.2.1.A, an interpolated k-value of 1.93 has
been applied to the online 15-minute WWHM2012 water quality flow rate for the western basin
and an interpolated k-value of 3.53 has been applied to offline 15-minute WWHM water quality
flow rate for the eastern basin. (The western and eastern basins were analyzed at separate times,
hence the use of both online and offline flows for sizing.) The BioPod Biofiltration Units include an
internal high flow bypass weir system to accommodate higher flows without the need for a flow
splitter.
The modified water quality flow rate from the West Basin (shown in Figure 15 below) using the
offline water quality flow rate, is 0.217 * 3.50 = 0.76 cfs with a peak 100-year developed flow rate
of 2.0891 cfs. Please note that the water quality flow rate of 0.76 CFS is 0.04 CFS greater than the
Figure 14: Water Quality Systems
Biopod Biofilter
Unit (Western Basin
Enhanced Water
Quality Facility)
BioPod Biofilter
Unit (Eastern Basin
Enhanced Water
Quality Facility)
NAVIX Topgolf Renton – Renton, WA 56
0.72 CFS flow rate to which the already installed water quality facility was designed to treat.
However, City of Renton staff has indicated this 0.04 CFS difference is acceptable.
The modified water quality flow rate from the East Basin (shown in Figure 16 below) using the
offline water quality flow rate is 0.3773 * 3.53 = 1.331 cfs with a peak 100-year developed flow rate
of 3.3183 cfs. Please note that water quality flow rate for the East Basin was calculated assuming
the basin is comprised of 90% pollution generating impervious surface to be conservative (4.14
acres). See the BioPod sizing letter below as well as the WWHM2012 input and output in Appendix
D.
Figure 15: West Basin Water Quality
NAVIX Topgolf Renton – Renton, WA 57
Figure 16: East Basin Water Quality
The BioPod Biofilter sizing letters, prepared by Oldcastle, are provided below.
NAVIX Topgolf Renton – Renton, WA 58
NAVIX Topgolf Renton – Renton, WA 59
NAVIX Topgolf Renton – Renton, WA 60
NAVIX Topgolf Renton – Renton, WA 61
NAVIX Topgolf Renton – Renton, WA 62
NAVIX Topgolf Renton – Renton, WA 63
NAVIX Topgolf Renton – Renton, WA 64
NAVIX Topgolf Renton – Renton, WA 65
NAVIX Topgolf Renton – Renton, WA 66
100-YEAR FLOOD/OVERFLOW CONDITION
Review of the most recent FEMA FIRM as adopted by King County indicates that the development
area on the project site does not lie within the 100-year flood plain. The portion of FIRM containing
the subject property is included in Figure 17 below.
Figure 17: King County FEMA Map
PROJECT
SITE
NAVIX Topgolf Renton – Renton, WA 67
CONVEYANCE SYSTEM ANALYSIS AND DESIGN
CONVEYANCE CALCULATIONS
The conveyance capacity of the proposed on-site conveyance system is analyzed per basin,
including the off-site tributary basins, as discussed further below.
West Basin: For the West Basin, runoff from the on-site areas, including the proposed building roof
and the proposed western parking lot area, will be conveyed to the existing municipal conveyance
systems within Logan Avenue N and N 8th Street, as described previously. See Figures 18 and 19 for
the areas draining to N 8th Street and Logan Avenue N respectively.
Figure 18: West Basin Areas (to N 8th Street)
NAVIX Topgolf Renton – Renton, WA 68
Figure 19: West Basin Areas (to Logan Avenue N)
The peak 100-year flow from the West Basin to N 8th Street is 1.754 cfs as determined using
WWHM2012 (see Appendix D). As demonstrated in the Manning’s calculation below, the proposed
12-inch conveyance pipe through which the West Basin areas shown in Figure 18 discharge to the
municipal system in N 8th Street sloped at a minimum 0.5% has sufficient capacity to convey the
100-year peak flow.
NAVIX Topgolf Renton – Renton, WA 69
The peak 100-year flow from the West Basin to Logan Avenue N is 2.089 cfs as determined using
WWHM2012 (see Appendix D). As demonstrated in the Manning’s calculation below, the 18-inch
conveyance pipe and the associated 18-inch stub through which the West Basin areas shown in
Figure 19 discharge to Logan Avenue N sloped at a minimum 0.5% has sufficient capacity to convey
the 100-year peak flow.
NAVIX Topgolf Renton – Renton, WA 70
Combined East Basin: For the East Basin, stormwater runoff from the proposed outfield area,
the proposed eastern parking lot area, future mixed use parcel, and the Boeing Basin will be
routed to the discharge point at the City municipal conveyance system in Park Avenue N, which
is the existing downstream discharge point for runoff from the East Basin. As described
previously, runoff from the Boeing Basin, which includes the existing Boeing 10-80 office
building and the adjacent Boeing parcel to the southeast, will combine with the on-site runoff
from the eastern basin and runoff from the future mixed use parcel (here conservatively
assumed to be 100% impervious cover). See Figure 20 below for the combined East Basin areas
draining to Park Avenue N.
NAVIX Topgolf Renton – Renton, WA 71
Figure 20: Combined East Basin Areas (to Park Avenue N)
The runoff from the combined East Basin area will be conveyed by a 24-inch pipe to an existing
24-inch pipe in Park Avenue N. The peak 100-year flow from the East Basin is 6.506 cfs as
determined using WWHM2012 (see Appendix D). As demonstrated in the Manning’s calculation
below, the 24-inch conveyance pipe and the associated 24-inch stub sloped at a minimum 0.5%
has sufficient capacity to convey the 100-year peak flow from the combined East Basin.
NAVIX Topgolf Renton – Renton, WA 72
See Appendix J for detailed conveyance calculations for both the proposed on-site conveyance
system and the existing municipal conveyance system in Park Ave N and Logan Ave N. From these
analyses, the on-site and existing off-site conveyance systems are adequately sized to convey the
25-year developed peak flow as required by the 2017 SWDM Sections 1.2.4.1 and 1.2.4.2.
SPILL CONTROL
As required by the 2017 SWDM Section 1.2.4.3.G, spill control devices will be installed for runoff
from pollution generating impervious surfaces prior discharging from site. Flow restrictor (tee)
sections per Section 4.2.1.1. will be installed at SDCB #5 and SDCB #20 to provide spill control for
the east and west basin parking lots prior to water quality treatment and subsequent discharge
from the site.
OUTFIELD BASIN PUMP
As mentioned previously, the outfield is not a pollution generating surface and does not require
water quality treatment. Due to the shallow nature of the downstream stormwater connection
however, the project will require installation of a stormwater pump to convey runoff from outfield
surface drainage and targets.
The pump has been sized to handle the 100-yr peak flow of 1.82 cfs as calculated using the rational
method. The flow generated by this storm event will be completely removed within 24 hours
without ponding more than 12” at the lowest target. Moreover, the 100-yr peak flow of 1.82 cfs is
NAVIX Topgolf Renton – Renton, WA 73
greater than the 25-yr peak flow of 1.16 cfs as calculated using WWHM, the minimum city required
storm event for pump sizing. Therefore, the pump is sized to adequately handle the required flow.
Outfield basin pump runoff inputs and outputs can be found in Appendix D. Detailed pump
information can be found in Appendix I. See Figure 21 below for outfield and target pump basin
area.
Figure 21: Outfield and Target Pump Basin
PUMP SYSTEMS DESIGN CRITERIA
As required by the City of Renton 2017 SWDM, pump systems must meet minimum design criteria
of Section 4.2.3.1. See requirements and how the proposed system meets them below.
1. The proposed pump system is privately owned and maintained.
2. The proposed pump system is used to convey water from one location to another within the
site.
3. The proposed pump system has a dual pump equipped with external alarm system.
Additional pump design and specifications can be found in Appendix I.
4. The proposed pump system does not circumvent any other City drainage requirements and
construction and operation will not violate any other City requirements.
5. Pump failure will not result in flooding of a building or emergency access. As the pump
discharge piping IE is lower than the rim of the lowest outfield target, pump failure would
result in backwater of the target drainage system until the discharge piping acts as a
release.
6. The proposed pump system has emergency backup power installed.
Approx. Pump
Structure Location
NAVIX Topgolf Renton – Renton, WA 74
7. An emergency response plan that details how backup power will be activated during an
emergency as well as a response for pump repairs and replacement in the event of a failure
will be included in the next submittal.
SPECIAL REPORTS AND STUDIES
Special reports and studies for this property include the following (See Appendix B):
Geotechnical Report prepared by GeoEngineers, Inc., dated October 29, 2019
Geotechnical Infiltration Feasibility Evaluation prepared by GeoEngineers, Inc., dated March
4, 2020
Email correspondence from Transpo Group confirming the project is not a high-use site,
dated February 19, 2020
OTHER PERMITS
Other permits required for this project include the following:
Building Permit and building-related permits
Clearing and Grading Permit
NPDES Permit
NAVIX Topgolf Renton – Renton, WA 75
CSWPPP ANALYSIS AND DESIGN
ESC Plan Analysis and Design (Part A)
All erosion and sediment control measures shall be governed by the requirements of Appendix D in
the City of Renton Surface Water Design Manual. A temporary erosion and sedimentation control
plan has been prepared to assist the contractor in complying with these requirements. The Erosion
and Sediment Control (ESC) plan is included with the construction plans.
Erosion Risk Assessment
The degree of erosion risk on the proposed project site is minimal. The following factors contribute
to a low degree of erosion risk:
Slope across the site is slight. Runoff will not travel at high velocities across the site and,
therefore, will not cause noticeable erosion impacts.
The site is already stabilized with hard surfaces and the portions that will be removed will
generally create temporary closed depression areas that will trap stormwater runoff.
Construction Sequence and Procedure
The proposed development will include an erosion/sedimentation control plan designed to prevent
sediment-laden run-off from leaving the site during construction. The erosion potential of the site
is influenced by four major factors: soil characteristics, vegetative cover, topography and climate.
Erosion/sedimentation control is achieved by a combination of structural measures, cover
measures, and construction practices that are tailored to fit the specific site.
Prior to the start of any grading activity upon the site, all erosion control measures, including
stabilized construction entrances, shall be installed in accordance with the construction documents.
The best construction practice will be employed to properly clear and grade the site and to
schedule construction activities. The planned construction sequence for the construction of the site
will be provided with a subsequent submittal.
Trapping Sediment
Structural control measures will be used to reduce erosion and retain sediment on the construction
site. The control measures will be selected to fit specific site and seasonal conditions.
The following structural items will be used to control erosion and sedimentation processes:
Compost socks
Catch basin inlet sediment protection
Proper cover measures
Sediment Pond for each Site Sub-Basin (See Appendix E for sizing calculations)
Weekly inspection of the erosion control measures will be required during construction. Any
sediment buildup shall be removed and disposed of off-site.
Vehicle tracking of mud off-site shall be avoided. Installation of a stabilized construction entrance
will be installed at a location to enter the site. The entrances are a minimum requirement and may
NAVIX Topgolf Renton – Renton, WA 76
be supplemented if tracking of mud onto public streets becomes excessive. In the event that mud
is tracked off site, it shall be swept up and disposed of off-site on a daily basis. Depending on the
amount of tracked mud, a vehicle road sweeper may be required.
Because vegetative cover is the most important form of erosion control, construction practices must
adhere to stringent cover requirements. More specifically, the contractor will not be allowed to
leave soils open for more than 14 days and, in some cases, immediate seeding will be required.
Wet Weather TESC Operating Plan
Work between October 1st and April 30th must adhere to the Wet Season Special Provisions noted in
Section D.2.4.2 in Appendix D of the 2017 City of Renton Surface Water Design Manual.
SWPPS Plan Design (Part B)
A variety of storm water pollutant controls are recommended for this project. Some controls are
intended to function temporarily and will be used as needed for pollutant control during the
construction period. These include temporary sediment barriers such as silt fences. For most
disturbed areas, permanent stabilization will be accomplished by covering the soil with pavement,
building, or vegetation.
The CSWPPP Worksheet Forms are located in Appendix C. Minimum maintenance recording
requirements can be found in 2017 SWDM Section D.2.4.4.
A. Erosion and Sediment Controls
1. Soil Stabilization - The purpose of soil stabilization is to prevent soil from leaving the
site. In the natural condition, soil is stabilized by native vegetation. The primary
technique to be used at this project for stabilizing site soil will be to provide a
protective cover of grass, pavement, or building.
a) See 2017 City of Renton Surface Water Design Manual Section D.2.1.2.6. for
Temporary and Permanent Seeding requirements.
b) Structural Controls – See construction plans for the TESC Plan D-2.0.
Inlet protection and straw wattles are proposed to minimize siltation
of construction activities.
c) Clearing Limits – Clearing limits are defined by the placement of silt
fence or construction fence.
d) Storm Drain Inlet Protection – Curb and grated inlets are protected
from the intrusion of silt and sediment through a variety of measures
as shown on the Construction Drawings. The primary mechanism is to
place controls in the path of flow sufficient to slow sediment-laden
water to allow settlement of suspended soils before discharging into
the storm sewer. Controls typically provide a secondary benefit by
means of filtration. Grated inlets typically include a sturdy frame
wrapped in silt fence or crushed stone-lined perimeter to slow the
NAVIX Topgolf Renton – Renton, WA 77
flow of water. Curb inlets typically include crushed stone barriers held
in place with silt fence material or geotextile fabric. Where inlets are
located in paved areas the contractor shall install filter fabric in the
catch basin.
2. Dewatering Controls
a) The water resulting from construction site de-watering activities must be
treated prior to discharge or disposed of as specified. Accumulated water in
foundation areas, excavations, and utility trenches shall be removed and
disposed of in a manner that does not pollute surface waters or cause
downstream erosion or flooding. See 2017 City of Renton Surface Water
Design Manual Section D.2.1.7. for detailed specifications.
3. Flow Control
a) See TESC Plans D-2.1, D-2.2, and D-2.3 for layout of perimeter interceptor
swales, check dams, and sediment ponds. Onsite flow control facilities and
other provisions on the TESC plan sheets aim to prevent runoff peaks from
discharging from the project site during construction.
4. Protect Existing and Proposed Stormwater Facilities and On-Site BMPs
a) All existing stormwater facilities within the limits of disturbance are being
removed or rerouted. See Drainage Plans C-3.1, C-3.2, and C-3.3 for proposed
stormwater facilities and on-site BMPs. Proposed stormwater facilities and
on-site BMPs are separated by a minimum of seven feet from sanitary sewer
facilities and ten feet from water facilities.
5. Maintain Protective BMPs
a) See TESC Plans D-2.1, D-2.2, and D-2.3 for protective BMPs. The contractor
and designated CESCL professional are responsible for the implementation,
monitoring, adaptation, and continued performance of protective BMPs
throughout construction.
6. Manage the Project
a) The contractor and designated CESCL professional are responsible for the
implementation, monitoring, adaptation, and continued performance of
protective BMPs throughout construction. The TESC plans, SWPPS plan,
CSWPP plan, and technical information report provide a detailed construction
sequence, temporary erosion and sediment control BMP calculations, sizing,
and layout, and a template for an inspection and maintenance program for
the project to successfully manage erosion and sediment control.
NAVIX Topgolf Renton – Renton, WA 78
See 2017 City of Renton Surface Water Design Manual Section D.2.4.5. for Final Stabilization
requirements.
B. Other Pollutant Controls
Control of sediments has been described previously. Other aspects of this SWPPP are
listed below:
1. Sawcutting and Surfacing – Concrete spillage and concrete discharge to waters
of the state is prohibited. The purpose is to prevent slurry and cuttings from
draining to any natural or constructed drainage conveyance including
stormwater systems. Sawcutting and surfacing operations include sawing,
coring, grinding, roughening, hydro-demolition, bridge and road surfacing.
Do not allow process water generated during hydro-demolition, surface
roughening, or similar operations to drain to any natural or constructed drainage
conveyance. Slurry and cuttings must be vacuumed during cutting and surfacing
operation and shall not remain on permanent concrete or asphalt pavement
overnight.
Dispose of waste material and demolition debris in a manner that does not cause
contamination of water. Slurry and cuttings must be collected, handled, and
disposed at an appropriate disposal site in a manner than does not violate
ground water or surface water quality standards.
2. Dust Control - Construction traffic must enter and exit the site at the stabilized
construction entrance. The purpose is to trap dust and mud that would otherwise
be carried off-site by construction traffic.
Water trucks will be used as needed during construction to reduce dust
generated on the site. Dust control must be provided by the General Contractor
to a degree that is acceptable to the owner, and in compliance with applicable
local and state dust control regulations. After construction, the site will be
stabilized (as described elsewhere), which will reduce the potential for dust
generation.
Chemical treatments have not been approved for this site. The Civil Engineer of
Record must be contacted if these are requested to be utilized.
3. Solid Waste Disposal - No solid materials, including building materials, are
allowed to be discharged from the site with stormwater. All solid waste, including
disposable materials incidental to the major construction activities, must be
collected and placed in containers. The containers will be emptied as necessary
by a contract trash disposal service and hauled away from the site. The location
of solid waste receptacles shall be shown on the TESC Plan D-2.0.
NAVIX Topgolf Renton – Renton, WA 79
Substances that have the potential for polluting surface and/or groundwater
must be controlled by whatever means necessary in order to ensure that they do
not discharge from the site. As an example, special care must be exercised during
equipment fueling and servicing operations. If a spill occurs, it must be contained
and disposed so that it will not flow from the site or enter groundwater, even if
this requires removal, treatment, and disposal of soil. In this regard, potentially
polluting substances should be handled in a manner consistent with the impact
they represent.
4. Water Source - Non-storm water components of site discharge must be clean
water. Water used for construction which discharges from the site must originate
from a public water supply or private well approved by the State Health
Department. Water used for construction that does not originate from an
approved public supply must not discharge from the site.
5. Concrete Waste from Concrete Ready-Mix Trucks – Discharge of excess or waste
concrete and/or wash water from concrete trucks will be allowed on the
construction site, but only in specifically designated diked areas that have been
prepared to prevent contact between the concrete and/or wash water and storm
water that will be discharged from the site. Waste concrete can be placed into
forms to make riprap or other useful concrete products. The cured residue from
the concrete washout diked areas shall be disposed in accordance with
applicable state and federal regulations. The jobsite superintendent is
responsible for assuring that these procedures are followed.
6. Fuel Tanks – Temporary on-site fuel tanks for construction vehicles shall meet all
state and federal regulations. Tanks shall have approved spill containment with
the capacity required by the applicable regulations. The tank shall be in sound
condition free of rust or other damage which might compromise containment.
Hoses, valves, fittings, caps, filler nozzles, and associated hardware shall be
maintained in proper working condition at all times.
Temporary on-site fuel tanks are not proposed for this project at this time.
7. Hazardous Waste Management and Spill Reporting Plan – Any hazardous or
potentially hazardous waste that is brought onto the construction site will be
handled properly in order to reduce the potential for storm water pollution. All
materials used on this construction site will be properly stored, handled and
dispensed following any applicable label directions. Material Safety Data Sheets
(MSDS) information will be kept on site for any and all applicable materials.
Should an accidental spill occur, immediate action will be undertaken by the
General Contractor to contain and remove the spilled material. All hazardous
materials will be disposed of by the Contractor in the manner specified by local,
state, and federal regulations and by the manufacturer of such products. As
soon as possible, the spill will be reported to the appropriate state and local
NAVIX Topgolf Renton – Renton, WA 80
agencies. As required under the provisions of the Clean Water Act, any spill or
discharge entering the waters of the United States will be properly reported.
The General Contractor will prepare a written record of any such spill and will
provide notice to the Owner within 24-hours of the occurrence of the spill.
Any spills of petroleum products or hazardous materials in excess of Reportable
Quantities as defined by EPA or the state or local agency regulations, shall be
immediately reported to the EPA National Response Center (1-800-424-8802)
and the Washington State Department of Ecology at (360) 407-6300 or 1-800-
258-5990. The reportable quantity for petroleum products is per the State of
Washington is any amount that contacts public waterways or public storm
systems OR equal to or greater than 1 gallon on a commercial project that does
not contact public water systems such as creeks, rivers, lakes, or storm systems
and must be reported within 24 hours.
The EPA guidelines define spills within the public water systems as those that:
violate applicable water quality standards; cause a film or “sheen” upon, or
discoloration of the surface of the water or adjoining shorelines; or cause a
sludge or emulsion to be deposited beneath the surface of the water or upon
adjoining shorelines. The reportable quantity for hazardous materials is per the
Comprehensive Environmental Response, Compensation and Liability Act
(CERCLA), and is any hazardous substance with reportable quantity that
appears in Table 302.4of 40 CFR parts 302, for other substance not found on
this list, the reportable quantity is one pound.
In order to minimize the potential for a spill of hazardous materials to come in
contact with stormwater, the following steps will be implemented:
a) All materials with hazardous properties (such as pesticides,
petroleum products, fertilizers, detergents, construction chemicals,
acids, paints, paint solvents, cleaning solvents, additives for soil
stabilization, concrete, curing compounds and additives, etc.) will be
stored in a secure location, under cover, when not in use.
b) The minimum practical quantity of all such materials will be kept on
the job site and scheduled for delivery as close to time of use as
practical.
c) A spill control and containment kit (containing for example,
absorbent such as kitty litter or sawdust, acid neutralizing agent,
brooms, dust pans, mops, rags, gloves, goggles, plastic and metal
trash containers, etc.) will be provided at the storage site.
d) All of the product in a container will be used before the container is
disposed of. All such containers will be triple rinsed, with water prior
to disposal. The rinse water used in these containers will be disposed
NAVIX Topgolf Renton – Renton, WA 81
of in a manner in compliance with state and federal regulations and
will not be allowed to mix with storm water discharges.
e) All products will be stored in and used from the original container
with the original product label.
f) All products will be used in strict compliance with instructions on the
product label.
g) The disposal of excess or used products will be in strict compliance
with instructions on the product label.
8. Long-Term Pollutant Controls - Storm water pollutant control measures installed
during construction, that will also provide benefits after construction, will not be
applicable to this project since most of the pollution control measures are
already in place. Those sediment barriers that do not interfere with normal
operations and appear to provide long-term benefits can be left in place after
construction is completed.
9. Source Controls – Per Section 1.3.4 of the 2016 KCSWDM, structural source
control measures, such as car was pads or dumpster area roofing, shall be
applied to the entire site containing the proposed project, not just the project
site. Dumpster area roofing is proposed as a structural source control for this
project.
B. Construction Phase "Best Management Practices"
During the construction phase, the General Contractor shall implement the following
measures:
1. Materials resulting from the clearing and grubbing or excavation operations shall
be stockpiled up slope from adequate sedimentation controls. Materials
removed to an off-site location shall be protected with appropriate controls and
properly permitted.
2. The General Contractor shall designate areas on the TESC Plan D-2.0 for
equipment cleaning, maintenance, and repair. The General Contractor and
subcontractors shall utilize such designated areas. Cleaning, maintenance, and
repair areas shall be protected by a temporary perimeter berm, shall not occur
within 150 feet away of any waterway, and in areas located as far as practical
from storm drains.
3. Use of detergents for large scale washing is prohibited (i.e., vehicles, buildings,
pavement surfaces, etc.)
4. Chemicals, paints, solvents, fertilizers, and other toxic materials must be stored in
weatherproof containers. Except during application, the contents must be kept in
trucks or within storage facilities. Runoff containing such material must be
NAVIX Topgolf Renton – Renton, WA 82
collected, removed from the site, treated, and disposed at an approved solid waste
or chemical disposal facility.
C. Off-Site Facilities
Whenever dirt, rock, or other materials are imported to the construction site or
exported for placement in areas off of the primary construction site, the General
Contractor is responsible for determining that all stormwater permitting and pollution
control requirements are met for each and every site which receives such materials or
from which such materials are taken. Prior to the disturbance of any such site, the
General Contractor will furnish the Owner with a copy of the storm water permit issued
for each such site, as well as a copy of the off-site Owners certification statement
agreeing to implement necessary storm water pollution prevention measures. The
General Contractor will also furnish a copy of the SWPPP for each such site, including a
description of the erosion control measures, which will be applied.
At a minimum, each off-site area that provides or receives materials or is disturbed by
project activities must implement erosion control measures consisting of perimeter
controls on all down slope and side slope boundaries and must also provide for both
temporary stabilization measures and for permanent re-vegetation after all disturbance
is ended.
NAVIX Topgolf Renton – Renton, WA 83
BOND QUANTITIES AND FACILITIES SUMMARY
As required by City of Renton Drainage Review, a Bond Quantity Worksheet summarizing the
proposed site and drainage improvements for the project has been completed and attached in
Appendix F.
See Appendix F for the Site Improvement Bond Quantity Worksheet.
See Appendix G for the Facilities Summary Sheet.
NAVIX Topgolf Renton – Renton, WA 84
OPERATION AND MAINTENANCE GUIDELINES
NAVIX Topgolf Renton – Renton, WA 85
NAVIX Topgolf Renton – Renton, WA 86
NAVIX Topgolf Renton – Renton, WA 87
NAVIX TopGolf Renton – Renton, WA
APPENDIX A
EXHIBITS
EXISTING AND PROPOSED CONDITIONS
LOT 5A-2LOGAN AVE. N.N. 8TH ST.PARK AVE. N.N. 6TH ST.15241 NE 90TH STREETREDMOND, WA 98052TEL. 425.823-5700FAX 425.823-6700ALTA/ NSPS LAND TITLE SURVEYALTA/NSPS LAND TITLE SURVEYLOT 5A-2 (CITY OF RENTON LLA LUA-10-020-LLA)TOP GOLF - RENTON LANDINGJOB NO.DRAWN BYSCALEDATECHECKED BYSHEET1"=200'ZLNTJO/JRP/MWF11/21/1918-046www.axismap.comNW 1/4, SW 1/4, SEC. 8, T. 23 N., R. 5 E., W.M.CITY OF RENTON, KING COUNTY, WASHINGTON1 OF 2VICINITY MAP(NOT TO SCALE)N. 8TH ST.N.
PARK
DR
.I - 405LO
G
A
N
A
V
E
.
N
.
PARK AVE. N.N. 6TH ST.SUNSET BLVD900EXIT 5EXIT 5N. LANDING WAYRENTONLAKEWASHINGTONBOEINGSITECONTROL DIAGRAMSCALE 1"=200'NGRAPHIC SCALE01" = 200'100'200'NARCO/MURRAYDESIGN BUILDITF DEVELOPMENTS, LLC745 PARK AVE N.RENTON, WASheet 79 of 80
LOT 5A-2LOGAN AVE. N.N. 8TH ST.PARK AVE. N.NGRAPHIC SCALE01" = 40'4080'2040JOB NO.DRAWN BYSCALEDATECHECKED BYSHEET15241 NE 90TH STREETREDMOND, WA 98052TEL. 425.823-5700FAX 425.823-67001"=40'ZLNTJO/JRP/MWF11/21/1918-046www.axismap.comALTA/ NSPS LAND TITLE SURVEYALTA/NSPS LAND TITLE SURVEYLOT 5A-2 (CITY OF RENTON LLA LUA-10-020-LLA)TOP GOLF - RENTON LANDINGNW 1/4, SW 1/4, SEC. 8, T. 23 N., R. 5 E., W.M.CITY OF RENTON, KING COUNTY, WASHINGTON2 OF 2ARCO/MURRAYDESIGN BUILDITF DEVELOPMENTS, LLC745 PARK AVE N.RENTON, WASheet 80 of 80
PPPPP
LOT 5A-2THE BOEING CO.THE BOEING CO.COMPACT
COM
PA
C
T
COMP
A
C
T
COM
PA
CT
COM
P
AC
T
COM
PA
CT
COM
PA
C
T
COMP
A
C
T
COMP
AC
TCOMP
A
CT
COM
P
AC
T
COM
P
A
CT
COM
PA
C
T
COMPACTCOMPACTCOMPACTCOMP
ACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPA
CT
COMPACT
COMPAC
T
COMPAC
T
COM
PAC
T
COMP
AC
T
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOM
P
A
C
T
COM
P
A
C
T
COM
P
A
C
T
COM
P
A
C
T
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOM
P
ACT
COM
P
A
C
T
COMP
A
C
T
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT
COM
PA
C
T
COM
P
AC
T
COMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACTEVEVEVEVNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETSEE SHEET C-1.1SEE SHEET C-1.2SEE SHEET C-1.3C-1.0OVERALL SITE IMPROVEMENT PLAN15R-412315
P
P
PP COMPACT
COMPACT
COMPACT
COMPACT
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTEVEVEVEVNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-1.1SITE IMPROVEMENT PLAN16R-412316
PLOT 5A-2
THE BOEING CO.
THE BOEING CO.
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
COMPACT
COMPACTNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-1.2SITE IMPROVEMENT PLAN17R-412317
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-1.3SITE IMPROVEMENT PLAN18R-412318
PPPPP
LOT 5A-2THE BOEING CO.THE BOEING CO.COMPACT
COM
PA
C
T
COMP
A
C
T
COM
PA
CT
COM
P
AC
T
COM
PA
CT
COM
PA
C
T
COMP
A
C
T
COMP
AC
TCOMP
A
CT
COM
P
AC
T
COM
P
A
CT
COM
PA
C
T
COMPACTCOMPACTCOMPACTCOMP
ACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
COMPACTCOMPACT
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPA
CT
COMPACT
COMPAC
T
COMPAC
T
COM
PAC
T
COMP
AC
T
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOM
P
A
C
T
COM
P
A
C
T
COM
P
A
C
T
COM
P
A
C
T
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOM
P
ACT
COM
P
A
C
T
COMP
A
C
T
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT
COM
PA
C
T
COM
P
AC
T
COMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACTEVEVEVEVNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETSEE SHEET C-3.1SEE SHEET C-3.2SEE SHEET C-3.3C-3.0OVERALL DRAINAGE PLAN35R-412335
P
P
PP COMPACT
COMPACT
COMPACT
COMPACT
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTEVEVEVEVNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-3.1DRAINAGE PLAN36R-412336
PLOT 5A-2
THE BOEING CO.
THE BOEING CO.
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT
COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
COMPACT COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT COMPACT COMPACT COMPACT COMPACT COMPACT
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACT
COMPACT
COMPACTNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-3.2DRAINAGE PLAN37R-412337
COMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTCOMPACTNO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-3.3DRAINAGE PLAN38R-412338
NO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-3.12DRAINAGE DETAILS47R-412347
NO.REVISIONBYDATEAPPRPlanning/Building/Public Works Dept.CITY OFRENTONIN COMPLIANCE WITH CITY OF RENTON STANDARDSARCO/MURRAY780 LOGAN AVENUE NORTHRENTON, WA 98057TOPGOLF RENTONZ.NALLJ.GREEN/T.PRUSAJ.GREEN/T.PRUSAJ.TAFLIN/J.GREENJ.TAFLINTOPGOLF RENTON
TOPGOLF RENTONSECTION 08, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.08.10.20218011235 s.e. 6th street | suite 150bellevue, wa 98004t: 425.453.9501 | f: 425-453-8208www.navixeng.comRTED-40-4123
C20-000631LUA19-000094PR19-0002021007.09.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1107.29.21MASTER SITE PLAN MODIFICATIONNAVIXJET1208.10.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1308.31.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJET1409.08.21CIVIL CONSTRUCTION PERMIT RESUBMITTALNAVIXJETC-3.13DRAINAGE DETAILS48R-412348
NAVIX TopGolf Renton – Renton, WA
APPENDIX B
SPECIAL REPORTS AND STUDIES
Geotechnical Engineering Report
prepared by GeoEngineers, Inc., dated October 29, 2019.
Geotechnical Infiltration Feasibility Evaluation
prepared by GeoEngineers, Inc., dated March 4, 2020.
Email Correspondence with Transpo Group Confirming
the Project is not a High-Use Site, dated February 19, 2020.
Geotechnical Engineering Services
Logan Avenue North and North 8th Street
Development Project
Renton, Washington
for
ARCO Murray Design Build
October 29, 2019
Geotechnical Engineering Services
Logan Avenue North and North 8th Street
Development Project
Renton, Washington
for
ARCO Murray Design Build
October 29, 2019
17425 NE Union Hill Road, Suite 250
Redmond, Washington 98052
425.861.6000
October 29, 2019| Page i File No. 23325-001-00
Table of Contents
1.0 INTRODUCTION ................................................................................................................................................. 1
1.1. Project Understanding .............................................................................................................................. 1
2.0 FIELD EXPLORATIONS AND LABORATORY TESTING .................................................................................... 1
2.1. Field Explorations ...................................................................................................................................... 1
2.2. Laboratory Testing .................................................................................................................................... 1
3.0 SITE CONDITIONS ............................................................................................................................................. 2
3.1. Surface Conditions.................................................................................................................................... 2
3.2. Subsurface Soil Conditions ...................................................................................................................... 2
3.3. Groundwater Conditions ........................................................................................................................... 2
4.0 CONCLUSIONS AND RECOMMENDATIONS ................................................................................................... 3
4.1. Earthquake Engineering ........................................................................................................................... 4
4.1.1. Site-Specific Response Spectrum ................................................................................................ 4
4.1.2. Seismic Hazards ............................................................................................................................ 5
4.2. Building Foundations ................................................................................................................................ 6
4.2.1. Augercast Piles .............................................................................................................................. 6
4.2.2. Shallow Foundations ..................................................................................................................... 9
4.2.3. Ground Improvement .................................................................................................................. 11
4.3. Lowest-Level Building Slab ..................................................................................................................... 12
4.3.1. Subgrade Preparation ................................................................................................................. 12
4.3.2. Design Features .......................................................................................................................... 12
4.4. Net Poles ................................................................................................................................................. 13
4.4.1. General ......................................................................................................................................... 13
4.5. Outfield and Pavement Area Settlement Mitigation ............................................................................. 14
4.5.1. Surcharge and Preload Program ................................................................................................ 14
4.6. Below-Grade Walls .................................................................................................................................. 15
4.6.1. Drainage ....................................................................................................................................... 16
4.7. Earthwork ................................................................................................................................................ 16
4.7.1. Clearing and Site Preparation ..................................................................................................... 16
4.7.2. Subgrade Preparation ................................................................................................................. 17
4.7.3. Subgrade Protection .................................................................................................................... 17
4.7.4. Structural Fill................................................................................................................................ 17
4.7.5. Temporary Cut Slopes ................................................................................................................. 20
4.7.6. Permanent Cut and Fill Slopes ................................................................................................... 21
4.7.7. Erosion and Sediment Control .................................................................................................... 21
4.7.8. Utility Trenches ............................................................................................................................ 21
4.8. Pavement Recommendations ................................................................................................................ 22
4.8.1. Subgrade Preparation ................................................................................................................. 22
4.8.2. New Hot-Mix Asphalt Pavement ................................................................................................. 22
4.8.3. Portland Cement Concrete Pavement ........................................................................................ 22
4.9. Construction Dewatering ........................................................................................................................ 23
4.10.Infiltration Considerations ...................................................................................................................... 23
October 29, 2019 | Page ii File No. 23325-001-00
4.11.Recommended Additional Geotechnical Services ................................................................................ 23
5.0 LIMITATIONS .................................................................................................................................................. 24
6.0 REFERENCES ................................................................................................................................................. 24
LIST OF FIGURES
Figure 1. Vicinity Map
Figure 2. Site Plan
Figure 3. Cross Section A-A’
Figure 4. Cross Section B-B’
Figure 5. Cross Section C-C’
Figure 6. Cross Section D-D’
Figure 7. Recommended Site-Specific MCER Response Spectrum
APPENDICES
Appendix A. Field Explorations
Figure A-1 – Key to Exploration Logs
Figures A-2 through A-26 – Log of Explorations
Appendix B. Laboratory Testing
Figures B-1 through B-5 – Sieve Analysis Results
Figures B-6 through B-10– Atterberg Limits Test Results
Appendix C. Site-Specific Seismic Response Analysis
Figure C-1. As-recorded Response Spectra 2,475-year Event
Figure C-2. Spectrally Matched and Filtered Response Spectra
Figure C-3. Shear Wave Velocity Profiles – Shallow
Figure C-4. Shear Wave Velocity Profiles – Deep
Figure C-5. Soil Amplification Factor, Lower Bound Profile 2,475-year Event
Figure C-6. Soil Amplification Factors, Upper Bound Profile 2,475-year Event
Figure C-7. Soil Amplification Factors, Porfile Comparison 2,475-year Event
Figure C-8. Probabilistic MCE Response Spectrum Comparison
Figure C-9. Deterministic MCEr Response Spectrum (Seattle Fault, Mw=7.2, Rrup=2.9 km)
Figure C-10. Recommended Site-Specific MCER Response Spectrum
Appendix D. Report Limitations and Guidelines for Use
October 29, 2019 | Page 1 File No. 23325-001-00
1.0 INTRODUCTION
This report presents the results of GeoEngineers, Inc.’s (GeoEngineers) geotechnical engineering services
for the proposed development project located at Logan Avenue North and North 8th Street in Renton,
Washington. The site is shown relative to surrounding physical features on Figure 1, Vicinity Map and
Figure 2, Site Plan.
The purpose of this report is to provide geotechnical engineering conclusions and recommendations for the
design of the proposed development. GeoEngineers’ geotechnical engineering services have been
completed in general accordance with the scope of services outlined in our Agreement for Professional
Services dated March 22, 2018, Change Order No. 1 dated April 16, 2018, and Change Order No. 2 dated
July 16, 2019.
1.1. Project Understanding
GeoEngineers understands that the proposed development consists of a low-rise structure, an outfield area
consisting of turf or lawn and enclosed with nets supported by poles up to 170 feet in height, an
aboveground parking garage (up to two levels high) and surface parking. Our understanding of the project
and the required geotechnical scope of services is based on information provided by Eric Uebelhor with
Arco Murray Design Build.
2.0 FIELD EXPLORATIONS AND LABORATORY TESTING
2.1. Field Explorations
The subsurface conditions at the site were evaluated by drilling 24 borings (B-1, B-2, PB-1, AB-1 through
AB-3, OB-1 through OB-7, GEI-1, GEI-2, B-1-19 through B-4-19, and GEI-1-19 through GEI-5-19) and
advancing six cone penetration tests (CPTs) (CPT-1 through CPT-6) to depths ranging from approximately
10 to 85 feet below existing site grades. CPTs were advanced to practical refusal. In addition, one
groundwater monitoring well (GEI-3-19a) was drilled and installed next to boring GEI-3-19. The approximate
locations of the explorations are shown in Figure 2. Descriptions of the field exploration program and the
boring and CPT logs are presented in Appendix A, Field Explorations.
2.2. Laboratory Testing
Soil samples were obtained during drilling and were taken to GeoEngineers’ laboratory for further
evaluation. Selected samples were tested for the determination of moisture content, fines content, grain-
size distribution, and plasticity indices (Atterberg limits). A description of the laboratory testing and the test
results are presented in Appendix B, Laboratory Testing.
October 29, 2019 | Page 2 File No. 23325-001-00
3.0 SITE CONDITIONS
3.1. Surface Conditions
The site is bounded by office and parking structures to the south, Park Avenue North to the east,
North 8th Street to the north, and Logan Avenue North to the west. The site is relatively flat, with up to 3 feet
grade difference throughout.
The site is currently unoccupied, overall vegetated with grassy areas with some pavement associated with
previous site development. Based on our review of historical aerial photographs (available on Google Earth),
the site was previously occupied by warehouse structures that were demolished between 2005 and 2007.
Underground utilities running below and adjacent to the site consist of storm and sanitary sewer, water,
power and communications.
3.2. Subsurface Soil Conditions
GeoEngineers’ understanding of subsurface conditions is based on the results of our exploration program,
as described in the ‘Field Explorations’ section of this report. The approximate locations of the explorations
are presented in Figure 2.
The soils encountered at the site consist of relatively shallow fill overlying alluvial deposits, as shown in
Figures 3 through 6, Cross Sections A-A’ through D-D’, respectively, and the boring logs presented in
Appendix A.
Fill was encountered in each of the borings. Fill was observed below the pavement or topsoil, and generally
consisted of loose to dense sand with varying silt and gravel content. A thin layer of stiff sandy silt with
occasional gravel was encountered within the fill unit in boring B-1. The thickness of fill ranged from 4 feet
up to approximately 8 feet across the site.
Alluvium was observed below the fill. The alluvium typically consists of three units:
■ Upper loose/soft to medium dense/medium stiff alluvial sand to silty sand and silt with thin layers of
soft to medium stiff peat;
■ Lower medium dense to dense/stiff alluvial gravel, sand to silty sand and silt; and
■ Within the lower alluvial zone a loose/medium stiff sand and silt alluvium layer with thin layers of stiff
peat.
3.3. Groundwater Conditions
Based on conditions observed during drilling, the groundwater table at the site could range from depths of
approximately 4 to 13 feet below the existing ground surface (bgs), which corresponds to approximately
Elevations 17 to 25 feet (North American Vertical Datum of 1988 [NAVD 88]). A monitoring well was
installed next to boring GEI-3-19 to observe the depth of groundwater at the site. Measurements completed
approximately 3 weeks following the well installation indicate that the site groundwater level is about
8.2 feet below existing grades, which corresponds to approximately Elevation 21.8 feet (NAVD 88).
October 29, 2019 | Page 3 File No. 23325-001-00
The table below provides a summary of the monitoring well and groundwater measurements at the site.
TABLE 1. GROUNDWATER MEASUREMENTS
Well ID
Ground Surface
Elevation
(feet)
Depth to Bottom
of Casing
(feet bgs)
Well Screen
Interval
(feet bgs)
Measured
Groundwater
Depth (feet bgs)
Measured
Groundwater Elevation
(feet bgs)
GEI-3-19a 30 16 5 to 15
8.0 (8/8/19)
8.1 (8/12/19)
8.2 (8/23/19)
22.0 (8/8/19)
21.9 (8/12/19)
21.8 (8/23/19)
Groundwater observations represent conditions observed during exploration and may not represent the
groundwater conditions throughout the year. Groundwater seepage is expected to fluctuate as a result of
season, precipitation and other factors.
4.0 CONCLUSIONS AND RECOMMENDATIONS
A summary of the geotechnical considerations is provided below. The summary is presented for introductory
purposes only and should be used in conjunction with the complete recommendations provided in
this report.
■ The site is designated as seismic Site Class F per the 2015 International Building Code (IBC) due to the
presence of potentially liquefiable soils below the building footprint. As a result, a site-specific seismic
response analysis has been completed and is included in Appendix C, Site Specific Seismic Response
Analysis. The building should be designed using the recommended risk-targeted maximum considered
earthquake (MCER) site-specific response spectrum presented in Table 1 and Figure 7, Recommended
Site-Specific MCER Response Spectrum.
■ The results of our liquefaction analyses indicate that fill and loose to medium dense alluvial soils, below
the groundwater table, are susceptible to liquefaction during the building code-prescribed
maximum-considered earthquake (MCE) event (i.e. earthquake event with 2,500-year return period).
We completed liquefaction-induced settlement analyses using the site-specific peak ground
acceleration (PGA) of 0.45g and mean earthquake magnitude of 7.2. Based on the results of our
liquefaction-induced settlement analysis, we estimate that free field ground surface settlement on the
order of 3 to 15 inches could occur during a MCE-level earthquake due to soil liquefaction.
■ Foundation support for the proposed building can be provided by augercast piles or by shallow
foundations bearing on improved ground. For shallow foundations bearing on improved ground, an
allowable static bearing pressure of 6,000 pounds per square foot (psf) can be used for ground
improvement consisting of rigid inclusions with an area replacement ratio of 10 to 12 percent. The
estimated post-construction static foundation settlement of new footings, prepared as described in this
report, is estimated to be less than 1 inch.
■ Design of the at-grade slabs should consider site settlements. In addition to being susceptible to
liquefaction, the upper alluvial soils are compressible and can be anticipated to settle under new loads.
Static settlements will depend on the thickness of new fill placed in the building footprint. If slab areas
are not supported on deep foundations or improved ground or treated with a preload program,
long-term static settlement is anticipated to be greater than 1 inch. The at-grade floor slab for the
October 29, 2019 | Page 4 File No. 23325-001-00
building should be underlain by at least 6 inches of clean crushed rock for uniform support and as a
capillary break.
■ Based on site grading plans, we understand that new site fills will range up to about 7 feet in thickness
in the outfield and 3 feet in thickness below the building footprint. Up to 5½ inches of long-term static
settlement are estimated for new site fill of up to 7 feet in thickness. Where long-term static settlement
is not desirable, they can be mitigated using deep foundations, ground improvement or a surcharge
and preload program.
■ The feasibility of infiltration was assessed at the site through review of near surface soil conditions and
groundwater levels. Due to relatively shallow groundwater (as shallow as 4 feet based on observations
during drilling) and the presence of low permeability silt soils near the ground surface, we conclude
that the use of large scale infiltration facilities is not feasible at this site.
4.1. Earthquake Engineering
4.1.1. Site-Specific Response Spectrum
A site-specific response analysis was completed in accordance with the procedure outlined in Chapter 21
of the American Society of Civil Engineers (ASCE) 7-10 code to develop the site-specific MCER response
spectrum. The methodology used and the details of the site-specific ground response analyses are
presented in Appendix C. The recommended MCER site-specific response spectrum is presented in Figure 7
and is defined in Table 1. The design spectrum is taken as two thirds of the MCER values presented in
Table 2 per ASCE 7-10 Section 21.3.
TABLE 2. RECOMMENDED SITE-SPECIFIC MCER RESPONSE SPECTRUM
Period (sec) Sa (g)
0.01 0.45
0.05 0.71
0.075 0.79
0.10 0.86
0.20 1.04
0.30 1.04
0.40 1.04
0.50 1.04
0.75 1.04
1.00 1.04
2.00 0.68
3.00 0.40
4.00 0.26
5.00 0.21
October 29, 2019 | Page 5 File No. 23325-001-00
4.1.2. Seismic Hazards
4.1.2.1. Surface Fault Rupture
The site is located about 2.4 miles south of the Seattle Fault zone. Based on the distance from mapped
faults, it is our opinion there is a low risk of fault rupture at the site.
4.1.2.2. Liquefaction Potential
Liquefaction refers to a condition in which vibration or shaking of the ground, usually from earthquake
forces, results in development of high excess pore water pressures in saturated soils and subsequent loss
of stiffness and/or strength in the deposit of soil so affected. In general, soils that are susceptible to
liquefaction include loose to medium dense, clean to silty sands and low-plasticity silts that are below the
water table. Ground settlement, lateral spreading and/or sand boils may result from soil liquefaction.
Structures, such as buildings, supported on or within liquefied soils may experience foundation settlement
or lateral movement that can be damaging.
We evaluated the liquefaction potential of the site soils based on the information from the borings and
CPTs and using the Simplified Procedure (Youd and Idriss 2001 and Idriss and Boulanger 2008). The
Simplified Procedure is based on comparing the cyclic resistance ratio (CRR) of a soil layer (the cyclic shear
stress required to cause liquefaction) to the cyclic stress ratio (CSR) induced by an earthquake. The factor
of safety against liquefaction is determined by dividing the CRR by the CSR. Liquefaction hazards, including
settlement and related effects, were evaluated when the factor of safety against liquefaction was calculated
as less than 1.0.
Based on our analyses, the potential exists for liquefaction within the sandy and low-plasticity silt alluvial
deposits encountered in the explorations completed at the site. The cohesive soils (i.e. sandy silt
encountered within the alluvium soils) may also experience loss of shear strength during seismic loading.
We estimated the factor of safety to be less than 1.0 during a MCE event (i.e. earthquake event with
2,500-year return period), which has a rock outcrop peak ground acceleration (PGA) of 0.45g and mean
earthquake magnitude of 7.2 at the project site based on our site-specific response analysis.
4.1.2.3. Liquefaction-induced Settlement
Estimated ground settlement resulting from earthquake-induced liquefaction was analyzed using empirical
procedures based on correlations from the standard penetration test (SPT) results from the soil borings
(Tokimatsu and Seed 1987; Ishihara and Yoshimine 1992; Idriss and Boulanger 2008) and the tip
penetration resistance results from the CPTs. Liquefaction potential of the site soils was evaluated using
the PGA of 0.45g and mean earthquake magnitude of 7.2.
Liquefaction-induced ground settlement of the potentially liquefiable soils is estimated to be on the order
of 16 inches. Based on the research completed by Cetin et al. (2009), liquefaction at depths greater than
60 feet does not result in settlement that can be observed at the ground surface. In addition, the
liquefaction between depths of 40 to 60 feet results in settlement that is approximately one-third of
settlement estimated using empirical procedures. Therefore, we estimate the ground surface liquefaction-
induced settlement to be on the order of 3 to 15 inches, with the differential settlement between column
footings equal to the total estimated settlement.
4.1.2.4. Residual Strengths of Liquefiable Soils
The residual strength of liquefiable soils was estimated for use in our deep foundation capacity analysis.
The loose to medium dense sandy and low-plasticity silt alluvial deposits at depths shallower than 50 to
60 feet are susceptible to liquefaction and do not have strengths sufficient for deep foundation or ground
October 29, 2019 | Page 6 File No. 23325-001-00
improvement load bearing. However, the medium dense to dense alluvial deposits at depths greater than
50 to 60 feet, while including layers of soils that are potentially liquefiable under the design seismic event,
are estimated to have residual strength that will contribute to the capacity of deep foundations. The residual
strength of the medium dense to dense alluvial deposits was estimated using the method proposed by
Idriss and Boulanger (2008).
4.1.2.5. Lateral Spreading
Lateral spreading involves lateral displacements of large volumes of liquefied soil. Lateral spreading can
occur on near-level ground as blocks of surface soils are displaced relative to adjacent blocks. Lateral
spreading also occurs as blocks of surface soils are displaced toward a nearby slope or free-face such as
a nearby waterfront or stream bank by movement of the underlying liquefied soil. Due to the distance to a
nearby free-face and the relatively flat grade, it is our opinion the risk of lateral spreading is low.
4.2. Building Foundations
Based on the presence of the compressible peat and organic silt layers and the presence of the potentially
liquefiable soils, feasible foundation support for the proposed building can be provided by augercast piles
or by shallow foundations bearing on improved ground. Specific design and construction recommendations
for each of these options are presented in the following sections of this report.
4.2.1. Augercast Piles
Augercast piles are constructed using a continuous-flight, hollow-stem auger attached to a set of leads
supported by a crane or installed with a fixed-mast drill rig. The first step in the pile casting process consists
of drilling the auger into the ground to the specified tip elevation of the pile. Grout is then pumped through
the hollow-stem during steady withdrawal of the auger, replacing the soils on the flights of the auger.
The final step is to install a steel reinforcing cage and typically a center bar into the column of fresh grout.
One benefit of using augercast piles is that the auger provides support for the soils during the pile
installation process, thus eliminating the need for temporary casing or drilling fluid.
4.2.1.1. Construction Considerations
The augercast piles should be installed using a continuous-flight, hollow-stem auger. As is standard
practice, the pile grout must be pumped under pressure through the hollow stem as the auger is withdrawn.
Maintenance of adequate grout pressure at the auger tip is critical to reduce the potential for encroachment
of adjacent native soils into the grout column. The rate of withdrawal of the auger must remain constant
throughout the installation of the piles to reduce the potential for necking of the piles. Failure to maintain
a constant rate of withdrawal of the auger should result in immediate rejection of that pile. Reinforcing
steel for bending and uplift should be placed in the fresh grout column as soon as possible after withdrawal
of the auger. Centering devices should be used to provide concrete cover around the reinforcing steel.
The contractor should adhere to a waiting period of at least 12 hours between the installation of piles
spaced closer than 8 feet, center-to-center. This waiting period is necessary to avoid disturbing the curing
concrete in previously cast piles.
Grout pumps must be fitted with a volume-measuring device and pressure gauge so that the volume of
grout placed in each pile and the pressure head maintained during pumping can be observed. A minimum
grout line pressure of 100 pounds per square inch (psi) should be maintained. The rate of auger withdrawal
should be controlled during grouting such that the volume of grout pumped is equal to at least 115 percent
October 29, 2019 | Page 7 File No. 23325-001-00
of the theoretical pile volume. A minimum head of 10 feet of grout should be maintained above the auger
tip during withdrawal of the auger to maintain a full column of grout and to prevent hole collapse.
The geotechnical engineer of record should observe the drilling operations, monitor grout injection
procedures, record the volume of grout placed in each pile relative to the calculated volume of the hole and
evaluate the adequacy of individual pile installations.
4.2.1.2. Axial Capacity
Axial pile load capacity in compression is developed from end bearing and from side frictional resistance in
the lower medium dense to dense/stiff alluvial soils. Uplift pile capacity will also be developed from side
frictional resistance in these soils. Axial pile capacities are presented in Tables 3 and 4 below, for 18- and
24-inch-diameter augercast piles, respectively.
TABLE 3. ALLOWABLE AXIAL PILE CAPACITY – 18-INCH AUGERCAST PILES
Location
Minimum Pile Tip
Elevation (feet)
Static Capacity (kips) Seismic Capacity (kips)
Downward Uplift Downward Uplift
Main Building – North -46 160 75 75 150
Main Building – North -57 230 100 150 200
Main Building – South -46 230 80 75 150
Main Building – South -51 230 90 150 170
Parking Garage -51 200 80 90 180
Parking Garage -57 230 100 150 200
TABLE 4. ALLOWABLE AXIAL PILE CAPACITY – 24-INCH AUGERCAST PILES
Location
Minimum Pile Tip
Elevation
Static Capacity (kips) Seismic Capacity (kips)
Downward Uplift Downward Uplift
Main Building – North -46 250 100 100 200
Main Building – North -57 350 130 200 260
Main Building – South -46 350 100 100 200
Main Building – South -51 350 120 200 230
Parking Garage -51 350 110 120 200
Parking Garage -57 350 130 200 260
Allowable pile capacities were evaluated based on Allowable Stress Design (ASD) and are for combined
dead plus long-term live loads. The allowable capacities are based on the strength of the supporting soils
and include a factor of safety of 3 for end bearing, 2 for side friction and a factor of safety of 1.1 for seismic
conditions. The allowable seismic capacities include the effects of downdrag and the residual strength of
potentially liquefiable layers within the lower medium dense to dense alluvium. The capacities apply to
single piles. If piles are spaced at least three pile diameters on center, as recommended, no reduction of
axial capacity for group action is needed, in our opinion.
The structural characteristics of pile materials and structural connections may impose limitations on pile
capacities and should be evaluated by the structural engineer. For example, steel reinforcing will be needed
for augercast piles subjected to uplift or large bending moments.
October 29, 2019 | Page 8 File No. 23325-001-00
4.2.1.3. Lateral Capacity
Lateral loads can be resisted by passive soil pressure on the vertical piles and by the passive soil pressures
on the pile cap. Because of the potential separation between the pile-supported foundation components
and the underlying soil from settlement, base friction along the bottom of the pile cap should not be
included in calculations for lateral capacity.
Tables 5 and 6 summarize recommended design parameters for laterally loaded piles. We recommend that
these parameters be incorporated into the commercial software LPILE to evaluate response and capacity
of piles subject to laterally loading. For potentially liquefiable soils, a reduced p-multiplier should be applied
to the model P-Y curve of the relevant soil units for evaluating seismic conditions (Boulanger, et al. 2003).
TABLE 5. LPILE SOIL PARAMETERS – MAIN BUILDING
Soil Unit1
Approximate Depth Below
Ground Surface (feet) Effective
Unit
Weight
(pcf)
Friction
Angle
(degrees)
Stiffness
Parameter, k
(pci)
P-
Multiplier1
Top of Soil
Layer
Bottom of
Soil Layer
Fill 0 4 120 34 110 -
Upper Loose/Soft to
Medium
Dense/Medium Stiff
Alluvium
4 50 57.6 32 50 1 (static)
0.1 (seismic)
Lower Medium Dense
to Dense/Stiff
Alluvium
50 200 67.6 36 120 1 (static)
0.5 (seismic)
Notes:
1 Sand (Reese) Model
pcf – pounds per cubic foot
pci – pounds per cubic inch
TABLE 6. LPILE SOIL PARAMETERS – PARKING GARAGE
Soil Unit1
Approximate Depth Below
Ground Surface (feet) Effective
Unit
Weight
(pcf)
Friction
Angle
(degrees)
Stiffness
Parameter, k
(pci) P-Multiplier1
Top of Soil
Layer
Bottom of
Soil Layer
Fill 0 4 120 34 110 -
Upper Loose/Soft to
Medium
Dense/Medium Stiff
Alluvium
4 60 57.6 32 50 1 (static)
0.1 (seismic)
Lower Medium Dense
to Dense/Stiff
Alluvium
60 200 67.6 36 120 1 (static)
0.5 (seismic)
Notes:
1 Sand (Reese) Model
pcf – pounds per cubic foot
pci – pounds per cubic inch
October 29, 2019 | Page 9 File No. 23325-001-00
Piles spaced closer than five pile diameters apart will experience group effects that will result in a lower
lateral resistance for trailing rows of piles with respect to leading rows of piles for an equivalent deflection.
We recommend that the lateral load capacity for piles in a pile group spaced less than five pile diameters
apart be reduced in accordance with the factors in Table 7 per American Association of State Highway and
Transportation Officials (AASHTO) Load and Resistance Factor Design (LRFD) Bridge Design Specifications
Section 10.7.2.4.
TABLE 7. PILE P-MULTIPLIERS, PM, FOR MULTIPLE ROWS
Pile Spacing1
(In Terms of Pile Diameter)
P-Multipliers, Pm2, 3
Row 1 Row 2 Row 3 and Higher
3D 0.80 0.40 0.30
5D 1.00 0.85 0.70
Notes:
1 The P-multipliers presented are a function of the center-to-center spacing of piles in the group in the direction of loading expressed
in multiples of the pile diameter, D.
2 The values of Pm were developed for vertical piles only.
3 The P-multipliers are dependent on the pile spacing and the row number in the direction of the loading. To establish values of Pm
for other pile spacing values, interpolation between values should be conducted.
We recommend that the passive soil pressure acting on the pile cap be estimated using an equivalent fluid
density of 350 pounds per cubic foot (pcf) where the soil adjacent to the foundation consists of adequately
compacted structural fill. This passive resistance value includes a factor of safety of 1.5 and assumes a
minimum lateral deflection of 1 inch to fully develop the passive resistance. Deflections that are less than
1 inch will not fully mobilize the passive resistance in the soil.
4.2.1.4. Pile Settlement
We estimate that the post-construction settlement of pile foundations, designed and installed as
recommended, will be on the order of 1 inch or less. Maximum differential settlement should be less than
about one-half the post-construction settlement. Most of this settlement will occur rapidly as loads are
applied.
4.2.2. Shallow Foundations
4.2.2.1. Allowable Bearing Pressure
The building can be supported on shallow foundations provided the foundations bear on improved ground.
Rigid inclusion ground improvement was considered for this evaluation and is discussed in further detail in
the “Ground Improvement” section. For preliminary purposes, footings may be designed using a maximum
net allowable soil bearing value of 6,000 psf on properly-compacted structural fill consisting of at least a
2-foot-thick layer of crushed rock above ground improved with rigid inclusions with an area-replacement
ratio of about 10 to 12 percent. The net allowable soil bearing values apply to the total of dead and long-
term live loads and may be increased by up to one-third for wind or seismic loads.
4.2.2.2. Size and Embedment
The design frost depth for the Puget Sound area is 12 inches; therefore, we recommend that exterior
footings for the structures be founded at least 18 inches below lowest adjacent finished grade. Interior
footings should be founded at least 12 inches below bottom of slab or adjacent finished grade. For shallow
October 29, 2019 | Page 10 File No. 23325-001-00
foundation support, we recommend widths of at least 18 and 36 inches, respectively, for continuous wall
and isolated column footings supporting the proposed building.
4.2.2.3. Settlement
Provided all loose soil is removed and the subgrade is prepared as recommended under “Construction
Considerations” below, static settlement of shallow foundations bearing on improved ground is anticipated
to be less than 1 inch. The settlement will occur rapidly, essentially as loads are applied. Total settlement
(including liquefaction-induced settlement) of shallow foundations bearing on improved ground is
anticipated to be in the order of 2 to 4 inches. Differential settlements measured along 25 feet of wall
foundations or between similarly loaded column footings are expected to be less than 1 inch.
4.2.2.4. Lateral Resistance
Lateral foundation loads may be resisted by passive resistance on the sides of footings and by friction along
the base of the footings. For footings supported on structural fill placed and compacted in accordance with
our recommendations, the allowable frictional resistance may be computed using a coefficient of friction
of 0.35 applied to vertical dead-load forces.
The allowable passive resistance may be computed using an equivalent fluid density of 350 pcf (triangular
distribution). This value is appropriate for foundation elements that are surrounded by structural fill. The
structural fill should extend out from the face of the foundation element for a distance at least equal to
three times the height of the element and be compacted to at least 95 percent of the maximum dry density
(MDD).
The above coefficient of friction and passive equivalent fluid density values incorporate a factor of safety
of about 1.5.
4.2.2.5. Footing Drains
We recommend that perimeter footing drains be installed around the building where the lowest finished
floor is lower than adjacent site grades. The perimeter drains should be installed at the base of the exterior
footings. The perimeter drains should be provided with cleanouts and should consist of at least
4-inch-diameter perforated pipe placed on a 3-inch bed of, and surrounded by, 6 inches of drainage
material enclosed in a non-woven geotextile fabric such as Mirafi 140N (or approved equivalent) to prevent
fine soil from migrating into the drain material. We recommend that the drainpipe consist of either
heavy-wall solid pipe (SDR-35 polyvinyl chloride [PVC], or equal) or rigid corrugated smooth interior
polyethylene pipe (ADS N-12, or equal). We recommend against using flexible tubing for footing drainpipes.
The drainage material should consist of Gravel Backfill for Drains conforming to Section 9-03.12(4) of the
2018 Washington State Department of Transportation (WSDOT) Standard Specifications. The perimeter
drains should be sloped to drain by gravity to a suitable discharge point, preferably a storm drain. We
recommend that the cleanouts be covered and be placed in flush mounted utility boxes. Water collected in
roof downspout lines must not be routed to the footing drain lines.
4.2.2.6. Construction Considerations
Immediately prior to placing concrete, all debris and soil slough that accumulated in the footings during
forming and steel placement must be removed. Debris or loose soils not removed from the footing
excavations will result in increased settlement. We recommend that the footing excavations be cut using a
smooth-edged bucket to reduce the amount of disturbed soil exposed at the subgrade.
October 29, 2019 | Page 11 File No. 23325-001-00
If wet weather construction is planned, we recommend that all footing subgrades be protected using a lean
concrete mud mat. The mud mat should be placed the same day that the footing subgrade is excavated
and approved for foundation support.
The condition of all footing excavations should be observed by the Geotechnical Engineer to evaluate if the
work is completed in accordance with our recommendations and that the subsurface conditions are as
anticipated.
4.2.3. Ground Improvement
Ground improvement is recommended to mitigate potentially liquefiable soils and to control foundation
settlement. Based on our experience, rigid inclusions are a feasible and economical ground improvement
option for this site. GeoEngineers can design the ground improvement system in collaboration with the
general contractor and structural engineer. General recommendations are provided below for ground
improvement using rigid inclusions. During the design phase of the project, foundation support options
should be reviewed with the project team to determine the preferred foundation support alternative.
The purpose of ground improvement is to mitigate potential static and/or seismic induced settlement
resulting from consolidation and seismic liquefaction of the alluvial deposits. The benefits of ground
improvement for this site include:
■ Ground improvement will allow for conventional shallow foundations and slabs on grade, both of which
are anticipated to result in more efficient and more cost-effective construction; and
■ Ground improvement will mitigate the potential settlement resulting from liquefaction of the native
alluvial soils during the design seismic event to tolerable magnitudes.
4.2.3.1. Rigid Inclusions
Rigid inclusions consist of unreinforced lean concrete columns installed below the building foundation
elements on a variable grid pattern. The purpose of the rigid inclusions placed in a grid pattern is to provide
a significantly higher strength material capable of dissipating building loads in a less concentrated manner
and to provide a ‘block’ of a composite soil and lean concrete material that will reduce the potential for
differential settlement.
Advantages with the use of rigid inclusions include the following:
■ They are more economical than augercast piles (shorter length, no reinforcement and allows for the
use of conventional spread footings/slabs on grade);
■ There is minimal disturbance of adjacent structures during installation; and
■ There is a lower level of construction noise (i.e. no pile driving), there will be lesser impacts to nearby
businesses/residences/buried utilities during construction.
Rigid inclusions for this site would be constructed using similar techniques for installing augercast piles.
Where augercast methods are used, the first step in the rigid inclusion casting process consists of drilling
the auger into the ground to the specified tip elevation of the column. Grout is then pumped into the hole
through the base of the auger.
October 29, 2019 | Page 12 File No. 23325-001-00
The layout/design of the rigid inclusions will be completed once the building design has been finalized.
For preliminary design and pricing purposes, rigid inclusions may consist of the following:
■ 18- to 24-inch-diameter rigid inclusions constructed using 1,000 to 2,000 psi concrete.
■ An area of replacement of about 10 to 12 percent. The appropriate area replacement ratio and the
need for the rigid inclusions to extend beyond the edges of the foundation footprint will be influenced
by seismic total and differential settlement tolerances.
■ Rigid inclusions should extend 60 to 70 feet deep beginning about 2 feet below the bottom of
foundations and floor slabs.
■ Rigid inclusions should be located under shallow foundations and should extend a distance equals to
at least one spacing beyond the foundation footprint.
■ At least 2 feet of clean crushed rock with negligible sand and fines should be placed over the top of the
rigid inclusions under the floor slab and foundations. A woven soil stabilization geotextile should be
placed within this layer. In addition, a non-woven geotextile filter fabric should be used between the top
of the rigid inclusions and this layer to minimize migration of soil from the subgrade to the crushed rock
layer. This layer of crushed rock will help transfer loads from the foundations and slab-on-grade to the
rigid inclusions and will help reduce differential settlement.
GeoEngineers can assist the project team with preparation of the ground improvement plan and
specifications once the foundation layout and building loads have been finalized.
4.3. Lowest-Level Building Slab
4.3.1. Subgrade Preparation
Floor slab support will be dependent of the type of foundation support selected for the building, the
potential for long-term static settlement due to the building pad fill, and the tolerance for
liquefaction-induced settlement. If mitigation of static and/or liquefaction-induced settlement is required,
the slab can be supported structurally (augercast piles) or constructed as a slab-on-grade with ground
improvement below the slab (rigid inclusions). If settlement mitigation is not required, the slab can be
constructed as a slab-on-grade without ground improvement.
4.3.2. Design Features
We recommend that the floor slabs be underlain by a capillary break gravel layer consisting of at least
6 inches of clean crushed gravel meeting the requirements of Mineral Aggregate Type 22 (¾-inch crushed
gravel), City of Seattle Standard Specification 9-03.16. The gravel layer should be placed directly over
compacted structural fill. If a 2-foot-thick layer of crushed rock is placed as part of ground improvement
plans, it will also suffice as a capillary break layer. For slabs designed as a beam on an elastic foundation,
a modulus of subgrade reaction of 85 pounds per cubic inch (pci) may be used for subgrade soils prepared
as recommended above.
If water vapor migration through the slabs is objectionable, the gravel should be covered with a heavy
plastic sheet, such as 10-mil plastic sheeting, to act as a vapor retarder. This will be necessary in occupied
spaces and where the slabs will be surfaced with tile or will be carpeted. It may also be prudent to apply a
sealer to the slab to further retard the migration of moisture through the floor. The contractor should be
made responsible for maintaining the integrity of the vapor retarder during construction.
October 29, 2019 | Page 13 File No. 23325-001-00
4.4. Net Poles
4.4.1. General
Based on information provided by ARCO Murray, it is our understanding that typical net pole foundations
consist of 3-, 4- and 5-foot-diameter drilled concrete piles. The net pole foundations are to be designed by
others. The following sections present our design recommendations for each of the net pole foundation
sizes being considered for this project.
4.4.1.1. Axial Capacity
We understand that the net pole design is controlled by lateral capacity. Axial pile load capacity in
compression is developed from end bearing and from side frictional resistance in the underlying soils, and
uplift pile capacity will also be developed from side frictional resistance. Table 8 presents allowable axial
capacities for 3-, 4- and 5-foot-diameter drilled concrete piles embedded at least 15 feet into the lower
medium dense to dense/stiff alluvium. Allowable pile capacities were evaluated based on Allowable Stress
Design (ASD) and are for combined dead plus long-term live loads. The allowable capacities are based on
the strength of the supporting soils and include a factor of safety of 3 for end bearing, 2 for side friction
and a factor of safety of 1.1 for seismic conditions. The allowable seismic capacities include the effects of
downdrag and the residual strength of potentially liquefiable layers within the lower medium dense to
dense/stiff alluvium.
TABLE 8. ALLOWABLE STATIC AXIAL CAPACITY FOR NET POLE FOUNDATIONS
Foundation
Diameter
Minimum Pile Tip
Elevation (feet)
Static Capacity (kips) Seismic Capacity (kips)
Downward Uplift Downward Uplift
3-foot -42 230 110 150 230
4-foot -42 350 160 250 300
5-foot -42 500 200 350 400
The capacities apply to single piles. If piles are spaced at least three pile diameters on center, as
recommended, no reduction of axial capacity for group action is needed, in our opinion.
4.4.1.2. Lateral Capacity
Lateral loads can be resisted by passive soil pressure on the vertical piles for the net pole foundations.
Table 9 summarizes recommended design parameters for laterally loaded net pole foundations. We
recommend that these parameters be incorporated into the commercial software LPILE to evaluate
response and capacity of shafts subject to laterally loading. For potentially liquefiable soils, a reduced
p-multiplier should be applied to the model P-Y curve of the relevant soil units for evaluating seismic
conditions (Boulanger, et al. 2003).
October 29, 2019 | Page 14 File No. 23325-001-00
TABLE 9. LPILE SOIL PARAMETERS FOR NET POLE FOUNDATIONS
Soil Unit1
Approximate Depth Below
Ground Surface (feet)
Effective Unit
Weight (pcf)
Friction
Angle
(degrees)
Stiffness
Parameter, k
(pci)
P-
Multiplier
Top of Soil
Layer
Bottom of
Soil Layer
Fill 0 6 120 34 110 -
Upper Loose/Soft to
Medium
Dense/Medium Stiff
Alluvium
6 60 57.6 32 50
1 (static)
0.1
(seismic)
Lower Medium
Dense/Medium Stiff
to Dense/Stiff
Alluvium
60 200 67.6 34 120
1 (static)
0.5
(seismic)
Notes:
1 Sand (Reese) Model
2 Refer to Figures 3 and 4
Piles spaced closer than five pile diameters apart will experience group effects that will result in a lower
lateral resistance for trailing rows of piles with respect to leading rows of piles for an equivalent deflection.
We recommend that the lateral load capacity for piles in a pile group spaced less than five pile diameters
apart be reduced in accordance with the factors in Table 6 per AASHTO LRFD Bridge Design Specifications
Section 10.7.2.4.
We recommend that the net pole foundations be designed using a static allowable lateral bearing pressure
of 1,000 psf where the soil adjacent to the foundation consists of undisturbed native soil. For seismic
design conditions, the lateral capacity should be evaluated using the parameters presented in Table 8
above, with the appropriate P-multiplier.
4.5. Outfield and Pavement Area Settlement Mitigation
The outfield and pavement areas are underlain by compressible alluvial soils that will experience long-term
static settlement if subjected to new loads from site fill. The site grading plan indicates that fill ranging up
to 7 feet in thickness (up to 9 feet in local isolated areas) are planned for portions of the outfield and (up
to 3 feet of net fill are planned) to level site grades within the main building footprint. Based on our analysis,
we estimate up to 5½ inches of long-term static settlement resulting from up to 7 feet of new site fill without
mitigation. We anticipate that settlement below the building slab will not be desirable and also understand
that the outfield target structures are settlement sensitive. Options for mitigation include the installation of
deep foundations or ground improvement below settlement sensitive structures. A surcharge and preload
program can also be incorporated into the construction schedule to mitigate static settlements due to new
loads where long term static settlement is not desirable. Our design recommendations for surcharge and
preload are presented below.
4.5.1. Surcharge and Preload Program
The purpose of the preload fill is to induce, prior to final site grading and project completion, a significant
portion of the settlement that will occur when new loads are applied. The program will significantly reduce
post-construction settlement and potential differential settlements due to variability in areal loading and
October 29, 2019 | Page 15 File No. 23325-001-00
thickness of compressible soils. We evaluated preload scenarios for planned fill thicknesses ranging from
3 to 7 feet for preload periods of 9 to 12 weeks. Table 10 summarizes the results of our evaluation.
TABLE 10. LONG-TERM SETTLEMENT (3-, 5- AND 7-FOOT PRELOAD SCENARIOS)
Planned Fill
Thickness
(feet)
Total Long-
Term
Settlement
(inches)
Total Settlement
Remaining after 3-foot
preload
Total Settlement
Remaining after 5-foot
preload
Total Settlement
Remaining after 7-foot
preload
9 weeks 12 weeks 9 weeks 12 weeks 9 weeks 12 weeks
3.0 2.4 0.2 0.1 - - - -
5.0 3.9 2.0 1.9 0.3 0.2 - -
7.0 5.4 3.8 3.7 2.1 2.0 0.4 0.2
Our estimates for the settlement of the preload fill were developed assuming that the preload fill has a total
moist density of at least 120 pcf. If the material used for the preload weighs less than 120 pcf, the height
of the preload fill mound should be adjusted.
Because the site soils have sandy interbeds, the long-term settlement is expected to occur relatively quickly.
Additional surcharge fill can be used to expedite the settlement if needed due to the construction schedule.
The following outlines a summary of our recommendations for grading and constructing the preload area:
■ The preload fill area should extend a distance beyond the extent of the area where settlement is being
mitigated equal to the height of the preload fill.
■ The preload fill toe should be sloped at a 1H:1V (horizontal to vertical) slope. The top of the mound
should be crowned and sloped for drainage.
■ The preload fill should be placed in lifts (not to exceed 12 inches in thickness) and compacted to
95 percent MDD to planned final grade elevation per the project civil engineer. A minimum compaction
level of 85 percent should be achieved for the surcharge fill (if any) above planned final grade elevation.
■ Settlement plates should be installed within the preload fill area. Settlement plate weekly survey
readings should be obtained during construction of preload fill. The first round of survey readings
should be obtained before the first lift of preload fill is placed. After the preload fill has been fully
constructed the settlement plates should also be surveyed on a weekly basis. The settlement
monitoring data will be used to confirm that the preload program is adequately completed.
4.6. Below-Grade Walls
Conventional cast-in-place walls may be necessary for small retaining structures (i.e. retaining or dock-high
walls) located on-site. The lateral soil pressures acting on conventional cast-in-place subsurface walls will
depend on the nature, density and configuration of the soil behind the wall and the amount of lateral wall
movement that can occur as backfill is placed.
For walls that are free to yield at the top at least 0.1 percent of the height of the wall, soil pressures will be
less than if movement is limited by such factors as wall stiffness or bracing. Assuming that the walls are
backfilled, and drainage is provided as outlined in the following paragraphs, we recommend that yielding
walls supporting horizontal backfill be designed using an equivalent fluid density of 35 pcf (triangular
October 29, 2019 | Page 16 File No. 23325-001-00
distribution), and that non-yielding walls supporting horizontal backfill be designed using an equivalent fluid
density of 55 pcf (triangular distribution). For seismic loading conditions, a rectangular earth pressure
equal to 8H psf, where H is the height of the wall, should be added to the active/at-rest pressures. For
lateral earth pressure due to surcharge loads, a rectangular earth pressure equals to 0.2q, where q is the
uniform surcharge pressure on top of wall, should be added to the active/at-rest pressures. Lateral
resistance for conventional cast-in-place walls can be provided by frictional resistance along the base of
the wall and passive resistance in front of the wall in accordance with the “Lateral Resistance” discussion
earlier in this report.
The above soil pressures assume that wall drains will be installed to prevent the buildup of hydrostatic
pressure behind the walls, as discussed in the paragraphs below.
If retaining walls, vaults, or recessed target structures are installed without drainage, hydrostatic pressure
behind the walls should be estimated by 62.4Hw psf (triangular distribution), where Hw is the height of the
lowest drainage outlet behind the wall.
4.6.1. Drainage
Positive drainage should be provided behind cast-in-place retaining walls by placing a minimum 2-foot-wide
zone of Gravel Backfill for Walls conforming to Section 9-03.12(2) of the 2018 WSDOT Standard
Specifications. A perforated or slotted drainpipe should be placed near the base of the retaining wall to
provide drainage. The drainpipe should be surrounded by a minimum of 6 inches Gravel Backfill for Drains
conforming to Section 9-03.12(4) of the 2018 WSDOT Standard Specifications. The Gravel Backfill for
Drains should be wrapped with a geotextile filter fabric meeting the requirements of construction geotextile
for underground drainage, WSDOT Standard Specification 9-33. The wall drainpipe should be connected to
a header pipe and routed to a sump or gravity drain. Appropriate cleanouts for drainpipe maintenance
should be installed. A larger-diameter pipe will allow for easier maintenance of drainage systems.
4.7. Earthwork
4.7.1. Clearing and Site Preparation
All areas to receive fill, structures or pavements should be cleared of vegetation and stripped of topsoil.
Clearing should consist of removal of all trees, brush and other vegetation within the designated clearing
limits. The topsoil materials could be separated and stockpiled for use in areas to be landscaped. Debris
associated with building and site work demolition should be removed from the site, but organic materials
could be chipped/composted and reused in landscape areas, if desired.
We anticipate that the depth of stripping to remove topsoil will generally be about 6 to 12 inches, where
present. Stripping depths may be greater in some areas, particularly where trees and large vegetation have
been removed. Actual stripping depths should be determined based on field observations at the time of
construction. The organic soils can be stockpiled and used later for landscaping purposes or may be spread
over disturbed areas following completion of grading. If spread out, the organic strippings should be in a
layer less than 1-foot-thick, should not be placed on slopes greater than 3H:1V and should be track-rolled
to a uniformly compacted condition. Materials that cannot be used for landscaping or protection of
disturbed areas should be removed from the project site.
October 29, 2019 | Page 17 File No. 23325-001-00
Care must be taken to minimize softening of the subgrade soils during stripping operations. Areas of the
exposed subgrade which become disturbed should be compacted to a firm, non-yielding condition, if
practical, prior to placing any structural fill necessary to achieve design grades. If this is not practical
because the material is too wet, the disturbed material must be aerated and recompacted or excavated
and replaced with structural fill.
4.7.2. Subgrade Preparation
Prior to placing new fills, pavement or hardscape base course materials, and gravel below on-grade floor
slabs, subgrade areas should be proof-rolled to locate soft or pumping soils. Prior to proof rolling, unsuitable
soils should be removed from below building and pavement/hardscape areas. Proof-rolling can be
completed using a piece of heavy tire-mounted equipment such as a loaded dump truck. During wet
weather, the exposed subgrade areas should be probed to determine the extent of soft soils. If soft or
pumping soils are observed, they should be removed and replaced with structural fill.
If deep pockets of soft or pumping soils are encountered outside the building footprint, it may be possible
to limit the depth of overexcavation by placing a woven geotextile fabric such as Mirafi 500X (or similar
material) on the overexcavated subgrade prior to placing structural fill. The geotextile will provide additional
support by bridging over the soft material and will help reduce fines contamination into the structural fill.
This may be performed under pavement areas depending on actual conditions observed during
construction, but it should not occur under the planned building.
After completing the proof-rolling, the subgrade areas should be recompacted to a firm and unyielding
condition, if possible. The achievable degree of compaction will depend on when construction is performed.
If the work is performed during dry weather conditions, we recommend that all subgrade areas be
recompacted to at least 95 percent of the MDD in accordance with the American Society for Testing and
Materials (ASTM) D 1557 test procedure (modified Proctor). If the work is performed during wet weather
conditions, it may not be possible to recompact the subgrade to 95 percent of the MDD. In this case, we
recommend that the subgrade be compacted to the extent possible without causing undue heaving or
pumping of the subgrade soils.
Subgrade disturbance or deterioration could occur if the subgrade is wet and cannot be dried. If the
subgrade deteriorates during proof rolling or compaction, it may become necessary to modify the proof
rolling or compaction criteria or methods.
4.7.3. Subgrade Protection
Site soils may contain significant fines content (silt/clay) and will be highly sensitive and susceptible to
moisture and equipment loads. The contractor should take necessary measures to prevent site subgrade
soils from becoming disturbed or unstable. Construction traffic during the wet season should be restricted
to specific areas of the site, preferably areas that are surfaced with crushed rock materials not susceptible
to wet weather disturbance.
4.7.4. Structural Fill
All fill, whether on-site soils or imported fill for support of foundations, floor slab areas, pavement areas
and as backfill for retaining walls or in utility trenches should meet the criteria for structural fill presented
below. Structural fill soils should be free of organic matter, debris, man-made contaminants and other
October 29, 2019 | Page 18 File No. 23325-001-00
deleterious materials, with no individual particles larger than 4 inches in greatest dimension. The suitability
of soil for use as structural fill depends on its gradation and moisture content.
4.7.4.1. Fill Criteria
Recommended structural fill material quality varies depending upon its use as described below:
■ Structural fill to construct pavement areas, to place below foundations and slabs, to construct
embankments, to backfill retaining walls and utility trenches, and to place against foundations
should consist of gravel borrow as described in Section 9-03.14(1) of the 2018 WSDOT Standard
Specifications, with the additional restriction that the fines content be limited to no more than
5 percent, especially if the work occurs in wet weather or during the wet season (October through May).
However, if earthwork occurs during the normally dry months (June through September) on-site sandy
soils that are properly moisture conditioned, that are free of concrete rubble and other debris, and that
can be properly compacted may be used as structural fill in these areas. It may be possible to use
on-site sandy soils during wet weather for areas requiring only 90 percent compaction provided the
earthwork contractor implements good wet weather techniques and drier soils are used; however, we
recommend gravel borrow be specified for planning/bidding purposes.
■ Structural fill placed in the minimum 2-foot-wide drainage zone behind retaining walls consist of Gravel
Backfill for Walls conforming to Section 9-03.12(2) of the 2018 WSDOT Standard Specifications.
■ Structural fill placed around wall and footing drains should consist of Gravel Backfill for Drains
conforming to Section 9-03.12(4) of the 2018 WSDOT Standard Specifications.
■ Structural fill placed as capillary break material below slab-on-grade floors should consist of clean
crushed rock and meet the gradation requirements of Mineral Aggregate Type 22 (¾-inch crushed
gravel), City of Seattle Standard Specification 9-03.16. The capillary break may be eliminated if ground
improvement methods are used to support the buildings and a 2-foot thick crushed rock layer is placed
below the slabs.
■ Structural fill placed as crushed surfacing base course below pavements should conform to
Section 9-03.9(3) of the 2018 WSDOT Standard Specifications.
We recommend that the suitability of structural fill soil from proposed borrow sources be evaluated by a
representative of our firm before the earthwork contractor begins transporting the soil to the site.
4.7.4.2. Reuse of On-site Soils
On-site silty soils located within the upper few feet across the site will be difficult to reuse in the wet season
or wet weather conditions. The silty soils should not be reused under the planned structures. The on-site
sandy soils located above the water table may be used as structural fill in all areas during dry weather
conditions (typically June through September), provided the material is properly moisture conditioned.
Imported Gravel Borrow may be required for use as structural fill during wet weather conditions and during
the wet season (typically October through May) if the on-site sandy soils cannot be properly moisture
conditioned and compacted. The existing sandy soils are expected to be suitable for structural fill in areas
requiring compaction to at least 95 percent of MDD (per ASTM D 1557), provided the work is accomplished
during the normally dry season (June through September) and that the soil can be properly moisture
conditioned to within 2 percent of the optimum moisture content. Concrete rubble and other debris must
be removed from the existing fill soils before they can be reused as structural fill. Imported structural fill
consisting of sand and gravel (WSDOT Gravel Borrow) should be planned under all building floor slabs and
October 29, 2019 | Page 19 File No. 23325-001-00
foundation elements and as wall backfill, especially if construction occurs during wet weather or the wet
season (typically October through May).
The contractor should plan to cover and maintain all stockpiles of on-site soil with plastic sheeting if it will
be used as structural fill. The reuse of on-site soils is highly dependent on the skill of the contractor and
the weather conditions, and we will work with the design team and contractor to maximize the reuse of
on-site soils during the wet and dry seasons; however, imported gravel borrow should be planned for and
specified for wet weather construction.
4.7.4.3. Fill Placement and Compaction Criteria
Structural fill should be mechanically compacted to a firm, non-yielding condition. Structural fill should be
placed in loose lifts not exceeding 12 inches in thickness if using heavy compactors and 6 inches if using
hand operated compaction equipment. The actual lift thickness will be dependent on the structural fill
material used and the type and size of compaction equipment. Each lift should be moisture conditioned to
within 2 percent of the optimum moisture content and compacted to the specified density before placing
subsequent lifts. Structural fill should be compacted to the following criteria:
■ All fill placed under the proposed structures should be placed as structural fill compacted to at least
95 percent of the MDD estimated using the ASTM D 1557 test method.
■ Structural fill placed against foundations should be compacted to at least 95 percent of the MDD.
■ Structural fill placed behind below-grade walls should be compacted to between 90 to 92 percent of
the MDD estimated using ASTM D 1557. Care should be taken when compacting fill near the face of
below-grade walls to avoid over-compaction and hence overstressing the walls. Hand operated
compactors should be used within 5 feet behind the wall. The upper 2 feet of fill below floor slab
subgrade level should also be compacted to at least 95 percent of the MDD. The contractor should
keep all heavy construction equipment away from the top of retaining walls a horizontal distance equal
to half the height of the wall, or at least 5 feet, whichever is greater.
■ Structural fill in new pavement and hardscape areas, including utility trench backfill, should be
compacted to at least 90 percent of the MDD, except that the upper 2 feet of fill below final subgrade
level should be compacted to at least 95 percent of the MDD.
■ Structural fill placed as crushed surfacing base course below pavements should be compacted to
95 percent of the MDD.
■ Non-structural fill, such as fill placed in landscape areas, should be compacted to at least 90 percent
of the MDD.
An adequate number of in-place moisture and density tests should be performed during the placement and
compaction of structural fill to evaluate whether the specified degree of compaction is being achieved.
4.7.4.4. Weather Considerations
Disturbance of near surface soils should be expected, especially if earthwork is completed during periods
of wet weather. During dry weather, the soils will: (1) be less susceptible to disturbance; (2) provide better
support for construction equipment; and (3) be more likely to meet the required compaction criteria.
October 29, 2019 | Page 20 File No. 23325-001-00
The wet weather season generally begins in October and continues through May in western Washington;
however, periods of wet weather may occur during any month of the year. For earthwork activities during
wet weather, we recommend the following steps be taken:
■ The ground surface in and around the work area should be sloped so that surface water is directed
away from the work area. The ground surface should be graded so that areas of ponded water do not
develop. Measures should be taken by the contractor to prevent surface water from collecting in
excavations and trenches. Measures should be implemented to remove surface water from the
work area.
■ Surface water must not be directed toward slopes and we recommend that storm water drainage
ditches be constructed where needed along the crest of slopes to prevent uncontrolled surface water
runoff.
■ Earthwork activities should not take place during periods of moderate to heavy precipitation.
■ Slopes with exposed soils should be covered with plastic sheeting.
■ The contractor should take necessary measures to prevent on-site soils and soils to be used as fill from
becoming wet or unstable. These measures may include the use of plastic sheeting, sumps with pumps,
and grading. The site soils should not be left uncompacted and exposed to moisture. Sealing the
surficial soils by rolling with a smooth-drum roller prior to periods of precipitation will help reduce the
extent that these soils become wet or unstable.
■ The contractor should cover all soil stockpiles that will be used as structural fill with plastic sheeting.
■ Construction traffic should be restricted to specific areas of the site, preferably areas that are surfaced
with the existing asphalt or working pad materials not susceptible to wet weather disturbance.
■ Construction activities should be scheduled so that the length of time that soils are left exposed to
moisture is reduced to the extent practical.
Routing of equipment on the existing fill and native silty soils during the wet weather months will be difficult
and the subgrade will likely become highly disturbed and rutted. In addition, a significant amount of mud
can be produced by routing equipment directly on these soils in wet weather. Therefore, to protect the
subgrade soils and to provide an adequate wet weather working surface for the contractor’s equipment
and labor, we recommend that the contractor protect exposed subgrade soils with crushed rock or
asphalt-treated base (ATB), as necessary.
4.7.5. Temporary Cut Slopes
For planning purposes, temporary unsupported cut slopes more than 4 feet high may be inclined at 1½H:1V
in the fill and native soils. These inclinations may need to be flattened by the contractor if significant
caving/sloughing or groundwater seepage occurs. For open cuts at the site, we recommend that:
■ No traffic, construction equipment, stockpiles, or building supplies be allowed at the top of cut slopes
within a distance of at least 5 feet from the top of the cut;
■ The excavation not encroach on a 1H:1V influence line projected down from the edges of nearby or
planned foundation elements;
October 29, 2019 | Page 21 File No. 23325-001-00
■ Exposed soil along the slope be protected from surface erosion using waterproof tarps or plastic
sheeting or flash coating with shotcrete;
■ Construction activities be scheduled so that the length of time the temporary cut is left open is reduced
to the extent practicable;
■ Erosion control measures be implemented as appropriate such that runoff from the site is reduced to
the extent practicable;
■ Surface water be diverted away from the excavation; and
■ The general condition of the slopes be observed periodically by GeoEngineers to confirm adequate
stability.
Because the contractor has control of the construction operations, the contractor should be made
responsible for the stability of cut slopes, as well as the safety of the excavations. Shoring and temporary
slopes must conform to applicable local, state and federal safety regulations.
4.7.6. Permanent Cut and Fill Slopes
We recommend that permanent cut or fill slopes be constructed at inclinations of 2H:1V or flatter and be
blended into existing slopes with smooth transitions. To achieve uniform compaction, we recommend that
fill slopes be overbuilt slightly and subsequently cut back to expose well compacted fill.
To reduce erosion, newly constructed slopes and disturbed existing slopes should be planted or
hydroseeded shortly after completion of grading. Until the vegetation is established, some sloughing and
raveling of the slopes should be expected. This may necessitate localized repairs and reseeding. Temporary
covering, such as clear heavy plastic sheeting, or erosion control blankets (such as American Excelsior
Curlex 1 or North American Green SC150BN) could be used to protect the slopes during periods of rainfall.
4.7.7. Erosion and Sediment Control
In our opinion, the erosion potential of the on-site soils is low to moderate. Construction activities including
stripping and grading will expose soils to the erosional effects of wind and water. The amount and potential
impacts of erosion are partly related to the time of year that construction occurs. Wet weather construction
will increase the amount and extent of erosion and potential sedimentation.
Erosion and sedimentation control measures may be implemented by using a combination of interceptor
swales, straw bale barriers, silt fences and straw mulch for temporary erosion protection of exposed soils.
All disturbed areas should be finish graded and seeded as soon as practicable to reduce the risk of erosion.
4.7.8. Utility Trenches
Trench excavation, pipe bedding and trench backfilling should be completed using the general procedures
described in the 2018 WSDOT Standard Specifications, or City of Renton requirements, or as specified by
the project civil engineer.
Utility trench backfill should consist of structural fill and should be placed in lifts of 12 inches or less (loose
thickness) when using heavy compaction equipment, and 6 inches or less when using hand compaction
equipment, such that adequate compaction can be achieved throughout the lift. Each lift must be
compacted prior to placing the subsequent lift. Prior to compaction, the backfill should be moisture
October 29, 2019 | Page 22 File No. 23325-001-00
conditioned to within 2 percent of the optimum moisture content. The backfill should be compacted in
accordance with the criteria discussed above.
4.8. Pavement Recommendations
4.8.1. Subgrade Preparation
We recommend the subgrade soils in new pavement areas be prepared and evaluated as described in the
“Earthwork” section of this report. Where existing fill is present, we recommend placing a 6-inch-thick
imported granular subbase layer meeting the requirements of Gravel Borrow (Section 9-03.14(1) of the
2018 WSDOT Standard Specifications) below the pavement sections described below. If the subgrade soils
are excessively loose or soft, it may be necessary to excavate localized areas and replace them with
additional gravel borrow or gravel base material. Pavement subgrade conditions should be observed and
proof-rolled during construction and prior to placing the subbase materials to evaluate the presence of
unsuitable subgrade soils and the need for over-excavation and placement of a geotextile separator.
The following pavement recommendations are for standard hot-mix asphalt (HMA) pavement designs. We
understand that permeable pavement may be considered at the site. We can provide permeable pavement
recommendations upon request.
4.8.2. New Hot-Mix Asphalt Pavement
In light-duty pavement areas (e.g., pedestrian access or passenger car parking), we recommend a
pavement section consisting of at least a 3-inch thickness of ½-inch HMA (PG 58-22) per WSDOT
Sections 5-04 and 9-03, over a 4-inch thickness of densely compacted crushed surfacing base course
(CSBC) per WSDOT Section 9-03.9(3).
In medium-duty pavement areas (e.g., drive aisles), we recommend a pavement section consisting of at
least a 4-inch thickness of ½-inch HMA (PG 58-22) over a 6-inch thickness of densely compacted CSBC per
WSDOT Section 9-03.9(3).
The crushed surfacing base course in both light-duty and medium-duty areas should be compacted to at
least 95 percent of the MDD (ASTM D 1557). We recommend that a proof-roll of the compacted base
course be observed by a representative from our firm prior to paving. Soft or yielding areas observed during
proof-rolling may require over-excavation and replacement with compacted structural fill.
The pavement sections recommended above are based on our experience and typical traffic data provided
by ARCO Murray. Thicker asphalt sections may be needed based on the actual projected traffic data, bus
or truck loads, and intended use.
4.8.3. Portland Cement Concrete Pavement
Portland cement concrete (PCC) sections may be considered for loading dock aprons, trash dumpster areas
and where other concentrated heavy loads may occur. For heavy-duty (e.g., service trucks, fire trucks, etc.)
concrete paving, we recommend 8 inches of PCC overlying 6 inches of CSBC per WSDOT Section 9-03.9(3).
The concrete thickness should be increased by the thickness of the reinforcing steel, if steel reinforcement
is used.
October 29, 2019 | Page 23 File No. 23325-001-00
The crushed surface base course in both light duty and heavy-duty areas should be compacted to at least
95 percent of the MDD (ASTM D 1557). We recommend that a proof-roll of the compacted base course be
observed by a representative from our firm prior to paving. Soft or yielding areas observed during
proof-rolling may require over-excavation and replacement with compacted structural fill.
We recommend PCC pavements incorporate construction joints and/or crack control joints spaced
maximum distances of 12 feet apart, center-to-center, in both the longitudinal and transverse directions.
Crack control joints may be created by placing an insert or groove into the fresh concrete surface during
finishing, or by sawcutting the concrete after it has initially set-up. We recommend the depth of the crack
control joints be approximately one-fourth the thickness of the concrete. We also recommend that the
project team consider sealing crack control joints with an appropriate sealant to help restrict water
infiltration into the joints.
4.9. Construction Dewatering
Static groundwater was observed in the borings at the time of exploration, as described in the “Groundwater
Conditions” section of this report. Therefore, shallow excavations for utility trenches, underground vaults
and elevator shafts may encounter groundwater.
Dewatering during construction of these areas and other excavations on site may be required. Based on
the soil conditions and our experience in the area, we expect that groundwater in excavations less than
about 5 feet below existing grades can be controlled by open pumping using sump pumps. For excavations
extending deeper and below the static ground water table dewatering using well points or deep wells will
be necessary. We recommend that the contractor be required to submit a proposed dewatering system
design and plan layout to the project team for review and comment prior to beginning construction.
The level of effort required for dewatering will depend on the time of year during which construction is
accomplished. Less seepage into the work areas and a lower water table should be expected if construction
is accomplished in the late summer or early fall months, and correspondingly, more seepage and a higher
water table should be expected during the wetter periods of the year and into the spring months. We
recommend that earthwork activities be completed in the late summer or early fall months when
precipitation is typically at its lowest.
4.10. Infiltration Considerations
The feasibility of infiltration was assessed at the site through review of near surface soil conditions and
groundwater levels. Due to a relatively shallow groundwater table (as shallow as 4 feet based on
observations during drilling) and the presence of low permeability silt soils near the ground surface, we
conclude that the use of large scale infiltration facilities is not feasible at this site. GeoEngineers can
provide design infiltration rates for on-site best management practices (BMPs) such as permeable
pavement or rain gardens, if required.
4.11. Recommended Additional Geotechnical Services
Throughout this report, recommendations are provided where we consider additional geotechnical services
to be appropriate. These additional services are summarized below:
■ GeoEngineers can prepare construction drawings and specifications for ground improvement (such as
stone columns or rigid inclusions) for the project, if requested.
October 29, 2019 | Page 24 File No. 23325-001-00
■ GeoEngineers should be retained to review the project plans and specifications when complete to
confirm that our design recommendations have been implemented as intended.
■ During construction, GeoEngineers should observe stripping and grading; observe and evaluate
installation of ground improvement elements or deep foundations; observe and evaluate the suitability
of foundation, wall and floor slab subgrades; observe removal of unsuitable fill and debris/rubble from
below the building and parking garage footprints and hardscape areas; observe and test structural fill
including wall and utility trench backfill; observe installation of subsurface drainage measures and
infiltration facilities; evaluate the suitability of pavement subgrades and other appurtenant structures,
and provide a summary letter of our construction observation services. The purposes of GeoEngineers’
construction phase services are to confirm that the subsurface conditions are consistent with those
observed in the explorations, to provide recommendations for design changes should the conditions
revealed during the work differ from those anticipated, to evaluate whether or not earthwork and
foundation installation activities are completed in accordance with our recommendations, and other
reasons described in Appendix D, Report Limitations and Guidelines for Use.
