Applicant Information
Project Address: 3101 Mountain View Ave N, Renton, WA, 98056
Parcel Number: 3342103895
Applicant: Seaborn Pile Driving Company, 1080 W Ewing St Building B, Seattle, WA 98119 206-236-
1700
Property Owner: Sin Lew
Legal Description: HILLMANS LK WN GARDEN OF EDEN # 1 POR OF LOTS 56-57 & 58 & OF ADJ
2ND CL SH LDS DAF BEG AT INTX OF S LN OF LOT 58 WITH GOV MDR LN TH S 80-13-02 W
42.78 FT TH N 72-03-18 W 99.44 FT TH S 89-50-57 W 190.56 FT TO INNER HARBOR LN TH N 23-
40-00 E ALG SD HARBOR LN 52.76 FT TH N 89-50-57 E 219.38 FT TH S 75-24-20 E 83.14 FT TH S!
61-50-30 E 22.86 FT TH N 89-50-57 E TO ELY LN OF BLK A TH SLY ALG SD ELY LN TO S LN OF!
LOT 58 TH S 89-50-57 W ALG SD S LN TO BEG TGW POR OF LOTS 57 & 58 & OF ADJ 2ND CL SH!
LDS DAF BEG AT INTX OF S LN OF LOT 58 WITH MDR LN TH S 80-13-02 W 42.78 FT TO TPOB TH!
N 72-03-18 W 99.44 FT TH S 89-50-57 W 190.56 FT TO INNER HARBOR LN TH S 23-40-00 W ALG!
SD HARBOR LN TAP S 80-13-02 W FR TPOB TH N 80-13-02 E TO TPOB
Description of Work: We propose to install (1) new boat lift.
Job specific comments
Purpose
The proposed dock is to provide for safe boat moorage and safe water recreational activities for a
single-family residence.
Habitat Enhancement
The proposed planting plan has been designed to mitigate the existing and proposed pier.
Water Quality
In order to prevent debris from entering the lake during the demolition stage of the project, a
containment boom will surround the crane barge and work area.
Permits
Renton Substantial Development Permit:
We are applying for the permit to be reviewed under the:
"4-3-090.E.1 Shoreline Use Table: Recreation: Boat Lifts -Single Family Residential:
P7 - Allowed as accessory to a residential dock; provided, that all lifts are placed as far waterward
as feasible and safe; and platform lifts are fully grated."
2
Mitigation
Shoreline Plantings: The shoreline plantings have been designed to provide the spread of tree and
shrub nutrients into the adjacent waters of Lake Washington.
Contractor: Seaborn Pile Driving Company License #: SEABOPD942CG
Address: 1080 W Ewing St. Bldg B. Seattle WA 98119
Office: 206.236.1700
Contact: Zion Napier Email: permits@seabornpiledriving.com
Construction Narrative
Mobilization
Mobilize crew, crane barge, supply, and material barge to the site.
Boat Lift Installation
1. Set out a Sediment Containment Curtain around the work area waterward of the bulkhead
to contain any silt and debris that may be generated during construction.
2. Set lift on the lakebed.
3. Adjust legs to the correct height.
4 Clean the work area and remove the sediment curtain.
Structural Notes
General
●All materials, workmanship, design, and construction shall conform to the submitted
drawings and the International Building Code.
●The contractor will be responsible for all safety precautions and methods and processes
to perform the designated work.
3
Materials
All materials will conform to the International Building Code.
Best Management Practices
1.Above the Water Line Work
1.Seaborn Pile Driving Company will employ one crane barge, one supply, and one
debris barge to complete the scope of work. A tug will tow the barges on and off
the job site.
2.Seaborn Pile Driving Company personnel working in, near, or over the water will
at all times wear either USCG approved life vests or work vests as well as hard
hats and safety glasses.
2.Material Handling
1.While at the job site, a floating containment boom will completely surround the
work area.
3.Hazardous Materials
●No hazardous materials will be mixed or stored in or near the water. No cleaning
of materials will be performed in or near the water.
4.Polluting Materials in Water
●Seaborn Pile Driving Company will take extra precautions to ensure materials
don’t fall into or pollute the water. Any material that enters the water will be
removed immediately. Any hazardous material such as oily rags will not be
handled near or over the water.
●A spill kit will be employed on the barges at the job site.
●If any pollutants enter the water, Seaborn Pile Driving Company will contact the
appropriate agencies and report the spill immediately.
5.Materials Disposal
●Seaborn Pile Driving Company will dispose of the rotten wood and pile sections
in an approved legal disposal site in accordance with all applicable laws and
permit requirements.