HomeMy WebLinkAboutFinal Agenda PacketCITY OF RENTON
AGENDA - City Council Regular Meeting
7:00 PM - Monday, November 6, 2023
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
Please note that this regular meeting of the Renton City Council is being offered as a hybrid
meeting and can be attended in person at the Council Chambers, 7th floor of City Hall, 1055 S
Grady Way, Renton, 98057 or remotely through Zoom.
For those wishing to attend by Zoom: Please (1) click this link
https://us02web.zoom.us/j/84938072917?pwd=TUNCcnppbjNjbjNRMWpZaXk2bjJnZz09 (or
copy/paste the URL into a web browser) or (2) call-in to the Zoom meeting by dialing 253-215-
8782 and entering 849 3807 2917 Passcode 156708, or (3) call 425-430-6501 by 5 p.m. on the
day of the meeting to request an invite with a link to the meeting.
Registration for Audience Comment: Registration will be open at all times, but speakers must
register by 5 p.m. on the day of a Council meeting in order to be called upon. Anyone who
registers after 5 p.m. on the day of the Council meeting will not be called upon to speak and
will be required to re-register for the next Council meeting if they wish to speak at that next
meeting.
Request to Speak Registration Form:
o Click the link or copy/paste the following URL into your browser:
https://forms.office.com/g/bTJUj6NrEE
You may also call 425-430-6501 or email jsubia@rentonwa.gov or
cityclerk@rentonwa.gov to register. Please provide your full name, city of residence,
email address and/or phone number, and topic in your message.
A sign-in sheet is also available for those who attend in person.
Video on Demand: Please click the following link to stream Council meetings live as they
occur, or to select previously recorded meetings:
Renton Channel 21 Video on Demand
1.CALL TO ORDER AND PLEDGE OF ALLEGIANCE
2.ROLL CALL
3.ADMINISTRATIVE REPORT
a)Administrative Report
4.AUDIENCE COMMENTS
All remarks must be addressed to the Council as a whole, if a response is requested
please provide your name and address, including email address, to the City Clerk to
allow for follow-up.
Speakers must sign-up prior to the Council meeting.
Each speaker is allowed three minutes.
When recognized, please state your name & city of residence for the record.
NOTICE to all participants: Pursuant to state law, RCW 42.17A.555, campaigning for any
ballot measure or candidate in City Hall and/or during any portion of the council meeting,
including the audience comment portion of the meeting, is PROHIBITED.
5.CONSENT AGENDA
The following items are distributed to Councilmembers in advance for study and review, and
the recommended actions will be accepted in a single motion. Any item may be removed for
further discussion if requested by a Councilmember.
a)Approval of Council Meeting minutes of October 23, 2023.
Council Concur
b)AB - 3456 Finance Department submits a utility bill adjustment requests from Bel Renton
Holdings, LLC, for a multi-family property at 201 SW 5th Pl Bldg L, and recommends
adjusting the account in the total amount of $3,450.63 for excess water usage caused by
a qualified water line leak in accordance with Renton Municipal Code 8-4-46 and 8-5-23.
Refer to Finance Committee
c)AB - 3457 Finance Department submits a utility bill adjustment request from T3 Capital,
LLC for a commercial property located at 1222 Bronson Way N, and recommends
adjusting the account in the amount of $2,222.33 for excess water usage caused by a
qualified water line leak in accordance with Renton Municipal code 8-4-46 and 8-5-23.
Refer to Finance Committee
d)AB - 3460 Finance Department recommends execution of an agreement with
SoftResources, LLC, in the amount of $162,000 plus sales tax, for Enterprise Resource
Planning (ERP) software implementation project management services.
Refer to Finance Committee
e)AB - 3461 Parks & Recreation Department recommends execution of an agreement with
Renova Exteriors, LLC, in the amount of $144,265.05, to install, maintain, and remove
city-wide winter lights from late-November 2023 through the end of February 2024.
Refer to Finance Committee
f)AB - 3458 Public Works Transportation Systems Division recommends setting December
4, 2023 as a Public Hearing date to consider the adoption of an ordinance adding a one-
tenth of one percent sales tax within the boundaries of the Renton Transportation Benefit
District to support transportation improvements.
Refer to Finance Committee; Set Public Hearing on December 4, 2023
g)AB - 3462 Public Works Utility Systems Division reports bid opening on September 26,
2023 for the Burnett Ave S Sidewalk & Utilities Replacement (CAG-23-299) project, and
recommends awarding the contract to the lowest responsive and responsible bidder,
Active Construction, Inc., in the amount of $897,897; and requests authorization to
transfer $182,184 from the General Fund to the project budget to cover the budget gap.
Refer to Finance Committee
6.UNFINISHED BUSINESS
Topics listed below were discussed in Council committees during the past week. Those topics
marked with an asterisk (*) may include legislation. Committee reports on any topics may be
held by the Chair if further review is necessary.
a)Committee of the Whole: 1) Mid-Biennial Budget
b)Transportation Committee: 1) 60 Day Closure of Sunset Blvd NE*
c)Utilities Committee: 1) Agreement with Carollo Engineers, Inc. for Kennydale Lakeline
Sewer System Improvements - Final Design; 2) Agreement with Jacobs Engineering, Inc
for Ginger Creek and Honey Creek Subbasin Plans
7.LEGISLATION
Resolutions:
a)Resolution No. 4510: Authorizing Sunset Blvd Closure (See item 6.b)
Ordinances for first reading:
a)Ordinance No. 6122: 2024 Property Tax Increase (Recommended for Approval via Council
Motion on 10/23/2023)
b)Ordinance No. 6123: 2024 Property Tax Levy (Recommended for Approval via Council
Motion on 10/23/2023)
8.NEW BUSINESS
(Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more
information.)
9.ADJOURNMENT
COMMITTEE OF THE WHOLE MEETING AGENDA
(Preceding Council Meeting)
5:45 p.m. - 7th Floor -Council Chambers/Videoconference
Hearing assistance devices for use in the Council Chambers are available upon request to the City Clerk
CITY COUNCIL MEETINGS ARE TELEVISED LIVE ON GOVERNMENT ACCESS CHANNEL 21
To view Council Meetings online, please visit rentonwa.gov/councilmeetings
Mayor’s Office
Memorandum
DATE: November 6, 2023
TO: Valerie O’Halloran, Council President
Members of Renton City Council
FROM: Armondo Pavone, Mayor
Ed VanValey, Chief Administrative Officer
SUBJECT: Administrative Report
• Information about preventative street maintenance, traffic impact projects, and
road closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open. Preventative street maintenance, traffic impact projects, and road
closures will be at the following locations:
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closure on NE 10th St from NE Sunset Blvd to
Kirkland Ave NE. Questions may be directed to Kip Braaten, 206-503-1746.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closure on NE 12th St and Jefferson Ave NE for
utility installation. Questions may be directed to Brad Stocco, 425-282-2373.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent westbound lane closure on S Grady Way at Williams Ave S
for construction work. Questions may be directed to Tom Main, 206-999-1833.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m.. Road closure on Kirkland Ave NE between NE Sunset Blvd and NE
12th St for utility installation. Detour route will be provided. Questions may be
directed to Brad Stocco, 425-282-2373.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closure on Lincoln Ave NE at the 4100 block for
construction work. Questions may be directed to Kip Braaten, 206-503-1746.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closure on Oakesdale Ave SW at the 1900 block for
construction work. Questions may be directed to Tom Main,206-999-1833.
AGENDA ITEM #3. a)
Valerie O’Halloran, Council President
Members of Renton City Council
Page 2 of 2
November 6, 2023
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closure on Park Ave N between N 3rd St and N 4th St
for construction work. Questions may be directed to Pat Decaro, 425-207-6013.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closure on westbound Park Ave N at Logan Ave N for
construction work. Questions may be directed to Joel McCann, 425-757-9595.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closure on NE Sunset Blvd between Edmonds Ave NE
and Kirkland Ave NE for construction work. Questions may be directed to Brad
Stocco, 425-282-2373.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Intermittent lane closures on Williams Ave S at Grady Way S for
construction work. Questions may be directed to Tom Main, 206-999-1833.
Monday, November 6 through Friday, Thursday, November 9, 8:00 a.m. to
3:00 p.m. Southbound travel and parking lane closures on Williams Ave S
between S 2nd and S 3rd Streets for construction work. Questions may be
directed to Justin Johnson, 425-902-7102.
Ongoing Street Closure (City of Renton Resolution No. 4446). FULL STREET
CLOSURE on Sunset Lane NE between NE 10th Street and Harrington Place NE in
support of the Solera Development Project (LUA20-000305). Questions may be
directed to Brad Stocco, 425-282-2373.
AGENDA ITEM #3. a)
October 23, 2023 REGULAR COUNCIL MEETING MINUTES
CITY OF RENTON
MINUTES ‐ City Council Regular Meeting
7:00 PM ‐ Monday, October 23, 2023
Council Chambers, 7th Floor, City Hall – 1055 S. Grady Way
CALL TO ORDER AND PLEDGE OF ALLEGIANCE
Mayor Pavone called the meeting of the Renton City Council to order at 7:00 PM and led the
Pledge of Allegiance.
ROLL CALL
Councilmembers Present:
Valerie O'Halloran, Council President
Ed Prince, Council Position No. 5
James Alberson, Jr., Council Position No. 1
Carmen Rivera, Council Position No. 2
Ryan McIrvin, Council Position No. 4
Ruth Pérez, Council Position No. 6
Kim‐Khánh Vǎn, Council Position No. 7
Councilmembers Absent:
ADMINISTRATIVE STAFF PRESENT
Armondo Pavone, Mayor
Kristi Rowland, Deputy Chief Administrative Officer
Alex Tuttle, Senior Assistant City Attorney
Jason Seth, City Clerk
Kari Roller, Finance Administrator
Gina Estep, Economic Development Director
Brianne Bannwarth, Development Engineering Director
Commander Lance Gray, Police Department
Attended Remotely:
Judith Subia, Council Liaison
Ellen Bradley‐Mak, Human Resources / Risk Management Administrator
Martin Pastucha, Public Works Administrator
Vanessa Dolbee, Interim Community & Economic Development Administrator
Ron Straka, Public Works Utility Systems Director
Amanda Free, Assistant Economic Development Director
AGENDA ITEM #5. a)
October 23, 2023 REGULAR COUNCIL MEETING MINUTES
April Alexander, Executive Assistant
PUBLIC HEARING
Mid‐Biennium Budget Adjustment #2: This being the date set, and proper notices having
been posted and published in accordance with local and state laws, Mayor Pavone opened
the public hearing to consider the Mid‐Biennium Budget Adjustment (Hearing #2).
Finance Administrator Kari Roller reported that this is the second public hearing on the
2023/2024 Mid‐Biennial Budget adjustment and stated that the purpose of this hearing is to
solicit public comment. Mayor Pavone called for public comment:
Diane Dobson, speaking on behalf of the Renton Chamber of Commerce, urged
Council to reconsider the proposed allocations for the $2.6 million in surplus ARPA
funds that were not spent during the Covid‐19 pandemic. She recommended that
instead of spending funds on sidewalk improvements, the additional funds could be
spent to bolster human services needs and to support another round of small
business grants for local business owners.
There being no correspondence or additional comments, it was
MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CLOSE THE PUBLIC
HEARING. CARRIED.
ADMINISTRATIVE REPORT
Deputy CAO Kristi Rowland reviewed a written administrative report summarizing the City’s
recent progress towards goals and work programs adopted as part of its business plan for
2023 and beyond. Items noted were:
Washington Department of Transportation (WSDOT) will begin work to replace the
northern portion of the Lind Avenue overpass, which was damaged in June 2022. To
prepare for this repair, WSDOT has planned two overnight closures. On Monday,
October 23, from 11 p.m. to 4:30 a.m., I‐405 southbound lanes will be closed with
traffic detouring via the SR 167 interchange, Rainier Avenue and Grady Way. On
Tuesday, October 24, from 11 p.m. to 4:30 a.m., the I‐405 northbound lanes closure
will only require people to use the I‐405‐SR 167 collector/distributor ramp to
continue north on I‐405.
There will be a weekend‐long closure from 11 p.m., Friday, November 3, through 4:30
a.m. Monday, November 6. Traffic will detour via SR 515/Talbot Road and Grady Way.
If work finishes early, southbound I‐405 will reopen as soon as possible. This is the
only weekend‐long closure planned for this project.
Information about preventative street maintenance, traffic impact projects, and road
closures happening this week can be found at http://rentonwa.gov/traffic. All
projects are weather permitting and unless otherwise noted, streets will always
remain open.
AGENDA ITEM #5. a)
October 23, 2023 REGULAR COUNCIL MEETING MINUTES
AUDIENCE COMMENTS
John Sheller, unknown, speaking on behalf of the King County Library System, stated
that many libraries are offering expanded hours and in‐person events again. He urged
everyone to participate in the Patron Satisfaction Survey through November 15, 2023.
A link to the survey can be found at www.kcls.org.
Kayla Somvilay, Renton, stated that she is speaking on behalf of United Community of
Laos, and explained the organization's mission and history. She urged Council to help
them find a space for the organization to meet.
Koua Franz, Renton, spoke about her participation with the United Community of
Laos and its support of the Hmong community. She too urged Council to consider
finding a public space the organization could use for its meetings.
Tracie Friedman, Renton, echoed the previous speakers' request to find a public
meeting space for the United Community of Laos. She also noted that the
organization is seeking partners to build a community center.
Jack Skeel, Renton, spoke about the DIY Skatepark located near the old Longacres site
under I‐405. He urged the city officials to consider taking over a lease for the park and
stated that Dorothy Miller, Property & Acquisition Specialist at the Washington State
Department of Transportation is the point of contact.
CONSENT AGENDA
The following items are distributed to Councilmembers in advance for study and review, and the
recommended actions will be accepted in a single motion. Any item may be removed for further
discussion if requested by a Councilmember.
a)Approval of Council Meeting minutes of October 16, 2023. Council Concur.
b)AB ‐ 3454 Community & Economic Development Department recommended amending the
city's Bicycles and Trails Master plan to create an opportunity to connect two trails, #33 May
Creek Hill Climb and #34 May Creek Trail, that was not previously identified on the plan map.
Refer to Planning Commission and Planning & Development Committee.
c)AB ‐ 3452 Police Department recommended approval of an Interagency Agreement with the
Washington Traffic Safety Commission to receive up to $10,000 in grant funds to conduct
multi‐jurisdictional, high visibility enforcement traffic emphasis patrols. Refer to Finance
Committee.
d)AB ‐ 3453 Public Works Transportation Systems Division recommended adoption of a
resolution authorizing a 60‐day closure of Sunset Blvd NE, between January 15, 2023, and
May 14, 2024, for the purpose of widening the existing bridge over Sunset Blvd NE and
completing seismic retrofits on the existing bridge piers. Refer to Transportation (Aviation)
Committee.
e)AB ‐ 3445 Public Works Utility Systems Division recommended approval to execute an
agreement with Jacobs Engineering Group, Inc., in the amount of $296,170.91 for the
development of comprehensive subbasin plans for the piped sections of Ginger and Honey
Creek. Refer to Utilities Committee.
MOVED BY O'HALLORAN, SECONDED BY PRINCE, COUNCIL CONCUR TO APPROVE
THE CONSENT AGENDA AS PUBLISHED CARRIED.
AGENDA ITEM #5. a)
October 23, 2023 REGULAR COUNCIL MEETING MINUTES
UNFINISHED BUSINESS
Topics listed below were discussed in Council committees during the past week. Those topics marked
with an asterisk (*) may include legislation. Committee reports on any topics may be held by the Chair if
further review is necessary.
a)Finance Committee: Chair Pérez presented a report recommending approval of the following
payments:
1.Accounts Payable – total payment of $10,764,753.84 for vouchers 10710, 10715‐10717,
10719, 10721, 411981‐412293; payroll benefit withholding vouchers 7234‐7244, 10718,
411971‐411980 and 1 wire transfer.
2.Payroll – total payment of $1,872,525.48 for payroll vouchers that include 667 direct
deposits and 9 checks. (08/16/2023‐08/31/2023 pay period).
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
b)Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to authorize the Mayor and City Clerk to enter into an agreement with Anchor
QEA in the amount of $149,936 for the May Creek Park Master Plan project. The Anchor QEA
scope of services includes a fee proposal in the amount of $149,936. Funding for this work has
been budgeted in fund May Creek Park. The funding source is Fund 303 (Parks Impact Mitigation
Fund). This fund can only be used for projects that create new capacity and the proposed project
aligns with this fund’s intended use.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
c)Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to renew the Healthcare Management Administrators (HMA) Agreement and
2024 administrative fee rates. The total cost for HMA’s administrative services is increasing by
4.60% for 2024 and will be $44.78 per employee, per month. The HMA fee increase in 2023 was
3.60%. Enrollment varies during the year and is approximately 650 (575 active members and 65
retirees). Cost: 650 enrolled x $44.78/month x 12 months = $349,284.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
d)Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to approve the 2024 Kaiser healthcare premium rates for active employees and
LEOFF 1 retirees. Kaiser’s premium rates are increasing 7.01% for active employees, with a slight
decrease for LEOFF 1 retirees with Medicare coverage. The increase for active employees is up
from 5.82% in 2023 but compares favorably overall to premium rate increases within the
industry.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
AGENDA ITEM #5. a)
October 23, 2023 REGULAR COUNCIL MEETING MINUTES
e)Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to renew the 2024 Stop Loss (excess loss) insurance contract with Symetra and
authorize the Mayor and City Clerk to sign the implementing documents, when ready. The
competitive bids for coverage in 2024 resulted in Symetra, giving the city a rate pass, which
means there is no increase in premium rates for 2024. This is very favorable for the city, as the
industry trend for excess coverage renewal rates is between 15% to 20%. This coverage carries
an individual deductible amount of $250,000, which will remain unchanged from last year.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
f)Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to renew the city’s life insurance and long‐term disability insurance coverage
for employees with Standard Life, at a reduced premium rate guaranteed through 2026. The rate
reduction for Life Insurance premiums is ‐16.26% and the reduction for Long Term Disability
(LTD) is ‐17.24%. These rates are guaranteed for three years, through 2026.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
g)Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to approve the 23EMPG Award Obligation Letter and accept the award in the
amount of $58,285.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
h)Finance Committee: Chair Pérez presented a report recommending concurrence in the staff
recommendation to authorize the Mayor and City Clerk to execute the Interagency Agreement
with Washington Traffic Safety Commission for the obligation of grant funding in the amount of
$182,700.00 for the Safer Access to Neighborhood Destinations traffic safety project.
MOVED BY PÉREZ, SECONDED BY ALBERSON, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
i)Planning & Development Committee: Chair Prince presented a report recommending
concurrence in the staff and Planning Commission recommendation to adopt the 2023 Title IV
Docket 18, Group D item: D‐231: Code Interpretations. The Committee further recommended
that an ordinance for this item be prepared and presented for first reading when this is
complete.
MOVED BY PRINCE, SECONDED BY MCIRVIN, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
j)Planning & Development Committee: Chair Prince presented a report recommending
concurrence with the staff and Planning Commission recommendation to adopt the Clean
Economy Strategy (CES) 2.0. The Planning and Development Committee further recommended
that a resolution for this item be prepared and presented for adoption when it is complete.
MOVED BY PRINCE, SECONDED BY MCIRVIN, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
AGENDA ITEM #5. a)
October 23, 2023 REGULAR COUNCIL MEETING MINUTES
k)Planning & Development Committee: Chair Prince presented a report recommending
concurrence in the staff and Planning Commission recommendation to adopt State‐mandated
updates to the City’s Construction Code/International Building Code, with optional Appendix T
solar‐ready provisions for one and two‐family dwelling units. The Planning and Development
Committee further recommended that a resolution for this item be prepared and presented for
adoption when it is complete.
MOVED BY PRINCE, SECONDED BY MCIRVIN, COUNCIL CONCUR IN THE
COMMITTEE RECOMMENDATION. CARRIED.
NEW BUSINESS
(Includes Council Committee agenda topics; visit rentonwa.gov/cityclerk for more information.)
MOVED BY RIVERA, SECONDED BY MCIRVIN, COUNCIL REFER TO THE
ADMINISTRATION THE IDENTIFICATION OF ANY SURPLUS SPACES TO BE USED BY
THE PUBLIC. CARRIED.
MOVED BY PÉREZ, SECONDED BY O'HALLORAN, SCHEDULE FIRST READING OF THE
BUDGET RELATED LEGISLATION TO TAKE PLACE AFTER REVIEW AND
RECOMMENDATION BY THE FINANCE COMMITTEE, THE PROPERTY TAX LEVY
SHOULD REMAIN SCHEDULED FOR FIRST READING ON NOVEMBER 6, WITH ANY
CHANGES TO THE NUMBERS PREVIOUSLY PRESENTED EXPLAINED IN A
NOVEMBER 6 COMMITTEE OF THE WHOLE. CARRIED.
ADJOURNMENT
MOVED BY PRINCE, SECONDED BY MCIRVIN, COUNCIL ADJOURN. CARRIED.
TIME: 7:37 PM
Jason A. Seth, MMC, City Clerk
Jason Seth, Recorder
23 Oct 2023
AGENDA ITEM #5. a)
Council Committee Meeting Calendar
October 23, 2023
October 30, 2023
Monday
5th Monday – No Meetings
November 6, 2023
Monday
3:00 PM * Community Services Committee, Chair Rivera
Location: Council Conference Room/Videoconference
1. Severe Weather Shelter Update
2. Recreation Division Updates
3. Emerging Issues in EHHS
• Professional Services Contracts Update
4:00 PM * Utilities Committee, Chair Alberson
Location: Council Conference Room/Videoconference
1. Agreement with Carollo Engineers, Inc. for Kennydale Lakeline Sewer
System Improvements - Final Design
2. Agreement with Jacobs Engineering, Inc for Ginger Creek and Honey
Creek Subbasin Plans
3. Emerging Issues in Utilities
• Google Fiber Proposal
5:00 PM Transportation Committee, Chair McIrvin
Location: Council Conference Room/Videoconference
1. 60 Day Closure of Sunset Blvd NE
2. Emerging Issues in Transportation
• Renton Municipal Airport Update
5:45 PM Committee of the Whole, Chair O’Halloran
Location: Council Chambers/Videoconference
1. Mid-Biennial Budget
7:00 PM Council Meeting
Location: Council Chambers/Videoconference
* revised 10/24/23
AGENDA ITEM #5. a)
AB - 3456
City Council Regular Meeting - 06 Nov 2023
SUBJECT/TITLE:Utility Bill Leak Adjustment Request for Bel Renton Holdings, LLC
042942-018
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Finance Department
STAFF CONTACT:Travus Goforth, Utility Accounts Supervisor
EXT.:6920
FISCAL IMPACT SUMMARY:
This leak adjustment in the amount of $3,450.63 is broken down as follows:
June 23 July 23 Total
Water $155.75 $331.63 $487.38
Sewer $328.41 $699.26 $1,027.67
Metro $618.55 $1,317.03 $1,935.58
Total $1,102.71 $2,347.92 $3,450.63
SUMMARY OF ACTION:
Per Renton Municipal Code 8-4-46 and 8-5-23 for water and wastewater billing adjustments for water leaks,
the city will grant an adjustment of up to a maximum of two regular meter reading cycles during the billing
period when the water leak occurred. The finance department received a formal leak adjustment request from
Bel Renton Holdings, LLC, a multi-family property, for a leak that occurred at the service address 201 SW 5TH Pl
Bldg L. The property owner has met the requirements outlined in the code to adequately qualify for the leak
adjustment. The requested adjustment in the amount of $3,450.63 covers the billing periods for June 2023
and July 2023.
EXHIBITS:
A. Issue Paper
STAFF RECOMMENDATION:
Staff recommends an adjustment to this customer’s account for a total of $3,450.63 for excess water usage caused by a
qualified water line leak in accordance with RMC 8-4-46 and 8-5-23.
AGENDA ITEM #5. b)
Finance Department
Memorandum
DATE:Wednesday, November 1, 2023
TO:Valerie O’Halloran, Council President
Members of Renton City Council
VIA:Armondo Pavone, Mayor
FROM:Kari Roller, Administrator
STAFF CONTACT:Travus Goforth, Utility Accounts Supervisor
SUBJECT:Utility Bill Leak Adjustment Request
Account: 042942-018
Owner: BEL RENTON HOLDINGS LLC
ISSUE
Should City Council grant the request for a reduction of increased water, City sewer and King
County Metro charges resulting from a water leak at the service address listed above?
BACKGROUND
In accordance with Renton Municipal Code (RMC) 8-4-46 and 8-5-23, water and wastewater
billing adjustments for water leaks, the City will grant an adjustment of up to a maximum of two
(2) regular meter reading cycles during the billing period when the water leak occurred. Water
will be adjusted by 50% of leaked consumption; sewer will be adjusted by 100% of all leaked
water that did not enter the sanitary sewer system.
The finance department received a formal leak adjustment request from BEL RENTON
HOLDINGS LLC, a multi-family property, for a leak that occurred at the service address 201 SW
5TH PL BLDG L. The water leak was located in the parking lot on the main water line and was
repaired on 7/17/23. The property owner has met the requirements outlined in the code,
including submitting proof of repair, to adequately qualify for the leak adjustment.
The requested adjustment covers the billing period(s) for June and July 2023 as follows:
June 23 July 23 Total
Water $155.75 $331.63 $487.38
Sewer $328.41 $699.26 $1,027.67
Metro $618.55 $1,317.03 $1,935.58
Total $1,102.71 $2,347.92 $3,450.63
RECOMMENDATION
Staff recommends an adjustment to this customer’s account for a total of $3,450.63 for excess
consumption caused by a qualified water line leak in accordance with RCM 8-5-23.
AGENDA ITEM #5. b)
AB - 3457
City Council Regular Meeting - 06 Nov 2023
SUBJECT/TITLE:Utility Bill Leak Adjustment Request for T3 Capital, LLC 046904-000
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Finance Department
STAFF CONTACT:Travus Goforth, Utility Accounts Supervisor
EXT.:6920
FISCAL IMPACT SUMMARY:
This leak adjustment in the amount of $2,222.33 is broken down as follows:
July 23 August 23 Total
Water $121.77 $206.64 $328.41
Sewer $243.54 $413.28 $656.82
Metro $458.70 $778.40 $1,237.10
Total $824.01 $1,398.32 $2,222.33
SUMMARY OF ACTION:
Per Renton Municipal Code 8-4-46 and 8-5-23 for water and wastewater billing adjustments for water leaks,
the city will grant an adjustment of up to a maximum of two regular meter reading cycles during the billing
period when the water leak occurred. The finance department received a formal leak adjustment request from
T3 Capital, LLC, a commercial property, for a leak that occurred at the service address 1222 Bronson Way N. The
property owner has met the requirements outlined in the code to adequately qualify for the leak adjustment.
The requested adjustment in the amount of $2,222.33 covers the billing periods for July 2023 and August
2023.
EXHIBITS:
A. Issue Paper
STAFF RECOMMENDATION:
Staff recommends an adjustment to this customer’s account for a total of $2,222.33 for excess water usage caused by a
qualified water line leak in accordance with RMC 8-4-46 and 8-5-23.
AGENDA ITEM #5. c)
Finance Department
Memorandum
DATE:Wednesday, November 1, 2023
TO:Valerie O’Halloran, Council President
Members of Renton City Council
VIA:Armondo Pavone, Mayor
FROM:Kari Roller, Administrator
STAFF CONTACT:Travus Goforth, Utility Accounts Supervisor
SUBJECT:Utility Bill Leak Adjustment Request
Account: 046904-000
Owner: T3 CAPITAL LLC
ISSUE
Should City Council grant the request for a reduction of increased water, City sewer and King
County Metro charges resulting from a water leak at the service address listed above?
BACKGROUND
In accordance with Renton Municipal Code (RMC) 8-4-46 and 8-5-23, water and wastewater
billing adjustments for water leaks, the City will grant an adjustment of up to a maximum of two
(2) regular meter reading cycles during the billing period when the water leak occurred. Water
will be adjusted by 50% of leaked consumption; sewer will be adjusted by 100% of all leaked
water that did not enter the sanitary sewer system.
The finance department received a formal leak adjustment request from T3 CAPITAL LLC, a
commercial property, for a leak that occurred at the service address 1222 BRONSON WAY N.
The water leak was located on the main water line to check valve and was repaired on 9/20/23.
The property owner has met the requirements outlined in the code, including submitting proof
of repair, to adequately qualify for the leak adjustment.
The requested adjustment covers the billing period(s) for July and August 2023 as follows:
July 23 August 23 Total
Water $121.77 $206.64 $328.41
Sewer $243.54 $413.28 $656.82
Metro $458.70 $778.40 $1,237.10
Total $824.01 $1,398.32 $2,222.33
RECOMMENDATION
Staff recommends an adjustment to this customer’s account for a total of $2,222.33 for excess
consumption caused by a qualified water line leak in accordance with RMC 8-5-23.
AGENDA ITEM #5. c)
AB - 3460
City Council Regular Meeting - 06 Nov 2023
SUBJECT/TITLE:Agreement with SoftResources, LLC for Enterprise Resource Planning
Project Management
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Finance Department
STAFF CONTACT:Melissa Melloy, Senior Finance Analyst
EXT.:6869
FISCAL IMPACT SUMMARY:
Funding for this agreement in the amount of $162,000 is available from the approved 2023 CIP budget for the
Eden System Replacement.
SUMMARY OF ACTION:
The city’s current ERP system, Eden by Tyler Technologies, will expire in 2027. In alignment with Information
Technology’s philosophy, we expect to see a commercial off-the-shelf (COTS) solution that will include all the
components required to not only replace the existing system but provide necessary enhancements and
improvements while also integrating and interfacing with existing city-owned software tools. The
implementation of the new ERP system will be a highly complex process.
This professional services contract is intended to assist and empower the city to efficiently and effectively
manage the ERP implementation process. Specifically, the consultant will provide the following ERP
implementation project management services:
Plan and monitor project progress
Vendor management and liaison
Manage project time, scope, quality, and budget
Extension and augmentation to the City implementation team
EXHIBITS:
A. Issue Paper
B. Agreement
STAFF RECOMMENDATION:
Authorize the agreement with SoftResources, L.L.C. for ERP software implementation project management
services for a maximum contract value of $162,000, plus any applicable state and local sales taxes, and
reimbursement for authorized out-of-pocket travel expenses.
AGENDA ITEM #5. d)
Finance Department
Memorandum
DATE:September 9, 2023
TO:Valerie O’Halloran, Council President
Members of Renton City Council
VIA:Armondo Pavone, Mayor
FROM:Kari Roller, Administrator
STAFF CONTACT:Melissa Melloy, Senior Finance Analyst
SUBJECT:ERP Software Implementation Project
Management Services
ISSUE
Should the city execute a professional services
contract with SoftResources, L.L.C. for ERP
software implementation project management
services?
RECOMMENDATION
Staff recommends Council authorize the
agreement with SoftResources, L.L.C. for ERP
software implementation project management
services for a maximum contract value of $162,000,
plus any applicable state and local sales taxes, and
reimbursement for authorized out-of-pocket travel
expenses.
OVERVIEW
The city’s current ERP system, Eden by Tyler
Technologies, will expire in 2027. In alignment with
Information Technology’s philosophy, we expect to
see a commercial off-the-shelf (COTS) solution that
will include all the components required to not
only replace the existing system but provide
necessary enhancements and improvements while
also integrating and interfacing with existing city-
owned software tools. The implementation of the
new ERP system will be a highly complex process.
AGENDA ITEM #5. d)
This professional services contract is intended to
assist and empower the city to efficiently and
effectively manage the ERP implementation
process. Specifically, the consultant will provide the
following ERP implementation project
management services:
•Plan and monitor project progress
•Vendor management and liaison
•Manage project time, scope, quality, and
budget
•Extension and augmentation to the City
implementation team
FISCAL IMPACT
This cost of this professional service would be a
one-time contract not to exceed $162,000, plus any
applicable state and local sales taxes, and
reimbursement for authorized out-of-pocket travel
expenses.
CONCLUSION
The city entering into this agreement will ensure a
project that delivers quality, is on time, on budget,
and within scope. The city would benefit highly
from entering this agreement given the complex
nature of this project and the importance of
successful implementation to city operations.
AGENDA ITEM #5. d)
AGENDA ITEM #5. d)
AGREEMENT FOR ERP SOFTWARE IMPLEMENTATION PROJECT
MANAGEMENT SERVICES
THIS AGREEMENT, dated for reference purposes only as November 06, 2023, is by and between
the City of Renton (the “City”), a Washington municipal corporation, and SoftResources, L.L.C.
(“Consultant”), a Washington LLC. The City and the Consultant are referred to collectively in this
Agreement as the “Parties.” Once fully executed by the Parties, this Agreement is effective as of
the last date signed by both parties.
1. Scope of Work: Consultant agrees to provide project management services related to the
implementation of new ERP software as specified in Exhibit 1, which is attached and
incorporated herein and may hereinafter be referred to as the “Work.”
2. Changes in Scope of Work: The City, without invalidating this Agreement, may order
changes to the Work consisting of additions, deletions or modifications. Any such changes
to the Work shall be ordered by the City in writing and the Compensation shall be
equitably adjusted consistent with the rates set forth in Exhibit A or as otherwise mutually
agreed by the Parties.
3. Time of Performance: Consultant shall commence performance of the Agreement
pursuant to the schedule(s) set forth in Exhibit A. All Work shall be performed by no later
than December 31, 2025.
4. Compensation:
A. Amount. Total compensation to Consultant for Work provided pursuant to this
Agreement shall not exceed $162,000, plus any applicable state and local sales taxes.
Compensation shall be paid based upon Work actually performed according to the
rate(s) or amounts specified in Exhibit A. The Consultant agrees that any hourly or flat
rate charged by it for its Work shall remain locked at the negotiated rate(s) unless
otherwise agreed to in writing or provided in Exhibit A. Except as specifically provided
herein, the Consultant shall be solely responsible for payment of any taxes imposed
as a result of the performance and payment of this Agreement.
B. Method of Payment. On a monthly or no less than quarterly basis during any quarter
in which Work is performed, the Consultant shall submit a voucher or invoice in a form
specified by the City, including a description of what Work has been performed, the
name of the personnel performing such Work, and any hourly labor charge rate for
AGENDA ITEM #5. d)
PAGE 2 OF 10
such personnel. The Consultant shall also submit a final bill upon completion of all
Work. Payment shall be made by the City for Work performed within thirty (30)
calendar days after receipt and approval by the appropriate City representative of the
voucher or invoice. If the Consultant’s performance does not meet the requirements
of this Agreement, the Consultant will correct or modify its performance to comply
with the Agreement. The City may withhold payment for work that does not meet the
requirements of this Agreement.
