Loading...
HomeMy WebLinkAbout7945.04 E 2023 1026Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 2023 1026 Date Thu 10/26/2023 Weather 55°F Cloudy Arrival/Departure Time(s) 1:30PM; 2PM Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Willem Scherwin | 206-793-8569 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was onsite to observe the sidewalk subgrade. Sidewalk Subgrade Observations ESNW rep was onsite to observe sidewalk subgrade. The sidewalk was excavated approximately 6” into native brown silty sand with gravel. ESNW rep probed the subgrade and observed it to be dense, firm, and suitable for crushed rock and concrete. Rep observed a localized area at the northern end of the sidewalk that was saturated. ESNW rep recommends that the sidewalk subgrade be over excavated approximately 12” in total to place geotextile woven fabric, and 1 ¼” minus crushed rock. ESNW rep will return to observe over excavation. Report ID 7945.04 E 2023 1026 Page 2 of 2 Earth Solutions NW, LLC Sidewalk Subgrade Over Excavation