STORM DRAINAGE REPORT
FOR
•
— —
. -
RAYMOND AVENUE CENTER
•
RENTON, WASHINGTON
BY
•
BUSH, ROED & HITCHINGS
2009 MINOR AVENUE EAST
SEATTLE, WA 98102
(206) 323-4144
CONTACT : JOHN E. ANDERSON, P.E.
BRH JOB NO. 92233 . 02
0V < t ?
j • •
.0)
nEcovED
,r tp itt 1*--40 co •
FE 1 6 1996
sq.,•
1IP. • ,r) 25,.i 18 ;;;;,.
DEVELOPMENT PLANNIN *-04,
CITY OF R 4
ENTON •- —
kAtiL44.1- 2_ce—cl
\},\ EXPIRES 12/1/97
i
( 'LONGACRES RACE TRACK )
\� - - - - - - / r�t1
cn RFti N
T
rn °4, -1°>- "- - rn
O (••cuFlc AVE s.w
" N, 0,— ` /THOMAS AV1 .W. p
"f , i RAYMOND AVE S.W.
Z
Diii Li
-0 ! I
LJND AVE. S w4 z-
i
---111
,.
(VALLEY FREEWAY) ..•
STATE SIGN ROUTE 167
Raymond Avenue Center is a 10.39 acre site located at the southwest
quadrant of the intersection of Southwest 19th Street and Raymond
Avenue South. The proposed development would occur on Parcel B.
Development would include the construction of a 99, 900 square foot
building and associated parking. A divided driveway would be
extended to Raymond Avenue .
Spring Brook Creek defines the southern and western boundary of the
site. The original easement for Spring Brook Creek did not
coincide with the actual stream location. Bush, Roed & Hitchings
has prepared a lot line adjustment which defines the easements
according to the surveyed location of the stream. Lot lines shown
on the documents submitted for site plan and shoreline review
reflect the most current survey information.
Several years ago, the site was filled to approximately elevation
18 . Fill slopes toe down to the banks of Spring Brook Creek on the
southern and western boundary. On the eastern boundary, the fill
slopes toe down approximately 60 feet west of the east property
line. Areas east of the fill slopes are classified wetlands. A 60
inch culvert discharges into a ditch on the west side of Raymond
Avenue . The ditch is located within the 19th Street right-of-way
just north of the north property line. Existing drainage maps
indicate the area tributary to the ditch include Panther Creek
Wetlands . From the 60 inch culvert, the ditch flows west to Spring
Brook Creek.
Existing grades on the developable areas are approximately 9 to 10
feet higher than surrounding grades . The ground surface where the
proposed development will occur is flat . Tall grasses cover the
area. There are no significant tree located within the buildable
area. Storm water run-off from the site sheet flows to the
surrounding low lands . No defined drainage courses were observed
on the site .
The proposed site plan maintains a minimum 50 foot setback from
Spring Brook Creek and a 25 foot setback from the surrounding
wetlands . In most areas the proposed development exceeds the
minimum setback requirements . Storm water run-off from the
developed areas south of the building will sheet flow across the
asphaltic concrete paving to three curb breaks . From the curb
breaks the storm water flows into biofiltration swales . Areas
north of the building will sheet flow to catch basins . From the
catch basins the storm water is tightlined to a biofiltration
swale . According to the design standards, a single 200 foot long
biofiltration swale would be adequate . Using four, 200 foot long
biofiltration swales will provide a significantly higher water
quality than required by the design standards .
A wetpond is required because the development is located next to
Spring Brook Creek and has more than one acre of impervious surface
area subject to vehicular traffic. Also, since the storm water
will discharge into Spring Brook Creek the detention volume will be
calculated using Department of Fisheries guidelines . These
standards require a peak discharge rate from the detention system
equal to 1/2 the pre-developed 2 year rate for a 10 year developed
storm inflow. Peak discharge rates from the detention system for
storm events greater than the 10 year can match pre-developed peak
rates for the same storm event .
Analysis of the combine wetpond/detention pond shows that it
performs significantly better than the Department of Fisheries
guidelines . Initial sizing was base on maximizing the available
area. The goal was to make the detention volume shallow. This
would prevent storm water from backing into the biofiltration
swales . By making the detention volume shallow, there is not
sufficient head pressure to reach the pre-developed 25 year and 100
year peak discharge rates . The calculations show the developed 25
year storm will be discharges at approximately 1/2 the pre-
developed 10 year peak rate and the developed 100 year storm
discharges at less than the pre-developed 10 year peak rate.
Therefore, development of this site would reduce the peak rates for
all storm events .
Volume provided by the wetpond exceeds the required volume by
approximately a factor of three. This is also a result of
maximizing the available area. The design guidelines require a 3
foot minimum depth plus 1 foot of sediment storage. Maintaining
the depth requirement across the pond provides a storage volume of
approximately 26, 881 cubic feet . The required volume is
approximately 8, 116 cubic feet. Therefore, the storm water quality
will be significantly better than required by Department of
Fisheries guidelines . The additional volume will also mitigate the
two small areas filled within the 100 year flood plain. A storage
volume of 10, 024 cubic feet is required for compensation.
reports/92233 . 02
.-•' ._ .- • ; i
i i . --- • -41-- • - • .
;; 1
r.
1 ,
.
i
--------1 I .
•,--..
1 -14G-foN, • 1.1 - r----- '
..••
12 I 1 .. .. 1
I suR.L . I -----------.
- ''..•: I i
i_
___—•-- ______________,,j . --1_-------1.
___ L ___-gral----
...
•
_-
•__--_.v,
•
_
*--] _.----------, !.__-.. •--- [
.._..-••• . .
,.. ..„, . . ..
. .
. . _
_os _•--_,
.. ..,•••,-,:_:--J---- ____--..-:-• ., rsco„._--- i ,:-.. ,..i/7- - -, •
.. , ... • . .
.,. .
.
•
..„--:3-01-5"--- c___---. .__- • 1 1 i _••••••,-,.. i---
0 -_-___---
,.... ___
..../, . .,• .
•
!..
...._ ,
•
,_ ,,, ol-_---, .• __, ./ . ____,, _ •—
.
_____, ,.._--- WS 1
-'-' '. ' Culvert
.---_______.---
-----------
® 0 --'--
- ---- -- — , .
.....
i .
".„..... • _ -..-
E j 9
R M333 c4
._
... N
. , •
.....r,r, --- - " ,. ., .
•
. •
- -.:- • -•.....• - ii -...
-.....
n
1 . •
•. - 1.1..
I 1' .
•
, . ...:.4;:,:.....-' P•' :.. +..,' • '''• . i'''''...g Y.'.!,)';:!?.:.'t....;;;41.-..:,' '.
.•
• --.' 'v
I I
...', :7 RM334 R • 0 ,:...:.., ....:,...,,.----....i... ..„..,..,,.,.: .:,•• .. ....,..-..,.:„.:. .:,..-. ..:.,..; ..
•-;,.... ,-:...,.. •:-. ••-•,,s.1.1--=...• .
w
,>
• ...,....:.• .:-....
' ...-..,. ,i....• .--,-4.e.) ....,---.::.. 1 .
•.- ..: • -. ... ..: . 16 -
•
• ro ZONE X .;...;,;),.:. ...,!.•:•••:•4 , . .• -• .7:., i •,••11-•: ,'.. 1
-A W.-A
' • rg
P ...... .. • .
. . ,. .... .
. .•...... .....
• . ..
I> - . ..,...,-....,.• 1 ...... ..,
. .
• ,„:...„... .........,.:„.•.......,;:•-• ...„.•::‘...„L..-.,..,..._.:__....„..„...;_„..... _....._. : . . . ..., . . .. .....„ . • ...:
. ,, ..,....„
. .•
___ _ • • ..., • .• .. . • .
. ......,.: .. • • ... •. •• _ .........
. •• • .
.. .. ......• .•. .
... ... . • . . .-.„..... ,..
. ..
. .: ••• . ..._ •. ..• :• . .
•
. . . .
... .. .
:• • . . • . .. . .... . •.•. .... . .• ..
: . ... - .... •••
• • • , • ....
. . . . .. .•
•
• .
. • .
. ..
• . •. .
•
_ •. .
, . .. . . .
. .
... . . . .. . .. .. . .. .
. . .
. •. . . . . . __ ..•
. ... .. .. .
. •• ..
. ...
. . .
, .......HtE I
• '
, — ‘. • ., .
7--"'• •
: I ,,j• ., .. . .
• •
• • • - - • • A ..,•••'• 1 * .
. ..., •
. . .. ..
•
ZONE X •
. ..
.1,- .j.:. -. 1 -,•• • • •
- 1
' • ', • . i --. • ',. :. ..: .! . ' I
- - - .
• • . , .. ., ..
• •
• -
--- . , . , • ..
.. ,
— • • .
. . . .
• .::•;:•1.-s,-• •:F..„. i.-:.... .• • . •. .. . ..:. .- '''••• • ..'. •,.'.• ..;:.-•.7;••,•-1., . • . . • . •:.•-: •',.'.'. •'•• ,-... , • •••••
• , —.)-•,:.-1.: ,. . .
•
.. .
. . ..,. .• . • . .• • J"..'• .,.*:•A • , • ). ',.-:,:..",s:::.; .. •..--'„) •-•-•-1."•-•
•!• : ...../ • :• ••::• • •
• - .% . ';.:1. .:I. "•' -•• • 1.4.:....:, :••,•;...,IL:'..f7t::.!"- -•.::..,
. .. ...... . . . ..-, ". —
-. : . ...: . .. .. t...... .
• - .. • • •
' ....'''...j.......;.t,I4'.... .....4... ',.7...I,,"..1'.'
. .. . . . .. . • .
.
.., . ... .•. .
. ..., .
..• .. . • .
• .
,......• ,:::1•,....•::::-.': ,...'''' • . '..•' . '.......'n,......... ... - ••,.::; .. .`:....7:4 q .. .-,?-...-?.-•:-A,--",•tr.' ---.: -
•...••"1.•-•-••f•::;-.,i•-r,••- . 4.,:.,.-.•.1: _, •,•:::: •--.:,...":._. - . .' :.,''....:•• '::::::...•,;::),. :, -. .. . .,.:...,..,,,, .. . .1
.•
. . ,.• — •••• • -• •
. . ..--,. .
•
.. • ,......
•
. '''.. .. ' • 7 ..--' :-.:.t.. :::-:.-.1-:-•••:.•::.. "::::•1-.•:••;;Y:--•,...f. . • .. - . •-•••s‘•, • ,..;:...4.1 .'s•-:-•;:.•• -:,. •;,•:‘:: i,‘.- ;a: z o N E x
ZONE ''-. ••••• . *. • ..... •' :.•...;!*:::.:..-;•. ....: ''-...•':'•''';;:.:.'::. . '. '''"•,.. .'•:::;:-1,1., :.;.•,-:',:ij,1..•:.•:•'...; `•''.;,•-'6';':i''.-
... • • .`-'..")•::-:, , :. ...:,-.. : . :•••• . - . • ':• '...: ,-.;•• ':,•-•';'-.1;* -i•-• . -:. ,3.•.'','i.-'..'1- • . I I I I
• X
• . . • ••.- • ••!.:••.',..:::.• .,,...:•.:': .•-,•'.'.-...:-.,-. ,.". .:• .-•.:•;r,..:-.•••:.1:-. if;,-.:-;.‘''....1' ..---.....': .•-: .-':.:•i..'• :::-.)'::. ;- ..--- : ; , 1
' •:. •:-...3.- ••• '•'-..•':::d.., ‘E.-....,•,-,,,-:'../....•••••• .•••.;;.::?„-,•,',':...-•.-.-:•••,,..,:;•'••• .'-,Ii.., 4..:, .,.,•••;:.,,-;:,:...-.,•,-;........,; •:,;:.•1--'..• ,..-
: ...• ..• ••. -, • ...-: -...:;::.i.:-.., '..,.• ......:c••,.: .7,-..-.'.' ,..:..;,.., •••-•,:•.-:-1....,..;-•-•,':',.... . .•.! . .r,-*,••;3•.,-;,;::,,,?:li,.-.i,;.,,,-.-,,.I.......,.,
,,:-.....,.,;..i,,,;.,-,,,,:::?:::,..!....-,:•.,.,;:,..,::f.......z..:';:::;::::,.R;...;:t!..-.. „."i;-, Z ` . ,'Fiisi::!..0.:'2:1•.',-.1',.0•••,..••- — - • .
' ., .. ....., •',::.:•,-.,......:„...,•,..;,•,!:‘..".•.•.„'?..• .., :.";:',:.;.,. ••,%;,..::,-•.'A 1..*:..•:::-...;I.:,•;.:•••'.., ,,,,,:',';'.,-.:- :'•.:•,.•••,•;!•.•:',••.:1`..,:z.:.,;1:;,.....V`'.'g'.-:!•;..1';• 'F '"•2••;'.`\,,'..". •. ...... .. .
•-,. •—.-.:,:-..,:••; .. •••,;:,-,...• -,. .—-,1:- •••••,. ...; •••••-•,-• :..;', ';',;i.::•:;•::::',:,••.:-•..:r,.,:i;'.•;:;;";:',i''''.:.'%';'•"••'..'...*.•,t-r•i•!•-.',I,!••.1.,''.••''•:__. 1 !*
•••• ••• --1•':•:::••'' s.•••••,•••":.•:".•''':'-';'''',';;••••••' . 11 1 I (°.;1) I
• ' '..'.1.• ••'-'JI•=.",,,-`,,,,•'''i'-.1'•:•;.;:.-;•...c,...,-;.:;',..'
1 ;
! I
...'-:.": .,.-..:- : ...• .. ::. •-. ,•'...,;•";''.....:14'!-.,•1,',•:••;•••;;'''••'*`:,•;;;•••••:::' • i
IIN-1ON ; I 1 I , I DO YEI\IZ" Vwor2
. ,
• • .
. •
1
• • .
, 1 :088
I 1 ''• z.vAi-ripki — 1‘ •• •
• . ./• 1
. ,
,.. ,______ I i 1
BRIDGE UNDER q_3) . . .
_
CONSIRUCI ION • , .
• • sloD) .
• . !
:o
! .
'
10
•
•
•
--,,
. RM338
-.T. iirs-r -• - ----27TH '
11111111.1. L___S°"4 --'------• -
r•mt-e-r•
FILL V1 im I ti .I co YR " FLaop •
TorPL IVZ ..
l• I ° r L Z4 GF
/ /� ll
ti'ti : `°
1 8, ,�/'
�. •
,yti`,,,I = 8.40 1 CURB
//� l� , f� / 13 BREAK
ot
/ ./
� /i r /
• , / IE0
Kti -.
0, / / /
$ 12 ---._
1 I
- 10. W • 19.=• •
\...
,i�1N,A ;,
•
.. Ivo:
, .
.. ._ -.- . —_ 441.:A(�� SS MH s , � 14 o,s
TE19.00+ •`i4‘ ;4rsz� . : EXIST. SS MH
IE-11.28 .,,� �P.\!g I IE 1T. S
SS p 4
� '��' TH A N U E
= / 1 TE= • 8 CH EX GR '- y IV. . SEWER RAY),1• AVENUE S
IE 1 •ry , 8 SAN/ IE-10.•. — — —
KING COUNTY, W ASHINGTON, SURFACE WATER DESIGN MANUAL
FIGURE 3.5.1C 2-YEAR 24-HOUR ISOPLUVIALS
\ ii...dsvitair 4eur
..‘ . 74:ay • • . . . . %v. i wiA- ,
/4 "Rill i 41-alk ATI lho'S •
. ig gialr: illorimitir 111‘, 1
10 - ismri Novax..4-ili 'is, ,„,, .,
/1 Argirog, . -vac% C!
-..guia...2116 - i - , /grill likitNIAi ' •
le 1411"aSir ' --'i rojkaireviiij . i .1. , •
1 \ /\r-irttltttill -t.,*;ie . kir-illai ..r1r011101144 Illif 7
%,., i . ) ,•I 4::.
2Q itittiou i'" - ',Pei IIIIXF.7.,,Aiiii. A f ' No
ifiSi
\ — e„,.., Vit..247. 7.11=1V111111 // A 0, %ilk .
i Al .
•.i ... plithe.,. itiOt-fpxsiu.---- 40.0s
4' III 'rah i t -3„,ii FY VII',...91,114. ,111 -iall 411r.h.
lilitaliiii)ii I i )) ' ilk I (10 1 4.61111- r 4 .a*-4f
el iltVr c. ' 7:\k.
AkAttrAlt._, _ .,iv-,-►, /
itivi
,..„_., - '-'---t wii.4.
l' A
/1 1-*-= , tumral.k t lopoi —"vs:iv:tot_
/...elaw,Teakm _-,_-_11 b. - _. -.....Ap;,\71., , \
,ikallr4910,11 'Iti .4‘ _ ...
i i.roinoul. 7;-- , MI mp., it Iron• '.-- Q....V4„..0 \ i
li
VIM \ ''' I=1'`, 11 PANS :_-_110..- A- / --..r.
I { ' I\ - %. I Irma itag -
7./.// !: II= ... ... leNmt. 1iIR . .
.., , , , I, i ifiligl. ..E'. ' . Ir vit Are RR!f .�
.- "liti
'1/4 ; - • pupa
1`jcv ._ .--., same A i ) :Jprirtitittillir.‘ci
-� __ 1
-7: I gli " .1k . - Ingpikilip-11.
, . .r , • - \
4,. Nr.,_ .ins • • -"°Y--
PZ = 2 , CSC, '� a t l amy
if
!- `
2-YEAR 24-HOUR PRECIPITATION w�I��`� 1�IN ,
..3.4 r' ISOPLUVIALS OF 2-YEAR 24-HOUR �' wr���r --
TOTAL PRECIPITATION IN INCHES ir
fy , ,!
0 1 2 4 S 6 7 • moss " •
`♦♦ N _ _
Se. Sr-�1'1a300,000 3.5.1-8 1/9°
1 -
\\ EARINGTON GARDENS: 1 yp �/ I f
N NO I VALLEY OFF10E —M—t 9 •- 0I I i'
1 w %.` C PARK �I/ ._ Ip
eilll " pi, l ram,
� DEING
0 I I COMaPANY I/7� STONEFIENGE
y' II..w.®®. S�20I II TD. 4
I ���°
e I I ��."IOY �
° I -comoAVOmr
i 1 I .,. I I CFHCESOUTH LAATE _ 'LL
v ' OFFICE PLAZA 4� ucxr POYSTRIAL
/ I N1I
I
_ -0__ __
GLACIER PARK wn.-
GLAC-- COMPANY
U
PARK
I I
CO OLYMPIC PIPE LINE I© OLYMPIC PPE
COMPANY 1E3 LINE CO.
v
mil,Roo a.irroloos.ix.
0 W.
CM OF R^NTON
^ �,NF1COg00 RAN
Ems mama MOM CO NO.
IWaMs Ns
252304-90 7+08
CITY OFJ ATTLE 647777
WATER 'OEP
COUNTY CITY:SLOG .
302305— 007=06 '
CITYAO . RENTON 379700
200; MILL YE SOUTH.
RENTON• NA 98055
•
•
302305=9066: 04 '
CITY OF : SEA .LE 617777
•
. ;a
252304-9037-08
CITY.: 0F, SEATTLE : ' 647777
WATER DEPT .
•
COUNTY, CITY, BLDG ,
252304...9058-.02 '
kOCWHANSGEORGE . 190.139
% -ALLPAK •CONTAINER
. 1106 ,SW '27TH . ST
•
RENTON WA : , "98055
' • ' '.•• . - • • '"" • .
252304-9064.'04' •
RENTON " illL : L C - ' 559999 ._
5601 -SIXTHIAVENUE : SOUTH .
SEATTLE WA- . 98108
. .
•
.•: • : . . „ . .•
302305-9007-06
CIMOF RENTON . :379700
200 MILL " AVE, SOUTM
RENTOWWA 98055
••, • .. . • • ,
302305-9066704 . .
" CITT:OF SEATTLE 617777 . ,
•
. „ . _
: 302305-9054-02
OLYMPIC .PIPE -LINE COMPANY 5N0674
. KEVY: KENNETWR
• PCLBOX5568 •
•
DENVERCO 80217 H.
.• • •. . :,• „.... , „ , „
3340404000-07'
RENTON INC 1.90072
•C/0- 6SIC ,REALTY:CORP"
• • 255 "SHORELINE ' DR STE.'600
REDWOOD • CiTY;CA . . 94065
334040."5300-701
: GROUP -HEALTH : COOP/PUGET ,SND261233
5211.4ALL, ST ,
SWTLEWA - . . " ' 98121 ,
•
•
_',: 4' ..:BA.T CH.
•:NUMBER: : . . ' H©: .Seek7 _ •1 ., ,,.
*,: 'CUSTOMER ;NAME;: - BUSH,ROEO&HITCHIN
''r : _ • L>l,kit j. 'l_:
a
yt
_ 41. k - _ -
.P. J�'+'�'� .I .. 1.
‘,
.,... .,...._.: .:..,.....,.. .,,.. , ..... .„ ,,....: :, .. .... "...), : .• ,.. .. , ,:,• ...,..,,,.,,....
. .•,.... ..... .• . ., : , ., ..:•,...,,,,.....,•....:. .••i•,.:., ••.'''.1.1*;.-•.'• :--i: '''.:' ‘ ''‘'. '."-' • .:: ,",.
ic)
" ' s, t'41,,..:., •'.,...--:,.':.,... .. ...,:. : • - :',', •-.-' ...:.:',.,-,1-2.',':,::-.--.;:1:„'; :‘ A.: it.-.. .. .:, - -.--.`.. .. -.....- ::. ] '..,. ..-,-,',::-..',. .. -...-...;.,..,....-..-... ::"....i •„.:"-..t.. ..- ..., :-.-. :.,,,....:::. ,-.. ... •
..,._. .,..,.:.. ,;,..,,,........,....:-..-..., ,..,.,,,,,.i.;.•:,!... . . .. .:...,J-_.....,. . .. ._ ..F. ... .....:.• ,,,,.......,.. :,,...,
-;•'-;• ..4..'.'..,.•:' .:::.:...',7.-- ....--:.:.::-..,::-.,..... .. . . '- .... ..• ',1:- -,',...,..;.•..., ,- • -HI
.....;...-,...i....,.....-'•,-,.•.. ..::.'........ , ..,;,••
➢y � r ..:. -
.2,- ,,, .,:... ......,. :.,..!......,....:•••••,. ,.. .,., '
.:. ,.:•-•-:;..,......;, . .....•':....'..--,... .•;. .;,:r.F'•:,-..4--. `",;".,,,••'. :-. - ,•:: ,...--,..,,''."'",.%--,••••••.z.'''•'•''-2_ •
252304-9019-0 :'
••CITY..'OF ;R :ENT N '209800
• :CITY>HALL" .
:. ., 200. MILL . AVE.,: OUTH..
RENTON : WA gancc
COMMENTS 154 ?..
000580-0001-07
THE BOEING COMPANY 530653 .
PO BOX 3707 M/S 1F-09
SEATTLE WA 98124
• 192305-9013-03
STONEHENGE II LIMITED 229800
PARTNERSHIP
3605 132ND AVE SE SUITE 300 '
BELLEVUE WA 98006
• 192305-9076-07
SOUTHGATE OFFICE PLAZA I 913335 ,
LIMITED PRTNRSHP
3605 = 132ND' AVE SE 4300
SEATTLE WA 98006
192305-9095-04
STONEHENGE . III LIMITED . 229800
PARTNERSHIP
3605 132ND AVE SE SUITE 300
BELLE VUE .WA 98006
242304-9020-08
WINMAR CO INC ' 2N0425
PO BOX.: 21545
SEATTLE WA 98111
242304-9022-06
THE BOEING COMPANY • 530653
PO BOX 3707 M/S IF-09
SEATTLELWA 98124 '
242304.-91157.04
WINMAR , C0 INC 2N0425
PO BOX 21545
SEATTLE WA 98111
252304-9019-00
CITY OF RENTON 209800
CITY' HALL
200 MILL AVE SOUTH .
RFNITIN WA , faAncg
vICINTIT MAP to
777
i444 4
Az..
c.i......
—
i I
---
.....,
,
,
,
, • , --Ar—T— g Rl
. ,., .
.. ,
... ,
,' •
WETLAND /, ,
.
'long ATEOITOT-Or---1-
,
r
(
,..n-W---
,
1''
,)
:
7 ,,A
- PARCEL L,4
. „,.:5„.:0,-- . . •
77.--------------, ---.;..,j1'-'-:.. -- '.-S,, f-;-----"'" '•' - II1
,' ,,.. , _i__ I-
,
, . -' „- ' ....-,„...zw:,T2`..-, \'
,
. „ . ...4/ -''"7`41:Zi-',\ \\ III
, I-
•. „ tz)9
_I K
i——
,•
.,-------)--- ci-§
• L_AL ‘' '",-- \ —0.g z -
1 ,, ., ,„ ,„.-/„,,,,, ,r,,,,,, y,...... __ _,,, - I •
/ i'l g?.1,:gi''/ .' AIK -,.' , %... ".,.. . ''‘‘s k ''>,. WSW•EI.Ev.430 n',:-.'Sk •,-'''S' ; 1'
, // / / . Ai ".'•' \ R.,,,, --- ._ n,,,. 1 1 El 1 ;:ii g ..
91E
/ .. / ,•„. - - --,-,„:--- ___,,. --- ---- -.7.;------- ......
,......----"" ..,.. ...--4 /
A' 4 -' - • ,..," -4, c3-----------_-_z-,%--,;!--4_,_ _ -, %,,..t.t., -..-------,, ,
KEAN il0i.lid.;4TIER i „,e 7 ' -'-',•' 1".1'..r-'-------=.:._---- --------...' -•---_--- -- -- - --.. --------- Of
MR(•ELEV.4.5, , \' -r
, // t/in PROPOW DISTRIONTION — •3____ .-.'""" •
I
•
,• !WILDING ..--- ...-.------' i'..1,14,11: ''1 ?--1 i
•. / a .•• ef Wa DR 4.7' '- ---t __ __,____--_„....__----4.I, .,,,, ,"„,i,i. , ._. ,..
AcKNO STALLS •'
'\' ‘/‘:1,,,,I :ill :91
6- . vo - .40011111Ma.
• •- Wrdik V.I... '')
:*// / / 1 AIL' .•-
,a r L 4 • •• ...... , .:'' lalmilimrAIP'llila .111111.iiiiiiiiiii91.111Pliiilliiiiiiiiiiiri:%a r' 1 e'-.---.., FCTfEtrt'''
• 6 CO..6,61.K I-
...0: .,6/ to° WETLAND 4,,,' -A'' . • .. .
„__-__________1÷1,______________________
hmt. -... .
.„./..... 11 .,..' • 6 CO._MK -1 .- •
- 8
NTE AREA VA 04129 EOM CV ECM.ROAD
DEDDAF,F41....' i N___7 NCB.. 2 x 1
0.1.10 AREA 99.951..
TrFE OF 02012.1.21 v11 EfIEWIERED a SITE PLAN .:-.-.''' i---- CRANED ME WE lil o 5
CCOAFFCY GROW R1.810,0 5 '''' , 2
I —
• MING DISIRCT Ma FOLOIRIAL(Li ICE, i 60.101. 4 .
_I <
ELECTRICAL PM 1.2044.1..41.ARE EOM DEN. i'
CODE,WED taS4 UHL • P..1.11.CODE OECKLIST 4,1•0 1.1.045 0.1.TO ea
WY CF MENTO12.1.6 WOE 161.19.6118 TO ME CITY CV PENTON FOR A lERANT le Sheet
Ill.....T01 WAIF EIJELDHO CODE ItrieOvErIENT PEPTIrr.
1.0.1.16 STA,NO. pl i
5T4100,2D V x IV UN 2'O...
g, All
- COVALT V a 110 OW V 0.131.44.
. P.M00 FROMM 2,8 SM..ll IlL.val.4 1.1.C.AT111.16,
4:4. .
.
.1
i-
I. .
PIPELNNE EASEMENT PER—15-
WETLAND „B 15.0 REC.NO.589073
i
;- az, PARCEL 5 76. "A" .-
•
t- e LOT I alma LOT Ma -
.J.°• 6 °%"23,. LOT x
9L7 'I
/' `mac B0 /1 aJ D\ \Y�$e\.
•
ORDINARY HIGH WATER , v ,V' a \ J--s
ELEVATION= 4.5' / I I I;I \ �\n '.5 7. PLAIN
tt\ / i \w e ELEV..16 00
r a _-�• tJ,ap �'\6� ORDINARY HIGH WATER
% j: a { ;/ \' lo ELEVATION=4.5' I
(j POI
��// , p
�' G�:/a',N a,/ s oo n.aD I �\x N vim` w
.0.
z 'W OQ�i! ¢.N.�— 1 1660 125D____ .a__3 w__ — Z 1 \ •�s.� N ,��.w�
/'• Rn` } %/,� IE-fAW \ \\ J" \\\ tOM1 W CWlll¢
/ 20.9, 12.00 Of'-'T\ . \• 21.... \9'4s e I __ )
\\ ,� Yf �.\ E ilia so a=se'n3'WI r1y 3' --( — g [012b(.a 1
/ w/ i. / zo.ss � \ \\\ `` re _ , Sao////! •
1. I PER Nc AGE DITCH NO..e.SE
MENT
j' 0.95 - Tr`tee•w ���� `w� O 0 y6 sae JL� ` `I
/i // FINISH FLOOR = 21.00 20.9 •
.,.:o. —1z• $••! __IE_14� ��
90 �32• �!-- I I 3 01E rETPCNO EN POND
/ -re-man / A 19.J5 10.111.13, METER „ w1) a =` _ -'`" = / 1 W el wimlTOP Or of�iTm,.a.n ii`.a060D
8. 815�, A C E L rwet _ z.,= ®_-_ �- . L„ I .1: II 'TI aar m6110x-a 10"'
• PS.0//• - / ••J -- 20.9oo tfl45 �O` `J
//ft I 19.90 Oa_ ca 19.J0 _ I
�. 1 reel. 20.95 IE"a61 20.95 ¢.,3.i120.95 IE�,i.95 IE,SN 20.J0 `0 I 4 .�->b -!___ • \rz'1...
%/,�/ 19.601 20.95 1 1E tB.6o — [a t IE y'_12'Sp— \ I y
a13
20.J0 1¢_lsao m_r— ___ ___
•
.3 i. ( /0 soi--- 1z•so- �1z sD— 12• pillim
i M�r��II ==H 1 I, /I
n ,9. _!s - -sroE-aim e' /
na�4^ .j,/ /- - r 20.70 w.- .,nEu�l{SS 11N • Al I I
AC WETUND BUFFER
ae — -aEEr,,.::- -..- LIg ant
8
s, ...1.
;w //1 • WETLAND „A'. 1 ~ ; �' >r
1320 3v • ` —__I e cow-VW x
INSTALL 325'E 12• I —
DI WATERLINE
EXTEND TO EXISTING o�p0/r
, i I ( SEAL �F
I Vag
�I
\ ra BUSH, ROED & HITCHINGS, INC.
I� ML C ENCANEERS&LAND SURVLTTMS
N.
A Bali MD AVE. (zee)3E3-nw SEW.n[ ano,
•
feC
CITY OF RENTON
\ .•',OatI DEPARTMENT OF PUBLIC WORKS
GRAPHIC SCALE Ia/1. SCHEMATIC GRADING&UTILITIES
�,1� ,>_ RAYMOND CENTER
'° '°° RENTON WASHINGTON
or — MOM RIIMIMIIMMIRNMENINI _ ..... m Pa NAND
rz air
•
nN w) WO _ ___ .__.._. _..___.�
N- K oauEu G AMER'w re Pu wu
90 PENNON 00 wvN O.L,E 02950 Tu 91EE,. 1 OD I
` 4 I
144..t..%.h ,ones,r
�, •K..
�* `.� • I
1 o
a1�4�4���il"`. SoR�Y '
}am t ? A! C '.aye
� . I 1� it 6� • 1
j ; ro 04. ``\
i 1 v v I
I m v. • \
4 I , \ `'\
r I I p /: ` S. 1
H o \ , \q .,
I 1 Q ; 8r ee
l ' i
¢ 1 '
z i I i
• I ._��_.. __83 / • .w .
Y 1‘1,1 ;o 'p,,•> E 4
D i ,- �+ - 1
I �I`°I ::,z
i+ 1 4.' lie ,0,4.,'
j1 .-'.`.� . , ' ' 1
ilk ®® 1
1 at Q
. i I aI r 1: °E I;`
D I— I (" m
1 2
aD d 0 r I
I
1
�m I •� 1 MAR tt
T I , N
..,..
in
r D
D '} s ', , I
z , 1 '
1 , 1
1 , ,
I
y L,
Ian a: ``, \1, ••�..
, Ili 51 , ,. 1
a _— �\\ -T ._..it c MVO.a 7; -, `t-' --- t.`� 1\• L
SW „19TH STREET n•:,..:•
— gg ___ 1e 1bn_� .so�n�_�
S
•
SITE PLAN RA1'MOND AVE. CENTER lob no. 1
,
s LANCE MUELLER ■ ASSOCIATES \�
= RA7HOND AVE.SILL/S.W.19iH STREET L mo drawn
REtyTON, WASNINGTON eM000l
i • MC w I r ■ o T • • • 1 • m�lwia chocked 1
130 LAKESIDE• SEATTLE.WA 95122 • 206 329 266 �VF10f®
3 >x
OFLLS NORT ST LLC U8/5e
.. .. dote no. rertelon . doh
N I j1Li '
/ q 2 6
\ C.J. HHLL hAINIS I IQA �,
\ EARING-ON GARDENS, I
'\DD. V. NO. I ,`
mommmi VALLEY OFFICE —�— SIT �i
1 \ c-o �I� T�. 1 PARK I Ii
I I , =m1 S c_o /' r /
—y_ TAX lOT Y2Gt�049XflO
I•C31• r,�ex TAX LOT A33404.4000-0 ./ s ,i LOCATION MAP
�_�_$
SfJBfra00'
_— . - S. 19th ST. , \
TAX LOT/D2305-90O-0
c-o / ,
Q, I� C-O I
A BOEIING , a 'V I COMPANY G`O/'T LO f S 1 i
/
tUc il d
H
NE
9 $ d 11 _f0, =Q, I TAX LOT 00009pg00AO
CO TE
r I / 1� l
ct A co I I / I-L TAX LOT MS230S90TE-0
zC-0-C AL/OB E
Tr? r I A Ha-HEAW/NDUSTRIAL
U
/ I g \ TAX LOT nu�49020-0 OY Y ICE PLAZA I-L-LIGHT INDUSTRIAL
/i�i C_D
... , . I-
•
GLACIER PARK
I I GLACIER COM PAN Y
PARKN_I I. 'I H-I • - -
U CO OLYMPIC PIPE LINE 1 OLYMPIC PIPE
' COMPANY I,.1 LINE CO.
sr . if
ISO F,AN.L' . 0 BUSH. ROm a HUTCHINGS. INC.
. O,t. ri 1� rra A.CML XR 75 Is LAND SUFPRIORS
� Xunr...IROaR CITY OF RENTON
t/n/t. DEPARTMENT OF PUBLIICs.WIORKKS
+r1 .y. NEIGHBORHOOD PLAN
FON
GM JOB 1112233 MINN CO.NC.
99.WPG Mm 03/DA/95 ro XAX 92233.00
• X,�wPG
JEA rJll wm s
.0 .DWW ST .KR. XIS .PW0l00 ....+v........n XCTCOI OT 5
I
•
0 0 0 Q Q Q O O
1 77T-
1 k .' II'I I I I( i Ij I{
fi
1
w
I 1
Y 4.
,
----f-- -_-H-4 _�-i i , O�
I
__-1.-_ I -�----— 1
4 o I
b
I� I
I
q� tt
ao 1 I t
70 -_...-r -1----1--------- fir \ \
11
\ It.
• rai11G vex:aa!s:.kssnas
a -V
FLOOR PLAN RAPT IOND AVE. CENTER lob no.
LANDS MUOLl00 0 A090CIAT09
a RAYMOND AVE.S.W.<SW.MTH STREET "° ��ORD E l
RENTON, WASHINGTON �y�y R drown
__ • n e N I T E e TO . AIA L✓atwrw� checked
130 LAKESIDE• SGTTLE,WA 90122 • 206 325 2353
cBYY�flo� S NORTHWEST LI.Cr �-� ,�y„
. dab no. revision dab
Ill ®
o i
. o --o
'
I.
. IIIIIIIII"
. o .11111flll:: •---o
Mil::
IIiI0I::
1101II"
o ]INIIBI:: _0
II'I1I"'
I II II 1IGIDI'.
- - o i.uuli= ---o ;III�IUI.: —o
e
I II II ;IIIllull!'
®il!l .-o_ .IIIIIIIII
— ;IIIIIIIII116
° - -__._ IIiIMI.1U
e I Ill ll Ellin
0I1II - -
o ___o ;11IIIIIII::
;N1 ' —0
e III !Ill
I
o o —o
D bZ
o ; III .
____,±..__,
$ 2- uI
2 .
1 —O
1 BUILDING ELEVATIONS ,♦e,
1. CENTER LANCE YUE LL8i1 I A990DIATEt RAYMOND AVE. Allm ob no.
tR
i RAYMOND AVE S.I.U.1 S1LL 19TH STREET dwrn
W R£NTON, W4SHPIGTON
A • e H I T t e I • • Al * DEVELOPED a�� chocked
130 LAKESIDE• SEA2TLEI7W0k 98122 • Sot 323 2533 :. BYOFUJ NORTHIIEST LLG �vw - --_'--- _•_
s
•
Lj' ,h I*,•• M1,I .t ta• f�u i °P'7�•;3.Y.'d'' �!r°p 7• ,+i"r' -Ai,' 3✓,•y,`ajd �'<•f.+..,.,,a; ,y.' `ti`.r�.r.�,�a•.y^P C...,.�,
;,1.°.sf' �,�I 4 Lk 9 74—c,�Ai,' >0 ''''e �,'" ' �:; =14 /4? �.� F'FYF4soa-„y ,,4 J Y s's4z iiii ' e?5.w.;:
,It..s,.". t :LYE-14i, .thIT, . •1•;,.-, ,,,t'- „�l'I t$3tlftl2Ti i.JidQ. ' ' . ,a t ,U .,>. ., ,t1. ,,,: `,%,' :X t>',•
L 24Z..r:1:�r 7E6". tD'8'+al F+�, .sn ot%r. .:.K$ I > !;:!�� �T, ,'��'�"` �h".. t•': � f.. �f`sue,, '
a,
K. V n� 1 O:a Y �v:��t.l,
_G�__.a.Y ,gip 5 �. .?S•,a"4i .S'^ '=Yam$.3.�'�,.'�^v'.•���i:���ia',-s,{��•c3���.,.,�.sm.,•'>,'nf�'.`..#� ','L��en��'c '�'.S��tA'�raxr >r.� �3
e KLNa>:cdaC,.. +�.-. o!➢��e '~.g`,,`-c'v?��� :("s.'x =`<"I��l �u7 `'4`'�^'�� r�i,�,, .�? 'a�}�(».?.,:,��,,,.,,=%. ,L-^z�y� �a y�:7,,,x;,•�r
R. tom..-,,.+•-n�'n. •
., ,�:h :!4Y4:f! _ .',(t 5;1t{±�lfi,$:tiM,; q' r3-"n-;< �;x. • " .,'i .`.'Y i7`{.`�'':.
k: •:�1.',211 ',:f.„y 4;p.LL ...y.n,�Y�V, .,d••,:,. 'h6�•.••Y10" �7!J 81� 9N "'k•
ram^, ,j�. �0,:>=� =4 ,0�'.�>�, ,'Tr
?^Y - .Y '�!^ � ti,. ,l ,W,‘ ,its. ..t.
.., $1: ,...1bG,�'• ,.,. "fit. �k t..=�t:'t;.`.�"r.., , .,. :x". •,,-.�,.
H £.�b:l� .n F,e.. x L ,, ... -_s.«�i:^aYl;!J^.�..�;i..,...� n I.d'�:�'£��,.....i".?��:._.^�`.:JS:,... .....,n. .. .�... ...•. ,..,,e',aii!�I�Y:.:,c.FC�D.�11?Ya�,1[lF W n/vf:*`
: ,. ,.�'r...i4. r*•J r..' H ,v,A, I.s f':.,� .,rs':n•, ,.gr. .,a, _ .. ,
(C-1 .
. :.: 1,v24...64,,,,,,i..40,,,,,;;J,.-,...-..:,.:-; • . . . .4/
•
i i/ •• 'Y au , I ..VItp \ I� ,,} "S"• „ _ {{ , , e D
v,,,,,rzzo3,1git..i,..i.:.,::..]:,„„:. ...•• "./... . ci.....)•,,--k .
•..,..„.„..,,,.,,...‘,,„.....,:.....••:.., .c.: . -;4.);:il:
. ......„,,,,,,,,,„,,...„.......,...., . ,....„. , ,., 3,„...„
., ,....,„:„.„,...„,„,::,,,:.....: . ‹..„..,
,. .i,„...,„. ,.....,..:• •:. • .....„,.. „......., . .. • .. .. •
. i„. ,OrtRIN;
•
•..•�` L .� �,`� Y li
,';> t'9 4 • I
1: I r
, - ., ,oN. I I tJ
•-:,..,M•t•cb<q... "/ •• ________ , 1 hi .:-,F.-
• is ,v.., , 0
•
I
'.. grill
•
1 1L
- •
- i I 1
t • I
• �. "\ • I
,t ::: \� I
1 N. t , I I j
:� � u. •
L. .s y: ,,
•
` •IL.
•
• '" \\; • \ � li It \ uuuluuu
'''' Z' -;.' i •
•
•
.,, \'',..., "•%:,;•,,..,. • .4,y.:gol....:,\
-r' f:.r'i`""^yfs/1il•i'''A'J•F!.
•
• • .;•••::::,..
..,:z•
,..
1... .......
~u it.
1, `I TI I �.. II • I;. .a1' 1,• ; ���, I I'Iu' ti • �_ IIJ ..s�`�,�%✓ ,�� IcnIiui1itijr
141t,
. ;''' . 1:7;1611.•;:',..
a ,, r ۥ o
•
lil
Ilk :
Rif y;��� ¢ t.Iji s 1 fit.
f. i r1 [ - 1 � BETE 1s
..... i' . _ 4. i.::.. I �1 :% lfir: as
pi
' i A 1i •
I , JII 1
• I jII 1 I I
1 •
•I
LANDSCAPE_ . _ _ _ __LANDSCAPE
f1A7CHLINE \l imp . " MATCNLINE
1 �� �;�' :,r 4 .i 1.1-11 L l ;I I I i I•..11 •:i.-1 j.+_,- _+ I
l eti I nm t' •ws •
fro, J . • q''''41Iiil 1 11 •
•
T''A1 jll 1-*•-•1-•- ,:.,•!-,.••••.a y ',_
�.
10 11 fr:\:tv ii:: .
• ., i i,„ 1 1. , ,, ,.. •t• •, k. ,_.,.„ • ,
. • V`.. - . 51 tt, .
k, ,: •: , • ,cfh vs R, • ri 1
•
•
•
' dIT I! I S' �• p`k1' ill"
(' \ } W;• t
I.
• II• nA \ Or I'
•yr, �;'r ��
t
.4101. 4,,, ';! t ,V1 '•:,•'•••-•: ..-;• 1
—I _yirs� 11
r J^� - S
Z
/xq I
y C - ci
In r
Z ,,.I I�' .I 1 a
•
NORTH LANDSCAPE PLAN RA1'1"IOND AVE. CENTER Icb^c• •
g, LANCE MUELLER S ASSOCIATES �•' '•}
r _ RAmorrD AVE.S.W. sou.19TF1 STREET
' a "� - I]J
RENTay WASHINGTCN "_.;. :,:1,.
N A . c N I T ■ c T • • A I A Dt�'IIA'm ch•ckad ".'.".;�;;\'.l'
130 LAKESIDE• SEATTLE. WA 98122 • 208 325 2553 BY O�JS NORTFUE$T LLC V"� do•h�9U SO. :,nv(floii'�;�( ,.�+j;aU�/ 1
•
•
• [TY OF RENTON
1055 S. Grady Way
Renton, WA 98055
Printed: 07-10-2001
Land Use Actions
RECEIPT
Permit#: LUA96-015, 3Pr
Payment Made: 07/10/2001 10:16 AM Receipt Number: R0104005
Total Payment: 3,031.30 Payee: OPUS NORTHWEST
Current Payment Made to the Following Items:
Trans Account Code Description Amount
5954 604.237.00.00.0000 Special Deposits 3, 031.30
Payments made for this receipt
Trans Method Description Amount
Payment Check 085476 3, 031.30
Account Balances
Trans Account Code Description Balance Due
3021 303.000.00.345.85 Park Mitigation Fee .00
5006 000.345.81.00.0002 Annexation Fees .00
5007 000.345.81.00.0003 Appeals/Waivers .00
5008 000.345.81.00.0004 Binding Site/Short Plat .00
5009 000.345.81.00.0006 Conditional Use Fees .00
5010 000.345.81.00.0007 Environmental Review .00
5011 000.345.81.00.0008 Prelim/Tentative Plat .00
5012 000.345.81.00.0009 Final Plat .00
5013 000.345.81.00.0010 PUD .00
5014 000.345.81.00.0011 Grading & Filling Fees .00
5015 000.345.81.00.0012 Lot Line Adjustment .00
5016 000.345.81.00.0013 Mobile Home Parks .00
5017 000.345.81.00.0014 Rezone .00
5018 000.345.81.00.0015 Routine Vegetation Mgmt .00
5019 000.345.81.00.0016 Shoreline Subst Dev .00
5020 000.345.81.00.0017 Site Plan Approval .00
5021 000.345.81.00.0018 Special Permit Fees .00
5022 000.345.81.00.0019 Variance Fees .00
5023 000.345.81.00.0020 Other Misc Planning/Zone .00
5024 000.345.81.00.0024 Conditional Approval Fee .00
5036 000.345.81.00.0005 Comprehensive Plan Amend .00
5909 000.341. 60.00.0024 Booklets/EIS/Copies .00
5941 000.341.50.00.0000 Maps (Taxable) .00
5954 604.237.00.00.0000 Special Deposits .00
5955 000.05.519. 90.42.1 Postage .00
5998 000.231.70.00.0000 Tax .00
Remaining Balance Due: $0.00
CITY ' RENTON
..{L Planning/Building/Public Works Department
Jesse Tanner,Mayor - m Gregg Zimmerman P.E:,Administrator.
November 22,2000,=
•
Ms:Lindsay Herrell
Opus Northwest,L.L.C.
915. 118th Avenue SE, Suite 300
Bellevue,WA 98005 :
- SUBJECT: PLANTING PLAN FOR SPRINGBROOK INDUSTRIAL PARK
(FILE NO.LUA 96-015,SA,SM,ECF=RAYMOND.AVE CTR:II) •
•
Dear Ms.Herrell:
I have reviewed the proposed Landscape Planting Plan(dated October 12,2000) submitted for
Springbrook Industrial Park. Main Street Design has proposed to add a total of 70 Spirea -
douglasii (Western spirea)within the wetland buffer to;replace dead and dying shrubs.:Fifty of
the plants would be installed within the wetland buffer located on the east portion of the site. An
additional 10 Spirea would be installed at the north end of the site, and 10 would be installed
along the south end of the site. All of the;plants would be two gallon, and planting pits will be a
minimum of three times the size of the rootball and backfilled with imported soil..