C. Effect of Payment. Payment for any part of the Work shall not constitute a waiver by
the City of any remedies it may have against the Consultant for failure of the
Consultant to perform the Work or for any breach of this Agreement by the
Consultant.
D. Non-Appropriation of Funds. If sufficient funds are not appropriated or allocated for
payment under this Agreement for any future fiscal period, the City shall not be
obligated to make payments for Work or amounts incurred after the end of the
current fiscal period, and this Agreement will terminate upon the completion of all
remaining Work for which funds are allocated. No penalty or expense shall accrue to
the City in the event this provision applies.
5. Termination:
A. The City reserves the right to terminate this Agreement at any time, with or w ithout
cause by giving ten (10) calendar days’ notice to the Consultant in writing. In the event
of such termination or suspension, all finished or unfinished documents, data, studies,
worksheets, models and reports, or other material prepared by the Consu ltant
pursuant to this Agreement shall be submitted to the City, if any are required as part
of the Work.
B. In the event this Agreement is terminated by the City, the Consultant shall be entitled
to payment for all hours worked to the effective date of termination, less all payments
previously made. If the Agreement is terminated by the City after partial performance
of Work for which the agreed compensation is a fixed fee, the City shall pay the
Consultant an equitable share of the fixed fee. This provision shall not prevent the
City from seeking any legal remedies it may have for the violation or nonperformance
of any of the provisions of this Agreement and such charges due to the City shall be
deducted from the final payment due the Consultant. No payment shall be made by
the City for any expenses incurred or work done following the effective date of
termination unless authorized in advance in writing by the City.
6. Warranties And Right To Use Work Product: Consultant represents and warrants that
Consultant will perform all Work identified in this Agreement in a professional and
workmanlike manner and in accordance with all reasonable and professional standards
AGENDA ITEM #5. d)
PAGE 3 OF 10
and laws. Compliance with professional standards includes, as applicable, performing the
Work in compliance with applicable City standards or guidelines (e.g. design criteria and
Standard Plans for Road, Bridge and Municipal Construction). Professional engineers shall
certify engineering plans, specifications, plats, and reports, as applicable, pursuant to
RCW 18.43.070. Consultant further represents and warrants that all final work product
created for and delivered to the City pursuant to this Agreement shall be the original work
of the Consultant and free from any intellectual property encumbrance which would
restrict the City from using the work product. Consultant grants to the City a non-
exclusive, perpetual right and license to use, reproduce, distribute, adapt, modify, and
display all final work product produced pursuant to this Agreement. The City’s or other’s
adaptation, modification or use of the final work products other than for the purposes of
this Agreement shall be without liability to the Consultant. The provisions of this section
shall survive the expiration or termination of this Agreement.
7. Record Maintenance: The Consultant shall maintain accounts and records, which
properly reflect all direct and indirect costs expended and Work provided in the
performance of this Agreement and retain such records for as long as may be required by
applicable Washington State records retention laws, but in any event no less than six
years after the termination of this Agreement. The Consultant agrees to provide access
to and copies of any records related to this Agreement as required by the City to audit
expenditures and charges and/or to comply with the Washington State Public Records Act
(Chapter 42.56 RCW). The provisions of this section shall survive the expiration or
termination of this Agreement.
8. Public Records Compliance: To the full extent the City determines necessary to comply
with the Washington State Public Records Act, Consultant shall make a due diligent search
of all records in its possession or control relating to this Agreement and the Work,
including, but not limited to, e-mail, correspondence, notes, saved telephone messages,
recordings, photos, or drawings and provide them to the City for production. In the event
Consultant believes said records need to be protected from disclosure, it may, at
Consultant’s own expense, seek judicial protection. Consultant shall indemnify, defend,
and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim
or litigation related to a Public Records Act request for which Consultant has responsive
records and for which Consultant has withheld records or information contained therein,
or not provided them to the City in a timely manner. Consultant shall produce for
distribution any and all records responsive to the Public Records Act request in a timely
manner, unless those records are protected by court order. The provisions of this section
shall survive the expiration or termination of this Agreement.
9. Independent Contractor Relationship:
A. The Consultant is retained by the City only for the purposes and to the extent set forth
in this Agreement. The nature of the relationship between the Consultant and the City
AGENDA ITEM #5. d)
PAGE 4 OF 10
during the period of the Work shall be that of an independent contractor, not
employee. The Consultant, not the City, shall have the power to control and direct the
details, manner or means of Work. Specifically, but not by means of limitation, the
Consultant shall have no obligation to work any particular hours or particular
schedule, unless otherwise indicated in the Scope of Work or where scheduling of
attendance or performance is mutually arranged due to the nature of the Work.
Consultant shall retain the right to designate the means of performing the Work
covered by this agreement, and the Consultant shall be entitled to employ other
workers at such compensation and such other conditions as it may deem proper,
provided, however, that any contract so made by the Consultant is to be paid by it
alone, and that employing such workers, it is acting individually and not as an agent
for the City.
B. The City shall not be responsible for withholding or otherwise deducting federal
income tax or Social Security or contributing to the State Industrial Insurance
Program, or otherwise assuming the duties of an employer with respect to Consultant
or any employee of the Consultant.
C. If the Consultant is a sole proprietorship or if this Agreement is with an individual, the
Consultant agrees to notify the City and complete any required form if the Consultant
retired under a State of Washington retirement system and agrees to indemnify any
losses the City may sustain through the Consultant’s failure to do so.
10. Hold Harmless: The Consultant agrees to release, indemnify, defend, and hold harmless
the City, elected officials, employees, officers, representatives, and volunteers from any
and all claims, demands, actions, suits, causes of action, arbitrations, mediations,
proceedings, judgments, awards, injuries, damages, liabilities, taxes, losses, fines, fees,
penalties, expenses, attorney’s or attorneys’ fees, costs, and/or litigation expenses to or
by any and all persons or entities, arising from, resulting from, or related to the negligent
acts, errors or omissions of the Consultant in its performance of this Agreement or a
breach of this Agreement by Consultant , except for that portion of the claims caused by
the City’s sole negligence. For claims that are covered by Consultant’s professional
liability, errors and omission insurance coverage, the Consultant’s obligation to indemnify
and defend the City shall be capped at $2,000,000.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
construction, alteration, improvement, etc., of structure or improvement attached to real
estate…) then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the
Consultant and the City, its officers, officials, employees and volunteers, Consultant’s
liability shall be only to the extent of Consultant’s negligence.
AGENDA ITEM #5. d)
PAGE 5 OF 10
It is further specifically and expressly understood that the indem nification provided in
this Agreement constitute Consultant’s waiver of immunity under the Industrial
Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties
have mutually negotiated and agreed to this waiver. The provisions of this section shall
survive the expiration or termination of this Agreement.
11. Gifts and Conflicts: The City’s Code of Ethics and Washington State law prohibit City
employees from soliciting, accepting, or receiving any gift, gratuity or favor from an y
person, firm or corporation involved in a contract or transaction. To ensure compliance
with the City’s Code of Ethics and state law, the Consultant shall not give a gift of any kind
to City employees or officials. Consultant also confirms that Consultant does not have a
business interest or a close family relationship with any City officer or employee who was,
is, or will be involved in selecting the Consultant, negotiating or administering this
Agreement, or evaluating the Consultant’s performance of the Work.
12. City of Renton Business License: Unless exempted by the Renton Municipal Code,
Consultant shall obtain a City of Renton Business License prior to performing any Work
and maintain the business license in good standing throughout the term of this
agreement with the City.
Information regarding acquiring a city business license can be found at:
https://www.rentonwa.gov/Tax
Information regarding State business licensing requirements can be found at:
https://dor.wa.gov/doing-business/register-my-business
13. Insurance: Consultant shall secure and maintain:
A. Commercial general liability insurance in the minimum amounts of $1,000,000 for
each occurrence/$2,000,000 aggregate for the Term of this Agreement.
B. In the event that Work delivered pursuant to this Agreement either directly or
indirectly involve or require Professional Services, Professional Liability, Errors and
Omissions coverage shall be provided with minimum limits of $1,000,000 per
occurrence. "Professional Services", for the purpose of this section, shall mean any
Work provided by a licensed professional or Work that requires a professional
standard of care.
C. Workers’ compensation coverage, as required by the Industrial Insurance laws of the
State of Washington, shall also be secured.
AGENDA ITEM #5. d)
PAGE 6 OF 10
D. Commercial Automobile Liability for owned, leased, hired or non-owned, leased, hired
or non-owned, with minimum limits of $1,000,000 per occurrence combined single
limit, if there will be any use of Consultant’s vehicles on the City’s Pr emises by or on
behalf of the City, beyond normal commutes.
E. Consultant shall name the City as an Additional Insured on its commercial general
liability policy on a non-contributory primary basis. The City’s insurance policies shall
not be a source for payment of any Consultant liability, nor shall the maintenance of
any insurance required by this Agreement be construed to limit the liability of
Consultant to the coverage provided by such insurance or otherwise limit the City’s
recourse to any remedy available at law or in equity.
F. Subject to the City’s review and acceptance, a certificate of insurance showing the
proper endorsements, shall be delivered to the City before performing the Work.
G. Consultant shall provide the City with written notice of any policy cancellation, within
two (2) business days of their receipt of such notice.
14. Delays: Consultant is not responsible for delays caused by factors beyond the
Consultant’s reasonable control. When such delays beyond the Consultant’s reasonable
control occur, the City agrees the Consultant is not responsible for damages, nor shall the
Consultant be deemed to be in default of the Agreement.
15. Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or
encumber any rights, duties or interests accruing from this Agreement without the
written consent of the other.
16. Notices: Any notice required under this Agreement will be in writing, addressed to the
appropriate party at the address which appears below (as modified in writing from time
to time by such party), and given personally, by registered or certified mail, return receipt
requested, by facsimile or by nationally recognized overnight courier service. Time period
for notices shall be deemed to have commenced upon the date of receipt, EXCEPT
facsimile delivery will be deemed to have commenced on the first business day following
transmission. Email and telephone may be used for purposes of administering the
Agreement, but should not be used to give any formal notice required by the Agreement.
CITY OF RENTON
Kristin Trivelas
1055 South Grady Way
Renton, WA 98057
Phone: (425) 430-6929
CONSULTANT
Elaine Watson
11411 SE 124th Street, Suite 270
Kirkland, WA 98034-4341
Phone: (425) 216-4030
AGENDA ITEM #5. d)
PAGE 7 OF 10
ktrivelas@rentonwa.gov ewatson@softresources.com
17. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational
qualification, the Consultant agrees as follows:
A. Consultant, and Consultant’s agents, employees, representatives, and volunteers
with regard to the Work performed or to be performed under this Agreement, shall
not discriminate on the basis of race, color, sex, religion, nationality, creed, marital
status, sexual orientation or preference, age (except minimum age and retirement
provisions), honorably discharged veteran or military status, or the presence of any
sensory, mental or physical handicap, unless based upon a bona fide occupational
qualification in relationship to hiring and employment, in employment or application
for employment, the administration of the delivery of Work or any other benefits
under this Agreement, or procurement of materials or supplies.
B. The Consultant will take affirmative action to insure that applicants are employed and
that employees are treated during employment without rega rd to their race, creed,
color, national origin, sex, age, sexual orientation, physical, sensory or mental
handicaps, or marital status. Such action shall include, but not be limited to the
following employment, upgrading, demotion or transfer, recruitment or recruitment
advertising, layoff or termination, rates of pay or other forms of compensation and
selection for training.
C. If the Consultant fails to comply with any of this Agreement’s non -discrimination
provisions, the City shall have the right, at its option, to cancel the Agreement in
whole or in part.
D. The Consultant is responsible to be aware of and in compliance with all federal, state
and local laws and regulations that may affect the satisfactory completion of the
project, which includes but is not limited to fair labor laws, worker's compensation,
and Title VI of the Federal Civil Rights Act of 1964, and will comply with City of Renton
Council Resolution Number 4085.
18. Miscellaneous: The parties hereby acknowledge:
A. The City is not responsible to train or provide training for Consultant.
B. Consultant will not be reimbursed for job related expenses except to the extent
specifically agreed within the attached exhibits.
C. Consultant shall furnish all tools and/or materials necessary to perform the Work
except to the extent specifically agreed within the attached exhibits.
AGENDA ITEM #5. d)
PAGE 8 OF 10
D. In the event special training, licensing, or certification is required for Consultant to
provide Work he/she will acquire or maintain such at his/her own expense and, if
Consultant employs, sub-contracts, or otherwise assigns the responsibility to perform
the Work, said employee/sub-contractor/assignee will acquire and or maintain such
training, licensing, or certification.
E. This is a non-exclusive agreement and Consultant is free to provide his/her Work to
other entities, so long as there is no interruption or interference with the provision of
Work called for in this Agreement.
F. Consultant is responsible for his/her own insurance, including, but not limited to
health insurance.
G. Consultant is responsible for his/her own Worker’s Compensation coverage as well as
that for any persons employed by the Consultant.
19. Other Provisions:
A. Approval Authority. Each individual executing this Agreement on behalf of the City
and Consultant represents and warrants that such individuals are duly authorized to
execute and deliver this Agreement on behalf of the City or Consultant.
B. General Administration and Management. The City’s project manager is Kristin
Trivelas. In providing Work, Consultant shall coordinate with the City’s contract
manager or his/her designee.
C. Amendment and Modification. This Agreement may be amended only by an
instrument in writing, duly executed by both Parties.
D. Conflicts. In the event of any inconsistencies between Consultant proposals and this
Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to
this Agreement are incorporated by reference only to the extent of the purpose fo r
which they are referenced within this Agreement. To the extent a Consultant
prepared exhibit conflicts with the terms in the body of this Agreement or contains
terms that are extraneous to the purpose for which it is referenced, the terms in the
body of this Agreement shall prevail and the extraneous terms shall not be
incorporated herein.
E. Governing Law. This Agreement shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington and the City of
Renton. Consultant and all of the Consultant’s employees shall perform the Work in
accordance with all applicable federal, state, county and city laws, codes and
ordinances.
AGENDA ITEM #5. d)
PAGE 9 OF 10
F. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared
by the joint efforts of the Parties and shall not be construed against one party or the
other as a result of the preparation, substitution, submission or other event of
negotiation, drafting or execution.
G. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or
interpret this Agreement or any of its terms or covenants shall be brought in the King
County Superior Court for the State of Washington at the Maleng Regional Justice
Center in Kent, King County, Washington, or its replacement or successor. Consultant
hereby expressly consents to the personal and exclusive jurisdiction and venue of
such court even if Consultant is a foreign corporation not registered with the State of
Washington.
H. Severability. A court of competent jurisdiction’s determination that any provision or
part of this Agreement is illegal or unenforceable shall not cancel or invalidate the
remainder of this Agreement, which shall remain in full force and effect.
I. Sole and Entire Agreement. This Agreement contains the entire agreement of the
Parties and any representations or understandings, whether oral or written, not
incorporated are excluded.
J. Time is of the Essence. Time is of the essence of this Agreement and each and all of
its provisions in which performance is a factor. Adherence to completion dates set
forth in the description of the Work is essential to the Consultant’s performance of
this Agreement.
K. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be
construed to give any rights or benefits in the Agreement to anyone other than the
Parties, and all duties and responsibilities undertaken pursuant to this Agreement will
be for the sole and exclusive benefit of the Parties and no one else.
L. Binding Effect. The Parties each bind themselves, their partners, successors, assigns,
and legal representatives to the other party to this Agreement, and to the partners,
successors, assigns, and legal representatives of such other party with respect to all
covenants of the Agreement.
M. Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s
failure to enforce any provision of this Agreement shall not be a waiver and shall not
prevent either the City or Consultant from enforcing tha t provision or any other
provision of this Agreement in the future. Waiver of breach of any provision of this
Agreement shall not be deemed to be a waiver of any prior or subsequent breach
unless it is expressly waived in writing.
AGENDA ITEM #5. d)
PAGE 10 OF 10
N. Counterparts. The Parties may execute this Agreement in any number of
counterparts, each of which shall constitute an original, and all of which will together
constitute this one Agreement.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the da te
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Armondo Pavone
Mayor
Elaine Watson
Principal
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By: __________________________
Shane Moloney
City Attorney
Contract Template Updated 5/21/2021
AGENDA ITEM #5. d)
Proposal for
City of Renton, Washington
ERP Software Implementation
Project Management Services
September 1, 2023
Submitted by
SoftResources LLC
Elaine Watson, Principal
425.216.4030
ewatson@softresources.com
AGENDA ITEM #5. d)
SoftResources LLC
11411 NE 124th Street, Suite 270
Kirkland, WA 98034
SoftResources LLC | Page 2
September 1, 2023
Kristin Trivelas
Melissa Crawford
Melissa Melloy
1055 S. Grady Way, 5th Floor
Renton, WA 98056
SoftResources is pleased to present this proposal to the City of Renton, Washington (City) to provide
ERP Implementation Project Management services including Financials and Human Capital Management
modules.
Workplan
The Project Management services provided by SoftResources are focused on acting as a highly
experienced extension to our client’s internal resources and project team. We offer a variety of services
for all phases of the implementation including implementation planning, implementation execution,
post implementation activities, and project close out. Our goal is to ensure a project that delivers
quality, is on time, on budget, and within scope. We will work in collaboration with the City and the
selected vendor to facilitate project success.
The types of implementation project management services SoftResources can provide are detailed in
the following table. This list is not intended to be all encompassing and we will flex our services to
support the City with the project.
Implementation Project Management Services
Implementation
Services Overview
SoftResources can support the City with the implementation of ERP
software. Based on our experience the services we provide will vary
throughout the various phases of implementation and we are prepared to
support the project in this manner. The implementation services should
support the following basic pillars:
• Plan and monitor project progress.
• Vendor management and liaison.
• Manage project time, scope, quality, and budget.
• Extension and augmentation to the City implementation team.
Tasks Description
a. Project Plan and
Timeline
• Review the vendor’s implementation project plan that defines tasks,
assigns responsibilities, dates, milestones, and deliverables.
• Ensure all tasks required for the project for all parties are included in this
Plan with start and end dates and resource assignments.
• Monitor progress of the project with a vision towards completed,
current, and future tasks.
AGENDA ITEM #5. d)
Proposal for City of Renton
Implementation Project Management Services – ERP Software
SoftResources LLC | Page 3
Implementation Project Management Services
b. Task Management • Participate in the coordination and oversight of task management
ensuring adherence to the project plan and timeline.
• Ensure staff are updated to current and upcoming tasks and understand
the tasks as outlined in the project plan.
c. Change Orders • Review project change orders initiated by the vendor to ensure they are
in line with expectations.
• Ensure the change orders include the proper documentation and
justification for any additional services or software required beyond the
original contract.
d. Project Team
Status Meetings
• Coordinate, schedule and participate in implementation planning
meetings with the client project team and the vendor implementation
team.
• The meetings are used to review the status of the project as well as
upcoming tasks and deliverables. Meetings are typically held weekly
although ad hoc meetings may also be scheduled.
e. Vendor Status
Meeting
• Participate in regular status meetings with client and the selected
vendor. Status meetings should discuss the current state of the project
and include a review of completed tasks, current tasks, future tasks,
issues, risks, client and vendor resources, budget vs. actual reporting,
and other planning activities based on the current stage of the
implementation.
• These meetings are typically held weekly although ad hoc meetings may
also be scheduled.
f. Executive Sponsor
Liaison
• Participate in the required communication to keep client executive
sponsor apprised of project status. This typically is in conjunction with
the client’s internal project manager or project team.
g. Communications
Plan
• Communication is a critical requirement for a successful implementation
project. During implementation planning the vendor should develop a
Communication Plan that defines the elements of communication for
the project. This Plan outlines the who, what, where, when, and how of
communication across the organization.
• SoftResources will review the vendor’s Communication Plan to ensure it
meets the needs of the City.
h. Organizational
Change
Management
• Identify the possible change management issues the project may face
and develop a change management plan to address them.
• SoftResources follows the Prosci’ s ADKAR methodology accompanied by
our client’s philosophies and strategies for change management.
i. Risk Management
Plan
• A Risk Management Plan defines the potential risks for the project,
assigns a risk owner, and outlines the Plan to address the risk should it
arise. The vendor typically creates this Plan as part of project initiation.
AGENDA ITEM #5. d)
Proposal for City of Renton
Implementation Project Management Services – ERP Software
SoftResources LLC | Page 4
Implementation Project Management Services
• The Risk Management Plan will include all risks for the project including
but not limited to the solution, unsatisfied requirements, security,
project resourcing, budget, etc.
• Optionally SoftResources can create a Risk Management Plan according
to client preferences and direction.
j. Discovery • This is normally the first phase of a software implementation. During the
discovery process, the selected vendor will provide training on the
software and review of the best practices and functionality it can
provide. The sessions will be used to review the current environment for
financial accounting across the organization.
• SoftResources can participate in these sessions and act as an objective
guide to the information provided and the decisions made.
k. Design and
Configuration
• At completion of Discovery Sessions the vendor will provide a
recommendation for the design of the system that’s created as part of
the pre-discovery process with the City.
• The Design phase also includes the plan for interfaces or integration,
data conversion, cutover plan, forms development, report development,
testing plan test scripts, roles definitions, user administration.
• SoftResources can support through the review of the design document
and review of the configuration completed to provide an objective view.
l. Business Process
Improvements
• Implementing new software offers unique opportunities for business
process improvements. The new system likely offers enhanced
functionality compared to the legacy system. SoftResources will work
with your team and the vendor to optimize business processes and
leverage the new solutions’ capabilities.
m. Data Conversion • We can assist with the review or development of a Data Conversion
Plan. The Plan will include identification of data to be converted, an
approach to extraction of data from legacy systems, how data will be
imported to the new software, how to test the converted data and
overall timing for the process.
• SoftResources can help with monitoring the data conversion process to
ensure tasks are completed as defined, data is validated, and signoff is
achieved.
n. Integration Plan • An Integration Plan that defines the required integrations to remaining
business solutions is a critical part of the implementation. The Plan
defines the who, what, when, where, and how of data integration.
SoftResources has extensive experience working with integrations,
including helping to decide when to build (or not build) them.
o. Training Plan • SoftResources can assist with the development of a Training Plan that
defines the who, what, when, where, and how of training. That is who
needs to be trained, what do they need to be trained on, what materials
AGENDA ITEM #5. d)
Proposal for City of Renton
Implementation Project Management Services – ERP Software
SoftResources LLC | Page 5
Implementation Project Management Services
are required for training, when do they need to be trained, where will
they be trained, and how will they be trained.
p. Testing Plan • Assist with the development of a Testing Plan for all stages of the
implementation including unit, integration, conversion, interfaces, forms
and reports, workflow, and roles.
• The Testing Plan will include tasks such as development of test scripts,
assistance with documentation of testing results, and identification of
configuration adjustments required.
q. Post-Go-Live
Planning
• Participate in the review of tasks or activities that need to be completed
after go-live or the move to production status.
• Create a post-go-live document that defines the tasks, assigns
responsibilities, and establishes a timeline for completion.
r. Go-Live and
Cutover Plan
• Services can include development of a cutover strategy, go-live checklist,
readiness assessment, quality review, definition of critical-success-
factors, final data conversion, system cutover, rollback plan, and future
phase planning.
s. Closeout • Administer project closeout including review of the project plan to
ensure all tasks are complete
• Review the cutover strategy to be used by client to ensure all steps have
been properly executed
• Participate in the vendor’s transition to support process for staff.
Scope Control
If there are services performed at the City’s request, which are outside of those listed in the Work Plan
section of this proposal, an amendment to this proposal or a new letter of understanding will be drafted
for the City’s approval before the services are performed.
Fees and Billing
To provide flexibility for the services requested by the City, SoftResources provides implementation
project management services as requested and required by our clients. Fees are billed monthly for
services provided at a rate of $200 per hour. Mileage for on-site services will be billed monthly as
incurred.
The following table provides not to exceed amounts for services and travel. We will monitor the budget
on a monthly basis to ensure we remain within the parameters defined. We have assumed a total
timeline of 18 months. SoftResources will flex our services to meet the specific needs of the City and
understand the time and travel required may be adjusted throughout the project. There are no
minimums required for consulting services.
AGENDA ITEM #5. d)
Proposal for City of Renton
Implementation Project Management Services – ERP Software
SoftResources LLC | Page 6
Assumption Rate Total Not to Exceed $
Services 18
Months
Average 45
Hours Per Month
810
Hours
$ 162,000.00
Travel 12
Trips
$40
Per Trip
-- $ 480.00
Staffing
SoftResources will assign Project Management resources to this project. The Project Manager assigned
will be Elaine Watson or Pamela Ettien to ensure continuity for the City’s project.
Confirmation
For your convenience in confirming this agreement we have enclosed an acceptance page for your
signature. Please sign and email the entire Engagement Letter as a PDF to ewatson@softresources.com.
Elaine Watson, Principal
SoftResources LLC
AGENDA ITEM #5. d)
Proposal for City of Renton
Implementation Project Management Services – ERP Software
SoftResources LLC | Page 7
Proposal Acceptance
To: Elaine Watson
SoftResources LLC
ewatson@softresources.com
From: Kristin Trivelas
Fiscal Services Director
City of Renton
The SoftResources Proposal for Implementation Project Management Services dated September 1, 2023
is accepted.
City of Renton SoftResources LLC
Signature
Name
Title
Date
AGENDA ITEM #5. d)
AB - 3461
City Council Regular Meeting - 06 Nov 2023
SUBJECT/TITLE:Agreement with Renova Exteriors LLC for Winter Lights Display
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Parks & Recreation Department
STAFF CONTACT:Carrie Nass, Recreation Director
EXT.:6624
FISCAL IMPACT SUMMARY:
$144,265.05 from department general fund and Community Economic Development will support lighting
features in the Downtown Renton commercial district with a fund transfer to Recreation in the amount of
$18,000. A 2023 LTAX grant will help offset $10,000 of the contract. The total contract anticipated to be the
following: $85,140.97 (Coulon) + $13,018.60 (Piazza) + $16,167.30 (Downtown) + $1,729 (RCC) + $14,975
(maintenance) = $131,030.87 + tax ($13,234.18) = $144,265.05
SUMMARY OF ACTION:
Our City-wide, multi-month (late November 2023 – February 2024) Winter Lights contract includes
installation, maintenance, and removal of lights at Gene Coulon Memorial Beach Park, Piazza and Gateway
Parks, Clock Tower, Erasmus the Dragon, Downtown lights poles, City Center Parking Garage, and Renton
Community Center.
An RFP went out in August 2023 to select a new City of Renton Winter Lights contractor. Renova Exteriors LLC,
dba, Renova Holiday Lighting was selected in mid-September 2023. This vendor also does light installation at
The Landing. Final determinations for scope of work involved staff from Facilities, Parks Maintenance,
Recreation, Economic Development and Transportation.
Winter Lights kicks off in Downtown November 18th and at Gene Coulon Memorial Beach Park on December
1st. Multi-colored holiday lights will be removed in early January 2024. The remaining installations of white
lights will remain on until end of February 2024. This year’s contract expands the downtown lights to enhance
economic vitality and promote the city as a destination experience for the Renton community and visitors.
EXHIBITS:
A. 2023_RenovaHolidayLighting_Contract Signed
STAFF RECOMMENDATION:
Authorize the Mayor and City Clerk to execute a contract with Renova Exteriors, LLC for $131,030.87 + tax
($13,234.18) = $144,265.05 to install, maintain, and remove city-wide winter lights from late-November 2023
through the end of February 2024.
AGENDA ITEM #5. e)
AGREEMENT FOR WINTER LIGHTS & OUTDOOR DÉCOR AT
COULON PARK, PIAZZA PARK, CITY CENTER PARKING GARAGE,
CLOCK TOWER, DOWNTOWN LIGHT POLES, GATEWAY PARK,
AND RENTON COMMUNITY CENTER
THIS AGREEMENT, dated for reference purposes only as October 17, 2023, is by and between
the City of Renton (the “City”), a Washington municipal corporation, and Renova Exteriors LLC,
dba Renova Holiday Lighting (“Consultant”), a limited liability company. The City and the
Consultant are referred to collectively in this Agreement as the “Parties.” Once fully executed by
the Parties, this Agreement is effective as of the last date signed by both parties.
1. Scope of Work: Consultant agrees to provide materials and labor necessary to perform
work for the installation, maintenance, and de-installation of Winter Lights & Outdoor
Décor at Gene Coulon Memorial Beach Park, Piazza Park, City Center Parking Garage,
Clock Tower, Gateway Park, light poles in downtown Renton, and Renton Community
Center as specified in Exhibit A – Scope of Work & Maintenance, which is attached and
incorporated herein and may hereinafter be referred to as the “Work.”
2. Changes in Scope of Work: The City, without invalidating this Agreement, may order
changes to the Work consisting of additions, deletions or modifications. Any such changes
to the Work shall be ordered by the City in writing and the Compensation shall be
equitably adjusted consistent with the rates set forth in Exhibit A or as otherwise mutually
agreed by the Parties.
3. Time of Performance: Consultant shall commence performance of the Agreement
pursuant to the schedule(s) set forth in Exhibit A. All Work shall be performed by no later
than February 29, 2024.
4. Compensation:
A. Amount. Total compensation to Consultant for Work provided pursuant to this
Agreement shall not exceed $131,030.87, plus any applicable state and local sales
taxes. Compensation shall be paid based upon Work actually performed according to
the rate(s) or amounts specified in Exhibit A. The Consultant agrees that any hourly or
flat rate charged by it for its Work shall remain locked at the negotiated rate(s) unless
otherwise agreed to in writing or provided in Exhibit A. Except as specifically provided
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 2 OF 13
herein, the Consultant shall be solely responsible for payment of any taxes imposed
as a result of the performance and payment of this Agreement.
B. Method of Payment. On a monthly or no less than quarterly basis during any quarter
in which Work is performed, the Consultant shall submit a voucher or invoice in a form
specified by the City, including a description of what Work has been performed, the
name of the personnel performing such Work, and any hourly labor charge rate for
such personnel. The Consultant shall also submit a final bill upon completion of all
Work. Payment shall be made by the City for Work performed within thirty (30)
calendar days after receipt and approval by the appropriate City representative of the
voucher or invoice. If the Consultant’s performance does not meet the requirements
of this Agreement, the Consultant will correct or modify its performance to comply
with the Agreement. The City may withhold payment for work that does not meet the
requirements of this Agreement.
C. Effect of Payment. Payment for any part of the Work shall not constitute a waiver by
the City of any remedies it may have against the Consultant for failure of the
Consultant to perform the Work or for any breach of this Agreement by the
Consultant.
D. Non-Appropriation of Funds. If sufficient funds are not appropriated or allocated for
payment under this Agreement for any future fiscal period, the City shall not be
obligated to make payments for Work or amounts incurred after the end of the
current fiscal period, and this Agreement will terminate upon the completion of all
remaining Work for which funds are allocated. No penalty or expense shall accrue to
the City in the event this provision applies.
5. Termination:
A. The City reserves the right to terminate this Agreement at any time, with or without
cause by giving ten (10) calendar days’ notice to the Consultant in writing. In the event
of such termination or suspension, all finished or unfinished documents, data, studies,
worksheets, models and reports, or other material prepared by the Consultant
pursuant to this Agreement shall be submitted to the City, if any are required as part
of the Work.
B. In the event this Agreement is terminated by the City, the Consultant shall be entitled
to payment for all hours worked to the effective date of termination, less all payments
previously made. If the Agreement is terminated by the City after partial performance
of Work for which the agreed compensation is a fixed fee, the City shall pay the
Consultant an equitable share of the fixed fee. This provision shall not prevent the
City from seeking any legal remedies it may have for the violation or nonperformance
of any of the provisions of this Agreement and such charges due to the City shall be
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 3 OF 13
deducted from the final payment due the Consultant. No payment shall be made by
the City for any expenses incurred or work done following the effective date of
termination unless authorized in advance in writing by the City.
6. Warranties And Right To Use Work Product: Consultant represents and warrants that
Consultant will perform all Work identified in this Agreement in a professional and
workmanlike manner and in accordance with all reasonable and professional standards
and laws. Compliance with professional standards includes, as applicable, performing the
Work in compliance with applicable City standards or guidelines (e.g. design criteria and
Standard Plans for Road, Bridge and Municipal Construction). Professional engineers shall
certify engineering plans, specifications, plats, and reports, as applicable, pursuant to
RCW 18.43.070. Consultant further represents and warrants that all final work product
created for and delivered to the City pursuant to this Agreement shall be the original work
of the Consultant and free from any intellectual property encumbrance which would
restrict the City from using the work product. Consultant grants to the City a non-
exclusive, perpetual right and license to use, reproduce, distribute, adapt, modify, and
display all final work product produced pursuant to this Agreement. The City’s or other’s
adaptation, modification or use of the final work products other than for the purposes of
this Agreement shall be without liability to the Consultant. The provisions of this section
shall survive the expiration or termination of this Agreement.
7. Record Maintenance: The Consultant shall maintain accounts and records, which
properly reflect all direct and indirect costs expended and Work provided in the
performance of this Agreement and retain such records for as long as may be required by
applicable Washington State records retention laws, but in any event no less than six
years after the termination of this Agreement. The Consultant agrees to provide access
to and copies of any records related to this Agreement as required by the City to audit
expenditures and charges and/or to comply with the Washington State Public Records Act
(Chapter 42.56 RCW). The provisions of this section shall survive the expiration or
termination of this Agreement.
8. Public Records Compliance: To the full extent the City determines necessary to comply
with the Washington State Public Records Act, Consultant shall make a due diligent search
of all records in its possession or control relating to this Agreement and the Work,
including, but not limited to, e-mail, correspondence, notes, saved telephone messages,
recordings, photos, or drawings and provide them to the City for production. In the event
Consultant believes said records need to be protected from disclosure, it may, at
Consultant’s own expense, seek judicial protection. Consultant shall indemnify, defend,
and hold harmless the City for all costs, including attorneys’ fees, attendant to any claim
or litigation related to a Public Records Act request for which Consultant has responsive
records and for which Consultant has withheld records or information contained therein,
or not provided them to the City in a timely manner. Consultant shall produce for
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 4 OF 13
distribution any and all records responsive to the Public Records Act request in a timely
manner, unless those records are protected by court order. The provisions of this section
shall survive the expiration or termination of this Agreement.
9. Independent Contractor Relationship:
A. The Consultant is retained by the City only for the purposes and to the extent set forth
in this Agreement. The nature of the relationship between the Consultant and the City
during the period of the Work shall be that of an independent contractor, not
employee. The Consultant, not the City, shall have the power to control and direct the
details, manner or means of Work. Specifically, but not by means of limitation, the
Consultant shall have no obligation to work any particular hours or particular
schedule, unless otherwise indicated in the Scope of Work or where scheduling of
attendance or performance is mutually arranged due to the nature of the Work.
