HomeMy WebLinkAboutW-419906NOTES
01
w
I
0
0
N
U
I
ry
CD
U
I
�C-D
lk�z
I cD
J CD
m LLJ
Lj
mry
I �
� V)
o,
J
m
CO
W ¢
I
=X
J
N �
o =>
I ry
N 1
CD
o, m
( ¢
(D I
x
o �
U1 ¢
i I
�x
x
� N
O N
U
+� J
c
c 1
z3C!)
CnN
�m
af cn
L¢
p I
X
CD
CD LLJ
N
C3] Cn
CD
� I
CD
N �
I
CD m
o ¢
oI
oX
CD
N
N �
J
m
I
c)
J
m
C ¢
T I
LX
m,
V)
I
C,
Cn
u J
oom
�x
N O
o
U �
o x
RECORD DRAWINGS
THESE AS -BUILT DOCUMENTS HAVE BEEN PREPARED
FROM THE CONTRACTOR'S REDLINED MARK-UPS OF THE
CONSTRUCTION DOCUMENTS. THE ENGINEER REVIEWING
THESE RECORD DRAWINGS HAS NOT WITNESSED ALL THE
ELEMENTS OF CONSTRUCTION AND IS NOT RESPONSIBLE
FOR ERRORS OR OMISSIONS IN DATA OR CERTIFY THE
ACCURACY OF THE INFORMATION PROVIDED BY THE
CONTRACTOR'S AS -BUILT REDLINES.
REPLACE CONCRETE SIDEWALK AND
CURB & GUTTER IN KIND PER COR
STD 101 AND 102 (TYP)
FULL DEPTH ASPHALT
DEMOLITION AND TRENCH
PATCHING (TYP)
2» ASPHALT GRIND
REMOVE EXISTING RAISED
PAVEMENT MARKINGS /
CURB, POWER 1 AND OVERLAY (TYP)
TO GRADE
o
1
SW, & SS POLE
CN
SS
F•—
W
I S S S S S
•'S•'� •k�� K
qq S
:ti•1' S S S
»-,-
U P
_ _
I
— U P
W
2
1"
r:�1 `
'R'
S
S� S
S -
» . .
s....:.,... s::�.,
,.:.`
Tz
LLJ
W
,w
' UArt "»'��� •»��` �'. �«'»»».`�'.`•»"»`»�.`«»'.`»'� `: »'.``'»»`«"»`».``»'»'».'• `: •'» • `»'«'»'» `
• :t. 5
....
Ci
;•::�
0 «
O ® O ® ® OO
Z o CURB & GUTTER 1 --- ---
_ - Ev
U _
U ADJUST GAS VALVE ADJUST MH COVER
TO GRADE TO GRADE
o 5\
O �
"
U 5,
LLJ
LLJ
(n
o r
Liz
00
00 ■
LLJ
Z
J
2
U
a
CATCH BASIN INSERT
PER COR STD PLAN
216.30 (TYP)
RENTON SUNSET GARDEN
IMPROVEMENTS UNDER
SEPARATE PERMIT. SEE
NOTE 1. (TYP)
JEFFERSON AVE NE (COMMERCIAL ACCESS
v
CATCH BASIN INSERT
PER COR STD PLAN
216.30 (TYP)
- RENTON SUNSET GARDEN
IMPROVEMENTS UNDER
SEPARATE PERMIT. SEE
NOTE 1. (TYP)
1
ROADWAY GRADING TO BE
ESTABLISHED BY RENTON
-SUNSET GARDEN IMPROVEMENTS
UNDER SEPARATE PERMIT
JEFFERSON AVE NE (RESIDENTIAL ACCESS
1 1 AS —BUILT
Vra
REVISION
10/10
BY I DATE
ir• .
w
W
w
_w� _
§6=§B= §B Cn
D _.
0
CURB &GUTTER, 1
RAMP, & DRIVEWAY
EV
T
0
I
DESIGNED:
BG
DRAWN:
DC, JYL
CHECKED:
CB
AP P R
TJ E
w
y
1. MULTIPLE CONTRACTORS WILL BE MOBILIZED IN THE VICINITY OF WORK.
SCHEDULE AND COORDINATE ALL WORK WITH THE ADJACENT SUNSET
GARDENS PROJECT TO AVOID CONFLICTS.
2. RESET CATCH BASINS AND ADJUST WATER VALVE BOXES, MANHOLES,
CLEANOUTS, AND MONUMENT CASES IN ASPHALT OVERLAY SECTIONS
TO MATCH NEW PAVEMENT GRADE PER CITY OF RENTON STANDARD
PLANS.
3. GRIND EX PAVEMENT TO 2" DEPTH FOR FULL WIDTH OF RESTORATION
LIMITS PRIOR TO PLACING 2" HMA OVERLAY.
LEGEND
----------------
ROW LINE
SAW CUT
ROAD CENTERLINE
CATCH BASIN INSERT
CONCRETE SIDEWALK DEMO
ASPHALT PAVEMENT
2" ASPHALT GRIND AND OVERLAY
2" TEMPORARY HOT -MIX ASPHALT
CONSTRUCTION NOTES
01 PROTECT IN PLACE ALL WORK CONSTRUCTED BY THE ADJACENT
SUNSET GARDENS PROJECT. COORDINATE AND SCHEDULE
(n
DEMOLITION WITH SUNSET GARDENS PROJECT TO AVOID REWORK.
z
LU
2
LLJ
O
01�
n
2
z
CQ
G
LLJ
I -
a
LLJ
F____
U)
I
LL
0 10' 20' 40'
O
Cf)
1 inch = 20 feet
z
w�SNj'���1
W
f
�
G�
(Q
• Cal 1811 ��'o�, ��'CISTER�'� 5th Avenue, Suite 1600
w
��`� Seat
® two business days �`rsIONAL E�Seattle, WA 98101
C/)
AS -BUILT 04199
W-419906
before you dig www.2.ff.
10/16/2023 wwkpffcom
z
STICAL.
AS SHOWN
NNVD 1988
HORIZONTAL• NAD 1983/1991
CITY OF
CITY OF RENTON
DATE,
11/15/2022
• RENTON
RENTON SUNSET GARDENS
OFF -SITE WATER MAIN IMPROVEMENTS
�
�
DRAWING NO,
ONE INCH
DATUM
Planning/Building/Public Works
Dept.
TESC & PAVEMENT RESTORATION PLAN
C201
z
AT FULL SCALE
IF NOT ONE INCH
SCALE ACCORDINGLY
-JEFFERSON AVE N E
SHEET: 06 0 ' 14