The proposal to replace dead and dying•plant:material in the wetland. buffer is approved. Please
•
contact me upon completion of the installation,`so that aninspection of the installation can occur.
•I can be reached at(425)430-7286.
Sincerely, q.^ .
Jennifer Toth Henning
Principal Planner
cc:, File"
Terra Whareham,Opus Northwest
•
S\f)FVFT Op sF.R\r)Rv&Pr,AN INC\JTH\springbrook letter.doc\cor • -
1055 South Grady Way-Renton,Washington 98055
This oaoer contains 50%recycled material.20%'post consumer -
Op rthwest,L.L.C.
! OPUS® 915-118th Avenue SE
Suite 300
Bellevue,WA 98005
425-453-4100 Fax 425-453-1712
DEVELOPMENT PLANNING
CITY OF RENTON
October 17, 2000 OCT 1. 8 2000
RECEIVE
Jennifer Toth Henning
Senior Planner
City of Renton
Development Services Division
1055 South Grady Way
Renton, WA 98055
RE: Planting plan for Springbrook Industrial Park
Renton, WA
Dear Ms. Henning,
Enclosed you will find the proposed planting plan for Springbrook Industrial Park per
your request at our October 10th site visit. This document is for your review and
approval. Please respond in writing to Terra Whareham at Opus Northwest,L.L.C., and
do not hesitate to contact me with any questions at(425) 519-6842.
Thank you for your continued time and help.
Sincerely,
Opus Northwest,L.L.C.
. clieview
Lindsay errell
Real Estate Intern
Enclosure
cc: Terra Whareham, Opus Northwest
•
•
Opus Northwest,L.L.C.is an affiliate of the Opus Group of Companies—Architects,Contractors,Developers
Atlanta,Austin,Chicago,Columbus,Dallas,Denver,Ft.Lauderdale,Houston,Indianapolis,Kansas City,Miami,Milwaukee,Minneapolis,Orange County,Orlando,
Pensacola,Philadelphia,Phoenix,Portland,Sacramento,San Francisco,Seattle,Tampa,Washington D.C.
INO-1And /214Fr- All dad dteicvl
rinaPed at-Jai 1q71.0 Guirn
MA to tyiiz Lpri-GR
ad PO' 7-.01-4/ /Tge7;
irAN9717/-70 i7H- Aid/ A m// 79i/in
toze rwt-00,// 4?2:,%1/ •
/944 X/7-/-2 //77 /---rr-d 7pai€4
/j4f&-Aw7d Por-P-T/P
0 z wz * -,P*e el %e 6''?; z
• Ala
Padd, _
PGrle/Rii
pyr&A 11a7
. _M4/fail&
1,frpFR-
7?
i
1e4,4 / ) fiv-x - MAIN STREET DESIGN
LANDSCAPE ARCHITECTURE
110 Third Avenue N. • Edmonds, Washington 98020
/r9
gaarn w-(2-,z90
r:r"
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
DATE: December 24, 1997
TO: Larry Warren
FROM: Gregg Zimmerman 6
SUBJECT: Opus Northwest Correction of Drainage Channel Easement
This memo is to record my understanding as to your approval as to legal form of the Drainage
Channel Easement amendment. On December 24, 1997 I read this amendment to you over the phone
and we discussed the provisions. In response to your questions,Tom Boyns has stated in the attached
memo that we feel the survey is correct in all respects. We also feel confident that the National
Resource Conservation Service will be supportive of the revisions to .the channel that will be
necessitated by the encroachment of the emergency access road. Thank you.
•
cc: Ron Straka
Scott Woodbury
Torn Boyar
H:\W W6ODOTWEMO.DOT\bh •
•
•
•
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
DATE: December 23, 1997
TO: Gregg Zimmerman
FROM: Tom Boyns, X 6209
SUBJECT: OPUS NORTHWEST ISSUE
SPRINGBROOK INDUSTRIAL CENTER
We have been requested by Deborah Berg, attorney for Opus, of Tousley Brain PLLC,to expedite
the Mayor's acceptance of the easement amendment and the Agreement to amend the City's
drainage channel easement. Both original documents are attached with the record of survey
showing the Opus encroachment onto the City easement rights.
I have also attached a copy of Larry Warren's memo to us approving the amendment form. He
questions the building encroachment issue which is addressed to the satisfaction of the Surface
Water Utility staff Scott Woodbury and Ron Straka, Supervisor. Opus has provided a copy of
their bond for$50,000 as listed in the amendment agreement.
We have discussed the issue with Mr. Steadman and believe his survey is clearly correct in all
respects. We concur with his belief that the construction staking was done from the monument at
the southeast corner of the Opus property as if the monument were the property corner and not
offset by 9.69 feet-please refer to page one of the record of.survey.
We have reviewed the legal description as requested by Mr.Warren. We have found no error.
We have included the original Easement Agreement for the new correct water easement. This form
does not require signature by the City. Opus will send a messenger to pick up the entire package to
have it recorded. This should be included in the package.
The accompanying memo to the Mayor can be modified to suit the purpose. The Mayor may not
be available but Wanda Britts has arranged for Kathy Koelker-Wheeler to come in and sign
acceptance if necessary.
Deborah Berg,or Stephen Day of Tousley Brain will probably call to expedite our handling of this
information. Larry Warren reported that he will not be in until Monday which is not early enough
to meet Opus'needs.
Larry's remaining concerns are over the conditions in the Agreement to Amend Drainage Channel
Easement which he has not seen. I have left a full copy for him in his office.
1
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
DATE: December 23, 1997
TO: Jesse Tanner,Mayor
FROM: Gregg Zimmerman,Administrator
STAFF CONTACT: Tom Boyns
SUBJECT: Opus Northwest Correction of Easements
ISSUE:
Opus Northwest,L.L.C.has contracted to sell their property at SW 19th and Raymond Avenue SW
which they recently developed as the Springbrook Industrial Center which must close by the end of
1997. In the process of selling they discovered that several portions of their construction extend into
the City's drainage channel easement encroaching on the City's rights,and that the utility easements
were offset from their as build locations. This needs to be corrected prior to closing their sale. They
have provided correction documentation and requested these documents be accepted on December 24,
1997 so that they can pick them up and have them recorded to clear the title to the property and close
their sale.
RECOMMENDATION:
The Planning/Building/Public Works Department recommends accepting the documents,but holding
them until the City Attorney can review and approve them at his earliest convenience.
BACKGROUND:
•
Opus granted the City of Renton a drainage channel easement over a fifty foot wide strip of their
property along Springbrook Creek in exchange for credit towards their System Development Charges
equivalent to their actual cost to relocate their surface water detention system on the site. This
overlays a forty foot wide stream buffer within City Code.
The construction on the site was misplaced and primarily their Fire Lane encroaches onto the City
easement. When the channel improvements are constructed this encroachment could increase project
costs if not mitigated. The property is being sold and the Buyer requires this issue to be resolved prior
to closing.
City staff met with Opus representatives and agreed that appropriate mitigation would include moving
some of the encroaching improvements. The Fire lane cannot be moved,therefore the appropriate
mitigation is that Opus will design and build a retaining wall to protect the required Fire Lane at Opus
December 23, 1997 --'
Page 2 •
cost. This cost was estimated at$27,000 to$30,000. Opus has agreed to post a bond for$50,000 to
ensure that they will perform the mitigation as proposed.
Opus retained Hebrank, Steadman&Associates,P.S.professional land surveyors to prepare and
record and ALTA survey documenting the encroachments. This survey has been recorded under
971223-9001.
CONCLUSION:
While there is no guarantee that one surveyor is more correct than another. The material provided by
Mr. Steadman clearly indicates that the descriptions presented are correct and can be relied upon.
H:\Opus.doc
CITY 1F RENTON
N> Office of the City Attorney
Jesse Tanner,Mayor Lawrence J.Warren
Memorandum
TO: Tom Boyns, Property Services Supervisor
FROM: Lawrence J. Warren, City Attorney
DATE: December 22, 1997
SUBJECT: Opus Northwest Correction of Easements
The Easement Replacement Creation and Amendment Agreement
p g
is approved as to form. Please have the appropriate
staff people review the legal descriptions and determine
that the placement of the easements is correct this time.
I need more details before commenting .on the building
encroachment issue.
awrenceJ. Warren
LJW:tmj
T10.11:61
Post Office Box 626 - 100 S. 2nd Street - Renton, Washington 98057 - (425)255-8678
•
_ C
ST. PAUL FIRE AND MARINE
INSURANCE COMPANY
ftopary&Lobby St. Paul, Minnesota
Insurance A Capital Stock Company
CONTRACT BOND
Bond No. JY 3740
Know all men by these presents that we, OPUS NORTHWEST, L.L.C.
200 — 112th Ave. NE, Suite 205
Bellevue, Washington 98004
as Principal,
and the ST. PAUL FIRE AND MARINE INSURANCE COMPANY, a corporation organized under the laws of the State of
Minnesota and duly authorized to transact business in the State of Washington as Surety, are held
and firmly bound unto City of Renton
200 Mill Avenue So.
Renton, WA 98055
as Obligee,
in the sum of Fifty Thousand Dollars and 00/100***************($50,000.00)
DOLLARS, for the payment whereof well and truly to be made, the Principal and the Surety bind themselves, their heirs,
executors, administrators, successors and assigns,jointly and severally, firmly by these presents.
SIGNED, sealed, and dated this 22nd day of December 19 97
WHEREAS the Principal fwo1/1/gUAaihitk/ai hib/'.M"ttiVUlftlf-4dt!4/cbbbM/v/ViiVA/Virf '/ok/aE/akS0
liefritk/A/464/vfik///////////////////////////44//c/f//////////////////////////////////////AN////
0,11 has agreed to perform:
Springbrook Creek Bank Improvements
Renton, WA
NOW, THEREFORE, THE CONDITION OF THIS OBLIGATION IS SUCH, that if the said Principal
shall construct, or have constructed, the improvements herein described and shall save the
Obligee harmless from any loss, cost or damage by reason of its failure to complete said
Work, then this obligation shall be null and void; otherwise to remain in full force
and effect.
Any suit lender this bond mast be instituted before the expiration of one (1) .year
from the date of completion and acceptance. •
OPUS NORTHWEST, L L C. (Seal)
cipal
By !/P�6 . /l6r
Titk
ST. P FIRE AN . RINE INSURANCE COMPANY
Attorney-in-fact
Bruce N. Telander
•
At MM,OWLEDGMENT OF PRINCIPAL (Cos--'-3tion) -
.
%OOS—Ackttowlediroent by Corporation or Aanciation. (Revised I937) Miller-Davis Co..Minneapolis.Minn.
estate of WASHINGTO)i t ss. On this day of M 19
'County of ( 1 before me appeared
to me personally known, who, being by me duly sworn, did say that he is the
of OPUS NORTHWEST, L.L.C. , a corporation,
that the seal affixed to the foregoing instrument is the corporate seal of said corporation,
(If no seai.so state.and strike nut above as to corporate sell)
and that said instrument was executed in behalf of Si.id corporation by authority of its Board of
Directors ; and that said I ....--
i
acknowledged said instrument to be the free act and deed of said corporation. •
I
1 •Xotarll Public ! County,
1
.31y commission cxpii
ii•es _— —---— -- . —.
''
'I •
1'
.
1
ACKNOWLEDGMENT!OFSURETY • 'I
1
SOTA i 22nd December 19 97
Mate Of ,ss. On this i day of
County of �1 }?TN before me appeared!
i Bruce N. Telander
• to me personally known, who, being by me duly sworn, did say that he is the
Attorney-in-Fact
o f _ ST.:....t UL...F.1 ... `TD...MMRINE...INSIT$AN:CE..COMPANY , a corporation, .
that the seal affixed to the foregoing instrument is the'co'rporate seal of said corporation,
and that said instru.f ent was•executed in behalf of 'said corporation by authority of its Board of
_.........D7.raGtQ : ; and that said 1 Bruce...N... .Te1andeV._�..
"ern'eis:d e ri .. - "�• '7 ; to be the free act. and deed f said corpor lion
°� NINl1 E. WERS EIN S
v_4{ yiln NOTARY n�IC.MINNISOTA .. \.,
' 4i : MY COMMISSION EXPIRES 1 - County, � �'
�;„�s°� JANUARY 31,2000 Notary Public
January 31, 2000
. ,)fy commission•
expires............_.._...._._ __.....
.
•
•
•
• j
' i
•
i i I
;:facsirnile,and any such power of attorney or certificate bearing such facsimile signatures or facsimile seal shall be valid and binding upon the Company and
W RECORDED RETURN TO:
Office of the City Clerk
Renton Municipal Building
200 Mill Avenue South
Renton, WA 98065 • . USItIA
GRANTOR: Opus Northwest,L.L.C. a Delaware limited
Project. Springbrook Industrial Center
liability company PID: 242304-9020
GRANTEE: City of Renton,a Municipal Corporation Grantor: Opus Northwest,L.L.C.
of King County STR: 242304
ABBREVIATED LEGAL DESCRIPTION: Street Intersection: Raymond and
Adjusted Lot 2'of City of Renton Lot Line S.W. 19th
Adjustment No.LUA-95-064-LLA.
2,4 Recorded under Recording No. 9508039005,
King County,Washington.
. Full description is on pages A-1 and?.-2.
ASSESSOR'S TAX PARCEL No: 242304-9020-08
EASEMENT AGREEMENT
(No Monetary Consideration)
THIS INSTRUMENT is made the , ,�— day of ' 19v-, by and between OPUS
NORTHWEST L.L.C., a Delaware limited liability company , hereinafter called "Grantor," and the CITY OF
RENTON,a Municipal Corporation of King County,Washington,hereinafter called"Grantee."
Grantor owns certain real property situated in King County, Washington (the "Property") the legal
CO2
description of which is attached hereto as Exhibit A. The Grantor,for and in consideration of mutual benefits, does
by these presents,grants,bargains,sells, conveys,and warrants unto the said Grantee, its successors and assigns, an
easement for public utilities (including water, wastewater, and surface water) with necessary appurtenances over,
under, through, across and upon the following described property (the "Utilities Easement') in King County,.
Washington,more particularly described as follows:
See attached Exhibit B for legal description of the Utilities Easement area.
INITIAL
DOCUMENT FORM APPROVED BY
a CITY ATTO p be--f' la I/°I1 /�l
Y �
I PROPERTY SERVICES
avvormeic?fAtt.itet...fr.
The aforementioned Utilities Easement is also referred to below as the "Right-of-Way" and is granted
according to the following conditions:
For the purpose of constructing, reconstructing, installing, repairing, replacing, enlarging, operating and
maintaining underground utilities and utility pipelines, including,but not limited to, water, sewer and storm
drainage lines, together with the right of ingress and egress thereto without prior institution of any suit or
proceedings of law and without incurring any legal obligation or liability therefor. Following the initial
construction of its facilities. Grantee may from time to time construct such additional underground
facilities, as it may require within the Right-of-Way. This easement is granted subject to the following
terms and conditions
1. Grantee droll give reasonable notice to Grantor and any occupants (the "Occupants") of
the building located on the parcel within which the Right-of-Way is located(the"Parcel")before exercising
the easement rights granted herein, if its activities might impact the business operations or activities of the
Grantor or the Occupants. Except in case of emergency, Grantee shall coordinate its activities with the
Grantor and the Occupants so as to cause minimum disruption to the business operations and activities of
the Grantor and the Occupants.
2. The Grantee chap, upon completion of any work within the Parcel, at Grantee's cost
promptly restore the surface and any private improvements disturbed or destroyed during execution of the
work, as nearly as practicable to the condition they were in ittimediately before commencement of the work •
or entry by the Grantee.
(7) 3. Grantor shall retain the right to use the IRight-of-Way as long as such use does not
e1 interfere with the easement rights herein granted to the Grantee. Grantor shall not, however, have the right
to:
(a) Erect or maintain any building or structures within the Right-of-Way; or
I"t (b) Plant trees, shrubs or vegetation having deep root patterns which may cause
damage to or interfere with the utilities to be placed within the Right-of-Way by
the Grantee; or I'
II
(c) Develop, landscape, or beautify,the Right-of-Way area in any way which would
unreasonably increase the costs to the Grantee of restoring the Right-of-Way area
and any private improvements therein.
•
(d) Dig, tunnel or perform other forms of construction activities on the Parcel which 17
would disturb the'compaction or unearth Grantee's facilities on the Right-of- •
Way,or endanger the lateral support facilities.
(e) Blast within fifteen(15)feet of the Right-of-Way.
I I
it
LIB
This easement shall run with the land described herein, and shall be binding upon the parties, their
heirs, successors in interest and assigns. Grantors covenant.that they are the lawful owners of the above
properties and that they have a good and lawful right to execute this agreement.
III
1 GRANTOR:
OPUS NORTHWEST,L.L.C.,
a Delaware limited liability company
By:
Jo Solberg
1 ZCi a President
STATE OF WASHINGTON )
ss.
COUNTY OF KING )
I certify that I know or have satisfactory evidence that John Solberg is the person who appeared
before me, and said person acknowledged that he signed this instrument, on oath stated that he was authorized to
execute the instrument and acknowledged it as the Vice President of Opus Northwest,L.L.C., to be the free and
voluntary act of such party for
the uses and purposes mentioned in this instrument.
Dated: I — gg- Gl- •
(Si attire of No Iubhc) C
01 .\1
40"66111tio
einhel'i (lours
d (Printed Name of Notary Public)
/r/act •
mow.:_= My Appointment expires. I� .
0.
�FCE�R3E•,,C?Q�
'FTgTE C � •�
-.SillIt5t
3
EXHIBIT A
LEGAL DESCRIPTION OF THE PROPERTY •
Project: Springbrook Industrial Center ;I
PID: 242304-9020
Grantor. Opus Northwest,L.L.C.
STR: 242304
Street Intersection: Raymond and
S.W. 19th
THAT PORTION OF GOVERNMENT LOT 13.SECTION 24.TOWNSHIP 23,NORTH.RANGE 4 EAST,
WILLIAMETTE MERIDIAN.IN KING COUNTY,WASHINGTON.MORE PARTICULARLY DESCRIBED AS
FOLLOWS:
COMMENCING AT THE SOUTHEAST CORNER OF SAID(SECTION 24;THENCE NORTH 00°47'36'
EAST ALONG THE EAST LINE THEREOF 9.69 FEET TO THE EASTERLY MARGIN OF A 40.00 FOOT
WIDE RIGHT OF WAY FOR SPRINGBROOK CREEK AS,DESCRIBED UNDER KING COUNTY
RECORDING NUMBER 9412231106 AND THE TRUE POINT OF BEGINNING;
THENCE NORTH 37°00'42'WEST ALONG SAID RIGHT OF WAY LINE,A DISTANCE OF 32.02 FEET;
THENCE NORTH 55°28'15'WEST 83.16 FEET; '
THENCE NORTH 52°24'00'WEST 186.02 FEET; j
THENCE NORTH 54°03'5T WEST 280.51 FEET;
THENCE NORTH 35°11'09'WEST 138.12 FEET; •
THENCE NORTH 23°44'21'WEST 81.38 FEET TO A POINT OF TANGENCY WITH A CURVE
CONCAVE TO THE EAST HAVING A RADIUS OF 35.78 FEET;
THENCE NORTHERLY ALONG SAID CURVE THROUGH IA CENTRAL ANGLE OF 52°20'18'AN ARC
DISTANCE OF 32.69 FEET TO A POINT OF NON-TANGENCY; •
THENCE NORTH 50°08'30'EAST 107.69 FEET; ,
THENCE NORTH 51°45'16'EAST 68.97 FEET;
THENCE NORTH 59°39'11'EAST 93.78 FEET TO A POINT OF TANGENCY WITH A CURVE CONCAVE II
TO THE NORTHWEST HAVING A RADIUS OF 154.57 FEET;
CD THENCE NORTHEASTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 45°50'57'AN
g i ARC DISTANCE OF 123.69 FEET TO A POINT OF TANGENCY;
till THENCE NORTH 13°48'14'EAST 114.90 FEET TO A POINT OF TANGENCY WITH A CURVE
CONCAVE TO THE WEST HAVING A RADIUS OF 334.26 FEET;
N^' THENCE NORTHERLY ALONG SAID CURVE THROUGH,A CENTRAL ANGLE OF 36°45'26'AN ARC
`� DISTANCE OF 214.44 FEET TO A POINT OF NON-TANGENCY;
41.4 THENCE NORTH 23°47'30'WEST 104.50 FEET; •
THENCE NORTH 28°32'10'WEST 63.10 FEET;
THENCE NORTH 20°51'33'WEST 41.80 FEET TO A POINT ON THE NORTH LINE OF SAID II
cn GOVERNMENT LOT 13 AS SAID LINE IS SHOWN ON A RECORD OF SURVEY BY R.F.MILLPOINTER
AS RECORDED UNDER KING COUNTY RECORDING NUMBER 8910069012 AND WHICH BEARS
NORTH 87°26'45'WEST FROM THE NORTHEAST CORNER OF SAID GOVERNMENT LOT 13; ,
THENCE SOUTH 87°26'45"EAST ALONG SAID NORTH LINE 378.76 FEET TO SAID NORTHEAST
CORNER;
THENCE SOUTH 00°47'36'WEST ALONG THE EAST LINE OF SAID SECTION 24,A DISTANCE OF
1,320.39 TO THE TRUE POINT OF BEGINNING;
(ALSO KNOWN AS ADJUSTED LOT 2 OF CITY OF RENTON LOT LINE ADJUSTMENT NUMBER LUA •
-
95-064-LLA,RECORDED UNDER RECORDING NUMBER 9508039005).
oy93. 3T
Ia:II
%:a
(...
I �'I J _0,:•L LAB•S
it
` XPIRES 9/21/99 /t/9--97
A-1 _,__.�_,__,�,__
1
i
1
1
.
EXHIBIT B
UTILITIES EASEMENT AREA
Project: Springorook ludustrial Cater
PIED: 242304-9020
Grantor: Opus Northwest,L.L.C.
STIR: 242304
Street Intersection: Raymond and
S.W. I9th
A 15.00 FOOT WIDE STRIP OF LAND OVER, UNDER AND ACROSS ADJUSTED LOT 2 OF
CITY OF RENTON LOT LINE ADJUSTMENT NO. LUA-95-064-LLA AS RECORDED UNDER
KING COUNTY RECORDING NUMBER 9508039005; SAID STRIP OF LAND HAVING 7.50
FEET ON EACH SIDE OF THE FOLLOWING DESCRIBED CENTERLINES:
BEGINNING AT A POINT ON THE EAST LINE OF SAID LOT 2, WHICH LIES S 00°47'36'W •
10.51 FEET FROM THE NORTHEAST CORNER THEREOF;
THENCE S 50°10'41°W 55.67 FEET;
c7y THENCE S 56°08'11"W 108.98 FEET;
t?' THENCE S 14°19'36"W 219.62 FEET TO A POINT HEREINAFTER REFERRED TO AS
td POINT"A"; •
THENCE CONTINUING.S 14°19'36°W 149.82 FEET TO A POINT HEREINAFTER REFERRED
d' TO AS POINT"B";
N THENCE CONTINUING S 14°19'36"W 108.86 FEET;
THENCE S 45°10'45"W 27.10 FEET TO A POINT HEREINAFTER REFEERED TO AS
POINT"C";
THENCE CONTINUING S 45°10'45' W 182.76 FEET;
THENCE S 01°03'18" E 5.00 FEET TO A POINT HEREINAFTER REFERRED TO AS
POINT"0";
THENCE CONTINUING S 01°03'18° E 235.04 FEET;
THENCE S 07°08'42" E 14.20 FEET;
THENCE S 55°04'24° E 134.66 FEET TO A POINT HEREINAFTER REFERRED TO AS
POINT"E";
THENCE CONTINUING S 55°04'24" E 71.49 FEET;
THENCE S 66°31'22° E 27.73 FEET;
THENCE S 89°05'06" E.21.35 FEET TO A POINT HEREINAFTER REFERRED TO AS •
POINT"F";
THENCE CONTINUING S 89°05'06" E 65.65 FEET;.
THENCE N 42°34'04" E 17.16 FEET;
THENCE N 00°48'06" E 335.05 FEET TO A POINT HEREINAFTER REFERRED TO AS
POINT"G";
B-1
1
1
•
•
THENCE CONTINUING N 00°48'06" E 205.80 FEET;
THENCE N 20°25'13"W 38.00 FEET TO A POINT HEREINAFTER REFERRED TO AS
POINT"H";
THENCE CONTINUING N 20°25'13"W 34.10 FEET; II
THENCE N 00°38'36" E 351.41 FEET;
THENCE N 24°26'44' E 8.43 FEET;
THENCE N 46°57'09' E 152.26 FEET TO A POINT ON THE EAST LINE OF SAID LOT 2
WHICH LIES S 00°47'36"W 18.80 FEET FROM THE NORTHEAST CORNER THEREOF;
AND BEGINNING AT AFORESAID POINT"A"; I
THENCE N 75'40'24"W 54.40 FEET;
THENCE S 85°02'18"W 22.43 FEET, MORE OR LESS,TO THE WEST LINE OF SAID LOT 2;
AND BEGINNING AT AFORESAID POINT"B";
THENCE S 75°40'24' E 25.67 FEET;
AND BEGINNING AT AFORESAID POINT"C";
THENCE S 44°49'15" E 28.92 FEET;
AND BEGINNING ATI AFORESAID POINT"D";
THENCE S 88°56'421 W 41.97 FEET;
THENCE N 01°03'18"W 16.85 FEET;
AND BEGINNING AT AFORESAID POINT'E': ,
THENCE S 34°55'36"W 19.43 FEET; ,
AND BEGINNING AT AFORESAID POINT'F';
THENCE S 00°54'54"W 36.12 FEET;
4-1 AND BEGINNING AT AFORESAID POINT"G";
'1
Cr THENCE S 89°11'54 E 18.95 FEET;
( P
N AND BEGINNING AT AFORESAID POINT "H";
PI THENCE N 69°34'47' E 21.48 FEET TO THE TERMINUS OF THE HEREIN DESCRIBED
V •CENTERLINES;
0)
THE SIDELINES OF SAID EASEMENT SHALL BE EXTENDED OR SHORTENED, AS
NECESSARY, TO INTERSECT THE EAST AND WEST LINES OF SAID LOT 2.
sff
a/ 9 S• . ^ '! ;1 i�
. �..•. •fit. V •
�4s O4:WA8St 1
i t:{7 l'. 2
3itti
• ":'?IsTsa •44'
g
5 ,,J I. c'i'4 L LAy0
' XPIRES 9 i 21/99 '4
it
It-30-9 7
B-2
_
•
EXHIBIT &CONTINUED
•
EASEMENT MAP EXHIBIT
. Project Springbrook Industrial Center
PID: 242304-9020
Grantor. Opus Northwest,L.L.C.
STR: 242304 •
Street Intersection: Raymond and
S.W. 19th
• NONIMKSI COWtR l01 2. ,
O11 CF RENION WI LIC
A0[SIL(NI 140.
LW-93-06I-LIA REC.N0.
I30e019003 —S 001T3611 1660'
RAYMOND •k' 4
i AVENUE S.W' 6\
S 0P471671 1031'— \•'S' c _ ',tG
117 E.
W 0 fTA1I1•A• POINT'N• KW.0• 11 PONI 7• .
W N6t Fowl ` �- I
(� ar scow c 0 r .� Fo[n LOT 2 1: �1 1 I
1"� I © i POUN•C• Po1I T .
lit M
SPRING 0 n 0.
tbq II POHL ro O D
rgi
LOT 1
co S.Ste4,
, i. iir:k ''': ... :4116-)
,,: 1ff
,,,• O•: • 200 100 0 200 400
1r'A( L**�S
[ifF[I 9/21/99 GRAPHICAL SCALE: 1•• = 200'
l..���((( /s•L,-97
H HEI3RANK, STEADMAN 1�RAYM Wl
AS—BUILT WATERLINE EASEMENT QAfE;ja)0C97
FOR BT:P
& ASSOCIATCS, P.S. SP RINGBROOK IMP CHECK:ASS
INDUSTRIAL FINAL OIECK:ns
PROFESSIONAL LAND SURVEYORS CENTER . 97132.00
666L FIFTH MINE SOURS SEATILE.NA49NOT011 Sill(L06176 09R CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON SIIffT 10F2
• B-3 •
EXHIBIT B CONTINUED '•
EASEMENT COURSE,BEARING & DISTANCE
i
I
.
COURSE BEARING DISTANCE COURSE BEARING DISTANCE 1
1 S 50'10'41"W 55.67' ! 21 N 00'38.36"E 351.41'
2 S 56'08'11"W 108.98' I 22 N 24'26.44"E 8.43'
3 S 14'19'36"W 219.62' .1 23 N 46'57'09"E 152.26'
4 S 14'19'36"W 149.82' 24 N 75'40'24"W 54.40'
5 S 14'19'36"W 108.86' I 25 S 85'02.18"W 22.43'
6 S 45'10'45"W 27.10' j 26 S 75'40.24"E 25.67'
7 S 45'10'45"W 182.76' I 27 S 44'49.15"E 28.92' .
8 S O1'03.18"E 5.00' 28 S 88'56'42"W 41.97'
• 9 S O 1'03'18"E 235.04' I 29 N O1'03'18"W 16.85'
10 S 07'08'42"E 14.20' 30 S 34'55'36"W 19.43' •
1
11 S 55'04.24"E 134.66' 31 S 00'54'54"W 36.12'
12 S 55'04.24"E 71.49' 1 32 S 89'11'54"E 18.95'
13 S 66'31'22"E 27.73' 33 N 69'34.47"E 21.48'
14 S 89'05'06"E 21.35'
15 S 89'05.06"E 65.65'
tA 16 N 42'34.04"E 17.16' 1
17 N 00'48'06"E 335.05'
18 N 00'48'06"E 205.80' :I, 19 N 20'25'13"W 38.00'
Idi
Nuos.sTFq 20 N 20'25.13"W 34.10'
AL Lilo
' ,, ❑WPCs 9/2I/99 I 1 I
/2-dt-!7
N IIEBRANK STEADMAN AS-BUILT WAI ORNE EASEMENT D+iTF S:I?EC9L.
DRANK BLEVI'& • ASSOCIATES, P.S. u SPRINGBROOK ANECKbS
FIP CHECK:SS
INDUSTRIAL
APROFESSIONAL J LAND SURVEYORS CENTER - 97132.00 it
6509 FIFTH►9EAE SCUM SEAM.W*OINGTCN UM(29O)1M1912 CITY OF RENTON. COUNTY OF KING. STATE OF WASNWGTON 'SIEC12OF2
i •
i
.
i
Ii
i
I
.
B-4
i
II
1
i
I 0
WHEN RECORDED RETURN TO:
Office of the City Clerk
Renton Municipal Building
200 Mill Avenue South
Renton, WA 980.E
GRANTOR Opus Northwest,L.L.C.,a Delaware limited project•. Sprmgbrook Industrial Center
liability company PID: 242304-9020
GRANTEE: City of Renton,a Municipal Corporation Grantor. Opus Northwest,L.L.C.
of King County STR: 242304
ABBREVIATED LEGAL DESCRIPTION:11, Street Intersection: Raymond and
t1) Adjusted Lot 2 of City of Renton Lot Line. S.W. 19th
Adjustment No.LUA-95-064-LLA.
Recorded under Recording No. 9508039005,
King County,Washington.
N Full description is on pages A-1 and A-2.
1r0 ASSESSOR'S TAX PARCEL No: 242304-9020-08
EASEMENT AMENDMENT AGREEMENT
(No Monetary Consideration)
0
THIS INSTRUMENT is made the 'O- day of D Pm _iy 19 Q by and between OPUS
NORTHWEST L.L.C., a Delaware limited liability company , hereinafter called "Grantor," and the CITY OF
RENTON,a Municipal Corporation of King County,Washington,hereinafter called"Grantee."
g Grantor owns certain real property situated in King County, Washington (the "Property") the legal
u, description of which is attached hereto as Exhibit A.
0
a The Property is the subject of an easement for maintaining a sewer line and appurtenances (the "Sewer
Easement") previously granted to Grantee, the legal description of which is attached hereto as Exhibit B. The
Sewer Easement was recorded April 8, 1997 under Recording No. 9704081637 in the real property records of King
x County,Washington.
• H
I . x
I S '
0 INITIAL
DOCUMENT FORM APPROVE,p BY
CITY ATTORNEY ia-ig"77 Z
1 PROPERTY SERVICES
•
y�r
e t
D i
This Agreement amends the Sewer Easement agreement by replacing an incorrect diagram recorded with
and used to illustrate the Sewer Line Easement (attached hereto as Exhibit C. the "Incorrect Sewer Easement
Diagram"). The corrected diagram describing the Sewer Easement is attached hereto as Exhibit D (the "Sewer
Easement Diagram").
All other terms and conditions of the Sewer Easement remain in full force and effect and are unchanged by
this Agreement.
GRANTOR: GRANTEE:
OPUS NORTHWEST,L.L.C., CITY OF RENTON,
a Delaware limited liability company a Municipal Corporation of King County
By: : ' I c ,4•.4" /� •
J olberg ' By:
Vice President Name: Jesse Tanner
Title: Ail,4gel%—
STATE OF WASHINGTON )
)ss.
V, COUNTY OF KING
I certify that I know or have satisfactory evidence that John Solberg is the person who appeared
before me, and said person acknowledged that he signed this instrument, on oath stated that he was authorized to
execute the instrument and acknowledged it as the Vice President of Opus Northwest,L.L.C., to be the free and
voluntary act of such party for the uses and purposes mentioned in this instrument.
Dia
Dated: �r�- ge /
4&inc,
gi1iUIj4 Signs of Notary�blic)
Vain
�:G)�G (Printed Name of. otary Public) -/
+tlA LIC My Appointment expires D/3//,9606
,�%`•�••:eER ��•�C��e'
2
_
- , - -
ti
•
•
STATE OF WASHINGTON )
)ss.
COUNTY OF KING )
I certify that I know or have satisfactory evidence that Yey4i �/t/iW is the person who
appeared before me, and said person acknowledged that he/she signed this instrument, on oath stated that he/she
was authorized to execute the instrument and acknowledged it as the At iktiO,- of The City of Renton
to be the free and voluntary act of such party for the uses and purposes mentioned in this instrument
•�� 44%g510N
�o NOTARY 0% M
—.A._ (Signature o 1,/o y Public) r/
DNA %C PUBLIC oo;'2y �IL�N r�i� l� /► .
sy), .. 20;�Oeee i!/(J�
,, �•�... ER..• '�O �. (Printed Name of Notary Public)
•#•i•0FWASH ss,,
My Appointment expires /0
.41
t`w,
3
x
EXHIBIT A
• LEGAL DESCRIPTION;•OF THE PROPERTY
•
Project Springbrook Industrial Center
PID: 242304-9020
Grantor. Opus Northwest,L.L.C. .
STR: 242304
Street Intersection: Raymond and
S.W. 19th
THAT PORTION OF GOVERNMENT LOT 13,SECTION124,TOWNSHIP 23,NORTH.RANGE 4 EAST,
WILLIAMETTE MERIDIAN,IN KING COUNTY.WASHINGTON,MORE PARTICULARLY DESCRIBED AS
FOLLOWS: 'i
COMMENCING AT THE SOUTHEAST CORNER OF SAID SECTION 24;THENCE NORTH 00°47'36'
• EAST ALONG THE EAST LINE THEREOF 9.69 FEET TO THE EASTERLY MARGIN OF A 40.00 FOOT
WIDE RIGHT OF WAY FOR SPRINGBROOK CREEK AS DESCRIBED UNDER KING COUNTY
RECORDING NUMBER 9412231106 AND THE TRUE POINT OF BEGINNING;
THENCE NORTH 37°00'42'WEST ALONG SAID RIGHT OF WAY LINE,A DISTANCE OF 32.02 FEET;
THENCE NORTH 55°28'15'WEST 83.16 FEET; •
THENCE NORTH 52°24'00'WEST 186.02 FEET; ,
THENCE NORTH 54°03'5T WEST 280.51 FEET; .
THENCE NORTH 35°11'09'WEST 138.12 FEET;
THENCE NORTH 23°44'21'WEST 81.38 FEET TO A POINT OF TANGENCY WITH A CURVE •
CONCAVE TO THE EAST HAVING A RADIUS OF 35.78 FEET;
• THENCE NORTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 52°20'18'AN ARC.
DISTANCE OF 32.69 FEET TO A POINT OF NON-TANGENCY;
THENCE NORTH 50°08'30'EAST 107.69 FEET;
L') THENCE NORTH 51°45'16'EAST 68.97 FEET;
. THENCE NORTH 59°39'11'EAST 93.78 FEET TO A POINT OF TANGENCY WITH A CURVE CONCAVE
Veil TO THE NORTHWEST HAVING A RADIUS OF 154.57 FEET;
THENCE NORTHEASTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 45°50'57'AN
Kr ARC;DISTANCE OF 123.69 FEET TO A POINT OF TANGENCY;
C4 THENCE NORTH 13°48'14'EAST 114.90 FEET TO A POINT OF TANGENCY WITH A CURVE
C4 CONCAVE TO THE WEST HAVING A RADIUS OF 334.26 FEET;
r°'4 THENCE NORTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 36°45'26'AN ARC
DISTANCE OF 214.44 FEET TO A POINT OF NON-TANGENCY;
r THENCE NORTH 23°47'30'WEST 104.50 FEET;
THENCE NORTH 28°32'10'WEST 63.10 FEET; I
THENCE NORTH 20°51'33'WEST 41.80 FEET TO A POINT ON THE NORTH LINE OF SAID
GOVERNMENT LOT 13 AS SAID LINE IS SHOWN ON A RECORD OF SURVEY BY R.F.MILLPOINTER
AS RECORDED UNDER KING COUNTY RECORDING NUMBER 8910069012 AND WHICH BEARS
NORTH 87°26'45'WEST FROM THE NORTHEAST CORNER OF SAID GOVERNMENT LOT 13;
THENCE SOUTH 87°26'45'EAST ALONG SAID NORTH LINE 378.76 FEET TO SAID NORTHEAST
CORNER;
THENCE SOUTH 00°47'36'WEST ALONG THE EAST LINE OF SAID SECTION 24,A DISTANCE OF
1,320.39 TO THE TRUE POINT OF BEGINNING;
(ALSO KNOWN AS ADJUSTED LOT 2 OF CITY OF RENTON LOT LINE ADJUSTMENT NUMBER LUA-
95-064-LLA RECORDED UNDER RECORDING NUMBER 9508039005).
v9g:s?':,
7 i.
I.,'s,p4,C a$.9:1
• ! ',V 0 L LAKE
\ 1 EXPIRES 9/21/99 0a/9-97..
A-1 vi ry
i r
•
EXHIBIT B
SEWER EASEMENT AREA
Project: Springbrook ltrdustrial Center
PM: 242304-9020
Grantor. Opus Northwest,L.L.C.
STR: 242304
Street Intersection: Raymond and
S.W. 19th
A 15.00 foot wide easement for maintaining a Sewer Line and appurtenances, within the Springbrook
Industrial Center. said easement tieing 7.50 feet wide on each side of the following described easement•
centerline:
Commencing at the Northeast Property Corner of Adjusted Lot 2 of City of Renton Lot Line Adjustment
Number L1!A-95-064-1.1.A,as recorded under'King County Recording Number 9508039005:
•
Thence North 87"26'45" West along the North Property Line.,a distance of 25.16 fret to the TRUE POINT
OF BEGINNING of this Easement Centerline Description:
Thence South I7"22'45" µ'gist. a distance of.256.04 feet: Thence South 62"36'16" West, a distance of
138.00 fret to the'I'crmmus of this Sewer Line Centerline Easement Description.
t.2
r1
e•1
i p
•
B-1
. . 'EXHIBIT C •
INCORRECT SEWER EASEMENT DIAGRAM
Project Springbrook Industrial Center
Pm: 242304-9020
Grantor Opus Northwest,L.L.C.
STR: 242304
,
I Street Intersection: Raymond and
S.W. 19th
1
; ,..,• • ,."" •• :''':•• •.....,•::::. ..................g. .
'IC: Llt••••=lt i.3- _ _.1777.!.7 — — = ,.',..----
..scr.: :asc:-7..-mar 4,-...2:01/. 4,, •72 ::: ..
•• :::_ .,;,:r::
, •• • t -,
.•••• f• r r
• . . 1 _'•,:: _•,1-"...i:
;.. .
, • •I: ii: = ...:
— - - .
, ,_, •• .1 .......4. • .: .- .
C) I.
3.7:41.' •; •• "::7 . 7:-.7- ' ...... S. :7 L-:: • ::;:
- i. -r:I.::. • .1..r
tr, ,•••:71
.• ... ,..
LC) SIZialiniiii.1114t.1 ..-.
.. .t. :7-7:'" • :I -:
- .
1 -
1.4 I ..
7••2• •-••C : •••••-•. .. . ••••• :• •
Id 1 7 I. .--.•.. • *-4.....•
...
' ...f.T.
_.... -:•• ..:.• 4 ,. 'a'.... t. .. "....:.
VIC I
....... r•'•
.... ' '... .• •44... -.
1 3... .4...-;.'...• • :..:..r..
VA T :-....--•• -S .t ::r , .;,
i'• , -..:
•...: i. :7:4-, • 'I.::
a) / • •. ,, ..
•:,.....-••-•:.:
.• , -
" :. :7:4•- • •-• It
1 .... ..
-..
'"I• !
., • rt
/
• 1•••
• • 1-2 :1' S :2*: 4 C. ::: :2.r.... •j.... ..... .. f•
•.•.. •'''. ...• .. .. .:C..=.17.. '" ''
•- :. 1.3-*r.:, C ' :i I'.
4
. '..31 , ":...,. . - . • ••••
• 7 III .• 6.4.4... , ' :•:.".•
...-.r. 4. .4 I:: Z../;:'4" C44 '.' • .A .. . .. .. .
..
..'••• !I. -
.. ..%i ;'• .1. r••:
1 • I:: r ...)". -,-E. ! -
1 ... ,, .• .i e 1 : ,ri •I. :rtr...• •
I '• ...4e1.4.• !.
, '.N. ...;.• :41 I • r-, 4 ::.1.:5- L.. : 23 J!
,!'
\ I
T ! i 'aft"I:CI' i..1 •
• I'. 1 I PI 'I. •:-e'•:.• C I •:2:- _.
II . W•110'7.;!- 9-:za ";:. , .x.:.7:3. .c. : •7:.
.* ' rri•-•"'.1% I I.
• .... • . : .
... . . . .
• '
N. •.•:..... . :..: 2.--• "I-I.•! : :: .:
...._
...:.....,..:...
.i: i•-• :. ••••-I I : :! ••
.' •"'...••••'' •'•• .
".'• ••• • •' ''
. s _
. ••
. . -•-.
'••Z. z_L ... . •••... 4•.... . : • ::
.. .. ..--.-
:2--.•-"-- .i ..
. ,
C-1
. _
. . . - .
EXHIBIT D
SEWER EASEMENT DIAGRAM
Project Springbrook Industrial Center
PID: 242304-9020
Grantor: Opus Northwest,L.L.C.
STR: 242304
Street Intersection: Raymond and
S.W. 19th
110Ri1M51 CORER LOT:. •
OTT Of REM10N LOT LIE
AWJYS11ENT ND.
LUA-95.06/-UA REC.NO. -
950600500S
RAYMOND N ST261511 25.16
AVENUE S.W
1722.151 256 EC
CET9ECAVANG 1 15:Of 15� S 62 36.16 N 159.00• .
LOT 2 •
1111,1
m / I
cra
SPRI Mc
11.4
s I/
Dim CP,O
LOT 1
rs %t
°,� 200 100 0 200 400
"5 •I1 DNA( L AMA S --
EWKS 9/21/0 GRAPHICAL SCALE: 1" _ 200'
"" iz•2s.-97
AS—BUILT SANITARY SEWER EASEMENT AI
FOR�H IIEBRANh, STEADMAN FGR RANTI N91
& ASSOCIATES, P.S. SPRINGBROOK
INDUSTRIAL JAP CHECK:JSS
OIAL CHECK JSS
APROFESSIONAL LAND SURVEYORS CENTER 97132.00
6569 FIFTH AVM(SOUR SEATTLE Wi91WGTON 9U06 L200)262.1962 CITY OF RENTON, COUNTY OF KING, STATE OF WASHINGTON SHEET 1 a 1
•
•
D-1
4 i-
•
•
WHEN RECORDED RETURN TO:' YAI
Office of the City Clerk
Renton Municipal Building
200 Mill Avenue South
Renton,WA 98055
•
GRANTOR: Opus Northwest,L.L.C.,a Delaware limited
Project:. Springbrook Industrial Center
liability company PID: 242304-9020
GRANTEE: City of Renton,a Municipal Corporation Grantor: Opus Northwest,L.L.C.
of King County STR: 242304
ABBREVIATED LEGAL DESCRIPTION: Street Intersection: Raymond and
Adjusted Lot 2 of City of Renton Lot Line S.W. 19th
115 Adjustment No.LUA-95-064-LLA.
Recorded under Recording No.9508039005,
vai King County,Washington. •
d' Full description is on pages A-1 and A-2.
ASSESSOR'S TAX PARCEL No: 242304-9020-08
C
AGREEMENT TO AMEND DRAINAGE CHANNEL EASEMENT
(No Monetary Consideration)
THIS AGREEMENT TO AMEND DRAINAGE CHANNEL EASEMENT ("Amendment") is made the
27i-9 day of (7ecmirlber 19 97, by and between OPUS NORTHWEST L.L.C., a Delaware limited liability
company , hereinafter called "Grantor," and the CITY OF RENTON, a Municipal Corporation of King County,
Washington,hereinafter called"Grantee."
rg
Grantor owns certain real property situated in King County, Washington (the "Property") the legal
p, description of which is attached hereto as Exhibit A.
A portion of the Property is subject to an easement for constructing, using, and maintaining a drainage
schannel(the"Drainage Channel Easement")previously granted to Grantee in an instrument recorded July 5, 1996,
cj under Recording No. 9607050550 in the real property records of King County, Washington: The legal description
of the area subject to the Drainage Channel Easement(the"Easement Area")is attached hereto as Exhibit B.
d
INITIAL
DOCUMENT FORM APPROVED BY
CITY ATTO /t248-917 6 A
M_ -
0,,,,,f,t4e5/3A24-7ter
I PROPERTY SERVICES
N
•
•
I
•
This Amendment amends the Drainage Channel Easement agreement as follows:
1. Grantee agrees that the existing encroachments into the Drainage Channel Easement Area as shown in
that certain survey recorded on December 23 , 1997 in the real property records of King County, Washington
under Recording No. 91 r 2 2.3—Soot (the "Existing Allowable Encroachments") may remain in the
Easement Area.
2. At the time Grantee plans the construction of the drainage channel improvements that Grantee intends
to construct in the Easement Area(the"Channel Improvements") Grantor and Grantee shall cooperate in designing
the drainage Channel Improvements to minimize the need for retaining walls to support the Existing Allowable
Encroachments and maintain the slope of the adjacent Channel Improvements.