Consultant shall retain the right to designate the means of performing the Work
covered by this agreement, and the Consultant shall be entitled to employ other
workers at such compensation and such other conditions as it may deem proper,
provided, however, that any contract so made by the Consultant is to be paid by it
alone, and that employing such workers, it is acting individually and not as an agent
for the City.
B. The City shall not be responsible for withholding or otherwise deducting federal
income tax or Social Security or contributing to the State Industrial Insurance
Program, or otherwise assuming the duties of an employer with respect to Consultant
or any employee of the Consultant.
C. If the Consultant is a sole proprietorship or if this Agreement is with an individual, the
Consultant agrees to notify the City and complete any required form if the Consultant
retired under a State of Washington retirement system and agrees to indemnify any
losses the City may sustain through the Consultant’s failure to do so.
10. Hold Harmless: The Consultant agrees to release, indemnify, defend, and hold harmless
the City, elected officials, employees, officers, representatives, and volunteers from any
and all claims, demands, actions, suits, causes of action, arbitrations, mediations,
proceedings, judgments, awards, injuries, damages, liabilities, taxes, losses, fines, fees,
penalties, expenses, attorney’s or attorneys’ fees, costs, and/or litigation expenses to or
by any and all persons or entities, arising from, resulting from, or related to the negligent
acts, errors or omissions of the Consultant in its performance of this Agreement or a
breach of this Agreement by Consultant, except for that portion of the claims caused by
the City’s sole negligence.
Should a court of competent jurisdiction determine that this agreement is subject to RCW
4.24.115, (Validity of agreement to indemnify against liability for negligence relative to
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 5 OF 13
construction, alteration, improvement, etc., of structure or improvement attached to real
estate…) then, in the event of liability for damages arising out of bodily injury to persons
or damages to property caused by or resulting from the concurrent negligence of the
Consultant and the City, its officers, officials, employees and volunteers, Consultant’s
liability shall be only to the extent of Consultant’s negligence.
It is further specifically and expressly understood that the indemnification provided in
this Agreement constitute Consultant’s waiver of immunity under the Industrial
Insurance Act, RCW Title 51, solely for the purposes of this indemnification. The Parties
have mutually negotiated and agreed to this waiver. The provisions of this section shall
survive the expiration or termination of this Agreement.
11. Gifts and Conflicts: The City’s Code of Ethics and Washington State law prohibit City
employees from soliciting, accepting, or receiving any gift, gratuity or favor from any
person, firm or corporation involved in a contract or transaction. To ensure compliance
with the City’s Code of Ethics and state law, the Consultant shall not give a gift of any kind
to City employees or officials. Consultant also confirms that Consultant does not have a
business interest or a close family relationship with any City officer or employee who was,
is, or will be involved in selecting the Consultant, negotiating or administering this
Agreement, or evaluating the Consultant’s performance of the Work.
12. City of Renton Business License: Unless exempted by the Renton Municipal Code,
Consultant shall obtain a City of Renton Business License prior to performing any Work
and maintain the business license in good standing throughout the term of this
agreement with the City.
Information regarding acquiring a city business license can be found at:
https://www.rentonwa.gov/Tax
Information regarding State business licensing requirements can be found at:
https://dor.wa.gov/doing-business/register-my-business
13. Insurance: Consultant shall secure and maintain:
A. Commercial general liability insurance in the minimum amounts of $1,000,000 for
each occurrence/$2,000,000 aggregate for the Term of this Agreement.
B. In the event that Work delivered pursuant to this Agreement either directly or
indirectly involve or require Professional Services, Professional Liability, Errors and
Omissions coverage shall be provided with minimum limits of $1,000,000 per
occurrence. "Professional Services", for the purpose of this section, shall mean any
Work provided by a licensed professional or Work that requires a professional
standard of care.
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 6 OF 13
C. Workers’ compensation coverage, as required by the Industrial Insurance laws of the
State of Washington, shall also be secured.
D. Commercial Automobile Liability for owned, leased, hired or non-owned, leased, hired
or non-owned, with minimum limits of $1,000,000 per occurrence combined single
limit, if there will be any use of Consultant’s vehicles on the City’s Premises by or on
behalf of the City, beyond normal commutes.
E. Consultant shall name the City as an Additional Insured on its commercial general
liability policy on a non-contributory primary basis. The City’s insurance policies shall
not be a source for payment of any Consultant liability, nor shall the maintenance of
any insurance required by this Agreement be construed to limit the liability of
Consultant to the coverage provided by such insurance or otherwise limit the City’s
recourse to any remedy available at law or in equity.
F. Subject to the City’s review and acceptance, a certificate of insurance showing the
proper endorsements, shall be delivered to the City before performing the Work.
G. Consultant shall provide the City with written notice of any policy cancellation, within
two (2) business days of their receipt of such notice.
14. Delays: Consultant is not responsible for delays caused by factors beyond the
Consultant’s reasonable control. When such delays beyond the Consultant’s reasonable
control occur, the City agrees the Consultant is not responsible for damages, nor shall the
Consultant be deemed to be in default of the Agreement.
15. Successors and Assigns: Neither the City nor the Consultant shall assign, transfer or
encumber any rights, duties or interests accruing from this Agreement without the
written consent of the other.
16. Notices: Any notice required under this Agreement will be in writing, addressed to the
appropriate party at the address which appears below (as modified in writing from time
to time by such party), and given personally, by registered or certified mail, return receipt
requested, by facsimile or by nationally recognized overnight courier service. Time period
for notices shall be deemed to have commenced upon the date of receipt, EXCEPT
facsimile delivery will be deemed to have commenced on the first business day following
transmission. Email and telephone may be used for purposes of administering the
Agreement, but should not be used to give any formal notice required by the Agreement.
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 7 OF 13
CITY OF RENTON
Sonja Mejlaender
1055 South Grady Way
Renton, WA 98057
Phone: (425) 430-6514
smejlaender@rentonwa.gov
CONSULTANT
Brett Farrington
1705 S 93rd St, Ste F-8
Seattle, WA 98108
Phone: (206) 312-1916
brett@renovaexteriors.com
17. Discrimination Prohibited: Except to the extent permitted by a bona fide occupational
qualification, the Consultant agrees as follows:`
A. Consultant, and Consultant’s agents, employees, representatives, and volunteers
with regard to the Work performed or to be performed under this Agreement, shall
not discriminate on the basis of race, color, sex, religion, nationality, creed, marital
status, sexual orientation or preference, age (except minimum age and retirement
provisions), honorably discharged veteran or military status, or the presence of any
sensory, mental or physical handicap, unless based upon a bona fide occupational
qualification in relationship to hiring and employment, in employment or application
for employment, the administration of the delivery of Work or any other benefits
under this Agreement, or procurement of materials or supplies.
B. The Consultant will take affirmative action to insure that applicants are employed and
that employees are treated during employment without regard to their race, creed,
color, national origin, sex, age, sexual orientation, physical, sensory or mental
handicaps, or marital status. Such action shall include, but not be limited to the
following employment, upgrading, demotion or transfer, recruitment or recruitment
advertising, layoff or termination, rates of pay or other forms of compensation and
selection for training.
C. If the Consultant fails to comply with any of this Agreement’s non-discrimination
provisions, the City shall have the right, at its option, to cancel the Agreement in
whole or in part.
D. The Consultant is responsible to be aware of and in compliance with all federal, state
and local laws and regulations that may affect the satisfactory completion of the
project, which includes but is not limited to fair labor laws, worker's compensation,
and Title VI of the Federal Civil Rights Act of 1964, and will comply with City of Renton
Council Resolution Number 4085.
18. Miscellaneous: The parties hereby acknowledge:
A. The City is not responsible to train or provide training for Consultant.
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 8 OF 13
B. Consultant will not be reimbursed for job related expenses except to the extent
specifically agreed within the attached exhibits.
C. Consultant shall furnish all tools and/or materials necessary to perform the Work
except to the extent specifically agreed within the attached exhibits.
D. In the event special training, licensing, or certification is required for Consultant to
provide Work he/she will acquire or maintain such at his/her own expense and, if
Consultant employs, sub-contracts, or otherwise assigns the responsibility to perform
the Work, said employee/sub-contractor/assignee will acquire and or maintain such
training, licensing, or certification.
E. This is a non-exclusive agreement and Consultant is free to provide his/her Work to
other entities, so long as there is no interruption or interference with the provision of
Work called for in this Agreement.
F. Consultant is responsible for his/her own insurance, including, but not limited to
health insurance.
G. Consultant is responsible for his/her own Worker’s Compensation coverage as well as
that for any persons employed by the Consultant.
19. Other Provisions:
A. Approval Authority. Each individual executing this Agreement on behalf of the City
and Consultant represents and warrants that such individuals are duly authorized to
execute and deliver this Agreement on behalf of the City or Consultant.
B. General Administration and Management. The City’s project manager is Sonja
Mejlaender. In providing Work, Consultant shall coordinate with the City’s contract
manager or his/her designee.
C. Amendment and Modification. This Agreement may be amended only by an
instrument in writing, duly executed by both Parties.
D. Conflicts. In the event of any inconsistencies between Consultant proposals and this
Agreement, the terms of this Agreement shall prevail. Any exhibits/attachments to
this Agreement are incorporated by reference only to the extent of the purpose for
which they are referenced within this Agreement. To the extent a Consultant
prepared exhibit conflicts with the terms in the body of this Agreement or contains
terms that are extraneous to the purpose for which it is referenced, the terms in the
body of this Agreement shall prevail and the extraneous terms shall not be
incorporated herein.
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 9 OF 13
E. Governing Law. This Agreement shall be made in and shall be governed by and
interpreted in accordance with the laws of the State of Washington and the City of
Renton. Consultant and all of the Consultant’s employees shall perform the Work in
accordance with all applicable federal, state, county and city laws, codes and
ordinances.
F. Joint Drafting Effort. This Agreement shall be considered for all purposes as prepared
by the joint efforts of the Parties and shall not be construed against one party or the
other as a result of the preparation, substitution, submission or other event of
negotiation, drafting or execution.
G. Jurisdiction and Venue. Any lawsuit or legal action brought by any party to enforce or
interpret this Agreement or any of its terms or covenants shall be brought in the King
County Superior Court for the State of Washington at the Maleng Regional Justice
Center in Kent, King County, Washington, or its replacement or successor. Consultant
hereby expressly consents to the personal and exclusive jurisdiction and venue of
such court even if Consultant is a foreign corporation not registered with the State of
Washington.
H. Severability. A court of competent jurisdiction’s determination that any provision or
part of this Agreement is illegal or unenforceable shall not cancel or invalidate the
remainder of this Agreement, which shall remain in full force and effect.
I. Sole and Entire Agreement. This Agreement contains the entire agreement of the
Parties and any representations or understandings, whether oral or written, not
incorporated are excluded.
J. Time is of the Essence. Time is of the essence of this Agreement and each and all of
its provisions in which performance is a factor. Adherence to completion dates set
forth in the description of the Work is essential to the Consultant’s performance of
this Agreement.
K. Third-Party Beneficiaries. Nothing in this Agreement is intended to, nor shall be
construed to give any rights or benefits in the Agreement to anyone other than the
Parties, and all duties and responsibilities undertaken pursuant to this Agreement will
be for the sole and exclusive benefit of the Parties and no one else.
L. Binding Effect. The Parties each bind themselves, their partners, successors, assigns,
and legal representatives to the other party to this Agreement, and to the partners,
successors, assigns, and legal representatives of such other party with respect to all
covenants of the Agreement.
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 10 OF 13
M. Waivers. All waivers shall be in writing and signed by the waiving party. Either party’s
failure to enforce any provision of this Agreement shall not be a waiver and shall not
prevent either the City or Consultant from enforcing that provision or any other
provision of this Agreement in the future. Waiver of breach of any provision of this
Agreement shall not be deemed to be a waiver of any prior or subsequent breach
unless it is expressly waived in writing.
N. Counterparts. The Parties may execute this Agreement in any number of
counterparts, each of which shall constitute an original, and all of which will together
constitute this one Agreement.
IN WITNESS WHEREOF, the Parties have voluntarily entered into this Agreement as of the date
last signed by the Parties below.
CITY OF RENTON
By:_____________________________
CONSULTANT
By:____________________________
Armondo Pavone
Mayor
Brett Farrington
Owner
_____________________________
Date
_____________________________
Date
Attest
_____________________________
Jason A. Seth
City Clerk
Approved as to Legal Form
By: __________________________
Shane Moloney
Renton City Attorney
Contract Template Updated 5/21/2021
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
10/25/2023 | 8:40 AM PDT
AGENDA ITEM #5. e)
PAGE 11 OF 13
City of Renton Outdoor Winter Lights & Decor
Exhibit A – Scope of Work & Maintenance
Contractor required to provide and use its own outdoor rated extension cords at all sites and locations.
All connections are to be moisture resistant.
Gene Coulon Memorial Beach Park:
• (45) Interior side of sequoias south & north of Kidd Valley east of paved path, cascade
draped in C9s (warm white) 45 x $618.70 = $27,841.50
• (34) Light Poles (install w/programmable RGB mini lights) from the South end (walkway
ending with bollards near Boat Launch) to the North end roundabout: 34 x $411.86 =
$14,003.24
• Interior and exterior of Ivar’s Water Walk hand railings in high/low “W” drummer boy
design in multi-color on south/west/north sides, and (8) lights poles in programmable
RGB mini lights: total $4,637 for all.
• (19) North & South of Ivar’s/Kidd Valley medium tree wraps along east & west of
walking path (w/programmable RGB mini lights) 19 x $721.88 = $13,715.72
• Light park-art Coulon Walkers (statues) wrapped in mini lights: 3 x $541.28 = $1,623.84
(programmable RGB mini lights)
• (9) North Picnic Shelter area — large tree wraps (w/programmable RGB mini lights) 9 x
$1,010.63 = $9,095.67
• North Picnic Shelter — rooftop ridge lines in blue and green. Roofline rims in warm
white C9s $1,849. Roofline rims in white remain on until end of February 2024.
• Ivar’s at $2529, Kidd Valley at $2,954, Galleria/Pavilion (covered picnic area) at $3,443
and Pilothouse out on the water walk $1,309— rooftops ridge lines in colored lights and
roofline rims in warm white C9s. Roofline rims in white for all four structures remain on
until end of February 2024. Total for all four structures: $10,235
• Saturation of lights at interior of Belvedere, including 2nd level of picnic area: $2,140
• All light installations complete no later than Friday, November 17, 2023
• Sub-Total: $85,140.97 + tax
• Programmable RGBs and/or colored lights on until January 2, 2024; roofline rims in white on
until end of February 2024
• Maintenance and checking lights at Gene Coulon Memorial Beach Park:
Lights checked daily when lights are already turned on (i.e. 4p-9p)
• For lighting install:
Contractor provides schedule in advance and City will have electrical already turned on
• Contractor required to provide own and use outdoor rated extension cords at all sites and
locations. All connections are to be moisture resistant.
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 12 OF 13
Piazza Park:
• Full coverage on large central tree in multi color $2,856.10; lift rental: $1,500
• (7) Large deciduous trees (interior circle of trees) in warm white: 7 x $495 = $3,465
• (21) small deciduous trees (inside landscaping areas of the park) in multi-color (or warm white
pending supply): 21 x $247.50 = $5,197.50
• Sub-Total: $13,018.60 + tax
• Light installations completed no later than Wednesday, November 8, 2023
• Lights on until January 2, 2024
• Maintenance and checking lights at Piazza Park: Lights checked daily when lights are already
turned on (i.e. 4p-9p)
• For lighting install:
Contractor provides schedule in advance and City will have electrical already turned on
• Contractor required to provide own and use outdoor rated extension cords at all sites and
locations. All connections are to be moisture resistant.
EXPANDED DOWNTOWN LIGHTING FOOTPRINT
Light Poles - Clock Tower – City Center Parking Garage – Gateway/Gravel Lot – Erasmus the Dragon
Contractor required to provide own and use outdoor rated extension cords at all sites and locations. All
connections are to be moisture resistant.
City Center Parking Garage
• Parking Garage entrance (awning over entrance), and the east/west awnings in C9s warm white:
Sub-Total $1,680 + tax
• Light installations completed no later than Wednesday, November 8, 2023
• Lights on until end of February 2024
Gateway Park/Gravel Lot
• Gateway Park/Gravel Lot: snowflake projection: Sub-Total $4,770 + tax
• Light installations completed no later than Wednesday, November 8, 2023
• Lights removed early January 2024
Clock Tower
• Rooflines on Clock Tower in C9s warm white: $1,135.50
• (2) 60” lit wreaths on Clock Tower - $912
• Sub-Total $2,047.50 + tax
• Light installations completed no later than Wednesday, November 8, 2023
• Wreaths removed early January 2024, but white lights remain on until end of February 2024
Downtown Renton Light Poles
• (28) Wrapping of light poles in white (power on 24/7) 28 x $235.35 = $6,589.80 + tax
• Light installations completed no later than Wednesday, November 8, 2023
• Lights on until end of February 2024
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
PAGE 13 OF 13
Erasmus the Dragon
• Lights, wreaths, garland $1,080
• Light installations completed no later than Wednesday, November 8, 2023
• Sub-Total: $1,080 + tax
• Power source from privately owned building; CED already has electrical easement because of
dragon
• Lights/décor on through January 2, 2024
• Sub-Total of Parking Garage, Gateway Park/Gravel Lot, Clock Tower, Light Poles, Erasmus the
Dragon: $16,167.30 + tax
Renton Community Center:
• Lighting in all warm white of both front and back entranceways including peaks; lights on until
end of February 2024
• Light installations completed no later than Wednesday, November 8, 2023
• Maintenance and checking lights at RCC:
Lights checked daily when lights are already turned on (power on 24/7)
• For lighting install:
Contractor provides schedule in advance and City will have electrical already turned on
• Sub-Total $1,729 + tax
Daily Light Maintenance
December 1, 2023 – January 2, 2024, 4pm-9pm
Sub-Total: $14,975 + tax
Weekly Light Maintenance
January 3, 2024 through February 29, 2024
Renova Holiday Lighting will provide weekly light maintenance as part of existing contract.
All options include all materials, manpower and equipment required for installation, maintenance,
removal and storage of decorations for 2023 Holiday.
Contract Total:
$85,140.97 (Coulon) + $13,018.60 (Piazza) + $16,167.30 (Downtown) + $1,729 (RCC) + $14,975 (Dec
daily maint) = $131,030.87 + tax ($13,234.18) = $144,265.05
DocuSign Envelope ID: 3AB8ABD3-F31D-4737-BDEB-88130F3E611F
AGENDA ITEM #5. e)
AB - 3458
City Council Regular Meeting - 06 Nov 2023
SUBJECT/TITLE:Approval of 1/10 of 1% Sales Tax Dedicated to Transportation
Improvements
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Public Works Transportation Systems Division
STAFF CONTACT:Jim Seitz, Transportation Director
EXT.:7245
FISCAL IMPACT SUMMARY:
If authorized by the City Council the proposed ordinance will be sent to the Department of Revenue directing
them to start collecting an additional 1/10 of 1% sales for transportation improvements starting April 1, 2024.
Revenue from the additional sales tax is expected to generate approximately $3. 5 million annually for
unfunded transportation improvements.
SUMMARY OF ACTION:
The attached ordinance would authorize the Renton Transportation Benefit District (RTBD) to impose an
additional 1/10 of 1% sales tax within the City of Renton. The ordinance amends the Renton Municipal Code
(RMC) Title V, adding a new section chapter 5.27.035.
In 2022, the State Legislature approved a bill granting the City Council the ability to implement a one tenth of
one percent sales tax via a councilmanic vote. The sales tax is estimated to generate at least $3.5M in revenue
annually. The revenue available to the RTBD is proposed to be used for any purpose allowed by chapter 36.73
RCW with emphasis on meeting the unfunded needs of the City ‘s Street Overlay Program ($1.5M) and
Walkway Program ($2.0M) within the currently adopted Six-Year Transportation Improvement Program. This
level of investment is needed in these two programs to maintain the city streets’ pavement condition rating
and based on the sidewalk assessment undertaken in the last year identifying missing or inadequate sidewalks
throughout the City.
Staff is proposing the following schedule leading up to the passage of a 1/10 of 1% citywide sales tax for
transportation improvements that would go into effective April 1, 2024
Agenda Bill Recommending a one-tenth of One-percent Sales Tax – November 6, 2023
Finance Committee Meeting – November 13, 2023
Public Hearing and first reading – December 4, 2023
Council Approval – December 11, 2023
Once adopted the ordinance imposing the one-tenth of one-percent sales tax would be sent to the
Washington State Department of Revenue, for the sales tax to be collected starting April 1, 2024.
EXHIBITS:
A. Six-Year Transportation Program (TIP)
B. Ordinance
STAFF RECOMMENDATION:
1. Set December 4, 2023 as the public hearing date for consideration of an ordinance adding an addition
1/10 of 1% Sale Tax within the boundaries of the Renton Transportation Benefit District.
AGENDA ITEM #5. f)
2. Adopt an Ordinance Amending Title 5 adding a new section Chapter 5.27.035, Additional Sales and
Use Tax for Renton Transportation Benefit District.
AGENDA ITEM #5. f)
Transportation Improvement Program
2024—2029 | Six-Year Adopted
August 7, 2023
Department of Public Works
Transportation Systems Division
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
Acknowledgements
Mayor
Armondo Pavone
City Council
Valerie O’Halloran, Council President
Ed Prince
James Alberson, Jr.
Ryan McIrvin
Ruth Pérez
Carmen Rivera
Kim-Khánh Văn
Chief Administrative Officer
Ed VanValey
Public Works
Martin Pastucha, Public Works Administrator
Jim Seitz, Transportation Systems Director
Ellen Talbo, Transportation Planning and Programming Manager
Bob Hanson, Transportation Design Manager
Chris Barnes, Transportation Operations Manager
Eric Cutshall, Transportation Maintenance Manager
Heather Gregersen, Program Development Coordinator
2024 – 2029 Transportation Improvement Program
1
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
It is the City's policy to assure full compliance with Title VI of the Civil Rights Act of 1964, the
Civil Rights Restoration Act of 1987, and related statutes and regulations in all programs and
activities. Title VI requires that no person shall, on the grounds of race, color, sex, or national
origin be excluded from the participation in, be denied the benefits of, or be otherwise
subjected to discrimination under any Federal Aid Highway program or other activity for which
the City of Renton receives Federal financial assistance.
Any person who believes they have been aggrieved by an unlawful discriminatory practice under
Title VI has a right to file a formal complaint with the City of Renton. Any such complaint must
be in writing and filed with the City of Renton Human Resources within one hundred, eighty
(180) days following the date of the alleged discriminatory occurrence. Title VI Discrimination
Complaint Forms may be obtained from the City's website (www.rentonwa.gov) or from the
Human Resources office at no cost to the complainant by calling (425) 430-7655.
如果您需要此信息翻譯成中文 請電郵 ada@rentonwa.gov.
Si necesita traducir esta información al español, correo electrónico ada@rentonwa.gov.
Nếu quý vị cần thông tin này chuyển ngữ sang tiếng Việt xin gửi đến hòm thư điện tử
ada@rentonwa.gov.
Title VI Declaration
To Request Translated Materials
2
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
Table of Contents
Section A – Introduction
Purpose of the Transportation Improvement Program 5
Section B – Projects Map and Index Location
Map Index 10
Transportation Improvement Program Map 11
Section C – Development and Prioritization
TIP Development 13
City Business Plan 16
Expenditures and Revenues 17
Summary of Projects and Prioritization 18
Section D – Program/Project Descriptions
Individual Program/Project Pages 25
Section E – Appendix
Abbreviations and Acronyms
Resolution to Adopt Six-Year 2024-2029 TIP
2024 – 2029 Transportation Improvement Program
3
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
Section A
Introduction
2024 – 2029 Transportation Improvement Program
4
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Purpose of the Transportation Improvement Program
This document is Renton’s comprehensive transportation program for the ensuing six calendar years and is
mandated by the Revised Code of Washington and Washington Administrative Code. The Transportation
Improvement Program (TIP) is a multi-year planning tool that updates the future plans for transportation
projects and programs within the City that:
•support the mission and vision of the Renton Business Plan
•include new or enhanced bicycle or pedestrian facilities
or other applicable changes that promote non-motorized transit
•reflect the involvement of the public and the City’s elected officials
This document enables the Mayor and the City Council to review work that has been accomplished as well as
current and future transportation needs. The TIP is a planning document that identifies transportation-
related projects which are, or may become, eligible for federal, state and/or local funding. Local projects
must be included in the TIP in order to be eligible for state and federal grant programs.
TRANSPORTATION
IMPROVEMENT
PROGRAM
COMPREHENSIVE PLAN
Land Use Vision
COMMUNITY PLANS
City Center Community Plan
Benson Hill Community Plan
Sunset Area Community
Investment Strategy
Downtown Civic Core Vision
and Action Plan
Renton Trails and Bicycle
Master Plan
PROGRAM INPUT
Maintenance and
Operations
Walkway and Safety
Bridge and Guardrail
Project Development/
Planning
STATE & REGIONAL
TRANSPORTATION
IMPROVEMENT
PROGRAM
(STIP/RTIP)
Mandated by law
Capital Investment
Program (CIP)
Funded Priorities
Projects in the City to be
built to City standards/
plans By Others
Other Regional Projects in
which the City may wish
to Participate
5
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Changes from previous TIP
NEW TRANSPORTATION FUNDING/ADVANCED FUNDING
Transportation received funding in the State Transportation Budget in 2023 for the Grady Way & Rainier Ave
Intersection Improvements project and worked diligently to advance future funds for the Sunset Trail project
in order to help meet the Region’s annual delivery targets. Details are noted in the specific project sheets.
Current City efforts continue to be focused on delivering existing grant-funded projects through their
completion and preparing for delivering new pavement and sidewalk projects utilizing potential
transportation benefit district funds. The City will need to continue identifying revenues to contribute toward
local match amounts to continue to be competitive in future grant opportunities.
PROJECTS/PROGRAMS ADDED
• South 116th Sidewalk Project (TIP #23-04.1)
• Traffic Calming Program (TIP #23-07.2)
• Maplewood Sidewalk Rehabilitation (TIP #23-10.1)
• Sunset Trail (TIP #23-16.1)
PROJECTS COMPLETED/REMOVED:
• Safer Access to Neighborhood Destinations (SAND) (TIP #22-15)
• Bronson Way Bridge—Seismic Retrofit and Painting (TIP #22-16)
• Duvall Ave NE Roadway Improvements (TIP #22-17)
• Lake Washington Loop Trail Phase 5 (TIP #22-19)
PROJECTS UNDER CONSTRUCTION:
• Park Ave North Extension (TIP #23-17)
• Rainier Ave Corridor Improvements—Phase 4 (TIP #23-18)
Project Title Funding Phase Amount Fiscal Year
Grady Way & Rainier Ave Intersection
Improvements State Planning $ 750,000 2023
TOTAL $ 750,000
6
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
7
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
Section B
Projects Map and Index
2024 – 2029 Transportation Improvement Program
8
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Project Numbering and Map
This section explains the annual TIP number system. All TIP numbers start with the year the TIP document is
adopted then followed by a “-” (dash). The TIP project numbering system starts with programmatic activities
that typically have annual financial allocations. With this in mind, the TIP numbers for these programs
often remain the same for future TIPs and are at the beginning of the list since they are often citywide.
The next grouping of projects in alphabetical order are projects with full or partial funding secured, such as
with federal or state grants or developer contributions, or where the City has a financial commitment to
implementing within the six-year period.
The last group of projects, where the projects start over in alphabetical order, are unfunded local projects.
The final grouping are mostly outside agency-led projects, that have been identified in other long-range
plans for the City.
The following map shows the projects in the 2024 - 2029 Transportation Improvement Program (TIP), listed
by TIP number after the prefix “23-___”. City-wide projects or programs are challenging to display on a map
and are not shown.
9
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
MAP INDEX
Programs are not shown on map.
TIP #23-07.1 Safe Routes to Transit
project locations have been
identified separately due to the
potential of becoming discrete TIP/
CIP projects in the future.
Individual project locations include:
S 43rd St/S Carr Road & Talbot Rd S
S Puget Dr/Royal Hills Dr SE/116th
Main Ave S/S 3rd St
Houser Way/Mill Ave S
NE 12th St; west of Sunset Blvd
NE 12th St; east of Sunset Blvd
Bronson Way N/Park Ave N;
adjacent to Liberty Park
SR900/Oakesdale Ave SW
SE Petrovitsky Dr/118th Ave SE
SE Petrovitsky Dr/122 Pl SE
Map # Project Name
2 SW 43rd St Preservation
3 Oakesdale Ave SW Preservation Project
4.1 South 116th Sidewalk Project
6.1 Oakesdale Ave SW & SW 41st St Intersection Improvements
7.1 Safe Routes to Transit
10.1 Maplewood Sidewalk Rehabilitation
15 Houser Way Bridge Seismic Retrofit and Painting
16 NE Sunset Boulevard (SR 900) Corridor Improvements
16.1 Sunset Trail
17 Park Ave North Extension
18 Rainier Ave Corridor Improvements Phase 4
19 Rainier Ave N Corridor Improvements Phase 5
20 Renton Connector
21 SE 168th St Protected Bike Lanes
22 South 2nd Street Conversion Project
23 South 7th Street Corridor Improvements
24 Williams Ave N Bridge Seismic Retrofit and Painting
25 116th Ave SE Improvements
26 Carr Road improvements
27 Grady Way & Rainier Ave Intersection Improvements
28 Hoquiam Ave NE Non-motorized Improvements
29 Houser Way Non-Motorized Improvements
30 Houser Way North Shared Use Path
31 Lind Ave SW Roadway Widening
33 Logan Ave North Improvements
34 Maple Valley Highway Barriers
35 Monster Road SW/68th Ave S Roadway Improvements
36 N 8th St Direct Access Ramps
37 NE 3rd Street Corridor Improvements
38 NE 4th St Corridor Improvements
39 NE Sunset Blvd Transit and Access Improvements
40 Nile Ave NE Bridge Replacement
41 Renton-Maple Valley Highway & 140th Way SE
42 Renton Bus Rapid Transit (BRT) Improvements
43 South 3rd Street Conversion Project
44 South Grady Way Multi-Modal Improvements
46 Lake to Sound (L2S) Trail
47 South Lake Washington Transit Hub
48 Southport Pedestrian Connection
49 SW 27th Street/Strander Boulevard Connection
50 NE 44th Street/I-405 Park and Ride
51 Eastrail
CED-1 I-405/44th Gateway Signage & Green-scaping Improvements
10
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
11
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
Section C
Development and Prioritization
2024 – 2029 Transportation Improvement Program
12
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
TIP Development
The Transportation Systems Division creates and maintains an interconnected, multimodal network so that
people and goods move safely and efficiently. The six-year Transportation Improvement Program (TIP) is a
short-range planning document that is annually updated based on needs and policies identified in the City of
Renton’s Comprehensive Plan, and other adopted plans such as: the City Center Community Plan, Sunset
Area Community Investment Strategy, Benson Hill Community Plan, Downtown Civic Core Vision & Action
Plan, and the Renton Trails and Bicycle Master Plan.
As the city Business Plan is updated annually and reflects current Council priorities, the annual update of the
TIP helps ensure that Transportation Capital Programming stays aligned with the City’s current goals and
aspirations. Programs and long-term plans are intended for equitable outcomes citywide and to address
historical inequities in the services that the Transportation System Division provides. Out of these efforts
come the discreet projects that are funded or waiting to be funded.
TIP project and financial development activities are intricately intertwined and involve interactions with
multiple groups and agencies at the local, regional, state and federal levels. Within the Transportation
Systems Division, the Planning and Programming Section coordinates project development year-round
with the Transportation Operations, Transportation Maintenance Section, and the Transportation Design
Section.
Within the City of Renton, there are actions and interactions involving other departments and divisions, the
private sector, the City Council and Administration, which strongly influence the direction of the
transportation program. With its heavy dependence on many different and unpredictable sources of
external funding and with the significant impacts created by ongoing local and regional land use decisions,
transportation project development is a continuous activity comprised of a multitude of diverse elements.
This TIP represents Renton’s current list of needed projects and programs for the next six years.
13
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
The TIP process increases
transparency and alignment to
the City’s vision as projects or
programs get added, edited, or
removed with each annual
update. Each program and
project is assigned a category
type for CIP organization:
Operations and Safety (OS),
Maintenance and Preservation
(MP) , Roadway Corridor (RC),
Non-Motorized (NM) and
Other Programs/Planning (OP).
However, some projects or
programs fall into more than
one category and this is
conveyed by the project
aspects, or goals/purposes,
listed on each project
information page.
PROJECT ASPECTS:
Maintenance and Preservation: Projects with this aspect include transportation assets that should be
replaced or rehabilitated at the point of lowest cost in the life-cycle to maximize use of funding sources.
Projects that preserve and maintain an asset will extend the useful life before more extensive and costly
repairs or reconstruction are needed.
Operations and Safety: Projects and programs with this aspect help the safety and efficiency of traffic
operations. Typical project elements include roadway widening, road diets, channelization, signage,
street lighting, traffic signals, transit speed and reliability, and roadside safety.
Non-Motorized: Projects that address improved mobility of any self-propelled, human-powered mode
of transportation improve community quality of life. A safe and vibrant community depends on the
ability to provide safe access to those walking, riding bicycles or other non-motorized vehicles. Projects
typically included in the TIP with this aspect expand the pedestrian and bicycle network throughout the
city where missing or where there is needed improvement.
Plan Implementation and Compliance/Other Programs: This aspect involves efforts needed for
planning, designing, and construction of roadway improvements necessitated by new development,
regulatory compliance and other reasons, such as regional transportation projects, economic
development, Council policy and/or directive(s).
Roadway Corridor: This aspect involves efforts to improve whole segments of the system through a
corridor approach that address safety and adequate flow-through.
14
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Each program/project has a current FUNDING STATUS that identifies if it has funding or if it is a “candidate”
project with no determined funding source at this time.
Plan Category Funding Status Project Status TIP Actions
Fully Funded - CN Under Construction /
Project Closeout
All funds programmed and all grant funds
obligated.
Funded - CN
Design >60% Complete /
Funded for Construction
Getting ready for Construction
Documentation.
All funds programmed and/or will
obligate grant funds when ready, and if
necessary.
Partially Funded - CN
Design In Progress/ <60% Complete .
Environmental process complete.
Getting ready for Final Review plans.
Some funds programmed for Construction
phase, such as grant funding. More
funding needed.
Partially Funded
- PE/ROW
Design In Progress/ >30% Complete.
ROW phase is relevant to project.
Programmed for PE and ROW and/or will
obligate for ROW grant funds when ready
and if necessary.
Construction Phase NOT FUNDED.
Partially Funded - PE
Design In Progress. Project only funded
for Design. Waiting for available revenue
sources for other phases.
Programmed for PE only and other
analysis remains to be done.
Construction Phase NOT FUNDED.