5.0 LIMITATIONS
We have prepared this report for the exclusive use of ARCO Murray Design Build and their authorized agents
for the Logan Avenue North and North 8th Street development project in Renton, Washington.
Within the limitations of scope, schedule and budget, our services have been executed in accordance with
generally accepted practices in the field of geotechnical engineering in this area at the time this report was
prepared. No warranty or other conditions, express or implied, should be understood.
Any electronic form, facsimile or hard copy of the original document (email, text, table and/or figure), if
provided, and any attachments are only a copy of the original document. The original document is stored
by GeoEngineers, Inc. and will serve as the official document of record.
Please refer to Appendix D for additional information pertaining to use of this report.
6.0 REFERENCES
Al Atik, L. and N. Abrahamson (2010). “An Improved Method for Nonstationary Spectral Matching,”
Earthquake Spectra, Vol. 26, No. 3, pp. 601-617.
ASCE 7-10, 2010. “Minimum Design Loads for Buildings and Other Structures,” American Society of Civil
Engineers.
ASTM D-1557, 2012. “Standard Testing Method for Laboratory Compaction Characteristics of Soil Using
Modified Effort,” ASTM International.
Atkinson, G.M., Boore, D.M., 2003. “Empirical ground-motion relations for subduction-zone earthquakes
and their application to Cascadia and other regions,” Bulletin of the Seismological Society of
America, v. 93, n. 4, p. 1703-1729.
October 29, 2019 | Page 25 File No. 23325-001-00
Boore, D.M. and G.M. Atkinson, 2008. “Ground Motion Prediction Equations for the Average Horizontal
Component of PGA, PGV, and 5% Damped PSA at Spectral Periods between 0.01s and 10.0 s.”
Earthquake Spectra 24, 99-138.
R. W. Boulanger, B. L. Kutter, S. J. Brandenberg, P. Singh, D. Chang, September, 2003. “Pile Foundations
in Liquefied and Laterllay Spreading Ground during Earthquakes: Centrifuge Experiments &
Analyses.” Center for Geotechnical Modeling, Repot No. UCD/CGM-03/01.
Campbell, K.W. and Y. Bozorgnia, 2008. “NGA Ground Motion Model for the Geometric Mean Horizontal
Component of PGA, PGV, PGD and 5% Damped Linear Elastic Response Spectra for Periods
Ranging from 0.01 to 10s.” Earthquake Spectra, Vol. 24, No. 1, 139-171.
Chiou, B.S.J. and R.R. Youngs, 2008. “An NGA Model for the Average Horizontal Component of Peak Ground
Motion and Response Spectra.” Earthquake Spectra, Vol. 24, No. 1, 173-215.
City of Seattle, 2017, “Standard Specifications for Road, Bridge and Municipal Construction.”
Darendeli, M., 2001. “Development of a new family of normalized modulus reduction and material damping
curves.” Ph.D. Thesis, Dept. of Civil Eng., Univ. of Texas, Austin.
Cetin, K.O., H.T. Bulge, J. Wu, A.M. Kammerer, and R.B. Seed 2009, “Probabilistic Model for the Assessment
of Cyclically Induced Reconsolidation (Volumetric) Settlement.” Journal of Geotechnical and
Geoenvironmental Engineering, 135(3), pp. 387-398.
Fouad, L. and E.M. Rathje (2012). “RSPMatch09” http://nees.org/resources/rpsmatch09.
Idriss, I. M., and R. W. Boulanger 2008. “Soil Liquefaction during Earthquakes.” Earthquake Engineering
Research Institute MNO-12.
International Code Council, 2015, “International Building Code.”
Ishihara, K., and Yoshimine, M., “Evaluation of Settlements in Sand Deposits Following Liquefaction During
Earthquakes,” Soils and Foundations, 32(1), 1992, pp. 173-188.
Petersen, Mark D., Frankel, Arthur D., Harmsen, Stephen C., Mueller, Charles S., Haller, Kathleen M.,
Wheeler, Russell L., Wesson, Robert L., Zeng, Yuehua, Boyd, Oliver S., Perkins, David M., Luco,
Nicolas, Field, Edward H., Wills, Chris J., and Rukstales, Kenneth S. (2008). Documentation for the
2008 Update of the United States National Seismic Hazard Maps: United States Geological Survey
Open-File Report 2008-1128.
Shahi, S.K. and J.K. Baker (2014). “NGA-West2 Models for Ground-Motion Directionality.” Earthquake
Spectra, Vol. 30, No. 3, pp. 1285-1300.
Tokimatsu K., Seed H.B., 1987. “Evaluation of settlements in sands due to earthquake shaking,” Journal
of Geotechnical Engineering, 1987, vol. 113, pp. 861-878.
USGS Unified Hazard Tool (Version Dynamic: Conterminous U.S. 2008).
October 29, 2019 | Page 26 File No. 23325-001-00
U.S. Geological Survey – National Seismic hazard Mapping project Software, “Earthquake Ground Motion
Parameters, Version 5.0.9a,” 2002 data, 2009.
Washington State Department of Transportation (WSDOT), 2018. “Standard Specifications for Road,
Bridge, and Municipal Construction.”
Wong, Ivan; Sparks, Andrew; Thomas, Patricia; Nemser, Eliza, 2003, Evaluation of near-surface site
amplification in the Seattle, Washington, metropolitan area—Final technical report: Seismic
Hazards Group, URS Corporation [under contract to] U.S. Geological Survey, 1 v.
Youd, T. L. and Idriss, I. M. 2001. “Liquefaction Resistance of Soils: Summary Report from the 1996 NCEER
and 1998 NCEER/NSF Workshops on Evaluation of Liquefaction Resistance of Soils,” Journal of
Geotechnical and Geoenvironmental Engineering, Vol. 127, No. 4, April 2001, pp. 298-313.
Youngs, R.; Chiou, S-J.; Silva, W.; Humphrey, J. (1997). Strong ground motion attenuation relationships for
subduction zone earthquakes. Seismological Research Letters 68. 58-73.
Zhao J.X., Zhang, J., Asano, A., Ohno, Y., Oouchi, T., Takahashi, T., Ogawa, H., Irikura, K., Thio, H., Somerville,
P., Fukushima, Y., and Fukushima, Y., 2006 Attenuation relations of strong ground motion in Japan
using site classification based on predominant period: Bulletin of the Seismological Society of
America, v. 96, p. 898–913.
FIGURES
µ
SITE
Vicinity Map
Figure 1
Logan Avenue N / N 8th Street Development
Renton, Washington
2,000 2,0000
Feet
Data Source: Mapbox Open Street Map, 2018
Notes:1. The locations of all features shown are approximate.2. This drawing is for information purposes. It is intended toassist in showing features discussed in an attached document. GeoEngineers, Inc. cannot guarantee the accuracy and contentof electronic files. The master file is stored by GeoEngineers,Inc. and will serve as the official record of this communication.
Projection: NAD 1983 UTM Zone 10N
P:\23\23325001\GIS\MXD\2332500100_F01_VicinityMap.mxd Date Exported: 09/10/19 by glohrmeyer
P
P
PP 28
28
303030303030
30
3030
30
323230303030 3
2
3
0
282830303030302828
2
8282
8
30
303029
31
29
29
29
292929
29
29 29
292929 2929
29
2929
GENERATORXFMR
DUMPSTERENCLOSURE
PROPOSED BUILDING
HGI & HOME2135,803 S.F.
5 STORY, 228 ROOMS
77 PARKING SPACESAB-1
CPT-1
B-1
OB-1
OB-6
B-2
OB-2
OB-3
OB-4
PB-1
OB-5
OB-7
AB-3
GEI-2
GEI-1
CPT-2
CPT-3
CPT-4
CPT-5
CPT-6
N 8th St.Park Ave. NLogan Ave. NB'B
A A'
B-1-19
B-2-19
B-3-19
GEI-3-19
GEI-4-19
GEI-3-19a
B-4-19
C'CD'D
GEI-2-19
GEI-1-19
GEI-5-19
AB-2
Figure 2
Logan Avenue N / N 8th Street Development
Renton, Washington
Site Plan
W E
N
S
P:\23\23325001\CAD\00\GeoTech\23325000100_F02-06_Site Plan and Cross-Sections.dwg TAB:F02 Date Exported: 09/03/19 - 22:18 by syiLegend
Property Boundary
Boring by GeoEngineers, 2018
Notes:
1.The locations of all features shown are approximate.
2.This drawing is for information purposes. It is intended to assist
in showing features discussed in an attached document.
GeoEngineers, Inc. cannot guarantee the accuracy and content
of electronic files. The master file is stored by GeoEngineers, Inc.
and will serve as the official record of this communication.
Data Source: Site Survey by Axis Survey & Mapping, dated 04/23/18.
Projection: WA State Plane, North Zone, NAD83, US Foot
Feet
0100 100
AB-1, B-1, GEI-1, OB-1, PB-1
CPT-1 Cone Penetration Test by GeoEngineers, 2018
Cross-Section Location
A A'
B-1-19 & GEI-1-19 Boring Completed by GeoEngineers, 2019
GEI-3-19a Monitoring Well Completed by GeoEngineers, 2019
Elevation (Feet)Elevation (Feet)Distance (Feet)
-60
-40
-20
0
20
40
-60
-40
-20
0
20
40
0 80 160 240 320 400 480 560 640 720 800 880 960960OB-6(Offset 81 ft)OB-1(Offset 36 ft)PB-1(Offset 33 ft)OB-5(Offset 74 ft)CPT-1(Offset 26 ft)CPT-6(Offset 14 ft)A
(West)
A'
(East)
Fill
Upper Loose/Soft to
Medium Dense/Medium
Stiff Sands and Silts
(Alluvium)
Lower Medium Dense to Dense/Stiff
Gravels, Sand and Silt (Alluvium)AB-1(Offset 15 ft)B-4-19(Offset 12 ft)QT (tsf)0 500
QT (tsf)
0 500
ACGPSMSP-SM
ML
SP-SMSM
24
2
11
7
TSSM
GW-GM
SMML
SM
ML
SM
25
8
3
6
3
3
4
TSSM
SMSM
SM
ML
ML
ML
SM
SM
13
2
2
3
4
5
19
14
TS
SM
SM
ML
SP-SM
OL
PT
SM
SP-SM
MLPT
14
5
4
3
2
8
21
7
9
Grass
SM
SMML
SP-SM
SM
SP-SM
PT
SP-SM
8
6
8
14
8
4
14
Loose/Medium Stiff Sand and Silt with Thin Layers of Stiff Peat (Alluvium)
Lower Medium Dense to Dense/Stiff Gravels, Sand and Silt (Alluvium)
ACCRSM
SM
ML
SM
ML
SM
ML
MH
SM
GP
MH
SM
SP-SM
SM
28
5
3
4
17
17
2
5
4
6
14
31
22
23
12
31
20
9
26
Figure 3
Logan Avenue N / N 8th Street Development
Renton, Washington
Cross-Section A-A'P:\23\23325001\CAD\00\GeoTech\23325000100_F02-06_Site Plan and Cross-Sections.dwg TAB:F03 Date Exported: 09/11/19 - 15:26 by syiLegend
Notes:
1.The subsurface conditions shown are based on interpolation
between widely spaced explorations and should be considered
approximate; actual subsurface conditions may vary from those
shown.
2.This figure is for informational purposes only. It is intended to
assist in the identification of features discussed in a related
document. Data were compiled from sources as listed in this
figure. The data sources do not guarantee these data are
accurate or complete. There may have been updates to the
data since the publication of this figure. This figure is a copy of
a master document. The hard copy is stored by GeoEngineers,
Inc. and will serve as the official document of record.
Datum: NAVD 88, unless otherwise noted.
SM
20
Boring
Inferred Soil Contact
Soil Classification
Blow Count
Legend
EXPLORATION ID(Offset Distance)Fill
Horizontal Scale in Feet
080 80
Vertical Scale in Feet
020 20
Vertical Exaggeration: 4X
QT (tsf)
0 500EXPLORATION ID(Offset Distance)Cone Penetration Test
Tip Resistance
Upper Loose/Soft to Medium Dense/Medium
Stiff Sands and Silts (Alluvium)
Lower Medium Dense to Dense/Stiff
Gravels, Sand and Silt (Alluvium)
Loose/Medium Stiff Sand and Silt with
Thin Layers of Stiff Peat (Alluvium)
Elevation (Feet)Elevation (Feet)Distance (Feet)
-60
-40
-20
0
20
40
-60
-40
-20
0
20
40
0 80 160 240 320 400 480 560 640 720 800 880 960 1040 1100
B
(West)
B'
(East)B-2(Offset 11 ft)OB-2(Offset 25 ft)OB-3(Offset 35 ft)OB-4(Offset 75 ft)OB-7(Offset 106 ft)GEI-2(Offset 63 ft)CPT-2(Offset 90 ft)CPT-3(Offset 56 ft)CPT-5(Offset 50 ft)B-1-19(Offset 60 ft)B-2-19(Offset 21 ft)GEI-3-19a(Offset 80 ft)GEI-1-19(Offset 0 ft)GEI-3-19(Offset 82 ft)GEI-4-19(Offset 34 ft)QT (tsf)
0 500
QT (tsf)
0 500
QT (tsf)
0 500
TS
SM
SM
ML
SM
OH
SPSM
SP-SM
SM
MH
SM
SP
24
2
2
2
33
23
6
4
8
TSSM
SP-SMMLML
SM
PT
SM
ML
SM
SP-SM
5
3
4
2
21
5
10
GrassSM
SW-SM
SM
PT
SP-SM
ML
SP-SM
19
9
2
2
9
2
13
TSSM
SP
MHSMML
SM
SP-SM
ML
SP
26
8
6
14
2
11
12
5
TSSM
SMMLSM
MH
SM
MH
ML
SP
MLPT
19
5
1/12"
3
2
3
4
TSSM
SP-SM
MLMLMLSM
18
2
1/12"
5
Fill
Upper Loose/Soft to
Medium Dense/Medium
Stiff Sands and Silts
(Alluvium)
Lower Medium Dense to Dense/Stiff
Gravels, Sand and Silt (Alluvium)
Loose/Medium Stiff Sand and Silt with Thin Layers of Stiff Peat (Alluvium)
Lower Medium Dense to Dense/Stiff Gravels, Sand and Silt (Alluvium)
AC
SM
ML
SP-SM
ML
PT
ML
SM
ML
PT
MH
SM
PT
SM
ML
SM
SP-SM
ML
SM
SP-SM
4
4
1
10
1
2
8
4
10
23
16
17
36
66
80
5
30
37
TS
SM
ML
SM
SP-SM
ML
SM
ML
PT
ML
PT
ML
SM
SP-SM
ML
SP-SM
SM
58
25
2
3
9
7
24
6
6
6
7
4
44
21
87
7
56
29
TS
SM
ML
SM
ML
SM
ML
SM
ML
SM
PT
SM
PT
SP-SM
PT
ML
SM
MLSM
23
10
1
2
3
14
12
18
9
20
17
7
9
35
23
11
17
33
TS
SM
SM
SP-SM
SM
PT
ML
ML
SP-SM
ML
SM
SP-SM
SM
ML
SM
ML
SM
SM
42
8
7
7
6
6
12
14
13
11
21
4
6
41
14
13
18
37
TS
SM
ML
SM
ML
SP-SM
ML
PT
SM
PT
ML
PT
ML
SP-SM
PT
ML
SP-SM
45
4
11
4
1
6
4
13
4
9
7
6
7
22
32
17
10
30
Figure 4
Logan Avenue N / N 8th Street Development
Renton, Washington
Cross-Section B-B'P:\23\23325001\CAD\00\GeoTech\23325000100_F02-06_Site Plan and Cross-Sections.dwg TAB:F04 Date Exported: 09/11/19 - 15:26 by syiNotes:
1.The subsurface conditions shown are based on interpolation between
widely spaced explorations and should be considered approximate; actual
subsurface conditions may vary from those shown.
2.This figure is for informational purposes only. It is intended to assist in the
identification of features discussed in a related document. Data were
compiled from sources as listed in this figure. The data sources do not
guarantee these data are accurate or complete. There may have been
updates to the data since the publication of this figure. This figure is a
copy of a master document. The hard copy is stored by GeoEngineers, Inc.
and will serve as the official document of record.
Datum: NAVD 88, unless otherwise noted.
Legend
SM
20
Boring
Inferred Soil Contact
Soil Classification
Blow Count
Legend
EXPLORATION ID(Offset Distance)Horizontal Scale in Feet
080 80
Vertical Scale in Feet
020 20
Vertical Exaggeration: 4X
QT (tsf)
0 500EXPLORATION ID(Offset Distance)Cone Penetration Test
Tip Resistance
Fill
Upper Loose/Soft to Medium Dense/Medium
Stiff Sands and Silts (Alluvium)
Lower Medium Dense to Dense/Stiff
Gravels, Sand and Silt (Alluvium)
Loose/Medium Stiff Sand and Silt with
Thin Layers of Stiff Peat (Alluvium)
Elevation (Feet)Elevation (Feet)Distance (Feet)
-60
-40
-20
0
20
40
-60
-40
-20
0
20
40
0 60 120 180 240 300 360 420 480 540
C
(North)
C'
(South)
TSMLSMSMMLSMMLSM
SP-SM
ML
SM
ML
ML
SP-SM
SP-SM
PT
ML
PT
SM
SM
16
2
2
10
12
23
3
6
7
4
6
6
44
25
TS
SM
SM
ML
SM
OHSPSM
SP-SM
SM
MH
SM
SP
24
2
2
2
33
23
6
4
8 B-2(Offset 58 ft)B-1(Offset 28 ft)B-4-19(Offset 27 ft)B-1-19(Offset 40 ft)B-2-19(Offset 9 ft)B-3-19(Offset 12 ft)CPT-2(Offset 112 ft)CPT-1(Offset 84 ft)QT (tsf)
0 500 QT (tsf)
0 500 AB-2(Offset 1 ft)Grass
SM
SP-SMPTMLSM
33
22
6
19
Fill
Upper
Loose/Soft to
Medium
Dense/Medium
Stiff Sands and
Silts (Alluvium)
Lower Medium Dense
to Dense/Stiff Gravels,
Sand and Silt (Alluvium)
Loose/Med
i
u
m
S
t
i
f
f
S
a
n
d
a
n
d
S
i
l
t
w
i
t
h
Thin Layers
o
f
S
t
i
f
f
P
e
a
t
(
A
l
l
u
v
i
u
m
)
?
?
Building North
ACCRSM
SM
ML
SM
ML
SM
ML
MH
SM
GP
MH
SM
SP-SM
SM
28
5
3
4
17
17
2
5
4
6
14
31
22
23
12
31
20
9
26
AC
SM
ML
SP-SM
ML
PT
ML
SM
ML
PT
MH
SM
PT
SM
ML
SM
SP-SM
ML
SM
SP-SM
4
4
1
10
1
2
8
4
10
23
16
17
36
66
80
5
30
37
TS
SM
ML
SM
SP-SM
ML
SM
ML
PT
ML
PT
ML
SM
SP-SM
ML
SP-SM
SM
58
25
2
3
9
7
24
6
6
6
7
4
44
21
87
7
56
29
TS
SM
ML
SP-SM
SM
ML
SM
ML
SM
ML
SM
ML
SM
PT
SP-SM
SP-SM
ML
SP-SM
ML
26
27
6
8
24
20
22
2
18
29
10
24
40
34
29
25
35
15
Building South
Figure 5
Logan Avenue N / N 8th Street Development
Renton, Washington
Cross-Section C-C'P:\23\23325001\CAD\00\GeoTech\23325000100_F02-06_Site Plan and Cross-Sections.dwg TAB:F05 Date Exported: 09/11/19 - 15:27 by syiNotes:
1.The subsurface conditions shown are based on interpolation between
widely spaced explorations and should be considered approximate; actual
subsurface conditions may vary from those shown.
2.This figure is for informational purposes only. It is intended to assist in the
identification of features discussed in a related document. Data were
compiled from sources as listed in this figure. The data sources do not
guarantee these data are accurate or complete. There may have been
updates to the data since the publication of this figure. This figure is a
copy of a master document. The hard copy is stored by GeoEngineers, Inc.
and will serve as the official document of record.
Datum: NAVD 88, unless otherwise noted.
Legend
SM
20
Boring
Inferred Soil Contact
Soil Classification
Blow Count
Legend
EXPLORATION ID(Offset Distance)Horizontal Scale in Feet
060 60
Vertical Scale in Feet
020 20
Vertical Exaggeration: 3X
QT (tsf)
0 500EXPLORATION ID(Offset Distance)Cone Penetration Test
Tip Resistance
Fill
Upper Loose/Soft to Medium Dense/Medium
Stiff Sands and Silts (Alluvium)
Lower Medium Dense to Dense/Stiff
Gravels, Sand and Silt (Alluvium)
Loose/Medium Stiff Sand and Silt with
Thin Layers of Stiff Peat (Alluvium)
Elevation (Feet)Elevation (Feet)Distance (Feet)
-60
-40
-20
0
20
40
-60
-40
-20
0
20
40
0 60 120 180 240 300 360 420 450
D
(West)
D'
(East)
TSGMSMMLSP
ML
SM
ML
SP-SM
ML
SP
18
6
13
5
8
2
16 GEI-1(Offset 8 ft)GEI-2-19(Offset 0 ft)GEI-5-19(Offset 7 ft)Fill
Upper Loose/Soft to
Medium Dense/Medium
Stiff Sands and Silts
(Alluvium)
Lower Medium Dense to Dense/Stiff
Gravels, Sand and Silt (Alluvium)
Loose/Medium Stiff Sand and Silt with
Thin Layers of Stiff Peat (Alluvium)
Lower Medium Dense to Dense/Stiff Gravels, Sand and Silt (Alluvium)
TSSMMLSMML
SM
ML
SP-SM
PT
MLPTSM
ML
SP-SM
PT
ML
SM
18
9
14
18
4
2
17
4
8
5
4
4
7
32
19
12
15
23
TS
SM
ML
SM
ML
SM
ML
PT
SM
SP-SM
ML
SP-SM
ML
SP-SM
PT
ML
SMMLSM
28
7
6
4
4
4
24
5
6
19
10
5
8
44
19
12
20
25
Figure 6
Logan Avenue N / N 8th Street Development
Renton, Washington
Cross-Section D-D'P:\23\23325001\CAD\00\GeoTech\23325000100_F02-06_Site Plan and Cross-Sections.dwg TAB:F06 Date Exported: 09/11/19 - 15:27 by syiNotes:
1.The subsurface conditions shown are based on interpolation between
widely spaced explorations and should be considered approximate; actual
subsurface conditions may vary from those shown.
2.This figure is for informational purposes only. It is intended to assist in the
identification of features discussed in a related document. Data were
compiled from sources as listed in this figure. The data sources do not
guarantee these data are accurate or complete. There may have been
updates to the data since the publication of this figure. This figure is a
copy of a master document. The hard copy is stored by GeoEngineers, Inc.
and will serve as the official document of record.
Datum: NAVD 88, unless otherwise noted.
Legend
SM
20
Boring
Inferred Soil Contact
Soil Classification
Blow Count
Legend
EXPLORATION ID(Offset Distance)Horizontal Scale in Feet
060 60
Vertical Scale in Feet
020 20
Vertical Exaggeration: 3X
Fill
Upper Loose/Soft to Medium Dense/Medium
Stiff Sands and Silts (Alluvium)
Lower Medium Dense to Dense/Stiff
Gravels, Sand and Silt (Alluvium)
Loose/Medium Stiff Sand and Silt with
Thin Layers of Stiff Peat (Alluvium)
0.01
0.1
1
10
0.01 0.1 15% Damped Spectral Acceleration, Sa(g)Period (seconds)
Recommended Site-Specific MCEr Response
Spectrum
Recommended Site-Specific MCERResponse Spectrum
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure 7
Project: 23325-001-00 Executed: 5/16/2018
APPENDICES
APPENDIX A Field Explorations
October 29, 2019 | Page A-1 File No. 23325-001-00
APPENDIX A
FIELD EXPLORATIONS
Subsurface conditions at the site were evaluated by drilling 24 borings (B-1, B-2, PB-1, AB-1 through AB-3,
OB-1 through OB-7, GEI-1, GEI-2, B-1-19 through B-4-19, and GEI-1-19 through GEI-5-19) and advancing
six cone penetration tests (CPTs) (CPT-1 through CPT-6) to depths ranging from approximately 10 to 85 feet
below existing site grades. CPTs were advanced to practical refusal. The borings were completed by
Advanced Drill Technologies, Inc. from April 3 to April 4, 2018, from July 29 to August 1 and August 23,
2019. The CPTs were completed by In Situ Engineering on April 3, 2018.
The locations of the explorations were estimated by taping/pacing from existing site features as well as
surveyed. The approximate exploration locations are shown on the Figure 2, Site Plan.
Borings
The borings were completed using a D-50 track mounted drill rig with continuous-flight, hollow-stem auger
drilling equipment. The borings were continuously monitored by a technician from our firm who examined
and classified the soils encountered, obtained representative soil samples, observed groundwater
conditions and prepared a detailed log of each exploration.
The soils encountered in the borings were generally sampled at 2½- and 5-foot vertical intervals with a
2-inch, outside-diameter split-barrel standard penetration test (SPT) sampler. The disturbed samples were
obtained by driving the sampler 18 inches into the soil with a 140-pound automatic hammer. The number
of blows required for each 6 inches of penetration was recorded. The blow count ("N-value") of the soil was
calculated as the number of blows required for the final 12 inches of penetration. This resistance, or
N-value, provides a measure of the relative density of granular soils and the relative consistency of cohesive
soils. Where very dense soil conditions precluded driving the full 18 inches, the penetration resistance for
the partial penetration was entered on the logs. The blow counts are shown on the boring logs at the
respective sample depths.
Soils encountered in the borings were visually classified in general accordance with the classification
system described in Figure A-1, Key to Exploration Logs. A key to the boring log symbols is also presented
in Figure A-1. The logs of the borings are presented in Figures A-2 through A-26. The boring logs are based
on our interpretation of the field and laboratory data and indicate the various types of soils and groundwater
conditions encountered. The logs also indicate the depths at which these soils or their characteristics
change, although the change may actually be gradual. If the change occurred between samples, it was
interpreted. The densities noted on the boring logs are based on the blow count data obtained in the borings
and judgment based on the conditions encountered.
Observations of groundwater conditions were made during drilling. The groundwater conditions
encountered during drilling are presented on the boring logs. Groundwater conditions observed during
drilling represent a short-term condition and may or may not be representative of the long-term groundwater
conditions at the site. Groundwater conditions observed during drilling should be considered approximate.
October 29, 2019 | Page A-2 File No. 23325-001-00
Monitoring Wells
A groundwater monitoring wells was installed next to boring GEI-3-19. The monitoring well was constructed
using 2-inch-diameter polyvinyl chloride (PVC) casing. The depth to which the casing was installed was
selected based on our understanding of subsurface soil and groundwater conditions encountered during
drilling. The lower portion of the casing was slotted to allow entry of water into the casing. Medium sand
was placed in the borehole annulus surrounding the slotted portion of the casing. A bentonite seal was
placed above the slotted portion of the casing. The monitoring well was protected by installing flush-mount
steel monuments set in concrete. Completion details for the monitoring well is shown on Figure A-24.
Groundwater levels in the monitoring wells were measured on August 8, 12 and 23, 2019, as summarized
in the main body of the report.
The groundwater monitoring wells should be abandoned during construction in accordance with the
procedures of the Washington State Department of Ecology.
Cone Penetration Tests
The CPT is a subsurface exploration technique in which a small-diameter steel tip with adjacent sleeve is
continuously advanced with hydraulically operated equipment. Measurements of tip and sleeve resistance
allow interpretation of the soil profile and the consistency of the strata penetrated. The tip resistance,
friction ratio and pore water pressure are recorded on the CPT logs. The logs of the CPT probes are
presented at the end of this appendix as Figures A-27 through A-34. The CPT soundings were backfilled in
general accordance with procedures outlined by the Washington State Department of Ecology.
Measured groundwater level in exploration,well, or piezometer
Measured free product in well or piezometer
Distinct contact between soil strata
Approximate contact between soil strata
Contact between geologic units
SYMBOLS TYPICAL
DESCRIPTIONS
GW
GP
SW
SP
SM
FINEGRAINED
SOILS
SILTS ANDCLAYS
NOTE: Multiple symbols are used to indicate borderline or dual soil classifications
MORE THAN 50%RETAINED ONNO. 200 SIEVE
MORE THAN 50%PASSINGNO. 200 SIEVE
GRAVEL
ANDGRAVELLYSOILS
SC
LIQUID LIMITLESS THAN 50
(APPRECIABLE AMOUNTOF FINES)
(APPRECIABLE AMOUNTOF FINES)
COARSEGRAINEDSOILS
MAJOR DIVISIONS GRAPH LETTER
GM
GC
ML
CL
OL
SILTS AND
CLAYS
SANDS WITHFINES
SANDANDSANDY
SOILS
MH
CH
OH
PT
(LITTLE OR NO FINES)
CLEAN SANDS
GRAVELS WITHFINES
CLEAN GRAVELS
(LITTLE OR NO FINES)
WELL-GRADED GRAVELS, GRAVEL -SAND MIXTURES
CLAYEY GRAVELS, GRAVEL - SAND -CLAY MIXTURES
WELL-GRADED SANDS, GRAVELLYSANDS
POORLY-GRADED SANDS, GRAVELLYSAND
SILTY SANDS, SAND - SILT MIXTURES
CLAYEY SANDS, SAND - CLAYMIXTURES
INORGANIC SILTS, ROCK FLOUR,CLAYEY SILTS WITH SLIGHTPLASTICITY
INORGANIC CLAYS OF LOW TOMEDIUM PLASTICITY, GRAVELLYCLAYS, SANDY CLAYS, SILTY CLAYS,LEAN CLAYS
ORGANIC SILTS AND ORGANIC SILTYCLAYS OF LOW PLASTICITY
INORGANIC SILTS, MICACEOUS ORDIATOMACEOUS SILTY SOILS
INORGANIC CLAYS OF HIGHPLASTICITY
ORGANIC CLAYS AND SILTS OFMEDIUM TO HIGH PLASTICITY
PEAT, HUMUS, SWAMP SOILS WITHHIGH ORGANIC CONTENTSHIGHLY ORGANIC SOILS
SOIL CLASSIFICATION CHART
MORE THAN 50%OF COARSEFRACTION RETAINEDON NO. 4 SIEVE
MORE THAN 50%OF COARSEFRACTION PASSINGON NO. 4 SIEVE
SILTY GRAVELS, GRAVEL - SAND -SILT MIXTURES
POORLY-GRADED GRAVELS,GRAVEL - SAND MIXTURES
LIQUID LIMIT GREATERTHAN 50
Continuous Coring
Bulk or grab
Direct-Push
Piston
Shelby tube
Standard Penetration Test (SPT)
2.4-inch I.D. split barrel
Contact between soil of the same geologicunit
Material Description Contact
Graphic Log Contact
NOTE: The reader must refer to the discussion in the report text and the logs of explorations for a proper understanding of subsurface conditions.Descriptions on the logs apply only at the specific exploration locations and at the time the explorations were made; they are not warranted to berepresentative of subsurface conditions at other locations or times.
Groundwater Contact
Blowcount is recorded for driven samplers as the number ofblows required to advance sampler 12 inches (or distance noted).See exploration log for hammer weight and drop.
"P" indicates sampler pushed using the weight of the drill rig.
"WOH" indicates sampler pushed using the weight of thehammer.
Key to Exploration Logs
Figure A-1
Sampler Symbol Descriptions
ADDITIONAL MATERIAL SYMBOLS
NSSSMSHS
No Visible SheenSlight SheenModerate SheenHeavy Sheen
Sheen Classification
SYMBOLS
Asphalt Concrete
Cement Concrete
Crushed Rock/Quarry Spalls
Topsoil
GRAPH LETTER
AC
CC
SOD Sod/Forest Duff
CR
DESCRIPTIONS
TYPICAL
TS
Percent finesPercent gravelAtterberg limitsChemical analysisLaboratory compaction testConsolidation testDry densityDirect shearHydrometer analysisMoisture contentMoisture content and dry densityMohs hardness scaleOrganic contentPermeability or hydraulic conductivityPlasticity indexPoint lead testPocket penetrometerSieve analysisTriaxial compressionUnconfined compressionVane shear
%F%GALCACPCSDDDSHAMCMDMohsOCPMPIPLPPSATXUCVS
Laboratory / Field Tests
Rev 07/2019
PP = 0.0 psf
PP = 0.0 psfAL (LL = 35, PI = 5)
Groundwater observed at approximately 10 feetbelow ground surface during drilling
PP = 0.0 psf
Added drilling mud at 20 feet; no heave observed
PP = 0.0 psf
AL (LL = 47, PI = 10)
PP = 500 psf
15
40
48
23
Topsoil
Gray sandy silt with occasional gravel (stiff, moist) (fill)
Brown silty fine to medium sand with occasional gravel(medium dense, moist to wet)
Gray silty fine sand (very loose, moist) (alluvium)
Gray silt with trace fine sand (very soft to soft, moist)
Gray silty fine sand (very loose, moist to wet)
Brown-gray silt (very soft to soft, wet)
Gray silty fine sand with occasional silt lenses (loose tomedium dense, wet)
Gray fine to medium sand with silt (loose to mediumdense, wet)
Brown silt with organic matter and occasionalhorizontal bedding (stiff, moist)
Gray silty fine sand (medium dense, wet)
With organic matter (wood debris), becomes veryloose
Brown-gray silt (soft, moist)
Gray-light brown silt with organic matter (wood debris)(medium stiff, moist)
Gray fine sand with silt and occasional organic matter(wood debris) (loose, moist)
1
2SA
3a3b
3c
4aAL4b
5a5b
6a6b6c
7
8
9AL
10a
10b
4
18
7
6
12
18
18
18
18
16
2
2
10
12
23
3
6
TS
ML
SM
SM
ML
SM
ML
SM
SP-SM
ML
SM
ML
ML
SP-SM
Notes:
61.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.49503-122.206167
29.5
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-1
Logan Avenue N/N 8th Street Development
Figure A-2
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
PP = 6,500 psfPP = 500 psf
PP = 4,500 - 6,000 psf
Gravels at 55 feet
Broken cobble in shoe
204
159
Gray fine to coarse sand with trace silt (loose, wet)
Brown fibrous peat (soft to medium stiff, moist)
Brown-gray silt (soft to medium stiff, moist)
With occasional peat lenses, becomes medium stiff
Brown fibrous peat with silt lenses (medium stiff,moist)
Gray silty fine to medium sand with peat lenses (loose,moist)
Gray silty fine to coarse sand with occasional gravel
11
12aMC12b
13b13aMC
14
15
16
11
18
18
18
10
0
7
4
6
6
44
25
SP-SM
PT
ML
PT
SM
SM
Sheet 2 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-1 (continued)
Logan Avenue N/N 8th Street Development
Figure A-2
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30
PP = 500 psfAL (LL = 35, PI = 5)Groundwater observed at approximately 8½ feetbelow ground surface during drilling
AL (LL = 117, PI = 33)
AL (LL = 78, PI = 15)
6
10
35
38
61
15
Topsoil
Brown silty fine to coarse sand with gravel (loose,moist) (fill)
Becomes medium dense
Gray silty fine sand (very loose, wet) (alluvium)
Gray sandy silt (very soft to soft, wet)
Brown silty fine sand (very loose, wet)
Brown-gray sandy organic silt (very soft to soft, moistto wet)
Gray fine to coarse sand (dense, wet)
Gray silty fine sand (dense, moist)
Gray fine sand with trace silt (medium dense, moist)
Gray silty fine to medium sand (loose, moist)
Light brown elastic silt with occasional peat (mediumstiff, moist)
Becomes gray and soft to medium stiff
Gray fine sand with silt (very loose to loose, moist)
1MC
2SA
3
4AL
5
6AL
7a
7b
8
9a
9bAL
10a
10b
18
16
18
18
18
18
18
7
10
24
2
2
2
33
23
6
4
TS
SM
SM
ML
SM
OH
SP
SM
SP-SM
SM
MH
SM
Notes:
36.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494673-122.206018
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-2
Logan Avenue N/N 8th Street Development
Figure A-3
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Gray-brown fine to medium sand with brown silt lensesand occasional organic matter (wood debris)(loose, moist)
11128 SP
Sheet 2 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-2 (continued)
Logan Avenue N/N 8th Street Development
Figure A-3
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35 Graphic LogGroupClassificationElevation (feet)
PP = 0.0 psf
Groundwater observed at approximately 9 feetbelow ground surface during drilling
5
9
39
9
83
Approximately 6 inches of asphalt concrete pavement
Gravel
Brown silty fine to coarse sand with gravel (loose,moist) (fill)
Brown fine to coarse sand with silt and gravel (mediumdense, moist)
Gray silt with sand (very soft to soft, moist) (alluvium)
Gray medium to coarse sand with trace silt (mediumdense, wet)
Gray fine to medium sand (loose, wet)
1MC
2SA
3%F
4
5
11
18
18
18
24
2
11
7
AC
GP
SM
SP-SM
ML
SP-SM
SM
Notes:
11.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495257-122.206812
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring AB-1
Logan Avenue N/N 8th Street Development
Figure A-4
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10 Graphic LogGroupClassificationElevation (feet)2520
PP = 500 - 1,000 psfAL (LL = 37, PI = 7)
13
9
8139
27
Grass
Brown silty fine to coarse sand with gravel and organicmatter (roots, wood debris) (loose, moist) (fill)
Grades to fine to medium, becomes dense
Brown-gray fine to coarse sand with silt (mediumdense, dry)
Brown peat with silt (medium stiff, moist) (alluvium)
Gray sandy silt with occasional peat lenses (mediumstiff, moist)
Gray silty fine to medium sand (medium dense, wet)
1MC
2SA
3
4aMC4bAL
5
18
18
16
33
22
6
19
Grass
SM
SP-SM
PT
ML
SM
Notes:
11.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494096-122.206213
31
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
Groundwater not observed at time of exploration
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring AB-2
Logan Avenue N/N 8th Street Development
Figure A-5
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10 Graphic LogGroupClassificationElevation (feet)302520
Groundwater observed at approximately 4½ feetbelow ground surface during drilling
PP = 0.0 psf
12
16 16
Topsoil
Brown-orange silty fine to coarse sand with occasionalgravel (loose, moist) (fill)
Becomes orange fine to medium and medium dense
Becomes loose
Gray fine to medium sand with trace silt (loose, wet)(alluvium)
Brown-gray sandy silt (very soft, moist)
Becomes medium stiff
Gray silty fine sand (loose, moist)
1MC
2SA
3a3b
4
5a5b
16
18
16
18
7
1
6
TS
SM
SP-SM
ML
SM
Notes:
11.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495154-122.202615
29.5
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring AB-3
Logan Avenue N/N 8th Street Development
Figure A-6
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10 Graphic LogGroupClassificationElevation (feet)2520
Groundwater observed at approximately 4½ feetbelow ground surface during drilling
PP = 3,000 - 4,000 psf
PP = 500 psfAL (non-plastic)
10
7
37
9
Topsoil
Brown silty fine to coarse sand with gravel (loose,moist) (fill)
Brown fine to coarse gravel with silt and sand (mediumdense, moist)
Gray silty fine sand with oxidation staining (loose,moist) (alluvium)
Gray silt with trace fine sand (medium stiff, moist)
Gray silty fine to medium sand (very loose, wet)
Grades to fine to coarse, becomes loose
Gray sandy silt (soft, wet)
Gray silty fine sand (very loose to loose, wet)
1MC
2SA
3
4
5
6
7a7bAL
8
1
18
6
18
16
18
18
25
8
3
6
3
3
4
TS
SM
GW-GM
SM
ML
SM
ML
SM
Notes:
26.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495213-122.205624
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring OB-1
Logan Avenue N/N 8th Street Development
Figure A-7
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25 Graphic LogGroupClassificationElevation (feet)252015105
Groundwater observed at approximately 4 feetbelow ground surface during drillingPP = 1,000 - 1,500 psf
9
157
Topsoil
Brown-gray silty fine to coarse sand with gravel andorganic matter (grass roots) (loose, moist) (fill)
Brown-orange fine to coarse sand with silt and gravel(loose, dry)
Gray silt with fine sand and occasional peat, orangeoxidation staining (soft, moist) (alluvium)
Brown sandy silt with oxidation staining (soft, wet)
Gray silty fine sand (very loose to loose, wet)
Peat with interbedded silt (very soft to soft, moist)
Gray silty fine sand (medium dense, moist)
Gray silt with fine sand and occasional organic matter(wood debris) (medium stiff, moist)
Gray silty fine sand (loose, moist)
Gray fine to medium sand with silt (loose to mediumdense, moist)
1MC
2
3a3b
4
5a5bMC
6
7a7b
8
18
18
18
18
18
18
18
5
3
4
2
21
5
10
TS
SM
SP-SM
ML
ML
SM
PT
SM
ML
SM
SP-SM
Notes:
26.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494579-122.205501
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring OB-2
Logan Avenue N/N 8th Street Development
Figure A-8
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25 Graphic LogGroupClassificationElevation (feet)252015105
PP = 500 psf
PP = 0.0 psfPP = 500 psfAL (LL = 100, PI = 32)
13
32
170
63
10
Grass
Gray-brown silty fine to coarse sand with gravel andorganic matter (roots) (loose, moist) (fill)
Brown fine to medium sand with silt and gravel,orange oxidation staining (medium dense, moist)
Gray silty fine sand (loose, moist) (alluvium)
Becomes very loose, wet
Brown peat with interbedded silt (very soft to soft, wet)
Gray fine sand with silt (stiff, wet)
Gray silt with fine sand and occasional organic matter(roots) (very soft to soft, wet)
Gray fine to moist sand with trace silt (medium dense,wet)
1
2SA
3a3b
4MC
5a5bMC
6
7a7bAL
8
18
18
18
18
18
18
18
19
9
2
2
9
2
13
Grass
SM
SW-SM
SM
PT
SP-SM
ML
SP-SM
Notes:
26.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494747-122.205271
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
Groundwater not observed at time of exploration
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring OB-3
Logan Avenue N/N 8th Street Development
Figure A-9
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25 Graphic LogGroupClassificationElevation (feet)252015105
PP = 3,000 psfAL (LL = 54, PI = 19)
PP = 0.0 psf
5
29
Topsoil
Brown silty fine to coarse sand with gravel (loose,moist) (fill)
Brown-orange fine to medium sand with trace silt(medium dense, moist)
Becomes gray and loose
Gray sandy elastic silt (medium stiff to stiff, moist)(alluvium)
Gray silty fine to medium sand (loose, wet)
Gray silt with fine sand (medium stiff, wet)
Gray silty fine sand (medium dense, wet)
Gray fine to medium sand with trace silt (very loose,wet)
Sandy silt (very soft to soft, wet)
Gray fine to medium sand with trace silt (mediumdense, wet)
Becomes loose
1MC
2
3a3bAL
4a4b
5
6a6b
7
8
9
12
12
16
18
18
18
18
18
26
8
6
14
2
11
12
5
TS
SM
SP
MH
SM
ML
SM
SP-SM
ML
SP
Notes:
31.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494866-122.204484
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
Groundwater not observed at time of exploration
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring OB-4
Logan Avenue N/N 8th Street Development
Figure A-10
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30 Graphic LogGroupClassificationElevation (feet)2520151050
PP = 4,000 - 5,000 psf
PP = 0.0 - 500 psf
Groundwater observed at approximately 9½ feetbelow ground surface during drilling
14 13
Grass
Brown silty fine to medium sand with gravel (loose,moist) (fill)
Becomes brown to orange
Orange silty fine sand with trace gravel (loose, wet)(alluvium)
Gray silt with occasional organic matter (roots)(medium stiff, moist)
Gray fine sand with silt (loose, wet)
Becomes medium dense
Gray silty fine to coarse sand (loose, wet)
Gray fine to medium sand with trace silt (very loose toloose, wet)
Peat (soft to medium stiff, moist)
Gray fine to coarse sand with trace silt and occasionalgravel (medium dense, wet)
1
2SA
3a3b
4
5
6a6b
7a7b
8
18
16
18
18
18
18
18
8
6
8
14
8
4
14
Grass
SM
SM
ML
SP-SM
SM
SP-SM
PT
SP-SM
Notes:
26.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495127-122.204148
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring OB-5
Logan Avenue N/N 8th Street Development
Figure A-11
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25 Graphic LogGroupClassificationElevation (feet)252015105
PP = 0.0 - 500 psf
PP = 0.0 psf
PP = 0.0 psf
Added drilling mud at 25 feet; 12 inches of heaveobserved
11
36 46
Topsoil
Brown silty fine to coarse sand with occasional graveland organic matter (grass roots) (loose, moist) (fill)
Gray silty fine sand with occasional organic matter(roots) (medium dense, wet)
Brown-orange fine to coarse sand with gravel (veryloose, wet)
Gray silty fine sand (very loose, moist to wet) (alluvium)
Gray sandy silt with peat lenses and organic matter(wood debris) (soft, moist)
Gray sandy silt with trace organic matter (roots) (soft,wet)
Gray silt with trace fine sand and organic matter(roots, wood debris) (soft to medium stiff, wet)
Gray silty fine to medium sand (loose, wet)Becomes fine sand
Gray silty fine to medium sand (medium dense, wet)
1MC
2
3a3b%F
4
5a5b5c
6
7a7b
8
9
4
18
18
18
18
18
18
18
13
2
2
3
4
5
19
14
TS
SM
SM
SM
SM
ML
ML
ML
SM
SM
Notes:
31.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495094-122.205341
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
Groundwater not observed at time of exploration
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring OB-6
Logan Avenue N/N 8th Street Development
Figure A-12
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30 Graphic LogGroupClassificationElevation (feet)2520151050
PP = 0.0 - 500 psf
PP = 500 psfGroundwater observed at approximately 8¼ feetbelow ground surface during drilling
AL (LL = 53, PI = 10)PP = 0.0 psf
10
30
50
61
Topsoil
Gray silty fine to coarse sand with gravel and organicmatter (roots) (loose, moist) (fill)
Gray silty fine to coarse sand with gravel (mediumdense, moist)
Gray sandy silt (medium stiff, wet) (alluvium)
Gray silty fine to medium sand (loose, wet)
Gray sandy elastic silt (very soft, wet)
Gray silty fine to medium sand (very loose, wet)
Gray sandy elastic silt with peat lenses (very soft tosoft, moist)
Brown sandy silt (soft, moist)
Gray fine to medium sand (very loose, wet)
Becomes very loose to loose
Gray-brown silt with organic matter (roots) (soft tomedium stiff, moist)
Peat with silt lenses (soft to medium stiff, moist)
1MC
2
3a%F3b
4a4b
5
6aAL6b
7a7b
8a
8b8c
14
18
18
18
18
18
18
19
5
1/12"
3
2
3
4
TS
SM
SM
ML
SM
MH
SM
MH
ML
SP
ML
PT
Notes:
26.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.49496-122.203687
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring OB-7
Logan Avenue N/N 8th Street Development
Figure A-13
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25 Graphic LogGroupClassificationElevation (feet)252015105
Groundwater observed at approximately 12½feet below ground surface during drilling
AL (LL = 93, PI = 33)PP = 0.0 - 500 psf
6
36
52
72
Topsoil
Brown silty fine to coarse gravel with sand (loose,moist) (fill)
Brown silty fine to coarse sand with occasional gravel(medium dense, moist)
Gray silt with fine to coarse sand lenses (very stiff,moist) (alluvium)
Orange fine to medium sand with trace gravel(medium dense, moist)
Gray silt with sand (medium stiff, moist)Becomes stiff, wet
Gray silty fine to medium sand (loose, wet)
Gray sandy silt with thin lens of peat (medium stiff tostiff, wet)
Gray fine to medium sand with trace silt (loose, wet)
Gray-brown silt with peat lenses (very soft to soft,moist)With occasional organic matter (wood debris, roots)
Gray fine to medium sand (medium dense, wet)
1MC
2a2b
2c
3%F
4
5
6a6b
7aAL7b
8
14
18
18
6
18
18
18
18
6
13
5
8
2
16
TS
GM
SM
ML
SP
ML
SM
ML
SP-SM
ML
SP
Notes:
26.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494298-122.203708
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-1
Logan Avenue N/N 8th Street Development
Figure A-14
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25 Graphic LogGroupClassificationElevation (feet)252015105
PP = 500 psf
Groundwater observed at approximately 8 feetbelow ground surface during drillingPP = 500 psf
12
13 11
Topsoil
Gray silty fine to coarse sand with gravel (loose, moist)(fill)
Gray fine to medium sand with silt and gravel (mediumdense, moist)
Becomes very loose, wet
Gray sandy silt (very soft to soft, wet) (alluvium)
Gray silt with fine sand (very soft, wet)
Light gray-brown silt with thin peat lenses (very soft,wet)
Gray silty fine to medium sand (loose, wet)
1MC
2SA
3a3b
4a4b
5
18
18
18
18
18
2
1/12"
5
TS
SM
SP-SM
ML
ML
ML
SM
Notes:
11.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.49451-122.202649
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-2
Logan Avenue N/N 8th Street Development
Figure A-15
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10 Graphic LogGroupClassificationElevation (feet)2520
Groundwater observed at approximately 6¼ feetbelow ground surface during drilling
PP = 500 psf
PP = 0.0 psfAL (LL = 120, PI = 33)
Added drilling mud at 20 feet; 13 inches of heaveobserved
11
34
100
16
73
Topsoil
Brown silty fine to coarse sand with gravel and organicmatter (roots) (loose, moist) (fill)
Becomes medium dense
Gray silty fine to coarse sand (loose, wet) (alluvium)
With gravel, becomes very loose to loose
Gray silt with sand (soft to medium stiff, wet)
Gray fine to medium sand with silt (very loose, wet)
Brown organic silt with organic matter (roots) (very softto soft, wet)
Brown-dark brown fibrous peat with silt lenses(medium stiff to stiff, moist)
Gray silty fine sand (loose, moist to wet)
Gray fine to coarse sand with trace silt (mediumdense, wet)
1
2SA
3a3b
4a4b
5%F
6a6bAL
7a7b
8
9
6
5
8
18
18
18
18
0
14
5
4
3
2
8
21
7
TS
SM
SM
ML
SP-SM
OL
PT
SM
SP-SM
Notes:
36.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495414-122.204592
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring PB-01
Logan Avenue N/N 8th Street Development
Figure A-16
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
PP = 0.0 psf216Gray silt with fine sand and organic matter (peat, wooddebris) (loose, wet)
Dark brown fibrous peat with occasional silt (stiff,moist)
10a10bMC
16 9 ML
PT
Sheet 2 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring PB-01 (continued)
Logan Avenue N/N 8th Street Development
Figure A-16
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35 Graphic LogGroupClassificationElevation (feet)
Groundwater observed during drilling atapproximately 8.9 feet below ground surface
Driller added mud
Attempted to collect Shelby tube sample at 21.5to 23.5 feet; no recovery
28 10
Approximately 8 inches of asphalt concrete pavementand base course
Brown fine to medium silty sand (very loose to loose,moist) (fill)
Gray silt with trace of peat (soft to medium stiff, moist)(alluvium)
Gray fine to medium sand with silt (very loose to loose,moist)
Grades to very loose, wet
Grades to loose to medium dense, wet
Gray silt with sand and trace peat (very loose, wet)
Brown peat with silt (very soft to soft, wet)
Gray silt with sand (very soft to soft, wet)
Gray silty fine to medium sand (loose, wet)
Brown-gray silt with sand with trace peat (soft tomedium stiff, wet)
1
2
3
4%F
5
6
7
8
12
14
14
13
18
12
18
18
4
4
1
10
1
2
8
4
AC
SM
ML
SP-SM
ML
PT
ML
SM
ML
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494803-122.206424
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
7/29/20197/29/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-1-19
Logan Avenue N/N 8th Street Development
Figure A-17
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
AL (LL = 54; PI = 16)
AL (LL = 0; PI = 0)
48
Brown peat with silt (stiff, wet)
Brown-gray elastic silt with occasional sand andorganic matter (roots) (very stiff, wet)
Gray silty fine to medium sand (medium dense, wet)
Brown peat with gray fine to medium sand lenses (stiffto very stiff, wet)
Gray silty fine to medium sand (medium dense, wet)
Gray-brown silt with peat lenses (very stiff, moist)
Gray silty fine to medium sand (medium dense todense, wet)
Grades to coarse sand
Gray fine to coarse sand with silt and occasional gravel(very dense, wet)
Brown-gray non-plastic silt with occasional sand andorganic matter (roots) (medium stiff, moist)
Gray fine sand (dense, wet)
9MC
10AAL10B
11
12
13
14
15
16AL
17
18
18
18
15
13
10
10
18
18
10
23
16
17
36
66
80
5
30
PT
MH
SM
PT
SM
ML
SM
SP-SM
ML
SM
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-1-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-17
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
Gray fine to medium sand with silt lenses (dense, wet)181837 SP-SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-1-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-17
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
Groundwater observed during drilling atapproximately 9.6 feet below ground surface
Heave; driller added mud
24 6
Approximately 6 inches of topsoil
Brown silty fine to coarse sand with occasional gravel(very dense, moist) (fill)
Grades to medium dense
Gray silt with occasional organic matter (roots) (verysoft to soft, moist) (alluvium)
Gray silty fine to medium sand (very loose, wet)
Gray fine to medium sand with silt (loose, wet)
Grades to medium dense
Gray silt with occasional peat (medium stiff, wet)
Gray silty fine sand (loose, wet)
1
2
3
4
5
6%F
7
8
9
14
14
17
17
18
18
12
18
58
25
2
3
9
7
24
6
TS
SM
ML
SM
SP-SM
ML
SM
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494581-122.20621
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
7/29/20097/29/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-2-19
Logan Avenue N/N 8th Street Development
Figure A-18
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Gray silt with fine to medium sand (medium stiff, wet)
With organic matter (roots) (medium stiff, wet)
Brown peat with sand lenses (medium stiff, wet)
Brown-gray silt with wood debris (medium stiff, wet)
Brown peat (soft to medium stiff, wet)
Gray silt (soft to medium stiff, wet)
Gray silty fine to coarse sand (dense, wet)
Gray fine to coarse sand with silt and gravel (mediumdense, wet)
(very dense, wet)
Brown-gray silt with occasional organic matter (roots)(medium stiff, wet)
Gray fine to medium sand with silt (very dense, wet)
10
11
12A12B
13a13B
14
15
16
17
18
18
18
18
18
6
7
17
16
17
6
6
7
4
44
21
87
7
56
ML
PT
ML
PT
ML
SM
SP-SM
ML
SP-SM
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-2-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-18
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
Gray silty fine to medium sand (medium dense, wet)191429 SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-2-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-18
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
Groundwater observed during drilling atapproximately 10.8 feet below ground surface
Driller added mud
37 76
Approximately 6 inches of topsoil
Brown silty fine to medium sand with occasional gravel(medium dense, moist) (fill)
Gray-brown silt with sand and occasional peat lenses(medium stiff, moist) (alluvium)
Gray fine to coarse sand with silt (medium dense, wet)
Gray silty fine to medium sand (medium dense, wet)
Gray silt (very soft to soft, wet)
Gray silty fine to medium sand (very loose, wet)
1
2
3
4
5%F
6
7
8
9A
9B
14
16
17
14
11
6
12
18
26
27
6
8
24
20
22
2
TS
SM
ML
SP-SM
SM
ML
SM
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494222-122.206267
31
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
7/30/20197/30/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-3-19
Logan Avenue N/N 8th Street Development
Figure A-19
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)302520151050
48
Gray sandy silt (stiff, wet)
Gray silty fine to medium sand with occasional gravel(medium dense, wet)
Gray silt with occasional peat lenses (very stiff, wet)
Gray silty fine to medium sand (medium dense, wet)
Sandy silt (stiff, wet)
Gray silty fine sand with occasional peat lenses (looseto medium dense, wet)
Brown peat with silt (very stiff, moist)
Gray fine to medium sand with silt (medium dense,wet)
Gray fine to coarse sand with silt and gravel (dense,wet)
Grades to medium dense
Gray silt with occasional roots (hard, wet)
Gray fine to medium sand with silt and occasional
10A
10B
11A
11B
12AMC
12B
13A
13B
14
15
16
17
18A
18B
17
18
16
16
9
14
10
7
16
18
29
10
24
40
34
29
25
35
ML
SM
ML
SM
ML
SM
PT
SP-SM
SP-SM
ML
SP-SM
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-3-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-19
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-5-10-15-20-25-30-35-40-45
gravel (dense, wet)
Grades to medium dense
Gray sandy silt (stiff, wet)
19A
19B
12 15
ML
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-3-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-19
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
Groundwater observed during drilling atapproximately 12.1 feet below ground surface
AL (LL = 63; PI = 14)
36
60
30
Approximately 1 inch of asphalt concrete pavement
Approximately 3½ inches of gravel base coarse
Brown-gray silty fine to coarse sand with gravel(medium dense, moist) (fill)
Gray silty fine sand (medium dense, moist) (alluvium)
Gray sandy silt (soft, moist)
With peat lenses (soft to medium stiff, moist)
Gray silty fine to medium sand (very loose, moist)
Gray sandy silt with organic matter (roots) (very stiff,wet)
Gray fine sand with silt (medium dense, wet)
Gray silt with occasional roots (very soft to soft, wet)
Gray elastic silt with occasional sand (medium stiff,wet)
1
2A
2B
3
4A
4B
5A
5B%F
6A
6B
7
8
9AL
18
13
18
18
18
18
18
18
28
5
3
4
17
17
2
5
AC
CR
SM
SM
ML
SM
ML
SM
ML
MH
Notes:
86.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.49527-122.20641
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
8/23/20198/23/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-4-19
Logan Avenue N/N 8th Street Development
Figure A-20
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Driller noted gravel at 50 feet
AL (LL = 94; PI = 28)
7
79
25
4
20
Gray silty fine sand with silt lens (medium dense, wet)
Gray fine to coarse gravel with sand (dense, wet)
Grades to medium dense, wet
Gray to brown-gray elastic silt with sand andoccasional wood (stiff, wet)
Gray silty fine to medium sand (dense, wet)
10
11
12
13SA
14
15
16AL
17%F
18
18
18
18
10
7
7
18
18
18
4
6
14
31
22
23
12
31
20
SM
GP
MH
SM
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-4-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-20
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
25 7Gray fine to medium sand with silt (loose, wet)
Gray silty fine to medium sand with occasional silt(medium dense, wet)
19%F
20
12
18
9
26
SP-SM
SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-4-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-20
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80
85 Graphic LogGroupClassificationElevation (feet)-50-55
Groundwater observed during drilling atapproximately 13 feet below ground surface
Driller added mud
17 13
Approximately 6 inches of topsoil
Brown silty fine to coarse sand with gravel andoccasional roots (medium dense, moist) (fill)
Grades to very loose, moist
Gray sandy silt (very soft, moist) (alluvium)
Gray silty fine sand (very loose, wet)
Gray sandy silt with occasional organic matter (roots)(stiff, wet)
Gray silty fine to medium sand with occasional organicmatter (roots) (medium dense, wet)
Gray silt (very stiff, wet)
Gray silty fine sand (medium dense, wet)
1
2
3%F
4A
4B
5
6
7
8
9A
9B
16
17
15
18
18
18
17
18
23
10
1
2
3
14
12
18
TS
SM
ML
SM
ML
SM
ML
SM
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494669-122.203797
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
7/30/20197/30/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-1-19
Logan Avenue N/N 8th Street Development
Figure A-21
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
100
Gray sandy silt with peat lenses (stiff, wet)
Gray silty fine sand with occasional organic matter(wood debris) (medium dense, wet)
Brown peat with sand (medium stiff, wet)
Grades to stiff
Gray silty fine to medium sand with occasional organicmatter (wood debris) (dense, wet)
Brown-gray peat with interbedded silt lenses (very stiff,moist)
Gray-brown fine to medium sand with silt (mediumdense, wet)
Brown peat with interbedded silt lenses (stiff, wet)
Gray sandy silt with interbedded peat lenses (very stiff,wet)
10
11
12
13A13BMC
14
15
16A
16B
17
18A
18B
18
15
16
18
18
18
18
18
18
9
20
17
7
9
35
23
11
17
ML
SM
PT
SM
PT
SP-SM
PT
ML
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-1-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-21
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
Gray silty fine sand with interbedded silt lenses(medium dense, wet)
Gray silt (hard, wet)
Gray silty fine sand (dense, wet)
191833
SM
ML
SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-1-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-21
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
Groundwater observed during drilling atapproximately 9 feet below ground surfaceDriller added mud
21 6
Approximately 6 inches of topsoil
Brown fine to coarse sand with gravel (medium dense,moist) (fill)
Gray silt with occasional roots and oxidation stains(very stiff, moist)
Brown silty fine to coarse sand with occasional gravel(loose, moist) (alluvium)
Gray silt with sand lenses and oxidation stains (stiff,moist)
Gray silty fine sand (medium dense, wet)
Grades to very loose to loose
Gray silt with peat lenses (very soft to soft, wet)
Grades to very stiff
Gray fine to coarse sand with silt and occasional wooddebris (medium dense, wet)
Brown peat (soft to medium stiff, wet)
1
2A
2B
3A
3B
4
5
6
7
8A8B%F
9
15
15
18
15
14
18
18
16
18
9
14
18
4
2
17
4
TS
SM
ML
SM
ML
SM
ML
SP-SM
PT
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494274-122.203771
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
7/31/20197/31/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-2-19
Logan Avenue N/N 8th Street Development
Figure A-22
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Grades to medium stiff to stiff
Gray silt with occasional wood debris (medium stiff,wet)
Brown peat with silt lenses (medium stiff, wet)
Gray silty fine sand with occasional wood debris(loose, wet)
Gray silt (soft to medium stiff, wet)
With wood debris
Gray fine to medium sand with silt (dense, wet)
With silt lens and wood debris, grades to mediumdense
Brown peat with interbedded silt lenses (stiff, moist)
Gray silt with sand lenses (stiff, wet)
10
11A
11B
12
13
14
15
16
17
18
18
18
18
18
18
18
18
18
18
8
5
4
4
7
32
19
12
15
ML
PT
SM
ML
SP-SM
PT
ML
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-2-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-22
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
Gray silty fine to medium sand (medium dense, wet)191823 SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-2-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-22
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
Groundwater observed during drilling atapproximately 9 feet below ground surface
Driller added mud
32
24
45
16
Approximately 6 inches of topsoil
Brown silty fine to coarse sand with gravel (dense,moist) (fill)
Brown-gray silty fine sand with occasional wood debris(loose, wet) (alluvium)
Gray fine to coarse sand with silt (loose, wet)
Gray silty fine to medium sand (medium dense, wet)
1
2
3
4SA
5
6
7
8%F
9
11
4
14
18
16
18
15
18
42
8
7
7
6
6
12
14
TS
SM
SM
SP-SM
SM
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.49445-122.203359
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
7/31/20197/31/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-3-19
Logan Avenue N/N 8th Street Development
Figure A-23
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Dark brown peat lenses (stiff, moist)
Gray silt with interbedded fine sand and peat lenses(stiff, wet)
Gray silt with occasional organic matter (roots) (verystiff, wet)
Gray fine to medium sand with silt and occasionalwood debris (medium dense, wet)
Grades to very loose to loose
Gray silt with peat lenses (medium stiff, moist)
Gray silty fine sand with peat lenses (loose, wet)
Gray fine to medium sand with silt (dense, wet)
Gray silty fine sand with peat lenses (medium dense,wet)
Gray silt with peat lenses (stiff, moist)
Gray silty fine sand with occasional wood debris(medium dense, wet)
Dark brown-gray silt with peat lenses (stiff, moist)
Gray silty fine to medium sand (medium dense, wet)
10
11
12A
12B
13
14A
14B
15
16A
16B
17A
17B
18
18
18
18
7
18
18
18
18
18
13
11
21
4
6
41
14
13
18
PT
ML
ML
SP-SM
ML
SM
SP-SM
SM
ML
SM
ML
SM
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-3-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-23
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
Gray silty fine sand with peat lenses (dense, wet)191837 SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-3-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-23
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
Refer to Material Description in Log of BoringGEI-3-19
Groundwater measured on 8/12/19 to depth of8.1 feet; groundwater elevation 21.9 feetGroundwater measured on 8/23/19 to depth of8.2 feet; groundwater elevation 21.8 feet
Concrete surfaceseal
2-inch Schedule 40PVC well casingBentonite seal
10-20 silica sandbackfill2-inch Schedule 40PVC screen,0.010-inch slotwidth
1
4
5
15
16
StartDrilled8/1/2019
HammerData
Date MeasuredHorizontalDatum
Vertical Datum
LatitudeLongitude
DrillingEquipment
Top of CasingElevation (ft)
Elevation (ft)
Groundwater Depth toWater (ft)
Notes:
Surface Elevation (ft)
Logged By
Diedrich D50 drill rig
29.8030
47.494454-122.20333 WA State Plane NorthNAD83 (feet)8/8/2019 8.00
16 DrillingMethod8/1/2019
End
Checked By DrillerTotalDepth (ft)
Autohammer140 (lbs) / 30 (in) Drop
22.00
BZ
LA
Advance Drill Technologies,Inc.
DOE Well I.D.: BKU952A 2-in well was installed on 8/1/2019 to a depth of 16 ft.
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Steel surface
monument
Elevation (feet)252015Depth (feet)0
5
10
15
FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingWater LevelIntervalRecovered (in)Blows/footCollected SampleGraphic LogGroupClassificationWELL LOG
MoistureContent (%)FinesContent (%)Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Monitoring Well GEI-3-19a
Logan Avenue N/N 8th Street Development
Figure A-24
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_WELL_%F
Groundwater observed during drilling atapproximately 9.7 feet below ground surface
Driller added mud
22 18
Approximately 6 inches of topsoil
Brown silty fine to coarse sand with gravel (dense,moist) (fill)
Becomes gray and very loose to loose, moist
Gray silt with sand and wood debris (soft to mediumstiff, moist) (alluvium)
Gray silty fine sand (medium dense, moist)
(very loose to loose, wet)
Gray silt with sand lenses and wood debris (very soft,wet)
Gray fine sand with silt (loose, wet)
Gray silt with sand lenses and occasional wood debris(soft to medium stiff, wet)
Dark brown peat (soft to medium stiff, wet)
Gray silty fine sand (medium dense, wet)
1
2
3A
3B
4%F
5
6A
6B
7A
7B
8A
8B
9
16
15
16
15
18
18
18
15
45
4
11
4
1
6
4
13
TS
SM
ML
SM
ML
SP-SM
ML
PT
SM
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494585-122.202964
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
8/1/20198/1/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-4-19
Logan Avenue N/N 8th Street Development
Figure A-25
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Dark brown peat with silt lenses (soft to medium stiff,moist)
Gray silt with occasional peat lenses (soft to mediumstiff, wet)
(stiff, wet)
(medium stiff, wet)
Dark brown peat (medium stiff, wet)
Gray sandy silt with occasional wood debris (mediumstiff, wet)
Gray fine to medium sand with silt (medium dense,wet)
Grades to dense
Dark brown peat with silt and sand lenses (very stiff,wet)
Grades to stiff
Gray sandy silt (stiff, wet)
10A
10B
11
12
13A
13B
14A
14B
15
16
17
18A
18B
18
18
18
18
18
18
17
18
18
4
9
7
6
7
22
32
17
10
PT
ML
PT
ML
SP-SM
PT
ML
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-4-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-25
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
With peat lenses (very stiff, wet)
Gray fine sand with silt (medium dense to dense, wet)
19A
19B
18 30
SP-SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-4-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-25
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
Groundwater observed during drilling atapproximately 9.6 feet below ground surfaceDriller added mud
29 26
Approximately 6 inches of topsoil
Brown silty fine to coarse sand with gravel (mediumdense, moist) (fill)
Gray sandy silt with sand lenses and organic matter(roots) (medium stiff, moist) (alluvium)
Gray silty fine sand (loose, moist)
Grades to very loose to loose, wet
Gray sandy silt with 6-inch layer of silty fine sand (softto medium stiff, wet)
With peat lenses (soft to medium stiff, wet)
With occasional wood debris (very stiff, wet)
Gray fine sand with silt and occasional wood debris(medium dense, wet)
Gray sandy silt with sand lenses and wood debris(medium stiff, wet)
1
2
3
4%F
5
6
7
8
9
6
0
15
15
18
18
18
18
28
7
6
4
4
4
24
5
TS
SM
ML
SM
ML
SM
ML
Notes:
81.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.494264-122.202968
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
8/1/20198/1/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-5-19
Logan Avenue N/N 8th Street Development
Figure A-26
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Dark brown peat with silt lenses (medium stiff, moist)
Gray silty sand (medium dense, wet)
Gray fine sand with silt lenses (loose to mediumdense, wet)
Gray silt with peat lenses (medium stiff, wet)
Grades to medium stiff to stiff
Gray fine to medium sand with occasional wood debris(dense, wet)
Gray silt with sand lenses and wood debris (very stiff,wet)
Gray fine sand with silt (medium dense, wet)
Dark brown peat with interbedded silt lenses (stiff,moist)
Gray silt with sand (very stiff, wet)
Gray silty sand (medium dense, wet)
10
11A
11B
12
13
14
15
16A
16B
17
18A
18B
18
16
18
18
18
18
18
18
18
6
19
10
5
8
44
19
12
20
PT
SM
SP-SM
ML
SP-SM
ML
SP-SM
PT
ML
SM
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-5-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-26
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
Gray sandy silt with occasional organic matter (roots)(very stiff, wet)
Gray silty fine sand (medium dense, wet)
19A
19B
18 25 ML
SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring GEI-5-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-26
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80 Graphic LogGroupClassificationElevation (feet)-50
CPT-01
CPT Contractor: In Situ EngineeringCUSTOMER: GeoEngineersLOCATION: RentonJOB NUMBER: 23325-001-00
OPERATOR: Okbay/MayfieldCONE ID: DDG1263TEST DATE: 4/3/2018 8:10:21 AMPredrill: Backfill: 20% bentonite slurrySurface Patch:
Depth(ft)
Tip COR(tsf)
0 5000
10
20
30
40
50
60
70
80
90
F.Ratio(%)
0 12
Pore Pressure(psi)
-10 80
SBT FR(RC 1983)
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *SBT/SPT CORRELATION: UBC-1983
0 12
SPT(blows/ft)
0 60
Figure A-27
HOLE NUMBER: CPT-01
Depth 4.27ftRef*Arrival 8.48mSVelocity*
Depth 10.83ftRef 4.27ft Arrival 25.27mSVelocity 329.04ft/S
Depth 17.39ftRef 10.83ft Arrival 39.68mSVelocity 432.75ft/S
Depth 23.79ftRef 17.39ft Arrival 51.56mSVelocity 526.10ft/S
Depth 30.35ftRef 23.79ft Arrival 63.90mSVelocity 524.33ft/S
Depth 36.91ftRef 30.35ft Arrival 77.57mSVelocity 475.70ft/S
Depth 43.47ftRef 36.91ft Arrival 92.34mSVelocity 441.65ft/S
0 20 40 60 80 100 120 140 160
Depth 49.54ftRef 43.47ft Arrival 101.40mSVelocity 666.67ft/S
Time (mS)
Hammer to Rod String Distance (ft): 4.49* = Not Determined
Figure A-28
CPT-02
CPT Contractor: In Situ EngineeringCUSTOMER: GeoEngineersLOCATION: RentonJOB NUMBER: 23325-001-00
OPERATOR: Okbay/MayfieldCONE ID: DDG1263TEST DATE: 4/3/2018 9:36:38 AMPredrill: Backfill: 20% bentonite slurrySurface Patch:
Depth(ft)
Tip COR(tsf)
0 5000
10
20
30
40
50
60
70
80
90
F.Ratio(%)
0 12
Pore Pressure(psi)
-10 80
SBT FR(RC 1983)
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *SBT/SPT CORRELATION: UBC-1983
0 12
SPT(blows/ft)
0 60
Figure A-29
HOLE NUMBER: CPT-02
Depth 4.10ftRef*Arrival 10.04mSVelocity*
Depth 10.50ftRef 4.10ft Arrival 15.74mSVelocity 935.66ft/S
Depth 16.73ftRef 10.50ft Arrival 32.93mSVelocity 343.59ft/S
Depth 22.97ftRef 16.73ft Arrival 46.01mSVelocity 464.35ft/S
Depth 29.69ftRef 22.97ft Arrival 61.44mSVelocity 429.61ft/S
Depth 36.09ftRef 29.69ft Arrival 73.20mSVelocity 539.10ft/S
0 20 40 60 80 100 120 140 160
Depth 42.65ftRef 36.09ft Arrival 88.28mSVelocity 432.38ft/S
Time (mS)
Hammer to Rod String Distance (ft): 4.49* = Not Determined
Figure A-30
CPT-03
CPT Contractor: In Situ EngineeringCUSTOMER: GeoEngineersLOCATION: RentonJOB NUMBER: 23325-001-00
OPERATOR: Okbay/MayfieldCONE ID: DDG1263TEST DATE: 4/3/2018 10:22:04 AMPredrill: Backfill: 20% bentonite slurrySurface Patch:
Depth(ft)
Tip COR(tsf)
0 5000
10
20
30
40
50
60
70
80
90
F.Ratio(%)
0 12
Pore Pressure(psi)
-10 80
SBT FR(RC 1983)
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *SBT/SPT CORRELATION: UBC-1983
0 12
SPT(blows/ft)
0 60
Figure A-31
CPT-04
CPT Contractor: In Situ EngineeringCUSTOMER: GeoEngineersLOCATION: RentonJOB NUMBER: 23325-001-00
OPERATOR: Okbay/MayfieldCONE ID: DDG1263TEST DATE: 4/3/2018 10:56:04 AMPredrill: Backfill: 20% bentonite slurrySurface Patch:
Depth(ft)
Tip COR(tsf)
0 5000
10
20
30
40
50
60
70
80
90
F.Ratio(%)
0 12
Pore Pressure(psi)
-10 80
SBT FR(RC 1983)
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *SBT/SPT CORRELATION: UBC-1983
0 12
SPT(blows/ft)
0 60
Figure A-32
CPT-05
CPT Contractor: In Situ EngineeringCUSTOMER: GeoEngineersLOCATION: RentonJOB NUMBER: 23325-001-00
OPERATOR: Okbay/MayfieldCONE ID: DDG1263TEST DATE: 4/3/2018 11:22:27 AMPredrill: Backfill: 20% bentonite slurrySurface Patch:
Depth(ft)
Tip COR(tsf)
0 5000
10
20
30
40
50
60
70
80
90
F.Ratio(%)
0 12
Pore Pressure(psi)
-10 80
SBT FR(RC 1983)
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *SBT/SPT CORRELATION: UBC-1983
0 12
SPT(blows/ft)
0 60
Figure A-33
CPT-06
CPT Contractor: In Situ EngineeringCUSTOMER: GeoEngineersLOCATION: RentonJOB NUMBER: 23325-001-00
OPERATOR: Okbay/MayfieldCONE ID: DDG1263TEST DATE: 4/3/2018 12:41:18 PMPredrill: Backfill: 20% bentonite slurrySurface Patch:
Depth(ft)
Tip COR(tsf)
0 5000
10
20
30
40
50
60
70
80
90
F.Ratio(%)
0 12
Pore Pressure(psi)
-10 80
SBT FR(RC 1983)
1 sensitive fine grained 2 organic material 3 clay
4 silty clay to clay 5 clayey silt to silty clay 6 sandy silt to clayey silt
7 silty sand to sandy silt 8 sand to silty sand 9 sand
10 gravelly sand to sand 11 very stiff fine grained (*) 12 sand to clayey sand (*) *SBT/SPT CORRELATION: UBC-1983
0 12
SPT(blows/ft)
0 60
Figure A-34
APPENDIX B Laboratory Testing
October 29, 2019 | Page B-1 File No. 23325-001-00
APPENDIX B
LABORATORY TESTING
Soil samples obtained from the explorations were transported to GeoEngineers’ laboratory and evaluated
to confirm or modify field classifications, as well as to evaluate engineering properties of the soil samples.
Representative samples were selected for laboratory testing to determine percent fines (material passing
the U.S. No. 200 sieve) and gradation test (sieve analysis). The tests were performed in general accordance
with test methods of ASTM International (ASTM) or other applicable procedures.
Moisture Content
Moisture content tests were completed in general accordance with ASTM D 2216 for representative
samples obtained from the explorations. The results of these tests are presented on the exploration logs in
Appendix A at the depths at which the samples were obtained.
Percent Passing U.S. No. 200 Sieve (%F)
Selected samples were “washed” through the U.S. No. 200 mesh sieve to estimate the relative percentages
of coarse- and fine-grained particles in the soil. The percent passing value represents the percentage by
weight of the sample finer than the U.S. No. 200 sieve. These tests were conducted to verify field
descriptions and to estimate the fines content for analysis purposes. The tests were conducted in general
accordance with ASTM D 1140, and the results are shown on the exploration logs in Appendix A at the
respective sample depths.
Sieve Analyses
Sieve analyses were performed on selected samples in general accordance with ASTM D 422. The wet
sieve analysis method was used to determine the percentage of soil greater than the U.S. No. 200 mesh
sieve. The results of the sieve analyses were plotted, were classified in general accordance with the
Unified Soil Classification System (USCS) and are presented in Figures B-1 through B-5, Sieve Analysis
Results.
Atterberg Limits
We completed Atterberg limits tests on selected fine-grained soil samples. We used the test results to
classify the soil as well as to evaluate index properties and consolidation characteristics. Liquid limits,
plastic limits and plasticity index were obtained in general accordance with ASTM Test Method D 4318.
Results of the Atterberg limits tests are summarized in Figures B-6 through B-10.
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000PERCENT PASSING BY WEIGHT GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE SIZE
SAND SILT OR CLAYCOBBLESGRAVEL
COARSE MEDIUM FINECOARSEFINE
Boring Number
Depth
(feet)Soil Description
B-1
B-2
AB-1
AB-2
2.5
2.5
2.5
2.5
Silty fine to medium sand with gravel (SM)
Silty fine to coarse sand with gravel (SM)
Fine to coarse sand with silt and gravel (SP-SM)
Silty fine to medium sand with occasional gravel (SM)
Symbol
Moisture
(%)
15
10
9
9
3/8”3”1.5”#4 #10 #20 #40 #60 #1003/4”Figure B-1Sieve Analysis ResultsLogan Avenue N/N 8thStreet DevelopmentRenton, Washington023325-001-00 Date Exported: 04/18/18
Note:This report may not be reproduced,except in full,without written approval of GeoEngineers,Inc.Test results are applicable only to the specific sample on which they wereperformed,and should not be interpretedas representativeof any other samples obtainedat othertimes,depths or locations,orgeneratedby separateoperations orprocesses.
Thegrain size analysis resultswereobtained ingeneral accordancewith ASTMD 6913.
#200
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000PERCENT PASSING BY WEIGHT GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE SIZE
SAND SILT OR CLAYCOBBLESGRAVEL
COARSE MEDIUM FINECOARSEFINE
Boring Number
Depth
(feet)Soil Description
AB-3
OB-1
OB-3
OB-5
2.5
2.5
2.5
2.5
Silty fine to medium sand with occasional gravel (SM)
Fine to coarse gravel with silt and sand (GW-GM)
Fine to medium sand with silt and gravel (SW-SM)
Silty fine to medium sand with gravel (SM)
Symbol
Moisture
(%)
16
7
13
14
3/8”3”1.5”#4 #10 #20 #40 #60 #1003/4”Figure B-2Sieve Analysis ResultsLogan Avenue N/N 8thStreet DevelopmentRenton, Washington023325-001-00 Date Exported: 04/18/18
Note:This report may not be reproduced,except in full,without written approval of GeoEngineers,Inc.Test results are applicable only to the specific sample on which they wereperformed,and should not be interpretedas representativeof any other samples obtainedat othertimes,depths or locations,orgeneratedby separateoperations orprocesses.
Thegrain size analysis resultswereobtained ingeneral accordancewith ASTMD 6913.
#200
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000PERCENT PASSING BY WEIGHT GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE SIZE
SAND SILT OR CLAYCOBBLESGRAVEL
COARSE MEDIUM FINECOARSEFINE
Boring Number
Depth
(feet)Soil Description
GEI-2
PB-01
2.5
2.5
Fine to medium sand with silt and gravel (SP-SM)
Silty fine to coarse sand with gravel (SM)
Symbol
Moisture
(%)
13
11
3/8”3”1.5”#4 #10 #20 #40 #60 #1003/4”Figure B-3Sieve Analysis ResultsLogan Avenue N/N 8thStreet DevelopmentRenton, Washington023325-001-00 Date Exported: 04/18/18
Note:This report may not be reproduced,except in full,without written approval of GeoEngineers,Inc.Test results are applicable only to the specific sample on which they wereperformed,and should not be interpretedas representativeof any other samples obtainedat othertimes,depths or locations,orgeneratedby separateoperations orprocesses.
Thegrain size analysis resultswereobtained ingeneral accordancewith ASTMD 6913.
#200
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000PERCENT PASSING BY WEIGHT GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE SIZE
2”
SAND SILT OR CLAYCOBBLESGRAVEL
COARSE MEDIUM FINECOARSEFINE
Boring Number
Depth
(feet)Soil Description
GEI-3-19 7.5 Silty fine sand (SM)
Symbol
Moisture
(%)
32
3/8”3”1.5”#4 #10 #20 #40 #60 #1003/4”Figure B-4Sieve Analysis ResultsLogan Avenue N/N 8thStreet DevelopmentRenton, Washington23325-001-00 Date Exported: 8/13/19
Note:This report may not be reproduced,except in full,without written approval of GeoEngineers,Inc.Test results are applicable only to the specific sample on which they were
performed,and should not be interpreted as representative of any other samples obtainedat othertimes,depths or locations,or generated by separate operations orprocesses.
Thegrain size analysis resultswereobtained in general accordance with ASTM D 6913.GeoEngineers 17425 NE Union Hill Road Ste 250,Redmond,WA 98052
#2001”#140
0
10
20
30
40
50
60
70
80
90
100
0.0010.010.11101001000PERCENT PASSING BY WEIGHT GRAIN SIZE IN MILLIMETERS
U.S. STANDARD SIEVE SIZE
2”
SAND SILT OR CLAYCOBBLESGRAVEL
COARSE MEDIUM FINECOARSEFINE
Boring Number
Depth
(feet)Soil Description
B-4-19 50 Fine to coarse gravel with sand (GP)
Symbol
Moisture
(%)
7
3/8”3”1.5”#4 #10 #20 #40 #60 #1003/4”Figure B-5Sieve Analysis ResultsLogan Avenue N/N 8thStreet DevelopmentRenton, Washington23325-001-00 Date Exported: 8/30/19
Note:This report may not be reproduced,except in full,without written approval of GeoEngineers,Inc.Test results are applicable only to the specific sample on which they were
performed,and should not be interpreted as representative of any other samples obtainedat othertimes,depths or locations,or generated by separate operations orprocesses.
Thegrain size analysis resultswereobtained in general accordance with ASTM D 6913.GeoEngineers 17425 NE Union Hill Road Ste 250,Redmond,WA 98052
#2001”#140
Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable
only to the specific sample on which they were performed, and should not be interpreted as representative of any other
samples obtained at other times, depths or locations, or generated by separate operations or processes.
The liquid limit and plasticity index were obtained in general accordance with ASTM D 4318.
Figure B-6
Atterberg Limits Test Results
Logan Avenue N/N 8th Street Development
Renton, Washington
023325-001-00 Date Exported: 04/18/18Symbol
Boring
Number
Depth
(feet)
Moisture
Content
(%)
Liquid
Limit
(%)
Plasticity
Index
(%)Soil Description
B-1
B-1
B-2
B-2
7.5
27
7.5
15
40
48
35
38
35
47
35
117
5
10
5
33
Silt (ML)
Silt (ML)
Sandy silt (ML)
Sandy organic silt (OH)
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100 110 120PLASTICITY INDEX LIQUID LIMIT
PLASTICITY CHART
CL-ML ML or OL
CL or OL
OH or MH
CH or OH
Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable
only to the specific sample on which they were performed, and should not be interpreted as representative of any other
samples obtained at other times, depths or locations, or generated by separate operations or processes.
The liquid limit and plasticity index were obtained in general accordance with ASTM D 4318.
Figure B-7
Atterberg Limits Test Results
Logan Avenue N/N 8th Street Development
Renton, Washington
023325-001-00 Date Exported: 04/18/18Symbol
Boring
Number
Depth
(feet)
Moisture
Content
(%)
Liquid
Limit
(%)
Plasticity
Index
(%)Soil Description
B-2
AB-2
OB-1
OB-3
25
7.5
20
7.5
61
39
37
32
78
37
NP
NP
15
7
NP
NP
Elastic silt (MH)
Sandy silt (ML)
Sandy silt (non-plastic) (ML)
Silty fine sand (non-plastic) (SM)
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100PLASTICITY INDEX LIQUID LIMIT
PLASTICITY CHART
CL-ML ML or OL
CL or OL
OH or MH
CH or OH
Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable
only to the specific sample on which they were performed, and should not be interpreted as representative of any other
samples obtained at other times, depths or locations, or generated by separate operations or processes.
The liquid limit and plasticity index were obtained in general accordance with ASTM D 4318.
Figure B-8
Atterberg Limits Test Results
Logan Avenue N/N 8th Street Development
Renton, Washington
023325-001-00 Date Exported: 04/18/18Symbol
Boring
Number
Depth
(feet)
Moisture
Content
(%)
Liquid
Limit
(%)
Plasticity
Index
(%)Soil Description
OB-3
OB-4
OB-7
GEI-1
20
5
15
20
63
29
50
52
100
54
53
93
32
19
10
33
Silt with organic matter (ML)
Sandy elastic silt (MH)
Sandy elastic silt (MH)
Silt with peat lenses (ML)
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100PLASTICITY INDEX LIQUID LIMIT
PLASTICITY CHART
CL-ML ML or OL
CL or OL
OH or MH
CH or OH
Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable
only to the specific sample on which they were performed, and should not be interpreted as representative of any other
samples obtained at other times, depths or locations, or generated by separate operations or processes.
The liquid limit and plasticity index were obtained in general accordance with ASTM D 4318.
Figure B-9
Atterberg Limits Test Results
Logan Avenue N/N 8th Street Development
Renton, Washington
023325-001-00 Date Exported: 04/18/18Symbol
Boring
Number
Depth
(feet)
Moisture
Content
(%)
Liquid
Limit
(%)
Plasticity
Index
(%)Soil Description
PB-01 15 100 120 33 Organic silt (OH)
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100 110 120PLASTICITY INDEX LIQUID LIMIT
PLASTICITY CHART
CL-ML ML or OL
CL or OL
OH or MH
CH or OH
Note: This report may not be reproduced, except in full, without written approval of GeoEngineers, Inc. Test results are applicable only to
the specific sample on which they were performed, and should not be interpreted as representative of any other samples obtained
at other times, depths or locations, or generated by separate operations or processes. The liquid limit and plasticity index were
obtained in general accordance with ASTM D 4318. GeoEngineers 17425 NE Union Hill Road Ste 250, Redmond, WA 98052 Figure B-10
Atterberg Limits Test Results
Logan Avenue N/N 8th Street Development
Renton, Washington
23325-001-00 Date Exported: 8/30/19Symbol
Boring
Number
Depth
(feet)
Moisture
Content
(%)
Liquid
Limit
(%)
Plasticity
Index
(%)Soil Description
B-1-19
B-4-19
B-4-19
40
30
65
48
60
79
54
63
94
16
14
28
Elastic silt with occasional sand (MH)
Elastic silt with occasional sand (MH)
Elastic silt with sand (MH)
0
10
20
30
40
50
60
0 10 20 30 40 50 60 70 80 90 100PLASTICITY INDEX LIQUID LIMIT
PLASTICITY CHART
CL-ML ML or OL
CL or OL
OH or MH
CH or OH
APPENDIX C Site-Specific Seismic Response Analysis
October 29, 2019 | Page C-1 File No. 23325-001-00
APPENDIX C
SITE-SPECIFIC SEISMIC RESPONSE ANALYSIS
Nonlinear site response analyses were completed using the computer software FLAC (Fast Lagrangian
Analysis of Continua) developed by Itasca of Minneapolis, Minnesota. The purpose of the nonlinear site
response analyses is to evaluate site-specific soil amplification factors (AFs) and develop site-specific risk-
targeted maximum-considered earthquake (MCER) response spectra based on ASCE 7-10 (2010) using the
following approach:
1. Complete a site-specific probabilistic seismic hazard analyses (PSHA) to compute rock outcrop uniform
hazard spectra (UHS) for the maximum-considered earthquake (MCE) (2 percent probability of
exceedance in 50 years, 2,475-year return period). Rock outcrop conditions are defined as the Site
Class B/C boundary or Vs30=760 meters per second (m/sec).
2. Complete seismic hazard deaggregation for the 2,475-year event at the periods of interest and select
a suite of seven acceleration time histories that represent the contributing seismic sources to the total
hazard at the site.
3. Modify the frequency content of the time histories via spectral matching to match the input time history
response spectra to the target rock outcrop response spectra.
4. Develop shear wave velocity profiles and one-dimensional (1D) soil models based on the shear wave
velocity measurements obtained at the site and its vicinity and using subsurface information collected
from the geotechnical explorations completed at the site.
5. Complete nonlinear site response analyses to compute the soil response spectra at ground surface
and calculate site-specific soil AFs.
6. Evaluate maximum component adjustment (MCA) factors and risk coefficients per ASCE 7-10
Section 21.2.1.2.
7. Develop probabilistic MCER ground motions by multiplying the probabilistic MCE ground motions from
(1) by the site-specific soil AFs, MCA factors, and risk coefficients.
8. Develop deterministic MCER ground motions per ASCE 7-10 by evaluating the 84th percentile maximum
direction deterministic response spectrum including the MCA factors.
9. Develop the recommended site-specific MCER response spectrum by taking the lesser of the
probabilistic and deterministic MCER response spectra and comparing it to 80 percent of the ASCE 7-10
code-based response spectrum.
Rock Outcrop Uniform Hazard Spectrum
A site-specific PSHA was completed using the computer code Haz45.2 to develop the rock outcrop uniform
hazard spectrum. Relevant seismic sources based on the 2014 United States Geological Survey (USGS)
seismic source characterization (SSC) model were considered for the project. The 2014 USGS SSC model
contains seismic source characteristics and recurrence models developed by USGS for the 2014 update of
the National Seismic Hazard Maps (Petersen et al. 2014). The UHS for the 2,475-year event was computed
for rock outcrop conditions (i.e. Site Class B/C boundary, Vs30=760 m/sec). The suite of ground motion
models (GMMs) and corresponding weights that were used to complete the PSHA are presented in
Table C-1 below. Table C-2 presents the 2,475-year rock outcrop UHS.
October 29, 2019 | Page C-2 File No. 23325-001-00
TABLE C-1. GROUND MOTION MODELS AND WEIGHTS
Earthquake Source Ground Motion Prediction Equations Weight
Crustal
Abrahamson et al. (2014) [ASK14] 0.250
Boore et al. (2014) [BSSA14] 0.250
Campbell and Bozorgnia (2014) [CB14] 0.250
Chiou and Youngs (2014) [CY14] 0.250
Cascadia Subduction Zone
Benioff/Intraslab
Atkinson and Boore – Global Subduction (2003, 2008) [AB08-G] 0.167
Atkinson and Boore – Cascadia Subduction (2003, 2008) [AB08-C] 0.167
Zhao et al. (2006) [Z06] 0.333
BC Hydro – Global (Abrahamson et al. 2016) 0.234
BC Hydro – Cascadia (Abrahamson et al. 2016) 0.099
Cascadia Subduction Zone
Interface
Atkinson and Boore – Global Subduction (2003, 2008) 0.100
Zhao et al. (2006) 0.300
BC Hydro – Global (Abrahamson et al. 2016) 0.600
TABLE C-2. 2,475-YEAR UNIFORM HAZARD SPECTRUM (2,475-YEAR, VS30 = 760 M/SEC)
Period (sec) Target Rock Outcrop
0.01 0.651
0.05 0.962
0.075 1.256
0.1 1.486
0.2 1.507
0.3 1.198
0.4 0.989
0.5 0.820
0.75 0.578
1 0.439
2 0.200
3 0.113
4 0.074
5 0.051
Selection of Input Acceleration Time Histories
The seismic hazard deaggregation was performed at a spectral period (T) of 1.0 and 2.0 seconds to
evaluate the percent contribution of the various source-types to the uniform hazard associated with the
2,475-year earthquake event. The deaggregation results are presented in Table C-3. Based on the results,
four crustal events, one subduction-intraslab event, and two subduction-interface events were selected to
represent the 2,475-year event. Table C-4 summarizes the 2,475-year record suite used.
October 29, 2019 | Page C-3 File No. 23325-001-00
TABLE C-3. MCE SEISMIC HAZARD DEAGGREGATION (VS30=760 M/SEC)
Earthquake Source Percent Contribution to Hazard at
T=1.0 sec T=2.0 sec
Crustal 63 52
Subduction Zone – Intraslab 13 13
Subduction Zone – Interface 24 35
TABLE C-4. INPUT EARTHQUAKE TIME HISTORIES FOR 2,475-YEAR EVENT SITE RESPONSE ANALYSIS
Earthquake Type Mw Station Distance (km)
Tabas Iran, 1978 Crustal (Reverse) 7.4 Tabas 2.1
Loma Prieta, 1989 Crustal (Reverse
Oblique) 6.9 Saratoga – Aloha Ave 8.5
Niigata Japan, 2004 Crustal (Reverse) 6.6 NIGH11 8.9
Taiwan SMART1 (45), 1986 Crustal (Reverse) 7.3 SMART1 E02 51.4
El Salvador, 2001 Subduction Intraslab 7.6 Santa Tecia -
Maule, 2010 Subduction-Interface 8.8 Concepcion San Pedro (CCSP) 82.4
Tohoku, 2011 Subduction-Interface 9.0 Ujiie_TCGH12 299.0
Ground Motion Modification
The suites of input acceleration time histories were modified via spectral matching to match the target rock
outcrop 2,475-year response spectra from T=0.01 to 5.0 seconds. Spectral matching was completed
using RSPMatch09 (Fouad et al. 2012) based on the improved spectral matching approach proposed by
Al Atik, et al. (2010). The ground motions were processed with a Butterworth low pass filter to filter out
frequencies greater than 25 Hertz. The as-recorded and spectrally matched response spectra are
presented in Figures C-1 and C-2.
One-Dimensional Soil Models
Shear wave velocity (Vs) profiles were developed using measurements collected the site, and shear wave
velocity data for alluvium soils to account for the variability and uncertainty in the dynamic properties of the
soil. In-situ measurements were collected at two CPT locations (CPT-1 and CPT-2). Additionally, shear wave
velocity measurements for Alluvium soils were collected as part of the nearby Project Impact (Wong et
al. 2003).
We developed shear wave velocity profiles based on the in-situ measurements from CPTs, correlations with
SPT measurements from the borings completed at the site, and shear wave velocity data for alluvium soils
from a nearby study. Uncertainty in the shear wave velocity profile was incorporated into the analysis by
considering the difference between the CPT in-situ measurements and the shear wave velocity
measurements within alluvium soils, completed nearby. Two shear wave velocity profiles, lower bound (LB),
and upper bound (UB), were developed to capture the range of the measured shear wave velocity of the
soils to account for the uncertainty in the shear wave velocity of the subsurface soils encountered at the
October 29, 2019 | Page C-4 File No. 23325-001-00
site. The two profiles developed are presented in Figures C-3 and C-4, for depths extending to 100 feet
(shallow) and 400 feet (deep), respectively.
Table C-5 summarizes the soil type, layer depth, soil unit weight, plasticity index (PI), and shear modulus
reduction (G/Gmax) and damping curves used in the representative FLAC 1D soil model.
TABLE C-5. ONE-DIMENSIONAL SOIL MODEL
Soil Type Depth (feet)
Soil Unit
Weight (pcf) Plasticity Index G/Gmax and Damping Curves
Alluvium 1 0 to 10 100 0 Darendeli (2001)
Alluvium 2 10 to 50 110 0 Darendeli (2001)
Alluvium 3 50 to 60 120 0 Darendeli (2001)
Alluvium 4 60 to 170 125 0 Darendeli (2001)
Alluvium 5 170 to 400 125 0 Darendeli (2001)
Notes:
pcf – pounds per cubic foot
Site-Specific Amplification Factors
Site-specific soil AFs were computed for a 2,475-year event using the following approach:
1. Compute ground surface response spectra by propagating the suite of ground motions upward through
the LB and UB 1D soil models.
2. Compute lower bound and upper bound soil AFs as the average of the ratio of the ground surface
response spectra and the input rock outcrop response spectra for each ground motion suite.
3. Evaluate site-specific soil AFs as the weighted-average of the LB and UB soil AFs by assigning
0.5 weights to both LB and UB soil profiles.
Figures C-5 and C-6 present the individual and average soil AFs computed for the LB and UB profiles for
the 2,475-year event, respectively. Figure C-7 presents the recommended site-specific soil AFs. Figure C-8
presents the effect of site amplification by comparing the probabilistic MCE before (target rock outcrop
UHS) and after applying the recommended site-specific soil AFs (MCER).
Maximum Component Adjustment Factors and Risk Coefficients
Per ASCE 7-10, the probabilistic and deterministic MCER ground motions are to be taken in the direction of
maximum horizontal response. MCA factors are used to convert the geometric mean spectral ordinates to
spectral ordinates that correspond to the direction of maximum horizontal response. The MCA factors per
Shahi and Baker (2014) were used for this evaluation.