3. If Grantee determines that rock retaining walls are required to support the Existing Allowable
Encroachments and maintain the slope of the adjacent Channel Improvements, Grantee shall notify Grantor of the
height and general location of the required walls. Grantor shall either(1)design and construct such retaining walls
in accordance with plans and specifications approved by Grantee or (2) pay Grantee's costs of designing and
constructing such retaining walls. The obligations of Grantor under this Amendment ("Grantor's Channel
Obligations")are personal to Opus Northwest,L.L.C.,a Delaware limited liability company. I'
f�f
4. To secure the performance by Grantor of the Grantors Obligations, Grantor shall post a$50,000, two-
year bond. Grantee shall have the option to require Grantor to'extend the term of the bond for a third year, if the
retaining wall construction described in this agreement has not!been substantially completed within the two-year
bond period. •
All other terms and conditions of the Drainage Channel Easement remain in full force and effect and are
e3' unchanged by this Agreement.
� I
-01
� I
i I
GRANTOR: GRANTEE:
OPUS NORTHWEST,`L.L.C., CITY OF RENTON,
a Delaware limited liability compan a Municipal Corporation of King County
By: taillalmtri
i . Solberg; 1 By:
4444
Vice President Name: Jesse Tanner
Title: 14 Att'OL
' u
2
•
•
i
•
STATE OF WASHINGTON )
)ss.
COUNTY OF KING )
I certify that I know or have satisfactory evidence that John Solberg is the person who appeared
before me, and said person acknowledged that he signed this instrument, on oath stated that he was authorized to
' execute the instrument and acknowledged it as the Vice President of Opus Northwest,L.L.C., to be the free and
voluntary act of such party for the uses and purposes mentioned in this instrument.
;,,,,. ;•/,9 agi9f .
Y ••• / 4 . /
/j(rhvym
v.. et.r..
N...o. .... . tir)zytzq
z � (Siure of NVr,)Public)
?„ I "'.11 Bi 0 3 1\1 1771)ei7/(/ 14 (I ourj
iliso yip Q ,.. 0•: (Printed Name of Notary Public)
'49 .•Py,�,,,� My Appointment expires /2/51/ / f)
.••••�OFeV`.t*,.t
In STATE OF WASHINGTON )
(.7 )ss.
t•'•i COUNTY OF KING )
•
41
who
the
`� I certify that I know or have satisfactory evidence that 1(�i4e�A1UNP4 isperson
!ui appeared before me,and said person acknowledged that he/she signed this instrument, on oath stated that he/she
•
•Po was authoriz ejiNleW14Pi4 a instrument and acknowledged it as the A4*t f 0i of The City of Renton
to be the fiot of such party for the uses and purposes mentioned in this instrument.
.��gDDaatteedd % ♦ A
( ° * &; T
tnAt p PUBUC o. ! (Signature o i t Public)
"♦'••,,.WASN�t��� (Printed Name of Notary Public)
My Appointment expires 10 'f'
3
, I , , 1
•
1'
EXHIBIT A
LEGAL DESCRIPTION OF THE PROPERTY '
Project S tin brook Industrial Center
P >;
j, HD: 242304-9020
. ' Grantor. Opus Northwest, L.L.C.
STR: 242304
1 Street Intersection: Raymond and
S.W. 19th
THAT PORTION OF GOVERNMENT LOT 13,SECTION 24,TOWNSHIP 23,NORTH.RANGE 4 EAST, •
WILLIAMETTE MERIDIAN,IN KING COUNTY,WASHINGTON.MORE PARTICULARLY DESCRIBED AS
FOLLOWS:
COMMENCING AT THE SOUTHEAST CORNER OF SAID'SECTION 24;THENCE NORTH 00°47'36'
EAST ALONG THE EAST LINE THEREOF 9.69 FEET TO THE EASTERLY MARGIN OF A 40.00 FOOT
WIDE RIGHT OF WAY FOR SPRINGBROOK CREEK AS DESCRIBED UNDER KING COUNTY
RECORDING NUMBER 9412231106 AND THE TRUE POINT OF BEGINNING;
THENCE NORTH 37°00'42'WEST ALONG SAID RIGHT,OF WAY LINE,A DISTANCE OF 32.02 FEET;
THENCE NORTH 55°28'15'WEST 83.16 FEET; '
THENCE NORTH 52°24'00'WEST 186.02 FEET; I I
THENCE NORTH 54°03'57'WEST 280.51 FEET;
THENCE NORTH 35°11'09'WEST 138.12 FEET;
In THENCE NORTH 23°44'21'WEST 81.38 FEET TO A POINT OF TANGENCY WITH A CURVE
CONCAVE TO THE EAST HAVING A RADIUS OF 35.78 FEET;
T4 THENCE NORTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 52°20'18"AN ARC • uI
DISTANCE OF 32.69 FEET TO A POINT OF NON-TANGENCY;
41 THENCE NORTH 50°08'30'EAST 107.69 FEET;
N THENCE NORTH 51°45'16'EAST 68.97 FEET;
N THENCE NORTH 59°39'11'EAST 93.78 FEET TO A POINT OF TANGENCY WITH A CURVE CONCAVE
.4 TO THE NORTHWEST HAVING A RADIUS OF 154.57 FEET;
THENCE NORTHEASTERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 45°5017'AN
P. ARC DISTANCE OF 123.69 FEET TO A POINT OF TANGENCY;
THENCE NORTH 13°48'14"EAST 114.90 FEET TO A POINT OF TANGENCY WITH A CURVE
CONCAVE TO THE WEST HAVING A RADIUS OF 334.26 FEET;
THENCE NORTHERLY ALONG SAID CURVE THROUGH A CENTRAL ANGLE OF 36°45'26"AN ARC
DISTANCE OF 214.44 FEET TO A POINT OF NON-TANGENCY;
THENCE NORTH 23°47'30'WEST 104.50 FEET;
THENCE NORTH 28°32'10'WEST 63.10 FEET; .
THENCE NORTH 20°51'33'WEST 41.80 FEET TO A POINT ON THE NORTH LINE OF SAID
GOVERNMENT LOT 13 AS SAID LINE IS SHOWN ON A RECORD OF SURVEY BY R.F.MILLPOINTER
AS RECORDED UNDER KING COUNTY RECORDING NUMBER 8910069012 AND WHICH BEARS
NORTH 87°26'45'WEST FROM THE NORTHEAST CORNER OF SAID GOVERNMENT LOT 13;
THENCE SOUTH 87°26'45'EAST ALONG SAID NORTH LINE 378.76 FEET TO SAID NORTHEAST
. CORNER;
THENCE SOUTH 00°47'36'WEST ALONG THE EAST UNE OF SAID SECTION 24,A DISTANCE OF
1,320.39 TO THE TRUE POINT OF BEGINNING;
(ALSO KNOWN AS ADJUSTED LOT 2 OF CITY OF RENTON LOT LINE ADJUSTMENT NUMBER LUA- .
95-064-LLA.RECORDED UNDER RECORDING NUMBER 9508039005).
�0�9'�•i 9r
>;e
a;,m x••o
of I" =�
i 1 ��.s� eca mist �•J¢
` .Yq L LA
"\ _xPIRES 9/21/99 4/l/9-97
I'
,
1
' i
EXHIBIT B
DRAINAGE CHANNEL EASEMENT
LEGAL DESCRIPTION
Project: Springbrook Industrial Center
P1D: 242304-9020
Grantor: Opus Northwest,L.L.C.
STR: 242304
Street Intersection: Raymond and
S.W. 19th
)dement Area;
That portion of Lot 2 of City of Renton Lot Line Adjustment No. LLA-95-064 (King County Recording No.
95C8039005)in the southeast quarter of the southeast quarter of Section 24,Township 23 North,Range 4 East.W.M.,
in King County.Washington,described as follows:
Commencing at the south corner of said Lot 2 and the true point of beginning;
thence along the west line of said Lot 2 the following courses:
7.4 N 37°00'42"W 32.02 feet; '
thence N 55°28'15"W 83.16 feet;
thence N 52°24'00"W 186.02 feet;
;hence N 54°03'57"W 230.51 feet;
thence N 35°11'09"W 138.12feet;
rNI thence N 23°44'21"W 81.33 feet to a curve concave to the east having a radius of 35.78 feet;
Cq thence northerly along said curve through a central angle of 52°20'28"an arc distance of 32.69 feet;
it 1 thence leaving said curve on a non-tangent bearing N 50°08'30"E 107.69 feet;
iNb thence N 51°45'16'E 68.97 feet;
thence N 59°39'11"E 93.78 feet to a curve concave to the northwest having a radius of.154.57 feet;
thence northeasterly along said curve through a central angle of 45°50'57"an arc distance of 123.69 feet;
thence N 13°48'14"E 114.90 feet to a curve concave to the west having a radius of 334.26 feet;
thence northerly along said curve through a central angle of 36°45'26"an arc.distance of 214.44 feet;
thence leaving said curve on a non-tangent bearing N 23°47'30"W 104.50 feet;
thence N 28°32'10"W 63.10 feet;
thence,N 20°51'33"W 41.80 feet to the northwest corner of said Lot 2; "
thence leaving said west line of said Lot 2 S 87°26'45"E along the north line of said Lot 2 140.00 feet;
thence leaving said north line S 37°01'21"W 82.90 feet;
thence S 23°47'30" E 96.43 feet to a point on a curve,concave to the west, said•curve being non-tangent to the
preceeding course and having a radius of 384.26 feet,the center of which bears S 65°25'36"W;
thence southerly along said curve through a central angle of 36°45'26"an arc distance of 257.38 feet;
thence S 13°48'14"W 114.90 feet to a curve'concave to the northwest having a radius of 204.57 feet;
thence southwesterly along said curve through a cer.tral angle of 45°50'57"an arc distance of 163.70 feet;
thence S 59°39'11 W 90.32 feet; '
thence S 51°45'16"W 61.54 feet to a curve concave to the east having a radius of 105.00 feet;
thence southerly along said curve through a central angle of 86°56'32"an arc distance of 159.33 feet;
thence S 35°11'09"E 88.78 feet;• ' '
thence'S 54°03'57"E 272.92 feet;
thence S 52°24'00"E 185.41 feet;
thence S 55°28'15"E 72.03 feet to the east line of said Lot 2;
thence S 00°47'36"W along said east line 72.32 feet to the true point of beginning.
Contains 90,418 square feet of land.,more or less.
B-1 '
EXHIBIT B CONTINUED
MAP EXHIBIT
Project: Springbrook Industrial Center
PID: 242304-9020
Grantor: Opus Northwest,L.L.C.
STR: 242304
Street Intersection: Raymond and
S.W. 19th
22 '
10
9 ex23
� i
8 $ 'I I
24' j!
7
25 `ee Lane and Cu ,'e Tablas on Following Sheet
6
26
5
,I
27
• I
4
� II
28
o t'3too• ,00 3 29
( 11.1 FEET )
2 30
1
South Corner.of Lot 2
B-2
EXHIBIT B CONTINUED
MAP EXHIBIT
Project: Springbrook Industrial Center
Pm: 242304-9020
Grantor. Opus Northwest,L.L.C.
STR: 242304
Street Intersection: Raymond and
S.W. 19th
17
Northwest Corner of Lot 2'----- 'g
\ \
Line Table 18
l+e ID 1 arise Dist(11) 15
1 N 37'00'42"W 32.02
2 N55'2815"W 83.16 19
°rat 3 N 52'24'00"W 186.02
i N 5 •03.5T W 210.51 14
�� N 35'11.09"W i33.12
6 N 23.44'2r W 81.38
ill \\\
8 N 50'08'30"'E 107.69
N 9 N 51.45'16"E 68.97
04
10 N 59'39'11'E 93.7E
!"'l 12 N 13'41'14"E 114.90
PsT 14 N 23'4710"W 104.50
V) 15 N 28.32'10"W 63.10 13
16 N 20'5113"W 41.80 Curve Table 20
17 S 87'26'45"E 140.00
18 S 3r01 Zi"W 32.90 ID 0 Radios(It) Central Angie Are Lam*
19 S 23.47'30"E 96.43 7 35.7E 52'20'2r 32.69
21 S 13.48'14-W 114.90 11 154.57 45•50'5T 123.69
23 S 59'39'11"W 90.32 13 334.26 36•4526" 214.44
24 S 51.45'16"W 61.54 20 384.26 36.45'26" 257.3E
26 S 35.11'09"E' 88.78 22 204.57 45•S0'5r 163.70
27 S 54"03'5T E 272.92 25 105.00 86'56'32" 159.33 12
21
28 S 52'24'00"E 185.41
29 S 55'23'15'E 72.03 I
30 S 00•47'36"W 72.32
11
I .
• 22
10 •
0 1'=100• ,00 .
'ts
( [N FEET ) 9
C+•S' 23
8 f
24 F
B-3
e.
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
• DATE: February 9, 1998
TO: Project File
FROM: Jennifer Toth Henning
SUBJECT: Raymond Avenue Center II,LUA96-015,SA,SM,ECF
General Electric has submitted a building permit for tenant improvements. The improvements include
revisions to the parking area located along the western boundary of the project site. The curved
parking area would be straightened out,resulting in the elimination of 6 parking spaces.
According to calculations provided by the applicant, 13,071 s.f. would be used as office and 87,710
s.f. would be used as warehouse. The office use requires a minimum of 3/1,000 gsf and a maximum
of 4.5/1,000 gsf. The required parking for the office use would be 39.21 minimum and 58.8
maximum. The warehouse requires 1 space per each 1,500 gsf. For the 87,710 s.f warehouse space,
58.47 parking spaces would need to be provided.
The total amount of parking required for these specific uses would be 98 minimum and 117 maximum.
The applicant is reducing the amount of parking by 6 stalls would not adversely affect the site and
would comply with the intent of the Parking and Loading Ordinance as it was applied to the proposal
when it was initially approved.
A copy of the revision is attached.
cc:
\\TS_SERVER\SYS2:\COMMON\-Document6\jth
Syitnesis
Limited Liability Company •
Architectsi
RECEW
JAN 1 9 1998
January 16, 1998
•
BUILDING DIVISION •
Jennifer Henning
City of Renton
200 Mill Avenue South
Renton.WA. 98055
-
I '
RE: General Electric •
Permit#B970813
Dear Ms.Henning:
The following parking calculations are for 30 tenants. q.c(; ' >.D'`f
Partners Books,Inc.
Office: 2,672 SF @ 1:300 = 9
Warehouse: 26,811 SF @ 1:2500= 11
Washington Shoe
Office: 3,011 SF @ 1:300 = 10
Warehouse: 33,995 SF @ 1:2500= 14
General Electric
Office: 7,388 SF @ 1:300 =25
Warehouse: 26,904 SF @ 1:2500= 11
Total Parking Required: 80
Required Accessible Parking/WAC 1994
Table No. 11-F: 4
Total Parking Provided: 122
Total Accessible Parking: 6
Please call with any questions.
Si r y, • ' .17-.= I --
141
G
I -r
Jr
ndy Bro
'ncipal chitect 7 /6)
/: /S00 = 5�
q 61:1 h-
97026.01/Doc/City of Renton Lt. /7/-. (i` ''- rl
12828 Northup Way,Suite 400,Bellevue,Washington 98005 1.—, 40 A. Phone:(425)869-1946 Fax:(425)885 6208
P
4.0 sTarF o� CITY OF RENTON
RECFRIFD
ems....
y /iEV ® :D9
y 1889 a
STATE OF WASHINGTON al=vctve 1a•`uuI ve
d cr5t;kJ
DIVISION
DEPARTMENT OF ECOLOGY
Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008-5452 • (425) 649-7000
January 6, 1998 .
•
Mark Miller
Mark Miller Consultants
10801 Main Street, Suite 100
Bellevue, WA 98004
Dear Mr. Miller:
Re: Renton Permit#LUA-96-015
RAYMOND AVENUE CENTER II/WINMAR-METRO, INC. - Applicant
Revised Shoreline Management Permit#1996-NW-10026-A
The subject.Revised Shoreline Substantial Development
p t Permit was approved by the
City of Renton on December 10, 1997, and received and filed by this office on
December 17, 1997. The 21 day appeal period will terminate January 07, 1998.
At your own risk, construction may begin during this appeal period provided all other
federal, state, and local laws regulating such construction have been complied with.
The Shorelines Hearings Board will notify you by letter if this permit is appealed.
Sincerely,
U C�7�
Ann E. Kenny, Shoreline Specialist
Shorelands and Environmental
Assistance Program
AEK:aek '
REVREC.DOC
cc: James D. Hanson, City of Renton
LJ
CIT1 OF RENTON
>,.. Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
December 2, 1997
Dave Kessler
Project Manager
Opus Northwest LLC
200-112th Avenue NE
Suite 205
Bellevue,WA 98004
SUBJECT: RAYMOND AVE. CENTER 2,LUA 96-015,SA,SM,ECF
WETLAND BUFFER ENCROACHMENT APPROVAL REQUEST
Dear Mr. Kessler:
I am in receipt of your letter dated November 26, 1997, in which you request administrative
approval of several small encroachments into the required 25-foot wide wetland buffer area along
the east side of the Raymond Ave. Center 2(Springbrook Industrial Center)project.
ISSUE:.
The survey and as-built work associated with the subject project has revealed several small
encroachments of the constructed facilities into the required 25-foot wide wetland buffer along the
east side of this project. The applicant has requested administrative approval to leave the
encroachments as they are, pursuant to Section 4-32-4B of the City's Wetlands Management
Ordinance.
EVALUATION:
There are a number of small encroachments of the constructed facilities into the 25-foot wetland
buffer. These include two long and narrow strips of asphalt approximately 120 and 80 linear feet
long respectively and 1 to 2 feet wide; a roughly triangular piece of the entrance road roughly 5
feet wide by 25 feet long; a smaller triangular section of this same access road several feet by
several feet in dimension; a water vault and blowoff valve assembly; and a fire hydrant. The
applicant request is to obtain administrative approval for leaving these facilities in their constructed
location. In support of the application, the applicant has stated that "the paving, hydrant, and
water valve and blow off have absolutely no adverse impact to the wetland and its 25' buffer".
Section 4-32-4B of the City Wetland Management Ordinance states in part:
The following activities may be permitted with administrative review and approval by the
Department Administrator:
1. Any activities having minimal adverse impacts as determined by the responsible
official on buffers and no adverse impacts on regulated wetlands,provided all
associated buffer impacts are mitigated.
Document2
200 Mill Avenue South- Renton, Washington 98055
Page 2
December 2, 1997
It would appear that the subject encroachments are relatively minor in nature, and would meet the
criteria of activities having minimal adverse impacts on the buffer, and no adverse impact on the
regulated wetland. It would also appear that removal of the encroaching facilities would have an
adverse impact on the viability of the development that would be disproportionate to any negative
impacts to the wetlands that would occur if the encroaching facilities were to be left intact.
DECISION:
Administrative approval of the request to leave the encroachments into the wetland buffer as
currently constructed is hereby granted, subject to the following condition to mitigate the impacts
of this encroachment on the buffer area:
1) The applicant shall provide plantings in the wetland buffer areas adjacent to the encroachments.
A planting plan shall be prepared by a biologist with expertise in wetlands, and shall be approved
by Development Services Division staff prior to planting. Monitoring and replacement(as needed)
of the wetland buffer plantings shall be pursuant to the provisions of the City Wetland
Management Ordinance.
Sincerely,
214 li
Gregg Zimmerman,Administrator
Planning/Building/Public Works Department
cc: Jennifer Toth Henning(with attachment)
; DEC-22-97 MON 09:54 OPUS NORTHWFT LLC FAX 12064531712 P. 01/05
fink 4.
opus
Opus Northwest LLC
•
200- 112th Avenue NE, Ste 205 Phone: (425)453-4100
Bellevue, Washington 98004 Faxp (425)453-1712
FAX COVER SHEET beL'4o �� /,g9?
,�
1JZ°i R�1 i/44/NG
J
To: � !r?b1;� Company:
Fax Number:
_ Phone Number: _
Date/Time: ZZ G
Number of Pages (w/cover):
Regarding: From: TW- ) 1(sL
Message:
•
Original to follow? No Yes
Please contact with questions
or problems regarding transmission of this fax.
The information contained in this facsimile message is privileged and confidential and is intended only for the use
of the individual or entity named above. If the reader of this message is not the intended recipient, or the
employee or agent responsible for delivering it to the intended recipient, you are hereby notified that any
dissemination, distribution or copying of this communication is strictly prohibited. If you have received this
communication in error, please notify us immediately by telephone and return the Original message to us at the
above address. Thank you.
DEC-22-97 NON 09:54 OPUS NORTHWEST LLC FAX NO. 12064531712 P. 02/05
•12/19/1997 16:52 3609432791 IES ASSOCIATES PACE 02
IES ASSOCIATES
• 1514 Muirhead Ave.NW
December 19, 1997 oiymwa,WA 99562
Ph:(380)943-6127
Fax:(360)943.2791
Jennifer Toth Henning
Senior Planner
City of Renton
200 Miii Avenue South
Renton,Washington 98055
and
Mr.Dave Kessler
Opus Northwest,LLC
200-112th Avenue NE,Suite 205
Bellevue, WA 98004
RE: Raymond AVentic Center 2,UJA-96-015,SA,SM,ECF
Dear Ms.Henning:
We have reviewed the Upland Buffer Planting Plan developed by Wm.Todd Tressler,Landscape
Architect for the Springbrook,Raymond Avenue Center proposal submitted by OPUS Northwest.
All of the plantings tire suitable for the soil and hydrological conditions expected on the site at the
completion of the project. The mix includes species with good protective cover and height
diversity,wildlife food producers and color. All of the species,with the exception of Rosa
rugosa,axe native to the Pacific Northwest.
•
I have talked with the designer about the selection of rugosa over native roses.His concerns were
with lack of shade and soil conditions. An altetuative rose,which he has agreed to substitute if
you require all native species,is bald-hip rose(Rosa gymnocarpa). It will not provide as much
summer cover as rugosa,however, it is native to the Pacific Northwest.
If you have questions,eell me at(360)943-0127.
Sincer. y
R . Van Wormer
„,: land Ecologist
J
•
n % h
•
:,�:
/DEC-22-97 MON 09:55 OPUS NORTHWEST LLC FAX NO. 12064531712 P. 03/05
12/19/1997 16:52 3609432791 IES ASSQCIATES PAGE 01
!ES Associates
1514 Muirhead Avenue
Olympia, WA 98502
(360) 943-0127 PHONE
(360) 943-2791 FAX
FAX ,./
DATE: 12-/t-97 TIME: • " 5/)
TO: J _ NUMBER OF PAGES
(�� - TO FOLLOW;
� t
PHONE , -42-5-4J5-'¢I 0
FAX:
425 453- /7/Z
FROM: 2441/_ -r)hrp
iaktk-V1
IF YOU HAVE ANY PROBLEMS WITH THIS TRANSMISSION, PLEASE CALL:
(360) 943-0127
SUBJECT: _
MESSAGE:
4•14.441,t7,1‘rdilh
r ).!••
_ •
;DEC-22-97 MON 09�55 OPUS NORTHWFGT LLC//
FAX NO. 12064531712__ P. 04/05
12/19/1997 1711
_== COVER PAGE =__
TO:
FAX: 14254531712
FROM : IES ASSOCIATES
FAX : 3E 9432791 •
TEL: 3E@S430127
COMMENT : URGENT
1
DEC-22-97 MON 09:56 OPUS NORTHWE'°T LLC FAX NO. 12064531712 P. 05/05
, 12/19/1997 17:11 3609432791 IES ASSOCIATES PAGE 01
IES Associates
1514 Muirhead Avenue
Olympia, WA 98502
(360) 943--0127 PHONE
(360) 943-2791 FAX
FAX
DATE: ! "/9 97 _ liME: 56
TO: Dalt,. NUMBER OF PAGES
TO FOLLOW:
PHONE: d.Z5--455-4106
FAX: 4Z5 17/2
FROM: •
IF YOU HAVE ANY PROBLEMS WITH THIS TRANSMISSION, PLEASE CALL:
(360) 943-0127
SUBJECT: Oo MESSAGE:
FoY „k„`" do c fru. i s-x.2_
Li/I/Ad Zizz 64z y6,22..e
,i^W
40 CII = OF RENTON
°
Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
December 17, 1997
Mr.Dave Kessler
Opus Northwest,LLC
200-112th Avenue NE, Suite 205
Bellevue,WA 98004
SUBJECT: RAYMOND AVENUE CENTER 2,LUA-96-015,SA,SM,ECF
Dear Mr. Kessler:
We are in receipt of the landscape planting plan, dated December 12, 1997. The plan was
prepared in order to comply with Gregg Zimmerman's condition of approval regarding
encroachments into the wetland buffer area. The condition states: "The applicant shall provide
plantings in the wetland buffer areas adjacent to the encroachments. A planting plan shall be
prepared by a biologist with expertise in wetlands, and shall be approved by Development
Services Division staff prior to planting Monitoring and replacement(as needed) of the wetland
buffer plantings shall be-pursuant to the provisions of the City Wetland Management
. Ordinance.''.
If the plan has been prepared by a Landscape Architect,the professional stamp and signature must
be shown on the'drawing. In addition, the.plan must be endorsed by a,wetlands biologist, per the
condition. If the plan was prepared by•.a wetlands biologist, then a.letter from the biologist must
accompany the plan.
The Installation Notes included on the plan indicate that planting should occur October through
December. _ Or, if planting occurs in the Spring'(March or April) irrigation would be required
throughout the summer months.
The City's Wetlands Management Ordinance (Code Section 4-32) a mitigation plan, and requires
• bonding and monitoring for mitigation of wetland impacts. The Wetlands Mitigation Plan must
outline how the monitoring data will be evaluated;monitoring reports shall be submitted quarterly
for the first year and annually thereafter, and .at a minimum, should document milestones,
successes, problems, and contingency actions of the compensation project. The monitoring must
occur for a period of not less than five years. The City requires a surety device such as a letter of
credit, irrevocable set-aside letter of cash in the amount equivalent to one and one-half (1-1/2)
times the estimated cost of the performance and surety and conditions sufficient to fulfill the
requirements. The City will release the surety device upon determining that all activities, including
any required compensatory.mitigation, have been completed in compliance with the terms and
conditions of the permit; and upon the posting of a maintenance surety device.
The City requires posting of cash or other security acceptable to the City such as letter of credit or
irrevocable surety and conditions sufficient to guarantee that mitigation required perform
satisfactorily for a minimum of five(5)years after they have been completed.
•
• H:\DIVISION.SIDEVELOP.SER\DEV&PLAN.ING\JTHIOPSRYMD2.DOC
200 Mill Avenue South- Renton, Washington 98055
60 This paper contains 50%recycled material.20%post consumer - \
Page 2
1
December 17, 1997
In order to approve the Landscape Planting Plan and sign off on the condition permitted
encroachment into the wetland buffer, staff will need verification of the acceptability of the plan
from a wetlands biologist, a maintenance and monitoring plan, and surety devices for planting and
maintenance as discussed above.
Please contact me at(425)277-6186 if you have any questions regarding this correspondence.
Sincerely, fotki,
41Na
Jenm er Toth Henning
Senior Planner
i . ,
•
•
•
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
DATE: November 26, 1997
TO: Gregg Zimmerman
FROM: Jennifer Toth Henning
SUBJECT: Raymond Avenue Center II(Springbrook Industrial Center)
Opus Northwest contacted me this week to discuss encroachment issues that had come to their
attention as the result of an ALTA survey. As you will see from the attached map, "Area 3" has
resulted in the encroachment of asphalt paving and curbing for the fire lane into the 25-foot wetland
buffer area. "Area 5" is a water vault or valve and blowoff approximately one foot (1') inside the
wetland buffer. "Area 9" shows a fire hydrant abutting the wetland buffer boundary, but it does not
appear to cross into the buffer area.
As noted in the owner's letter,they are willing to relocate the asphalt paving and curbing to meet City
Code requirements of the Wetlands Ordinance. They have requested that they be allowed to leave the
water vault and blow off in the current location. Typically, we would not have been made aware of
this encroachment, and it came to light only as a result of the ALTA survey. Since Opus is in the
process of closing a sale on the property, they must be in full compliance with City.Code, or have
appropriate documentation showing that exceptions have been granted.
Section 4-32-4B "Additional Allowed and Regulated Activities in a Wetland Buffer"states in part:
The following activities may be permitted with administrative review and approval
by the Department Administrator:
1. Any activities having minimal adverse impacts as determined by the responsible
official on buffers and no adverse impacts on regulated wetlands, provided all
associated buffer impacts are mitigated"
Furthermore, an argument could be made that the activity is potentially exempt, according to Code
Section 4-31-4.C.6 which states under"Exempt Activities" since the vault/valve and blow-off appear
to encroach into the wetland buffer by less than 10%.
"6. Overbuilding (enlargement beyond existing project, needs) or replacement of
existing utility systems and replacement and/or rehabilitation of existing streets,
provided the work does not increase the footprint of the structure, line or street by
more than ten percent(10%) within the wetland and/or buffer areas."
Buffer averaging is not an option in this instance, since minimum buffer width of 25 feet must be
maintained. It appears that a determination could be made to permit the water vault/valve and blowoff
to remain in their current location. In addition, the fire lane would represent less than a 10%
encroachment is considered for the entire fire lane bordering the wetland buffer.
November 26, 1997
Page 2
The applicant has requested consideration of these issue. I would be happy to discuss them with you.
Please feel free to call me at X6186 if you have any questions.
cc: project file LUA-96-015,SA,SM,ECF
H:\W W60DOT\MEMO.DOT\bbh
is Northwest LLC
opus Su - Avenue NE _
Suite 205 205
Bellevue,Washington 98004
425-453-4100 Fax 425-453-1712
November 26`h, 1997
Ms.Jennifer Toth Henning
City of Renton
Municipal Building-3 rd Floor
200 Mill Avenue South
Renton,WA 98055
RE: Setback Revision for Springbrook Industrial Center
Dear Jennifer,
Attached please find three copies of the revised site plan showing the new paving setback from
Springbrook Creek at Springbrook Industrial Center. This plan reflects the paving and setback as it
actually exists since construction was completed.
As discussed with you yesterday,the required paving setback is 25' from the Ordinary High Water mark,
therefore we are anticipating that a revision from 50' to 40' should require only an administrative review
and an amendment of our Shorelines Permit filed with the state.
We appreciate your timely response and your willingness to help us with this matter as we are trying to sell
the building and close on December 12`h
Please feel free to call me if I can be of assistance in any way. We would appreciate it if we could have a
response by next Friday. Thank you again for your helpfulness.
Sincerely,
Dave essler -
Project Manager
CC:Deborah Berg-Tousley Brain
John Solberg -Opus Northwest
Bart Brynestad-Opus Northwest
- k/ELOPMENT PLANNINr
NOV 2 6 1997
Opus Northwest LLC is an affiliate of the Opus group of companies—Architects,Contractors,Developers
Chicago,Columbus,Dallas,Denver,Ft.Lauderdale,Milwaukee,Minneapolis,Pensacola,Phoenix,Sacramento,San Francisco,Seattle,Tampa,Washington,D.C.
4. .._ . CIT' '__ .)F RENTON
:.LL � Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
December 10, 1997
•
State Department of Ecology
Northwest Regional Office
3190 160th Ave. SE
Bellevue, WA 98008-5452
SUBJECT: Minor Revisions to the Shoreline Management Substantial Development Permit for
Raymond Avenue Center ll
File No. LUA-96-015;SA,SM,ECF/Shoreline Permit#1996-NW-10026
Dear Shoreline Permit Coordinator:
Enclosed is a copy of a revised site plan for the above-referenced project. An ALTA survey conducted for the
property revealed discrepancies between the approved site plan and the as-built condition. The approved site
plan indicated a 50-foot setback from Springbrook Creek to the edge of the parking areas. The as-built
condition indicates that a 40-foot the setback actually exists. Since the project is an industrial use in an Urban
Environment designation, the minimum building setback required by the City's Shoreline Master Program is•
25 feet. The project maintains a 65-foot building setback from the water's edge.
A Shoreline Substantial Development Permit was issued by the City of Renton on May 22, 1996. The
Department of Ecology appeal period ended on June 14, 1996.
These revisions appear to be minor, and this letter is intended to amend the Shoreline Permit. Please review
this revision and attachments and call me at (425) 277-6186 if you have any questions or need additional
information. .
Sincerely,
•
(Pth
Jennifer Toth Henning •
Project Manager
Enclosures: Revised Site Plan
Shoreline Substantial Development Permit
nau&kesslCr,
cc: , Opus Northwest LLC
•
•
200 Mill Avenue South - Renton, Washington 98055
:.� This paper contains 50%recycled material,20%post consumer
- . - -
. .
•
IIIMMMMIIIIIW
VICANIIT MP ii '00 i
S.S.71 ..
•
;—
1 1 1
1 ,
Ir71 Cilli 40 E
. • , ty 0 v.,),0 ;
• i2H.•
c 1 1 MeV.
--
1 I 'Crl
,
,
. 1 -'-k4 LJ -----•- [• , • • -'-
.
- . .• , g . 13
• . 3, . .
• ..• , ; 1 'TS.'''''''' LI“:7.7; I I 1 P.,3 Z•F;!,1,
EAN D I
_... 1 --_. ,,,
• ,
, .,
, A R C E L ,,I. : ,,•:-
••}"..,1%; , j •
Er
_ __...•
I . , . • 1
-,,:,,,. .—l\'''''\...,;-- -g;-;- • I In
1 • , - ------------------:-----•
I • ' ' '' L'17.4.1'.:7-''.‘ca.1/4..\ -
I .
,
, •''..,` \ • ,
I .,.." 13 win
',., \ .
•E
' ,,,-- *,:•X ,„,/_"„:..:..-,1::,;--- ,..----.'..-.:k•••-:-.--, k. v•.
• —•i_
1 . .
•
NI.',.
.
.
• —, _,
n .
/ ,,•• ,„••••,/,,,7-. ' •,,':. A., i I fy i- -i
.,,,,' /, '...:".... \
2.---'--
/4„-•;-•; .•,,,,,-. ....,..„ ., , .,.. i•,, , , , \
. .
. ••, ,
.., „
45)
/. q- i •,/,./ *.• . , -‘‘, ss s'•• ' \-.k\ I I ,
/-' - ' \s:‘, '''. 7.•••• CI-6 t
i . ..„•.:;*- ./•%1''''V =...4i .:
•./ , „;7/,akb„ . _
,,_ / -'•ei
.f,-,ri• o--./ ,.., Nv
I , 7,,.,e9,,,:f ,ill ' \ -.`..**‘, . '..,:.•?\...:.„.,,, ,.... ...-'
. -- /1 M WI g
MEM MCA TATER
- A ), ..,,, -0. s•Sgr
w 6.• i,./ / ..v..;-. -; i
i .:
'-' 1 / i ....
*/ / , --.. . \ .‘. .;.',..''. 9ai t
qc' / ,./7-
. •••I
' MAN 1..1 WATER , .t.:...,'\.....f,':"--...,::---......":„___ Frif._-.7::: ::=1--.... ..,.._ .,.„,,,,_..._.,..-........,-•
1 11.4.•El.r.... /I : '-,_. -----:.;<•(;-z-e;
', FIZOPC=ItgIIIIIIIIIIMCUT ON ..„;‘,.. ' . ,• - -- -- -----_ '
DAMN* ,....,.... _. in. ; --•'--,-,--------r-------, ---'-----,':-
---.
I / / / / /•\
• / ammr=“mimm..... , ,7 r''''' ! '---------• -•<,;- -.7---,..,;-.f,-,-%;"---..-->'---'I I, nr:'i 1,g:= , -If ••I..
•/ I `,.,, ' -.. Ae....i. I 11 ._._____':-.C_ '1 0 .;,',,f.,.-...il .1
.6/
ee
i/ ...7' .4'. , ' -7A.:.---- AEI= P r\R L,:IL .'B ,:,..;,74/.-• .. .-• ,;.;
v •. II illigirft,,,41141 ------------:--xt•-4-,s,,,_,•.„4,,..,-,-_-,:__Ili 1 Ili 1 -,
/ ..,,,,,,i' ..,,,,,,,;4,1_.---,•:,/,: ma ., OW:'....1 .„ : en.....Pftrlin•.— .v ---;'-Z-WW- ------- --_-•,_:__..j ,) I
/ j'aW.„_ ' ' - ••• . , . ,. , .. m;., :: :.,. eon 111 W v.e --.eiegiiN, . ,,,,--..--,-\\-..,„::. ,i....,,, 1 .
-,----4, I • - . 111 — ...rip.
/ ;
/ /
•/ ;1 " ---',-.6:, -0.' •
4.--- -
• ..i ti'' •"•1 •''''''''' ;• -* -4 - - --- - '----— - .1:-- - wolgeirtniumiliftilizii!!a_i_killoriii_i__:_lit r' ;:=,- ; 7.-..zt.,-t....-- •
.4.< ,/ • —__•_. ,_ r .. __ .;.,• t , ,(--, 1
, 1 Jroe
4
------•
p ,.,,.
1 WI- If AND-' 4:'.../ ,/ .: •
I
• r 1 1 e..•.•• „,-. ,- '
NOM 5 - X
WI.4CEA VW POW ItIGN4t4t. I l loae ce MST.FWD X X 2
9.0.1JFG ARLA W.2.P.
•
•' ±>-,---}0.0441.6.WE LYE MI o•
TM 6 020511.1. VN Pe10•121.9, a SITE PLAN LI, .Z..•.-., 1 1 ,
OCO.S.W.GOV. R6 I 40 B .1 . A'
. Mt.DIM. 1.10FrI Mind/a.,• NOTE. . e0 0 u,1
z J
ELECTRICAL MO I•rndak,A.ME 50:00e M..
.4
.. COMM, PM USG ENEMY CODE 61E0[1.11$T./.R..15 Lee TO OE
OTT OP IENTOI ZOOti COX StersiTTED TO TFIE OTT OP KEW.FOR A 113.1.4NT e sheet
ll..G.G1.1 PLATE=DM WOE IITROVITINT MM.
PAK.WALL WES
8T.D.1,0 V•IV ori1 r PIM. r'
. A1.1
• • tn
P....61•1•DvIDED Oa VA.a ROVA 4 I.LG SULU/
•
--
• .
•
• .
•
•
• .
CIT,. OF RENTON
IL . Planning/Building/Public Works Department .
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
December 10, 1997
• Mr.David Kessler •
Opus Northwest LLC
200 112th Avenue NE, Suite 205
Bellevue,WA 98004
SUBJECT: RAYMOND AVENUE CENTER II--PROPOSED REVISIONS TO THE
APPROVED SITE PLAN(LUA-96-015,SA,SM,ECF)
Dear Mr.Kessler:
We are in receipt of your letter of November 26, 1997 and materials submitted to consider
revisions to the approved site plan for Raymond Avenue Center II. The materials consist of an
ALTA survey by Hebrank, Steadman and Associates(November, 1997), and the revised site plan
for the Springbrook Industrial Center(also known as Raymond Avenue Center II(dated November
24, 1997). These as-built drawings illustrate minor revisions to the site plan with regard to the
location of parking and circulation areas.
•
The approved site plan maintained a 50-foot setback from the Ordinary High Water Line for
Springbrook Creek. Revisions indicate that building, parking and circulation areas shifted south
approximately 8 to 10 feet. The setback from Springbrook Creek haschanged to 40 feet according
to the revised plan.
Development within "Urban" shoreline designations is permitted subject to the City's Shoreline
Master Program. For industrial development, structures are permitted where they are set back a
minimum of 25 feet from the water's edge. Commercial buildings must be set back a minimum of
50 feet from the water's edge. The revised site plan shows a decreased set back from the water's
edge,but the project would still meet the minimum setback. The distance between the building and
the water's edge is approximately 65 feet. Parking and circulation drives would have a minimum
setback of 40 feet from the water's edge.
•
According to the City Code, revisions or adjustments to an approved site plan are reviewed to
determine whether the revisions are considered to be minor, and can be processed administratively, •
or, whether the changes are considered to be major adjustments requiring an amended application
and a decision form the body that originally approved the project. (Major adjustments involve a
substantial change in the basic site design, intensity, density, use, and the like generally involving
more than a ten percent(10%)change in area or scale.)
The documented modifications to the approved site plan for Raymond Avenue Center--II File No.
LUA-96-015,SA,SM,ECF)are considered to be within the minor modification, or"10%threshold"
for revisions, and would not require an amended application or review by the City's Hearing
Examiner at this time. This determination is based on the judgment that the basic site design plan,
intensity,density,use, and the like are generally the same, with no more than a 10%change in area • •
or scale.
•
H:\DIVISION.S\DEVELOP.SER\DEV&PLAN.INGUTH\OPUSRYMD.DOC
200 Mill
Avenue South - Renton, Washington 98055
m T.ic nnnnr nnnf�inc�.n%rnrvrinrl mfnriel 9n nnc rnnm mnr
Page2
December 10, 1997
The original conditions of approval and environmental mitigation measures are still applicable to
the project. City Staff will forward a copy of the revisions to the State Department of Ecology to
amend the Shoreline Substantial Development Permit for the project.
This determination will be final unless a written appeal of the administrative determination --
accompanied by the required $75.00 filing fee -- is filed with the City's Hearing Examiner within
14 days of the date of this decision: See Section 4-8-11 of the Renton Municipal Code for further
information of the appeal process.
Please feel free to contact Jennifer Henning at (425)277-6186 if you have any questions regarding
this correspondence.
Sincerely,
. es C.Hanson,Director
Development Services Division
cc: Parties of Record
•
•
I •
,20',.......
NCINITY KAP it,
• "' ... vm.1.1..17,:t
•.----..1 :,....,,
———
.
_._ JL
.
1 i /4 k.s
fl7:I't*1,41'lI°C CTi.1§21 4
2
_ LJ •
. 1
• I -11 ---erIrs• -.-
. .
•
,,....•
• . :
, - • , 1.._... • .,
_ .
. .
. • - . 1 i
. . , i . •
• 'O.,
. ,
. P,A R C E'_ A
, ..•
1 . .
at
, . _____•___________________ 1-
,,
,....- , - '...-.;....-a-,,E-R„..\. '..
4
.. . ...,:..,,c,, ,..- / '.P.i.OiNSI'V•g.:.7'.„c... \
0 181•11
I • '
...'''' ,,..t',' ''''.1.--:a.7:-=-----.,---.%`=,... \ \.
I I
! ` ' ,,,' ••,' ,,,.-.,: !..-..--i&7==---j.--::_'',,.. ,•,,, \ \:.kt.,..._,.L',..
! ' r '''''- '-' '''.••\ I I 1 .7
\‘\'-:.•. "".\ . ; I I
'
, ...- : ''‘?_'''*'• \
,
,I,. • . ••',,,,..,''' ..... ,\ ‘• . ‘.:i., \: I CD 1
`1` • ,
1 . ,„ ,..; e,./.%„ \i'.'..: '• : /.,.. ot• -‘‘ ‘‘` \'''''t• to)
•2= f ..//, • -'''",0,-.1.,I ',, • ' :, I a••6
•
, • -/----_,._._r \ s's.‘ ',....,., '.... ,.....
c',/
- Z k
, --3. !------, \\,:\.‘....,....
, . , .." ,.. •, .„„.„...,„4„, _, . , ,..
..../ ,,..
I ,
. --• •\ ,.. , ., -,...,-'.
• P.1 1 4.',,P5'N A ! M wi g
, .,.
,,,, ,... 1„.„.
TEM 1.1.1.1 WM
,..........a,'!'- '
! ry RK p
, .. , ,,/, . nenza004..40.4coms ... '.-- \ ..•s....; p ,aq .
• 4.
5h i
I .
1 . \‘•P.,., .... '''...IP.f-,', • -.,...- s .',.-`Z'....:•.:k.f.' ..
_ E1 ., ' sy /-'-{ - =t.i./ ''. ‘• ..,....1-' -,--...--.. •Ittt=',,,- ---''.. ,.... ...' . .... ' /1 I 1
I .
4 ' 1— . ...., •\--..-13.--:-..-----.-‘;.:,,---4-__•-.1z,-.--,,-1-..... _ ......--
WM 11.11.07. ..' ir' , ..,.. ' . ,,.. ..:...-1.•_.-•l'•:•-•-•--.,-L- • -.-,-- -,r2---"-''''-'--.-''''.. .... -•l'..r---'-:'‘\ \ ! • I ';•! Elf
1 •1.2.ASO / / ,
/ .
; INILDIN6 • -- wzr; oot...." --..C.,2,-.:---7r,----4 -.-1:**,.. r ,..,--.-%71',._-_-C--.':.);11 1,4, .1' t I 1 _I -
/ /• / //t - tooTtk=sm.
?I
.....,,. ..../ „ z.: P.ARC'L .,....!;,..., !pi iiiiii,jpet,ftka„ ------,,,,A.L.--..--r--A ,i,_______ii ,1, -4 ••• 1
, . .54- .. k, 44. t to.... 11•1*.4...1 _, .. , eort..4.1•ftil7sto lirt ' •••-','''',-'=-71 -7-11.-1-:c---,.7--,-._Iji'''I 1 I to/ :,*
c•
...- F-..-Vmswerr-h— • ) ,.. , ol ' or. 4 .
s'.\ •", ."\. ••••, 7:.... ''''‘,.. ,, • '): : '
. •-- .. • ‘..; • 71[2.2.91., - --
. 1.11/WW2 WWII.
--
4'- ., / '_------.-- ,,----- :--'---*.- : -- ---,-.---- "
-• • / ---. 1,
. • g
. . .
Wigs 7e -I ,- •
- 2
'...141:-..42.11. i 2210....T.Mb
• TR WA ION AOPEES
L.O...L.10 LOT . ,s.„/40 1470440
5.1105.50 505 0
TM 010.51.12.211 .110.11.21.1.0. a SITE PLAN .:- -' I 20 owe552 455 1.1.1 o 5
•r --4.. . 2
0550540 GPOP R SI 40 5
ZOOG 06150 Lula 40.15545.5..,• r_,5,211 .1
_1 5
5,5,555,,...0 n,-.1.41pr 4 MG 5=55 O500(
.0,041551a GM W. Mart COM 050.0.40 IL.05TO PE
sheet
cm GP Mid 7065 CODE 5.1551•119 TO 745 OTT 0 RENT.KM•11.1.1.
....1 OWE SAW.CLOL 050005 1.0.15.
P4010 SiAll WET• 51.0.4.40 2•1212111 2 0.011.1.1.
• . . WI.=.3.IV 112.1 2 0.2.4. ,T) All
,.,
-
1,4555 05515m in 504-1.5 n ac.vat.1.050,
• .
* •
*
•
•
•
•• • .
. •
•
CAG-96-091
'WHEN RECORDED RETURN TO: [Asr Fief RI►'z*R
Office of the City Clerk Project: ,,u a rt g5-14 do pk o
var
Renton Municipal Building
AGREEMENT-AND,EA El E1�1T Work Order# 65 23 c
r ��
200 Mill Avenue South FOR D) i) Adr CANNEL Pict •2 i 23 oy 9 c 2 o •
Renton,WA 98055 Grantor: UPu5 •
Jl l J. l {! 'SG Street t Intersection: Pq 5/.1 a
.1\4 w,.a.%)4 : Sw
4., .}.. fl, G
cn
THIS INSTRUMENT,made thisl4.ttday of ``j '.' ` S 19' b; by and between Opus Northwest a
LLC, hereinafter called "Grantor," and the C' OF RENTON, a Municipal Corporation of King County,
Washington, hereinafter called "Grantee."
