Loading...
HomeMy WebLinkAboutW-419905NOTES 01 w I 0 0 N U I ry CD U I �C-D lk�z I cD J CD m W Q / /w mry I I— �Q �V) 0 J m CO wQ � I x s_ J o 0 I U I Cn ry I o_j / J m o, cn _Q I 0 x o/ 0 c� I Q I a) M a) x � N � N -D c-D ca m +� J N I C, o I �m L¢ p I r-- x CD ow N / ~ � (/7 CD � I CD N � I Cn CD m o Q CD I o x N / N � J m I c) J m C Q T I x m/ V) I C, Cn u J oom �x N O o U � o x 17+D0— I■i■T.'111Ofr iiII=SIMMa�rTA I M .y I r: I M •.a Cn .. •L. ) • ?:f do do do do do —dn— dn n REMOVE EXISTING RAISED PAVEMENT STA 19+76.43---"' MARKERS (TYP) 2" ASPHALT GRIND FULL DEPTH ASPHALT END STRIPING 0 INSTALL NEW EMBOSSED YELLOW METHYL AND OVERLAY (TYP) DEMOLITION AND TRENCH METHACRYLATE PER WSDOT STD PLAN PATCHING (TYP) PROTECT IN PLACE EX N0. M-20.10-03 (TYP) MONUMENT AND CASE INSTALL NEW TYPE 2YY RAISED ADJUST MONUMENT BOX AND 0 PAVEMENT MARKERS PER WSDOT STD COVER TO FINISH GRADE PLAN NO. M-20.30-04 (TYP) NE 10TH ST (WES� MATCHLINE: STA 50+50, SEE SHEET C201 UV/\L_J IV 1 111I0I 1 VI\r%L/L_ ADJUST GAS VALVE TO FINISH GRADE REPLACE EX STOP BAR PER COR STD PLAN 128 BY OTHERS vvt�v�t`vv��v 0 J m CV 4 U PROTECT IN PLACE EX MONUMENT AND CASE ADJUST MONUMENT BOX & COVER TO FINISH GRADE STA 20+44.44 BEGIN STRIPING REPLACE EXISTING CROSSWALK PER COR STD PLAN 127 d V) Y a r RENTON SUNSET GARDEN o IMPROVEMENTS UNDER N SEPARATE PERMIT. ♦ SEE NOTE 1 (TYP) CATCH BASIN INSERT _ PER COR STD PLAN z 216.30 (TYP) N 1 0 0 MATCHLINE: STA 84+50, SEE SHEET C201 Q o 2" ASPHALT GRIND PROTECT IN PLACE EX ® 4 CURB &GUTTER 6.p (TYP GRADING & FULL MONUMENT AND CASE AND OVERLAY (TYP) ADJUST MONUMENT BOX AND 1 � --� � �:.:::::::::::::::: � 1 DEPTH PAVEMENT �210 AND DRAINAGE 4J N REPLACE CONCRETE POO-®o _ _ z W STA 84+63.81 SIDEWALK AND CURB & COVER TO FINISH GRADE *'**~* PAVING LIMIT STA 23+21.21 ! '` «"^ GUTTER IN KIND PER COR PAVING LIMIT TYP .=�:^'„*'~'••* s 1 RAMP T 1 1 1 TYP S D 0 AND 02 �w ( ) 4'ti• N x: �•. w Q 5 Q w ;f. » w � «' — „»^,* ~ ,~ «» *» '* » 10 2 ..• '' ski » + „ »f 1. . ��f ' y» _ w �ci J `Zm O*•* W cp .•�"Y 9 J �qp •W ® W .1 v 1.xI:J` 0 s • � :» I c� yF::Y: tiK '. %t. 0 0 k. :q. L ?ij;ieeiee — \ T may„ � 6 *„ ::•J U r t• L•• Y' �•1*•T•.. y,am�•• T •� 1TD"i� V ADJUST MH COVER TO GRADE STA 2 w Y T•5+20.3 ...........:... 2 I TRIPI REMOVE EXISTING RAISED PAVEMENT MARKERS TYP — ENDS NG T MH ADJUST COVER � -r � ' .a '.