Risk coefficients are used to convert the probabilistic MCE ground motions (2 percent probability of
exceedance in 50 years) to MCER ground motions, which correspond to a 1 percent probability of collapse
in 50 years. Risk coefficients were calculated according to Section 21.2.1.2 of ASCE 7-10 using a MATLAB
script provided to us by Nico Luco of USGS. The risk coefficients were computed based on the seismic
hazard curves based on the average Vs30 calculated from the ground surface. Table C-6 presents the MCA
factors and the risk coefficients.
October 29, 2019 | Page C-5 File No. 23325-001-00
TABLE C-6. MAXIMUM COMPONENT ADJUSTMENT FACTORS AND RISK COEFFICIENTS
Period (sec) Maximum Component Adjustment Factor Risk Coefficients
0.010 1.19 0.96
0.050 1.19 0.96
0.075 1.19 0.96
0.100 1.19 0.96
0.200 1.21 0.98
0.300 1.22 0.99
0.400 1.23 0.97
0.500 1.23 0.95
0.750 1.24 0.93
1.000 1.24 0.92
2.000 1.24 0.89
3.000 1.25 0.91
4.000 1.26 0.89
5.000 1.26 0.89
Deterministic (MCER) Ground Motions
Deterministic MCER ground motions were evaluated per ASCE 7-10 Section 21.2.2. Figure C-9 presents the
development of the crustal deterministic (MCER) response spectrum. Based on our experience in the area,
crustal ground motions generally govern when computing deterministic response spectrum, hence only the
crustal deterministic response spectrum is presented.
The deterministic response spectrum was developed by computing the 84th percentile response spectrum
for rock outcrop conditions for the Seattle Fault (MW=7.2, RRUP=2.9 km) with the average Vs30=143 m/sec
using four equally-weighted NGA-West2 GMMs (ASK14, BSSA14, CB14, and CY14) (dashed gray lines
[individual GMMs] and solid red line [weighted average]). Lastly, MCA factors were applied to convert the
deterministic response spectrum (weighted average) to the direction of maximum horizontal response
(solid black line presented in Figure C-9).
Probabilistic (MCER) Ground Motions
Probabilistic MCER ground motions were evaluated per ASCE 7-10 Section 21.2.1. Probabilistic MCER
ground motions were computed by first multiplying the target rock outcrop UHS (Probabilistic MCE) by the
recommended MCA factors and risk coefficients. Lastly, soil AFs were applied to compute the probabilistic
MCER (dashed black line in Figure C-10).
Recommended Site-Specific MCER Response Spectrum
The recommended site-specific MCER response spectrum was developed by taking the lesser of the
probabilistic and deterministic MCER response spectra and comparing it to 80 percent of the ASCE 7-10
Site Class E MCER response spectrum (allowable code minimum) (Figure C-10). The recommended site-
specific MCER response spectrum is a smoothed version of the site-specific MCER response spectrum and
code spectrum. Table C-7 presents the recommended site-specific response spectrum.
October 29, 2019 | Page C-6 File No. 23325-001-00
TABLE C-7. RECOMMENDED SITE-SPECIFIC MCER RESPONSE SPECTRUM
Period (s) MCER Response Spectrum
0.01 0.45
0.05 0.71
0.075 0.79
0.10 0.86
0.20 1.04
0.30 1.04
0.40 1.04
0.50 1.04
0.75 1.04
1.00 1.04
2.00 0.68
3.00 0.40
4.00 0.26
5.00 0.21
0.01
0.1
1
10
0.01 0.1 15% Damped Spectral Acceleration, Sa (g)Period (seconds)
M7.35 Tabas_Iran L1 (Reverse) [C]
M6.9 Loma Prieta - Saratoga - Aloha Ave (Reverse
Oblique) [C]
M6.63 Niigata_Japan, NIGH11 (Reverse)
M7.3 Taiwan SMART1(45) - SMART1 E02
(Reverse) [C]
M9.0 Tohoku -Ujiie_TCGH12_EW [IF]
M8.8 Chile - Concepcion San Pedro_CCSP_NS
M7.6 El Salvador - Santa Tecia_ST_NS [IS]
2475-year UHS (Vs30=760 m/sec)
Average of 7 Input Ground Motions
As-recorded Response Spectra
2475-year Event
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-1
Legend
Crustal Event
Interface Subduction Zone Event
IntraslabSubduction Zone Event
[C]
[IF]
[IS]Project: 23325-001-00 Executed: 05/16/2018
0.01
0.1
1
10
0.01 0.1 15% Damped Spectral Acceleration, Sa (g)Period (seconds)
M7.35 Tabas_Iran L1 (Reverse) [C]
M6.9 Loma Prieta - Saratoga - Aloha Ave (Reverse
Oblique) [C]
M6.63 Niigata_Japan, NIGH11 (Reverse)
M7.3 Taiwan SMART1(45) - SMART1 E02
(Reverse) [C]
M9.0 Tohoku -Ujiie_TCGH12_EW [IF]
M8.8 Chile - Concepcion San Pedro_CCSP_NS
M7.6 El Salvador - Santa Tecia_ST_NS [IS]
2475-year UHS (Vs30=760 m/sec)
Average of 7 Input Ground Motions
Spectrally Matched and Filtered
Response Spectra
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-2
Legend
Crustal Event
Interface Subduction Zone Event
IntraslabSubduction Zone Event
[C]
[IF]
[IS]Project: 00694-040-00 Executed: 02/14/2018
0
10
20
30
40
50
60
70
80
90
100
0 500 1000 1500 2000 2500 3000
Depth (ft)Vs (ft/s)
B-1 Correlated Vs Data
B-2 Correlated Vs Data
CPT-1 Vs Data
CPT-2 Vs Data
Generalized Vs (LB) Profile
Generalized Vs (UB) Profile
Shear Wave Velocity Profiles - Shallow
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-3
Project: 23325-001-00Exec uted: 05-16-2018
0
50
100
150
200
250
300
350
400
450
0 500 1000 1500 2000 2500 3000
Depth (ft)Vs (ft/s)
B-1 Correlated Vs Data
B-2 Correlated Vs Data
CPT-1 Vs Data
CPT-2 Vs Data
Generalized Vs (LB) Profile
Generalized Vs (UB) Profile
Shear Wave Velocity Profiles - Deep
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-4
Project:23325-001-00 Executed: 05/16/2018
0
1
2
3
4
5
6
0.01 0.1 1Amplification Factor, Surface Sa/ Rock Outcrop SaPeriod (seconds)
M7.35 Tabas_Iran L1 (Reverse) [C]
M6.9 Loma Prieta - Saratoga - Aloha Ave (Reverse
Oblique) [C]
M6.63 Niigata_Japan, NIGH11 (Reverse)
M7.3 Taiwan SMART1(45) - SMART1 E02
(Reverse) [C]
M9.0 Tohoku -Ujiie_TCGH12_EW [IF]
M8.8 Chile - Concepcion San Pedro_CCSP_NS
M7.6 El Salvador - Santa Tecia_ST_NS [IS]
Average Amplification Factor, Lower Bound Profile
Soil Amplification Factor, Lower Bound Profile
2475-year Event
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-5
Legend
Crustal Event
Interface Subduction Zone Event
IntraplateSubduction Zone Event (Bennioff)
[C]
[IF]
[IP]Project: 23325‐001‐00 Executed: 05/16/2018
0
1
2
3
4
5
6
0.01 0.1 1Amplification Factor, Surface Sa/ Rock Outcrop SaPeriod (seconds)
M7.35 Tabas_Iran L1 (Reverse) [C]
M6.9 Loma Prieta - Saratoga - Aloha Ave (Reverse
Oblique) [C]
M6.63 Niigata_Japan, NIGH11 (Reverse)
M7.3 Taiwan SMART1(45) - SMART1 E02 (Reverse)
[C]
M9.0 Tohoku -Ujiie_TCGH12_EW [IF]
M8.8 Chile - Concepcion San Pedro_CCSP_NS
M7.6 El Salvador - Santa Tecia_ST_NS [IS]
Average Amplification Factor, Upper Bound Profile
Soil Amplification Factors, Upper Bound Profile
2475-year Event
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-6
Legend
Crustal Event
Interface Subduction Zone Event
IntraplateSubduction Zone Event (Bennioff)
[C]
[IF]
[IP]Project: 23325‐001‐00 Executed: 05/16/2018
0
1
2
3
4
5
6
0.01 0.1 1Amplification Factor, Surface Sa/ Rock Outcrop SaPeriod (seconds)
Average Amplification Factor, Lower Bound Profile
Average Amplification Factor, Upper Bound Profile
Recommended Weighted Average Amplification
Factor (Site Specific)
Soil Amplification Factors
Profile Comparison 2475-year Event
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-7
Project: 23325‐001‐00 Executed: 05/16/2018
0.01
0.1
1
10
0.01 0.1 15% Damped Spectral Acceleration, Sa(g)Period (seconds)
Target Rock Outcrop UHS
Target Rock Outcrop UHS x Site Specific Soil
Amplification Factors
Probabilistic MCE
Response Spectrum Comparison
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-8
Project: 23325-001-00 Executed: 05/16/2018
0.01
0.1
1
10
0.01 0.1 15% Damped Spectral Acceleration, Sa(g)Period (seconds)
ASK14 (No-Basin)
BSSA14 (No-Basin)
CB14 (No-Basin)
CY14 (No-Basin)
Weighted-Avg. Det (Crustal)
Weighted-Avg. Det + Basin Amplification Factors +
Max. Component Adj. Factors (Crustal)
Deterministic MCER Response Spectrum
(Seattle Fault, Mw=7.2, Rrup=2.9 km)
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-9
Project: 23325-001-00 Executed: 5/16/2018
0.01
0.1
1
10
0.01 0.1 15% Damped Spectral Acceleration, Sa(g)Period (seconds)
ASCE 7-10 Site Class E MCEr
0.8 x ASCE 7-10 Site Class E MCEr
Deterministic (MCE) Response Spectrum
Site-Specific Probabilistic MCEr Response
Spectrum
Recommended Site-Specific MCEr Response
Spectrum
Recommended Site-Specific MCERResponse Spectrum
Logan Avenue N/N 8th Street Development
Renton, Washington
Figure C-10
Project: 23325-001-00 Executed: 5/16/2018
APPENDIX D Report Limitations and Guidelines for Use
October 29, 2019 | Page D-1 File No. 23325-001-00
APPENDIX D
REPORT LIMITATIONS AND GUIDELINES FOR USE1
This appendix provides information to help you manage your risks with respect to the use of this report.
Geotechnical Services Are Performed for Specific Purposes, Persons and Projects
This report has been prepared for the exclusive use of ARCO Murray Design Build and other project team
members for the Logan Avenue North and North 8th Street development project. This report is not intended
for use by others, and the information contained herein is not applicable to other sites.
GeoEngineers structures our services to meet the specific needs of our clients. For example, a geotechnical
or geologic study conducted for a civil engineer or architect may not fulfill the needs of a construction
contractor or even another civil engineer or architect that are involved in the same project. Because each
geotechnical or geologic study is unique, each geotechnical engineering or geologic report is unique,
prepared solely for the specific client and project site. Our report is prepared for the exclusive use of our
Client. No other party may rely on the product of our services unless we agree in advance to such reliance
in writing. This is to provide our firm with reasonable protection against open-ended liability claims by third
parties with whom there would otherwise be no contractual limits to their actions. Within the limitations of
scope, schedule and budget, our services have been executed in accordance with our Agreement with the
Client and generally accepted geotechnical practices in this area at the time this report was prepared. This
report should not be applied for any purpose or project except the one originally contemplated.
A Geotechnical Engineering or Geologic Report Is Based on a Unique Set of Project-specific
Factors
This report has been prepared for the Logan Avenue North and North 8th Street development project in
Renton, Washington. GeoEngineers considered a number of unique, project-specific factors when
establishing the scope of services for this project and report. Unless GeoEngineers specifically indicates
otherwise, do not rely on this report if it was:
■ Not prepared for you,
■ Not prepared for your project,
■ Not prepared for the specific site explored, or
■ Completed before important project changes were made.
For example, changes that can affect the applicability of this report include those that affect:
■ The function of the proposed structure;
■ Elevation, configuration, location, orientation or weight of the proposed structure;
1 Developed based on material provided by ASFE, Professional Firms Practicing in the Geosciences; www.asfe.org .
October 29, 2019 | Page D-2 File No. 23325-001-00
■ Composition of the design team; or
■ Project ownership.
If important changes are made after the date of this report, GeoEngineers should be given the opportunity
to review our interpretations and recommendations and provide written modifications or confirmation, as
appropriate.
Subsurface Conditions Can Change
This geotechnical or geologic report is based on conditions that existed at the time the study was performed.
The findings and conclusions of this report may be affected by the passage of time, by manmade events
such as construction on or adjacent to the site, or by natural events such as floods, earthquakes, slope
instability or groundwater fluctuations. Always contact GeoEngineers before applying a report to determine
if it remains applicable.
Most Geotechnical and Geologic Findings Are Professional Opinions
Our interpretations of subsurface conditions are based on field observations from widely spaced sampling
locations at the site. Site exploration identifies subsurface conditions only at those points where subsurface
tests are conducted or samples are taken. GeoEngineers reviewed field and laboratory data and then
applied our professional judgment to render an opinion about subsurface conditions throughout the site.
Actual subsurface conditions may differ, sometimes significantly, from those indicated in this report. Our
report, conclusions and interpretations should not be construed as a warranty of the subsurface conditions.
Geotechnical Engineering Report Recommendations Are Not Final
Do not over-rely on the preliminary construction recommendations included in this report. These
recommendations are not final, because they were developed principally from GeoEngineers’ professional
judgment and opinion. GeoEngineers’ recommendations can be finalized only by observing actual
subsurface conditions revealed during construction. GeoEngineers cannot assume responsibility or liability
for this report's recommendations if we do not perform construction observation.
Sufficient monitoring, testing and consultation by GeoEngineers should be provided during construction to
confirm that the conditions encountered are consistent with those indicated by the explorations, to provide
recommendations for design changes should the conditions revealed during the work differ from those
anticipated, and to evaluate whether or not earthwork activities are completed in accordance with our
recommendations. Retaining GeoEngineers for construction observation for this project is the most
effective method of managing the risks associated with unanticipated conditions.
A Geotechnical Engineering or Geologic Report Could Be Subject to Misinterpretation
Misinterpretation of this report by other design team members can result in costly problems. You could
lower that risk by having GeoEngineers confer with appropriate members of the design team after
submitting the report. Also retain GeoEngineers to review pertinent elements of the design team's plans
and specifications. Contractors can also misinterpret a geotechnical engineering or geologic report. Reduce
that risk by having GeoEngineers participate in pre-bid and preconstruction conferences, and by providing
construction observation.
October 29, 2019 | Page D-3 File No. 23325-001-00
Do Not Redraw the Exploration Logs
Geotechnical engineers and geologists prepare final boring and testing logs based upon their interpretation
of field logs and laboratory data. To prevent errors or omissions, the logs included in a geotechnical
engineering or geologic report should never be redrawn for inclusion in architectural or other design
drawings. Only photographic or electronic reproduction is acceptable, but recognize that separating logs
from the report can elevate risk.
Give Contractors a Complete Report and Guidance
Some owners and design professionals believe they can make contractors liable for unanticipated
subsurface conditions by limiting what they provide for bid preparation. To help prevent costly problems,
give contractors the complete geotechnical engineering or geologic report, but preface it with a
clearly written letter of transmittal. In that letter, advise contractors that the report was not prepared for
purposes of bid development and that the report's accuracy is limited; encourage them to confer with
GeoEngineers and/or to conduct additional study to obtain the specific types of information they need or
prefer. A pre-bid conference can also be valuable. Be sure contractors have sufficient time to perform
additional study. Only then might an owner be in a position to give contractors the best information
available, while requiring them to at least share the financial responsibilities stemming from unanticipated
conditions. Further, a contingency for unanticipated conditions should be included in your project budget
and schedule.
Contractors Are Responsible for Site Safety on Their Own Construction Projects
Our geotechnical recommendations are not intended to direct the contractor’s procedures, methods,
schedule or management of the work site. The contractor is solely responsible for job site safety and for
managing construction operations to minimize risks to on-site personnel and to adjacent properties.
Read These Provisions Closely
Some clients, design professionals and contractors may not recognize that the geoscience practices
(geotechnical engineering or geology) are far less exact than other engineering and natural science
disciplines. This lack of understanding can create unrealistic expectations that could lead to
disappointments, claims and disputes. GeoEngineers includes these explanatory “limitations” provisions in
our reports to help reduce such risks. Please confer with GeoEngineers if you are unclear how these “Report
Limitations and Guidelines for Use” apply to your project or site.
Geotechnical, Geologic and Environmental Reports Should Not Be Interchanged
The equipment, techniques and personnel used to perform an environmental study differ significantly from
those used to perform a geotechnical or geologic study and vice versa. For that reason, a geotechnical
engineering or geologic report does not usually relate any environmental findings, conclusions or
recommendations; e.g., about the likelihood of encountering underground storage tanks or regulated
contaminants. Similarly, environmental reports are not used to address geotechnical or geologic concerns
regarding a specific project.
October 29, 2019 | Page D-4 File No. 23325-001-00
Biological Pollutants
GeoEngineers’ Scope of Work specifically excludes the investigation, detection, prevention or assessment
of the presence of Biological Pollutants. Accordingly, this report does not include any interpretations,
recommendations, findings, or conclusions regarding the detecting, assessing, preventing or abating of
Biological Pollutants and no conclusions or inferences should be drawn regarding Biological Pollutants, as
they may relate to this project. The term “Biological Pollutants” includes, but is not limited to, molds, fungi,
spores, bacteria, and viruses, and/or any of their byproducts.
If Client desires these specialized services, they should be obtained from a consultant who offers services
in this specialized field.
PPPP282830303232
3030303032302828303030302931 292929292929N 8th St.Logan Ave. NB'BAA'C'
C
OB-1
CPT-1
OB-2
AB-2
CPT-2
AB-1
B-2
B-1-19B-4-19
B-2-19
B-3-19
B-5-20
B-6-20
B-7-20
B-8-20
B-9-20
B-10-20
B-11-20
B-12-20
B-1
Geophysical Measurement Area
Proposed Building
Figure 1
Logan Avenue N / N 8th Street Development
Renton, Washington
Site Plan
WENSP:\23\23325001\CAD\00\Ground Improvement Baseline Report\23325000100_F02-04_Site Plan and Cross-Sections.dwg TAB:F02 Date Exported: 02/14/20 - 11:08 by syiLegend
Property Boundary
Boring by GeoEngineers, 2018
Notes:
1. The locations of all features shown are approximate.
2. This drawing is for information purposes. It is intended to assist
in showing features discussed in an attached document.
GeoEngineers, Inc. cannot guarantee the accuracy and content
of electronic files. The master file is stored by GeoEngineers, Inc.
and will serve as the official record of this communication.
Data Source: Site Survey by Axis Survey & Mapping, dated 04/23/18.
Projection: WA State Plane, North Zone, NAD83, US Foot
Feet
050 50AB-1, B-1, OB-1
CPT-1 Cone Penetration Test by GeoEngineers, 2018
B-1-19 & GEI-1-19 Boring Completed by GeoEngineers, 2019
B-5-20
Geophysical Measurement Area
Cross-Section Location
A A'Boring Completed by GeoEngineers, 2020
Potential
Bioretention
Facility Location
PP = 0.0 psf
PP = 0.0 psfAL (LL = 35, PI = 5)
Groundwater observed at approximately 10 feetbelow ground surface during drilling
PP = 0.0 psf
Added drilling mud at 20 feet; no heave observed
PP = 0.0 psf
AL (LL = 47, PI = 10)
PP = 500 psf
15
40
48
23
Topsoil
Gray sandy silt with occasional gravel (stiff, moist) (fill)
Brown silty fine to medium sand with occasional gravel(medium dense, moist to wet)
Gray silty fine sand (very loose, moist) (alluvium)
Gray silt with trace fine sand (very soft to soft, moist)
Gray silty fine sand (very loose, moist to wet)
Brown-gray silt (very soft to soft, wet)
Gray silty fine sand with occasional silt lenses (loose tomedium dense, wet)
Gray fine to medium sand with silt (loose to mediumdense, wet)
Brown silt with organic matter and occasionalhorizontal bedding (stiff, moist)
Gray silty fine sand (medium dense, wet)
With organic matter (wood debris), becomes veryloose
Brown-gray silt (soft, moist)
Gray-light brown silt with organic matter (wood debris)(medium stiff, moist)
Gray fine sand with silt and occasional organic matter(wood debris) (loose, moist)
1
2SA
3a3b
3c
4aAL4b
5a5b
6a6b6c
7
8
9AL
10a
10b
4
18
7
6
12
18
18
18
18
16
2
2
10
12
23
3
6
TS
ML
SM
SM
ML
SM
ML
SM
SP-SM
ML
SM
ML
ML
SP-SM
Notes:
61.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.49503-122.206167
29.5
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/4/20184/4/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-1
Logan Avenue N/N 8th Street Development
Figure A-2
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
PP = 6,500 psfPP = 500 psf
PP = 4,500 - 6,000 psf
Gravels at 55 feet
Broken cobble in shoe
204
159
Gray fine to coarse sand with trace silt (loose, wet)
Brown fibrous peat (soft to medium stiff, moist)
Brown-gray silt (soft to medium stiff, moist)
With occasional peat lenses, becomes medium stiff
Brown fibrous peat with silt lenses (medium stiff,moist)
Gray silty fine to medium sand with peat lenses (loose,moist)
Gray silty fine to coarse sand with occasional gravel
11
12aMC12b
13b13aMC
14
15
16
11
18
18
18
10
0
7
4
6
6
44
25
SP-SM
PT
ML
PT
SM
SM
Sheet 2 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-1 (continued)
Logan Avenue N/N 8th Street Development
Figure A-2
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30
PP = 0.0 psf
Groundwater observed at approximately 9 feetbelow ground surface during drilling
5
9
39
9
83
Approximately 6 inches of asphalt concrete pavement
Gravel
Brown silty fine to coarse sand with gravel (loose,moist) (fill)
Brown fine to coarse sand with silt and gravel (mediumdense, moist)
Gray silt with sand (very soft to soft, moist) (alluvium)
Gray medium to coarse sand with trace silt (mediumdense, wet)
Gray fine to medium sand (loose, wet)
1MC
2SA
3%F
4
5
11
18
18
18
24
2
11
7
AC
GP
SM
SP-SM
ML
SP-SM
SM
Notes:
11.5 NS
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495257-122.206812
30
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
4/3/20184/3/2018
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on locational survey. Vertical approximated based on topographic survey.
Sheet 1 of 1Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring AB-1
Logan Avenue N/N 8th Street Development
Figure A-4
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10 Graphic LogGroupClassificationElevation (feet)2520
Groundwater observed during drilling atapproximately 12.1 feet below ground surface
AL (LL = 63; PI = 14)
36
60
30
Approximately 1 inch of asphalt concrete pavement
Approximately 3½ inches of gravel base coarse
Brown-gray silty fine to coarse sand with gravel(medium dense, moist) (fill)
Gray silty fine sand (medium dense, moist) (alluvium)
Gray sandy silt (soft, moist)
With peat lenses (soft to medium stiff, moist)
Gray silty fine to medium sand (very loose, moist)
Gray sandy silt with organic matter (roots) (very stiff,wet)
Gray fine sand with silt (medium dense, wet)
Gray silt with occasional roots (very soft to soft, wet)
Gray elastic silt with occasional sand (medium stiff,wet)
1
2A
2B
3
4A
4B
5A
5B%F
6A
6B
7
8
9AL
18
13
18
18
18
18
18
18
28
5
3
4
17
17
2
5
AC
CR
SM
SM
ML
SM
ML
SM
ML
MH
Notes:
86.5 BZ
LA Advance Drill Technologies,Inc.Hollow-stem Auger
Diedrich D50 drill rigDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.49527-122.20641
29
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
8/23/20198/23/2019
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-4-19
Logan Avenue N/N 8th Street Development
Figure A-9
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Driller noted gravel at 50 feet
AL (LL = 94; PI = 28)
7
79
25
4
20
Gray silty fine sand with silt lens (medium dense, wet)
Gray fine to coarse gravel with sand (dense, wet)
Grades to medium dense, wet
Gray to brown-gray elastic silt with sand andoccasional wood (stiff, wet)
Gray silty fine to medium sand (dense, wet)
10
11
12
13SA
14
15
16AL
17%F
18
18
18
18
10
7
7
18
18
18
4
6
14
31
22
23
12
31
20
SM
GP
MH
SM
Sheet 2 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-4-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-9
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60
65
70
75 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30-35-40-45
25 7Gray fine to medium sand with silt (loose, wet)
Gray silty fine to medium sand with occasional silt(medium dense, wet)
19%F
20
12
18
9
26
SP-SM
SM
Sheet 3 of 3Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-4-19 (continued)
Logan Avenue N/N 8th Street Development
Figure A-9
Date:9/11/19 Path:P:\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)80
85 Graphic LogGroupClassificationElevation (feet)-50-55
Added drilling mud at 10 feet
Attempted Shelby sample at 27 feet, no recovery
6 inches topsoil
Brown silty fine to coarse sand with occasional gravel(moist) (fill)
Gray silty fine sand with interbedded silt (very loose,moist) (alluvium)
Gray silt with trace organic matter (soft to medium stiff,wet)
Gray fine sand with silt (very loose to loose, wet)
Gray fine to medium sand with silt (loose, wet)
Gray silt with fine sand and lenses of organic matter(medium stiff, wet)
Gray silty fine sand (medium dense, wet)
Gray silty fine sand (very loose, wet)
Gray silt with fine sand (very soft, wet)
Gray silty fine sand with interbedded silt and organicmatter (wet)
Gray fine to medium sand with silt (very loose, wet)
Gray silt with sand lenses (very soft to soft, wet)
1
2
3A
3B
4A
4B
5
6A
6B
7A
7B
7C
24
18
18
12
18
18
24
18
1
4
5
21
1
2
TS
SM
SM
ML
SP-SM
SP-SM
ML
SM
SM
ML
SM
SP-SM
ML
Notes:
61.5 BZ
MD Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D50 drillingDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495062-122.206107
30NAVD88
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
1/23/20201/23/2020
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-10-20
Figure A-15
Logan Avenue N/N 8th Street Development
Date:3/4/20 Path:\\GEOENGINEERS.COM\WAN\PROJECTS\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
MC from CRS test = 62%; AL (non-plastic)
Moisture content test completed on peat lenses
Driller noted gravel
105
33
113
Brown gray silt with organic matter and peat lenses(soft, wet)
Gray clay with organic matter (wet)
Gray silt with organic matter (wet)
Gray silty fine sand (wet)
Gray fine to medium sand with silt lenses (mediumdense, wet)
Gray silty fine sand with interbedded silt and peat, up to12-inch peat interbeds (loose, wet)
Gray fine to coarse sand with silt and occasional gravel(dense, wet)
Gray fine to coarse sand with occasional gravel (dense,wet)
8
9ACRS/AL
9B
10
11
12
13
18
24
18
18
18
18
3
13
8
6
45
46
ML
CL
ML
SM
SP-SM
SM
SP-SM
SP
Sheet 2 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-10-20 (continued)
Figure A-15
Logan Avenue N/N 8th Street Development
Date:3/4/20 Path:\\GEOENGINEERS.COM\WAN\PROJECTS\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30
Added drilling mud at 10 feet
Attempted Shelby sample at 17 feet, no recovery
5 inches asphalt concrete pavement
3 inches base course
Brown gray silty fine sand with gravel (moist) (fill)
Gray silt with trace organic matter (very soft, moist)(alluvium)
Gray fine silty sand (very loose, moist)
Gray fine to medium sand with silt (loose, moist)
With occasional gravel, becomes wet
Brown gray silt with organic matter and occasionalgravel (medium stiff, moist)
Gray silty fine sand (medium dense, wet)
Becomes very loose
Brown gray silt with sand lenses and occasional organicmatter (soft, wet)
Gray silty fine sand with interbedded silt (wet)
Gray fine to medium sand with silt (wet)
Gray silty fine sand with silt lenses and occasionalorganic matter (medium dense, wet)
1
2A
2B
3
4A4B
4C
5
6A
6B
6C
7
24
16
18
16
13
16
23
18
1
8
5
24
3
19
AC
CR
SM
ML
SM
SP-SM
ML
SM
ML
SM
SP-SM
SM
Notes:
61.5 BZ
MD Advance Drill Technologies, Inc.Hollow-stem Auger
Diedrich D50 drillingDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495234-122.206538
29NAVD88
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
1/24/20201/24/2020
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-11-20
Figure A-16
Logan Avenue N/N 8th Street Development
Date:2/14/20 Path:\\GEOENGINEERS.COM\WAN\PROJECTS\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
Testing completed on MH material; MC from CRStest = 51%; AL (LL = 56, PI = 13)53
131
130
Becomes fine to medium
Gray silt with sand and organic matter and occasionalsand lenses (wet)
Gray fine to medium sand with silt
Gray elastic silt with occasional organic matter (wet)
Gray silty sand with silt and peat lenses (medium stiff tostiff, wet)
Brown peat with sand lenses (medium stiff, wet)
Gray silty fine sand with silt lens and occasional organicmatter (loose, wet)
Becomes medium dense
Brown peat with occasional sand (stiff, wet)
Gray silty fine to coarse sand with gravel (dense, wet)
Gray fine to coarse sand with silt and gravel (mediumdense, wet)
Gray silty fine to coarse sand with occasional gravel(medium dense, wet)
8ACRS/AL
8B
9A9B
10A10B
11
12
13
27
18
18
16
10
13
18
8
7
12
45
22
27
ML
SP-SM
MH
SM
PEAT
SM
PEAT
SM
SP-SM
SM
Sheet 2 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-11-20 (continued)
Figure A-16
Logan Avenue N/N 8th Street Development
Date:2/14/20 Path:\\GEOENGINEERS.COM\WAN\PROJECTS\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30
Attempted Shelby sample at 7 feet; no recovery
Added drilling mud between 10 and 15 feet
AL (LL = 34, PI = 4)37
6 inches topsoil
Gray silty fine to medium sand with occasional gravel(moist) (fill)
Gray silty fine sand with interbedded silt (very loose,moist) (alluvium)
Gray sandy silt with sand lenses and organic matter(medium stiff, wet)
Gray silty fine sand (loose to medium dense, wet)
Gray silty fine to medium sand (loose, wet)
Gray silty fine sand (medium dense, wet)
Brown gray silt with sand and trace organic matter (verysoft, wet)
Gray silty fine to medium sand with organic matter lens(loose, wet)
Brown gray silt with occasional sand lenses and organicmatter (medium stiff, wet)
1
2
3A
3B
4
5
6
7A
7B
24
18
25
18
10
12
18
14
1
10
6
13
1
6
TS
SM
SM
ML
SM
SM
SM
ML
SM
ML
Notes:
61.5 BZ
MD Advance Drill Technologies, Inc. Hollow-stem Auger
Diedrich D50 drillingDrillingEquipmentAutohammer140 (lbs) / 30 (in) Drop
WA State Plane NorthNAD83 (feet)47.495376-122.206219
28NAVD88
LatitudeLongitude
Start TotalDepth (ft)
Logged By
Checked By
End
Surface Elevation (ft)Vertical Datum
Drilled
HammerData
SystemDatum
Driller DrillingMethod
See "Remarks" section for groundwater observed
1/24/20201/24/2020
Note: See Figure A-1 for explanation of symbols.Coordinates Data Source: Horizontal approximated based on Locational Survey. Vertical approximated based on Topographic Survey.
Sheet 1 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-12-20
Figure A-17
Logan Avenue N/N 8th Street Development
Date:3/4/20 Path:\\GEOENGINEERS.COM\WAN\PROJECTS\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)0
5
10
15
20
25
30
35 Graphic LogGroupClassificationElevation (feet)2520151050-5
AL (LL = 48, PI = 12)
238
47
With sand lenses, becomes soft to medium stiff
Brown peat (soft to medium stiff, wet)
Gray silt with occasional sand and organic matter andsand lenses (wet)
Gray clay with organic matter (wet)
Brown gray silt with sand and organic matter lens(medium stiff, wet)
Without sand, becomes stiff
Gray silty fine sand with silt and peat lenses (loose tomedium dense, wet)
Gray fine sand with silt (medium dense, wet)
Grades to fine to medium sand with gravel, becomesvery dense
Becomes medium dense
8A
8B
8CCRS/AL
9
10A10B
11
12
13
18
28
18
18
14
18
18
4
6
10
20
63
26
PEAT
ML
CL
ML
SM
SP-SM
Sheet 2 of 2Project Number:
Project Location:
Project:
Renton, Washington
23325-001-00
Log of Boring B-12-20 (continued)
Figure A-17
Logan Avenue N/N 8th Street Development
Date:3/4/20 Path:\\GEOENGINEERS.COM\WAN\PROJECTS\23\23325001\GINT\2332500100.GPJ DBLibrary/Library:GEOENGINEERS_DF_STD_US_JUNE_2017.GLB/GEI8_GEOTECH_STANDARD_%F_NO_GWREMARKS
MoistureContent (%)FinesContent (%)FIELD DATA
MATERIALDESCRIPTION
Sample NameTestingRecovered (in)IntervalBlows/footCollected SampleDepth (feet)35
40
45
50
55
60 Graphic LogGroupClassificationElevation (feet)-10-15-20-25-30
1
Tim Prusa
From:Francesca Liburdy <francesca.liburdy@transpogroup.com>
Sent:Wednesday, February 19, 2020 10:48 AM
To:Jenelle Taflin
Cc:Mike Swenson; Jason Green
Subject:RE: Topgolf Renton; High-Use Site
Hi Jenelle,
Thanks for your email. Using the data we received from existing TopGolf sites, the Renton TopGolf will not meet the trip
thresholds required for a high-use site. The minimum threshold for a high-use site is 100 daily trips per 1,000 square
feet, or 6,440 daily trips for the size of the Renton site. We looked at the daily trip counts provided from existing TopGolf
sites in Scottsdale, AZ and Edison, NJ. Both sites are also 102-bay facilities and we anticipate would be similar in size to
the Renton TopGolf. The midweek average daily volume at the Scottsdale and Edison TopGolf locations is 1,637 daily
trips, with an average of 3,160 daily trips over the weekend. These daily volumes are not high enough to reach the
threshold for a high-use site. Let us know if you have questions or if you need additional information.
Thank you,
Francesca Liburdy, EIT
|
Transportation Engineer
425-896-5235
From: Jenelle Taflin <jtaflin@navixeng.com>
Sent: Wednesday, February 19, 2020 10:20 AM
To: Francesca Liburdy <francesca.liburdy@transpogroup.com>
Cc: Mike Swenson <mike.swenson@transpogroup.com>; Jason Green <jgreen@navixeng.com>
Subject: RE: Topgolf Renton; High-Use Site
Hi Francesca,
Any word on this? Thanks,
Jenelle Taflin, P.E., LEED AP
Navix Engineering
d: 425.458.7896 | c: 206.251.2842
From: Jenelle Taflin
Sent: Friday, February 14, 2020 9:12 AM
To: Francesca Liburdy <francesca.liburdy@transpogroup.com>
Cc: Mike Swenson <mike.swenson@transpogroup.com>; Jason Green <jgreen@navixeng.com>
Subject: Re: Topgolf Renton; High-Use Site
Hi Francesca,
2
Yes, we do. We need to know if the site is considered a high-use site, which determines whether or not we need an
oil/water separator for stormwater runoff treatment. Thank you!
Jenelle Taflin, P.E., LEED AP
Navix Engineering
11235 SE 6th Street, Suite 150, Bellevue, WA 98004
o: 425.458.7896 | c: 206.251.2842
jtaflin@navixeng.com | linkedin.com/JenelleTaflin
www.navixeng.com
On Feb 14, 2020, at 6:30 AM, Francesca Liburdy <francesca.liburdy@transpogroup.com> wrote:
Hi Jenelle,
Do you still need this information from us? We will need to get some additional data from TopGolf to
determine a daily trip rate if it is necessary.
Thanks,
<image001.png>
Francesca Liburdy, EIT
|
Transportation Engineer
<image002.png>
425-896-5235
From: Jenelle Taflin <jtaflin@navixeng.com>
Sent: Monday, February 10, 2020 8:46 AM
To: Mike Swenson <mike.swenson@transpogroup.com>
Cc: Francesca Liburdy <francesca.liburdy@transpogroup.com>; Jason Green <jgreen@navixeng.com>;
Tim Prusa <tprusa@navixeng.com>
Subject: RE: Topgolf Renton; High-Use Site
Thanks, Mike! The GSF if 64,403 SF. Please let us know if you need any additional info. Thanks,
Jenelle Taflin, P.E., LEED AP
Navix Engineering
d: 425.458.7896 | c: 206.251.2842
From: Mike Swenson <mike.swenson@transpogroup.com>
Sent: Saturday, February 8, 2020 6:39 AM
To: Jenelle Taflin <jtaflin@navixeng.com>
Cc: Francesca Liburdy <francesca.liburdy@transpogroup.com>; Jason Green <jgreen@navixeng.com>;
Tim Prusa <tprusa@navixeng.com>
Subject: RE: Topgolf Renton; High-Use Site
3
We were only provided peak hour trips rates from TopGolf. We will do some digging on Monday and see
what we can come up with.
What is the gsf for the facility? We only noted the number of bays as that was the basis for our tg
estimates.
<image009.png>
Mike Swenson PE, PTOE |
Principal
<image010.png>
425-896-5208
<image011.png>
206-909-5785
From: Jenelle Taflin <jtaflin@navixeng.com>
Sent: Friday, February 7, 2020 2:07 PM
To: Mike Swenson <mike.swenson@transpogroup.com>
Cc: Francesca Liburdy <francesca.liburdy@transpogroup.com>; Jason Green <jgreen@navixeng.com>;
Tim Prusa <tprusa@navixeng.com>
Subject: Topgolf Renton; High-Use Site
Hi Mike,
Would you be able to provide us with an ADT number for the Topgolf Renton site for us to determine
whether we meet the definition of a high-use site (see below)? Thank you!
<image012.jpg>
Jenelle Taflin, P.E., LEED AP
Navix Engineering
11235 SE 6th Street, Suite 150, Bellevue WA 98004
d: 425.458.7896 | c: 206.251.2842
jtaflin@navixeng.com | linkedin.com/JenelleTaflin
www.navixeng.com
Professional Engineer – WA, ID
Confidentiality Disclaimer:
This communication, including any attachments, is the property of Navix Engineering and may contain confidential,
proprietary, and/or privileged information. Unauthorized use of this communication is strictly prohibited and may be
unlawful. If you have received this communication in error, please immediately notify the sender by reply e-mail and
destroy all copies of the communication and associated attachments.
NAVIX TopGolf Renton – Renton, WA
APPENDIX C
CSWPP WORKSHEETS
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
NAVIX TopGolf Renton – Renton, WA
APPENDIX D
WWHM MODELS
WWHM2012
PROJECT REPORT
WEST BASIN PRE-DEVELOPED CONDITIONS
West Basin Boeing Predeveloped 200415 4/15/2020 10:11:40 PM Page 2
General Model Information
Project Name:West Basin Boeing Predeveloped 200415
Site Name:
Site Address:
City:
Report Date:4/15/2020
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/10/10
Version:4.2.16
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
West Basin Boeing Predeveloped 200415 4/15/2020 10:11:40 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 5.91
Pervious Total 5.91
Impervious Land Use acre
PARKING FLAT 1.76
Impervious Total 1.76
Basin Total 7.67
Element Flows To:
Surface Interflow Groundwater
West Basin Boeing Predeveloped 200415 4/15/2020 10:11:40 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.38
Pervious Total 0.38
Impervious Land Use acre
PARKING FLAT 7.29
Impervious Total 7.29
Basin Total 7.67
Element Flows To:
Surface Interflow Groundwater
West Basin Boeing Predeveloped 200415 4/15/2020 10:11:40 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:5.91
Total Impervious Area:1.76
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.38
Total Impervious Area:7.29
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 1.093147
5 year 1.60271
10 year 1.982502
25 year 2.511572
50 year 2.942173
100 year 3.404713
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 2.803912
5 year 3.549715
10 year 4.057323
25 year 4.716667
50 year 5.221921
100 year 5.739932
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 1.751 3.655
1950 1.810 3.899
1951 1.061 2.282
1952 0.636 2.005
1953 0.596 2.165
1954 0.864 2.281
1955 0.895 2.580
1956 0.900 2.540
1957 1.255 2.897
1958 0.767 2.322
West Basin Boeing Predeveloped 200415 4/15/2020 10:12:10 PM Page 8
1959 0.599 2.355
1960 1.131 2.347
1961 1.003 2.470
1962 0.640 2.137
1963 0.972 2.391
1964 0.842 2.323
1965 1.354 2.988
1966 0.685 1.984
1967 1.831 3.423
1968 1.445 3.893
1969 1.220 2.720
1970 0.993 2.613
1971 1.217 3.117
1972 1.715 3.249
1973 0.593 1.931
1974 1.207 2.851
1975 1.305 3.246
1976 0.927 2.208
1977 0.853 2.364
1978 1.016 2.894
1979 1.065 3.965
1980 2.040 3.627
1981 1.042 2.926
1982 1.986 4.143
1983 1.018 3.347
1984 0.785 2.121
1985 1.068 2.922
1986 1.049 2.522
1987 1.125 3.888
1988 0.569 2.351
1989 0.711 2.940
1990 3.418 5.096
1991 2.343 4.046
1992 0.792 2.100
1993 0.564 1.812
1994 0.477 1.962
1995 0.887 2.593
1996 1.533 2.786
1997 1.216 2.698
1998 0.943 2.710
1999 2.509 5.595
2000 1.095 2.775
2001 0.842 3.026
2002 1.739 3.579
2003 1.354 2.780
2004 2.258 5.229
2005 1.055 2.391
2006 1.012 2.117
2007 3.124 4.893
2008 2.295 3.975
2009 1.340 3.594
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 3.4176 5.5948
2 3.1241 5.2289
3 2.5085 5.0958
West Basin Boeing Predeveloped 200415 4/15/2020 10:12:10 PM Page 9
4 2.3432 4.8931
5 2.2950 4.1431
6 2.2578 4.0460
7 2.0405 3.9749
8 1.9857 3.9647
9 1.8315 3.8988
10 1.8101 3.8935
11 1.7511 3.8875
12 1.7392 3.6550
13 1.7153 3.6267
14 1.5331 3.5935
15 1.4447 3.5785
16 1.3540 3.4233
17 1.3537 3.3472
18 1.3404 3.2489
19 1.3046 3.2459
20 1.2552 3.1168
21 1.2203 3.0258
22 1.2167 2.9880
23 1.2161 2.9403
24 1.2072 2.9264
25 1.1310 2.9215
26 1.1250 2.8969
27 1.0950 2.8944
28 1.0678 2.8510
29 1.0645 2.7865
30 1.0606 2.7804
31 1.0551 2.7749
32 1.0489 2.7204
33 1.0418 2.7101
34 1.0176 2.6984
35 1.0156 2.6128
36 1.0121 2.5927
37 1.0029 2.5802
38 0.9932 2.5403
39 0.9722 2.5218
40 0.9434 2.4704
41 0.9271 2.3913
42 0.8998 2.3910
43 0.8954 2.3643
44 0.8872 2.3547
45 0.8640 2.3512
46 0.8526 2.3473
47 0.8420 2.3234
48 0.8418 2.3218
49 0.7922 2.2819
50 0.7853 2.2807
51 0.7667 2.2082
52 0.7114 2.1648
53 0.6849 2.1374
54 0.6395 2.1206
55 0.6361 2.1173
56 0.5991 2.1002
57 0.5958 2.0045
58 0.5933 1.9837
59 0.5687 1.9621
60 0.5637 1.9307
61 0.4767 1.8118
West Basin Boeing Predeveloped 200415 4/15/2020 10:12:10 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.5466 1400 22073 1576 Fail
0.5708 1225 20285 1655 Fail
0.5950 1072 18696 1744 Fail
0.6192 930 17184 1847 Fail
0.6434 808 15802 1955 Fail
0.6676 703 14585 2074 Fail
0.6918 611 13494 2208 Fail
0.7160 555 12551 2261 Fail
0.7402 505 11601 2297 Fail
0.7644 463 10712 2313 Fail
0.7886 413 9901 2397 Fail
0.8128 374 9212 2463 Fail
0.8369 345 8594 2491 Fail
0.8611 310 7963 2568 Fail
0.8853 284 7351 2588 Fail
0.9095 263 6842 2601 Fail
0.9337 244 6372 2611 Fail
0.9579 218 5935 2722 Fail
0.9821 206 5548 2693 Fail
1.0063 191 5140 2691 Fail
1.0305 176 4798 2726 Fail
1.0547 160 4472 2795 Fail
1.0789 147 4184 2846 Fail
1.1031 136 3886 2857 Fail
1.1273 127 3630 2858 Fail
1.1515 122 3412 2796 Fail
1.1757 113 3221 2850 Fail
1.1999 107 3039 2840 Fail
1.2241 99 2836 2864 Fail
1.2483 97 2650 2731 Fail
1.2725 92 2511 2729 Fail
1.2967 90 2363 2625 Fail
1.3209 86 2216 2576 Fail
1.3451 80 2082 2602 Fail
1.3693 73 1953 2675 Fail
1.3935 69 1819 2636 Fail
1.4177 65 1718 2643 Fail
1.4419 61 1622 2659 Fail
1.4661 57 1516 2659 Fail
1.4903 56 1421 2537 Fail
1.5145 53 1341 2530 Fail
1.5387 51 1262 2474 Fail
1.5629 47 1192 2536 Fail
1.5871 46 1112 2417 Fail
1.6113 43 1042 2423 Fail
1.6355 39 985 2525 Fail
1.6597 39 940 2410 Fail
1.6839 38 889 2339 Fail
1.7081 38 850 2236 Fail
1.7323 35 805 2300 Fail
1.7565 33 768 2327 Fail
1.7807 32 727 2271 Fail
1.8049 31 693 2235 Fail
1.8291 29 654 2255 Fail
West Basin Boeing Predeveloped 200415 4/15/2020 10:12:10 PM Page 12
1.8533 27 614 2274 Fail
1.8775 25 594 2376 Fail
1.9017 24 565 2354 Fail
1.9259 22 547 2486 Fail
1.9501 21 516 2457 Fail
1.9743 20 488 2440 Fail
1.9985 19 461 2426 Fail
2.0226 17 435 2558 Fail
2.0468 16 423 2643 Fail
2.0710 15 404 2693 Fail
2.0952 14 385 2750 Fail
2.1194 14 371 2650 Fail
2.1436 14 351 2507 Fail
2.1678 14 334 2385 Fail
2.1920 12 322 2683 Fail
2.2162 11 312 2836 Fail
2.2404 10 295 2950 Fail
2.2646 9 281 3122 Fail
2.2888 9 269 2988 Fail
2.3130 8 260 3250 Fail
2.3372 8 248 3100 Fail
2.3614 6 236 3933 Fail
2.3856 6 228 3800 Fail
2.4098 5 215 4300 Fail
2.4340 5 210 4200 Fail
2.4582 4 200 5000 Fail
2.4824 3 190 6333 Fail
2.5066 3 181 6033 Fail
2.5308 2 178 8900 Fail
2.5550 2 171 8550 Fail
2.5792 2 163 8150 Fail
2.6034 2 156 7800 Fail
2.6276 2 148 7400 Fail
2.6518 2 141 7050 Fail
2.6760 2 137 6850 Fail
2.7002 2 135 6750 Fail
2.7244 2 129 6450 Fail
2.7486 2 124 6200 Fail
2.7728 2 118 5900 Fail
2.7970 2 110 5500 Fail
2.8212 2 107 5350 Fail
2.8454 2 106 5300 Fail
2.8696 2 103 5150 Fail
2.8938 2 103 5150 Fail
2.9180 2 96 4800 Fail
2.9422 2 90 4500 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
West Basin Boeing Predeveloped 200415 4/15/2020 10:12:10 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
West Basin Boeing Predeveloped 200415 4/15/2020 10:12:10 PM Page 14
LID Report
West Basin Boeing Predeveloped 200415 4/15/2020 10:12:31 PM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2020; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
EAST BASIN PRE-DEVELOPED CONDITIONS
East Basin Boeing Predeveloped 200415 4/15/2020 10:20:43 PM Page 2
General Model Information
Project Name:East Basin Boeing Predeveloped 200415
Site Name:
Site Address:
City:
Report Date:4/15/2020
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/10/10
Version:4.2.16
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
East Basin Boeing Predeveloped 200415 4/15/2020 10:20:43 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 4.52
Pervious Total 4.52
Impervious Land Use acre
PARKING FLAT 0.56
Impervious Total 0.56
Basin Total 5.08
Element Flows To:
Surface Interflow Groundwater
East Basin Boeing Predeveloped 200415 4/15/2020 10:20:43 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.25
Pervious Total 0.25
Impervious Land Use acre
PARKING FLAT 4.83
Impervious Total 4.83
Basin Total 5.08
Element Flows To:
Surface Interflow Groundwater
East Basin Boeing Predeveloped 200415 4/15/2020 10:20:43 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:4.52
Total Impervious Area:0.56
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.25
Total Impervious Area:4.83
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.549748
5 year 0.87983
10 year 1.136797
25 year 1.505985
50 year 1.814024
100 year 2.150979
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 1.857622
5 year 2.351686
10 year 2.687951
25 year 3.12473
50 year 3.459429
100 year 3.802577
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.994 2.421
1950 1.062 2.583
1951 0.569 1.512
1952 0.297 1.328
1953 0.241 1.434
1954 0.417 1.511
1955 0.426 1.709
1956 0.479 1.683
1957 0.652 1.919
1958 0.337 1.538
East Basin Boeing Predeveloped 200415 4/15/2020 10:21:13 PM Page 8
1959 0.298 1.560
1960 0.616 1.555
1961 0.504 1.637
1962 0.260 1.416
1963 0.488 1.584
1964 0.447 1.539
1965 0.718 1.980
1966 0.323 1.314
1967 1.076 2.268
1968 0.689 2.579
1969 0.644 1.802
1970 0.480 1.731
1971 0.656 2.065
1972 0.968 2.152
1973 0.265 1.279
1974 0.620 1.889
1975 0.689 2.151
1976 0.474 1.463
1977 0.424 1.566
1978 0.487 1.918
1979 0.387 2.627
1980 1.178 2.403
1981 0.484 1.939
1982 1.098 2.745
1983 0.545 2.218
1984 0.374 1.405
1985 0.504 1.936
1986 0.554 1.671
1987 0.532 2.576
1988 0.222 1.558
1989 0.227 1.948
1990 2.080 3.376
1991 1.365 2.680
1992 0.406 1.391
1993 0.246 1.200
1994 0.185 1.300
1995 0.401 1.718
1996 0.910 1.846
1997 0.643 1.788
1998 0.488 1.796
1999 1.499 3.707
2000 0.541 1.838
2001 0.319 2.005
2002 0.950 2.371
2003 0.740 1.842
2004 1.170 3.464
2005 0.552 1.584
2006 0.549 1.403
2007 1.918 3.242
2008 1.336 2.633
2009 0.736 2.381
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 2.0798 3.7065
2 1.9176 3.4641
3 1.4985 3.3756
East Basin Boeing Predeveloped 200415 4/15/2020 10:21:13 PM Page 9
4 1.3654 3.2416
5 1.3360 2.7448
6 1.1777 2.6802
7 1.1699 2.6331
8 1.0983 2.6268
9 1.0764 2.5831
10 1.0619 2.5795
11 0.9936 2.5756
12 0.9681 2.4213
13 0.9505 2.4025
14 0.9095 2.3809
15 0.7403 2.3707
16 0.7357 2.2680
17 0.7178 2.2176
18 0.6895 2.1523
19 0.6886 2.1506
20 0.6563 2.0649
21 0.6515 2.0047
22 0.6439 1.9795
23 0.6431 1.9481
24 0.6195 1.9388
25 0.6159 1.9356
26 0.5687 1.9192
27 0.5539 1.9177
28 0.5525 1.8888
29 0.5493 1.8460
30 0.5449 1.8420
31 0.5413 1.8384
32 0.5325 1.8022
33 0.5042 1.7955
34 0.5035 1.7877
35 0.4884 1.7310
36 0.4884 1.7177
37 0.4869 1.7094
38 0.4836 1.6830
39 0.4804 1.6708
40 0.4785 1.6366
41 0.4738 1.5843
42 0.4467 1.5840
43 0.4264 1.5664
44 0.4245 1.5601
45 0.4171 1.5578
46 0.4063 1.5550
47 0.4008 1.5394
48 0.3874 1.5383
49 0.3739 1.5117
50 0.3375 1.5110
51 0.3225 1.4629
52 0.3185 1.4343
53 0.2981 1.4161
54 0.2968 1.4049
55 0.2655 1.4027
56 0.2595 1.3914
57 0.2460 1.3281
58 0.2407 1.3143
59 0.2270 1.3000
60 0.2220 1.2792
61 0.1854 1.2004
East Basin Boeing Predeveloped 200415 4/15/2020 10:21:13 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.2749 1771 35826 2022 Fail
0.2904 1451 32768 2258 Fail
0.3060 1217 30137 2476 Fail
0.3215 1021 27570 2700 Fail
0.3371 839 25260 3010 Fail
0.3526 715 23271 3254 Fail
0.3682 597 21365 3578 Fail
0.3837 518 19714 3805 Fail
0.3992 446 18191 4078 Fail
0.4148 393 16827 4281 Fail
0.4303 340 15507 4560 Fail
0.4459 307 14365 4679 Fail
0.4614 279 13293 4764 Fail
0.4770 251 12414 4945 Fail
0.4925 219 11505 5253 Fail
0.5081 206 10607 5149 Fail
0.5236 187 9860 5272 Fail
0.5392 170 9157 5386 Fail
0.5547 155 8590 5541 Fail
0.5703 146 7982 5467 Fail
0.5858 130 7411 5700 Fail
0.6014 121 6881 5686 Fail
0.6169 117 6432 5497 Fail
0.6325 111 5985 5391 Fail
0.6480 100 5602 5602 Fail
0.6635 92 5212 5665 Fail
0.6791 89 4870 5471 Fail
0.6946 85 4558 5362 Fail
0.7102 82 4259 5193 Fail
0.7257 80 3974 4967 Fail
0.7413 72 3715 5159 Fail
0.7568 69 3499 5071 Fail
0.7724 65 3300 5076 Fail
0.7879 61 3133 5136 Fail
0.8035 59 2935 4974 Fail
0.8190 55 2738 4978 Fail
0.8346 52 2573 4948 Fail
0.8501 50 2434 4868 Fail
0.8657 48 2301 4793 Fail
0.8812 45 2167 4815 Fail
0.8968 42 2040 4857 Fail
0.9123 41 1915 4670 Fail
0.9278 39 1791 4592 Fail
0.9434 37 1698 4589 Fail
0.9589 35 1595 4557 Fail
0.9745 33 1492 4521 Fail
0.9900 32 1406 4393 Fail
1.0056 31 1321 4261 Fail
1.0211 30 1257 4190 Fail
1.0367 29 1187 4093 Fail
1.0522 28 1109 3960 Fail
1.0678 25 1047 4188 Fail
1.0833 24 985 4104 Fail
1.0989 23 943 4100 Fail
East Basin Boeing Predeveloped 200415 4/15/2020 10:21:13 PM Page 12
1.1144 22 892 4054 Fail
1.1300 19 858 4515 Fail
1.1455 17 809 4758 Fail
1.1611 17 774 4552 Fail
1.1766 13 732 5630 Fail
1.1921 12 702 5850 Fail
1.2077 12 665 5541 Fail
1.2232 12 622 5183 Fail
1.2388 11 602 5472 Fail
1.2543 9 575 6388 Fail
1.2699 9 552 6133 Fail
1.2854 9 525 5833 Fail
1.3010 9 501 5566 Fail
1.3165 8 479 5987 Fail
1.3321 7 449 6414 Fail
1.3476 6 430 7166 Fail
1.3632 6 414 6900 Fail
1.3787 5 396 7919 Fail
1.3943 5 382 7640 Fail
1.4098 5 366 7319 Fail
1.4253 5 348 6960 Fail
1.4409 4 333 8325 Fail
1.4564 4 320 8000 Fail
1.4720 4 308 7700 Fail
1.4875 4 294 7350 Fail
1.5031 2 281 14050 Fail
1.5186 2 268 13400 Fail
1.5342 2 260 13000 Fail
1.5497 2 248 12400 Fail
1.5653 2 236 11800 Fail
1.5808 2 228 11400 Fail
1.5964 2 215 10750 Fail
1.6119 2 210 10500 Fail
1.6275 2 201 10050 Fail
1.6430 2 192 9600 Fail
1.6586 2 182 9100 Fail
1.6741 2 178 8900 Fail
1.6896 2 171 8550 Fail
1.7052 2 166 8300 Fail
1.7207 2 157 7850 Fail
1.7363 2 149 7450 Fail
1.7518 2 145 7250 Fail
1.7674 2 138 6900 Fail
1.7829 2 137 6850 Fail
1.7985 2 132 6600 Fail
1.8140 2 125 6250 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
East Basin Boeing Predeveloped 200415 4/15/2020 10:21:13 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
East Basin Boeing Predeveloped 200415 4/15/2020 10:21:13 PM Page 14
LID Report
East Basin Boeing Predeveloped 200415 4/15/2020 10:21:23 PM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2020; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
WEST BASIN SEDIMENT POND
TG West Basin Sed Pond 200415 4/15/2020 8:49:04 PM Page 2
General Model Information
Project Name:TG West Basin Sed Pond 200415
Site Name:
Site Address:
City:
Report Date:4/15/2020
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/10/10
Version:4.2.16
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
TG West Basin Sed Pond 200415 4/15/2020 8:49:04 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 5.94
Pervious Total 5.94
Impervious Land Use acre
Impervious Total 0
Basin Total 5.94
Element Flows To:
Surface Interflow Groundwater
TG West Basin Sed Pond 200415 4/15/2020 8:49:04 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 1.54
Pervious Total 1.54
Impervious Land Use acre
ROOF TOPS FLAT 0.59
SIDEWALKS FLAT 1.19
PARKING FLAT 2.62
Impervious Total 4.4
Basin Total 5.94
Element Flows To:
Surface Interflow Groundwater
TG West Basin Sed Pond 200415 4/15/2020 8:49:05 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:5.94
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:1.54
Total Impervious Area:4.4
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.174641
5 year 0.27428
10 year 0.330748
25 year 0.39057
50 year 0.427588
100 year 0.459074
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 1.775914
5 year 2.279421
10 year 2.625764
25 year 3.079393
50 year 3.429553
100 year 3.790614
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.172 2.396
1950 0.214 2.383
1951 0.385 1.492
1952 0.121 1.224
1953 0.098 1.323
1954 0.151 1.447
1955 0.240 1.617
1956 0.191 1.598
1957 0.154 1.874
1958 0.174 1.448
TG West Basin Sed Pond 200415 4/15/2020 8:50:29 PM Page 8
1959 0.149 1.422
1960 0.260 1.544
1961 0.147 1.583
1962 0.091 1.318
1963 0.125 1.532
1964 0.165 1.438
1965 0.118 1.946
1966 0.114 1.244
1967 0.237 2.163
1968 0.148 2.464
1969 0.145 1.769
1970 0.120 1.659
1971 0.128 1.980
1972 0.286 2.171
1973 0.130 1.166
1974 0.141 1.838
1975 0.191 1.960
1976 0.138 1.422
1977 0.016 1.429
1978 0.121 1.767
1979 0.073 2.417
1980 0.271 2.451
1981 0.108 1.842
1982 0.209 2.664
1983 0.187 2.067
1984 0.115 1.342
1985 0.069 1.845
1986 0.303 1.557
1987 0.268 2.388
1988 0.106 1.419
1989 0.069 1.775
1990 0.560 3.568
1991 0.337 2.750
1992 0.130 1.329
1993 0.135 1.122
1994 0.046 1.184
1995 0.194 1.624
1996 0.409 1.840
1997 0.342 1.756
1998 0.077 1.678
1999 0.321 3.638
2000 0.135 1.771
2001 0.024 1.851
2002 0.148 2.357
2003 0.189 1.832
2004 0.244 3.380
2005 0.175 1.551
2006 0.207 1.391
2007 0.416 3.183
2008 0.536 2.700
2009 0.263 2.173
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.5598 3.6377
2 0.5360 3.5684
3 0.4155 3.3802
TG West Basin Sed Pond 200415 4/15/2020 8:50:29 PM Page 9
4 0.4092 3.1831
5 0.3846 2.7498
6 0.3421 2.6999
7 0.3371 2.6641
8 0.3208 2.4637
9 0.3027 2.4514
10 0.2864 2.4171
11 0.2714 2.3962
12 0.2678 2.3884
13 0.2632 2.3835
14 0.2600 2.3570
15 0.2444 2.1725
16 0.2400 2.1706
17 0.2375 2.1627
18 0.2139 2.0674
19 0.2086 1.9797
20 0.2068 1.9603
21 0.1942 1.9460
22 0.1913 1.8737
23 0.1910 1.8514
24 0.1888 1.8450
25 0.1870 1.8418
26 0.1753 1.8398
27 0.1736 1.8377
28 0.1716 1.8319
29 0.1650 1.7750
30 0.1541 1.7706
31 0.1505 1.7689
32 0.1489 1.7673
33 0.1481 1.7559
34 0.1480 1.6784
35 0.1467 1.6586
36 0.1449 1.6237
37 0.1412 1.6172
38 0.1383 1.5978
39 0.1354 1.5826
40 0.1350 1.5571
41 0.1301 1.5508
42 0.1300 1.5439
43 0.1278 1.5323
44 0.1253 1.4921
45 0.1214 1.4478
46 0.1212 1.4471
47 0.1195 1.4377
48 0.1181 1.4295
49 0.1155 1.4221
50 0.1136 1.4215
51 0.1085 1.4193
52 0.1057 1.3908
53 0.0980 1.3415
54 0.0913 1.3291
55 0.0774 1.3231
56 0.0733 1.3179
57 0.0689 1.2437
58 0.0685 1.2244
59 0.0455 1.1844
60 0.0242 1.1659
61 0.0165 1.1220
TG West Basin Sed Pond 200415 4/15/2020 8:50:30 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0873 17706 118451 668 Fail
0.0908 16439 115564 702 Fail
0.0942 15019 111842 744 Fail
0.0976 14040 109190 777 Fail
0.1011 12829 105789 824 Fail
0.1045 11954 103351 864 Fail
0.1079 11137 101041 907 Fail
0.1114 10190 98025 961 Fail
0.1148 9535 95800 1004 Fail
0.1183 8778 92977 1059 Fail
0.1217 8269 90967 1100 Fail
0.1251 7617 88400 1160 Fail
0.1286 7133 86432 1211 Fail
0.1320 6588 83930 1273 Fail
0.1354 6194 82090 1325 Fail
0.1389 5861 80379 1371 Fail
0.1423 5461 78133 1430 Fail
0.1458 5174 76529 1479 Fail
0.1492 4819 74412 1544 Fail
0.1526 4575 72850 1592 Fail
0.1561 4256 70861 1664 Fail
0.1595 4045 69492 1717 Fail
0.1629 3850 68102 1768 Fail
0.1664 3566 66263 1858 Fail
0.1698 3382 64915 1919 Fail
0.1732 3146 63204 2009 Fail
0.1767 2984 61942 2075 Fail
0.1801 2791 60338 2161 Fail
0.1836 2622 59204 2257 Fail
0.1870 2485 57985 2333 Fail
0.1904 2325 56531 2431 Fail
0.1939 2188 55376 2530 Fail
0.1973 2041 53921 2641 Fail
0.2007 1927 52895 2744 Fail
0.2042 1793 51568 2876 Fail
0.2076 1712 50606 2955 Fail
0.2111 1589 49344 3105 Fail
0.2145 1497 48403 3233 Fail
0.2179 1397 47440 3395 Fail
0.2214 1300 46264 3558 Fail
0.2248 1239 45408 3664 Fail
0.2282 1159 44232 3816 Fail
0.2317 1104 43462 3936 Fail
0.2351 1049 42435 4045 Fail
0.2386 1006 41601 4135 Fail
0.2420 951 40788 4288 Fail
0.2454 890 39805 4472 Fail
0.2489 849 38992 4592 Fail
0.2523 790 38029 4813 Fail
0.2557 748 37323 4989 Fail
0.2592 716 36447 5090 Fail
0.2626 678 35762 5274 Fail
0.2660 631 34885 5528 Fail
0.2695 601 34243 5697 Fail
TG West Basin Sed Pond 200415 4/15/2020 8:50:30 PM Page 12
0.2729 575 33645 5851 Fail
0.2764 541 32853 6072 Fail
0.2798 507 32297 6370 Fail
0.2832 475 31506 6632 Fail
0.2867 442 30928 6997 Fail
0.2901 401 30244 7542 Fail
0.2935 376 29688 7895 Fail
0.2970 353 29174 8264 Fail
0.3004 326 28490 8739 Fail
0.3039 302 27998 9270 Fail
0.3073 275 27356 9947 Fail
0.3107 260 26907 10348 Fail
0.3142 235 26244 11167 Fail
0.3176 219 25816 11788 Fail
0.3210 195 25196 12921 Fail
0.3245 182 24768 13608 Fail
0.3279 161 24298 15091 Fail
0.3314 146 23699 16232 Fail
0.3348 134 23314 17398 Fail
0.3382 119 22779 19142 Fail
0.3417 110 22373 20339 Fail
0.3451 97 21859 22535 Fail
0.3485 93 21496 23113 Fail
0.3520 87 21139 24297 Fail
0.3554 78 20666 26494 Fail
0.3588 69 20300 29420 Fail
0.3623 62 19853 32020 Fail
0.3657 56 19543 34898 Fail
0.3692 48 19109 39810 Fail
0.3726 42 18794 44747 Fail
0.3760 38 18386 48384 Fail
0.3795 33 18095 54833 Fail
0.3829 29 17802 61386 Fail
0.3863 23 17440 75826 Fail
0.3898 21 17154 81685 Fail
0.3932 20 16771 83855 Fail
0.3967 19 16495 86815 Fail
0.4001 17 16123 94841 Fail
0.4035 14 15834 113100 Fail
0.4070 13 15567 119746 Fail
0.4104 9 15246 169400 Fail
0.4138 4 14985 374625 Fail
0.4173 3 14679 489300 Fail
0.4207 3 14457 481900 Fail
0.4242 3 14164 472133 Fail
0.4276 3 13926 464200 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
TG West Basin Sed Pond 200415 4/15/2020 8:50:31 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
TG West Basin Sed Pond 200415 4/15/2020 8:50:31 PM Page 14
LID Report
TG West Basin Sed Pond 200415 4/15/2020 8:55:07 PM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2020; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
EAST BASIN SEDIMENT POND
East Basin Sed Pond_210610 7/9/2021 2:51:20 PM Page 2
General Model Information
Project Name:East Basin Sed Pond_210610
Site Name:TG Renton-East Basin
Site Address:
City:
Report Date:7/9/2021
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
East Basin Sed Pond_210610 7/9/2021 2:51:20 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 6.29
Pervious Total 6.29
Impervious Land Use acre
Impervious Total 0
Basin Total 6.29
Element Flows To:
Surface Interflow Groundwater
East Basin Sed Pond_210610 7/9/2021 2:51:20 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.62
Pervious Total 0.62
Impervious Land Use acre
PARKING FLAT 5.67
Impervious Total 5.67
Basin Total 6.29
Element Flows To:
Surface Interflow Groundwater
East Basin Sed Pond_210610 7/9/2021 2:51:20 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:6.29
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.62
Total Impervious Area:5.67
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.184931
5 year 0.290442
10 year 0.350236
25 year 0.413583
50 year 0.452783
100 year 0.486124
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 2.201607
5 year 2.794358
10 year 3.198593
25 year 3.724477
50 year 4.128009
100 year 4.542172
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.182 2.890
1950 0.227 3.040
1951 0.407 1.803
1952 0.128 1.563
1953 0.104 1.688
1954 0.159 1.791
1955 0.254 2.022
1956 0.202 1.992
1957 0.163 2.284
1958 0.184 1.817
East Basin Sed Pond_210610 7/9/2021 2:53:31 PM Page 8
1959 0.158 1.832
1960 0.275 1.857
1961 0.155 1.944
1962 0.097 1.669
1963 0.133 1.882
1964 0.175 1.810
1965 0.125 2.359
1966 0.120 1.554
1967 0.251 2.686
1968 0.157 3.056
1969 0.153 2.147
1970 0.127 2.052
1971 0.135 2.449
1972 0.303 2.579
1973 0.138 1.502
1974 0.150 2.246
1975 0.203 2.525
1976 0.146 1.739
1977 0.017 1.839
1978 0.129 2.254
1979 0.078 3.090
1980 0.287 2.886
1981 0.115 2.295
1982 0.221 3.263
1983 0.198 2.615
1984 0.122 1.665
1985 0.073 2.293
1986 0.321 1.970
1987 0.284 3.034
1988 0.112 1.829
1989 0.073 2.287
1990 0.593 4.085
1991 0.357 3.223
1992 0.138 1.649
1993 0.143 1.416
1994 0.048 1.526
1995 0.206 2.031
1996 0.433 2.206
1997 0.362 2.130
1998 0.082 2.118
1999 0.340 4.416
2000 0.143 2.182
2001 0.026 2.360
2002 0.157 2.832
2003 0.200 2.201
2004 0.259 4.122
2005 0.186 1.886
2006 0.219 1.675
2007 0.440 3.863
2008 0.568 3.166
2009 0.279 2.796
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.5928 4.4161
2 0.5676 4.1225
3 0.4400 4.0854
East Basin Sed Pond_210610 7/9/2021 2:53:31 PM Page 9
4 0.4333 3.8627
5 0.4072 3.2628
6 0.3622 3.2230
7 0.3569 3.1660
8 0.3397 3.0897
9 0.3205 3.0564
10 0.3033 3.0399
11 0.2874 3.0340
12 0.2835 2.8898
13 0.2787 2.8857
14 0.2754 2.8321
15 0.2588 2.7959
16 0.2541 2.6865
17 0.2515 2.6151
18 0.2265 2.5788
19 0.2209 2.5249
20 0.2190 2.4485
21 0.2056 2.3597
22 0.2026 2.3593
23 0.2022 2.2948
24 0.1999 2.2925
25 0.1981 2.2870
26 0.1857 2.2841
27 0.1839 2.2540
28 0.1817 2.2464
29 0.1747 2.2064
30 0.1632 2.2006
31 0.1594 2.1820
32 0.1577 2.1473
33 0.1569 2.1303
34 0.1567 2.1184
35 0.1553 2.0524
36 0.1535 2.0311
37 0.1495 2.0216
38 0.1465 1.9918
39 0.1434 1.9701
40 0.1430 1.9441
41 0.1378 1.8863
42 0.1377 1.8819
43 0.1353 1.8571
44 0.1327 1.8395
45 0.1285 1.8317
46 0.1283 1.8287
47 0.1265 1.8173
48 0.1251 1.8104
49 0.1223 1.8032
50 0.1202 1.7913
51 0.1149 1.7394
52 0.1119 1.6878
53 0.1038 1.6747
54 0.0967 1.6693
55 0.0819 1.6646
56 0.0776 1.6487
57 0.0730 1.5627
58 0.0726 1.5544
59 0.0482 1.5261
60 0.0256 1.5018
61 0.0174 1.4163
East Basin Sed Pond_210610 7/9/2021 2:53:31 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0925 17753 127306 717 Fail
0.0961 16198 123841 764 Fail
0.0997 15197 121296 798 Fail
0.1034 13945 118195 847 Fail
0.1070 12816 115157 898 Fail
0.1107 11978 112954 943 Fail
0.1143 10960 110131 1004 Fail
0.1179 10309 108056 1048 Fail
0.1216 9486 105425 1111 Fail
0.1252 8769 102944 1173 Fail
0.1289 8288 101105 1219 Fail
0.1325 7668 98795 1288 Fail
0.1361 7080 96528 1363 Fail
0.1398 6684 94838 1418 Fail
0.1434 6188 92656 1497 Fail
0.1471 5781 90539 1566 Fail
0.1507 5499 88999 1618 Fail
0.1543 5138 86967 1692 Fail
0.1580 4877 85555 1754 Fail
0.1616 4571 83630 1829 Fail
0.1653 4267 81769 1916 Fail
0.1689 4070 80379 1974 Fail
0.1725 3820 78561 2056 Fail
0.1762 3557 76829 2159 Fail
0.1798 3379 75588 2236 Fail
0.1835 3157 73941 2342 Fail
0.1871 2954 72380 2450 Fail
0.1907 2817 71182 2526 Fail
0.1944 2616 69663 2662 Fail
0.1980 2447 68187 2786 Fail
0.2017 2331 67097 2878 Fail
0.2053 2167 65685 3031 Fail
0.2089 2059 64658 3140 Fail
0.2126 1917 63311 3302 Fail
0.2162 1793 61942 3454 Fail
0.2199 1715 60958 3554 Fail
0.2235 1604 59696 3721 Fail
0.2271 1484 58541 3944 Fail
0.2308 1396 57600 4126 Fail
0.2344 1300 56402 4338 Fail
0.2380 1221 55226 4523 Fail
0.2417 1168 54392 4656 Fail
0.2453 1101 53237 4835 Fail
0.2490 1062 52403 4934 Fail
0.2526 1006 51397 5109 Fail
0.2562 930 50349 5413 Fail
0.2599 893 49601 5554 Fail
0.2635 843 48681 5774 Fail
0.2672 790 47740 6043 Fail
0.2708 748 47013 6285 Fail
0.2744 719 46093 6410 Fail
0.2781 670 45152 6739 Fail
0.2817 639 44510 6965 Fail
0.2854 599 43569 7273 Fail
East Basin Sed Pond_210610 7/9/2021 2:53:31 PM Page 12
0.2890 565 42735 7563 Fail
0.2926 542 42093 7766 Fail
0.2963 499 41280 8272 Fail
0.2999 478 40681 8510 Fail
0.3036 440 39954 9080 Fail
0.3072 401 39163 9766 Fail
0.3108 378 38543 10196 Fail
0.3145 350 37751 10786 Fail
0.3181 323 37024 11462 Fail
0.3218 301 36511 12129 Fail
0.3254 276 35762 12957 Fail
0.3290 256 35078 13702 Fail
0.3327 239 34586 14471 Fail
0.3363 218 33944 15570 Fail
0.3400 203 33452 16478 Fail
0.3436 184 32832 17843 Fail
0.3472 158 32212 20387 Fail
0.3509 146 31762 21754 Fail
0.3545 132 31142 23592 Fail
0.3582 119 30586 25702 Fail
0.3618 110 30137 27397 Fail
0.3654 97 29581 30495 Fail
0.3691 91 29067 31941 Fail
0.3727 85 28682 33743 Fail
0.3764 77 28148 36555 Fail
0.3800 69 27720 40173 Fail
0.3836 63 27207 43185 Fail
0.3873 55 26715 48572 Fail
0.3909 48 26330 54854 Fail
0.3945 42 25859 61569 Fail
0.3982 38 25389 66813 Fail
0.4018 33 25025 75833 Fail
0.4055 28 24597 87846 Fail
0.4091 22 24105 109568 Fail
0.4127 21 23763 113157 Fail
0.4164 20 23335 116675 Fail
0.4200 19 22865 120342 Fail
0.4237 17 22565 132735 Fail
0.4273 14 22159 158278 Fail
0.4309 13 21859 168146 Fail
0.4346 9 21496 238844 Fail
0.4382 4 21094 527350 Fail
0.4419 3 20818 693933 Fail
0.4455 3 20443 681433 Fail
0.4491 3 20082 669400 Fail
0.4528 3 19791 659700 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
East Basin Sed Pond_210610 7/9/2021 2:53:32 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0.5242 acre-feet
On-line facility target flow:0.6671 cfs.
Adjusted for 15 min:0.6671 cfs.
Off-line facility target flow:0.3773 cfs.
Adjusted for 15 min:0.3773 cfs.
East Basin Sed Pond_210610 7/9/2021 2:53:32 PM Page 14
LID Report
East Basin Sed Pond_210610 7/9/2021 2:57:22 PM Page 25
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2021; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
WEST BASIN WATER QUALITY
West Basin WQ Sizing_210810 8/12/2021 11:52:59 AM Page 2
General Model Information
Project Name:West Basin WQ Sizing_210810
Site Name:TG Renton-East Basin
Site Address:
City:
Report Date:8/12/2021
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
West Basin WQ Sizing_210810 8/12/2021 11:52:59 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 3.3
Pervious Total 3.3
Impervious Land Use acre
Impervious Total 0
Basin Total 3.3
Element Flows To:
Surface Interflow Groundwater
West Basin WQ Sizing_210810 8/12/2021 11:52:59 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.89
Pervious Total 0.89
Impervious Land Use acre
PARKING FLAT 2.41
Impervious Total 2.41
Basin Total 3.3
Element Flows To:
Surface Interflow Groundwater
West Basin WQ Sizing_210810 8/12/2021 11:52:59 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:3.3
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.89
Total Impervious Area:2.41
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.097023
5 year 0.152378
10 year 0.183749
25 year 0.216983
50 year 0.237549
100 year 0.255041
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.975727
5 year 1.253634
10 year 1.444944
25 year 1.69567
50 year 1.889311
100 year 2.089064
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.095 1.319
1950 0.119 1.307
1951 0.214 0.821
1952 0.067 0.671
1953 0.054 0.725
1954 0.084 0.795
1955 0.133 0.888
1956 0.106 0.877
1957 0.086 1.031
1958 0.096 0.795
West Basin WQ Sizing_210810 8/12/2021 11:53:32 AM Page 8
1959 0.083 0.779
1960 0.144 0.850
1961 0.082 0.870
1962 0.051 0.723
1963 0.070 0.842
1964 0.092 0.790
1965 0.066 1.071
1966 0.063 0.683
1967 0.132 1.188
1968 0.082 1.353
1969 0.081 0.973
1970 0.066 0.911
1971 0.071 1.088
1972 0.159 1.196
1973 0.072 0.639
1974 0.078 1.011
1975 0.106 1.074
1976 0.077 0.782
1977 0.009 0.783
1978 0.067 0.970
1979 0.041 1.325
1980 0.151 1.352
1981 0.060 1.011
1982 0.116 1.465
1983 0.104 1.134
1984 0.064 0.737
1985 0.038 1.013
1986 0.168 0.854
1987 0.149 1.310
1988 0.059 0.777
1989 0.038 0.972
1990 0.311 1.972
1991 0.187 1.517
1992 0.072 0.730
1993 0.075 0.616
1994 0.025 0.649
1995 0.108 0.891
1996 0.227 1.013
1997 0.190 0.966
1998 0.043 0.921
1999 0.178 2.002
2000 0.075 0.973
2001 0.013 1.015
2002 0.082 1.298
2003 0.105 1.009
2004 0.136 1.859
2005 0.097 0.853
2006 0.115 0.766
2007 0.231 1.758
2008 0.298 1.489
2009 0.146 1.190
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3110 2.0017
2 0.2978 1.9720
3 0.2309 1.8594
West Basin WQ Sizing_210810 8/12/2021 11:53:32 AM Page 9
4 0.2273 1.7576
5 0.2137 1.5171
6 0.1900 1.4895
7 0.1873 1.4650
8 0.1782 1.3535
9 0.1682 1.3520
10 0.1591 1.3248
11 0.1508 1.3192
12 0.1488 1.3097
13 0.1462 1.3066
14 0.1445 1.2980
15 0.1358 1.1964
16 0.1333 1.1901
17 0.1319 1.1880
18 0.1188 1.1341
19 0.1159 1.0878
20 0.1149 1.0737
21 0.1079 1.0709
22 0.1063 1.0307
23 0.1061 1.0150
24 0.1049 1.0135
25 0.1039 1.0133
26 0.0974 1.0115
27 0.0965 1.0107
28 0.0953 1.0088
29 0.0916 0.9734
30 0.0856 0.9732
31 0.0836 0.9722
32 0.0827 0.9699
33 0.0823 0.9663
34 0.0822 0.9208
35 0.0815 0.9114
36 0.0805 0.8914
37 0.0784 0.8879
38 0.0768 0.8774
39 0.0752 0.8701
40 0.0750 0.8541
41 0.0723 0.8532
42 0.0722 0.8501
43 0.0710 0.8424
44 0.0696 0.8213
45 0.0674 0.7951
46 0.0673 0.7946
47 0.0664 0.7898
48 0.0656 0.7831
49 0.0641 0.7818
50 0.0631 0.7790
51 0.0603 0.7774
52 0.0587 0.7658
53 0.0545 0.7370
54 0.0507 0.7301
55 0.0430 0.7253
56 0.0407 0.7228
57 0.0383 0.6829
58 0.0381 0.6711
59 0.0253 0.6487
60 0.0135 0.6386
61 0.0091 0.6156
West Basin WQ Sizing_210810 8/12/2021 11:53:32 AM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0485 17547 117553 669 Fail
0.0504 16159 114216 706 Fail
0.0523 14964 111008 741 Fail
0.0542 13854 107992 779 Fail
0.0561 12814 105105 820 Fail
0.0581 11811 102303 866 Fail
0.0600 10900 99650 914 Fail
0.0619 10121 97041 958 Fail
0.0638 9383 94517 1007 Fail
0.0657 8731 92100 1054 Fail
0.0676 8145 89854 1103 Fail
0.0695 7593 87544 1152 Fail
0.0714 7060 85299 1208 Fail
0.0733 6590 83138 1261 Fail
0.0752 6145 81085 1319 Fail
0.0772 5777 79139 1369 Fail
0.0791 5431 77214 1421 Fail
0.0810 5097 75396 1479 Fail
0.0829 4808 73535 1529 Fail
0.0848 4522 71802 1587 Fail
0.0867 4252 70112 1648 Fail
0.0886 4017 68508 1705 Fail
0.0905 3784 66883 1767 Fail
0.0924 3546 65321 1842 Fail
0.0943 3337 63824 1912 Fail
0.0962 3138 62370 1987 Fail
0.0982 2952 60958 2064 Fail
0.1001 2791 59653 2137 Fail
0.1020 2603 58242 2237 Fail
0.1039 2451 56916 2322 Fail
0.1058 2312 55611 2405 Fail
0.1077 2160 54328 2515 Fail
0.1096 2026 53108 2621 Fail
0.1115 1900 51953 2734 Fail
0.1134 1790 50798 2837 Fail
0.1153 1689 49708 2943 Fail
0.1173 1590 48660 3060 Fail
0.1192 1484 47526 3202 Fail
0.1211 1383 46478 3360 Fail
0.1230 1293 45515 3520 Fail
0.1249 1225 44489 3631 Fail
0.1268 1157 43590 3767 Fail
0.1287 1098 42649 3884 Fail
0.1306 1048 41708 3979 Fail
0.1325 997 40767 4088 Fail
0.1344 930 39912 4291 Fail
0.1363 884 38970 4408 Fail
0.1383 838 38158 4553 Fail
0.1402 790 37345 4727 Fail
0.1421 743 36553 4919 Fail
0.1440 714 35783 5011 Fail
0.1459 671 35013 5218 Fail
0.1478 630 34243 5435 Fail
0.1497 595 33559 5640 Fail
West Basin WQ Sizing_210810 8/12/2021 11:53:32 AM Page 12
0.1516 566 32875 5808 Fail
0.1535 539 32212 5976 Fail
0.1554 497 31506 6339 Fail
0.1574 473 30885 6529 Fail
0.1593 436 30265 6941 Fail
0.1612 401 29623 7387 Fail
0.1631 370 29046 7850 Fail
0.1650 348 28447 8174 Fail
0.1669 324 27891 8608 Fail
0.1688 296 27313 9227 Fail
0.1707 272 26779 9845 Fail
0.1726 256 26223 10243 Fail
0.1745 235 25709 10940 Fail
0.1764 217 25153 11591 Fail
0.1784 198 24661 12455 Fail
0.1803 180 24127 13403 Fail
0.1822 158 23613 14944 Fail
0.1841 145 23164 15975 Fail
0.1860 130 22715 17473 Fail
0.1879 119 22244 18692 Fail
0.1898 109 21774 19976 Fail
0.1917 97 21382 22043 Fail
0.1936 91 20961 23034 Fail
0.1955 82 20542 25051 Fail
0.1975 76 20144 26505 Fail
0.1994 69 19765 28644 Fail
0.2013 61 19387 31781 Fail
0.2032 54 19023 35227 Fail
0.2051 48 18664 38883 Fail
0.2070 41 18309 44656 Fail
0.2089 38 17956 47252 Fail
0.2108 33 17622 53400 Fail
0.2127 27 17299 64070 Fail
0.2146 22 16983 77195 Fail
0.2165 21 16655 79309 Fail
0.2185 20 16335 81675 Fail
0.2204 19 16003 84226 Fail
0.2223 17 15680 92235 Fail
0.2242 14 15389 109921 Fail
0.2261 12 15103 125858 Fail
0.2280 8 14814 185175 Fail
0.2299 4 14547 363675 Fail
0.2318 3 14309 476966 Fail
0.2337 3 14042 468066 Fail
0.2356 3 13781 459366 Fail
0.2375 3 13548 451600 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
West Basin WQ Sizing_210810 8/12/2021 11:53:32 AM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0.3246 acre-feet
On-line facility target flow:0.3857 cfs.
Adjusted for 15 min:0.3857 cfs.
Off-line facility target flow:0.217 cfs.
Adjusted for 15 min:0.217 cfs.
West Basin WQ Sizing_210810 8/12/2021 11:53:32 AM Page 14
LID Report
West Basin WQ Sizing_210810 8/12/2021 11:53:42 AM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2021; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
EAST BASIN WATER QUALITY
East Basin WQ Sizing_210607 7/9/2021 3:07:46 PM Page 2
General Model Information
Project Name:East Basin WQ Sizing_210607
Site Name:TG Renton-East Basin
Site Address:
City:
Report Date:7/9/2021
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
East Basin WQ Sizing_210607 7/9/2021 3:07:46 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 4.6
Pervious Total 4.6
Impervious Land Use acre
Impervious Total 0
Basin Total 4.6
Element Flows To:
Surface Interflow Groundwater
East Basin WQ Sizing_210607 7/9/2021 3:07:46 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.46
Pervious Total 0.46
Impervious Land Use acre
PARKING FLAT 4.14
Impervious Total 4.14
Basin Total 4.6
Element Flows To:
Surface Interflow Groundwater
East Basin WQ Sizing_210607 7/9/2021 3:07:46 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:4.6
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.46
Total Impervious Area:4.14
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.184931
5 year 0.290442
10 year 0.350236
25 year 0.413583
50 year 0.452783
100 year 0.486124
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 1.607989
5 year 2.041079
10 year 2.33645
25 year 2.720728
50 year 3.015611
100 year 3.318273
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.182 2.111
1950 0.227 2.220
1951 0.407 1.317
1952 0.128 1.141
1953 0.104 1.232
1954 0.159 1.308
1955 0.254 1.476
1956 0.202 1.455
1957 0.163 1.668
1958 0.184 1.327
East Basin WQ Sizing_210607 7/9/2021 3:09:57 PM Page 8
1959 0.158 1.337
1960 0.275 1.357
1961 0.155 1.420
1962 0.097 1.219
1963 0.133 1.375
1964 0.175 1.322
1965 0.125 1.723
1966 0.120 1.135
1967 0.251 1.962
1968 0.157 2.232
1969 0.153 1.569
1970 0.127 1.499
1971 0.135 1.788
1972 0.303 1.884
1973 0.138 1.097
1974 0.150 1.641
1975 0.203 1.844
1976 0.146 1.271
1977 0.017 1.343
1978 0.129 1.646
1979 0.078 2.256
1980 0.287 2.109
1981 0.115 1.676
1982 0.221 2.383
1983 0.198 1.910
1984 0.122 1.216
1985 0.073 1.674
1986 0.321 1.439
1987 0.284 2.216
1988 0.112 1.335
1989 0.073 1.670
1990 0.593 2.986
1991 0.357 2.355
1992 0.138 1.204
1993 0.143 1.034
1994 0.048 1.114
1995 0.206 1.483
1996 0.433 1.612
1997 0.362 1.556
1998 0.082 1.547
1999 0.340 3.226
2000 0.143 1.594
2001 0.026 1.723
2002 0.157 2.069
2003 0.200 1.608
2004 0.259 3.011
2005 0.186 1.378
2006 0.219 1.223
2007 0.440 2.822
2008 0.568 2.313
2009 0.279 2.041
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.5928 3.2259
2 0.5676 3.0113
3 0.4400 2.9857
East Basin WQ Sizing_210607 7/9/2021 3:09:57 PM Page 9
4 0.4333 2.8216
5 0.4072 2.3833
6 0.3622 2.3551
7 0.3569 2.3134
8 0.3397 2.2561
9 0.3205 2.2323
10 0.3033 2.2198
11 0.2874 2.2155
12 0.2835 2.1111
13 0.2787 2.1085
14 0.2754 2.0690
15 0.2588 2.0414
16 0.2541 1.9621
17 0.2515 1.9097
18 0.2265 1.8841
19 0.2209 1.8436
20 0.2190 1.7884
21 0.2056 1.7235
22 0.2026 1.7231
23 0.2022 1.6760
24 0.1999 1.6744
25 0.1981 1.6699
26 0.1857 1.6685
27 0.1839 1.6459
28 0.1817 1.6409
29 0.1747 1.6119
30 0.1632 1.6077
31 0.1594 1.5937
32 0.1577 1.5686
33 0.1569 1.5561
34 0.1567 1.5470
35 0.1553 1.4990
36 0.1535 1.4833
37 0.1495 1.4764
38 0.1465 1.4547
39 0.1434 1.4387
40 0.1430 1.4200
41 0.1378 1.3779
42 0.1377 1.3746
43 0.1353 1.3567
44 0.1327 1.3431
45 0.1285 1.3374
46 0.1283 1.3353
47 0.1265 1.3272
48 0.1251 1.3219
49 0.1223 1.3173
50 0.1202 1.3084
51 0.1149 1.2706
52 0.1119 1.2325
53 0.1038 1.2234
54 0.0967 1.2190
55 0.0819 1.2158
56 0.0776 1.2042
57 0.0730 1.1411
58 0.0726 1.1352
59 0.0482 1.1143
60 0.0256 1.0966
61 0.0174 1.0343
East Basin WQ Sizing_210607 7/9/2021 3:09:57 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0925 17753 102367 576 Fail
0.0961 16198 99116 611 Fail
0.0997 15197 96827 637 Fail
0.1034 13945 93747 672 Fail
0.1070 12816 90817 708 Fail
0.1107 11978 88699 740 Fail
0.1143 10960 85983 784 Fail
0.1179 10309 84015 814 Fail
0.1216 9486 81427 858 Fail
0.1252 8769 78946 900 Fail
0.1289 8288 77149 930 Fail
0.1325 7668 74904 976 Fail
0.1361 7080 72743 1027 Fail
0.1398 6684 71075 1063 Fail
0.1434 6188 69000 1115 Fail
0.1471 5781 67011 1159 Fail
0.1507 5499 65557 1192 Fail
0.1543 5138 63696 1239 Fail
0.1580 4877 62306 1277 Fail
0.1616 4571 60530 1324 Fail
0.1653 4267 58862 1379 Fail
0.1689 4070 57600 1415 Fail
0.1725 3820 55974 1465 Fail
0.1762 3557 54413 1529 Fail
0.1798 3379 53215 1574 Fail
0.1835 3157 51761 1639 Fail
0.1871 2954 50349 1704 Fail
0.1907 2817 49323 1750 Fail
0.1944 2616 48039 1836 Fail
0.1980 2447 46777 1911 Fail
0.2017 2331 45836 1966 Fail
0.2053 2167 44574 2056 Fail
0.2089 2059 43633 2119 Fail
0.2126 1917 42478 2215 Fail
0.2162 1793 41323 2304 Fail
0.2199 1715 40510 2362 Fail
0.2235 1604 39505 2462 Fail
0.2271 1484 38393 2587 Fail
0.2308 1396 37602 2693 Fail
0.2344 1300 36618 2816 Fail
0.2380 1221 35612 2916 Fail
0.2417 1168 34928 2990 Fail
0.2453 1101 34030 3090 Fail
0.2490 1062 33345 3139 Fail
0.2526 1006 32511 3231 Fail
0.2562 930 31677 3406 Fail
0.2599 893 31057 3477 Fail
0.2635 843 30287 3592 Fail
0.2672 790 29495 3733 Fail
0.2708 748 28960 3871 Fail
0.2744 719 28255 3929 Fail
0.2781 670 27506 4105 Fail
0.2817 639 26993 4224 Fail
0.2854 599 26287 4388 Fail
East Basin WQ Sizing_210607 7/9/2021 3:09:57 PM Page 12
0.2890 565 25645 4538 Fail
0.2926 542 25175 4644 Fail
0.2963 499 24554 4920 Fail
0.2999 478 24062 5033 Fail
0.3036 440 23464 5332 Fail
0.3072 401 22843 5696 Fail
0.3108 378 22437 5935 Fail
0.3145 350 21881 6251 Fail
0.3181 323 21361 6613 Fail
0.3218 301 20952 6960 Fail
0.3254 276 20441 7406 Fail
0.3290 256 19930 7785 Fail
0.3327 239 19560 8184 Fail
0.3363 218 19113 8767 Fail
0.3400 203 18801 9261 Fail
0.3436 184 18364 9980 Fail
0.3472 158 17947 11358 Fail
0.3509 146 17635 12078 Fail
0.3545 132 17203 13032 Fail
0.3582 119 16797 14115 Fail
0.3618 110 16506 15005 Fail
0.3654 97 16095 16592 Fail
0.3691 91 15712 17265 Fail
0.3727 85 15460 18188 Fail
0.3764 77 15075 19577 Fail
0.3800 69 14807 21459 Fail
0.3836 63 14467 22963 Fail
0.3873 55 14147 25721 Fail
0.3909 48 13888 28933 Fail
0.3945 42 13599 32378 Fail
0.3982 38 13295 34986 Fail
0.4018 33 13107 39718 Fail
0.4055 28 12831 45825 Fail
0.4091 22 12577 57168 Fail
0.4127 21 12352 58819 Fail
0.4164 20 12087 60434 Fail
0.4200 19 11802 62115 Fail
0.4237 17 11618 68341 Fail
0.4273 14 11360 81142 Fail
0.4309 13 11171 85930 Fail
0.4346 9 10898 121088 Fail
0.4382 4 10647 266175 Fail
0.4419 3 10451 348366 Fail
0.4455 3 10228 340933 Fail
0.4491 3 9993 333100 Fail
0.4528 3 9835 327833 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
East Basin WQ Sizing_210607 7/9/2021 3:09:57 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0.5242 acre-feet
On-line facility target flow:0.6671 cfs.
Adjusted for 15 min:0.6671 cfs.
Off-line facility target flow:0.3773 cfs.
Adjusted for 15 min:0.3773 cfs.