Program Funding Multiple Projects in various phases. Funding is allocated annually.
Candidate Project identified in other Planning
Document(s) as high priority/high need.
No determined funding programmed.
May need further analysis.
Other – Led by Others Projects led by other departments or
agencies but affects overall system.No determined funding programmed.
CONSTRAINED
Unprogrammed
Each program/project is ranked against the others on the
list using select criteria to create an initial priority list. The
prioritization list is developed primarily for rank order in
the Transportation CIP budget documents and then
adjusted for significant changes in the mid-biennium TIP.
Council and the Mayor provide feedback and comments for
final ranking.
•Addresses identified hazard
•Addresses traffic safety concerns
•Preventative actions to reduce injuries
Safety
•Listed in existing city planning documents
•Aligns with existing City Plans
•Supports economic development
Plan
Implementation
•Essential to transportation network operations
•Improves/maintains Infrastructure or System
•Fills gap in facilities or network
System Integrity
•Grant commitment/delivery needs
•Prevent loss of funds
•Reduces risk or liability
Financial
•Identified as priority by elected official
•Regulator directed/court order
•High rank in previous TIP
Directives
•Addresses environmental impacts
•Addresses development impactsMitigative
High
Medium
Low
15
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
INSERT BUSINESS PLAN
16
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Expenditures and Revenues
The City relies heavily on grant funding to leverage the amount of local funding to implement the larger
capital projects. Since projects need to be included in the TIP to be eligible for grants, the projects and
programs included in the TIP are projects the City would like to implement in the six-year timeframe if
funding were available. The document also identifies secured or reasonably expected revenues for each of
the projects included in the TIP to aid in future budget discussions.
The City is proposing the adoption of a citywide Transportation Benefit District (TBD) that is anticipated to
generate approximately $3,500,000 in revenue annually. The TBD revenues can enhance investment in
various transportation projects and programs including those outlined in the TIP, Trails and Bicycle Master
Plan, and the ADA Transition Plan.
This document is one step in developing the fiscally-constrained Transportation CIP as part of the City’s
17
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Summary of Projects and Prioritization
The prioritization of the TIP is influenced by the interconnection and/or interdependence among TIP
projects, projects by other City departments, projects by other jurisdictions, as well as the timing of those
other projects. The significance of the prioritization process of the TIP in preparation for budget discussions
is that the projects and programs are in a ranked order and provide one way to look at the program as a
whole. The projects/programs that do not have secured funding would not appear in budget documents.
The ratings across the scoring criteria are qualitative because the intent is to create an initial prioritized list
of all the projects and programs listed in the TIP. This prioritization does not directly affect how much
funding specific projects or programs receive. Ultimately, this is dependent on how much funding is
available and final funding decisions are made by the elected policy makers. The TIP is a resource that can
be used to help make policy and budget decisions.
Summary of Projects/Programs by
Neighborhood Planning Area
18
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Prioritization Summary
19
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Prioritization Summary
High
Medium
Low
•Addresses identified hazard
•Addresses traffic safety concerns
•Preventative actions to reduce injuries
Safety
•Listed in existing city planning documents
•Aligns with existing City Plans
•Supports economic development
Plan
Implementation
•Essential to transportation network operations
•Improves/maintains Infrastructure or System
•Fills gap in facilities or network
System Integrity
•Grant commitment/delivery needs
•Prevent loss of funds
•Reduces risk or liability
Financial
•Identified as priority by elected official
•Regulator directed/court order
•High rank in previous TIP
Directives
•Addresses environmental impacts
•Addresses development impactsMitigative
20
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
21
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
Section E
Program/Project Details
2024 – 2029 Transportation Improvement Program
22
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
2024-2029
TIP# Name Planning Area
23-01 Street Overlay Citywide
23-02 SW 43rd St Preservation Valley
23-03 Oakesdale Ave SW Preservation Project Valley
23-04 Walkway Program Citywide
23-04.1 South 116th Sidewalk Project Benson
23-05 Roadway Safety and Guardrail Program Citywide
23-06 Intersection Safety & Mobility Program Citywide
23-06.1 Oakesdale Ave SW & SW 41st St Intersection Improvements Valley
23-07 Traffic Safety Program Citywide
23-07.1 Safe Routes to Transit Various
23-07.2 Traffic Calming Program Citywide
23-08 Traffic Signal Preservation Program Citywide
23-09 Intelligent Transportation Systems (ITS) Program Citywide
23-10 Sidewalk Rehabilitation and Replacement Program Citywide
23-10.1 Maplewood Sidewalk Rehabilitation Cedar River
23-11 Bridge Inspection & Repair Program Citywide
23-12 Barrier-Free Transition Plan Implementation Citywide
23-13 Project Development & Pre-Design Program Citywide
23-14 Arterial Circulation Program Citywide
23-15 Houser Way Bridge Seismic Retrofit and Painting City Center
23-16 NE Sunset Boulevard (SR 900) Corridor Improvements Highlands
23-16.1 Sunset Trail Highlands
23-17 Park Ave North Extension City Center
23-18 Rainier Ave Corridor Improvements Phase 4 City Center
23-19 Rainier Ave N Corridor Improvements Phase 5 City Center
23-20 Renton Connector City Center
23-21 SE 168th St Protected Bike Lanes Benson
23-22 South 2nd Street Conversion Project City Center
23-23 South 7th Street Corridor Improvements City Center
23-24 Williams Ave Bridge Seismic Retrofit and Painting City Center
23-25 116th Ave SE Improvements Benson
23-26 Carr Road improvements Talbot, Benson
23-27 Grady Way & Rainier Ave Intersection Improvements City Center
23-28 Hoquiam Ave NE Non-Motorized Improvements East Plateau
23-29 Houser Way Non-Motorized Improvements City Center
23-30 Houser Way North Shared Use Path City Center
23
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
2024-2029
TIP# Name Planning Area
23-31 Lind Ave SW Roadway Widening Valley
23-32 Local Road Safety Plan Implementation Citywide
23-33 Logan Ave North Improvements City Center
23-34 Maple Valley Highway Barriers Cedar River
23-35 Monster Road SW/68th Ave S Roadway Improvements Valley
23-36 N 8th St Direct Access Ramps City Center
23-37 NE 3rd Street Corridor Improvements Highlands, East Plateau
23-38 NE 4th St Corridor Improvements Highlands, East Plateau
23-39 NE Sunset Blvd Transit and Access Improvements Highlands
23-40 Nile Ave NE Bridge Replacement East Plateau
23-41 Renton-Maple Valley Highway & 140th Way SE Cedar River
23-42 Renton Bus Rapid Transit (BRT) Improvements City Center
23-43 South 3rd Street Conversion Project City Center
23-44 South Grady Way Multi-Modal Improvements City Center
23-45 Transit Master Plan Citywide
23-46 Lake to Sound (L2S) Trail City Center
23-47 South Lake Washington Transit Hub City Center
23-48 Southport Pedestrian Connection City Center
23-49 SW 27th Street/Strander Boulevard Connection Valley
23-50 NE 44th Street/I-405 Park and Ride Kennydale
23-51 Eastrail City Center
CED-1 I-405/44th Gateway Signage & Green-scaping Improvements Kennydale
24
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:11
Project Account #:122108
Planning Area:Citywide
Street Classification:varies
Project Length:various
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits 424,241 88,241 - 336,000 56,000 56,000 56,000 56,000 56,000 56,000
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 10,345,376 1,222,307 459,069 8,664,000 1,444,000 1,444,000 1,444,000 1,444,000 1,444,000 1,444,000
Construction Services - - - - - - - - - -
Total Expenses 10,769,617 1,310,548 459,069 9,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 1,769,617 1,310,548 459,069 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
*Trans Benefit District (TBD)9,000,000 - - 9,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
Total Resources 10,769,617 1,310,548 459,069 9,000,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000 1,500,000
This program funds resurfacing and other pavement preservation treatments for city streets and alleyways. Installation of ADA-
compliant curb ramps is incorporated into the overlay program in accordance to federal requirements.
Street Overlay TIP #: 23-01
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
To extend the useful life of the pavement surface and reduce the need for roadway reconstruction.
The City's average Pavement Condition Index (PCI) is currently rated at 73. City staff has developed a 10 year pavement preservation
plan to keep the citywide average PCI at or above 70 and forecasts the annual funding need will be at least $2,100,000. This program
has the potential to be funded through Transportation Benefit District (TBD) financing. We anticipate TBD would generate
$3,500,000/year and $1,500,000 would be applied to this program starting in 2024. The annual Street Overlay contract will require
annual investment of $1,500,000 to keep the roads in good working condition. The remaining $600,000 of funding need is work
performed by city maintenance crews as part of their annual maintenance preservation work.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,769,617
25
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:12
Project Account #:122999
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:1.14 mi
Funding Status:Partially Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 508,314 80,463 427,851 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 4,719,700 - - 4,719,700 4,719,700 - - - - -
Construction Services 700,000 - - 700,000 700,000 - - - - -
Total Expenses 5,928,014 80,463 427,851 5,419,700 5,419,700 - - - - -
Source of Fund:
REET 1/2 2,250,000 427,851 1,822,149 1,822,149 - - - - -
B&O Tax 1,263,314 80,463 - 1,182,851 1,182,851 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,414,700 - - 2,414,700 2,414,700
Total Resources 5,928,014 80,463 427,851 5,419,700 5,419,700 - - - - -
SW 43rd St Preservation,
west City limits to SR 167 ramps TIP #: 23-02
To extend the useful life of SW 43rd St and improve public safety.
The project had been federally funded, but the federal funds were swapped out with local funds and reallocated to another city project
in order to assist the Region with meeting its annual delivery target. As a result, the City agreed to complete construction of the project
with local funds. Design will be complete in 2023. Construction is set to begin in Spring 2024.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will resurface the roadway from the western city limits to the SR 167 Ramps, except where there are existing concrete
panels. This project will also upgrade all intersection ramps to current ADA standards as well as install and replace all delineation to City
of Renton standards. Also included in this project are storm drainage improvements and the adjustment or evaluation for replacement
of existing features affected by resurfacing such as monuments, catch basins, or drainage grates.
3,513,314 2,414,700
26
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:13
Project Account #:122104
Planning Area:Valley
Street Classification:Minor Arterial
Project Length:1.14 mi
Funding Status:Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 400,000 - 400,000 - - - - - - -
R-O-W (includes Admin)50,000 - - 50,000 50,000 - - - - -
Construction 2,008,110 - - 2,008,110 - 2,008,110 - - - -
Construction Services - - - - - - - - - -
Total Expenses 2,458,110 - 400,000 2,058,110 50,000 2,008,110 - - - -
Source of Fund:
REET 1/2 1,158,110 400,000 758,110 50,000 708,110 - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,300,000 - - 1,300,000 - 1,300,000 - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - -
Total Resources 2,458,110 - 400,000 2,058,110 50,000 2,008,110 - - - -
Oakesdale Ave SW Preservation Project,
SW 34th St to SW 16th St TIP #: 23-03
The current conditions of the pavement and the amount of heavy traffic on this roadway warrants the need for preventative
maintenance. This project is on a major truck route on a key transit corridor. Resurfacing this roadway will improve the overall condition
of the pavement and the project will extend the pavement life.
This project received a federal Surface Transportation Block Grant (STBG) for construction in 2022 in the amount of $1,300,000. Design
began in 2023. Construction funding will be available FY 2025.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will resurface the roadway along Oakesdale Ave SW from SW 34th St northward to SW 16th St. This project will install signed
and marked bike lanes, update channelization, adjust or upgrade intersection ramps and corners to current ADA standards, adjust or
evaluate the replacement of existing features affected by resurfacing such as monuments, catch basins, or drainage grates. The existing
shoulders north of SW 27th St serve as unofficial bike lanes as noted in the Trails and Bicycle Master Plan.
2,458,110 -
*Picture: Current Intersection of Oakesdale Ave SW and SW 27th St.
27
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:34
Project Account #:120009
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 12,317,096 - 317,096 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Construction Services - - - - - - - - - -
Total Expenses 12,317,096 - 317,096 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 317,096 - 317,096 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
*Trans Benefit District (TBD)12,000,000 - - 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Total Resources 12,317,096 - 317,096 12,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000 2,000,000
Walkway Program TIP #: 23-04
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides for the design and construction of non-motorized transportation facilities for pedestrians as well as to provide City
match funding for larger federal and state funded projects. This fund can also be used as City/local match for grant applications.
To provide safe and convenient non-motorized facilities to complete the city-wide transportation network. Specific improvements will
respond to the needs of school children, the elderly and persons with disabilities, and support increased use of transit.
Staff is in the process of identifying where walkways do not exist citywide. Once identified, funding will be used to replace or install the
missing sidewalks based on a prioritized schedule. This program has the potential to be funded through Transportation Benefit District
(TBD) financing. We anticipate TBD would generate $3,500,000/year and $2,000,000 would be applied to the annual Walkway Program
in future years. There is current funding programmed for improvements along South 116th St that is shown in its own TIP sheet (TIP #23-
04.1).
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
317,096
*Picture: Example of missing sidewalk in Benson neighborhood.
28
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:6
Project Account #:122804
Planning Area:Benson
Street Classification:Minor Arterial
Project Length:0.16 mi
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,000,000 - 500,000 500,000 500,000 - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,000,000 - 500,000 500,000 500,000 - - - - -
Source of Fund:
REET 1/2 1,000,000 - 500,000 500,000 500,000 - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 1,000,000 - 500,000 500,000 500,000 - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will install sidewalk, curb and gutter, drainage and possible planter strip along S 116th St from SE 162nd St to SE 160th St.
To provide safe and convenient non-motorized facilities to complete the city-wide transportation network.
New project.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,000,000 -
*Picture: Existing conditions along 116th Ave SE.
South 116th Sidewalk Project TIP #: 23-04.1
29
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:18
Project Account #:120110
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation; Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 335,000 - 35,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Construction Services - - - - - - - - - -
Total Expenses 335,000 - 35,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 35,000 - 35,000 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 300,000 - - 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Total Resources 335,000 - 35,000 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Before After
Roadway Safety and Guardrail Program TIP #: 23-05
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program will provide guardrail improvements annually and will improve the safety of the roadside environment.
To implement roadside safety improvements including barrier systems and hazardous object removal.
This program will develop a policy and standardized criteria for barriers and selection of projects.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
35,000 300,000
30
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:19
Project Account #:122601
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 66,096 26,734 39,362 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 940,001 257,271 182,730 500,000 - 100,000 100,000 100,000 100,000 100,000
Construction Services - - - - - - - - - -
Total Expenses 1,006,097 284,005 222,092 500,000 - 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 406,097 284,005 122,092 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation 600,000 - 100,000 500,000 - 100,000 100,000 100,000 100,000 100,000
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 1,006,097 284,005 222,092 500,000 - 100,000 100,000 100,000 100,000 100,000
Intersection Safety & Mobility Program TIP #: 23-06
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program will install new traffic signals, central signal system upgrades or make improvements to existing signals to improve traffic
signal operations. Historically, one traffic signal is designed and constructed every 2-3 years to meet safety and mobility needs.
To meet safety and mobility needs, new traffic signals are needed to meet increasing demand for signalized traffic control. Elements
used to prioritize project intersections may include vehicular approach volumes, accident analysis, signal-warrant analysis, and
pedestrian volume.
Preliminary engineering for intersection improvements at Oakesdale Ave SW and SW 41st St (TIP #23-06.1) were complete in 2021. The
project remains on hold until all funding for construction and sufficient staff resources have been identified. A portion of 2023
expenditures are shown in the Oakesdale Ave SW and SW 41st St TIP sheet.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,006,097 -
31
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:20
Project Account #:
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,195,565 - 650,000 545,565 545,565 - - - - -
Construction Services 239,113 - - 239,113 239,113 - - - - -
Total Expenses 1,434,678 - 650,000 784,678 784,678 - - - - -
Source of Fund:
REET 1/2 - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation 650,000 - 650,000 - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 784,678 - - 784,678 784,678
Total Resources 1,434,678 - 650,000 784,678 784,678 - - - - -
Oakesdale Ave SW & SW 41st St Intersection
Improvements TIP #: 23-06.1
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project would install a new traffic signal with marked crosswalks at the intersection of Oakesdale Ave SW and SW 41st St.
To improve access and safety to meet safety and mobility needs. The project will help meet increasing demand and reduce the potential
for crashes, making the corridor more attractive to users of the adjacent Springbrook Creek Trail and for motorists/freight vehicles
travelling through to the major retailers and businesses along this corridor and within the vicinity.
This project was designed within the Intersection Safety and Mobility Program. Design is complete however Staff is currently evaluating
whether culvert replacement is needed at the intersection. Project is currently on hold until the full construction funding can be
identified. *Funding shown in 2023 will be programmed in a subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
650,000 784,678
32
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:9
Project Account #:122115
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Other 30,024 30,024 - - - - - - - -
Professional Services 109,211 97,211 12,000 - - - - - - -
Preliminary Engineering 31,681 31,681 - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,669,496 16,559 102,937 1,550,000 50,000 300,000 300,000 300,000 300,000 300,000
Construction Services - - - - - - - - - -
Total Expenses 1,840,412 175,476 114,937 1,550,000 50,000 300,000 300,000 300,000 300,000 300,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 340,412 175,476 114,937 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,500,000 - - 1,500,000 - 300,000 300,000 300,000 300,000 300,000
Total Resources 1,840,412 175,476 114,937 1,550,000 50,000 300,000 300,000 300,000 300,000 300,000
*Picture: Benson Rd S/S 29th St where crossing improvements, including installation of a Rectangular Rapid Flashing Beacon (RRFB), have been completed.
Traffic Safety Program TIP #: 23-07
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program funds small-scale traffic safety improvements that require materials, labor, or equipment. These types of improvements
include, but are not limited to, converting school zone signs to electronic operation, installation of pedestrian safety traffic signals, radar
speed signs, and physical devices for traffic calming. This program has become increasingly important after the city's adoption of a Local
Road Safety Plan that helped prioritize safety related projects throughout the city.
To address traffic safety concerns, increase pedestrian/bicycle safety, and help encourage responsible driving through engineering.
Ongoing based on requests received by the public and city staff for evaluation and analysis. Funds can be supplied from this program to
construct the projects developed from the year, 2020, Safe Routes to Transit project (TIP #23-07.1) in association with the Renton-Kent-
Auburn Area Mobility Plan for the design and purchase of materials for pedestrian safety improvements. The City is constructing speed
cushions along Lake Washington Blvd (TIP #23-07.2) to address speeding concerns and will fund the completion of design work for a
HAWK signal at the intersection of Duvall Ave NE and NE 6th Street.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
340,412 1,500,000
33
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:17
Project Account #:123009
Planning Area:various
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 1,515,076 1,515,076 - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,942,924 818 452,106 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Construction Services - - - - - - - - - -
Total Expenses 3,458,000 1,515,894 452,106 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Source of Fund:
REET 1/2 468,000 41,930 426,070 - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (KC Metro)1,500,000 1,473,964 26,036 - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,490,000 - - 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Total Resources 3,458,000 1,515,894 452,106 1,490,000 250,000 250,000 220,000 345,000 425,000 -
Safe Routes to Transit TIP #: 23-07.1
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Capital projects that improve safety, convenience and accessibility for people walking, bicycling and using assistive mobility devices
(such as wheelchairs or walkers) to connect to transit services and facilities. King County Metro agreed to compensate the City for design
and acquire materials ($1,500,000) for agreed upon locations in Fall 2020. Construction is estimated to extend through 2028.
To improve safety, convenience and accessibility for people walking, bicycling and using assistive mobility devices (such as wheelchairs
or walkers) to connect to transit services and facilities.
All 18 projects have pre-100% or completed design plans. Three projects were completed by city Transportation Sign Maintenance crews
including a cycle track and two intersection lane configurations using low-cost delination devices, signing and pavement marking. One
project is currently under construction by an outside contractor for three pedestrian crossings with pedestrian signalization, flashing
beacons and wheelchair ramps along NE Sunset Blvd. Available funds within the Traffic Safety Program can be transferred to this
program to help fund the construction of the remaining projects, as needs arise. Where possible, the remaining projects can be funded
and constructed within the limits of other transportation projects being constructed, i.e. E. Valley Rd./S. 180th St. Pedestrian
Crossing/Ramp improvements as part of the city overlay project. Future funding allocated to this program will be utilized to fund
remaining projects.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,968,000 1,490,000
*Picture: Improvements made at 128th Ave SE and SE 168th St.
34
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:36
Project Account #:123010
Planning Area:Citywide
Street Classification:Local or Collector
Project Length:Varies
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - -
Preliminary Engineering 409,000 - - 409,000 50,000 45,000 45,000 154,000 45,000 70,000
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,057,650 - 196,650 861,000 183,000 82,000 83,000 278,000 109,000 126,000
Construction Services 176,350 - 53,350 123,000 26,000 12,000 12,000 39,000 16,000 18,000
Total Expenses 1,643,000 - 250,000 1,393,000 259,000 139,000 140,000 471,000 170,000 214,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 250,000 - 250,000 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,393,000 - - 1,393,000 259,000 139,000 140,000 471,000 170,000 214,000
Total Resources 1,643,000 - 250,000 1,393,000 259,000 139,000 140,000 471,000 170,000 214,000
Traffic Calming Program TIP #: 23-07.2
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
The City developed a traffic calming program that specifically targets speeding in or around residential areas by utilizing tier 1 traffic
calming devices, and then utilizing tier 2 traffic calming devices, only after exhausting tier 1 traffic calming devices. Tier 1 traffic calming
devices would include signing, plastic curbing, pavement markings, or other treatments that passively reduce speeding. Tier 2 traffic
calming devices would include raised crosswalks, speed cushions, mini-roundabouts or other treatments that actively reduce speeding.
The City is on track to complete the first speed cushion installation on Lake Washington Blvd N in summer 2023, and has preliminary
engineering designs for six other locations that will be completed as funding becomes available. The City will also consider other suitable
traffic calming treatments to reduce speeds at these locations if speed cushions are less feasible. List of locations can be found in the
City's 2022-2023 Traffic Calming Locations: Technical Analysis Summary report.
Reduce speeding in or around residential areas on streets classified as local or collector with 25 mph or less.
New program. *Funding shown in 2023 will be programmed in a subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
250,000 1,393,000
35
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:21
Project Account #:122904
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Other 77,981 77,981 - - - - - - - -
Professional Services - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 707,147 25,115 182,032 500,000 - 100,000 100,000 100,000 100,000 100,000
Construction Services - - - - - - - - - -
Total Expenses 785,128 103,096 182,032 500,000 - 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 285,128 103,096 182,032 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - 100,000 100,000 100,000 100,000 100,000
Total Resources 785,128 103,096 182,032 500,000 - 100,000 100,000 100,000 100,000 100,000
Traffic Signal Preservation Program TIP #: 23-08
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
The City of Renton owns and operates 135 traffic signals. This program replaces obsolete and failed video detection cameras, signal
heads, signal cabinets, UPS batteries and LED indications as needed based on the findings from the following annual preventative
maintenance programs: Signal cabinet replacement program, signal head replacement program and the LED change out program.
To maintain the City's traffic signals operating as efficiently as possible and to maintain the retroflectivity of all the traffic signs.
Most of Renton's traffic signals and UPS systems require extensive maintenance and preventative maintenance programs to keep traffic
signals operating as efficiently as possible and to prevent them from going into red flash failure mode. Pavement deterioration has
increased the number of failed loops throughout the City and as loops fail they are replaced with video detection cameras and associated
equipment, greatly increasing public safety. Funding will be used for the replacement of up to 60 traffic signal UPS batteries, 4 signal
cabinets, 4 intersection signal head change outs, and 32 intersection LED change outs.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
285,128 500,000
36
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:35
Project Account #:122162
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Planning 30,000 - 30,000 - - - - - - -
Professional Services - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 555,493 - 133,493 422,000 47,000 75,000 75,000 75,000 75,000 75,000
Construction Services - - - - - - - - - -
Total Expenses 585,493 - 163,493 422,000 47,000 75,000 75,000 75,000 75,000 75,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 210,493 - 163,493 47,000 47,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 375,000 - - 375,000 - 75,000 75,000 75,000 75,000 75,000
Total Resources 585,493 - 163,493 422,000 47,000 75,000 75,000 75,000 75,000 75,000
Intelligent Transportation Systems (ITS) Program TIP #: 23-09
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Intelligent Transportation Systems (ITS) includes physical tools and technologies/software such as signal controller upgrades, fiber optic
communication, supporting communication equipment, security of the transportation network, cameras for monitoring traffic
congestion and effects of signal timing, a data management system and traffic adaptive systems, dynamic message signs and transit
signal priority.
To maximize the operations and efficiency of the roadway system without adding additional capacity.
Current funding will cover the cost to conduct an ITS Master Plan and to cover the cost to pay WSDOT for placement of city conduit
within and across the I-405 and 44th Street Interchange. Future years funding will be used for high priority projects identified in the ITS
Master Plan. The Plan will help staff prioritize future shadow conduit opportunities with franchise utilities as well as other needs, such as
ITS security software programs and hardware equipment for the Transportation fiber optic networks.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
210,493 375,000
37
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:22
Project Account #:122801
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 600,000 630 99,370 500,000 - 100,000 100,000 100,000 100,000 100,000
Construction Services - - - - - - - - - -
Total Expenses 600,000 630 99,370 500,000 - 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 100,000 630 99,370 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - 100,000 100,000 100,000 100,000 100,000
Total Resources 600,000 630 99,370 500,000 - 100,000 100,000 100,000 100,000 100,000
Sidewalk Rehabilitation and Replacement Program TIP #: 23-10
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides for the replacement of existing curb and gutter, sidewalks, and curb ramps where such facilities have deteriorated
or have been damaged.
To address existing sidewalk deficiencies and provide safer facilities for pedestrians on neighborhood streets.
The City completed a condition survey of the existing sidewalks in 2021. Staff are currently validating the data and will begin work on
prioritizing sidewalk locations for repairs and maintenance. The money programmed in 2023 is for improvements along Cedar Ave S and
the money programmed in 2024 is shown in it's own TIP sheet (TIP #23-10.1) and will be used to complete improvements in the
Maplewood Glen neighborhood subdivision.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
100,000 500,000
38
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:29
Project Account #:122803
Planning Area:Cedar River
Street Classification:varies
Project Length:varies
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,000,000 - - 1,000,000 1,000,000 - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,000,000 - - 1,000,000 1,000,000 - - - - -
Source of Fund:
REET 1/2 1,000,000 - - 1,000,000 1,000,000 - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 1,000,000 - - 1,000,000 1,000,000 - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will remove and replace curb and sidewalks in the Maplewood Glen neighborhood.
To address existing sidewalk deficiencies and provide safer facilities for pedestrians on neighborhood streets. Also provides for
pavement/roadway overlay.
New project.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,000,000 -
Maplewood Sidewalk Rehabilitation TIP #: 23-10.1
39
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:3
Project Account #:120106
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Maintenance and Preservation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits 25,000 10,509 14,491 - - - - - - -
Professional Services 145,496 58,090 87,406 - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services 510,133 5,873 204,260 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Total Expenses 680,630 74,472 306,157 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 430,630 74,472 306,157 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 250,000 - - 250,000 - 50,000 50,000 50,000 50,000 50,000
Total Resources 680,630 74,472 306,157 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Bridge Inspection & Repair Program TIP #: 23-11
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Per 23 CFR 650 Subpart C, the City is required to perform condition inspections on all City owned bridge structures, located in the
public right-of-way, open for public use and spanning 20-ft or more. There are presently 27 bridge structures included in the program.
They are inspected every two years to monitor the condition of bridge elements and identify deficiencies in need of repair. Updates to
bridge load ratings and scour evaluations are periodically performed based upon the condition of the bridge structures and/or new
directives from.
The goals of the program are to keep the bridges open and safe for public use, preserve bridge infrastructure by maximizing the useful
life through active maintenance, retrofitting and rehabilitation, and replace bridges with reliable new structures when repair or
rehabilitation is not feasible.
Funds shown under construction are for minor repairs to bridge structures.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
430,630 250,000
40
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:15
Project Account #:122705
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Operations and Safety, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,396,921 96,921 50,000 1,250,000 50,000 240,000 240,000 240,000 240,000 240,000
Construction Services - - - - - - - - - -
Total Expenses 1,396,921 96,921 50,000 1,250,000 50,000 240,000 240,000 240,000 240,000 240,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 196,921 96,921 50,000 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,200,000 - - 1,200,000 - 240,000 240,000 240,000 240,000 240,000
Total Resources 1,396,921 96,921 50,000 1,250,000 50,000 240,000 240,000 240,000 240,000 240,000
Barrier-Free Transition Plan Implementation TIP #: 23-12
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides funding for designing and building features in response to individual requests to improve access for pedestrians
and evaluates per the current ADA Transition Plan.
To support the City's effort to transition pedestrian facilities within the right-of-way into conformity with provisions contained in the
Americans with Disabilities Act (ADA) Guidelines. An updated ADA Transition Plan was adopted on December 13, 2021. A
programmatic approach is required to ensure compliance with federal law.
An update to the ADA Transition Plan was complete in 2021. The plan recommended additional investment of $240,000/year over
historical funding allocation (over 50 years) to support plan implementation for pedestrian barrier removal.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
196,921 1,200,000
41
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:26
Project Account #:122150
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 471,688 61,419 110,269 300,000 50,000 50,000 50,000 50,000 50,000 50,000
Preliminary Engineering 250,709 709 - 250,000 - 50,000 50,000 50,000 50,000 50,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 722,397 62,128 110,269 550,000 50,000 100,000 100,000 100,000 100,000 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 222,397 62,128 110,269 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - 100,000 100,000 100,000 100,000 100,000
Total Resources 722,397 62,128 110,269 550,000 50,000 100,000 100,000 100,000 100,000 100,000
Project Development & Pre-Design Program TIP #: 23-13
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program consists of critical activities to develop future capital improvement projects that consist of, but are not limited to, project
scoping, cost estimates, pre-design, interlocal agreements, analyses of existing and projected transportation problems, local and regional
mobility goals and deficiency analyses.
To develop transportation projects that best serve the needs of Renton and meet eligibility requirements for grant applications.
The funding allocated to this program is mainly used to hire consultants to perform the work listed above.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
222,397 500,000
42
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROGRAM
Priority Rank:39
Project Account #:120029
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Other-Program Funding
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Spent 2022 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 383,480 1,060 132,420 250,000 - 50,000 50,000 50,000 50,000 50,000
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 383,480 1,060 132,420 250,000 - 50,000 50,000 50,000 50,000 50,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 133,480 1,060 132,420 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 250,000 - - 250,000 - 50,000 50,000 50,000 50,000 50,000
Total Resources 383,480 1,060 132,420 250,000 - 50,000 50,000 50,000 50,000 50,000
Arterial Circulation Program TIP #: 23-14
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This program provides for the short and long-range planning and traffic analyses required to evaluate and update proposed
transportation improvements projects, to assess the impacts of new development proposals, and to recommend local and regional
transportation system improvements for all modes of travel. This program also covers programmatic activities to maintain compliance in
federal and state regulations, such as assuring that project specifications and management comply with current State and Federal
standards and regulations, Title VI reporting and ADA Transition Plan implementation.
To perform critical activities needed for the development of transportation projects that will best serve the needs of Renton and be
eligible for grant applications.
A Network Mobility Evaluation was completed in 2021 to prepare for the update of the Transportation Element of the City's
Comprehensive Plan. Funding for this program will be evaluated as needs arise.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
133,480 250,000
43
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:4
Project Account #:123001
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 620,000 107,881 300,000 212,119 212,119 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 2,072,700 - - 2,072,700 - 2,072,700 - - - -
Construction Services 435,000 - - 435,000 - 235,000 200,000 - - -
Total Expenses 3,127,700 107,881 300,000 2,719,819 212,119 2,307,700 200,000 - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 128,700 22,881 40,500 65,319 20,319 45,000 - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)2,999,000 85,000 259,500 2,654,500 191,800 2,262,700 200,000 - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 3,127,700 107,881 300,000 2,719,819 212,119 2,307,700 200,000 - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Houser Way Bridge - Seismic Retrofit and Painting,
across Cedar River TIP #: 23-15
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The
project will also perform a seismic analysis and retrofit and replace/upgrade the bridge rails along with other improvements. The Houser
Way Bridge was built by the City of Renton in 1960. It is a three span bridge that crosses over the Cedar River. The main span is carried
by steel girders. The girders are coated with paint to protect the steel from corrosion. Corrosion causes section loss which results in a
reduced load carrying capacity of the girders. The existing paint is failing. The bridge is located in a zone of moderate to high liquification
susceptibility during seismic events. The bridge rail has been damaged.
To help extend the service life of the Houser Way Bridge and reduce the seismic vulnerability.
In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,999,000 to perform a seismic retrofit and
painting of the bridge. The project is currently in the design phase. Construction is anticipated for summer 2024.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
3,127,700 -
44
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:45
Project Account #:122902
Planning Area:Highlands
Street Classification:Principal Arterial
Project Length:0.93 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 2,000,000 - - 2,000,000 - - 1,500,000 500,000 - -
R-O-W (includes Admin)3,000,000 - - 3,000,000 - - - 1,500,000 1,500,000 -
Construction 14,000,000 - - 14,000,000 - - - - 5,000,000 9,000,000
Construction Services 1,000,000 - - 1,000,000 - - - - - 1,000,000
Total Expenses 20,000,000 - - 20,000,000 - - 1,500,000 2,000,000 6,500,000 10,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 20,000,000 - - 20,000,000 - - 1,500,000 2,000,000 6,500,000 10,000,000
Total Resources 20,000,000 - - 20,000,000 - - 1,500,000 2,000,000 6,500,000 10,000,000
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project addresses pedestrian, transit and bicycle needs through key improvements such as channelization, traffic signal
modifications, signal treatments, possible queue jumps, access management through installation of medians and installation of a multi-
use trail. Project will be implemented in phases.
To address area growth, this project will improve access to transit and a non-motorized facility network.