That said Grantor(s), for and in consideration of ten dollars ($10.00) and other good and valuable consideration, the x
receipt of which is hereby acknowledged by said Grantor, do by these presents, grant, bargain, sell, convey, and
warrants unto the said Grantee, its successors and assigns, an easement for drainage with necessary appurtenances a
over, under, through, across and upon the following described property (the easement area) in King County, N
Washington, more particularly described as follows: o
See attached EXHIBIT A for legal description _ a
For the purpose of installing, constructing, operating, maintaining, removing, repairing, replacing, and using a
drainage channel, together with the nonexclusive right of ingress and egress thereto without prior institution of any a
suit or proceedings of law . Following the initial construction of its facilities, Grantee may from time to time
construct such additional facilities as it may require. This easement is granted subject to the following terms and
conditions:
11)
Lo 1. The Grantee shall, upon completion of any work within the property covered by the easement, restore the surface •
Cj of the easement, and any private improvements disturbed or destroyed during execution of the work, as nearly as
Le: practicable to the condition they were in immediately before commencement of the work or entry by the Grantee.
All restoration shall be performed as soon as reasonably possible following completion of any work and shall be
coordinated in advance with Grantor so as to cause the minimum amount of disruption to the use of and operation
tLo of Grantor's property of which the easement area is a part.
2. Grantor shall retain the right to use the surface of the easement as long as such use does not interfere with the
easement rights granted to the Grantee. Grantor shall,not,however, have the right to:
a. Erect or maintain any buildings, utilities, structures, and related appurtenances within the easement; or
b. Develop, landscape, or beautify the easement area in any way which would unreasonably increase the costs to
the Grantee of restoring the easement area and any private improvements therein.
3. At the request of the Grantee, the Grantor has revised its development plans for the easement area and the
adjoining parcel to the east so that no improvements will be constructed within the easement area by the Grantor.
To accomplish the said redesign,the Grantor will incur an additional cost of$25,079, as outlined in the attached
Exhibit B. Therefore,to compensate the Grantor for this cost in exchange for this easement,the Grantee shall:
a. offset a portion of Grantor's storm drainage system development charge in the amount of$25,079 that may
become due for the Springbrook Creek Industrial Center proposal (LUA-96-015,SA,SM,ECF) or the
Raymond Avenue Center proposal(LUA-95-064,SA,SM,ECF,LLA),whichever is implemented.
b. allow the Grantor to remove and grade soil from and within the easement area for use as fill material for the
construction of either of the development proposal listed in 3a above. Such activities, however, shall be
H:DOCS:96-306b:SW:ps Agreement and Easement t,,T1AL
Sheet 1 of 6 . I/73
PROPERTY SERVICES
prohibited in that portion of the easement area lying within and 25' from the ordinary high water level in the
creek. Final grades after the soil removal and grading within the easement area are not to exceed 3 horizontal
to 1 vertical and any excavated area shall be graded so as to remain free-draining.
4. Notwithstanding anything set forth above, Grantee's rights under this agreement are subject to the rights of
Winmar-Metro, Inc., a Washington corporation ("Winmar"), its successors and assigns, under and pursuant to
that certain non-exclusive access and utilities easement recorded as instrument 9603151187 in the Records of
King County, Washington (the "Winmar Easement"), insofar as the Winmar Easement contemplates that
Winmar may install a bridge and/or other appurtenances over the creek, including the easement area, all, subject,
however, to Winmar obtaining the review and approval of all governmental agencies necessary in connection
with any such bridge, including the City of Renton.
5. Grantee shall give Grantor reasonable notice prior to Grantee's exercise of its access rights hereunder in the case,
of any activities that may impact the operation of Grantor's facilities, business operations or activities on the
property of which the easement is a part. Grantee shall coordinate its activities so as to cause minimum
disruption of Grantor's and its tenants' business activities on the Grantor's property of which the easement is a
part and shall cause its contractors or subcontractors to conform to all reasonable requests from Grantor or its
tenants regarding minimization of interference or use of any of the access in parking areas on or adjacent to the
easement.
6. Grantee shall indemnify and hold Grantor fully and completely harmless from any and all claims, costs,
liabilities and damages arising out of this Easement Agreement or the use of the easement or the easement area
by Grantee, its agents, contractors and employees (including reasonable attorneys' fees incurred in the
investigation or defense of such actions).
7. In the event of litigation between the parties hereto, declaratory or otherwise, in connection with or arising out of
this Easement Agreement, the prevailing party shall recover from the non-prevailing party all costs, including •
reasonable attorneys' fees, paralegals' fees, and other professional or consultants' fees expended or incurred in
connection therewith, as set by the court, including for appeals, which shall be determined and fixed by the court
as part of the judgment.
ll�
lJ
Ca
H:DOCS:96-306b:SW:ps Agreement and Easement `�IxfTIAL
Sheet 2 of 6 &
PROPERTY SERVICES
This easement shall run with the land described herein, and shall be binding upon the parties,their heirs, successors in
interest and assigns. Grantors covenant that they are the lawful owners of the above properties and that they have a
good and lawful right to execute this agreement.
Signatti/ess/of Grantor:
l and ;
and
STATE OF WASHINGTON )
) SS
COUNTY OF KING ) D
I certify that I sow or have satisfactory evidence that M#K IZq uulyogsr signed thi§ instrument, on oath stated that
—
'she/they " v ere authorized to execute the instrument and acknowledged it as the rie 5 i Q CAJ1 of
OPWS IVo,t- 0.007 L C to be the free and voluntary act of such party/parties for the uses and purposes mentioned in
the instrument. '
Dated (v 1 II lob tttill S. 1.0U'',�����ss����i L n
��I�\Sx0 N f - G� _
v �`
; tS a',o9 w Notary Public in and for the State
w c o NOTARY N ® of Washington residing at Q�oYt�t,u., to,9
�'a� 7 Notary(print): E1J LijnJ 5. Lou ww.SR
Nj\ '1 27 OJc' \t� My appointment expires: I i I a�l46
OF wrti'
Approv as to Legal Form: CITY OF RENTON
avo—,..atA.4..Pa1/1)
BY: BY
C) Lawrence J. Warren, Jesse T er
City Attorney Mayor
ATTEST:
BY
Marilyn J. Pe s
7 City Clerk
v)�
H:DOCS:96-306b:SW:ps Agreement and Easement INITIAL
Sheet 3 of 6
PROPERTY SERVICES
E/%Sr 1",0-f vaad
Project: r-
• EXHIBIT A Work Order# 65-23e
LEGAL DESCRIPTION PID: LW=o •
Grantor: 0 Pu r •
STR: 241-23- y •
Street Intersection: `r 11,1 . S
R.ny,,.,4A AvE W
Easement Area:
That portion of Lot 2 of City of Renton Lot Line Adjustment No. LLA-95-064 (King County Recording No.
9508039005) in the southeast quarter of the southeast quarter of Section 24, Township 23 North, Range 4 East, W.M.,
in King County, Washington, described as follows:
Commencing at the south corner of said Lot 2 and the true point of beginning;
thence along the west line of said Lot 2 the following courses:
N 37°00'42" W 32.02 feet;
thence N 55°28'15"W 83.16 feet;
thence N 52°24'00"W 186.02 feet;
thence N 54°03'57" W 280.51 feet;
thence N 35°11'09" W 138.12 feet;
thence N 23°44'21"W 81.38 feet to a curve concave to the east having a radius of 35.78 feet;
thence northerly along said curve through a central angle of 52°20'28" an arc distance of 32.69 feet;
thence leaving said curve on a non-tangent bearing N 50°08'30"E 107.69 feet;
thence N 51°45'16" E 68.97 feet;
thence N 59°39'11" E 93.78 feet to a curve concave to the northwest having a radius of 154.57 feet;
thence northeasterly along said curve through a central angle of 45°50'57" an arc distance of 123.69 feet;
thence N 13°48'14" E 114.90 feet to a curve concave to the west having a radius of 334.26 feet;
thence northerly along said curve through a central.angle of 36°45_26" an arc distance of 214.44 feet;
thence leaving said curve on a non-tangent bearing N 23°47'30"W 104 50 feet;
thence N 28°32'10" W 63.10 feet;
thence N 20°51'33"W 41.80 feet to the northwest corner of said Lot 2;
119 thence leaving said west line of said Lot 2 S 87°26'45" E along the north line of said Lot 2 140.00 feet;
vj thence leaving said north line S 37°01'21"W 82.90 feet;
® thence S 23°47'30" E 96.43 feet to a point on a curve concave to the west, said curve being non-tangent to the
LO preceeding course and having a radius of 384.26 feet,the center of which bears S 65°25'36"W;
Fj thence southerly along said curve through a central angle of 36°45'26" an arc distance of 257.38 feet;
0 thence S 13°48'14" W 114.90 feet to a curve concave to the northwest having a fadius of 204.57 feet;
CD thence southwesterly along said curve through a central angle of 45°50'57" an arc distance of 163.70 feet;
°I thence S 59°39'11"W 90.32 feet;
thence S 51°45'16"W 61.54 feet to a curve concave to the east having a radius of 105.00 feet;
thence southerly along said curve through a central angle of 86°56'32" an arc distance of 159.33 feet;
thence S 35°11'09" E 88.78 feet;
thence S 54°03'57"E 272.92 feet;
thence S 52°24'00" E 185.41 feet;
thence S 55°28'15" E 72.03 feet to the east line of said Lot 2;
thence S 00°47'36" W along said east line 72.32 feet to the true point of beginning.
Contains 90,418 square feet of land,more or less.
H:DOCS:96-306b1:SW:ps Agreement and Easement na�Tlni.
Sheet 4 of 6
PROPERTY SERVICES
Project. i sr pc Si bWit1 �Cttk',C
r .
EXHIIBIT A CONTINUED Work Order# 5-23c.
MAP EXHIBIT PIDL 2 L/2 3oy 30 2c
Grantor: 0 ru 5
STR: 2--4/- 3-1/
22 Street Intersection:sue+/3'" '-
10 kAti o,J0 SAC SW
9 '
Cy 23
8 ti
24 F
7
25 See Line and Curve Tables on Following Sheet
6
26
5
•
27
4
1n 28
0
0 1"=100' no 3 29
,, 11111;;;111111.i i
( IN FEET )
2 30
1
South Corner of Lot 2
H:DOCS:96-306b1:SW:ps • Agreement and Easement IAL
Sheet 5 of 6
f7LE NAME. & l650251RA)IOND.C7RIESV7UORXDIOG/PLT
PROPERTY SERVICES
Project:2la�1- .5,0; v:u ,Ceve,C
EXHIBIT A CONTINUED Work Order# fob 2-3 0
MAP EXHIBIT PID_ 24113 oy 9c2.o
Grantor: 0 Pu 5 ,
STR: 2-4/Z30q
Street Intersection: Su;!4 ill 5'1 g •
(Z .Yek uo kV6 51-1
17
Northwest Corner of Lot 2 J 16
Line Table
18
ID# Bearing Dist.(ft) 15
I N 37°00'42"W 32.02
2 N 55°28'15"W 83.16 • 19
3 N 52°24'00"W 186.02
4 N 54°03'57"W 280.51 14
5 N 35°11'09"W 138.12
6 N 23°44'21"W 81.38
8 N 50°08'30"E 107.69
9 N 51°45'16"E 68.97 .
10 N 59°39'11"E 93.78
12 N 13°48'14"E 114.90
14 N 23°47'30"W 104.50
15 N 28°32'10"W 63.10 13
16 N 20°51'33"W 41.80 Curve Table 20 •
17 S 87°26'45"E 140.00
18 S 37°01'21"W 82.90 ID# Radius(ft) Central Angle Arc Length
19 S 23°47'30"E 96.43 7 35.78 • 52°20'28" 32.69
21 S 13°48'14"W 114.90 11 154.57 , 45°50'57" 123.69
23 S 59°39'11"W 90.32 13 334.26 36°45'26" 214.44
24 S 51°45'16"W 61.54 20 384.26 36°45'26" 257.38
0 26 S 35°11'09"E 88.78 22 204.57 45°50'57" 163.7011, 12
27 S 54°03'57"E 272.92 25 105.00 86°56'32" 159.33 21
C 28 S 52°24'00"E 185.41
in 29 S 55°28'15"E 72.03'
Cj 30 S 00°47'36"W 72.32
0
taD 11
CI
A 22
10
0 1"=100' 100 _._
.4
( IN FEET ) 9 'ix
0y 23
8 ,
24 F
H:DOCS:96-306b1:SW:ps Agreement and asement INITIAL
Sheet6of6 767�
FILE NAME: LC 1650251RAYMONOCIR‘ESW760RY.ONC/PLT
PROPERTY SERVICES
Opus Northwest LLC
� �e, .OPUS 20ite 205 h Avenue NE E /ii /m
Bellevue,Washington 98004
206-453-4100 Fax 206-453-1712 •
•
•
April 24, 1996 •
• ti
Mr. Ronald J. Straka, Engineering Supervisor
Public Works Department ,icy• -' =`7
• City of Renton t�
200 Mill Avenue, South
Renton, Washington 98055
•
RE: Springbrook Industrial Center, Storm Drainage System
Dear Ron:
Pursuant to our meeting of 2 weeks ago relating to the possible widening of Springbrook Creek,
Opus Northwest LLC would be interested in allowing an easement for a future widening of
Springbrook Creek, subject to the following conditions: •
1. A mutually agreeable easement is executed.
2. Additional costs due to storm drainage rework, being taken out of the storm drainage SDC
charge as proposed by the City of Renton.
3. Opus would be able to cut and fill the site as previously submitted, using soils from within the
50' setback. -
•
1fj
Please find enclosed data sheets from BUsh, Roed.& Hitchings onr the changes proposed in the
storm system. Preliminary plans will be submitted to you under separate cover. The storm
Ochanges pursuant to our discussions would be as follows:.
• Add 534 lineal feet of 12"storm pipe at$18 per lineal foot or $9,612
CC • Delete 341 lineal feet of 12"storm pipe at$1.8per lineal foot or {$6,138}
• Delete 485 lineal feet of 15"stormpipe at$20per lineal foot or . {$9,700}
• Add 731 lineal feet of 18"storm pipe at$25 per lineal foot or $18,275
• Add 38 lineal feet of 24"storm pipe at$35 per lineal foot or $1,330
• Add 4 each type 1 catch basins at$850 per each or $3,400
• Add 2 each type 2 catch.basins at$2500 per each or $5,000
• Delete 1 each type 2 catch basin at$2500 per each or {$2,500}
• Re-engineering costs for sketching, drawing and calculations $2 000 5, �Ce
• Total additional costs $2- ZS� c-17
Arteua�2 1 r9`1b . traM
Opus Northwest LLC is an affiliate of the Opus group of companies—Architects,Contractors,Developers
Chicago,Columbus,Dallas,Denver,Ft.Lauderdale,Milwaukee,Minneapolis,Pensacola,Phoenix,Sacramento,San Francisco,Seattle,Tampa,Washington,D.C.
•
•
OPUS.
Letter to Mr.Ronald J.Straka
Re:Storm Drainage System
April 24,1996
If we cannot use soils from within the 50' setback, where we had initaially proposed biofiltration
swales our cost will increase an additional $12,80Q00
•
Please review this information and call myself or John Anderson at Bush, Roed & Hitchings, if you •
have any questions. Assuming this meets with your approval we are prepared to finalize the storm
drainage plans incorporating these changes, execute a easement with the City of Renton and
formalize a agreement reducing the storm drainage SDC charge by $21,279. Please remember
that time is of the essence to get all this accomplished.
Very truly yours,
Bart Bry estad
Director- Real Estate Development
Enclosure
cc: John Anderson - Bush, Roed & Hitchings
BB/mmj
Springbrook:str4 24.doc
lJ
tiO
MAY.-01-96 WED 07:49 OPUS ZTHWEST LLC FAX NO. 12GL9J31712 „. P, 02/03
• Opus Northwest LLC
01.
.OPUS 200—112ih Avenue NE
J Suite 205
Bellevue,Washington 96004 -1-1-7// /( 6 ( Tip)vzn
206453-4100 Fax 206-453-1712
May 1, 1996
Mr. Ronald J. Straka
Engineering Supervisor
Public Works Department
City of Renton
200 Mill Avenue South
Renton, Washington 98055
RE: Springbrook industrial Center, 19th & Raymond Avenue S., Renton Washington
• Dear Mr. Straka:
Please find enclosed a notice of additional work from Bush, Roed & Hitchings, my Civil
Engineering for the Springbrook Industrial Center Project. 'Their quote is for the storm system
redesign pursuant to our latest discussions. I had errantly given you the number for this work in
my letter of last as$2,000. The actual price for this work will be $5,800. Please insert the $5,800
in lieu of the $2,000 in the letter I had previously sent you.
As discussed you should now be preparing a draft easement exhibit and a letter agreement
discussing the reduction in the storm sewer system development charge. Please.expedite this
process as I would like to get these two items completed by next week.
0 Please call myself or John Anderson of Bush, Roed & Hitchings at (206) 323-4144, if you have
any additional questions.
/
Very truly yours,
•
Bart Brynestad
Director- Real Estate Development
Enclosure
B8/mmj
Springbrook:stry 1.dcc
MAY-01-96 WED 07:50 OPU,' )RTHWEST LLC FAX NO. 121 i31712 P. 03/03
2063237135 B.R.H. F-603 T-929 P-002 APR 25 '96 14:28
•
BUSK ROED &HIICHiNGS,INC. •
Notice of Additional Work No. 1
Attention: Bart Brynestad Date: 04/25/96
Opus NW, LLC Contract No.: 92233.14
Description: Raymond Avenue Center
Work to
be performed: Re-design storm system per city of Renton
Reason for Work: As requested by city of Renton
Work under this Notice of Additional Work will be accomplished:
❑ With no Change to the contract price.
X For a lump sum Increase of$5,800 to the contract price. •
o On a time and expense basis not to exceed$ without
written authorization.
o With work to start immediately on a time and expense basis.
o With no change in the completion date.
0 o With completion date extended calendar days.
1/9
Performance of this additional work is authorized by signature. Authorization must be
received prior to release of drawings.
t.
0)
Issued by: 9b
H, Project Manager Date
Authorized by:
Client • Date
i .
N
tWily "Fe
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office, 3190 - 160th Ave 5.E.'• Bellevue, Washington 98008-5452 • (206) 649-7000
June 7, 1996
Mark Miller or
Mark Miller Consultants, Inc. J/A,�y4
10801 Main Street, Suite 100 �`
1 .7 ,99
Belle,de, WA 98004 •N w
Dear Mr. Miller:
Re: Renton Permit# LUA-96-015
• WINMAR-METRO, INC./ Raymond Avenue Center II - Applicant/Project
Shoreline Substantial Development Permit # 1996-NW-10026
The subject Shoreline Management Substantial Development permit, to construct a 99,635
square foot building, dock-high service doors for 20 trucks, and on-site parking for 128
vehicles, has been filed with this office by the City of Renton on May 24, 1996.
The development authorized by the subject permit may NOT begin until the end of the 21-day
appeal period, June 14, 1996. You will be notified in writing if this permit is appealed. Other
federal, state, and local permits may be required in addition to the subject permit.
If this permit is NOT appealed, this letter constitutes the Department of Ecology's final •
notification of action on this permit.
Sincerely,
icr.ur
Alice Kelly, Shorelands Specialist
Shorelands and Water Resources Program
AK:ak
SDP.DOC
cc: James D. Hanson, Renton
0
CITY OF RENTON
PLANNINGBUILDING/PUBLIC WORKS
MEMORANDUM
DATE: June 14, 1996
TO: Bob Arthur,Jan Conklin erill
FROM: Jennifer Toth Henning
SUBJECT: Raymond Avenue South(a.k.a. Opus,Springbrook Industrial)—
File No.LUA-96-015,SA,SM,ECF
Condition No. 2 of the Shoreline Substantial Development Permit requires that the applicant furnish
an easement to the City of Renton along Springbrook Creek shoreline for public access. Scott
Woodbury has informed me that the easement document has been signed by Opus and is in the process
of being recorded by the City Clerk.
If you have any questions,please call be at 6186.
•
1 \'
1111:lattc___I
1996 Renton City Council Minutes Page 221
d. Agree to construct a six-foot chain link fence along the entire east property
line of the deeded area if and when the City's future channel widening
project within the deed area is implemented; and
e. Agree to provide and install perch poles along the creek if required by the
Hearing Examiner for the said SW 16th Technical Center proposal.
The above provisions will be set forth in the proposed agreement regarding
right-of-way acquisition for drainage channel with Benaroya Capital Company
LLC. The expenditure required for the acquisition based on these provisions is
estimated to not exceed $160,000. MOVED BY CORMAN, SECONDED BY
CLAWSON, COUNCIL CONCUR IN THE COMMITTEE REPORT.*
City Attorney Lawrence J. Warren requested that Council change the word
"waive" appearing in item numbers a and c in the committee report to "offset".
MOVED BY EDWARDS, SECONDED BY CORMAN,
COUNCIL AMEND THE MOTION BY REPLACING
THE WORD "WAIVE" WITH "OFFSET". CARRIED.
*ORIGINAL MOTION AS AMENDED CARRIED.
Public Works Springbrook Utilities Committee Chair Corman presented a report
Creek Widening, Raymond recommending concurrence in Planning/Building/Public
Ave SW Acquisition for Works Department's recommendation that the Mayor and
Easement from Opus NW, City Clerk be authorized to execute an agreement and
CAG-96- easement for drainage channel with Opus Northwest LLC
for the acquisition of a 2.0 acre easement along the east side
of Springbrook Creek between SW 19th St. and SW 23rd
St. The easement is needed for the future widening of the
creek, as proposed in the City of Renton Surface Water
Utility's East Side Green River Watershed Project (File No.
LUA-95-205).
The expenditure required for the easement acquisition is
$25,079. There are currently no funds budgeted for
obtaining the easement. Therefore, to compensate Opus in
exchange for the easement, the Utilities Committee
recommended concurrence in the Planning/Building/Public
Works Department's recommendation to waive OFFSET
$25,079 of Surface Water Utility system development
charges that will become due for the development proposed
on the property owned by Opus at 1901 Raymond Ave. SW
(File No. SA-96-015). MOVED BY CORMAN,
SECONDED BY SCHLITZER, COUNCIL ADOPT THE
COMMITTEE REPORT AS AMENDED BY
REPLACING THE WORD "WAIVE" WITH "OFFSET".
CARRIED.
SAD East Renton Sewer Utilities Committee Chair Corman presented a report
Interceptor SAD #0002 recommending concurrence with staffs recommendation
that the East Renton Sanitary Sewer
Special Assessment District No. 0002 be approved as amended from the
original submittal to Council on May 6, 1996. The amendment to the Special
Assessment District consists of a minor expansion of the northeast boundary of
the district to include that area known as the plat of White Fence Ranch. The
Special Assessment District will establish connection charges equal to $224.52
IENXPRIENEEIMENNEMEinegiiiimonomme
CURRENT PLANNING DIVISION
AFFIDAVIT OF SERVICE BY MAIUNG
On the 13ti day of •VV•-a..-t , 1996, I deposited in the mails of the United
States, a sealed envelope containin
€s\N::•trektv‘e_ reArmct
documents. This information was sent to:
Name
Representing
•
•
'Dept tcolociti
pdtev-tAe.i CzttAcus
VrojAt. hntklev-
. Wtv‘wk6X— vv.ervio
•
0(54.1..% nork4wxist u-c.
(Signature of Sender) 11.)441..to.....k.
STATE OF WASHINGTON
) SS
COUNTY OF KING
I ,z.vp4 s,ig
certify that I know or have satisfactory evidence that
54--A)DR4 K. signed this
instrument and acknowledged it to be his/her/their free and voluntary act for tt1.0.4., purposes
mentioned in the instrument. z
' 14
Dated:
ht
Notary P ic in and op the State of Washiff:,
/4-R ,
Notary (' nt)
........ •My appointment expires: " ..
•
Project Name: --t>0 ktevw.e. cesAttir
Project Number 96 .0\5, s4, ,siv‘ ,ecr
NOTARY.DOC
•
STATe _:'
v..4 py
1989
STATE OF WASHINGTON
DEPARTMENT OF ECOLOGY
Northwest Regional Office, 3190 - 160th Ave S.E. • Bellevue, Washington 98008-5452 • (206) 649-7000
June 7, 1996
Mark Miller Op at
Mark Miller Consultants, Inc. B ''6
10801 Main Street, Suite 100 '0 19
Bellevue, WA 98004 0444 �6
Dear Mr. Miller:
Re: Renton Permit# LUA-96-015
WINMAR-METRO, INC./ Raymond Avenue Center II - Applicant/Project
Shoreline Substantial Development Permit# 1996-NW-10026
The subject Shoreline Management Substantial Development permit, to construct a 99,635
square foot building, dock-high service doors for 20 trucks, and on-site parking for 128
vehicles, has been filed with this office by the City of Renton on May 24, 1996.
The development authorized by the subject permit may NOT begin until the end of the 21-day
appeal period, June 14, 1996. You will be notified in writing if this permit is appealed. Other
federal, state, and local permits may be required in addition to the subject permit.
If this permit is NOT appealed, this letter constitutes the Department of Ecology's final •
notification of action on this permit.
Sincerely,
rr.e,(2,r-
Alice Kelly, Shorelands Specialist
Shorelands and Water Resources Program
AK:ak
SDP.DOC
cc: James D. Hanson, Renton
•
CITY F RENTON
"IL Planning/Building/Public Works Department
Jesse Tanner,Mayor - Gregg'Zimmerman P.E.,Administrator
May 23, 1996
•
State Department of Ecology.
Northwest Regional Office
3190 160th.Ave. SE
Bellevue,WA 98008-5452
SUBJECT: Shoreline Management Substantial Development Permit for
File No. LUA-96-015;SA, SM, ECF
Dear Permit Coordinator
' Enclosed is the Shoreline Substantial Development Permit for the above referenced project. The permit was
issued by the City of Renton on May 22, 1996.
We are-filing this action with the.Department of Ecology and the Attorney General per WAC.173-14-090.
Please review this permit and attachments and call me at (206) 277-6186 if you have any questions or need.
additional information.
Sincerely, .
•
J nifer Toth Henning
Project Manager
Enclosures: Legal Description (Attachment"A")
SEPA Determination (Attachment"B")
Copy of Original Application '
Affidavit of Public Notice/Publication
Site Plan
cc: Office of Attorney General
City of Renton, Transportation Systems
City of Renton, Utility Systems •
City of Renton, Code Compliance Inspector
Applicant
SHLTR.DOC
200 Mill Avenue South - Renton, Washington 98055
TI.i___.._.___,_.__env.__.._i_..__.___. new---•----..---
CITY OF RENTON
SHORELINE MANAGEMENT ACT OF 1971
PERMIT FOR SHORELINE MANAGEMENT
SHORELINE SUBSTANTIAL DEVELOPMENT PERMIT
APPLICATION NO.: LUA-96-015, SA, SM, ECF
DATE RECEIVED: February 15, 1996
DATE OF PUBLICATION: April 1, 1996
DATE APPROVED: May 22, 1996
DATE DENIED: N/A
TYPE OF ACTION(S): [X] Substantial Development Permit
[ ] Conditional Use Permit
[ ] Variance Permit
Pursuant to Chapter 90.58 RCW,the City of Renton has granted a permit:
This action was taken on the following application:
APPLICANT: Mark Miller(Mark Miller Consultants, Inc.)
PROJECT: Raymond Avenue Center II
DEVELOPMENT DESCRIPTION: The applicant seeks a Shoreline Substantial Development
Permit in order to develop a 10-acre vacant site with a 99,635 square foot building, dock-high service
doors for 20 trucks, and on-site parking for 128 vehicles. The site is adjacent to Springbrook Creek.
On-site recreation opportunities for employees would include an outdoor picnic area at the southeast
corner of the site and an outdoor half-court basketball south of the western parking area. The
development would be speculative in nature but would be suitable for warehouse, office and
manufacturing uses as permitted in the Light Industrial (IL) Zone.
Springbrook Creek is designated as an "Urban" environment by the City's Shoreline Master Program.
A portion of Wetland "A" mapped on the eastern edge of the site is designated "Conservancy"
environment. A 25-foot buffer would be maintained from Wetland "A", and the proposed structure
would be located no closer than 45 feet to the edge of the wetland. In other words, no site
development would occur within areas designated "Conservancy".
A previous development proposal for a smaller building (81,250 square feet) and more parking
spaces (137 vehicles) was approved for the site in May, 1995 (Raymond Avenue Center - File No.
LUA-95-064, SA, SM, ECF, LLA). A Shoreline Substantial Development Permit for Raymond Avenue
Center was approved by the City on June 6, 1995. The current proposal is a modification of the
previous site plan and features a larger building. Revisions proposed resulted in the filing of an
application for Site Plan Approval, Environmental Review, and a Shoreline Substantial Development
Permit.
As with the previous proposal, the site would be developed with a 50-foot wide buffer between
Springbrook Creek and other site development. Under the previous proposal public access to and
along Springbrook Creek was to be developed on the west side of the Creek at the time the western
SHSBDV.DOC
City of Renton P/B/PW Department Shoreline Substantial Development Permit
Raymond Avenue Center 11 Page 2 of 3
half of the property developed (west side of Springbrook Creek). Since the time of the approval of
the Shoreline Substantial Development Permit for Raymond Avenue Center, the western one-half of
the property has been sold.
As a separate action, the City of Renton has negotiated with the applicant for an easement along
Springbrook Creek to enable the City to widen Springbrook Creek for flood control purposes. The
City would need to seek and obtain a separate Shoreline Substantial Development Permit for the
widening of Springbrook Creek. At the time that the widening of Springbrook Creek occurs, a shelf
would be created along the creek that would allow public access to and along the shoreline. In
addition,the Springbrook Creek Trail will be developed on the west side of the creek, across from the
subject parcel.
LEGAL DESCRIPTION: See Attachment"A"
SEC-TWNP-R: S24, T23N, R4E
WITHIN SHORELINES OF: Springbrook Creek
APPLICABLE MASTER PROGRAM: City of Renton Shoreline Master Program
The following section/page of the Master Program is applicable to the development:
Section Description Page
3.03 Shorelines of the City page 13
4.02 Conservation Element page 15
4.04 Public Access Element page 17, 18
4.05 Recreation Element page 18, 19
5.03 Conservancy Environment pages 20-22
5.04 Urban Environment page 22
6.04 Public Access page 24
6.05 Facility Arrangement- Shoreline Orientation page 24
6.06 Landscaping page 24
6.07 Unique and Fragile Areas page 24
7.11-02 Parking- Private Parking page 32
Development of this project shall be undertaken pursuant to the following terms and conditions:
1. The applicant shall comply with the mitigation measures established by the City of Renton's
Environmental Review Committee and the Site Plan Approval conditions established by the City of
Renton's Zoning Administrators (See Attachment"B").
2. Public access shall be allowed to and along the Springbrook Creek shoreline.. This may be provided
by means of furnishing an easement to the City of Renton along Springbrook Creek allowing public
access, or by means of other easement or conveyance accomplishing this end.
This permit is granted pursuant to the Shoreline Management Action of 1971 and pursuant to the following:
1. The issuance of a license under the Shoreline Management Act of 1971 shall not release the
applicant from compliance with federal, state, and other permit requirements.
2. This permit may be rescinded pursuant to Section 14(7) of the Shoreline Management Act of 1971 in
the event the permittee fails to comply with any condition hereof.
SHSBDV.DOC
City of Renton P/B/PW Department — Shoreline Substantial Development Permit
Raymond Avenue Center 11 Page 3 of 3
3. A construction permit shall not be issued until thirty (30) days after approval by the City of Renton
Development Services Division or until any review proceedings initiated within this thirty (30) day
review period have been completed.
5/a A7.6
Planning/B it 1n ublic Works Administrator ate
THIS SECTION FOR DEPARTMENT USE ONLY IN REGARD
TO A CONDITIONAL USE OR VARIANCE PERMIT
DATE RECEIVED:
APPROVED:
DENIED:
If Conditional Use, Section of the City's Shoreline Master Program authorizing the use:
If Variance, Section(s) of the City's Shoreline Master Program being varied:
This Conditional UseNariance permit is approved/denied by the Department pursuant to Chapter 90.58 RCW.
Development shall be undertaken pursuant to the following additional terms and conditions:
Date Signature of Authorized Department Official
cc: Attorney General's Office
City of Renton, Plan Review(Neil Watts)
City of Renton, Surface Water Utility(Ron Straka)
Applicant
SHSBDV.DOC
/ ;; ' CITYF RENTON
Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
April 16, 1996
Mr. Mark Miller
Mark Miller Consultants, Inc. .
10801 Main Street, Suite#100
Bellevue, WA 98004
SUBJECT: Raymond Avenue Center II
Project No. LUA-96-015,SA,SM,ECF
Dear Mr. Miller:
This letter is to inform you that the comment and/or appeal periods have ended for the Environmental
Review Committee's (ERC) Determination of Non-Significance - Mitigated for the. above-referenced
project. .
No appeals were filed. This decision is final and application for the appropriately required permits may
proceed.
If you have any questions, please feel free to contact me at 277-6186. '
For the Environmental Review Committee,
Jennifer Toth Henning
Project Manager
cc: Mr. Larry Capellaro/King County Drainage District#1
•
•
FINAL.DOC
200 Mill Avenue South - Renton, Washington 98055
cv.
Aft
WimWashington State Northwest Region
Department of Transportation 15700 Dayton Avenue North
- P.O.Box 330310
Sid Morrison Seattle,WA 98133-9710
Secretary of Transportation
(206)440-4000
DATE: April 9, 1996 DEVCiOPMEN PLANNING
TO: Jennifer Toth Henning 12.199v
City of Renton, Project Manager APR
200 Mill Avenue South
Renton, WA 98055 RECEIVED
Subject: SR 4055 MP 2 . 06 CS 1743
Mitigated Determination of
Nonsignificance-Raymond Avenue
Center II
DyLeffir441(4/t
File No. LUA-96-015, SA, SM, ECF
FROM: Robert A. Joseph on, PE, Manager of Planning & Local
Coordination
Washington State Department of Transportation
Northwest Region
15700 Dayton Ave. North, MS 122
PO Box 330310
Seattle, WA 98133-9710
Thank you for giving us the opportunity to review this
Mitigated Determination of Nonsignificance for the Raymond
Avenue Center II which, is located at 2000 Raymond Avenu
South. Our response is checked below.
We have reviewed the subject document and have no
comments . The project will have no significant impact
on the state highway system.
X The State recommends that a traffic study be prepared
to analyze the state intersections that are impacted
by ten or more of the project' s generated peak hour
trips and also determine what mitigation measures, if
any, would be required.
If you have any questions, please contact Don Hurter at 440-
4664 or Vickie Erickson at 440-4915 of my Developer Services
section.
• VE:ve
filename
DEVELOPMENT PLANNING'
CITY OF,RENTON`
KING COUNTY - • _
,Transit Division APR01996
Department of Transportation'
Transit Design&Construction Section,Environmental Planning&Real Estate ji§cEIV 821.Second Avenue, Seattle,WA. 98104-15.98 M/S 122 Phone:(206)684-1418',Fax: (206) '
April`5, 1996 ,
City of Renton
Jennifer Toth Henning, Project Manager
r '
200 Mill'Avenue South
Renton, WA. 98055'
"
DNS, Raymond'Avenue Center II- Project Number LUA-96-015,SA,SM,ECF ,
Dear'Ms. Henning: • , . • ' , I ,
King County Transit Division staff have reviewed this proposal and have the following , ,
comments.. ,
The closest service to this site is route 153 which operates on SW'16th St, north of the. ,
l ,• site. Route;153"operates weekdays during peak"hours: Further north on Grady Way are
routes 163, 240 and 340. Route 163 is a peak hour peak direction route, but routes 240 ' '
and 340 operate,all day seven days a week. -
- . If there are more than 100-full time employees who-arrive.between 6 a.m. and 9 a.m.; ' ,
this site may be subject to the Renton Commute,Trip Reduction Ordinance. If this is the ,
case, it appears that measures to support ridesharing, as opposed to more transit service, ,
would be best. Measures that support ridesharing include guaranteed ride home, HOV "
- parking'and Commuter Bonus Plus. = , ,
Thank you for the opportunity to review and comment. '
Sincerely, '
d Kra` . "
Gary Kriedt,: t. '''.0 ,
Environmental Planner .
g:\oap71:doc '
AFFIDAVITCURRENT PLANNING DIVISION
•••••••••••• """""""• ••••••••••••••••• ••••••••••••••.. .................. ................. .................
•••••••••••••-•••• • •
On the 2..'5 day of IVV)...14iA , 1996, I deposited in the mails of the United
States, a sealed envelope containing • •
Ttale\ re4ort Vd etty m K etkri4
documents. This information was sent to:
Name Representing
Opus y\ov-444Lotigi- LL(..
MitleAr-
)tin-vvuut
(Signature of Sender) 93).ALtill_ kS.et,egr_K
STATE OF WASHINGTON
) SS •
COUNTY OF KING
. -
I certify that I know or have satisfactory evidence that S * S-4e
instrument and acknowledged it to be his/her/their free and voluntary act foYthe uses4;arithifit*Vs
mentioned in the instrument. •
24.
Dated: a 1i/Y) tIA,• / ' • ilkaAv' •
Notary Publin and for the State /Mingto9 iry
/60 47/ 6242
Notary(Print) X0.4446,--, ..c
My appointment expires:
Project Name: vo.„...10Atria tige. cevckr.lx..
Project Number.
9(61 -015 , SA ,SNA% EC,f
NOTARY.DOC
....................................
....................................
..................................
ENVIRONMENTAL REVIEW COMMITTEE
MEETING NOTICE
MARCH 19 1996
To: Gregg Zimmerman, Planning/Building/Public Works Administrator
Sa Chastain, Comunity Services Administrator
Lee Wheeler, Fire Chief
From: Jim Hanson & Mike Kattermann
Meeting Date: Tuesday, MARCH 19, 1996
Time: 9:00 AM
Location: Third Floor>Conference..Room
Agenda listed below.
Boeing Buildings 4-45 & 4-79 Watermain Replacement(New) (Pywell/5586)
LUA-96-01 7,ECF
The applicant seeks approval to replace an existing water line on-site. Approximately 2,350 L.F. of 12" fire main and 1,623
L.F. of 8"watermain will be installed. The existing line will be abandoned in place. Location: Boeing's Renton Facility in the
vicinity of the 4-45 and 4-79 buildings.
Farwest Steel Distribution Center(New) (Henning/6186)
LUA-96-022,SA,ECF
The applicant seeks administrative Site Approval and Environmental Review for the development of a vacant 3.7
acre site for a steel distribution center. The site would be developed in two phases. Phase I would result in
construction of a 63,300 square foot warehouse building, a 660 square foot temporary office facility, and a 2,700
square foot office building. Phase 2 construction would add 32,250 square feet of warehouse to the west side of
the Phase I warehouse. Total amount of new buildings at build-out would be 98,910 square feet. A total of 50
automobile parking spaces would be provided. Access would be from SW 34th Street and from Lind Avenue.
Location: SW 34th Street, Between East Valley Road and Lind Avenue.
Raymond Avenue Center II(New) (Henning/6186)
LUA-96-015,SA,ECF
The applicant proposes to develop the site for warehouse, office and manufacturing uses. The proposed
structure would be 99,635 Square Feet in size. Parking for 128 cars and dock high service for 20 trucks would
also be provided. Development would maintain a 50 foot setback from Springbrook Creek and a 25 foot buffer
from the Class Ill wetland on site. Location: 2000 Raymond Avenue South.
cc: J.Covington, Executive Assistant to the Mayor
L.Warren,City Attorney (R)
F. Kaufman,Hearing Examiner
S.Carlson, Economic Development Director(R)
J.Gray, Fire Prevention
A. Larson, Fire Prevention(R)
P.Pierce,P/B/PW Admin.
is
AFFIDAVIT OF PUBLICATION
Jessica Folkerts
, being first duly sworn on oath
NOTICO NIVIEItrr
F'ENVrFty
states that he/she is the Legal Clerk of the DETERMINATIQN" 44 Muncpa code:. ;
ENVIRONMENTAL"REVIEW COMMITTEE RAYMDND AVENUE CENTER II
VALLEY DAILY NEWS RENroN,WASHINGTON LUA-96015,SA,SM,ECF The Environmental Review Committee The licant
(ERC) has issued a Determination of Non- site forwarehousepro t�tl Yew the
600 S. Washington Kent, WA. 98032 I Significance— fufitigated for the falk►wing luring uses. The proposed structure
a daily newspaper published six (6) times week. Said newspaper is a legal project under the authority of the Renton would be 99,635 Square Feet in size.
newspaper of general circulation and .is now and has been for more than six Parking for 128 cars and dock high ser- i.
months prior to the date of publication referred to, printed and published in the vice for 20 trucks would also be
English language continually as a daily newspaper in Kent, King County, Wash- ed. Development would maintain a 0
,ington. The Valley Daily News has been approved as a legal newspaper by order foot setback from r from
Creek
of the Superior Court of the State of Washington for King County.' _. _ __ wetlandnd a foot buffer project
the Class m
on site. This project requires a f
The notice in the exact form attached, was published in the Valley Daily News Shoreline Substantial Development Per-
(and not in supplement form) which was regularly distributed to the subscribers mil for development within 200 feet of
during the below stated period. The annexed notice, a mond A Avenue SW.Creek.Cr Location:2000 Ray- ,.
mood
The 15 day comment and 14 day appeal
Notice of Env D e t periods for this project will run concurrently
and end at 5:00 p.m. on April 9, 1996.
sures imposed by the City of Renton's Appeal procedures and the mitigation mea-
ronmental Review Committee are •available
at the was published on 4-1-96 Floor,Municipal Buildng,R Renton, .
ton 98055.Phone:235-2550.You should be
ed for said foregoing publication is the sum of prepared to make specific factual objec- '
The full amount of the fee charged 9 g tiio nsl.1Publication dates March 25,1986 and '
/(,, _ ' Ap , 1996.
_ —
Published in the V
alley Daily News April
$ 5 0.5 3 1, 1996. 1376•
e I Clerk alley Daily News
Subscribed and sworn before me this3 day of i/24p�-� 1 9
...0,0ounmft,... e0.gth11-.,Yir‘.LqdLit:or
a°y�tiN fi Fk — ' •
gd .Z�.•'$�pjy Fy f� Notary Public or the State of Was ington
4 ;µ°s' -� Npa residing at Auburn
4 '<'o 0 i AR k .,% King County, Washington
yA * . ti
_1 pe�ig79C �e�
'R 2� 9
-7� 0 31 1
�• •f'WAS��' 00
NOTICE OF ENVIRONMENTAL DETERMINATION
ENVIRONMENTAL REVIEW COMMITTEE
RENTON, WASHINGTON
The Environmental Review Committee (ERC) has issued a Determination of Non-Significance -
Mitigated for the following project under the authority of the Renton Municipal Code.
RAYMOND AVENUE CENTER II
LUA-96-015,SA,SM,ECF
The applicant proposes to develop the site for warehouse, office and manufacturing
uses. The proposed structure would be 99,635 Square Feet in size. Parking for 128
cars and dock high service for 20 trucks would also be provided. Development would
maintain a 50 foot setback from Springbrook Creek and a 25 foot buffer from the Class
Ill wetland on site. This project requires a Shoreline Substantial Development Permit for
development within 200 feet of Springbrook Creek. Location: 2000 Raymond Avenue
SW.
The 15 day comment and 14 day appeal periods for this project will run concurrently and end at 5:00
p.m. on April 9, 1996. Appeal procedures and the mitigation measures imposed by the City of Renton's
Environmental Review Committee are available at the Development Services Division, Third Floor,
Municipal Building, Renton, Washington 98055. Phone: 235-2550. You should be prepared to make
specific factual objections. Publication dates March 25, 1996 and April 1, 1996.
••
Publication Date: April 01, 1996
Account No. 51067
dnsmpub.dot
•
On the 2 day of YV'&i(1 , 1996, I deposited in the mails of the United
States, a sealed envelope containing
documents. This information was sent to: •
Name Representing •
fir' scolocri
•
cf i\aq_ •
kyym AlslAer. rt of
1>a4td l.i E'Tannaan °F Igo 'uxvt .. -Rcsouat-P3t
Lltc.k. AviNdelsovl 'Deft f -Tvansrotatttne,
Su. . -Qwnne.vti cif Scat k
Duw aVY% 1wate" %Le.
e Ma ohn %1•ishevles YYW.Lkiesh
(Signature of Sender) IALMNLIrt k.
STATE OF WASHINGTON )
) SS
COUNTY OF KING )
I certify'that I know or have satisfactory evidence that's n 2 A k. S Q, signedtithis
instrument and acknowledged it to be his/her/their free and voluntary act for uses and 4pd;F.os '0.
mentioned in the instrument. � ,,`:;
a'.' ail, /c1 C/(o w � �
Dated:
Notary PubliOn and for the State .it'/ as ington
Notary (Print) (Vl 4) r\iR c ie r:,'+�
My appointment expires: ' 6 �q-y y ,
Project Namesw:ti f‘tcC
Project Number. 1(9 _015, SAA , cCc-,k
NOTARY.DOC
4; - CITY OF RENTON
Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
March 20, 1996
Washington State
Department of Ecology
Environmental Review Section
PO Box 47703
Olympia, WA 98504-7703
SUBJECT: Environmental Determinations
Transmitted herewith is a copy of the Environmental Determination and Environmental Checklist for the following project
reviewed by the Environmental Review Committee on March 19, 1996:
DETERMINATION OF NON-SIGNIFICANCE-MITIGATED
RAYMOND AVENUE CENTER II
LUA-96-015,SA,S M,EC F
The applicant proposes to develop the site for warehouse, office and manufacturing uses. The proposed.
structure would be 99,635 Square Feet in size. Parking for 128 cars and dock high service for 20 trucks
would also be provided. Development would maintain a 50 foot setback from Springbrook Creek and a
25 foot buffer from the Class III wetland on site. Location: 2000 Raymond Avenue South.
The 15 day comment period and the 14 day appeal period for this project will run concurrently. The comment/appeal
period will end at 5:00 PM on April 9, 1996. Following the end of the comment/appeal period, the City will finalize its
Determination unless comments received require, a reevaluation. Appeal procedures and the mitigation measures
imposed by the City of Renton's Environmental Review Committee are available at the Development Services Division,
Third Floor, Municipal Building, Renton, Washington 98055. Phone: 235-2550.
If you have questions, please call me at (206) 277-6186.
For the Environmental Review Committee,
OtH4-01/14A/to
fifer Toth Henning
Project Manager
cc: Gregory M. Bush, Metro
Department of Wildlife
Larry Fisher, Department of Fisheries
David F. Dietzman, Department of Natural Resources
Don Hurter, Department of Transportation
Sue Rumery, City of Seattle
Duwamish Tribal Office
Rod Malcom, Fisheries, Muckleshoot Indian Tribe (Ordinance) 0
Rita.Perstac, Puget Power
•
•
AGNCYLTR.DOC
Inn 1\4;11 OQfCC
;; CITY ._JF RENTON
"LL �` Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator
March 20, 1996'
Mr. Mark Miller
Mark Miller Consultants, Inc.
10801 Main Street, Suite#100
Bellevue, WA 98004
SUBJECT: Raymond Avenue Center II
Project No. LUA-96-015,SA,SM,ECF
Dear Mr. Miller:
This letter is written on behalf of the Environmental Review Committee and is to inform you that they have completed
their-review of the environmental impacts of the above-referenced project. The Committee, on March 19, 1996, decided
that your project may be issued a threshold Determination of Non-Significance-Mitigated with the following conditions:
See enclosed Mitigation Measures document.