East Basin WQ Sizing_210607 7/9/2021 3:09:57 PM Page 14
LID Report
East Basin WQ Sizing_210607 7/9/2021 3:14:17 PM Page 25
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2021; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
WEST BASIN TO 8TH
West Basin to 8th_210811 8/11/2021 10:17:31 PM Page 2
General Model Information
Project Name:West Basin to 8th_210811
Site Name:TG Renton-East Basin
Site Address:
City:
Report Date:8/11/2021
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
West Basin to 8th_210811 8/11/2021 10:17:31 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 2.64
Pervious Total 2.64
Impervious Land Use acre
Impervious Total 0
Basin Total 2.64
Element Flows To:
Surface Interflow Groundwater
West Basin to 8th_210811 8/11/2021 10:17:31 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.55
Pervious Total 0.55
Impervious Land Use acre
ROOF TOPS FLAT 0.59
SIDEWALKS FLAT 1.19
PARKING FLAT 0.31
Impervious Total 2.09
Basin Total 2.64
Element Flows To:
Surface Interflow Groundwater
West Basin to 8th_210811 8/11/2021 10:17:31 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:2.64
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.55
Total Impervious Area:2.09
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.077618
5 year 0.121902
10 year 0.146999
25 year 0.173587
50 year 0.190039
100 year 0.204033
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.831966
5 year 1.063515
10 year 1.222291
25 year 1.429742
50 year 1.58953
100 year 1.754015
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.076 1.112
1950 0.095 1.128
1951 0.171 0.693
1952 0.054 0.580
1953 0.044 0.626
1954 0.067 0.678
1955 0.107 0.760
1956 0.085 0.750
1957 0.068 0.873
1958 0.077 0.681
West Basin to 8th_210811 8/11/2021 10:18:01 PM Page 8
1959 0.066 0.675
1960 0.116 0.716
1961 0.065 0.739
1962 0.041 0.622
1963 0.056 0.716
1964 0.073 0.674
1965 0.052 0.905
1966 0.050 0.584
1967 0.106 1.014
1968 0.066 1.155
1969 0.064 0.823
1970 0.053 0.777
1971 0.057 0.927
1972 0.127 1.002
1973 0.058 0.554
1974 0.063 0.857
1975 0.085 0.931
1976 0.061 0.663
1977 0.007 0.679
1978 0.054 0.834
1979 0.033 1.145
1980 0.121 1.128
1981 0.048 0.864
1982 0.093 1.243
1983 0.083 0.976
1984 0.051 0.629
1985 0.030 0.865
1986 0.135 0.735
1987 0.119 1.129
1988 0.047 0.674
1989 0.031 0.843
1990 0.249 1.627
1991 0.150 1.264
1992 0.058 0.623
1993 0.060 0.529
1994 0.020 0.563
1995 0.086 0.763
1996 0.182 0.852
1997 0.152 0.816
1998 0.034 0.791
1999 0.143 1.692
2000 0.060 0.828
2001 0.011 0.876
2002 0.066 1.092
2003 0.084 0.849
2004 0.109 1.575
2005 0.078 0.722
2006 0.092 0.645
2007 0.185 1.480
2008 0.238 1.241
2009 0.117 1.031
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.2488 1.6918
2 0.2382 1.6268
3 0.1847 1.5746
West Basin to 8th_210811 8/11/2021 10:18:01 PM Page 9
4 0.1819 1.4802
5 0.1709 1.2635
6 0.1520 1.2428
7 0.1498 1.2408
8 0.1426 1.1545
9 0.1345 1.1448
10 0.1273 1.1287
11 0.1206 1.1281
12 0.1190 1.1279
13 0.1170 1.1119
14 0.1156 1.0923
15 0.1086 1.0315
16 0.1067 1.0139
17 0.1055 1.0020
18 0.0951 0.9755
19 0.0927 0.9310
20 0.0919 0.9267
21 0.0863 0.9046
22 0.0850 0.8759
23 0.0849 0.8727
24 0.0839 0.8651
25 0.0831 0.8644
26 0.0779 0.8567
27 0.0772 0.8520
28 0.0762 0.8489
29 0.0733 0.8431
30 0.0685 0.8336
31 0.0669 0.8278
32 0.0662 0.8226
33 0.0658 0.8164
34 0.0658 0.7913
35 0.0652 0.7766
36 0.0644 0.7631
37 0.0628 0.7599
38 0.0615 0.7500
39 0.0602 0.7391
40 0.0600 0.7348
41 0.0578 0.7217
42 0.0578 0.7157
43 0.0568 0.7155
44 0.0557 0.6928
45 0.0539 0.6813
46 0.0539 0.6787
47 0.0531 0.6776
48 0.0525 0.6754
49 0.0513 0.6741
50 0.0505 0.6738
51 0.0482 0.6629
52 0.0470 0.6450
53 0.0436 0.6287
54 0.0406 0.6262
55 0.0344 0.6228
56 0.0326 0.6221
57 0.0306 0.5843
58 0.0305 0.5796
59 0.0202 0.5626
60 0.0108 0.5537
61 0.0073 0.5290
West Basin to 8th_210811 8/11/2021 10:18:01 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0388 17560 121082 689 Fail
0.0403 16164 117788 728 Fail
0.0419 14966 114730 766 Fail
0.0434 13851 111671 806 Fail
0.0449 12816 108869 849 Fail
0.0464 11811 106153 898 Fail
0.0480 10900 103458 949 Fail
0.0495 10119 101019 998 Fail
0.0510 9385 98602 1050 Fail
0.0526 8731 96228 1102 Fail
0.0541 8145 93961 1153 Fail
0.0556 7593 91694 1207 Fail
0.0571 7060 89555 1268 Fail
0.0587 6590 87523 1328 Fail
0.0602 6147 85470 1390 Fail
0.0617 5777 83502 1445 Fail
0.0633 5431 81555 1501 Fail
0.0648 5097 79695 1563 Fail
0.0663 4808 77898 1620 Fail
0.0678 4524 76166 1683 Fail
0.0694 4252 74433 1750 Fail
0.0709 4017 72829 1813 Fail
0.0724 3782 71203 1882 Fail
0.0739 3546 69599 1962 Fail
0.0755 3337 68145 2042 Fail
0.0770 3138 66712 2125 Fail
0.0785 2952 65214 2209 Fail
0.0801 2785 63824 2291 Fail
0.0816 2597 62434 2404 Fail
0.0831 2447 61151 2499 Fail
0.0846 2304 59867 2598 Fail
0.0862 2160 58605 2713 Fail
0.0877 2024 57322 2832 Fail
0.0892 1898 56146 2958 Fail
0.0907 1790 54926 3068 Fail
0.0923 1687 53729 3184 Fail
0.0938 1583 52616 3323 Fail
0.0953 1483 51590 3478 Fail
0.0969 1379 50520 3663 Fail
0.0984 1292 49515 3832 Fail
0.0999 1217 48510 3986 Fail
0.1014 1155 47526 4114 Fail
0.1030 1098 46563 4240 Fail
0.1045 1050 45665 4349 Fail
0.1060 997 44681 4481 Fail
0.1075 930 43783 4707 Fail
0.1091 884 42927 4855 Fail
0.1106 837 42050 5023 Fail
0.1121 789 41238 5226 Fail
0.1137 743 40425 5440 Fail
0.1152 718 39591 5514 Fail
0.1167 668 38735 5798 Fail
0.1182 633 37944 5994 Fail
0.1198 596 37217 6244 Fail
West Basin to 8th_210811 8/11/2021 10:18:01 PM Page 12
0.1213 569 36511 6416 Fail
0.1228 539 35741 6630 Fail
0.1244 497 35035 7049 Fail
0.1259 474 34350 7246 Fail
0.1274 434 33666 7757 Fail
0.1289 401 33046 8240 Fail
0.1305 370 32447 8769 Fail
0.1320 348 31827 9145 Fail
0.1335 323 31185 9654 Fail
0.1350 296 30586 10333 Fail
0.1366 273 30008 10991 Fail
0.1381 256 29431 11496 Fail
0.1396 235 28918 12305 Fail
0.1412 217 28340 13059 Fail
0.1427 198 27827 14054 Fail
0.1442 180 27271 15150 Fail
0.1457 158 26757 16934 Fail
0.1473 145 26287 18128 Fail
0.1488 130 25795 19842 Fail
0.1503 119 25282 21245 Fail
0.1518 109 24811 22762 Fail
0.1534 97 24340 25092 Fail
0.1549 91 23849 26207 Fail
0.1564 82 23378 28509 Fail
0.1580 76 22972 30226 Fail
0.1595 69 22565 32702 Fail
0.1610 61 22116 36255 Fail
0.1625 54 21752 40281 Fail
0.1641 48 21331 44439 Fail
0.1656 41 20937 51065 Fail
0.1671 38 20542 54057 Fail
0.1687 33 20140 61030 Fail
0.1702 27 19808 73362 Fail
0.1717 22 19425 88295 Fail
0.1732 21 19096 90933 Fail
0.1748 20 18775 93875 Fail
0.1763 19 18495 97342 Fail
0.1778 17 18142 106717 Fail
0.1793 14 17836 127400 Fail
0.1809 12 17511 145925 Fail
0.1824 8 17203 215037 Fail
0.1839 4 16931 423275 Fail
0.1855 3 16587 552900 Fail
0.1870 3 16298 543266 Fail
0.1885 3 16003 533433 Fail
0.1900 3 15714 523800 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
West Basin to 8th_210811 8/11/2021 10:18:01 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0.2734 acre-feet
On-line facility target flow:0.3356 cfs.
Adjusted for 15 min:0.3356 cfs.
Off-line facility target flow:0.189 cfs.
Adjusted for 15 min:0.189 cfs.
West Basin to 8th_210811 8/11/2021 10:18:01 PM Page 14
LID Report
West Basin to 8th_210811 8/11/2021 10:18:24 PM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2021; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
WEST BASIN TO LOGAN
West Basin to Logan_210811 8/11/2021 10:42:44 PM Page 2
General Model Information
Project Name:West Basin to Logan_210811
Site Name:TG Renton-East Basin
Site Address:
City:
Report Date:8/11/2021
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
West Basin to Logan_210811 8/11/2021 10:42:44 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 3.3
Pervious Total 3.3
Impervious Land Use acre
Impervious Total 0
Basin Total 3.3
Element Flows To:
Surface Interflow Groundwater
West Basin to Logan_210811 8/11/2021 10:42:44 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.89
Pervious Total 0.89
Impervious Land Use acre
PARKING FLAT 2.41
Impervious Total 2.41
Basin Total 3.3
Element Flows To:
Surface Interflow Groundwater
West Basin to Logan_210811 8/11/2021 10:42:44 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:3.3
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.89
Total Impervious Area:2.41
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.097023
5 year 0.152378
10 year 0.183749
25 year 0.216983
50 year 0.237549
100 year 0.255041
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.975727
5 year 1.253634
10 year 1.444944
25 year 1.69567
50 year 1.889311
100 year 2.089064
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.095 1.319
1950 0.119 1.307
1951 0.214 0.821
1952 0.067 0.671
1953 0.054 0.725
1954 0.084 0.795
1955 0.133 0.888
1956 0.106 0.877
1957 0.086 1.031
1958 0.096 0.795
West Basin to Logan_210811 8/11/2021 10:43:14 PM Page 8
1959 0.083 0.779
1960 0.144 0.850
1961 0.082 0.870
1962 0.051 0.723
1963 0.070 0.842
1964 0.092 0.790
1965 0.066 1.071
1966 0.063 0.683
1967 0.132 1.188
1968 0.082 1.353
1969 0.081 0.973
1970 0.066 0.911
1971 0.071 1.088
1972 0.159 1.196
1973 0.072 0.639
1974 0.078 1.011
1975 0.106 1.074
1976 0.077 0.782
1977 0.009 0.783
1978 0.067 0.970
1979 0.041 1.325
1980 0.151 1.352
1981 0.060 1.011
1982 0.116 1.465
1983 0.104 1.134
1984 0.064 0.737
1985 0.038 1.013
1986 0.168 0.854
1987 0.149 1.310
1988 0.059 0.777
1989 0.038 0.972
1990 0.311 1.972
1991 0.187 1.517
1992 0.072 0.730
1993 0.075 0.616
1994 0.025 0.649
1995 0.108 0.891
1996 0.227 1.013
1997 0.190 0.966
1998 0.043 0.921
1999 0.178 2.002
2000 0.075 0.973
2001 0.013 1.015
2002 0.082 1.298
2003 0.105 1.009
2004 0.136 1.859
2005 0.097 0.853
2006 0.115 0.766
2007 0.231 1.758
2008 0.298 1.489
2009 0.146 1.190
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.3110 2.0017
2 0.2978 1.9720
3 0.2309 1.8594
West Basin to Logan_210811 8/11/2021 10:43:14 PM Page 9
4 0.2273 1.7576
5 0.2137 1.5171
6 0.1900 1.4895
7 0.1873 1.4650
8 0.1782 1.3535
9 0.1682 1.3520
10 0.1591 1.3248
11 0.1508 1.3192
12 0.1488 1.3097
13 0.1462 1.3066
14 0.1445 1.2980
15 0.1358 1.1964
16 0.1333 1.1901
17 0.1319 1.1880
18 0.1188 1.1341
19 0.1159 1.0878
20 0.1149 1.0737
21 0.1079 1.0709
22 0.1063 1.0307
23 0.1061 1.0150
24 0.1049 1.0135
25 0.1039 1.0133
26 0.0974 1.0115
27 0.0965 1.0107
28 0.0953 1.0088
29 0.0916 0.9734
30 0.0856 0.9732
31 0.0836 0.9722
32 0.0827 0.9699
33 0.0823 0.9663
34 0.0822 0.9208
35 0.0815 0.9114
36 0.0805 0.8914
37 0.0784 0.8879
38 0.0768 0.8774
39 0.0752 0.8701
40 0.0750 0.8541
41 0.0723 0.8532
42 0.0722 0.8501
43 0.0710 0.8424
44 0.0696 0.8213
45 0.0674 0.7951
46 0.0673 0.7946
47 0.0664 0.7898
48 0.0656 0.7831
49 0.0641 0.7818
50 0.0631 0.7790
51 0.0603 0.7774
52 0.0587 0.7658
53 0.0545 0.7370
54 0.0507 0.7301
55 0.0430 0.7253
56 0.0407 0.7228
57 0.0383 0.6829
58 0.0381 0.6711
59 0.0253 0.6487
60 0.0135 0.6386
61 0.0091 0.6156
West Basin to Logan_210811 8/11/2021 10:43:14 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0485 17547 117553 669 Fail
0.0504 16159 114216 706 Fail
0.0523 14964 111008 741 Fail
0.0542 13854 107992 779 Fail
0.0561 12814 105105 820 Fail
0.0581 11811 102303 866 Fail
0.0600 10900 99650 914 Fail
0.0619 10121 97041 958 Fail
0.0638 9383 94517 1007 Fail
0.0657 8731 92100 1054 Fail
0.0676 8145 89854 1103 Fail
0.0695 7593 87544 1152 Fail
0.0714 7060 85299 1208 Fail
0.0733 6590 83138 1261 Fail
0.0752 6145 81085 1319 Fail
0.0772 5777 79139 1369 Fail
0.0791 5431 77214 1421 Fail
0.0810 5097 75396 1479 Fail
0.0829 4808 73535 1529 Fail
0.0848 4522 71802 1587 Fail
0.0867 4252 70112 1648 Fail
0.0886 4017 68508 1705 Fail
0.0905 3784 66883 1767 Fail
0.0924 3546 65321 1842 Fail
0.0943 3337 63824 1912 Fail
0.0962 3138 62370 1987 Fail
0.0982 2952 60958 2064 Fail
0.1001 2791 59653 2137 Fail
0.1020 2603 58242 2237 Fail
0.1039 2451 56916 2322 Fail
0.1058 2312 55611 2405 Fail
0.1077 2160 54328 2515 Fail
0.1096 2026 53108 2621 Fail
0.1115 1900 51953 2734 Fail
0.1134 1790 50798 2837 Fail
0.1153 1689 49708 2943 Fail
0.1173 1590 48660 3060 Fail
0.1192 1484 47526 3202 Fail
0.1211 1383 46478 3360 Fail
0.1230 1293 45515 3520 Fail
0.1249 1225 44489 3631 Fail
0.1268 1157 43590 3767 Fail
0.1287 1098 42649 3884 Fail
0.1306 1048 41708 3979 Fail
0.1325 997 40767 4088 Fail
0.1344 930 39912 4291 Fail
0.1363 884 38970 4408 Fail
0.1383 838 38158 4553 Fail
0.1402 790 37345 4727 Fail
0.1421 743 36553 4919 Fail
0.1440 714 35783 5011 Fail
0.1459 671 35013 5218 Fail
0.1478 630 34243 5435 Fail
0.1497 595 33559 5640 Fail
West Basin to Logan_210811 8/11/2021 10:43:14 PM Page 12
0.1516 566 32875 5808 Fail
0.1535 539 32212 5976 Fail
0.1554 497 31506 6339 Fail
0.1574 473 30885 6529 Fail
0.1593 436 30265 6941 Fail
0.1612 401 29623 7387 Fail
0.1631 370 29046 7850 Fail
0.1650 348 28447 8174 Fail
0.1669 324 27891 8608 Fail
0.1688 296 27313 9227 Fail
0.1707 272 26779 9845 Fail
0.1726 256 26223 10243 Fail
0.1745 235 25709 10940 Fail
0.1764 217 25153 11591 Fail
0.1784 198 24661 12455 Fail
0.1803 180 24127 13403 Fail
0.1822 158 23613 14944 Fail
0.1841 145 23164 15975 Fail
0.1860 130 22715 17473 Fail
0.1879 119 22244 18692 Fail
0.1898 109 21774 19976 Fail
0.1917 97 21382 22043 Fail
0.1936 91 20961 23034 Fail
0.1955 82 20542 25051 Fail
0.1975 76 20144 26505 Fail
0.1994 69 19765 28644 Fail
0.2013 61 19387 31781 Fail
0.2032 54 19023 35227 Fail
0.2051 48 18664 38883 Fail
0.2070 41 18309 44656 Fail
0.2089 38 17956 47252 Fail
0.2108 33 17622 53400 Fail
0.2127 27 17299 64070 Fail
0.2146 22 16983 77195 Fail
0.2165 21 16655 79309 Fail
0.2185 20 16335 81675 Fail
0.2204 19 16003 84226 Fail
0.2223 17 15680 92235 Fail
0.2242 14 15389 109921 Fail
0.2261 12 15103 125858 Fail
0.2280 8 14814 185175 Fail
0.2299 4 14547 363675 Fail
0.2318 3 14309 476966 Fail
0.2337 3 14042 468066 Fail
0.2356 3 13781 459366 Fail
0.2375 3 13548 451600 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
West Basin to Logan_210811 8/11/2021 10:43:14 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0.3246 acre-feet
On-line facility target flow:0.3857 cfs.
Adjusted for 15 min:0.3857 cfs.
Off-line facility target flow:0.217 cfs.
Adjusted for 15 min:0.217 cfs.
West Basin to Logan_210811 8/11/2021 10:43:14 PM Page 14
LID Report
West Basin to Logan_210811 8/11/2021 10:43:24 PM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2021; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
EAST BASIN TO PARK
East Basin to Park_210812 8/12/2021 9:48:26 AM Page 2
General Model Information
Project Name:East Basin to Park_210812
Site Name:TG Renton-East Basin
Site Address:
City:
Report Date:8/12/2021
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2019/09/13
Version:4.2.17
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
East Basin to Park_210812 8/12/2021 9:48:26 AM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 9.08
Pervious Total 9.08
Impervious Land Use acre
Impervious Total 0
Basin Total 9.08
Element Flows To:
Surface Interflow Groundwater
East Basin to Park_210812 8/12/2021 9:48:26 AM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Lawn, Flat 0.99
Pervious Total 0.99
Impervious Land Use acre
PARKING FLAT 8.09
Impervious Total 8.09
Basin Total 9.08
Element Flows To:
Surface Interflow Groundwater
East Basin to Park_210812 8/12/2021 9:48:26 AM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:9.08
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0.99
Total Impervious Area:8.09
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.26696
5 year 0.41927
10 year 0.505587
25 year 0.597033
50 year 0.65362
100 year 0.701749
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 3.147996
5 year 3.997918
10 year 4.577799
25 year 5.332459
50 year 5.911721
100 year 6.50639
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.262 4.139
1950 0.327 4.340
1951 0.588 2.582
1952 0.185 2.231
1953 0.150 2.410
1954 0.230 2.562
1955 0.367 2.889
1956 0.292 2.847
1957 0.236 3.269
1958 0.265 2.597
East Basin to Park_210812 8/12/2021 9:48:56 AM Page 8
1959 0.228 2.613
1960 0.397 2.660
1961 0.224 2.781
1962 0.140 2.384
1963 0.192 2.692
1964 0.252 2.584
1965 0.181 3.378
1966 0.174 2.222
1967 0.363 3.841
1968 0.226 4.370
1969 0.222 3.074
1970 0.183 2.935
1971 0.195 3.502
1972 0.438 3.696
1973 0.199 2.143
1974 0.216 3.215
1975 0.292 3.603
1976 0.211 2.489
1977 0.025 2.625
1978 0.186 3.217
1979 0.112 4.410
1980 0.415 4.138
1981 0.166 3.280
1982 0.319 4.669
1983 0.286 3.735
1984 0.176 2.380
1985 0.105 3.278
1986 0.463 2.814
1987 0.409 4.332
1988 0.162 2.609
1989 0.105 3.263
1990 0.856 5.869
1991 0.515 4.623
1992 0.199 2.357
1993 0.207 2.023
1994 0.070 2.178
1995 0.297 2.903
1996 0.626 3.161
1997 0.523 3.050
1998 0.118 3.026
1999 0.490 6.322
2000 0.206 3.121
2001 0.037 3.369
2002 0.226 4.057
2003 0.289 3.152
2004 0.374 5.900
2005 0.268 2.700
2006 0.316 2.399
2007 0.635 5.530
2008 0.819 4.541
2009 0.402 3.989
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.8558 6.3219
2 0.8194 5.9000
3 0.6352 5.8687
East Basin to Park_210812 8/12/2021 9:48:56 AM Page 9
4 0.6255 5.5297
5 0.5879 4.6686
6 0.5229 4.6234
7 0.5153 4.5415
8 0.4904 4.4103
9 0.4627 4.3701
10 0.4378 4.3397
11 0.4149 4.3323
12 0.4093 4.1385
13 0.4023 4.1385
14 0.3975 4.0567
15 0.3736 3.9894
16 0.3669 3.8408
17 0.3630 3.7350
18 0.3270 3.6963
19 0.3189 3.6026
20 0.3161 3.5015
21 0.2968 3.3777
22 0.2924 3.3688
23 0.2919 3.2803
24 0.2886 3.2775
25 0.2859 3.2691
26 0.2680 3.2631
27 0.2654 3.2170
28 0.2622 3.2146
29 0.2522 3.1608
30 0.2356 3.1522
31 0.2301 3.1210
32 0.2277 3.0740
33 0.2264 3.0497
34 0.2262 3.0260
35 0.2243 2.9350
36 0.2215 2.9027
37 0.2158 2.8893
38 0.2114 2.8471
39 0.2070 2.8137
40 0.2064 2.7812
41 0.1989 2.7001
42 0.1987 2.6923
43 0.1954 2.6600
44 0.1916 2.6248
45 0.1855 2.6135
46 0.1853 2.6093
47 0.1827 2.5967
48 0.1805 2.5841
49 0.1765 2.5821
50 0.1736 2.5616
51 0.1658 2.4890
52 0.1615 2.4096
53 0.1498 2.3986
54 0.1395 2.3840
55 0.1183 2.3800
56 0.1121 2.3574
57 0.1054 2.2308
58 0.1047 2.2216
59 0.0696 2.1775
60 0.0370 2.1429
61 0.0252 2.0230
East Basin to Park_210812 8/12/2021 9:48:56 AM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.1335 17706 126664 715 Fail
0.1387 16352 123606 755 Fail
0.1440 15180 120718 795 Fail
0.1492 13896 117489 845 Fail
0.1545 12906 114815 889 Fail
0.1597 11950 112291 939 Fail
0.1650 10898 109340 1003 Fail
0.1703 10149 106965 1053 Fail
0.1755 9450 104677 1107 Fail
0.1808 8825 102538 1161 Fail
0.1860 8145 100035 1228 Fail
0.1913 7623 98003 1285 Fail
0.1965 7107 96014 1350 Fail
0.2018 6650 94089 1414 Fail
0.2070 6147 91822 1493 Fail
0.2123 5792 89983 1553 Fail
0.2175 5467 88186 1613 Fail
0.2228 5155 86454 1677 Fail
0.2281 4808 84486 1757 Fail
0.2333 4543 82817 1822 Fail
0.2386 4276 81149 1897 Fail
0.2438 4045 79545 1966 Fail
0.2491 3784 77727 2054 Fail
0.2543 3557 76208 2142 Fail
0.2596 3360 74775 2225 Fail
0.2648 3166 73364 2317 Fail
0.2701 2954 71695 2427 Fail
0.2753 2791 70305 2518 Fail
0.2806 2616 69022 2638 Fail
0.2858 2468 67738 2744 Fail
0.2911 2308 66220 2869 Fail
0.2964 2165 65043 3004 Fail
0.3016 2045 63824 3120 Fail
0.3069 1917 62648 3268 Fail
0.3121 1790 61258 3422 Fail
0.3174 1697 60124 3542 Fail
0.3226 1602 59097 3688 Fail
0.3279 1498 58028 3873 Fail
0.3331 1382 56766 4107 Fail
0.3384 1296 55696 4297 Fail
0.3436 1228 54734 4457 Fail
0.3489 1167 53729 4604 Fail
0.3541 1098 52510 4782 Fail
0.3594 1050 51654 4919 Fail
0.3647 1004 50756 5055 Fail
0.3699 943 49836 5284 Fail
0.3752 884 48873 5528 Fail
0.3804 841 48039 5712 Fail
0.3857 793 47162 5947 Fail
0.3909 747 46392 6210 Fail
0.3962 713 45408 6368 Fail
0.4014 673 44638 6632 Fail
0.4067 634 43826 6912 Fail
0.4119 601 43056 7164 Fail
East Basin to Park_210812 8/12/2021 9:48:56 AM Page 12
0.4172 567 42179 7438 Fail
0.4224 540 41473 7680 Fail
0.4277 502 40746 8116 Fail
0.4330 477 40083 8403 Fail
0.4382 436 39313 9016 Fail
0.4435 403 38585 9574 Fail
0.4487 374 37901 10133 Fail
0.4540 352 37259 10584 Fail
0.4592 323 36489 11296 Fail
0.4645 298 35848 12029 Fail
0.4697 277 35227 12717 Fail
0.4750 260 34650 13326 Fail
0.4802 235 33987 14462 Fail
0.4855 218 33409 15325 Fail
0.4907 202 32875 16274 Fail
0.4960 180 32212 17895 Fail
0.5013 158 31677 20048 Fail
0.5065 146 31142 21330 Fail
0.5118 132 30672 23236 Fail
0.5170 119 30073 25271 Fail
0.5223 109 29559 27118 Fail
0.5275 97 29110 30010 Fail
0.5328 93 28661 30818 Fail
0.5380 82 28083 34247 Fail
0.5433 76 27613 36332 Fail
0.5485 69 27185 39398 Fail
0.5538 63 26736 42438 Fail
0.5590 54 26180 48481 Fail
0.5643 48 25795 53739 Fail
0.5696 42 25389 60450 Fail
0.5748 38 24982 65742 Fail
0.5801 33 24490 74212 Fail
0.5853 27 24084 89200 Fail
0.5906 23 23677 102943 Fail
0.5958 21 23314 111019 Fail
0.6011 20 22822 114110 Fail
0.6063 19 22480 118315 Fail
0.6116 17 22137 130217 Fail
0.6168 14 21795 155678 Fail
0.6221 12 21380 178166 Fail
0.6274 9 21040 233777 Fail
0.6326 4 20702 517550 Fail
0.6379 3 20381 679366 Fail
0.6431 3 19986 666200 Fail
0.6484 3 19658 655266 Fail
0.6536 3 19376 645866 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
East Basin to Park_210812 8/12/2021 9:48:56 AM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:1.0267 acre-feet
On-line facility target flow:1.3035 cfs.
Adjusted for 15 min:1.3035 cfs.
Off-line facility target flow:0.7369 cfs.
Adjusted for 15 min:0.7369 cfs.
East Basin to Park_210812 8/12/2021 9:48:56 AM Page 14
LID Report
East Basin to Park_210812 8/12/2021 9:49:06 AM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2021; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
WWHM2012
PROJECT REPORT
OUTFIELD PUMP BASIN
Pump Sizing 200415 4/15/2020 8:31:39 PM Page 2
General Model Information
Project Name:Pump Sizing 200415
Site Name:
Site Address:
City:
Report Date:4/15/2020
Gage:Seatac
Data Start:1948/10/01
Data End:2009/09/30
Timestep:15 Minute
Precip Scale:1.000
Version Date:2018/10/10
Version:4.2.16
POC Thresholds
Low Flow Threshold for POC1:50 Percent of the 2 Year
High Flow Threshold for POC1:50 Year
Pump Sizing 200415 4/15/2020 8:31:39 PM Page 3
Landuse Basin Data
Predeveloped Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
C, Forest, Flat 1.82
Pervious Total 1.82
Impervious Land Use acre
Impervious Total 0
Basin Total 1.82
Element Flows To:
Surface Interflow Groundwater
Pump Sizing 200415 4/15/2020 8:31:39 PM Page 4
Mitigated Land Use
Basin 1
Bypass:No
GroundWater:No
Pervious Land Use acre
Pervious Total 0
Impervious Land Use acre
SIDEWALKS FLAT 1.82
Impervious Total 1.82
Basin Total 1.82
Element Flows To:
Surface Interflow Groundwater
Pump Sizing 200415 4/15/2020 8:31:40 PM Page 7
Analysis Results
POC 1
+ Predeveloped x Mitigated
Predeveloped Landuse Totals for POC #1
Total Pervious Area:1.82
Total Impervious Area:0
Mitigated Landuse Totals for POC #1
Total Pervious Area:0
Total Impervious Area:1.82
Flow Frequency Method:Log Pearson Type III 17B
Flow Frequency Return Periods for Predeveloped. POC #1
Return Period Flow(cfs)
2 year 0.05351
5 year 0.084039
10 year 0.10134
25 year 0.11967
50 year 0.131012
100 year 0.140659
Flow Frequency Return Periods for Mitigated. POC #1
Return Period Flow(cfs)
2 year 0.693902
5 year 0.876478
10 year 1.000526
25 year 1.161434
50 year 1.284589
100 year 1.410735
Annual Peaks
Annual Peaks for Predeveloped and Mitigated. POC #1
Year Predeveloped Mitigated
1949 0.053 0.899
1950 0.066 0.971
1951 0.118 0.561
1952 0.037 0.499
1953 0.030 0.539
1954 0.046 0.564
1955 0.074 0.640
1956 0.059 0.630
1957 0.047 0.714
1958 0.053 0.576
MIN REQUIRED FLOW FOR PUMP
SIZING. SEE APPENDIX I FOR PUMP
SIZING CALCUALTIONS.
Pump Sizing 200415 4/15/2020 8:33:00 PM Page 8
1959 0.046 0.588
1960 0.080 0.577
1961 0.045 0.610
1962 0.028 0.532
1963 0.038 0.591
1964 0.051 0.579
1965 0.036 0.736
1966 0.035 0.492
1967 0.073 0.848
1968 0.045 0.964
1969 0.044 0.670
1970 0.037 0.646
1971 0.039 0.771
1972 0.088 0.796
1973 0.040 0.482
1974 0.043 0.703
1975 0.059 0.810
1976 0.042 0.545
1977 0.005 0.590
1978 0.037 0.722
1979 0.022 0.988
1980 0.083 0.886
1981 0.033 0.725
1982 0.064 1.023
1983 0.057 0.832
1984 0.035 0.525
1985 0.021 0.723
1986 0.093 0.627
1987 0.082 0.968
1988 0.032 0.587
1989 0.021 0.734
1990 0.172 1.237
1991 0.103 0.988
1992 0.040 0.520
1993 0.041 0.450
1994 0.014 0.490
1995 0.059 0.643
1996 0.125 0.684
1997 0.105 0.664
1998 0.024 0.674
1999 0.098 1.378
2000 0.041 0.686
2001 0.007 0.754
2002 0.045 0.879
2003 0.058 0.683
2004 0.075 1.289
2005 0.054 0.589
2006 0.063 0.520
2007 0.127 1.205
2008 0.164 0.971
2009 0.081 0.897
Ranked Annual Peaks
Ranked Annual Peaks for Predeveloped and Mitigated. POC #1
Rank Predeveloped Mitigated
1 0.1715 1.3779
2 0.1642 1.2892
3 0.1273 1.2365
Pump Sizing 200415 4/15/2020 8:33:00 PM Page 9
4 0.1254 1.2050
5 0.1178 1.0225
6 0.1048 0.9881
7 0.1033 0.9878
8 0.0983 0.9712
9 0.0927 0.9706
10 0.0877 0.9675
11 0.0832 0.9638
12 0.0820 0.8987
13 0.0806 0.8969
14 0.0797 0.8864
15 0.0749 0.8791
16 0.0735 0.8477
17 0.0728 0.8322
18 0.0655 0.8103
19 0.0639 0.7959
20 0.0634 0.7710
21 0.0595 0.7536
22 0.0586 0.7357
23 0.0585 0.7340
24 0.0578 0.7251
25 0.0573 0.7235
26 0.0537 0.7218
27 0.0532 0.7142
28 0.0526 0.7033
29 0.0505 0.6858
30 0.0472 0.6842
31 0.0461 0.6830
32 0.0456 0.6735
33 0.0454 0.6700
34 0.0453 0.6645
35 0.0449 0.6464
36 0.0444 0.6430
37 0.0433 0.6398
38 0.0424 0.6295
39 0.0415 0.6271
40 0.0414 0.6101
41 0.0399 0.5906
42 0.0398 0.5901
43 0.0392 0.5891
44 0.0384 0.5878
45 0.0372 0.5870
46 0.0371 0.5791
47 0.0366 0.5768
48 0.0362 0.5763
49 0.0354 0.5643
50 0.0348 0.5614
51 0.0332 0.5449
52 0.0324 0.5393
53 0.0300 0.5316
54 0.0280 0.5250
55 0.0237 0.5204
56 0.0225 0.5199
57 0.0211 0.4994
58 0.0210 0.4919
59 0.0139 0.4899
60 0.0074 0.4820
61 0.0050 0.4503
Pump Sizing 200415 4/15/2020 8:33:01 PM Page 11
Duration Flows
Flow(cfs)Predev Mit Percentage Pass/Fail
0.0268 17556 131691 750 Fail
0.0278 16168 128696 795 Fail
0.0289 14964 125788 840 Fail
0.0299 13854 122943 887 Fail
0.0310 12816 120184 937 Fail
0.0320 11807 117617 996 Fail
0.0331 10900 115157 1056 Fail
0.0341 10121 112783 1114 Fail
0.0352 9388 110409 1176 Fail
0.0362 8731 108120 1238 Fail
0.0373 8147 105939 1300 Fail
0.0383 7597 103821 1366 Fail
0.0394 7060 101853 1442 Fail
0.0404 6590 99928 1516 Fail
0.0415 6149 97939 1592 Fail
0.0426 5777 96121 1663 Fail
0.0436 5431 94325 1736 Fail
0.0447 5099 92592 1815 Fail
0.0457 4808 90795 1888 Fail
0.0468 4524 89127 1970 Fail
0.0478 4254 87416 2054 Fail
0.0489 4017 85726 2134 Fail
0.0499 3782 84144 2224 Fail
0.0510 3546 82646 2330 Fail
0.0520 3339 81128 2429 Fail
0.0531 3138 79631 2537 Fail
0.0541 2952 78197 2648 Fail
0.0552 2787 76764 2754 Fail
0.0562 2597 75331 2900 Fail
0.0573 2447 73984 3023 Fail
0.0583 2304 72636 3152 Fail
0.0594 2160 71374 3304 Fail
0.0605 2025 70134 3463 Fail
0.0615 1898 68872 3628 Fail
0.0626 1790 67653 3779 Fail
0.0636 1687 66476 3940 Fail
0.0647 1586 65321 4118 Fail
0.0657 1483 64166 4326 Fail
0.0668 1379 63033 4570 Fail
0.0678 1292 61921 4792 Fail
0.0689 1219 60830 4990 Fail
0.0699 1154 59824 5184 Fail
0.0710 1098 58819 5356 Fail
0.0720 1048 57835 5518 Fail
0.0731 997 56894 5706 Fail
0.0741 930 55868 6007 Fail
0.0752 883 54905 6218 Fail
0.0763 837 53943 6444 Fail
0.0773 789 53044 6722 Fail
0.0784 743 52125 7015 Fail
0.0794 713 51290 7193 Fail
0.0805 668 50456 7553 Fail
0.0815 630 49622 7876 Fail
0.0826 596 48831 8193 Fail
Pump Sizing 200415 4/15/2020 8:33:01 PM Page 12
0.0836 565 48061 8506 Fail
0.0847 539 47269 8769 Fail
0.0857 497 46499 9355 Fail
0.0868 473 45708 9663 Fail
0.0878 434 44981 10364 Fail
0.0889 399 44211 11080 Fail
0.0899 366 43483 11880 Fail
0.0910 348 42756 12286 Fail
0.0920 323 42093 13031 Fail
0.0931 296 41387 13982 Fail
0.0942 272 40788 14995 Fail
0.0952 256 40125 15673 Fail
0.0963 235 39505 16810 Fail
0.0973 217 38885 17919 Fail
0.0984 195 38222 19601 Fail
0.0994 180 37580 20877 Fail
0.1005 158 37003 23419 Fail
0.1015 145 36382 25091 Fail
0.1026 130 35805 27542 Fail
0.1036 119 35206 29584 Fail
0.1047 110 34693 31539 Fail
0.1057 97 34137 35192 Fail
0.1068 92 33645 36570 Fail
0.1078 82 33088 40351 Fail
0.1089 77 32575 42305 Fail
0.1099 69 32019 46404 Fail
0.1110 61 31506 51649 Fail
0.1121 55 31078 56505 Fail
0.1131 48 30565 63677 Fail
0.1142 41 30115 73451 Fail
0.1152 38 29645 78013 Fail
0.1163 33 29217 88536 Fail
0.1173 27 28704 106311 Fail
0.1184 22 28340 128818 Fail
0.1194 21 27891 132814 Fail
0.1205 20 27442 137210 Fail
0.1215 19 27014 142178 Fail
0.1226 17 26608 156517 Fail
0.1236 14 26201 187150 Fail
0.1247 12 25816 215133 Fail
0.1257 9 25389 282100 Fail
0.1268 4 25025 625625 Fail
0.1279 3 24640 821333 Fail
0.1289 3 24255 808500 Fail
0.1300 3 23913 797100 Fail
0.1310 3 23485 782833 Fail
The development has an increase in flow durations
from 1/2 Predeveloped 2 year flow to the 2 year flow
or more than a 10% increase from the 2 year to the 50
year flow.
The development has an increase in flow durations for
more than 50% of the flows for the range of the
duration analysis.
Pump Sizing 200415 4/15/2020 8:33:01 PM Page 13
Water Quality
Water Quality BMP Flow and Volume for POC #1
On-line facility volume:0 acre-feet
On-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Off-line facility target flow:0 cfs.
Adjusted for 15 min:0 cfs.
Pump Sizing 200415 4/15/2020 8:33:01 PM Page 14
LID Report
Pump Sizing 200415 4/15/2020 8:37:37 PM Page 22
Disclaimer
Legal Notice
This program and accompanying documentation are provided 'as-is' without warranty of any kind. The
entire risk regarding the performance and results of this program is assumed by End User. Clear
Creek Solutions Inc. and the governmental licensee or sublicensees disclaim all warranties, either
expressed or implied, including but not limited to implied warranties of program and accompanying
documentation. In no event shall Clear Creek Solutions Inc. be liable for any damages whatsoever
(including without limitation to damages for loss of business profits, loss of business information,
business interruption, and the like) arising out of the use of, or inability to use this program even
if Clear Creek Solutions Inc. or their authorized representatives have been advised of the
possibility of such damages. Software Copyright © by : Clear Creek Solutions, Inc. 2005-2020; All
Rights Reserved.
Clear Creek Solutions, Inc.
6200 Capitol Blvd. Ste F
Olympia, WA. 98501
Toll Free 1(866)943-0304
Local (360)943-0304
www.clearcreeksolutions.com
NAVIX TopGolf Renton – Renton, WA
APPENDIX E
TESC SEDIMENT POND SIZING
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
Per Section D.2.1.5.2: Sediment Pond of the City of Renton Surface Water Design Manual:
Determining Pond Geometry: (Pg D-49)
1. “Obtain the discharge from the hydrologic calculations for the 2-year and 10-year peak
flows using the approved model with 15-minute time steps (Q2 and Q10). The approved
model 10-year 15-minute peak flow shall be used if the project size, expected timing
and duration of construction, or downstream conditions warrant a higher level of
protection, or if the pond discharge path leaves the site (note provisions must be made
to prevent increases in the existing site conditions 2-year and 10-year runoff peaks
discharging from the project site during construction, see Section D.3.9, Flow Control). If
no hydrologic analysis is required, the Rational Method may be used (Section 3.2.1 of
the SWDM).”
NAVIX: West Basin Pond Q10 = 2.63 cfs. East Basin Pond Q10 = 3.20 cfs. See Appendix
D for WHMM models used to obtain 10-year peak flow rates.
2. “Determine the required surface area at the top of the riser pipe with the equation:
SA = 2 x Q10/0.00096 or 2080 square feet per cfs of inflow
See Section D.2.1.5.1 for more information on the derivation of the surface area
calculation.”
NAVIX: Both sediment pond surface areas were sized to the above design criteria.
Following the above equation, the West Basin pond has a surface area of SAw = 5470
sf and the East Basin pond has a surface area of SAe= 5221 sf. See calculations
below.
West Basin Surface Area
SAw = Q10 x 2080 sf/cfs
SAw = 2.63 cfs x 2080 sf/cfs
SAw = 5470.40 sf
SAw = 5470 sf
East Basin Surface Area
SAe = Q10 x 2080 sf/cfs
SAe = 3.20 cfs x 2080 sf/cfs
SAe = 6,656 sf
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
SAe = 6,656 sf
3. “The basic geometry of the pond can now be determined using the following design
criteria:
· Required surface area SA (from Step 2 above) at the top of the riser
· Minimum 3.5-foot depth from the top of the riser to the bottom of the pond
· Maximum 3:1 interior side slopes and maximum 2:1 exterior slopes. The interior
slopes may be increased to a maximum of 2:1 if fencing is provided at or above
the maximum water surface
· One foot of freeboard between the top of the riser and the crest of the
emergency spillway
· Flat bottom
· Length-to-width ratio between 3:1 and 6:1.”
NAVIX: Both sediment ponds were sized to the above design criteria.
· The required surfaces areas for each pond from Step 2 above have been
provided.
· The depth from the top of the riser to the bottom of the pond is 3.5 feet.
· The interior side and exterior slopes are 2:1 and fencing will be provided
above the maximum water surface.
· There is one foot of freeboard between the top of the riser and the crest of
the emergency spillway.
· Both ponds have a flat bottom.
· The length-to-width ratio of the pond is 3:1.
Sizing of Discharge Mechanisms: (Pg D-49)
“Principal Spillway: Determine the required diameter for the principal spillway (riser pipe).
The diameter shall be the minimum necessary to pass the developed condition 10-year peak
flow using the approved model with 15-minute time steps (). Use Figure 5.1.4.H (SWDM
Chapter 5) to determine this diameter (h = one foot). Note: A permanent control structure
may be used instead of a temporary riser.”
NAVIX: A temporary riser will be for the principal spillway. Following Figure 5.1.4.H
with h = 1 foot, the diameter of the West Basin Pond principal spillway riser is dw =
10 inches. The diameter of the East Basin Pond principal spillway riser is de = 12
inches. See a markup of Figure 5.1.4.H below.
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
Emergency Overflow Spillway: Determine the required size and design of the emergency
overflow spillway for the developed condition 100-year approved model 15-minute peak
flow using the procedure in Section 5.1.1 (“Emergency Overflow Spillway” subsection) of the
SWDM.
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
NAVIX: Per Table 4.2.2.A, Riprap lining specified for discharge velocities of 5-10 fps
will be used for the emergency overflow spillways of both ponds.
Dewatering Orifice: Determine the size of the dewatering orifice(s) (minimum 1-inch
diameter) using a modified version of the discharge equation for a vertical orifice and a
basic equation for the area of a circular orifice.
1. “Determine the required area of the orifice with the following equation:
2ℎ.
0.6 36000 .4.8110 √ℎ
where A0 = orifice area (square feet)
As = pond surface area (square feet)
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
h = head of water above orifice (height of riser in feet)
T = dewatering time (24 hours)
g = acceleration of gravity (32.2 feet/second )”
NAVIX: Both sediment dewatering orifices were sized to the above design criteria.
Following the above equations and following step, the West Basin pond has a
dewatering orifice of Dw = 6 in and the East Basin pond has a dewatering orifice of
De = 5 in. See calculations below.
West Basin Dewatering Orifice
Ao = 4.81(10^-6)(As)sqrt(h)
As = SAw = 5470 sf
h = 3.5 ft
Ao = 4.81(10^-6) x 5470 x sqrt(3.5)
Aow = 0.0492 sf
East Basin Dewatering
Ao = 4.81(10^-6)(As)sqrt(h)
As = SAe = 6656 sf
h = 3.5 ft
Ao = 4.81(10^-6) x 6656 x sqrt(3.5)
Aoe = 0.0599 sf
2. “Convert the required surface area to the required diameter D (inches) of the orifice:
24 !"#13.54 % ”
NAVIX: Calculations continued
West Basin Dewatering Orifice
D = 13.54 x sqrt(Ao)
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
Ao = Aow = 0.0492 sf
Dw = 13.54 x sqrt(0.0492)
Dw = 3.0033 in
East Basin Dewatering Orifice
D = 13.54 x sqrt(Ao)
Ao = Aoe = 0.0599 sf
De = 13.54 x sqrt(0.0599
De = 3.314 in
3. “The vertical, perforated tubing connected to the dewatering orifice must be at least 2
inches larger in diameter than the orifice to improve flow characteristics. The size and
number of perforations in the tubing should be large enough so that the tubing does not
restrict flow. The flow rate should be controlled by the orifice.”
NAVIX: Calculations continued
West Basin Dewatering Orifice
D = D + 2
Dw = 3.0033 in + 2 = 5.0033 inches
Dw = 6 inches
East Basin Dewatering Orifice
D = D + 2
De = 3.314 + 2 = 5.314 inches
De = 6 inches
Additional Design Specifications: (Pg D-50)
· “The pond shall be divided into two roughly equal volume cells by a permeable
divider that will reduce turbulence while allowing movement of water between
cells. The divider shall be at least one-half the height of the riser and a minimum of
one foot below the top of the riser. Wire-backed, 2- to 3-foot high, extra strength
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
filter fabric (see Section D.2.1.3.1) supported by threated 4” x 4”s may be used as a
divider. Alternatively, staked straw bales wrapped with filter fabric (geotextile) may
be used.”
NAVIX: The ponds will each be divided in half by extra strength filter fabric as called
out on sheet D-2.6.
· “If the pond is more than 6 feet deep, a different mechanism must be proposed. A
riprap embankment is on acceptable method of separation for deeper ponds. Other
designs that satisfy the intent of this provision are allowed as long as the divider is
permeable, structurally sound, and designed to prevent erosion under or around the
barrier”
NAVIX: The proposed ponds are not more than 6 feet deep. Extra strength filter
fabric will be used to divide ponds as called out on sheet D-2.6.
· “To aid in determining sediment depth, one-foot intervals shall be prominently
marked on the riser.”
NAVIX: One-foot intervals shall be prominently marked on the riser.
· “If an embankment of more than 6 feet is proposed, the pond must comply with the
criteria under “Embankments” in Section 5.1.1 of the Surface Water Design Manual”
NAVIX: Project does not propose embankments of greater than 6 feet.
Maintenance Standards: (Pg D-50)
1. “Sediment shall be removed from the pond when it reaches 1 foot in depth”
NAVIX: Sediment shall be removed from the pond when it reaches 1 foot in depth.
2. “Any damage to the pond embankments or slopes shall be repaired.”
NAVIX: Any damage to the pond embankments or slopes shall be repaired.
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
Per Section 5.1.1.2: Methods of Analysis of the City of Renton Surface Water Design Manual:
Emergency Overflow Spillway Capacity: (Pg 5-16)
“The emergency overflow spillway weir section shall be designed to pass the 100-year
runoff event for developed conditions assuming a broad-crested weir. The broad-crested
weir equation for the spillway section in Figure 5.1.1.E, for example, would be:
“Determine the required area of the orifice with the following equation:
&’(2 ’/[2 3+ ,-
.+8 15+tan2 -]
where &’ = peak flow for the 100-year runoff event (cfs)
C = discharge coefficient (0.6)
g = gravity (32.2 feet/second )
L = length of weir (ft)
H = height of water over weir (ft)
2 = angle of side slopes
Assuming C = 0.6 and tan2 3 (for 3H:1V slopes), the equation becomes:
&’3.21 ,-.+ 2.4 -
To find width L for the weir section, the equation is rearranged to use the computed &’
and trial values of H (0.2 feet minimum):
, [&’/3.21 -45] − 2.4 - or 6 feet minimum”
NAVIX: Both emergency overflow spillways were sized to the above design criteria.
Following the above equations and following steps, the West Basin pond has an emergency
overflow spillway of Lw = 19 ft and the East Basin pond has an emergency overflow spillway
of Le = 8 ft. See calculations below.
West Basin Emergency Overflow Spillway
, [&’/3.21 -45] − 2.4 -
Q100w = 3.7906 cfs
H = 0.2 ft
,7 [3.7906/3.21 0.2 45] − 2.4 0.2
Lw = 12.72 ft
Lw = 13 ft
TECHNICAL INFORMATION REPORT
NAVIX TopGolf Renton Appendix E
East Basin Emergency Overflow Spillway
, [&’/3.21 -45] − 2.4 -
Q100e = 4.542 cfs
H = 0.2 ft
,:[4.542/3.21 0.2 45] − 2.4 0.2
Le = 15.41 ft
Le = 16 ft
NAVIX TopGolf Renton – Renton, WA
APPENDIX F
BOND QUANTITY WORKSHEET
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200••Section I: Project Information•••Section II: Bond Quantities Worksheets••Section II.a EROSION CONTROL (Stabilization/Erosion Sediment Control (ESC))•Section II.b TRANSPORTATION (Street and Site Improvements)•Section II.c DRAINAGE (Drainage and Stormwater Facilities): •Section II.d WATER - ONLY APPLICABLE IF WATER SERVICE IS PROVIDED BY CITY OF RENTON•Section II.e SANITARY SEWER - ONLY APPLICABLE IF SEWER SERVICE IS PROVIDED BY CITY OF RENTON••••••Section III. Bond Worksheet•BOND QUANTITY WORKSHEET INSTRUCTIONSThis worksheet is intended to be a "working" copy of the bond quantity worksheet, which will be used throughout all phases of the project, from initial submittal to project close-out approval. Submit this workbook, in its entirety, as follows:The following forms are to be completed by the engineer/developer/applicant as applicable to the project: The Bond Worksheet form will auto-calculate and auto-populate from the information provided in Section I and Section II.This section includes all pertinent information for the projectSection II contains a separate spreadsheet TAB for each of the following specialties: (1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for civil construction permit submittal. Hard copies are to be included as part of the Technical Information Report (TIR).(1) electronic copy (.xlsx format) and (1) hard copy of the entire workbook for final close-out submittal.This section must be completed in its entiretyInformation from this section auto-populates to all other relevant areas of the workbookThis section calculates the required Permit Bond for construction permit issuance as well as the required Maintenance Bond for project close-out submittals to release the permit bond on a project. All unit prices include labor, equipment, materials, overhead and profit. Complete the 'Quantity' columns for each of the appropriate section(s). Include existing Right-of-Way (ROW), Future Public Improvements and Private Improvements.The 'Quantity Remaining' column is only to be used when a project is under construction. The City allows one (1) bond reduction during the life of the project with the exception of the maintenance period reduction.Excel will auto-calculate and auto-populate the relevant fields and subtotals throughout the document. Only the 'Quantity' columns should need completing.Additional items not included in the lists can be added under the "write-in" sections. Provide a complete description, cost estimate and unit of measure for each write-in item. Note: Private improvements, with the exception of stormwater facilities, are not included in the bond amount calculation, but must be entered on the form. Stormwater facilities (public and private) are required to be included in the bond amount.Page 1 of 14Ref 8-H Bond Quantity WorksheetINSTRUCTIONSUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200Date Prepared: Name:PE Registration No:Firm Name:Firm Address:Phone No.Email Address:Project Name: Project Owner:CED Plan # (LUA):Phone:CED Permit # (U):Address: Site Address:Street Intersection:Addt'l Project Owner:Parcel #(s):Phone:Address: Clearing and grading greater than or equal to 5,000 board feet of timber? Yes/No:NOWater Service Provided by:If Yes, Provide Forest Practice Permit #:Sewer Service Provided by: Abbreviated Legal Description:LOT 5A-2, CITY OF RENTON LOT LINE ADJUSTMENT NO. LUA-10-020-LLA, AS RECORDED JUNE 2, 2010 UNDER RECORDING NUMBER 20100602900006, RECORDS OF KING COUNTY, WASHINGTON.900 Logan Avenue North, Renton, WA 98057201 Riverplace, Suite 400Logan Ave N. & N. 8th St.C200006318/7/2020Prepared by:FOR APPROVALProject Phase 1jtaflin@navixeng.comJenelle Taflin41872Navix Engineering, Inc.11235 SE 6th St, Suite 150(425) 453-9501SITE IMPROVEMENT BOND QUANTITY WORKSHEETPROJECT INFORMATIONCITY OF RENTONCITY OF RENTON1 Select the current project status/phase from the following options: For Approval - Preliminary Data Enclosed, pending approval from the City; For Construction - Estimated Data Enclosed, Plans have been approved for contruction by the City; Project Closeout - Final Costs and Quantities Enclosed for Project Close-out SubmittalEngineer Stamp Required (all cost estimates must have original wet stamp and signature)Clearing and GradingUtility ProvidersN/AProject Location and DescriptionProject Owner InformationTopGolf RentonGreenville, South Carolina 29601TPN: 0886610010WA Renton Park, LLCLUA19-00094Page 2 of 14Ref 8-H Bond Quantity WorksheetSECTION I PROJECT INFORMATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631UnitReference #PriceUnitQuantity CostBackfill & compaction-embankmentESC-16.50$ CY10006,500.00Check dams, 4" minus rockESC-2SWDM 5.4.6.380.00$ Each362,880.00Catch Basin ProtectionESC-335.50$ Each15532.50Crushed surfacing 1 1/4" minusESC-4WSDOT 9-03.9(3)95.00$ CY DitchingESC-59.00$ CY Excavation-bulkESC-62.00$ CY Fence, siltESC-7SWDM 5.4.3.11.50$ LF23203,480.00Fence, Temporary (NGPE)ESC-81.50$ LF Geotextile FabricESC-92.50$ SY Hay Bale Silt TrapESC-100.50$ EachHydroseedingESC-11SWDM 5.4.2.40.80$ SY Interceptor Swale / DikeESC-121.00$ LF25002,500.00Jute MeshESC-13SWDM 5.4.2.23.50$ SY Level SpreaderESC-141.75$ LF Mulch, by hand, straw, 3" deepESC-15SWDM 5.4.2.12.50$ SY Mulch, by machine, straw, 2" deepESC-16SWDM 5.4.2.12.00$ SY Piping, temporary, CPP, 6"ESC-1712.00$ LF Piping, temporary, CPP, 8"ESC-1814.00$ LF Piping, temporary, CPP, 12"ESC-1918.00$ LF1703,060.00Plastic covering, 6mm thick, sandbaggedESC-20SWDM 5.4.2.34.00$ SY Rip Rap, machine placed; slopesESC-21WSDOT 9-13.1(2)45.00$ CY10450.00Rock Construction Entrance, 50'x15'x1'ESC-22SWDM 5.4.4.11,800.00$ Each Rock Construction Entrance, 100'x15'x1'ESC-23SWDM 5.4.4.13,200.00$ Each26,400.00Sediment pond riser assemblyESC-24SWDM 5.4.5.22,200.00$ Each24,400.00Sediment trap, 5' high berm ESC-25SWDM 5.4.5.119.00$ LFSed. trap, 5' high, riprapped spillway berm section ESC-26SWDM 5.4.5.170.00$ LF Seeding, by handESC-27SWDM 5.4.2.41.00$ SY Sodding, 1" deep, level groundESC-28SWDM 5.4.2.58.00$ SY Sodding, 1" deep, sloped groundESC-29SWDM 5.4.2.510.00$ SY TESC SupervisorESC-30110.00$ HR606,600.00Water truck, dust controlESC-31SWDM 5.4.7140.00$ HR608,400.00UnitReference #PriceUnitQuantity Cost EROSION/SEDIMENT SUBTOTAL:45,202.50SALES TAX @ 10%4,520.25EROSION/SEDIMENT TOTAL:49,722.75(A)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR EROSION & SEDIMENT CONTROLDescription No.(A)WRITE-IN-ITEMS Page 3 of 14Ref 8-H Bond Quantity WorksheetSECTION II.a EROSION_CONTROLUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostGENERAL ITEMS Backfill & Compaction- embankmentGI-16.00$ CY1500090,000.00Backfill & Compaction- trenchGI-29.00$ CY650058,500.00Clear/Remove Brush, by hand (SY)GI-31.00$ SYBollards - fixedGI-4240.74$ EachBollards - removableGI-5452.34$ EachClearing/Grubbing/Tree RemovalGI-610,000.00$ Acre990,000.00Excavation - bulkGI-72.00$ CY600012,000.00Excavation - TrenchGI-85.00$ CY650032,500.00Fencing, cedar, 6' highGI-920.00$ LFFencing, chain link, 4'GI-1038.31$ LFFencing, chain link, vinyl coated, 6' highGI-1120.00$ LFFencing, chain link, gate, vinyl coated, 20' GI-121,400.00$ EachFill & compact - common barrowGI-1325.00$ CYFill & compact - gravel baseGI-1427.00$ CYFill & compact - screened topsoilGI-1539.00$ CYGabion, 12" deep, stone filled mesh GI-1665.00$ SYGabion, 18" deep, stone filled mesh GI-1790.00$ SYGabion, 36" deep, stone filled meshGI-18150.00$ SYGrading, fine, by handGI-192.50$ SYGrading, fine, with graderGI-202.00$ SYMonuments, 3' LongGI-21250.00$ EachSensitive Areas SignGI-227.00$ EachSodding, 1" deep, sloped groundGI-238.00$ SYSurveying, line & gradeGI-24850.00$ DaySurveying, lot location/linesGI-251,800.00$ AcreTopsoil Type A (imported)GI-2628.50$ CYTraffic control crew ( 2 flaggers )GI-27120.00$ HR607,200.00Trail, 4" chipped woodGI-288.00$ SYTrail, 4" crushed cinderGI-299.00$ SYTrail, 4" top courseGI-3012.00$ SYConduit, 2"GI-315.00$ LFWall, retaining, concreteGI-3255.00$ SFWall, rockeryGI-3315.00$ SFSUBTOTAL THIS PAGE:7,200.00283,000.00(B)(C)(D)(E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)Page 4 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)ROAD IMPROVEMENT/PAVEMENT/SURFACINGAC Grinding, 4' wide machine < 1000syRI-130.00$ SYAC Grinding, 4' wide machine 1000-2000syRI-216.00$ SYAC Grinding, 4' wide machine > 2000syRI-310.00$ SY970097,000.00AC Removal/DisposalRI-435.00$ SYBarricade, Type III ( Permanent )RI-556.00$ LFGuard RailRI-630.00$ LFCurb & Gutter, rolledRI-717.00$ LF1151,955.00Curb & Gutter, verticalRI-812.50$ LFCurb and Gutter, demolition and disposalRI-918.00$ LF1602,880.00Curb, extruded asphaltRI-105.50$ LFCurb, extruded concreteRI-117.00$ LF598541,895.00Sawcut, asphalt, 3" depthRI-121.85$ LF480888.00Sawcut, concrete, per 1" depthRI-133.00$ LFSealant, asphaltRI-142.00$ LFShoulder, gravel, 4" thickRI-1515.00$ SYSidewalk, 4" thickRI-1638.00$ SY23874.0031011,780.00Sidewalk, 4" thick, demolition and disposalRI-1732.00$ SYSidewalk, 5" thickRI-1841.00$ SYSidewalk, 5" thick, demolition and disposalRI-1940.00$ SYSign, Handicap RI-2085.00$ Each9765.00Striping, per stallRI-217.00$ Each3102,170.00Striping, thermoplastic, ( for crosswalk )RI-223.00$ SF215645.00Striping, 4" reflectorized lineRI-230.50$ LFAdditional 2.5" Crushed SurfacingRI-243.60$ SYHMA 1/2" Overlay 1.5" RI-2514.00$ SYHMA 1/2" Overlay 2"RI-2618.00$ SYHMA Road, 2", 4" rock, First 2500 SYRI-2728.00$ SYHMA Road, 2", 4" rock, Qty. over 2500SYRI-2821.00$ SYHMA Road, 4", 6" rock, First 2500 SYRI-2945.00$ SYHMA Road, 4", 6" rock, Qty. over 2500 SYRI-3037.00$ SYHMA Road, 4", 4.5" ATBRI-3138.00$ SYGravel Road, 4" rock, First 2500 SYRI-3215.00$ SYGravel Road, 4" rock, Qty. over 2500 SYRI-3310.00$ SYThickened EdgeRI-348.60$ LFSUBTOTAL THIS PAGE:6,597.00154,255.00(B)(C)(D)(E)Page 5 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostSITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR STREET AND SITE IMPROVEMENTSQuantity Remaining (Bond Reduction) (B)(C)PARKING LOT SURFACINGNo.2" AC, 2" top course rock & 4" borrowPL-121.00$ SY2204,620.0014400302,400.002" AC, 1.5" top course & 2.5" base coursePL-228.00$ SY4" select borrowPL-35.00$ SY1.5" top course rock & 2.5" base coursePL-414.00$ SYSUBTOTAL PARKING LOT SURFACING:4,620.00302,400.00(B)(C)(D)(E)LANDSCAPING & VEGETATIONNo.Street TreesLA-1Median LandscapingLA-2Right-of-Way LandscapingLA-3Wetland LandscapingLA-4SUBTOTAL LANDSCAPING & VEGETATION:(B)(C)(D)(E)TRAFFIC & LIGHTINGNo.SignsTR-15,000.00$ 210,000.00Street Light System ( # of Poles)TR-25,000.00$ EA1890,000.00Traffic SignalTR-3Traffic Signal ModificationTR-4SUBTOTAL TRAFFIC & LIGHTING:100,000.00(B)(C)(D)(E)WRITE-IN-ITEMSConcrete Pavement 9", 6" CSBCWI - 150.00$ SY85042,500.00SUBTOTAL WRITE-IN ITEMS:42,500.00STREET AND SITE IMPROVEMENTS SUBTOTAL:18,417.00882,155.00SALES TAX @ 10%1,841.7088,215.50STREET AND SITE IMPROVEMENTS TOTAL:20,258.70970,370.50(B)(C)(D)(E)Page 6 of 14Ref 8-H Bond Quantity WorksheetSECTION II.b TRANSPORTATIONUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostDRAINAGE (CPE = Corrugated Polyethylene Pipe, N12 or Equivalent) For Culvert prices, Average of 4' cover was assumed. Assume perforated PVC is same price as solid pipe.) Access Road, R/DD-126.00$ SY* (CBs include frame and lid)BeehiveD-290.00$ EachThrough-curb Inlet FrameworkD-3400.00$ EachCB Type ID-41,500.00$ Each1421,000.00CB Type ILD-51,750.00$ EachCB Type II, 48" diameterD-62,300.00$ Each1432,200.00 for additional depth over 4' D-7480.00$ FT125,760.00CB Type II, 54" diameterD-82,500.00$ Each for additional depth over 4'D-9495.00$ FTCB Type II, 60" diameterD-102,800.00$ Each411,200.00 for additional depth over 4'D-11600.00$ FT31,800.00CB Type II, 72" diameterD-126,000.00$ Each for additional depth over 4'D-13850.00$ FTCB Type II, 96" diameterD-1414,000.00$ Each for additional depth over 4'D-15925.00$ FTTrash Rack, 12"D-16350.00$ EachTrash Rack, 15"D-17410.00$ EachTrash Rack, 18"D-18480.00$ EachTrash Rack, 21"D-19550.00$ EachCleanout, PVC, 4"D-20150.00$ Each142,100.00Cleanout, PVC, 6"D-21170.00$ EachCleanout, PVC, 8"D-22200.00$ Each51,000.00Culvert, PVC, 4" D-2310.00$ LFCulvert, PVC, 6" D-2413.00$ LFCulvert, PVC, 8" D-2515.00$ LFCulvert, PVC, 12" D-2623.00$ LFCulvert, PVC, 15" D-2735.00$ LFCulvert, PVC, 18" D-2841.00$ LFCulvert, PVC, 24"D-2956.00$ LFCulvert, PVC, 30" D-3078.00$ LFCulvert, PVC, 36" D-31130.00$ LFCulvert, CMP, 8"D-3219.00$ LFCulvert, CMP, 12"D-3329.00$ LFSUBTOTAL THIS PAGE:75,060.00(B)(C)(D)(E)Quantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESPage 7 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, CMP, 15"D-3435.00$ LFCulvert, CMP, 18"D-3541.00$ LFCulvert, CMP, 24"D-3656.00$ LFCulvert, CMP, 30"D-3778.00$ LFCulvert, CMP, 36"D-38130.00$ LFCulvert, CMP, 48"D-39190.00$ LFCulvert, CMP, 60"D-40270.00$ LFCulvert, CMP, 72"D-41350.00$ LFCulvert, Concrete, 8"D-4242.00$ LFCulvert, Concrete, 12"D-4348.00$ LFCulvert, Concrete, 15"D-4478.00$ LFCulvert, Concrete, 18"D-4548.00$ LFCulvert, Concrete, 24"D-4678.00$ LFCulvert, Concrete, 30"D-47125.00$ LFCulvert, Concrete, 36"D-48150.00$ LFCulvert, Concrete, 42"D-49175.00$ LFCulvert, Concrete, 48"D-50205.00$ LFCulvert, CPE Triple Wall, 6" D-5114.00$ LF1802,520.00Culvert, CPE Triple Wall, 8" D-5216.00$ LF234037,440.00Culvert, CPE Triple Wall, 12" D-5324.00$ LF180343,272.00Culvert, CPE Triple Wall, 15" D-5435.00$ LFCulvert, CPE Triple Wall, 18" D-5541.00$ LF47519,475.00Culvert, CPE Triple Wall, 24" D-5656.00$ LF59033,040.00Culvert, CPE Triple Wall, 30" D-5778.00$ LFCulvert, CPE Triple Wall, 36" D-58130.00$ LFCulvert, LCPE, 6"D-5960.00$ LFCulvert, LCPE, 8"D-6072.00$ LFCulvert, LCPE, 12"D-6184.00$ LFCulvert, LCPE, 15"D-6296.00$ LFCulvert, LCPE, 18"D-63108.00$ LFCulvert, LCPE, 24"D-64120.00$ LFCulvert, LCPE, 30"D-65132.00$ LFCulvert, LCPE, 36"D-66144.00$ LFCulvert, LCPE, 48"D-67156.00$ LFCulvert, LCPE, 54"D-68168.00$ LFSUBTOTAL THIS PAGE:135,747.00(B)(C)(D)(E)Page 8 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESDRAINAGE (Continued)Culvert, LCPE, 60"D-69180.00$ LFCulvert, LCPE, 72"D-70192.00$ LFCulvert, HDPE, 6"D-7142.00$ LFCulvert, HDPE, 8"D-7242.00$ LFCulvert, HDPE, 12"D-7374.00$ LFCulvert, HDPE, 15"D-74106.00$ LFCulvert, HDPE, 18"D-75138.00$ LFCulvert, HDPE, 24"D-76221.00$ LFCulvert, HDPE, 30"D-77276.00$ LFCulvert, HDPE, 36"D-78331.00$ LFCulvert, HDPE, 48"D-79386.00$ LFCulvert, HDPE, 54"D-80441.00$ LFCulvert, HDPE, 60"D-81496.00$ LFCulvert, HDPE, 72"D-82551.00$ LFPipe, Polypropylene, 6"D-8384.00$ LFPipe, Polypropylene, 8"D-8489.00$ LFPipe, Polypropylene, 12"D-8595.00$ LFPipe, Polypropylene, 15"D-86100.00$ LFPipe, Polypropylene, 18"D-87106.00$ LFPipe, Polypropylene, 24"D-88111.00$ LFPipe, Polypropylene, 30"D-89119.00$ LFPipe, Polypropylene, 36"D-90154.00$ LFPipe, Polypropylene, 48"D-91226.00$ LFPipe, Polypropylene, 54"D-92332.00$ LFPipe, Polypropylene, 60"D-93439.00$ LFPipe, Polypropylene, 72"D-94545.00$ LFCulvert, DI, 6"D-9561.00$ LFCulvert, DI, 8"D-9684.00$ LFCulvert, DI, 12"D-97106.00$ LF34736,782.00Culvert, DI, 15"D-98129.00$ LFCulvert, DI, 18"D-99152.00$ LFCulvert, DI, 24"D-100175.00$ LFCulvert, DI, 30"D-101198.00$ LFCulvert, DI, 36"D-102220.00$ LFCulvert, DI, 48"D-103243.00$ LFCulvert, DI, 54"D-104266.00$ LFCulvert, DI, 60"D-105289.00$ LFCulvert, DI, 72"D-106311.00$ LFSUBTOTAL THIS PAGE:36,782.00(B)(C)(D)(E)Page 9 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESSpecialty Drainage ItemsDitching SD-19.50$ CYFlow Dispersal Trench (1,436 base+)SD-328.00$ LF French Drain (3' depth)SD-426.00$ LF140036,400.00Geotextile, laid in trench, polypropyleneSD-53.00$ SY7802,340.00Mid-tank Access Riser, 48" dia, 6' deepSD-62,000.00$ EachPond Overflow SpillwaySD-716.00$ SYRestrictor/Oil Separator, 12"SD-81,150.00$ EachRestrictor/Oil Separator, 15"SD-91,350.00$ EachRestrictor/Oil Separator, 18"SD-101,700.00$ EachRiprap, placedSD-1142.00$ CYTank End Reducer (36" diameter)SD-121,200.00$ EachInfiltration pond testingSD-13125.00$ HRPermeable PavementSD-14Permeable Concrete SidewalkSD-15Culvert, Box __ ft x __ ftSD-16SUBTOTAL SPECIALTY DRAINAGE ITEMS:38,740.00(B)(C)(D)(E)STORMWATER FACILITIES (Include Flow Control and Water Quality Facility Summary Sheet and Sketch)Detention PondSF-1Each Detention TankSF-2Each Detention VaultSF-3Each Infiltration PondSF-4Each Infiltration TankSF-5Each Infiltration VaultSF-6Each Infiltration TrenchesSF-7Each Basic Biofiltration SwaleSF-8Each Wet Biofiltration SwaleSF-9Each WetpondSF-10Each WetvaultSF-11Each Sand FilterSF-12Each Sand Filter VaultSF-13Each Linear Sand FilterSF-14Each Proprietary FacilitySF-15Each Bioretention FacilitySF-16Each SUBTOTAL STORMWATER FACILITIES:(B)(C)(D)(E)Page 10 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostQuantity Remaining (Bond Reduction) (B)(C)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR DRAINAGE AND STORMWATER FACILITIESWRITE-IN-ITEMS (INCLUDE ON-SITE BMPs)Area Drain, 12" GrateWI-1500.00$ Each2613,000.00Lift Station, XX GPM/HPWI-250,000.00$ Each150,000.00Bioclean XX GPM Modular Wetland FacilityWI-340,000.00$ Each280,000.00WI-4WI-5WI-6WI-7WI-8WI-9WI-10WI-11WI-12WI-13WI-14WI-15SUBTOTAL WRITE-IN ITEMS:143,000.00DRAINAGE AND STORMWATER FACILITIES SUBTOTAL:429,329.00SALES TAX @ 10%42,932.90DRAINAGE AND STORMWATER FACILITIES TOTAL:472,261.90(B) (C) (D) (E)Page 11 of 14Ref 8-H Bond Quantity WorksheetSECTION II.c DRAINAGEUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostConnection to Existing WatermainW-12,000.00$ Each24,000.00Ductile Iron Watermain, CL 52, 4 Inch DiameterW-250.00$ LF1758,750.00Ductile Iron Watermain, CL 52, 6 Inch DiameterW-356.00$ LF25614,336.00Ductile Iron Watermain, CL 52, 8 Inch DiameterW-460.00$ LFDuctile Iron Watermain, CL 52, 10 Inch DiameterW-570.00$ LFDuctile Iron Watermain, CL 52, 12 Inch DiameterW-680.00$ LF1751140,080.00Gate Valve, 4 inch DiameterW-7500.00$ Each1500.00Gate Valve, 6 inch DiameterW-8700.00$ Each64,200.00Gate Valve, 8 Inch DiameterW-9800.00$ EachGate Valve, 10 Inch DiameterW-101,000.00$ EachGate Valve, 12 Inch DiameterW-111,200.00$ Each1214,400.00Fire Hydrant AssemblyW-124,000.00$ Each520,000.00Permanent Blow-Off AssemblyW-131,800.00$ EachAir-Vac Assembly, 2-Inch DiameterW-142,000.00$ EachAir-Vac Assembly, 1-Inch DiameterW-151,500.00$ EachCompound Meter Assembly 3-inch DiameterW-168,000.00$ Each18,000.00Compound Meter Assembly 4-inch DiameterW-179,000.00$ EachCompound Meter Assembly 6-inch DiameterW-1810,000.00$ EachPressure Reducing Valve Station 8-inch to 10-inchW-1920,000.00$ EachWATER SUBTOTAL:4,000.00210,266.00SALES TAX @ 10%400.0021,026.60WATER TOTAL:4,400.00231,292.60(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR WATERQuantity Remaining (Bond Reduction) (B)(C)Page 12 of 14Ref 8-H Bond Quantity WorksheetSECTION II.d WATERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
CED Permit #:C20000631ExistingFuture PublicPrivateRight-of-WayImprovementsImprovements(D) (E)DescriptionNo. Unit PriceUnitQuant.CostQuant.CostQuant.CostQuant.CostClean OutsSS-11,000.00$ Each44,000.00Grease Interceptor, 500 gallonSS-28,000.00$ EachGrease Interceptor, 1000 gallonSS-310,000.00$ EachGrease Interceptor, 1500 gallonSS-415,000.00$ Each115,000.00Side Sewer Pipe, PVC. 4 Inch DiameterSS-580.00$ LFSide Sewer Pipe, PVC. 6 Inch DiameterSS-695.00$ LF24022,800.00Sewer Pipe, PVC, 8 inch DiameterSS-7105.00$ LF63566,675.00Sewer Pipe, PVC, 12 Inch DiameterSS-8120.00$ LFSewer Pipe, DI, 8 inch DiameterSS-9115.00$ LFSewer Pipe, DI, 12 Inch DiameterSS-10130.00$ LFManhole, 48 Inch DiameterSS-116,000.00$ Each530,000.00Manhole, 54 Inch DiameterSS-136,500.00$ EachManhole, 60 Inch DiameterSS-157,500.00$ EachManhole, 72 Inch DiameterSS-178,500.00$ EachManhole, 96 Inch DiameterSS-1914,000.00$ EachPipe, C-900, 12 Inch DiameterSS-21180.00$ LFOutside DropSS-241,500.00$ LSInside DropSS-251,000.00$ LSSewer Pipe, PVC, ____ Inch DiameterSS-26Lift Station (Entire System)SS-27LSSANITARY SEWER SUBTOTAL:138,475.00SALES TAX @ 10%13,847.50SANITARY SEWER TOTAL:152,322.50(B) (C) (D) (E)SITE IMPROVEMENT BOND QUANTITY WORKSHEETFOR SANITARY SEWERQuantity Remaining (Bond Reduction) (B)(C)Page 13 of 14Ref 8-H Bond Quantity WorksheetSECTION II.e SANITARY SEWERUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
Planning Division |1055 South Grady Way – 6th Floor | Renton, WA 98057 (425) 430-7200Date:Name:Project Name: PE Registration No:CED Plan # (LUA):Firm Name:CED Permit # (U):Firm Address:Site Address:Phone No.Parcel #(s):Email Address:Project Phase: Site Restoration/Erosion Sediment Control Subtotal (a)Existing Right-of-Way Improvements Subtotal (b)(b)24,658.70$ Future Public Improvements Subtotal(c)-$ Stormwater & Drainage Facilities (Public & Private) Subtotal(d)(d)472,261.90$ (e)(f)Site RestorationCivil Construction PermitMaintenance Bond99,384.12$ Bond Reduction2Construction Permit Bond Amount 3Minimum Bond Amount is $10,000.001 Estimate Only - May involve multiple and variable components, which will be established on an individual basis by Development Engineering.2 The City of Renton allows one request only for bond reduction prior to the maintenance period. Reduction of not more than 70% of the original bond amount, provided that the remaining 30% willcover all remaining items to be constructed. 3 Required Bond Amounts are subject to review and modification by Development Engineering.* Note: The word BOND as used in this document means any financial guarantee acceptable to the City of Renton.** Note: All prices include labor, equipment, materials, overhead and profit. EST1((b) + (c) + (d)) x 20%-$ MAINTENANCE BOND */**(after final acceptance of construction)49,722.75$ 24,658.70$ 509,249.95$ 49,722.75$ -$ 472,261.90$ -$ 558,972.70$ P (a) x 100%SITE IMPROVEMENT BOND QUANTITY WORKSHEET BOND CALCULATIONS8/7/2020Jenelle Taflin41872Navix Engineering, Inc.R((b x 150%) + (d x 100%))S(e) x 150% + (f) x 100%Bond Reduction: Existing Right-of-Way Improvements (Quantity Remaining)2Bond Reduction: Stormwater & Drainage Facilities (Quantity Remaining)2T(P +R - S)Prepared by:Project InformationCONSTRUCTION BOND AMOUNT */**(prior to permit issuance)(425) 453-9501jtaflin@navixeng.comTopGolf RentonLUA19-00094900 Logan Avenue North, Renton, WA 98057TPN: 0886610010FOR APPROVALC2000063111235 SE 6th St, Suite 150Page 14 of 14Ref 8-H Bond Quantity WorksheetSECTION III. BOND WORKSHEETUnit Prices Updated: 06/14/2016Version: 04/26/2017Printed 8/12/2020
NAVIX TopGolf Renton – Renton, WA
APPENDIX G
FACILITIES SUMMARY SHEET
2016 KING COUNTY SURFACE WATER DESIGN MANUAL, REFERENCE D
4/24/2016
Page 1
STORMWATER FACILITY SUMMARY SHEET DPER Permit No.___________________
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)Date ___________________
OVERVIEW:NPDES Permit No.___________________
Project Name
Parcel No.____________________________
Project Location Retired Parcel No.____________________________
Downstream Drainage Basins:Project includes Landscape Management Plan?yes
Major Basin Name ______________________________________________(include copy with TIR as Appendix)no
Immediate Basin Name ______________________________________________
GENERAL FACILITY INFORMATION: Leachable Metals
Infiltration Impervious Surface Limit
Type # of Type # of Type # of facilities Flow Control BMPs
Ponds ______ Ponds ______ Ponds ______ Basic Clearing Limit
Vaults ______ Tanks ______ Vaults ______ Conservation Drainage Facility
Tanks ______ Trenches _____ Tanks ______ Flood Problem Landscape Management Plan
If no flow control facility, check one:
Project qualifies for KCSWDM Exemption (KCSWDM 1.2.3):
Basic Exemption (Applies to Commercial parcels only)Area % of Total
Redevelopment projects
Cost Exemption for Parcel Redevelopment projects
Direct Discharge Exemption
Other _____________________ Total impervious surface served by
Project qualifies for 0.1 cfs Exception per KCSWDM 1.2.3 flow control facility(ies) (sq ft)
Impervious surface served by flow
KCSWDM Adjustment No. ___________________control facility(ies) designed
1990 or later (sq ft)
approved KCSWDM Adjustment No. __________________ Impervious surface served by
Shared Facility Name/Location: _________________________ pervious surface absorption (sq ft)
No flow control required (other, provide justification): Impervious surface served by approved
____________________________________________________ water quality facility(ies) (sq ft)
Flow Control
Performance Std
Declarations of Covenant Recording No.
Water QualityDetention
TREATMENT SUMMARY FOR TOTAL IMPERVIOUS SURFACES
-----
Total Impervious Acreage (ac)
No flow control required per approved
Flow control provided in regional/shared facility per approved
PROVIDE FACILITY DETAILS AND FACILITY SKETCH FOR EACH FACILITY ON REVERSE. USE ADDITIONAL SHEETS AS NEEDED FOR ADDITIONAL FACILITIES
Impervious Surface Exemption for Transportation Total Acreage (ac)
Topgolf Renton
780 Logan Ave N
0886610010
X
N/A
N/A
N/A
N/A
N/A
N/A
East Lake Washington - Renton Basin
East Lake Washington
Not assigned
X
13.68
8.80
N/A
N/A
N/A
3.58
64.33%
26.17%
2016 KING COUNTY SURFACE WATER DESIGN MANUAL, REFERENCE D
4/24/2016
Page 2
STORMWATER FACILITY SUMMARY SHEET DPER Permit No.___________________
(provide one Stormwater Facility Summary Sheet per Natural Discharge Location)
Project Name Downstream Drainage Basins:
Major Basin Name _______________________________
Project Location Immediate Basin Name ___________________________
FLOW CONTROL FACILITY:Basin:
Facility Name/Number _______________________________________ New Facility Project Impervious
Facility Location ____________________________________________ Existing Facility Acres Served ________
UIC? □ yes □ no UIC Site ID:% of Total Project Impervious
cu.ft.Volume Factor Acres Served ________
_____________ ac.ft.____________of Safety _______No. of Lots Served ________
Control Structure location: _______________________________________________
Type of Control Structure:No. of Orifices/Restrictions __________
Riser in vault Size of Orifice/Restriction (in.) No.1 ______ cu.ft.
Riser in Type II CB (numbered starting with lowest No.2 ______ ac.ft.
Weir in Type II CB orifice): No.3 ______
(inches in decimal format)No.4 ______
WATER QUALITY FACILITIES Design Information
Indicate no. of water quality facilities/BMPs for each type:Water Quality design flow (cfs)
_______Flow dispersion Water Quality treated volume (sandfilter) (cu.ft.)
_______Filter strip Water Quality storage volume (wetpool) (cu.ft.)
_______Biofiltration swale regular, wet or Landscape management plan Farm management plan
continuous inflow
_______Wetvault combined w/detention ______High flow bypass structure (e.g., flow-splitter catch basin)
_______Wetpond basic large combined w/detention ______Oil/water separator baffle coalescing plate
_______Pre-settling pond ______Storm filter
_______Stormwater wetland ______Pre-settling structure (Manufacturer:______________________)
_______Sand filter basic large Sand bed depth ______Catch basin inserts (Manufacturer:________________________)
regular linear vault (inches)______________Source controls _________________________________________
● Is facility lined? yes no If so, what marker is used above liner?_____________________________________________________
Facility Summary Sheet Sketch: All detention, infiltration and water quality facilities must include a detailed sketch (11"x17" reduced size plan sheets preferred).
Dam Safety Regulations (WA State Dept of
Ecology):
Reservoir Volume
above natural grade
Depth of Reservoir
above natural grade (ft)
Live Storage
Volume
Live Storage
Depth (ft)
Topgolf Renton
780 Logan Ave N
2
0.3939, 0.7129
East Lake Washington - Renton Basin
N/A
X Roof cover over trash area
N/A
N/A
East Lake Washington
A
PLAN VIEW
1'-0" TOP
25'-6" WALL OD
26'-6" SLAB OD
11'-6"
WALL OD
12'-6"
FOOTING
RIM: 29.63'
24'-0" WALL ID
10'-0"
WALL ID
2" SLOT
TYPICAL
7.42'
[89.08"]
10" BASE
SECTION A-ASECTION D-D
10'-1"8"
IE: 23.55'
D
RIM: 29.63'
SECTION B-B
A
D
SAU
DFI1325-05
10 USAXXXXINLET, Ø26" OPENING
FOR Ø18" HDPE, IE: 23.55'.
2X 6"x24" INLET WINDOW, EL:25.21'.
COBBLES FOR ENERGY DISSIPATION
6X Ø4.00" SLOTTED PVC
UNDERDRAIN PIPE.
INTERIOR/EXTERIOR JOINT SEALANT REQUIRED,
(CONSEAL CS-231 OR EQUIVALENT), BY OTHERS.
6X Ø4.00" SLOTTED PVC
UNDERDRAIN PIPE.
TREATED OUTLET ORIFICE
CAP INTO OUTLET CHAMBER.
INTERIOR/EXTERIOR JOINT
SEALANT REQUIRED,
(CONSEAL CS-231 OR
EQUIVALENT), BY OTHERS.
BYPASS WEIR, EL: 25.87'.
2X 6"x24" INLET WINDOW,
EL: 25.21'.
3X Ø4.00" SLOTTED PVC
UNDERDRAIN PIPE.
6.00" DRAIN ROCK.
18.00" StormMixf MEDIA
2.00" MULCH.
Ø6.00" PVC OUTLET ORIFICE
CAP INTO OUTLET CHAMBER.FIDSAUXXXX USADFI1154
0010
FIDSAUXXXX USADFI115
40010
B
2X DRAIN DOWN DEVICE
2'-6"10'-1"8"
B
OUTLET, Ø26" OPENING
FOR Ø18" HDPE, IE: 23.04'.
DRAIN DOWN DEVICE
2X 6"x24" INLET
WINDOW, EL: 25.21'.
COBBLES FOR ENERGY DISSIPATION
2X Ø24.00" BOLTED & GASKETED ACCESS COVERS,
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
INLET, Ø26" OPENING
FOR Ø18" HDPE.OUTLET, Ø26" OPENING
FOR Ø18" HDPE.
BAFFLE WALL
BAFFLE WALL
DRAIN DOWN DEVICE
5'-3"EL: 25.8
IE:
SAU
DFI1325-05
10 USAXXXX6.08'
[72.96"]
9" TYPICAL
WALL THICKNESS
5'-0"
BYPASS WEIR, EL: 25.87'.
OUTLET, Ø26" OPENING
FOR Ø18" HDPE, NEARSIDE.
EL: 22.21'
2X Ø36.00" BOLTED & GASKETED ACCESS COVERS,
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
INLET, Ø26" OPENING
FOR Ø18" HDPE, FARSIDE.
RIM: 29.63'
~4" ADJUST TO GRADE
REV DESCRIPTION BY DATEPDD-10545-0-BPU-1024IB.dwg, 2020-05-08 12:26 PM Swapnil Kotwal 2.770Bioretention/
Biofiltration
INTERNAL DRAWING ID REVISION SHEET
MFG DRAWN ENGINEER CHECKEDDATE SALES ORDER
REV DATE
HD Fowler
BioPod™ Biofilter Underground
10'x24' Panel Vault with Internal Bypass
Ph: 800.579.8819 | www.oldcastleinfrastructure.com/stormwater
APPROVED W/ NO EXCEPTIONS TAKEN:
APPROVED AS NOTED:
REVISE AND RESUBMIT:
SIGNATURE DATE
* THIS MUST BE FILLED OUT BEFORE
MANUFACTURING BEGINS *
THIS DOCUMENT IS THE PROPERTY OF OLDCASTLE INFRASTRUCTURE, INC.
IT IS CONFIDENTIAL, SUBMITTED FOR REFERENCE PURPOSES ONLY AND
SHALL NOT BE USED IN ANY WAY INJURIOUS TO THE INTERESTS OF, OR
WITHOUT THE WRITTEN PERMISSION OF OLDCASTLE INFRASTRUCTURE, INC.COPYRIGHT © 2020 OLDCASTLE INFRASTRUCTURE, INC. ALL RIGHTS RESERVED.
CUSTOMER
JOB NAME
5/8/20 010-AU PPS MJT MJT S171966
-
-PDD-10545
Topgolf Renton - Renton, WA
1 OF 1
NOTES:
1.DESIGN LOADINGS:
A.AASHTO HS-20-44 W/ IMPACT.
B.DESIGN FILL: 1' MAXIMUM.
C.ASSUMED WATER TABLE = 5' BELOW GRADE.
D.DRY LATERAL EARTH PRESSURE (EFP) = 40
PCF.
E.LATERAL LIVE LOAD SURCHARGE = 80 PSF
(APPLIED TO 8' BELOW GRADE).
F.NO LATERAL SURCHARGE FROM ADJACENT
BUILDINGS, WALLS, PIERS, OR
FOUNDATIONS.
2.CONCRETE 28 DAY COMPRESSIVE STRENGTH
SHALL BE 5,000 PSI MINIMUM.
3.STEEL REINFORCEMENT: REBAR, ASTM A-615 OR
A-706, GRADE 60.
4.MESH REINFORCEMENT: ASTM A-1064, S1.2, GRADE
80.
5.CEMENT: ASTM C-150 SPECIFICATION.
6.REFERENCE STANDARD:
A.ASTM C 890
B.ASTM C 913
7.THIS STRUCTURE IS DESIGNED TO THE
PARAMETERS NOTED HEREIN. PLEASE VERIFY
THAT THESE PARAMETERS MEET PROJECT
REQUIREMENTS (I.E. LIVE LOAD, FILL RANGE,
WATER TABLE). IF DESIGN PARAMETERS ARE
INCORRECT, REVIEWING ENGINEER/AUTHORITY
SHALL NOTIFY OLDCASTLE INFRASTRUCTURE
UPON REVIEW OF THIS SUBMITTAL.
8.OVERSIZED HOLES TO ACCOMMODATE SPECIFIC
PIPE TYPE MUST BE CONCENTRIC TO PIPE ID.
AFTER PIPES ARE INSTALLED, ALL ANNULAR
SPACES SHALL BE FILLED WITH A MINIMUM OF
3000 PSI CONCRETE FOR FULL THICKNESS OF
PRECAST WALLS. PIPES ARE TO BE FLUSH WITH
THE INSIDE SURFACE OF THE CONCRETE
STRUCTURE.
9.CONTRACTOR RESPONSIBLE TO VERIFY ALL SIZES,
LOCATIONS AND ELEVATIONS OF OPENINGS.
10.CONTRACTOR RESPONSIBLE TO ENSURE
ADEQUATE BEARING SURFACE IS PROVIDED (I.E.
COMPACTED AND LEVEL PER PROJECT
SPECIFICATIONS).
11.ADAPTORS/ANGLES AND EXTERNAL PIPING BY
OTHERS.
12.SYSTEM SHIPPED EMPTY. INTERNAL PIPE, FILTER
MEDIA & DRAIN ROCK PROVIDED IN BULK &
INSTALLED BY OTHERS.
13.MAXIMUM PICK WEIGHT: = 45,000 LBS. (MEDIA
SHIPPED SEPARATELY AND INSTALLED BY
CONTRACTOR).
14.OLDCASTLE REPRESENTATIVE TO BE ON SITE TO
OVERSEE THE INSTALLATION OF ALL INTERNAL
COMPONENTS BY INSTALLING CONTRACTOR.
BPU-1024IB-PV
WADOE GULD
Max Treatment Flow
0.72 cfs
Max Peak Flow
20 cfs
23.06'
6.57'
[78.84"]
2.81'
[33.72"]
SECTION B-B
4X Ø6" SLOTTED PVC
UNDERDRAIN PIPE.
12" DRAIN ROCK.
18" StormMixf MEDIA
2" MULCH.
PLAN VIEW
(TOP SLAB & BASE SLAB JOINT PROJECTION NOT SHOWN FOR CLARITY)
SECTION A-A
VARIES
OUTLET, Ø26" OPENING
FOR Ø18" CPEP
INTERIOR/EXTERIOR JOINT SEALANT REQUIRED,
(CONSEAL CS-231 OR EQUIVALENT), BY OTHERS.
INLET, Ø26" OPENING
FOR Ø18" CPEP
VARIES
6X Ø36" BOLTED & GASKETED ACCESS COVERS,
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
3.17'
[38.00"]
RIM: VARIES
31.20' - 31.40'
RIM: VARIES
31.20' - 31.40'
IE: 24.96'
IE: 24.46'
EL: 27.63'
BYPASS WEIR3X INTERIOR BAFFLE WALL,
EL: 28.96'
Ø12" DOGHOUSE
OPENING FOR Ø10" PVC
SECTION D-D
(OUTLET PIPE NOT SHOWN FOR CLARITY)
2X Ø30" DOGHOUSE
OPENING, IE: 24.46'
10"x84" OPENING FOR 4X Ø6" UNDERDRAIN,
IE: 24.46', (TYPICAL 2 PLACES).
6X Ø24" BOLTED & GASKETED ACCESS COVERS.
FIELD POURED CONCRETE COLLAR REQUIRED,
BY OTHERS.
10"x84" OPENING
FOR 4X Ø6" UNDERDRAIN.2X Ø30" DOGHOUSE
OPENING,
IE: 24.46'
BYPASS WEIR,
EL: 27.63'
3X INTERIOR BAFFLE WALL,
EL: 28.96'
8X 4"x24" INLET WINDOW, IE: 27.13'
8X COBBLES FOR ENERGY DISSIPATION.
5X DRAIN DOWN
DEVICE, SK-0962
5'-6"
1'-2" SLAB
1'-4" SLAB
2X INTERIOR WALL,
EL: 29.29'
SAU
DFI1325-0
5
10 USAXXXX38'-0" WALL ID
40'-6" SLAB OD
#1 12'-0" MEDIA
SURFACE AREA
9" TYPICAL
WALL THICKNESS
1'-0"#2 12'-0" MEDIA
SURFACE AREA
#4 12'-0" MEDIA
SURFACE AREA
1'-0"
A
16'-6"
WALL OD
15'-0"
WALL ID
D
17'-6"
FOOTING
2X 1'-9"
OUTLET, Ø26" OPENING
FOR Ø18" CPEP,
IE: 24.46'
INLET, Ø26" OPENING
FOR Ø18" CPEP,
IE: 24.96'D
A
8X COBBLES FOR
ENERGY
DISSIPATION.
8X 4"x24" INLET
WINDOW,
IE: 27.13'
5X DRAIN DOWN
DEVICE, SK-0962
4X Ø6" SLOTTED
PVC UNDERDRAIN
PIPE.
Ø12" DOGHOUSE
OPENING FOR Ø10" PVC
6"BYPASS WEIR,
EL: 27.63'
3X INTERIOR
BAFFLE WALL,
EL: 28.96'
3'-6"
9"
10'-9" MEDIA
SURFACE AREA
6"
TYP B
B
2'-6"
2X INTERIOR WALL,
EL: 29.29'
39'-6" WALL OD6"
TYP
Ø8" ORIFICE CAP
SAU
DFI1325-0
5
10 USAXXXXSAU
DFI1325-0
5
10 USAXXXXSAU
DFI1325-0
5
10 USAXXXXSAU
DFI1325-0
5
10 USAXXXXSAU
DFI1325-0
5
10 USAXXXX2X INTERIOR WALL,
EL: 29.29'
FIDSAU
XXXX USADFI11540010
FIDSAU
XXXX USADFI11540010
FIDSAU
XXXX USADFI11540010
FIDSAU
XXXX USADFI11540010
FIDSAU
XXXX USADFI11540010
FIDSAU
XXXX USADFI11540010
20'-3" BASE SLAB #1 20'-3" BASE SLAB #2
5X DRAIN DOWN
DEVICE, SK-0962
14'-0" TOP SLAB #1 13'-0" TOP SLAB #2 13'-6" TOP SLAB #3
REV DESCRIPTION BY DATE
1 UPDATED AS PER RECEIVED COMMENT ON 3/26/21 PPS 3/26/21
2 WAS BPU-816IB, IS BPU-1024 AND UPDATED AS PER REDLINES PPS 7/8/21
3 UPDATED AS PER RECEIVED COMMENTS ON 8/6/21 PPS 8/6/21
4 CHANGED INLET/OUTLET PIPE SIZES FROM Ø12" TO Ø18" HDPE PPS 8/12/21
5 WAS 1024 BPU, IS 1538 BPU PPS 3/9/21
PDD-10546-5-BPU-1538IB.dwg, 2021-09-08 4:55 PM Akshata Savant 14.850Bioretention/
Biofiltration
SHEET NAME REVISION SHEET
MFG DRAWN ENGINEER CHECKEDDATE SALES ORDER
REV DATE
HD Fowler
BioPod™ Biofilter Underground
15'x38' Panel Vault with Internal Bypass
Ph: 800.579.8819 | www.oldcastleinfrastructure.com/stormwater
APPROVED W/ NO EXCEPTIONS TAKEN:
APPROVED AS NOTED:
REVISE AND RESUBMIT:
SIGNATURE DATE
* THIS MUST BE FILLED OUT BEFORE
MANUFACTURING BEGINS *
THIS DOCUMENT IS THE PROPERTY OF OLDCASTLE INFRASTRUCTURE, INC.
IT IS CONFIDENTIAL, SUBMITTED FOR REFERENCE PURPOSES ONLY AND
SHALL NOT BE USED IN ANY WAY INJURIOUS TO THE INTERESTS OF, OR
WITHOUT THE WRITTEN PERMISSION OF OLDCASTLE INFRASTRUCTURE, INC.COPYRIGHT © 2021 OLDCASTLE INFRASTRUCTURE, INC. ALL RIGHTS RESERVED.
CUSTOMER
PROJECT NAME
5/8/20 010-AU PPS MJT MJT S171966
5
9/3/21PDD-10546
Topgolf Renton - Renton, WA
1 OF 1
NOTES:
1.DESIGN LOADINGS:
A.AASHTO HS-20-44 W/ IMPACT.
B.DESIGN FILL: 1' MAXIMUM.
C.ASSUMED WATER TABLE = 5' BELOW GRADE.
D.DRY LATERAL EARTH PRESSURE (EFP) = 40 PCF.
E.LATERAL LIVE LOAD SURCHARGE = 80 PSF (APPLIED
TO 8' BELOW GRADE).
F.NO LATERAL SURCHARGE FROM ADJACENT
BUILDINGS, WALLS, PIERS, OR FOUNDATIONS.
2.CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE
5,000 PSI MINIMUM.
3.STEEL REINFORCEMENT: REBAR, ASTM A-615 OR A-706,
GRADE 60.
4.MESH REINFORCEMENT: ASTM A-1064, S1.2, GRADE 80.
5.CEMENT: ASTM C-150 SPECIFICATION.
6.REFERENCE STANDARD:
A.ASTM C 890
B.ASTM C 913
7.THIS STRUCTURE IS DESIGNED TO THE PARAMETERS
NOTED HEREIN. PLEASE VERIFY THAT THESE
PARAMETERS MEET PROJECT REQUIREMENTS (I.E. LIVE
LOAD, FILL RANGE, WATER TABLE). IF DESIGN
PARAMETERS ARE INCORRECT, REVIEWING
ENGINEER/AUTHORITY SHALL NOTIFY OLDCASTLE
INFRASTRUCTURE UPON REVIEW OF THIS SUBMITTAL.
8.OVERSIZED HOLES TO ACCOMMODATE SPECIFIC PIPE
TYPE MUST BE CONCENTRIC TO PIPE ID. AFTER PIPES
ARE INSTALLED, ALL ANNULAR SPACES SHALL BE FILLED
WITH A MINIMUM OF 3000 PSI CONCRETE FOR FULL
THICKNESS OF PRECAST WALLS. PIPES ARE TO BE FLUSH
WITH THE INSIDE SURFACE OF THE CONCRETE
STRUCTURE.
9.CONTRACTOR RESPONSIBLE TO VERIFY ALL SIZES,
LOCATIONS AND ELEVATIONS OF OPENINGS.
10.CONTRACTOR RESPONSIBLE TO ENSURE ADEQUATE
BEARING SURFACE IS PROVIDED (I.E. COMPACTED AND
LEVEL PER PROJECT SPECIFICATIONS).
11.MEDIA, DRAIN ROCK, MULCH, AND INTERNAL
COMPONENTS SHIPPED SEPARATELY. INSTALLER
RESPONSIBLE FOR PLACEMENT OF THESE MATERIALS IN
THE STRUCTURE.