The Sunset Trail project (TIP #23-16.1) will serve as Phase 1 and will construct the multi-use trail portion of the original project. Future
phases and timing will be determined based on available funding.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 20,000,000
NE Sunset Blvd (SR900) Corridor Improvements,
Sunset Blvd NE to Monroe Ave NE TIP #: 23-16
45
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:8
Project Account #:122105
Planning Area:Highlands
Street Classification:Principal Arterial
Project Length:0.32 mi
Funding Status:Partially Funded - PE/ROW
Project Description:
Program Aspects: Operations and Safety, Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 1,143,000 - 692,150 450,850 450,850 - - - - -
R-O-W (includes Admin)484,000 - - 484,000 - 300,000 184,000 - - -
Construction 7,010,000 - - 7,010,000 - - 3,000,000 4,010,000 - -
Construction Services - - - - - - - - - -
Total Expenses 8,637,000 - 692,150 7,944,850 450,850 300,000 3,184,000 4,010,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 248,190 - 132,000 116,190 50,850 39,800 25,540 - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,378,810 - 560,150 818,660 400,000 260,200 158,460 - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 7,010,000 - - 7,010,000 - - 3,000,000 4,010,000 - -
Total Resources 8,637,000 - 692,150 7,944,850 450,850 300,000 3,184,000 4,010,000 - -
Sunset Trail,
Edmonds Ave NE to NE 10th St TIP #: 23-16.1
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
This project will install a multi-use trail on the north side of NE Sunset Blvd from Edmonds Ave NE to NE 10th Street, planter between
the trail and the street, street lighting, retaining walls, and ADA upgrades. The scope of this project was previously included in the NE
Sunset Boulevard (SR 900) Corridor Improvements project (TIP #23-16) but was extracted in an effort to phase the project so that it
became more financially feasible for the City to complete within a reasonable timeframe.
To address area growth, this project will improve access to transit and the non-motorized facility network.
The Sunset Trail project received a Congestion Mitigation and Air Quality (CMAQ) grant in the amount of $1,378,810 for Design
($960,150)/ROW ($418,660) in 2022. The City advanced the Design funds so work can begin in 2023.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,627,000 7,010,000
46
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:2
Project Account #:122190
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.23 mi
Funding Status:Fully Funded - CN
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Other 137,401 137,401 - - - - - - - -
Preliminary Engineering 1,392,116 1,392,116 - - - - - - - -
R-O-W (includes Admin)4,565,736 3,992,517 573,219 - - - - - - -
Construction 3,952,789 - 3,952,789 - - - - - - -
Construction Services 1,139,080 - 639,080 500,000 500,000 - - - - -
Total Expenses 11,187,123 5,522,035 5,165,088 500,000 500,000 - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation 2,945,536 222,869 2,222,667 500,000 500,000 - - - - -
Bonds / LID's Formed 8,241,587 5,299,166 2,942,421 - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 11,187,123 5,522,035 5,165,088 500,000 500,000 - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Park Ave North Extension,
Logan Ave N to Southpark TIP #: 23-17
The project will extend Park Ave N to the north of Logan Ave N, to provide access to Southport and The Boeing Company. Improvements
include the construction of a railroad crossing, signal improvements, utility improvements, illumination installation, underground utility
relocation and landscaping. The project is funded by Local Revitalization Financing (LRF) and Mitigation funding.
To improve accessibility and address additional development growth in the South Lake Washington Revitalization Area.
Construction is currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
11,187,123 -
47
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:1
Project Account #:122195
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.51 mi
Funding Status:Fully Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 3,339,314 3,314,314 25,000 - - - - - - -
R-O-W (includes Admin)4,317,459 4,060,407 257,052 - - - - - - -
Construction 25,446,000 - 9,086,000 16,360,000 14,360,000 2,000,000 - - - -
Construction Services 3,736,275 26,834 1,000,000 2,709,441 2,209,441 500,000 - - - -
Total Expenses 36,839,049 7,401,556 10,368,052 19,069,441 16,569,441 2,500,000 - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)19,074,850 5,600,000 3,260,559 10,214,291 9,214,291 1,000,000 - - - -
Grants Awarded (State)7,355,150 - 1,000,000 6,355,150 5,855,150 500,000 - - - -
Mitigation 10,409,049 1,801,556 6,107,493 2,500,000 1,500,000 1,000,000 - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 36,839,049 7,401,556 10,368,052 19,069,441 16,569,441 2,500,000 - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Rainier Ave Corridor Improvements Phase 4,
S 3rd St to NW 3rd Pl TIP #: 23-18
Phase 4 of the Rainier Ave Corridor Improvements will extend previous corridor improvements from S 3rd St to 1,000 feet north of Airport
Way (NW 3rd Pl). Project elements include extending southbound BAT lane from S 2nd St to S 3rd St, pedestrian improvements with street
scaping, High Intensity Activated Crosswalk (HAWK), transit facility upgrades, access management, and a segment of a regional ped/bike
path trail (Lake Washington Loop Trail) from Airport Way to 1,000 feet north of Airport Way.
To improve traffic operations, reduce collisions, and provide greater ease of non-motorized and transit-based travel.
A Surface Transportation Program (STP) grant in the amount of $2,600,000 was awarded (2014) for Design of Phase 4. Additional grants
received for the project include; (2018) STP $3,000,000 for Right-of-Way; (2018) STP $4,500,000, (2020) STP $4,793,000, (2021) WSDOT
Regional Mobility $2,000,000, and (2021) Transportation Improvement Board (TIB) $5,000,000 for Construction. The project also received
supplemental federal funding for the Construction phase in 2022 in the amount of $4,181,850 as well as an increase to the TIB funding
participation ($355,150). Construction is currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
36,839,049 -
48
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:30
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.76 mi
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 3,694,886 - - 3,694,886 1,000,000 2,694,886 - - - -
R-O-W (includes Admin)3,464,400 - - 3,464,400 - 1,732,200 1,732,200 - - -
Construction 16,474,430 - - 16,474,430 - - 2,474,430 10,000,000 4,000,000 -
Construction Services 2,000,000 - - 2,000,000 - - - 1,000,000 1,000,000 -
Total Expenses 25,633,716 - - 25,633,716 1,000,000 4,427,086 4,206,630 11,000,000 5,000,000 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 25,633,716 - - 25,633,716 1,000,000 4,427,086 4,206,630 11,000,000 5,000,000 -
Total Resources 25,633,716 - - 25,633,716 1,000,000 4,427,086 4,206,630 11,000,000 5,000,000 -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Rainier Ave N Corridor Improvements Phase 5,
NW 3rd Pl to north city limits TIP #: 23-19
Phase 5 of the Rainier Ave Corridor Improvements will extend the improvements from NW 3rd Pl to the northern City limits. Project
elements include widening of sidewalks with streetscaping, adding pedestrian-scale illumination and planted buffer strips. There is excess
road capacity north of NW 3rd Pl (NB) where the project will remove one of the two NB lanes on Rainier Ave N. On the east side of
Rainier Ave S/N, a new multi-use trail will be installed (previously referred to as the Lake Washington Loop Trail Phase 5).
The project will separate pedestrians and bicyclists from the vehicular traffic, enhancing safety and encouraging residents to use active
transportation modes.
The City is seeking available funding for the project. Phase 4 of the Rainier Ave Corridor Improvements is currently in construction (TIP
#23-18).
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 25,633,716
49
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:33
Project Account #:122103
Planning Area:City Center
Street Classification:Collector
Project Length:0.3 mi
Funding Status:Partially Funded - PE
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 1,760,612 251,951 1,000,000 508,661 508,661 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 11,250,000 - - 11,250,000 - 500,000 2,000,000 6,000,000 2,750,000 -
Construction Services 1,950,000 - - 1,950,000 - - - 1,200,000 750,000 -
Total Expenses 14,960,612 251,951 1,000,000 13,708,661 508,661 500,000 2,000,000 7,200,000 3,500,000 -
Source of Fund:
REET 1/2 166,122 - 74,523 91,599 91,599 - - - - -
B&O Tax 94,490 34,013 60,477 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,500,000 217,938 865,000 417,062 417,062 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 13,200,000 - - 13,200,000 - 500,000 2,000,000 7,200,000 3,500,000 -
Total Resources 14,960,612 251,951 1,000,000 13,708,661 508,661 500,000 2,000,000 7,200,000 3,500,000 -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Renton Connector,
S 2nd St to S 5th St TIP #: 23-20
The Renton Connector project will install a continuous non-motorized facility along Burnett Ave S between S 2nd St and S 5th St via
separated walkways, protected bicycle lanes (cycle track), and a multi-use path. This project will also include landscaped medians,
reconfigured public parking areas, curb ramp upgrades to ADA standards, and traffic signalization improvements.
To create a signature north-south non-motorized connection in the downtown core via a corridor for pedestrians and cyclists between
the Cedar River and the South Renton Transit Center to the South via S 7th St (TIP # 23-23). This becomes an essential link that connects
to the Cedar River Trail, Lake to Sound Trail, Lake Washington Loop Trail, and the Eastside Rail Corridor.
Transportation received Surface Transportation Program (STP) funding ($1,500,000) from the contingency list in 2019. Design is
currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,760,612 13,200,000
50
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:37
Project Account #:
Planning Area:Benson
Street Classification:Collector
Project Length:0.76 mi
Funding Status:Partially Funded - PE
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 25,000 - 25,000 - - - - - - -
Preliminary Engineering 600,000 - 400,000 200,000 200,000 - - - - -
R-O-W (includes Admin)80,000 - - 80,000 - 80,000 - - - -
Construction 2,500,000 - - 2,500,000 - - 1,500,000 1,000,000 - -
Construction Services - - - - - - - - - -
Total Expenses 3,205,000 - 425,000 2,780,000 200,000 80,000 1,500,000 1,000,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 125,000 - 75,000 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)500,000 - 350,000 150,000 150,000 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,580,000 - - 2,580,000 - 80,000 1,500,000 1,000,000 - -
Total Resources 3,205,000 - 425,000 2,780,000 200,000 80,000 1,500,000 1,000,000 - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
SE 168th St Protected Bike Lanes,
108th Ave SE to 128th Ave SE TIP #: 23-21
This project will construct protected bike lanes on SE 168th St between 108th Ave SE and 128th Ave SE.
To install an east-west bike route that connects multiple community destinations and improves access to transit.
The City was awarded a $500,000 allocation in the 2021-2023 State Capital Budget. Staff is currently in the process of conducting additional
public outreach, including surveying of the adjacent property owners along SE 168th St, and may redefine scope based on community
feedback. *Funding shown in 2023/2024 will be programmed in a subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
625,000 2,580,000
51
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:27
Project Account #:123006
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.7 mi
Funding Status:Partially Funded - PE
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - 200,000 - - - - - - -
Preliminary Engineering 1,551,956 10,525 1,041,431 500,000 500,000 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 17,150,000 - - 17,150,000 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Construction Services - - - - - - - - - -
Total Expenses 18,901,956 10,525 1,241,431 17,650,000 500,000 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 411,206 2,543 358,663 50,000 50,000 - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,340,750 7,982 882,768 450,000 450,000 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 17,150,000 - - 17,150,000 - 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Total Resources 18,901,956 10,525 1,241,431 17,650,000 500,000 1,250,000 5,900,000 4,500,000 3,500,000 2,000,000
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
South 2nd Street Conversion Project,
Rainier Ave S to Main Ave S TIP #: 23-22
The South 2nd Street Conversion Project will convert the existing 4–lane one-way roadway to a roadway with one through-lane in each
direction between Main Ave South and Rainier Ave South. This project also includes pedestrian and bicycle facilities, traffic operations
improvements, and transit upgrades that will provide better traffic operation and circulation for all modes of transportation. Transit
facility upgrades include new RapidRide stops and a transit queue jump at the new traffic signal at the Shattuck intersection.
To improve multimodal mobility in and around the downtown core. This project also hopes to enhance downtown Renton as a
destination, while improving circulation and enhancing pedestrian safety. The intersection of S 2nd St and Burnett is a key connection to
the Renton Connector Project (TIP #23-20).
The City was awarded $1,340,750 in Surface Transportation Program (STP) funds for preliminary engineering in the PSRC Countywide
competition in 2018. Additional planning will occur before Design work begins in 2022. Construction estimates are preliminary and will
depend on the results of the additional planning work the City is conducting. *Funding shown in 2023 for Planning will be programmed in a
subsequent budget adjustment.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
1,751,956 17,150,000
52
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:7
Project Account #:122151
Planning Area:City Center
Street Classification:Minor Arterial
Project Length:1.13 mi
Funding Status:Funded - CN
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 885,000 11,803 873,197 - - - - - - -
R-O-W (includes Admin)100,000 - - 100,000 100,000 - - - - -
Construction 2,000,000 - - 2,000,000 985,000 1,015,000 - - - -
Construction Services 285,000 - - 285,000 165,000 120,000 - - - -
Total Expenses 3,270,000 11,803 873,197 2,385,000 1,250,000 1,135,000 - - - -
Source of Fund:
REET 1/2 635,000 - - 635,000 500,000 135,000 - - - -
B&O Tax 185,000 11,803 173,197 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)1,450,000 - - 1,450,000 450,000 1,000,000 - - - -
Grants Awarded(SoundTran)1,000,000 - 700,000 300,000 300,000 - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 3,270,000 11,803 873,197 2,385,000 1,250,000 1,135,000 - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South 7th Street Corridor Improvements,
Oakesdale Ave SW to Burnett Ave S TIP #: 23-23
This project develops S/SW 7th St as a key east-west bicycle route into the downtown: between Oakesdale Ave S and Burnett Ave S. This
project will install a multi-use path on S 7th St, between Shattuck and Burnett Ave S, and install intersection improvements at multiple
intersections along the corridor from Shattuck Ave S to Oakesdale Ave SW. The intersection improvements from Shattuck Ave S westward
along this corridor will improve bicycle facilities and intersection operations to provide upgraded signage to bicyclists and will help simplify
bicycle movements through complex intersections. Bicycle improvements include push-button activation, green bike lanes through
conflict/crossing zones, and pavement markings. This project will also upgrade an existing marked crosswalk with flashing beacons with
higher visibility technology.
To create a designated east-west ped/bike route through the City's commercial core and an important link between regional trails.
Phase 1 was completed which included a traffic signal and an eastbound right-turn lane at S 7th St/Shattuck Ave S. In 2019, Sound Transit
awarded $1,000,000 toward Design and Construction of the multi-use path between Talbot and Shattuck. In 2020, $1,450,000 of Surface
Transportation Program (STP) funds was awarded for FY 2024 for construction of the multi-use path between Shattuck and Burnett Ave S as
well as various intersection improvements. Design is currently underway.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
3,270,000 -
53
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:5
Project Account #:123003
Planning Area:City Center
Street Classification:Minor Arterial
Project Length:N/A
Funding Status:Funded - CN
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 620,000 90,767 301,548 227,685 227,685 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 2,143,700 - - 2,143,700 - 2,143,700 - - - -
Construction Services 350,000 - - 350,000 - 350,000 - - - -
Total Expenses 3,113,700 90,767 301,548 2,721,385 227,685 2,493,700 - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 128,700 13,802 40,500 74,398 29,398 45,000 - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (Federal)2,985,000 76,965 261,048 2,646,987 198,287 2,448,700 - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 3,113,700 90,767 301,548 2,721,385 227,685 2,493,700 - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Williams Ave Bridge - Seismic Retrofit and Painting,
across Cedar River TIP #: 23-24
The project will remove the existing paint from the steel girders, repair corrosion damage and apply a new protective paint system. The
project will also perform a seismic analysis and retrofit along with other improvements. The Williams Ave Bridge was built by the City of
Renton in 1954. It is a three span bridge that crosses over the Cedar River. The main span is carried by steel girders. The girders are coated
with paint to protect the steel from corrosion. Corrosion causes section loss which results in a reduced load carrying capacity of the girders.
The existing paint is failing. The bridge is located in a zone of moderate to high liquefication susceptibility during seismic events.
To extend the service life of the Williams Ave Bridge and reduce seismic vulnerability.
In late 2017, the project was awarded a Federal Highway Administration (FHWA) grant of $2,985,000 to perform a seismic retrofit and
painting of the bridge. The project is currently in the design phase. Construction is anticipated for summer 2025.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
3,113,700 -
54
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:23
Project Account #:122117
Planning Area:Benson
Street Classification:Minor Arterial
Project Length:2.5 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
Total Resources 1,689,000 - - 1,689,000 - 689,000 1,000,000 - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
116th Ave SE Improvements,
SE 168th St to SE 160th St TIP #: 23-25
Widen roadway to provide a 3-lane roadway with bike lanes along 116th Ave SE and Edmonds Way SE, including new pavement, curb,
gutter, sidewalk, street lights, traffic signals, storm drainage, channelization and landscaping from Puget Drive SE to the southern City limits.
Benson Hill Community Plan recommended improvements for a first phase, based on the neighborhood needs. The priority, cost and
schedule for the phased improvements will be determined based on available funding.
Improvements will enhance vehicular, bicycle and pedestrian safety along this important north-south transportation corridor.
Transportation has received $1,000,000 in funding to construct sidewalks near the Family First Center (TIP #23-04.1). Staff is continuing to
look for grant opportunities for the larger project. Programmed funding is for Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 1,689,000
55
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:24
Project Account #:122920
Planning Area:Talbot, Benson
Street Classification:Principal Arterial
Project Length:1.87 mi
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - - 200,000 - 200,000 - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 200,000 - - 200,000 - 200,000 - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 200,000 - - 200,000 - 200,000 - - - -
Total Resources 200,000 - - 200,000 - 200,000 - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Carr Road Improvements,
Davis Ave S to 109th Ave SE TIP #: 23-26
This project would design needed infrastructure improvements on Carr Road, from Valley Medical Center past the SR 515/108th Ave SE
intersection. Potential improvements vary from roadway realignment/widening at several locations to address geometric deficiencies,
widening to 5-lane roadway (2 lanes westbound, 3 lanes eastbound), pavement restoration/reconstruction including bicycle lanes on new
alignment.
Improvements are necessary to enhance vehicle traffic capacity and safety for vehicles, bicycles, and pedestrians on this major east-west
transportation corridor.
A corridor study prepared by King County in 2003 identified the need for roadway improvements from the Lind Ave SW and SW 43rd St
intersection extending east and crossing SR 167 and ending at 116th Ave SE. Previous expenditures were for corridor signal upgrades
associated with a federal grant. Future roadway improvement options include spot safety improvements, bicycle and pedestrian
improvements, roadway widening and roadway on new alignment. Programmed estimates are for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 200,000
56
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:38
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 750,000 - 750,000 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 750,000 - 750,000 - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)750,000 - 750,000 - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 750,000 - 750,000 - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Grady Way & Rainier Ave Intersection Improvements TIP #: 23-27
The project will be a coordinated effort between the City of Renton and WSDOT and will make the following improvements; provide grade
separation of one eastbound and one westbound lane of Grady Way South over SR167, construct an additional right turn lane from
eastbound Grady Way South to southbound SR 167, construct new curbs, gutters, storm drainage and sidewalk improvements and; install
Transit Signal Priority through the intersection of SR 167 & Grady Way South.
The project will provide a connection point to the Rainier Avenue transit corridor which leads to Renton’s key regional growth centers -
downtown and Southport/The Landing.
The City received $750,000 in the State Transportation Budget in 2023 for Planning. Additional planning work is needed to determine if the
current scope is the best alternative for improving access to the new South Renton Transit Center. Additional funding sources have yet to be
identified. Programmed funding is for Planning only. Total project cost is estimated at $55M.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
750,000 -
57
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:42
Project Account #:
Planning Area:East Plateau
Street Classification:Collector
Project Length:0.42 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 50,000 50,000 - - - - - - - -
Preliminary Engineering 500,000 - - 500,000 - - 500,000 - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 1,500,000 - - 1,500,000 - - - 1,000,000 500,000 -
Construction Services - - - - - - - - - -
Total Expenses 2,050,000 50,000 - 2,000,000 - - 500,000 1,000,000 500,000 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 50,000 50,000 - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,000,000 - - 2,000,000 - - 500,000 1,000,000 500,000 -
Total Resources 2,050,000 50,000 - 2,000,000 - - 500,000 1,000,000 500,000 -
Hoquiam Ave NE Non-Motorized Improvements,
NE 10th Pl to NE Sunset Blvd TIP #: 23-28
*Picture: Shows existing narrow shoulders along Hoquiam Ave, north of NE 12th St.
Project Expenditures & Resources TOTAL Programmed Six-Year Program
This project would improve the experience for people walking and biking along Hoquiam Ave NE between NE 10th Pl and NE Sunset Blvd by
installing a walkway where needed and improving crossings.
Improve the experience for people walking and biking along Hoquiam Ave NE between NE 10th Pl and NE Sunset Blvd.
A feasibility study to evaluate constructability requirements and to address environmental challenges was complete in May 2022. The
preferred alternative may be a good candidate for Safe Routes to School-type grants. Project will be on hold until construction funding is
identified.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
50,000 2,000,000
58
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:50
Project Account #:
Planning Area:City Center
Street Classification:varies
Project Length:0.36 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 220,000 - - 220,000 - - - 220,000 - -
R-O-W (includes Admin)165,000 - - 165,000 - - - - 165,000 -
Construction 1,802,000 - - 1,802,000 - - - - - 1,802,000
Construction Services - - - - - - - - - -
Total Expenses 2,187,000 - - 2,187,000 - - - 220,000 165,000 1,802,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,187,000 - - 2,187,000 - - - 220,000 165,000 1,802,000
Total Resources 2,187,000 - - 2,187,000 - - - 220,000 165,000 1,802,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Houser Way Non-Motorized Improvements,
Mill Ave S to Bronson Way S TIP #: 23-29
This project would install a separated bike facility on the north side of Houser Way S/N, between Mill Ave S. and Bronson Way N.
Intersection crossings would be improved at Cedar River Park Drive and Mill Ave S. The project will include planning and pavement overlay,
channelization, and intersection crossing improvements. For feasibility and constructability issues, the roadway and pedestrian bridge
sections would not be part of this project. The feedback during the public engagement process for the Trails and Bicycle Master Plan update
identified Houser Way as the route for the Eastside Rail Corridor alignment. With the development of the Civic Core Plan, development of
this section of the bicycle network creates an important connection point for bicycle traffic between the north and south portions of the
City's urban growth center.
To create a bike facility that creates a connection to the Cedar River Trail and downtown. The crossing at Cedar River Park Drive is a
connection point for people connecting from Liberty Park to the Renton Community Center.
This project is pending available funding but is also subject to the schedule of the Houser Way Bridge - Seismic Retrofit and Painting project
(TIP #23-15) and the redevelopment of the 200 Mill site.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 2,187,000
59
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:55
Project Account #:
Planning Area:City Center
Street Classification:Minor Arterial
Project Length:0.57 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - - 100,000 -
Preliminary Engineering 1,000,000 - - 1,000,000 - - - - - 1,000,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,100,000 - - 1,100,000 - - - - 100,000 1,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,100,000 - - 1,100,000 - - - - 100,000 1,000,000
Total Resources 1,100,000 - - 1,100,000 - - - - 100,000 1,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Houser Way North Shared Use Path,
N 8th St to Lake Washington Blvd TIP #: 23-30
This project will develop a shared use path along the east side of Houser Way from Lake Washington Boulevard N to the existing shared use
path on N 8th St.
To create an established bicycle facility connecting the Eastside Rail Corridor to the downtown core.
This project was originally a widening and realignment project. The scope was changed to align with the Trails and Bicycle Master Plan and
is subject to available funding. A public engagement process would be required during design to ensure involvement of surrounding
businesses. Programmed estimates are for Planning and Design only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 1,100,000
60
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:52
Project Account #:120024
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:0.73 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - - 200,000 - - - - 200,000 -
Preliminary Engineering 1,300,000 - - 1,300,000 - - - - - 1,300,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 1,500,000 - - 1,500,000 - - - - 200,000 1,300,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 1,500,000 - - 1,500,000 - - - - 200,000 1,300,000
Total Resources 1,500,000 - - 1,500,000 - - - - 200,000 1,300,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Lind Ave SW Roadway Widening,
SW 16th St to SW 34th St TIP #: 23-31
Widen existing roadway to five lanes where required. Includes new roadway, curbs, sidewalks, drainage, signals, lighting, signing and
channelization. Additionally, these improvements address demands resulting from an interchange at Lind Ave SW which is included in the
WSDOT I-405 Master Plan (currently unfunded). A potential project could be a signal at the intersection at Lind Ave SW and SW 34th St
which is currently unsignalized.
To increase the capacity of this major north/south arterial to meet increasing traffic demands in the Valley due in part to development.
In 2020, a subarea TOD study for the South Grady/north Valley area was begun. This roadway is critical for the I-405 Master Plan and may
be important for any future light rail planning for the city. Programmed estimates are for Planning and Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 1,500,000
61
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:10
Project Account #:
Planning Area:Citywide
Street Classification:varies
Project Length:varies
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 50,000 - - 50,000 50,000 - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 750,000 - - 750,000 - 150,000 150,000 150,000 150,000 150,000
Construction Services - - - - - - - - - -
Total Expenses 800,000 - - 800,000 50,000 150,000 150,000 150,000 150,000 150,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 800,000 - - 800,000 50,000 150,000 150,000 150,000 150,000 150,000
Total Resources 800,000 - - 800,000 50,000 150,000 150,000 150,000 150,000 150,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Local Road Safety Plan Implementation TIP #: 23-32
This program would design and construct improvements identified in the Local Road Safety Plan. An adopted plan is created from analyzing
the data of the fatal and serious injury crashes in the city and the conditions that exist when those crashes occurred. A prioritized list of
projects are developed by a set of criteria after analyzing the data.
To address and mitigate or reduce the risk of fatal or serious injury crashes.
The City's Local Road Safety Plan was adopted in 2022. The City is working with a consultant on the next step in the process, which is
developing a Safer Mobility Action Plan. Plan implementation will be contingent on available funding. Staff is currently looking for grant
opportunites.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 800,000
62
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:51
Project Account #:122303
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.76 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 200,000 - - 200,000 - - - 200,000 - -
Preliminary Engineering 3,500,000 - - 3,500,000 - - - - 1,500,000 2,000,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 3,700,000 - - 3,700,000 - - - 200,000 1,500,000 2,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 3,700,000 - - 3,700,000 - - - 200,000 1,500,000 2,000,000
Total Resources 3,700,000 - - 3,700,000 - - - 200,000 1,500,000 2,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Logan Ave North Improvements,
S 2nd St to Park Ave N TIP #: 23-33
Phase 1 (Cedar River Bridge to N 6th St) is complete. Phase 2 (N 6th St to Park Ave N) will add a NB lane, new curb, gutter, sidewalks (on the
east side), landscaped buffer, and a pedestrian/bicycle trail (west side), streetlights, pedestrian scale illumination, crosswalks,
channelization.
The increase in traffic and the new RapidRide transit have warranted widening to add a northbound lane. Included with the improvements
are urban roadway amenities to implement "Complete Streets" practice per City code.
Project continues to be on hold until the Boeing Company is in a position to dedicate right-of-way to the project. Planning studies would
have to be conducted to analyze if intersection improvements are required to adjust for current traffic conditions. Programmed estimates
shown are for Planning and Preliminary Engineering phases.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 3,700,000
63
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:46
Project Account #:
Planning Area:Cedar River
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation, Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 522,970 - - 522,970 - - 299,035 223,935 - -
R-O-W (includes Admin)156,300 - - 156,300 - - - 156,300 - -
Construction 2,458,630 - - 2,458,630 - - - 619,765 1,000,000 838,865
Construction Services - - - - - - - - - -
Total Expenses 3,137,900 - - 3,137,900 - - 299,035 1,000,000 1,000,000 838,865
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 3,137,900 - - 3,137,900 - - 299,035 1,000,000 1,000,000 838,865
Total Resources 3,137,900 - - 3,137,900 - - 299,035 1,000,000 1,000,000 838,865
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Maple Valley Highway Barriers,
SE 5th St to approximately 1800 feet west of intersection TIP #: 23-34
This project includes two barriers: One is to install a concrete median barrier between east and westbound travel lanes of the SR 169 S-
Curve between the Riviera Apartments and S. 5th Street including associated roadway widening to add the barrier. The second barrier
improvement will remove the existing concrete barrier end treatment located eastbound (east of the Riviera Apartments) and replace with
2 new concrete barriers extending west.
Maple Valley Highway (SR 169) is a principal arterial carrying 44,000 vehicles per day. This project will improve safety for traffic on Maple
Valley Highway (SR 169) at this location, which has been the site of numerous collision impacts.
The design report for the Cedar River half bridge is complete and was funded by the Roadway Safety and Guardrail Program (TIP # 23-05).
Final design and construction is pending funding availability.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 3,137,900
64
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:48
Project Account #:
Planning Area:Valley
Street Classification:Principal Arterial
Project Length:2.2 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 500,000 - - 500,000 - - 500,000 - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 500,000 - - 500,000 - - 500,000 - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - - 500,000 - - -
Total Resources 500,000 - - 500,000 - - 500,000 - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Monster Rd SW/68th Ave S Roadway Improvements TIP #: 23-35
Widen existing roadway to four lanes plus two-way-left-turn-lane where needed and bike lanes. Realign Beacon Coal Mine Road approach
to intersection with the Monster Road SW roadway. Includes new roadway, curbs, sidewalk, drainage, street lighting, traffic signals,
channelization, retaining walls and widening the existing bridge.
Will serve growing north-south traffic demand and help provide another truck route into the city.
Phase 1 of improvements will address drainage problems between the Monster Rd Bridge and the City limits. A preliminary design study
was completed in 1999. The project cost is estimated at $32M, with the City's share estimated at $13M and King Co. at $19M at the time.
Scope, cost and implementation schedule to be determined. Programming includes planning studies only to scope of possible phased
implementation in coordination with King County.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 500,000
65
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:16
Project Account #:
Planning Area:City Center
Street Classification:Collector
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
Total Resources 20,000,000 - - 20,000,000 - 7,500,000 10,000,000 2,500,000 - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
N 8th St Direct Access Ramps TIP #: 23-36
This project would be part of the I405 Implementation Plan to achieve a successful Regional Bus Rapid Transit (BRT) network and improve
transit service utilization.
Direct access ramps at North 8th Street would provide improved access to the neighborhoods west of I-405: residential neighborhoods
within the City Center (North Renton and South Renton), West Hill, south Seattle, and unincorporated King County. These direct access
ramps would not only improve access to businesses such as, The Boeing Company, PACCAR Inc., and SECO Development, but also would help
decrease congestion in other parts of the City that need access to I-405.
The 2022 Legislature approved a substantial "Move Ahead Washington" transportation package that included the N 8th St Direct Access
Ramp project ($245,000,000). The City is awaiting updates as the project moves forward in the legislative process. Programmed funding
includes Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 20,000,000
66
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:43
Project Account #:122176
Planning Area:Highlands, East Plateau
Street Classification:Principal Arterial
Project Length:0.92 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - 100,000 - -
Preliminary Engineering 4,982,500 - - 4,982,500 - - - 200,000 2,000,000 2,782,500
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 5,082,500 - - 5,082,500 - - - 300,000 2,000,000 2,782,500
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 5,082,500 - - 5,082,500 - - - 300,000 2,000,000 2,782,500
Total Resources 5,082,500 - - 5,082,500 - - - 300,000 2,000,000 2,782,500
Project Expenditures & Resources TOTAL Programmed Six-Year Program
NE 3rd Street Corridor Improvements,
Sunset Blvd N to Jefferson Ave NE TIP #: 23-37
This project involves a series of improvements in this corridor to improve traffic operations such as rechannelization and traffic signal
modifications, possible transit priority signal treatments and queue jumps.
To improve traffic operations for all modes of transportation, especially addressing the needs of transit, bicycle and pedestrian traffic.
This corridor has a strong potential for transit usage and is experiencing rapid residential and retail growth. The NE 3rd/4th Corridor Study
was adopted in May 2005. Funding will need to be identified to conduct a renewed public engagement process and redefine/reconfirm
project scope. Programmed estimates are for Planning and Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 5,082,500
67
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:44
Project Account #:
Planning Area:Highlands, East Plateau
Street Classification:Principal Arterial
Project Length:1.05 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - - - 100,000
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 100,000 - - 100,000 - - - - - 100,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 100,000 - - 100,000 - - - - - 100,000
Total Resources 100,000 - - 100,000 - - - - - 100,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
NE 4th Street Corridor Improvements,
Jefferson Ave NE to Duvall Ave NE TIP #: 23-38
This project involves a series of improvements to traffic operations such as rechannelization and traffic signal modifications, possible transit
priority signal treatments and queue jumps. This project also may include a new signal at NE 4th St and Bremerton Ave NE, if warranted by
development.
To improve traffic operations for all modes of transportation, especially addressing the needs of transit, bicycle and pedestrian traffic.
The NE 3rd/4th Corridor Study was adopted in May 2005. Funding will need to be identified to conduct a renewed public engagement
process and redefine/reconfirm project scope. Programmed estimates are for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 100,000
68
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:53
Project Account #:
Planning Area:Highlands
Street Classification:Principal Arterial
Project Length:0.70 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - 100,000 - - -
Preliminary Engineering 5,480,000 - - 5,480,000 - - - 2,500,000 1,490,000 1,490,000
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 5,580,000 - - 5,580,000 - - 100,000 2,500,000 1,490,000 1,490,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 5,580,000 - - 5,580,000 - - 100,000 2,500,000 1,490,000 1,490,000
Total Resources 5,580,000 - - 5,580,000 - - 100,000 2,500,000 1,490,000 1,490,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
NE Sunset Blvd Transit and Access Improvements,
Union Ave NE to Hoquiam Ave NE TIP #: 23-39
This project would address transit and traffic operational needs through key improvements such as channelization, traffic signal
modifications, signal treatments, possible queue jumps, access management through installation of medians. This project would also
include EB right turn only lanes at Elma Pl NE and Hoquiam Ave NE.
Improve traffic operations and safety.
This project focuses on the eastern end of SR 900 around Duvall and prepares for potential upgrade of Metro route 240 to bus rapid transit
service. Programmed estimates are for Planning and Preliminary Engineering only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 5,580,000
69
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:25
Project Account #:123004
Planning Area:East Plateau
Street Classification:Collector
Project Length:1.16 mi
Funding Status:Candidate
Project Description:
Program Aspects: Maintenance and Preservation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 750,000 - - 750,000 - - 250,000 500,000 - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 6,000,000 - - 6,000,000 - - - - 3,000,000 3,000,000
Construction Services - - - - - - - - - -
Total Expenses 6,750,000 - - 6,750,000 - - 250,000 500,000 3,000,000 3,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 6,750,000 - - 6,750,000 - - 250,000 500,000 3,000,000 3,000,000
Total Resources 6,750,000 - - 6,750,000 - - 250,000 500,000 3,000,000 3,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Nile Ave NE Bridge Replacement,
across May Creek TIP #: 23-40
The Nile Ave NE Bridge was built by King County in 1951. Ownership was transferred to the City in 2009 as part of the MacKay Annexation
(Ord #5456). It is a single span bridge that crosses over May Creek. The initial phase of this project will evaluate replacement options with a
type, size and location (TS&L) study.
The bridge is 20 years beyond its original design life of 50 years. It will very likely need to be replaced or significantly retrofitted within the
next 10 years. The main span is comprised of precast concrete girders. The girders are supported on treated timber piles with timber caps.
Some of the timber piles are showing signs of deterioration.
