Loading...
HomeMy WebLinkAboutW-419912N i J w 0 I Q I 0 U I CD U C1 (n D" cn m (n Q / m Q N O o 0 X w 0 N 0 / 0 / 0 0 U r7 oCD CD �z �w J C F-- �=> cn c— oQ � C2�I cD CD I- O CDm m N V7 / Q �x o/ cD cN I O O O O x O N N N / I N m F- I- I c1 cn ry I m 0 Q T X cn o' cn I Of Of N X c'b3 N O c U � CD x °. ° a PROTECT IN PLACE °.�� 6 99 D E EX TRAFFIC LOOP ° �\ VERIFY LOCATION IN FIELD ° ° C ° EX 2" BLOWOFF TO BE USED FOR POLYPIGGING. UPON ALL CLEANING, TESTING, AND DISINFECTION OF NEW MAIN, ABANDON IN PLACE 0, (1) 12" VERTICAL GROSS (MdXFE� ISO,(1) BLIND FL ON BOT EX12"W so°FJ » TAP & i" TEMP BLOWOFF TO REMAIN(1) TEMP THRUST BL FJ\ vJ d� (1)-12" GV, (MJxMJ) rFJ \ ° nnnTrnT IN nl Anr ° .° ° d EX TRAFFI6 LOOP a \` ° VERIFY LOGATION IN FIELD 3Nr 12 W so S� STA 17+72.14, 2.06' LT so J J 01 CO NE T 0 X 2 S B PER COR STD 300.4 so (SEE NOTE 4) so rFJ 0 �1' rFJ, d (1)-12 SLEEVE, (MJ) 12" DI SPOOLS AS REQUIRED STA 17+82.73, 1.94' LT (1)-12" 45° HORIZONTAL BEND, (MJ) (1)—THRUST BLOCK STA 17+92.75, 8.28' RT (1)-12" 45° HORIZONTAL BEND, (MJ) (1)—THRUST BLOCK a � \ I0� y S� 12" W 8 �i'00 12" W 1 / NA*Pi ABANDON EX 8" (435 ZONE) W / � O i � s (1)-8" CAP, `vivy 0 (1)-6" GV, (FLxMJ) (1)—TEMP PLUG (MJ) (1)-6" SLEEVE, (MJ) 6" DI SPOOLS AS REQUIRED EX 6" 565 ZONE W\� TO REMAIN (1)-6'x5'x2' DEAD MAN SID so rF�J o`er l y �FJ � NF 10 � `-' ° rFJ T so / c� FJ\ _ 12» W S� ISO,0 ABANDON EX 6'ro r��J (565 ZONE) W DEMOLISH EX 6" W so (1)-6" CAP, (MJ) BACKFILL WITH so r16 COMPACTED CSBC STA 20+22.6 CIV STA 20+21.50, 9.12' RT —12' x6" TEE, FLxFL) (1) THRUST BLOCK —12" ADAPTER, (MJXFL) (1)-12" GV, (FLxMJ) NA 6" DI SPOOL AS REQUIRED CONNECTION TO EX 6" (565 ZONE) W (2)-6" 45° ROTATED BENDS W 41, EX 8" (435 ZONE) s Q ° V W TO REMAIN ° NOTES: NOTES: 1. VERIFY LOCATION OF EXISTING MAIN PRIOR TO INSTALLATION OF NEW MAIN. 1. VERIFY LOCATION OF EXISTING MAIN PRIOR TO INSTALLATION OF NEW MAIN. REFER TO COR PROJECT WTR2703179 IN COR MAPS FOR RECORD DRAWINGS. 2. INSTALL UNDERLINED ITEMS AS PART OF FINAL CONNECTION TO EXISTING MAIN AFTER PRESSURE TESTING AND DISINFECTION OF NEW MAIN. FINAL 2. INSTALL UNDERLINED ITEMS AS PART OF FINAL CONNECTION TO EXISTING C C MAIN AFTER PRESSURE TESTING AND DISINFECTION OF NEW MAIN. FINAL CONNECTION BY COR AFTER APPROVAL OF NEW MAIN. 3 POLYPIG STATIONS FOR 12" THE WATER MAIN EXTENSION IN NE !a-Ti+ STREET ARE Lpn A Trn AT THE E� ERN EN�AF�- 3. PROVIDE TEMPORARY BLOWOFF ASSEMBLY AS REQUIRED FOR TESTING AND WATER MAIN �CVG�°�� DISINFECTION PER COR STD PLAN 300.7. AFTER ALL TESTING, CLEANING BY POLYPIG, AND DISINFECTION, REMOVE TEMPORARY BLOWOFF AND TEMPORARY BLOCK. 