12.OLDCASTLE REPRESENTATIVE TO BE ON SITE TO
OVERSEE INSTALLATION.
13.CONTRACTOR TO ENSURE UNIT IS PROTECTED FROM
CONSTRUCTION DEBRIS/RUNOFF AFTER INSTALLATION.
14.CONTRACTOR RESPONSIBLE FOR SUPPLYING CRANE TO
OFF-LOAD AND SET PANELS; SUPPLY PERSONNEL AND
TOOLS NEEDED FOR INSTALLATION; INSTALL GASKET AT
TOP, BOTTOM AND BETWEEN ALL WALLS; GROUT ALL
SEAMS & WALL CONNECTIONS PRIOR TO BACKFILLING
(GROUT TO BE NON-SHRINK, 5000 PSI MINIMUM BEFORE
BACKFILLING).
15.SECTION HEIGHTS, SLAB/WALL THICKNESSES AND
KEYWAYS ARE SUBJECT TO CHANGE DUE TO
AVAILABILITY AND PRODUCTION PLANT CAPABILITY.
16.ADAPTORS/ANGLES AND EXTERNAL PIPING BY OTHERS.
17.MAXIMUM PICK WEIGHT: 61,700 LBS.
UNIT ID: East
BioPod Underground - Panel Vault
Treatment Flow Rate = 1.38 cfs
5
NAVIX TopGolf Renton – Renton, WA
APPENDIX H
Outfield Material Product Data and Maintenance Instructions
NAVIX TopGolf Renton – Renton, WA
Outfield Material Product Data:
See attached sheets.
Maintenance Instructions:
Outfield area does not use fertilizers or pesticides as the surface is an artificial turf and is not
considered PGIS. No vehicular traffic beyond the Kubota RTV vehicles that collect golf balls access
the outfield outside of unexpected maintenance to the net poles, which is typically done from the
exterior of the outfield netting. Heavy equipment is not required for select repair of turf, if needed
this can be manually handled by individuals.
(888) SYN.TURF ♦ PerfectTurfInc.com
230 Gerry Drive ♦ Wood Dale, IL 60191
Product Specifications
TopGolf Turf – Premium – for 2017
TopGolf Turf is custom-made exclusively for TopGolf USA. Perfect Turf LLC helped design TopGolf Turf
and the new TopGolf Turf Premium in working with Mark Caster. The goals in designing TopGolf Turf
Premium were to create a system that better protected the golf ball covers, offered improved durability, kept the
sand infill in place despite the 100% horizontal drainage design and yet keep costs down to within budget.
Applications: Golf Driving Range
Face Weight: min. 52 oz/sq. yard
Pile Height: 1.5” grass blade
Roll Width: 15’ wide rolls, 180 inches
Yarn Type: min 12,000 denier Monofilament Polyethylene grass blade with green curled Polyethylene thatch
layer alternating rows with min 12,000 denier slit film Polyethylene grass blade with green curled Polyethylene
thatch layer.
Colors: Type 1: Dark Green/Emerald (Rough), Type 2: Lime Green (Target), Type 3: Olive (Fairway)
Backing: min. 2 layers 13 pic polybac primary backing with a min 20 oz. polyurethane secondary backing
Backing Weight: min. 26 oz/sq. yard
Total Product Weight: minimum 78 oz/sq. yard
Perforations: TopGolf Turf is design with no holes for 100% horizontal drainage, but drainage holes are
available at no additional cost.
Infill Requirements: Required, minimum 4 pounds of rounded silica sand per square foot is recommended for
best performance.
Warranty: Eight-year limited warranty supplied by manufacturer against undue fading and fiber degradation.
Construction Details
Type: Tufted
Gauge: 3/8 inch (Other gauge widths will NOT be accepted)
Stitching: ~14 per 4 inches (10cm)
Scrim: Scrim is cut off as close as possible to the first row of stitching on each side making the
turf “seam tape ready” for greater productivity during the installation process
Example of
future two-tone
fairway look in
development
PO Box 2041
Dalton, GA 30722-2041 (706) 226-1400 tsioffice@optilink.us
OUR LETTERS AND REPORTS APPLY ONLY TO THE SAMPLE TESTED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS. THESE LETTERS AND REPORTS ARE FOR THE USE ONLY OF THE CLIENT TO WHOM THEY ARE ADDRESSED AND THEIR COMMUNICATION TO ANY OTHERS OR THE USE OF THE NAME TESTING SERVICES, INC. MUST RECEIVE OUR PRIOR WRITTEN APPROVAL. OUR REPORTS, LETTERS, NAME, SEALS, OR INSIGNIA ARE NOT UNDER ANY CIRCUMSTANCES TO BE USED IN ADVERTISING TO THE GENERAL PUBLIC.
TEST REPORT
CLIENT: Company: Perfect Turf LLC Report Number: 71360 Address: 230 Gerry Drive Lab Test Number: 2920-2670--2673 Wood Dale, IL 60191 Test Completion Date: 7/25/2017 Report Date: 7/25/2017 Requested By: Dave Sternberg Page: 1 of 2 TEST MATERIAL: Material Type: Synthetic Turf Date Received: 5/25/2017 Material Condition: EXCELLENT: XXX GOOD: POOR: REJECTED: Product Name: PT 52 oz. TESTING METHODS REQUESTED: Testing Services Inc. was instructed by the client to test for the following… Standard: ASTM D1907 Test Method: Standard Test Method for Liner Density of Yarn by the Skein Method Standard: ASTM D2256 Test Method: Standard Test Method for Tensile Properties of Yarns by the Single Strand Method Standard: ASTM D3218 Test Method: Standard Specification of Polyolefin Monofilaments (Ribbon Thickness & Width) Standard: ASTM F2765 Test Method: Standard Specification for Total Lead Content in Synthetic Turf Fibers Standard: ASTM D5848 Test Method: Standard Test Method for Mass per Unit Area of Pile Yarn Floorcoverings Standard: ASTM D5823 Test Method: Standard Test Method for Tuft Height of Pile Yarn Floorcoverings Standard: ASTM D5793 Test Method: Standard Test Method for Binding Sites Per Unit Length or Width of Pile Yarn Floorcoverings Standard: ASTM D1335 Test Method: Standard Test Method for Tuft Bind Strength of Pile Yarn Floorcoverings Standard: ASTM D2859 Test Method: Standard Test Method for Ignition Characteristics of Finished Textile Floor Covering Materials SAMPLING PLAN: Sampling Date: 5/25/2017
• Specimen sampling is performed in the sampling department at TSI.
• The sampling size of specimens is determined by the test method requirements.
• In the event a specific sampling size is not called for, a determination will be made based on previous testing experience, and approved for use by an authorized manager.
• All samples are subjected to the outside environmental conditions of temperature and relative humidly. • Sample requiring pre-determined exposure to specified environmental conditions based on a specific test method, take place in the departments in which they are tested
DEVIATION FROM TEST METHODS: State reason for any Deviation from, Additions to, or Exclusions From Test Method. None TEST DATA:
Test Method Test Description Test Results Monofilament Slit Film Thatch ASTM D1907/D1907M-12 Yarn Denier 10,412 9,730 3,989 ASTM D2256/D2256M-10(2015) Avg. Yarn Breaking Strength, Elongation 35.5 lbs/force / 76.7% 28.6 lbs/force / 43.1% 12.7 lbs/force / 52.8%
ASTM D3218-07(2012) Average Yarn Filament Width 0.0394”/1,001 microns 0.435”/ 11,049 microns 0.025”/ 635 microns ASTM D3218-07(2012) Average Yarn Filament Thickness 0.007” / 178 microns 0.004” / 102 microns 0.004” / 102 microns ASTM F2765-14 Total Lead Content <0.25 mg/Kg <0.25 mg/Kg <0.25 mg/Kg
PO Box 2041
Dalton, GA 30722-2041 (706) 226-1400 tsioffice@optilink.us
OUR LETTERS AND REPORTS APPLY ONLY TO THE SAMPLE TESTED AND ARE NOT NECESSARILY INDICATIVE OF THE QUALITIES OF APPARENTLY IDENTICAL OR SIMILAR PRODUCTS. THESE LETTERS AND REPORTS ARE FOR THE USE ONLY OF THE CLIENT TO WHOM THEY ARE ADDRESSED AND THEIR COMMUNICATION TO ANY OTHERS OR THE USE OF THE NAME TESTING SERVICES, INC. MUST RECEIVE OUR PRIOR WRITTEN APPROVAL. OUR REPORTS, LETTERS, NAME, SEALS, OR INSIGNIA ARE NOT UNDER ANY CIRCUMSTANCES TO BE USED IN ADVERTISING TO THE GENERAL PUBLIC.
TEST REPORT
CLIENT: Company: Perfect Turf LLC Report Number: 71360 Address: 230 Gerry Drive Lab Test Number: 2920-2670--2673 Wood Dale, IL 60191 Test Completion Date: 7/25/2017 Report Date: 7/25/2017 Requested By: Dave Sternberg Page: 2 of 2 TEST MATERIAL: Material Type: Synthetic Turf Date Received: 5/25/2017 Material Condition: EXCELLENT: XXX GOOD: POOR: REJECTED: Product Name: PT 52 oz. TEST DATA: Test Method Test Description Test Results ASTM D5848-10e1 Total Product Weight 82.98 oz/yd² ASTM D5848-10e1 Pile Yarn Weight 52.08 oz/yd² ASTM D5848-10e1 Primary Backing Weight 7.62 oz/yd² ASTM D5848-10e1 Secondary Backing Weight 23.28 oz/yd² ASTM D5823-13 Average Pile Height 1.50” ASTM D5793-13 Stitch Count & Gauge 3.66 Stiches per inch 3/8” Gauge ASTM D1335-12 Average Tuft Bind Strength 15.7 lbs/force *ASTM F2859-15 Pill Flammability 8 out of 8 Pass Meets 16CFR 1630 (FF1-70) *Testing performed with infill system of 4.0 lbs/ft2 20/40 Silica Sand Uncertainty: We undertake all assignments for our clients on a best effort basis. Our findings and judgments are based on the information using the latest test methods available. TSI can only ensure the test results for the specific items tested. Unless otherwise noted in the deviations sections of this report, all tests performed are in compliance with stated test method. Test Report Approval: Erle Miles, Jr. VP, Testing Services Inc
TSi Accreditation: Our laboratory is accredited by the US Dept of Commerce, National Institute of Standards and Technology: ISO/IEC 17025:2005. Our code # is: NVLAP 100108-0.
R
NAVIX TopGolf Renton – Renton, WA
APPENDIX I
PUMP DESIGN AND SPECIFICATIONS
Date:
WWW.JENSENWATERRESOURCES.COM
m
521 DUNN CIRCLE
SPARKS, NV 89431
(775) 440-2025OPERATION & MAINTENANCE MANUAL
PROJECT:
LOCATION:
Jensen Precast
m
625mBerginmWaym
Sparks,mNVm89431m
(775)m359-6200m
m
3853mLoseemRdm
NmLasmVegas,mNVm89030m
(702)m649-0045m
5400mRaleymBlvdm
Sacramento,mCAm958m
(916)m991-8800m
7210mHighwaym32m
Orland,mCAm95963m
(530)m865-4277m
12101mBrandtmRdm
Lockeford,mCam95237m
(209)m727-5573m
3430mPachecomBoulevardm
Martinez,mCAm94553m
(925)m222-3471m
4915AmE.mAnnadalemAvem
Fresno,mCAm93725m
(559)m248-0270m
14221mSanmBernardinomAvem
Fontana,mCAm92335m
(909)m350-4111m
12440mVigilantemRoadm
Lakeside,mCAm92040m
(909)m350-4111m
2410mWestmBroadwaymRoadm
Phoenix,mAZm85041m
(602)m268-0228m
4801mE.mWyomingmStreetm
Tucson,mAZm85706m
(520)m748-1607m
91-110mHanuamStreetmSuitem
202m
Kapolei,mHIm96707m
(808)m528-1175
Manufacturer of Precast
Concrete Products Since
1968
PRODUCT:
www.jensenwaterresources.com
TABLE OF CONTENTS
COMPLETED START UP REPORT ............................................................................ 3
SITE SPECIFIC DRAWINGS ................................................................................ 11
PUMPS ............................................................................................................ 14
PUMP DATA SHEETS ................................................................................................................. 15
PUMP INSTALLATION AND OPERATING MANUAL ................................................................... 19
VALVES ........................................................................................................... 43
CHECK VALVES .......................................................................................................................... 44
CONTROL PANEL ............................................................................................. 54
CONTROL PANEL WIRING DIAGRAMS ...................................................................................... 55
PUMP CONTROLLER INSTALLATION AND OPERATING MANUAL ............................................. 61
LEVEL SENSORS ............................................................................................. 193
PRESSURE TRANSMITTER ....................................................................................................... 194
FLOAT SWITCH ........................................................................................................................ 200
www.jensenwaterresources.com
COMPLETED START-UP REPORT
3
START UP REPORT
PROJECT NAME: PROJECT LOCATION: SITE CONTRACT: DATE OF START UP: STATION DESIGNATION:
STATION CONDITION AND LAYOUT
Appearance of Station (Scale: 1[Dirty]-10[Clean]): Distance from Pump(s) to Control Panel: Time Between Pump Install and Start Up:
Condition of Equipment:
Condition of Electrical Wiring (Scale 1[Poor]-10[Good]):
Is High Voltage, Low Voltage Wires In Separate Conduit? : □ Yes or □ NoIs Each Pump’s High Voltage Wire in a Separate Conduit?: □ Yes or □ NoIs a Junction Box Used?: □ Yes or □ No
•Is Junction Box Water Tight?:□ Yes or □ No
•Is Wiring Connections in J-Box Water Tight?:□ Yes or □ NoDoes Electrical Conduit Appeared to be Sealed? : □ Yes or □ NoAre Check Valves Installed in the Correct Orientation? : □ Yes or □ NoAre Isolation Valves Open? : □ Yes or □ NoDo Pumps have Cooling Jacket? : □ Yes or □ No
•Is Cooling Jacket Properly Vented? :□ Yes or □ NoIs Pump Seated on Discharge Properly? : □ Yes or □ NoAre Flange Connections Leaking? : □ Yes or □ NoDo Check Valves Appear to be Operating Correctly? : □ Yes or □ NoSubmitted Voltage:_______________ Supplied Voltage:________________
LEVEL DETECTION
Type of Level Detection System Used:
Manufacturer: Model #: Back up level detection: How was Level Detection System Verified to be Operating? :
Is Level Detection Installed Away from Turbulence? : □ Yes or □ NoIf Pressure Transducer is Used, Is it properly Vented? : □ Yes or □ No
Are level control devices set at correct elevations? : □ Yes or □ No
4
**FOR REFERENCE ONLY**
REPLACE PLACE HOLDER START-UP REPORT WITH COMPLETED REPORT AFTER JENSEN WATER
RESOURCES TECHNICIAN COMPLETES START-UP & COMMISSIONING SERVICES.
CONTROL PANEL
Manufacturer: Serial#: Rated Volts: Max Amps: Largest FLA: Phase: Controller Type (Logo, OLS, Multismart): Drive Type (DOL/VFD):
What Ramp Up and Decal Time is the VFD Set For? Accel: Sec, Decel: Sec What is the Min Frequency the Pump Can Operate at? : Hz. What is the Max Frequency the Pump Can Operate at? : Hz.
Inline Voltage: L1/L2 = , L2/L3 = , L1/L3 = Are Thermal Leads Landed Correctly? : □ Yes or □ No Are Seal Fail Leads Landed Correctly? : □ Yes or □ No Are the Pressure Sensing Device Leads Landed Correctly? : □ Yes or □ No Are Pump Leads Landed Correctly? : □ Yes or □ No Are there overload relays? □ Yes or □ No
• Have they been set to the correct amperage? □ Yes or □ No
PROGRAMMING Transducer Set Points Float Set Points Pump on Elevation: _____________ Pump on Float Elevation: ____________ Pump off Elevation: _____________ Pump off Float Elevation: ____________ Lag Pump Elevation: _____________ Lag Pump on Float Elevation: ____________ High Alarm Elevation: _____________ High Level Float Elevation: ____________ Low Alarm Elevation: _____________ Low Level Float Elevation: ____________
Transducer offset: _____________ Transducer Range: (Check one)
• 10 psi = 23.1 _____________
• 15 psi = 34.65 _____________
• Other: _____________
Minimum pump run time: _____________ Maximum pump run time: _____________ Amperage overload set point: _____________
Control Panel Comments:
5
PUMP #1 (PER CONTROL PANEL) Physical Location in Wet Well(I.E. North, South, East, West): Manufacturer: Pump Model #: Serial #: Rated Voltage: Rated Phase: Rated Hertz: Rated Horsepower: Rated Amps: Rotation of Impeller (Looking down on pump): □ Clockwise or □ Counter-Clockwise Does Impeller Turn Freely By Hand? : □ Yes or □ No Electrical Readings at Panel:
• Single Phase Voltage Supply at Panel Line Connection, Pump On: L1/L2 = , L1/Ground = , L2/Ground = Amperage Load Connection, Pump On: U1 = , U2 = , Z2 =
• Three Phase Voltage Supply at Panel Line Connection, Pump On: L1/L2 = , L2/L3 = , L1/L3 = Amperage Load at Panel Line Connection, Pump On: L1 = , L2 = , L3 = Pump #1 Comments:
6
PUMP #2 (PER CONTROL PANEL)
Physical Location in Wet Well(I.E. North, South, East, West): Manufacturer: Pump Model #:
Serial #: Rated Voltage: Rated Phase: Rated Hertz: Rated Horsepower: Rated Amps:
Rotation of Impeller (Looking down on pump): □ Clockwise or □ Counter-ClockwiseDoes Impeller Turn Freely By Hand? : □ Yes or □ NoElectrical Readings at Panel:
•Single Phase
Voltage Supply at Panel Line Connection, Pump On:L1/L2 = , L1/Ground =, L2/Ground = Amperage Load Connection, Pump On:
U1 = , U2 =, Z2 =
•Three Phase
Voltage Supply at Panel Line Connection, Pump On:L1/L2 = , L2/L3 =, L1/L3 = Amperage Load at Panel Line Connection, Pump On:L1 = , L2 =, L3 = Pump #2 Comments:
7
FLOW / PRESSURE READINGS (IF APPLICABLE)
Flow meter reading:
•Normal operation: ____________
•Lag/ high water flow: ____________
Pressure reading:
•Normal operation: ____________
•Lag/ high water flow: ____________
ALARM TESTING
•Audible alarm:____________
•Visual alarm:____________
•
•Pump failure: ____________
•Transducer Alarms: ____________
•Low alarm:____________
•High alarm:____________
8
TRAINING ROSTER (IF APPLICABLE) NAME (PRINTED) COMPANY DATE
Were O&M documents provided at day of start up? : □ Yes or □ NoIf not, when will O&M documents be provided? :
NOTES:
9
Jensen Engineered Systems Representative:
Name (Printed) Phone Number
Signature Date
Owner’s Representative:
Name (Printed) Phone Number Company
10
www.jensenwaterresources.com
SITE SPECIFIC DRAWINGS
11
PLAN VIEW
NOT TO SCALE
PROFILE VIEW
NOT TO SCALE
PROFILE VIEW
NOT TO SCALE
TOP LEFT ISOMETRIC VIEW W/ SECTION
NOT TO SCALE 031220 Topgolf Renton WA - Design 1.idwSHEET:
REV:
1 OF 2 4/23/2019 3/16/2020MODIFIED:CREATED:
PART NUMBER:DRAWN BY:
DESCRIPTION:
TOPGOLF RENTON
521 DUNN CIRCLE, SPARKS, NV 89431
www.jensenwaterresources.com
(855) 468-5600
484 SWPS C. Purdie
2018 Jensen Precast - All rights reserved.
All materials appearing as Jensen Precast documents and the like are
proprietary work product and are protected under
U.S. copyright and other laws.
Unless in conjunction with business conducted with Jensen Precast, any
use of Jensen Precast work product without express, written consent is
prohibited, and recipient is prohibited from distributing any and all work
product to non-approved third parties under penalty of civil action.
Title Page
DISCLAIMERS, INCLUDING BUT NOT LIMITED TO:
1.) All elevations have been provided by others, and have not been verified by Jensen Precast. Contractor to verify all dimensions and elevations
in field prior to installation.
2.) These layout drawings are intended to show overall system design only. All concrete component thicknesses, dimensions, and joint
orientations may vary across Jensen Precast's manufacturing facilities. Contractor to confirm all thicknesses, dimensions, and joint orientations
prior to installation.
3.) System design criteria has been provided to Jensen Precast. Others are responsible for verification that system meets intended application.
4.) Foundation, subgrade, and backfill to be designed by others.
TOPGOLF RENTON
DUPLEX STORMWATER PUMP STATION
12
PLAN VIEW
NOT TO SCALE
PROFILE VIEW
NOT TO SCALE
BILL OF MATERIALS
DESCRIPTIONQTYITEM
SUBMERSIBLE PUMP HOMA AMS436-200/2.8T/C29
AUTOCOUPLING ASSY 4IN FLG STD HOMA 8604055210
UPPER GUIDE RAIL BRACKET 4IN FLG CPLNG 304SS HOMA 8732306211
INTERMEDIATE GUIDE RAIL BRACKET 4IN FLG CPLNG 304SS HOMA 8732106212
FLOAT BRACKET 3 HOOK TYPE 316SS113
FLOAT BRACKET 1 HOOK TYPE 316SS214
FLOAT SWITCH 100FT COX OPTI-F1100215
PIPE 1-1/2IN SCH40 GUIDE RAIL 304SS80 FT16
90 DEG ELBOW 4IN DUCTILE IRON FLG217
MJ SLEEVE 4IN WITH SS BOLT AND MJ GASKET218
PIPE 4IN PE X PE DUCTILE IRON SPOOL 4FT219
PIPE 4IN FLG X PE DUCTILE IRON SPOOL 3.5FT220
CHECK VALVE 4IN NEOPRENE TIDEFLEX TF-1221
RFCA 4IN W/ SS HARDWARE ROMAC222
CONNECTOR BOOT S106-7MWS-MULTI CORE-SEAL ASTM C923/C1644 SS MULTI HOLE-7
1.50-4.80
423
PIPE 4IN FLG X FLG DUCTILE IRON SPOOL 4FT624
PIPE 4IN FLG X PE DUCTILE IRON SPOOL 2FT 6IN225
PRESSURE TRANSDUCER 15PSI 100FT CABLE PMC VL2113-IS-15PSI-100'126
SINK WEIGHT SS PMC SW2000127
CHAIN 3/8IN 316SS40 FT28
CHAIN 3/16IN 316SS20 FT29
031220 Topgolf Renton WA - Design 1.idwSHEET:
REV:
2 OF 2 4/23/2019 3/16/2020MODIFIED:CREATED:
PART NUMBER:DRAWN BY:
DESCRIPTION:
TOPGOLF RENTON
521 DUNN CIRCLE, SPARKS, NV 89431
www.jensenwaterresources.com
(855) 468-5600
484 SWPS C. Purdie
2018 Jensen Precast - All rights reserved.
All materials appearing as Jensen Precast documents and the like are
proprietary work product and are protected under
U.S. copyright and other laws.
Unless in conjunction with business conducted with Jensen Precast, any
use of Jensen Precast work product without express, written consent is
prohibited, and recipient is prohibited from distributing any and all work
product to non-approved third parties under penalty of civil action.
MECHANICAL DETAIL
DISCLAIMERS, INCLUDING BUT NOT LIMITED TO:
1.) All elevations have been provided by others, and have not been verified by Jensen Precast. Contractor to verify all dimensions and elevations
in field prior to installation.
2.) These layout drawings are intended to show overall system design only. All concrete component thicknesses, dimensions, and joint
orientations may vary across Jensen Precast's manufacturing facilities. Contractor to confirm all thicknesses, dimensions, and joint orientations
prior to installation.
3.) System design criteria has been provided to Jensen Precast. Others are responsible for verification that system meets intended application.
4.) Foundation, subgrade, and backfill to be designed by others.
PUMP CHARACTERISTICS
DESCRIPTION VALUE
DUTY POINT
MANUFACTURER
MODEL NUMBER
PUMP TYPE
MOTOR SIZE
REQUIRED POWER SUPPLY
NOTES:
ALL PRECAST CONCRETE STRUCTURES AND ACCESS HATCHES/COVERS TO BE SUPPLIED BY OTHERS.
SYSTEM CHARACTERISTICS
CHARACTERISTICS VALUES
DUTY POINT PER PUMP 200 GPM @ 20.1' TDH
MANUFACTURER HOMA
MODEL NUMBER AMS436-200/2.8T/C
PUMP TYPE SUBMERSIBLE NON-CLOG PUMP
MOTOR SIZE 2.8 HP / 4.1A
REQUIRED POWER SUPPLY 460V, 3 PH
10" INLET PIPING TO BE INSTALLED,
*CORED & SEALED BY OTHERS
8'-0" WET WELL I.D.
ANTI-FLOTATION COLLAR
2'-0"
FOUNDATION, SUBGRADE AND
BACKFILL DESIGNED BY OTHERS
FOUNDATION, SUBGRADE AND
BACKFILL DESIGNED BY OTHERS
13
15
16
25
17
19
26
19'-10"
P6'-0" VALVE VAULT I.D.
5'-10"
30" X 48" DOUBLE DOOR
ACCESS HATCH
24
20
FLOOR EL: 10.65'
LOW WATER ALARM EL: 12.15'
PUMPS OFF EL: 12.65'
INLET INVERT AND
LEAD PUMP ON EL: 13.65'
LAG PUMP ON EL: 14.65'
HIGH WATER ALARM EL: 23.58'
RIM EL: 30.49'
9
10
11
12
19
22
18
21
P3'-0" CAST IRON
FRAME AND COVER2018
PRECAST WET WELL
PROVIDED BY OTHERS
PRECAST WET WELL
PROVIDED BY OTHERS
27
24
24
13
www.jensenwaterresources.com
PUMPS
14
www.jensenwaterresources.com
PUMP DATA SHEETS
15
3/16/20202
Date:Page:Created by:Project Project no.:
Impeller
Impeller type:Ø:Ø:
1.84 hp
Head
Efficiency
Shaft power P2
AM
S
4
3
6
-
2
0
0
62.8%
Application range
-200
-200
4
6
8
10
12
14
16
18
20
22
24
26
28
30
32
[ft]
0
10
20
30
40
50
[%]
0
0.4
0.8
1.2
1.6
2
[hp]
0 40 80 120 160 200 240 280 320 360 400 440 480 [US g.p.m.]
1
Solid size Max. Min.Sel.
Single channel impeller 91/16" 7
1/2"77/8"
Operating data
Speed:Frequency: Duty point:Discharge port:
1160 rpm 200 US g.p.m.Q =H =20.1 ft 4" ANSI
Power data referred to:Water, clean [100%] ; 68°F; 62.322lb/ft³; 1.0818E-5ft²/s
Ø:
Performance Curve
Testnorm:
Ø:2.0.1 - 19.08.2019 (Build 147)AMS436-200/2,8T/C
60 Hz
3 inch
Shaft power P2:
HI Standard Sect. 11.6.5.4
16
( )
H 27
1/4
Wet well installation with coupling kit (T, 200...230)270 [10 5/8"]200 [7 7/8"]240 [9 1/2"]415 [16 3/8"]60 [2 3/8"]
Ø15 [5/8"]
200 [7 7/8"]
109 [4 1/4"]
424 [16 3/4"]
20 [3/4"]
87 [3 3/8"]195 [7 5/8"]DN100 PN10[Flange 4" Ansi125 lb/sq. in. RF]
(2x)Rail1 1/2"(4x) Anchor bolt
(4x)Anchor bolt60 [2 3/8"]310 [12 1/8"]884 [35 3/8"]357 [14 1/4"]280 [11 1/4"]A140 [5 5/8"]460 [18 3/8"]
Upper slide rail bracket
min level
inch
2.0.1 - 19.08.2019 (Build 147)Table Dimensions
Dimensions in mm [inch], letters see table
Dimensions
AMS436-200/2,8T/C
Created by:Project no.:Project Page: Date:
3/16/20203
min level = Minimum fluid level for intermittent operation (S3)
17
NEMA code
10.7
8.2
230 / 460
AMS436-200/2,8T/C
Fluid Temperature
Density Kin. viscosity
Flow
62.31 1.077E-5
°F
lb/ft³ft²/s
Operating data
US g.p.m.
ft
ft
68
Impeller type
Pump Code
Impeller Ø
Max.
Min.
Speed
Flow
HeadSuction port
Pump
Discharge port
rpm
inch
US g.p.m.
ft
ft
%
Materials
Motor housing
Pump housing
Impeller
Wear ring
Motor shaft
Bolts
Elastomeres
Technical Data
Solid size inch
Max.
hp
Pump efficiency max.
Required rated power max. P2
Motor
Motor design
Motor name
Frequency
Rated power P1
Rated speed
Rated voltage
Degree of protection
Temperature class
Insulation class
cos phi
Hz
hp
rpm
V
A
A
A
%
Explosion protectionRated power P2
Efficiency
at % rated power
100%
75%
50%
50%
100%
75%
%
%
Starting current, direct starting
Rated current
Starting current, star-delta
Service factor
Weight aggregat
Power cable
Type of power cable
Control cable
Type of control cable
Cable length
Mechanical seal on motor side
Mechanical seal on medium side
Lower Bearing
Upper Bearing
SiC / SiC
SiC / SiC
Double row angular ball bearing
Deep Groove Ball Bearing
Remarks
DN100
4" ANSI
Single channel impeller
3
7.87
3~
3.4
60
2.8
1160
32.0
1.15
1160
28.4
7.2
479.9
62.8
2.5
H
IP 68
T3C
82.0
83.0
82.0
0.78
0.72
0.59
14.9Static headShaft power P2
Head
at % rated power
Shaft seal
Bearing
Submersible motor
hp
AM173.3,4T/6/3
E
Directly
%60.2
2.0.1 - 19.08.2019 (Build 147)/ 4,1
/ 16
AMS436-200/2,8T/C
Starting mode
Pump efficiency
hp
Weight/
10G1,5
H07RN8-F PLUS
257.94 lb
1.8
Single pumpPumpe type No. of pumps 1
AMS436-200/2,8T/C
Required pump NPSH ft
Sewage
AISI 430 F Stainless Steel
Bronze ASTM B505; C93200
Cast Iron ASTM A48;Cl.40B
Cast Iron ASTM A48;Cl.40B
Cast Iron ASTM A48;Cl.40B AISI 304 Stainless Steel
Nitrile Rubber
-------------------------------------
32.809 ft
200 US g.p.m.20.1 ft
Project Project no.:Created by:Page:
4 3/16/2020
Date:
18
www.jensenwaterresources.com
PUMP INSTALLATION AND OPERATING MANUAL
19
Installation, Operation, and
Maintenance Manual
AMS ...AM(X)...AV(X) ...AK(X) ...
60Hz
20
02 | English
Content
1.2. Preface .............................................................................................................................................................03
1.3. Proper use ........................................................................................................................................................03
1.4. Copyright ..........................................................................................................................................................03
2. Safety .................................................................................................................................04
2.1. Instructions and safety information ..................................................................................................................04
2.2. General safety ..................................................................................................................................................04
2.3. Operating personnel .........................................................................................................................................04
2.4. Electrical work ..................................................................................................................................................04
2.5. Operating procedure .........................................................................................................................................05
2.6. Safety and control devices ...............................................................................................................................05
2.7. Operation in an explosive atmosphere .............................................................................................................05
2.8. Sound Safety ....................................................................................................................................................05
2.9. Pumped fluids ..................................................................................................................................................05
3. General description ..........................................................................................................06
3.1. Application ........................................................................................................................................................06
3.2. Types of use .....................................................................................................................................................06
3.3. Construction .....................................................................................................................................................06
4. Package, Transport, Storage ...........................................................................................09
4.1. Delivery .............................................................................................................................................................09
4.2. Transport ...........................................................................................................................................................09
4.3. Storage .............................................................................................................................................................09
4.4. Returning to the supplier .................................................................................................................................10
5. Installation and initial commissioning ...........................................................................10
5.1. General .............................................................................................................................................................10
5.2. Installation ........................................................................................................................................................11
5.3. Use of chains ....................................................................................................................................................13
5.4. Initial operation .................................................................................................................................................14
5.5. Preparatory work ..............................................................................................................................................14
5.7. Direction of rotation ..........................................................................................................................................16
5.8. Motor protection ...............................................................................................................................................16
5.9. Variable Frequency Drives ................................................................................................................................16
5.10. Types of startups ............................................................................................................................................16
6. Maintenance .....................................................................................................................17
6.1. General .............................................................................................................................................................17
6.2. Maintenance intervals ......................................................................................................................................17
6.3. Maintenance tasks ...........................................................................................................................................17
6.4. Sealing chamber ...............................................................................................................................................19
7. Repairs ...............................................................................................................................19
7.1. General .............................................................................................................................................................19
7.2. Changing the impeller and pump unit ...............................................................................................................19
7.3. Spare Parts .......................................................................................................................................................20
8. Shutdown ..........................................................................................................................20
8.1. Temporary shutdown ........................................................................................................................................20
8.2. Final shutdown / storage ..................................................................................................................................20
8.3. Restarting after an extended period of storage ................................................................................................20
9. Troubleshooting ...............................................................................................................20
10. Connection of pumps and mixers .................................................................................23
21
English | 03
1.2. Preface
Dear Customer,
Thank you for choosing one of our company’s products.
You have purchased a product which has been manufac-
tured to the latest technical standards. Read this operat-
ing and maintenance manual carefully before you first use
it. This is the only way to ensure that the product is safely
and economically used.
The documentation contains all the necessary specifica-
tions for the product, allowing you to use it properly. In
addition, you will also find information on how to recog-
nize potential dangers, reduce repair costs and downtime,
and increase the reliability and working life of the product.
All safety requirements and specific manufacturer’s re-
quirements must be fulfilled before the product is put
into operation. This operating and maintenance manual
supplements any existing national regulations on industri-
al safety and accident prevention. This manual must also
be accessible to personnel at all times and also be made
available where the product is used.
1.3. Proper use
In the event of improper use, there is a danger to life for
the user as well as for third parties. Moreover, the product
and/or attachments may be damaged or destroyed.
It is important to ensure that the product is only operated
in technically perfect condition and as intended.
To do so, follow the operating instructions.
The pumps can be used in the range specified by us at any
time, in accordance with the current HOP.SEL version.
We have selected the pump based on the data available to
us. Please note that the offered pumps may only be used
in the defined field of application. Operating the pump out-
side the range of application can lead to operational prob-
lems or significant damage to the unit. Particularly with
long pipes, it may be necessary to start the pump slowly
via VFD or soft start system.
1.4. Copyright
This operation and maintenance manual has been copy-
righted by the manufacturer. This operation and mainte-
nance handbook is intended for use by assembly, oper-
ating and maintenance personnel. It contains technical
specifications and diagrams which may not be reproduced
or distributed, either completely or in part, or used for any
other purpose without the expressed consent of the man-
ufacturer.
1.5. Technical terms
Various technical terms are used in this operating and
maintenance manual.
Dry run
The product is running at full speed, however, there is no
liquid to be pumped. A dry run is to be strictly avoided. If
necessary, a safety device must be installed.
“wet” installation type
This installation type requires the product to be immersed
in the pumped fluid. It is completely surrounded by the
pumped fluid. Please observe the values for the maximum
submersion depth and the minimum water coverage.
“dry” installation type
In this installation type, the product is installed dry, i.e. the
pumped fluid is delivered to and discharged via a pipeline
system. The product is not immersed in the pumped fluid.
Please note that the surfaces of the product become very
hot!
“transportable” installation type
With this installation type the product is equipped with a
pedestal. It can be installed and operated at any location.
Please observe the values for the maximum submersion
depth and the minimum water coverage, and remember
that the surfaces of the product become very hot.
“S1” operating mode (continuous operation)
At the rated load, a constant temperature is reached that
does not increase even in prolonged operation. The oper-
ating equipment can operate uninterruptedly at the rated
load without exceeding the maximum permissible tem-
perature.
“S2” operating mode (short-term operation)
The operating time is specified in minutes, for example,
S2-20. That means, that the machine can work 20 min-
utes and should pauses after it, as long as the machine is
cooled down to 2K over medium temperature.
Operating mode “S3“ (intermittent operation):
For these operating modes, after the abbreviation, the
duty cycle is displayed as well as the cycle duration if it
deviates from 10 minutes. Example S3 30% means, that
the machine can work 3 minutes and afterwards should
pauses 7 minutes.
Low Level Lockout
The low level lockout is designed to automatically shut
down the product if the water level falls below the mini-
mum water coverage value of the product. This is made
possible by installing a float switch.
Level control
The level control is designed to switch the product on or
off depending on the filling level. This is made possible by
installing a float switch.
22
04 | English
2. Safety
This chapter lists all the generally applicable safety instruc-
tions and technical information. Furthermore, every other
chapter contains specific safety instructions and techni-
cal information. All instructions and information must be
observed and followed during the various phases of the
product‘s lifecycle (installation, operation, maintenance,
transport etc.). The operator is responsible for ensuring
that personnel follow these instructions and guidelines.
2.1. Instructions and safety information
This manual uses instructions and safety information for
preventing injury and damage to property.
To make this clear for the personnel, the instructions and
safety information are distinguished as follows:
Each safety instruction begins with one of the following
signal words:
Danger: Serious or fatal injuries can occur!
Warning: Serious injuries can occur!
Caution: Injuries can occur!
Caution (Instruction without symbol): Serious damage
to property can occur, including irreparable damage!
Safety instructions begin with a signal word and descrip-
tion of the hazard, followed by the hazard source and
potential consequences, and end with information on
preventing it.
2.2. General safety
• Never work alone when installing or removing the
product.
• The machine must always be switched off before
any work is performed on it (assembly, dismantling,
maintenance, installation). The machine must be dis-
connected from the electrical system and secured
against being switched on again. All rotating parts
must be at a standstill.
• The operator should inform his/her superior immedi-
ately should any defects or irregularities occur.
• It is of vital importance that the system is shut down
immediately by the operator if any problems arise
which may endanger safety of personnel. Problems
of this kind include:
• Failure of the safety and/or control devices
• Damage to critical parts
• Damage to electric installations, cables and
insulation.
• Tools and other objects should be kept in a place
reserved for them so that they can be found quickly.
• Sufficient ventilation must be provided in enclosed
rooms.
• When welding or working with electronic devices,
ensure that there is no danger of explosion.
• Only use fastening devices which are legally defined
as such and officially approved.
• The fastening devices should be suitable for the
conditions of use (weather, hooking system, load,
etc). If these are separated from the machine after
use, they should be expressly marked as fastening
devices. Otherwise they should be carefully stored.
• Mobile working equipment for lifting loads should
be used in a manner that ensures the stability of the
working apparatus during operation.
• When using mobile working equipment for lifting
non guided loads, measures should be taken to avoid
tipping and sliding etc.
• Measures should be taken that no person is ever
directly beneath a suspended load. Furthermore,
it is also prohibited to move suspended loads over
workplaces where people are present.
• If mobile working equipment is used for lifting loads,
a second person should be present to coordinate the
procedure if needed (for example if the operator‘s
field of vision is blocked).
• The load to be lifted must be transported in such a
manner that nobody can be injured in the case of a
power cut. Additionally, when working outdoors,
such procedures must be interrupted immediately if
weather conditions worsen.
These instructions must be strictly observed.
Non-observance can result in injury or serious
damage to property.
2.3. Operating personnel
All personnel who work on or with the product must be
qualified for such work; electrical work, for example may
only be carried out by a qualified electrician. The entire
personnel must be of age. Operating and maintenance
personnel must also work according to local accident pre-
vention regulations. It must be ensured that personnel
have read and understood the instructions in this operat-
ing and Maintenance handbook; if necessary this manual
must be ordered from the manufacturer in the required
language.
2.4. Electrical work
Our electrical products are operated with alternating or
industrial high-voltage current. The local regulations (e.g.
VDE 0100) must be adhered to. The “Electrical connec-
tion” data sheet must be observed when connecting
the product. The technical specifications must be strictly
adhered to. If the machine has been switched off by a
protective device, it must not be switched on again until
the error has been corrected.
Beware of electrical current!
Incorrectly performed electrical work can result in
fatal injury! This work may only be carried out by a
qualified electrician.
Beware of Moisture!
Moisture penetrating cables can damage them
and render them useless. Furthermore, water can
penetrate into the terminal compartment or motor
and cause damage to the terminals or the winding.
Never immerse cable ends in the pumped fluid or
other liquids.
23
English | 05
2.4.1. Electrical connection
When the machine is connected to the electrical control
panel, especially when electronic devices such as soft
startup control or frequency drives are used, the relay
manufacturer‘s specifications must be followed in order
to conform to EMC. Special separate shielding measures
e.g. special cables may be necessary for the power supply
and control cables.
The connections may only be made if the equipment
meets NEC standards. Mobile radio equipment may
cause malfunctions.
Beware of electromagnetic radiation!
Electromagnetic radiation can pose a fatal risk for
people with pacemakers. Put up appropriate signs
and make sure anyone affected is aware of the
danger.
2.4.2. Ground connection
Our products (machine including protective devices and
operating position, auxiliary hoisting gear) must always be
grounded. If there is a possibility that people can come
into contact with the machine and the pumped liquid (e.g.
at construction sites), the grounded connection must be
additionally equipped with a fault current protection de-
vice. The electrical motors conform to motor protection
class IP 68 in accordance with the valid norms.
2.5. Operating procedure
When operating the product, always follow the locally
applicable laws and regulations for work safety, accident
prevention and handling electrical machinery. To help to
ensure safe working practice, the responsibilities of em-
ployees should be clearly set out by the owner. All per-
sonnel are responsible for ensuring that regulations are
observed. Certain parts such as the rotor and impeller ro-
tate during operation in order to pump the fluid. Certain
materials can cause very sharp edges on these parts.
Beware of rotating parts!
The moving parts can crush and sever limbs. Never
reach into the pump unit or the moving parts during
operation. Switch off the machine and let the moving
parts come to a rest before maintenance or repair
work!
2.6. Safety and control devices
Our products are equipped with various safety and control
devices. These include, for example moisture sensors and
temperature sensors. These devices must never be dis-
mantled or disabled. Equipment such as thermo sensors,
float switches, etc. must be checked by an electrician
for proper functioning before start-up (see the “Electrical
Connection” data sheet). Please remember equipment
such as PT100 temperature monitors or float switches
require the use of a HOMA GO switch for connection.
Please contact your HOMA distributor for information.
Personnel must be informed of the installations used and
how they work.
Caution!
Never operate the machine if the safety and monitor-
ing devices have been removed or damage, or if they
do not work.
2.7. Operation in an explosive atmosphere
Products marked as explosion-proof are suitable for op-
eration in an explosive atmosphere. The products must
meet certain guidelines for this type of use. Certain rules
of conduct and guidelines must be adhered to by the op-
erator as well. Products that have been approved for op-
eration in an explosive atmosphere are marked as explo-
sion-proof rated by FM. In addition, an “FM” symbol must
be included on the name plate!
2.8. Sound Safety
Depending on the size and capacity (kW), the products
produce a sound pressure of up to110 dB. The actual
sound pressure, however, depends on several factors.
These include, for example, the installation type (wet, dry,
transportable), fastening of accessories (e.g. suspension
unit) and pipeline, operating site, immersion depth, etc.
Once the product has been installed, we recommend that
the operator make additional measurements under all op-
erating conditions.
Caution: Wear ear protectors!
In accordance with the laws in effect, guidelines,
standards and regulations, ear protection must be
worn if the sound pressure is greater than 85 dB (A)!
The operator is responsible for ensuring that this is
observed!
2.9. Pumped fluids
Each pumped fluid differs in regard to composition, cor-
rosiveness, abrasiveness, TS content and many other
aspects. Generally, our products can be used for many
applications. For more precise details, see chapter 3, the
machine data sheet and the order confirmation. It should
be remembered that if the density, viscosity or the general
composition change, this can also alter many parameters
of the product. Different materials and impeller shapes
are required for different pumped fluids. The more exact
your specifications on your order, the more exactly we can
modify our product to meet your requirements.
If the area of application and/or the pumped fluid change,
we will be happy to offer supportive advice.
When switching the product into another pumped fluid,
observe the following points:
• Products which have been operated in sewage or
waste water must be thoroughly cleaned with pure
water or drinking water before use.
• Products which have pumped fluids which are haz-
ardous to health must always be decontaminated
before changing to a new fluid. Also clarify whether
the product may be used in a different pumped fluid.
• With products which have been operated with a
lubricant or cooling fluid (such as oil), this can escape
into the pumped fluid if the mechanical shaft seal is
defective.
Danger - explosive fluids!
It is absolutely prohibited to pump explosive liquids
(e.g. gasoline, kerosene, etc.). The products are not
designed for these liquids!
24
06 | English
3. General description
3.1. Application
Pump is suitable for pumping sewage, effluents, sludge
and surface water. The pumps are used for installations in
public and private sector, trade and industry. The pumps
can convey abrasive medium as surface water. For high-
ly abrasive content, such as concrete-gravel and sand in
the medium, it is necessary to protect the impeller and
pump housing against excessive abrasion or to shorten
the maintenance interval.
Before the pumping of chemically aggressive liquids, the
resistance of the pump materials must be checked.
The pumps are available in high quality materials of all
components (Stainless steel, bronze).
According to the type of installation and motor cool-
ing, the machine must be submerged in pumped liq-
uid at least up to the top edge of the pump or mo-
tor housing. For continuous operation (S1) without a
cooling jacket, the motor housing must completely be
submerged.
The temperature of the pumped medium may be up to
104°F or up to 140°F for a short period. The maximum
density of the medium is 0.03757 lbs/in³ and the pH may
be from 6 – 11. Stainless steel variants can be used at
a pH of 4 - 14. However, the pH alone only serves as a
guideline. Consult factory for assistance with chemically
aggressive liquids. Depending on the composition, it may
be necessary to use special sealing materials.
3.2. Types of use
The motors are designed for continuous operation (S1),
maximum 15 starts per hour. The hydraulic is designed for
permanent operation, e.g. supply of industrial water.
3.3. Construction
The pump consists of the motor and the pump housing as
well as the impeller which belongs to it.
No. Description
1 Eye hooks for lifting
2 Name plate
3 Pump housing
4 Suction inlet
5 Discharge
6 Motor housing
7 Cable entry
25
English | 07
3.3.1. Name plate
Flow max.:Sn:Pump:Cont. Duty: 40° C amb.Hmax:ft Hmin:ft lbsgpm
rpm
Motor:
HP
Ins. cl.:
HzU:V cos :AP:~Nema code:Wiring Diagram:Cl.I,DIV.1,GR.CD
I:Date:
Thermally protected! See manual for cord replacement!Do not remove covers while circuits are alive!
a
APPROVED
No.Description
a Pump name
b Serial number
c Flow max
d Hmax (Head max)
e Hmin (Head min)
f Submersion depth
g Weight
h Motor name
i Date of manufacture
j Voltage
k Motor Power
l Nominal current
m Frequency
m a Phase
n Motor speed
o Cos phi
p tTemperature class
p Nema Code Letter
r Wiring diagram
s Insulation class
t comments
3.3.2. Motor
The three-phase asynchronous motor consists of one sta-
tor and the engine shaft with impeller assembly. The cable
for the power supply is designed for maximum mechan-
ical performance in accordance with the characteristic or
pump name plate. Both the cable entries and the line are
water-pressure tight with respect to the substance being
pumped. The shaft bearing assembly is supported via ro-
bust, maintenance-free and permanently lubricated roller
bearings. All motors can also be delivered in an explo-
sion-proof version in accordance with FM Class I, Division
1, Groups C & D.
General motor data
Service factor 1.15
Operating mode S1
Max. liquid tempe-
rature
35°C / 95°F
Insulation class H (180°C / 356°F)
Degree of protection IP68
Cable length 32 ft
Rotor shaft seal Silicon-carbide / Silicon-carbide
Mechanical shaft seal Silicon-carbide / Silicon-carbide
Bearing One grooved ball bearing (above),
double-row type angular ball bearing
(below)
3.3.3. Monitoring Equipment
The unit is equipped with various types of monitoring-safe-
ty equipment. The following table shows an overview of
the options available. The options may vary depending on
the size of the pressure outlet
Motortype Motorversion
.../C Temperature monitoring in the winding, Oil chamber
seal conditions sensor
…U... Fully submerged motor, Temperature monitoring in the
winding, Oil chamber seal conditions sensor
…L... Fully submerged motor, closed liquid cooling,
Temperature monitoring in the winding, Seal probe
leakage chamber
...FM Temperature monitoring in the winding, Explosion
proof
.../C FM Temperature monitoring in the winding, Oil chamber
seal conditions sensor and motor connecting chamber,
Explosion proof
…U... FM Fully submerged motor, Temperature monitoring in the
winding, Oil chamber seal conditions sensor,
Explosion proof
Temperature Sensor
All pumps are equipped with a temperature sensor as-
sembly in the motor windings. In pumps with the stan-
dard design, the connections for the temperature sensor
are fed via the power cable to the outside and are to be
connected in the electric control box using the T1 and T3
power cable endings in such a way that the motor auto-
matically restarts after it has cooled down.
Instead of the standard sensor, the explosion-proof ver-
sions are equipped with a temperature sensor assem-
bly that has a higher activation temperature. This is to
be connected via the power cable endings T1 and T2 in
such a way that after activation, a manual reset in the
switchgear is necessary using a special contactor com-
bination. The temperature sensor assembly must be
connected in the switching cabinet so that it switches
off when it overheats.
26
08 | English
Switch-off temperature of the sensors:
Motor
Frame
Stator Winding
T1+T3
Regulator
Stator
Winding FM
T1+T2 Limiter
Lower
Bearing
Upper
Bearing
T 140°C / 284°F 140°C / 284°F 80°C /
176°F
n/a
P 150°C / 302°F 140°C / 284°F 80°C /
176°F
n/a
F 150°C / 302°F 140°C / 284°F 90°C /
194°F
105°C /
221°F
G 150°C / 302°F 150°C / 302°F 90°C /
194°F
105°C /
221°F
H 150°C / 302°F 150°C / 302°F 90°C /
194°F
105°C /
221°F
Seal monitoring for non-jacketed and media-cooled
pumps:
In case of a leak in the lower shaft seal, water enters the
oil chamber and changes the resistance of the oil. The
conductivity of the oil is monitored via 2 sensors. The sen-
sors are to be connected via 2 cables (labeled S1 and S2)
from the pump connection cables in the switch cabinet to
an evaluation instrument galvanically separated from the
probe circuit. The response sensitivity should be adjust-
able from 0-100 kΩ, the standard setting being 50 kΩ.
Seal monitoring for pumps with closed-loop cooling:
The penetration of coolant (water-glycol mixture) into a
leakage chamber is registered via 2 sensors. This leakage
chamber is situated between the motor-side mechanical
seal and the bottom shaft bearing. If the motor-side shaft
bearing should leak, coolant leaks into the leakage cham-
ber and establishes the contact between both sensors.
The sensors are to be connected via 2 cables (labeled S11
and S12) from the pump connection cables in the switch
cabinet to an evaluation instrument galvanically separated
from the probe circuit.
3.3.4. Additional pump protection devices
Several optional pump protection devices are available to
protect submersible motors from damage, and may have
provided in your pump.
Temperature Sensing RTD*: PT100 sensors are avail-
able in two critical locations on larger machines, the lower
bearings and motor windings. N.C. Circuit - 108 ohm
Moisture Sensors: Two styles of moisture sensors are
available on HOMA pumps.
Moisture Detectors*: These are micro float switches de-
signed to detect small amounts of liquid. These are avail-
able in the stator housing of 50hp and larger size pumps.
N.C. Circuit - 268 ohm
Leakage Detectors*: These normally open, 2 wire probes
are used to detect the presence of water in the pump.
Optional leak detectors can be installed as follows:
• Stator Chamber installation: Probe placed in bottom
of stator housing to detect presence of water in the
chamber.
• Stator or Motor cap installation: Probe used to detect
the presence of water only into the stator housing or
motor cap terminal board.
• Closed loop cooling Installation: Probe placed in sta-
tor housing to detect the presence of liquid in the dry
chamber.
* GO switch is required for sensor operation.
3.3.5. Sealing / Seal Housing
Sealing is accomplished by two silicon carbide mechani-
cal seals in a tandem arrangement, acting independently
from each other. The seal housing is situated between the
motor and the pump housing. It consists of the bearing
housing and the pressure cover, which together form the
sealing cavity with containing white mineral oil. Monitor-
ing possibilities are available using the inspection plug on
the bearing housing and optional electronic monitoring.
3.3.6. Jacketed Pump Option
The cooling jacket has been supplied based upon the
specified operating conditions of this application. It is
important this jacket is function properly, or the internal
motor components could become damaged. Several cool-
ing configurations are available depending upon customer
preference and system requirements.
You must know what configuration of cooling system is
to be used with the pump prior to installation. In some
cases, field test results may indicate a change of cooling
method is required. Consult factory for necessary chang-
es to the pump.
COOLIng RequIReMenTS
1 - Standard Media Cooled –
This construction does not require any external piping and
it is completely self-contained. This design is suitable for
the routine collection system application. No pump modi-
fications are required.
• Required Hardware – Automatic air bleed valve
mounted in upper vent port or a ¼” or 3/8” elbow
and small block valve for venting. A length of hose
routed to the sump should be attached to either air
bleed or the block valve outlet.
• Start Up Requirements – This jacket must be vent-
ed at start up. Additional venting may be required af-
ter situations where the suction or discharge piping
has been removed for maintenance and reinstalled.
Some adverse operating conditions can allow air to
become trapped in this jacket. This must be periodi-
cally vented off. If this occurs, it is recommended the
small air bleed valve is utilized.
2 - Media Cooled with external Flush -
This construction requires an external flow of water, typ-
ically re-use water. Applications which require this option
are typically heavy slurry or sludge service often found in
the treatment plant. This option routes the externally sup-
plied water into the pumped media. No pump modifica-
tions are required.
• Required Hardware – Mounting a regulating valve,
pressure gauge and automated block valve between
the water supply and the upper jacket port is re-
quired. The supply valve should be adjusted to al-
low the supply of water to exceed pump discharge
27
English | 09
pressure. This assures a positive flow of water into
the pump chamber. The block valve should be auto-
mated to open whenever the pump is operated.
• Start Up Requirements – This jacket must be vented
at start up. Additional venting may be required if cool-
ing water supply is interrupted.
3 - external Fluid Cooled -
This option requires an external flow of water like in op-
tion 2 above, but is used where dilution of the pumped
product is not desirable. The supply of water is internally
isolated from the pumped media. The water inlet is routed
into the jacket’s lowest port and returned out of the high-
est port. This option does NOT allow water to enter the
pumped media and pump must be ordered from factory
this way.
• Required Hardware – Mounting a regulating valve,
pressure gauge and automated block valve between
the water supply and the upper jacket port is re-
quired. The supply valve should be adjusted to allow
for a good supply of water to flow through the jacket.
The block valve should be automated to open when-
ever the pump is operated.
3.3.7. Volute
The volute may be available rubber-coated inside. Some
volutes are supplied with a cleanout port to easily remove
blockages. The pump may be equipped with a stationary
wear ring which can be found in the intake port. This wear
ring determines the gap between the impeller and the in-
take port. If this gap is too big, the performance of the
pump decreases and it can lead to blockages. The rings
can be replaced due to wear.
3.3.8. Impeller
M:Enclosed single channel impeller, for liquids containing
impurities and sludge with solid particles or long fibres.
K:Enclosed multi channel impeller, for liquids containing
impurities and sludge with solid particles.
V:Vortex impeller, for liquids containing a high level of
impurities or fibrous matter and containing gas.
4. Package, Transport, Storage
4.1. Delivery
On arrival, the delivered items must be inspected for dam-
age and a check made that all parts are present. If any
parts are damaged or missing, the transport company or
the manufacturer must be informed on the day of delivery.
Any claim made at a later date will be deemed invalid.
Damage to parts must be noted on the delivery or freight
documentation.
4.2. Transport
Only the appropriate and approved fastening devices,
transportation means and lifting equipment may be used.
These must have sufficient load bearing capacity to en-
sure that the product can be transported safety. If chains
are used they must be secured against slipping.
The personnel must be qualified for the tasks and must
follow all applicable national safety regulations during
the work. The product is delivered by the manufacturer/
shipping agency in suitable packaging. This normally pre-
cludes the possibility of damage occurring during trans-
port and storage.
Never lift the pump by its power cable! Jacketed
pump should never storage or shipped with the pump
by the jacket. Damage to sealing O Rings may result.
4.3. Storage
Newly supplied products are prepared that they can be
stored for 1 year. The product should be cleaned thor-
oughly before interim storage.
The following should be taken into consideration for
storage:
• Place the product on a firm surface and secure it
against falling over. Submersible mixers and aux-
iliary lifting devices should be stored horizontally,
submersible sewage pumps and submersible motor
pumps should be stored horizontally or vertically. It
should be ensured that they cannot bend if stored
horizontally.
Falling Hazard!
Never leave the pump unsecured!
• The product has to be stored in a place free from
vibrations and agitation to avoid damage to the ball
bearings.
• The device should be stored in a dry place without
temperature fluctuation.
• The product may not be stored in rooms where weld-
ing work is conducted as the resulting gases and ra-
diation can damage the elastomer parts and coatings.
• Be careful to not remove or damage the corrosion
resistant coatings.
• Any suction or pressure connections on products
should be closed tightly before storage to prevent
impurities.
• The power supply cables should be protected against
kinking, damage and moisture.
28
10 | English
• The cable will wick water into the pump if it is not pro-
tected properly. Power cable lead should be covered
with shrink tubing or suitable sealing material during
storage.
Beware of electrical current!
Damaged power supply cables can cause fatal inju-
ry! Defective cables must be replaced by a qualified
electrician immediately.
Beware of moisture!
Moisture penetrating cables can damage them and
render them useless. Therefore, never immerse ca-
ble ends in the pumped fluid or other liquids.
• The machine must be protected from direct sunlight,
heat, dust, and frost. Heat and frost can cause con-
siderable damage to impellers, rotors and coatings.
• The impeller must be turned at monthly intervals.
This prevents the bearing from locking and the film
of lubricant on the mechanical shaft seal is renewed.
This also prevents the gear pinions (if present on the
product) from becoming fixed as they turn and also
renews the lubricating film on the gear pinions (pre-
venting rust film deposits).
Beware of sharp edges!
Sharp edges can form on rotors and impellers.
There is a risk of injuries. Wear protective gloves.
• If the product has been stored for longer than six
month it should be cleaned of impurities such as dust
and oil deposits before start-up. Rotors and impellers
should be checked for smooth running, housing coat-
ing and damage.
• After remaining in storage for longer than one year,
it is necessary to change the oil in the seal chamber.
This is necessary even if the pump has never been
run, due to natural deterioration of mineral oil.
Before start-up, the filling levels (oil, cooling fluid
etc.) of the individual products should be checked and
topped up if required. Please refer to the machine data
sheet for specifications on filling. Damaged coatings
should be repaired immediately. Only a coating that
is completely intact fulfills the criteria for intended
usage!
If these rules are observed, your product can be stored
for a longer period. Please remember that elastomer parts
and coatings become brittle naturally. If the product is
to be stored for longer than 6 months, we recommend
checking these parts and replacing them as necessary.
Please consult the manufacturer.
4.4. Returning to the supplier
Products which are delivered to the factory must be clean
and correctly packaged. In this context, clean means
that impurities have been removed and decontaminat-
ed if it has been used with materials which are hazard-
ous to health. The packaging must protect the product
against damage. Please contact the manufacturer before
returning!
5. Installation and initial commissioning
5.1. General
To avoid damage to the lifting unit during installation and
operation, the following points must be observed:
• The installation work must be performed by qualified
personnel, in compliance with safety regulations.
• The pump must be inspected for damage prior to in-
stallation.
• For level controls, pay attention to the minimum wa-
ter coverage.
• Air bubbles in the volute and pipework must be avoid-
ed (by suitable ventilation devices or a slight incline
of the pump).
• Protect the pump from frost.
• The lifting device must have a maximum load capaci-
ty which is greater than the weight of the pump with
attachments and cable.
• The power lines of the pump must be laid in such a
way, that a safe operation and easy assembly/disas-
sembly is ensured.
• The power lines must be fixed properly in the operat-
ing room to prevent the cable from hanging loosely.
Depending on the cable length and weight, a cable
holder must be attached every 2-3 m.
• The foundation/structure must have sufficient
strength for secure and functionally correct fastening
of the pump. The operator is responsible for this.
• Verify low level lockout is functioning.
• Use baffles for the inlet. This prevents air entry into
the pumping medium, which can lead to unfavorable
operating conditions and result in increased wear.
• Do not install more than one check valve into any pip-
ing system or problems will occur.
29
English | 11
No. Description
1 Pipe
2 Coupling system
3 Service room
4 Inlet
5 Baffle plate
6 min. liquid level
7 Pump
external Seal Probe Installation Procedure
Mechanical Seal Leak Detection probe has been loose
to protect from shipping damage. Please follow this
procedure to install the probe.
1. Lay pump on its side with the plug on the seal cham-
ber facing upwards as indicated.
2. Unscrew the plug with the proper wrench, taking
care not to damage the sealing surface.
3. Verify that seal chamber oil level is within ¼” of the
indicated value. Measurement is from oil level to the
top of hole. See IOM Manual for seal chamber oil vol-
ume, if required.
4. Remove the new sealing gasket from package and
install it onto the seal probe plug.
5. Install the seal probe with gasket into the opening,
taking care not to damage the cable. Then tighten the
seal probe with the proper wrench until snug. Do not
overtighten. Once tight, verify the seal gasket is prop-
erly seated and the cable is not pinched or twisted.
NOTE: At installation of the seal probe be careful not
to bind the seal probe cord as it is being installed into
the pump.
6. Lift pump into a vertical position and inspect for any
leaks.
7. Secure seal probe cable to pump body and power ca-
ble with tyraps before installing pump.
5.2. Installation
Risk of falling!
When installing the pump and accessories, work is
carried out next to wetwell! Carelessness or wearing
the wrong shoes can lead to falling. This is life threat-
ening! Take all safety precautions to prevent this.
Torque Values
PUMPump mo-
delInstallation
Bolts
Anchors
SIZEize TORQUE
3” Autocoupling 8
4
M16X60mm
M16
146 Nm / 108 ft lb
100 Nm / 74 ft lb
4” Autocoupling 8
4
M16X60mm
M16
146 Nm / 108 ft lb
100 Nm / 74 ft lb
3” & 4” Ring stand 4 M16x25mm 146 Nm / 108 ft lb
3” & 4” Dry sump 8
4
M16x40mm
M16
146 Nm / 108 ft lb
100 Nm / 74 ft lb
6” Autocoupling 8
4
M20x70mm
M16
200 Nm / 150 ft lb
100 Nm / 74 ft lb
6” Ring stand 4 M20x40mm 200 Nm / 150 ft lb
6” DRYry SUMP-
sump
(1 Piece)
8
4
M20x45mm
M16
200 Nm / 150 ft lb
100 Nm / 74 ft lb
6” DRYry SUMP-
sump 6”
(N/P Motor)
8
4
M20x65mm
M16
200 Nm / 150 ft lb200
Nm / 150 ft lb
100 Nm / 74 ft lb
DRY SUMP 6” Dry
sump
(F Motor)
8
4
M20x70mm
M16
100 Nm / 74 ft lb
200 Nm / 150 ft lb
100 Nm / 74 ft lb
8” Autocoupling 8
4
M20x70mm-
M20x70m
M20x70mm
M20
200 Nm / 150 ft lb
200 Nm / 150 ft lb
200 Nm / 150 ft lb
8” Ring stand 4 M20x30mm 200 Nm / 150 ft lb
8” DRYry SUMP-
sump
(2 Piece)
8
4
M20x75mm
M20
200 Nm / 150 ft lb
200 Nm / 150 ft lb
30
12 | English
Notes:
1. For pumps larger than 8” please consult factory.
2. Flange bolts must be tightened in cross pattern to
avoid damage to the raise face flanges.
3. Standard flange bolts are 316SS
4. Standard anchors are plated steel.
5. Autocoupling systems include qty. 4 M12 anchors for
the upper bracket. Torque to 51 Nm / 38 ft lb.
6. Anchor bolt holes should be drilled to the actual di-
ameter of the anchor (M12 anchor requires 12mm
diameter hole).
Submerged installation on ring stand
Attach the ring stand (available as an accessory) with
screws to the pump suction nozzle. 90° connection-el-
bow or connection loop to the pressure port of the pump,
mount pressure line. Gate valves and check valves may
need to be installed in accordance with local regulations.
The pressure line must be fitted free of tension, when
using a hose, ensure it is laid kink-free.
Secure the pump by the handle with a cable or chain, and
lower it into the pumping medium. Properly position pow-
er cable and chain so they stay above the pump and con-
nate enter the pump suction.
Wet installation with automatic coupling system
The following instructions apply to the installation of the
original HOMA Autocoupling system:
• Determine the approximate position of the base el-
bow and the upper pipe bracket for the guide tubes,
using a plumb bob where necessary.
• Check the correct installation dimensions of the
pump(s) (see dimensional drawings in the appendix).
• Drill mounting holes for the guide rail bracket on the
inside edge of the shaft opening. If this is not possi-
ble due to the space available, the guide rail bracket
can also be mounted in an offset position with a 90°
folded plate on the underside of the shaft cover. Pro-
visionally fasten the guide rail bracket with 2 screws.
• Align the base elbow to the shaft floor, use a plumb
bob from the pipe bracket - the guide tubes must be
exactly perpendicular! Fasten the base elbow to the
wet well floor using anchor bolts. Ensure that the
base elbow is exactly horizontal! If the wet well floor
is uneven, support the bearing surface accordingly.
• Mount the pressure pipes with fittings free of tension
according to the usual mounting principles.
• Insert both guide rails into the eyelets on the base
elbow and cut to size according to the position of the
guise rail bracket. Partially unscrew the guide rails
bracket, insert them into the guide rails and fasten
the bracket. The guide rails must be positioned with
no play at all, otherwise vibration will occur during op-
eration of the pump.
• Clean the wet well of any solid material (debris,
stones, etc.) before commissioning.
• Mount the guide claw on the pump discharge (thread
or flange connection). Ensure that the rubber profile
is correctly seated in position in the guide claw (as a
seal against the coupling base), so that it will not fall
out when lowering the pump. See graphic below
• Attach the chain to the pump handle or lifting lugs.
Insert the pump with the guide rails in the guide claw
ears. Lower the pump into the wet well. If the pump
is seated on the base elbow, it automatically seals it-
self off to the pressure line and is ready for operation.
• Hang the end of the retrieval chain from a hook at the
wet well opening.
• Hang the motor connection cable of the pump in the
shaft at an appropriate length, with strain relief. Make
sure that the cables can not be bent or damaged.
Correct Incorrect
Rubber Ring Rubber Ring
Dry Installation
Foundation and Piping Requirements:
general
The following recommendations are basic guidelines
which are intended to outline basic requirements in the
design of the dry pit station. It is essential that a licensed
professional engineer be retained by the owner to design
the station and all support structures.
Foundations
Foundations may consist of any structure heavy enough
to provide permanent rigid support for the pump and inlet
elbow stand. Concrete foundations built up from the solid
ground are the most commonly used. The concrete floor
shall be level. The space required by the inlet stand and
the location of the foundation anchor bolts are shown on
the outline dimension drawing. Foundation bolts are to be
embedded in the concrete.
Suction Piping
Suction piping should be at least as large as the pump
inlet elbow suction. If reducers are utilized they should be
of the conical type. If the liquid source level is below the
volute horizontal centerline, the reducer must be eccen-
tric and installed with the level side up. If the liquid level is
above the pump volute horizontal centerline, either eccen-
tric or concentric reducers may be used. Suction piping
should be run as straight as possible. All pipe flange joints
should be gasketed to prevent air from entering the pipe.
High points that may collect vapor are to be avoided. Iso-
lation valves such as gate valves can be installed in order
to facilitate the removal of the pump for maintenance. Any
valve installed in the suction line should be installed with
the stems horizontal.
Discharge Piping
A check valve and isolation valve shall be installed in the
discharge line. The check valve should be installed be-
tween the pump discharge flange and the isolation valve.
If pipe increasers are used on the discharge line, they
should be placed between the check valve and the pump.
31
English | 13
The inlet elbow stand allows the pump to be installed in
a stationary position in a dry pit. Place the inlet stand in
position and tighten the anchor nuts.
Lower the pump on to the top flange of the inlet stand.
DO NOT ALLOW SLACK ON THE LIFTING CABLE UNTIL
THE PUMP IS BOLTED DOWN. Make sure the flange bolt
holes align with the mounting holes on the underside of
the volute. Secure the pump to the mounting flange with
the fasteners that are specified in the accessory fastener
selection table below.
Vent Valve Installation
HOMA dry pit pumps are supplied with a valve and fitting
that must be installed and maintained to ensure the prop-
er performance of these pumps.
The opening for this valve is located on the base of
the motor cap near the mounting screws. The pump is
shipped with a plug installed which must be removed pri-
or to start up.
This opening is a metric straight thread and requires an
adapter included with the valve and fitting hardware. It is
also recommended that a length of hose be attached to
the valve and routed back to the sump.
Pumps with cooling jackets must be vented!
The screw plug 903.02 must be removed and
replaced with the supplied vent valve.
Note: Leave vent valve open in wet pit pump application
to prevent air entrapment in jacket.
5.3. Use of chains
Chains are used to lower a pump in the operating space
or to pull it out. They are not intended to secure a floating
pump. Intended use is as follows:
• Fasten one end of the chain on the handle of the
pump provided for this purpose. If your pump has
two ring bolts as an attachment point, you must use
a double-strand chain. When doing so, the angle of
inclination of the chain strands must be between 0°
and 45°.
• Attach the other end to the lifting device.
• Ensure tension on the chain, and then lift the pump in
a slow and controlled manner.
• Gently lower the pump into operating space and low-
er it gently.
• Lower the pump to the operating point and make
sure that the pump has a secure footing or the cou-
pling system is engaged correctly.
• Remove the chain from the lifting device and secure
it to the safety chain, which is located at the top of
the operating room. This ensures that the chain can
not fall into the operating area and constitute a dan-
ger to anyone.
32
14 | English
Please note the following diagrams during installation.
No. Description
1 Chain guard
2 Chain
3 Handle
4 Pump
5.4. Initial operation
This chapter contains all the important instructions for op-
erating personnel for the safe commissioning and opera-
tion of the machine. The following information must be
strictly adhered to and checked:
• Type of installation
• Operating mode
• Minimum/max water coverage. Immersion depth
After a long downtime, these specifications are also to
be checked and any defects are to be rectified!
The operation and maintenance manual must always
be kept with the machine, or be kept in a designated
place where it is always accessible for all of the oper-
ating personnel.
To avoid injury to persons or damage during operation of
the machine, the following points must be observed:
• The initial operation may only be carried out by qual-
ified and trained personnel accompanied by an au-
thorized HOMA representative following the safety
instructions.
• All staff working on the machine must receive, read,
and understand the instructions.
• Activate all safety devices and emergency stop
switches before initial operation.
• Electrical and mechanical adjustments may only be
performed by professionals.
• This machine is only suitable for use at the specified
operating conditions.
5.5. Preparatory work
This pump has been designed so that it will operate re-
liably and for long periods under normal operating con-
ditions. This requires, however, that you comply with all
advice and instructions.
Please check the following points:
• Cable routing - no loops, slightly taut
• Liquid temperature and immersion depth check - see
machine data sheet
• If a hose is used on the discharge side, it should be
flushed before use with fresh water so that no depos-
its cause blockages
• For wet installation, the wet well must be cleaned
• The pressure and suction side pipe systems are to be
clean and all valves are to be opened.
• If the pump is jacketed with media cooling, the jacket
must be completely bled of air, i.e. it must be com-
pletely filled with the medium and there may be no
more air in it. The venting can be done by suitable
ventilation devices in the system, or, if available, by
venting screws at the outlet nozzle.
• Check the accessories, pipe system and suspension
unit for firm and correct fit
• Review the present level control.
• An isolation test and a level control must be carried
out before commissioning.
5.6. Electrical
When installing and selecting of electrical lines and when
connecting the motor, the relevant local and NEC regula-
tions must be observed. The motor must be protected by
a motor protection circuit breaker. Connect the motor per
the wiring diagram. Pay attention to the direction of rota-
tion! If rotation is in the wrong direction, the machine will
not perform to specifications. And can be damaged under
adverse circumstances. Check the operating voltage, and
ensure there is uniform power consumption by all phases
in accordance with the machine data sheet.
Make sure that all temperature sensors and monitoring
devices, e.g. sealing chamber control, are connected and
tested for function.
Risk of electrocution!
Improper use of electricity can be fatal! All pumps
with exposed cable ends must be connected by a
qualified electrician.
All electrical work shall be carried out under the super-
vision of an authorized, licensed electrician. The present
state adopted edition of the National Electrical Code as
well as all local codes and regulations shall be complied
with.
33
English | 15
5.6.1 Verification of power supply
Prior to making any electrical connections or applying
power to the pump, compare the power supply available
at the pump station to the data on the unit‘s nameplate.
Confirm that both voltage and phase match between
pump and control panel.
5.6.2 Power lead wiring
HOMA pumps may be provided with 1 or more cables,
depending on motor horsepower and operating voltage.
Power leads U1, U2, & Z2 for single phase and U, V, W
for three phase pumps may be provided as single conduc-
tor, or as multiple conductors. Multiple conductor config-
urations may use leads from separate cables, or may use
two conductors within one cable. Please refer to wiring
diagram in the appendix for specific connection details.
The pump must be connected electrically through a motor
starter with proper circuit breaker protection in order to
validate warranty. Do not splice cables.
5.6.3 Thermal switch wiring
Pumps are equipped with thermal switches embedded in
the stator windings which are normally closed, automat-
ically resetting switches. Switches will open when the
internal temperature rises above the design temperature,
and will close when the temperature returns to normal.
Thermal switches must be wired to a current regulated
control circuit in accordance with the NEC.
Identify thermal switch leads marked T1 and T3 in the
power or control cable.
The resistance across the leads will be 0.5 Ohms. Ther-
mal leads must be connected to the thermal overload
relay located in the control panel. Thermal switch leads
must be connected to validate warranty.
note: All sizes of Class 1, Div. 1 pumps for hazardous
service must have thermal switch leads connected to a
current regulated control circuit in accordance with neC.
5.6.4 Seal probe wiring
The mechanical seal leak detector probe utilized in the
pump is a conductive probe which is normally open. The
intrusion of water into the seal chamber completes the
electrical circuit. Control panel provisions will sense this
circuit closure, and will provide indication or alarm func-
tions depending on the panel design.
Either single or dual wire systems may be provided. Sin-
gle wire systems utilize one energizing conductor, and
the pump casing and neutral lead as the ground or return
portion of the circuit. The dual wire systems utilize two
separate conductors for each leg of the circuit.
With either system, the seal probe leads must be wired
into a control circuit provided in the control panel. This
control circuit must energize the probe with a regulated
power source, and sense the closed circuit in event of
water intrusion Indication and alarm functions must also
be provided in the control circuit. Please see control panel
wiring diagram for seal probe connection points.
For Hazardous Area Classification Pumps, leak de-
tector circuit must be in conformance with applica-
ble NEC codes and regulations.
5.6.5 Start / Run Capacitors and Relays
All single phase motors require start and run capacitors
along with a start relay to operate. Capacitors and relays
must be sized for the specific motor.
Capacitors are sized based on ideal conditions.
The run capacitor may need to be resized to match the
available field voltage. Each cap kit shipped is supplied
with a wiring diagram and start up procedure.
5.6.6 Single Phase Pump Start-Up Procedure
Run Capacitor sizing can vary depending on the incoming
supply voltage provided. HOMA Single Phase pumps are
provided with Start and Run Capacitor(s) sized for 220-
230V under load. Frequently, the available line voltage is
considerable different than indicated, and the Run capac-
itor(s) may need to be resized to match the available field
voltage. The following procedure will allow you to verify
proper operation of your single phase pump, and/or make
necessary changes to you capacitors to correct for your
power supply.
After verifying wiring is in accordance with your pump re-
quirements, start pump and record the following readings
from each of the (3) pump cable leads.
Current under load:
U1________Amps,>U2________Amps,>Z2________Amps
U1: (Should be) highest reading
U2: middle reading
Z2: lowest reading
Lead U1 (common) should have the highest current read-
ing. Lead Z2 (start) should have the lowest reading.
If Z2 current draw is greater than the current draw of ei-
ther U1 or U2, a smaller size Run capacitor (lower micro-
farad rating) is required to correct the condition. Example:
If a 60 µf Run capacitor was supplied, change to a 50 µf
Run capacitor and check current readings. Typically, only
one step down in capacitor size is required, but in certain
instances 2 steps may be required.
( ) The standard capacitor kit provided includes:
____________ µf start capacitor
____________ µf run capacitor.
( ) Additional run capacitors have been included for use
in tuning the pump to match available line voltages for
optimum performance.
____________ µf run capacitor
____________ µf run capacitor
____________ µf run capacitor
This form is provided for your use in optimizing the perfor-
mance and service life of your single phase pumps, and is
applicable to most Capacitor Start/Capacitor Run motors.
Please contact our customer service with any questions
or if you require any additional information or assistance.
34
16 | English
5.7. Direction of rotation
Rotation Direction Check
All pumps have the proper rotation direction when con-
nected to a clockwise field of rotation leads. If the pump
rotation is backwards, swap two lead and reconnect. For
smaller pumps, the check can be done by observing the
pump’s movement while starting. To do this, set the pump
lightly on the ground in a perpendicular fashion and switch
it on briefly. When observing from above, the pump itself
moves slightly in a counter-clockwise direction when ro-
tating in the right direction.
The correct direction of rotation of the pump is achieved
once the pump moves counter-clockwise, since when
viewed from above, the motor starts in a clockwise
direction.
START REACTIONROTOR REACTIONATTENTION
The direction of rotation is correct if the impeller/propeller rotates
in a clockwise manner
when viewing down from top of the placed unit
ATTENTION
The start reaction is counter clockwise
For large pumps, the direction can also be determined by
looking through the pump discharge into the volute. Brief-
ly run the motor in order to verify it is running clockwise.
Caution – Rotating Impeller!
Do not touch the rotating impeller or reach into the
volute through the pressure outlets! Never reach into
the volute or touch any rotating parts during opera-
tion. Switch the machine off and wait until all rotating
parts have come to a stop prior to carrying out main-
tenance and repair work!
It is also possible to check the direction of rotation with a
“motor and phase rotation indicator”. This measurement
device is held from the outside up to the motor housing
of the switched-on pump and displays the direction of ro-
tation via an LED.
5.8. Motor protection
The minimum requirement is a thermal relay/motor pro-
tection circuit breaker with temperature compensation,
differential triggering, and reclosing lock in accordance
with VDE 0660 or similar national regulations. If the equip-
ment is connected to power grids where problems often
occur, we recommend the additional use of protective
devices (e.g. overvoltage protection or under voltage pro-
tection or phase failure relays, lightning protection, etc.).
When connecting the machine, the local and legal require-
ments must be adhered to.
5.9. Variable Frequency Drives
Special considerations must be taken when operating
pumps with variable frequency drives (inverters).The in-
verter circuit design, horsepower required by pump, mo-
tor cooling system, power cable length, operating voltage,
and anticipated turndown ratio must be fully evaluated
during the design stage of the installation.
As a minimum, properly sized load reactors and filters
must be installed between the inverter and the pump to
protect the pump motor from damaging voltage spikes.
Warranty coverage will not be provided on any pump mo-
tor that is operated with a variable frequency drive, unless
the load side of the inverter is properly isolated from the
pump.
5.10. Types of startups
Types of startup using with cables with exposed ends
Direct start up
At full load, the motor protection circuit breaker should
be set to the rated current. In partial load operation it is
recommended to set the motor protection circuit breaker
5% above the measured current at the operating point.
Soft start
At full load, the motor protection should be set to the rat-
ed current. In partial load operation, it is recommended to
set the motor protection 5% above the measured current
at the operating point. The starting time must be max.
5s. The starting voltage is to be set at 40% of the rated
voltage according to the rating plate.
Start up with HOMA gO switch
Plug the connector into the socket provided and press the
on/off switch on the GO switch.
5.10.1. After start up
The nominal current is briefly exceeded on start-up. Af-
ter completion of this operation, the operating current
should not exceed the nominal current. If the motor does
not start immediately after switching on, it must be shut
down immediately. The switch breaks specified in the
technical data must be adhered to before turning on again.
If there is a new fault, the machine must again be shut
down immediately. The machine may only be started up
again after troubleshooting.
The following items should be checked:
• Current consumption (permissible deviation between
phases max. 5%)
• Voltage difference between the individual phases
(max. 1%)
• Switching frequency and pauses (see Technical Data)
• Air entry at the inlet - if necessary, a baffle plate must
be attached
• Minimum water coverage, level control, dry run pro-
tection
• Smooth running
• Check for leaks: if necessary, take the necessary
steps according to the chapter “Maintenance”
35
English | 17
6. Maintenance
6.1. General
The machine and the entire system must be inspected
and maintained at regular intervals. The time limit for
maintenance is set by the manufacturer and applies to
the general conditions of use. The manufacturer should
be consulted if the system is to be used with corrosive
and/or abrasive pumped liquids, as the time limit between
inspections may need to be reduced.
Note the following information:
• The operating and maintenance manual must be
available to the maintenance personnel and its in-
structions followed. Only the repair and maintenance
measures listed here may be performed.
• All maintenance, inspection and cleaning work on the
machine and the system may only be carried out by
trained specialists exercising extreme care in a safe
workplace. Proper protective clothing is to be worn.
The machine must be disconnected from the electric-
ity supply before any work is carried out. There must
be no way that it can be inadvertently switched on.
• Above a weight of 50kg, only hoisting gear which has
been officially approved and which is in a technical-
ly perfect condition should be used for lowering and
raising the machine.
Make sure that all fastening devices, ropes and safe-
ty devices are in a technically perfect condition. Work
may only commence if the auxiliary hoisting gear has
been checked and found to be in perfect working order.
If it is not inspected, danger to personnel may result!
• Wiring work on the machine and system must be
carried out by an electrician. For machines approved
for work in areas subject to explosion danger, please
refer to the “Explosion protection in accordance with
the regulation” chapter.
• When working with inflammable solvents and clean-
ing agents, fires, unshielded lighting and smoking are
prohibited.
• Machines which circulate fluids hazardous to health,
or which come into contact with them, must be de-
contaminated. It must be ensured that no dangerous
gases can form or are present.
• Ensure that all necessary tools and materials are
available. Tidiness and cleanliness guarantee safe and
problem-free operation of the machine. After work-
ing on the machine all cleaning materials and tools
should be removed from it. All materials and tools
should be stored in an appropriate place.
• Operating supplies such as oil and lubricants must
be collected in appropriate vessels and proper-
ly disposed. Appropriate protective clothing is
to be worn for cleaning and maintenance jobs.
Only lubricants expressly recommended by the
manufacturer may be used. Oils and lubricants should
not be mixed. Only use genuine parts made by the
manufacturer.
A trial run or functional test of the machine must be
performed as instructed in the general operating con-
ditions.
Oil type: white mineral oil. Used oil is to be disposed ac-
cordingly.
When using white mineral oil, note the following:
• Machines which have previously been operated us-
ing other lubricants must first be thoroughly cleaned
before they can be operated using white mineral oil.
6.2. Maintenance intervals
Before initial start-up or after a longer period of
storage:
• Check insulation resistance
• Check oil level in seal chamber
• Check that impeller rotates freely by hand
Monthly:
• Monitor the amperage and voltage
• Check the used relays for proper operation
every six months:
• Visual inspection of the power supply cable
• Visual inspection of the cable holder and the cable
bracing
• Visual inspection of accessories, e.g. the suspension
device and hoisting gears
8,000 operating hours or after two years, whichever
is earlier:
• Check the insulation resistance
• Check the lubricant in the seal chamber
• Functional inspection of all safety and control devices
15,000 operating hours or after five years, whichever
is earlier:
• General overhaul
If it is used in highly abrasive or corrosive material, the
maintenance intervals should be reduced!
6.3. Maintenance tasks
Monitoring the current consumption and voltage
The current consumption and voltage is to be monitored
periodically for all winding phases. This remains constant
during normal operation. Slight fluctuations are a result
of the composition of the pumped fluid. The current con-
sumption can assist in early detection and correction of
damage and/ or faulty operation in the impeller/propeller,
bearings and/or the motor. More extensive resulting dam-
age can thus be largely prevented and the risk of a total
failure can be reduced.
36
18 | English
Checking the used relays for posistors, oil chamber
monitors, etc.
Check the relays used are functioning fault-free. Defective
devices must be immediately replaced, because these
cannot ensure safe operation of the machine. The test
procedure details should be followed closely (in the oper-
ating instructions for each relay).
Checking the insulation resistance
To check the insulation resistance, the power supply ca-
ble must be disconnected. The resistance can then be
measured with an insulation tester (measuring voltage =
1000V DC).
The following values may not be exceeded:
• The insulation resistance may not be below 20 MΩ
during initial operation. For all further measurements
the value must be greater than 2 MΩ.
• Insulation resistance too low: Moisture may have
penetrated the cable and/or the motor.
Do not connect the machine, consult manufacturer!
Visual inspection of power supply cables
The power supply line must be examined for bubbles,
cracks, scratches, chafed areas and/or crushed sections.
If damage is found, the power cable must be exchanged
immediately.
The cables may only be changed by the manufactur-
er or an authorized/certified service workshop. The
machine may not be used again until the damage has
been adequately rectified.
Visual examination of the cable holders (carabiners)
and the cable bracing
When the machine is used in basins or pits, the lifting
cables/cable holders (carabiners) and the cable bracing
are subject to constant wear. Regular inspections are nec-
essary in order to prevent the lifting cables/cable holders
(carabiners) and/or cable bracing from wearing out and to
prevent the electricity cable from being damaged.
The lifting cables/cable holders (carabiners) and the
cable bracing are to be immediately replaced if any
signs of wear appear.
Visual inspection of accessories
Inspect accessories such as suspension units and hoist-
ing gear to check whether they are secured in a stable
manner. Loose and/or defective accessories should be
repaired immediately or replaced.
Oil Level check in Seal Chamber
Visual Inspection of Oil Chamber:
Oil Level
Please take the precise filling quantity from the spare
parts list or contact the manufacturer with the pump serial
number.
Oil Condition
The condition of the mechanical seals can be visually in-
spected as follows: Put the pump in horizontal position, so
that the oil chamber drain plug is on top (for larger pumps:
one of both oil chamber screws). Remove the drain plug
and take out a small quantity of oil. The oil becomes grey-
ish white like milk if it contains water. This may be the
result of defective shaft seals. In this case the condition
of the shaft seals should be checked by a HOMA Service
shop. Oil type: Mineral Oil
Used oil has to be disposed according to the existing en-
vironmental rules and regulations.
Visual Inspection of Coolant Chamber (Closed Loop
Pumps Only):
quantity of Coolant
Please take the precise filling quantity from the spare
parts list or contact the manufacturer with the pump serial
number.
The condition of the mechanical seals can be inspected
controlled as follows: Set up the pump vertically and un-
screw the ventilation screw located above and remove a
small quantity of coolant. If the cooling liquid becomes
grey (original color: light pink or light orange) this may be
the result of defective shaft seals. In this case the con-
dition of the shaft seals should be checked by a HOMA
Service shop. Type: Silica-free propylene glycol-based an-
tifreeze (available on request). Used cooling liquid has to
be disposed according to the existing environmental rules
and regulations.
Functional inspection of safety and control devices
Monitoring devices are temperature sensors in the motor,
oil chamber monitors, motor protection relays, overvolt-
age relays, etc.
Motor protection and overvoltage relays and other trip
elements can generally be triggered manually for test
purposes. To inspect the oil chamber monitor or the tem-
perature sensor, the machine must be cooled to ambient
temperature and the electrical supply cable of the moni-
toring device in the switch cabinet must be disconnected.
The monitoring device is then tested with an ohmmeter.
The following values should be measured:
Bi-metal sensor: Value = “0” - throughput
PTC sensor: A PTC sensor has a cold resistance of be-
tween 20 and 100 Ω. For 3 sensors in series this would
result in a value of between 60 and 300 Ω.
PT 100 sensor: PT 100 sensors have a value of 100ohms
at 0°C. Between 0°C and 100°C this value increases by
0.385 Ω per 1°C.
Moisture sensor: This value must approach infinity. If
there is a low value, there may be water in the oil.
Also observe the instructions of the optionally available
evaluation relay. In the case of larger deviations, please
consult the manufacturer. Please consult the appropri-
ate operating manual for details on inspecting the safety
and monitoring devices on the auxiliary lifting gear.
37
English | 19
general overhaul
During this the bearings, shaft seals, O rings and power
supply cables are inspected and replaced as required in
addition to normal maintenance work. This work may only
be conducted by the manufacturer or an authorized ser-
vice workshop.
Changing the oil
The drained oil must be checked for dirt and water con-
tent. If the oil is very dirty and shows water intrusion, it
must be changed again after four weeks. If there is again
water in the oil then, it seems likely that a seal is defec-
tive. In this case, please consult the manufacturer. If a oil
chamber or leakage monitoring system is being used, the
display will light up again within four weeks of changing
the oil if a seal is defective.
The general procedure for changing oil is as follows:
Switch off the machine, let it cool down, disconnect it
from the power supply (have this done by an electri-
cian), lock out tag out the control panel, clean it and
place it vertically on a solid base. Warm or hot oil may
be pressurized. The leaking oil may cause burns. For
that reason, let the machine cool down to ambient
temperature before you touch it.
6.4. Sealing chamber
As there are several versions and designs of these mo-
tors, the exact location of the screw plugs varies depend-
ing on the pump unit used.
• Slowly and carefully remove the filling plug from the
seal chamber.
Caution: The oil may be pressurized!
• Remove the drain plug. Drain the oil and collect it in
a suitable reservoir. Clean the drain plug, fit with a
new sealing ring and screw it in again. For complete
drainage, the machine must be slightly tipped on to
its side.
•
Make sure that the pump is on its side and secure!
• Fill lubricant by means of the opening in the filling
plug. Comply with the specified lubricants and filling
quantities.
• Clean the filling plug, fit with a new sealing ring and
screw it in again.
7. Repairs
7.1. General
When carrying out repair work, the following information
should always be noted:
• Round sealing rings as well as existing seals should
always be replaced.
• Screw fixings such as spring washers should always
be replaced.
• The correct torques must be observed.
In general, the following applies to repairs:
Switch off the machine, disconnect it from the pow-
er supply (have this done by an electrician), clean it
and place it on a solid base in a horizontal position.
Secure it from falling over and/or slipping.
If not otherwise stated, the torque values of the
below tables should be used. Values stated are for clean,
lubricated screws. Fixing torque [ft lbs] for screws A2/A4
(Coefficient of friction = 0.2)
A2/A4,
Hardeness class 70
A2/A4,
Hardeness class 80
DIN912/DIN933 DIN912/DIN933
M6 5 ft lbs 9 ft lbs
M8 12.5 ft lbs 21 ft lbs
M10 24 ft lbs 43 ft lbs
M12 42 ft lbs 73.5 ft lbs
M16 103 ft lbs 180.5 ft lbs
M20 201.5 ft lbs 364.5 ft lbs
7.2. Changing the impeller and pump unit
Changing the impeller and the pump unit.
• Loosen and remove the screws holding the volute to
the oil chamber.
• Secure and remove the volute from the oil chamber
with suitable equipment, e.g. hoisting gear. Place on
a secure base.
• Fasten the impeller with suitable equipment, loosen
and remove the impeller fastening (cylindrical screw
with socket hex).
Pay attention to the locking screw!
• Remove the impeller from the shaft using a suitable
extractor.
• Clean the shaft
• Attach a new impeller to the shaft.
Make sure that the sliding surfaces do not become
damaged!
• Screw a new impeller bolt and clamping disk back
onto the shaft. Fasten the impeller and tighten the
impeller bolt. See table below for toque values.
• Place the motor assembly with impeller back onto
the volute and fasten it with screws.
• It must be possible to turn the impeller by hand.
38
20 | English
Impeller Bolt Size Torque
10mm 35 Nm / 26 ft lb
12mm 61 Nm / 45 ft lb
16mm 146 Nm / 108 ft lb
20mm 285 Nm / 210 ft lb
Changing wear ring
The stationary and mobile wear ring determine the gap
between the impeller (mobile wear ring) and the intake
port (stationary wear ring). If this gap is too big, the per-
formance of the machine decreases, and/or it can lead to
entanglements.
If the stationary ring shows signs of wear, it should be
replaced. This minimizes wear on the intake port and and
impeller, consequently reducing expense for spare parts.
Only OeM Parts may be used for replacement!
Inspecting and replacing these parts is performed by the
manufacturer during the general overhaul or by specially
trained personnel.
7.3. Spare Parts
In order to obtain spare parts identify the required parts,
and contact authorized HOMA customer service with your
order. Authentic HOMA parts shall be used to maintain
warranty.
Explosion Proof pumps must be identified as such,
and the pump serial number must be referenced for
proper parts identification.
Note the following information concerning storage:
Beware of hot parts!
When removing the machine, be careful of the tem-
perature of the housing components. These can heat
up to well above 104°F. Let the machine cool down to
ambient temperature before you touch it.
• Clean the machine.
• Store it in a clean, dry place, protect the machine
against frost.
• Place it down vertically onto a firm foundation and
secure it against falling.
• Support the cable at the cable entry assembly to help
avoid a permanent deformation.
• Protect the ends of the electric power cable from
moisture.
• Protect the machine from direct sunshine as a pre-
ventive measure against brittleness in elastomer
parts and the impeller and casing coating.
• When storing the machine in a shop please remem-
ber: Radiation and gases which occur during electric
welding destroy the elastomers of the seals.
• During lengthy periods of storage, regularly (for ex-
ample every six months) turn the impeller or propeller
by hand. This prevents indentations in the bearings
and stops the rotor from rusting up.
8.3. Restarting after an extended period of storage
Before restarting the pump, it should be completely re-
commissioned. Clean it of dust and oil deposits, then car-
ry out the necessary maintenance actions (see “Mainte-
nance”). Check that the mechanical shaft seal is in good
order and working properly. Once this work has been
completed, the machine can be installed (see “Installa-
tion”) and connected to the electricity supply by a special-
ist. See “Start-up” for instructions on restarting.
Only restart the machine if it is in perfect condition and
ready for operation.
8. Shutdown
8.1. Temporary shutdown
For this type of shutdown, the machine remains installed
and is not cut off from the electricity supply. For tempo-
rary shutdown, the machine must remain completely sub-
merged so that it is protected from frost and ice. Make
sure the operating room and the pumped fluid cannot be
covered by ice. This ensures that the machine is always
ready for operation. Carry out a monthly start-up and run
the pump in operating conditions for 5 minutes.
Caution!
Only test the pump under the proper conditions of op-
eration and use. Never run the machine dry. This can
result in irreparable damage!
8.2. Final shutdown / storage
Switch off the system, disconnect the machine from the
electricity supply and dismantle and store it.
9. Troubleshooting
In order to prevent damage or serious injury while rec-
tifying machine faults, the following points must be
observed:
• Only attempt to rectify a fault if you have qualified
personnel. This means each job must be carried out
by trained specialist personnel, for example electrical
work must be performed by a trained electrician.
• Always secure the machine against an accidental
restart by disconnecting it from the electric system.
Take appropriate safety precautions.
• Always have a second person make sure the ma-
chine is switched off in an emergency.
• Secure moving parts to prevent injury.
• Independent work on the machine is at one‘s own
risk and releases the manufacturer from any warranty
obligation.
39
English | 21
The machine will not start
Cause Remedy
Electricity supply interrupted – short circuit or earth
connection in the cable or motor windings
Have the motor and wires checked by a specialist and replaced if
necessary
Fuses, the motor protection switch and/or monitoring
devices are triggered
Have a specialist inspect the connection and correct them as necessary
Have the motor protection switch adjusted according to the technical
specifications, and reset monitoring equipment.
Check that the impeller/propeller runs smoothly.