To date the project has not received grant funding for replacement. However, with a TS&L study, the City will be in a very good position to
apply for Federal Highway Administration (FHWA) funding when the bridge condition qualifies for replacement funding. The City plans to
move forward with the TS&L study in 2026.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 6,750,000
70
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:31
Project Account #:
Planning Area:Cedar River
Street Classification:Principal Arterial
Project Length:
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 3,650,000 - - 3,650,000 - 1,650,000 2,000,000 - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 7,710,595 - - 7,710,595 - - - 5,000,000 2,710,595 -
Construction Services 1,500,000 - - 1,500,000 - - - 1,000,000 500,000 -
Total Expenses 12,860,595 - - 12,860,595 - 1,650,000 2,000,000 6,000,000 3,210,595 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 12,860,595 - - 12,860,595 - 1,650,000 2,000,000 6,000,000 3,210,595 -
Total Resources 12,860,595 - - 12,860,595 - 1,650,000 2,000,000 6,000,000 3,210,595 -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Renton-Maple Valley Highway & 140th Way SE TIP #: 23-41
The Renton-Maple Valley Highway & 140th Way SE intersection experiences significant congestion and queuing during the afternoon
commute and the City has identified a need to improve traffic operations at this intersection. A consultant prepared an analysis that
evaluates two improvement options to add a second west bound left turn lane at the intersection.
Renton-Maple Valley Highway is an important principal arterial connecting Downtown Renton and I-405 with neighborhoods and other
cities to the east and south. Renton-Maple Valley Highway is designated as State route 169 and is controlled by WSDOT, changes to the
roadway require WSDOT approval.
Staff is working to review the two proposed improvement options as prepared by the Consultant. Project is awaiting available funding. Total
estimated project cost is $13M.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 12,860,595
71
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:54
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.37 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Construction Services - - - - - - - - - -
Total Expenses 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Total Resources 2,300,000 - - 2,300,000 - - - 300,000 1,000,000 1,000,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Renton Bus Rapid Transit (BRT) Improvements,
S Renton Village Pl extension to S Grady Way TIP #: 23-42
New transit access road improvements from I-405 exit 3 (Talbot Rd) to South Renton Transit Center. Includes reconfiguration of Grady Way,
Lake Ave S and S Renton Village Place to accommodate transit.
With current traffic conditions and configurations, improvements will be needed to ensure speed and reliability of the BRT system into and
out of the South Renton Transit Center. This transit hub is currently and will remain a key connection point for transit users for both Metro
and Sound Transit. Proximity to the Sounder Station and future increase of parking availability also plays a key role in improving accessibility
needs.
Estimated cost in Regional Transportation Plan is $23,856,858. Design and Construction should be implemented and coordinated with
South Renton Transit Center, development of Renton Village, and implementation of I-405 Bus Rapid Transit. Project completion year falls
outside the 6 years of the TIP.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 2,300,000
72
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:28
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:0.55 mi
Funding Status:Candidate
Project Description:
Program Aspects: Active Transportation, Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 4,000,000 - - 4,000,000 - - 500,000 1,700,000 1,500,000 300,000
R-O-W (includes Admin)100,000 - - 100,000 - - - - - 100,000
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 4,100,000 - - 4,100,000 - - 500,000 1,700,000 1,500,000 400,000
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 4,100,000 - - 4,100,000 - - 500,000 1,700,000 1,500,000 400,000
Total Resources 4,100,000 - - 4,100,000 - - 500,000 1,700,000 1,500,000 400,000
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South 3rd Street Conversion Project,
Rainier Ave S to Main Ave S TIP #: 23-43
The project provides pedestrian and bicyclist facilities and enhancements, traffic operation and circulation improvements in Downtown. The
improvements include adding raised intersections with bulb outs, parklets, pedestrian plaza, lighting, street furniture, streetscape, bicycle
Blvd., bike racks, signage, wayfinding and converting S 3rd St to two-way operations.
This project is one of the strategies identified in the City Center Community Plan and the Downtown Civic Core Plan. The project enhances
downtown Renton as a destination area, while improving circulation, reducing traffic speeds and enhancing pedestrian safety. A feasibility
study, including a Downtown Circulation Traffic Analysis for the conversion to two-way operations was completed.
This project will continue downtown improvements, further enhancing the pedestrian and bicyclist environment. Project is pending future
grant funding availability. Total estimated project cost is $21M. Programmed estimates are for Preliminary Engineering and ROW.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 4,100,000
73
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:47
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:1.16 mi
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 100,000 - - 100,000 - - - - 100,000 -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 100,000 - - 100,000 - - - - 100,000 -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 100,000 - - 100,000 - - - - 100,000 -
Total Resources 100,000 - - 100,000 - - - - 100,000 -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South Grady Way Multi-Modal Improvements,
Rainier Ave S to Talbot Rd South TIP #: 23-44
The project will remove the islands at the intersections of S Grady Way with Lake Ave S and Shattuck Ave S, to allow for a continuous
eastbound lane from Rainier Ave S to Talbot Rd S. Included are modifications to traffic signals, new pedestrian crossings and channelization.
This project will perform a comprehensive analysis of multi-modal transportation improvements, including review of potential transit
improvements along Grady Way, such as Business Access and Transit (BAT) lanes and Traffic Signal Priority (TSP).
To improve speed and reliability of transit, improve traffic operations at intersections for all modes, and ease congestion in the Downtown.
Project is pending future grant funding availability. The Rapid Ride I Line will implement a portion of this work. Reassessment should occur
after construction. Estimated project cost is $6.5M. Programmed estimates are for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 100,000
74
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:40
Project Account #:123005
Planning Area:Citywide
Street Classification:varies
Project Length:N/A
Funding Status:Candidate
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 500,000 - - 500,000 - - 250,000 250,000 - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 500,000 - - 500,000 - - 250,000 250,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 500,000 - - 500,000 - - 250,000 250,000 - -
Total Resources 500,000 - - 500,000 - - 250,000 250,000 - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
Transit Master Plan TIP #: 23-45
The plan establishes scalable short- and long-term strategies, and identifies projects that will foster a high-quality transit system to meet
Renton’s needs. Transportation staff have worked on and are currently working on multiple transit projects such as the Renton Access to
Transit Study (King County 2019 Proviso), Renton-Kent-Auburn Mobility Plan (RKAAMP), Rapid Ride I-Line, and Sound Transit I-405 BRT
(Stride).
The Transit Master Plan provides the city with a means to influence decisions made by regional transit authorities. It also provides a basis
on which to begin advancing proposed capital projects for further study, design and prioritization, and position them to be strong
competitors for grant funding.
Metro updated their guiding documents, Service Guidelines and METRO CONNECTS in 2021. This work would be to adjust to the new
regional transit vision to ensure the needs of Renton are met.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- 500,000
75
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:41
Project Account #:122903
Planning Area:City Center
Street Classification:varies
Project Length:1.6 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Lake to Sound (L2S) Trail,
Black River Riparian Forest to Cedar River TIP #: 23-46
The Lake to Sound (L2S) Trail is a joint partnership between the cities of Renton, SeaTac, Tukwila, Burien and Des Moines, in coordination
with King County. The 17-mile L2S Trail will provide an east-west connection between the shoreline of Lake Washington (Renton) and the
shoreline of Puget Sound (Des Moines). Phase A goes from Naches Ave SW (Renton) to Fort Dent Park (Tukwila). The length between
Naches Ave SW and Mill Ave S are future phases. Construction of Phase A (Naches Ave SW to Fort Dent Park in Tukwila) was completed in
early 2020.
Phase A connects Fort Dent (Tukwila) to the larger system of regional trails in South King County, including the Green River Trail, the
Interurban Trail and the Cedar River Trail. Phase A provides a 12-foot wide asphalt paved multi-use trail, with 2-foot gravel shoulders. In the
Downtown Civic Core Plan, the L2S Trail connects to the Eastside Rail Corridor (ERC) and the Renton Connector (TIP #23-20).
City staff will be developing scope, cost and schedule for future phases. Alignment within BNSF would require King County to purchase ROW
and new bridges to cross roadways. An alignment on S 7th Street (TIP #23-23) can be developed as a reasonable alternative or parallel
route as a trail within railroad ROW is developed. Pending available funding.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
76
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:57
Project Account #:
Planning Area:City Center
Street Classification:Principal Arterial
Project Length:N/A
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
South Lake Washington Transit Hub,
vicinity of Southport Dr N and Garden Ave N TIP #: 23-47
This project will implement a Rapid Ride Bus Transit Station in the vicinity of Park Ave. N and Garden Ave N. The project would include the
kit of parts associated for a Rapid Ride stop such as weather protection, lighting, seating, and litter receptacles.
The project is proposed to meet recent travel demand growth in the area and as a part of the connectivity of the regional transit system.
This transit hub will provide service to Southport and other new development in the area which includes two hotels. In addition, a large
manufacturing company's employees will benefit from the transit hub's location as well as visitors to The Landing and the 57-acre Gene
Coulon Park.
This project is pending available funding and coordination with King County Metro.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
77
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:56
Project Account #:
Planning Area:City Center
Street Classification:Local
Project Length:0.15 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Southport Pedestrian Connection TIP #: 23-48
A pedestrian path underneath the BNSF trestle that connects into Southport. The repair/rebuild of the trestle, and other associated work, is
funded by LRF which is programmed within the Park Ave N Extension project (TIP #23-17).
To create a pedestrian connection from Lake Washington Boulevard to the boardwalk in Southport.
This project would be designed, constructed, and funded by the developer.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
78
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:49
Project Account #:
Planning Area:Valley
Street Classification:Minor Arterial
Project Length:1.27 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Operations and Safety, Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses - - - - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources - - - - - - - - - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
SW 27th Street/Strander Boulevard Connection TIP #: 23-49
The project will provide a grade-separated crossing at the Union Pacific Railroad (UPRR) and Burlington Northern Santa Fe (BNSF)
railroad tracks. Bicycle and pedestrian connections will be provided to the Tukwila Station and the Interurban Trail. Phase 1 - Seg 2a - 2
lane roadway from Naches Ave SW to the Sounder Station, including a BNSF bridge has been completed.
A new east-west arterial roadway will connect the cities of Renton and Tukwila and provide significant congestion relief to existing
arterials. The new road will provide access to the Tukwila Train/Sound Transit Station.
The City of Tukwila had taken the lead for future phases, however, Tukwila City Council voted unanimously in 2019 to terminate their
efforts to manage the next phase of the Strander Blvd. Improvements due to multiple issues including rising project costs that had
surpassed sustainable funding levels for local jurisdictions to be the lead on.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
- -
79
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:14
Project Account #:123011
Planning Area:Kennydale
Street Classification:Collector
Project Length:
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 37,641 32,500 5,141 - - - - - - -
Preliminary Engineering 1,500,000 - - 1,500,000 1,500,000 - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 18,500,000 - - 18,500,000 500,000 2,000,000 8,000,000 8,000,000 - -
Construction Services - - - - - - - - - -
Total Expenses 20,037,641 32,500 5,141 20,000,000 2,000,000 2,000,000 8,000,000 8,000,000 - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 37,641 32,500 5,141 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (1)- - - - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined 20,000,000 - - 20,000,000 2,000,000 2,000,000 8,000,000 8,000,000 - -
Total Resources 20,037,641 32,500 5,141 20,000,000 2,000,000 2,000,000 8,000,000 8,000,000 - -
Project Expenditures &
Resources TOTAL Programmed Six-Year Program
NE 44th Street/I-405 Park and Ride TIP #: 23-50
This project will construct a Park and Ride adjacent to the Sound Transit NE 44th Street/I-405 Stride inline transit station. The park and
ride will be constructed with approximately 200 stalls plus amenities such as bike lockers. A boardwalk will also be constructed to
connect the park and ride to the sidewalks along NE 44th Street leading to the in-line station.
New high capacity transit SRIDE service will begin in 2026 connecting regional growth centers along the I-405 corridor between
Lynnwood and Burien with 2 stations in Renton. In order to provide adequate access to the station at NE 44th Street the construction of
a park and ride is critical given its location and lack of local transit access.
The project received $258,000 for the pedestrian boardwalk as part of the 2022 supplemental state capital budget. The City is working to
execute an agreement with Sound Transit to secure the construction funding. Final estimates are still in development. Current opinion of
cost is $20M.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
37,641 20,000,000
80
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:32
Project Account #:332084
Planning Area:City Center
Street Classification:varies
Project Length:1 mi
Funding Status:Other-Led by Others
Project Description:
Program Aspects: Active Transportation
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning 6,000,000 - 6,000,000 - - - - - - -
Preliminary Engineering - - - - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction - - - - - - - - - -
Construction Services - - - - - - - - - -
Total Expenses 6,000,000 - 6,000,000 - - - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax - - - - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)6,000,000 - 6,000,000 - - - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)- - - - - - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 6,000,000 - 6,000,000 - - - - - - -
Project Expenditures & Resources TOTAL Programmed Six-Year Program
Eastrail TIP #: 23-51
Project will be coordinated by King County Department of Natural Resources and Parks and BNSF for acquisition of property rights, then
design and construction of the Eastrail between Milepost 5 and Southport/South Coulon Park access road.
A coalition of King and Snohomish counties, multiple cities, Sound Transit, PSE, and the non-profit 'Eastrail Partners' that includes SECO
Development and others are working to construct a continuous 42-mile "Eastrail" along BNSF trackage between Renton and South
Snohomish County. One of the key gaps is in Renton, where the existing Eastrail terminates at Milepost 5, just north of the north vehicle
entrance to Coulon Park. Extending the trail offers opportunities for Eastrail users to connect to employment centers and regional trails
such as the Cedar River Trail, Lake to Sound Trail, Lake WA Loop Trail and other shared-use paths within Renton.
The project was allocated $6,000,000 in funding through the Move Ahead Washington budget package for pedestrian and bike safety
projects. Project completion year falls outside the 6 years of the TIP. Programmed funding is for Planning only.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
6,000,000 -
81
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
PROJECT
Priority Rank:
Project Account #:122102
Planning Area:Kennydale
Street Classification:Collector
Project Length:N/A
Funding Status:Partially Funded - CN
Project Description:
Program Aspects: Plan Implementation and Compliance
Purpose:
Status/Changes:
Funded:Unfunded:
Pre-2023 2023 Total 2024 2025 2026 2027 2028 2029
Expenditures:
Salaries/Benefits - - - - - - - - - -
Planning - - - - - - - - - -
Preliminary Engineering 57,700 - 57,700 - - - - - - -
R-O-W (includes Admin)- - - - - - - - - -
Construction 410,000 - - 410,000 410,000 - - - - -
Construction Services - - - - - - - - - -
Total Expenses 467,700 - 57,700 410,000 410,000 - - - - -
Source of Fund:
REET 1/2 - - - - - - - - - -
B&O Tax 57,700 - 57,700 - - - - - - -
Fund Balance - - - - - - - - - -
Grants Awarded (State)210,000 - - 210,000 210,000 - - - - -
Grants Awarded (2)- - - - - - - - - -
Mitigation - - - - - - - - - -
Bonds / LID's Formed - - - - - - - - - -
Other (1)200,000 - - 200,000 200,000 - - - - -
Other (2)- - - - - - - - - -
- - - - - - - - - -
Undetermined - - - - - - - - - -
Total Resources 467,700 - 57,700 410,000 410,000 - - - - -
*Image shown is one of the final design options under consideration.
Project Expenditures & Resources TOTAL Programmed Six-Year Program
This project will install major entry signage, enhanced landscaping, lighting and electrical features as part of the I-405/NE 44th St
Interchange project.
To create a unique gateway for the city as part of the WSDOT I-405 Renton to Bellevue Widening and Express Toll Lanes project.
The WSDOT I-405 project started construction in 2020. The City received $210,000 from the State Legislature to fund gateway entry signage
into the City. The City also received $200,000 from Flat Iron to help fund construction. City staff is currently working through Design.
Construction is anticipated to start in 2024.
*For Projects, expenditures are for the life of the project. For Programs, they are the total expenditures
programmed in the current CIP and for the 6 years in the TIP, 2024-2029.
467,700 -
I-405/44th Gateway Signage & Green-Scaping
Improvements TIP #: CED-01
82
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
83
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
Section E
Appendix
2024 – 2029 Transportation Improvement Program
84
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
City of Renton 2024 - 2029 TRANSPORTATION IMPROVEMENT PROGRAM
Abbreviations and Acronyms
The following list defines the abbreviated words and/or acronyms used in the City of Renton’s Six-Year
Transportation Improvement Program.
ADA American Disability Act
BAT Business Access Transit
BNSF Burlington Northern Santa Fe
BRAC Bridge Replacement Advisory Committee
CBD Central Business District
CIP Capital Improvement Program
CMAQ Congestion Mitigation and Air Quality
CTR Commute Trip Reduction (State Act)
DOE Department of Ecology
EB Eastbound
ECL East City Limits
EIS Environmental Impact Study
FHWA Federal Highway Administration
FMSIB Freight Mobility Strategic Investment Board
FY Fiscal Year
GIS Geographic Information System
GMA Growth Management Act
HOV High Occupancy Vehicles
ITS Intelligent Transportation System
LF Linear Feet
LID Local Improvement District
LRF Local Revitalization Financing
LOS Level of Service
MAP-21 Moving Ahead for Progress in the 21st Century Act
METRO Municipality of Metropolitan Seattle
MOU Memorandum of Understanding
MUTCD Manual on Uniform Traffic Control Devices
NCL North City Limits
NB Northbound
PS&E Plans, Specifications, and Estimates
ROW Right-of-Way
RKAAMP Renton Kent Auburn Area Mobility Plan
RTA Regional Transit Authority
SB Southbound
SCL South City Limits
SOV Single Occupant Vehicle
ST Sound Transit
SR State Route
STP Surface Transportation Program
TDM Transportation Demand Management Program
TIB Transportation Improvement Board
TIP Transportation Improvement Plan
WB Westbound
WCL West City Limits
WSDOT Washington State Department of Transportation
85
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
RESOLUTION NO. 4503 AGENDA ITEM #5. f)
1
CITY OF RENTON, WASHINGTON
ORDINANCE NO. ________
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, ADDING A NEW
SECTION 5-27-035 TO THE RENTON MUNICIPAL CODE IMPOSING AN
ADDITIONAL SALES AND USE TAX OF ONE-TENTH OF ONE PERCENT WITHIN THE
BOUNDARIES OF THE RENTON TRANSPORTATION BENEFIT DISTRICT FOR THE
PURPOSE OF FINANCING THE COSTS ASSOCIATED WITH TRANSPORTATION
IMPROVEMENTS IN THE DISTRICT AS AUTHORIZED BY RCW 36.73.065 AND RCW
82.14.0455; PROVIDING FOR SEVERABILITY, AUTHORIZING CORRECTIONS, AND
ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the Renton Transportation Benefit District (the “District”) was established by
City of Renton Ordinance No. 6115, passed by the Renton City Council on August 14, 2023 and
codified as Chapter 5-27 of the Renton Municipal Code (RMC); and
WHEREAS, under Ordinance No. 6121, passed by the Renton City Council on October 9,
2023, the City of Renton assumed the rights, powers, immunities, functions, and obligations of
the District pursuant to RCW 36.74.010 and enacted RMC 5-27-020 to recognize the assumption;
and
WHEREAS, RCW 36.73.040(3)(a) authorizes transportation benefit districts to impose a
sales and use tax, subject to the provisions of RCW 36.73.065 and RCW 82.14.0455; and
WHEREAS, RCW 36.73.065(4)(a)(v) authorizes transportation benefit districts to impose a
sales and use tax in accordance with RCW 82.14.0455 in an amount not exceeding one-tenth of one
percent (0.1%) for a period of ten (10) years upon a majority vote of the governing body of the
district for the purpose of financing the transportation improvements of a district; and
WHEREAS, post-assumption of the District as provided in Ordinance No. 6121, the Renton
City Council has all powers given to the governing body of the District; and
AGENDA ITEM #5. f)
ORDINANCE NO. ________
2
WHEREAS, the Renton City Council has carefully considered the financial needs of the
City’s transportation system and the imposition of the tax and has determined that the best
interests of the City and the District will be served by passing this ordinance;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
ORDAIN AS FOLLOWS:
SECTION I. All portions of the Renton Municipal Code in this ordinance not shown in
strikethrough and underline edits or are not explicitly repealed herein remain in effect and
unchanged.
SECTION II. Chapter 5-27 of the Renton Municipal Code is amended to add a new
section 5-27-035, Additional Sales and Use Tax for Renton Transportation Benefit District, to read
as follows:
5.27.035 ADDITIONAL SALES AND USE TAX FOR RENTON
TRANSPORTATION BENEFIT DISTRICT:
A. Pursuant to RCW 36.73.065 and RCW 82.14.0455, there is hereby imposed
an additional sales and use tax to be collected from persons who are taxable
by the state under Chapters 82.08 and 82.12 RCW upon the occurrence of any
taxable event within the Renton Transportation Benefit District. The amount of
the additional tax shall be one-tenth of one percent (0.1%) of the selling price, in
the case of the sales tax, or the value of the article used, in the case of the use tax.
B. The tax imposed by this section shall apply for a period of ten (10) years
from the date the tax is first collected within the District and shall thereafter cease
to be imposed unless renewed with the affirmative vote of the voters voting at an
AGENDA ITEM #5. f)
ORDINANCE NO. ________
3
election or a majority vote of the Renton City Council exercising its authority as
the governing body of the district.
C. The tax imposed by this Section shall be in addition to any other taxes
authorized by law, including but not limited to, the sales and use taxes by other
Sections of the Renton Municipal Code.
D. The revenues received from the tax imposed by this Section shall be
general revenues of the District and shall be used for those purposes set forth in
RMC 5.27.040 or as otherwise authorized by law.
SECTION III. The City Clerk and the Finance Director are hereby requested to submit this
ordinance to the Washington State Department of Revenue and to request that the Department
take all necessary steps to implement and collect the tax imposed by this ordinance as soon as
possible.
SECTION IV. Upon approval of the City Attorney, the City Clerk is authorized to direct
the codifier to make necessary corrections to this ordinance, including the corrections of
scriveners or clerical errors; references to other local, state, or federal laws, codes, rules, or
regulations; or ordinance numbering and section/subsection numbering and references. The City
Clerk is further authorized to direct the codifier to update any chapter, section, or subsection
titles in the Renton Municipal Code affected by this ordinance.
SECTION V. If any section, subsection, sentence, clause, phrase, or word of this
ordinance should be held to be invalid or unconstitutional by a court of competent jurisdiction,
such invalidity or unconstitutionality thereof shall not affect the constitutionality of any other
section, subsection, sentence, clause, phrase, or word of this ordinance.
AGENDA ITEM #5. f)
ORDINANCE NO. ________
4
SECTION VI. This ordinance shall be in full force and effect five (5) days after publication
of a summary of this ordinance in the City's official newspaper. The summary shall consist of this
ordinance's title.
PASSED BY THE CITY COUNCIL the day of , 2023.
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of , 2023.
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, City Attorney
Date of Publication:
ORD-PW:2279:10/12/2023
AGENDA ITEM #5. f)
AB - 3462
City Council Regular Meeting - 06 Nov 2023
SUBJECT/TITLE:Bid Award- Burnett Avenue S Sidewalk & Utilities Replacement
Project - CAG-23-299
RECOMMENDED ACTION: Refer to Finance Committee
DEPARTMENT: Public Works Utility Systems Division
STAFF CONTACT:Jonathan Chavez, Water Utility Civil Engineer III
EXT.:7208
FISCAL IMPACT SUMMARY:
The submitted low bid of $897,897 is under the engineer’s estimate of $990,336 by $92,439. The estimated
remaining total project cost including construction, contract administration, inspection and 10% construction
contingency is $1,007,587.
The city was awarded a grant for $490,000 from the Department of Commerce (CAG-22-031- Grant No. 20-
966627-211) for the design and construction of sidewalks, streetlights, and streetscape improvements along
Burnett Ave S. The contract amount for the design of the project is $107,548 leaving the remaining balance of
$382,452 for the construction contract for Schedule A.
An additional budget of $182,184 is needed to cover the total estimated cost of $564,636 for Schedule A
(Sidewalk & Street Lights), which includes construction cost, staff time for contract administration, inspection,
and construction contingency. The additional budget appropriation from the General Fund is proposed in the
mid-biennium budget adjustment that is submitted for Council’s review and approval.
SUMMARY OF ACTION:
The bid opening for this construction contract was held on September 26, 2023, 12 bids were received by the
city ranging from $897,897 to $1,355, 696 with our engineer’s estimate of $990,336.
The project consists of installation of new sidewalk, streetlights, street trees, litter receptacle, bench, and bike racks
along the east side of Burnet Ave S. from S. 4th St to S. 5th St along with approximately 500 feet of new 12-inch water
main, 111 feet of 12-inch storm system improvements, and asphalt overlay of the roadway.
There are sufficient funds in the Water Utility and Surface Water Utility 2023 Capital Improvement Program budget to
cover the construction cost for the watermain improvements (Schedule B - account no. 425.455290 – Downtown
Watermain Replacement) and storm system improvements (Schedule C - account no. 427.475510 – Downtown Storm
System Improvements).
The bid opening met the following Council criteria:
1) There was more than one bid;
2) There were no major irregularities with the lowest responsive and responsible bid.
However, the bid is above the project budget and is being referred to the Finance Committee for recommendation of a
budget transfer to cover the budget gap.
AGENDA ITEM #5. g)
Determination of responsive bid and responsible bidder
Water Utility staff has reviewed the low bid by Active Construction Inc. (ACI) and determined that the bid is
responsive and that ACI is a responsible bidder as defined in RCW 39.04.350, in Renton City policy 250-02 and
in section 1-02.14 of the project specifications (see Exhibit B – Bidder Assessment ACI). The surety has
confirmed with staff that the bid bond submitted by ACI is valid. We have checked the bidder’s provided
references and determined that they have the required experience and expertise to perform the project. ACI
has successfully completed similar projects with the City of Renton, including the Lake Washington Loop Trail
project (CAG-20-126), the Philips Arnold Park Site Improvements project (CAG-22-158), and they are currently
constructing the sidewalk, streetlights and streetscape improvements on Williams Ave S between S 2nd St and
S 3rd St (CAG-23-241).
EXHIBITS:
A. Final Bid Tabulation
B. City Clerk Bid Opening
C. Bidder Assessment
STAFF RECOMMENDATION:
Award the construction contract for the Burnett Avenue S Sidewalk & Utilities Replacement (CAG-23-299) to
the lowest responsive and responsible bidder, Active Construction Inc., in the amount of $897,897 and
authorize the Mayor and City Clerk to execute the construction contract.
AGENDA ITEM #5. g)
Project Burnett Ave S Sidewalk & Utility Replacement Project (CAG23-299)City of Renton Active Construction Sound Earthworks R.L. Alia Company
BID DATE: 26-Sep-23 Engineers Estimate
Item No. Description Unit Quantity Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount
SCHEDULE A SIDEWALK & UTILITY IMPROVEMENTS
A01 MINOR CHANGE
EST 1 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$
A02 ROADWAY SURVEYING
LS 1 10,000.00$ 10,000.00$ 7,125.00$ 7,125.00$ 7,800.00$ 7,800.00$ 8,000.00$ 8,000.00$
A03 RECORD DRAWINGS
LS 1 2,500.00$ 2,500.00$ 150.00$ 150.00$ 400.00$ 400.00$ 1,500.00$ 1,500.00$
A04 SPCC Plan
LS 1 750.00$ 750.00$ 150.00$ 150.00$ 500.00$ 500.00$ 1,000.00$ 1,000.00$
A05 MOBILIZATION
LS 1 90,000.00$ 90,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 50,000.00$ 44,000.00$ 44,000.00$
A06 PROJECT TEMPORARY TRAFFIC CONTROL
LS 1 24,000.00$ 24,000.00$ 37,244.93$ 37,244.93$ 54,000.00$ 54,000.00$ 12,000.00$ 12,000.00$
A07 CLEARING AND GRUBBING
LS 1 4,000.00$ 4,000.00$ 6,500.00$ 6,500.00$ 14,500.00$ 14,500.00$ 2,500.00$ 2,500.00$
A08 REMOVAL OF STRUCTURE AND OBSTRUCTION
LS 1 31,000.00$ 31,000.00$ 50,000.00$ 50,000.00$ 24,000.00$ 24,000.00$ 30,000.00$ 30,000.00$
A09 SALVAGE AND REINSTALL EXISTING FENCE PANELS
LS 1 750.00$ 750.00$ 6,900.00$ 6,900.00$ 5,000.00$ 5,000.00$ 1,000.00$ 1,000.00$
A10 TREE PROTECTION
LS 1 4,000.00$ 4,000.00$ 2,550.00$ 2,550.00$ 3,000.00$ 3,000.00$ 3,000.00$ 3,000.00$
A11 CRUSHED SURFACING TOP COURSE
TON 85 129.00$ 10,965.00$ 67.00$ 5,695.00$ 70.00$ 5,950.00$ 150.00$ 12,750.00$
A12 HMA CL. 1/2" PG 58H-22
TON 70 294.00$ 20,580.00$ 327.00$ 22,890.00$ 440.00$ 30,800.00$ 350.00$ 24,500.00$
A13 EROSION CONTROL AND WATER POLLUTION PREVENTION
LS 1 5,000.00$ 5,000.00$ 4,500.00$ 4,500.00$ 10,000.00$ 10,000.00$ 2,500.00$ 2,500.00$
A14 TOPSOIL TYPE A
CY 6 150.00$ 900.00$ 85.50$ 513.00$ 110.00$ 660.00$ 300.00$ 1,800.00$
A15 SEEDED LAWN INSTALLATION
SY 61 17.00$ 1,037.00$ 16.00$ 976.00$ 25.00$ 1,525.00$ 10.00$ 610.00$
A16 ARBORIST WOOD CHIP MULCH
CY 2 250.00$ 500.00$ 133.00$ 266.00$ 350.00$ 700.00$ 500.00$ 1,000.00$
A17 FLEXIBLE POROUS SURFACE TREATMENT
LS 1 10,420.00$ 10,420.00$ 6,760.00$ 6,760.00$ 1,600.00$ 1,600.00$ 7,500.00$ 7,500.00$
A18 CEMENT CONC. TRAFFIC CURB AND GUTTER
LF 480 60.00$ 28,800.00$ 53.00$ 25,440.00$ 65.00$ 31,200.00$ 50.00$ 24,000.00$
A19 CEMENT CONC. DRIVEWAY ENTRANCE MODIFIED TYPE R1B
SY 51 185.00$ 9,435.00$ 200.00$ 10,200.00$ 170.00$ 8,670.00$ 100.00$ 5,100.00$
A20 CEMENT CONC. DRIVEWAY ENTRANCE TYPE C1B
SY 54 245.00$ 13,230.00$ 255.00$ 13,770.00$ 170.00$ 9,180.00$ 120.00$ 6,480.00$
A21 CEMENT CONC. SIDEWALK
SY 118 125.00$ 14,750.00$ 114.00$ 13,452.00$ 120.00$ 14,160.00$ 70.00$ 8,260.00$
A22 CEMENT CONC. SIDEWALK W 2'x2' PATTERN
SY 178 165.00$ 29,370.00$ 136.00$ 24,208.00$ 140.00$ 24,920.00$ 200.00$ 35,600.00$
A23 ADJUST HANDHOLE OR IRRIGATION BOX COVER AND FRAME TO FINISH GRADE EA 5 750.00$ 3,750.00$ 475.00$ 2,375.00$ 330.00$ 1,650.00$ 800.00$ 4,000.00$
A24 ILLUMINATION SYSTEM ALONG BURNETT BETWEEN S 4TH ST AND S 5TH ST, COMPLETE LS 1 206,900.00$ 206,900.00$ 175,000.00$ 175,000.00$ 215,000.00$ 215,000.00$ 210,000.00$ 210,000.00$
A25 PERMANENT SIGNING
LS 1 1,000.00$ 1,000.00$ 1,800.00$ 1,800.00$ 1,600.00$ 1,600.00$ 2,000.00$ 2,000.00$
A26 REMOVE AND REPLACE PAVEMENT MARKING
LS 1 5,000.00$ 5,000.00$ 3,700.00$ 3,700.00$ 3,300.00$ 3,300.00$ 4,000.00$ 4,000.00$
A27 WASTE RECEPTACLE
EA 1 2,500.00$ 2,500.00$ 2,150.00$ 2,150.00$ 1,500.00$ 1,500.00$ 2,500.00$ 2,500.00$
A28 BENCH
EA 1 2,500.00$ 2,500.00$ 3,550.00$ 3,550.00$ 2,000.00$ 2,000.00$ 2,000.00$ 2,000.00$
A29 BIKE RACK 1 1,500.00$ 1,500.00$ 1,350.00$ 1,350.00$ 2,000.00$ 2,000.00$ 2,500.00$ 2,500.00$
Total Sch A 560,137.00$ Total Sch A 504,214.93$ Total Sch A 550,615.00$ Total Sch A 485,100.00$
SCHEDULE B WATER MAIN IMPROVEMENTS
B01 MOBILIZATION/DEMOBILIZATION (10% MAX) LS 1 30,000.00$ 30,000.00$ 1,000.00$ 1,000.00$ 100.00$ 100.00$ 30,000.00$ 30,000.00$
B02 TRENCH SURVEYING SYSTEMS LS 1 2,500.00$ 2,500.00$ 3,800.00$ 3,800.00$ 100.00$ 100.00$ 1,000.00$ 1,000.00$
B03 CONSTRUCTION SURVEYING, STAKING, AND AS-BUILT DRAWINGS LS 1 5,000.00$ 5,000.00$ 4,700.00$ 4,700.00$ 2,700.00$ 2,700.00$ 3,000.00$ 3,000.00$
B04 TEMPORARY TRAFFIC CONTROL LS 1 5,000.00$ 5,000.00$ 1,000.00$ 1,000.00$ 7,000.00$ 7,000.00$ 4,800.00$ 4,800.00$
B05 EROSION CONTROL AND WATER POLLUTION CONTROL LS 1 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 400.00$ 400.00$ 2,500.00$ 2,500.00$
B06 SITE SPECIFIC UTILITY POTHOLING EA 10 500.00$ 5,000.00$ 665.00$ 6,650.00$ 250.00$ 2,500.00$ 400.00$ 4,000.00$
B07 DUCTILE IRON CLASS 52 12-INCH DIAMETER PUSH-ON JOINT WATER PIPE AND RESTRAINED-JOINT FITTINGS LF 500 200.00$ 100,000.00$ 159.25$ 79,625.00$ 115.00$ 57,500.00$ 152.00$ 76,000.00$
B08 24"X12" TAPPING TEE AND 12" TAPPING VALVE EA 1 10,000.00$ 10,000.00$ 13,675.00$ 13,675.00$ 17,000.00$ 17,000.00$ 15,000.00$ 15,000.00$
B09 GATE VALVE ASSEMBLY, 12-INCH EA 3 4,000.00$ 12,000.00$ 4,500.00$ 13,500.00$ 4,600.00$ 13,800.00$ 4,000.00$ 12,000.00$
B10 FIRE HYDRANT ASSEMBLY EA 3 6,000.00$ 18,000.00$ 10,300.00$ 30,900.00$ 9,100.00$ 27,300.00$ 7,500.00$ 22,500.00$
B11 CONNECTION TO EXISTING WATER MAIN EA 2 5,000.00$ 10,000.00$ 6,100.00$ 12,200.00$ 5,800.00$ 11,600.00$ 4,000.00$ 8,000.00$
B12 WATER SERVICE CONNECTION, 1.5-INCH EA 2 3,000.00$ 6,000.00$ 6,850.00$ 13,700.00$ 6,500.00$ 13,000.00$ 8,000.00$ 16,000.00$
B13 WATER SERVICE CONNECTION, 1-INCH EA 6 2,500.00$ 15,000.00$ 3,325.00$ 19,950.00$ 2,500.00$ 15,000.00$ 3,400.00$ 20,400.00$
B14 CUT AND CAP EXISTING WATER MAIN EA 2 1,000.00$ 2,000.00$ 760.00$ 1,520.00$ 2,500.00$ 5,000.00$ 1,000.00$ 2,000.00$
B15 CONCRETE FOR THRUST BLOCKING AND DEAD-MAN ANCHOR BLOCKS CY 10 350.00$ 3,500.00$ 378.00$ 3,780.00$ 300.00$ 3,000.00$ 300.00$ 3,000.00$
B16 REMOVAL AND REPLACEMENT OF UNSUITABLE FOUNDATION MATERIAL Ton 10 50.00$ 500.00$ 80.00$ 800.00$ 50.00$ 500.00$ 90.00$ 900.00$
B17 GRAVEL BORROW FOR TRENCH BACKFILL (RECYCLED MATERIALS NOT ALLOWED) Ton 550 40.00$ 22,000.00$ 54.00$ 29,700.00$ 45.00$ 24,750.00$ 80.00$ 44,000.00$
B18 CRUSHED SURFACING TOP COURSE Ton 100 40.00$ 4,000.00$ 59.00$ 5,900.00$ 70.00$ 7,000.00$ 150.00$ 15,000.00$
B19 HOT MIX ASPHALT FOR FINAL TRENCH PATCH Ton 150 220.00$ 33,000.00$ 176.00$ 26,400.00$ 210.00$ 31,500.00$ 210.00$ 31,500.00$
B20 HOT MIX ASPHALT OVERLAY HMA CL. 1/2 INCH PG 58H-22 Ton 70 250.00$ 17,500.00$ 286.00$ 20,020.00$ 180.00$ 12,600.00$ 350.00$ 24,500.00$
B21 MINOR CHANGES LS 1 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$
Subtotal Sch B 327,000.00$ 314,820.00$ 277,350.00$ 361,100.00$
Sales Tax (10.1%)33,027.00$ Sales Tax (10.1%)31,796.82$ Sales Tax (10.1%)28,012.35$ Sales Tax (10.1%)36,471.10$
Total Sch B 360,027.00$ Total Sch B 346,616.82$ Total Sch B 305,362.35$ Total Sch B 397,571.10$
SCHEDULE C STORM DRAIN IMPROVEMENTS
C01 MINOR CHANGE EST 1 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ 10,000.00$ $10,000.00 10,000.00$
C02 PROJECT TEMPORARY TRAFFIC CONTROL LS 1 6,000.00$ 6,000.00$ 1,000.00$ 1,000.00$ 10,000.00$ 10,000.00$ $2,500.00 2,500.00$
C03 REMOVAL OF STRUCTURE AND OBSTRUCTION LS 1 6,700.00$ 6,700.00$ 1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ $2,500.00 2,500.00$
C04 SHORING OR EXTRA EXCAVATION CLASS B LS 1 3,000.00$ 3,000.00$ 1,000.00$ 1,000.00$ 1,800.00$ 1,800.00$ $11,500.00 11,500.00$
C05 CRUSHED SURFACING TOP COURSE TON 13 129.00$ 1,677.00$ 70.25$ 913.25$ 70.00$ 910.00$ $150.00 1,950.00$
C06 HMA CL. 1/2" PG 64-22 TON 12 280.00$ 3,360.00$ 178.00$ 2,136.00$ 720.00$ 8,640.00$ $400.00 4,800.00$
C07 DRAIN PIPE 3 IN . DIAM. LS 1 1,100.00$ 1,100.00$ 2,100.00$ 2,100.00$ 3,000.00$ 3,000.00$ $2,500.00 2,500.00$
C08 DUCTILE IRON STORM SEWER PIPE 12 IN. DIAM. LF 111 185.00$ 20,535.00$ 166.00$ 18,426.00$ 115.00$ 12,765.00$ $180.00 19,980.00$
C09 CATCH BASIN TYPE 1 EA 3 3,500.00$ 10,500.00$ 1,515.00$ 4,545.00$ 1,200.00$ 3,600.00$ $2,500.00 7,500.00$
C10 CATCH BASIN TYPE 2 48 IN. DIAM. EA 1 5,800.00$ 5,800.00$ 5,050.00$ 5,050.00$ 3,700.00$ 3,700.00$ $5,000.00 5,000.00$
C11 CONNECTION TO DRAINAGE STRUCTURE EA 1 1,500.00$ 1,500.00$ 895.00$ 895.00$ 1,100.00$ 1,100.00$ $1,000.00 1,000.00$
Total Sch C 70,172.00$ Total Sch C 47,065.25$ Total Sch C 56,515.00$ Total Sch C 69,230.00$
* Numbers in red are corrected errors.