Because the Environmental Review Committee imposed specific mitigation measures rather than issue a Determination
of Significance, there is a required 15 day comment period during which comments are solicited from various agencies,
jurisdictions or individuals (including the applicant)who may have an interest in the Committee's decision. The required
14 day appeal period will run concurrently with the comment period. The comment/appeal period will end at 5:00 PM on
April 9, 1996.
Following the end of the comment and appeal period, the City will finalize its Determination, unless comments received
require a reevaluation.
WAC 197-11-660 states that the responsibility for implementation measures may be imposed upon an applicant only to
the extent attributable to the identified adverse impacts of the imposed action. Since an environmental impact statement
has not been prepared for this project, any mitigation measure established by the ERC not directly attributable to an
identified adverse impact is deemed to be voluntarily accepted by the applicant.
Staff urges you to contact the various City"representatives, as appropriate, (e.g., the Public Works Division) as soon as.
possible, to obtain more information concerning specific mitigation elements recommended for this project, if you have
specific questions. This information will assist you in planning for implementation of your project and will enable you to
exercise your appeal rights more fully, if you choose to do so.
Appeal procedures and mitigation measures imposed by the City of Renton's Environmental Review Committee are
available at the Development Services Division, Third Floor, Municipal Building, Renton, Washington 98055. Phone:
235-2550. You should be prepared to make specific factual objections.
If you have any questions or desire clarification of the above, please call me at 277-6186.
For the Environmental Review Committee, -
•
Fifer Toth Henning •
Project Manager
•
DNSMLTR.DOC - -
200 Miiii Avenue South - Renton, Washington 98055.
[=1 TL.i.........................CIAO/......•..I...1.....1-.-:.,I O OZ......1..nnc•.r.n• -
•
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
MITIGATION MEASURES'AND CONDITIONS
APPLICATION NO(S): LUA-96-015,SA,SM,ECF
APPLICANT: MARK MILLER CONSULTANTS, INC. (MARK MILLER)
PROJECT NAME: Raymond Avenue Center II
DESCRIPTION OF PROPOSAL: The applicant proposes to develop the site for warehouse, office
and manufacturing uses. The proposed structure would,be 99,635 Square Feet in size. Parking for 128
cars and dock high service for 20 trucks would also be provided. Development would maintain a 50 foot
setback from Springbrook Creek and a 25 foot buffer from the Class III wetland on site.
LOCATION OF PROPOSAL: 2000 Raymond Avenue South
MITIGATION MEASURES:
•
1. The applicant shall pay the applicable Transportation Mitigation Fee at a rate of $75 per new
average daily trip. The fee is estimated to be $36,466.41. This fee is payable prior to the
-issuance of the building permit.
2. The applicant shall pay the appropriate Fire Mitigation Fee at $0.52 per square feet of•new
construction, prior to the issuance of the building'permit.
The Site Plan for Raymond Avenue Center II, File No, LUA-96-015,SA,SM,ECF is approved,
subject to following conditions: -
i
CONDITIONS:
•
1. The applicant shall submit a revised Site Plan that provides improved pedestrian linkages
between parking lots and the building entrances in order to facilitate safe access for pedestrians
and vehicles. This revised plan is subject to,
the review and approval of the Development
Services Division and must be submitted prior;to the issuance of the Construction Permit. A
pedestrian connection should also be provided from at least one of the walkways on Raymond
Avenue SW to the parking area. Crosswalks should be delineated in primary pedestrian access
areas as determined in consultation with staff.
2. The .applicant shall submit a site lighting plan subject to the review and approval of the
Development Services Division. The lighting shall be of a type and intensity so as not to impact
sensitive areas along Springbrook Creek and wetland buffer areas. This plan shall be submitted
prior to the issuance of a Construction Permit.
MITMEAS.DOC/
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
APPLICATION NO(S): LUA-96-015,SA,SM,ECF
APPLICANT: MARK MILLER CONSULTANTS, INC. (MARK MILLER)
PROJECT NAME: Raymond Avenue Center II
DESCRIPTION OF PROPOSAL: The applicant proposes to develop the site for warehouse, office
and manufacturing uses. The proposed structure would be 99,635 Square Feet inisize. Parking for 128
cars and dock high service for 20 trucks would also be provided. Development would maintain a 50 foot
setback from Springbrook Creek and a 25 foot buffer from the Class III wetland on ite.
LOCATION OF PROPOSAL: 2000 Raymond Avenue South
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the
environmental determination. Because these notes are provided as information only, they are
not subject to the appeal process for environmental determinations.
General:
1. The applicant shall comply with all applicable City, state, county, federal and other jurisdictional.
regulations, codes and policies governing the project and site.
2. All required utility, drainage and street improvements will require separate submittals prepared
by a registered Civil Engineer, according to City of Renton Drafting standards. Permit-
application must include an itemized cost estimate for these improvements. The fee for review
and inspection of these improvements is 5% of the first$100,000, 4% of anything over$100,000
but less than $200,000; and 3%, of anything over $200,000. One-half of the fee must be paid
upon application for building and construction permits, and the remainder when the permits are
issued. There may be additional fees for water service related expenses.
•
3. The applicant is required to obtain a construction permit in order to accomplish site work and
installation of site improvements.
Police Services:
4. Police calls for annual service are estimated at 51.5, based on the size of the proposed building.
The Valley area has been a target for theft of building materials and commercial burglaries since
1993. Police recommend that all building materials and tools be secured when not being used.
Security lighting is recommended at the construction site. Temporary construction trailers should
be equipped with heavy-duty commercial locks and auxiliary locking devices on any windows.
Security lighting is recommended for the finished building and parking lots. Heavy-duty dead-
bolt locks and peep-holes on back doors without visibility are also recommended. The tenant is
advised to consider the installation of an alarm system or contracting with private .security
services. The South Renton area has had an increase in commercial burglaries because the
area is not heavily populated during the night. Police should be contacted to discuss site
security during and after construction.
ADVNOTES.DOC/
Raymond Avenue Center
LUA-96-015,SA,S M,EC F
Fire Prevention:
5. Preliminary required fire flow is 3,500 gpm. Four hydrants are required; one within 150 feet of
the proposed building and three within 300 feet. kA 10-inch looped water main is required around
the structure. The looped water main shall not be connected to the same section of the existing
City main without intervening valves.
6. The City's Fire Mitigation Fee is required and is noted as a Mitigation Measure under the
Environmental Review Committee Report Mitigation Measures. This fee is payable prior to the
issuance of a building permit.
7. An approved fire sprinkler system is required. A fire alarm system may be required. The
applicant will need to coordinate with City Fire Prevention to determine the necessity of a fire
alarm system. All fire lanes would need to be marked according to City Ordinance.
8. The building shall be designed in accordance with Article 81 of the Uniform Fire Code for high-
piled combustible stock.
Water:
9. A utility easement at least 15 feet wide is required for the looped water main. A water System
Development Charge (SDC) is estimated to be $51,157 and is payable at the time the
construction permit is issued.
Stormwater:
10. The drainage outfall to Springbrook Creek would require a drainage easement from District#1.
11. The Stormwater SDC is estimated at $26,410.431 Some adjustment in the fee may occur based
on the on-site wetlands.
12. The City is considering the widening of the Springbrook Creek channel. This could affect the
location of the proposed bioswale. The City would need a 50-foot channel easement for channel
widening and to accommodate the channel slope. This would expand the channel into the
proposed setback area. As an option, the bioswale could be replaced with a tightlined drain pipe
since the site has both a wetpond and a detention pond. The City will work with the applicant
toward an appropriate resolution.
13. An earth berm is proposed between the detention pond and deep drainage channel near the SW
19th Street right-of-way. Stability of the berm and soil conditions need to be confirmed and
stated as such by the applicant's Engineer.
Sanitary Sewer/Wastewater:
14. Floor drains are required when a fire sprinkler system is in place. The floor drains 'must be
connected to the sanitary sewer system.
15. Backflow prevention devices are required on the sewer system if the floor elevation is below 22
feet in height(the height indicated on the plans).
16.' The sewer line from Manhole #1 to existing Manhole #2 in Raymond Avenue SW is to be
dedicated to the City and the remaining line to the south is to be labeled "private".
17. The minimum sewer line slope is 2% as required!by City Code. • .
18. Wastewater SDC is estimated to be $35,311.93.
ADVNOTES.DOC/
•
•
Raymond Avenue Center li
LUA-96-015,SA,SM,ECF
Transportation:
19. The fire lane would be required to be extended from Raymond Avenue SW approximately 325
feet to the existing pavement on SW 19th Street. The paved width of the fire lane is to be 20
feet, centered in the existing right-of-way. The subgrade and paved surface is required to meet
the City's standard for Industrial Collector roadways, and have a center crown of 2% slope. The
fire lane would need to taper into the existing pavement width. Meeting these standards would
allow for the future widening of SW 19th Street as an additional access roadway in the future.
20. The project is subject to the applicable Transportation Mitigation Fee and is discussed under the
ERC Report Mitigation Measures. The fee would need to be deposited to Account # R
105.000599.000.3180.0070.00.000136.
Parks and Recreation:
21. At the time that development occurs on the west side of Springbrook Creek, Parks will require a
trail connection for the Springbrook trail corridor. No dedication of land or other parks
improvements are required for this proposal.
Valley Habitat Landscaping Requirement:
22. Applicant is subject to the landscaping requirements for the.Valley, whereby an additional 2% of
the site must be retained as natural landscaping to provide for wildlife habitat per the City's
agreement with Soil Conservation Service.
ADVNOTES.DOC/
* -
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
APPLICATION NO(S): LUA-96-015,SA,SM,ECF
APPLICANT: MARK MILLER CONSULTANTS, INC. (MARK MILLER)
PROJECT NAME: Raymond Avenue Center II _
DESCRIPTION OF PROPOSAL: The applicant proposes to develop the site for warehouse, office and
manufacturing uses. The proposed structure would be 99,635 Square Feet in size. Parking for 128 cars and dock high
service for 20 trucks would also be provided. Development would maintain a 50 foot setback from Springbrook Creek
and a 25 foot buffer from the Class III wetland on site.
LOCATION OF PROPOSAL: 2000 Raymond Avenue South
LEAD AGENCY: City of Renton
Department of Planning/Building/Public Works
Development Planning Section
The City of Renton Environmental Review Committee has determined that it does not have a probable significant
adverse impact on the environment. An environmental impact statement (EIS) is not required under RCW
43.21 C.030(2)(c). Conditions were imposed as mitigation measures by the Environmental Review Committee under their
authority of Section 4-6-6 Renton Municipal Code. These conditions are necessary to mitigate environmental impacts
identified during the environmental review process.
The 15 day comment period and the 14 day appeal period for this project will run concurrently. The comment/appeal
periods for this project will end at 5:00 p.m. on April 9, 1996. Appeal procedures and the mitigation measures imposed
by the City of Renton's Environmental Review Committee are available at the Development Services Division, Third
Floor, Municipal Building, Renton, Washington 98055. Phone: 235-2550. You should be prepared to make specific
factual objections.
PUBLICATION DATE: March 25, 1996
DATE OF DECISION: March 19, 1996
SIGNATURES:
2J/I
9 I0e-e�- /4 ri l% %
Gregg mapp,,,,� dminitrator DATE
Depart Planning/Building/Public Works
m Chastain,Administrator DATE
Community Service Department
/ Le e er, Fire Chief a DATE
I Renton Fire Department
DNSMSIG.DOC
• .
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
•
•
MITIGATION MEASURES AND CONDITIONS
APPLICATION NO(S): LUA-96-015,SA,SM,ECF
APPLICANT: MARK MILLER CONSULTANTS, INC. (MARK MILLER)
PROJECT NAME: Raymond Avenue Center II
DESCRIPTION OF PROPOSAL: The applicant proposes to develop the site for warehouse, office
and manufacturing uses. The proposed structure would be 99,635 Square Feet in size. Parking for 128
cars and dock high service for 20 trucks would also be provided. Development would maintain a 50 foot
setback from Springbrook Creek and a 25 foot buffer from the Class III wetland on site.
LOCATION OF PROPOSAL:. 2000 Raymond Avenue South
MITIGATION MEASURES:
1. The applicant shall pay the applicable Transportation Mitigation Fee at a rate of $75 per new
average daily trip. The fee is estimated to be $36,466.41. This fee is payable prior to the
issuance of the building permit.
2. The applicant shall pay the appropriate Fire Mitigation Fee at $0.52 per square feet of new
construction, prior to the issuance of the building permit.
The Site Plan for Raymond Avenue Center ll, File No. LUA-96-015,SA,SM,ECF is approved,
subject to following conditions:
CONDITIONS:
1. The applicant shall submit a revised Site Plan that provides improved pedestrian linkages
between parking lots and the building entrances in order to facilitate safe access for pedestrians
and vehicles. This revised plan is subject to the review and approval of the Development
Services Division and must be submitted prior to the issuance of the Construction Permit. A
pedestrian connection should also be provided from at least one of the walkways on Raymond
Avenue SW to the parking area. Crosswalks should be delineated in primary pedestrian access
areas as determined in consultation with staff.
2. The applicant shall submit a site lighting plan subject to the review and approval of the
Development Services Division. The lighting shall be of a type and intensity so as not to impact
sensitive areas along Springbrook Creek and wetland buffer areas. This plan shall be submitted
prior to the issuance of a Construction Permit.
MITMEAS.DOG
CITY OF RENTON
DETERMINATION OF NON-SIGNIFICANCE
(MITIGATED)
APPLICATION NO(S): LUA-96-015,SA,SM,ECF
APPLICANT: MARK MILLER CONSULTANTS, INC. (MARK MILLER)
PROJECT NAME: Raymond Avenue Center II
DESCRIPTION OF PROPOSAL: The applicant proposes to develop the site for warehouse, office
and manufacturing uses. The proposed structure would be 99,635 Square Feet in size. Parking for 128
cars and dock high service for 20 trucks would also be provided. Development would maintain a 50 foot
setback from Springbrook Creek and a 25 foot buffer from the Class III wetland on site.
LOCATION OF PROPOSAL: 2000 Raymond Avenue South
Advisory Notes to Applicant:
The following notes are supplemental information provided in conjunction with the
environmental determination. Because these notes are provided as information only, they are
not subject to the appeal process for environmental determinations.
General:
1. The applicant shall comply with all applicable City, state, county, federal and other jurisdictional
regulations, codes and policies governing the project and site.
2. All required utility, drainage and street improvements will require separate submittals prepared
by a registered Civil Engineer, according to City of Renton Drafting standards. Permit
application must include an itemized cost estimate for these improvements. The fee for review
and inspection of these improvements is 5% of the first $100,000, 4% of anything over$100,000
but less than $200,000; and 3% of anything over $200,000. One-half of the fee must be paid
upon application for building and construction permits, and the remainder when the permits are
issued. There may be additional fees for water service related expenses.
3. The applicant is required to obtain a construction permit in order to accomplish site work and
installation of site improvements.
Police Services:
4. Police calls for annual service are estimated at 51.5, based on the size of the proposed building.
The Valley area has been a target for theft of building materials and commercial burglaries since
1993. Police recommend that all building materials and tools be secured when not being used.
Security lighting is recommended at the construction site. Temporary construction trailers should
be equipped with heavy-duty commercial locks and auxiliary locking devices on any windows.
Security lighting is recommended for the finished building and parking lots. Heavy-duty dead-
bolt locks and peep-holes on back doors without visibility are also recommended. The tenant is
advised to consider the installation of an alarm system or contracting with private security
services. The South Renton area has had an increase in commercial burglaries because the
area is not heavily populated during the night. Police should be contacted to discuss site
security during and after construction.
ADVNOTES.DOC/
Fire Prevention:
5. Preliminary required fire flow is 3,500 gpm. Four hydrants are required; one within 150 feet of
the proposed building and three within 300 feet. A 10-inch looped water main is required around
the structure. The looped water main shall not be connected to the same section of the existing
City main without intervening valves.
6. The City's Fire Mitigation Fee is required and is noted as a Mitigation Measure under the
Environmental Review Committee Report Mitigation Measures. This fee is payable prior to the
issuance of a building permit.
7. An approved fire sprinkler system is required. A fire alarm system may be required. The
applicant will need to coordinate with City Fire Prevention to determine the necessity of a fire
alarm system. All fire lanes would need to be marked according to City Ordinance.
8. The building shall be designed in accordance with Article 81 of the Uniform Fire Code for high-
piled combustible stock.
Water:
9. A utility easement at least 15 feet wide is required for the looped water main. A water System
Development Charge (SDC) is estimated to be $51,157 and is payable at the time the
construction permit is issued.
Stormwater:
10. The drainage outfall to Springbrook Creek would require a drainage easement from District#1.
11.. The Stormwater SDC is estimated at$26,410.43. Some adjustment in the fee may occur based
on.the.on-site wetlands....
12. The City is considering the widening of the Springbrook Creek channel. This could affect the
location of the proposed bioswale. The City would need a.50-foot channel easement for channel..
widening and to accommodate the channel. slope:- This would expand'the channel,into the . .
proposed setback area. As an option, the bioswale could be replaced with a tightlined drain pipe
since the site has both a.wetpond and a detention pond. The City will work with the applicant
toward an appropriate resolution.
13. An earth berm is proposed between the detention pond and deep drainage channel near the SW
19th Street right-of-way. Stability of the berm and soil conditions need to be confirmed and
stated as such by the applicant's Engineer.
Sanitary Sewer/Wastewater:
14. Floor drains are required when a fire sprinkler system is in place. The floor drains must be
connected to the sanitary sewer system.
15. Backflow prevention devices are required on the sewer system if the floor elevation is below 22
feet in height(the height indicated on the plans).
16. The sewer line from Manhole #1 to existing Manhole #2 in Raymond Avenue SW is to be
dedicated to the City and the remaining line to the south is to be labeled"private".
17. The minimum sewer line slope is 2% as required by City Code.
18. Wastewater SDC is estimated to be$35,311.93.
ADVNOTES.DOC/
Transportation:
19. The fire lane would be required to be extended from Raymond Avenue SW approximately 325
feet to the existing pavement on SW 19th Street. The paved width of the fire lane is to be 20
feet, centered in the existing right-of-way. The subgrade and paved surface is required to meet
the City's standard for Industrial Collector roadways, and have a center crown of 2% slope. The
fire lane would need to taper into the existing pavement width. Meeting these standards would
allow for the future widening of SW 19th Street as an additional access roadway in the future.
20. The project is subject to the applicable Transportation Mitigation Fee and is discussed under the
ERC Report Mitigation Measures. The fee would need to be deposited to Account # R
105.000599.000.3180.0070.00.000136.
Parks and Recreation:
21. At the time that development occurs on the west side of Springbrook Creek, Parks will require a
trail connection for the Springbrook trail corridor. No dedication of land or other parks
improvements are required for this proposal.
Valley Habitat Landscaping Requirement:
22. Applicant is subject to the landscaping requirements for the Valley, whereby an additional 2% of
the site must be retained as natural landscaping to provide for wildlife habitat per the City's
agreement with Soil Conservation Service.
ADVNOTES.DOC/
T . .
CITY OF RENTON
/ prnrsvr'n
CITY OF RENTON
Report DEPARTMENT OF PLANNING/BUILDING/PUBLIC WORIOR 2 I 1996
& ENVIRONMENTAL REVIEW& .`v�v® ors�vecs.s
Decision ADMINISTRATIVE LAND USE ACTION
DECISION DATE March 19, 1996
Project Name Raymond Avenue Center II
Applicant Mark Miller Consultants, Inc. (Mark Miller)
File Number LUA-096-015,SA,SM,ECF Project Manager Jennifer Toth Henning
Project Description The applicant proposes to develop the site for warehouse, office and manufacturing uses. • .
The proposed structure would be 99,635 square feet in size. Parking for 128 cars and,.
dock high service for 20 trucks would also be provided. Development would maintain a
50 foot setback from Springbrook Creek and a 25 foot buffer from the Class III wetland • •
on site. •
Project Location 2000 Raymond Avenue South •
Exist. Bldg. Area sf N/A Proposed New Bldg. Area 99,635 sf
•
Site Area 10.41 acres Total Building Area sf 99,635 sf
\ C.D. HIL LPMIA,j\I ,
\ EA RIINIGTON GARDENS. .
\ N� •\DD. rIY NIO I VALLEY DE ICE
1 I c_o "�Y. , T X LOT.11.0.0.y]pd0
as PARK
TAM lOT s]A]00A.DOY!-0 p"��'TX� 0 C-0 7
, ,_ 1
-IV I I 'l�' C-Q 1 ./
I I ,'b \ 2 TAX LOT I0010AOA00p0
SGHET300' II I T \ _ • S. 19th Sr. , ,
1�I TAX LOT N V230340143 /
G I.
c-o r •
• BOEIING 1 Lh
/ . 3
COIMPANIY Gr I r H
QW TAX LOT II LTD, o
• o x / ///// 0- .� I O
I I / / / f I TAX LOT.9t]06 00Tb0
? I I SDUTHGATE
O / 9 \ TAX LOT/242301.0020-0/ OrrICE PLAZA
v / I P I
//' i Li ___- 2"NN
I I c-o
.- - -_--- -. —.
_ _ sara ST.'
GLACIER PARK
I I GLACIER COMPANY
C PARK H-I . �`. H-I
Pra J OLYMPIC PIPE LINE I OLYIMPJC PIPE '
'TEERC.DOC
COMPANY I © LI,i\iE CO.
•
City of Renton P/B/PW Department Environmental Determinati,-_ Administrative Land Use Action
RAYMOND AVENUE CENTER zz LUA-96-015, SA,SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 2 of 16
Part One: PROJECT DESCRIPTION/BACKGROUND •
Raymond Avenue Center is a speculative proposal for a site in the Valley portion of Renton. In May, 1995
administrative site approval and environmental review were conducted for a proposed 81,250 square foot
building on the site. The proposal was granted administrative Site Plan Approval, and a Determination of
Non-Significance - Mitigated was issued by the Environmental Review Committee. The project was also
granted a Shoreline Substantial Development Permit and a Variance for a reduction of a Class 3 wetland
buffer in order to accommodate the entry drive.
•
The applicant has proposed revisions to the previously approved site plan, which are greater than a 10%
change. The revisions propose a larger building on the site and trigger requirements to conduct additional
environmental review and administrative site plan review.
The proposal would result in the development of a 99,635 square foot structure suitable for warehouse,
office and manufacturing uses as permitted in the Light Industrial (IL) Zone. As with the previous
proposal, the site would be developed to provide a 50-foot buffer between Springbrook Creek and other
site development. A minimum 25-foot buffer is provided between the wetland areas and site development
with the exception of a reduced buffer width for Wetland C at the northeastern corner of the site in order to
accommodate the extension of Raymond Avenue SW as the entrance drive. The reduced wetland buffer
was granted as an administrative wetlands variance during 1995. Since the proposal is identical for the,;:
site site access and effect on the wetland buffer, additional review of the wetland buffer is not required for this;
proposal.
Parking would be provided on-site. The applicant is proposing a total of 128 parking spaces, and dock
high service for 20 trucks. Two drive-in service doors would be provided on the west building facade,
north and south of the dock high doors. The majority of employee/visitor parking would occur on the north
side of the proposed structure. Additional parking would be accommodated west of the building, but outof
the required buffer areas for Springbrook Creek. Truck maneuvering in order to access dock-high doors
would also occur in the paved areas located along the west side of the structure. A third parking area
would be located on the southwestern corner of the site. -
The building would be concrete with reveals serving as architectural articulation. Office areas would
feature architectural glazing with a corporate entry feature. Proposed on-site recreational opportunities for
employees include a picnic area at the southeast corner of the site, outdoor half-court basketball south of
the western parking area, gravel path and bench along Springbrook Creek within the 50 creek setback
area on the west side of the proposed development.
Since the project is located in the Valley Planning Area, an additional 2% of the site as natural landscaping
is required. The applicant has proposed to retain areas of natural habitat as wetland and creek buffers in
order to meet this Code requirement.
Development would include the removal of 3,950 cubic yards of on-site material, and import of 5,660 cubic
yards of fill. Construction is anticipated to commence during the Spring of 1996 and last approximately six=.`•
months.
The proposal also requires a Shoreline Substantial Development Permit.
SITEERC.DOC
City of Renton P/H/PW Department Environmental Determinati - : , Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015,SA,SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 3 of 16
Part Two: ENVIRONMENTAL REVIEW
A. Environmental Impacts
The Proposal was circulated and reviewed by various City Departments and Divisions to determine whether the applicant has adequately
identified and addressed environmental impacts anticipated to occur in conjunction with the proposed development. Staff reviewers have
identified that the proposal is likely to have the following probable impacts:
1) Earth
Impacts Construction and site preparation activities (excavation and removal of 3,950 cubic yards of
material and import of 5,660 cubic yards of fill) could result in erosion and sedimentation. City Codes •
require that the applicant provide a Construction Mitigation Plan and a Temporary Erosion and
Sedimentation Control Plan (TESCP) prior to the issuance of a Construction Permit.
Mitigation Measures No further mitigation required.
Policy Nexus N/A
2) Air
Impacts Construction activity would result in increased levels of airborne particulate (especially dust)
potentially impacting air quality in the area of the project site. Emissions from construction equipment•
would have a minor impact on local air quality. Construction impacts would be short term in nature and
would be regulated through best management practices of the required TESCP. Vehicular emissions are
regulated by the State of Washington.
Mitigation Measures No further mitigation required.
Policy Nexus N/A
3) Transportation
Impacts The proposal would result in increased vehicular trips that would impact the City's road system.
The applicant estimates that 486 new trips per day would be generated by the project. New average daily
trips are subject to the City's Transportation Mitigation Fee of$75 per trip.
Mitigation Measures The applicant shall pay the applicable Transportation Mitigation Fee at a rate of $75
per new average daily trip. The fee is estimated to be $36,466.41. This fee is payable prior to the
issuance of the building permit.
Policy Nexus Traffic Mitigation Fee Resolution and adopting Ordinance, SEPA
SITEERC.DOC
City of Renton P/B/PW Department Environmental Determinati f Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015, SA,SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 4 of 16
4) Fire Protection
Impacts The proposal would be subject to the City's Fire Mitigation Fee, which is calculated at a rate of
$0.52 per square foot of new construction. The fee is estimated to be $51,810.20.
Mitigation Measures The applicant shall pay the appropriate Fire Mitigation Fee at $0.52 per square feet
of new construction, prior to the issuance of the building permit.
Nexus. Fire Mitigation Fee Resolution and adopting Ordinance; SEPA.
B. Recommendation
Based on analysis of probable impacts from the proposal, staff recommend that the Responsible
Officials make the following Environmental Determination:
DETERMINATION OF X DETERMINATION OF
NON-SIGNIFICANCE NON-.SIGNIFICANCE-MITIGATED.
Issue DNS with 14 day Appeal Period. X Issue DNS-M with 15 day Comment Period
with Concurrent 14 day Appeal Period.
Issue DNS with 15 day Comment Period with Issue DNS-M with 15 day Comment Period
Concurrent 14 day Appeal Period. followed by a 14 day Appeal Period.
C. MITIGATION MEASURES:
1. The applicant shall pay the applicable Transportation Mitigation Fee at a rate of $75 per new
average daily trip. The fee is estimated to be $36,466.41. This fee is payable prior to the issuance
of the building permit.
2. The applicant shall pay the appropriate Fire Mitigation Fee at $0.52 per square feet of new
construction, prior to the issuance of the building permit. ..._..
•
SITEERC.DOC
City of Renton P/B/PW Department Environmental Determinati_,__,,f: Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA—9 6—015,SA,SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 5 of 16
Advisory Notes to Applicant:
The following notes are supplemental Information provided In conjunction with the environmental determination..Because these notes are
provided as information only,they are not subject to the appeal process for environmental determinations.
General:
1. - The applicant shall comply with all•applicable City, state,. county, federal and other jurisdictional
regulations, codes and policies governing the project and site.
2. All required utility, drainage and street improvements will require separate submittals prepared by a
registered Civil Engineer, according to City of Renton Drafting standards. Permit application must
include an itemized cost estimate for these improvements. The fee for review and inspection .of
these improvements is 5% of the first $100,000, 4% of anything over $100,000 but less than •
$200,000; and 3% of anything over $200,000. One-half of the fee must be paid upon application,`
for building and construction permits, and the remainder when the permits are issued. There maj'•
be additional fees for water service related expenses.
3. The applicant is required to obtain a construction permit in order to,accomplish site work and
installation of site improvements.
Police Services:
4. Police calls for annual service are estimated at 51.5, based on the size of the proposed building.
The Valley area has been a target for theft of building materials and commercial burglaries since
1993. Police recommend that all building materials and tools be secured when not being used.
Security lighting is recommended at the construction site. Temporary construction trailers should
be equipped with heavy-duty commercial locks and auxiliary locking devices on any windows.
Security lighting is recommended for the finished building and parking lots. Heavy-duty dead-bolt
locks and peep-holes on back doors without visibility are also recommended. The tenant is
advised to consider the installation of an alarm system or contracting with private security services.
The South Renton area has had an increase in commercial burglaries because the area is not
heavily populated during the night. Police should be contacted to discuss site security during and
after construction.
Fire Prevention:
5. Preliminary required fire flow is 3,500 gpm. Four hydrants are required; one within 150 feet of the
proposed building and three within 300 feet. A 10-inch looped water main is required around the
structure. The looped water main shall not be connected to the same section of the existing City
main without intervening valves.
6. The City's Fire Mitigation Fee is required and is noted as a Mitigation Measure under the
Environmental Review Committee Report Mitigation Measures. This fee is payable prior to the
issuance of a building permit.
SITEERC.DOC
•
City of Renton P/B/PW Department Environmental Determinat____ .. Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015, SA, SM,,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 6 of 16
7. An approved fire sprinkler system is required. A fire alarm system may be required. The applicant .
will need to coordinate with City Fire Prevention to determine the necessity of a fire alarm system.
All fire lanes would need to be marked according to City Ordinance. • . %,
8. The building shall be designed in accordance with Article 81 of the Uniform Fire Code for high-piledA
combustible stock.
Water:
9. A utility easement at least 15 feet wide is required for the looped water main. A water System
Development Charge (SDC) is estimated to be $51,157 and is payable at the time the construction
permit is issued.
Stormwater:
10. The drainage outfall to Springbrook Creek would require a drainage easement from District#1.
11. The Stormwater SDC is estimated at$26,410.43. Some adjustment in the fee may occur based on
the on-site wetlands.
12. The City is considering the widening of the Springbrook Creek channel. This could affect,the
location of the proposed bioswale. The City would need a 50-foot channel easement for channel
widening and to accommodate the channel slope. This would expand the channel into the •
proposed setback area. As an option, the bioswale could be replaced with a tightlined drain pipe
since the site has both a wetpond and a detention pond. The City will work with the applicant
toward an appropriate resolution.
13. An earth berm is proposed between the detention pond and deep drainage channel near the SW
19th Street right-of-way. Stability of the berm and soil conditions need to be confirmed and stated
as such by the applicant's Engineer.
Sanitary Sewer/Wastewater:
14. Floor drains are required when a fire sprinkler system is in place. The floor drains must be
connected to the sanitary sewer system.
15. Backflow prevention devices are required on the sewer system if the floor elevation is below 22
feet in height (the height indicated on the plans).
16. The sewer line from Manhole#1 to existing Manhole#2 in Raymond Avenue SW is to be dedicated
to the City and the remaining line to the south is to be labeled "private".
17. The minimum sewer line slope is 2% as required by City Code.
18. Wastewater SDC is estimated to be $35,311.93.
Transportation:
19. The fire lane would be required to be extended from Raymond Avenue SW approximately 325 feet
to the existing pavement on SW 19th Street. The paved width of the fire lane is to be 20 feet,
centered in the existing right-of-way. The subgrade and paved surface is required to meet the
SITEERC.DOC
Cityof Renton P H PW Department •_ Environmental Determinat; & Administrative Land Use Action
� � eP
RAYMOND AVENUE CENTER II LUA—9 6-0 1 5, SA,SM,EC F
REPORT AND DECISION OF MARCH 19, 1996 Page 7 of 16
City's standard for Industrial Collector roadways, and have a center crown of 2% slope. The fire
lane would need to taper into the existing pavement width. Meeting these standards would allow
for the future widening of SW 19th Street as an additional access roadway in the future.
20. The project is subject to the applicable Transportation Mitigation Fee and is discussed under the
ERC Report Mitigation Measures. The fee would need to be deposited to Account # R
105.000599.000.3180.0070.00.000136.
Parks and Recreation:
21. At the time that development occurs on the west side of.Springbrook Creek, Parks will require a:
trail connection for the Springbrook trail corridor. No dedication of land or other. parks
improvements are required for this proposal. .
Valley Habitat Landscaping Requirement:
22. Applicant is subject to the landscaping requirements for the Valley, whereby an additional 2% of
the site must be retained as natural landscaping to provide for wildlife habitat per the City's
agreement with Soil Conservation Service.
Part Three: ADMINISTRATIVE LAND USE ACTION Report & Decision
A. Type of Land Use Action
x Site Plan Review Shoreline Substantial Development Permit
Conditional Use Binding Site Plan
Special Permit for Grade&Fill Administrative Code Determination
. r
B. Exhibits
is
The following exhibits were entered into the record:
Exhibit No. 1: Yellow file containing: application, proof of posting and publication, environmental review and other
documentation pertinent to this request.
Exhibit No. 2: Drawing No. 2, Site Plan(Received February 15, 1996).
Exhibit No. 3: Drawing No. 3, Floor Plan (Received February 15, 1996).
Exhibit No. 4: Drawing No. 4, Building Elevation(Received February 15, 1996).
Exhibit No. 5: Drawing No. 5, Landscape Plan (Received February 15, 1996)..
Exhibit No. 6: Schematic Grading &Utilities(Received February 15, 1996).
Exhibit No. 7: Neighborhood Plan(Received February 15, 1996).
SITEERC.DOC
City of Renton P/B/PW Department Environmental Determinat____ 6 Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015, SA, SM, CF
REPORT AND DECISION OF MARCH 19, 1996 Page 8 of 16 1
C. Consistency with Site Plan Review Criteria:
In reviewing the proposal with respect to the Site Plan Approval Criteria set forth in Section 4-31-
33(D) of the Site Plan Ordinance, the following Issues have been identified by City Departmental/
Divisional Reviewers:
1. GENERAL CRITERIA:
a. Conformance with the comprehensive plan, its elements and policies;
The proposal generally complies with the Comprehensive Plan.
b. Conformance with existing land use regulations;
The proposal conforms to the applicable zoning -- Light Industrial. Development standards have been
addressed by the proposal for compliance with lot coverage, setbacks, height limits etc.
The applicant proposes 128 parking spaces for the proposed use. Since this is a speculative building, and
final dedication of building square footage has not been ultimately determined, compliance with the
Parking and Loading Ordinance is based on the use as a manufacturing, warehouse, distribution center
with some office use. Manufacturing use (not warehouse) requires that a minimum of 1 parking space per
1,000 gross square feet (gsf) of area and a maximum of 1.5 parking spaces per gsf of area are provided.
Warehouse uses require 1 parking space for each 1,500 gsf of area. Office uses require a minimum of 3
parking spaces per 1,000 gsf and a maximum of 4.5 per 1,000 gsf.
Based on discussions with the applicant, the proposal would result in approximately 20,000 gsf of office,
and the remainder of the building (79,635 gsf) would be used for manufacturing and warehouse. Of the
remaining 79,635 gsf, approximately 50% (39,817.5 gsf) would be warehouse and 50% would be
manufacturing. Parking requirements for office stipulate that a minimum of 60 or a maximum of 90 spaces
would be needed. Required parking for the warehouse use would be 26.5 spaces and required parking
for the manufacturing use is estimated at 39 minimum to 60 maximum spaces.
The minimum number of vehicular parking spaces required to meet the Parking and Loading Ordinance
based on the proposed uses would be 126 spaces. The maximum number of parking spaces allowed for
the proposed uses would be 176.5. The applicant proposes 128 spaces, which meets the minimum
parking requirement and is less than the maximum allowed. The proposal complies with the Parking and
Loading Ordinance.
The project would comply with applicable development standards for lot coverage, building height, and
setbacks.
c. Mitigation of impacts to surrounding properties and uses;
The site plan would protect surrounding sensitive areas, on-site wetlands, and would maintain a minimum
50 foot buffer from Springbrook Creek.
d. Mitigation of impacts of the proposed site plan to the site;
See "c." above.
SITEERC.DOC
City of Renton P/B/PW Department Environmental Determinat & Administrative Land Use Action.
RAYMOND AVENUE CENTER II LUA-96-015, SA,SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 9 of 16
e. Conservation of area-wide property values;
Surrounding sites have developed with similar uses recently. The proposal would not result in decreased
property values.
f. Safety and efficiency of vehicle and pedestrian circulation;
Parking and vehicular maneuvering areas are generally separated. Additional provisions should be made
for pedestrian safety on the site through improved pedestrian walkways between the parking areas and
building entrances.
g. Provision of adequate light and air;
The proposal appears to comply. A lighting plan would need to be approved prior to issuance of the
Construction Permit.
h. Mitigation of noise, odors and other harmful or unhealthy conditions;
None anticipated to occur.
i. Availability of public services and facilities to accommodate the proposed use; and
Appropriate services and facilities are available to serve the proposed use, provided required site
improvements are installed.
j. Prevention of neighborhood deterioration and blight.
Development of the site with the proposal would effectively reduce deterioration and blight on the vacant
parcel.
2. MITIGATION OF IMPACTS TO SURROUNDING PROPERTIES AND USES:
a. Mitigation of undesirable impacts of proposed structures and site layouts that could impair
the use or enjoyment or potential use of surrounding uses and structures and of the community;
The site is adequately buffered from surrounding uses by existing wetlands, wetland buffers, and
Springbrook Creek. The applicant has designed a project that would utilize the southern portion of the
parcel for development of the building. Parking areas would be located in three areas to reduce the
barren appearance of a large parking lot. Surrounding properties would not be adversely affected by the
proposal.
b. Mitigation of undesirable impacts when an overscale structure, in terms of size, bulk, height,
and intensity, or site layout is permitted that violates the spirit and/or intent of the zoning code and
impairs the use, enjoyment or potential use of surrounding properties;
The nature of the site development program dictates a requirement for a large building. The proposed
structure would be appropriately situated on the parcel to decrease size/bulk/height impacts, since the
distribution building would be located in the widest portion of the parcel, and some stepping back of the
parcel occurs which decreases the appearance of excessive bulk when viewed from off-site areas to the
west.
SITEERC.DOC .
•
City of Renton P/B/PW Department Environmental Determinat & Administrative Land Use Action.
RAYMOND AVENUE CENTER II LUA-96-015, SA, SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 10 of 16
c. Provision of a desirable transition and linkage between uses and to the street, utility,
walkway, and trail systems in the surrounding area by the arrangement of landscaping, fencing
and/or other buffering techniques, in order to prevent conflicts and to promote coordinated and
planned benefit from, and access to, such elements;
An appropriate transition would occur from the private entry drive at Raymond Avenue South into and
through the project site. Existing site features including Springbrook Creek and site wetlands would
provide buffering for the proposed use: Landscaping would provide for additional transition between uses.
d. Consideration of placement and scale of proposed structures in relation to the natural
characteristics of a site in order to avoid over-concentration of structures on a particular portion of
a site such that they create a perception of greater height or bulk than intended under the spirit of
the zoning code; ,
One structure is proposed. The building would have architectural features to diminish the appearance of
excessive bulk when observed from both on and off the site. The structure would have a modulated
facade facing west and would be narrower at the south and north ends to help diminish the visual bulk of
the distribution building.
e. Effective location, design and screening of parking and service areas in order to promote
efficient function of such.facilities, to provide integrated facilities between uses when beneficial, to
promote '.'campus-like" or "park-like" layouts in appropriate zones, and to prevent unnecessary
repetition and conflict between uses and service areas or facilities;
Parking would be located in three separate areas connected by a looped drive. Service areas would be
concentrated on the west side of the site to allow for proper maneuvering of vehicles and separation from
pedestrian activities. Natural and proposed site landscaping would soften the appearance of parking
areas. In the largest parking area with 90 vehicle parking spaces, islands of site landscaping would break
up the barren appearance and maintain vehicular circulation. Vegetation in the Springbrook Creek buffer
would provide a backdrop for the 22 parking spaces located on the west side of the proposed structure
and would provide an adequate screen. Additional landscaping islands would not allow for the needed
maneuvering space for large tractor trucks. The 16 proposed parking spaces located on the south side.of
the proposed structure would have perimeter ornamental landscaping as a buffer.
f. Mitigation of the unnecessary and avoidable impacts of new construction on views from
existing buildings and future developable sites, recognizing the public benefit and desirability of
maintaining visual accessibility to attractive natural features and of promoting "campus-like" or
"park-like" settings in appropriate zones;
The natural vegetation present along Springbrook Creek will effectively screen views of the parking areas
from areas on the west side of the creek.
SITEERC.DOC
City of Renton P/B/PW Department Environmental Determinat & Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015, SA, SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 11 of 16
g. Provision of effective screening from public streets and residential uses for all permitted
outdoor storage areas (except auto and truck sales), for surface mounted utility equipment, for
rooftop equipment, and for all refuse and garbage containers, in order to promote a "campus-like"
or "park-like" setting where appropriate and to preserve the effect and intent of screening or
buffering otherwise required by the zoning code;
City Code requires that trash enclosures, recycling areas and outdoor storage areas be screened from
view. The site plan identifies an areas on the west portion of the site and adjacent to the western parking
area as the location for the trash enclosure. Screening is shown on three sides per City Code.
h. Consideration of placement and design of exterior lighting in order to avoid excessive
brightness or glare to adjacent properties and streets.
The proposal generally complies with items e through h. A lighting plan is required prior to the issuance of
the Construction Permit.
3. MITIGATION OF IMPACTS OF A PROPOSED SITE PLAN TO THE SITE:
a. Building placement and spacing to provide for privacy and noise reduction; orientation to
views and vistas and to site amenities, to sunlight and prevailing winds, and to pedestrian and `.
vehicle needs;
b. Consideration of placement and scale of proposed structures in relation to the openness and
natural characteristics of a site in order to avoid over concentration or the impression of oversized
structures;
The proposal generally complies with a and b. The site constrains development due to the presence of
wetlands and Springbrook Creek. A north-south building orientation is the most practical for this site.
c. Preservation of the desirable natural landscape through retention of existing vegetation and
limited soil removal, insofar as the natural characteristics will enhance the proposed development;
Wetlands and Springbrook Creek would be retained with the appropriate buffers, except for the small area
of the Wetland C buffer that has been granted a variance in order to accommodate the entrance road.
d. Use of existing topography to reduce undue cutting, filling and retaining walls in order to
prevent erosion and unnecessary storm water runoff, and to preserve stable natural slopes and
desirable natural vegetation;
•
e. Limitation of paved or impervious surfaces, where feasible, to reduce runoff and increase
natural infiltration; °
f. Design and protection of planting areas so that they are not susceptible to damage from
vehicles or pedestrian movements;
g. Consideration of building form and placement and landscaping to enhance year-round
conditions of sun and shade both on-site and on adjacent properties and to promote energy
conservation.
SITEERC.DOC
•
City of Renton P/B/PW Department Environmental Determinat__._ S Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-9 6-015, SA,SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 12 of 16
The proposal generally complies with d, e, f and g. The building would be oriented north/south and would
not result in the shading of any public open space areas. Site constraints limit the building configuration to
a north/south orientation. Planting areas would be grouped in planters and in areas that would not be
subject to damage from vehicles or pedestrian movements.
4. CIRCULATION AND ACCESS: r�
a. Provision of adequate and safe vehicular access to and from all properties;
b. Arrangement of the circulation pattern so that all ingress and egress movements may occur
at as few points as possible along the public street, the points being capable of channelization for
turning movements;
c. Consolidation of access points with adjacent properties, when feasible;
d. Coordination of access points on a superblock basis so that vehicle conflicts and
vehicle/pedestrian conflicts are minimized;
e. Orientation of access points to side streets or frontage streets rather than directly onto
arterial streets, when feasible;
The proposal generally complies with a through e. One public access.point is proposed from Raymond
Avenue SW. A secondary emergency fire access would be provided via SW 19th Street. A. looped
circulation drive would serve parking, dock-high doors, and would also serve as a fire lane along the.
eastern side of the structure. The primary parking area for 90 vehicles would be separated from truck.
maneuvering and back-up areas near dock-high doors on the west side of the parcel.
f. Promotion of the safety and efficiency of the internal circulation system, including they.
location, design and dimensions of vehicular and pedestrian access points, drives, parking,
turnarounds, walkways, bikeways, and emergency access ways;
The applicant will be required to demonstrate appropriate pedestrian circulation and to provide clear
direction to pedestrians via striped crosswalks to avoid conflicts with delivery trucks and truck maneuvering
that would occur on the site. The applicant will also be required to provide for a pedestrian connection
from Raymond Avenue SW to allow access to the parking lot or the proposed building.
g. Separation of loading and delivery areas from parking and pedestrian areas;
Generally, loading and delivery is separated from the parking and pedestrian areas, with the exception of
the westernmost parking lot which would be located directly across from the dock high door and truck
maneuvering areas. A sufficient distance (minimum 100 feet) is being maintained as a separation
between the parking lot and the dock high loading doors.
h. Provisions for transit and carpool facilities and access where appropriate; and
i. Provision for safe and attractive pedestrian connections between parking areas, buildings,:
public sidewalks and adjacent properties. • .
No provision has been made for transit or carpool uses (h), however, the applicant could designate some
parking spaces for carpool use in order to meet commuter trip reduction criteria as appropriate. The
SITEERC.DOC
•
City of Renton P/B/PW Department - Environmental Determinat=___ & Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015, SA, SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 13 of 16
applicant will be required to demonstrate that appropriate pedestrian connections exist between parking
areas, buildings etc.
5. SIGNAGE.
a. Signs primarily for the purpose of identification;
b. - Management of sign .elements, such as size, location and arrangement so that signs
complement the visual character of the surrounding area and.appear in proportion to the building
and site to which they pertain; I ,`
c. Limitation of the number of signs to avoid visual clutter and distraction;
d. Moderation of surface brightness or lighting intensity except for that necessary for sign
visibility; and
e. Provision of an identification system to allow for quick location of buildings and addresses.
(Ord. 3981, 4-7-86)
Items 5 a through 5e would be met through compliance with the.City Code. The applicant's sign plan must
meet the Sign Code and is subject to the approval of the Development Services Division.
6. AQUIFER PROTECTION AREA(APA):
N/A
7. HAZARDOUS WASTE TREATMENT AND STORAGE FACILITIES:
N/A
•
X Copies of all Review Comments are contained in the Official File.
Copies of all Review Comments are attached to this report
FINDINGS, CONCLUSIONS & DECISION
Having reviewed the written record in the matter, the City now makes and enters the following:
-1.
D. Findings
1) Request: The Applicant, Mark Miller, has requested Environmental Review & Site Plan
Approval for development of a 99,635 square foot building for warehouse, manufacturing and office use.
2) Environmental Review: The applicant's file containing the application, the State
Environmental Policy Act (SEPA) documentation, the comments from various City departments, the public
notices requesting citizen comment, and other pertinent documents was entered as Exhibit No. 1.
SITEERC.DOC
City of Renton P/B/PW Department _ Environmental Determinat & Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015,SA, SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 14.of 16
3) Site Plan Review: The applicant's site plan application complies with the requirements for
information for site plan review. The applicant's site plan and other project drawings are entered as
Exhibits No. 2 through 7.