Clean it or free it as necessary
The moisture sensors (option) has interrupted the power circuit (operator-
related)
See fault: Mechanical shaft seal leaks, seal chamber monitor reports
fault and switches the machine off
Machine runs but does not pump
Cause Remedy
No pumped fluid Open the container intake or valves
Intake blocked Clean the intake, valve, suction port or intake strainer
Impeller/propeller blocked or obstructed Switch off the machine, secure it against being switched on again and
free the impeller/ propeller
Defective hose or piping Replace defective parts
Intermittent operation Check the control panel
The motor starts, but the motor protection switch triggers shortly after start-up
Cause Remedy
The thermal trigger on the motor protection switch is incorrectly set Have a specialist compare the setting of the trigger with the technical
specifications and adjust it if necessary
Increased power consumption due to major voltage drop Have an electrician check the voltage on each phase and rewire if
necessary
Excessive voltage differences on the three phases Have a specialist inspect the connection and the switching system and
correct it as necessary
Incorrect direction of rotation Swap the 2 phases from the mains supply
Impeller/propeller impeded by adhesive material, blockages and/or solid
matter, increased current consumption
Switch off the machine, secure it against being switched on again and
free the impeller/ propeller or clean the suction port
The pumped fluid is too dense Contact the manufacturer
The machine runs, but not at the stated operating levels
Cause Remedy
Intake blocked Clean the intake, valve, suction port or intake strainer
Valve in the discharge line closed Fully open the valve
Impeller/propeller blocked or obstructed Switch off the machine, secure it against being switched on again and
free the impeller/ propeller
Incorrect direction of rotation Replace 2 phases on the mains supply
Air in the system Check the pipes, pressure shroud and/or pump unit, and bleed if
necessary
Machine pumping against excessive pressure Check the valve in the discharge line, if necessary open it completely
Signs of wear Replace worn parts
Defective hose or piping Replace defective parts
Inadmissible levels of gas in the pumped liquid Contact the factory
Two-phase operation Have a specialist inspect the connection and correct it as necessary
40
22 | English
The machine does not run smoothly and is noisy
Cause Remedy
Machine is running in an impermissible operation range Check the operational data of the machine and correct if necessary and/
or adjust the operating conditions
The suction port, strainer and/or impeller/propeller is blocked Clean the suction port, strainer and/or impeller/ Propeller
The impeller is blocked Switch off the machine, secure it against being switched on again and
free the impeller
Inadmissible levels of gas in the pumped liquid Contact the factory
Two-phase operation Have a specialist inspect the connection and correct it as necessary
Incorrect direction of rotation Incorrect direction of rotation
Signs of wear Replace worn parts
Defective motor bearing Contact the factory
The machine is installed with mechanical strain Check the installation, use rubber spacers if necessary
Mechanical shaft seal leaks, sealing chamber monitor reports fault and switches the machine off
Cause Remedy
Increased leakage when running in new mechanical shaft seals Change the oil
Defective sealing chamber cables Replace the moisture sensors
Mechanical shaft seal is defective Replace the mechanical shaft seal after contacting the factory
Further steps for troubleshooting
If the items listed here do not help you rectify the fault,
contact our customer service. They can help you as fol-
lows:
• Telephone or written help from customer service
• On-site support from customer service
• Checking and repairing the machine at the factory
Note that you may be charged for some services provided
by our customer support. Customer service will provide
you with details on this.
41
English | 23
10. Connection of pumps and mixers
Danger from electric current!
Incorrect working with electric current brings danger to life! All pumps with bare cable ends must be connected by a skilled
electrician.
10.1 Power cables
Pumps in Star 3-phase version
Cable identification Motor Terminal in control cabinet
U1 U1
V1 V1
W1 W1
U2 U2
V2 V2
W2 W2
Pumps in Direct start version
Cable identification Motor Terminal in control cabinet
U U1
V V1
W W1
10.2 Control cables
Depending on the design of the pump/agitator, it may be that no separate control cable is used. In this case monitoring
devices are run from the power cable.
Cable identification Motor Monitoring system
Monitoring in winding
T1 / T2 Temperature limiter (2 switches in series)
T1 / T4 Temperature controller (2 switches in series)
T1 / T2 / T3 Temperature limiter and controller
K1 / K2 PTC – Thermistor (3 thermistors in series)
PT1 / PT2
3 x PT100 individually installedPT3 / PT4
PT6 / PT6
Bearings monitoring
P1 / P2 PT100 upper bearing
P3 / P4 PT100 lower bearing
Seal monitoring
S1 / S2 Seal monitoring in oil chamber
S3 / S4 Seal monitoring in connection compartment
S5 / S6 Seal monitoring in Motor compartment with 2 Electrodes
S7 / S8 Seal monitoring in Motor compartment with float switch
S9 / S10 Seal monitoring in Gearbox (Agitator)
S11 / S12 Seal monitoring in Leakage compartment (internal cooling)
Heating
H1 / H2 Heating system
42
www.jensenwaterresources.com
VALVES
43
www.jensenwaterresources.com
CHECK VALVES
44
We are pleased to announce the introduction of the
revolutionary TF-1 Check Valve. It functions and operates
under the same simple principle of operation as the original
TF-2 Tideflex®.
This design is ideal for existing manhole instal-
lations where the invert of the pipe is close to
the floor of the vault. There are many check
valves in interceptors, manholes, and vaults.
These vaults are designed so that there would
be a maximum gravity head; thus, the invert
pipe is as close to the base as possible. The
TF-1 allows installations in such applications.
The Tideflex® Technologies Series TF-1
Tideflex® Check Valve is designed for appli-
cations in manholes, where the bottom of the
manhole is close to the invert of the pipe. The
TF-1 configuration allows the valve to be prop-
erly installed without manhole modification,
ensuring positive backflow prevention and a
lifetime of maintenance-free performance.
Tideflex Technologies • 600 N. Bell Ave., Carnegie, PA 15106 USA • 412-279-0044 • Fax 412-279-7878 • www.tideflex.com
Series TF-1—Tideflex® Check Valve
Features & Benefits
• Ideal for manhole installations
• Lightweight, all-elastomer design
• Seals around entrapped solids
• Cost-effective, maintenance-free design
Materials of Construction
• Elastomers available in Pure Gum Rubber, Neoprene, Hypalon®,
Chlorobutyl, Buna-N, EPDM, and Viton®
Technical Data
Pipe O.D. Length Bill Height Cuff Length (A) (L) (H) (C)
4 10 8 1 1/2 5 10 8 1 1/2 6 16 12 2 8 18 16 2 10 23 19 3 12 27 23 4 14 27 23 4 16 35 30 5 18 36 34 6 20 44 37 8 22 44 37 8 24 48 43 8 26 48 43 8 28 48 43 8 30 56 55 9 32 56 55 9 36 67 69 10 38 67 69 10 40 67 69 10 42 61 71 10 44 61 71 10 48 66 78 10 50 66 78 10 54 66 78 10 58 66 78 10 60 73 91 14 68 73 91 14 72 96 115 16
Numbers indicate maximum dimensions in inches.
L
C
A H
45
The revolutionary design of the all-rubber Tideflex® Check Valve
provides reliable backflow protection. This unique duck bill
design eliminates costly back-flow from oceans, rivers or storm
water and is the ideal valve for effluent diffuser systems.
Tideflex® Valves seal on entrapped solids and debris without
jamming. Unlike traditional flap gates there are no hinged
gates to hang open and no warping or freezing. It’s virtually
maintenance-free.
The Tideflex® Check Valve is available in a wide variety of elas-
tomers and is designed to meet your exact flow
specifications.
IMPORTANT
Please take a moment to review this manual. Before performing any maintenance on the valve be sure the
pipeline has been de-pressurized. The improper installation or use of this product may result in personal
injury, product failure, or reduced product life. Tideflex® Technologies can accept NO liability resulting from the
improper use or installation of this product. If you have any questions or problems, please call the customer service
department at (412) 279-0044. We appreciate your comments. Thank you for choosing Tideflex® Technologies.
TIDEFLEX® TF-1 AND TF-2 ALL-RUBBER CHECK VALVES
INSTALLATION, OPERATION, AND MAINTENANCE MANUAL
TF-1
TF-2
Division of Red Valve,Inc.
46
NEVER...
Cut or modify
check valve.
DO...
Use a soapy water solution to slide
check valve on pipe.
DO...
Keep valve on pallet until
ready to install.
DO...
Tighten clamp
bolts evenly.
Saddle Bill
Lifting
Clevis
Cuff
Clamps
Lifting
Eyebolt
2
Forward Pressure Opens Valve
Reverse Pressure Seals Valve
GENERAL DESCRIPTION
The Tideflex® Technologies' Check Valve is an all-elastomer, one-
piece check valve. Terms used in this IOM to refer to various parts
of the valve are described below.
1. Cuff - the cuff is designed with a full round bore and slips over
the end of the pipe.
2. Saddle - The saddle is the middle part of the valve, tapering
from the round cuff to the flat bill. The saddle directs the flow
to the bill, and is flexible to sustain increased flow conditions.
3. Bill - the bill is the discharge end of the valve. The bill flexes
to allow flow to discharge, yet is stiff enough to prevent the
valve from opening without line pressure.
Backpressure, the pressure created on the exterior of the
valve by reverse flow or submersion, will seal the lips of the
bill tightly together, preventing backflow into the valve.
4. Clamps - The clamps are tightened around the cuff after the
cuff has been slipped over the end of the discharge pipe. These
clamps are normally furnished by Red Valve Company. Hose
clamps are supplied for valves up to 12". Valves 14" and up
are supplied with fabricated clamps. 14"-20" are supplied with
one set, 20"-54" are supplied with two sets and sizes 60" and
up are supplied with three sets.
5. Lifting clevis - lifting clevis is attached to the bill of the check
valve for valves 36" and up. This clevis is used during
installation to assist in lifting the valve, and may be used to
attach a line to the bill to help support the valve after
installation.
OPERATION
Tideflex® Check Valves are custom made products intended for a
specific application and have been designed to respond to criteria
unique to that purpose, such as line pressure, minimum and
maximum back pressure and chemical compatibility. Should the
conditions for which the valve has been designed be altered or change
in any way, it could affect the normal operation of the valve.
Tideflex® Check Valves work on backpressure exerted on the bill area to
seal the valve. The bill may appear to be slightly open when installed.
This slight opening does not affect the operation of the valve, as the valve
depends on backpressure to seal.
The valve shall be installed with the bill in the vertical
position.
IMPORTANT
47
STORE VERTICALLY
NEVER STORE HORIZONTALLY
STORAGE
Tideflex® Check Valves should be stored in a cool, dry location
on original shipping pallet with the bill facing upward, not on its
side (see Figure 2). Do not drop, bend or twist check valve, or
damage may occur.
1. Store valve in a cool, clean, dry location.
2. Avoid exposure to light, electric motors, dirt or chemicals.
Resilient check valves are subject to deterioration when
exposed to ozones and non-compatible chemicals. Ozone
especially causes age hardening of the elastomer.
3. Store Installation Operation Manual with product so it will be
readily available for installation.
4. Do not remove wooden brace or metal shipping ring (36"+)
until valve is installed.
1. INSPECTION OF CHECK VALVE
Check the inside diameter of the cuff of the Tideflex® Check Valve
to compare it to the O.D. of the outfall pipe. Inspect the outfall pipe
for sharp or damaged areas. The pipeline should be in a smooth
condition to prevent cutting the rubber check valve.
Lifting clevis and lifting eye bolts are provided only for sizes 36"
and over.
Imperfections on the inside of the cuff area can be filled with a
silicone sealant prior to installing the valve on the pipe. This will
ensure a seal in the cuff area after clamps are tightened.
2. INSPECTION OF THE PIPE
Check the outside diameter of the pipe to determine if it
matches the I.D. of the cuff of the Tideflex® Check Valve. The
cuff of the check valve is usually made slightly larger to permit
ease of installation.
INSTALLATION INSTRUCTIONS
TIDEFLEX® CHECK VALVES
3
Figure 2
48
5. REMOVING THE VALVE FROM PALLET OR CRATING
A lifting clevis is provided at the top end of the Tideflex® Check
Valve. Lifting eye bolts are provided on the clamps.
Remove the cuff retainer shipping ring or wooden brace located
inside the cuff of the valve. The valve should be lifted from the
pallet using both the clevis and the lifting eye bolts.
4
Ground Clearance
IMPORTANT
6. LIFTING THE VALVE
Do not discard the metal clamps holding the valve onto the pallet.
THESE CLAMPS ARE NEEDED to install the Tideflex® Check Valve. In
lifting the Tideflex® Check Valve from the pallet, keep the bill end of the
Tideflex® higher than the cuff for ease of installation.
Current
Current
Incorrect
Correct
4B. FITTING TIDEFLEX® ON PIPE
A. To facilitate the insertion of the pipe into the Tideflex® Check Valve, it
might be necessary to grind a bevel on the inside cuff diameter.
B. Sometimes it is necessary to grind the inside of the cuff or add
gasket material to the O.D. of the pipe to properly fit the Tideflex® Check
Valve.
Outfall Pipe
Tideflex®
3. CLEARANCE
Make certain that sufficient ground clearance exists below the
valve, at least 10% of the valve diameter (i.e. 6" for a 60" valve).
4A. TIDEFLEX® WITH CURVED BILL INSTALLATION IN CURRENT
For Tideflex® fabricated with a curved bill, the valve should be installed so
the bill points in the direction of the current, not facing the current which
may cause the bill to be forced open.
Top View
Top View
Tideflex®
49
Clamp Angles
Cuff O.D.
Gasket Material
Holes90º
1
2
10. POSITIONING FOR THREE CLAMPS
After the unit is securely pegged into position, proceed to install
and tighten the first clamp. A mild lubricant may be applied to the
I.D. of the clamp to prevent a brake shoe effect when tightening
down clamps.
Install the second and third clamps on the cuff of the Tideflex®.
Rotating the first and second clamps 60° and 120°, respectively,
in relation to the first clamp will ensure even pressure around the
valve and pipe, thus increasing the effectiveness of the clamps.
5
8. SEAT TIDEFLEX® ON PIPE
The Tideflex® Check Valve should fit snugly against the outfall pipe,
leaving no gap. If possible, inspect installation from the inlet end
of the Tideflex® Check Valve to insure that the check valve cuff fits
snugly on the pipe. Do not allow a gap between the cuff and the
end face of the outfall pipe. A gap will create an imbalance which
will not provide proper support for the Tideflex® Check Valve. For
more information, see troubleshooting.
1
2
3
60º
60º
7. POSITIONING THE VALVE
With the bill end of the Tideflex® lifted higher than the cuff end start to
fit cuff on the outfall line. The Tideflex® Check Valve should fit snugly
against the outfall pipe, leaving no gap.
Flat portion of the valve to be at the bottom of the pipe. Flare to be at
the top.
TF-1
TF-2
Apply a soap/water solution to the outside of the pipe in which
the check valve is being installed on, to ease installation.
Outfall Pipe
Tideflex®
Snug Fit
Tideflex®
Outfall Pipe
Gap
Outfall Pipe
Tideflex®
Snug Fit
Tideflex®
Outfall Pipe
Gap
Tideflex®
After the unit is securely pegged into position, proceed to install and
tighten the first clamp. A mild lubricant may be applied to the I.D. of
the clamp to prevent a brake shoe effect when tightening down the
clamps.
Tideflex®
9. POSITIONING FOR TWO CLAMPS
Install the second clamp on the cuff of the Tideflex®. Rotating the
clamp 90° in relation to the first clamp will ensure even pressure
around the valve and pipe, thus increasing the effectiveness of the
clamps.
If a greater distance between the angles of the clamps is required to
provide more range for tightening the bolts, especially if angles are
bottoming out, gasket material can be wrapped around the O.D. of the
cuff as shown.
50
Drill Hole
Through
Valve &
Pipe
Insert
Holding
Bolt &
Fasten
Tack
Weld
Bolt to
Clamp
Clamp
with Hole
6
Outfall Pipe
Tideflex®
Snug Fit
Tideflex®
Outfall Pipe
Gap
11. POSITIONING BLANK HOLES IN CLAMPS
Tighten all clamps and bolts once all components have been
positioned properly. Pre-drilled holes are drilled in each clamp.
These are provided so as to secure the Tideflex® Check Valve with
holding pins to the outfall pipe. This will secure the Tideflex® Check
Valve to the pipe and assure a long, trouble-free service life. After
tightening the clamps, the pre-drilled holes should be staggered.
Holes are not drilled in the rubber cuff of the
Tideflex® at the factory since they would not line up to the
tightened clamps.
12. TACK WELDING HOLDING BOLTS TO CLAMPS
Once clamps are secure use a standard steel drill bit and drill holes
through the rubber cuff. Insert holding bolts through the cuff and secure
opposite side with nut, if possible. Holding bolts should be stainless
steel. Steel bolts can corrode and break off, causing the check valve
to slip off the pipe. Holding bolts are not provided because of various
widths of the outfall pipe.
13. BOLTS TACK WELDED TO CLAMPS
After tightening, heads of holding bolts can be tack welded to the
clamps using small tacks. Certain installations will not permit
installing of nuts to bolts. In these situations, the tightness of the
clamps and tack weld of the bolts will assure good support.
14. CORRUGATED PIPE AND SMOOTH WALL (PVC, HDPE)
PIPE INSTALLATION
For installation on corrugated pipe, it is recommended that the
corrugations be filled with hydraulic cement (or similar material)
that will provide a smooth O.D.
For smooth wall pipe, it is recommended that the valve be pinned.
51
TF-2 Check Valves are designed to slide over a pipe stub. Too short of a
pipe stub may cause the check valve to slip off or cause the check valve
to gap open.
For valves up to 4", the pipe stub length "B" should be a minimum of
1/2" longer than cuff depth "A".
6"-14" 1" longer
16"-24" 2" longer
30"-60" 2 1/2" longer
72" and up 3" longer
7
AB
Bulkhead
PipeStub
Hints to install large diameter check valves:
During the installation of the check valve, if force is needed
to seat the valve to the cuff stop on large diameter check
valves, the force required should be induced equally around
the cuff of the check valve, never at only the top, bottom or
in the center. The force required to push the check valve onto
the pipe can be placed on the bill but it should be distributed
evenly over the entire length of the bill. Failure to distribute
the pressure equally may cause improper performance of the
check valve. Use a wide angle iron or large wooden planks
across the bill to distribute the force equally.
TROUBLESHOOTING
Valve will not fit to pipe:
• Make certain that the inside cuff retainer ring has been removed prior to
fitting the valve to the pipe.
• Verify that the valve has enough area to fit over the pipe.
• If the pipe can be removed, or if an adapter ring which bolts to the wall
or inside a vault is used, a crane or high-lift may be used to lower the
valve onto the ring with the valve turned on end and the bill facing up.
Valve will not close fully, or check flow in opposing direction:
• Possible obstruction in line. Inspect the valve for entrapped foreign
objects which may have lodged between the lips of the valve.
• Valve may not be installed high enough to clear the ground under the
bill. Ensure that there is enough space between the bottom of the valve
and the ground in order to prevent contact of the two or debris
build-up.
• Backpressure may not be sufficient to completely seal the valve.
• The valve may not have been installed in a vertical position.
Valve will not stay on pipe:
• Check all clamp bolts to assure that all bolts are tightened sufficiently.
• Valve may not be fully seated onto outfall line.
• Clamps are not rotated 90° from each other in order to provide
adequate holding power.
• Valve cuff has a much larger I.D. in relation to pipe O.D.
• Make sure holding pins are used on 42" and larger check valves in order to
prevent the valve from slipping off the line.
52
WARRANTIES - REMEDIES - DISCLAIMERS - LIMITATION OF LIABILITY
Unless otherwise agreed to in writing signed by Tideflex® Technologies, all Products supplied by Tideflex® Technologies will be described in the specifications set
forth on the face hereof.
THE WARRANTIES SET FORTH IN THIS PROVISION ARE EXCLUSIVE AND IN LIEU OF ALL OTHER WARRANTIES WHETHER STATUTORY, EXPRESS OR IMPLIED (INCLUDING
ALL WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE AND ALL WARRANTIES ARISING FROM COURSE OF DEALING OR USAGE OR TRADE).
Tideflex® Technologies Products are guaranteed for a period of one year from date of shipment, against defective workmanship and material only, when properly
installed, operated and serviced in accordance with Tideflex® Technologies' recommendations. Replacement for items of Red Valve's manufacture will be made
free of charge if proved to be defective within such year; but not claim for transportation, labor or consequential damages shall be allowed. We shall have the
option of requiring the return of the defective product to our factory, with transportation charges prepaid, to establish the claim and our liability shall be limited to
the repair or replacement of the defective product, F.O.B. our factory. Tideflex® Technologies will not assume costs incurred to remove or install defective products
nor shall we incur backcharges or liquidated damages as a result of warranty work. Tideflex® Technologies does not guarantee resistance to corrosion erosion,
abrasion or other sources of failure, nor does Tideflex® Technologies guarantee a minimum length of service, or that the product shall be fit for any particular
service. Failure of purchaser to give prompt written notice of any alleged defect under this guarantee forthwith upon its discovery, or use, and possession thereof
after an attempt has been made and completed to remedy defects therein, or failure to return product or part for replacement as herein provided, or failure to
install and operate said products and parts according to instructions furnished by Tideflex® Technologies, or failure to pay entire contract price when due, shall be
a waiver by purchaser of all rights under these representations. All orders accepted shall be deemed accepted subject to this warranty which shall be exclusive
of any other or previous warranty, and shall be the only effective guarantee or warranty binding on Tideflex® Technologies, anything on the contrary contained
in purchaser's order, or represented by any agent or employee of Tideflex® Technologies in writing or otherwise, not withstanding implied warranties. Tideflex®
Technologies MAKES NO WARRANTY THAT THE PRODUCTS, AUXILIARIES AND PARTS ARE MERCHANTABLE OR FIT FOR ANY PARTICULAR PURPOSE.
Tideflex® Technologies Warranty
MAINTENANCE
Line pressure should flush the valve clean of debris in most cases. Peri-
odic inspections for trapped debris should be conducted.
In vacation seashore areas quart size plastic bottles have a tendency to
float on top and not flush through except during a major storm.
A feathered 1" x 4", 1-1/2" x 12", or suitable plank inserted into the bill
of the valve and turned 90° is a simple method of clearing the check
valve of small debris which may be trapped between the lips.
CAUTION: Sharp objects should not be used on the Tideflex® Check
Valve, as there is a chance of cutting the rubber and damaging the
protective fabric covering.
Any gouges in the cover wrap that occur should be sealed to safeguard
against ozone or chemical attack. This is best done with rubber cement
or a good brand of silicone or polyurethane rubber sealer made by the
major manufacturers.
600 North Bell Avenue
Carnegie, PA 15106
(412) 919-0919
FAX (412) 919-0918
www.tideflex.com
TF1 TF2 IOM 5/18
53
www.jensenwaterresources.com
CONTROL PANEL
54
www.jensenwaterresources.com
CONTROL PANEL WIRING DIAGRAMS
55
alifornia
otor ControlsMCBenicia, CA 94510(707) 746-6255www.cmcontrols.com
3070 Bay Vista Ct. Suite C
NEMA 3R ENCLOSURE
WITH WINDOW KIT AND INNER DOOR
48"H X 36"W X 12"D
UL508A LABELED
SHOWN WITH EXTERIOR DOOR CLOSED
2
1
3
4
4
CUSTOMER and PROJECT NAMEalifornia
otor ControlsMCBenicia, CA 94510
(707) 746-6255www.cmcontrols.com
3070 Bay Vista Ct. Suite C NONE
56
GENERIC INFORMATION SHOWN
RUNNINGPUMP 1
HAND OFF AUTO RUNNINGPUMP 2
HAND OFF AUTO
PUMP 1OUT OF SERVICE
R
PUMP 2OUT OF SERVICE
R
GENERAL FAULT
R
ON
OFF
PUMP 2
MAINDISCONNECT
alifornia
otor ControlsMCBenicia, CA 94510(707) 746-6255www.cmcontrols.com
3070 Bay Vista Ct. Suite C
ON
OFF
PUMP 1
SHOWN WITH EXTERIOR DOOR OPEN
21
25
22 (22)
26
(25)
(26)
24
23
CUSTOMER and PROJECT NAMEalifornia
otor ControlsMCBenicia, CA 94510
(707) 746-6255www.cmcontrols.com
3070 Bay Vista Ct. Suite C NONE
57
GENERIC INFORMATION SHOWN
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 4 POLE RELAY
CR12
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 4 POLE RELAY
CR13 A1 15
B1 B2 B3
18 16 A2
UR
Telemecanique
SFR1
RM22LG11MR
A1 15
B1 B2 B3
18 16 A2
UR
Telemecanique
SFR2
RM22LG11MR
H FRAME CBH FRAME CB
GNDGNDGND 10" inch FAN REVERSEDTO BLOW OUTWARD116-4315-4055 FAN KIT 10"+ + - -
Output DC24V 60W
DC OK
UNO POWERInput AC100V-240V
L N
PHOENIXCONTACT
UNO-PS/1AC/24DC/60W - 2902992PR 5202
PULSEISOLATOR
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 4 POLE RELAY
CR8
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 4 POLE RELAY
CR7
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CR1(24VDC)
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CR2(24VDC)
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CR3
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CR4
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CR11
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CRH
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CR6
FINDER94 SERIES SOCKET55 SERIES RELAYSIZE FOR 2 POLE RELAY
CRG(24VDC)
ATV 21IP20
DEPTH= 8.39"FRAME SIZE 5
ATV 21
IP20
DEPTH= 8.39"FRAME SIZE 5
X3X3X3111213 212223242526 7 8 5 6
H1 H2 H3 H4
X1 X2
150VA TRANSFORMER631-1409-301
Schneider Electric
SHOWN WITH INNER DOOR OPEN
VFD FRAME SIZE GOOD FOR
480V UP TO 40HP
208V/240V UP TO 30HP
31
3X 39
5X 38
36
4X 40
32 (32)
332X 41 33
34
42
43 44
37
35
45
CUSTOMER and PROJECT NAMEalifornia
otor ControlsMCBenicia, CA 94510
(707) 746-6255www.cmcontrols.com
3070 Bay Vista Ct. Suite C NONE
58
GENERIC INFORMATION SHOWN
CUSTOMER and PROJECT NAMEalifornia
otor ControlsMCBenicia, CA 94510
(707) 746-6255www.cmcontrols.com
3070 Bay Vista Ct. Suite C NONET3T2T1L3L2L1CB2
__A
T3T2T1L3L2L1CB1
__A
L1 L2L3T1 T2T3MAIN DISC.
100A
N.O.TEMP
TS
FAN
120VAC
POWER SUPPLY
L N
+-
1.2AMPS24VDC -
120V TO PAGE 2X3 N
PUMP 1 RUNNINGGX1 X2
PUMP 2 RUNNINGGX1 X2
VFD1
RYA RYC
VFD2RYARYC
24+24-
24VDC TO PAGE 2
FAN
BACKUP FLOATS
CR13A1 A2
CR1195 CR1295
CR1395
TO VFD 1
P24
TS1X3 11
PUMP 1 OVER-TEMP
CR7A1 A2
1
13 14
CR1312 8
CR7
10 6
TO VFD 1
F, RES
TO VFD 2
P24
TS2X3 12
PUMP 2 OVER-TEMP
CR8A1 A2
1
13 14
CR1310 6
CR8
10 6
TO VFD 2
F, RES
PUMP2
2423
AUTOOFFHAND
PUMP1
2423
AUTOOFFHAND
LOW
LEVEL
+-
RC1TR1
HIGH
LEVEL
RC2TR2
OPTIFLOAT TRANSCEIVER
OPTIFLOAT POWER SUPPLY
120VAC
POWER SUPPLY
L N
+-12VDC1.9AMPS
TM
LOW LOW WATER
CR11A1 A2
HIGH HIGH WATER
CR12A1 A2
TM
R2
TM
R1
PS1
PS2
SFR111 14
SFR21114
PUMP 1 MOISTURE
CR3
A1 A2
PUMP 2 MOISTURE
CR4A1 A2
PUMP 1 RUNNING
CR1A1 A2
PUMP 2 RUNNING
CR2
A1 A2
31
101 103
102
201 203
202
41
42
43 44
105
205
106
206
104
204
24+BROWN
A1 A2
MIN
MOISTURE
PROBES
MAX
SFR1
Pump 1
121 122
A1 A2
MIN
MOISTURE
PROBES
MAX
SFR2
Pump 2
221 222
NOTE: TERMINAL NUMBERS ARE ALSO WIRE NUMBERS
CRG95 HIGH LEVEL ALARM DOMELIGHTRX1 X245
NOTE: GROUND PUMPS ON THE VFD GROUND TERMINAL
PUMP 1
__ HP / __ FLA
R/L1
S/L2
T/L3
U/T1
V/T2
W/T3
GND
VFD 1
VFD 1 S/N:
PUMP 2
__ HP / __ FLA
R/L1
S/L2
T/L3
U/T1
V/T2
W/T3
GND
VFD 2
VFD 2 S/N:
B
(+)
A
(-)FROM PV600 COM 2BLKTO VFD 2 A(-)
REDTO VFD 2 B(+)
RED FROM VFD 1 B(+)
BLK FROM VFD 1 A(-)B
(+)
A
(-)
WHITE
12+12-
TOTAL FLA: ___A MAX
L1 L2L3480V / 3ɸ / 60Hz
X1X2X3
H4H3H2H1
120V 24V
T2T1
L2L1
CB-CCT
0.5A
CCT
460V: 120-24V
150VA
59
GENERIC INFORMATION SHOWN
HORN
HORN RELAY
CRHA1 A2
CRH9 5
NOTE 1:
NOTICE TO INSTALLER: USE 18 GA SHEILDED
AND TWISTED CABLE ON ALL ANALOG SIGNAL
WIRES.
120V FROM PAGE 1
V+OV
I0
I1
PUMP Vision
PV1200
I2
I3
I4
I5
I6
I7
I8
I9
I10
I11
I12
I13
I14
I15
I16
I17
O2
O3
O4
O5
O6
O7
O8
O9
O10
O11
V2
0V
V1
0V
24VDC FROM PAGE 1
COM
COM
O13
O14
O12
O15
O16
PUMP 1 OUT OF SERVICERX1 X2
PUMP 2 OUT OF SERVICERX1 X2
CR6
A1 A2
GENERAL ALARM CONTACTCR6
9 5
5 6
PUMP 1 HOA
"AUTO"
PUMP 2 HOA
"AUTO"
PUMP 1 HOA - AUTO
PUMP 2 HOA - AUTO
GENERAL ALARMRX1 X2
ACM
24+24-
X3 N
24-FROM 0V
24-TO ACM INPUT
O0
O1
COM2
LOW LEVEL FLOAT
FROM ISR
CR11128
HIGH LEVEL FLOAT
FROM ISR
CR12
12 8
PUMP 1 OVER-TEMP
CR7
12 8
PUMP 2 OVER-TEMP
CR8128
PUMP 1 MOISTURE
PUMP 2 MOISTURE
COM1
N
N
T+
(AN0)
18 GA SHIELDED TWISTED PAIR FOR
PRESSURE TRANSMITTER WIRING
SUBMERSIBLE
LEVEL TRANSMITTER
4-20MA
7 8
+ -
ISB
PR5104B
4-20mA
INTRINSICALLY
SAFE BARRIER
14+13-
44+42-
31 33
0V FROM 0V
CR3
9 5
CR495
HIGH LEVEL FLOATCR12
11 7
73 74
PUMP 2 SEAL FAILURECR4
12 8
67 68
PUMP 1 SEAL FAILURECR3
12 8
65 66
PUMP 2 RUNNINGCR2
9 5
63 64
PUMP 1 RUNNINGCR1
9 5
61 62
PUMP 1 OVERTEMPCR7
10 2
69 70
PUMP 2 OVERTEMPCR8
10 2
71 72
51
52
107
207
53
110
210
108
208
109
209
55
56
54
4443
4443
LT-1
GND
ETHERNET SUPPLIED BY OTHERS
(ETHERNET)
PIN 1 - (+) RED
PIN 6 - (-) BLACK
TO VFD 1
CRGA1 A2
GND
CUSTOMER and PROJECT NAMEalifornia
otor ControlsMCBenicia, CA 94510
(707) 746-6255www.cmcontrols.com
3070 Bay Vista Ct. Suite C NONE
60
GENERIC INFORMATION SHOWN
www.jensenwaterresources.com
PUMP CONTROLLER
INSTALLATION AND OPERATING MANUAL
61
California Motor Controls, Inc. Benicia, CA
InstallaƟon and OperaƟon Manual
UNIVERSAL PUMP CONTROLLER
LEVEL CONTROL
62
Level Control
i California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Table of Contents
1. Features
Overview of Standard Features ....................................................................... 1‐2
Safety ............................................................................................................... 3
Dimensions ...................................................................................................... 4‐5
ConnecƟons ..................................................................................................... 6
2. ConstrucƟon
CommunicaƟon ............................................................................................... 7‐8
Wiring ConsideraƟons ..................................................................................... 9
Wiring Diagram ................................................................................................ 10
I/O List ............................................................................................................. 11‐12
3. Sequence of OperaƟon
Pump Staging ................................................................................................... 13‐16
FVNR or RVSS, Pump Down ............................................................................. 13
FVNR or RVSS, Pump Up .................................................................................. 13
VFD, Pump Down, ProporƟon.......................................................................... 13‐14
VFD, Pump Up, ProporƟon .............................................................................. 14
VFD, Pump Down, PID Constant Level ............................................................. 14‐15
VFD, Pump Up, PID Constant Level .................................................................. 15‐16
VFD, Pump Down, PID Constant Flow .............................................................. 15‐16
AlternaƟon ....................................................................................................... 17
Alarms .............................................................................................................. 18
Logs & Trending ............................................................................................... 20
4. Main Dashboard
Main Dashboard .............................................................................................. 20‐28
5. Pump Dashboard
Pump Dashboard ............................................................................................. 29‐33
7. Trending & Logs
Main Trending Screen ...................................................................................... 34
Historical Trending Screen ............................................................................... 35‐36
Alarm Log ......................................................................................................... 37
63
Level Control
ii California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Table of Contents
7. Trending & Logs (conƟnued)
Run Log ............................................................................................................ 38
VFD Fault Log ................................................................................................... 39
8. Alarm Handler
Alarm Handler .................................................................................................. 40‐43
9. Other
ConfiguraƟon Access ....................................................................................... 44
ConfiguraƟon Menu ........................................................................................ 45
10. Set Points & Sequencing
Menu ............................................................................................................... 46
Start/Stop Set Points ....................................................................................... 47
Stop Mode ....................................................................................................... 48
Start/Stop Set Points ‐ VFD PID Mode ............................................................. 49
VFD Speed Limits ............................................................................................. 50
PID Seƫngs ‐ VFD PID Mode ............................................................................ 51‐52
AlternaƟon ....................................................................................................... 53
11. Timers
Menu ............................................................................................................... 54
Maximum Run ................................................................................................. 55
Start Delay ....................................................................................................... 56
Exercise ............................................................................................................ 57
Time Clock ....................................................................................................... 58
VFD Flush ......................................................................................................... 59
Pump Down ..................................................................................................... 60
Purge Solenoid ................................................................................................. 61
12. Alarms
Menu ............................................................................................................... 62
Menu ‐ System OpƟons ................................................................................... 63
Alarm Enable ................................................................................................... 64
Alarm ConfiguraƟon ........................................................................................ 65
OpƟon Alarm ConfiguraƟon ............................................................................ 66
64
Level Control
iii California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
13. ConfiguraƟon
Menu ............................................................................................................... 67
Number of Pumps ............................................................................................ 68
Lag Staging Mode ............................................................................................ 69
VFD/Starter Type ............................................................................................. 70
VFD/RVSS Motor Setup ................................................................................... 71
VFD/RVSSMV Ammeter and kW Meter Setup ................................................. 72
VFD Modbus IP Setup ...................................................................................... 73
OperaƟon Mode .............................................................................................. 74
Level Sensors ................................................................................................... 75‐76
Flow Meters ..................................................................................................... 77
Calculated Flow ............................................................................................... 78‐79
Analog Input CalibraƟon .................................................................................. 80
Special OpƟons Menu ...................................................................................... 81
Pump Status Indicator Color SelecƟon ................................................... 82
Analog Output FuncƟon Assignment ..................................................... 83
14. CommunicaƟon
Menu ............................................................................................................... 84
Comm Port 1 Setup.......................................................................................... 85
Comm Port 2 Setup.......................................................................................... 86
Ethernet Port Setup ......................................................................................... 87
Email Addresses ............................................................................................... 88
Email Service Provider ..................................................................................... 89‐90
CANbus ‐ Cascade Pump Control ..................................................................... 91‐92
15. Data Log ConfiguraƟon
Menu ............................................................................................................... 93
File Manager Folder SelecƟon and Status ....................................................... 94
SD Data Log Setup ........................................................................................... 95
SD Card File Manager ...................................................................................... 96
Flow Data Log Reset Times .............................................................................. 97
65
Level Control
iv California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Table of Contents
16. DiagnosƟcs
Menu ............................................................................................................... 98
Input and Output Monitor ............................................................................... 99
Alarm Test........................................................................................................ 100
ConfiguraƟon Info ............................................................................................ 101
VFD/RVSS/MV Modbus CommunicaƟon Monitor ........................................... 102
ETM and Start Counter Reset .......................................................................... 103
Maintenance Timers ........................................................................................ 104
Display Backlight and Screen Saver ................................................................. 105
Test Email ........................................................................................................ 106
Level Control Test Mode .................................................................................. 107‐109
Backup and Restore ......................................................................................... 110
Backup and Restore ‐ IniƟalizaƟon Screen ...................................................... 111
InformaƟon Mode Menu ................................................................................. 112
17. MOTOR Vision
System Overview ............................................................................................. 113
MOTOR Vision Pump Dashboards ................................................................... 114
Starter SelecƟon .............................................................................................. 115
Insight Dashboard ............................................................................................ 116‐117
Insight Overload ConfiguraƟon ........................................................................ 118‐119
U‐Line Dashboard ............................................................................................ 120‐122
U‐Line Starter ConfiguraƟon ............................................................................ 123
18. Other
System Clock and NIST Server Setup ............................................................... 124
Text Entry Screen ............................................................................................. 125
66
Level Control
1 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The PUMP Vision PV1200 is considered a “universal pump controller” because it can be configured to
operate up to four pumps in the three main water/waste water applicaƟons; Pressure Booster, Level ,
and Well Pump control. The PV1200 combines these three applicaƟons into one easy to use, cost
effecƟve controller without compromising features or funcƟons.
When the controller is first iniƟalized, one of the three applicaƟon modes is selected, and the control‐
ler then boots up in the specific applicaƟon mode (Pressure Booster, Level, or Well Pump). and pro‐
vides all of the necessary “Dashboard” screens needed to provide the user with the most advanced and
intuiƟve pump control available.
While the three applicaƟon modes share many common configuraƟon features, the PV1200 operaƟons
manual is broken into three separate manuals to help simplify the manual for the user who will be in‐
terested in only one of the modes anyway. This manual address the Level Control mode.
Overview of PUMP Vision PV1200 Level Control
PUMP DASHBOARD ‐ A pump dashboard provides control of the
pump and an overview of pump status and running condiƟons.
BuƩons are provided to access the pump Run Log, VFD Alarm Log.
MAIN DASHBOARD ‐ A main dashboard provides an overview of the
enƟre pump staƟon status including pump, level, alarm, flow, and
more. Easy access is provided to data logs, pump dashboards, setup
and alarm handler.
SETUP AND CONFIGURATION ‐ Numerous screens present the appli‐
caƟon’s setup and configuraƟon opƟons to the user in an easy to
understand and operate format. This manual provides a guide
through those screens.
Please see the PV1200 Brochure for more details of the features in
an overview format.
Overview of Standard Features
67
Level Control
2 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The PUMP Vision PV1200 is housed in a rugged 9.62” x 12.32” case that can be door mounted with NEMA 4X or
IP65 protecƟon. All wiring is terminated at pull out terminals, making it simple to replace the unit should the
need arise.
The backlit 800 x 600 pixel 12.1” TFT QVGA, LCD display is graphical and can display any font type, bitmap images,
and animated graphics.
If the PUMP Vision’s data logger funcƟon is enable, a removable SD memory card is required. A 7 year baƩery is
provided to retain the Real Time Clock memory.
The PUMP Vision base unit includes 18 digital inputs, 4 analog inputs and 15 relay type outputs. Two of the in‐
puts can be used as high‐speed counter inputs. The base configuraƟon is suitable for most applicaƟons of up to
four pumps. AddiƟonal I/O, up to 128 points, can easily be added with the modules mounƟng on standard DIN
rail. Digital, analog, RTD and other types of I/O are available.
CommunicaƟon
Two RS232C or RS485 (user configurable) ports and an (opƟonal) Ethernet port are provided and each can be
used to program the unit, or connect to other controllers in a network.
These ports can each be set to communicate with the Modbus protocol
and the PUMP Vision can be set to operate as a Modbus master or
slave. In the Modbus master mode, the PV1200 controls VFDs, RVSS
starters, and MOTOR Vision starters. In the slave mode the PV1200
connects to BAS and SCADA systems and other monitoring equipment.
Remote Access
One of the remote control opƟons available for the PUMP Vision PV1200 is our Remote Operator soŌware. Once
connected to the PUMP Vision, either directly through the COM port, or through a remote connecƟon method
such as dial‐up modem (land‐line or GSM cellular), Internet, or radio, a user can open the Remote Access soŌ‐
ware program that provides a “virtual” PUMP Vision on the screen of the PC. This soŌware can be downloaded
from our Website
OperaƟon of the system is idenƟcal to being there. The user simply uses the mouse to press the “buƩons” of the
on‐screen version of the PUMP Vision. All of PUMP Vision informaƟon and set point screens can be accessed.
The pumps can be started and stopped. Alarm messages can be
read, set points can be changed, data and trends can be viewed.
Overview of Standard Features
68
Level Control
3 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
SAFETY CONSIDERATIONS
• Failure to comply with appropriate safety guidelines can result is severe personal injury or
property damage. Always exercise proper cauƟon when working with electrical equipment.
• Do not aƩempt to use the controller with voltage exceeding permissible levels. Permissible
voltage levels are listed in the technical specificaƟons provided in this manual.
• Install an external circuit breaker or fuse and take all appropriate safety measures against
short‐circuiƟng in external wiring.
• Do not install in areas with: excessive or conducƟve dust, corrosive or flammable gas, mois‐
ture or rain, excessive heat, regular impact shocks or excessive vibraƟon.
• Do not place in water or let water leak onto the controller.
• Do not allow debris to fall inside the unit during installaƟon.
• Double‐check all the wiring before turning on the power supply.
• Ascertain that terminal blocks are properly secured in place.
• Do not touch live wires.
• Stay as far as possible for high‐voltage cables and power equipment..
• Leave a minimum of 10mm space for venƟlaƟon between the top and boƩom edges of the
controller and the enclosure walls.
• A non‐isolated power supply can be used provided that a 0V signal is connected to the chas‐
sis.
• Standard safety consideraƟons require that metal cabinet panels be grounded to avoid elec‐
trocuƟon.
• Do not connect either the Neutral or Line signal of the 120VAC circuit to the device’s 0V ter‐
minal.
• In the event of voltage fluctuaƟons, or non‐conformity to voltage power supply specifica‐
Ɵons, connect the device to a regulated power supply.
• The wiring of this device is specifically designed to be safe any easy. A technician or engi‐
neer trained in the local and NaƟonal Electric Code should perform all tasks associated with
the electrical wiring of the device.
Safety
69
Level Control
4 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Dimensions
70
Level Control
5 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Panel MounƟng
Before you begin, note that the panel
itself cannot be more that 0.197” thick.
1.Make a panel cut‐out that measures
185mm x 128mm (7.283” x 5.039”).
2.Check the seal that is placed over the
back of the unit. The seal must fit
snugly against the back rim of the
operaƟng panel.
3.Slide the controller into the cut‐out.
4.Push the four black plasƟc mounƟng
brackets into their slots on the sides
of the controller.
5.Tighten the bracket screws against the
panel. Hold the bracket securely
against the unit while Ɵghtening
the screw.
Dimensions
71
Level Control
6 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
ConnecƟons
72
Level Control
7 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The PUMP Vision PV1200 has two serial ports. Both can be set for RS232 or RS485 independently.
The PUMP Vision is connected directly to the PC with a standard RJ11 type cable which should not be longer than
10’ when using RS232. An RJ11 to 9 pin D connector is used to connect to the PC.
CommunicaƟon Ports
RS232/RS485:
DIP Switch
Settings
The settings be-
low are for each
Switch Settings
1 2 3 4 5 6
RS232* ON ON ON OFF ON OFF
RS485 OFF OFF OFF ON OFF ON
RS485 with ter-
mination**
ON ON OFF ON OFF ON
*Default factory
setting
**Causes the unit
to function as an
end unit in an
RS485 network
73
Level Control
8 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
RS485
Use RS485 to create mulƟ‐drop network containing up to 32 staƟons, or for Modbus communicaƟons.
Note that
when a port is
set to RS485, both RS232 and RS485 can be used simultaneously if flow control signals DTR and DSR are not used.
•Note that the ports are not isolated. If the controller is used with a non‐isolated external device,
avoid potenƟal voltage that exceeds ±10V.
•To avoid damaging the system, all non‐isolated device ports should relate to the same ground sig‐
nal.
•Use shielded, twisted pair cable.
•Minimize the drop length leading form each device to the bus.
•Ideally, the main cable should be run in and out of the network device.
•Do not cross posiƟve (A) and negaƟve (B) signals. PosiƟve terminals must be wired to posiƟve and
negaƟve terminals to negaƟve.
CommunicaƟon Ports
74
Level Control
9 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
.
On‐board I/O
I/O connecƟon points are provided by external connectors at the top and boƩom of the controller. The connect‐
ors plug in, enabling quick and easy removal. They provide screw‐type connecƟon points for the power source,
inputs an outputs. The connecƟon points are clearly labeled on the controller itself.
The top generally provides connecƟons for the power supply, analog inputs and digital inputs. The boƩom con‐
nector provides terminals for the relay outputs.
ConnecƟons to the Controller
1.Strip the wire to a length of 0.250‐0.300 inches.
2.Unscrew the terminal to its widest posiƟon before inserƟng a wire.
3.Insert the wire completely into the terminal to ensure a proper connecƟon.
4.Tighten enough to keep the wire from pulling free.
5.Use 14 gauge to 26 gauge wire.
6.Do not exceed 1 inch pounds of torque.
7.We recommend crimp connectors (ferrules) on the wire ends.
Wiring ConsideraƟons
•A technician or engineer trained in the local and NaƟonal Electric Code should perform all tasks
associated with the electrical wiring of the controller.
•Input or output cables should not be run though the same mulƟcore cable or share the same wire.
•Do not lay input or output cables near high voltage power cables.
•Allow for voltage drop and noise interference with input and output lines used over an extended
distance. Use wire that is properly sized for the current load.
•Double‐check all the wiring before turning on the power supply.
•Unused I/O terminals should not be connected. Ignoring this direcƟve may damage the controller.
Wiring
75
Level Control
10 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Wiring Diagram
Typical Wiring Diagram for Constant Speed or VFD Mode
76
Level Control
11 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Connect input and output devices as needed.
Digital Inputs
I0 Redundant backup low level float switch
I1 Redundant backup high level float switch
I2 Pump 4 seal failure
I3 Pump 1 HOA ‐ AUTO
I4 Pump 2 HOA ‐ AUTO
I5 Pump 3 HOA ‐ AUTO
I6 Pump 4 HOA ‐ AUTO
I7 Pump 1 Run Input
I8 Pump 2 Run Input
I9 Pump 3 Run Input
I10 Pump 4 Run Input
I11 Pump 1 over‐temperature
I12 Pump 2 over‐temperature
I13 Pump 3 over‐temperature
I14 Pump 4 over‐temperature
I15 Pump 1 seal failure
I16 Pump 2 seal failure
I17 Pump 3 seal failure
OpƟonal
I32 Generator running
I33 Generator fault
I34 Power failure
I35 UPS failure
I36 Dry well water
I37 Intrusion
I38 Low level float switch/Mutli‐segment 1/OpƟon alarm 1
I39 High level float switch/Mutli‐segment 2/OpƟon alarm 2
I40 Stop float switch/Mutli‐segment 3
I41 Start float switch/Mutli‐segment 4
I42 Start 1st lag pump float switch/Mutli‐segment 5
I43 Start 2nd lag pump switch/Mutli‐segment 6
I44 Start 3rd lag pump switch/Mutli‐segment 7
I45 Low level float switch/Mutli‐segment 8/OpƟon alarm 3
I46 Low level float switch/Mutli‐segment 9/OpƟon alarm 4
I47 Low level float switch/Mutli‐segment 10/OpƟon alarm 5
Analog
AN0 4‐20mA Primary level sensor
AN1 4‐20mA Secondary level sensor
AN3 4‐20mA Flow Meter
I/O List
77
Level Control
12 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Digital Outputs
O0 General Alarm Indicator
O1 Pump 4 failure
O2 Pump 1 Run
O3 Pump 2 Run
O4 Pump 3 Run
O5 Pump 4 Run
O6 Pump 1 out of service
O7 Pump 2 out of service
O8 Pump 3 out of service
O9 Pump 4 out of service
O10 Horn
O11 High level alarm
O12 Low level alarm
O13 Pump 1 failure
O14 Pump 2 failure
O15 Pump 3 failure
O16 General Alarm Contact
Analog Outputs
AOUT0 4‐20mA VFD 1 speed reference
AOUT1 4‐20mA VFD 2 speed reference
AOUT2 4‐20mA VFD 3 speed reference
AOUT3 4‐20mA VFD 4 speed reference
(these are used only if VFDs are not connected by network to the PV1200)
I/O List
78
Level Control
13 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
When the PV1200 has been fully configured, all of the level control set points have been entered and all alarm
condiƟons are saƟsfied, the system is ready to operate. The PV1200 has a “dashboard” for each pump that pro‐
vides a HAND‐OFF‐AUTO selector switch for control of the pump. When in the HAND posiƟon, the PV1200 will
command the pump to run as long as there are no alarm condiƟons that are configured for pump shutdown on
fault. In the AUTO posiƟon, the pumps will run when called by the pump sequencer. The PV1200 can be config‐
ured in a number ways since the sequencer has two parts; the pump stager and the alternator. The pump stager
calls for the pumps as needed based on the level set points. The alternator determines which pump will run
when the stager calls.
PUMP STAGING
FVNR or RVSS Starters, Pump Down OperaƟon
When the PV1200 is configured for Pump Down operaƟon, the pumps work to empty the tank or sump.
When then level of the liquid in the tank or sump rises to the Start Lead Pump set point, the lead pump starts. In
mulƟple pump systems, if the level conƟnues to rise to the Start Lag Pump set points, the lag pumps start, in se‐
quence.
When liquid level drops to the Stop Pump set point(s), the pump(s) stop. The pumps stop at individual stop set
points if the PV1200 is in MulƟpoint Stop mode, or all at once if in the Single Point Stop mode.
FVNR or RVSS Starters, Pump Up OperaƟon
When the PV1200 is configured for Pump Up operaƟon, the pumps work to fill the tank or other vessel.
When then level of the liquid in the tank falls to the Start Lead Pump set point, the lead pump starts. In mulƟple
pump systems, if the level conƟnues to fall to the Start Lag Pump set points, the lag pumps start, in sequence.
When liquid level rises to the Stop Pump set point(s), the pump(s) stop. The pumps stop at individual stop set
points if the PV1200 is in MulƟpoint Stop mode, or all at once if in the Single Point Stop mode
VFD Starters, Pump Down OperaƟon, ProporƟon Mode
When then level of the liquid in the tank or sump rises to the Start Lead Pump set point, the lead pump starts and
accelerates to its proporƟonal point in the ProporƟon Band. In mulƟple pump systems, if the level conƟnues to
rise to the Start Lag Pump set points, the lag pumps start, in sequence and at thir respecƟve proporƟonal speed
set points.
When liquid level drops, the pumps ramp down in speed, following the proporƟon band, to the Stop Pump set
point(s), the pump(s) stop. The pumps stop at individual stop set points if the PV1200 is in MulƟpoint Stop mode,
or all at once if in the Single Point Stop mode.
ProporƟon Mode ‐ The speed of the pumps is directly proporƟonal to the posiƟon of the liquid within the “level
band”. The level band is the distance between the last Lag Pump Start set point in the system (second pump in a
duplex, third in a triplex, etc.) where the pumps will run at maximum speed, and the Stop Lead Pump set point
when the pumps will be running at their minimum speed.
SEQUENCE OF OPERATION
Pump Staging
79
Level Control
14 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
SEQUENCE OF OPERATION
Pump Staging
The speed of the pumps is linearly proporƟonal those two points.
An example system: A triplex (three pump) system
The start set point for the 2nd lag pump is 5.0’
The start set point for the 1st lag pump is 4.0’
The start set point for the 1st lag pump is 3.5’
The stop set point for the lead pump is 2.0’
Level Band ‐ In this example, the level band is 3.0’, which is the difference between the 2nd lag start set point and
the stop lead pump set point.
In the VFD configuraƟon, the VFDs are set up to have a maximum speed of 100% and a minimum speed of 40%
due to the pump curves. In this example, the Speed Band is 60%.
In this example, the lead pump will start at 70% speed and if the level rises, the speed of the pump rises. At the
1st Lag Pump Start set point, the second pump will start and the speed of the pumps will be 80%. If the level ris‐
es to the 2nd Lag Pump Start set point, the third pump will start and the speed of all pumps will be 100%.
When the level drops, the speed of the pumps drop unƟl the stop set points, where the speed of the pump(s) will
be at 40%.
VFD Starters, Pump Up OperaƟon, ProporƟon Mode
When then level of the liquid in the tank or sump drops to the Start Lead Pump set point, the lead pump starts
and accelerates to its proporƟonal point in the ProporƟon Band. In mulƟple pump systems, if the level conƟnues
to drop to the Start Lag Pump set points, the lag pumps start, in sequence and at their respecƟve proporƟonal
speed set points.
When liquid level rises, the pumps ramp down in speed, following the proporƟon band, to the Stop Pump set
point(s), the pump(s) stop. The pumps stop at individual stop set points if the PV600 is in MulƟpoint Stop mode,
or all at once if in the Single Point Stop mode.
See the above descripƟon of the ProporƟon Mode for an example of how the speed of the pumps is controlled as
the same example could be used with reversed set points.
VFD Starters, Pump Down OperaƟon, PID Mode ‐ Constant Level
The PID mode is used to maintain a specific level in a tank or sump. Depending on the configuraƟon, the pump(s)
may or may not ever shut down.
When the liquid level rises to the Start Lead Pump set point, the lead pump Start Delay Timer begins Ɵming,
When the Ɵmer expires, the lead pump VFD will start and immediately ramp to the minimum speed set point at
the rate programmed into the VFD acceleraƟon funcƟon (CMC recommends a 5 second VFD acceleraƟon set
point).
When the VFD reaches Minimum Speed, the PID loop begins and the speed of the pump will be modulated to
maintain the Target Level set point. With each sample cycle, a change may be made to the VFD speed, propor‐
Ɵonal to the level deviaƟon from the Target Level set point.
80
Level Control
15 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
SEQUENCE OF OPERATION
Pump Staging
The speed of the VFD can increase up to the Maximum Speed set point and can decrease to the Minimum Speed
set point. The speed changes occur at the interval set in the Sample Cycle Ɵmer.
The proporƟon of the speed change can be adjusted in the PID setup screen, and is entered as a raƟo of 0.1 Ō. :
1% Speed.
If a 1.0 : 1 raƟo is set, the VFD speed will change 1% for each 0.1 feet of deviaƟon from target set point.
The amount of change is limited by the Trim set points. The Trim set points are used to keep the VFD speed from
changing too much in reacƟon to a high deviaƟon from set point. LimiƟng the change will prevent the VFD from
going to Maximum speed or Minimum speed with it doesn’t need to.
As the level rises, the pumps that are running speed up to try to maintain the target set point. When the speed
of the running VFDs meets or exceeds the Lag Pump Start set point, the Lag Pump Start Delay Ɵmer begins Ɵm‐
ing. When the Ɵmer expires, the lag pump will start and ramp up to the VFD speed reference (the speed at which
the pumps are running). The pump accelerates at the rate programmed into the VFD acceleraƟon funcƟon (5
seconds Accel and Decel Ɵmers are recommended).
All running pumps modulate at the same speed. In triplex and quadruplex systems, the lag pumps all start in the
same manner, each with separate Start Delay Ɵmers.
As the level drops, the speed of the pumps slows. When the speed reaches the Lag Stop set point, the last pump
to start shuts down first. When it drops out, the speed of the pumps that are running may speed up to maintain
level, or depending on the influent condiƟon, the speed may stay below the Lag Stop set point and the next pump
in the sequence will de‐stage.
The lead pump will stop if the level drops to the Lead Pump Stop set point. This will only happen if the inflow is
less than what the lead pump will handle when running at minimum speed.
VFD Starters, Pump Up OperaƟon, Mode ‐ Constant Level
When the liquid level drops to the Start Lead Pump set point, the lead pump Start Delay Timer begins Ɵming,
When the Ɵmer expires, the lead pump VFD will start and immediately ramp to the minimum speed set point at
the rate programmed into the VFD acceleraƟon funcƟon (CMC recommends a 5 second VFD acceleraƟon set
point).
When the VFD reaches Minimum Speed, the PID loop begins and the speed of the pump will be modulated to
maintain the Target Level set point. With each sample cycle, a change may be made to the VFD speed, propor‐
Ɵonal to the level deviaƟon from the Target Level set point.
As the level drops, the pumps that are running speed up to try to maintain the target set point. When the speed
of the running VFDs meets or exceeds the Lag Pump Start set point, the Lag Pump Start Delay Ɵmer begins Ɵm‐
ing. When the Ɵmer expires, the lag pump will start and ramp up to the VFD speed reference (the speed at which
the pumps are running). The pump accelerates at the rate programmed into the VFD acceleraƟon funcƟon (5
seconds Accel and Decel Ɵmers are recommended).
All running pumps modulate at the same speed. In triplex can quadruplex systems, the lag pumps all start in the
same manner, each with separate Start Delay Ɵmers.
81
Level Control
16 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
SEQUENCE OF OPERATION
Pump Staging
As the level rises, the speed of the pumps slows. When the speed reaches the Lag Stop set point, the last pump
to start shuts down first. When it drops out, the speed of the pumps that are running may speed up to maintain
level, or depending on the effluent condiƟon, the speed may stay below the Lag Stop set point and the next
pump in the sequence will de‐stage.
The lead pump will stop if the level rises to the Lead Pump Stop set point. This will only happen if the ouƞlow is
less than what the lead pump will handle when running at minimum speed.
VFD Starters, Pump Down OperaƟon, PID Mode ‐ Constant Flow
The Constant Flow Mode is used to pump out a sump, but limit the amount of flow out of the pumps. This mode
of operaƟon requires a hardwired flow meter, either pulse or 4‐20 mA, be connected to the PUMP Vision.
When the liquid level rises to the Start Lead Pump set point, the lead pump Start Delay Timer begins Ɵming,
When the Ɵmer expires, the lead pump VFD will start and immediately ramp to the minimum speed set point at
the rate programmed into the VFD acceleraƟon funcƟon (CMC recommends a 5 second VFD acceleraƟon set
point).
When the VFD reaches Minimum Speed, the PID loop begins and the speed of the pump will be modulated to
maintain the Maximum Discharge Flow Rate set point. With each sample cycle, a change may be made to the
VFD speed, proporƟonal to the flow deviaƟon from the Maximum Flow set point.
The speed of the VFD can increase up to the Maximum Speed set point and can decrease to the Minimum Speed
set point. The speed changes occur at the interval set in the Sample Cycle Ɵmer.
The proporƟon of the speed change can be adjusted in the PID setup screen, and is entered as a raƟo of 1.0.
GPM. : 1% Speed.
If a 1.0 : 1 raƟo is set, the VFD speed will change 1% for each gallon per minute of deviaƟon from target flow set
point.
The amount of change is limited by the Trim set points. The Trim set points are used to keep the VFD speed from
changing too much in reacƟon to a high deviaƟon from set point. LimiƟng the change will prevent the VFD from
going to Maximum speed or Minimum speed with it doesn’t need to.
As the flow increases, the pumps that are running speed up to try to maintain the target flow set point. When
the speed of the running VFDs meets or exceeds the Lag Pump Start set point, the Lag Pump Start Delay Ɵmer
begins Ɵming. When the Ɵmer expires, the lag pump will start and ramp up to the VFD speed reference (the
speed at which the pumps are running). The pump accelerates at the rate programmed into the VFD acceleraƟon
funcƟon (5 seconds Accel and Decel Ɵmers are recommended).
All running pumps modulate at the same speed. In triplex and quadruplex systems, the lag pumps all start in the
same manner, each with separate Start Delay Ɵmers.
As the flow decreases, the speed of the pumps slows. When the speed reaches the Lag Stop set point, the last
pump to start shuts down first. When it drops out, the speed of the pumps that are running may speed up to
maintain level, or depending on the influent condiƟon, the speed may stay below the Lag Stop set point and the
next pump in the sequence will de‐stage.
The lead pump will stop if the level drops to the Lead Pump Stop set point.
82
Level Control
17 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Jockey AlternaƟon
In Jockey AlternaƟon mode, Pump 1 is always the first pump to run. The remaining lag pumps are alternated as if
they were in a full alternaƟon sequence. For example, in a triplex jockey alternaƟon system where the first lag
called in this cycle is Pump 2, the next pumping cycle will call Pump 3 as the first lag. Jockey AlternaƟon is only
available for triplex and quadruplex systems.
Full AlternaƟon
Each Ɵme a pumping cycle starts aŌer the system has been at rest, the next pump in sequence will be the lead
pump. So if pump 1 is lead pump in this cycle, Pump 2 will be lead pump in the next cycle. The other pump(s) in
the system will start as lag pump(s) as needed.
Constant Lead
In Constant Lead mode, a certain pump is selected to always be the lead pump.
Slave Mode
The PV1200 can be configured to run any individual lag pump as a “slave” to the lead pump. When a lag
pump is set to Slave mode, it will run in unison with the lead pump.
Standby Mode.
The PV1200 can be configured to run any individual lag pump as a “standby pump” to the system. The
standby pump only runs if another called pump has failed. This is used when there are more pumps in the
system than there is capacity to handle the flow, and the extra pump(s) are in the system for redundancy.
SEQUENCE OF OPERATION
AlternaƟon
83
Level Control
18 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Alarm CondiƟons
All alarm condiƟons with operate according to the way they are set up. Each alarm can opƟonally be set up to:
Be enabled or disabled
Stop the pumps
Require manual reset
Sound the horn
Light the alarm light
Flash the alarm light
Close the alarm contact
Send an email
User adjustable Ɵme delay
All enabled alarm condiƟons will be logged into the alarm data logger.
All enabled alarm condiƟons will be managed by the fault handler.
For all alarm condiƟons, touching the screen of the PV1200 will silence the horn output.
Inputs are provided for the following alarm condiƟons:
High Level ‐ Main Level Sensor
Low Level ‐ Main Level Sensor
Transducer Failure
Pump Failure
MOTOR Vision Fault
VFD Failure
High Level Alarm ‐ Backup Float Switch
Low Level Alarm ‐ Backup Float Switch
High Temperature
Moisture in Motor
In VFD mode the VFD Fault condiƟons are monitored through Modbus and annunciated on the controller.
Pump Failure
This condiƟon is determined by the motor starter failing to close an input to the controller within a preset Ɵme
period. If a pump fails to start, the pumping duty is automaƟcally transfer to the next available pump in se‐
quence.
The pump can be taken “Out‐of‐Service” and this failure alarm is prevented, by puƫng either the “soŌ” HOA, or
the panel HOA into the OFF posiƟon. This allows maintenance of the pump without generaƟng an alarm condi‐
Ɵon. As with a pump failure condiƟon, the pumping duty is automaƟcally transferred to the remaining pump(s).
SEQUENCE OF OPERATION
Alarms
84
Level Control
19 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Fault Data Logging
Fault condiƟons are logged into memory with a date and Ɵme stamp. When a fault condiƟon occurs, the fault
status indicator will light on the main screen and the Alarm Log will display any acƟve faults. Touching the fault
status indicator will take the user to the Alarm Handler, where alarm condiƟons can be viewed and managed.
The Alarm Log will display any acƟve alarms. Touching the Alarm Log buƩon will allow the user to scroll through
any acƟve alarms if more than one are present. Holding the Alarm Log will take the user to the System Alarm
Log, where details including the Ɵme date, Ɵme of occurrence and alarm condiƟon can be viewed and managed.
The screen can be scrolled down through the past 1000 fault condiƟons. When the screen is exited and then re‐
entered, the log automaƟcally returns to showing the latest fault condiƟons.
Trending
The on screen trending graph plots the sump or tank level with a reading saved every second. It saves history for
the past 1.5 hours. The graph can be scrolled by the user to view the history. The opƟonal micro SD card records
the trend data in a file that is automaƟcally created once a month. A maximum of 63 months is retained on the
SD card.
SEQUENCE OF OPERATION
Logs and Trend Graphs
85
Level Control
20 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
For each applicaƟon type, the PUMP Vision PV1200 has a Main Dashboard that provides a complete overview of
the system status and touch access to pump dashboards, logs, trends, set points, and complete system configura‐
Ɵon.
Main Dashboard Screen Elements and FuncƟons
Status Bar ‐ Depending on the current display, the top of the screen status bar may display the name of the current
display screen, system level, baƩery status, level, date and Ɵme. A Status Bar is on every display screen in the
PV1200 controller. All Status Bars include the display name, and most include the level display.
Menu Bar ‐ Depending on what screen you are on, different menu opƟons appear. The Main Dashboard’s Menu
Bar includes buƩons to access the Pump Dashboards and the Setup display.
Alarm Bar ‐ The Main Dashboard’s Alarm Bar includes two alarm message bars, Alarm Handler buƩon, Alarm Si‐
lence, Alarm Test, and Alarm Reset buƩons.
StaƟon Status Overview ‐ The staƟon status overview area shows pump call and run status, digital and graphic
level display, set point display and access to modificaƟon, and flow status.
Pump Status Overview ‐ An overview is provided for each pump configured in the system. Pump status, HOA, run
data, and access to Pump Dashboards and MOTOR Vision data is available.
Pump Status
Overview
MAIN DASHBOARD
Status Bar
Alarm Bar
Menu Bar
StaƟon Status
Overview
86
Level Control
21 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
A blue status bar is at the top of each screen in the PV1200. The status bar includes:
Display Name ‐ MAIN DASHBOARD ‐ Touch for program informaƟon (only on the Main Dashboard).
BaƩery Status ‐ This buƩon will give instrucƟons on how to change the baƩery. It will change color to yellow and
display a warning message when the baƩery is low. The PV1200 uses a 3V Lithium CR2450N coin type baƩery
that is located behind a user accessible cover in the back of the unit. The lithium baƩery will last for up to 10
years in the PV1200 if the unit is kept powered up. The baƩery is used to maintain the current Ɵme, and to retain
the system configuraƟon and user set points that are stored in RAM memory. Note: the configuraƟon and user
set points are also stored in non‐volaƟle Flash RAM memory if the system has been backup up, but the PV1200
will need user intervenƟon to restore the system if the power fails while the baƩery is dead.
System Time ‐ Displays the current system Ɵme. Touch the buƩon to set Time and Date of the PV1200. The sys‐
tem Ɵme is used to provide a date and Ɵme stamp to system events, data logging, and trending. Keeping the
Ɵme accurate will assist in providing useful diagnosƟc informaƟon. When the PV1200 is connected to the Inter‐
net, it can keep the date and Ɵme current automaƟcally with periodic connecƟon to an NIST Time Server.
System Date ‐ Displays the current date. The date is changed in the System Time setup screen.
Level ‐ The level is shown on nearly all screens except the Main Dashboard on the right side of the Status Bar.
MAIN DASHBOARD
Status Bar
System Time Display
Name
System Date
BaƩery Status
87
Level Control
22 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Main Alarm Message Bar ‐ If there are active alarms, this message bar displays the alarm condition. If there are no
alarms, SYSTEM NORMAL is displayed.
Touching the message text will scroll through all of the active alarm conditions if more than one condition is ac‐
tive. The main message bar shows the 10 possible level control alarms.
Option Alarm Message Bar ‐ If there are active option alarms, this message bar displays the alarm condition. If
there are no alarms, the bar is blank.
Touching the message text will scroll through all of the active alarm conditions if more than one condition is ac‐
tive. The option message bar shows the 10 possible option alarms.
Reset ‐ This button only appears when there is a fault condition that can be manually reset. Touching the button
will reset the alarm if the condition has cleared.
Number of Active Alarms ‐ If there are active alarms, this button displays red and indicates the number of active
alarm conditions. Touch the button for the Alarm Handler. The button does not appear if there are no
unacknowledged alarms.
Alarm Test/Alarm Silence ‐ Touch the button for the Alarm Test screen. This button will read “SILENCE” when the
horn is sounding as it doubles as the alarm silence button.
Alarm Test/
Alarm Silence
Main Alarm
Message Bar
Reset
Alarm Handler
BuƩon
OpƟon Alarm
Message Bar
MAIN DASHBOARD
Alarm Bar
88
Level Control
23 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The StaƟon Status area of the Main Dashboard displays the status of the pump status in one secƟon.
Sensor Source ‐ When the optional Secondary Level Sensor is installed, touch the label to toggle the displayed value
of the two sensors and to change the Level Status display. A three minute timer automatically reverts the display
to the primary sensor unless the primary is failed, and then the backup becomes the default display.
All modes of level sensing are monitored for failure. The 4‐20 mA sensors are monitored for out of
range signals, and the floats and multi‐probe are monitored for switches out of sequence. If there is a
failure of either the primary or secondary sensor, it will be indicated on the level label.
The system automatically transfers to the backup level sensor if the primary sensor fails.
Digital Level Display ‐ Liquid level display in tenths of feet.
The PV1200 level controller can be configured to have a primary and an optional secondary level sensor.
The sensors can be any 4‐20 MA sensor, float switches, or 10 segment probe (multi‐probe). Regardless
of sensor type, the level is displayed digitally. With float switches and multi‐probe, the level is interpret‐
ed by the closure of level switches.
Flow Rate and Total ‐ When the system is configured for either a wired flow meter or calculated flow, the flow data
is displayed here. The flow rate and total gallons are shown. When configured for calculated flow, a negative
number appears when no pumps are running, showing the calculated inflow rate.
Flow Rate
And Total Digital Level Display
Sensor Source
MAIN DASHBOARD
StaƟon Status
89
Level Control
24 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
High Level Alarm Status ‐ The status of the high level alarm and the redundant high level alarm is shown here, if
configured in the system. When the condition is triggered a warning message is displayed. The alarm message is
displayed when the alarm timer has expired. The area is blank if there are no current alarm conditions.
Low Level Alarm Status ‐ The status of the low level alarm and the redundant low level alarm is shown here (no
current alarm condition is shown), if configured in the system. When the condition is triggered a warning mes‐
sage is displayed. The alarm message is displayed when the alarm timer has expired. The area is blank if there
are no current alarm conditions.
Pumps Called ‐ As the level rises (or drops in tank fill applications) the pump start set points are tripped and pumps
are “called” to run. This field indicates either:
SYSTEM IS IDLE
(X number) PUMPS RUNNING
TIME CLOCK SHUTDOWN
The color of the text changes from green for idle, amber for one pump called, and red for more than one pump
called.
Pumps Running ‐ This field responds back with the number of pumps running and is blank when no pumps are run‐
ning.
Graphic Level Display—Liquid Fill ‐ The column graph display of the liquid level is scaled to the same range as the
level sensor and “fills” with blue liquid proportional to the level in the sump or tank.
High Level
Alarm Status
Low Level
Alarm Status
Pumps Running
Pumps Called
Graphic Level
Display
Tank Fill Mode
Graphic Level
Display
Sump Mode
MAIN DASHBOARD
StaƟon Status
90
Level Control
25 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Change Set Points
Sensor Source ‐ The user enter
Level Set Points and Status ‐ The user entered set points from the setup screen are shown here and can be modi‐
fied from here by touching the LEVEL SETUP buƩon and entering the Level 1 User password.
Set Point Status Labels ‐ The set point’s funcƟon label changes color to indicate status:
Black = Level below set point
Orange = Level above set point
Red = Alarm condiƟon
Pump Status ‐ The status of each pump is shown in text and color. With VFD systems, the frequency of the VFD is
also displayed. The color key for the pump status:
GRAY = Pump stopped
GREEN = Pump running
RED = Pump failed
BLUE = Pump Out‐of‐service
LIGHT BLUE = Pump needs maintenance
YELLOW = Pump called, but not yet running
ORANGE = Remote run command (external to the PUMP Vision).
Change Set Points ‐ Touch this buƩon to enter the Level 1 password and change the set points.
Pump Status
Level Set Points
And Status
MAIN DASHBOARD
StaƟon Status
91
Level Control
26 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Menu ‐ The menu bar at the boƩom of the Main Dashboard screen provides access to:
LEVEL SETUP Access to Level 1 password screen and then level control set point ediƟng.
TIMERS Access to the Timer Menu.
ALTERNATION Access to the AlternaƟon Setup screen.
LOGS Access to the Alarm Log. From the Alarm Log, access to the Run Log and Flow
Logs.
TRENDS Access to the Main Trend screen, From the Main Trend, access to the Trend His‐
tory and Flow Trends.
CONFIGURATION Access to all levels of controller configuraƟon
VFD Speed Reference ‐ Displays the speed command to the VFDs in percentage of maximum speed. Not displayed
when the system is not configured for VFDs.
Alternation Status ‐ The pump alternation sequence mode and the current lead pump status is displayed here. For
more information on the modes and setup of the alternator, refer the Alternator page of this manual.
Pump Mini‐Dashboard ‐ A “mini” dashboard is provided for each pump configured in the system. The features and
functions shown above for Pump 2 are the minimum provided. In VFD or MOTOR Vision systems, pump running
current and frequency may be shown. Each pump has an operational HOA selector switch to manually control
the pumps. An option can eliminate the OFF position of the HOA.
Pump Dashboard ‐ Touch these buttons to access the full Pump Dashboard for each pump.
Menu
AlternaƟon
Status
VFD Speed
Reference
Pump Mini‐
Dashboard
Pump
Dashboard
MAIN DASHBOARD
Pump Mini Dashboard
92
Level Control
27 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The Status and Set Points screen displays the operaƟonal set points for all pumps and alarms. The set points can
be changed by touching the LEVEL SETUP buƩon on the menu bar. The user is taken to a Level 1 password entry
screen. AŌer the password is successfully entered, the desired set point can be altered by touching the entry
values, which are blue when in the edit mode, and entering a new value through the numeric keypad.
Level Setup ‐ This buƩon takes the user to password entry screen.
Password Entry ‐ Enter the Level 1 password. See the Password Setup page of this manual for more informaƟon on
the password.
Set Point Entry ‐ Once the Level 1 password has been correctly entered, the set points in the StaƟon Status area
turn blue which indicates that they can be edited. Touch the set point to be edited and the numeric entry keypad
appears. Enter the new set point.
The set points remain in the edit mode for two minutes of screen inacƟvity and then automaƟcally revert to the
locked mode.
Float switch systems— The “set points” are the elevations at which the float switches are installed. These eleva‐
tions must be manually measured and entered for the PV1200 to be able to display and trend the approximate
level of the sump or tank.
Multi‐segment sensor systems— Once the Level 1 password has been correctly entered, the Multi‐segment Sen‐
sor Setup screen is accessed to provide sensor setup options.
Level
Setup
MAIN DASHBOARD LEVEL SETUP
4‐20 mA and Float Switch
Password
Entry
Set Point
Entry
93
Level Control
28 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Assigning
FuncƟons
Status
Indicators
Overview
The PV1200 can use a 10 segment probe rod as a level sensor, either for the primary sensor, or as a backup. In
both cases the Setup screen provides an easy way to configure the funcƟon for probe segment switch. Each seg‐
ment is wired to a digital input on the PV1200 . The probes come in various lengths and the length of the in‐
stalled probe must be entered into the Level Sensor setup screen.
Status Indicators ‐ The status indicator changes text and color to indicate when the level is above the mulƟ‐probe
switch and the text changes from OPEN to CLOSED.
Assigning FuncƟons ‐ The PV1200 automaƟcally assigns the funcƟon to the mulƟ‐probe switches starƟng at the
lowest level with the necessary funcƟons for the number of pumps configured in the system. To “skip” a switch,
simply touch the label to toggle from the assigned funcƟon to “skip”. When “skip” is selected the PV1200 auto‐
maƟcally shiŌs all subsequent funcƟons one posiƟon higher on the rod. If the segment is touched when “skip” is
displayed, the next funcƟon in sequence will move to the segment posiƟon.
**Always start the switch funcƟon setup at the lowest level**
Probe Level ‐ The rod has segments at a regular intervals which correlate to a water level that is displayed here
Hardware Input ‐ The PV1200 input number that the probe segment is wired to.
Probe
Level
Hardware
Input
MAIN DASHBOARD LEVEL SETUP
MulƟ‐segment Sensor
94
Level Control
29 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Pump Status
Nameplate
Pump Status
Indicator
PUMP DASHBOARDS
Common
Overview ‐ Pump Dashboards
A “dashboard” is provided for each pump that is configured in the system and is each is opƟmized for FVNR, VFD
or MOTOR Vision systems. Just as the Main Dashboard provides an overview of the enƟre pump staƟon, the
Pump Dashboards provide an overview of the operaƟon and status of the individual pumps.
Pump Status Nameplate ‐ Displays the current status of the pump. Status messages include: OFF, CALL, RUNNING,
OUT OF SERVICE, FAILED, REMOTE RUN, and MAINT. DUE.
The PUMP Vision has an input for an auxiliary contact of the motor starter to wire to. It monitors the status of
either that input, or the run status of a MOTOR Vision starter or VFD connected by Modbus to determine if the
pump is running or stopped. When the PUMP Vision output energizes the motor starter, the status is CALLED.
When the input goes high, the status is RUNNING. If the run read back does not go high, the status is FAILED.
The status is OUT OF SERVICE if the input from the hardware HOA is not high.
Pump Status Indicator Light ‐ Status of each pump is shown in color. The color key for the pump status:
Red: Pump failure ‐ flashing for maintenance due
Light Green: Pump running ‐ shows motor Hz in VFD mode
Dark Green: Pump stopped
Blue: Pump out of service
Yellow: Pump called, but not yet running
Light Blue (flashing): Maintenance due
Amber: Pump running by remote hardwired signal
The key above shows the default Pump Status BuƩon colors. The colors can be “remapped” by the user to other
color themes in the PV1200 OpƟon ConfiguraƟon screen in the Level 3 configuraƟon mode.
95
Level Control
30 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Alarm Indicators
Run Stats
PUMP DASHBOARDS
Common
Run Stats
Run Timer Displays the Current (or previous, if idle) run duraƟon.
Elapsed Time Meter Displays the total run Ɵme of the pump. The display is in hundredths of an hour
and will display over 40 million hours. These can be reset in the ETM & Counter
Reset screen in the DiagnosƟcs Menu.
Start Counter Displays the total number of pump starts. This counter can count to over 32,000
starts. These can be reset in the ETM & Counter Reset screen in the DiagnosƟcs
Menu.
Alarm Indicators ‐ Status indicators monitor the pump condiƟons for any alarm that the pump is configured for.
System Problem Shows Orange indicator when any abnormal condiƟon exists in the system. It is
shown on the Pump Dashboard page to alert the user that a system problem ex‐
ists that may be prevenƟng the pump from running.
Pump Starter Failure A “watchdog” Ɵmer monitors the pump starter and requires a signal feedback
prior to the Ɵmer elapsing to prove the starter has responded to a call request.
VFD/MV/RVSS Fault A fault in the VFD or in VFD communicaƟon. This alarm is replaced with a MO‐
TOR Vision Fault alarm in MOTOR Vision systems, and RVSS Fault alarm in RVSS
systems.
High Motor Temp Indicates a high motor temperature condiƟon wired to a hardware input.
Moisture In Motor Indicates a seal failure condiƟon wired to a hardware input.
96
Level Control
31 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
PUMP DASHBOARDS
Manual Speed
Seƫng
“SoŌ HOA Switch
“SoŌ HOA BuƩons
Increment &
Decrement
Starter
Status
“SoŌ HOA” BuƩons ‐ Touch these buƩons to change the status of the “soŌ” HOA switch. The “soŌ” HOA is in the
PUMP Vision to allow remote control of the pumps when the controller is wired through a network or wireless
connecƟon.
HAND Seƫng the switch to hand runs the pump as long as there are no shutdown condiƟons.
OFF Seƫng the switch to off puts the pump into the out‐of‐service condiƟon.
“SoŌ HOA” Switch ‐ A virtual three posiƟon switch allows the user to see whether the soŌ HOA is set to HAND,
OFF, or AUTO. The switch is only operaƟonal when the HOA—AUTO input of the PV1200 is high. When the
HOA—AUTO input is off, the switch image turns BLUE* to indicate that the pumps hardwired HOA is in the OFF
posiƟon the pump is out‐of‐service. In the event that the HOA—AUTO input is off and the RUN input is high, the
PV1200 assumes that the pump starter is geƫng a remote run command and the switch image turns ORANGE*.
*The colors that the “soŌ” HOA switch turn are the default Pump Status BuƩon colors. The colors can be
“remapped” by the user to other color themes in the PV1200 OpƟon ConfiguraƟon screen in the Level 3 configu‐
raƟon mode.
Manual Speed Seƫng ‐ Displays the current VFD speed in terms of percentage. The speed can also be directly ad‐
justed by touching the manual speed display and then entering the desired set point on the keypad screen.
Increment ‐ This buƩon gradually increases the VFD manual speed.
Decrement ‐ This buƩon gradually decreases the VFD manual speed.
Starter Status ‐ In VFD or MOTOR Vision configured systems, the status of the Modbus communicaƟon to the start‐
er is monitored and displayed here.
VFD/RVSS Fault Log/MOTOR Vision Dashboard— In VFD, RVSS, or MOTOR Vision configured systems, this buƩon
gives access to either the VFD or RVSS Fault Log in VFD or RVSS systems, or the MOTOR Vision Dashboard in MO‐
TOR Vision configured systems.
Note: Touching an Increment/Decrement
buƩon changes the value by 0.1%. Touch and
hold to auto‐increment the set point.
VFD/RVSS
Fault Log/
MVision
Dashboard
97
Level Control
32 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
VFD Gauges
Fault Status
VFD Gauges ‐ Analog gauges with digital readings below show important motor informaƟon. Some gauges are not
visible when the VFD that is connected does not support the funcƟon.
KilowaƩs The gauge displays the kilowaƩs being consumed and the digital display
shows the total kWh (mWh) hours consumed (if available from starter or
VFD).
VFD Speed Command Displays the current VFD Speed Reference sent from the PV1200 in percent‐
age (0‐100%).
VFD Output Frequency Displays the current VFD output frequency in hertz (0‐60 Hz).
Motor Current Displays the motor current draw in Amps.
VFD Fault Status Displays the current VFD status or fault. Touch the buƩon to go to the VFD fault log. The VFD
Fault Log displays the last 250 VFD fault condiƟons. This feature is currently only available on the Schneider and
ABB drives.
PUMP DASHBOARDS
VFD Systems
98
Level Control
33 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
PUMP DASHBOARDS
MOTOR Vision Systems
MV Status
MOTOR Vision
Dashboard
Overview
The PV1200 con be connected to the Insight “smart” motor overload relay from Eaton CorporaƟon, or the Tesys
U‐Line “smart” motor starter from Schneider Electric. These overload relays connect to the PV1200 by Modbus
and provide much informaƟon about the operaƟng condiƟons of the motor. In addiƟon to the features common
to all Pump Dashboards, the MOTOR Vision dashboard includes:
MV Status ‐ The MOTOR Vision status indicator confirms that the MOTOR Vision starter is connected and will indi‐
cate WARNING or TRIPPED if there is a MOTOR Vision fault.
MOTOR Vision Dashboard ‐ Touch the message here to access the MOTOR Vision Dashboard .
MOTOR Vision—Insight Gauges
KilowaƩs The gauge displays the kilowaƩs being consumed
Voltage Displays the supply average voltage.
Frequency Displays the supply frequency in hertz (0‐60 Hz).
Motor Current Displays the motor current draw in Amps.
U‐Line Gauges
Thermal Load Displays the motor thermal load as a percentage of the overload set point.
Motor Current Displays the motor current draw in Amps.
Gauges
99
Level Control
34 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The trend screen charts the sump/tank level and VFD speed, or sump/tank level and number of pumps running in
non‐VFD systems.
Main Trend Graph The main trend graph has two possible “pens”.
Red pen = main sensor
Yellow pen = VFD % speed, or number of pumps running in non‐VFD systems
Change Pen Focus ‐ To change the “focus” of the graph so that the scale of a different pen is shown, touch the
graph to toggle through the choices.
Graph Scale ‐ Each pen has its own scale. The scale for each pump is user adjustable by touching the scale’s max.
Number and entering a new value.
Mode SelecƟon ‐ Touch this buƩon to toggle between Run and History mode.
Run ‐ the graph shows current Ɵme for the past minute (approximately).
History ‐ the graph can be scrolled using the forward and backward buƩons.
Grid Lines ‐ Touch the G buƩon to add graph lines to the display. Touch again to hide the lines.
Flow ‐ Touch this buƩon to access the flow trend chart when flow monitoring and logging are enabled.
Historical Trend ‐ Touch this buƩon to access the historical trend chart when SD Card data logging is enabled. The
buƩon does not appear if there is no SD Card installed.
Mode SelecƟon
Grid Lines
Graph Scale
Return
Change Pen Focus
MAIN TREND SCREEN
Historical
Trend
100
Level Control
35 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Chart Name
When an SD card is install in the PV1200 and Trending is enabled in the SD Memory Card Data Logging setup
screen, the main trend chart is recorded onto the SD Card. The PV1200 automaƟcally creates a new trend data
file each month. A maximum of 63 months of data can be stored on one card before files must be deleted or a
new card installed. Within each data file are “segments”. At least one segment exists in each file and a new seg‐
ment is created within the month’s file each Ɵme the PV1200 is power cycled.
Tip: To maintain single segment charts within each file, install a UPS to the PV1200 power supply to prevent pow‐
er cycling the controller.
The files can be displayed on the PV1200 screen, or they can be downloaded or copied from the SD card to a PC
and reviewed using the SD Card Manager soŌware. When the screen above is accessed from the Main Trend
screen, the most current month’s data file is iniƟally displayed. Depending on the length of the first segment, it
may take some Ɵme (up to a couple of minutes) to load the data for display. Once the data is displayed it can be
scrolled though to review trends. If mulƟple segments exist within the month’s data file, they can each be
viewed by scrolling through the segments.
The historical trend graph has three possible “pens”.
Red pen = main sensor
Yellow pen = VFD % speed, or number of pumps running in non‐VFD systems
Green pen = sucƟon level or pressure
Chart Name
Displayed File‐ Displays the month and year of the chart being displayed .
Displayed File
Grids Lines
HISTORICAL TREND SCREEN
SD Memory Card
101
Level Control
36 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Scroll Bar
File Name ‐ This is the name of the file as stored on the SD memory card.
Scroll Bar ‐ The scroll bar controls where in the graph segment is being displayed. The graph can be scrolled by the
page by touching the arrow buƩon at either end, or “dragging” the handle and sliding it to a point elsewhere in
the chart.
Segment No. ‐ Shows the segment number currently being displayed.
Back ‐ Touch this buƩon to view to the previous month’s file. If no file exists for the month being request, ‘FILES
DOES NOT EXIST IS DISPLAYED’.
Forward ‐ Touch this buƩon to view to the following month’s file. If no file exists for the month being request,
‘FILES DOES NOT EXIST IS DISPLAYED’.
Most Recent ‐ Touch this buƩon to advance to the most recently month’s file.
Seg. Back ‐ Touch this buƩon to return to the previous segment in the month.
Seg. Forward ‐ Touch this buƩon to advance to the next segment in the month. Each segment must load in turn
and each may take some seconds to load.
File Status ‐ Shows LOADING when a data file segment is in the process of being read to the screen and END OF FILE
when the last segment in the file is being displayed.
Back Most
Recent
Forward Seg.
Back
Seg.
Forward
Segment No.
File Name File Status
HISTORICAL TREND SCREEN
SD Memory Card
102
Level Control
37 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
By touching the Alarm Log label on the main screen, the user can access the Alarm Log screen, that displays the
alarm condiƟons with date and Ɵme of occurrence. This log saves the past 1,000 alarm condiƟons.
Last Entry ‐ Touch this buƩon to return to the most recent alarms aŌer scrolling.
Page Up ‐ Touch this buƩon to move up a page in the alarm history.
Line Up ‐ Touch this buƩon to scroll up one line in the alarm history.
Line Down ‐ Touch this buƩon to scroll down one line in the alarm history.
Page Down ‐ Touch this buƩon to move down a page in the alarm history.
Return ‐ Touch this buƩon to return to the Main Screen.
Clear Log ‐ Touch this buƩon to clear the Alarm Log. A password screen will pop up that requires the entry of the
clear log password, 1234.
AcƟve Faults ‐ The Number of acƟve faults is displayed here. Touch this buƩon to access the Alarm Handler.
Run Log ‐ Touch this buƩon to access the pump run Ɵme log.
Flow Log ‐ Touch this buƩon to access the flow logs (if flow monitoring and logging is enabled).
Run Log Return
Line Down
Last Entry
Page Down
Line Up
Page Up
ALARM LOG
Clear Log
Flow Log
AcƟve Faults
103
Level Control
38 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The Pump Run Log records the past 500 pump run events. It is accessed from the Pump Control screen. The
Pump Called, Date, Start/End Ɵmes and DuraƟon are stored each Ɵme a pump is run.
Last Entry ‐ Touch this buƩon to return to the most Run history aŌer scrolling.
Page Up ‐ Touch this buƩon to move up a page in the run history.
Line Up ‐ Touch this buƩon to scroll up one line in the run history.
Line Down ‐ Touch this buƩon to scroll down one line in the run history.
Page Down ‐ Touch this buƩon to move down a page in the run history.
Return ‐ Touch this buƩon to return to the previous screen.
Clear Log ‐ Touch this buƩon to clear the Run log. A password screen will pop up that requires the entry of the
clear log password, 1234.
Run Log ‐ Touch this buƩon to access the pump run Ɵme log.
Flow Log ‐ Touch this buƩon to access the flow logs (if flow monitoring and logging is enabled).
Alarm Log Return
Line Down
Last Entry
Page Down
Line Up
Page Up
RUN LOG
Flow Log
Clear Log
104
Level Control
39 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
There is a separate fault log for each of the VFDs, accessed from the Pump Control screen when the system is in
the VFD mode (when communicaƟng with the PV1200 through Modbus). The VFD logs save the last 250 fault
condiƟons.
Last Entry ‐ Touch this buƩon to return to the most recent fault aŌer scrolling.
Page Up ‐ Touch this buƩon to move up a page in the fault history.
Line Up ‐ Touch this buƩon to scroll up one line in the fault history.
Line Down ‐ Touch this buƩon to scroll down one line in the fault history.
Page Down ‐ Touch this buƩon to move down a page in the fault history.
Return ‐ Touch this buƩon to return to the Pump Screen.
Clear Log ‐ Touch this buƩon to clear the fault log. A password screen will pop up that requires the entry of the
clear log password, 1234.
Return
Line Down
Last Entry
Page Down
Line Up
Page Up
VFD FAULT LOG
Clear Log
105
Level Control
40 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
In the event of an alarm condiƟon, at least two indicaƟons will appear on the main screen.
Alarm Message Bar ‐ The alarm message bar will display the alarm that has occurred. In the event of mulƟple
alarms being triggered, the latest alarm will be displayed. Touching the alarm message bar will scroll through the
alarm messages.
Alarm Handler ‐ The Alarm Handler will appear showing the number of acƟve alarms. Touching the Alarm Handler
buƩon will take the user to the Alarm Handler screen. Once the alarms are no longer acƟve, the Alarm Handler
will display FAULTS NEED ACK (acknowledgment). Once the user has acknowledged the alarms the Alarm Han‐
dler will disappear.
Message Bar
ALARM HANDLER
Alarm
Handler
106
Level Control
41 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Return
Reset
ALARM HANDLER
Overview
The Alarm Handler is a series of screens that provides access to acƟve and non‐acknowledged alarm condiƟons.
The handler displays informaƟon about each alarm condiƟon.
This is the first screen that appears when entering the Alarm Handler. It displays the number of alarms that have
occurred within the two alarm groups (System Alarms and OpƟon Alarms).
Return ‐ Touch this buƩon to return to the previous screen.
Reset ‐ Touch this buƩon to acknowledge and clear all non‐acƟve alarms within the alarm group. Note: Once the
reset buƩon has been touched, details regarding the alarm condiƟon are erased from the Alarm Handler. The
alarm record will sƟll exist in the alarm log and data logs.
Details ‐ Touch the Details buƩon for the group to be viewed. This accesses the next screen in the Alarm Handler
that shows which alarms have occurred within the group.
Group Count ‐ Indicates the number of alarms that have occurred within each alarm group.
Group Count
Details
107
Level Control
42 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Details
Overview
The second level of the Alarm Handler is list of all alarm condiƟons that are either sƟll acƟve, or are inacƟve but
have not been acknowledged by the operator. Once an alarm is no longer acƟve and it has been acknowledged,
it is removed from the list.
Date & Time ‐ This shows the date and Ɵme the alarm condiƟon occurred.
Details—“Magnifying Glass” ‐ Touch this to go to the next level screen. Each alarm condiƟon has one of these
buƩons to give access to the specific informaƟon on the alarm status and condiƟon.
Acknowledged ‐ This shows whether or not the alarm has been acknowledged in the Alarm Details screen.
Alarm Name ‐ This shows the alarm condiƟon.
Refresh ‐ Touch this buƩon to refresh the list.
Refresh ‐ Touch this buƩon to clear all inacƟve alarms from the list.
Return ‐ Touch this buƩon to return to the previous screen.
Return
ALARM HANDLER
Date & Time
Alarm Name
Alarm AcƟve
Acknowledged
Refresh
108
Level Control
43 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Acknowledge
Overview
The third level of the Alarm Handler is detailed informaƟon about the specific alarm condiƟon.
Alarm Name ‐ This shows what the alarm condiƟon is.
Alarm Time and Date ‐ This shows the latest Ɵme the alarm condiƟon occurred.
Count ‐ This shows how many Ɵmes the alarm condiƟon has occurred.
Status ‐ This shows if the alarm is acƟve or not.
Acknowledge ‐ Touch the “Ack” buƩon to acknowledge this alarm.
Scroll ‐ Touch the scroll buƩons to scroll through the other uncleared alarms.
Return to Previous
Status
Count
ALARM HANDLER
Scroll
BuƩons
Name
Date & Time
109
Level Control
44 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Accessing the Setup Menu requires that a password be entered. Touch the LEVEL 1, LEVEL 2, or LEVEL 3 buƩon
and the password entry keypad will appear. Enter the password to proceed.
Three levels of access are provided so that the higher level configuraƟon funcƟons can be protected.
Level 1 ‐ Access to all set points, Ɵmers, alternaƟon, and other operaƟonal seƫngs
Level 2 ‐ All Level 1 funcƟons, plus email address and alarm configuraƟon
Level 3 ‐ Access to all funcƟons including top level configuraƟon
Change the Passwords ‐ The Level 3 password must be entered to access the change screen. Once the correct
password is entered, the screen below appears and new passwords can be entered for all three levels. The pass‐
word must be numeric only and can be up to 9 characters long.
Level 3 ConfiguraƟon Access
Level 2 ConfiguraƟon Access
Level 1 ConfiguraƟon Access
Level 3 Default Password is 3070
Level 2 Default Password is 8144
Level 1 Default Password is 9876
FACTORY DEFAULTS
NOTE: make note of all passwords if changed. If the Level 3 password is lost, the controller must be factory ini‐
Ɵalized to restore access to the system.
CONFIGURATION ACCESS
110
Level Control
45 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The data entry screen will pop up whenever any set point or data entry field is touched. The screen is intuiƟve.
Touch the number buƩons to enter a value, touch the enter buƩon to accept the new value. Touch the Esc
buƩon to leave the data entry screen.
Data Entry / Password Entry
Setup Menu Level 1
Setup Menu Level 3
Once the correct password is entered for the level selected, the SETUP MENU appears. Depending on the access
level, some menu opƟons may be grayed out, prevenƟng access to that area of system setup.
CONFIGURATION MENUS
111
Level Control
46 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The Set points & Sequencing menu displays the following opƟons in all system configuraƟon
MENU ITEM ACCESS FUNCTION
START/STOP SET POINTS 1 Pump start and stop set points for lead
and lag pumps
ALTERNATION 1
Pump sequencing control
Not visible on simplex systems
PID SETTINGS 2
Adjust the VFD speed control loop
Only visible on PID configured systems
VFD SPEED 1
Set the minimum and maximum VFD
speeds for AUTO and MANUAL mode
Only visible on VFD configured systems
SET POINTS AND SEQUENCING
Menu
112
Level Control
47 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The pump start and stop set points can be entered on the Systems Seƫngs screen, as well as on the Setup screen
accessed from the Main Dashboard.
It is important to consider all of the system needs when setting the pump start and stop set points. Factors may
include:
•Minimum water level to protect submersible pumps.
•Keep a minimum distance between lead pump start and pumps stop to prevent “short cycling” of the
pumps.
•Keep sufficient distance between lead pump start and lag pumps start set points to prevent starting lag
pumps needlessly.
•In tank fill applications, stop set point must be set to prevent overfilling the vessel.
Stop Set Point Start Set Points
Start Set Points ‐ Enter the start set points here.
Stop Set Point (or Points) ‐ Enter the pumps stop set point here.
For multiple stop set points, set the Stop Mode to MULTI‐POINT.
Stop Mode Selector ‐ Touch the switch to toggle between single
or multi‐point stop mode. In multi‐point mode, there is a sepa‐
rate stop set point for each pump in the sequence.
SET POINTS AND SEQUENCING
Start and Stop Set Points
Stop Mode
Selector
113
Level Control
48 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
Stop Mode ConfiguraƟon
When the mode is set to single point, the start/stop set points screen has only one stop set point and all running
pumps stay on unƟl they reach that set point.
When the mode is set to mulƟ point, the start/stop set points screen has a stop set point for each pump, so each
pump stops at its own set point.
Toggle Stop Mode ‐ Touch here to select between single‐point or mulƟ‐point stop mode.
Single stop set point MulƟple stop set points
SET POINTS AND SEQUENCING
Stop Mode
Stop Mode
Selector
114
Level Control
49 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The pump start and stop set points can be entered on the Systems Seƫngs screen, as well as on the Setup screen
accessed from the Main Dashboard.
In the VFD PID mode, the PV1200 will modulate the speed of the VFDs to maintain a target level. Whether the
pump will start and stop with the set points depends on where the VFD minimum speed seƫng puts the pump on
the curve and the rate of flow in and out of the vessel.
Start Set Points ‐ Enter the start set points here.
Stop Set Point ‐ Enter the pumps stop set point here.
Target Level/Flow Set Point ‐ Enter the level or flow that the system is to maintain here.