$ 990,336.00 $ 897,897.00 912,492.35$ 951,901.10$ Total of Schedules
A, B, & C AGENDA ITEM #5. g)
Project Burnett Ave S Sidewalk & Utility Replacement Project (CAG23-299)
BID DATE: 26-Sep-23
Item No. Description Unit Quantity
SCHEDULE A SIDEWALK & UTILITY IMPROVEMENTS
A01 MINOR CHANGE
EST 1
A02 ROADWAY SURVEYING
LS 1
A03 RECORD DRAWINGS
LS 1
A04 SPCC Plan
LS 1
A05 MOBILIZATION
LS 1
A06 PROJECT TEMPORARY TRAFFIC CONTROL
LS 1
A07 CLEARING AND GRUBBING
LS 1
A08 REMOVAL OF STRUCTURE AND OBSTRUCTION
LS 1
A09 SALVAGE AND REINSTALL EXISTING FENCE PANELS
LS 1
A10 TREE PROTECTION
LS 1
A11 CRUSHED SURFACING TOP COURSE
TON 85
A12 HMA CL. 1/2" PG 58H-22
TON 70
A13 EROSION CONTROL AND WATER POLLUTION PREVENTION
LS 1
A14 TOPSOIL TYPE A
CY 6
A15 SEEDED LAWN INSTALLATION
SY 61
A16 ARBORIST WOOD CHIP MULCH
CY 2
A17 FLEXIBLE POROUS SURFACE TREATMENT
LS 1
A18 CEMENT CONC. TRAFFIC CURB AND GUTTER
LF 480
A19 CEMENT CONC. DRIVEWAY ENTRANCE MODIFIED TYPE R1B
SY 51
A20 CEMENT CONC. DRIVEWAY ENTRANCE TYPE C1B
SY 54
A21 CEMENT CONC. SIDEWALK
SY 118
A22 CEMENT CONC. SIDEWALK W 2'x2' PATTERN
SY 178
A23 ADJUST HANDHOLE OR IRRIGATION BOX COVER AND FRAME TO FINISH GRADE EA 5
A24 ILLUMINATION SYSTEM ALONG BURNETT BETWEEN S 4TH ST AND S 5TH ST, COMPLETE LS 1
A25 PERMANENT SIGNING
LS 1
A26 REMOVE AND REPLACE PAVEMENT MARKING
LS 1
A27 WASTE RECEPTACLE
EA 1
A28 BENCH
EA 1
A29 BIKE RACK 1
SCHEDULE B WATER MAIN IMPROVEMENTS
B01 MOBILIZATION/DEMOBILIZATION (10% MAX) LS 1
B02 TRENCH SURVEYING SYSTEMS LS 1
B03 CONSTRUCTION SURVEYING, STAKING, AND AS-BUILT DRAWINGS LS 1
B04 TEMPORARY TRAFFIC CONTROL LS 1
B05 EROSION CONTROL AND WATER POLLUTION CONTROL LS 1
B06 SITE SPECIFIC UTILITY POTHOLING EA 10
B07 DUCTILE IRON CLASS 52 12-INCH DIAMETER PUSH-ON JOINT WATER PIPE AND RESTRAINED-JOINT FITTINGS LF 500
B08 24"X12" TAPPING TEE AND 12" TAPPING VALVE EA 1
B09 GATE VALVE ASSEMBLY, 12-INCH EA 3
B10 FIRE HYDRANT ASSEMBLY EA 3
B11 CONNECTION TO EXISTING WATER MAIN EA 2
B12 WATER SERVICE CONNECTION, 1.5-INCH EA 2
B13 WATER SERVICE CONNECTION, 1-INCH EA 6
B14 CUT AND CAP EXISTING WATER MAIN EA 2
B15 CONCRETE FOR THRUST BLOCKING AND DEAD-MAN ANCHOR BLOCKS CY 10
B16 REMOVAL AND REPLACEMENT OF UNSUITABLE FOUNDATION MATERIAL Ton 10
B17 GRAVEL BORROW FOR TRENCH BACKFILL (RECYCLED MATERIALS NOT ALLOWED) Ton 550
B18 CRUSHED SURFACING TOP COURSE Ton 100
B19 HOT MIX ASPHALT FOR FINAL TRENCH PATCH Ton 150
B20 HOT MIX ASPHALT OVERLAY HMA CL. 1/2 INCH PG 58H-22 Ton 70
B21 MINOR CHANGES LS 1
SCHEDULE C STORM DRAIN IMPROVEMENTS
C01 MINOR CHANGE EST 1
C02 PROJECT TEMPORARY TRAFFIC CONTROL LS 1
C03 REMOVAL OF STRUCTURE AND OBSTRUCTION LS 1
C04 SHORING OR EXTRA EXCAVATION CLASS B LS 1
C05 CRUSHED SURFACING TOP COURSE TON 13
C06 HMA CL. 1/2" PG 64-22 TON 12
C07 DRAIN PIPE 3 IN . DIAM. LS 1
C08 DUCTILE IRON STORM SEWER PIPE 12 IN. DIAM. LF 111
C09 CATCH BASIN TYPE 1 EA 3
C10 CATCH BASIN TYPE 2 48 IN. DIAM. EA 1
C11 CONNECTION TO DRAINAGE STRUCTURE EA 1
* Numbers in red are corrected errors.
Indepth Excavation HCON Inc. New X Inc. Northwest Cascade Inc.
Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount
25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$
7,500.00$ 7,500.00$ 12,500.00$ 12,500.00$ 7,730.00$ 7,730.00$ 8,000.00$ 8,000.00$
1,000.00$ 1,000.00$ 1,000.00$ 1,000.00$ 2,973.00$ 2,973.00$ 3,500.00$ 3,500.00$
1,200.00$ 1,200.00$ 1,000.00$ 1,000.00$ 1,467.00$ 1,467.00$ 500.00$ 500.00$
80,000.00$ 80,000.00$ 58,000.00$ 58,000.00$ 46,154.00$ 46,154.00$ 65,000.00$ 65,000.00$
20,000.00$ 20,000.00$ 75,000.00$ 75,000.00$ 12,842.00$ 12,842.00$ 50,000.00$ 50,000.00$
1,000.00$ 1,000.00$ 5,300.00$ 5,300.00$ 1,835.00$ 1,835.00$ 48,000.00$ 48,000.00$
1,000.00$ 1,000.00$ 50,000.00$ 50,000.00$ 78,300.00$ 78,300.00$ 48,000.00$ 48,000.00$
5,000.00$ 5,000.00$ 10,000.00$ 10,000.00$ 3,092.00$ 3,092.00$ 3,000.00$ 3,000.00$
1,000.00$ 1,000.00$ 9,100.00$ 9,100.00$ 612.00$ 612.00$ 2,400.00$ 2,400.00$
40.00$ 3,400.00$ 30.00$ 2,550.00$ 95.00$ 8,075.00$ 117.00$ 9,945.00$
450.00$ 31,500.00$ 310.00$ 21,700.00$ 450.00$ 31,500.00$ 397.00$ 27,790.00$
1,100.00$ 1,100.00$ 8,000.00$ 8,000.00$ 1,784.00$ 1,784.00$ 17,000.00$ 17,000.00$
35.00$ 210.00$ 100.00$ 600.00$ 125.00$ 750.00$ 280.00$ 1,680.00$
5.00$ 305.00$ 35.00$ 2,135.00$ 30.00$ 1,830.00$ 23.00$ 1,403.00$
45.00$ 90.00$ 500.00$ 1,000.00$ 178.00$ 356.00$ 280.00$ 560.00$
6,500.00$ 6,500.00$ 7,500.00$ 7,500.00$ 1,427.00$ 1,427.00$ 9,250.00$ 9,250.00$
75.00$ 36,000.00$ 61.00$ 29,280.00$ 57.00$ 27,360.00$ 63.00$ 30,240.00$
200.00$ 10,200.00$ 240.00$ 12,240.00$ 188.00$ 9,588.00$ 168.00$ 8,568.00$
200.00$ 10,800.00$ 240.00$ 12,960.00$ 188.00$ 10,152.00$ 168.00$ 9,072.00$
150.00$ 17,700.00$ 125.00$ 14,750.00$ 164.00$ 19,352.00$ 100.00$ 11,800.00$
200.00$ 35,600.00$ 150.00$ 26,700.00$ 261.00$ 46,458.00$ 117.00$ 20,826.00$
850.00$ 4,250.00$ 500.00$ 2,500.00$ 417.00$ 2,085.00$ 1,000.00$ 5,000.00$
210,000.00$ 210,000.00$ 210,000.00$ 210,000.00$ 243,761.00$ 243,761.00$ 189,000.00$ 189,000.00$
2,000.00$ 2,000.00$ 6,500.00$ 6,500.00$ 2,973.00$ 2,973.00$ 2,000.00$ 2,000.00$
3,750.00$ 3,750.00$ 3,150.00$ 3,150.00$ 3,567.00$ 3,567.00$ 3,950.00$ 3,950.00$
1,400.00$ 1,400.00$ 1,500.00$ 1,500.00$ 2,973.00$ 2,973.00$ 4,200.00$ 4,200.00$
2,750.00$ 2,750.00$ 1,500.00$ 1,500.00$ 2,973.00$ 2,973.00$ 3,350.00$ 3,350.00$
1,200.00$ 1,200.00$ 1,500.00$ 1,500.00$ 1,784.00$ 1,784.00$ 1,200.00$ 1,200.00$
Total Sch A 521,455.00$ Total Sch A 612,965.00$ Total Sch A 598,753.00$ Total Sch A 610,234.00$
35,000.00$ 35,000.00$ 25,000.00$ 25,000.00$ 3,780.00$ 3,780.00$ 28,500.00$ 28,500.00$
5,000.00$ 5,000.00$ 1,000.00$ 1,000.00$ 2,700.00$ 2,700.00$ 1,150.00$ 1,150.00$
3,000.00$ 3,000.00$ 1,500.00$ 1,500.00$ 11,800.00$ 11,800.00$ 2,750.00$ 2,750.00$
10,000.00$ 10,000.00$ 8,000.00$ 8,000.00$ 9,450.00$ 9,450.00$ 27,000.00$ 27,000.00$
1,000.00$ 1,000.00$ 2,000.00$ 2,000.00$ 3,780.00$ 3,780.00$ 7,200.00$ 7,200.00$
850.00$ 8,500.00$ 500.00$ 5,000.00$ 918.00$ 9,180.00$ 675.00$ 6,750.00$
195.00$ 97,500.00$ 222.00$ 111,000.00$ 197.00$ 98,500.00$ 159.00$ 79,500.00$
14,000.00$ 14,000.00$ 13,000.00$ 13,000.00$ 16,740.00$ 16,740.00$ 13,500.00$ 13,500.00$
3,500.00$ 10,500.00$ 3,500.00$ 10,500.00$ 5,940.00$ 17,820.00$ 4,200.00$ 12,600.00$
8,500.00$ 25,500.00$ 7,500.00$ 22,500.00$ 10,800.00$ 32,400.00$ 7,400.00$ 22,200.00$
10,000.00$ 20,000.00$ 3,600.00$ 7,200.00$ 3,780.00$ 7,560.00$ 3,500.00$ 7,000.00$
6,000.00$ 12,000.00$ 7,000.00$ 14,000.00$ 9,180.00$ 18,360.00$ 6,400.00$ 12,800.00$
2,500.00$ 15,000.00$ 2,200.00$ 13,200.00$ 3,780.00$ 22,680.00$ 2,900.00$ 17,400.00$
1,500.00$ 3,000.00$ 3,800.00$ 7,600.00$ 1,296.00$ 2,592.00$ 2,000.00$ 4,000.00$
200.00$ 2,000.00$ 10.00$ 100.00$ 270.00$ 2,700.00$ 500.00$ 5,000.00$
50.00$ 500.00$ 10.00$ 100.00$ 162.00$ 1,620.00$ 43.00$ 430.00$
35.00$ 19,250.00$ 1.00$ 550.00$ 38.00$ 20,900.00$ 43.00$ 23,650.00$
40.00$ 4,000.00$ 35.00$ 3,500.00$ 52.00$ 5,200.00$ 102.00$ 10,200.00$
250.00$ 37,500.00$ 200.00$ 30,000.00$ 210.00$ 31,500.00$ 207.00$ 31,050.00$
250.00$ 17,500.00$ 200.00$ 14,000.00$ 183.00$ 12,810.00$ 398.00$ 27,860.00$
25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$
365,750.00$ 314,750.00$ 357,072.00$ 365,540.00$
Sales Tax (10.1%)36,940.75$ Sales Tax (10.1%)31,789.75$ Sales Tax (10.1%)36,064.27$ Sales Tax (10.1%)36,919.54$
Total Sch B 402,690.75$ Total Sch B 346,539.75$ Total Sch B 393,136.27$ Total Sch B 402,459.54$
$10,000.00 10,000.00$ $10,000.00 10,000.00$ $10,000.00 10,000.00 $10,000.00 10,000.00$
$7,500.00 7,500.00$ $18,000.00 18,000.00$ $4,460.00 4,460.00 $17,000.00 17,000.00$
$500.00 500.00$ $5,400.00 5,400.00$ $6,541.00 6,541.00 $3,100.00 3,100.00$
$1,500.00 1,500.00$ $1,000.00 1,000.00$ $4,162.00 4,162.00 $1,150.00 1,150.00$
$40.00 520.00$ $35.00 455.00$ $72.00 936.00 $117.00 1,521.00$
$400.00 4,800.00$ $200.00 2,400.00$ $298.00 3,576.00 $266.00 3,192.00$
$1,000.00 1,000.00$ $1,500.00 1,500.00$ $2,973.00 2,973.00 $575.00 575.00$
$200.00 22,200.00$ $175.00 19,425.00$ $95.00 10,545.00 $219.00 24,309.00$
$4,000.00 12,000.00$ $3,500.00 10,500.00$ $1,426.00 4,278.00 $1,800.00 5,400.00$
$5,000.00 5,000.00$ $5,500.00 5,500.00$ $6,185.00 6,185.00 $4,500.00 4,500.00$
$2,000.00 2,000.00$ $2,500.00 2,500.00$ $2,973.00 2,973.00 $1,350.00 1,350.00$
Total Sch C 67,020.00$ Total Sch C 76,680.00$ Total Sch C 56,629.00$ Total Sch C 72,097.00$
991,165.75$ 1,036,184.75$ 1,048,518.27$ 1,084,790.54$ AGENDA ITEM #5. g)
Project Burnett Ave S Sidewalk & Utility Replacement Project (CAG23-299)
BID DATE: 26-Sep-23
Item No. Description Unit Quantity
SCHEDULE A SIDEWALK & UTILITY IMPROVEMENTS
A01 MINOR CHANGE
EST 1
A02 ROADWAY SURVEYING
LS 1
A03 RECORD DRAWINGS
LS 1
A04 SPCC Plan
LS 1
A05 MOBILIZATION
LS 1
A06 PROJECT TEMPORARY TRAFFIC CONTROL
LS 1
A07 CLEARING AND GRUBBING
LS 1
A08 REMOVAL OF STRUCTURE AND OBSTRUCTION
LS 1
A09 SALVAGE AND REINSTALL EXISTING FENCE PANELS
LS 1
A10 TREE PROTECTION
LS 1
A11 CRUSHED SURFACING TOP COURSE
TON 85
A12 HMA CL. 1/2" PG 58H-22
TON 70
A13 EROSION CONTROL AND WATER POLLUTION PREVENTION
LS 1
A14 TOPSOIL TYPE A
CY 6
A15 SEEDED LAWN INSTALLATION
SY 61
A16 ARBORIST WOOD CHIP MULCH
CY 2
A17 FLEXIBLE POROUS SURFACE TREATMENT
LS 1
A18 CEMENT CONC. TRAFFIC CURB AND GUTTER
LF 480
A19 CEMENT CONC. DRIVEWAY ENTRANCE MODIFIED TYPE R1B
SY 51
A20 CEMENT CONC. DRIVEWAY ENTRANCE TYPE C1B
SY 54
A21 CEMENT CONC. SIDEWALK
SY 118
A22 CEMENT CONC. SIDEWALK W 2'x2' PATTERN
SY 178
A23 ADJUST HANDHOLE OR IRRIGATION BOX COVER AND FRAME TO FINISH GRADE EA 5
A24 ILLUMINATION SYSTEM ALONG BURNETT BETWEEN S 4TH ST AND S 5TH ST, COMPLETE LS 1
A25 PERMANENT SIGNING
LS 1
A26 REMOVE AND REPLACE PAVEMENT MARKING
LS 1
A27 WASTE RECEPTACLE
EA 1
A28 BENCH
EA 1
A29 BIKE RACK 1
SCHEDULE B WATER MAIN IMPROVEMENTS
B01 MOBILIZATION/DEMOBILIZATION (10% MAX) LS 1
B02 TRENCH SURVEYING SYSTEMS LS 1
B03 CONSTRUCTION SURVEYING, STAKING, AND AS-BUILT DRAWINGS LS 1
B04 TEMPORARY TRAFFIC CONTROL LS 1
B05 EROSION CONTROL AND WATER POLLUTION CONTROL LS 1
B06 SITE SPECIFIC UTILITY POTHOLING EA 10
B07 DUCTILE IRON CLASS 52 12-INCH DIAMETER PUSH-ON JOINT WATER PIPE AND RESTRAINED-JOINT FITTINGS LF 500
B08 24"X12" TAPPING TEE AND 12" TAPPING VALVE EA 1
B09 GATE VALVE ASSEMBLY, 12-INCH EA 3
B10 FIRE HYDRANT ASSEMBLY EA 3
B11 CONNECTION TO EXISTING WATER MAIN EA 2
B12 WATER SERVICE CONNECTION, 1.5-INCH EA 2
B13 WATER SERVICE CONNECTION, 1-INCH EA 6
B14 CUT AND CAP EXISTING WATER MAIN EA 2
B15 CONCRETE FOR THRUST BLOCKING AND DEAD-MAN ANCHOR BLOCKS CY 10
B16 REMOVAL AND REPLACEMENT OF UNSUITABLE FOUNDATION MATERIAL Ton 10
B17 GRAVEL BORROW FOR TRENCH BACKFILL (RECYCLED MATERIALS NOT ALLOWED) Ton 550
B18 CRUSHED SURFACING TOP COURSE Ton 100
B19 HOT MIX ASPHALT FOR FINAL TRENCH PATCH Ton 150
B20 HOT MIX ASPHALT OVERLAY HMA CL. 1/2 INCH PG 58H-22 Ton 70
B21 MINOR CHANGES LS 1
SCHEDULE C STORM DRAIN IMPROVEMENTS
C01 MINOR CHANGE EST 1
C02 PROJECT TEMPORARY TRAFFIC CONTROL LS 1
C03 REMOVAL OF STRUCTURE AND OBSTRUCTION LS 1
C04 SHORING OR EXTRA EXCAVATION CLASS B LS 1
C05 CRUSHED SURFACING TOP COURSE TON 13
C06 HMA CL. 1/2" PG 64-22 TON 12
C07 DRAIN PIPE 3 IN . DIAM. LS 1
C08 DUCTILE IRON STORM SEWER PIPE 12 IN. DIAM. LF 111
C09 CATCH BASIN TYPE 1 EA 3
C10 CATCH BASIN TYPE 2 48 IN. DIAM. EA 1
C11 CONNECTION TO DRAINAGE STRUCTURE EA 1
* Numbers in red are corrected errors.
Rodarte Construction Inc. Tucci & Sons Inc. Sascon LLC Laser Underground&Earthworks Inc.
Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount Unit Price Bid Amount
25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$
8,000.00$ 8,000.00$ 7,500.00$ 7,500.00$ 20,000.00$ 20,000.00$ 10,000.00$ 10,000.00$
500.00$ 500.00$ 500.00$ 500.00$ 2,000.00$ 2,000.00$ 2,250.00$ 2,250.00$
250.00$ 250.00$ 250.00$ 250.00$ 2,000.00$ 2,000.00$ 2,250.00$ 2,250.00$
52,000.00$ 52,000.00$ 49,265.00$ 49,265.00$ 67,000.00$ 67,000.00$ 70,000.00$ 70,000.00$
74,000.00$ 74,000.00$ 98,000.00$ 98,000.00$ 30,000.00$ 30,000.00$ 50,000.00$ 50,000.00$
2,500.00$ 2,500.00$ 3,800.00$ 3,800.00$ 35,000.00$ 35,000.00$ 10,000.00$ 10,000.00$
40,000.00$ 40,000.00$ 20,000.00$ 20,000.00$ 95,000.00$ 95,000.00$ 25,000.00$ 25,000.00$
3,000.00$ 3,000.00$ 5,000.00$ 5,000.00$ 7,500.00$ 7,500.00$ 7,500.00$ 7,500.00$
2,200.00$ 2,200.00$ 6,000.00$ 6,000.00$ 4,500.00$ 4,500.00$ 5,000.00$ 5,000.00$
100.00$ 8,500.00$ 75.00$ 6,375.00$ 65.00$ 5,525.00$ 50.00$ 4,250.00$
300.00$ 21,000.00$ 296.00$ 20,720.00$ 315.00$ 22,050.00$ 430.00$ 30,100.00$
6,000.00$ 6,000.00$ 1,000.00$ 1,000.00$ 8,000.00$ 8,000.00$ 12,000.00$ 12,000.00$
100.00$ 600.00$ 775.00$ 4,650.00$ 65.00$ 390.00$ 60.00$ 360.00$
6.00$ 366.00$ 79.00$ 4,819.00$ 3.00$ 183.00$ 25.00$ 1,525.00$
225.00$ 450.00$ 1,000.00$ 2,000.00$ 90.00$ 180.00$ 100.00$ 200.00$
27,000.00$ 27,000.00$ 8,500.00$ 8,500.00$ 15,000.00$ 15,000.00$ 20,000.00$ 20,000.00$
70.00$ 33,600.00$ 73.00$ 35,040.00$ 68.00$ 32,640.00$ 85.00$ 40,800.00$
200.00$ 10,200.00$ 157.00$ 8,007.00$ 170.00$ 8,670.00$ 200.00$ 10,200.00$
275.00$ 14,850.00$ 157.00$ 8,478.00$ 170.00$ 9,180.00$ 200.00$ 10,800.00$
160.00$ 18,880.00$ 106.00$ 12,508.00$ 110.00$ 12,980.00$ 150.00$ 17,700.00$
180.00$ 32,040.00$ 123.00$ 21,894.00$ 130.00$ 23,140.00$ 150.00$ 26,700.00$
180.00$ 900.00$ 1,100.00$ 5,500.00$ 1,500.00$ 7,500.00$ 700.00$ 3,500.00$
215,000.00$ 215,000.00$ 198,000.00$ 198,000.00$ 250,000.00$ 250,000.00$ 330,000.00$ 330,000.00$
4,000.00$ 4,000.00$ 2,400.00$ 2,400.00$ 6,500.00$ 6,500.00$ 10,000.00$ 10,000.00$
4,000.00$ 4,000.00$ 3,900.00$ 3,900.00$ 13,500.00$ 13,500.00$ 3,000.00$ 3,000.00$
4,000.00$ 4,000.00$ 4,000.00$ 4,000.00$ 3,200.00$ 3,200.00$ 4,000.00$ 4,000.00$
3,000.00$ 3,000.00$ 3,400.00$ 3,400.00$ 2,400.00$ 2,400.00$ 4,000.00$ 4,000.00$
2,700.00$ 2,700.00$ 3,200.00$ 3,200.00$ 2,800.00$ 2,800.00$ 4,000.00$ 4,000.00$
Total Sch A 614,536.00$ Total Sch A 569,706.00$ Total Sch A 711,838.00$ Total Sch A 740,135.00$
30,000.00$ 30,000.00$ 1,500.00$ 1,500.00$ 12,000.00$ 12,000.00$ 30,000.00$ 30,000.00$
100.00$ 100.00$ 250.00$ 250.00$ 4,800.00$ 4,800.00$ 6,000.00$ 6,000.00$
3,000.00$ 3,000.00$ 4,800.00$ 4,800.00$ 1,500.00$ 1,500.00$ 3,500.00$ 3,500.00$
6,000.00$ 6,000.00$ 45,000.00$ 45,000.00$ 5,000.00$ 5,000.00$ 25,000.00$ 25,000.00$
3,500.00$ 3,500.00$ 3,200.00$ 3,200.00$ 5,000.00$ 5,000.00$ 2,000.00$ 2,000.00$
800.00$ 8,000.00$ 375.00$ 3,750.00$ 900.00$ 9,000.00$ 500.00$ 5,000.00$
190.00$ 95,000.00$ 189.00$ 94,500.00$ 190.00$ 95,000.00$ 120.00$ 60,000.00$
15,000.00$ 15,000.00$ 16,500.00$ 16,500.00$ 16,500.00$ 16,500.00$ 15,000.00$ 15,000.00$
5,000.00$ 15,000.00$ 4,100.00$ 12,300.00$ 6,500.00$ 19,500.00$ 4,500.00$ 13,500.00$
8,500.00$ 25,500.00$ 9,600.00$ 28,800.00$ 9,600.00$ 28,800.00$ 9,000.00$ 27,000.00$
4,500.00$ 9,000.00$ 6,700.00$ 13,400.00$ 4,500.00$ 9,000.00$ 9,000.00$ 18,000.00$
7,500.00$ 15,000.00$ 9,000.00$ 18,000.00$ 7,500.00$ 15,000.00$ 8,500.00$ 17,000.00$
3,000.00$ 18,000.00$ 4,000.00$ 24,000.00$ 2,000.00$ 12,000.00$ 3,750.00$ 22,500.00$
750.00$ 1,500.00$ 3,800.00$ 7,600.00$ 1,250.00$ 2,500.00$ 1,250.00$ 2,500.00$
350.00$ 3,500.00$ 250.00$ 2,500.00$ 450.00$ 4,500.00$ 500.00$ 5,000.00$
50.00$ 500.00$ 144.00$ 1,440.00$ 85.00$ 850.00$ 50.00$ 500.00$
40.00$ 22,000.00$ 52.00$ 28,600.00$ 22.00$ 12,100.00$ 45.00$ 24,750.00$
100.00$ 10,000.00$ 75.00$ 7,500.00$ 45.00$ 4,500.00$ 45.00$ 4,500.00$
240.00$ 36,000.00$ 214.00$ 32,100.00$ 175.00$ 26,250.00$ 150.00$ 22,500.00$
525.00$ 36,750.00$ 296.00$ 20,720.00$ 235.00$ 16,450.00$ 250.00$ 17,500.00$
25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$
378,350.00$ 391,460.00$ 325,250.00$ 346,750.00$
Sales Tax (10.1%)38,213.35$ Sales Tax (10.1%)39,537.46$ Sales Tax (10.1%)32,850.25$ Sales Tax (10.1%)35,021.75$
Total Sch B 416,563.35$ Total Sch B 430,997.46$ Total Sch B 358,100.25$ Total Sch B 381,771.75$
$10,000.00 10,000.00$ $10,000.00 10,000.00$ $10,000.00 10,000.00$ $10,000.00 10,000.00$
$4,500.00 4,500.00$ $30,000.00 30,000.00$ $3,500.00 3,500.00$ $8,000.00 8,000.00$
$400.00 400.00$ $8,800.00 8,800.00$ $2,500.00 2,500.00$ $25,000.00 25,000.00$
$100.00 100.00$ $250.00 250.00$ $2,600.00 2,600.00$ $1,000.00 1,000.00$
$100.00 1,300.00$ $75.00 975.00$ $65.00 845.00$ $50.00 650.00$
$325.00 3,900.00$ $214.00 2,568.00$ $285.00 3,420.00$ $250.00 3,000.00$
$700.00 700.00$ $1,450.00 1,450.00$ $2,500.00 2,500.00$ $2,500.00 2,500.00$
$180.00 19,980.00$ $228.00 25,308.00$ $155.00 17,205.00$ $200.00 22,200.00$
$2,400.00 7,200.00$ $3,800.00 11,400.00$ $1,500.00 4,500.00$ $2,500.00 7,500.00$
$7,000.00 7,000.00$ $10,500.00 10,500.00$ $5,500.00 5,500.00$ $5,000.00 5,000.00$
$1,300.00 1,300.00$ $1,100.00 1,100.00$ $1,500.00 1,500.00$ $3,000.00 3,000.00$
Total Sch C 56,380.00$ Total Sch C 102,351.00$ Total Sch C 54,070.00$ Total Sch C 87,850.00$
1,087,479.35$ 1,103,054.46$ 1,124,008.25$ 1,209,756.75$ AGENDA ITEM #5. g)
Project Burnett Ave S Sidewalk & Utility Replacement Project (CAG23-299)
BID DATE: 26-Sep-23
Item No. Description Unit Quantity
SCHEDULE A SIDEWALK & UTILITY IMPROVEMENTS
A01 MINOR CHANGE
EST 1
A02 ROADWAY SURVEYING
LS 1
A03 RECORD DRAWINGS
LS 1
A04 SPCC Plan
LS 1
A05 MOBILIZATION
LS 1
A06 PROJECT TEMPORARY TRAFFIC CONTROL
LS 1
A07 CLEARING AND GRUBBING
LS 1
A08 REMOVAL OF STRUCTURE AND OBSTRUCTION
LS 1
A09 SALVAGE AND REINSTALL EXISTING FENCE PANELS
LS 1
A10 TREE PROTECTION
LS 1
A11 CRUSHED SURFACING TOP COURSE
TON 85
A12 HMA CL. 1/2" PG 58H-22
TON 70
A13 EROSION CONTROL AND WATER POLLUTION PREVENTION
LS 1
A14 TOPSOIL TYPE A
CY 6
A15 SEEDED LAWN INSTALLATION
SY 61
A16 ARBORIST WOOD CHIP MULCH
CY 2
A17 FLEXIBLE POROUS SURFACE TREATMENT
LS 1
A18 CEMENT CONC. TRAFFIC CURB AND GUTTER
LF 480
A19 CEMENT CONC. DRIVEWAY ENTRANCE MODIFIED TYPE R1B
SY 51
A20 CEMENT CONC. DRIVEWAY ENTRANCE TYPE C1B
SY 54
A21 CEMENT CONC. SIDEWALK
SY 118
A22 CEMENT CONC. SIDEWALK W 2'x2' PATTERN
SY 178
A23 ADJUST HANDHOLE OR IRRIGATION BOX COVER AND FRAME TO FINISH GRADE EA 5
A24 ILLUMINATION SYSTEM ALONG BURNETT BETWEEN S 4TH ST AND S 5TH ST, COMPLETE LS 1
A25 PERMANENT SIGNING
LS 1
A26 REMOVE AND REPLACE PAVEMENT MARKING
LS 1
A27 WASTE RECEPTACLE
EA 1
A28 BENCH
EA 1
A29 BIKE RACK 1
SCHEDULE B WATER MAIN IMPROVEMENTS
B01 MOBILIZATION/DEMOBILIZATION (10% MAX) LS 1
B02 TRENCH SURVEYING SYSTEMS LS 1
B03 CONSTRUCTION SURVEYING, STAKING, AND AS-BUILT DRAWINGS LS 1
B04 TEMPORARY TRAFFIC CONTROL LS 1
B05 EROSION CONTROL AND WATER POLLUTION CONTROL LS 1
B06 SITE SPECIFIC UTILITY POTHOLING EA 10
B07 DUCTILE IRON CLASS 52 12-INCH DIAMETER PUSH-ON JOINT WATER PIPE AND RESTRAINED-JOINT FITTINGS LF 500
B08 24"X12" TAPPING TEE AND 12" TAPPING VALVE EA 1
B09 GATE VALVE ASSEMBLY, 12-INCH EA 3
B10 FIRE HYDRANT ASSEMBLY EA 3
B11 CONNECTION TO EXISTING WATER MAIN EA 2
B12 WATER SERVICE CONNECTION, 1.5-INCH EA 2
B13 WATER SERVICE CONNECTION, 1-INCH EA 6
B14 CUT AND CAP EXISTING WATER MAIN EA 2
B15 CONCRETE FOR THRUST BLOCKING AND DEAD-MAN ANCHOR BLOCKS CY 10
B16 REMOVAL AND REPLACEMENT OF UNSUITABLE FOUNDATION MATERIAL Ton 10
B17 GRAVEL BORROW FOR TRENCH BACKFILL (RECYCLED MATERIALS NOT ALLOWED) Ton 550
B18 CRUSHED SURFACING TOP COURSE Ton 100
B19 HOT MIX ASPHALT FOR FINAL TRENCH PATCH Ton 150
B20 HOT MIX ASPHALT OVERLAY HMA CL. 1/2 INCH PG 58H-22 Ton 70
B21 MINOR CHANGES LS 1
SCHEDULE C STORM DRAIN IMPROVEMENTS
C01 MINOR CHANGE EST 1
C02 PROJECT TEMPORARY TRAFFIC CONTROL LS 1
C03 REMOVAL OF STRUCTURE AND OBSTRUCTION LS 1
C04 SHORING OR EXTRA EXCAVATION CLASS B LS 1
C05 CRUSHED SURFACING TOP COURSE TON 13
C06 HMA CL. 1/2" PG 64-22 TON 12
C07 DRAIN PIPE 3 IN . DIAM. LS 1
C08 DUCTILE IRON STORM SEWER PIPE 12 IN. DIAM. LF 111
C09 CATCH BASIN TYPE 1 EA 3
C10 CATCH BASIN TYPE 2 48 IN. DIAM. EA 1
C11 CONNECTION TO DRAINAGE STRUCTURE EA 1
* Numbers in red are corrected errors.