4) Comprehensive Plan: The subject proposal .is consistent with the Comprehensive Plan
designation of Employment Area - Industrial (EAI).
5) Zoning: The site plan as presented, complies with the zoning requirements and development
standards of the Light Industrial (IL) zoning designation.
6) Existing Land Use: Land uses surrounding the subject site include: North: Office (Valley Office
Park); East: vacant and offices; South: vacant and industrial; and:West:.vacant half of site, Springbrook
Creek, and office (former Longacres).
E. Conclusions
1) The subject proposal complies with the policies and codes of the City of Renton.
2) The proposal complies with the Comprehensive Plan designation of EAI; and the Zoning
designation of IL.
3) The proposal complies with the Site Plan Review approval criteria, provided conditions of approval
are satisfied.
F. Decision
The Site Plan for Raymond Avenue Center II, File No. LUA-96-015,SA,SM,ECF is approved, subject
to following conditions:
CONDITIONS:
1. The applicant shall submit a revised Site Plan that provides improved pedestrian linkages between
parking lots and the building entrances in order to facilitate safe access for pedestrians and
vehicles. This revised plan is subject to the review and approval of the Development Services •
Division and must be submitted prior to the issuance of the Construction Permit. A pedestrian
connection should also be provided from at least one of the walkways on Raymond Avenue SW to
the parking area. Crosswalks should be delineated in primary pedestrian access areas as
determined in consultation with staff.
2. The applicant shall submit a site lighting plan subject to the review and approval of the
Development Services Division. The lighting shall be of a type and intensity so as not to impact
sensitive areas along Springbrook Creek and wetland buffer areas. This plan shall be submitted
prior to the issuance of a Construction Permit.
SITEERC.DOC
•
•
City of Renton P/H/PW Department Environmental Determinat_-. & Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015, SA,SM,ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 15 of 16
DATE OF DECISION ON LAND USE ACTION: March 21, 1996
SIGNATURES: •
J. e .Hanson,Zoning Administrator March 21, 1996
3-2,r
Michael D.Kattermann,Zoning Administrator March 21, 1996
TRANSMITTED this 21st day of March, 1996 to the applicant and owner:
Mr. Mark Miller/Applicant •
Mark Miller Consultants, Inc. ti
10801 Main Street, Suite#100
Bellevue, WA 98004
Winmar-Metro, Inc./Owner
700 Fifth Avenue, #2600
Seattle,WA 98104
Opus Northwest LLC/Developer
200-112th Avenue,#205
Bellevue, WA 98004
TRANSMITTED this 21st day of March, 1996 to the following:
Bob Arthur,Land Use Inspector
Jim Chandler,Building Official
Art Larson,Fire Marshal
Neil Watts,Public Works Division
Lawrence J.Warren,City Attorney
Valley Daily News
Land Use Action Appeals & Requests for Reconsideration:
The decision on the requested administrative land use action is being made concurrently with the Environmental Determination.
The administrative land use and environmental decisions will become final if the decision/decisions is not appealed within 14 days
of the date of the publication. An appeal of either or both decisions must be filed within the 14 day appeal period (RCW
43.21.C.075(3); WAC 197-11-680).
SITEERC.DOC
City of Renton P/B/PW Department Environmental DeterminaL..,.. & Administrative Land Use Action
RAYMOND AVENUE CENTER II LUA-96-015, SA, SM,'ECF
REPORT AND DECISION OF MARCH 19, 1996 Page 16 of 16
REQUESTS FOR RECONSIDERATION must be filed in writing on or before April 9, 1996. Any aggrieved person feeling that
the decision of the Site Plan Review Committee is based on erroneous procedure, errors of law or fact, error in judgment, or the
discovery of new evidence which could not be reasonably available at the prior meeting, may make a written request to the Zoning
Administrator for review by the Site Plan Committee within fourteen(14)days of publication. This request shall set forth the
specific errors relied upon by such appellant, and the Committee may, after review of the record, take further action as it deems
proper. If an appeal is made to the Hearing Examiner, requests for reconsideration will be forwarded to that office for
consideration at the same time as the appeal.
AN APPEAL TO THE HEARING EXAMINER is governed by Title IV, Section 4-8-11.B, which requires that such appeals be filed t
directly with the Hearing Examiner. Appeals must be made in writing before 5 p.m. on April 9, 1996. Any appeal must be
accompanied by a$75.00 fee and other specific requirements. . .t
7' 4
THE APPEARANCE OF FAIRNESS DOCTRINE provides that no ex parte(private one-on-one) communications may occur
concerning land use decision. The Doctrine applies not only to the initial committee decision, but to all Request for
Reconsideration as well as Appeals to the Hearing Examiner. All communications after the decision date must be made in writing
through the Zoning Administrator. All communications are public record and this permits all interested parties to know the
contents of the communication and would allow them to openly rebut the evidence in writing. Any violation of this doctrine could
result in the invalidation of the request by the Court.
. ti
SITEERC.DOC
i
i
AFFIDAVIT OF PUBLICATION
JPSSi r-a Pnl ira
rt s , being first duly sworn on oath
states that he/she is the Legal Clerk of the
VALLEY DAILY NEWS"
600 S. Washington Kent, WA. 98032
a daily newspaper published six (6) times week. Said newspaper is a legal ; ,
newspaper of general circulation and is now and has been for more than six
months prior to the date of publication referred to, printed and published in the ,
English language continually as a daily newspaper in Kent, King County, Wash-
" ington. The Valley Daily News has been approved as a legal newspaper by order
of the Superior Court of the State of Washington for King County.
The notice in the exact form attached, was published in the Valley Daily News p .
(and not in supplement form) which was regularly distributed to the subscribers •
during the below stated period. The annexed notice, a -
i - r maintain a 50 foot setback from Spring-
Notice of Env De L brook Creek-and..a-25 foot-buffer from11181-° '
, Class III wetland on site. Location: 2000 t
d
Raymond Avenue South.
The 15 day comment and 14 day appeal ; •
periods for this project will run concurrently
was published on 3 25 6 and end at 5:00 p.m. on April 9, 1996. '
The full amount of the fee charged for said foregoing publication is the sum of _ Appeal posed by the City of R nton's Envi-
sores imposed
NOTICE OF ENVIRONMENTAL ronmental Review Committee are available
DETERMINATION at the Development Services Division,Third
$ 44'9 ENVIRONMENTAL REVIEW COMMITTEE. Floor,Municipal Building,Renton,Washing-
t RENTON,WASHINGTON ton 98055,Phone:235-2550.You should be
l + The Environmental Review Committee prepared to make specific factual objec-f
(ERC) has issued a Determination of Non. lions.
a Clerk, -Ile wily News Significance - Mitigated for the followin Published in the Valley Daily"News -
!3 March 25, 1996. 1349
/� c / Y project under the authority of the Renton i
Subscribed and sworn before me this Z? ay of Mal "�� 19 d �b 'RA Municipal AVENUE ECF CENTER II ��y
! The applicant proposes to develop the
;site for warehouse, office and manufactur-
¢ . . ling uses.The proposed structure would be
, v���s��s. 99,635 Square Feet in size.Parking for 128
a,�s� O1j M F4-y cars and dock high service for 20 trucks
a , '• ..••••••.• j Notary Public or the State of Washington would also be provided,pevelopmen2 would
, SS�ON F-to••- 1k residing at > rfl�l
/ ooTARkt
� •°�, King"County, Washington !
•
i a • AS '
— OF iAS`�� 9go '
NOTICE OF ENVIRONMENTAL DETERMINATION
ENVIRONMENTAL REVIEW COMMITTEE
RENTON, WASHINGTON
The Environmental Review Committee (ERC) has issued a Determination of Non-Significance -
Mitigated for the following project under the authority of the Renton Municipal Code.
RAYMOND AVENUE CENTER II
LUA-96-015,SA,SM,ECF
The applicant proposes to develop the site for warehouse, office and manufacturing
uses. The proposed structure would be 99,635 Square Feet in size. Parking for 128
cars and dock high service for 20 trucks would also be provided. Development would
maintain a 50 foot setback from Springbrook Creek and a 25 foot buffer from the Class
Ill wetland on site. Location: 2000 Raymond Avenue South.
The 15 day comment and 14 day appeal periods for this project will run concurrently and end at 5:00
p.m. on April 9, 1996. Appeal procedures and the mitigation measures imposed by the City of Renton's
Environmental Review Committee are available at the Development Services Division, Third Floor,
Municipal Building, Renton, Washington 98055. Phone: 235-2550. You should be prepared to make
specific factual objections.
Publication Date: MARCH 25, 1996
Account No. 51067
dnsmpub.dot
710
iti
ENVIRONMENTAL DETERMINATION
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
RAYMOND AVENUE CENTER II
LUA-96-015,SA,SM,ECF ,
The applicant proposes to develop the site for warehouse.office and manufacturing uses.The proposed
structure would be 99,635 Square Feet In size. Parking for 128 cars and dock high service for 20 trucks
would also be provided. Development would maintain a 50 foal setback from Spdngbraok Creek and a '
25 foot buffer from the Class III wetland on site.Location:2000 Raymond Avenue South.
THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED
THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE
ENVIRONMENT.
•
AN ENVIRONMENTAL IMPACT STATEMENT WILL NOT BE REQUIRED.
• n YOU MAY COMMENT ON THIS DETERMINATION UNTIL 5:00 PM,_ THE CITY WILL NOT
ACT ON THIS PROPOSAL UNTIL AFTER THIS DATE. '
n APPEALS OF THIS DETERMINATION MAY BE FILED WITH THE CITY OF RENTON HEARING
•
EXAMINER BY 5:00 PM,
'XXX I YOU MAY COMMENT ON THIS DETERMINATION BY 5:00 PM ON APRIL 9.1996 OR PPEA I
THIS DETERMINATION BY 5:00 PM,APRIL 9,1996. THE COMMENT AND APPEAL PERIODS
WILL RUN CONCURRENTLY. "
I \ i
•
_M1l�.i^IS
` ` 1 '� .V_-'fry I . '/ALI_=Y oPFI:E
' 1 i c.e �s 1 PJ,rIN
, —i— I ' 1 `s° Li I: 1 1 [
1,-,, Nr , n1 :TUNEr:1:
/ �� II urn C
c.e I u� /AT% 1Jr4°1 O s 8
H
I
I I 5"^I'fi Ka 1T=
v / 1 7 I //// I I ai FICE I'LS.ZA
/ II
L_� ,
i --�....._........... GLAEPv i'AN(----„T—
I I "t.'�i I r�� COMPANY
i'l,.il x, D xx
`' oLYI::C P.'I.LINE I!-] O'_YMPIC PIPE
11c] LINECO.
FOR FURTHER INFORMATION,PLEASE CONTACT THE CITY OF RENTON,DEVELOPMENT
SERVICES DIVISION AT 235-2550.
•DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
'Please include the project NUMBER when calling for proper file identification:
CERTIFICATION
I, ,Sct.vd IA ,)&(I-SOYI , hereby certify that • 3 copies of the above document
were posted-by me in 3 conspicuous places on or nearby the described property on
IWIXt:h 22, 16101 to
. Signed: 5'liU'lCIA JlLit ,,,, '
STATE OF WASHINGTON ) '~- �' ~v v `
p r t
COUNTY OF KING ) - ;- i'- a , .
I certify that I know or have satisfactory evidence that S(zt n, C. 'S u %4->^.z .'4
signed this instrument and acknowledged it to be his/her/their free avotary act for'thb'kis.e
and purposes mentioned in the instrument. ,...., .
Dated: s ✓vA GuL,JA I Yl'1� ,,cj� _ ,��
Notary Public in nd for'the State W/a iington
/ 1lo L!/- /y t,22( 2 cr- ---C ..- — 6t7c. `•
Notary (Print) WI,a g; k A.) Ski;
1 C (��-1
My appointment expires: h. cS_9 1
NOTARY.DOC •
• .•
: ,
. •
.. . .
.. \J TICE. ' . .
. . .
. .. .
. .
ENVIRONMENTAL DETERMINATION
POSTED TO NOTIFY INTERESTED PERSONS OF AN ENVIRONMENTAL ACTION
RAYMOND AVENUE CENTER II
LUA-96-015,SA,S M,ECF
The applicant proposes to develop the site for warehouse,office and manufacturing uses. The proposed
• structure would be 99,635 Square Feet in size. Parking for 128 cars and dock high service for 20 trucks
would also be provided. Development would maintain a 50 foot setback from Springbrook Creek and a
25 foot buffer from the Class III wetland on site. Location: 2000 Raymond Avenue South.
THE CITY OF RENTON ENVIRONMENTAL REVIEW COMMITTEE (ERC) HAS DETERMINED
THAT THE PROPOSED ACTION DOES NOT HAVE A SIGNIFICANT ADVERSE IMPACT ON THE
ENVIRONMENT.
AN ENVIRONMENTAL IMPACT STATEMENT WILL NOT BE REQUIRED.
•
YOU MAY COMMENT ON THIS DETERMINATION UNTIL 5:00 PM, . THE CITY WILL NOT
' ACT ON THIS PROPOSAL UNTIL AFTER THIS DATE.
APPEALS OF THIS DETERMINATION MAY BE FILED WITH THE CITY OF RENTON HEARING
EXAMINER BY 5:00 PM,
xxx YOU MAY COMMENT ON THIS DETERMINATION BY 5:00 PM ON APRIL 9, 1996 OR APPEAL
THIS DETERMINATION BY 5:00 PM, APRIL 9, 1996. THE COMMENT AND APPEAL PERIODS
WILL RUN CONCURRENTLY.
\ C D HILLMAINS •
_.`,HINGiON GAF ENS. '
ADD J'V NO I a VALLEY OFFICE
c.o �-0 s'4`' ,EM; PARF(
I
,
I I '4: MI 5 ,..w,
..•smnsotr I d Tl♦- S tits ST. .
1, \//r T.L•If..2306.160 .
�Q°1 I f �, °.°
3OEIING , .i, 3
� I I OMP\II`! GOV r. LOT! � I9� 4 STONEHEINGE a
a) II LTD. <
y SITE
/a
1 /7-
r P I I : t� // 1 souHGar_
0 / 3 / I HI2
ICEIPL.AZA '
/ I I •
V
i� .. ....... —.
�.1—.0 ST:
1-I - GLACIER-PARK
GLACIER I COMPANY
11 PARK NI © 11.1
LJ CU OLYMPIC PIPE LINE OLYMPIC PIPE
P\COMNY 1© LINE CO.
FOR FURTHER INFORMATION, PLEASE CONTACT THE CITY OF RENTON, DEVELOPMENT
SERVICES DIVISION AT 235-2550.
. DO NOT REMOVE THIS NOTICE WITHOUT PROPER AUTHORIZATION
<::P.: as:e°include>;the': ro'ec.t;NUM.BER< .K .Oiji6 :for: ro .er:0.30
::.....: . P.;.J. ..:.... _:.:.: .: 9...: .:::p:..::::;p...:>.::.:<:.<.::. entificattyon:=..`; ;::;::;;: .>I
City o_'___Jon Department of Planning/Building/Pu_____larks
ENVIRONMENTAL 8 DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: R,V4 COMMENTS DUE: MARCH 11, 1996
' APPLICATION NO: LUA-96-015,SA,SM,ECF DATE CIRCULATED: FEBRUARY 28, 1996
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENNIFER TOTH HENNING
PROJECT TITLE: RAYMOND AVENUE CENTER II WORK ORDER NO: 78058
ii99 ION: 2000 RAYMOND AVENUE SOUTH
SITE AREA 10 ACRES I BUILDING AREA(gross): 99,635 SQ.FT.
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE. PARKING FOR 128 CARS AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 FOOT "
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE. /
/ li
3
A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major information
Impacts impacts Necessary impacts impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land'Shoreilne Use Utilities //
Animals Transportation //
Environmental Health Public Services
Energy/ Historic/Cultural
Natural Resources - I Preservation I %
/7 �7l' 9-/ t; L.,'
B. POLICY-RELATED COMMENTS/ y� pA�A�� � _claidzI
�h �� 4 z/ q� �� m�� /` C,. lam`
c/ 2t 2g'r� rr7 r2�.� 1�i '�/
c ,1� o/iv c5'O c/ 72; % e'-'77/2P
C. CODE-RELATED COMMENTS
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable Impact or areas
where additional information Is needed to prope assess this proposal. 1 .
%/!‘4)</Ce.P-etl6 ./ ,k c;3-1//
Signature of Director or Authorized Representative 3 kk.*My
u J D to
DEVAPP.DOC Rev.10A73
City or:'/. . ;,.:ton Department of Planning/Building/Pul,;.,, /orks
ENVIRONMENTAL 8 DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: 'Nicks COMMENTS DUE: APRIL 21, 1995
APPLICATION NO: LUA-95-064,SA,SM,ECF,LLA DATE CIRCULATED: APRIL 10, 1995
APPLICANT: MARK MILLER CONSULTANTS, INC. PROJECT MANAGER: JENNIFER TOTH HENNING
PROJECT TITLE: RAYMOND AVENUE CENTER WORK ORDER NO: 79951
LOCATION: 2000 BLOCK OF RAYMOND AVENUE SW
SITE AREA: 452,716 SQ.FT. (10.39 ACRES) BUILDING AREA(gross):
BUILDING AREA(new expansion gross): 81,250 Sq.Ft.
SUMMARY OF PROPOSAL: The applicant proposes to construct a building approximately 80,000 square feet in size suitable for
warehouse, office and manufacturing uses. Parking for 137 cars would be provided on site. Fifty foot setbacks from Springbrook
Creek and 25 feet from the Class III wetland are proposed. The project requires Environmental Review(ECF), Shoreline Permit
(SM), and Site Plan Approval (SA). A Lot Line Adjustment(LLA) is also being requested to create two lots, one on each side of the
Springbrook Creek right-of-way.
A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary impacts Impacts Necessary
Earth Housing
Air Aesthetics
' Water Light/Glare ✓'
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
' Environmental Health Public Services
Energy/ Histonc/Cultural
Natural Resources Preservation
a )
//cz•vcl.5 cc x bit-) ajd-r roc, G?-1cr1c G' i`,kr,1-Gl a/01/2
7
�� L CSC
B. POLICY-RELATED COMMENTS
c--xr rii ci— fz IccctfccI Gii/W7dh /clime r �
?1c •u$- / c64.3 /C - /Z' a ic& /�'�Dc�e�
' `
cr)r tr4� Ct 1ti — c•
'i(n f
. c ecis4c.ct ; t �-tC� cnc/ aS '7 �/3 c 77c•c, t
e-764.)e-/ 5-4 aw/ / ,eQc 5/ce`-1 '7 hc-b p //1 "Mt t /c / ' �y4'•,ec
C. CODE-RELATED COMMENTS GCr ,7GI2''cL/70rl c.-of / /%s' 1-4 Yr—A.L / -
1 l( v! 51 rv2.�,-f G) CL- )
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
i where additional information is needed to properly assess this proposal.
-5igt5a�e of Director or Authorized Representative
Dat Jfr'
DEVAPP.DOC Rey.1 0/93
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: March 11, 1996
TO: Jennifer Toth Henning DEVELOPMENT PLANNING
CIT(OF: C Ir
FROM: Rebecca Lind
STAFF CONTACT: Paul Cohen (277-5578) REC O v
ED
SUBJECT: Raymond Avenue Center LUA-95-064,SM,ECF,LLA
1. Intent of the Land Use Designation
The site is designated Employment Area - Industrial (EAI). This designation is intended to
"create and sustain industrial areas which function as integrated employment activity areas".
Primary uses in the EAI should be industrial, but secondary uses, including warehousing are
encouraged. New industrial development in the Green River Valley should be well landscaped
with provisions for safe and convenient pedestrian circulation.
2. Areas of Consistency with the Comprehensive Plan
The following policies support the proposal.
Economic Development
Objective ED-C: Sustain and expand the current industrial and manufacturing (heavy and light)
employment base.
Policy ED-15. Develop strategies to attract manufacturing and industrial jobs.
Employment Area-Industrial
Objective LU-EE: Create and sustain industrial areas which function as integrated employment
activity areas and include a core of industrial uses and other related businesses and services,
transit facilities and amenities.
Policy LU-195. The primary use in the Employment Area - Industrial designation should be
industrial.
Policy LU-196. A mix of offices, light industrial warehousing and manufacturing should be
encouraged as the secondary uses in the Employment Area-Industrial classification with conditions
as appropriate.
2. Areas of Potential Inconsistency with the Comprehensive Plan
i1
April 21 , 1995
Page 2
At the level of specificity shown on the submitted materials, no inconsistencies with the policies
are noted.
3. Advisory
As the proposal is refined, the following policy guidance should be considered by the applicant
and reviewing City staff.
Policy LU-162. On-site open space and recreational facilities in developments should be
required while allowing for flexibility of design.
Policy LU-200. Development standards should restrict the number and intensity of secondary
uses in Employment Area-Industrial designations to insure the secondary uses do not significantly
reduce the amount.of land available for industrial activity in the City.
Policy LU-203. Off-site impacts from industrial development such as noise, odors, light and
glare, surface and ground water pollution, and air quality should be controlled through setbacks,
landscaping, screening and/or fencing, drainage controls, environmental mitigation and other
techniques.
Policy LU-206. Site plan review should be required for all new projects to ensure a high level of
quality in site development.
Policy LU-207. Parking should be located internally to the site and landscaped as appropriate to
mitigate adverse visual impacts.
Policy LU-209. Safe, convenient pedestrian movement should be encouraged through appropriate
access and the location of facilities on sites such as covered walkways, drop-off zones, kiosks,
security lighting, and covered bus stops.
Policy LU-211. Site design and zoning designations should be used to protect environmentally
sensitive areas in applicable industrial employment areas.
Policy EN-10. Establish and protect buffers along wetlands to facilitate infiltration and maintain
stable water temperatures, provide for the biological regime, reduce amount and velocity of run-
off, and provide for wildlife habitat.
A:\RAYAVCEN/OD
City of‘____lion Department of Planning/Building/PuL;,�-4Vorks
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: CoAttima-um. LaoCOMMENTS DUE: MARCH 11, 1996
APPLICATION NO: LUA-96-015,SA,SM,ECF DATE CIRCULATED: FEBRUARY 28, 1996
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENNIFER TOTH HENNING
PROJECT TITLE: RAYMOND AVENUE CENTER II _ WORK ORDER NO: 78058 R19\1TON
Ii®9TION: 2000 RAYMOND AVENUE SOUTH
SITE AREA: 10 ACRES BUILDING AREA(gross): 99,635 Si.g19 2 8 N96
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE.VRKINGQRj1 C,n��44��AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 )
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE.
A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Infonnatlon Environment Minor Major Inrormatlon
Impacts Impacts Neee/s}ary Impacts Impacts Necessary
Earth i� Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
LancYShoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
B. POLICY-RELATED COMMENTS 1■1 '■■ � )/(�\) tJ/(�/t ///�) ■/�/�)/�J /yam/[j 1■l
5D (Lb � o kT Y VVO r T1 LObDU2 V1 D f 1&
6( t mVr(
C. CODE-RELATED COMMENTS
We have vi ap catio ' particular attention to those areas in which we have expertise nd hay identified areas of probable impact or areas
where a drG 1 i n n grope assess this proposal. n�f I to°
Signatur o Director or Authorized Representative Date
DEVAPP.DOC Rev.10/B3
C
I
City 1ton, Department of Planning/Building/Pul _Vorks
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT:^ �'. h COMMENTS DUE: MARCH 11, 1996 °OlR,,
�1/�IASFIr1 im . �p
APPLICATION NO: LUA-96-015,SA,SM,ECF DATE CIRCULATED: FEBRUARY 28, peg
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENNIFER TOTH HEWNRNIfl /96
PROJECT TITLE: RAYMOND AVENUE CENTER II WORK ORDER NO: 78058 „0��s°twos
I0e9otTION: 2000 RAYMOND AVENUE SOUTH
SITE AREA 10 ACRES I BUILDING AREA(gross): 99,635 SQ.FT.
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE. PARKING FOR 128 CARS AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 FOOT
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE.
A. ENVIRONMENTAL IMPACT(e.g.Non-Code)COMMENTS
Element of the Probable Probable Mont Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth . Housing
Air Aesthetics
Water Light/Glare -
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation r/
Environmental Health Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
I
B. POLICY-RELATED COMMENTS
C. CODE-RELATED COMMENTS
•
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additio al information Is needed to property assess this proposal.
.
Signature of Director or Authorized Representative / Date
DEVAPP.DOC Rev.10I10
CITY OF RENTON
PLANNING/BUILDING/PUBLIC WORKS
MEMORANDUM
DATE: March 11, 1996 , Bn
TO: Jennifer Toth Henning Co M '7 a���
A
FROM: Rebecca Lind al L -o.4'
STAFF CONTACT: Paul Cohen (277-5578)
SUBJECT: Raymond Avenue Center LUA-95-064,SM,ECF,LLA
1. Intent of the Land Use Designation
The site is designated Employment Area - Industrial (EAI). This designation is intended to
"create and sustain industrial areas which function as integrated employment activity areas".
Primary uses in the EAI should be industrial, but secondary uses, including warehousing are
encouraged. New industrial development in the Green River Valley should be well landscaped
with provisions for safe and convenient pedestrian circulation.
2. Areas of Consistency with the Comprehensive Plan
The following policies support the proposal.
Economic Development
Objective ED-C: Sustain and expand the current industrial and manufacturing (heavy and light)
employment base.
Policy ED-15. Develop strategies to attract manufacturing and industrial jobs.
Employment Area-Industrial
Objective LU-EE: Create and sustain industrial areas which function as integrated employment
activity areas and include a core of industrial uses and other related businesses and services,
transit facilities and amenities.
Policy LU-195. The primary use in the Employment Area - Industrial designation should be
industrial.
Policy LU-196. A mix of offices, light industrial warehousing and manufacturing should be
encouraged as the secondary uses in the Employment Area-Industrial classification with conditions
as appropriate.
2. Areas of Potential Inconsistency with the Comprehensive Plan
April 21 , 1995
Page 2
At the level of specificity shown on the submitted materials, no inconsistencies with the policies
are noted.
3. Advisory
As the proposal is refined, the following policy guidance should be considered by the applicant
and reviewing City staff.
Policy LU-162. On-site open space and recreational facilities in developments should be
required while allowing for flexibility of design.
Policy LU-200. Development standards should restrict the number and intensity of secondary
uses in Employment Area-Industrial designations to insure the secondary uses do not significantly
reduce the amount of land available for industrial activity in the City.
Policy LU-203. Off-site impacts from industrial development such as noise, odors, light and
glare, surface and ground water pollution, and air quality should be controlled through setbacks,
landscaping, screening and/or fencing, drainage controls, environmental mitigation and other
techniques.
Policy LU-206. Site plan review should be required for all new projects to ensure a high level of
quality in site development.
Policy LU-207. Parking should be located internally to the site and landscaped as appropriate to
mitigate adverse visual impacts.
Policy LU-209. Safe, convenient pedestrian movement should be encouraged through appropriate
access and the location of facilities on sites such as covered walkways, drop-off zones, kiosks,
security lighting, and covered bus stops.
Policy LU-211. Site design and zoning designations should be used to protect environmentally
sensitive areas in applicable industrial employment areas.
Policy EN-10. Establish and protect buffers along wetlands to facilitate infiltration and maintain
stable water temperatures, provide for the biological regime, reduce amount and velocity of run-
off, and provide for wildlife habitat.
A:\RAYAVCEN/OD
f City o ton Department of Planning/Building/Pub orks
-ENVIRONMENTAL & DEV'ELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: 1,0m COMMENTS DUE: MARCH 11, 1996
APPLICATION NO: LUA-96-015,SA,SM,ECF DATE CIRCULATED: FEBRUARY 28, 1996
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENNIFER TOTH HENNING
PROJECT TITLE: RAYMOND AVENUE CENTER II WORK ORDER NO: 78058
1/4.99T, ION: 2000 RAYMOND AVENUE SOUTH
SITE AREA: 10 ACRES I BUILDING AREA(gross): 99,635 SQ.FT.
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE. PARKING FOR 128 CARS AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 FOOT
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE.
A. ENVIRONMENTAL IMPACT(e.g.Non-Code)COMMENTS
' Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Water LJght/G/are
Plants Recreation
Land'Shorellne Use Utilities
Animals Transportation
Environmental Health Public Services
Energy/ Historic/Cultural
Natural Resources Preservation
B. POLICY-RELATED COMMENTS
C. CODE-RELATED COMMENTS
We have reviewed this application with particular attention to those areas In which we have expertise and have Identified areas of probable impact or areas
where additional information Is needed to properly assess this proposal.
Signature of Director or Authorized Representative Date
DEVAPP.DOC Rev.10193
Clz
City a _ ;1ton Department of Planning/Building/Pu Vorks
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENTS (A)& eLiAt ,COMMENTS DUE: MARCH 11, 1996
APPLICATION NO: LUA-96-015,SA,SM,E F DATE CIRCULATED: FEBRUARY 28, 1996
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENNIFER TOTdiiKilKtrOYV
PROJECT TITLE: RAYMOND AVENUE CENTER II WORK ORDER NO: 78058 r":r';R•"9Vs�,'
Ii.e9 TION: 2000 RAYMOND AVENUE SOUTH FEB2 8 1996
SITE AREA 10 ACRES I BUILDING AREA(gross): 99,635AS .
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND-rim
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE. PARKING FOR 128 CARS AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 FOOT
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE. •
' A. ENVIRONMENTAL IMPACT(e.g.Non-Code)COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
impacts Impacts Necessary Impacts impacts Necessary
Earth Housing
Air Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities 114d�`�
Animals Transportation
Environmental Health Public Servkes
' Energy/ Historic/Cultural
' Natural Resources Preservation
Sets a-t-F a c,h ' ' v- Ye V I : Car-A-2.»•
B. POLICY-RELATED COMMENTS (
//• 5 7 2
C. CODE-RELATED
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additional information is needed to properly assess this proposal.
Signature of Director or Authorized Representative Date
DEVAPP.DOC Rev.10ID3
RAYMOND AVENUE CENTER II
RAYMOND AVE. SW & SW 19TH ST.
W.O.# 78058 Rev. EIS Submittal
March 1, 1996
STORM (Surface Water):
1. Out fall to Spring Brook Creek will need a drainage easement from District #1.
2. HPA (Hydrologic Project Approval ) will be require.
3. The System Development Service Connection charge is $26,410.43.
Some adjustment in the dollar amount may occur if wet lands measure is
documented.
4. Geotechnical report missing.
5. The City is considering widening the Spring Brook Creek channel which could have a
impact on the location of the proposed bioswale.
6. An earth berm is proposed between the detention pond and deep drainage channel
just off the SW 19th St. righ-of-way.. Stability of the berm and soil conditions need
to be confirmed.
SEWER (Waste Water):
1. Floor drains are required with a sprinkler system and the drains are to be connected
into the sewer system.
2. Back flow prevention device is required on the sewer system if floor elevation is
below 22-feet which has been indicated on the plans.
3. Sewer line from MH#1 to existing MH in Raymond Ave, SW to be dedicated to City
and remaining line to the South to be labeled "Private".
4. Minimum sewer line slope is 2%.
5. The special System Development Connection charge is $35,311.93.
96CM047
RAYMOND AVENUE CENTER II
RAYMOND AVE. SW & SW 19TH ST.
W.O.# 78058 Rev. EIS Submittal
March 1, 1996
TRANSPORTATION ISSUES:.
1 . SW 19TH STREET: Fire lane is to extend from Raymond Ave. SW approximately
325-ft to existing pavement on SW 19th St.
The paved width of the fire lane is to be 20-ft. centered in the existing right-of-way.
The subgrade and paved surface is to meet City Industrial Collector roadway
standards with a center crown of 2% slope. The fire lane is to taper into the
existing pavement width.
This will allow future widening of SW 19th St. as an additional access roadway in
the future.
2. The Transportation Mitigation fee is as follows:
$75 x (4.88 x 99,635/1000) = $36,466.41
Deposit $36,466.41 to Acc.# R 105.000599.000.3180.0070.00.000136.
95CM048
S
Y
�.r O
.v'+::n.�...a LLN)] ........ .......v.... /: .. . •
. . ..I : I N§F
EEPPEmmo
Project Name / \a o 116-Kkl. Ave, Ci iif e' L
Project Address
Contact Person 'It4` /V11//6 ( &Y.SLatf�u 5) >)C- D
Address /L g[ f/„4L/�l/ . free f . i:e/7L /Jv , e//e Ofe 11)'-, 9 '1--
Phone Number ('p'& 42/5 1 '/7Z/
Permit Number 7g
I/17 -e `� G` Wiz' �Zc d xi-
Project y� �zeizitc /
Description ai ���-- ,f ('
Land Use Type: Method of Calculation:
❑ Residential ©-ITE Trip Generation Manual
❑ Retail ❑ Traffic Study
QiNon-retail ❑ Other
Calculation:
4 7 _' X Cam(, x 99, 63.6 J
/ 049
Transportation Mitigation Fee: 0 6, `L
n
Calculated by: �>�lrm 4, /lei -- Date: -9///74
Account Number: R, /05e 0U659 , 0o0 , �i64,36 06)7z)ipa, ovo/Y
Date of Payment
RAYMOND AVENUE CENTER II
RAYMOND AVE. SW & SW 19TH ST.
W.O.# 78058 Rev. EIS Submittal
March 1, 1996
STORM (Surface Water):
1. Out fall to Spring Brook Creek will need a drainage easement from District #1.
2. HPA (Hydrologic Project Approval ) will be require.
3. The System Development Service Connection charge is $26,410.43.
Some adjustment in the dollar amount may occur if wet lands measure is
documented.
4. Geotechnical report appears satisfactory.
5. The City is considering widening the Spring Brook Creek channel which will have a
impact on the location of the proposed bioswale. The City will need a 50-foot
channel easement for channel widening and to accommodate the channel slope.
This will expand the channel into the proposed set back area.
The bioswale could be replaced with a tight line drain pipe since the site has both a
wet pond and a detention pond.
We are meeting with the Developer Engineers to work to a solution.
6. An earth berm is proposed between the detention pond and deep drainage channel
just off the SW 19th St. right-of-way.. Stability of the berm and soil conditions
need to be confirmed and stated as such by the Developer's Engineer.
SEWER (Waste Water):
1. Floor drains are required with a sprinkler system and the drains are to be connected
into the sewer system.
2. Back flow prevention device is required on the sewer system if floor elevation is
below 22-feet which has been indicated on the plans.
3. Sewer line from MH #1 to existing MH in Raymond Ave, SW to be dedicated to City
and remaining line to the South to be labeled "Private".
4. Minimum sewer line slope is 2%.
5. The special System Development Connection charge is $35,311.93.
96CM047
City 'ton Department of Planning/Building/PUJ Vorks
ENVIRONMENTAL 8 DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: 'Ply Pevteuj > LLkiltirCOMMENTS DUE: MARCH 11, 1996
APPLICATION NO: LUA-96-015,SA,SM,ECF DATE CIRCULATED: FEBRUARY 28, 1996
QF RENTON
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENNIFER TOTH HENNIt�G,�,�A , D
'Iw a
PROJECT TITLE: RAYMOND AVENUE CENTER II WORK ORDER NO: 78058
it%it 0 b 1J96
Ite9TION: 2000 RAYMOND AVENUE SOUTH
SITE AREA 10 ACRES BUILDING AREA(gross): 99,635 SQ.FT:-"'-n.selvG
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE. PARKING FOR 128 CARS AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 FOOT
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE.
A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
Environment Minor Major Information Environment Minor Major Information
Impacts Impacts Necessary Impacts Impacts Necessary
•
Earth Housing
Air _Aesthetics
Water Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy/ HistoriclCultural
Natural Resources Preservation
B. POLICY-RELATED COMMENTS
Reg 1:4 vec1 4li v- ci40_,.) is 3500 isj a o I h recq u ( re.5
a G, toot) W o�� I i t -e, c� e L t-c�
IX< < L e-- /.1-f>C r -6
C. CODE-RELATED COMMENTS
I r 4 V t IT; r-U e sc->k/r7. ( S T„`S 1 1- IL l w.IiCcTGb`
/6-Poof' sd�h p. e . -,eYtt h ."-1) '?114cr?)
CI o l.o e a d 7.1.3 crrv,5-fir o s t Ss cieA
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where rtional information is needed
property assess this proposal.
�I '1--41 /1 f 6
Signature of Director or Authorized Represents Date
DEVAPP.DOC Rev.10093
Cityof l7enton Department of Planning/Building/Pub orks
P
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: t 11(e_ Rene A+ CM COMMENTS DUE: MARCH 11, 1996
APPLICATION NO: LUA-96-015,SA,SM,ECF DATE CIRCULATED: FEBRUARY 28;°1996,,,F,,,,
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENIFER TOTH HENNING
PROJECT TITLE: RAYMOND AVENUE CENTER II WORK ORDER NO: 78058 FEB e i
1.@9TION: 2000 RAYMOND AVENUE SOUTH ,�.�_...,; _, A; ; �j;� ��
I'11L�`ilvu �, ��—
SITE AREA: 10 ACRES BUILDING AREA(gross): 99,635 SQ.FT.
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE. PARKING FOR 128 CARS AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 FOOT
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE.
A. ENVIRONMENTAL IMPACT(e.g.Non-Code)COMMENTS
Element of the Probable Probable More Element of the Probable Probable More
' Environment Minor Major information Environment Minor Major Information
Impacts Impacts Necessary impacts Impacts Necessary
Earth Housing
Air Aesthetics
Wafer Light/Glare
Plants Recreation
Land/Shoreline Use Utilities
Animals Transportation
Environmental Health Public Services
Energy/ Historic/Cultural
Natural Resources. Preservation
' B. POLICY-RELATED COMMENTS
C. CODE-RELATED COMMENTS
See aik Q ��� ter-�Q ,, ciao /'t c q y (°196.
We have reviewed this application with particular attention to those areas in which we have expertise and have identified areas of probable impact or areas
where additional information is needed to pro assess this proposal.
% 12._ 3 /q/96
Signature of Director or Authorized Representati Date
DEVAPP.DOC Rev.10/93
111
Oti�Y Obi
. " ♦ CITY OF RENTON
FIRE PREVENTION BUREAU
MEMORANDUM
DATE: March 4, 1996
TO: Jennifer Henning - Senior Planner
FROM: Corey Thomas - Plan Review Inspector
SUBJECT: Code-Related Comments for Raymond Avenue Center
1. The preliminary fire flow required is 3,500 gpm for the above-subject
project. Four hydrants are required; one hydrant is required within
150-feet of the proposed structure and three hydrants are required
within 300-feet of the proposed structure. A looped water main is
required to be installed around the building. The looped main shall
not be connected to the same section of the existing city main without
intervening valves.
2. The fire mitigation fees are applicable at a rate of$0.52 per square
foot of building - 99,635 square feet x $0.52 = $51,810.20. This fee is
payable at the time the building permit is issued.
3. An approved fire sprinkler system is required to be installed
throughout the structure.
4. Further details are necessary in order to determine whether or not an
approved fire alarm system is required to be installed throughout the
structure.
5. The building shall be designed in accordance with Article 81 of the
Uniform Fire Code for high-piled combustible stock.
6. All fire lanes shall be marked according to the City Ordinance.
If you have any further question, please contact me on extension 2524.
CWT:mbt
raymd
r
City of_._�,Jton Department of Planning/Building/Pul_ ,Yorks
ENVIRONMENTAL & DEVELOPMENT APPLICATION REVIEW SHEET
REVIEWING DEPARTMENT: pAlCe COMMENTS DUE: MARCH 11, 1996
APPLICATION NO: LUA-96-015,SA,SM,ECF DATE CIRCULATED: FEBRUARY 28, 1996
APPLICANT: MARK MILLER CONSULTANTS PROJECT MANAGER: JENNIFER TOTH HENNING
PROJECT TITLE: RAYMOND AVENUE CENTER II WORK ORDER NO: 78058
1te9FION: 2000 RAYMOND AVENUE SOUTH
SITE AREA 10 ACRES I BUILDING AREA(gross): 99,635 SQ.FT. S S L CF%
SUMMARY OF PROPOSAL: THE APPLICANT PROPOSES TO DEVELOP THE SITE FOR WAREHOUSE, OFFICE AND
MANUFACTURING USES. THE PROPOSED STRUCTURE WOULD BE 99,635 SQ.FT. IN SIZE. PARKING FOR 128 CARS AND
DOCK HIGH SERVICE FOR 20 TRUCKS WOULD ALSO BE PROVIDED. DEVELOPMENT WOULD MAINTAIN A 50 FOOT
SETBACK FROM SPRINGBROOK CREEK AND A 25 FOOT BUFFER FROM THE CLASS III WETLAND ON SITE.
Q
A. ENVIRONMENTAL IMPACT(e.g.Non-Code) COMMENTS ^ �
Element of the Probable Probable More Bement of the Probable 'IW Probable More
Environment Minor Major Information Environment Minor Major information
Impacts Impacts Necessary Impacts Impacts Necessary
Earth Housing
Air Aesthetics
Wafer Light/Glare
Plants Recreation
LancMShoreline Use Utilities
Animals Transportation
Environmental Health Public Services X X
Energy/ Historic/Cultural
Natural Resources Preservation
Police cal §s for service estimated at 51 . 51 annually , based on the size of the
proposed building. This area of Renton has been plagued by thefts of building
materials and commercial burglaries for the past 1 1/2 years . Recommend the
builder secure all building materials when they are not in use , provide security
lighting at the construction site„ lock op all tools , and secure any temporary
construction trailers with heavy duty commercial locks and auxiliary locking
devices on any windows .
Once the site is constructed , it will need security lighting around the building
B. POLICY-RELATED COMMENTS
and in the parking lots , doors will need heavy-duty dead-bolt locks , and any
back doors that don ' t have an adjacent window will need peep-holes fgr employees
to be able to view the parking lots before exiting the building. Recommend the
tenant install an alarm system or consider the services of pri :ut =,s.ecurity . The
, South Renton area has a large number of commercial burglaries because the area
is relatively deserted at night , and the burglars know they can break into
businesses quickly , easily , and probably not be detected until an employee comes
to work in the morning.
' C. CODE-RELATED COMMENTS
We have reviewed this appication with particular attention to those areas In which we have expertise and have Identified areas of probable Impactor areas
where additional Information Is needed to property assess this proposal.
adAl
SI nature of Director or authorized -epresentative Date
DEVAPP.DOC Rev.10193
l .t. f
,::..;•::tt;r::;•£;};i }};to'::4''t;+, .\ti.....:,::itt:+••irr'•}:ryr>:t•:••:ry>}:ri ti.:ii••.:::.::,t::+:a:,,•::i.:;:..•.<.�:::.;:.i:...,..t:....:..:..:.::...;
..:tiw,•,�,;3:;3:S:i':.':rrr}'ri:,,•,,,l.:rr•.�.:,•:\•:ti•.C:,v,. \ . .siai•T.rr;r,•::ii:.::.t•ix<i.:•: . ....:: i \;,?fi: .:/.:tNfr:;%::..: _ �ti\\"4\k�<::::•:+ V,':}:;.;::..
ryr.....•4ti..,:i:.i.:..,::i.::a::/;.y:::;.::......+� \ \*r•••ti.a::. :n::.it•,.i:ta:, }:: .: ~....::}a�+iS'�a
ii•4:;a}:.:::i?x,.s:}.:la:•.i::.};•;k}c�ry}}::• :•}2 #';Ct'ff..•':>}:.:;;,:.:.},.,..ti.:...(u n
•,,.i,.:ix:..:::a.::.:,-::J/•..::,•::r:::::i::,.ai: \.?..�:::r•r?:r.rr:•i:•:i:i•••..fir..•n`n.'•:.. .tiT`•�.,{` • i
t'}" nv ^ \n••x...,vv.:.;.. f....::::•�•::.:i..v.:r...::: \�\ 'lea,-•
.k,r ri. ?: fiFj
:C;i•.'i::r {ti:}:}.f;:•}itff.:v/:., ?%i:•>C}:?;:iiii}\S\ \\\ti�'•r + :C{:'.fi /f'
}^; <Y''.Y:+.a:c;:A:.:;.a4c,*.•t„,;\\\\,3�.i:,':y.;r,`.: ■66■,,■lyy�1 +MM,��-{,,{yyLL • ■- py► �N• „1rl•
}}}{.. :\:,4-..•t,•f:�ln.':4.n �:ati l� �IN....Ir::IlJ11M:T ` ��.��+:� if�!7':{$� +�i .\ \� ,� •
•.'ri.,
:;:;5:•. i,r{,'�4,aX { rcy \giiy`r ,',�`:;; '2•'s$ti} •' � •sS'>3kv •Ci�,� \\�\.
�� GKY+�r A•:�:a.Y�,.<i•:inrv4YF.i.,}.}ri�:SiY:� ,nY 44 � ,{)•iY:{./l/.Uf >v.'., \ \�:}\\
v. 3t
�v}}}}:•r.'i}}:;.r:t•.,•;!:,:;r' . ...a.} .'�'4\\�••• :4}a::a}...::•:ot:•ra.,:r4:•::i•:.,,C \4', ♦ .+. : -
:+.fi'y,;;1•.?;.}.::::ar.:.rr•:ri•``i:f :'{•�c::+: :\r}.t,. .�, i ;�r>,43.,,,r'•�;:�, .:r.:: �;\\ ,443 : '•hR•.�':Fi4i � \ \. ``S...*c`:•� \ : b\ .:t •.}}.,.
•
•}}};?:a4:r},}>`..:.n.;t./,}i.:.:t;a;:•}}%'},• 4ti\,c::;o:::o:•: . # .J»,riprt.+"�-\i,. \�\}�\?n'�`
:^?:+.i-:}::•f.}4;/,.::ivnv:a:}r�Li•:fAi:a:.r+:�}(•\v.?�,�+,.?�,.,�n�42�\•\}.v:vrr}:{{iif-Y!tl[:'rYT'.lT..i��.-l .fiY� �'�y}��{'���b `' nd�IXa{OL,ny� �
................ ..}.. .,. .:.............:........�.�..:..........{..::......:.....:.;,-:�.?T,�T�T..T..F:Y�i9N:n:n.Cri:::ri0.`}2.�\ m:::.Y•.':+ '-,+�i}a,��iQT}-=`v.2':
PROJECT NAME: "C 6vti 1D
APPLICATION NO:• 16'r 0115 I SR'r IrS/v�s.E
The following is a list of property owners within 300 feet of the subject site. The Development
Services Division will notify these individuals of the proposed development. '
NAME ADDRESS ASSESSOR'S PARCEL
NUMBER
GEE. - -� ,�- . . ..
•
•
•
•
•
wEcovED
FEB 1 5 1996
DEVECITY OF LOPFAENTReNTOtd PLAh11JIIJG
\', r. o •
N
::;•c0:_� o
u �7
0 A
•
(Attach additional sheets, if necessary)
I.
(Continued) •
NAME 'ADDRESS ASSESSOR'S PARCEL
NUMBER
1
.
Applicant Certification
I, .301-4-1--) ` -- v7 SaP.j , hereby certify that the above list(s) of adjacent property
(Print Name)
owners and their addresses were obtained from:
0 City of Renton Technical Services Records
0 Title Company Records
i 7ja'- King •unty Assessors Records
4 - r .