Lag Pump Staging ‐ VFD PID Mode
As the water level rises (or falls in a tank fill application) the speed of the pump increases to maintain a constant
level and if the speed rises above a set point that is user set near the top of the pump curve, another pump is
staged on. When the VFD speed drops below a set point that is user set near the low end of the pump curve, a
pump is stopped.
In the Constant Flow mode, the lag pumps are staged on in the same manner as in the Constant Level mode.
Start Speed ‐ Touch here to enter the speed above the VFD set point at which the lag pumps will sequence on.
Stop Speed ‐ Touch here to enter the speed below the VFD set point at which the lag pumps will sequence off.
Start Set Point Stop Set Point
Target Level/Flow
Set Point
Start Speed
Stop Speed
SET POINTS AND SEQUENCING
Start/Stop Set Points ‐ VFD PID Mode
115
Level Control
50 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Maximum Speed ‐ The top speed that the VFDs will run in automaƟc mode. Values are entered in percent of 60Hz.
The maximum speed can be set up to 150%, but extreme care must be given in over‐revving the pumps.
Minimum Speed ‐ The lowest speed that the VFDs will run in automaƟc mode. Values are entered in percent of
60Hz. The minimum speed set point must be lower than the lag stop set point, or else the lag pumps cannot de‐
stage.
Maximum Manual Speed ‐ The top speed the operator can run the VFD in Hand mode. Values are entered in per‐
cent of 60Hz. Prevents over‐pressure. This set point should be determined by running one pump in hand mode
during typical flow and adjusƟng the VFD speed for demand.
Maximum
Speed
SET POINTS AND SEQUENCING
VFD Speed Limits
Minimum
Speed
Maximum
Manual Speed
116
Level Control
51 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The PV1200 uses an algorithm that samples the level (or flow) on a preset Ɵme interval to determine deviaƟon
from set point. Based on the deviaƟon from set point, the controller will make an adjustment to the VFD that is
proporƟonal to the deviaƟon.
In the Constant Level Mode, the adjustment will be up (faster speed) when the level is too high, or down (slower
speed) when the level is too low. This mode can be reversed for tank fill applicaƟons.
In the Constant Flow Mode, the adjustment will be up (faster speed) when the flow is too low, or down (slower
speed) when the flow is too high. This mode is only available for sump applicaƟons.
The amount of change can be limited with the trim seƫngs.
Sample Time ‐ Select here to modify the Sample Timer frequency. Sample Ɵme is the frequency at which the level
or flow will be checked. This Ɵme seƫng is dependent on the size of the sump or tank being pumped and the
size of the pumps.
For systems with a small sump or tank, and with larger pumps relaƟve to tank size, the controller needs to be
faster acƟng. Lower the Ɵme interval to perhaps 5 seconds or less to achieve a smooth reacƟon to the changes in
flow condiƟons. On a large system, where it takes more Ɵme for the pump speed to have influence on the level
or flow, increase the Ɵme to 30 seconds or more. When changes are made to the Ɵme interval, an offseƫng
adjustment is usually needed to the proporƟon seƫng.
As the sample cycle Ɵme interval is shortened, the proporƟon of change to the VFD speed for each 0.1 Ō. of level
change will need to be reduced so that there aren’t rapid large changes to the VFD speed. Rapid small changes to
the drive speed provide a smoother reacƟon. Conversely, when the sample Ɵmer is set slower, a larger propor‐
Ɵon of VFD speed for each 0.1 Ō. of level is needed.
In Constant Flow Mode, the PID works in the same manner as the Constant Level Mode. The difference is the
proporƟon of change is 1.0%:1 GPM
Sample Time
SET POINTS AND SEQUENCING
PID Seƫngs ‐ VFD PID Mode
117
Level Control
52 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Start Delay ‐ Select here to modify the Start Delay Timer. It is important to delay the start of the PID funcƟon unƟl
the VFD has ramped up to the minimum speed set point since that is the beginning of the pump curve and the
flow rated needs to be tested before ramping higher on the pump curve.
On VFD Modbus systems, the controller knows when the VFD has reached minimum speed set point. On VFD
hardwired systems, it doesn’t have that feedback.
The delay Ɵme should be as long as it takes to get the drive to minimum speed. For example, if the minimum
speed is 60% and the VFD acceleraƟon Ɵme is 5 seconds* to 100%, the PID delay Ɵmer should be 3 seconds.
*the recommended seƫng to properly respond to the PV1200
ProporƟon ‐ Enter the proporƟon of VFD speed change % to each 0.1 Ō. of level deviaƟon. This seƫng is default
and gives a 1% change in VFD speed for each 0.1 feet of level.
Trim Up ‐ The upper limit of VFD speed change with each sample cycle in percent.
Trim Down ‐ The lower limit of VFD speed change with each sample cycle in percent.
The trim is used to limit the VFD speed change with each sample Ɵme, which can help control the VFD from mak‐
ing too radical a speed change if the deviaƟon is great. The default is 6.0 Up and ‐6.0 Down. These can be indi‐
vidually set as some systems may be more reacƟve in one direcƟon than the other.
SET POINTS AND SEQUENCING
PID Seƫngs ‐ VFD PID Mode
Start Delay
ProporƟon
Trim Down Trim Up
118
Level Control
53 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The pump alternator automaƟcally sets the pump lead based on the alternaƟon parameters set within this menu.
Pump alternaƟon allows the PV1200 to balance usage between pumps by changing the leads on a Ɵmed or cyclic
interval.
AlternaƟon Status ‐ Indicates the current posiƟon/lead pump of the alternator.
Mode SelecƟon ‐ Touch this knob to rotate through the possible alternaƟon modes.
AutomaƟc ‐ Change of lead duty aŌer each pump cycle
Time clock ‐ Change of lead duty only by clock interval. Up to 99 days at specific Ɵme of day.
Least Hours ‐ Lead is pump with least total run hours
Pump 1 ‐ Pump 1 is always the lead pump
Pump 2 ‐ Pump 2 is always the lead pump
Pump 3 ‐ Pump 3 is always the lead pump
Pump 4 ‐ Pump 4 is always the lead pump
Step BuƩon ‐ The lead pump can be manually stepped to the next pump in sequence by touching the step buƩon.
Note that this can be done while the pumps are running and will occur instantly.
AlternaƟon Time ‐ Indicates the Ɵme of day (24 hour) that the system will alternate (on the day interval) when in
Ɵme clock alternaƟon mode. Touch here to change the alternaƟon Ɵme.
Interval ‐ Touch here to change the interval period between pump alternaƟon. The interval can be up to 99 days.
Unlock Screen ‐ The set points are read only unƟl the unlock buƩon is touched and the level 1 password is entered
to the password keypad. The screen locked indicator will change to screen unlocked.
AlternaƟon Time
AlternaƟon Status
Step BuƩon
AlternaƟon
Mode Selector
Unlock Screen
SET POINTS AND SEQUENCING
AlternaƟon
AlternaƟon
Interval
119
Level Control
54 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The Timers menu displays the following opƟons in all system configuraƟons. This menu can be access either from
the Main display, or the Main ConfiguraƟon Menu.
MENU ITEM ACCESS LEVEL FUNCTION
START DELAY 1 “Stagger starts” the pumps
PUMP DOWN 1 Periodically extends a pump cycle to the low level
set point to help clear sump debris
EXERCISE 1 Periodically runs the pumps to keep them from seiz‐
ing during too long of an idle period
MAXIMUM RUN 1
Sets a maximum amount of Ɵme a pump can run in
a given cycle
The pumps can restart if demand requires
FLUSH 1
Runs the VFDs a 100% speed at the end of a pump‐
ing cycle, for a set period of Ɵme, to help clear the
discharge pipe. Disabled in non VFD systems
TIME CLOCK 1/3
Allow pump operaƟon during specific periods of
Ɵme during the day
Must be enabled in Level 3 OpƟons Setup
BUBBLER PURGE 1 Cycle Ɵmer for a bubbler purge solenoid.
Must be enabled in Level Sensor setup.
MAINTENANCE TIMER 1 Monitors pump run Ɵme and issues alert when
maintenance period is exceeded.
TIMERS MENU
120
Level Control
55 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The purpose of the maximum run Ɵmer is to prevent a pump from running too long in the event that the normal
pump shutdown triggers don’t occur. If the Ɵmer funcƟon is enabled, the Ɵmer begins when the pump starts. If
the Ɵmer expires, the pump stops. If the pump call condiƟon is sƟll present, the pump will restart. When a Ɵmer
expires, pumps downstream in the sequence will stop as well. This screen allows the user to configure the maxi‐
mum run Ɵmers individually for up to 4 pumps.
Enable/Disable ‐ Touch these switches to toggle between ‘ENABLED’ and ‘DISABLED’. Most systems do not need
this funcƟon.
Time Remaining ‐ Remaining Ɵme these are red when currently acƟve.
Maximum Run Timer ‐ The maximum amount of Ɵme that the pump is allowed to run. This feature can be enabled
or disabled.
Unlock Screen ‐ The set points are read only unƟl the unlock buƩon is touched and the Level 1 password is entered
to the password keypad. The screen locked indicator will change to screen unlocked.
Enable/Disable Time Remaining
Maximum Run
TIMERS
Maximum Run
Unlock Screen
121
Level Control
56 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
This screen allows the user to configure the maximum run Ɵmers individually for up to 4 pumps.
Start Delay Timer ‐ The primary purpose of the Start Delay is to stagger the start of all pumps when power is re‐
stored aŌer a power failure. This staggered start prevents power surge and voltage drop on the uƟlity system
and is especially important when the system is operaƟng on an emergency power generator.
The lead pump start will be delayed unƟl the controller is finished with its power on self‐test, and then each sub‐
sequent pump is delayed by the amount of Ɵme set on the start delay Ɵmer. The recommended delay Ɵme is 3
seconds.
When operaƟng in the VFD‐PID mode on 3 and 4 pump systems, it is important to increase to Ɵme to at least 20
seconds. The reasons is that lag pumps are sequenced on when the pump or pumps that are running reach a
determined speed (set as the lag pump start speed). In VFD systems with more than two pumps, if the Ɵme delay
is too short, the lag pump that is called to start will not have enough Ɵme to ramp up to the current VFD speed
command and have an impact on the PID funcƟon in Ɵme to prevent the next lag pump from starƟng. It may
take some experimentaƟon to determine the best delay Ɵme in these systems as there are several factors that
come into play. It is recommended that the Ɵme be set to the minimum possible without causing all pumps to
sequence on unnecessarily.
The set points are provided only for the pumps configured in the system. Each Ɵmer starts when the previous
expires. They are read‐only unƟl the modify buƩon is touched and the Level 1 password is entered to the pass‐
word keypad.
Lead Start Delay
1st Lag Start Delay
2nd Lag Start Delay
3rd Lag Start Delay
Unlock Screen
TIMERS
Start Delay
122
Level Control
57 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The purpose of the exercise timer is to prevent a pump from sitting idle too long and rusting up. This is a useful
function when a system sits idle for periods of time in areas where corrosion is a problem. The set points are
read only until the UNLOCK button is touched and the Level 1 password is entered to the password keypad. The
screen locked indicator will change to screen unlocked.
Exercise Run Timer ‐ The maximum amount of Ɵme that the pump is allowed to run. This feature can be enabled or
disabled.
Time of Day ‐ Time of day that the exercise function will run. 24 hr format.
Pump Enable/Disable ‐ Touching these switches toggles between ‘enabled’ and ‘disabled’.
Days Remaining ‐ The number of days remaining. When the number is 0, the pumps will run when the current
time matches the time of day set point.
Cycle Timer ‐ This is the time interval between each exercise run cycle with maximum interval of 999 days.
Duration timer ‐ This is the length of time that the pump runs with a maximum run time of 99 minutes, 59 seconds.
Unlock Screen ‐ The set points are read only unƟl the unlock buƩon is touched and the Level 1 password is entered
to the password keypad. The screen locked indicator will change to screen unlocked.
Enable
Time of Day
Days Remaining
DuraƟon Timer
Unlock Screen
TIMERS
Exercise
123
Level Control
58 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
TIMERS
Time Clock
Start Time
Overview
The funcƟon of the Ɵme clock is to setup specific Ɵme periods that the pumps can run. The clock is “7 day”, so a
different Ɵme period can be established for each day of the week. Any day of the week can be excluded from the
run program as well. Note: the pump Ɵme clock funcƟon must first be enabled in the System OpƟons configura‐
Ɵon.
Current Time and Date ‐ The Ɵme PV1200 internal Ɵme clock.
Time Clock Status ‐ The Indicator lights when the Time Clock “output contact” is closed.
Day Status ‐ The contact graphic “closes” to show if any Ɵme period is acƟve.
Start Time ‐ The Ɵme of day (24 hour clock) that the pumps allowed to run.
End Time ‐ The Ɵme of day (24 hour clock) that the pumps are shutdown.
Enable/Disable ‐ Touching these switches to toggle between ‘YES’ and ‘NO’, enabling or disabling the run Ɵme for
that day. Each day of the week is individually controlled.
Unlock Screen ‐ The set points are read only unƟl the UNLOCK buƩon is touched and the Level 1 password is en‐
tered to the password keypad. The screen locked indicator will change to screen unlocked.
Example Above‐ Two start and stop Ɵmes are provided for each day, primarily to provide a way to have one run
period that spans midnight, in addiƟon to giving two separate run periods during the day. The example shows
how to set up an overnight run period and daily dual run periods. In the example, the pumps run twice each
Tuesday, Thursday and Friday from 0600 to 0900 and from 1500 to 2100. On Saturday and Sunday nights, the
pumps run overnight from 2100, unƟl 0500 the next day. Monday is sƟll running from Sunday night unƟl 0500,
Enable/Disable
Day Status
Unlock Screen
Start Time
Current
Time and Date
Time Clock
Status
124
Level Control
59 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
VFD Flush Timers ‐ This funcƟon is especially useful in proporƟon mode VFD systems where the pumps are running
very slowly as they reach the stop set point and are not ejecƟng sewage well.
With this funcƟon enabled, the pumps run at the VFD maximum speed for the amount of Ɵme preset into the
flush duraƟon Ɵmer. This process tends to flush the discharge pipes out and prevent problems with valves near
the pumps.
It is important to do a Ɵmed draw down test to ensure sufficient liquid will remain in the sump and set the pump
stop set points and duraƟon Ɵmer accordingly.
Enable/Disable ‐ Touching this switch to toggle between ‘ENABLED and ‘DISABLED.
Preset Values ‐ Enter the duraƟon of the flush Ɵme.
Unlock Screen ‐ The set points are read only unƟl the unlock buƩon is touched and the Level 1 password is entered
to the password keypad. The screen locked indicator will change to screen unlocked.
Enable/Disable DuraƟon Timer
Unlock Screen
TIMERS
VFD Flush
125
Level Control
60 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
Pump Down Timers
This funcƟon can assist is clearing buildup of solids in sump pump systems by drawing down the water level to a
lower than normal set point. When enabled, this funcƟon will start the lead pump, regardless of the level, and
run the pump to the low level set point. The user can set the number of days between the pump down cycles
and the Ɵme of day for the pump down funcƟon to occur.
The low level alarm is disabled during the operaƟon of this funcƟon.
Preset Values ‐ Enter the Ɵme of day and the number of days between pump down cycles.
Enable/Disable ‐ Touch this switch to toggle between ‘ENABLED’ and ‘DISABLED’.
Countdown ‐ Number of days unƟl next pump down cycle.
Unlock Screen ‐ The set points are read only unƟl the unlock buƩon is touched and the Level 1 password is entered
to the password keypad. The screen locked indicator will change to screen unlocked.
Preset Values
Enable/Disable
Countdown
Unlock Screen
TIMERS
Pump Down
126
Level Control
61 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
This funcƟon provides control of a purge solenoid valve in a bubbler or trapped air type level sensing system. The
solenoid opens to allow air into the sensing tube to help keep it clear of debris and recharge the air in the event
of leak.
Enable/Disable ‐ Touch this switch to toggle between ‘ENABLED’ and ‘DISABLED’.
DuraƟon ‐ Enter the number of seconds that the solenoid will be open.
Interval ‐ Enter the number of hours and minutes, up to 99:59, between each purge cycle.
Purge Status Nameplate ‐ The phase of the purge cycle is displayed here. When the interval Ɵmer expires, a two
second Ɵmer begin to give the system Ɵme to stabilize the level sensor signal before it potenƟally is exposed to
higher than normal pressures. Then the solenoid opens and the duraƟon Ɵmer begins. When the duraƟon Ɵmer
is finished, the solenoid closes and a ten second Ɵmer begins Ɵming to allow Ɵme for excess air pressure to bleed
out of the sensor tube. Then the purge cycle is finished and the interval Ɵmer begins again.
Indicator ‐ Lights when the purge cycle is acƟve.
Manual Purge Start ‐ Touch this buƩon to manually begin a purge cycle.
Unlock Screen ‐ The set points are read only unƟl the unlock buƩon is touched and the Level 1 password is entered
to the password keypad. The screen locked indicator will change to screen unlocked.
Enable/Disable
Interval
Purge Status
Nameplate
Unlock Screen
TIMERS
Purge Solenoid
DuraƟon
Indictor
Manual
Purge Start
127
Level Control
62 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The Alarms Menu accesses two groups of ten alarms each. The Level 2 or Level 3 password is needed for the
buƩons to be visible.
MENU ITEM FUNCTION
HIGH LEVEL ALARM‐MAIN High level alarm signal from the main level sensor
Includes set point except in MulƟ‐segment sensor mode
LOW LEVEL ALARM‐MAIN Low level alarm signal from the main level sensor
Includes set point except in MulƟ‐segment sensor mode
TRANSDUCER FAILURE
FLOAT SWITCH FAILURE
Monitors the primary level sensor input for out of range condiƟon.
Transducer only visible in 4‐20 mA sensor mode
Float switch failure only visible in the Float switch mode
PUMP FAILURE No read back from starter during pump call
MOTOR Vision FAULT MOTOR Vision fault signal through Modbus
HIGH LEVEL ALARM– BACKUP High level backup float switch
LOW LEVEL ALARM –BACKUP Low level backup float switch
HIGH MOTOR TEMP Temperature switch in motor winding
MOISTURE IN MOTOR Moisture probe in motor housing
VFD FAULT Fault signal from VFD
Only visible in VFD configured systems
ALARM SETUP MENU
System Alarms
System Alarms
System Alarms
128
Level Control
63 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
ALARM SETUP MENU
OpƟon Alarms
OpƟon Alarms
OpƟon Alarms
The System OpƟons Alarms Menu displays the following possible opƟons that are available only if the opƟonal
digital input expansion module is installed. . Except for the Control Power Failure alarm, which is connected to
Analog input 2 and always available, the alarm names are user definable, as are the input contact being Normally
Open or Normally Closed contact.
MENU ITEM ACCESS
LEVEL FUNCTION
CONTROL POWER FAILURE 2 Monitors analog input 2—see wiring schemaƟc
OPTION ALARM 1 2 Monitors digital input I32
OPTION ALARM 2 2 Monitors digital input I33
OPTION ALARM 3 2 Monitors digital input I34
OPTION ALARM 4 2 Monitors digital input I35
OPTION ALARM 5 2 Monitors digital input I36
OPTION ALARM 6 2 Monitors digital input I37
OPTION ALARM 7 2 Monitors digital input I45
Not available when mulƟ‐segment probe is installed
OPTION ALARM 8 2 Monitors digital input I46
Not available when mulƟ‐segment probe is installed
OPTION ALARM 9 2 Monitors digital input I47
Not available when mulƟ‐segment probe is installed
129
Level Control
64 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
ALARM SETUP
Enable Alarms
Alarm Name
Enable
Alarm
System Alarms
Alarm ConfiguraƟon
The two Alarm ConfiguraƟon screens provide the ability to individually enable alarms and once enabled, config‐
ure the funcƟons of the alarm.
The first step to configuring the alarm is to enable it. As shown in the images above, only alarms that are enabled
show the addiƟonal configuraƟon switches.
Alarm Name ‐ Name of the alarm funcƟon. Only alarms that are possible by system configuraƟon are shown.
When the alarm is acƟve, the alarm name text will be red in color.
Enable Alarm ‐ Touch these switches to toggle between ‘ENABLED’ and ‘DISABLED’.
Setup OpƟon Alarms ‐ Touch this buƩon to access the OPTION NAME AND INPUT TYPE SETUP screen. Each of the
9 opƟonal alarm channels can be user configured with custom name and choice of N.O. or N.C. input contact.
Note about alarm data logging: All enabled alarms are logged into the Alarm Log, Alarm Handler, and Alarm Mes‐
sage Bar, regardless of other alarm seƫngs.
OpƟon Alarms
Setup OpƟon Alarms
130
Level Control
65 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Set Points
ALARM SETUP MENU
Alarm ConfiguraƟon
Will the alarm stop the pumps?
Manually or automaƟcally reset?
Will the alarm sound the horn?
Will the alarm turn on the alarm light?
If alarm light is yes, will it flash the light?
Will the alarm close the alarm contact?
Will this alarm be transmiƩed to email?
Time delay before alarm is triggered.
Alarm ConfiguraƟon
For each alarm that is enabled, the funcƟon of the alarm can be individually configured by touching the switches
to enable or disable an alarm funcƟon. The simple table format gives a clear overview of which alarms will for
example stop the pumps or sound the horn.
Set Points ‐ Touch these buƩons to enter the set points for the alarm. Set points will be visible for alarms that
have an analog signal comparator.
131
Level Control
66 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
ALARM SETUP
OpƟon Alarm ConfiguraƟon
Overview
When the opƟonal digital input expansion module is aƩached, the PUMP Vision PV1200 controller includes nine
user definable alarm “channels” that monitor the inputs change in status to alarm, data log, and email condiƟons.
The condiƟons can be faults, or normal funcƟons that need to be monitored.
The logic is already in the PUMP Vision for all channels. The user needs to provide 24 VDC to the proper input
and enable the alarm in each of the alarm channels to be used, then assign customized names of up to 20 charac‐
ters. The input type must be set to match the resƟng state of the input contact, N.O. or N. C.
Once set up, all of the PUMP Vision funcƟons such as data logging, Alarm Handler, Alarm Message Bar, email
messages, and PV600 display screens will use the user defined name and alarm configuraƟon.
Enter Names‐ Touch these buttons to enter a user defined option alarm name of up to 20 characters for each alarm
channel that is enabled. If the channel is disabled, the button will be ‘grayed out’.
The Control Power Failure alarm is permanently assigned to Option Alarm Channel 1. No name change is possi‐
ble.
Set Contact Type ‐ Touch these switches to toggle between N.O. (Normally Open) and N.C. (Normally Closed) for
each alarm channel that is enabled. If the channel is disabled, the button will be ‘grayed out’.
Channel and Input ‐ Shows which input terminals on the PUMP Vision expansion input module are associated with
each channel and alarm name.
Enter Names
Set Contact Channel
And Input
132
Level Control
67 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The System ConfiguraƟon menu displays the following opƟons depending on system configuraƟons.
MENU ITEM ACCESS
LEVEL FUNCTION
NUMBER OF PUMPS 3 Select the number of pumps, the pump sequencing scheme.
STARTER OF VFD SELECTION 3 Select the starter or VFD type and type of communicaƟon to smart
starters and VFDs. Also set the amp range for meter displays.
LEVEL SENSING 2 Setup the primary and secondary level sensors and enable the
FLOW METER 3 Setup a wired flow meter or calculated flow sump or tank size
SPECIAL OPTIONS 3 Access the Special OpƟons Menu
MOTOR Vision 2 Setup the starters with MOTOR Vision. Only visible when MOTOR
Vision starters are selected.
OPERATING MODE 3 Select the direcƟon of operaƟon. Also set the VFD mode of PID or
ProporƟonal, with level or flow modulaƟon.
SYSTEM CONFIGURATION
Menu
133
Level Control
68 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Number of Pumps
SYSTEM CONFIGURATION
Number of Pumps
Sequencing
Mode
Lead
Pair
Number of Pumps in this System ‐ Touch this button to scroll through the choices of one, two, three, or four pumps.
Once the number of pumps is selected, the screen throughout the controller are changed to reflect the number
of pumps configured in the system.
Sequencing Mode ‐ Full Seq.‐ Full alternation means that all of the pumps in the system are all available for normal
duty and alternate equally. While the alternation cycle includes all of the pumps configured in the system,
pumps can still be staged as standby or slave in the sequence setup screen.
Sequencing Mode ‐ Jockey Pump ‐ Jockey pump systems typically have one small pump and one, two, or three main
(larger) pumps. In this sequence, the small pump runs as constant lead and the main pump(s) are lag. When the
jockey pump can’t keep up with flow, the lead main starts and the jockey stops. The system de‐stages in the
same manner. The main pumps alternate on triplex and quadruplex systems.
Peak Pump ‐ Peak Demand pump systems typically have two or three small pumps and one large pump. In this se‐
quence, the small pumps run as either a duplex or triplex pump system with a large pump that is reserved as a
standby for very high demand flows such as a hundred year storm. When the large pump starts, the smaller
pumps are all shut down after a 10 second time delay.
This mode is available in triplex or quadraplex systems. In a two pump system, the Jockey Pump Mode provides
the same function as the Peak Pump mode.
Sequencing Mode ‐ Dual Duplex ‐ Only available on four pump systems, this sequence runs two pair of two pumps.
Usually one pair is smaller than the other and run in lower flow periods. If they can’t keep up with the flow, the
systems uses the larger main pumps. Select Lead Pair button to toggle between pump lead pair sequence.
Lead Pair ‐ Only visible in Dual Duplex mode.
134
Level Control
69 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The Lag Staging Mode screen can be accessed through the Number of Pumps screen.
The ability to set the mode of operaƟon on the lag pumps gives the PV1200 flexibility in the way the pumps are
staged on and off. In a normal pump sequence, a lead pump is called, then a lag pump, then other pump, and so
on. However some pump systems need an alternate sequence. For example a triplex pump system where the
discharge capacity is limited to two pumps, however the staƟon is criƟcal and must have two pumps always avail‐
able. The LAG 2 pump would be set to STANDBY. Then the third pump in the sequence will only run in the event
that one of the other two pumps has failed.
In another triplex pump applicaƟon there may be a need to have two pumps always running and having the third,
again, available as a standby pump. The LAG 1 would be set to SLAVE and the LAG 2 would be set to STANDBY.
In all cases, the pump alternaƟon scheme is not affected by the Lag Staging Mode seƫngs.
Mode SelecƟon ‐ Touch these buƩons to scroll through the operaƟon mode for each lag pump. The lag staging
mode opƟons available are:
NORMAL ‐ The pump will stage in the normal lead, lag sequence.
SLAVE ‐ The pump will run whenever the lead pump runs.
STANDBY ‐ The pump is not a part of the staging sequence, but it will be available to run if a
running pump has failed.
Lag Staging
Mode
SYSTEM CONFIGURATION
Lag Staging Mode
135
Level Control
70 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Starter Type ‐ Touch one of these switches to select the pump starter type. The choices include:
FVNR ‐ Across‐The‐Line starters (and hardwired RVSS starters)
FVNR with MOTOR Vision starters
RVSS ‐ connected by Modbus
VFD ‐ hard wired to I/O
VFD ‐ connected by Modbus
RTU/IP Switch ‐ Touch this switch to toggle between Modbus RTU (RS485) and Modbus IP (Ethernet) communica‐
Ɵon with the VFD. The switch will only appear for VFDs that support Ethernet communicaƟon.
VFD IP ‐ Some of the listed VFDs can communicated with the PV1200 by Modbus IP. For those that can, a buƩon
appears here. Touch the buƩon to bring up the VFD Modbus IP ConfiguraƟon screen.
Configure ‐ This buƩon appears if a Modbus connected starter is enabled, including RVSS, VFD, and MOTOR Vi‐
sion starters and provides access to the RVSS or VFD Motor ConfiguraƟon screen, or the MOTOR Vision Starter
SelecƟon Screen.
FVNR Type
VFD
Type
RVSS Type
VFD IP Configure RTU/IP Switch
SYSTEM CONFIGURATION
VFD/RVSS/Starter Type
136
Level Control
71 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Motor Data
SYSTEM CONFIGURATION
VFD/RVSS Motor Setup
Overview
When the PV600 is connected by Modbus to an RVSS or VFD selected as the pump starter the PV600 provides
access to the basic motor setup parameters of the VFD or RVSS. This feature reduces the need to access the in‐
ternally mounted VFD or RVSS keypad.
Motor Data
Motor HP ‐ Enter the motor nameplate HP (or kW on some VFDs or RVSSs)
Voltage ‐ Enter the supply voltage to the VFD or RVSS
VFD Maximum Frequency ‐ In some applicaƟons, it may be desirable to run the pump past the normal design
rpm. This is possible by adjusƟng the maximum frequency of the VFD. The allowable range is 50Hz—
99.9Hz. Default seƫng is 60Hz. Use extreme cauƟon when considering higher speeds as it may harm the
pump and/or motor.
Motor FLA ‐ Enter the motor nameplate full load amperes.
Motor RPM ‐ Enter the motor nameplate RPM (only on VFD configured systems)
AcceleraƟon ‐ Enter the desired acceleraƟon Ɵme for the RVSS or VFD. On VFD PID systems, the acceleraƟon
Ɵme should be set for 5 seconds to allow the PV600 to provide smooth control of the PID loop.
DeceleraƟon ‐ Enter the desired deceleraƟon Ɵme for the RVSS or VFD. On VFD PID systems, the decelera‐
Ɵon Ɵme should be set for 5 seconds to allow the PV600 to provide smooth control of the PID loop.
DirecƟon ‐ NORMAL is the default seƫng. If for some reason it is suspected that the pump is running back‐
ward, the direcƟon of rotaƟon can be changed by touching the buƩon and seƫng the VFD or RVSS in re‐
verse run mode. This can eliminate the need to physically reverse the motor leads to reverse pump rota‐
Ɵon.
.* These parameters are not shown on RVSS configured systems.
CAUTION: This should only be done by trained personnel as damage to the pump can be severe if the pump is im‐
properly configured!
137
Level Control
72 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Meter Range SelecƟon ‐ Touch this knob to rotate the dial and select the ammeter and kW meter range to use for
the Pump Dashboard screens and the MOTOR Vision Dashboard screens. There are 14 meter ranges up to 600A
maximum.
Voltage ‐ Touch this switch to toggle between 240VAC and 480VAC range. The funcƟon of this seƫng is to
properly scale the kW meter relaƟve to the ammeter on systems configured with kW monitoring equipment.
Pump SelecƟon‐ Touch this knob to rotate the dial and access each pump’s VFD or RVSS seƫngs individually
Copy ‐ Touch this buƩon to copy the currently selected pump’s RVSS or VFD configuraƟon seƫngs, including motor
data and ammeter range, to all of the other connected VFDs or RVSSs in the system.
Pump
Starter
Voltage
SYSTEM CONFIGURATION
VFD/RVSS Ammeter and kW Meter Range
Meter Range
SelecƟon
Copy
138
Level Control
73 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Modbus IP ConfiguraƟon
When using Modbus IP communicaƟon, The VFD Modbus IP ConfiguraƟon screen becomes selectable. Here the
individual IP addresses and slave ID’s for each VFD can be set.
IP Address ‐ Enter the full IP address for the Pump 1 VFD. This must match what is programmed into the VFD.
Fourth Octet ‐ For Pumps 2 through 4, only the fourth octet of the IP address needs to be entered since the other
porƟon of the IP address must be in the same subnet as Pump 1. These must match what is programmed into
the VFD.
VFD ID ‐ Enter the Slave ID number for each VFD. This must match what is programmed into the VFD.
NOTE: New seƫngs are in effect immediately. Be sure that the pumps are either locked off or the system is pre‐
pared for the pumps to possibly start when communicaƟon with the VFD is established.
SYSTEM CONFIGURATION
VFD Modbus IP ConfiguraƟon
IP Address
Fourth Octet VFD ID
139
Level Control
74 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The PV1200 can be set to operate in a pump down
mode for emptying sumps and wet wells, or pump
up mode to fill reservoirs and tanks. In addiƟon,
when VFDs are installed, the system can be set to
operate in types of speed control modes.
DirecƟon ‐ Touch this switch to toggle between
TANK FILL and SUMP EMPTY.
VFD OperaƟon Mode ‐ Touch this knob to rotate the dial to the desired mode. The modes of VFD control available
are:
ProporƟonal ‐ the speed of the pumps is proporƟonal to the level of the liquid.
PID Level‐ the speed of the pumps is modulated to maintain a specific level in the sump or tank.
PID Flow‐ the speed of the pumps is modulated to maintain a specific flow from the sump or tank.
ProporƟon Mode ‐ The speed of the pumps is directly proporƟon to the posiƟon of the liquid within the level band.
The pumps run at the VFD maximum speed when the level reaches the last lag start set point, and ramp down to
the VFD minimum speed as the pumps reach the stop set point. The speed of the VFDs is proporƟonal and linear
between those two points.
PID Modes ‐ The speed of the VFDs is changes to maintain either level or flow.
DirecƟon
SYSTEM CONFIGURATION
OperaƟon Mode
VFD OperaƟng
Mode
140
Level Control
75 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The PV1200 level controller can operate with almost any type of level sensor including 4‐20 mA transducers, 4‐20
mA ultrasonic sensors, float switches, and mulƟ‐segment rods.
The PV1200 also supports the use of two level sensors on the same system. When two level sensors are connect‐
ed, one is designated to be the primary sensor and the other is the backup sensor. The purpose of the backup
sensor is to take over control of the system in the event of a primary sensor failure.
When only one sensor is connected, this screen provides access to the configuraƟon opƟons.
Primary Level Sensor Selector ‐ Touch the knob to rotate the dial and select one of the level sensor options. The
options are:
4‐20 mA Transducer (submersible, bubbler, trapped air, any other 4‐20 mA level sensor)
4‐20 mA Ultrasonic Level Transducer
Float Switches (low level, stop, start for each pump, high level)
Multi‐segment Probe (for a 10 contact probe rod)
Unit of Measurement ‐ Inches or PSI: When 4‐20 mA pressure is selected as the primary sensor, it is necessary to
select Inches or PSI as the transducer scale unit of measurement. If the transducer to be connect is scaled in feet
or inches, select inches and enter the range directly in inch format.
When the transducer is scaled in psi, select psi here and enter the transducer psi range. The PV1200 will convert
the psi range to feet using 2.31 feet/psi as the conversion.
Purge Solenoid ‐ Touch this switch to enable the purge solenoid timer. The timer then becomes available for setup
in the Timers Menu. This is only visible when one of the sensors is 4‐20 mA transducer.
Calibration ‐ Touch this button to access ANALOG INPUT CALIBRATION configuration screens.
Purge
Solenoid
SYSTEM CONFIGURATION
Level Sensors
Primary
Level Sensor
Selector
Unit of
Measurement
CalibraƟon
141
Level Control
76 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Offset Sensor Range
Secondary Level Sensor Selector—Touch the knob to rotate the dial and select one of the level sensor options.
The options are:
4‐20 mA Transducer (submersible, bubbler, trapped air, any other 4‐20 mA level sensor)
4‐20 mA Ultrasonic Level Transducer
Float Switches (low level, stop, start for each pump, high level)
Multi‐segment Probe (for a 10 contact probe rod)
NOTE: Some combinations of sensors are not possible. If either the primary or the secondary sensor is float
switch or multi‐segment sensor, the other cannot also be float switches or multi‐segment sensor. This is because
there is only one set of the digital inputs required to connect either of those two types of sensors.
Sensor Range ‐ Enter the calibrated range of the level sensor that is connected to the PV1200.
Offset ‐ With all sensor types except float switches, an offset can be entered. The offset is used to correct the
level reading when the sensor is located above the zero elevation reference point. The offset is added to the lev‐
el sensor input reading and then used for the level display and set point comparators.
Direction of Sensing ‐ Touch this switch to toggle between direct and reverse sensing for ultrasonic sensors. Ultra‐
sonic sensors configured to read water height are considered “Direct”, and sensors configured to read distance
from sensor, or sensor offset, to liquid surface are considered “Reverse”. This switch is only visible when Sonic
sensor is selected.
Trend Range ‐ With all sensor types a range can be entered that is used for the trend graph. This is useful when a
tighter resolution is needed for viewing the trending graph history. The minimum and maximum set points en‐
tered here will be the minimum and maximum points possible on the trend graph.
Calibration ‐ Touch this button to access ANALOG INPUT CALIBRATION configuration screens.
SYSTEM CONFIGURATION
Level Sensors
DirecƟon
Of Sensing
Trend Range
Secondary
Level Sensor
Selector
CalibraƟon
142
Level Control
77 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Flow meter sensor type = PULSE
Touch the knob to selected this mode
K Factor: Appears when sensor type is set to
Pulse type. Enter the K Factor from the flow me‐
ter data sheet.
Range for Flow Trend Display: This range may be
different than the transducer range to improve
resoluƟon of the graph.
Flow Meter Setup ‐ None, or Calculated Flow
Flow meter sensor type ‐ Can be set to NONE
The PV1200 can calculate the flow rates and to‐
tals if the measurements of the sump or tank are
entered into the Calculated Flow Setup screen.
Touch this buƩon to access the Calculated Flow
Setup screen.
SYSTEM CONFIGURATION
Flow Meter
Flow Meter Setup ‐ Pulse transmiƩer
Flow meter sensor type = 4‐20mA TRANSDUCER
Touch the knob to selected this mode
Range: Appears when transducer is set for sensor
type. The top of range is input in a data entry
screen in Gallons Per Minute (GPM). This should
be the range as calibrated on the flow meter.
Range for Flow Trend Display: This range may be
different than the transducer range to improve
resoluƟon of the graph.
Touch this buƩon to access the ANALOG INPUT
CALIBRATION screens.
Flow Meter Setup ‐ 4‐20 transmiƩer
143
Level Control
78 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The PV1200 level controller can calculate both the inflow and ouƞlow in a sump or tank, even if no flow meter if
connected to the controller. All that is required is that the sump or tank be a cylinder or a rectangular prism,
with regular and parallel sides, and the dimensions of the shape be entered into the calculated flow setup
screen.
Gallons per foot calculaƟon ‐ once the size of the sump or tank is entered, the PV1200 can calculate the gallons
per foot of elevaƟon. Since the PV1200 has stop and start pump set points entered, it can calculate a fixed vol‐
ume of water.
Calculated Inflow ‐ When the pumps stop pumping water, it is at the stop pump’s set point. With the pumps off,
there is only liquid entering the tank. When the level rises, it reaches the lead pump start set point and a pump
starts pumping. The PV1200 measures the Ɵme that the pumps are off and can calculate the average inflow
gpm.
In an example; the tank holds 100 gallons per foot of elevaƟon. The stop set point is 3.0 Ō. and the start lead
pump set point is 5.0 Ō. In this system there is 200 gallons of fill while the pumps are off. If it takes 10 minutes
to fill that amount, the inflow rate is 20 gpm average.
Calculated Ouƞlow ‐ When the pumps start pumping water, the PV1200 Ɵmes how long it takes to reach the stop
set point. Again, it can calculate the gpm with the data. Using the previous example, if the pump runs for 2
minutes to lower the level back to the stop set point, the ouƞlow rate is 100 gpm, plus the 20 gpm average in‐
flow rate, for a total ouƞlow rate of 120 gpm.
On systems with widely inconsistent inflow rates, the margin of error will be greater.
Tank Dimensions
Volume
per Foot
Select Shape
Rectangular Prism Tank Shape
SYSTEM CONFIGURATION
Flow Meter—Calculated Flow
144
Level Control
79 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Calculated totals ‐ The PV1200 uses the calculated flow rate data to calculate a totalized flow per day, week, and
month.
Select Shape ‐ Select the shape of the tank or sump (cylinder or rectangular prism).
Tank Dimensions ‐ Enter tank dimensions in inches (accurate to 1/10th inch).
Volume per Foot ‐ The PV1200 calculates the total gallons per foot of tank or sump elevaƟon.
Cylindrical Tank Shape
Tank Dimensions
Volume
per Foot
Select Shape
SYSTEM CONFIGURATION
Flow Meter—Calculated Flow
145
Level Control
80 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Engineering
Overview
The PV1200 level controller has three 4‐20 mA analog inputs and are scaled by factory default to 4‐20 mA. Alt‐
hough it is usually not required when the factory calibraƟon of the sensor is accurate, it is possible if necessary to
make adjustments to both sides of the analog to digital conversion scales. While the field sensor is normally
scaled to provide a 4‐20 mA analog input, there are Ɵmes when the sensor may not output exactly 4‐20 mA. In
the above example, the actually readings are not to that exact scale on the Backup Transducer and an adjustment
on both the minimum mA input and maximum mA input is needed.
Actual mA Input ‐ The actual input reading can obtained with either a voltmeter, or by looking at Actual mA Input
value on Analog Input CalibraƟon screen. Once the full scale of the sensor is determined, the values can be input.
Minimum mA Input ‐ Enter the value obtained with the sensor is at its minimum output.
Maximum mA Input ‐ Enter the value obtained with the sensor is at its maximum output.
Minimum Digital Units Output ‐ Enter the minimum scale of the sensor output (usually 0) .
Maximum Digital Units Output ‐ Enter the maximum scale of the sensor output.
Actual mA Input ‐ This is the actual mA input at the PV1200 analog input terminal. This value can be verified by an
external digital mulƟ‐meter.
Engineering Units ‐ The units of measurement are shown here. This can be change for the pressure sensors on the
sensor configuraƟon screen. (touch RETURN).
Minimum
mA Input
Maximum
mA Input
Minimum Digital
Units output
Maximum Digital
Units output
Level Backup Level Flow
Actual
146
Level Control
81 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The Special OpƟons screen is a menu that gives access to enabling special funcƟons in the PV1200 controller. The
table below shows the opƟons available in the three modes and the funcƟon performed.
SYSTEM CONFIGURATION
Special OpƟons Menu
Menu Item
Enable
MENU ITEM BOOST‐LEVEL WELL FUNCTION
PUMP STATUS INDICATOR COLOR X X X Select custom colors for the pump status indicators
ANALOG OUTPUT FUNCTION X X X Select which process signals to output to the 4‐20 mA
analog outputs.
TIME CLOCK CONTROL X X X Set specific Ɵme periods within a 7‐day schedule in which
the pumps can run
TARGET SET. P/W BYPASS X X Enable ability to modify target pressure set point without a
password
GENERATOR LOAD SHED X X Reduce number of pumps in operaƟon when running on
emergency power
ANALOG SET POINT ADJUST 1 Enable Remote Analog Set Point (RAS) or Remote Analog
Set Point Adjust (RASA)
HIGH SYSTEM PRESSURE SWITCH 1 1 Override high pressure set point with pressure switch
LOW FLOW BYPASS TIMER 1 1 1 Set alarm and lag pump start Ɵme delay in low pressure/
level events
NETWORK READBACK DISABLE 1 1 1 Set run priority to digital feedback inputs
DISABLE ALARMS 1 1 1 Enable/Disable external alarm bit
HIDE HOA OFF BUTTONS 1 1 1 Change visibility of OFF buƩon on HOA switches
REDUNDANT TRANSDUCER 1 1 AutomaƟcally use a backup transducer in the event of a
primary transducer failure
PID LEVEL W/MAX. FLOW 1 Maintain constant level. If flow reaches set point, switch
to PID Flow. Auto Reset
I2 SYSTEM ENABLE X Reads input I2 to enable or disable pump operaƟon
(not for quadraplex w/seal failure sensor)
I32 SYSTEM ENABLE X Reads input I2 to enable or disable pump operaƟon
147
Level Control
82 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
SYSTEM CONFIGURATION
Special OpƟons ‐ Setup Pump Status Indicator Colors
Color
Selectors
Reset
Overview
Some facilities may have an indictor light color scheme that requires compliance from all HMIs and control panels
to a certain color scheme that does not match the PUMP Vision “standard”. One of the more common alterna‐
tives to the PUMP Vision default is a red RUN indicator, green OFF indicator, amber FAULT indicator, etc.
This screen makes it possible to change the default color scheme to a custom color scheme.
Color Selectors ‐ Touch the color selectors to scroll through the available choices.
Reset ‐ Touch the LOAD FACTORY DEFAULT COLORS button to return to the standard scheme.
The table below shows the colors that are available for each status indication. The X’s show the possibilities and
the D’s indicate the default colors. The default colors are also shown in the picture above.
NOTE: The colors chosen for Out 0f Service and Remote Run will also be used for the “soft” HOA switch when it is
in OOS or Remote Run.
FUNCTION
RUNNING D X X
FAILURE D X X
OUT OF SERVICE X X X
CALLED X D X
MAINTENANCE DUE X D X X
REMOTE RUN X X D
STOPPED D X X X
X
D
148
Level Control
83 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
SYSTEM CONFIGURATION
Special OpƟons ‐ Expansion Analog Output Setup
Base
Outputs
Overview
Base Outputs ‐ This option allows the “connection” of any system configured process variables (listed below) to
be sent through one of the PV1200’s four 4‐20 mA analog outputs.
None No output
VFD Speed (0‐100%)
System Pressure (PSI scale of transducer input)
Suction Pressure/Level (PSI scale of transducer input)
Temperature (0‐200 F scale of PT100 sensor input)
Flow (GPM scale of transmitter input)
Primary Level (distance scale of transducer input)
Secondary Level (distance scale of transducer input)
Output Selector ‐ Touch each of the output selectors to chose which process signal to “connect” to the analog
output for each of the four outputs. When VFDs are installed that are not connected by Modbus and hardwired
analog signals are needed as a speed reference, it is not possible to change the selection from VFD SPEED.
Each output has the same selections, except that the VFD Speed signals are for specific pumps (Pump 1 outputs
to Output 0, Pump 2 outputs to Output 1, and so on).
It is possible to “connect” the same process signal to multiple analog outputs.
NOTE: Only process signals configured in the system will be available for selection.
Current Value ‐ The value being outputted at the PV600 analog output terminal is shown.
Expansion Outputs ‐ In some configurations, there may not be sufficient analog outputs to meet the project’s
needs and an expansion analog I/O module must be added to the PUMP Vision system. This option allows the
“connection” of any system configured process variables (listed below) to be sent through one of the PV1200’s
two optional expansion 4‐20 mA analog outputs.
Expansion
Outputs
Output
Selector
Current
Value
149
Level Control
84 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
MENU ITEM ACCESS LEVEL FUNCTION
SERIAL AND ETHERNET
COM PORTS
3
Setup RS232/RS485 port for Modbus communicaƟon
with SCADA or BAS
Setup RS485 communicaƟon with VFDs or MOTOR
Vision
Setup Ethernet for Modbus communicaƟon with
SCADA or BAS
EMAIL ADDRESSE LIST 3 Setup email addresses for alarm noƟficaƟon
Not available when no Ethernet card is installed
EMAIL SERVICE PROVIDER 3
Setup the email service provider IP address and login
informaƟon
Not available when no Ethernet card is installed
CANbus CASCADE STAGING 3 Setup link to second system for up to 8 pump opera‐
Ɵon.
Overview
The CommunicaƟon menu displays the following opƟons (some only when the opƟonal Ethernet card is in‐
stalled.)
COMMUNICATIONS
Menu
150
Level Control
85 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The PV1200 has two serial ports used for Modbus communicaƟon. Port 1 is available for a Modbus RTU connec‐
Ɵon. Port wiring informaƟon is shown in the installaƟon secƟon of this manual. A list of the Modbus registers is
available from CMC.
ConfiguraƟon BuƩon ‐ Touch the knob to rotate the dial through three opƟons:
RS232 Modbus Slave
RS485 Modbus Slave
None
Note that depending on the communicaƟon opƟon chosen, the dip switches on the back of the controller must
be set.
Baud‐ Touch the knob to rotate the dial through five opƟons.
9600
19200
38400
57600
115200
Data/Parity/Stop ‐ Touch this switch to toggle between 8‐N‐1 and 8‐E‐1.
Network ID ‐ Touching this buƩon brings up a numeric entry screen. Valid entries range from 0 to 127.
Apply Changes ‐ Touch this buƩon to make Ethernet and Com Port changes acƟve. This is also a method of re‐
iniƟalizing the Ethernet port in the event that communicaƟons to the port are lost.
Data/Parity/Stop
COM 1 Mode
Selector
COMMUNICATION
COM 1 Serial Port
Baud
Network ID
Apply
151
Level Control
86 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The COM 2 port is used exclusively for internal Modbus connecƟon to VFDs or MOTOR Vision.
Installed SwƟch ‐ Touching this switch toggles between YES for installed and NO for no VFD or MOTOR Vision
starter. Each starter has its own buƩon, to allow individual removal. This feature allows a system to have a VFD
on one pump and an RVSS or FVNR starter on another.
Enable Switch ‐ Touching this switch toggles between YES for enabled and NO for disable communicaƟon to the
VFD or MOTOR Vision starter. Each starter has its own buƩon, to allow individual removal. This feature allows
a system to have a Modbus VFD on one pump and non Modbus VFD on another.
Baud‐ Touch this switch to toggle between 9600 and 19200 baud rates
Data/Parity/Stop ‐ Touch this switch to toggle between 8‐N‐1 and 8‐E‐1.
Graphic Indicator ‐ Shows a picture of the type of unit that is connected.
Apply Changes ‐ Touch this buƩon to make Ethernet and Com Port changes acƟve. This is also a method of re‐
iniƟalizing the Ethernet port in the event that communicaƟons to the port are lost.
Graphic
Indicator
COMMUNICATION
COM 2 Serial Port
Data/Stop/
Parity
Baud
Enable
Installed
Apply
152
Level Control
87 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Ethernet Setup
If the PV1200 has the opƟonal Ethernet board, the system will iniƟalize the port on power up and enable the
configuraƟon screen. Once enabled and configured, the port supports four simultaneous connecƟons through
“sockets”. Ethernet access from the Remote Access and programming soŌware, as well as a Modbus IP connec‐
Ɵon, are automaƟcally enabled.
IP Address ‐ Touch each buƩon to enter the numbers of the desired IP address.
Subnet Mask ‐ Touch each buƩon to enter the numbers of the desired Subnet Mask.
Default Gateway ‐ Touch each buƩon to enter the numbers of the desired Default Gateway.
Password ‐ Touch this buƩon to enter the password for the controller. In order to connect to the controller
with Remote Access or Remote Operator, this password must be entered.
Apply Changes ‐ Touch this buƩon to make Ethernet and Com Port changes acƟve. This is also a method of re‐
iniƟalizing the Ethernet port in the event that communicaƟons to the port are lost.
COMMUNICATION
Ethernet Port
IP Address
Subnet Mask
Default Gateway
Password Apply
153
Level Control
88 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Email Address
Text Message
COMMUNICATION
Email Addresses
Send Alarms
File Email Setup
Send Files
Overview
On this screen the user can enter a list addresses for up to six email recipients. For each recipient on the list,
Send Alarms and Send Files can be individually set.
Email Address ‐ Touch these buƩons to enter the email address up to 36 characters.
Send Alarms‐ These buƩons toggle between YES and NO. Message sending can be individually disabled per user
without removing their name from the SEND TO list. When a alarm email event is triggered, the email handler
will send out a message to each enabled recipient on the list.
Send Files ‐ These buƩons toggle between YES and NO. File sending can be individually disabled per user without
removing their name from the SEND TO list. When a file email event is triggered, the email handler will send out
the file to each enabled recipient on the list. NOTE: When sending a file message to a text message address, the
message will arrive, stripped of the file. The files can only be sent to email addresses.
File Email Setup ‐ Touch this buƩon to access the FILE EMAIL SETUP screen when each data file type can be setup
to send automaƟcally on a periodic basis.
Text Message ‐ To send a text message, send an e‐mail to the cell phone using the format of
5555551212@provider.com where the phone number of the cell phone and the cell phone service provider are
entered in the email recipient address.
Contact your service provider or check their website for their email address format.
Some common service providers:
AT&T ‐ cellnumber@txt.aƩ.net US Cellular ‐ cellnumber@email.uscc.net
Verizon ‐ cellnumber@vtext.com Nextel ‐ cellnumber@messaging.nextel.com
T‐Mobile ‐ cellnumber@tmomail.net Boost ‐ cellnumber@myboostmobile.com
Sprint PCS ‐ cellnumber@messaging.sprintpcs.com Alltel ‐ cellnumber@message.alltel.com
Virgin Mobile ‐ cellnumber@vmobl.com
154
Level Control
89 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The PV1200 can send out alarm e‐mail and text messages if configured with the opƟonal Ethernet board and if
connected to the Internet. An SMTP server with a staƟc IP address is also required. The ESP informaƟon above
is a working email box that is available for use in tesƟng a system. For full Ɵme use, each user must establish
their own email service provider and mailbox.
First, an e‐mail account must be established with a user login name and password.
Next, the IP address of the SMTP server must be determined as the PV1200 cannot resolve a DNS name. To find
out what the IP address is for your server:
• From your Windows Start buƩon click RUN.
• When the RUN box opens, enter CMD into the command line and click OK.
• At the DOS prompt that appears, type “ping mail.server.com” (subsƟtute the name of your SMTP serv‐
er for the mail.server.com) and press enter.
• The IP address of your server will be displayed in brackets.
• Use this address to enter your IP address into the controller.
SMTP IP Address ‐ Touching these buƩons will bring up a text entry screen. Enter in the SMTP IP Address.
Port ‐ Enter the Port number here.
Name ‐ Enter the name of the email account.
Password ‐ Enter the password for the email account.
From Address ‐ Enter the address you want to appear in the From line in the emails.
StaƟon ID ‐ Enter the staƟon ID here.
SMTP IP Address
Name
Password
From Address
StaƟon ID
Port
COMMUNICATION
Email Service Provider
155
Level Control
90 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Delay Auth.
Delay Send
Delay Reconnect
Delay Retry
COMMUNICATION
Email Service Provider
Overview
These Ɵmers are necessary to control the process of connecƟng to the remote email service provider, providing
user name and password, then sending the message or file. AddiƟonal Ɵmers are needed to control the recon‐
necƟon and retry aƩempts on the server.
Delay Auth.‐ It is recommended to set this Ɵmer to one second to allow the PV600 Ɵme to establish its connecƟon
to the server. Slightly longer Ɵmes may be needed in some case with slower Internet speeds or service providers.
A value too low will result in an ‘authenƟcaƟon failure’ message on the TEST EMAIL screen.
Delay Send ‐ This Ɵmer adds Ɵme aŌer authenƟcaƟon before sending the message or file. A value of 0 will oŌen
work here, but with some cellular connecƟons a slight delay of perhaps 100 ms will prevent a message send fail‐
ure.
Delay Reconnect ‐ Depending on the type of email account that has been established with the email service provid‐
er, there may be a limitaƟon on the number of Ɵmes per minute that the PV600 can connect to send a message
due to the ESPs security against ’robot’ emailers. Since the way that the PV600 manages the message queue,
each message is a separate connecƟon and the ESP is recognizing that there is a machine sending the message.
With free email accounts, the limitaƟon may be to as liƩle as once a minute. In paid accounts, there may be very
liƩle limitaƟon to the frequency. If the frequency is higher than the ESPs limit, the connecƟon will be rejected
and the PV600 connecƟon retry Ɵmer will start Ɵming down to a reconnect try.
Delay Retry ‐ If a connecƟon aƩempt is rejected by the ESP, the PV600 will retry the connecƟon for three Ɵmes be‐
fore failing the email address and moving to the next recipient on the list. The seƫng on this Ɵmer should be
high enough that three Ɵmes the seƫng is longer that the ESPs connecƟon frequency limit.
NOTE: Experiment with the Delay Reconnect Ɵmer to get the least Ɵme possible without connecƟon failures. The
shorter the Ɵme, the quicker the message gets to all the recipients on the email list. Use the TEST EMAIL screen
in the DIAGNOSTICS MENU to test the connecƟon and monitor failure messages.
156
Level Control
91 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Two PV1200s can be connected together with a CANbus port to effecƟvely create an 8 pump controller. This
requires special wiring for each system shown on the following pages.
Once connected, one unit must be set as the master and the other as the slave. The master controls which sys‐
tem’s pumps will operate as the lead pumps and which are lag. The lead duty is automaƟcally transferred on a
weekly basis.
For example, two Triplex systems are linked. This week, this staƟon’s pumps will alternate as lead 1,2,3 ‐ 3,2,1
etc. and the other staƟon’s pumps alternate as lag 4,5,6 ‐ 5,6,4 etc. if needed. Next week, it is reversed. This
staƟon is 4,5,6 ‐ 5,6,4 and the other is 1,2,3 ‐ 2,3,1 ‐ 3,1,2.
Can be used with any combinaƟon of two panels.
MASTER wiring Slave Wiring
COMMUNICATION
CANbus ‐ Cascade Pump Control
157
Level Control
92 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
Using the PV1200’s CANbus connecƟon, two panels can work in tandem as one system that operates up to eight
total pumps. Shown above is a screen from a system that is connected and running in Cascade Mode.
Cascade Control Enable ‐ This must be enabled in order to use cascade sequencing through CANbus. Touch the
switch to toggle between ENABLED or DISABLED.
Controller FuncƟon ‐ Touch this switch to select MASTER or SLAVE. One staƟon must be the master and one must
be the slave. AŌer making the choice and seƫngs on both staƟons, the PV1200s must be rebooted.
Apply ‐ Touch this buƩon to ’Apply’ the change aŌer changing the control master/slave funcƟon. The buƩon is not
visible when a change has not been made by touching the ‘Controller FuncƟon’ buƩon. .
Connected Indicator ‐ Once the systems have been properly wired together and the master/slave funcƟon has been
set and systems rebooted, the ‘Connected’ indicator will read YES.
Lead System ‐ As described previously in this secƟon, the lead duty of each PV1200 automaƟcally changes on a
weekly basis. One of the controllers will read “This Controller’ and the other will read ‘Remote Controller’. This
buƩon not only serves as an indicator of the duty status, pushing the buƩon manually changes which system is
lead.
Ready Indicators ‐ Local, Remote, System ‐ Shows the status of each system and total system status. When the
‘System Ready Indicator’ reads ‘YES’, the system will operate in cascade mode.
Call Remote Delay Timers On ‐ The amount of Ɵme the system waits to call the pumps of the other system.
Call Remote Delay Timers Off ‐ The amount of Ɵme the system waits to shutdown the lead pump of the standby
system.
Enable/Disable
ConnecƟon
Timers
Apply
Remote Ready
System Ready
Local Ready
Lead System
COMMUNICATION
CANbus ‐ Master
Controller
FuncƟon
158
Level Control
93 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
MENU ITEM ACCESS
LEVEL FUNCTION
SD MEMORY CARD
DATA LOGGING 2
Enable the various data logs and trends.
Access the various data log folders and the files within. De‐
lete unwanted files.
Only available if the opƟonal SD memory card is installed.
FLOW LOG SETUP 2 Enable and setup the Flash RAM flow data logging for Day,
Week, Month logs.
Overview
The Data Log Menu displays the following opƟons when the opƟonal SD memory card is installed.
DATA LOG CONFIGURATION
Menu
159
Level Control
94 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
This screen allows the user to access the logging and trend data folders which have been saved to the SD card.
Each log is type is stored in a separate file folder to help with file management, with the excepƟon that all three
flow logs are stored in one folder. This screen also allows the user to view the status of all the data log folder that
are enabled by system configuraƟon. Each folder can hold 63 months of files. As the folders start to become full,
warning messages will appear on the Main Dashboard, Alarm Log, Alarm Handler, and will be emailed if the sys‐
tem is configured for email. A warning is generated when any log reaches three months of remaining file space,
again at two months, one month and at ‘full’. A warning is also generated if the remaining space on the SD card
is less than 10MB. To deal with an SD card that is full, either delete previous files or install a new SD card. Old
files can be deleted with the SD card in the PUMP Vision controller, or by removing the card and using a PC to
manage the files. On systems configured for email, the old files can be emailed for retenƟon prior to deleƟon.
Touch any buƩon to be taken to that trend or data log’s SD Card File Manager screen.
Trend File ‐ Touch this buƩon to open the folder where the trend history files are stored.
Data Table Folders ‐ Touch these buƩons to open the folders where the Data Table Format files are stored.
CSV Files ‐ Touch these buƩons to open the folders where the Excel .csv files are stored. Comma separate value
files can be viewed in most data table processing programs.
Number of Files ‐ The number of files in each folder type is displayed. For the Alarm Log, and the Weekly and
Monthly Flow Logs, there is only one possible file in the folder. In folders where data logging has not been ena‐
bled and no file exists, a ‘No Log’ message is indicated instead of a number of files.
Remaining Time ‐ The remaining Ɵme each folder type is displayed. For the Alarm Log, and the Weekly and Month‐
ly Flow Logs, there is only one possible file in the folder, so there is no chance of reaching the 63 file limit and the
only data logging limitaƟon is total card space. In folders where data logging has not been enabled and no file
exists, a ‘No Log’ message is indicated instead of remaining Ɵme.
Space Remaining ‐ The total number of megabytes of memory remaining in the PUMP Vision SD card is displayed.
File Email Setup ‐ Touch this buƩon to access the FILE EMAIL SETUP screen when each data file type can be setup
to send automaƟcally on a periodic basis.
Trend File .udt Data
Table Files
Excel .csv
Files
DATA LOG CONFIGURATION
File Manager Folder SelecƟon
File Email Setup SD Logging Setup
Space
Remaining
Number of
Files
Space
Remaining
160
Level Control
95 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Save Enable
.udt Files
DATA LOG CONFIGURATION
SD Data Log Setup
Save Enable
.csv Files
Overview
This screen allows the user to enable saving the trend and log files to the SD card. There are a total of thirteen
separate data log types being saved. Some are a conƟnuous log and some are monthly logs. The contents of the
logs are:
Alarm Log (full) An ‘eternal’ log. This log will keep every alarm event into one log.
Alarm Log (monthly) A monthly log. New log is created each month with only alarms from that
month being logged.
Run Log (monthly) A monthly log. New log is created each month with only run events from that
month being logged.
Trend Chart (monthly) A monthly log. New log is created each month with the trend chart from that
month being logged.
Daily Flow (monthly) A monthly log. New log is created each month with the daily flow totals from
that month being logged.
Weekly Flow (full) A ‘eternal’ log. One log is created with the weekly flow totals being logged.
Monthly Flow (full) A ‘eternal’ log. One log is created with the monthly flow totals being logged.
For each log that is enabled, a file is automaƟcally created and wriƩen to the SD Card for each month, except the
flow logs which are run conƟnuously.
Each file folder on the SD card can save up to 63 files, so 63 months of data are available for each log and the
trend.
Save File Type ‐ Touch each of the buƩons to enable/disable each file type for each log or trend.
Each log can be saved as both .UDT files which can be viewed and managed with the available PC based SD Card
Manager soŌware, or .CSV format which can be viewed and managed with Excel.
161
Level Control
96 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The SD Card File Manager screen allows the user to scroll through and view the files in the trend and log file folders.
Enable ‐ Touch this switch to toggle between save enabled and disabled. This switch and the one on the SD Card
Data Logging Setup screen perform the same funcƟon.
AcƟve File ‐ This is the name of the file to which data is currently being saved. If the log is not enabled in the Save to
SD Card screen, this will read ‘NOT SAVING’.
Current View ‐ This is the name of the file currently being displayed.
Number of files in folder and file number ‐ The total number of files in the folder is displayed. When the folder is
first entered, the most recent file is displayed and it’s number is the last number in the folder. As the file scroll
buƩons are touched, the file number increments or decrements.
The other data displayed in the Current View are the file’s creaƟon date and Ɵme, as well as the file size.
Back ‐ Touch this buƩon to view to the previous month’s file. If no file exists for the month being request, ‘FILES DOES
NOT EXIST IS DISPLAYED’.
Forward ‐ Touch this buƩon to view to the following month’s file. If no file exists for the month being request, ‘FILES
DOES NOT EXIST IS DISPLAYED’.
Most Recent ‐ Touch this buƩon to advance to the most recently month’s file.
Delete ‐ Touch this buƩon to delete the currently displayed file. Enter the clear log password, 1234, when prompted.
CauƟon: this will permanently delete the file from the SD card.
Email The File ‐ Touch this buƩon when Email is display to send the currently displayed file the enabled recipients
on the email list.
Email Status ‐ This area shows the file email progress and will show the port countdown Ɵmer when acƟve.
Back Most
Recent
Forward Delete
AcƟve File
Current View
DATA LOG CONFIGURATION
SD Card File Manager
Enable
Email
The File
Email Status
162
Level Control
97 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Daily Log
Overview
The PV1200 can log the flow data to the internal Flash RAM memory. Three separate logs are kept of the total
GPM and number of pumping cycles during the period. The logs can be individually enabled or disabled, reset,
and configured for start point. Each of the three logs stores the past 100 log periods in a FIFO data log.
Daily Log ‐ A separate total for each day, with the log beginning Ɵme being the Reset Time.
Weekly Log ‐ A separate total for each week, with the log beginning Ɵme being the Reset Time and Day of
Week.
Monthly Log ‐ A separate total for each month, with the log beginning Ɵme being the Reset Time and
Month.
Reset Time ‐ Set the Ɵme of the day that the log will write a new line.
Enable Log ‐ Set the day of the week that the log will write a new line.
Reset Total ‐ Set the day of the month that the log will write a new line.
Reset ‐ Reset the total gallons on the Main Dashboard and calculated Flow Summary page.
Unlock Screen ‐ This screen can be accessed from the Flow Log screen and in that case, the set points are read only
unƟl the unlock buƩon is touched and the Level 1 password is entered to the password keypad. The screen
locked indicator will change to screen unlocked. The screen is automaƟcally unlock when entered from the Con‐
figuraƟon Menu.
Enable Log
Reset Log
Reset Time
Reset Total
Weekly Log
Monthly Log
DATA LOG CONFIGURATION
Flow Data Log Reset Times
Unlock Screen
163
Level Control
98 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
MENU ITEM ACCESS LEV‐
EL FUNCTION
INPUT OUTPUT STATUS 1 Monitor digital and analog inputs and outputs, base and
expansion
ALARM TEST 1 Live test the alarm funcƟons
SD CARD FILES 1 Check status of configuraƟon SD card backup file
BACKUP/RESTORE CONFIG 2 Backup and restore the PV1200 configuraƟon
CONFIGURATION INFO 1 Overview of the PV1200 configuraƟon
VFD/MV COMMUNICATION 1 Monitor status of Modbus communicaƟon to VFD/MV
CHANGE PASSWORDS 3 Requires re‐entry of level 3 password. Change all pass‐
word levels to user defined passwords.
OPERATING SYSTEM Enter the PV1200 operaƟng system
DISPLAY LIGHT 1 Setup backlight brightness and screen saver Ɵme out
TEST EMAIL 2 Send test emails out
ETM RESET Reset the start counters and pump run Ɵme meters
TEST MODE 2 Run complete system test
Overview
The DiagnosƟc Menu is accessed from the Main ConfiguraƟon Menu and displays the following opƟons depend‐
ing on system configuraƟon.
DIAGNOSTICS
Menu
164
Level Control
99 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Base Digital Inputs ‐ This area shows the status of the digital inputs. If the input has power to it, the status indicator
will read ON.
Digital Base Outputs ‐ This area shows the status of the digital outputs. If the output is showing on, the output con‐
tact should be closed.
Analog Input and Outputs ‐ The analog I/O monitor provides a view of the controller’s handling of the analog to
digital and digital to analog conversions.
Raw Value ‐ The raw value is the digital value that will be converted to mA.
Scaled Value ‐ The scaled value is the engineering units that have been set up in the transducer configuraƟon
screens.
Analog Inputs ‐ The inputs are 14 bit, so the raw range is 3273‐16383 = 4‐20 mA.
Analog Outputs ‐ The outputs are 12 bit so the raw range is 0‐4095 = 4‐20 mA.
Only I/O that are configured in the system will be displayed, and the labels will change as needed for the system
configuraƟon, or when displaying the expansion output module.
Expansion Digital Inputs
When the PV1200 is configured for float switch or mulƟ‐segment probe control, or when some opƟonal inputs
are needed for staƟon monitoring funcƟons, an expansion input module can be connected to the controller. The
I/O monitor shows the status of the expansion I/O when added to the system.
DIAGNOSTICS
Input and Output Monitor
Base Digital
Outputs
Expansion
Inputs
Base Analog
Outputs
Base Digital
Inputs
Base Analog
Inputs
Raw
Value
Scaled
Value
165
Level Control
100 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The Alarm Test screen can be access either from the Main Dashboard, or from the DiagnosƟc Menu.
Alarm Output Test ‐ TesƟng the alarm outputs is possible without entering a password.
HORN Energizes the Alarm Horn output relay
FAULT LIGHT Energizes the Alarm Light output relay
CONTACT Energizes the Alarm Contact output relay
Touch and hold any of these buƩons to acƟvate the output contact for the funcƟon selected. Release the buƩon
to end the test.
Alarm Test ‐ Once the screen is unlocked, each alarm funcƟon can be individually tested by touching the buƩon
for the funcƟon to be tested. The alarm is logged into the alarm log, SD card, and alarm handler. The test will
also cause the alarm to process as configured in the alarm setup screen, with pump shutdowns, emails, horns,
lights, etc. Note that the horn will only sound for a moment because it is instantly silenced.
AcƟve Alarm Indicator ‐ If any acƟve alarm condiƟon exists, it will be annunciated with the “!” sign and a red alarm
label.
Unlock Screen ‐ This screen can be accessed from the Flow Log screen and in that case, the set points are read only
unƟl the unlock buƩon is touched and the Level 1 password is entered to the password keypad. The screen
locked indicator will change to screen unlocked. The screen is automaƟcally unlock when entered from the Con‐
figuraƟon Menu.
Alarm
Output Test
DIAGNOSTICS
Alarm Test
Unlock Screen
Alarm
Test
AcƟve
Alarm
Indicator
166
Level Control
101 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
ConfiguraƟon
Overview
This screen gives an overview of the configuraƟon
of the controller. The informaƟon on this page
can be a tool used to understand the operaƟon of
the system and is necessary for technical support
from CMC.
This informaƟon screen can also be accessed by
touching the MAIN DASHBOARD label on the Main
Dashboard, then touching the program number
bar.
PUMP Vision InformaƟon Screen
This screen is displayed automaƟcally for 10 sec‐
onds when the PUMP Vision is booƟng up. It can
be bypassed by touching the bypass buƩon.
This screen can be accessed by touching the MAIN
DASHBOARD label on the Main Dashboard, then
touching the program number bar.
Program No. Label
Touch the Program. No. Label to
access the ConfiguraƟon Info
screen.
Countdown Bypass
Touch the green countdown label to bypass the
10 second countdown Ɵmer and go to the Main
Dashboard screen.
DIAGNOSTICS
ConfiguraƟon Info
167
Level Control
102 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Touch to access the Modbus Sessions Coun‐
ters screen.
Modbus Sessions Counters
Overview
This screen shows the communicaƟon status be‐
tween the Modbus connected VFD, RVSS, or MV
starter and the controller.
The boƩom of the screen has a buƩon where the
user can reset the counters.
Overview
This screen shows the communicaƟon status of separate Modbus session types. The VFDs connected will deter‐
mine the sessions types used in a given applicaƟon and not all session types will be used.
The data on this screen can be used
to help diagnose Modbus communica‐
Ɵon failure causes.
DIAGNOSTICS
VFD/RVSS/MV Modbus CommunicaƟon Monitor
168
Level Control
103 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
This screen allows the user to zero the pump elapsed Ɵme meters and start counters. It is accessed from the
DiagnosƟc Menu and requires a Level 2 password to prevent unauthorized reset of the registers.
Total Run Hours ‐ The pump ETM hours.
ETM Reset ‐ Touch this buƩon to reset the pump’s elapsed Ɵme meter. A separate reset buƩon is provided and
visible for each pump that is configured in the system.
Total Starts ‐ The total number of Ɵmes the pump starter has energized.
Reset Start Counter ‐ Touch this buƩon to reset the pump’s start counter. A separate reset buƩon is provided and
visible for each pump that is configured in the system.
Total Run Hours
Reset Start
Counter
ETM Reset
Total Starts
DIAGNOSTICS
ETM and Start Counter Reset
169
Level Control
104 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The PV1200 can be set up to monitor the pump run Ɵme and announce when it is Ɵme to perform preventaƟve
maintenance on the pump. When the Ɵmers count down to zero, the pump status indicators will begin flashing
red and the pump status nameplate will read “maint. due”. When the maintenance due condiƟon acƟvates, an
email noƟficaƟon will also go out to the email recipient list, if the email funcƟon is enabled.
Enable Timer ‐ Enable the funcƟon by touching the buƩon for each pump. The funcƟon is not enabled by factory
default.
Interval Time ‐ Enter the pump manufacturer’s service interval here. The maximum number of hours that can be
entered is 99,999.99.
Time Remaining ‐ The Ɵme remaining is displayed here.
Reset ‐ To load the preset Interval Time into the Ɵme remaining, touch the reset buƩons. This will also
acknowledge the alarm.
Unlock Screen ‐ This screen can be accessed from the Flow Log screen and in that case, the set points are read only
unƟl the unlock buƩon is touched and the Level 1 password is entered to the password keypad. The screen
locked indicator will change to screen unlocked. The screen is automaƟcally unlock when entered from the Con‐
figuraƟon Menu.
Enable Timer
Reset
Interval Time
Time
Remaining
DIAGNOSTICS
Maintenance Timers
Unlock Screen
170
Level Control
105 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
Back Light Intensity ‐ The intensity of the back light can be adjusted by entering the percentage of illuminaƟon here.
Screen Saver ‐ Touch this switch to enable/disable the screen saver funcƟon. The LCD screen of the PV1200 is back‐
lit with a light that can be turned off to increase screen life.
Delay Timer ‐ Enter the amount of Ɵme of inacƟvity unƟl screen saver acƟvates.
Screen Saver
Delay Timer
Back Light
Intensity
DIAGNOSTICS
Display Backlight and Screen Saver
171
Level Control
106 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Test Email
Send Status
Cancel
DIAGNOSTICS
Test Email
ConnecƟon
Status
Overview
The Monitor and Test Email screen gives a view of the PUMP Vision’s email processor and provides buƩons to
send test emails to the email recipients enabled in the EMAIL ADDRESS screen.
Test the Email FuncƟon ‐ Touch this buƩon to begin test. The buƩons are disabled when the email funcƟon is
acƟve.
ConnecƟon Status ‐ This indicator provides the status of the connecƟon to the email service provider. The status
will show the following:
NOT CONNECTED = WaiƟng for email task
CONNECTING = AƩempƟng to connect to the server
CONNECTED = ConnecƟon and authenƟcaƟon successful
The status of the PV600 email reconnecƟon delay Ɵmer will be displayed here when the Ɵmer is acƟve.
Send Status ‐ Once the test buƩon has been touched, the PV600 will scan through the email address list and send
an email to all enabled addresses. The Send Status area has three columns.
SEND ‐ Shows whether the email is an alarm or a file email.
RESULT—The send status indicators will show the following:
IDLE = Email process inacƟve
IN PROGRESS = AƩempƟng to send email
SUCCESS = Send email successful
CONNECT FAILURE = Undetermined connecƟon failure
FAIL: (failure condiƟon) = Specific failure condiƟon detected (eg “FAIL: Password no‐authen.”)
ATT ‐ Shows the number of connecƟon aƩempts in the process of sending the email
Once the PV600 has finished sending the first email, it conƟnues to the next email address on the list. If the
PV600 encounters a failure with sending an email, it will conƟnue to the next email on the list aŌer a failure
delay Ɵmer has lapsed.
Cancel ‐ The email test funcƟon can be cancelled at any Ɵme during the process by touching the cancel buƩon.
172
Level Control
107 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
Manual Test Mode ‐ The PV1200 level controller can provide a simulated liquid level to fully test all funcƟons of the
control system strategy. When placed into the manual test mode, the simulated level will allow verificaƟon that
the pumps properly run when called and that all alarm funcƟons operate as intended.
The test mode screen is similar to the main dashboard and provides many of the same status displays including
level display, level status area, pump status, and alarms status.
CAUTION: only acƟvate the manual test mode if all equipment is ready for operaƟon. This includes making the
control system electrically safe for operaƟon and ensuring that the pumps are either ready for operaƟon, or are
locked out by disconnecƟon from power (this will cause pump failure alarms).
Note: the test mode will automaƟcally terminate aŌer 2 minutes if the screen is not touched. This prevents an
operator from leaving a system in test mode instead of returning it to normal operaƟon.
DIAGNOSTICS
Level Control Test Mode
173
Level Control
108 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
AcƟvity Indicator ‐ Indicates when the test mode is on.
Up and Down BuƩons ‐ Touch these buƩons to manually adjust the level up or down by 0.1 Ō. per touch. Hold the
buƩons for a 0.1 Ō./sec automaƟc pulse.
Start/Stop ‐ To acƟvate the test mode, touch the start and stop pushbuƩons.
Manual Level SimulaƟon ‐ When the system is set to manual by touching this buƩon, the simulated level is manual‐
ly entered by the user either by touching the up and down buƩons or by direct entry. Whichever method is used,
the level is held unƟl a new level is entered.
Manual Level Input ‐ Touching here will access the direct entry keypad.
Auto Level SimulaƟon ‐ When the system is set to auto by touching this buƩon, the level automaƟcally rises and
falls between the full scale of the sensor at a rate of 0.1 Ō./0.5 sec. AddiƟonally, the user can influence direcƟon
of simulaƟon by touching the up and down buƩons.
Up and Down BuƩons ‐ Touch these to manually set the direcƟon of the auto level simulaƟon.
SimulaƟon mode is designed to simulate a properly running system by starƟng and stopping one pump. It is not
designed for any normal test funcƟon.
When the system is set to simulate by touching this buƩon, the level automaƟcally rises and falls between the
lead pump start set point and the pump start set points.
Note: when in the simulate mode, the test mode screen can be exited to the main dashboard without turning the
simulate funcƟon off. The system will stay in the simulate mode for two hours before automaƟcally returning to
normal operaƟon. A warning screen provides an exit alert.
Start/Stop
Exit Test Mode
Manual Input
Manual Mode
Up and Down
AcƟvity
Indictor
DIAGNOSTICS
Level Control Test Mode
174
Level Control
109 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
SimulaƟon Mode
Auto Level SimulaƟon ‐ When the system is set to
auto by touching this buƩon, the level automaƟ‐
cally rises and falls between the full scale of the
sensor at a rate of 0.1 Ō./0.5 sec. AddiƟonally,
the user can influence direcƟon of simulaƟon by
touching the up and down buƩons.
Up and Down BuƩons ‐ Touch these to manually
set the direcƟon of the auto level simulaƟon.
SimulaƟon Mode is designed to simulate a
properly running system by starƟng and stopping
one pump. It is not designed for any normal test
funcƟon.
When the system is set to simulate by touching
this buƩon, the level automaƟcally rises and falls
between the lead pump start set point and the
pump stop set point.
Note: when in the simulate mode, the test mode
screen can be exited to the main dashboard with‐
out turning the simulate funcƟon off. The system
will stay in the simulate mode for two hours be‐
fore automaƟcally returning to normal operaƟon.
A warning screen provides an exit alert.
Auto Level SimulaƟon
DIAGNOSTICS
Level Control Test Mode
175
Level Control
110 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Backup & Restore ConfiguraƟon and Set Points
The PV1200 can save the enƟre system configuraƟon and all of the user set points to internal flash memory,
called the data table, and also to a removable SD memory card. When the system configuraƟon is backed up to
an SD memory card, the configuraƟon can be restored into a new or duplicate controller. This makes replace‐
ment of a controller very simple and eliminates the possibility of user error in seƫng it up. Saving the configura‐
Ɵon to the flash memory is important too, as is provides protecƟon against a failed controller baƩery, though not
a failed controller.
Save to SD ‐ Touch here to save the system configuraƟon and set points to the SD memory card. This buƩon is
disabled if an SD card is not present in the PV1200.
Saved Indicator ‐ When the configuraƟon has been completely saved, saved will be indicated here.
Auto Save Enable‐ Toggle the automaƟc flash RAM backup funcƟon by touching here. The PV1200 will automaƟcal‐
ly back up the configuraƟon to the internal flash RAM when exiƟng the configuraƟon screens if the controller is
set for automaƟc backup.
Save to Table ‐ Touch here to manually save the set points to the Flash RAM memory.
Email File ‐ Touch here to manually send the configuraƟon file to the recipients enabled on the EMAIL ADDRESS
screen. The file can then be saved on a computer for use if necessary to restore a damaged controller. This op‐
Ɵon is only available on systems configured for email file sending.
Restore ‐ Touch here to restore a controller from either the flash RAM memory or from an SD card. The PV1200
will reboot and the IniƟalize Controller screen will be displayed. Warning: proceeding with the restore funcƟon
will erase the exisƟng configuraƟon.
SD Card Status ‐ Touch here to access the SD Card Status screen.
A properly formaƩed SD memory card is available from www.cmcontrols.com. When a properly formaƩed card is
inserted into the back of the controller, this opƟon becomes available.
Save to SD
SD Card Status
Save to Table
Restore
Saved Indicator
Auto‐Save
Enable
DIAGNOSTICS
Backup and Restore
Email
File
176
Level Control
111 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The PV1200 must be ‘iniƟalized’ whenever it has been factory reset, or when the RESTORE buƩon has been
touched on the Backup and Restore screen. The controller will also need to be re‐iniƟalized if ever the backup
baƩery has failed and the controller subsequently loses power. When iniƟalizaƟon is required, this screen will
appear when the controller boots up. A choice must be made between the three opƟons described below.
To boot with a factory default:
System Type ‐ Touch this know to rotate dial through the three system types:
Booster Pump
Level Control
Well Pump
Custom Type ‐ Touch this buƩon to enter your customer code.
Load Base ‐ Touch this buƩon to load the factory default configuraƟon for the system selected.
To boot from the Flash RAM
Restore Table ‐ Load all configuraƟon and set point data from the internal Flash RAM memory.
To restore from the SD Card
Restore SD ‐ Load all configuraƟon and set point data from the SD memory card.
Once a choice has been made by touching one of the three load buƩons, the controller will countdown three
seconds, then reboot with the new configuraƟon to the PUMP Vision InformaƟon Screen.
Restore SD
Load Base
Restore Table
Custom Type
System Type
Selector
DIAGNOSTICS
Backup and Restore ‐ IniƟalizaƟon Screen
Load Custom
177
Level Control
112 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The InformaƟon Mode accesses some of the PV1200’s operaƟon system. Most funcƟons in this menu are not
intended for the user and are reserved for cerƟfied technicians. Within this menu it is possible to make changes
that will require re‐iniƟalizaƟon of the controller.
MENU ITEM ACCESS
LEVEL FUNCTION
OPERANDS 1111 Access to view and edit all system registers and Ɵmers
VERSION 1111 O/S version informaƟon
UNIT ID 1111 This unit’s ID on a CANBus system
FLASH MEMORY 1111 Load and monitor RAM applicaƟon memory to FLASH
RAM.
SD 1111 Unavailable for Copyright reasons
CANBus Monitor CANBus network traffic
TIME & DATE 1111 Set the system Ɵme and date
SERIAL 1111 Monitor serial network traffic
ETHERNET 1111 Monitor Ethernet network traffic and set IP address
WORKING MODE 1111 Stop, Run, Reboot, IniƟalize the controller
DIAGNOSTICS
InformaƟon Mode
178
Level Control
113 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
The MOTOR Vision System
The PUMP Vision PV1200 can communicate with smart motor starters via a Modbus connecƟon that enables
the PUMP Vision to display a variety of important pump and motor informaƟon.
Depending on the type of MOTOR Vision starter that is connected, the PUMP Vision can display:
• Current per phase, average and imbalance
• Voltage per phase, average and imbalance
• Ground fault, power factor and frequency
• Trip and fault informaƟon
Various motor controllers are able to connect to the PUMP
Vision as MOTOR Vision devices, including:
• Variable frequency drives
• RVSS starters
• Insight overload and power monitor
• U‐Line integrated motor starter
MOTOR Vision
179
Level Control
114 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
When MOTOR Vision is enabled in the PV1200, the Pump Dashboards will show the MOTOR Vision Panel.
Com Status ‐ ‘MOTOR Vision—NORMAL’ when the Modbus communicaƟon from the PV1200 to the MOTOR Vi‐
sion motor starter is good. ‘MOTOR Vision ‐ COM FAIL’ is displayed when the communicaƟons has failed.
MOTOR Vision Dashboard ‐ Touch this buƩon to access the MOTOR Vision Dashboard.
MOTOR Vision Starter SelecƟon OpƟons
When FVNR starters (constant speed pumps) are needed in the system, two opƟons are available to enable MO‐
TOR Vision in the PV1200. The Schneider U‐Line complete motor starter, which is good for pumps up to 20HP @
480 volts, and the Eaton Insight overload relay, which can be used on any motor up to 400HP at 480 volts.
Below is a list of the data that is available, through Modbus, to the PV1200 with each of the two opƟons.
Com Status
MOTOR Vision
Dashboard
Schneider U‐Line Motor Starter
Monitored by the Insight
Thermal overload
Short‐circuit
Ground fault
Low or high voltage
Low current (pump running dry)
Mechanical jam
Long start
Phase failure and reversal
Contactor failure
Amps per phase, average amps, and cur‐
rent imbalance
Volts per phase, average volts, and voltage
imbalance
Eaton Insight Overload Relay
MOTOR Vision
Panel
Monitored by the U‐Line
Thermal overload
Short‐circuit
Ground fault
Low current (pump running dry)
Mechanical jam
Long start
Phase failure and reversal
Contactor failure
Amps per phase, average amps, and cur‐
rent imbalance
MOTOR Vision
Pump Dashboard
180
Level Control
115 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
MOTOR Vision is enabled in the PV1200 by selecƟng ‘FVNR Constant speed w/MOTOR Vision’ on the
VFD/Starter Type and OperaƟon screen. Once that selecƟon has been made, the MOTOR Vision setup
buƩon appears on the ConfiguraƟon Menu. On this screen, the type of MOTOR Vision starter that is
connected must be selected.
MOTOR Vision Type Select ‐ Touch this switch to toggle between the Schneider U‐Line and Eaton Insight
starters. The switch has a safeguard built in to prevent accidental erasure of all MOTOR Vision set points
as the two MOTOR Vision start types have incompaƟble configuraƟons and must be erased when a
change is made. A message is displayed that reads ‘Change this will erase exisƟng MV configuraƟon’,
followed by ‘Touch again within 10 seconds to confirm”. To make the confirmaƟon that the type is to be
changed, the switch must be touched again within the 10 seconds. If no changed is needed, do not
touch the switch again and the opƟon will reset automaƟcally.
Comm Status ‐ This field will indicate the communicaƟon status of the starters. When the MOTOR Vision
starters are properly configured for Modbus, COM port 1 is properly configured and matched to the MO‐
TOR Vision starter, and the wiring is correct, the status will read ‘GOOD’.
Pump 1 MOTOR Vision Starter ‐ Modbus address 11
Pump 2 MOTOR Vision Starter ‐ Modbus address 12
Pump 3 MOTOR Vision Starter ‐ Modbus address 13
Pump 4 MOTOR Vision Starter ‐ Modbus address 14
When all devices are reporƟng good communicaƟon, The
Configure ‐ Touch this buƩon to go to the MOTOR VISION ‐ U‐LINE OVERLOAD CONFIGURATION screen. If commu‐
nicaƟon is failed to any MOTOR Vision starter configured in the system, this buƩon is disabled.
Configure
Comm Status
MOTOR Vision
Starter SelecƟon
MOTOR Vision
Type Select
181
Level Control
116 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Analog and Digital Meters ‐ A secƟon of the dashboard includes meters for voltage, current, frequency, power fac‐
tor, kilowaƩs, and ground fault.
Fault Status Overview ‐ 13 separate fault condiƟons can be monitored and displayed in a clear table format.
CommunicaƟon Status ‐ This field shows the communicaƟon status between the PV1200 and the starter.
Fault Status Message ‐ This field shows the fault status of the MOTOR Vision starter as:
NORMAL ‐ Green
WARNING ‐ Amber
FAULT ‐ Red
The PUMP Vision PV1200 can be set to communicate with the
Eaton Insight power monitor/overload relay via a Modbus con‐
necƟon that enables the PUMP Vision to display volts current,
ground fault, power factor, and a variety of trip informaƟon.
A MOTOR Vision Dashboard is provided for each pump config‐
ured with an Eaton Insight. The Dashboard gives a clear over‐
view of the motor operaƟng condiƟons, with numerous param‐
eters being constantly monitored and reported to the PUMP
Vision.
Fault Status
Overview
Fault Status
Message
CommunicaƟon
Status
MOTOR Vision
Insight Dashboard
MOTOR Vision Insight Dashboard
Analog and
Digital Meters
182
Level Control
117 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Enabled ‐ Displays the state of the alarm configuraƟon as set in the MOTOR Vision ConfiguraƟon screen.
Tripped ‐ Indicates TRIP when the funcƟon has caused a trip on the overload relay.
Warning ‐ Indicates WARN when a condiƟon is causing an impending trip.
Fault Reset ‐ Touch this buƩon to send a fault reset command to the Insight overload. The buƩon is disa‐
bled if there are no condiƟons to reset.
Meters ‐ Analog and digital meters are provided for a number of motor operaƟng condiƟons, inlcuding:
Supply Voltage—with individual digital displays for each phase, average, and imbalance
Current—with individual digital displays for each phase, average, and imbalance
Supply Frequency
Ground Fault Amperes
Power factor Percent
KilowaƩs
Note: The range for the current meter must be setup in the VFD/Starter Type and Amp Range screen.
Fault Monitors ‐ give an overview of the pump motor’s running condiƟons. Each of the monitored funcƟons have a
warning and trip status indicator Individual trip funcƟons are presented in a table format for easy overview of
alarm condiƟons. The indicators have four possible states:
WARN
TRIP
OK
OK STATUS NORMAL
FUNCTION IS OVER WARNING THRESHOLD
FUNCTION IS OVER TRIPPED THRESHOLD
FUNCTION IS NOT ENABLED
Enabled
MOTOR Vision
Insight Dashboard
Fault Reset
BuƩon
Meters
Fault
Monitors
Warning
Tripped
183
Level Control
118 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Voltage
Number of Turns
CommunicaƟon
Trip Range
Overview
The MOTOR Vision Overload ConfiguraƟon screen provides access to the thermal overload seƫng of the Insight
overload. The changes made on this screen are wriƩen though the Modbus connecƟon into the smart motor
overload, making the overload configuraƟon simple, without the need for opening the control cabinet door.
Voltage ‐ Displays the voltage raƟng of the connect Insight unit connected. The PV1200 reads the range automaƟ‐
cally from the Insight overload.
Trip Range ‐ Displays the current trip range for each pump. The possible trip ranges available will depend on the
Insight unit connected. Touch the buƩon to scroll through the possible choices.
Number of Turns ‐ AŌer the Trip Range is set, the number of passes needed through the current transducer is dis‐
played here. If the motor load will be more than 90 amps, the motor load wire will have to pass through a sepa‐
rate current transformer that will reduce the higher current to a 0‐5A range that the Insight can read. In that
case, the size of the required current transformer with one wire pass is shown.
Overload Trip Class ‐ Touch this buƩon to modify the thermal trip class. The seƫng must be entered as 5, 10, 15,
20, 25 , 30.
Overload Trip Seƫng ‐ Touch this buƩon to modify the full load amperage overload seƫng for each pump. The
seƫng must be within the Trip Range.
CommunicaƟon ‐ Displays ‘COMM FAIL’ , or if communicaƟon to the Insight is good, either ‘1‐9 A BASE’ or ‘10‐90 A
BASE’, depending on what Insight unit is connected.
MOTOR Vision
Insight ConfiguraƟon
Overload
Overload
Trip Seƫng
184
Level Control
119 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Delay Timer
Enable/Disable
Fault Set Point
Alarm and Trip ConfiguraƟon
Enable/Disable ‐ Touch this switch to toggle between enable or disable the trip fault condiƟon.
Fault Set Point ‐ Touch this buƩon to set the fault condiƟon value.
Delay Timer ‐ Touch this buƩon to set the delay Ɵmer for each fault condiƟon.
Restart AŌer Trip ConfiguraƟon
Delay Timer ‐ There are three separate alarm delay Ɵmer seƫngs. Enter the restart Ɵme delay seƫngs
for each fault group:
Line Fault Timer—Delays under‐voltage, over‐voltage, and voltage imbalance restart aƩempt
Load Fault Timer—Delays under‐current, low kW, and high kW restart aƩempt
Motor Fault—Delays thermal overload, mechanical jam and current imbalance restart aƩempts
Trip Mode ‐ Select ALARM (only) or TRIP. A trip mode buƩon is available for the Line Fault group, and
another for ground fault.
Restart Tries ‐ Enter the number of Ɵmes that the Insight is to try reseƫng the fault condiƟon before re‐
quiring external fault reset. Restart try seƫngs are available for the Load Fault and Motor Fault groups.
Other Setup Scre
MOTOR Vision
Insight ConfiguraƟon
Delay Timer
Trip Mode
Restart Tries
185
Level Control
120 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Starter Status ‐ The MOTOR Vision U‐Line Dashboard has an animated photo of the U‐Line motor starter. The
disconnect handle rotates to show the actual posiƟon of the starter’s handle, the ‘LCD display” shows starter
status and fault condiƟons, and the communicaƟon indicators flash to show communicaƟon status.
Meters ‐ A secƟon of the dashboard includes meters for thermal load, current, power factor, and ground fault.
Fault Status Overview ‐ 8separate fault condiƟons can be monitored and displayed in a clear table format.
The PUMP Vision PV1200 can be set to communicate with the Schneider
(Square D) U‐Line products via a Modbus connecƟon that enables the PUMP
Vision to display current, ground fault, and a variety of trip informaƟon.
A MOTOR Vision Dashboard is provided for each pump configured with an
Eaton Insight. The Dashboard gives a clear overview of the motor operaƟng
condiƟons, with numerous parameters being constantly monitored and report‐
ed to the PUMP Vision.
MOTOR Vision
U‐Line Dashboard
MOTOR Vision U‐Line Dashboard
MOTOR Vision
Fault Status
Meters
Starter Status
186
Level Control
121 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Reset
Reset ‐ Touch this buƩon to send a fault reset command to the Insight overload. The buƩon is disabled if
there are no condiƟons to reset. Some faults trip the breaker handle on the U‐Line starter. The me‐
chanical handle on the U‐Line starter must be manually reset.
Com Status ‐ This field shows the communicaƟon status between the PV1200 and the starter.
MOTOR Vision Fault Status ‐ The MOTOR Vision U‐Line Dashboard gives an overview of the pump motor’s running
condiƟons. Each of the eight monitored funcƟons have a warning and trip status indicator (except short‐circuit
and mag‐trip which have no warning). The status indicator can display:
WARN
TRIP
OK
OK STATUS NORMAL
FUNCTION IS OVER WARNING THRESHOLD
FUNCTION IS OVER TRIPPED THRESHOLD
FUNCTION IS NOT ENABLED
MOTOR Vision
Fault Status
MOTOR Vision
U‐Line Dashboard
Com
Status
187
Level Control
122 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Meters
Starter Status ‐ The MOTOR Vision U‐Line Dashboard has an animated photo of the U‐Line motor starter. The
disconnect handle rotates to show the actual posiƟon of the starter’s handle, the ‘LCD display” shows starter
status and fault condiƟons, and the communicaƟon indicators flash to show communicaƟon status.
Starter Status Nameplate ‐ Changes text to show the pump status.
Disconnect Handle ‐ Rotates to mimic the actual motor starter’s three possible posiƟons of OFF, ON and
TRIPPED.
‘LCD Display’ ‐ Shows with color and text the status of the starter’s contact and operaƟng state.
Com Status ‐ Three ‘LED indicators’ mimic the LED indicators on the actual starters to show the status of
the Modbus communicaƟon connecƟon to the PUMP Vision.
Meters ‐ Analog and digital meters are provided for a number of motor operaƟng condiƟons, inlcuding:
Current—with individual digital displays for each phase, average, and imbalance
Ground Fault % of Load Amperes
Thermal Load % of FLA
Power Factor Percent
Note: The range for the current meter must be setup in the VFD/Starter Type and Amp Range screen.
MOTOR Vision
U‐Line Dashboard
Com
Status
‘LCD Display’
Disconnect
Handle
Starter
Status
188
Level Control
123 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Trip Range
Overload Seƫng
Overview
The MOTOR Vision Overload ConfiguraƟon screen provides access to the thermal overload and short‐circuit trip
seƫngs of the U‐Line motor starter. The changes made on this screen are wriƩen though the Modbus connec‐
Ɵon into the smart motor starter, making the starter configuraƟon simple, without the need for opening the
control cabinet door.
Trip Range ‐ Displays the current trip range for each pump. The PV1200 reads the range automaƟcally from the U‐
Line starter
Overload Seƫngs ‐ Touch this buƩon to modify the full load amperage overload seƫng for each pump. The seƫng
must be within the Trip Range.
Thermal Trip Class ‐ Touch this buƩon to modify the thermal trip class. The seƫng must be entered as 5, 10, 15,
20, 25 , 30.
Short‐circuit Trip ‐ Touch this buƩon to modify the short‐circuit trip percentage. The range is 300‐1700%.
Warning ‐ Touch these switches to toggle between enable/disable of warning parameters for each fault condiƟon
for the pump.
Trip ‐ Touch these switches to toggle between enable/disable of trip parameters for each fault condiƟon for the
pump.
Trip Delay Timer ‐ Set the delay Ɵmer before each warning/trip fault condiƟon is reached.
Reset @ ‐ Allow the starter to reset when it has reached this percent of each fault condiƟon.
Reset AƩempts ‐ Number of conƟguous reset aƩempts before fault condiƟon will not aƩempt another reset.
