Loading...
HomeMy WebLinkAboutW-419906NOTES 01 w I 0 0 N U I ry CD U I �C-D lk�z I cD J CD m LLJ Lj mry I � � V) o, J m CO W ¢ I =X J N � o => I ry N 1 CD o, m ( ¢ (D I x o � U1 ¢ i I �x x � N O N U +� J c c 1 z3C!) CnN �m af cn L¢ p I X CD CD LLJ N C3] Cn CD � I CD N � I CD m o ¢ oI oX CD N N � J m I c) J m C ¢ T I LX m, V) I C, Cn u J oom �x N O o U � o x RECORD DRAWINGS THESE AS -BUILT DOCUMENTS HAVE BEEN PREPARED FROM THE CONTRACTOR'S REDLINED MARK-UPS OF THE CONSTRUCTION DOCUMENTS. THE ENGINEER REVIEWING THESE RECORD DRAWINGS HAS NOT WITNESSED ALL THE ELEMENTS OF CONSTRUCTION AND IS NOT RESPONSIBLE FOR ERRORS OR OMISSIONS IN DATA OR CERTIFY THE ACCURACY OF THE INFORMATION PROVIDED BY THE CONTRACTOR'S AS -BUILT REDLINES. REPLACE CONCRETE SIDEWALK AND CURB & GUTTER IN KIND PER COR STD 101 AND 102 (TYP) FULL DEPTH ASPHALT DEMOLITION AND TRENCH PATCHING (TYP) 2» ASPHALT GRIND REMOVE EXISTING RAISED PAVEMENT MARKINGS / CURB, POWER 1 AND OVERLAY (TYP) TO GRADE o 1 SW, & SS POLE CN SS F•— W I S S S S S •'S•'� •k�� K qq S :ti•1' S S S »-,- U P _ _ I — U P W 2 1" r:�1 ` 'R' S S� S S - » . . s....:.,... s::�., ,.:.` Tz LLJ W ,w ' UArt "»'��� •»��` �'. �«'»»».`�'.`•»"»`»�.`«»'.`»'� `: »'.``'»»`«"»`».``»'»'».'• `: •'» • `»'«'»'» ` • :t. 5 .... Ci ;•::� 0 « O ® O ® ® OO Z o CURB & GUTTER 1 --- --- _ - Ev U _ U ADJUST GAS VALVE ADJUST MH COVER TO GRADE TO GRADE o 5\ O � " U 5, LLJ LLJ (n o r Liz 00 00 ■ LLJ Z J 2 U a CATCH BASIN INSERT PER COR STD PLAN 216.30 (TYP) RENTON SUNSET GARDEN IMPROVEMENTS UNDER SEPARATE PERMIT. SEE NOTE 1. (TYP) JEFFERSON AVE NE (COMMERCIAL ACCESS v CATCH BASIN INSERT PER COR STD PLAN 216.30 (TYP) - RENTON SUNSET GARDEN IMPROVEMENTS UNDER SEPARATE PERMIT. SEE NOTE 1. (TYP) 1 ROADWAY GRADING TO BE ESTABLISHED BY RENTON -SUNSET GARDEN IMPROVEMENTS UNDER SEPARATE PERMIT JEFFERSON AVE NE (RESIDENTIAL ACCESS 1 1 AS —BUILT Vra REVISION 10/10 BY I DATE ir• . w W w _w� _ §6=§B= §B Cn D _. 0 CURB &GUTTER, 1 RAMP, & DRIVEWAY EV T 0 I DESIGNED: BG DRAWN: DC, JYL CHECKED: CB AP P R TJ E w y 1. MULTIPLE CONTRACTORS WILL BE MOBILIZED IN THE VICINITY OF WORK. SCHEDULE AND COORDINATE ALL WORK WITH THE ADJACENT SUNSET GARDENS PROJECT TO AVOID CONFLICTS. 2. RESET CATCH BASINS AND ADJUST WATER VALVE BOXES, MANHOLES, CLEANOUTS, AND MONUMENT CASES IN ASPHALT OVERLAY SECTIONS TO MATCH NEW PAVEMENT GRADE PER CITY OF RENTON STANDARD PLANS. 3. GRIND EX PAVEMENT TO 2" DEPTH FOR FULL WIDTH OF RESTORATION LIMITS PRIOR TO PLACING 2" HMA OVERLAY. LEGEND ---------------- ROW LINE SAW CUT ROAD CENTERLINE CATCH BASIN INSERT CONCRETE SIDEWALK DEMO ASPHALT PAVEMENT 2" ASPHALT GRIND AND OVERLAY 2" TEMPORARY HOT -MIX ASPHALT CONSTRUCTION NOTES 01 PROTECT IN PLACE ALL WORK CONSTRUCTED BY THE ADJACENT SUNSET GARDENS PROJECT. COORDINATE AND SCHEDULE (n DEMOLITION WITH SUNSET GARDENS PROJECT TO AVOID REWORK. z LU 2 LLJ O 01� n 2 z CQ G LLJ I - a LLJ F____ U) I LL 0 10' 20' 40' O Cf) 1 inch = 20 feet z w�SNj'���1 W f � G� (Q • Cal 1811 ��'o�, ��'CISTER�'� 5th Avenue, Suite 1600 w ��`� Seat ® two business days �`rsIONAL E�Seattle, WA 98101 C/) AS -BUILT 04199 W-419906 before you dig www.2.ff. 10/16/2023 wwkpffcom z STICAL. AS SHOWN NNVD 1988 HORIZONTAL• NAD 1983/1991 CITY OF CITY OF RENTON DATE, 11/15/2022 • RENTON RENTON SUNSET GARDENS OFF -SITE WATER MAIN IMPROVEMENTS � � DRAWING NO, ONE INCH DATUM Planning/Building/Public Works Dept. TESC & PAVEMENT RESTORATION PLAN C201 z AT FULL SCALE IF NOT ONE INCH SCALE ACCORDINGLY -JEFFERSON AVE N E SHEET: 06 0 ' 14