,Siang lar---. Date Z/,3 / 7
��,'-\OLB (Applicant)
m° ^1 woaif-
0
��`���-'-6`o1 •:o'�O�a NOTARY
`moo o� 6T TfQ: A. bs,,ribed an sworn before me, a of ' Public, in, for he State of Washin ton,
. residing at: ;_/'/� on the day of g
• F UB LlG
u'�•`�y Sign��� ��
��• � .s S,i:�C.�`®'" (Notary Public)
`1 c
s o to U e:::;<:<>:»::::;::>::>:::�>:*::::»::>::::»>:>::>:::::;:>:<:»::>::<>:<>:>;>:<:::>:::::>:<:»::;::>:<:>:<:::>::>::>:::<:::>:::
:i:i:i:CERTIFICATI F:MAILIN 0 0 NG::<':'`i <`<at>:i:'i<itiEgi<ii>`.iigg:`:€>g_�':�Na'>::`>i `; ' .
�� ereby certify that notices of the•propoSetV application ere ma ed to
each:lister>`.spro:>:: y{ wner ti :• `::; >.:.•ii.:`s'>i ::: :>:s<> > r :zr :g.:::$ ::$i ig3i.i > ''><> s:«:s>:i::'`: : : ' :gi.:i> `
td e a o
::::i:::::r :::%::ii::: ?::>:i::i:::ii'::::::::: :i::i::::<<%< :::::':�`::�>::i:i: ::i:::::`:::::'.g%':i. ::::>::: :::::?: :::;:%:: :::;::::<'r:i::�::>
ATTEST::;::Sub ibed:;and::sworn;.before:.me::a::No . .:;Public;::: ::: for.:the:State;t i ashin• tort <'i: :
re :sidin .at:<:>:::;:;..; : ;>.;?J/ ; ::;:<::::::>:>::::;.::::.::: on:.the.: da of:.::.;:.,.. : : : : ::: :,•>:.::>:>:< i c . : "::;;;:::<:<::»::::::::::
listprop.doc 6//9 91
REV 07/95
2
1
'- - - - -'rrrrW'r-+-- 1.7. T.0 C YT TT TT Y.W. 4"7,14fiV.T•
*° BATCH NUMBER: HD ._COMMENTS a-
* - CUSTOMER NAME BUSH•ROLu .HITCHIN 11,,. t
*° u•
****Vtit *-1-ft** rntftAt**Itnit** **, *****t t*hoe******h**.! ************fetir **, rtr,t44 411*
000580-0001-07. 000580-0001-07
THE . BOEING COMPANY: 530653 THE BOEING COMPANY 530653
PO BOX 3707 M/S 1F-09 • . PO BOX 3707 M/S 1F-09
SEATTLE WA 98124 SEATTLE WA 98124
192305-9013-03 192305-9013-03
STONEHENGE II LIMITED 229800 STONEHENGE II LIMITED 229800
PARTNERSHIP . PARTNERSHIP
3605 132ND AVE `SE SUITE 300 . 3605 132N0 AVE SE SUITE 300
BELLEVUE WA ' 98006 . BELLEVUE WA 98006
1923057.9076-07 • 192305-9076-07
SOUTHGATE OFFICE PLAZA I . 913335 ' SOUTHGATE OFFICE PLAZA I - 913335
LIMITED PRTNRSHP LIMITED PRTNRSHP
3605 132ND . AVE SE :0300 - 3605 132ND AVE SE 0300
SEATTLE WA 98006 SEATTLE WA 98006
192305-9095-04 : 192305-9095-04.
-STONEHENGE III LIMITED - 229800 . . 1 STONEHENGE .. III LIMITED 229800
PARTNERSHIP.. PARTNERSHIP
3605 132ND AVE SE:.SUITE : 300 3605 132ND AVE SE SUITE .300
BELLEVUE WA . 98006 BELLEVUE WA - 98006
' 242304-9020-08 • ' - 242304-9020-08
WINMAR-:.CO.. INC. 2N0425 . -. WINMAR CO: INC 2N0425
PO: BOX 21545 .. . : . •PO' BOX . 21545- . . • . .
SEATTLE' WA '98111' • SEATTLE WA 98111
242304-9022-06 . . 242304-9022-06
THE .BOEING 'COMPANY 530653 ' THE BOEING COMPANY : 530653
• PO BOX 3707M/S.- IF-09 PO " BOX 3707 M/S IF-09
SEATTLE : WA 98124 SEATTLE WA 98124
•
•
242304-9115-04 : ; 242304-9115-04 *
WINMAR . CO INC 2N0425 WINMAR CO INC 2N0425 "-
PO' BOX : 21545 + PO : BOX 21545
SEATTLE . WA • 98111 SEATTLE WA 98111
252304-9019-00: ; 252304-9019-00
CITY : OF . RENTON- 209800. CITY . OF RENTON 209800
CITY HALL CITY HALL
200 MILL AVE SOUTH 200 MILL AVE SOUTH .
RENTON WA 98055 RENTON WA - 98055 .
252304-9037-08 • 252304-9037-08
CITY OF SEATTLE . 647777 CITY OF SEATTLE 647777
WATER DEPT WATER DEPT
COUNTY'`CITY; BLDG COUNTY CITY. BLDG
252304-9058-02 252304-9058-02
KOCH .HANS GEORGE . 190139 KOCH HANS GEORGE ' . 190139
' X.AALLPAK. CONTAINER X ALLPAK CONTAINER
1100• SW '27TH ' ST 1100 SW 27TH ST
RENTON WA 98055 RENTON WA 98055
252304'-9064-04 252304-9064-0,
RENTON 01 L L C $59999 RENTON nl L C i.-
5601 SIXTH AVENUE SOUTH 5601 . SIXTH AVENUE SOUTH 559999
SEATTLE WA 98108 SEATTLE WA
• 98108
302305-9007-06 302305-9007-06
CITY OF RENTON • 379700 CITY OF RENTON '�:�200 MILL AVE SOUTH 200 MILL AVE SOUTH 379700 -
RENTON WA 98055 RENTON WA
•
98055
302305-9066-04 302305-9066-04
CITY OF SEATTLE 617777 CITY OF SEATTLE
617777
•
302305-9084-02 302305-9084-02
•
OLYMPIC PIPE LINE COMPANY. 5N0674 OLYMPIC PIPE -LINE COMPANY 5N0674
ALEVY. KENNETH .R ALEVY:KENNETH R PO. BOX . 5568 PO BOX 5568 `
DENVER CO 80217
DENVER CO 80217
•
334040-4000-07 334040-4000-07
RENTON DELAWARE INC. 190072 .� -:
C/O• GSIC: REALTY. CORP RENTON OELAWARE INC 190072
255 SHORELINE DR STE 600 C/O• GSIC REALTY. CORP
255 SHORELINE DR STE 600
REOWOOD: CITY. CA • 9.4065 REDWOOD CITY;CA
•
94065
334040-5300�01 . • :'. :_..... ....... .._...__ ._. ,: .. . _ -
334040-5300-01 _ ;`j
GROUP_:HEALTH • 000P/PUGET. SND261233 •521•.WALL: ST . GROUP HEALTH COOP/PUGE7 SND261233
SEATTLE • WA 521 WALL . ST
98121 SEATTLE WA . 98121
•
•
•
• . - eF
•
[..{. :i ... , i , _. L'e'i2=4..F,....„i�.:'4R4.a.:Jt:•: ;,- -„.:,r::v5,,.:�yy$.;•••;A!...i r_..
•
'• -
;`42;6ioiogsfff4),.. ."i- `Q.ri;1-0,441/�SYSSf.: .
yt�>Y4 :<.':I .h. l '1 ':e , . t�.w•1� 'iG'G';? :1._'i•7 .�v, Re , .• 'Tia � ht
•
NOTICE OF r-rrOPOSED SITE APPROVAL APPLICATION
RENTON, WASHINGTON
A Site Approval (SA), Shoreline Substantial Development Permit (SM) and Environmental Checklist Review (ECF)
Application has been filed and accepted with the Development Services Division of the City of Renton. The following
briefly describes the application and the necessary Public Approvals.
PROJECT NAME/NUMBER: RAYMOND AVENUE CENTER II/LUA-96-015,SA,SM,ECF
DESCRIPTION: The applicant proposes to develop the site for warehouse, office and
manufacturing uses. The proposed structure would be 99,635 Square Feet in size. Parking for 128 cars and dock high
service for 20 trucks would also be provided. Development would maintain a 50 foot setback from Springbrook Creek
and a 25 foot buffer from the Class III wetland on site.
GENERAL LOCATION: 2000 Raymond Avenue South
PUBLIC APPROVALS: Environmental Review
Site Plan Approval
Building Permit
Shoreline Substantial Development Permit
The application can be reviewed in the Development Services Division located on the third floor of Renton City Hall.
Comments will be accepted anytime prior to Public Hearings, during Public Hearings, or prior to an administrative site
plan approval. For further information on the application, or if you wish to be made a PARTY OF RECORD and receive
additional notifications, by mail, of the City's environmental determinations, appeal periods and/or the public hearing
date(s) for this project, please contact the Development Services Division at 235-2550. Please include the project
NUMBER when calling for proper file identification.
------ - --- —
C.D NLLMGAI :• II
EARINGTCN GAM � •' V
1[
S VALLEY OFFICE
•
a I
I `�`, �=+ PARK —N— .y I�- I
_
ca.
O� I ICOMPA NY I
r STONENENGE
I I--�� !!!VA � � II LTD. C .
O
I / f01o___.. 9
I , , I w.00� OO~
/I I SOUTMGATE I«•I�..,,Q,.,,yt
I I I OFFK �a.u�n�nrr AE°LEA
i G GLMMK
u co
- -G—
I■
OLYMPIC PIPE LINE r I I GLYNEK PIPE
COMP NY LINE CO.
I
t-'
•
art Of FONTON I
-- ------ - -- - - -- - -- - - -— `. 1.f_ .�i :1=" li
GENMALOT.DOC
• PENDING APPLICATION
PROJECT NAME/NUMBER: RAYMOND AVENUE CENTER II/LUA-06-015,SA,SM,ECF
DESCRIPTION: The applicant proposes to develop the site for warehouse,office and manufacturing
uses.The proposed structure would be 99,635 Square Feet in size. Parking for 128 cars and dock high service for 20
trucks would also be provided. Development would maintain a 50 loot setback from Springbrook Creek and a 25 foot
buffer from the Class fit wetland on site.
GENERAL LOCATION: 2000 Raymond Avenue South
PUBLIC APPROVALS:
Building Permit -Preliminary Plat _Short Plat
•
_Conditional Use Permit _Rezone XXXX Site Plan Approval
XXXX Environmental Review -Shoreline Conditional Use -Other
Peril
Fill&Grade Permit XXXX Shoreline Substantial -Other
Development Permit
The application can be reviewed in the Development Services Division located on the third floor of Renton City Hall.
Comments will be accepted any lime prior to Public Hearings,during Public Hearings,or prior to an administrative silo
plan approval.Comments for Substantial Shoreline Perils must be received within thirty(30)days from the last dale of
applicant's'Notice of Application'publication in the Valley Daily News. For further Information on Ike application,or II
you wish to be made a PARTY OF RECORD and receive additional notifications of the City's environmental •
determinations,appeal periods and/or the public hearing date(s)for this project,please contact the Development
' Services Division at 235-2550. ,
r
fir, •
•
•
•
•
•
CERTIFICATION
,SCUIddA via L Q I'1 , hereby certify that 3 copies of the above document
were osted y me in 3 conspicuous places on or nearby the described property on
Fto b. z�. ��G
•
Signed: SCLlabi, J1 JV•
MY
STATE OF WASHINGTON )
) SS
COUNTY OF KING )
I certify that I know or have satisfactory evidence that �� J,g c,K. 4.
signed this instrument and acknowledged it to be his/her/their free and voluntary,a;t'.for•the uses
and purposes mentioned in the instrument. o;' e'er c•o
�r Z.: , nor
Dated:
Notary •lic in a ifor the State of Vass ifir g
Nota Print) l'Y14-�P -/e• twutkof
My appointment expires: iVq1'ce,
NOTARY.DOC
PENDING APPLICATION
PROJECT NAME/NUMBER: RAYMOND AVENUE CENTER II/LUA-96-015,SA,SM,ECF
DESCRIPTION: The applicant proposes to develop the site for warehouse, office and manufacturing
uses. The proposed structure would be 99,635 Square Feet in size. Parking for 128 cars and dock high service for 20
trucks would also be provided. Development would maintain a 50 foot setback from Springbrook Creek and a 25 foot
buffer from the Class III wetland on site.
GENERAL LOCATION: 2000 Raymond Avenue South
PUBLIC APPROVALS:
Building Permit Preliminary Plat Short Plat
Conditional Use Permit Rezone XXXX Site Plan Approval
XXXX Environmental Review Shoreline Conditional Use Other
Permit
Fill&Grade Permit XXXX Shoreline Substantial Other
Development Permit
The application can be reviewed in the Development Services Division located on the third floor of Renton City Hall.
Comments will be accepted any time prior to Public Hearings, during Public Hearings, or prior to an administrative site
plan approval. Comments for Substantial Shoreline Permits must be received within thirty(30)days from the last date of
applicant's"Notice of Application"publication in the Valley Daily News. For further information on the application, or if
you wish to be made a PARTY OF RECORD and receive additional notifications of the City's environmental
determinations, appeal periods and/or the public hearing date(s) for this project, please contact the Development
Services Division at 235-2550.
�\ ?ANIIGT
I\ u \ N%-�VALLEY DrICE _M_,I �
I II I y
1I .a i
nCf INC.
`I�CAIPANYLiI�fE:E j
Ya0
1 Fill GATF
/f I CFfFE PLAZA �•�rMW
•
I
°«MF4
cant rir m
CO OLYMPIC"PIPE LINE I OLYMPIC Gv C,PrY
eta -�
CITY iF RENTON
sal Planning/Building/Public Works Department
Jesse Tanner,Mayor Gregg Zimmerman P.E.,Administrator •
•
February 28, 1998
Mr. Mark Miller
Mark Miller Consultants, Inc.
10801 Main Street, Suite 100
Bellevue, WA 98004
SUBJECT: -Raymond Avenue Center II
Project No. LUA-96-015,SA,SM,ECF
Dear Mr. Miller.
The Development Planning Section of the City of Renton has formally accepted the
above-referenced application for review. •
It is tentatively scheduled for consideration by the Environmental Review Committee on
March 19, 1996. Prior to that review, you will be notified if any additional information is
required to continue processing your application for environmental review.
Please contact me, at 277-6186, if you have any questions.
Sincerely,
•
(1:
• ennifer Toth Henning
Project Manager -
ti!
•
ACCPTLRDOC
200 Mill Avenue South - Renton, Washington 98055
[Z7 T.ie nnnnr nnntnine Fflo.rnnunlml mnt n& 9S%nncr nn..e ,..er .- .
Mark Miller CONSULTANTS INC.
DEVELOPMENT ■ LAND USE • CONSTRUCTION MANAGEMENT
February 20, 1996
RECEIVED
FEB 21 1996
Jennifer Toth-Henning DEVELOPMENT PLANNING
Public Work Department CITY OFRENTON
City of Renton
200 Mill Ave . S .
Renton, WA 98055
RE: Raymond Center - Opus Northwest LLC
Dear Jennifer:
As a follow up to the site plan approval for the Raymond Center
application submitted on February 15, 1996, I am also enclosing the
following requested information:
Memorandum from Opus Northwest LLC regarding construction
mitigation description as per your site plan approval outline
item number 8 .
If you have any questions on this information, please do not
hesitate to call .
Very truly yours,
MARK MILLER CONSULTANTS, INC.
Mark Miller
MM:pp
Enclosure
cc : Bart Brynestad (w/ encls . )
10801 Main Street, Suite 100 • Bellevue,Washington 98004 • 206/455-1724 • FAX 206/455-5076
hob-th-yti I K1 14;b4 uru NUKI11Vt.a1 LLU riA NU. 1cu04031 iic r. uciuc
Ai, opus
Opus Northwest LLC
200 112th Avenue NE Phone: (206) 453-4100
Suite 205 Fax: (206) 453-1712
Bellevue, Washington 98004
MEMORANDUM
TO: Whom it may concern
FROM: Bart Brynestad
DATE: February 16, 1996
RE: 10 Acre Renton Site
8. Construction Mltiget(on Pe r(ptipn
• Proposed Construction Dates
It is proposed that construction will start in May 1996 and construction will be complete by December
1996.
• Hours of Operation
The hours of operation during construction will be 7:00am to 5:00pm, Monday through Friday.
• Proposed Hauling/Transportation Routes
Any hauling and transportation routes will be approved by the City of Renton. It is proposed that the
routes will be from 1-405 or Highway 167 to SW 16th Street to Raymond Avenue to the site.
• Measures to be implemented to minimize dust traffic and transportation impacts, mud, noise and
other noxious characteristics.
Dust debatement methods will be used at the site as well as street cleaning. All local and federal
requirements regarding noxious characteristics will be complied with.
02/16/96 FRI 14:48 [TX/RX NO 5012] e002
Mark Miller CONSULTANTS INC.
DEVELOPMENT ■ LAND USE ■ CONSTRUCTION MANAGEMENT
DEVELOPMENT PLANNING
CITY OF RENTON
February 16, 1996 FEB 2 0 1996
RECEIVED
Jennifer Toth-Henning
Public Works Department
City of Renton
200 Mill Ave. S .
Renton, WA 98055
RE: Raymond Center/Opus Northwest LLC
Dear Jennifer:
As a follow up to the site plan approval for Raymond Center
submitted for Opus Northwest LLC on February 15, 1996, I am
enclosing as requested the following items :
A. Three copies of October, 1992 wetland delineation by
Shannon & Wilson, Inc . ;
B. Three copies of April 14, 1995 geotechnical report by
Earth Consultants, Inc .
Very truly yours,
MARK MILLER CONSULTANTS, INC.
Mark Miller
MM:pp
Enclosures
cc : Bart Brynestad
10801 Main Street, Suite 100 ■ Bellevue,Washington 98004 ■ 206/455-1724 ■ FAX 206/455-5076
..............................:.:.:::.<.....:.......:......:.......................:. :..:..:::bEUEL'OPIVI ENT:S.ER�I:CES:.D.I. .1.SION........................ .
/.IA TER AP . LICATIO
...... C . ...�:::::::.::::::.:::::::.:::. .:.::.:::::.�..::::: .................... ..1.... O�iMATI .N... con ........ .......
..........:.::....... ::....:,::..::.::.:..:..:...::.::::::.:..::....:..::::::,::..:.
Note >[f<the:re<.s ore tF an onefe aI ow er le notarized Master:€Applcation,for.each.owner .,.... ....... ......... EXISTING LAND USE(S): Vacant
Lana. Owner _ Developer
NAME: Winmar-Metro,_ Inc . Opus Northwest
LLC
ADDRESS: 700 5th Ave-.., #2600 200 112th Ave
ROPOSED LAND USES: Office/Warehouse/Manu—
N.E. , #205 facturing
CITY: Seattle, WA ZIP: Bellevue,: WP_
98104 98004 EXISTING COMPREHENSIVE PLAN MAP DESIGNATION:
TELEPHONE NUMBER:
(206) 223-6292 (206) 453-410C PROPOSED COMPREHENSIVE PLAN MAP DESIGNATION:
NAME: Mark Miller
Mark Miller Consultants , Inc . EXISTING ZONING: IL
ADDRESS: 10801 Main Street, Suite 100
PROPOSED ZONING: IL
CITY: Bellevue, WA ZIP: 98004
SITE AREA (SQ. FT. OR ACREAGE): 452 , 716 s . f.
TELEPHONE NUMBER: (206) 455--1724
PROJECT VALUE: 1 500 00 0 . 0'0
»<; ........................
PROJECT.OR.DEVELOPMENT NAME:
•
• •
'?'.°-_Raymond.,..Avenue Center '
IS THE SITE LOCATED IN THE AQUIFER PROTECTION AREA? No.
I?ROPERTY/PRO eCT ApDDRESS(S)/LOCATION:
901 Ra 'mbid'' Avenue S .W.
IS THE SITE LOCATED IN ANY OTHER TYPE OF ENVIRONMENTALLY
SENSITIVE AREA?
Springbrook Creek
KING COUNTY ASSESSOR'S ACCOUNT NUMBER(S): RIVED
•
242304-9020-08 8 � �
?996
Dt_yELOPmPNT`-ry of Rery OONING
N
.i, r - I
:::!1:ii::<:::>::>::>::::i iii ::::i:mi::; . >: t` ,igl .i: sheet:)f>::ne.cess .......................................:
:>::::>: ::>:<:::>:::;::»>:::> ::::<::>::�EGAL::DE.S.CRI ,.. )N::.OF..:P.ROPEF3IY.. At�ach.:ae. :a_. :..........................::::.:...::::::::.::Y1.::::::..:............................ •,
.
Please see attached documents for legal description.
1
•
,I
:> :>::«: ::» :>:> « «: heck<a[Ia .Ircation:t thata .L it sf ffw( I>determi ne:fees :«<> < :> :> > :: : :
::: :::. ::: :: ::: . : ;: . .. :: .. ...:.: .::.. : ..: ._:::::::.:::..::::.:::.::....:..............:::.:...:..:.:::.:: ...:............::.:.......:...::.
i
_ANNEXATION $ SUBDIVISION: '
_ COMP. PLAN AMENDMENT $
_ REZONE 1 $ _ LOT LINE ADJUSTMENT $
_ SPECIAL PERMIT $ _,SHORT PLAT $
TEMPORARY PERMIT $ —TENTATIVE PLAT $
_ CONDITIONAL USE PERMIT $ _'PRELIMINARY PLAT $
X SITE PLAN APPROVAL $ 5 0 0 .0 0 _ FINAL PLAT $
_ GRADE & FILL PERMIT $
(NO. CU. YDS: ) PLANNED UNIT DEVELOPMENT: $
_ VARIANCE $
(FROM SECTION: ) _ PRELIMINARY !
_WAIVER $ _ FINAL I
_WETLAND PERMIT $
ROUTINE VEGETATION
_
MANAGEMENT PERMIT $ MOBILE HOME PARKS: $
'I
BINDING SITE PLAN $ . 1 j
SHORELINE REVIEWS: '
•X SUBSTANTIAL DEVELOPMENT $1 ,000 .00
_ CONDITIONAL USE $
_VARIANCE $ ,
_ EXEMPTION $No Charge 'ENVIRONMENTAL REVIEW., $ 500 . 0Q
REVISION $
OVV)NERSHIP>< > >> <» :'g:4! >NEME > >' > >M::: «><>>
LiDraik
I, (Print Name)/_J J/D(Z)k6p-"l , declare that I am (please check one)_the owner of the property involved in this application,,the
authorized representative to act for the property owner (please attach proof of authorization), and that the foregoing statements and answers herein
contained and the information herewith submitted are in all respects true and correct to the best of my knowledge and belief. '
4,000,V114,41
ATTEST: Subscribedand sworn to before rr}�+ , , �1�'�$ard
Eddie L. Hehdri kson, President for the State of residing at �,` IoN e.,42�L'f SI
(Name of Owner/Representative) 19 , on the J� TARy�. �'�$
ci% RIBS =s
(Signature of Owner/Representative) ♦ lw _4a ',`O.1.,
(Signature of Notary Public) b, 0F• !•. '•`'`.���
:;:.::::::::>::>:::::::::;::::;::::>::»::>::»:.::;<;::>::.>:<::<:::::>:::<:.;;.»::>::>:<:.:>::;:.::<:>:..: f ..h(s..se. t. .. . c. m. .lete:d':b:...C..t ..S:o......)............................................ ......:....:..............:..:..::::::.::...
:::...:.........:. .... ::.. ... .:.g .;.:::::::::..:.:..Cr. A.:.,.F3::.:..SH.PL.t:C.U.sLLA:.::::PP.�:::.F,.p.:.:."FP:::::5P,.:::::RV[VIP::>::>:::V::»>::>;:;;.;;:.;:.;:.;:.;;:.iii
;;:
REVISED 2/95
BUSH, ROED & HITCHINGS, INC.
LEGAL DESCRIPTION
LOT 2 OF CITY OF RENTON LOT LINE ADJUSTMENT NUMBER LUA-95-064-LLA, AS
RECORDED UNDER K.C.R.N. 9508039005.
>.....D. VELOP. E;<>:
MEN:::>SE' V:.;:::::.;:.: :.; :: :::.;::: <» > < <«< «`< > >><>< ><>> '< _;>
::.:::.::.::.::.::.::::.::::.:::.:.::.::.:......>:....:::.::.:,. ...................... .. T.. . R. fCES..QIVI.SI.ON...............
:: : : :. :. ...... ..ENT` LCHECKLIST
PURPOSE OF CHECKLIST: •
•
The State Environmental Policy Act (SEPA), Chapter 43.21C RCW, requires all governmental agencies
to consider the environmental impacts of a proposal before making decisions. An Environmental Impact
Statement (EIS) must be prepared for all proposals with probable significant adverse impacts on the
quality of the environment. The purpose of,Jhis.checklist is to provide information to help you and the
agency identify impacts from your proposal (and to reduce or avoid impacts from the proposal, if it can
be done) and to help the agency decide whether an EIS is required.
INSTRUCTIONS FOR APPLICANTS:
This environmental checklist asks you to describe some basic information about your proposal.
Governmental agencies use this checklist to determine whether the environmental impacts of your
proposal are significant, requiring preparation of an EIS. Answer the questions briefly, with the most
precise information known, or give the best description you can.
You must answer each question accurately and carefully, to the best of your knowledge. In most cases,
you should be able to answer the questions from your own observations or project plans without the need
to hire experts. If you really do not know the answer, or if a question does not apply to your proposal,
write "do not know"or"does not apply". Complete answers to the questions now may avoid unnecessary
delays later.
Some questions ask about governmental regulations, such as zoning, shoreline, and landmark
designations. Answer these questions if you can. If you have problems, the governmental agencies can
assist you.
The checklist questions apply to all parts of your proposal, even if you plan to do them over a period of
time or on different parcels of land. Attach any additional information that will help describe your
proposal or its environmental effects. The agency to which you submit this checklist may ask you to
explain your answers or provide additional information reasonably related to determining if there may be
significant adverse impact.
USE OF CHECKLIST FOR NONPROJECT PROPOSALS:
Complete this checklist for nonproject proposals, even though questions may be answered "does not
apply." IN ADDITION, complete the SUPPLEMENTAL SHEET FOR NONPROJECT ACTIONS (part D).
For nonproject actions (actions involving decisions on policies, plans and programs), the references in
the checklist to the words "project," "applicant," and "property or site" should be read as "proposal,"
"proposer," and "affected geographic area," respectively.
RPCRIVED
FEB I 5 1996
DEVELOPMENT PLANNING
CITY OF RENTON
•
i Environmental Checklist ,
A. BACKGROUND
1. Name of proposed project, if applicable:
RAYMOND STREET CENTER '!
2. Name of applicant: Opus Northwest LLC
ATTN: Bart Brynestad
3. Address and phone number of applicant and contact person: \ Architect: Bob Fadden
Opus Northwest LLC Mark
Person: Lance Mueller & Associates
Mark Miller (455-1724)
200-112th Ave. N.E. , Su_ it e 205 1080.1.-N�ain St., Suite 100 130 Lakeside, Suite 250
Bellevue, WA 98004 Bellevue, WA 98004 Seattle,.,WA 98122
4. Dale checklist prepared: 325-2553
February 14 , 1996
5. Agency requesting checklist:
City of Renton
6. Proposed timing or schedule (including phasing, if applicable):
Receive site plan approval
Receive Shoreline permit
Receive Grading permit
7. BnRt Wave any plansngr Fu ure additions, expansion, or further activity related to or connected
with this proposal? If yes, explain.
No
8. List any environmental information you know about that has been prepared, or will be prepared,
directly related to this proposal.
Soils report
Wetland review
9. Do you know whether applications are pending for governmental approvals of other proposals
directly affecting the property covered by your proposal? If yes, explain.
None
10. List any governmental approvals or permits that will be needed for your proposal, if known.
Shoreline permit Building permit
Grading permit Utility permits '!
Street use permits Department of Fisheries approval
11. Give brief, complete description of your proposal, including the proposed uses and the size of
the project and site.
See Exhibit "A"
•
2
i ; .I
S S
EXHIBIT "A"
RAYMOND STREET CENTER
Raymond Street Center is a commercial project designed for
warehouse, office and manufacturing use as permitted in the IL zone
in Renton. The building will be constructed for those uses,
permitted in the F1, Si and B or other acceptable occupancy groups
of the Uniform Building Code . The facility is planned to be
available for occupant use in late 1996 .
The facility will be constructed as a type III-N fully sprinklered
building. The roof structure will be a hybrid wood steel Berkley.
system with a class "B" built up roof membrane. The exterior walls
will be painted concrete with reveals serving as architectural
articulation. Office areas will feature insulated architectural
glazing with a corporate entry feature.
A secondary office entry area will be provided at the south end of
the facility. This will allow the facility to accommodate a
variety of users .
The building floor will be designed for 250 lb. /s . f . loading and be
concrete slab on grade. Future office areas may be located on
mezzanine areas . These floors may be of plywood and wood truss
construction or traditional metal system of concrete on a metal
deck or bar joists .
The site is located at the end of Raymond Street and is located
between Springbrook Creek drainage channel on the south and west
and a class III wetland area along its eastern boundary. The north
boundary of the site has a drainage ditch that flows along its
border to Springbrook ditch. The site is served with water and
sanitary sewer at the northeast corner where Raymond Street abuts
the lot . The approximate area of the site Parcel B is 452 , 716 s . f .
The site was previously filled under an earlier permit to
elevations shown on survey. The survey also indicates the edge of
the delineated wetland along the east boundary. The bank of the
drainage channel on the west and south is bermed above the
elevation of the fill . The existing site is covered with grass,
Scotch Broom and scrub Alder at wetland. Ditch areas have some
brush cover.
The site plan has been designed to meet the needs of current tenant
demands in the south Renton area. The plan has been developed to
accommodate the building and parking requirements based on
highpiled warehousing and manufacturing. The building area of
approximately 99, 635 s . f . is in the minimum range of area required
by most current users .
1
EXHIBIT "A"
RAYMOND STREET CENTER
Page Two
The layout of the site is a direct result of user needs, site
constraints and setback requirements .
In order to develop sufficient building area and dock high
services, the main loading and activity areas were located on the
western and southern faces of the building. The main office area
will be located at the north end of the building. The main
employee parking area will be placed between the water quality area
at the far north and the building. All paving, parking, drives and
service areas will be placed with a 50' setback from ordinary high
water of the drainage channel and 25' away from the class III
wetland. The site will have a low lot coverage of 19% with vehicle
parking for 128 cars. The building will provide dock high service
for 20 trucks and drive in service areas in at least two places .
The site plan, as designed, provides for separation of parking and
service activities . It also has good maneuvering and circulation
of large vehicles along with adequate areas for large vehicle
parking with opportunity for limited outside storage.
The site Parcel B, at this time, will be fully developed. All
areas outside of wetland and stream buffers will be landscaped,
paved and developed into water quality areas or building. If any
recontouring in buffer areas is necessary, those areas will be
restored, otherwise they will be left as native buffers .
\mark\raymdstl.exh
2
4111
Environmental Checklist
12. Location of the proposal. Give sufficient information for a person to understand the precise
location of your proposed project, including a street address, if any, and section, township, and
range if known. If a proposal would occur over a range of area, provide the range or boundaries
of the site(s). Provide a legal description, site plan, vicinity map, and topographic map, if
reasonably available. While you should submit any plans required by the agency, you are not
required to duplicate maps or detailed plans submitted with any permit applications related to this
checklist.
See civil drawings sheet C-1, 3 and attached neighborhood maps .
B. ENVIRONMENTAL ELEMENTS
1. EARTH
a. General description of the site (circle one)O oiling,-hilly, steep slopes, mountainous,
other
•
b. What is the steepest slope on the site (approximate percent slope?)
Less than 1% in all areas of development.
c. -- What general types of soils are found on the site (for example, clay, sand,.gravel, peat,
muck)? If you know the classification of agricultural soils, specify them and note any
prime farmland.
Silty sand, peat and silt.
d. Are there surface indications or history of unstable soils in the immediate vicinity? If so,
describe.
None
e. - Describe the purpose, type, and approximate quantities of any filling or grading
proposed. Indicate source of fill.
Volume out = 3 ,950 c .y. ; Volume fill:.= 5 ,660 c.y. •
Source of fill as approved by soils engineer.
f. Could erosion occur as a result of clearing, construction, or use? If so, generally
describe.
Erosion could occur during various construction activities
due to grading and trenching.
g. About what percent of the site will be covered with impervious surfaces after project
construction (for example, asphalt or buildings)?
Total area = 10 .39 ac. , .. disturbed area = 4 . 97 ac. , impervious
surface area = 4 .70 ac. Percent impervious = 45 .2% .
3
M 411,
Environmental Checklist
' I
h. Proposed measures to reduce or control erosion, or other impacts to the earth, if any:
Pro'vide city approved temporary erosion control plan until
final improvements are installed.
2. AIR
a. What types of emissions to the air would result from the proposal (i.e., dust, automobile,
odors, industrial wood smoke) during construction and when the project is completed? If
.any, generally describe and give approximate quantities if known.
Dust, equipment and vehicle emission during construction.
Vehicle emissions after completion and emission from gas
heating equipment.
b. Are there any off--site sources of emission or odor that may affect your proposal? If so,
generally describe. None
c. Proposed measures to reduce or control emissions or other impacts to air, if any:
Comply to vehicle emission standards and dust abatement
procedures .
I
3. WATER
a. Surface Water:
. I
1) Is there any surface water body on or in the immediate vicinity of the site (including year-
round and seasonal streams, saltwater„lakes, ponds,-wetlands)? If yes; describe type
and provide names. If appropriate, state what stream or river it flows into.
Spring Brook Creek (drainage channel) at the west. Existing
class III wetland at the east and north.
2) Will the project require any work over, in, or adjacent to (within 200 feet) the described
waters? If yes, please describe and attach available plans.
Building and site improvements within 50 ' of ordinary high
water — and within 25 ' of existing class III wetland at the
east and north.
3) Estimate the amount of fill and dredge material that would be placed in or removed from
surface water or wetlands and indicate the area of the site that would be affected.
Indicate the source of fill material.
None
4) Will the proposal require surface water withdrawals or diversions? Give general
description, purpose, and approximate quantities if known.
None
1
5) • Does the proposal lie within a 100-year flood plain? If so, note location on the site plan.
Site is currently filled above 100 year floodplain.
4
i I
a
,• imo
Environmental Checklist
6) Does the proposal involve any discharges of waste materials to surface waters? If so,
describe the type of waste and anticipated volume of discharge.
No
b. Ground Water:
1) :.Will.ground water be.withdrawn,.or will water be discharged to ground water? Give
general description, purpose, and approximate quantities if known.
No
2) Describe waste material that will.be discharged into the ground from septic tanks or other
sources, if any (for,example: Domestic sewage;industrial,: containing the following
chemicals...; agricultural; etc.). Describe the general size•ofthe system;'the of
such systems, the number of houses to be served (if applicable), or the number of
animals or humans the system(s) are expected to serve.
None
c. Water Runoff(including storm water):
1) Describe.the source of runoff. (including storm water) ..and.::method•.of.collection and
disposal, if any (include quantities, if known). -Where will this water flow? Will this water
flow into other waters, If so, describe.
Runoff from impervious surfaces will be collected into an
underground system and discharged into a city drainage ditch at the north
edgel of the site. Some of the clean roof water will be discharged into
2) wDtl nd at east to ma maintain or existinga run off conditions.
g waters? _If so, generally describe.
No
d. Proposed measures to reduce or control surface, ground, and runoff water impacts, if
any: Provide city approved water quality and detetio system
prior to discharge into city drain. Pay ci n
ty mitigation
fees per Ordinance .
4. PLANTS
a. Check or circle types of vegetation found on • - site:
X deciduous tree: alder, maple, aspen, other
evergreen tree: fir, cedar, pine, other
shrubs
X grass
pasture
crop or grain
X • wet soil plants: cattail, buttercup, bullrush, skunk cabbage, other
water plants:water lily, eel grass, milfoil, other
other types of vegetation
b. What kind and amount of vegetation will be removed or altered?
Grass and Scotchbroom will be removed in previously filled
area which will be developed.
5
410
111
Environmental Checklist
c. List threatened or endangered species known to be on or near the site.
None
d. Proposed landscaping, use of native plants, or other measures to preserve or enhance
vegetation on the site, if any:
Landscaping will be installed per city ordinance and Green
River ordinance. This landscaping will enhance habitat
value of the site.
5. ANIMALS
a. :Circle any birds:and animals which have been observed.on:or.near the site or-are known
to be on or near the site: (see next page)
Birds: hawk, heron, eagle6ongbirds, they
Mammals: deer, bear, elk, beaver, other
Fish: bass, salmon,trout, herring, shelifis i, other
b. List any threatened or endangered species known to be on or near the site.
None
c. Is the site part of a migration route? If sol, explain
Pacific Flyway
d. Proposed measures to preserve or enhance wildlife, if any:
Install new landscaping.
6. ENERGY AND NATURAL RESOURCES
a. What kinds of energ CID
natural ga, oil, wood stove, solar) will be used to meet
the completed proje - ergy nee•s Describe whether it will be used for heating,
manufacturing, etc.
Electricity will be used for lighting, cooling, convenience
outlets and to run equipment. Gas will be used for heating.
b. Would your project affect the potential use of solar energy by adjacent properties? If so,
generally describe.
No
1
c. What kinds of energy conservation features are included in the plans of this proposal?
List other proposed measures to reduce or control energy impacts, if any:
Conform to State Energy Code.
7. ENVIRONMENTAL HEALTH
6
111
Environmental Checklist
a. Are there any environmental health hazards, including exposure to toxic chemicals,
risk of fire and explosion, spill, or hazardous waste, that could occur as a result of this
proposal? If so, describe.
None
1) Describe special emergency services that might be required.
Fire, police and aid car.
2) Proposed measures to reduce or control environmental health hazards, if any:
None
b. Noise
1) What types of noise exist in the area which may affect your project (for example: traffic,
equipment, operation, other)?
• None
2) What types and levels of noise would be created by or associated with the project on a
short-term or a long-term basis (for example: traffic, construction, operation, other)?
Indicate what hours noise would come from the site.
Construction equipment noise and vehicle noise during
construction. Vehicle noise after completion.
3) Proposed measures to reduce or control noise impacts, if any:
Comply with vehicle noise standards and noise abatement
regulations .
8. LAND AND SHORELINE USE
a. What is the current use of the site and adjacent properties?
Undeveloped land.
b. Has the site been used for agriculture? If so, describe.
No
c. Describe any structures on the site. .
None
d. Will any structures be demolished? If so,what?
No
e. What is the current zoning classification of the site?
IL
f. What is the current comprehensive plan designation of the site?
Industrial
7
•
1110
11111.
' Environmental Checklist
g. If applicable,what is the current shoreline master program designation of the site?
Urban
h. Has any part of the site been classified as an "environmentally sensitive" area? If so,
specify.
Class III wetland at east and north lot lines.
I �
i. -Approximately how many people would reside or work in the completed project?
35 to 50
j. Approximately how many people would the completed project displace?
None
k. Proposed measures to avoid or reduce displacement impacts, if any:
None
I. Proposed measures to ensure the proposal is compatible with existing:.and.:projected
land uses and plans, if any: '
Comply with zoning standards .
9. HOUSING
a. Approximately how many units would. be provided, if any? Indicate whether high,
middle, or low-income housing.
DNA,
b. Approximately how many units, if any, would be eliminated? Indicate whether high,
middle, or low-income housing.
DNA
c. Proposed measures to reduce or control housing impacts, if any:
DNA
•
10. AESTHETIC'S
a. 'What is the tallest height of any proposed structure(s), not including antennas; what is
the principal exterior building material(s) proposed.
35 '; height above finish floor . Principal exterior material
is painted concrete.
b. What views in the immediate vicinity would be altered or obstructed? II
None .
c. Proposed measures to reduce or control aesthetic impacts, if any:.
Install landscaping. II,
8
•
F
410
Environmental Checklist
11. LIGHT AND GLARE
a. What type of light or glare will the proposal produce? What time of day would it mainly
occur?
Night lighting of site will be installed.
b. Could light or glare from the finished project be a safety hazard or interfere with views?
No
c. What existing off-site sources of light or glare may affect your proposal?
None
d. Proposed measures to reduce or control light and glare impacts, 'f any: Use Photometrics
to control lighting affects.
12. RECREATION
a. What designated and informal recreational opportunities are in the immediate Vicinity?
None
b. Would the proposed project displace any existing recreational uses?- If so, describe.
No
c. Proposed measures to reduce or control impacts.on.recreation, including recreation
opportunities to be provided by the project or applicant, if any:
Provide basketball area, seating area at channel and picnic
area. . . . .
13. HISTORIC AND CULTURAL PRESERVATION
a. Are there any places or objects listed on, or proposed for, national state, or local
preservation registers known to be on or next to the site? If so, generally describe.
No
b. Generally describe any landmarks or evidence of historic, archaeological, scientific, or
cultural importance known to be on or next to the site.
None
c. Proposed measures to reduce or control impacts, if any:
14. TRANSPORTATION
a. Identify public streets and highways serving the site, and describe proposed access to
the existing street system. Show on site plans, if any.
•
Raymond Street
•
, i
4114
Environmental Checklist
b. Is site currently served by public transit?1 If not, what is the approximate distance to the
nearest transit stop?
One1mile to any bus stop. jl
c. How jmany parking spaces would the completed project have? How many would the
project eliminate?
Approximately 128 new stalls. No existing stalls .
d. -Will the proposal require any new roads or streets,-or,improvements to existing roads or
streets, not including driveways? If so,'generally describe :(indicate whether-public or
private?
No .
:I I
e. Will the project use (or occur in the immediate ..vicinity:of) water,-grail, or air
transportation? If so, generally describe;
No
f. How.many vehicular trips per day would'be,generated by the completed project? If
known, indicate when peak volumes would occur.
4 . 88 trip per 1 ,000 s .f. or 486 .2 trips per day based on
ITF manual . �
g. Proposed measures to reduce or control transportation impacts, if any:
Participate in Renton Traffic Mitigation Program.
15. PUBLIC SERVICES •
a. Would the project result in an increased need for public services (for example: fire
protection, police protection, health care,,schools, other)? If so, generally describe.
Fire , police and aid car.
b. Proposed measures to reduce or control direct impacts on public services, if any.
Paycitymitigation fees per Ordinance .
g
16. UTILITIES
a. Circle util' '- rren . ailable at the site - 11211.a refuse
II
service telephone sanitary sewe septic system, : - .
10 Ji
Environmental Checklist
b. Describe the utilities that are proposed for the project, the utility providing the service,
and the general construction activities on the site or in the immediate vicinity which
might be needed.
Electricity — Puget Power
Telephone — U.S . West
Other utilities from City of Renton
C. SIGNATURE
I, .the.undersigned, state that to the best of my knowledge-the above information is.true and
complete. It :is understood that the lead agency may;withdraw any-declaration of non-
• significance that it might.issue in reliance upon this•checklist .should there be any willful
misrepresentation or willful lack of full disclosure on my part.
Proponent: MARK MILLER ONSULTANTS, INC. •
•
4110141.
Name Printed: MARK MILLER
Date: Fes' . is if 9 4
•
11
0 f
0 .: 1
I.
Environmental Checklist
I
D. SUPPLEMENTAL SHEETS FOR NONPROJECT ACTIONS r
i
• ;,:::s::ee s`€>s::'ould> ';<;:I:`: b.� >��:`ed>fo�ri>acfio'����`�€ nvolvin'��>deciso�ns>`on>�? of c s . en .
(Tt. se.:::.miii:i...t .:.v::igii Qn.Y,::::.: .,*i:$::::::::::.: .::.::..::.: ::.: . :.::.:.g:::: :.:: .::::::: :::.::::.:.P.. .:. ..,.::p:.. :.: .n..:
:..;.`:::u c1' `::`o`'''ee_ _.;. Pout f es s e s f ro ct n programs :Yo. .; o.n. t.n ,to.:fl:. : ..h. . b. �. . .......P . .:: . . ) ::.......:..: ::::: : :.:::::::::::::. .
i
Because these questions are very general, it may be helpful to read them in conjunction with the
list of the elements of the environment.
.When answering these questions, be aware of the extent.the proposal, or the types of activities
. likely.to.result from the proposal, would affect the item at a greater intensity or at a faster rate
• than if the proposal were not implemented. Respond briefly.and in general terms.
1. How would the proposal be likely to increase discharge to .water;:emissions to air;.production, I
. storage, or release of toxic or hazardous substances; or production-of noise? ,'
.
Proposed measures to avoid,or reduce/such increases are:
.
2. How would the proposal be likely to affect plants, animals, fish,-or marine life?
Proposed measures to protect or conserve plants, animals,-fish, or marine life are:
P
I
3. How would the proposal be likely to deplete energy or natural resources?
i
I i,
li
Proposed measures to protect or conserve energy and natural resources are:
4. How would the proposal be likely to use for affect environmentally sensitive areas or areas
designated (or eligible or under study) for governmental protection; such as parks, wilderness,
wild and scenic rivers, threatened or endangered species habitat, historic or cultural sites,
wetlands, flood plains, or prime farmlands? I .
Proposed measures to protect such'resources or to avoid or reduce impacts are:
5. How would the proposal be likely to affect land and shoreline use, including whether it would
allow or encourage land or shoreline uses incompatible with existing plans?
i
Proposed measures to avoid or reduce shoreline and land use impacts are:
I •
12
41)
Environmental Checklist
6. How would the proposal be likely to increase demands on transportation or public services and
utilities?
Proposed measures to reduce or respond to such demand(s) are:
7. Identify, if possible, whether the proposal may conflict with local, state, or federal laws or
requirements for the protection of the environment.
SIGNATURE
I, the undersigned, state that to the best of my knowledge the above information is true and
complete. It is understood that the lead agency may withdraw:any.-.declaration of non-
significance that it•might issue in reliance •upon this checklist should there .be any willful
misrepresentation or willful lack of full disclosure on my part.
Proponent:
Name Printed:
Date:
REVISED 9/94
•
13
111
Mark Miller CONSULTANTS INC.
DEVELOPMENT ■ LAND USE • CONSTRUCTION MANAGEMENT
February 15, 1996
0i
City of Renton
Development Services Division
Municipal Building DEB, 1 1996
200 Mill Ave . S .
Renton, WA 98055 �EVELopive�taP���No
oF
RE: Raymond Center
Dear City of Renton:
On behalf of Opus Northwest LLC I am applying for a site plan
approval, shoreline substantial development permit and
environmental review for the Raymond Center property. This
property previously received the above listed approvals
approximately May 3 , 1995 under Project No. LUA-95 . 064, SA, SM,
ECF, LLA for a 81, 250 square foot building. This application is
for a 99, 635 square foot building. The previous application
received a wetland variance approval on November 6, 1995 (No. LUA
95 . 064, SA, SM, ECF, LCA, Category 3) . The previously approved
wetlands variance has been incorporated into the plans of this
application. Also, as it relates to this property, the city
suggested on September 25, 1995 that a letter of map revision
with FEMA be obtained, but that the FEMA approval is not part of
site plan approval conditions . Opus Northwest LLC is currently
working on obtaining a letter of map revision in conjunction with
a future building permit application for this property.