•'. INSTALL NEW EMBOSSED YELLOW METHYL TO GRADE REPLACE EX G� METHACRYLATE PER WSDOT STD PLAN N0. C210 a STOP BAR PER M-20.10-03 (TYP) PROTECT IN PLACE EX ADJUST MH COVER TO GRADE COO STD PLAN 128 \ INSTALL NEW TYPE 2YY RAISED PAVEMENT MARKERS 2 MONUMENT AND CASE RAMP 1 FULL DEPTH ASPHALT ADJUST MONUMENT BOX AND DEMOLITION AND TRENCH PER WSDOT STD PLAN NO. M-20.30-04 (TYP) INC210 COVER TO FINISH GRADE PATCHING (TYP) RECORD DRAWINGS THESE AS —BUILT DOCUMENTS HAVE BEEN PREPARED FROM THE CONTRACTOR'S REDLINED MARK—UPS OF THE CONSTRUCTION DOCUMENTS. THE ENGINEER REVIEWING THESE RECORD DRAWINGS HAS NOT WITNESSED ALL THE ELEMENTS OF CONSTRUCTION AND IS NOT RESPONSIBLE FOR ERRORS OR OMISSIONS IN DATA OR CERTIFY THE ACCURACY OF THE INFORMATION PROVIDED BY THE CONTRACTOR'S AS —BUILT REDLINES. NE 10TH ST (EAST 1 AS —BUILT 10/10/23 URVEYED: DESIGNED: BG DRAW DC, JYL CHECKED: CB NO. REVISION BY DATE APPR APPROVED: TJ E 1. MULTIPLE CONTRACTORS WILL BE MOBILIZED IN THE VICINITY OF WORK. SCHEDULE AND COORDINATE ALL WORK WITH THE ADJACENT SUNSET GARDENS PROJECT TO AVOID CONFLICTS. 2. RESET CATCH BASINS AND ADJUST WATER VALVE BOXES, MANHOLES, CLEANOUTS, AND MONUMENT CASES IN ASPHALT OVERLAY SECTIONS TO MATCH NEW PAVEMENT GRADE PER CITY OF RENTON STANDARDS PLANS. 3. ALL DISTURBED PAVEMENT MARKINGS, PAINTINGS, AND STRIPING ON NE 10TH ST SHALL BE REPLACED AFTER OVERLAY. 4. GRIND EX PAVEMENT TO 2" DEPTH FOR FULL WIDTH OF RESTORATION LIMITS PRIOR TO PLACING 2" HMA OVERLAY. LEGEND PAINTED WHITE STRIPE EMBOSSED CENTERLINE STRIPING ROW LINE ------------ - - - - -- SAW CUT ROAD CENTERLINE O CATCH BASIN INSERT I ASPHALT PAVEMENT 21' ASPHALT GRIND AND OVERLAY 2" TEMPORARY HOT MIX ASPHALT cn I— Z CONSTRUCTION NOTES W 2 01 PROTECT IN PLACE ALL WORK CONSTRUCTED BY THE ADJACENT W SUNSET GARDENS PROJECT. COORDINATE AND SCHEDULE O DEMOLITION WITH SUNSET GARDENS PROJECT TO AVOID REWORK. l� Z_ Q W I - a W LL LL 0 10' 20' 40' O 1 inch = 20 feet Cf) Z S J. W 0 0 • Call 81 ��'CISTER�'� 1601 5th Avenue, Suite 1600 w o40 � �s ® E��� two business days s10NAL Seattle, WA 98101 C/) AS -BUILT 04199 W-419905 before you dig 10/16/2023 www.2.ff. wwkpffcom z SAS SHOWN TICAL- NA%M 19M HORIZONTAL* NAD 1983/1991 CITY OF CITY OF RENTON DAM, 11/15/2022 � RENTON RENTON SUNSET GARDENS OFF -SITE WATER MAIN IMPROVEMENTS � � DRAWING NO, ONE INCH DATUM Planning/Building/Public Works Dept. TESC & PAVEMENT RESTORATION PLAN C200 Z AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY — NE 10TH ST SHEET: 05 0 ' 14