McCann Construction Enterprises, Inc.Average Bid Low Bid Compareed to Average Low Bid Compareed to Eng Est
Unit Price Bid Amount Unit Price Bid Amount Low Bid Average Bid Low Bid
25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 100.00%25,000.00$
10,000.00$ 10,000.00$ 9,512.92$ 9,512.92$ 7,125.00$ 9,512.92$ 74.90%7,125.00$
1,500.00$ 1,500.00$ 1,439.42$ 1,439.42$ 150.00$ 1,439.42$ 10.42%150.00$
1,000.00$ 1,000.00$ 963.92$ 963.92$ 150.00$ 963.92$ 15.56%150.00$
77,000.00$ 77,000.00$ 59,034.92$ 59,034.92$ 50,000.00$ 59,034.92$ 84.70%50,000.00$
126,500.00$ 126,500.00$ 53,298.91$ 53,298.91$ 37,244.93$ 53,298.91$ 69.88%37,244.93$
5,400.00$ 5,400.00$ 11,361.25$ 11,361.25$ 6,500.00$ 11,361.25$ 57.21%6,500.00$
101,000.00$ 101,000.00$ 46,858.33$ 46,858.33$ 50,000.00$ 46,858.33$ 106.70%50,000.00$
5,000.00$ 5,000.00$ 5,166.00$ 5,166.00$ 6,900.00$ 5,166.00$ 133.57%6,900.00$
5,000.00$ 5,000.00$ 3,696.83$ 3,696.83$ 2,550.00$ 3,696.83$ 68.98%2,550.00$
75.00$ 6,375.00$ 77.83$ 6,615.83$ 5,695.00$ 6,615.83$ 86.08%5,695.00$
500.00$ 35,000.00$ 380.42$ 26,629.17$ 22,890.00$ 26,629.17$ 85.96%22,890.00$
8,500.00$ 8,500.00$ 6,698.67$ 6,698.67$ 4,500.00$ 6,698.67$ 67.18%4,500.00$
118.00$ 708.00$ 179.46$ 1,076.75$ 513.00$ 1,076.75$ 47.64%513.00$
7.00$ 427.00$ 22.00$ 1,342.00$ 976.00$ 1,342.00$ 72.73%976.00$
117.00$ 234.00$ 293.17$ 586.33$ 266.00$ 586.33$ 45.37%266.00$
10,000.00$ 10,000.00$ 10,086.42$ 10,086.42$ 6,760.00$ 10,086.42$ 67.02%6,760.00$
71.00$ 34,080.00$ 65.92$ 31,640.00$ 25,440.00$ 31,640.00$ 80.40%25,440.00$
179.00$ 9,129.00$ 181.00$ 9,231.00$ 10,200.00$ 9,231.00$ 110.50%10,200.00$
179.00$ 9,666.00$ 193.50$ 10,449.00$ 13,770.00$ 10,449.00$ 131.78%13,770.00$
120.00$ 14,160.00$ 124.08$ 14,641.83$ 13,452.00$ 14,641.83$ 91.87%13,452.00$
140.00$ 24,920.00$ 160.58$ 28,583.83$ 24,208.00$ 28,583.83$ 84.69%24,208.00$
900.00$ 4,500.00$ 729.33$ 3,646.67$ 2,375.00$ 3,646.67$ 65.13%2,375.00$
242,000.00$ 242,000.00$ 223,980.08$ 223,980.08$ 175,000.00$ 223,980.08$ 78.13%175,000.00$
1,400.00$ 1,400.00$ 3,597.75$ 3,597.75$ 1,800.00$ 3,597.75$ 50.03%1,800.00$
5,500.00$ 5,500.00$ 4,609.75$ 4,609.75$ 3,700.00$ 4,609.75$ 80.26%3,700.00$
5,100.00$ 5,100.00$ 3,043.58$ 3,043.58$ 2,150.00$ 3,043.58$ 70.64%2,150.00$
4,500.00$ 4,500.00$ 2,951.92$ 2,951.92$ 3,550.00$ 2,951.92$ 120.26%3,550.00$
2,500.00$ 2,500.00$ 2,227.83$ 2,227.83$ 1,350.00$ 2,227.83$ 60.60%1,350.00$
Total Sch A 776,099.00$ Total Sch A 607,970.91$ 504,214.93$ 607,970.91$ 82.93%504,214.93$
34,000.00$ 34,000.00$ 19,240.00$ 19,240.00$ 1,000.00$ 19,240.00$ 5.20% 1,000.00$
2,000.00$ 2,000.00$ 2,325.00$ 2,325.00$ 3,800.00$ 2,325.00$ 163.44% 3,800.00$
3,800.00$ 3,800.00$ 3,837.50$ 3,837.50$ 4,700.00$ 3,837.50$ 122.48% 4,700.00$
17,500.00$ 17,500.00$ 13,812.50$ 13,812.50$ 1,000.00$ 13,812.50$ 7.24% 1,000.00$
800.00$ 800.00$ 2,698.33$ 2,698.33$ 1,000.00$ 2,698.33$ 37.06% 1,000.00$
775.00$ 7,750.00$ 634.00$ 6,340.00$ 6,650.00$ 6,340.00$ 104.89% 6,650.00$
205.00$ 102,500.00$ 174.44$ 87,218.75$ 79,625.00$ 87,218.75$ 91.29% 79,625.00$
25,500.00$ 25,500.00$ 15,951.25$ 15,951.25$ 13,675.00$ 15,951.25$ 85.73% 13,675.00$
5,400.00$ 16,200.00$ 4,645.00$ 13,935.00$ 13,500.00$ 13,935.00$ 96.88% 13,500.00$
11,000.00$ 33,000.00$ 9,066.67$ 27,200.00$ 30,900.00$ 27,200.00$ 113.60% 30,900.00$
9,200.00$ 18,400.00$ 5,890.00$ 11,780.00$ 12,200.00$ 11,780.00$ 103.57% 12,200.00$
10,250.00$ 20,500.00$ 7,723.33$ 15,446.67$ 13,700.00$ 15,446.67$ 88.69% 13,700.00$
5,050.00$ 30,300.00$ 3,200.42$ 19,202.50$ 19,950.00$ 19,202.50$ 103.89% 19,950.00$
850.00$ 1,700.00$ 1,729.67$ 3,459.33$ 1,520.00$ 3,459.33$ 43.94% 1,520.00$
850.00$ 8,500.00$ 363.17$ 3,631.67$ 3,780.00$ 3,631.67$ 104.08% 3,780.00$
110.00$ 1,100.00$ 77.00$ 770.00$ 800.00$ 770.00$ 103.90% 800.00$
79.00$ 43,450.00$ 44.50$ 24,475.00$ 29,700.00$ 24,475.00$ 121.35% 29,700.00$
73.00$ 7,300.00$ 70.50$ 7,050.00$ 5,900.00$ 7,050.00$ 83.69% 5,900.00$
260.00$ 39,000.00$ 208.50$ 31,275.00$ 26,400.00$ 31,275.00$ 84.41% 26,400.00$
239.00$ 16,730.00$ 282.67$ 19,786.67$ 20,020.00$ 19,786.67$ 101.18% 20,020.00$
25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 25,000.00$ 100.00% 25,000.00$
455,030.00$ 354,435.17$ 354,435.17$ 314,820.00$
Sales Tax (10.1%)45,958.03$ Sales Tax (10.1%)35,797.95$ Sales Tax (10.1%)35,797.95$ 31,796.82$
Total Sch B 500,988.03$ Total Sch B 390,233.12$ 346,616.82$ 390,233.12$ 88.82%346,616.82$
$10,000.00 10,000.00$ $10,000.00 10,000.00$ $10,000.00 10,000.00$ 100.00% $10,000.00
$27,000.00 27,000.00$ $11,121.67 11,121.67$ $1,000.00 11,121.67$ 8.99% $1,000.00
$2,600.00 2,600.00$ $4,945.08 4,945.08$ $1,000.00 4,945.08$ 20.22% $1,000.00
$2,100.00 2,100.00$ $2,346.83 2,346.83$ $1,000.00 2,346.83$ 42.61% $1,000.00
$75.00 975.00$ $76.60 995.85$ $913.25 995.85$ 91.71% $913.25
$875.00 10,500.00$ $367.58 4,411.00$ $2,136.00 4,411.00$ 48.42% $2,136.00
$1,600.00 1,600.00$ $1,866.50 1,866.50$ $2,100.00 1,866.50$ 112.51% $2,100.00
$74.00 8,214.00$ $165.58 18,379.75$ $18,426.00 18,379.75$ 100.25% $18,426.00
$2,500.00 7,500.00$ $2,386.75 7,160.25$ $4,545.00 7,160.25$ 63.48% $4,545.00
$7,000.00 7,000.00$ $5,827.92 5,827.92$ $5,050.00 5,827.92$ 86.65% $5,050.00
$1,120.00 1,120.00$ $1,653.17 1,653.17$ $895.00 1,653.17$ 54.14% $895.00
Total Sch C 78,609.00$ Total Sch C 68,708.02$ 47,065.25 68,708.02$ 68.50%47,065.25$
1,355,696.03$ 1,066,912.05$ $897,897.00 1,066,912.05$ 84.16%897,897.00$ AGENDA ITEM #5. g)
Project: Burnett Ave S Sidewalk and utility Replacement Project ‐ CAG‐23‐299Due Date: September 26, 2023 Bids due by 2:00 pm ‐ Opening at 3:00 pm (Video Conference)CITY OF RENTONBID TABULATION SHEETBid Total fromProposal Bid Dept Cert Sub Recycle Ack Schedule of PricesTriple Form Bond L&I Wage List Mat. Form Adden 1 & 2*Includes Sales TaxActive Construction Inc.P.O. Box 4301PuyallupX X X X X X X $897,897.00WA98371HCON IncorporatedPO Box 7310052PuyallupX X X X X X X $1,037,175.65WA98373In Depth Excavation14751 N Kelsey St SE3Suite 105, PMB 166X X X X X X X $991,165.75MonroeWA98272BidderEngineer's Estimate $1,014,606.00AGENDA ITEM #5. g)
Project: Burnett Ave S Sidewalk and utility Replacement Project ‐ CAG‐23‐299Due Date: September 26, 2023 Bids due by 2:00 pm ‐ Opening at 3:00 pm (Video Conference)CITY OF RENTONBID TABULATION SHEETBid Total fromProposal Bid Dept Cert Sub Recycle Ack Schedule of PricesTriple Form Bond L&I Wage List Mat. Form Adden 1 & 2*Includes Sales TaxBidderLaser Underground & Earthworks Inc.20417 87th Ave SE4SnohomishX X X X X X X $1,209,756.75WA98296 McCann Construction Enterprises, Inc.PO Box 32115RentonX X X X X X X $1,355,696.03WA98056New X Inc.909 West Main St6Suite 202X X X X X X X $1,048,705.44Monroe WA98272Engineer's Estimate $1,014,606.00AGENDA ITEM #5. g)
Project: Burnett Ave S Sidewalk and utility Replacement Project ‐ CAG‐23‐299Due Date: September 26, 2023 Bids due by 2:00 pm ‐ Opening at 3:00 pm (Video Conference)CITY OF RENTONBID TABULATION SHEETBid Total fromProposal Bid Dept Cert Sub Recycle Ack Schedule of PricesTriple Form Bond L&I Wage List Mat. Form Adden 1 & 2*Includes Sales TaxBidderNorthwest Cascade Inc.P.O. Box 733997PuyallupX X X X X X X $1,084,790.54WA98373R.L. Alai Company10831 SE 181st St8Renton$951,901.10WAXXXXXX X98055Rodarte Construction Inc.17 East Valley Hwy E9AuburnX X X X X X X $1,087,479.35WA98092Engineer's Estimate $1,014,606.00AGENDA ITEM #5. g)
Project: Burnett Ave S Sidewalk and utility Replacement Project ‐ CAG‐23‐299Due Date: September 26, 2023 Bids due by 2:00 pm ‐ Opening at 3:00 pm (Video Conference)CITY OF RENTONBID TABULATION SHEETBid Total fromProposal Bid Dept Cert Sub Recycle Ack Schedule of PricesTriple Form Bond L&I Wage List Mat. Form Adden 1 & 2*Includes Sales TaxBidderSascon LLC20211 SE 210th Street10Maple ValleyX X X X X X X $1,124,008.25WA98038SEI Sound16507 110th Ave E11PuyallupX X X X X X X $912,492.35WA98374Tucci & Sons Inc4224 Waller Road12TacomaX X X X X X X $1,103,054.46WA98443‐1623Engineer's Estimate $1,014,606.00AGENDA ITEM #5. g)
Bidder:ACTIVE CONSTRUCTION INC.
0
WA UBI No.:273001533
License No.: ACTIVCI164JL
Entity Type:Corporation
Item Description Determination
1. A Proposal will be considered irregular and will be rejected if:
Criteria Met
(Per Below)
1.a. The bidder is not prequalified when so required;N/A
1.b. The authorized proposal form furnished by the Contracting Agency is not used or is altered;No
1.c. The complete proposal form contains any unauthorized additions, deletions, alternate bids, or conditions;No
1.d. The bidder adds provisions reserving the right to reject or accept the award, or enter into the Contract;No
1.e. A price per unit cannot be determined from the bid proposal;No
1.f. The proposal form is not properly executed;No
1.g. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as required in Section 1-02.6;No
1.h The Bidder fails to submit or properly complete a Disadvantaged Business Enterprise Certification (WSDOT Form 272-056), if
applicable, as required in Section 1-02.6;N/A
1.i
The Bidder fails to submit Written Confirmations (WSDOT Form 422-031) from each DBE firm listed on the Bidder's
complete DBE Uitlization Certification that they are in agreement with the bidder's DBE particiaption commitment, if
applicalbe, as required in Section 1-02.6, or if the written confirmation that is submitted fails to meet the requirements of
the Special Provisions;
N/A
1.j The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, as required in section 1-02.6, or if the
documentation that is submitted fails to demonstrate that a Good Faith Effort to meet the Condition of Award was made;N/A
1.k The Bidder fails to submit a DBE Bid Item Breakdown (WSDOT Form 272-054), if applicable as required in Section 1-02.6, or
if the documentation that is submitted fails to meet the requirements of the Special Provisions;N/A
1.l.The Bidder fails to submit DBE Trucking Credit Forms (WSDOT Form 272-058), if applicable, as required in Section 1-02.6, or
if the documentation that is submitted fails to meet the requirements of the Special Provisions;N/A
1.m. The bid proposal does not constitute a definite and unqualified offer to meet the material terms of the bid invitation.No
1.n. More than one proposal is submitted for the same project from a Bidder under the same or different names.No
Item Description Determination
2. A Proposal may be considered irregular and may be rejected if:
Criteria Met
(Per Below)
2.a. The Proposal does not include a unit price for every Bid item.No
2.b.Any of the unit prices are excessively unbalanced (either above or below the amount of a reasonable Bid) to the potential
detriment of the Contracting Agency;No
2.c. Receipt of Addenda is not acknowledged;No
2.d.A member of a joint venture or partnership and the joint venture or partnership submit Proposals for the same project (in
such an instance, both Bids may be rejected); or No
2.e. If the Proposal form entried are not made in ink.No
Item Description Determination
0
A Bidder will be deemed not responsible and the proposal rejected if the bidder does not meet the responsibility criteria in
RCW 39.04.350(1), as amended; or does not meet Supplemental Criteria 1-7 listed in this Section. The Contracting Agency
will verify that the Bidder meets the mandatory bidder responsibility criteria in RCW 39.04.350(1), and Supplmental Cirteria
1-2. Evidence that the Bidder meets Supplmental Criteria 3-7 shall be provided by the Bidder as stated later in this Section.
Criteria Met
(Per Below)
Bidder Assessment
CAG-23-299
Bid Opening
Burnett Avenues S Sidewalk & Utilities Replacement Project
City Special Provisions 1-02.13 Irregular Proposals (December 30, 2022 APWA GSP)
City Special Provisions 1-02.14 Disqualification of Bidder (May 17, 2018 APWA GSP, Option B)
City Special Provisions 1-02.13 Irregular Proposals (December 30, 2022 APWA GSP)
9/26/2023
Page 1 Bidder Assessment - Active Construction
AGENDA ITEM #5. g)
1 Delinquent State Taxes:
Criteria Met
(Per Below)
1.a.Criterion: The Bidder shall not owe delinquent taxes to the Washington State Department of Revenue without a payment
plan approved by the Department of Revenue.No
1.b.
Documentation: The Bidder, if and when required as detailed below, shall sign a statement (on a from to be provided by
the Contracting Agency) that the Bidder does not owe delinquent taxes to the Washington State Department of Revenue, or
if delinquent taxes are owned to the Washington State Department of Revenue, the Bidder must submit a written payment
plan approved by the Department of Revenue, to the Contracting Agency by the deadline listed below.
No
2 Federal Debarment
2.a. Criterion: The Bidder shall not currently be debarred or suspended by the Federal government. No
2.b.Documentation: The Bidder shall not be listed as having an "active exclusion" on the U.S. government's "System for Award
Management" database (www.sam.gov).No
3 Subcontractor Responsibility
3.a.
Criterion: The Bidder's standard subcontract form shall include the subcontractor responsibility language required by RCW
39.06.020, and the Bidder shall have an established procedure which it utilizes to validate the responsibility of each of its
subcontractors. The Bidder's subcontract form shall also include a requirement that each of its subcontractors shall have
and document a similar procedure to determine whether the sub-tier subcontractors with whom it contracts are also
"responsible" subcontractors as defined by RCW 39.06.020.
Yes
3.b.
Documentation: The Bidder, if an when required as detailed below, shall submit a copy of its standard subcontract form for
review by the Contracting Agency, and a written description of its procedure for validating the responsibility of
subcontractors with which it contracts.
Yes
4 Claims Against Retainage and Bonds
4.a.
Criterion: The Bidder shall not have a record of excessive claims filed against the retainage or payment bonds for public
works projects in the three years prior to the bid submittal date, that demonstrate a lack of effetive management by the
Bidder of making timely and appropriate payments to its subcontractors, suppliers, and workers, unless there are
exenuating circumstances and such circumstances are deemed acceptable to the Conracting Agency.
No claims as of 9/28/2023
4.b.
Documentation: The Bidder, if and when required as detailed below, shall submit a list of the public works projects
completed in the three years prior to the bid submittal date that have had claims against retainage and bonds and include
for each project the following information: Name of project; The owner and contact information for the owner; A list of
claims filed against the retainage and/or payment bond for any of the projects listed; A written explanation of the
circumstances surrounding each claim and the ultimate resolution of the claim.
No claims as of 9/28/2023
5 Public Bidding Crime
5.a.Criterion: The Bidder and/or its owners shall not have been convicted of a crime involving bidding on a public works
contract in the five years prior to the bid submittal date.
No. Signed form included
in response to City RFI
dated 10/4/23. Response
provided 10/9/23
5.b.
Documentation: The Bidder, if and when required as detailed below, shall sign a statement (on a form to be provided by
the Contracing Agency) that the Bidder and/or its owners have not been convicted of a crime involving bidding on a public
works contract.
No. Signed form included
in response to City RFI
dated 10/4/23. Response
provided 10/9/23
6 Termination for Cause/Termination for Default
6.a.
Criterion: The Bidder shall not have had any public works contract terminated for cause or terminated for default by a
government agency in the five years prior to the bid submittal date, unless there are extenuating circumstances and such
circumstances are deemed acceptable to the Contracting Agency.
No. Signed form included
in response to City RFI
dated 10/4/23. Response
provided 10/9/23
6.b.
Documentaiton: The Bidder, if and when required as detailed below, shall sign a statement (on a form to be provided by
the Contracting Agency) that the Bidder has not had any public works contract terminated for cause or terminated for
default by a government agency in the five years prior to the bid submittal date; or if Bidder was terminated, describe the
circumstances.
No. Signed form included
in response to City RFI
dated 10/4/23. Response
provided 10/9/23
7 Lawsuits
Page 2 Bidder Assessment - Active Construction
AGENDA ITEM #5. g)
7.a.
Criterion: The Bidder shall not have lawsuits with judgments entered against the Bidder in the fie years prior to the bid
submittal date that demonstrate a pattern of failing to meet the terms of contracts, unless there are extenuating
circumstances and such circumstances are deemed acceptable to the Contracting Agency.
No. Signed form included
in response to City RFI
dated 10/4/23. Response
provided 10/9/23
7.b.
Documentation: The Bidder, if and when required as detailed below, shall sign a statement (on a form to be provided by
the Contracting Agency) that the Bidder has not had any lawsuits with judgments entered against the Bidder in the five
years prior to the bid submittal date that demonstrate a pattern of failing to meet the terms of contracts, or shall submit a
list of all lawsuits with judgments entered against the Bidder in the five years prior to the bid submittal date, along with a
written explanation of the circumstances surrounding each such lawsuit. The Contracting Agency shall evaluate these
explanations to determine whether the lawsuits demonstrate a pattern of failing to meet of terms of construction related
contracts.
No. Signed form included
in response to City RFI
dated 10/4/23. Response
provided 10/9/23
Item Description Determination
(1)Before award of a public works contract, a bidder must meet the following responsibility criteria to be considered a
responsible bidder and qualified to be awarded a public works project. The bidder must:
Criteria Met
(Per Below)
Yes
0
0
(1)(b) Have a current state unified business identifier number;Yes
(1)(c)If applicable, have industrial insurance coverage for the bidder's employees working in Washington as required in
Title 51 RCW;Yes
(1)(d) Not be disqualified from bidding on any public works contract under RCW 39.06.010 or 39.12.065(3);Not disqualified
(1)(e)
If bidding on a public works project subject to the apprenticeship utilization requirements in RCW 39.04.320, not have been
found out of compliance by the Washington state apprenticeship and training council for working apprentices out of ratio,
without appropriate supervision, or outside their approved work processes as outlined in their standards of apprenticeship
under chapter 49.04 RCW for the one-year period immediately preceding the date of the bid solicitation;
Not found out of
compliance
(1)(f)
Have received training on the requirements related to public works and prevailing wage under this chapter and
chapter 39.12 RCW. The bidder must designate a person or persons to be trained on these requirements. The training must
be provided by the department of labor and industries or by a training provider whose curriculum is approved by the
department. The department, in consultation with the prevailing wage advisory committee, must determine the length of
the training. Bidders that have completed three or more public works projects and have had a valid business license in
Washington for three or more years are exempt from this subsection. The department of labor and industries must keep
records of entities that have satisfied the training requirement or are exempt and make the records available on its web
site. Responsible parties may rely on the records made available by the department regarding satisfaction of the training
requirement or exemption; and
Satisfied
(1)(g)
Within the three-year period immediately preceding the date of the bid solicitation, not have been determined by a final
and binding citation and notice of assessment issued by the department of labor and industries or through a civil judgment
entered by a court of limited or general jurisdiction to have willfully violated, as defined in RCW 49.48.082, any provision of
chapter 49.46, 49.48, or 49.52 RCW.
Satisfied
(2)
Before award of a public works contract, a bidder shall submit to the contracting agency a signed statement in accordance
with chapter 5.50 RCW verifying under penalty of perjury that the bidder is in compliance with the responsible bidder
criteria requirement of subsection (1)(g) of this section. A contracting agency may award a contract in reasonable reliance
upon such a sworn statement.
Satisfied
(3)In addition to the bidder responsibility criteria in subsection (1) of this section, the state or municipality may adopt relevant
supplemental criteria for determining bidder responsibility applicable to a particular project which the bidder must meet.N/A
(3)(a)Supplemental criteria for determining bidder responsibility, including the basis for evaluation and the deadline for
appealing a determination that a bidder is not responsible, must be provided in the invitation to bid or bidding documents.N/A
(3)(b)
In a timely manner before the bid submittal deadline, a potential bidder may request that the state or municipality modify
the supplemental criteria. The state or municipality must evaluate the information submitted by the potential bidder and
respond before the bid submittal deadline. If the evaluation results in a change of the criteria, the state or municipality must
issue an addendum to the bidding documents identifying the new criteria.
N/A
(1)(a) At the time of bid submittal, have a certificate of registration in compliance with chapter 18.27 RCW;
RCW 39.04.350 Bidder Responsibility Criteria
Page 3 Bidder Assessment - Active Construction
AGENDA ITEM #5. g)
(3)(c)
If the bidder fails to supply information requested concerning responsibility within the time and manner specified in the bid
documents, the state or municipality may base its determination of responsibility upon any available information related to
the supplemental criteria or may find the bidder not responsible.
N/A
(3)(d)
If the state or municipality determines a bidder to be not responsible, the state or municipality must provide, in writing, the
reasons for the determination. The bidder may appeal the determination within the time period specified in the bidding
documents by presenting additional information to the state or municipality. The state or municipality must consider the
additional information before issuing its final determination. If the final determination affirms that the bidder is not
responsible, the state or municipality may not execute a contract with any other bidder until two business days after the
bidder determined to be not responsible has received the final determination.
N/A
Page 4 Bidder Assessment - Active Construction
AGENDA ITEM #5. g)
1
CITY OF RENTON, WASHINGTON
RESOLUTION NO. _______
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING
TEMPORARY FULL STREET CLOSURES OF SUNSET BOULEVARD NE BETWEEN THE
I-405 NORTHBOUND AND SOUTHBOUND FREEWAY RAMPS.
WHEREAS, the Washington State Department of Transportation (WSDOT) is constructing
the I-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) project; and
WHEREAS, this construction activity will require a temporary street closures of Sunset
Boulevard NE between the I-405 northbound freeway on-ramp and southbound freeway off-
ramp; and
WHEREAS, pursuant to the City Code section 9-9-3, such street closures require City
Council authorization by means of a resolution;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The City Council does hereby authorize the temporary closures of Sunset
Boulevard NE between the I-405 northbound and southbound freeway ramps, not to exceed sixty
(60) days, anytime during the period beginning Monday, January 15, 2024 through Tuesday, May
14, 2024 for widening the existing I-405 bridge over Sunset Blvd. NE and completing the seismic
retrofits on the existing bridge piers for the purpose of increasing capacity of the I-405 freeway.
SECTION II. Notice of the closure shall be posted and published as required by RMC 9-9-
2 and RMC 9-9-3.
AGENDA ITEM # 7. a)
RESOLUTION NO. _______
2
PASSED BY THE CITY COUNCIL the day of , 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of , 2023.
______________________________
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, City Attorney
RES- PW:1956:10/18/23
AGENDA ITEM # 7. a)
1
CITY OF RENTON, WASHINGTON
ORDINANCE NO. ________
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING THE
DOLLAR AMOUNT AND PERCENTAGE INCREASE FOR THE PROPERTY TAX TO BE
LEVIED FOR THE YEAR 2024, PROVIDING FOR SEVERABILITY, AND ESTABLISHING
AN EFFECTIVE DATE.
WHEREAS, the City of Renton properly gave notice and City Council held public hearings
on October 16, 2023 and October 23, 2023 to consider the City’s 2023-2024 proposed budget
pursuant to RCW 84.55.120; and
WHEREAS, the City Council, after hearing and after duly considering all relevant evidence
and testimony presented, has determined that there is a need to increase the property tax
revenues from the prior year, in addition to the increase resulting from annexations, the addition
of new construction, and improvements to property, and any increases in the value of state-
assessed property, in order to discharge the expected expenses and obligation of the city; and
WHEREAS, RCW 84.55.120 requires the adoption of a separate ordinance specifically
authorizing the property tax increase;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
ORDAIN AS FOLLOWS:
SECTION I. The 2024 regular property tax levy in the amount of $25,783,496 requires an
increase of 1.00% or $252,859 above the 2023 levy without consideration for increases
attributable to annexation, new construction, improvements to property, and re-levy of prior
year refund and correction amounts. Such increase as shown below is hereby authorized
AGENDA ITEM # 7. a)
ORDINANCE NO. ________
2
SECTION II. If any section, subsection, sentence, clause, phrase, or word of this ordinance
should be held to be invalid or unconstitutional by a court of competent jurisdiction, such
invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section,
subsection, sentence, clause, phrase, or word of this ordinance.
SECTION III. This ordinance shall be in full force and effect five (5) days after publication
of a summary of this ordinance in the City's official newspaper. The summary shall consist of this
ordinance's title.
PASSED BY THE CITY COUNCIL the day of , 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of , 2023.
______________________________
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, City Attorney
Date of Publication:
ORD-Fin:2280:10/31/2023
2023 Actual Levy 25,285,929$
Limit Factor of 1% 252,859
New Construction 193,184
Prior Year Refunds 51,524
Annexation -
2024 Regular Levy 25,783,496
AGENDA ITEM # 7. a)
1
CITY OF RENTON, WASHINGTON
ORDINANCE NO. ________
AN ORDINANCE OF THE CITY OF RENTON, WASHINGTON, ESTABLISHING THE
PROPERTY TAX LEVY FOR THE YEAR 2024 FOR GENERAL CITY OPERATIONAL
PURPOSES IN THE AMOUNT OF $25,783,496, PROVIDING FOR SEVERABILITY,
AND ESTABLISHING AN EFFECTIVE DATE.
WHEREAS, the Council has met and considered its budget for the fiscal year 2024; and
WHEREAS, the Council, after hearing and considering all relevant evidence and testimony
presented, determined that, in order to discharge the expected expenses and obligations of the
city and in its best interest, the City of Renton requires a regular levy in the amount of
$25,783,496 for 2024;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
ORDAIN AS FOLLOWS:
SECTION I. The regular property tax levy is hereby authorized for 2024 in the amount of
$25,783,496. This amount includes new construction and improvements to property in the
amount of $193,184; re-levy of prior year refunds in the amount of $51,524; adjustments as a
result of annexations that have occurred in the amount of $0; and any increase in the value of
state-assessed property.
SECTION II. The regular levy includes levy for the Firemen’s Pension at the rate of $0.225
per $1,000 assessed valuation.
SECTION III. If any section, subsection, sentence, clause, phrase, or word of this ordinance
should be held to be invalid or unconstitutional by a court of competent jurisdiction, such
invalidity or unconstitutionality thereof shall not affect the constitutionality of any other section,
subsection, sentence, clause, phrase, or word of this ordinance.
AGENDA ITEM # 7. b)
ORDINANCE NO. ________
2
SECTION IV. This ordinance shall be in full force and effect five (5) days after publication
of a summary of this ordinance in the City's official newspaper. The summary shall consist of this
ordinance's title.
PASSED BY THE CITY COUNCIL the day of , 2023.
______________________________
Jason A. Seth, City Clerk
APPROVED BY THE MAYOR this day of , 2023.
______________________________
Armondo Pavone, Mayor
Approved as to form:
Shane Moloney, City Attorney
Date of Publication:
ORD-Fin:2281:10/31/2023
AGENDA ITEM # 7. b)