MOTOR Vision
U‐Line Overload ConfiguraƟon
Thermal
Trip Class
Short‐circuit
Trip
Reset AƩempts
Reset @
Warning
Trip
Trip Delay Time
189
Level Control
124 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Overview
The system clock setup is accessed by touching the date or Ɵme on any screen where they are displayed in the
Status Bar. The system Ɵme and date provides the date and Ɵme stamp to the data and alarm logs, and is used
for Ɵme clock related control funcƟons.
The clock is baƩery backed by the PV1200 user accessible backup baƩery so that the correct Ɵme is maintained
through power failures or other system shutdowns.
When the PV1200 is connected to the internet, the date and Ɵme can be automaƟcally undated by connecƟng
periodically to a NIST Ɵme server.
Date and Time ‐ Manually enter the correct date and Ɵme by touching these buƩons.
Enable/Disable ‐ Touch here to enable or disable the NIST Ɵme update funcƟon.
Setup NIST ‐ Touch here to access the NIST TIME SETUP screen. If the PV1200 has the opƟonal Ethernet card in‐
stalled and is connected to the internet, the opƟon to automaƟcally update the Ɵme from an NIST Ɵme server is
available.
NIST Time Server Setup ‐ it is necessary to enter the IP address of a NIST Ɵme server. The PV1200 factory defaults
to the server at the University of Colorado at Boulder. For a list of available servers in the U.S., see hƩp://
ƞ.nist.gov/ƞ‐cgi/servers.cgi.
IP Address ‐ Enter the NIST server IP address here.
Offset Hours ‐ Enter the correct hours offset for the local Ɵme zone from Greenwich Mean Time.
Daylight Saving Time ‐ Touch the switch to toggle Enable/Disable daylight saving Ɵme. This opƟon will not auto‐
maƟcally switch to Standard Time.
Update ‐ Touch this bar to update the system clock through the Internet NIST connecƟon.
Unlock Screen ‐ The date and Ɵme can only be modified when the screen is unlocked by entering the level 1 pass‐
word.
Enable/Disable
SYSTEM CLOCK
Time
Date IP Address
Daylight Saving Time
Update
190
Level Control
125 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
Text Entry Screen
Overview
When a data entry field is touched that requires an ASCII text entry, such as a email address, user login name,
password, etc., the ASCII text entry screen will appear. By default the screen with all upper case leƩers is dis‐
played.
Screen Scroll ‐ Scrolls through the five keyboard screens which offer keyboards for upper case, lowercase, sym‐
bols and special characters.
Clear ‐ Clears the data entry window.
Text Entry ‐ Moves the cursor leŌ or right in the data entry window.
Cursor Scroll ‐ Moves the cursor leŌ or right.
Return ‐ Exits the screen without saving changes .
Delete and Backspace ‐ Delete erased the character that the cursor is currently on. Backspace deletes the char‐
acter to the leŌ of the cursor.
Enter and Return ‐ Accept the data entry and return to the previous screen.
Return
Delete and
Backspace
Screen Scroll
Cursor Scroll Cursor Scroll
Enter and
Return
Text Entry
Clear
191
Level Control
126 California Motor Controls, Inc. Benicia, CA
V2.2 Copyright 2005‐2016 12/30/2016
www.cmcontrols.com
192
www.jensenwaterresources.com
LEVEL SENSORS
193
www.jensenwaterresources.com
PRESSURE TRANSMITTER
194
195
196
197
198
199
www.jensenwaterresources.com
FLOAT SWITCH
200
Cox Research and Technology, Inc. (“Cox”) warrants to the original purchaser (the “Customer”) that the Optical
Float® systems and products will be free of defects in materials or workmanship, for a period of 3 years from the date
of purchase. This warranty is void on products that have been, in our judgment, tampered with, abused, improperly
stored, improperly wired, improperly installed, misused or subjected to high voltages either through negligence,
power surges, lightning or other sources; modified, altered or adapted without Cox’s written consent; or used with
equipment not covered by this warranty, to the extent that problems are attributable to such use.
The Customer is required to obtain a return authorization number from Cox before returning any products. The
customer is responsible for all expenses including removal, re-installation and shipping necessary to deliver the
returned products to the factory for evaluation, repair, or replacement. Cox’s sole liability under this Limited Warranty
is, at its option, to repair or replace any products that are found defective in materials or workmanship, or to refund
the purchase price paid for the defective product.
Disclaimer of Further Warranties. THE LIMITED WARRANTY SET FORTH ABOVE IS THE EXCLUSIVE
WARRANTY APPLICABLE TO THIS CONTRACT, AND COX EXPRESSLY DISCLAIMS ALL OTHER WARRANTIES
OR REMEDIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR
PURPOSE, WHETHER THE SAME ARE WRITTEN, VERBAL, IMPLIED, OR STATUTORY. THE CUSTOMER IS
SOLELY RESPONSIBLE FOR DETERMINING THE SUITABILITY OF COX OPTICAL FLOAT SYSTEM PRODUCTS
FOR THE CUSTOMER’S INTENDED PURPOSES, AND COX SHALL NOT BE LIABLE FOR THE SUITABILITY OF
ITS OPTICAL FLOAT SYSTEM PRODUCTS FOR ANY PARTICULAR PURPOSE.
Limitation of Liability. Customer’s rights and remedy are governed exclusively by the terms and conditions of this
Limited Warranty and Customer expressly waives any claim based upon contract, tort, strict liability, or otherwise.
Under no circumstances shall Cox be liable for any incidental, consequential, or special damages, losses, or expenses
incurred by Customer or any third party arising from this offer of sale or the performance of Optical Floats systems
hereunder. Under no circumstances shall the amount of any claim for damages or liability exceed the amount paid
by Customer for products provided by Cox hereunder. This Limited Warranty may only be modified in writing by an
officer of Cox, and is the entire agreement between the parties hereto. If any provision of this Limited Warranty is
determined to be void, the remaining provisions are deemed valid and enforceable.
LIMITED WARRANTY
Cox Research and Technology, Inc.
225.756.3271 > 800.910.9109 > f: 225.755.103014697 South Harrell's Ferry RoadBaton Rouge, LA. 70816optifloat.com041309
The next generation of fl at.
INSTALLATION INSTRUCTIONS
PROCESS > POWER > LIGHT
®
The next generation of fl at.
INSTALLATION INSTRUCTIONS
PROCESS > POWER > LIGHT
®
Cox Research and Technology, Inc. (“Cox”) warrants to the original purchaser (the “Customer”) that the Optical
Float® systems and products will be free of defects in materials or workmanship, for a period of 3 years from the date
of purchase. This warranty is void on products that have been, in our judgment, tampered with, abused, improperly
stored, improperly wired, improperly installed, misused or subjected to high voltages either through negligence,
power surges, lightning or other sources; modified, altered or adapted without Cox’s written consent; or used with
equipment not covered by this warranty, to the extent that problems are attributable to such use.
The Customer is required to obtain a return authorization number from Cox before returning any products. The
customer is responsible for all expenses including removal, re-installation and shipping necessary to deliver the
returned products to the factory for evaluation, repair, or replacement. Cox’s sole liability under this Limited Warranty
is, at its option, to repair or replace any products that are found defective in materials or workmanship, or to refund
the purchase price paid for the defective product.
Disclaimer of Further Warranties. THE LIMITED WARRANTY SET FORTH ABOVE IS THE EXCLUSIVE
WARRANTY APPLICABLE TO THIS CONTRACT, AND COX EXPRESSLY DISCLAIMS ALL OTHER WARRANTIES
OR REMEDIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR
PURPOSE, WHETHER THE SAME ARE WRITTEN, VERBAL, IMPLIED, OR STATUTORY. THE CUSTOMER IS
SOLELY RESPONSIBLE FOR DETERMINING THE SUITABILITY OF COX OPTICAL FLOAT SYSTEM PRODUCTS
FOR THE CUSTOMER’S INTENDED PURPOSES, AND COX SHALL NOT BE LIABLE FOR THE SUITABILITY OF
ITS OPTICAL FLOAT SYSTEM PRODUCTS FOR ANY PARTICULAR PURPOSE.
Limitation of Liability. Customer’s rights and remedy are governed exclusively by the terms and conditions of this
Limited Warranty and Customer expressly waives any claim based upon contract, tort, strict liability, or otherwise.
Under no circumstances shall Cox be liable for any incidental, consequential, or special damages, losses, or expenses
incurred by Customer or any third party arising from this offer of sale or the performance of Optical Floats systems
hereunder. Under no circumstances shall the amount of any claim for damages or liability exceed the amount paid
by Customer for products provided by Cox hereunder. This Limited Warranty may only be modified in writing by an
officer of Cox, and is the entire agreement between the parties hereto. If any provision of this Limited Warranty is
determined to be void, the remaining provisions are deemed valid and enforceable.
LIMITED WARRANTY
Cox Research and Technology, Inc.
225.756.3271 > 800.910.9109 > f: 225.755.103014697 South Harrell's Ferry RoadBaton Rouge, LA. 70816optifloat.com041309
The next generation of fl at.
INSTALLATION INSTRUCTIONS
PROCESS > POWER > LIGHT
®
The next generation of fl at.
INSTALLATION INSTRUCTIONS
PROCESS > POWER > LIGHT
®
Cox Research and Technology, Inc. (“Cox”) warrants to the original purchaser (the “Customer”) that the Optical Float® systems and products will be free of defects in materials or workmanship, for a period of 3 years from the date of purchase. This warranty is void on products that have been, in our judgment, tampered with, abused, improperly stored, improperly wired, improperly installed, misused or subjected to high voltages either through negligence, power surges, lightning or other sources; modified, altered or adapted without Cox’s written consent; or used with equipment not covered by this warranty, to the extent that problems are attributable to such use. The Customer is required to obtain a return authorization number from Cox before returning any products. The customer is responsible for all expenses including removal, re-installation and shipping necessary to deliver the returned products to the factory for evaluation, repair, or replacement. Cox’s sole liability under this Limited Warranty is, at its option, to repair or replace any products that are found defective in materials or workmanship, or to refund the purchase price paid for the defective product. Disclaimer of Further Warranties. THE LIMITED WARRANTY SET FORTH ABOVE IS THE EXCLUSIVE WARRANTY APPLICABLE TO THIS CONTRACT, AND COX EXPRESSLY DISCLAIMS ALL OTHER WARRANTIES OR REMEDIES, INCLUDING WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE, WHETHER THE SAME ARE WRITTEN, VERBAL, IMPLIED, OR STATUTORY. THE CUSTOMER IS SOLELY RESPONSIBLE FOR DETERMINING THE SUITABILITY OF COX OPTICAL FLOAT SYSTEM PRODUCTS FOR THE CUSTOMER’S INTENDED PURPOSES, AND COX SHALL NOT BE LIABLE FOR THE SUITABILITY OF ITS OPTICAL FLOAT SYSTEM PRODUCTS FOR ANY PARTICULAR PURPOSE. Limitation of Liability. Customer’s rights and remedy are governed exclusively by the terms and conditions of this Limited Warranty and Customer expressly waives any claim based upon contract, tort, strict liability, or otherwise. Under no circumstances shall Cox be liable for any incidental, consequential, or special damages, losses, or expenses incurred by Customer or any third party arising from this offer of sale or the performance of Optical Floats systems hereunder. Under no circumstances shall the amount of any claim for damages or liability exceed the amount paid by Customer for products provided by Cox hereunder. This Limited Warranty may only be modified in writing by an officer of Cox, and is the entire agreement between the parties hereto. If any provision of this Limited Warranty is determined to be void, the remaining provisions are deemed valid and enforceable. LIMITED WARRANTYCox Research and Technology, Inc.225.756.3271 > 800.910.9109 > f: 225.755.103014697 South Harrell's Ferry RoadBaton Rouge, LA. 70816optifloat.com041309 The next generation of fl at.INSTALLATION INSTRUCTIONS
PROCESS > POWER > LIGHT
®The next generation of fl at.INSTALLATION INSTRUCTIONS
PROCESS > POWER > LIGHT
®
TR2A
201
1 14
4+RZPXFKGRWKH\FRVW"
$2SWL)ORDW®V\VWHPVFRVWDERXWWKHVDPHDQGLQPDQ\FDVHVOHVVWKDQVWDQGDUGLQWULQVLFDOO\VDIHV\VWHPVZLWKHOHFWULFIORDWVDQGLQWHUIDFHUHOD\V1HDUO\DOOZDVWHZDWHUSXPSVWDWLRQVUHTXLUHFRPSOLDQFHZLWK1)3$6WDQGDUGZKLFKFODVVLILHVPRVWZHWZHOOVDVD&ODVV'LYLVLRQKD]DUGRXVDUHD&RPELQLQJWKLVZLWKWKHH[WUHPHO\ORQJOLIHRIRUPRUHWLPHVWKDWRIFRQYHQWLRQDOHOHFWULFDOIORDWVDQGHYHQXVLQJWKHPLQOHVVVWULQJHQW&ODVV'LYLVLRQRU8QFODVVLILHGDUHDVWKHFRVWRIFKDQJLQJRXWFRQYHQWLRQDOHOHFWULFDOIORDWVPDNHVWKH2SWL)ORDW®OHYHOGHWHFWRUVE\IDUWKHEHVWYDOXH
4:KHUHGRZHSXUFKDVHWKHIORDWVDQGDFFHVVRULHV"
$7KH\FDQEHSXUFKDVHGIURPRXUQDWLRQDOGLVWULEXWRUV&RQWDFWXVZLWK\RXU UHTXLUHPHQWVDQGZHZLOOGLUHFW\RXWR\RXUGLVWULEXWRU
4:KDWLVWKHZDUUDQW\RQWKHIORDWV"
$6WDQGDUGZDUUDQW\LVIRU\HDUV/RQJHUZDUUDQWLHVDUHDYDLODEOH
4&DQZHJHWTXDQWLW\GLVFRXQWV
$<HV&RQWDFWXVZLWK\RXUUHTXLUHPHQWV
4+RZFDQWKH2SWL)ORDW®OHYHOGHWHFWRUVORZHURXUPDLQWHQDQFH
FRVW"$ 7KH2SWL)ORDW®OHYHOGHWHFWRUVDQGDFFHVVRULHVKDYHEHHQWHVWHG
ZLWKRXWIDLOXUHWRZHOORYHURSHUDWLRQV0RVWHOHFWULFDOIORDWVZLOOIDLOZLWKOHVVWKDQRSHUDWLRQV7KLVPHDQVWKDW\RXZLOOSUREDEO\FKDQJHRXWRUPRUHHOHFWULFDOIORDWVEHIRUH\RXFKDQJHRXWRSWLFDOIORDW7KLVLVGXHSULPDULO\WRWKHXVHRIWKHSODVWLFILEHUFDEOHLQVWHDGRIPHWDOOLFZLUHV7KHSODVWLFILEHUFDEOHFDQEHEHQWWKURXJKIXOOGHJUHHF\FOHVPDQ\WLPHVPRUHWKDQFRSSHUZLUHV
4,VWKHIORDW5R+6FRPSOLDQW"
$<HV,WLVFRQVLGHUHG³*UHHQ´WHFKQRORJ\,WLVDOOUHF\FODEOHDQG5R+6
FRPSOLDQW5R+6LVWKH(XURSHDQ8QLRQ³5HVWULFWLRQRI+D]DUGRXV
6XEVWDQFHV'LUHFWLYH´ZKLFKWRRNHIIHFW-XO\
4:KDWLVWKHDQJOHRIRSHUDWLRQRIWKHIORDW"
$ 7KH2SWL)LVDQDUURZDQJOHIORDW,WZLOORSHUDWHZLWKDVOLWWOHDVGHJUHHRIWLOWIURPKRUL]RQWDO+RZHYHUGXHWRWKHDQWLFKDWWHULQJOLTXLGLQWKHDFWLYDWLRQGHYLFHWKHUHPD\EHDVOLJKWWLPHGHOD\6SHFLDOIORDWVDUHDYDLODEOHWKDWGRQRWKDYHWKHWLPHGHOD\&RQWDFW&R[5HVHDUFKZLWK\RXUUHTXLUHPHQWV
4$UHWKHIORDWVVHQVLWLYHWRURWDWLRQ"
$1R7KHDFWLYDWLQJGHYLFHLVRQWKHFHQWHUD[LVWRWKHIORDWDQGLVWKXVLQGHSHQGHQWRIWKHURWDWLRQRIWKHIORDW
Opti-Float®and Optical Float®are registered trademarks of Cox Research and Technology, Inc. Baton Rouge, La.- coxresearch.com . The Opti-Float®level detector has both US and foreign patent protection.1
Combining new technology with a familiar device, the Opti-Float® level
detector is a revolutionary innovation in discrete level detectors. The new
float is made of safe, recyclable materials, is mercury and lead free, and is
engineered for many years of service.
The design of the Opti-Float® level detector is amazingly simple. Using
plastic fiber optic cable, a beam of light is transmitted from an LED in a
remote transceiver down to the float, where the beam makes and breaks
depending on the tilt of the float. When the transceiver detects the
presence of absence of light, a relay is activated in the transceiver, which
can then operate other devices. The transceivers are all dual, din rail
mounted units, that can connect to two floats. Additional transceivers can
be used for additional floats.
202
2
203
3
1. Proper installation of Opti-Float® level detectors will insure long trouble free operation.2. The transceivers are dual units capable of operating 2 floats. The transceivers have relay outputs both normally open and normally closed. The most common mode is normally open, floating tilted down, beam blocked, relay de-energized, relay contact
open. Relay contacts close when the float is tilted up.
3. Install transceivers on a din rail mounting. Connect a 12 VDC, 10 watt power supply to the+ and - terminals. Connect the relay contacts, R1 and R2 to the control circuit.4. The relays can be connected directly in the motor starter contactor coil circuit. For maximum relay life, it is recommended that interface relays be used on starters larger
than NEMA size 2.
5. Strip off the outer sheath of the pair of fiber optic cables as far as necessary. Use care so as not to cut the fiber cables.6. The fiber cables consist of a plastic light fiber with a thin polyethylene covering. Do not strip off this covering. Square cut the ends of the fiber cable using a sharp razor blade,
box cutter, cigar cutter or a simple device available from Cox Research. Look at the
cut end and verify that it is a clean cut with no polyethylene covering the light fiber. Re-cut if necessary. Polishing of the end is not required.7. Completely loosen the cinch nuts on the transceiver but do not remove them. Insert the fiber cables into the ends until they bottom out. The fiber cables will insert
approximately 16mm (5/8”) from the end of the fully loosened cinch nut.
8. Hand tighten the cinch nuts. Do not use any tool for this operation. Verify that the fiber cables are securely in place. Also make sure that the cables enter the connector straight. Undue lateral tension will keep the fibers from mating with the transmitter and receiver devices inside the housing. The minimum recommended
bending radius of the fiber cables is 25mm (1 “).
9. The blue connector is the light source and the black connector is the light receiver. It does not matter which fiber cable is inserted into which connector. Just make sure that they are matching pairs of the same float.10.When in operation, a float that is tilted above horizontal will illuminate its respective
red LED, R1 or R2, on the front of the transceiver. It does not matter whether the relay
is connected normally open or normally closed. The green PWR light will illuminate when the transceiver has power. 11.Spare transmitter and receiver connectors should be covered with plastic dust covers shipped with each unit. This will not only prevent contaminates from getting
into the device, it will also prevent ambient light from entering a spare receiver which
may cause it to switch on and off.12.It is recommended that float cables be ordered with the correct length of cable. However, in the event that a splice is necessary, the cable can be spliced with one pair of splices. Splices are tubular with cinch nuts on each end. Contact Cox Research for
splice kits.
13.Standard cable lengths are 30, 60 and 100 feet. Maximum recommended splice lengths are 150’ total.14.When installing the cables make sure that they are not unduly kinked, stressed, rubbing against sharp objects or installed such that the bending radius of the cable
is less than 25mm (1”) in any location. Larger loops are recommended.
204
4
15. For optimum operation when attached to supports, tether the float with about 100mm (4”) of cable slack.16. Attach the floats to support cable, chain, rod or other devices using standard wire ties. Attach the float cable perpendicular to the support and make an additional parallel
attachment about 100mm (4”) above the first one. See instructions supplied with Cox Research cable attachment devices for proper installation.17. Where float wires enter a junction or terminal box adjacent to a control panel, it is recommended that the float cable not be cut and spliced, but brought directly through the box to the control panel. Make a loop in the cable such that a splice could be
installed at a later date if necessary. If desired, the sheath of the optical cable can be removed where individual fibers are needed to be installed through seal off fittings.18.Although designed to take a large amount of abuse, for maximum life, it is recommended that the Opti-Float® level detectors not be abused by striking them
against the walls of wet wells.19.A complete fully assembled, UL listed, externally mounted Retro-Kit consisting of floats, transceivers, power supply and enclosure is available from Cox Research. An internally mounted kit without enclosure is also available. Contact us with your requirements.
205
5
206
6
207
7
208
8
209
9
210
10
211
11
212
4+RZORQJZLOOWKHIORDWODVW"
$ :HKDYHUXQH[WHQVLYHWHVWVRQWKHPDQGIRXQGWKDWWKHIORDWVDVZHOODVWKHFRQWUROOHUVFRQVLVWHQWO\ODVWZHOORYHURSHUDWLRQVZLWKRXWIDLOXUH(OHFWULFDOIORDWVFRQVLVWHQWO\IDLODWWKHSRLQWRIPD[LPXPUHSHDWHGEHQGLQJVWUHVVRIWKHFRSSHUZLUHVZKLFKLVQHDUWKHIORDWKRXVLQJ&RSSHUZLUHKDVDPXFKKLJKHUPRGXOXVRIHODVWLFLW\DQGIDWLJXHVYHU\TXLFNO\7KH2SWL)ORDW®OHYHOGHWHFWRUXVHVSODVWLFILEHUFDEOHDQGLVQHDUO\LQGHVWUXFWLEOHLQIORDWVZLWFKDSSOLFDWLRQV,WKDVDOLIHRIRUPRUHWLPHVWKDWRIFRQYHQWLRQDOHOHFWULFDOIORDWV
4+DYLQJDILEHURSWLFFDEOHDUHWKHUHDQ\VSHFLDOSUHFDXWLRQVWKDWZHKDYHWRWDNHWRDYRLGSUREOHPV"$ 1R7KHILEHURSWLFFDEOHXVHGZLWKWKH2SWL)ORDW®OHYHOGHWHFWRUZDVFXVWRPGHVLJQHGIRUWKHDSSOLFDWLRQ7KHILEHUVDUHSODVWLFQRWJODVVDQGFDQEHWLHGLQNQRWVDOWKRXJKQRWUHFRPPHQGHGZLWKRXWKDUP7KHFDEOHMDFNHWFDQEHVWULSSHGZLWKVWDQGDUGFRD[FDEOHVWULSSHUVRUVLPSOHVWULSSHUVWKDWZHFDQ
VXSSO\7KHHQGVRIWKHILEHUVDUHQRWWREHVWULSSHG7KH\DUHRQO\WREHFXW
ZLWKDVKDUSLQVWUXPHQWVXFKDVDUD]RURUDFXWWHUWKDWZHFDQVXSSO\7KH
HQGVGRQRWQHHGWREHSROLVKHGDQGSXVKHDVLO\LQWRWKHFRQWUROOHUFRQQHFWRU
ZLWKRXWWRROV
4$UHWKHUHDQ\VSHFLDOUHTXLUHPHQWVIRUKDQJLQJWKHIORDWVLQDZHWZHOO"
$ 1R$WWDFKWKHPDV\RXZRXOGDQ\RWKHUIORDW:HGRKDYHUHFRPPHQGDWLRQVDVWRWKHEHVWPHWKRGVRIDWWDFKPHQWWRFDEOHVFKDLQVDQGSLSHWKDWZLOOJLYH\RXWKHOHDVWDPRXQWRIWURXEOHZLWKVOLSSDJHHWF7KHVHPHWKRGVFDQEHDSSOLHGZLWKDQ\W\SHRIKDQJLQJFDEOHHYHQZLWKHOHFWULFDOIORDWV<RXFDQVHHWKHPRQRXUZHEVLWHRUFDOOXVDQGZHZLOOVHQG\RXDERRNOHW
4,VWKHFRQWUROOHUUDWHGIRUXVHGLUHFWO\ZLWKPRWRUVWDUWHUVRUGRZHQHHGWRKDYHLQWHUIDFHUHOD\VLQWKHFLUFXLW"
$ 7KHFRQWUROOHUKDVDPSUHOD\VRQWKHFLUFXLWERDUG:HFRQVHUYDWLYHO\UDWHWKHPDWDPSVDQGYROWV:HKDYHWHVWHGWKHFRQWUROOHUWRRYHURSHUDWLRQVZLWKRXWIDLOXUHHQHUJL]LQJDQGGHHQHUJL]LQJDVL]HPRWRUVWDUWHUZKLFKZLOOVWDUWD+3YROWPRWRU)RUVL]HDQGDERYHZHUHFRPPHQGWKHLQWHUIDFHUHOD\V:HGRQRWUHFRPPHQGFRQQHFWLQJWKHFRQWUROOHUGLUHFWO\WRDPRWRUZKHUHIXOOPRWRUFXUUHQWZLOOSDVVWKURXJKLW
4:KDWLVWKHPD[LPXPOHQJWKRIFDEOHVWKDWDUHDYDLODEOH"$:HVWRFNDQGIRRWFDEOHVEXWFDQVXSSO\ORQJHUFDEOHV&DOOXVZLWK\RXUVSHFLDOUHTXLUHPHQWV
4,QKRZGHHSRIZDWHUKDVWKHIORDWEHHQWHVWHG"
$ ,WKDVEHHQWHVWHGLQDZDWHUILOOHGSUHVVXUHFKDPEHUZLWKWKHRSWLFDOFDEOHVH[LWLQJWKHFKDPEHUWRIHHWRIZDWHUSUHVVXUHZLWKRXWIDLOXUHRUGHIRUPDWLRQRIWKHIORDWRUWKHFDEOH7KHXQLTXHVKDSHRIWKHIORDWGLVWULEXWHVWKHIRUFHVRIFRPSUHVVLRQHTXDOO\DURXQGWKHIORDWDQGSURGXFHVLWVVWUHQJWK12
Frequently Asked Questions
3 12
A. We have run extensive tests on them and found that the floats consistently last
well over 15,000,000 operations without failure. Electrical floats consistently fail at the point of maximum repeated bending stress of the copper wires, which is near the float housing. Copper wire has a much higher modulus of elasticity and fatigues very quickly. The Opti-Float® level detector uses plastic fiber cable and is nearly indestructible in float switch applications. It was a life
of 10 or more times that of conventional electrical floats.
213
13
/03/11
4+RZGR\RXNHHSWKHIORDWIURPFKDWWHULQJLQWXUEXOHQWZDWHU"
$ :HKDYHGHVLJQHGLWWKDWZD\7KHOLJKWHFOLSVHULQVLGHRIWKHIORDWRSHUDWHVLQDGDPSHQLQJIOXLGZLWKDYHU\ZLGHRSHUDWLQJWHPSHUDWXUHUDQJH7KLVGDPSHQLQJIOXLGVORZVWKHHFOLSVHUGRZQXVLQJWKHVDPHSULQFLSOHDVVKRFNDEVRUEHUVRQDQDXWRPRELOH$OVRWKHFRQWUROOHULVGHVLJQHGZLWKDVPDOOLQKHUHQWWLPHGHOD\EHIRUHRSHUDWLQJWKHUHOD\V7KHVHWZRIHDWXUHVHOLPLQDWHWKHSUREOHPVDVVRFLDWHGZLWKIORDWFKDWWHU
4:K\LVWKH2SWL)ORDW®OHYHOGHWHFWRUWZRWRQHLQFRORU"$7KHWRQHSDWHQWHGIHDWXUHKDVDSXUSRVH,WLVOLJKWLQFRORURQWKHGRPHVRWKDW\RXFDQHDVLO\VHHE\ORRNLQJGRZQLQWRWKHZDWHULIWKHIORDWLVWLOWHGXSRUGRZQ
4+RZUXJJHGLVWKHIORDWIURPDEXVH
$)RUWHVWLQJSXUSRVHVRQO\WKH2SWL)ORDW®OHYHOGHWHFWRUKDVEHHQWHVWHG
ZLWKDEXVHZLWKHYHU\WKLQJIURPVOHGJHKDPPHUVWREDVHEDOOEDWVWR
VODPPLQJWKHPLQWRFRQFUHWHDWKLJKYHORFLW\DOOZLWKRXWIDLOXUH+RZHYHUZH
GRQRWUHFRPPHQGDEXVHDQGVSHFLILFDOO\FDXWLRQDJDLQVWLW
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®OHYHOGHWHFWRUVDQG\RXDUHGRQH7KHVHFRQGPHWKRGLVWRXVHDQRSHQDVVHPEO\FRQVLVWLQJRIWKHVDPHFRPSRQHQWVH[FHSWZLWKRXWWKHHQFORVXUHDOOSUHPRXQWHGRQDVPDOODOXPLQXPSODWHWKDWPD\ILWLQWRH[LVWLQJVSDFHLQVLGHRI\RXUH[LVWLQJFRQWUROSDQHO&RQQHFWLRQVDUHPDGHVLPLODUO\7KHWKLUGPHWKRGLVWRPRXQWWKHLQGLYLGXDOFRPSRQHQWVLQVLGHRI\RXUH[LVWLQJFRQWUROSDQHODQGDJDLQZLUHVLPLODUO\
4:KDWW\SHVRIDFFHVVRULHVGR\RXKDYH"$:HKDYHPDQ\DFFHVVRULHVLQFOXGLQJH[WHUQDOZHLJKWVFDEOHVWULSSHUVFXWWHUVVSOLFHNLWVDQGXQLTXHKDQJLQJGHYLFHV<RXFDQILQGRXUFDWDORJDQGRWKHULQIRUPDWLRQRQWKHVHGHYLFHVRQRXUZHEVLWH
4&DQWKHRSWLFDOFDEOHEHVSOLFHG"
$ <HV$OWKRXJKLWLVEHVWWRRUGHUWKHIORDWVZLWKWKHFRUUHFWOHQJWKRIFDEOHWKHFDEOHFDQEHHDVLO\VSOLFHGLIQHFHVVDU\6HHRXUZHEVLWHIRUPRUHLQIRUPDWLRQRUJLYHXVDFDOO
13
214
03/03/11
11. Q. What types of accessories do you have? A. We have many accessories including external weights, cable strippers,cutters, splice kits and unique hanging devices. You can find our catalogand other information on these devices on our web site.12. Q. Can the optical cable be spliced?A.Yes. Although it is best to order the floats with the correct length of cable, the cable can be easily spliced if necessary. See our web site for more information or give us a call.
13. Q. How much do they cost?
A. Opti-Float®systems cost about the same and in many cases less than
standard intrinsically safe systems with electric floats and interface relays.
Nearly all waste water pump stations require compliance with NFPA
Standard 820 which classifies most wet-wells as a Class 1, Division 1
hazardous area. Combining this with the extremely long life of 10 or
more times that of conventional electrical floats, and even using them in
less stringent Class 1, Division 2 or Unclassified areas, the cost of
changing out conventional electrical floats makes the Opti-Float®level
detectors by far the best value.
14. Q. Where do we purchase the floats and accessories?
A. They can be purchased from our national distributors. Contact us with your
requirements and we will direct you to your distributor.
15. Q. What is the warranty on the floats?
A. Standard warranty is for 3 years. Longer warranties are available.
16. Q. Can we get quantity discounts.
A. Yes. Contact us with your requirements.
17. Q. How can the Opti-Float®level detectors lower our maintenance
cost?
A.The Opti-Float®level detectors and accessories have been tested
without failure to well over 12,000,000 operations. Most electrical floats
will fail with less than 100,000 operations. This means that you will
probably change out 10 or more electrical floats before you change out 1
optical float. This is due primarily to the use of the plastic fiber cable
instead of metallic wires. The plastic fiber cable can be bent through full
180 degree cycles many times more than copper wires.
03/03/11
18.Q. Is the float RoHS compliant?
A. Yes. It is considered “Green” technology. It is all recyclable and RoHS
compliant. RoHS is the European Union “Restriction of Hazardous
Substances Directive” which took effect July1, 2006.
19.Q. What is the angle of operation of the float?
A.The Opti-F1 is a narrow angle float. It will operate with as little as 1
degree of tilt from horizontal. However, due to the anti-chattering liquid in
the activation device, there may be a slight time delay. Special floats are
available that do not have the time delay. Contact Cox Research with
your requirements.
20.Q. Are the floats sensitive to rotation?
A. No. The activating device is on the center axis to the float and is thus
independent of the rotation of the float.
Opti-Float®and Optical Float®are registered trademarks of Cox Research and Technology, Inc. Baton
Rouge, La.-coxresearch.com . The Opti-Float®level detector has both US and foreign patent protection.
03/03/11
18.Q. Is the float RoHS compliant?
A. Yes. It is considered “Green” technology. It is all recyclable and RoHS
compliant. RoHS is the European Union “Restriction of Hazardous
Substances Directive” which took effect July1, 2006.
19.Q. What is the angle of operation of the float?
A.The Opti-F1 is a narrow angle float. It will operate with as little as 1
degree of tilt from horizontal. However, due to the anti-chattering liquid in
the activation device, there may be a slight time delay. Special floats are
available that do not have the time delay. Contact Cox Research with
your requirements.
20.Q. Are the floats sensitive to rotation?
A. No. The activating device is on the center axis to the float and is thus
independent of the rotation of the float.
Opti-Float®and Optical Float®are registered trademarks of Cox Research and Technology, Inc. Baton
Rouge, La.-coxresearch.com . The Opti-Float®level detector has both US and foreign patent protection.14
A. The Opti-Float® level detectors and accessories have been tested without fail-ure to well over 15,000,000 operations. Most electrical floats will fail with less than 100,000 operations. This means that you will probably change out 10 or more electrical floats before you change out 1 optical float. This is due primar-
ily to the use of the plastic fiber cable instead of metallic wires. The plastic fiber cable can be bent through full 180 degree cycles many times more than copper wires.
215
Cox Research and Technology, Inc. ("Cox") warrants to the original purchaser
(the "Customer") that the Optical Float systems and products will be free of defects in
materials or workmanship, for a period of 3 years from the date of purchase. This warranty is
void on products that have been, in our judgment, tampered with, abused, improperly stored,
improperly wired, improperly installed, misused or subjected to high voltages either through
negligence, power surges, lighting or other sources; modified, altered or adapted without
Cox's written consent; or used with equipment not covered by this warranty, to the extent that
problems are attributable to such use.
WARRANTY
The Customer is required to obtain a return authorization number from Cox before returning
any products. The Customer is responsible for all expenses including removal, re-installation
and shipping necessary to deliver the returned products to the factory for evaluation, repair,
or replacement. Cox's sole liability under this Limited Warranty is, at its option, to repair or
replace any products that are found defective in materials or workmanship, or to refund the
purchase price paid for the defective product.
Cox Research and Technology, Inc.
225.756.3271 > 800.910.9109 > f: 225.755.103014697 South Harrell's Ferry RoadBaton Rouge, LA. 70816
optifloat.com 0314138
R
Disclaimer of Further Warranties. THE LIMITED WARRANTY SET FORTH ABOVE IS
THE EXCLUSIVE WARRANTY APPLICABLE TO THIS CONTRACT, AND COX
EXPRESSLY DISCLAIMS ALL OTHER WARRANTIES OR REMEDIES, INCLUDING
WARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE,
WHETHER THE SAME ARE WRITTEN, VERBAL, IMPLIED, OR STATUTORY. THE
CUSTOMER IS SOLELY RESPONSIBLE FOR DETERMINING THE SUITABILITY OF COX
OPTICAL FLOAT SYSTEM PRODUCTS FOR THE CUSTOMER'S INTENDED PURPOSES,
AND COX SHALL NOT BE LIABLE FOR THE SUITABILITY OF ITS OPTICAL FLOAT
SYSTEM PRODUCTS FOR ANY PARTICULAR PURPOSE.
Limitation of Liability. Customer's rights and remedy are governed exclusively by the terms
and conditions of this Limited Warranty and Customer expressly waives any claim based
upon contract, tort, strict liability, or otherwise. Under no circumstances shall Cox be liable for
any incidental, consequential, or special damages, losses, or expenses incurred by
Customer or any third party arising from this offer of sale or performance of Optical Float
systems hereunder. Under no circumstances shall the amount of any claim for damages or
liability exceed the amount paid by Customer for products provided by Cox hereunder. This
Limited Warranty may only be modified in writing by an officer of Cox, and is the entire
agreement between the parties hereto. If any provision of this Limited Warranty is determined
to be void, the remaining provisions are deemed valid and enforceable.
Cox Research and Technology, Inc. ("Cox") warrants to the original purchaser(the "Customer") that the Optical Float systems and products will be free of defects in
materials or workmanship, for a period of 3 years from the date of purchase. This warranty isvoid on products that have been, in our judgment, tampered with, abused, improperly stored,
improperly wired, improperly installed, misused or subjected to high voltages either through
negligence, power surges, lighting or other sources; modified, altered or adapted without
Cox's written consent; or used with equipment not covered by this warranty, to the extent that
problems are attributable to such use.
WARRANTY
The Customer is required to obtain a return authorization number from Cox before returningany products. The Customer is responsible for all expenses including removal, re-installation
and shipping necessary to deliver the returned products to the factory for evaluation, repair,or replacement. Cox's sole liability under this Limited Warranty is, at its option, to repair or
replace any products that are found defective in materials or workmanship, or to refund the
purchase price paid for the defective product.
Cox Research and Technology, Inc.
225.756.3271 > 800.910.9109 > f: 225.755.103014697 South Harrell's Ferry RoadBaton Rouge, LA. 70816optifloat.com 0314138
R
Disclaimer of Further Warranties. THE LIMITED WARRANTY SET FORTH ABOVE ISTHE EXCLUSIVE WARRANTY APPLICABLE TO THIS CONTRACT, AND COX
EXPRESSLY DISCLAIMS ALL OTHER WARRANTIES OR REMEDIES, INCLUDINGWARRANTIES OF MERCHANTABILITY AND FITNESS FOR A PARTICULAR PURPOSE,
WHETHER THE SAME ARE WRITTEN, VERBAL, IMPLIED, OR STATUTORY. THE
CUSTOMER IS SOLELY RESPONSIBLE FOR DETERMINING THE SUITABILITY OF COX
OPTICAL FLOAT SYSTEM PRODUCTS FOR THE CUSTOMER'S INTENDED PURPOSES,
AND COX SHALL NOT BE LIABLE FOR THE SUITABILITY OF ITS OPTICAL FLOAT
SYSTEM PRODUCTS FOR ANY PARTICULAR PURPOSE.
Limitation of Liability. Customer's rights and remedy are governed exclusively by the terms
and conditions of this Limited Warranty and Customer expressly waives any claim based
upon contract, tort, strict liability, or otherwise. Under no circumstances shall Cox be liable for
any incidental, consequential, or special damages, losses, or expenses incurred byCustomer or any third party arising from this offer of sale or performance of Optical Float
systems hereunder. Under no circumstances shall the amount of any claim for damages or
liability exceed the amount paid by Customer for products provided by Cox hereunder. This
Limited Warranty may only be modified in writing by an officer of Cox, and is the entire
agreement between the parties hereto. If any provision of this Limited Warranty is determinedto be void, the remaining provisions are deemed valid and enforceable.
041613
The next generation of fl at. generation of fl The next generation of fl atgeneration of fl
®
PROCESS > POWER > LIGHT
030719216
Original Date:5/6/2020
Updated:8/5/2020
TOPGOLF - RENTON, WA - PUMP STATION
(FFE 30.5)
ASSUMPTIONS
DRAINAGE AREA:2.08 ACRES
CURVE NUMBER:98
TIME OF CONCENTRATION:5 MINUTES
100-YEAR RAINFALL EVENT
STORM TOTAL PEAK PUMP FLOOD
DURATION RAINFALL RUNOFF DISCHARGE ELEVATION STORAGE
(HRS)(INCHES)(CFS)(CFS)(FEET)(CF)
1
2
3
6
24 (TYPE IA)3.90 1.82 0.4456 23.45 3,957
MAXIMUM ALLOWABLE FLOOD ELEVATION:23.58 FT.
(12" of ponding above Green Target vault rim)
PUMP STATION DESIGN FLOW RATE:0.4456 CFS 200 GPM
Notes:
1) The design flow rate may be met using a configuration of multiple pumps in
stages/elevations to be finalized by the local pump designer/engineer. The enclosed
calculations are intended as a starting point for final design.
2) The pump system is assumed to drain into a free outfall.
ASSUMPTIONS (pump specifier will need to confirm these parameters work with pumps):
Wetwell Rim =30.49 feet
High Water Alarm =23.58 feet
Lag Pump On =14.65 feet
Lead Pump On (Invert In) =13.65 feet
Pump(s) Off =10.65 feet
Wetwell Diameter =8.00 feet
STAGE-STORAGE CALCULATIONS
Red Surface grade at lowest side of target 29.5
Red Top of Floor of Target 23.58 targetRed Bottom of Floor of Target / Top of Vault 23.08 targetvaultsRed Bottom of Vault / Top of Basin / RIM vaultsbasinsRed 1 Upstream Invert 21.4 basinsRed 1 Downstream Invert
Red 2 Upstream Invert 20.61
Red 2 Downstream Invert
Red 3 Upstream Invert 19.81
Red 3 Downstream Invert
Red 4 Upstream Invert 21.4 pipesRed 4 Downstream Invert pipesYellow 1 Surface grade at lowest side of target 29.5
Yellow 1 Top of Floor of Target 23.58 targetYellow 1 Bottom of Floor of Target / Top of Vault 22.58 targetvaultsYellow 1 Bottom of Vault / Top of Basin / RIM 20.58 vaultsbasinsYellow 1 Upstream Invert 17.96
Yellow 1 Downstream Invert 16.59 basinspipesGreen Surface grade at lowest side of target 29.5
Green Top of Floor of Target 23.58 targetGreen Bottom of Floor of Target / Top of Vault 22.58 targetvaultsGreen Bottom of Vault / Top of Basin / RIM 20.58 vaultsbasinsGreen Upstream Invert 16.59
Green Downstream Invert 15.48
Brown Surface grade at lowest side of target 29.5 basinspipesBrown Top of Floor of Target 23.58 targetBrown Bottom of Floor of Target / Top of Vault 22.58 targetvaultsBrown Bottom of Vault / Top of Basin / RIM 20.58 vaultsbasinsBrown Upstream Invert 15.48
Brown Downstream Invert 13.65 basinspipesBlue Surface grade at lowest side of target 30
Blue Top of Floor of Target 24.08 targetBlue Bottom of Floor of Target / Top of Vault 23.08 targetvaultsBlue Bottom of Vault / Top of Basin / RIM 21.08 vaultsbasinsBlue Upstream Invert 19.12
Blue Downstream Invert 15.48 basinspipesWhite Surface grade at lowest side of target 31
White Top of Floor of Target 25.08 targetWhite Bottom of Floor of Target / Top of Vault 24.08 targetvaultsWhite Bottom of Vault / Top of Basin / RIM 22.08 vaultsbasinsWhite Upstream Invert 20.41
White Downstream Invert 19.12
PUMP Rim 30.49
PUMP Upstream Invert 15.48
PUMP Downstream Invert 13.65
Lower Invert -.01 13.64
Lower Invert -3.0 (Pump Off Elev.)10.65
Lower Invert -3.01 (Pump Off Elev. - 0.01)10.64
Lower Invert + 1.0 (second pump on)14.65
Lower Invert + 0.99 14.64
AD 8 Rim 27.2
Upstream Invert 25.53
Downstream Invert 25.06
AD 9 Rim 27.2
Upstream Invert 25.06
Downstream Invert 24.75
AD 10 Rim 27.01
Upstream Invert 24.75
Downstream Invert 24.50
AD 11 Rim 28.00
Upstream Invert 26.25
Downstream Invert 25.16 basinspipes
TOPGOLF - RENTON
Outfield Drainage System
Volume Summary
10.64 - - - - - - - - -
10.65 0.01 0.01 - - - - - - -
13.64 3.00 1.00 150.29 - - - - 150.29 0.00
13.65 3.01 0.01 150.80 - - - - 150.80 0.00
14.64 4.00 2.00 200.56 - - - 35.00 235.56 0.01
14.65 4.01 0.01 201.06 - - - 35.10 236.16 0.01
15.48 4.84 3.00 242.78 - - - 94.80 337.58 0.01
16.59 5.95 1.11 298.58 - - 3.49 185.98 488.04 0.01
17.96 7.32 4.00 367.44 - - 12.13 312.10 691.67 0.02
19.12 8.48 1.16 425.75 - - 26.70 361.60 814.05 0.02
19.81 9.17 5.00 460.43 - - 37.54 389.80 887.77 0.02
20.41 9.77 0.60 490.59 - - 47.44 430.99 969.02 0.02
20.58 9.94 6.00 499.14 - - 50.78 445.44 995.35 0.02
20.61 9.97 0.03 500.64 - 2.16 51.00 447.76 1,001.56 0.02
21.08 10.44 7.00 524.27 - 36.00 54.69 477.99 1,092.95 0.03
21.4 10.76 0.32 540.35 - 64.80 56.20 494.80 1,156.15 0.03
22.08 11.44 8.00 574.53 - 126.00 60.47 512.40 1,273.40 0.03
22.58 11.94 0.50 599.67 - 171.00 62.04 512.40 1,345.11 0.03
23.08 12.44 9.00 624.80 477.90 180.00 63.61 512.40 1,858.71 0.04
23.58 12.94 0.50 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
24.08 13.44 10.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
24.5 13.86 0.42 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
24.75 14.11 11.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
25.06 14.42 0.31 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
25.08 14.44 12.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
25.16 14.52 0.08 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
25.53 14.89 13.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
26.25 15.61 0.72 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
27 16.36 14.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
27.01 16.37 0.01 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
27.2 16.56 15.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
28 17.36 0.80 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
29.5 18.86 16.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
30 19.36 0.50 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
30.49 19.85 17.00 649.93 3,252.14 180.00 63.61 512.40 4,658.08 0.11
31 20.36 0.51 997.27 3,252.14 180.00 63.61 512.40 5,005.42 0.11
∑storagei
Pipes
(cu-ft)
∑storagei
TOTAL
(cu-ft)
∑storagei
TOTAL
(ac-ft)
Elev.Stepped
∆elev.
∑storagei
Wetwell
(cu-ft)
∑storagei
Target
(cu-ft)
∑storagei
Vaults
(cu-ft)
∑storagei
Basins
(cu-ft)
Total Head
Rim 30.49 Pump Off 10.65
Diameter (in)96 Shape Factor 1.00
HWL 23.58 # Basins 1
Elevation Depth Volume
Volume for All
Wells
(ft) (ft) (CF) (CF)
10.64 0 0.00 0.00
Pump Off 10.65 0 0.00 0.00
13.64 2.99 150.29 150.29
Pump #1 On 13.65 3 150.80 150.80
14.64 3.99 200.56 200.56
Pump #2 On 14.65 4 201.06 201.06
15.48 4.83 242.78 242.78
16.59 5.94 298.58 298.58
17.96 7.31 367.44 367.44
19.12 8.47 425.75 425.75
19.81 9.16 460.43 460.43
20.41 9.76 490.59 490.59
20.58 9.93 499.14 499.14
20.61 9.96 500.64 500.64
21.08 10.43 524.27 524.27
21.40 10.75 540.35 540.35
22.08 11.43 574.53 574.53
22.58 11.93 599.67 599.67
23.08 12.43 624.80 624.80
23.58 12.93 649.93 649.93
24.08 12.93 649.93 649.93
24.50 12.93 649.93 649.93
24.75 12.93 649.93 649.93
25.06 12.93 649.93 649.93
25.08 12.93 649.93 649.93
25.16 12.93 649.93 649.93
25.53 12.93 649.93 649.93
26.25 12.93 649.93 649.93
27.00 12.93 649.93 649.93
27.01 12.93 649.93 649.93
27.20 12.93 649.93 649.93
28.00 12.93 649.93 649.93
29.50 12.93 649.93 649.93
30.00 12.93 649.93 649.93
30.49 12.93 649.93 649.93
31.00 19.84 997.27 997.27
Wet Well
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.58 Lower Limit 23.08
Diameter (in)180 Shape Factor 0.33
HWL 23.58 # Targets 4
Elevation Depth Volume For All of Color
(ft) (CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0 0.00 0.00
21.08 0 0.00 0.00
21.40 0 0.00 0.00
22.08 0 0.00 0.00
22.58 0 0.00 0.00
23.08 0 0.00 0.00
23.58 0.5 29.16 116.63
24.08 0.5 29.16 116.63
24.50 0.5 29.16 116.63
24.75 0.5 29.16 116.63
25.06 0.5 29.16 116.63
25.08 0.5 29.16 116.63
25.16 0.5 29.16 116.63
25.53 0.5 29.16 116.63
26.25 0.5 29.16 116.63
27.00 0.5 29.16 116.63
27.01 0.5 29.16 116.63
27.20 0.5 29.16 116.63
28.00 0.5 29.16 116.63
29.50 0.5 29.16 116.63
30.00 0.5 29.16 116.63
30.49 0.5 29.16 116.63
31.00 0.5 29.16 116.63
Red Target
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.58 Lower Limit 22.58
Diameter (in)552 Shape Factor 1
HWL 23.58 # Targets 2
Elevation Depth Volume For All of Color
(CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0 0.00 0.00
21.08 0 0.00 0.00
21.40 0 0.00 0.00
22.08 0 0.00 0.00
22.58 0 0.00 0.00
23.08 0.5 92.88 185.76
23.58 1 559.44 1118.88
24.08 1 559.44 1118.88
24.50 1 559.44 1118.88
24.75 1 559.44 1118.88
25.06 1 559.44 1118.88
25.08 1 559.44 1118.88
25.16 1 559.44 1118.88
25.53 1 559.44 1118.88
26.25 1 559.44 1118.88
27.00 1 559.44 1118.88
27.01 1 559.44 1118.88
27.20 1 559.44 1118.88
28.00 1 559.44 1118.88
29.50 1 559.44 1118.88
30.00 1 559.44 1118.88
30.49 1 559.44 1118.88
31.00 1 559.44 1118.88
Yellow Target
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.58 Lower Limit 22.58
Diameter (in)912
HWL 23.58 # Targets 1
Elevation Depth Volume For All of Color
(CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0 0.00 0.00
21.08 0 0.00 0.00
21.40 0 0.00 0.00
22.08 0 0.00 0.00
22.58 0 0.00 0.00
23.08 0.5 170.64 170.64
23.58 1 1,125.63 1125.63
24.08 1 1,125.63 1125.63
24.50 1 1,125.63 1125.63
24.75 1 1,125.63 1125.63
25.06 1 1,125.63 1125.63
25.08 1 1,125.63 1125.63
25.16 1 1,125.63 1125.63
25.53 1 1,125.63 1125.63
26.25 1 1,125.63 1125.63
27.00 1 1,125.63 1125.63
27.01 1 1,125.63 1125.63
27.20 1 1,125.63 1125.63
28.00 1 1,125.63 1125.63
29.50 1 1,125.63 1125.63
30.00 1 1,125.63 1125.63
30.49 1 1,125.63 1125.63
31.00 1 1,125.63 1125.63
Green Target
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.58 Lower Limit 22.58
Diameter (in) 912
HWL 23.58 # Targets 1
Elevation Depth Volume For All of Color
(CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0 0.00 0.00
21.08 0 0.00 0.00
21.40 0 0.00 0.00
22.08 0 0.00 0.00
22.58 0 0.00 0.00
23.08 0.5 121.50 121.50
23.58 1 769.50 769.50
24.08 1 769.50 769.50
24.50 1 769.50 769.50
24.75 1 769.50 769.50
25.06 1 769.50 769.50
25.08 1 769.50 769.50
25.16 1 769.50 769.50
25.53 1 769.50 769.50
26.25 1 769.50 769.50
27.00 1 769.50 769.50
27.01 1 769.50 769.50
27.20 1 769.50 769.50
28.00 1 769.50 769.50
29.50 1 769.50 769.50
30.00 1 769.50 769.50
30.49 1 769.50 769.50
31.00 1 769.50 769.50
Brown Target
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.58 Lower Limit 23.08
Diameter (in) 912
HWL 23.58 # Targets 1
Elevation Depth Volume For All of Color
(CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0 0.00 0.00
21.08 0 0.00 0.00
21.40 0 0.00 0.00
22.08 0 0.00 0.00
22.58 0 0.00 0.00
23.08 0 0.00 0.00
23.58 0.5 121.50 121.50
24.08 0.5 121.50 121.50
24.50 0.5 121.50 121.50
24.75 0.5 121.50 121.50
25.06 0.5 121.50 121.50
25.08 0.5 121.50 121.50
25.16 0.5 121.50 121.50
25.53 0.5 121.50 121.50
26.25 0.5 121.50 121.50
27.00 0.5 121.50 121.50
27.01 0.5 121.50 121.50
27.20 0.5 121.50 121.50
28.00 0.5 121.50 121.50
29.50 0.5 121.50 121.50
30.00 0.5 121.50 121.50
30.49 0.5 121.50 121.50
31.00 0.5 121.50 121.50
Blue Target
Stage-Storage-Discharge Summary Tables
Proposed Conditions
10.64 0.00 0 0.000
10.65 1.00 0 0.000
13.64 2.00 0 0.000
13.65 3.00 0 0.000
14.64 4.00 0 0.000
14.65 5.00 0 0.000
15.48 6.00 0 0.000
16.59 7.00 0 0.000
17.96 8.00 0 0.000
19.12 9.00 0 0.000
19.81 10.00 0 0.000
20.41 11.00 0 0.000
20.58 12.00 0 0.000
20.61 13.00 2 0.000
21.08 14.00 36 0.001
21.4 15.00 65 0.001
22.08 16.00 126 0.003
22.58 17.00 171 0.004
23.08 18.00 180 0.004
23.58 19.00 180 0.004
24.08 20.00 180 0.004
24.5 21.00 180 0.004
24.75 22.00 180 0.004
25.06 23.00 180 0.004
25.08 24.00 180 0.004
25.16 25.00 180 0.004
25.53 26.00 180 0.004
26.25 27.00 180 0.004
27 28.00 180 0.004
27.01 29.00 180 0.004
27.2 30.00 180 0.004
28 31.00 180 0.004
29.5 32.00 180 0.004
30 33.00 180 0.004
30.49 34.00 180 0.004
31 35.00 180 0.004
storage
(cu-ft)
∑storagei
(ac-ft)
Target Vault Summary
Stage-Storage-Discharge Summary Tables
Proposed Conditions
stage ∆elev.
Upper Limit 22.58 Lower Limit 20.58
Area (sq ft) 18.0
HWL 23.58 # Targets 2
Elevation Depth Volume For All of Color
(ft) (ft) (CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0.03 0.54 1.08
21.08 0.5 9.00 18.00
21.40 0.82 14.76 29.52
22.08 1.5 27.00 54.00
22.58 2 36.00 72.00
23.08 2 36.00 72.00
23.58 2 36.00 72.00
24.08 2 36.00 72.00
24.50 2 36.00 72.00
24.75 2 36.00 72.00
25.06 2 36.00 72.00
25.08 2 36.00 72.00
25.16 2 36.00 72.00
25.53 2 36.00 72.00
26.25 2 36.00 72.00
27.00 2 36.00 72.00
27.01 2 36.00 72.00
27.20 2 36.00 72.00
28.00 2 36.00 72.00
29.50 2 36.00 72.00
30.00 2 36.00 72.00
30.49 2 36.00 72.00
31.00 2 36.00 72.00
Yellow Vaults
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 22.58 Lower Limit 20.58
Area (sq ft) 18.0
HWL 23.58 # Targets 1
Elevation Depth Volume For All of Color
(ft) (ft) (CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0.03 0.54 0.54
21.08 0.5 9.00 9.00
21.40 0.82 14.76 14.76
22.08 1.5 27.00 27.00
22.58 2 36.00 36.00
23.08 2 36.00 36.00
23.58 2 36.00 36.00
24.08 2 36.00 36.00
24.50 2 36.00 36.00
24.75 2 36.00 36.00
25.06 2 36.00 36.00
25.08 2 36.00 36.00
25.16 2 36.00 36.00
25.53 2 36.00 36.00
26.25 2 36.00 36.00
27.00 2 36.00 36.00
27.01 2 36.00 36.00
27.20 2 36.00 36.00
28.00 2 36.00 36.00
29.50 2 36.00 36.00
30.00 2 36.00 36.00
30.49 2 36.00 36.00
31.00 2 36.00 36.00
Green Vault
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 22.58 Lower Limit 20.58
Area (sq ft) 18
HWL 23.58 # Targets 1
Elevation Depth Volume For All of Color
(ft) (ft) (CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0.03 0.54 0.54
21.08 0.5 9.00 9.00
21.4 0.82 14.76 14.76
22.08 1.5 27.00 27.00
22.58 2 36.00 36.00
23.08 2 36.00 36.00
23.58 2 36.00 36.00
24.08 2 36.00 36.00
24.5 2 36.00 36.00
24.75 2 36.00 36.00
25.06 2 36.00 36.00
25.08 2 36.00 36.00
25.16 2 36.00 36.00
25.53 2 36.00 36.00
26.25 2 36.00 36.00
27 2 36.00 36.00
27.01 2 36.00 36.00
27.2 2 36.00 36.00
28 2 36.00 36.00
29.5 2 36.00 36.00
30 2 36.00 36.00
30.49 2 36.00 36.00
31 2 36.00 36.00
Brown Vault
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.08 Lower Limit 21.08
Area (sq ft) 18.00
HWL 23.58 # Targets 1.00
Elevation Depth Volume For All of Color
(ft) (ft) (CF) (CF)
10.64 0 0.00 0.00
10.65 0 0.00 0.00
13.64 0 0.00 0.00
13.65 0 0.00 0.00
14.64 0 0.00 0.00
14.65 0 0.00 0.00
15.48 0 0.00 0.00
16.59 0 0.00 0.00
17.96 0 0.00 0.00
19.12 0 0.00 0.00
19.81 0 0.00 0.00
20.41 0 0.00 0.00
20.58 0 0.00 0.00
20.61 0 0.00 0.00
21.08 0 0.00 0.00
21.4 0.32 5.76 5.76
22.08 1 18.00 18.00
22.58 1.5 27.00 27.00
23.08 2 36.00 36.00
23.58 2 36.00 36.00
24.08 2 36.00 36.00
24.5 2 36.00 36.00
24.75 2 36.00 36.00
25.06 2 36.00 36.00
25.08 2 36.00 36.00
25.16 2 36.00 36.00
25.53 2 36.00 36.00
26.25 2 36.00 36.00
27 2 36.00 36.00
27.01 2 36.00 36.00
27.2 2 36.00 36.00
28 2 36.00 36.00
29.5 2 36.00 36.00
30 2 36.00 36.00
30.49 2 36.00 36.00
31 2 36.00 36.00
Blue Vault
Stage-Storage-Discharge Summary Tables
Proposed Conditions
10.64 10.64 0.00 0 0.000
10.65 10.65 0.01 0 0.000
13.64 13.64 2.99 0 0.000
13.65 13.65 0.01 0 0.000
14.64 14.64 0.99 0 0.000
14.65 14.65 0.01 0 0.000
15.48 15.48 0.83 0 0.000
16.59 16.59 1.11 3 0.000
17.96 17.96 1.37 12 0.000
19.12 19.12 1.16 27 0.001
19.81 19.81 0.69 38 0.001
20.41 20.41 0.60 47 0.001
20.58 20.58 0.17 51 0.001
20.61 20.61 0.03 51 0.001
21.08 21.08 0.47 55 0.001
21.4 21.4 0.32 56 0.001
22.08 22.08 0.68 60 0.001
22.58 22.58 0.50 62 0.001
23.08 23.08 0.50 64 0.001
23.58 23.58 0.50 64 0.001
24.08 24.08 0.50 64 0.001
24.5 24.5 0.42 64 0.001
24.75 24.75 0.25 64 0.001
25.06 25.06 0.31 64 0.001
25.08 25.08 0.02 64 0.001
25.16 25.16 0.08 64 0.001
25.53 25.53 0.37 64 0.001
26.25 26.25 0.72 64 0.001
27 27 0.75 64 0.001
27.01 27.01 0.01 64 0.001
27.2 27.2 0.19 64 0.001
28 28 0.80 64 0.001
29.5 29.5 1.50 64 0.001
30 30 0.50 64 0.001
30.49 30.49 0.49 64 0.001
31 31 0.51 64 0.001
Drain Basin Summary
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Elev. ∆Elev.storage
(cu-ft)
∑storagei
(ac-ft)Stage
Upper Limit 23.08 Lower Limit 21.40
Diameter (in) 12.00
HWL 23.58 # Targets 1
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0 0.00
20.58 0 0.00
20.61 0 0.00
21.08 0 0.00
21.4 0 0.00
22.08 0.68 0.53
22.58 1.18 0.93
23.08 1.68 1.32
23.58 1.68 1.32
24.08 1.68 1.32
24.5 1.68 1.32
24.75 1.68 1.32
25.06 1.68 1.32
25.08 1.68 1.32
25.16 1.68 1.32
25.53 1.68 1.32
26.25 1.68 1.32
27 1.68 1.32
27.01 1.68 1.32
27.2 1.68 1.32
28 1.68 1.32
29.5 1.68 1.32
30 1.68 1.32
30.49 1.68 1.32
31 1.68 1.32
Red Basin #1
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.08 Lower Limit 20.6
Diameter (in) 12
HWL 23.58 # Targets 1
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0 0.00
20.58 0 0.00
20.61 0.01 0.01
21.08 0.48 0.38
21.4 0.8 0.63
22.08 1.48 1.16
22.58 1.98 1.56
23.08 2.48 1.95
23.58 2.48 1.95
24.08 2.48 1.95
24.5 2.48 1.95
24.75 2.48 1.95
25.06 2.48 1.95
25.08 2.48 1.95
25.16 2.48 1.95
25.53 2.48 1.95
26.25 2.48 1.95
27 2.48 1.95
27.01 2.48 1.95
27.2 2.48 1.95
28 2.48 1.95
29.5 2.48 1.95
30 2.48 1.95
30.49 2.48 1.95
31 2.48 1.95
Red Basin #2
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.08 Lower Limit 19.81
Diameter (in) 12.00
HWL 23.58 # Targets 1.00
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0.6 0.47
20.58 0.77 0.60
20.61 0.8 0.63
21.08 1.27 1.00
21.4 1.59 1.25
22.08 2.27 1.78
22.58 2.77 2.18
23.08 3.27 2.57
23.58 3.27 2.57
24.08 3.27 2.57
24.5 3.27 2.57
24.75 3.27 2.57
25.06 3.27 2.57
25.08 3.27 2.57
25.16 3.27 2.57
25.53 3.27 2.57
26.25 3.27 2.57
27 3.27 2.57
27.01 3.27 2.57
27.2 3.27 2.57
28 3.27 2.57
29.5 3.27 2.57
30 3.27 2.57
30.49 3.27 2.57
31 3.27 2.57
Red Basin #3
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 23.08 Lower Limit 21.40
Diameter (in) 12.00
HWL 23.58 # Targets 1.00
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0 0.00
20.58 0 0.00
20.61 0 0.00
21.08 0 0.00
21.4 0 0.00
22.08 0.68 0.53
22.58 1.18 0.93
23.08 1.68 1.32
23.58 1.68 1.32
24.08 1.68 1.32
24.5 1.68 1.32
24.75 1.68 1.32
25.06 1.68 1.32
25.08 1.68 1.32
25.16 1.68 1.32
25.53 1.68 1.32
26.25 1.68 1.32
27 1.68 1.32
27.01 1.68 1.32
27.2 1.68 1.32
28 1.68 1.32
29.5 1.68 1.32
30 1.68 1.32
30.49 1.68 1.32
31 1.68 1.32
Red Basin #4
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 20.58 Lower Limit 17.95
Diameter (in)24.00
HWL 23.58 # Targets 1.00
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0.01 0.03
19.12 1.17 3.68
19.81 1.86 5.84
20.41 2.46 7.73
20.58 2.63 8.26
20.61 2.63 8.26
21.08 2.63 8.26
21.4 2.63 8.26
22.08 2.63 8.26
22.58 2.63 8.26
23.08 2.63 8.26
23.58 2.63 8.26
24.08 2.63 8.26
24.5 2.63 8.26
24.75 2.63 8.26
25.06 2.63 8.26
25.08 2.63 8.26
25.16 2.63 8.26
25.53 2.63 8.26
26.25 2.63 8.26
27 2.63 8.26
27.01 2.63 8.26
27.2 2.63 8.26
28 2.63 8.26
29.5 2.63 8.26
30 2.63 8.26
30.49 2.63 8.26
31 2.63 8.26
Yellow Basin #1
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 20.58 Lower Limit 17.96
Diameter (in) 24
HWL 23.58 # Targets 1
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 1.16 3.64
19.81 1.85 5.81
20.41 2.45 7.70
20.58 2.62 8.23
20.61 2.62 8.23
21.08 2.62 8.23
21.4 2.62 8.23
22.08 2.62 8.23
22.58 2.62 8.23
23.08 2.62 8.23
23.58 2.62 8.23
24.08 2.62 8.23
24.5 2.62 8.23
24.75 2.62 8.23
25.06 2.62 8.23
25.08 2.62 8.23
25.16 2.62 8.23
25.53 2.62 8.23
26.25 2.62 8.23
27 2.62 8.23
27.01 2.62 8.23
27.2 2.62 8.23
28 2.62 8.23
29.5 2.62 8.23
30 2.62 8.23
30.49 2.62 8.23
31 2.62 8.23
Yellow Basin #2
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 20.58 Lower Limit 16.59
Diameter (in) 24
HWL 23.58 # Targets 1
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 1.37 4.30
19.12 2.53 7.95
19.81 3.22 10.12
20.41 3.82 12.00
20.58 3.99 12.53
20.61 3.99 12.53
21.08 3.99 12.53
21.4 3.99 12.53
22.08 3.99 12.53
22.58 3.99 12.53
23.08 3.99 12.53
23.58 3.99 12.53
24.08 3.99 12.53
24.5 3.99 12.53
24.75 3.99 12.53
25.06 3.99 12.53
25.08 3.99 12.53
25.16 3.99 12.53
25.53 3.99 12.53
26.25 3.99 12.53
27 3.99 12.53
27.01 3.99 12.53
27.2 3.99 12.53
28 3.99 12.53
29.5 3.99 12.53
30 3.99 12.53
30.49 3.99 12.53
31 3.99 12.53
Green Basin
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 20.58 Lower Limit 15.48
Diameter (in) 24
HWL 23.58 # Targets 1
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 1.11 3.49
17.96 2.48 7.79
19.12 3.64 11.44
19.81 4.33 13.60
20.41 4.93 15.49
20.58 5.1 16.02
20.61 5.1 16.02
21.08 5.1 16.02
21.4 5.1 16.02
22.08 5.1 16.02
22.58 5.1 16.02
23.08 5.1 16.02
23.58 5.1 16.02
24.08 5.1 16.02
24.5 5.1 16.02
24.75 5.1 16.02
25.06 5.1 16.02
25.08 5.1 16.02
25.16 5.1 16.02
25.53 5.1 16.02
26.25 5.1 16.02
27 5.1 16.02
27.01 5.1 16.02
27.2 5.1 16.02
28 5.1 16.02
29.5 5.1 16.02
30 5.1 16.02
30.49 5.1 16.02
31 5.1 16.02
Brown Basin
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 21.08 Lower Limit 19.12
Diameter (in) 24
HWL 23.58 # Targets 1
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0.69 2.17
20.41 1.29 4.05
20.58 1.46 4.59
20.61 1.49 4.68
21.08 1.96 6.16
21.4 1.96 6.16
22.08 1.96 6.16
22.58 1.96 6.16
23.08 1.96 6.16
23.58 1.96 6.16
24.08 1.96 6.16
24.5 1.96 6.16
24.75 1.96 6.16
25.06 1.96 6.16
25.08 1.96 6.16
25.16 1.96 6.16
25.53 1.96 6.16
26.25 1.96 6.16
27 1.96 6.16
27.01 1.96 6.16
27.2 1.96 6.16
28 1.96 6.16
29.5 1.96 6.16
30 1.96 6.16
30.49 1.96 6.16
31 1.96 6.16
Blue Basin
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upper Limit 22.08 Lower Limit 20.41
Diameter (in) 24.00
HWL 23.58 # Targets 1.00
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0 0.00
20.58 0.17 0.53
20.61 0.2 0.63
21.08 0.67 2.10
21.4 0.99 3.11
22.08 1.67 5.25
22.58 1.67 5.25
23.08 1.67 5.25
23.58 1.67 5.25
24.08 1.67 5.25
24.5 1.67 5.25
24.75 1.67 5.25
25.06 1.67 5.25
25.08 1.67 5.25
25.16 1.67 5.25
25.53 1.67 5.25
26.25 1.67 5.25
27 1.67 5.25
27.01 1.67 5.25
27.2 1.67 5.25
28 1.67 5.25
29.5 1.67 5.25
30 1.67 5.25
30.49 1.67 5.25
31 1.67 5.25
Blue Basin
Stage-Storage-Discharge Summary Tables
Proposed Conditions
0 10.64 4.00 0 0.000
1 10.65 4.00 0 0.000
2 13.64 4.00 0 0.000
3 13.65 4.00 0 0.000
4 14.64 4.00 35 0.001
5 14.65 4.00 35 0.001
6 15.48 4.00 95 0.002
7 16.59 4.00 186 0.004
8 17.96 4.00 312 0.007
9 19.12 4.00 362 0.008
10 19.81 4.00 390 0.009
11 20.41 4.00 431 0.010
12 20.58 4.00 445 0.010
13 20.61 4.00 448 0.010
14 21.08 4.00 478 0.011
15 21.4 4.00 495 0.011
16 22.08 4.00 512 0.012
17 22.58 4.00 512 0.012
18 23.08 4.00 512 0.012
19 23.58 4.00 512 0.012
20 24.08 4.00 512 0.012
21 24.5 4.00 512 0.012
22 24.75 4.00 512 0.012
23 25.06 4.00 512 0.012
24 25.08 4.00 512 0.012
25 25.16 4.00 512 0.012
26 25.53 4.00 512 0.012
27 26.25 4.00 512 0.012
28 27 4.00 512 0.012
29 27.01 4.00 512 0.012
30 27.2 4.00 512 0.012
31 28 4.00 512 0.012
32 29.5 4.00 512 0.012
33 30 4.00 512 0.012
34 30.49 4.00 512 0.012
35 31 4.00 512 0.012
Pipe Summary
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Elev.∆Elev.storage
(cu-ft)
∑storagei
(ac-ft)Stage
Upstream Invert 21.40
Downstream Invert 20.60 Slope 1.01% Slope Degrees 0.580191
Pipe Diameter (ft)0.67 Length (ft)79
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0 0.00
20.58 0 0.00
20.61 0.01 0.00
21.08 0.48 5.69
21.4 0.8 16.20
22.08 1.476666667 27.90
22.58 1.476666667 27.90
23.08 1.476666667 27.90
23.58 1.476666667 27.90
24.08 1.476666667 27.90
24.5 1.476666667 27.90
24.75 1.476666667 27.90
25.06 1.476666667 27.90
25.08 1.476666667 27.90
25.16 1.476666667 27.90
25.53 1.476666667 27.90
26.25 1.476666667 27.90
27 1.476666667 27.90
27.01 1.476666667 27.90
27.2 1.476666667 27.90
28 1.476666667 27.90
29.5 1.476666667 27.90
30 1.476666667 27.90
30.49 1.476666667 27.90
31 1.476666667 27.90
Red 1 to Red 2
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 20.60
Downstream Invert 19.81 Slope 1.00% Slope Degrees 0.572939
Pipe Diameter (ft)0.67 Length (ft)79
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0.6 9.41
20.58 0.77 15.40
20.61 0.8 16.40
21.08 1.27 27.20
21.4 1.466666667 27.90
22.08 1.466666667 27.90
22.58 1.466666667 27.90
23.08 1.466666667 27.90
23.58 1.466666667 27.90
24.08 1.466666667 27.90
24.5 1.466666667 27.90
24.75 1.466666667 27.90
25.06 1.466666667 27.90
25.08 1.466666667 27.90
25.16 1.466666667 27.90
25.53 1.466666667 27.90
26.25 1.466666667 27.90
27 1.466666667 27.90
27.01 1.466666667 27.90
27.2 1.466666667 27.90
28 1.466666667 27.90
29.5 1.466666667 27.90
30 1.466666667 27.90
30.49 1.466666667 27.90
31 1.466666667 27.90
AD-12 to Green
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 21.40
Downstream Invert 19.81 Slope 2.01% Slope Degrees 1.153013
Pipe Diameter (ft)0.67 Length (ft)79
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0 0.00
20.41 0.6 4.68
20.58 0.77 7.64
20.61 0.8 8.16
21.08 1.27 16.40
21.4 1.59 22.00
22.08 2.266666667 27.90
22.58 2.266666667 27.90
23.08 2.266666667 27.90
23.58 2.266666667 27.90
24.08 2.266666667 27.90
24.5 2.266666667 27.90
24.75 2.266666667 27.90
25.06 2.266666667 27.90
25.08 2.266666667 27.90
25.16 2.266666667 27.90
25.53 2.266666667 27.90
26.25 2.266666667 27.90
27 2.266666667 27.90
27.01 2.266666667 27.90
27.2 2.266666667 27.90
28 2.266666667 27.90
29.5 2.266666667 27.90
30 2.266666667 27.90
30.49 2.266666667 27.90
31 2.266666667 27.90
AD-8 to AD-9
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 19.81
Downstream Invert 17.96 Slope 1.99% Slope Degrees 1.139604
Pipe Diameter (ft)0.67 Length (ft)93
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 1.16 14.60
19.81 1.85 26.90
20.41 2.45 32.80
20.58 2.526666667 32.80
20.61 2.526666667 32.80
21.08 2.526666667 32.80
21.4 2.526666667 32.80
22.08 2.526666667 32.80
22.58 2.526666667 32.80
23.08 2.526666667 32.80
23.58 2.526666667 32.80
24.08 2.526666667 32.80
24.5 2.526666667 32.80
24.75 2.526666667 32.80
25.06 2.526666667 32.80
25.08 2.526666667 32.80
25.16 2.526666667 32.80
25.53 2.526666667 32.80
26.25 2.526666667 32.80
27 2.526666667 32.80
27.01 2.526666667 32.80
27.2 2.526666667 32.80
28 2.526666667 32.80
29.5 2.526666667 32.80
30 2.526666667 32.80
30.49 2.526666667 32.80
31 2.526666667 32.80
Red 3 to Yellow 2
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 17.96
Downstream Invert 16.59 Slope 1.01% Slope Degrees 0.577151
Pipe Diameter (ft)0.67 Length (ft)136
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 1.37 36.30
19.12 2.046666667 47.90
19.81 2.046666667 47.90
20.41 2.046666667 47.90
20.58 2.046666667 47.90
20.61 2.046666667 47.90
21.08 2.046666667 47.90
21.4 2.046666667 47.90
22.08 2.046666667 47.90
22.58 2.046666667 47.90
23.08 2.046666667 47.90
23.58 2.046666667 47.90
24.08 2.046666667 47.90
24.5 2.046666667 47.90
24.75 2.046666667 47.90
25.06 2.046666667 47.90
25.08 2.046666667 47.90
25.16 2.046666667 47.90
25.53 2.046666667 47.90
26.25 2.046666667 47.90
27 2.046666667 47.90
27.01 2.046666667 47.90
27.2 2.046666667 47.90
28 2.046666667 47.90
29.5 2.046666667 47.90
30 2.046666667 47.90
30.49 2.046666667 47.90
31 2.046666667 47.90
Yellow 2 to Green
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 16.59
Downstream Invert 15.48 Slope 1.00% Slope Degrees 0.572939
Pipe Diameter (ft)1.00 Length (ft)111
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 1.11 48.00
17.96 2.12 87.20
19.12 2.12 87.20
19.81 2.12 87.20
20.41 2.12 87.20
20.58 2.12 87.20
20.61 2.12 87.20
21.08 2.12 87.20
21.4 2.12 87.20
22.08 2.12 87.20
22.58 2.12 87.20
23.08 2.12 87.20
23.58 2.12 87.20
24.08 2.12 87.20
24.5 2.12 87.20
24.75 2.12 87.20
25.06 2.12 87.20
25.08 2.12 87.20
25.16 2.12 87.20
25.53 2.12 87.20
26.25 2.12 87.20
27 2.12 87.20
27.01 2.12 87.20
27.2 2.12 87.20
28 2.12 87.20
29.5 2.12 87.20
30 2.12 87.20
30.49 2.12 87.20
31 2.12 87.20
Green to Brown
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 15.48
Downstream Invert 13.65 Slope 1.10% Slope Degrees 0.631609
Pipe Diameter (ft)1.00 Length (ft)166
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0.99 35.00
14.65 1 35.10
15.48 1.83 94.80
16.59 2.84 130.00
17.96 2.84 130.00
19.12 2.84 130.00
19.81 2.84 130.00
20.41 2.84 130.00
20.58 2.84 130.00
20.61 2.84 130.00
21.08 2.84 130.00
21.4 2.84 130.00
22.08 2.84 130.00
22.58 2.84 130.00
23.08 2.84 130.00
23.58 2.84 130.00
24.08 2.84 130.00
24.5 2.84 130.00
24.75 2.84 130.00
25.06 2.84 130.00
25.08 2.84 130.00
25.16 2.84 130.00
25.53 2.84 130.00
26.25 2.84 130.00
27 2.84 130.00
27.01 2.84 130.00
27.2 2.84 130.00
28 2.84 130.00
29.5 2.84 130.00
30 2.84 130.00
30.49 2.84 130.00
31 2.84 130.00
TD-6 to TD-7
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 17.95
Downstream Invert 16.59 Slope 1.00% Slope Degrees 0.572939
Pipe Diameter (ft)0.67 Length (ft)136
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 1.37 36.50
19.12 2.036666667 47.90
19.81 2.036666667 47.90
20.41 2.036666667 47.90
20.58 2.036666667 47.90
20.61 2.036666667 47.90
21.08 2.036666667 47.90
21.4 2.036666667 47.90
22.08 2.036666667 47.90
22.58 2.036666667 47.90
23.08 2.036666667 47.90
23.58 2.036666667 47.90
24.08 2.036666667 47.90
24.5 2.036666667 47.90
24.75 2.036666667 47.90
25.06 2.036666667 47.90
25.08 2.036666667 47.90
25.16 2.036666667 47.90
25.53 2.036666667 47.90
26.25 2.036666667 47.90
27 2.036666667 47.90
27.01 2.036666667 47.90
27.2 2.036666667 47.90
28 2.036666667 47.90
29.5 2.036666667 47.90
30 2.036666667 47.90
30.49 2.036666667 47.90
31 2.036666667 47.90
Yellow 1 to Green
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 20.41
Downstream Invert 19.12 Slope 1.00% Slope Degrees 0.572939
Pipe Diameter (ft)0.67 Length (ft)129
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 0 0.00
17.96 0 0.00
19.12 0 0.00
19.81 0.69 12.50
20.41 1.29 33.70
20.58 1.46 39.20
20.61 1.49 40.00
21.08 1.96 45.50
21.4 1.966666667 45.50
22.08 1.966666667 45.50
22.58 1.966666667 45.50
23.08 1.966666667 45.50
23.58 1.966666667 45.50
24.08 1.966666667 45.50
24.5 1.966666667 45.50
24.75 1.966666667 45.50
25.06 1.966666667 45.50
25.08 1.966666667 45.50
25.16 1.966666667 45.50
25.53 1.966666667 45.50
26.25 1.966666667 45.50
27 1.966666667 45.50
27.01 1.966666667 45.50
27.2 1.966666667 45.50
28 1.966666667 45.50
29.5 1.966666667 45.50
30 1.966666667 45.50
30.49 1.966666667 45.50
31 1.966666667 45.50
White to Blue
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 19.12
Downstream Invert 15.48 Slope 3.43% Slope Degrees 1.966743
Pipe Diameter (ft)0.67 Length (ft)106
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0 0.00
10.65 0 0.00
13.64 0 0.00
13.65 0 0.00
14.64 0 0.00
14.65 0 0.00
15.48 0 0.00
16.59 1.11 7.98
17.96 2.48 22.10
19.12 3.64 34.00
19.81 4.316666667 37.40
20.41 4.316666667 37.40
20.58 4.316666667 37.40
20.61 4.316666667 37.40
21.08 4.316666667 37.40
21.4 4.316666667 37.40
22.08 4.316666667 37.40
22.58 4.316666667 37.40
23.08 4.316666667 37.40
23.58 4.316666667 37.40
24.08 4.316666667 37.40
24.5 4.316666667 37.40
24.75 4.316666667 37.40
25.06 4.316666667 37.40
25.08 4.316666667 37.40
25.16 4.316666667 37.40
25.53 4.316666667 37.40
26.25 4.316666667 37.40
27 4.316666667 37.40
27.01 4.316666667 37.40
27.2 4.316666667 37.40
28 4.316666667 37.40
29.5 4.316666667 37.40
30 4.316666667 37.40
30.49 4.316666667 37.40
31 4.316666667 37.40
Blue to Brown
Stage-Storage-Discharge Summary Tables
Proposed Conditions
Upstream Invert 1,255.85
Downstream Invert 1,254.92 Slope 0.30%Slope Degrees 0.171887
Diameter (in)24.00 Length (ft)185
HWL 23.58
Elevation Depth Volume
(ft) (CF)
10.64 0
10.65 0
13.64 0
13.65 0
14.64 0 55.40
14.65 0 392.00
15.48 0 581.00
19.12 0 581.00
19.81 0 581.00
20.41 0 581.00
20.58 0 581.00
20.61 0 581.00
21.08 0 581.00
21.4 0 581.00
22.08 0 581.00
22.58 0 581.00
23.08 0 581.00
23.58 0 581.00
24.08 0 581.00
24.5 0 581.00
13-2 to 13-1
Stage-Storage-Discharge Summary Tables
Proposed Conditions
OFFICE FAX WWW.ARCOMURRAY.COM
Topgolf Renton
Emergency Response Plan – Storm Pump
Project Closeout/Facilities Training Requirements
1. Storm Pump Training
a. ARCO PM/Superintendent/Warranty Department, Electrician, Site Utility Contractor, Storm Pump
Commissioning Party conduct standard training for operations and maintenance for Topgolf
Facilities Manager, Director of Operations, and Operations team at project closeout
b. Onsite Facilities to follow maintenance program as outlined by Storm Pump Commissioning Party
2. Power Failure
a. Generator Rental
i. Pump station control panel equipped with Manual Transfer Switch for generator connection
ii. Instruction Manual for Manual Transfer Switch available in O&M manual
b. Generator Requirements
i. Generator with minimum power requirements to power two (2) storm pumps (redundant
system) with following power supply requirements
ii. Fuel tank sized to supply generator for min. one week
3. Pump Failure
a. Manufacturer Outreach for Service/Replacement
i. Manufacturer product support information available in O&M manual and on control panel
b. Temporary Pump Rental Requirements
i. 4" min. Trash Pump
ii. 400 GPM min. @ 20.1' TDH
iii. Two (2) 4" hoses
iv. Diesel Tank sized to supply pump for min. one week
4. Local Rental Companies
a. R&R Rentals
4101 NE Sunset Blvd
Renton, WA 98059
(425) 227-8155
b. United Rentals
17700 W Valley Hwy
Tukwila, WA 98188
(425) 251-8150
c. Sunbelt Rentals
20215 S 84th Ave S
Kent, WA 98032
(253) 872-0700
NAVIX TopGolf Renton – Renton, WA
APPENDIX J
CONVEYANCE CALCULATIONS
NAVIX TopGolf Renton – Renton, WA
The conveyance system was analyzed utilizing Autodesk Storm and Sanitary Analysis 2019 (SSA),
which uses the Rational Method to calculate backwater conditions. The conveyance system was
sized to accommodate the 25-year, 24-hour rainfall event. As indicated in the SSA outputs below,
no overflow occurs at any of the proposed onsite conveyance system structures during the 25-year
event as required by the 2017 City of Renton SWDM.
The SSA inputs for Rational Method analysis include precipitation value, tributary areas to each
stormwater structure, and weighted runoff coefficient as described below. The conveyance system
was sized to accommodate the 25-year, 24-hour rainfall event of 3.30 inches per hour per the NOAA
Atlas 2 “Precipitation-Frequency Atlas of the Western United States” as noted in Appendix III-A of
the 2014 Stormwater Management Manual for Western Washington as referenced by the 2017 City
of Renton SWDM.
Runoff from the tributary area for each catch basin was modeled in SSA as an individual subbasin.
Subbasins for each structure were included in the analysis. Private offsite systems, such as Boeing
to the south and Landing retail areas off Park Ave to the north, were conservatively modeled as
tributary areas connecting to directly to the public system. No storage was assumed for any offsite
system. See Figure 1 below for a schematic representation of the input subbasins.
Figure 1. SSA Model Schematic Area Inputs
1.34 AC Boeing
Subbasin
5.46 AC Landing Retail
Subbasin
4.27 AC Landing Retail
Subbasin
NAVIX TopGolf Renton – Renton, WA
The model assumes overflow conditions for water quality facilities and conservatively does not
account for storage in the onsite biofiltration units or offsite public detention facilities. The outfield
basin pump was modeled using pump curves and data from Appendix I. The weighted runoff
coefficient, C, used for each subbasin was conservatively modelled as 0.98, and the time of
concentration was 7 minutes, 10 seconds. The tailwater depth was assumed to be at the crown of
the outfall pipe.
The SSA conveyance analysis outputs include the table and 3 profile plots below. The table and
plots demonstrate that the demonstrate the hydraulic grade line during the 25-year, 24-hour
rainfall event does not overtop any structures as required in the 2017 SWDM. The profile plots
show the maximum hydraulic grade line during the 25-year storm approaching the outfalls on Logan
Ave N, N 8th St, and Park Ave N.
SSA Conveyance Analysis Output Table
FACILITY ID RIM ELEV
(FT)
PEAK
INFLOW
(CFS)
HGL
ELEV
(FT)
FREEBOARD
(FT)
TIME
FLOODED
(MIN)
TARGET INLET #2
(Target Drainage)
25.25 0.63 24.66 1.34 0.00
AD #1 (N 8th Street) 28.20 0.77 26.05 2.15 0.00
AD #10 (Outfield Surface Drainage) 29.20 0.35 26.26 2.94 0.00
AD #11 (Target Drainage) 27.20 0.16 25.25 1.95 0.00
AD #12 (Outfield Surface Drainage) 29.20 0.04 27.61 1.59 0.00
AD #13(0) (Target Drainage) 27.00 0.63 25.52 1.48 0.00
AD #14 (Outfield Surface Drainage) 28.40 0.09 26.87 1.53 0.00
AD #15 (Outfield Surface Drainage) 29.00 0.38 26.47 2.53 0.00
AD #16 (Outfield Surface Drainage) 31.00 0.52 26.09 4.91 0.00
AD #2 (N 8th Street) 28.00 0.59 26.43 1.57 0.00
AD #3 (N 8th Street) 28.20 0.24 26.77 1.43 0.00
AD #4 (N 8th Street) 27.30 0.23 26.44 0.86 0.00
AD #5 (Target Drainage) 28.00 0.17 26.41 1.59 0.00
AD #6 (N 8th Street) 28.00 0.17 26.41 1.59 0.00
AD #7 (Target Drainage) 27.01 0.36 25.09 1.92 0.00
AD#7 (N 8th Street) 30.21 0.98 25.71 4.49 0.00
AD #8 (Target Drainage) 27.20 0.09 25.65 1.55 0.00
AD #9 (Outfield Surface Drainage) 28.00 0.16 26.59 1.41 0.00
AD #A (N 8th Street) 29.57 0.05 28.17 1.40 0.00
AD #B (N 8th Street) 29.60 0.15 27.66 1.94 0.00
AD #C (N 8th Street) 29.02 0.15 27.33 1.69 0.00
AD #D (N 8th Street) 29.35 0.33 27.20 2.15 0.00
NAVIX TopGolf Renton – Renton, WA
AD #E (N 8th Street) 29.12 0.35 26.81 2.31 0.00
AD #F (N 8th Street) 29.62 0.15 27.66 1.96 0.00
Facility_ID_No.111411 (Park Ave N) 26.31 0.62 25.55 0.76 0.00
Facility_ID_No.111414 (Park Ave N) 27.47 0.67 24.03 3.44 0.00
Facility_ID_No.112959 (Park Ave N) 27.50 0.20 25.91 1.59 0.00
Facility_ID_No.114424 (Park Ave N) 26.59 6.20 23.50 3.09 0.00
Facility_ID_No.114426 (Park Ave N) 26.67 0.08 25.28 1.39 0.00
Facility_ID_No.114427 (Park Ave N) 26.65 0.16 25.22 1.43 0.00
Facility_ID_No.114428 (Park Ave N) 27.75 0.58 25.05 2.70 0.00
Facility_ID_No.114429 (Park Ave N) 27.24 0.09 25.84 1.40 0.00
Facility_ID_No.114431 (Park Ave N) 27.85 0.31 26.76 1.09 0.00
Facility_ID_No.114432 (Park Ave N) 28.28 0.15 26.78 1.49 0.00
Facility_ID_No.114503 (Park Ave N) 27.65 0.09 26.82 0.83 0.00
Facility_ID_No.114504 (Park Ave N) 27.60 0.07 27.04 0.56 0.00
Facility_ID_No.114505 (Park Ave N) 27.07 0.63 25.67 1.40 0.00
Facility_ID_No.114506 (Park Ave N) 29.85 13.09 22.53 7.32 0.00
Facility_ID_No.114507 (Park Ave N) 25.71 12.48 23.16 2.55 0.00
Facility_ID_No.114508 (Park Ave N) 28.61 0.09 27.61 1.00 0.00
Facility_ID_No.114509 (Park Ave N) 28.46 0.24 26.80 1.66 0.00
Facility_ID_No.114510 (Park Ave N) 27.95 0.44 26.64 1.31 0.00
Facility_ID_No.114511 (Park Ave N) 28.33 6.69 23.26 5.07 0.00
Facility_ID_No.114512 (Park Ave N) 28.62 0.08 27.49 1.13 0.00
Facility_ID_No.114513 (Park Ave N) 28.69 0.12 27.61 1.08 0.00
Facility_ID_No.114514 (Park Ave N) 28.57 0.31 26.98 1.59 0.00
BIOFILTRATION UNIT INLET #1
(West Basin)
25.20 2.40 24.09 1.10 0.00
BIOFILTRATION UNIT INLET #2
(East Basin)
26.05 1.01 25.26 0.79 0.00
BIOFILTRATION UNIT OUTLET #1
(West Basin)
24.68 2.40 23.74 0.94 0.00
BIOFILTRATION UNIT OUTLET #2
(Outfield Surface Drainage)
25.55 1.01 25.17 0.38 0.00
Pump (Target Drainage) 30.49 1.42 11.65 18.84 0.00
ROOF DRAIN SDCO #1 (N 8th Street) 30.21 0.45 25.76 4.45 0.00
ROOF DRAIN SDCO #2 (N 8th Street) 30.32 0.30 26.24 4.08 0.00
ROOF DRAIN SDCO #3 (N 8th Street) 30.34 0.30 26.72 3.62 0.00
ROOF DRAIN SDCO #4 (N 8th Street) 30.19 0.17 27.13 3.07 0.00
ROOF DRAIN SDCO #5 (N 8th Street) 30.16 0.04 27.59 2.56 0.00
SDCB #1 (West Basin) 29.30 0.37 26.54 2.76 0.00
SDCB #10 (West Basin) 28.74 0.34 25.25 3.49 0.00
SDCB #11 (West Basin) 28.50 0.48 24.84 3.66 0.00
SDCB #12 (East Basin) 29.40 0.10 27.53 1.87 0.00
NAVIX TopGolf Renton – Renton, WA
SDCB #12 (West Basin) 29.88 2.40 24.34 5.54 0.00
SDCB #13 (East Basin) 29.95 0.53 27.31 2.63 0.00
SDCB #13 (West Basin) 29.51 1.00 25.26 4.25 0.00
SDCB #14 (East Basin) 29.70 0.27 27.93 1.77 0.00
SDCB #15 (East Basin) 29.00 0.18 26.17 2.83 0.00
SDCB #16 (East Basin) 29.60 0.43 25.92 3.68 0.00
SDCB #17 (East Basin) 29.20 0.24 26.41 2.79 0.00
SDCB #18 (East Basin) 31.16 1.01 25.59 5.57 0.00
SDCB #19 (East Basin) 29.65 0.13 27.80 1.85 0.00
SDCB #2 (West Basin) 29.70 0.92 25.80 3.90 0.00
SDCB #3 (West Basin) 29.19 1.29 25.04 4.15 0.00
SDCB #4 (West Basin) 28.72 1.52 24.62 4.09 0.00
SDCB #5 (West Basin) 28.50 2.41 24.51 3.99 0.00
SDCB #6 (West Basin) 29.25 0.26 26.42 2.83 0.00
SDCB #7 (West Basin) 28.50 0.26 25.72 2.78 0.00
SDCB #8 (West Basin) 28.50 0.21 25.66 2.84 0.00
SDCB #9 (West Basin) 28.50 0.18 25.67 2.83 0.00
SDCO #A (N 8th Street) 28.61 0.13 26.10 2.51 0.00
SDMH #1 (Outfield Surface Drainage) 30.27 2.47 25.82 4.46 0.00
SDMH #2 (Outfield Surface Drainage) 30.43 2.50 25.67 4.76 0.00
SDMH #3 (Outfield Surface Drainage) 30.04 2.55 25.47 4.58 0.00
SDMH #4 (Outfield Surface Drainage) 29.88 3.65 25.11 4.77 0.00
SDMH #5 (Outfield Surface Drainage) 28.46 4.98 24.36 4.10 0.00
SDMH #6 (Outfield Surface Drainage) 30.17 5.22 23.75 6.42 0.00
SDMH #A (Outfield Surface Drainage) 28.67 4.98 24.68 3.99 0.00
SDMH #B (Outfield Surface Drainage) 31.49 0.92 25.88 5.61 0.00
SDMH #C (N 8th Street) 29.03 1.66 25.37 3.65 0.00
SDMH #D (N 8th Street) 30.17 1.43 25.57 4.60 0.00
SOLID LID MANHOLE (N 8th Street) 29.10 2.00 25.03 4.07 0.00
STUB FOR FUTURE CONNECTION (N 8t
h Street)
28.29 0.08 27.88 0.41 0.00
Target Drain #1 (Target Drainage) 23.08 0.00 19.40 3.68 0.00
Target Drain #10 (Target Drainage) 21.08 0.21 19.26 1.82 0.00
Target Drain #2 (Target Drainage) 23.08 0.00 20.62 2.46 0.00
Target Drain #3 (Target Drainage) 23.08 0.00 19.83 3.25 0.00
Target Drain #4 (Target Drainage) 23.08 0.00 21.41 1.67 0.00
Target Drain #5 (Target Drainage) 20.58 0.03 18.03 2.56 0.00
Target Drain #6 (Target Drainage) 20.58 1.13 17.00 5.00 0.00
Target Drain #7 (Target Drainage) 20.58 1.42 15.93 4.66 0.00
Target Drain #8 (Target Drainage) 20.58 0.03 18.03 2.56 0.00
Target Drain #9 (Target Drainage) 22.08 0.13 20.56 1.52 0.00
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary AnalysisLogan Ave NN 8th St
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary AnalysisLogan Ave N
Autodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary AnalysisAutodesk Storm and Sanitary AnalysisN 10th StN 8th St StPark Ave N
NAVIX TopGolf Renton – Renton, WA
APPENDIX K
LEACHABLE METALS ROOF COVENANT
Form Revised 12/12/06 1
RECORDING REQUESTED BY AND
WHEN RECORDED MAIL TO:
DECLARATION OF COVENANT
PROHIBITING USE OF LEACHABLE METALS
Grantor: _
Grantee: City of Renton
Legal Description:
_________________________________________________________________________________
_________________________________________________________________________________
Additional Legal(s) on:
Assessor's Tax Parcel ID#:
IN CONSIDERATION of the approved City of Renton ________________________ permit for
application file No. relating to real property legally described above, the
undersigned as Grantor(s), declares(declare) that the above described property is hereby established as
having a prohibition on the use of leachable metals on those portions of the property exposed to the
weather for the purpose of limiting metals in stormwater flows and is subject to the following
restrictions.
The Grantor(s) hereby covenants(covenant) and agrees(agree) as follows: no leachable metal
surfaces exposed to the weather will be allowed on the property. Leachable metal surfaces means a
surface area that consists of or is coated with a non-ferrous metal that is soluble in water. Common
leachable metal surfaces include, but are not limited to, galvanized steel roofing, gutters, flashing,
Form Revised 12/12/06 2
downspouts, guardrails, light posts, and copper roofing. City of Renton or its municipal successors shall
have a nonexclusive perpetual access easement on the Property in order to ingress and egress over the
Property for the sole purposes of inspecting and monitoring that no leachable metal is present on the
Property.
This easement/restriction is binding upon the Grantor(s), its heirs, successors, and assigns unless
or until a new drainage or site plan is reviewed and approved by the City of Renton or its successor.
Form Revised 12/12/06 3
IN WITNESS WHEREOF, this Declaration of Covenant is executed this _____ day of
____________________, 20_____.
GRANTOR, owner of the Property
GRANTOR, owner of the Property
STATE OF WASHINGTON ) COUNTY OF KING )ss.
On this day personally appeared before me:
_____________________________________________, to me known to be the individual(s) described
in and who executed the within and foregoing instrument and acknowledged that they signed the same as
their free and voluntary act and deed, for the uses and purposes therein stated.
Given under my hand and official seal this _____ day of ____________________, 20_____.
Printed name Notary Public in and for the State of Washington, residing at
My appointment expires