Loading...
HomeMy WebLinkAboutSTAMPED - 2023-11-02 Brotherton Field Conditions Resolutions Memo Page 1 of 6 4815 Center Street Tacoma, WA 98409-2319 (253) 474-9449 / sittshill.com Brent K. Leslie, P.E., S.E. Kathy A. Hargrave, P.E. Larry G. Lindell, P.E., S.E. Michael A. McEvilly, P.L.S. Andrew J. Boileau, P.E., S.E. David C. Boileau, A.I.A. Memorandum To: Nathan Janders, P.E., Development Engineering Manager From: Don Davis, P.E.; Damian Matzen, E.I.T. Date: November 2, 2023 CC: Scott Lindley, J.M. Riley Company; Jim Castino, Castino Architecture Subject: Brotherton Stormwater-Utility Modification During construction of the stormwater system for the new Brotherton Cadillac car dealership, several conflicts with existing utilities have been encountered in the field by the contractor. This memo itemizes the conflicts, summarizes our proposed plan revisions, and provides backup stormwater calculation information as necessary. Conflict #1: Domestic water and irrigation water services were found to be in conflict with the proposed storm pipe between CB11 and CB-E. Our initial proposal for adjustment of the stormwater system in the vicinity of the domestic and irrigation water crossings was deemed infeasible due to invert elevation offsets in CB11 which resulted in an unacceptable level of water water detained upstream of CB11. However, the pipe segment between CB11 and CB-E had already constructed based on our initial findings that the vertical step at CB11 would not negatively impact the hydraulic capacity of the system, and the contractor’s need to restore the surface in front of the carwash for the owner’s business. Therefore, the attached plan set includes proposed replacement of the 12” pipe upstream of CB11 to remedy the vertical discrepancy in CB11. The replaced pipe between the existing upstream catch basin and CB11 will be installed at a 0.44% slope (minimum slope required to achieve 3 feet per second (fps) full flow pipe velocity, see Appendix A), and result in an invert elevation approximately one-inch higher than the incoming 12” pipe in that structure. Since the crowns in that structure will not match, we have prepared a backwater analysis using Autodesk Storm and Sanitary Analysis (SSA) software to demonstrate that the upstream stormwater system will not be negatively impacted by the one-inch step, see Appendix B. It is expected that this pipe replacement will occur at a later date, when the contractor’s job trailer can be relocated elsewhere on the site. At that time, the contractor shall also excavate the 12” pipe crossing at the domestic and irrigation water services, and insert ethofoam pads between the utilities. Conflict #2: The existing 8” public water main which runs alongside the westerly property line of the Cadillac site was found to be in conflict with the proposed stormwater pipe segment between CB-D and CB-E. The proposed storm cannot be installed below the existing water due to elevation constraints in the downstream pipe network that we are tying into. We understand that the City of Renton has special design guidelines for non-standard utility separation, per Section 3-11.3 of the February 2021 Water Utility Design and Construction Standards. Therefore, we are proposing to route the storm over the existing water, with a minimum of 6” separation and with CL52 ductile iron pipe. In order to meet the 0.44% minimum slope for 3fps velocity, the entire pipe run from CB-E through CB-G upstream will need to be adjusted. DEVELOPMENT ENGINEERING NJanders 11/09/2023 Page 2 of 6 Another challenge stemmed from the aforementioned pipe slope adjustment. The downstream invert elevation of the pipe between the stormwater pump station and CB-B, an overflow pipe in the event the pumps are non-functional, had to be raised to an elevation such that the pipe between these two structures would be flat. We considered raising the upstream end of the pipe, but it is in conflict with the lid of the pump station structure. Therefore, we selected an alternate location for the overflow pipe from the system detained behind potentially inactive pumps. We are now proposing to install a pipe between CB10 to CB-D. If the pumps are non-functional, stormwater will back up the entire system behind the pump station until it reaches the elevation of this new overflow pipe. We have used SSA to model the stormwater system under a 100-year, 24-hour rainfall event, with the pumps disabled. The attached plan and profile excerpts from SSA, Appendices C and D, respectively, have been prepared to demonstrate that the Cadillac collection and conveyance system will satisfactorily drain via the new overflow pipe location. Pipes will surcharge, but stormwater structures will not overtop in the event the pumps are non-functional. Conflict #3: The existing 8” public water main in the SW 12th St ROW was found to be in conflict with the proposed sanitary sewer outfall from the Cadillac site. Similar to the above scenario, a gravity connection to the sanitary sewer main in 12th underneath the existing water main is not feasible. We are seeking approval of routing of the sanitary sewer service over the water main per the provisions of Section 3-11.3 of the aforementioned design guidelines document. This segment of the sanitary sewer service will be constructed with ductile iron pipe with just over 1’ of clearance to the existing water main. By adjusting the sanitary sewer service to pass over the water main, we observed another conflict between the sanitary sewer service and storm pipe connecting CB09 and CB10. The revised plans indicate that we will raise the storm pipe and replace with 8” DIP, to provide clearance for the sanitary sewer pipe. Page 3 of 6 APPENDIX A Stormwater pipes less than 0.50% must meet a minimum full flow pipe velocity of 3 feet per second. The following Manning’s Equation calculations shown below illustrate the minimum slope required in a full flow pipe to maintain 3 feet per second. 12 inch diameter pipe under full-flow conditions must have a slope of 0.44% or greater 8 inch diameter pipes under full-flow conditions must have a slope of 0.75% or greater Pipe Diameter D 12.0 (inches) Manning's "n" n 0.013 Slope S 0.44 (%)Formulas: Flow Depth d 12.00 (inches) Flow Depth Ratio d/D 1.00 (%) d/D = (d/D) Flow Point Angle q 360 (deg)q = 2*COS-1((1-(2*d/D)) Flow Area A 0.785 (ft2)A = 1/8*(RADIANS(qr)-SIN(qr))*(D/12)2 Wetted Perimeter WP 3.142 (ft) WP = p*(D/12)*qr/(2*p) Hydraulic Radius R 0.25 (ft) R = A/WP Flow Q 2.370 (cfs)Q = (1.49/n)*A*R2/3*S0.5 Velocity V 3.017 (fps)V = Q/A Pipe Diameter D 8.0 (inches) Manning's "n" n 0.013 Slope S 0.75 (%)Formulas: Flow Depth d 8.00 (inches) Flow Depth Ratio d/D 1.00 (%) d/D = (d/D) Flow Point Angle q 360 (deg)q = 2*COS-1((1-(2*d/D)) Flow Area A 0.349 (ft2)A = 1/8*(RADIANS(qr)-SIN(qr))*(D/12)2 Wetted Perimeter WP 2.094 (ft) WP = p*(D/12)*qr/(2*p) Hydraulic Radius R 0.167 (ft) R = A/WP Flow Q 1.047 (cfs)Q = (1.49/n)*A*R2/3*S0.5 Velocity V 3 (fps)V = Q/A Page 4 of 6 APPENDIX B – BACKWATER ANALYSIS AT EXISTING CB UPSTREAM OF CB11 Page 5 of 6 APPENDIX C – BACKWATER ANALYSIS FOR CADILLAC ON-SITE STORMWATER NETWORK, ASSUMING PUMPS ARE NON-FUNCTIONAL Page 6 of 6 APPENDIX D – BACKWATER ANALYSIS FOR CADILLAC ON-SITE STORMWATER NETWORK, ASSUMING PUMPS ARE NON-FUNCTIONAL