4. CONNECTION TO EX 12" STUB IS PER COR STD 300.4. CONNECTION TO EX 12° STUB NORTH CONNECTION TO EX 6" W NE 10TH ST & NESUNSET BLVD K*T�(I NE 10TH ST/JEFFERSON AVE NE (COMMERCIAL ACCESS SCA _SCALE' I'=5 RECORD DRAWINGS THESE AS —BUILT DOCUMENTS HAVE BEEN PREPARED FROM THE CONTRACTOR'S REDLINED MARK—UPS OF THE CONSTRUCTION DOCUMENTS. THE ENGINEER REVIEWING THESE RECORD DRAWINGS HAS NOT WITNESSED ALL THE ELEMENTS OF CONSTRUCTION AND IS NOT RESPONSIBLE FOR ERRORS OR OMISSIONS IN DATA OR CERTIFY THE ACCURACY OF THE INFORMATION PROVIDED BY THE CONTRACTOR'S AS —BUILT REDLINES. NO. —BUILT REVISION 10/10 BY I DATE DESIGNED: BG DRAWN: DC, JYL CHECKED: CB AP P R APPROVED: TJE (1)-12" ADAPTER (FLxMJ) ABANDON IN PLACE EX- 4" FIRE SPRINKLER. (l)-4" SLEEVE, (MJ) 4" DI SPOOLS AS REQUIRED (1)-6'x5'x2' DEAD MAN CONNECT TO EX 4" FIRE SPRINKLER TO \ REMAIN j 4" CAP (MJ) — BLOWOFF a. rFJ ° STA 53+54.17, 6.07' LT b CONNECTION TO >9 EX 8" W BY COR \crFJ `I Q' C� ,S (1)-1 "x8" TEE, (FLxFL) ° � � �' (1) THRUST BLOCK S �k, J ° Q ° —12" CAP, (MJ) @))THRUST BLOCK rFJ (1)-12" GV, (FLxMJ) \ i (1)-8" GV, (FLxMJ) n (1)—TEMP PLUG, (MJ) (1)-4" 45° ROTATED BEND, (MJ)- a 4 " DI W °° REPLACE EXISTING ° CONCRETE SIDEWAY (1)-45° ROTATED BEND, (MJ�` BEND, (1)-4" GV, (FLxMJ) — (1)—TEMP PLUG, (MJ) (1)-12" GV, (FLxMJ) / J A ° ° a ° ° (1)-8" 45° ROTATED BEND (MJ) i (1)-8" 450 ROTATED BEND (MJ) J (1)-8 SLEEVE, (MJ) 8" DI SPOOLS AS REQUIRED )REMOVE EX 8" GV 4" CAP (MJ) EX 8" W TO REMAIN STA 53+42.41, 5.65' LT EX 4" FIRE SPRINKLER RECONNECTION nV (1)-12"x4" TEE, (MJxFL)� �� O� (1)—THRUST BLOCK // 12" W NOTES: 1. VERIFY LOCATION OF EXISTING MAIN PRIOR TO INSTALLATION OF NEW MAIN. c/) I— z 2. INSTALL UNDERLINED ITEMS AS PART OF FINAL CONNECTION TO EXISTING LLJ MAIN AFTER PRESSURE TESTING AND DISINFECTION OF NEW MAIN. FINAL 2 CONNECTION BY COR AFTER APPROVAL OF NEW MAIN. LU 3. PROVIDE TEMPORARY BLOWOFF ASSEMBLY AS REQUIRED FOR TESTING AND 0 DISINFECTION PER COR STD 300.7. AFTER ALL TESTING, CLEANING BY � POLYPIG, AND DISINFECTION, REMOVE TEMPORARY BLOWOFF AND TEMPORARY BLOCK. 2 z 5Q L LLJ I - a NORTH CONNECTION TO EX 8 W NORTH w 2 JEFFERSON AVE NE (COMMERCIAL ACCESS 3 cn C300 SCALE: 1 "=5' �O2 ILL LL 0 � V z W G� Q • Cal 1811 �6' �'4ISTER�'� 1601 5th Avenue, Suite 1600 w ® two business days ��`rS10NAL ���tie Seattle, WA 98101 U) AS -BUILT 04199 W-419912 before you dig www.2.ff. z 10/16/2023 wwkpffcom SAS SHOWN HORIZONTAL- HAD 19�%1991 CITY OF CITY OF RENTON 11/15/2022 C;%R R EN TON RENTON SUNSET GARDENS PAGE* 0 ONE INCH DATU M N41W DRAWIOFF-SITE WATER MAIN IMPROVEMENTS NG N0: AT FULL SCALE Planning/Building/Public Works Dept. C330 z IF NOi ONE INCH SCALE ACCORDINGLY WATER UTILITY ENLARGEMENTS SHE` 12 G ' 14 Uj Er