As part of this application I am enclosing the following:
A. 11 copies of Master Application;
B. 11 copies of signed Environmental Checklist, including
project narrative;
C. One full set of mailing labels;
E. Two copies of notarized list;
F. One check for $2, 000 . 00;
G. 11 copies of architectural Al, A2, landscaping L1 . 1,
L1 .2 and civil 1 of 1;
H. 11 copies of neighborhood plan;
10801 Main Street, Suite 100 • Bellevue,Washington 98004 • 206/455-1724 • FAX 206/455-5076
S
City of Renton
February 15, 1996
Page Two
I . One set of reduced architectural; •
J. Two sets of reduced neighborhood plan;
K. One copy of 4"x 6" reduction drawing;
L. One set colored architectural landscaping and
neighborhood plans;
M. 11 copies of storm drainage report .
If you have any questions regarding this application, please
contact :
Mark Miller
Mark Miller Consultants, Inc .
10801 Main St . , Suite 100
Bellevue, WA 98004
(206) 455-1724
Thank you for your attention in processing our requests .
Very truly yours,
MARK MILLER CONSULTANTS, INC.
Mark Miller
MM:pp
Enclosures
cc : Opus Northwest LLC
M e il K C'1 .I 1 .' ; 1'+--'.,, i,;"'�.L �.,�-a..R qy �r ,-�'^e'.1 U
10801 Main Street, Suite 100 • Bellevue,Washington 98004 • 206/455-1724 • FAX 206/455-5076
****************************************************************
City of Renton WA Reprinted: 02/15/96 14 :36 Receipt
****************************************************************
Receipt Number: R9600662 Amount : 2, 010 .24 02/15/96 14 :35
Payment Method: CHECK Notation: #2810 M MILLER Init : LN
Project # : LUA96-015 Type : LUA Land Use Actions
Parcel No: 242304-9020
Site Address : 2000 RAYMOND AV SW
Total Fees : 2, 010 .24
This Payment 2, 010 .24 Total ALL Pmts : 2, 010 .24
Balance : . 00
****************************************************************
Account Code Description Amount
000 .345 . 81 . 00 . 0007 Environmental Review 500 . 00
000 . 345 . 81 . 00 . 0016 Shoreline Subst Dev 500 . 00
000 .345 . 81 . 00 . 0017 Site Plan Approval 1, 000 . 00
000 . 05 . 519 . 90 .42 . 1 Postage 10 . 24
. . . T 1412-01 1;5
DEVELOPMENT PLANNING - • 1`t
CITY OF RFNTON
FEB 2 01996 :• .. .
�4
t..T
•
a CE M - j .
'
4
d
I i;
;:
Preliminary Wetland Delineation
Van Woerden Tract .�_ •
.
x
t';
. Southwest of Raymond Ave. S.W.
Renton, Washington
=1 :t'i
1; •
October 1992 `�
. Mr. Tim Puryear :.
Winmar Company, inc. •``y
:T
rr.
• • L'a is
. 700 - 5th Avenue - 0
Gateway Tower
•,t
Seattle, WA 98104-5026 I'1
a r k Y .
i
i-..: . . - ,. „, 4 _ 'VA4
.: fp . •
ti.36er S.":
SHANNON 6WILSON, INC. _ ,1m
' - GEOTECHNICAL AND ENVIRONMENTAL CONSULTANTS 400 N. 34th St. ® Suite .100 , .
P.O. Box 300303 k'
Seattle, Washington 98103 • . - ',a.
. •
206�632 ®8020 :°•
. - f.-...
rF
1
• i' �..I��NI SEATTLE
EVERETT
KEW GEOTECHNICAL
AND ENVIRONMENTALts • I���S INC
ENE SK
ANCHORAGE
• SAINT LOUIS
October 27, 1992
Mr. Tim Puryear •
Winmar Company, Inc.
• 700 - 5th Avenue
,Gateway Tower
,Seattle, Washington '98104-5026
'RE: PRELIMINARY WETLAND DELINEATION
VAN WOERDEN TRACT
SOUTHWEST OF RAYMOND AVENUE SOUTHWEST
RENTON, WASHINGTON
A preliminary wetland delineation was requested by Mr. Tim Puryear from Winmar Company, Inc.
•
for the Van Woerden Tract property located southwest of Raymond Avenue Southwest in Renton,
Washington. Shannon &Wilson, Inc. prepared this preliminary wetland delineation in accordance •
with our proposal dated September 1, 1992. The scope of services was authorized by Mr. Dean
Henery on October 8, 1992. The objective of this preliminary wetland delineation is to identify
and flag wetland boundaries on the subject property using the Federal Manual for Identifying and •
Delineating Jurisdictional Wetlands (January, 1989).
Sincerely,
SHANNON & WILSON, INC.
Theresa R. Henson
Wetland Specialist
•
Irank W. Pita, P.E. P.G.
Vice President
TRH:FWP/trh
T1412-01.RPT/r1412-1kd/dgw
T-1412-01 •
400 NORTH 34TH STREET•SUITE 100
P.O.BOX 300303
SEATTLE,WASHINGTON 98103
206.632.8020 FAX 206.633.6777
•
SHANNON&WILSON.INC.
EXECUTIVE SUMMARY
The findings and conclusions presented in this study are based on an interpretation of information
currently available to Shannon &Wilson, Inc. This summary is for introductory purposes and
should only be used with the full text of this report.
Based upon information derived through site reconnaissance and readily available documents,
three wetland areas were delineated on the subject property. The wetland delineation was based
upon the Routine On-Site Determination Method described in the Federal Manual for Identifying
and Delineating Jurisdictional Wetlands (January, 1989). Wetland "A" is a palustrine forested
(willow),palustrine shrub-scrub(willow),palustrine emergent(yellow iris/cattail)wetland located
along the eastern property boundary. The on-site portion of Wetland "A" is approximately 1.35
acre(58,742 square feet(ft2))in size. Wetland "B" is a palustrine scrub-shrub (alder),palustrine
emergent (reed canarygrass/cattail) wetland located in the southwest quarter of the site. The
on-site portion of Wetland "B" is approximately 4.21 acre (183,184 ft2) in size. Wetland "C" [f
is a palustrine scrub-shrub (willow), palustrine emergent (sedge) wetland located along the _
northeastern property boundary. The on-site portion of Wetland "C" is approximately 0.03 acre f;
(1,329 ft2) in size. "
Using the City of Renton Wetland Management Ordinance No. 4346 (March 1992) Wetlands
"A", "B", and "C" would be classified as Category 3, Lower Quality Wetlands. .These wetlands
have been severely disturbed by human-related hydrologic alterations including diking, ditching,
channelization and outlet modification, and have had soils alterations including the presence of
fill, soil removal and soil compaction. The ordinance requires 25 foot native vegetation buffers
around the wetlands, since the site would have an urban Shoreline Master Program designation.
A 20 foot building setback from the wetland buffer edge may also be required by the City of
Renton Building Regulations.
Springbrook Creek flows in a northerly direction through the center of the site. Springbrook
Creek would require at least a 50 foot native vegetation buffer between the creek and any •
development, since the site would have an urban Shoreline Master Program designation.
A Modified Reppert Values Evaluation (MRVE) was completed for each of the three wetland
areas. Based on an interpretation of the MRVE, Wetlands "A" and "B" have generally high
to moderate functions and values, and Wetland "C" has generally moderate functions and values.
T-1412-01
i
SHANNON&WILSON.INC.
TABLE OF CONTENTS
Page
EXECUTIVE SUMMARY i •
1.0 INTRODUCTION 1
1.1 Scope of Services 1
1.2 Site Location and Description 2
2.0 DOCUMENT RESEARCH 3
•
2.1 Historical Aerial Photographs 3
2.2 Wetland Inventory Maps 5
2.2.1 City of Renton Wetland, Lakes, Rivers and Streams Maps 5
2.2.2 U.S. Fish and wildlife Service National Wetland Inventory Map 5 •
2.3 Washington State Natural Heritage System Database Review 5
2.3.1 Washington State Department of Wildlife Nongame Database Review . 5
2.3.2 Washington State Department of Natural Resources Database Review . 5
2.4 Soil Conservation Service Soil Survey of the King County Area 6
2.5 Springbrook Creek Stream Flow Data 7 • `
3.0 SITE RECONNAISSANCE 7
3.1 Site Conditions During Site Visit 7
3.2 Topography 7
3.3 Fauna 8
3.4 Vegetation 8
3.5 Soils 8 •
3.6 Hydrology 9
4.0 WETLAND AREAS 9 •
4.1 Wetland "A" 10
4.2 Wetland "B" 10 '
4.3 Wetland "C" 11
T-1412-01
ii
SHANNON&WILSON,INC.
TABLE OF CONTENTS (cont.)
Page
5.0 WETLAND FUNCTIONS AND VALUES - 11
5.1 Wetland "A" 12
5.2 Wetland "B" 12
5.3 Wetland "C" 12
6.0 WETLAND REGULATION 12
7.0 CONCLUSIONS 13
8.0 CLOSURE 14
9.0 LIST OF REFERENCES 16
LIST OF TABLES
Table.
No.
1 Identified Wetland Vegetation Species
2 Identified Upland Vegetation Species
3 Hydric Soil Indicators
4 Results of Triple Parameter Approach for each Plot/Test Hole
5 Hydrologic Regimes and Wetland Characteristics
•
LIST OF FIGURES
Figure
No.
1 Vicinity Map
2 Wetland Site Plan
3 City of Renton Wetlands Map
4 National Wetland Inventory Map
5 Soil Conservation Service Map
T-1412-01
iii '
•
SHANNON FiWILSON,INC.
TABLE OF CONTENTS (cont.)
LIST OF APPENDICES
•
APPENDIX A - WETLAND DELINEATION METHODOLOGY •
•
APPENDIX B - PHOTOGRAPHS •
•
APPENDIX C - DEPARTMENT OF WILDLIFE NONGAME DATABASE
INFORMATION
•
APPENDIX D - DEPARTMENT OF NATURAL RESOURCES DATABASE
INFORMATION
APPENDIX E - DEFINITION OF PLANT INDICATOR STATUS AND FIELD SHEETS
APPENDIX F - MODIFIED REPPERT WETLAND VALUES EVALUATION SHEETS
•
•
•
•
T-1412-01
•
iv
SHANNON 6WILSON,INC.
PRELIMINARY WETLAND DELINEATION
VAN WOERDEN TRACT
RENTON, WASHINGTON
1.0 INTRODUCTION
Shannon & Wilson, Inc. has completed a preliminary wetland delineation of the Van Woerden
Tract property located southwest of Raymond Avenue in Renton, Washington (Figure 1). The
scope of services was authorized by Dean Henery on October 8, 1992. This work was per-
formed for Winmar Company, Inc. to assist in the acquisition of permits necessary to proceed
with development of the subject site.
_ 1.1 Scope of Services
The scope of work for this study was limited to the following tasks:
► Review of local regulations pertaining to the wetland areas identified on or near the
subject site.. The review will be used to identify the required buffers and to classify . .
the on-site wetlands.
► Conduct a visual assessment to observe existing site conditions and identify and flag
any wetlands located on the site. This will be accomplished using the Routine On-Site f'
Determination Method, defined in the January 1989 Federal Manual for Identifying and
Delineating Jurisdictional Wetlands (Appendix A).
► A review of aerial photographs to help identify past disturbances and conditions of the
site.
•
► Review of readily available documents including: •
- Local wetland inventory maps.
•
- U.S. Fish and Wildlife Service National Wetland Inventory Maps.
- The Soil Conservation Service soil survey of King County. •
► A review of the Washington Department of Natural Resources database for endangered,
threatened, or sensitive plants or plant communities and animals and their breeding or
nesting areas on and near the site.
T-1412-01
1
SHANNON&WILSON,INC.
► Assessment of identified wetlands to help determine the overall functions and values •
of the wetlands.
► Preparation of a report documenting the process, findings, conclusions, and any recom-
mendations for this project.
1.2 Site Location and Description
The subject property is located southwest of Raymond Avenue Southwest along Springbrook
Creek in Renton, Washington (SE1/4 Sec. 24 T23N R4E) (Figure 1). The subject site is a .
rectangular shaped parcel of land consisting of approximately 28 acres. Springbrook Creek flows
in a northerly direction through the center of the site. The site consists of six distinct areas,
the northwest upland field, the southwest wetland, the eastern upland field, the northeast wetland
ditch, the eastern wetland, and Springbrook Creek (Figure 2). Photographs of the subject
property are included in Appendix B.
Three wetlands were identified on the subject site. Wetland "A" ,is a palustrine forested
(willow),palustrine shrub-scrub(willow),palustrine emergent(yellow iris)wetland located along
the eastern property boundary. The on-site portion of Wetland "A" is approximately 1.35 acre
(58,742 square feet (ft2) in size.. Wetland "B" is a palustrine scrub-shrub (alder), palustrine
emergent (reed canarygrass/cattail).wetland located in the southwest quarter of the site. The
on-site portion of Wetland "B" is approximately 4.21 acre (183,184 ft2) in size. Wetland "C"
is a palustrine scrub-shrub (willow), palustrine emergent (sedge) wetland located along the
northeastern property boundary. The on-site portion of Wetland "C" is approximately 0.03 acre
(1,329 ft2) in size.
The site is bounded on the north by undeveloped land and wetlands, on the south by a ware-
house, undeveloped land and wetlands, on the east by wetlands and a cleared lot, and on the
west by the Longacres Practice Track. .
•
•
T-1412-01
2
SHANNON FiWILSON,INC.
2.0 DOCUMENT RESEARCH
2.1 Historical Aerial Photographs
In the study of aerial photographs, observations are interpretive and limited to the subject site
and adjacent areas. Aerial photographs for the years 1936, 1946, 1956, 1960, 1968, 1974, 1980,
1985, and 1990 were reviewed to evaluate past site conditions.
1936 Aerial Photograph
Interpretation of the photograph taken in 1936 indicated that the subject property contained grassy
fields, and a bridge was located over the northern on-site portion of Springbrook Creek.
Springbrook Creek flowed in a northerly direction through the center of the site. A portion of
an old meander scar from the Green River extended from the east central property boundary
to Springbrook Creek. A small creek flowed north from the south central property boundary
into Springbrook Creek. An east-west ditch had been excavated from the northeast corner of r`
the site to Springbrook Creek.
1946 Aerial Photograph
j,
Interpretation of the photograph taken in 1946 indicated that the on-site fields had been recently
plowed, and planted, and shrub vegetation was located on-site along the eastern property
boundary. The meander scar was well defined and inundated. The small creek was shrub
covered.. Standing water was located in the central portion of the eastern field. Culverts and
fill material were placed at the eastern and western ends of the ditch located on the northeastern
property boundary.
1956 Aerial Photograph • 1-
Interpretation of the photograph taken in 1956 indicated that shrub vegetation that was located
along the eastern property boundary had been cleared. Otherwise the site appeared relatively
unchanged from the 1946 photo.
1960 Aerial Photograph
Interpretation of the photograph taken in June of 1960 indicated that at the majority of vegetation
that was located along the small creek had been cleared, and it was evident that the small stream
T-1412-01
3
SHANNON&WILSON,INC. •
did not have a well defined channel. The old meander scar had been recently dredge and the
dredge materials had been side cast to form a low dike. The eastern field contained several east-
west shallow ditches. Standing water was present over much of the southwestern field. •
•
1968 Aerial Photograph
Interpretation of the photograph taken in May of 1968 indicated that Springbrook Creek, the
meander scar, and the small creek had been recently deepened and widened. The dredge
materials had been side cast. The bridge crossing the northern on-site portion of Springbrook
Creek had been removed. A portion of the southwest field, and the adjacent property east of
the site had been cleared of vegetation.
1974 Aerial Photograph
Interpretation of the photograph taken in March of 1974 indicated that the southwest field had
been cleared, and a series of shallow east-west ditches had been constructed. A deep ditch
northwest-southeast ditch had been constructed in the southwest corner of the site. A deep ditch
had also been excavated along the southern property boundary. The northern portion of the
small creek, adjacent to Springbrook creek had been filled and a culvert was placed in the fill.
A tall berm had been constructed on the southern edge of the meander scar. A small "v" shaped
break was observed in the western portion of the berm. Standing water was present in all of
the ditches, in the southwest field, in Springbrook Creek, the meander scar, the small creek,
•
and in the eastern portion of the eastern field.
1980 Aerial Photograph
Interpretation of the photograph taken in May of 1980 indicated that the eastern field had been
filled. Standing water was evident in all of the on-site ditches, Springbrook Creek, the meander •
scar, and the southwestern field.
1985 Aerial Photograph
•
Interpretation of the photograph taken in March of 1985 indicated that the western half of the
site had been cleared of vegetation. Standing water was evident in the same locations described •
in the 1980 aerial photograph.
T-1412-01
4
•
SHANNON&WILSON,INC.
1990 Aerial Photograph
Interpretation of the photograph taken in July of 1990 indicated that the eastern field had been
' cleared and graded.
2.2 Wetland Inventory Maps
2.2.1 City of Renton Wetland, Lakes. Rivers and Streams Maps
The City of Renton's Wetland, Lakes, Rivers and Streams Maps shows a portion of
Wetland 9 (W-9) located on the eastern boundary of the subject property (Figure 3). Wetland
9 is listed in the City's Wetland Inventory Report as containing palustrine emergent, palustrine
scrub-shrub, palustrine forested, and palustrine open water (permanently flooded) wetland
classes. At the time of the site visit the wetland was entirely vegetated and an open water
component was not observed in the wetland.
2.2.2 U.S, Fish and Wildlife Service National Wetland Inventory Map
The.U.S. Fish and Wildlife Service National.Wetland Inventory Map (1973) for the area
shows a palustrine emergent saturated/semipermanent/seasonally flooded wetland (PEMY) as
being present in the steam beds and on the eastern boundary of the subject property (Figure 4).
2.3 Washington State Natural Heritage System Database Review
2.3.1 Washington State Department of Wildlife Nongame Database Review
A review of the Washington State Department of Wildlife Nongame Da
tabase p g has been
requested to determine if there has been a recorded occurrence of special animal species on-site
or within the immediate vicinity of the subject property. The data base review information has
not been received at this time but will be forwarded upon receipt in our office.
2.3.2 Washington State Department of Natural Resources Database Review
A review of the Washington State Department of Natural Resources Database determined
that there are no significant natural features located on or within the immediate vicinity of the
subject property (Appendix D). Significant natural features that would be listed include
endangered, threatened, or sensitive plant species as well as high quality native plant communi-
ties and wetlands.
T-1412-01
5
SHANNON 6WILSON,INC. •
2.4 Soil Conservation Service Soil Survey of the King County Area •
The U.S. Soil Conservation Service (SCS) Soil Survey of King County, Washington (1973) was
consulted to determine the general nature of soils on the subject site. The following soils
information was taken from this publication. Puyallup sandy loam (Py on the SCS map) and
Woodinville silt loam (Wo on the SCS map)is mapped as being present on the subject property
(Plate 5).
The Puyallup series is made up of well drained soils that formed in alluvium under grass,
hardwoods and conifers. These soils are typically located on natural levees adjacent to streams.
The surface layer is typically a grayish-brown and dark grayish-brown fine sandy loam extends
to a depth of about 34 inches. The substratum to a depth of about 60 inches, is a very dark
grayish-brown, and dark-brown medium sand, loamy sand, and sand. Permeability of this soil
is moderately rapid. Available water capacity is moderately high, surface runoff is slow, and
the erosion hazard is slight. the seasonal water table is typically at a depth of 4 to 5 feet. As i.
part of the mapping of the Puyallup series, the SCS has included up to 15 percent Briscot,
Newberg, Nooksack,,Oridia, and Renton soils; and up to 10% poorly drained Woodinville and
Puget soils. The Puyallup series is not included on the hydric soil list for King County; nor are
the Newberg and Nooksack soils included within the Puyallup map unit, however, the Briscot,
Oridia, Renton, Woodinville and Puget soils included in the Puyallup map unit are list as hydric
soils.
The Woodinville series is made up of poorly drained soils that formed under grass and sedges,
in alluvium, on steam bottoms. A representative profile of Woodinville soils includes gray silt
loam, silty clay loam, and layers of peaty muck to a depth of about 38 inches. This is underlain
by greenish-gray silt loam extending up to 60 inches or more in depth. Permeability of the
Woodinville soil is moderately slow and the water table is usually at or near the surface.
Available water capacity is high and surface runoff is slow. As part of the mapping of the r'
Woodinville soil, the SCS has included up to 15 percent Puget soils, up to 10 percent
Snohomish, Oridia, Briscot, Puyallup, Newberg and Nooksack soils. The Woodinville series
is included on the hydric soil list for King County; as are the Snohomish, Oridia, and Briscot
soils included in the Woodinville map unit. The Puyallup, Newburg and Nooksack soil included
in the Woodinville map unit are not included on the hydric soils list.
•
T-1412-01 •
6
SHANNON&WILSON,INC.
2.5 Springbrook Creek Stream Flow Data
Data gathered and provided by Mr. James Nuerenberg of Boeing indicates that Springbrook
Creek at the Bridge, directly north of the subject property, had base flows from September 1991
to February 1992 ranging between 5 and 18 cubic feet per second. This data indicates that
Springbrook Creek does not have a flow greater than 20 cubic feet per second, and therefore,
would not expect to be regulated under the Shoreline Management Act.
3.0 SITE RECONNAISSANCE
3.1 Site Conditions During Site Visit
On September 9, 1992, Ms. Theresa Henson, Wetland Specialist, and Ms. Ann Youberg,
Environmental Specialist, with Shannon &Wilson, visited the subject site to locate and flag the
wetland boundaries. The site visit included a visual observation of the subject site and surround-
ing area.
The eastern upland field 'on the subject property is relatively flat and contains a large area of
fill. North and east of the eastern upland field are on-site areas that were not filled, and are
considered to be wetlands, Wetland "C" and "A" respectively. South and west of the eastern
upland field is Springbrook Creek. The northwestern portion of the site contains an upland field
and a few shrubs. A weather station is located in the southern portion of this field. The •
majority of the southwestern portion of the site contains a wetland field. North of the wetland
field is a wetland containing shrubs,.a narrow upland berm, and a permanently flooded wetland
with cattails. The narrow upland berm was mapped as wetland because of its shape, and position
within the northern portion of Wetland "B". The southwest wetland field, shrub area and the
permanently flooded wetland are designated as Wetland "B".
3.2 Topography
The topography of the eastern field slopes gently to the west toward Springbrook Creek.
Wetland "A" is a six to eight foot deep depression surrounded with fill slopes. Wetland "B"
is a five to ten foot deep depression with fill slopes along the north and west boundaries, and
a levee on the east boundary. The wetland depression continues south off of the subject
property. The northwest field slopes gently to the east toward Springbrook Creek. Wetland
T-1412-01
7
SHANNON&WILSON,INC.
"C" is an eight foot deep depression surrounded with steep fill slopes. Based upon information
obtained from a U.S. Geological Survey Topographical Map, the topography of the subject
property ranges from approximately five to twenty feet above mean sea level in elevation.
3.3 Fauna •
Fauna noted during the site visit included mallards, one Great Blue Heron in Springbrook Creek,
goldfinches, swallows, two red-tailed hawks, California quail,various songbirds, and Northwest
garter snakes. Endangered, and\or threatened animal species were not observed during the site
reconnaissance.
3.4 Vegetation
Species and dominance of vegetation were observed and noted at 7 plot/test holes on the subject
property. The approximate locations of these plot/test holes are shown on Figure 2. The
dominant wetland tree and sapling species on the site was willow. Red osier dogwood was the
dominant wetland shrub species. Reed canarygrass, cattail, and yellow iris are all dominant
wetland herbaceous species on the site.
•
There were no dominant upland tree species on the site. Blackberry, scotch broom, and thistle
are the dominant upland shrub species. Pasture grasses such as orchard grass, bentgrass and
fescue are the dominant upland herbaceous species on the site. Field sheets detailing observa-
tions for vegetation are included in Appendix E. A listing of wetland and upland plant species
observed on the site are shown in Tables 1 and 2, respectively.
•
3.5 Soils
During the site reconnaissance, soil conditions, including color, texture, and approximate
moisture content were observed and recorded at seven plot/test holes on the subject site. The
indicators used to identify hydric soil are summarized in Table 3. Soil types observed on the
subject site ranged from a gravellysandyloam (fill) to a fine sandyloam to a silt loam. Hydric
Y
soil characteristics were observed in four of the seven plot/test holes (Table 4). Field sheets
detailing observations for soils are included in Appendix E.
• T-1412-01
8
SHANNON bWILSON,INC.
3.6 Hydrology
Hydrologic conditions including saturated soils and inundation as well as indicators of wetland
hydrology, as defined by the Federal Manual for Identifying and Delineating Jurisdictional
Wetlands, were observed within four of the seven plot/test holes (see Table 4). Field sheets
detailing observations of hydrologic conditions are included in Appendix E. F:
Wetland "A" discharges into the southeastern on-site portion of Springbrook Creek through a
ditch. At the time of the site visit Wetland "A" did not contain standing water or saturated soils.
A 36 inch diameter culvert discharges into the northwest corner of Wetland "B". Water from
the northern portion of Wetland "B" leaves this wetland through a 24 inch culvert that discharges
into Springbrook Creek. At the time of the site visit water approximately 2 feet deep was
observed in the northern portion of Wetland "B". Water from the southern portion of Wetland
"B" flows through a ditch and discharges into Springbrook Creek through a 24" culvert (Plate
2). At the time of the site visit saturated soils were present in the southern portion of Wetland
"B". A 60 inch diameter culvert discharges into the eastern end of Wetland "C". Water from
• Wetland "C" leaves this wetland through a 60 inch culvert that discharges into the northeastern
on-site portion of Springbrook Creek. At the time of the site visit water approximately one foot F=
deep was observed flowing in Wetland "C".
4.0 WETLAND AREAS
•
Based upon the use of the triple parameter approach defined within the Federal Manual for
Identifying and Delineating Jurisdiction Wetlands, three areas on the subject site were found to
contain wetlands.
Species of vegetation, soil conditions, and hydrologic conditions were observed at seven plot/test
holes on the subject site (see Table 4 and 5). The final wetland boundary was refined through
additional observations of vegetation, soils, and hydrologic conditions between a plot/test holes
exhibiting wetland characteristics and a plot/test holes exhibiting upland characteristics. The •
on-site wetlands were classified as wetlands due to the presence of all three wetland parameters
(Table 4).
T-1412-01
9
•
•
SHANNON&WILSON,INC.
•
•
4.1 Wetland "A"
Wetland "A" is a Lower Quality Wetland containing three wetland classes, a palustrine forested
wetland, a palustrine scrub-shrub wetland, and a palustrine emergent wetland. Wetland "A"
is located along the eastern property boundary, and the on-site portion of this wetland is
approximately 1.35 acre (58,472 ft2) in size. The eastern boundary of Wetland "A" is located
off-site, and was not delineated. One plot/test holes (plot/test hole 2) was inspected in the •
vicinity of this wetland to identify the presence of hydrophytic vegetation, hydric soils, and
characteristics indicative of wetland hydrology (Table 4).
Wetland "A" is between 50 and 200 feet wide, approximately 1,100 feet long, and is a six to
eight foot deep depression surrounded by fill slopes. Hydrology in Wetland "A" appears to be
present due to precipitation and shallow groundwater. Culverts and discharge points into the
wetland were not located during the site visit. Water leaves Wetland "A" through a ditch located
in the southern portion of the wetland. This ditch discharges into Springbrook Creek. At the
time of the site visit saturated soils and standing water were not present within the wetland.
Vegetation in the northern portion of Wetland "A" is dominated by willow, cottonwood,
nightshade, and reed canarygrass. The southern half of the wetland is dominated by cattails and
yellow iris in the base of the wetland, surrounded by willow, and cottonwood on the slopes.
4.2 Wetland "B"
Wetland "B" is a Lower..Quality Wetland containing two wetland classes, a palustrine scrub-
shrub wetland, and a palustrine emergent wetland. Wetland "B" is located in the southwestern
corner of the site, and the on-site portion of this wetland is approximately 4.21 acre (183,184
ft2)in size. The southern and western boundaries of Wetland "B" are located off-site, and were
not delineated. Two plot/test holes (plot/test holes 6 and 7) were inspected in the vicinity of
this wetland to identify the presence of hydrophytic vegetation, hydric soils, and characteristics
indicative of wetland hydrology (Table 4).
Wetland "B" is a triangular shaped wetland, and is a five to ten foot deep depression with fill
slopes along the north and west boundaries, and a levee on the east boundary. The wetland
depression continues south off of the subject property. A narrow berm is located between the
northern and southern portions of Wetland "B". A 36 inch diameter culvert discharges into the
northwest corner of Wetland "B". Water from the northern portion of Wetland "B" leaves this
T-1412-01
10 '
SHANNON FIWILSON,INC.
wetland through a 24 inch culvert that discharges into Springbrook Creek. At the time of the
site visit water approximately 2 feet deep was observed in the northern portion of Wetland "B".
Hydrology in the southern portion of Wetland "B" appears to be present due to precipitation,
shallow groundwater, and seepage from the base of the berm that separates the northern and
southern portions of Wetland "B". Water from the southern portion of Wetland "B" flows
through a ditch and discharges into Springbrook Creek through a 24" culvert (Plate 2). At the
time of the site visit saturated soils were present in the southern portion of Wetland "B".
vegetation in the northern portion of Wetland "B" is dominated by cattails and sedges. The
southern portion of the wetland is dominated by willow and reed canarygrass.
4.3 Wetland "C"
Wetland "C" is a Lower Quality Wetland containing two wetland classes, a palustrine scrub-
shrub wetland,and a palustrine emergent wetland. Wetland "C"is located along the northeastern
property boundary, and the on-site portion of this wetland is approximately 0.03 acre (1,329
ft2) in size. The northern boundary of Wetland "C" is located off-site, and was not delineated.
One plot/test holes (plot/test hole 1) was inspected in the vicinity of this wetland to identify the
presence of hydrophytic vegetation, hydric soils, and characteristics indicative of wetland '
i d
hydrology (Table 4).
Wetland "C" is between 50 and 100.feet.wide, approximately 250 feet long, and is an eight foot
deep depression surrounded with steep fill slopes. A 60 inch diameter culvert discharges into
the eastern end.of Wetland "C", and water leaves Wetland "C" through a 60 inch culvert that
discharges into the northeastern on-site portion of Springbrook Creek. At the time of the site
visit water approximately one foot deep was flowing in Wetland "C". Vegetation at the bottom
of Wetland "C" includes sedges, and duckweed. The slopes of the wetland are dominated by
red osier dogwood and willow.
5.0 WETLAND FUNCTIONS AND VALUES
•
A Modified Reppert Values Evaluation (MRVE) was completed for each of the three wetland
areas (Appendix F).
T-1412-01
11
SHANNON FIWILSON,INC.
•
5.1 Wetland "A"
Based on an interpretation of the MRVE, Wetland "A" has generally high to moderate functions
and values. Wetland "A" has low values in its ability to provided shoreline protection. Wetland
"A" has moderate values as an aquatic study area, its ability to store storm and flood water, and
its ability to offer groundwater recharge capabilities. Wetland "A" has high values in its ability
to offer water purification capabilities, and potential as a cultural resource. Wetland "A" has
high to moderate values in its natural biological function, and its ability to offer hydrologic
support functions.
5.2 Wetland "B" .
•
Based on an interpretation of the MRVE, Wetland "B" has generally high to moderate functions
and values. Wetland "B" has generally moderate values in relationship to its natural biological
functions, its use as an aquatic study area, its ability to store storm and flood water, and its
ability to offer shoreline protection. Wetland "B" has generally high to moderate values in
ability to offer hydrologic support functions.. Wetland "B" has generally high values in its ability
to offer groundwater recharge capabilities, its potential as a cultural resource, and its ability to
offer water purification capabilities.
5.3 Wetland "C" .. .
Based on an interpretation of the MRVE, Wetland "C" has moderate functions and .values.
Wetland "C" has generally low values in it ability to proved shoreline protection. Wetland "C"
has moderate values in relationship to its natural biological functions, and its potential as a
cultural resource, store storm and flood water, its ability to offer water purification capabilities,
its ability to provide natural groundwater recharge, and its potential use as an aquatic study area.
Wetland "C" has high to moderate values in its ability to offer hydrologic support functions.
6.0 WETLAND REGULATION
Between January 1989 and August 17, 1991, the U.S. Army Corps of Engineers (Corps) used
the Federal Manual for Identifying and Delineating Jurisdictional Wetlands (1989) to identify
wetlands. The Corps is currently using the Corps of Engineers Wetlands Delineation Manual
(1987) rather than the 1989 Manual. The transition from the 1989 manual to the 1987 manual
T-1412-01
12
SHANNON&WILSON,INC.
was mandated by the 1992 Energy and Water Development Appropriations Act, enacted on
August 17, 1991. The City of Renton requires the use of the 1989 manual to identify wetlands.
Therefore, this wetland delineation was completed using the 1989 manual. Wetland boundaries
may differ depending upon which manual is used to identify the wetlands. Therefore, depending
on which agencies have jurisdiction over wetlands on a specific project, wetlands may need to
be evaluated using both the 1987, and 1989 manuals. If you plan on filling wetland on the
subject property it will be necessary to delineate the wetland using the 1987 manual. It is
expected that delineation of wetlands on this specific site will not be significantly different if
identified using the 1987 manual.
•
If you plan on filling wetland on the subject property it will be necessary to acquire an individual
permit from the U.S. Army Corps of Engineers because the three on-site wetlands are hydro-
logically interconnected to Springbrook Creek, which has a flow greater than 5 cubic feet per
second. Individual permits are difficult and costly to obtain, and the applicant must demonstrate
that the wetland impact is unavoidable and that other practicable alternative sites which impact
less wetlands area are not available. Mitigation is required to offset all unavoidable wetland
losses.resulting from fill.activities. .
Usingthe Cityof Renton Wetland Management Ordinance No. 4346
g (March 1992) Wetlands
"A", "B", and "C" would be classified as Category 3, Lower Quality Wetlands. These wetlands
have been severely disturbed by human-related hydrologic alterations including diking, ditching,
channelization and outlet modification, and have had soils alterations including the presence of
fill, soil removal and soil compaction. The ordinance requires a 25 foot native vegetation buffer
around the wetlands, since the site would have an urban Shoreline Master Program designation.
A 20 foot building setback from the wetland buffer edge may also be required by the City of
Renton Building Regulations.
Springbrook Creek flows in a northerly direction through the center of the site. Springbrook
Creek would require at least a 50 foot native vegetation buffer between the creek and any
development, since the site would have an urban Shoreline Master Program designation. •
•
7.0 CONCLUSIONS
The soils, hydrologic conditions, and vegetation necessary for an area to be considered a wetland
were found within three separate areas on the subject site. Wetland "A" is a palustrine forested
T-1412-01
13
•
SHANNON&WILSON.INC.
(willow),palustrine shrub-scrub(willow),palustrine emergent(yellow iris)wetland located along
the eastern property boundary. The on-site portion of Wetland "A" is approximately 1.35 acre
(58,742 square feet (ft2) in size. Wetland "B" is a palustrine scrub-shrub (alder), palustrine
emergent (reed canarygrass/cattail) wetland located in the southwest quarter of the site. The
on-site portion of Wetland "B" is approximately 4.21 acre (183,184 ft2) in size. Wetland "C"
is a palustrine scrub-shrub (willow), palustrine emergent (sedge) wetland located along the'
northeastern property boundary. The on-site portion of Wetland "C" is approximately 0.03 acre
(1,329 ft2) in size.
Using the City of Renton Wetland Management Ordinance No. 4346 (March 1992) the on-site
wetlands would be classified as Category 3, Lower Quality Wetlands, and would requires a 25
foot native vegetation buffers around the wetlands. Springbrook Creek would require at least
a 50 foot native vegetation buffer between the creek and any development.
If you plan on filling wetland on the subject property it will be necessary to acquire an individual
permit from the U.S. Army Corps of Engineers because the three on-site wetlands are hydro-
logically to Springbrook which has a flowgreater than 5 cubic feet r
interconnectedCreek, per E
'second. Individual permits are difficult and costly to obtain,"and the applicant must demonstrate
that the wetland impact is.unavoidable and that other practicable alternative sites which impact
less wetlands area are not-available. : Mitigation is required to offset all:unavoidable wetland
losses resulting from fill activities.:.
8.0 CLOSURE
The findings and conclusions documented in this report have been prepared for specific applica-
tion to this project and have been developed in a manner consistent with that level of care and
•
skill normally exercised by members of the environmental science profession currently practicing
under similar conditions in the area, and in accordance with the terms and conditions set.forth
in our proposal dated September 1, 1992. The conclusions and recommendations presented in .
this report are professional opinions based on interpretation of information currently available
to us and made within the operational scope, budget and schedule constraints of this project.
No warranty, expressed or implied, is made.
Wetlands boundaries identified by Shannon &Wilson are considered to be preliminary until the
wetland boundaries flagged are validated by the Corps and/or the local jurisdictional agency.
T-1412-01
14
SHANNON bWILSON,INC.
Validation of the wetland boundary by the regulating agency(s) provides a certification, usually •
written, that the wetland boundaries verified are the boundaries that will be regulated by the
agency(s) until a specified date or until the regulation are modified. Only the regulating
agency(s) can provide this certification. •
Since wetlands are dynamic communities affected by both natural and man-made activities,
changes in wetland boundaries may be expected. Therefore, wetland delineations cannot remain
valid for an indefinite period of time. The U.S. Army Corps of Engineers (Corps) typically
recognizes the validity of wetland delineations for a period of three years after completion. The
•
City of Renton recognize the validity of wetland delineations for a period of two years. Any
development activities on a site two or three years after the completion of this wetland delinea-
tion :.
report may require revision of the wetland delineation. In addition changes in Government
Codes, regulations, or laws may occur. Due to such changes, our observations and conclusions
applicable to this site may need to be revised wholly or in part.
Sincerely,
SHANNON &.WILSON, INC.
��as R G))...cnivu
Theresa R. Henson
Wetland Specialist •
Frank W. Pita, P.E., P.G.
Vice President .
•
TRH:FWP/dgw
•
•
T-1412-01
15
SHANNON&WILSON,INC.
9.0 LIST OF REFERENCES
City of Renton, 1992, Building Regulations, City of Renton, Washington.
City of Renton, 1990, Shoreline Master Program, adopted by Ordinance No. 3758.
City of Renton, 1992, Wetland Management Ordinance, Ordinance No. 4336.
City of Renton, 1992, Wetlands, Lakes, Rivers and Streams Maps.
Cowardin, L.M., V. Carter, F.C. Golet, and E.T. LaRoe, 1979, Classification of Wetlands and
Deepwater Habitats of the United States, U.S. Fish and Wildlife Service Publication
FWS/OSB-79/31.
Federal Interagency Committee for Wetland Delineation, January 10, 1989. Federal Manual
for Identifying and Delineating Jurisdictional Wetlands. U.S. Army Corps of Engineers,
U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service, and U.S.D.A.
Soil Conservation Service, Washington, D.C. Cooperative Technical Publication.
Reed, P.B., Jr., 1988, National List of Plant Species That Occur in Wetlands: Northwest
(Region 9), U.S. Fish and Wildlife Service Biological Report 88(26.9).
t:.
Reppert, R.T., W. Sigleo, E. Stakhiv, L. Messman, and C. Beyers, 1979, Wetland Values
Concepts and Methods for Wetland Evaluation, U.S. Army Corps of Engineers, Institute .
for Water Resources, Fort Belvoir, Virginia.
U. S. Department of Agriculture, Soil Conservation Service, 1987, Hydric Soils of the United
States, Prepared in cooperation with the National Technical Committee for Hydric Soils.
U.S. Department of Agriculture, Soil Conservation Service (SCS), 1973, Soil Survey of King
County Area Washington.
U.S. Fish and Wildlife Service, 1988, National List Of Plant Species That Occur In Wetlands:
Northwest (Region 9), Biological Report 88(26.9).
U.S. Fish and Wildlife Service, 1973, National Wetland Inventory Map, Renton Washington,
quadrangle.
T-1412-01 •
16 •
I c
SHANNON&WILSON,INC.
TABLE 1
IDENTIFIED WETLAND VEGETATION SPECIES*
Trees Black Cottonwood (Populus trichocarpa)
Red Alder (Alnus rubra)
Western Red Cedar (Thuia plicata)
Willow sp. (Salix sp.)
Shrubs Black Hawthorn (Crataegus douglasii) •
Douglas Spiraea (Spiraea douglasii)
Red Osier Dogwood (Cornus stolonifera)
Salmonberry (Rubus spectabilis)
Herbs American Brooklime (Veronica americana)
Bird's Foot Trefoil (Lotus corniculatus)
Bittersweet Nightshade (Solanum dulcamara)
Common Cattail (Typha angustifolia)
Common Duckweed (Lemna minor)
Common Plantain (Plantago major)
Common Velvetgrass (Holcus lanatus)
Creeping Buttercup (Ranunculus repens)
Curly Dock (Rumex crispus)
Giant Horsetail (Equisetum telmatia)
Lady Fern (Athyrium filix-femina)
Hardstem Bulrush (Scirpus acutus)
Hedge Nettle (Stachys emersonii)
Lyngby's Sedge (Carex lyngbyei)
Morning Glory (Calystegia sepium)
Pacific Water Parsley (Oenanthe sarmentosa)
Redtop Bentgrass (Agrostis alba)
•
Reed Canarygrass (Phalaris arundinaceae)
Soft Rush (Juncus effusus)
Stinging Nettle (Urtica dioica)
Water Smartweed (Polygonum amphibium) •
Watson's Willow Herb (Epilobium ciliatum)
Yellow Iris (Iris pseudacorus)
* This listing represents the major plant species identified. There may be other species pres-
ent within the subject site that are not listed.
T-1412-01
,
SHANNON FWWILSON,INC.
TABLE 2
IDENTIFIED UPLAND VEGETATION SPECIES*
Trees None observed
Shrub Butterfly Bush (Buddleja davidii)
Dewberry (Rubus vitifolius)
Evergreen Blackberry (Rubus laciniatus)
Himalayan Blackberry (Rubus discolor)
Red Elderberry (Sambucus racemosa)
Scotch Broom (Cytisus scoparius)
Herbs Bracken Fern (Pteridium aquilinum)
Bull Thistle (Cirsium vulgare)
Canada Goldenrod (Solidago canadensis)
Canada Thistle (Cirsium arvense)
Dandelion (Taraxacum officinale)
Fireweed (Epilobium angustifolium)
Foxglove (Digitalis purpureum) �4
Japanese Knotweed (Polygonum cuspidatum)
Lanceleaf Plantain (Plantago lanceolata) . '
Pearly Everlasting (Anaphalis margaritacea)
Orchard Grass (Dactylis glomerata)
Quack Grass (Agropyron repens)
Sweet-Pea (Lathyrus tingitanus)
Tansy (Tanacetum vulgare)
Tall Fescue (Festuca arundinaceae)
White Clover (Trifolium repens)
* This listing represents the major plant species identified. There may be other species pres-
ent within the subject site that are not listed.
•
•
T-1412-01
•
• SHANNON&WILSON,INC.
TABLE 3
HYDRIC SOIL INDICATORS
Hydric
Indicator Diagnostic Criteria
Organic Content > 50% by volume (constitutes an organic soil).
Sulfidic Material "Rotten egg" odor.
Soil Color Matrix Chroma of 3 or less in sandy soils.
Matrix Chroma of 2 or less in mottled soils.
Matrix chroma of 1 or less in unmottled soils.
Gleyed colors.
Water Saturation Soil saturated at 0.5, 1.0, or 1.5 feet from the surface (dependant on the
soils drainage class and permeability) for a significant period (usually a
week or more) during the growing season.
Soil Color
Definitions Hue: Indicates the dominant spectral color(i.e., red, yellow, green,
blue, and purple).
Value: Measure of degree of darkness or lightness of the color. •
Chroma: The measure of the purity or strength of the color.
Source: Federal Interagency Committee for Wetland Delineation, January 10,
1989. Federal Manual for Identifying and Delineating Jurisdictional
Wetlands. U.S. Army Corps of Engineers, U.S. Environmental Protection
Agency, U.S. Fish and Wildlife Service, and U.S.D.A. Soil Conservation
Service, Washington D.C. Cooperative technical publication.
T-1412-01
SHANNON FiWILSON,INC.
TABLE 4
RESULTS OF TRIPLE PARAMETER APPROACH FOR
EACH PLOT/TEST HOLE
Plot/Test Hole Wetland Hydric Wetland Wetland
Vegetation Sas Hydrology Determination
1 Yes Yes Yes Yes
2 Yes Yes Yes Yes
3 No No No No
4 Yes No No No
5 No No No No
6 Yes Yes Yes Yes
7 Yes Yes Yes Yes
T-1412-01
SHANNON F&WILSON,INC.
TABLE 5
HYDROLOGIC REGIMES AND WETLAND CHARACI hRISTICS
Degree of Inundation Duration of Inundation Wetland
or Saturation or Saturation* Characteristics
Permanently inundated " 100% present
Semi-permanently to nearly 75 - < 100% present
permanently inundated or
saturated •
•..
Regularly inundated or >_ 25 - < 75% usually present
saturated .
•
Seasonally inundated or 12.5 - < 25% often present
•
present
Irregularly inundated or z 5 - < 12.5% often absent
saturated
Intermittently or never < 5% absent c:
inundated or saturated !'
* percent of growing season
** inundation > 6.6 feet mean water depth
*** inundation <_ 6.6 feet mean water depth
Note: Saturation implies that the soils are saturated to the grounds surface at some point in an
average rainfall year. Soil saturation to the surface normally occur when the water table
is (a) 0.5 feet from the surface for somewhat poorly drained mineral soils, (b) 1.0 feet
from the surface for highly permeable, poorly drained, or very poorly drained mineral
soils, (c) 1.5 feet from the surface for low permeability, poorly drained, or very poorly
drained mineral soils, and (d)at depth where saturation occurs more than rarely in poorly
drained or very poorly drained organic soils, for a significant period (usually a week or
more) during the growing season.
Source: Federal Interagency Committee for Wetland Delineation, January 10, 1989. Federal
Manual for Identifying and Delineating Jurisdictional Wetlands. U.S. Army Corps
of Engineers, U.S. Environmental Protection Agency, U.S. Fish and Wildlife Service,
T-1412-01
. ..
. ,.,,,,,,,,,,,..:_„_...,.,., ,. .........._...._ •4,5,75, L. ... .,,,,,-„, , .. • , N •
•
•
.0••
l.
,, ` •y�' -2 - : �• I�• �}r .fir � 9
.'•� L RAILROAD \ •..i� j ':,fi•�:.k i.. : /. i .
,.:...:,:;
r,,/.(.,.,l..u—'-,-..-.-.-..
•
7 �t`ri` /VV O4pq���\ou `yyR'' . s••� L:;:� ;/y II
/ \__ - \I.'N BM /I L) lei r�It. , ,1(,I.:.
• 1 .�� �I :.1--.'` L
. ` -,;�n13\ •
11 irlV I �� 71 F■;L' •, `I ,'
I I I \ I •t_ _i bsla
t.^.� Coll quurse ,\ I �_ l -'�k'• ) \
Vk 1 I : -:� •
\ Q� I o TrIF-RN " :' ;
`` ter. •
'1,(V Sewage EiLI.e LI •}' I-_ . ♦ - \ ■ -I
01 ,.
tSr. ,• \ % .� a • • it I;:: .11. HI"' \. J:': ; _ I' ?/i
•
` 1/ 1 r • h1111G II I 1" •• •r •' -`••• \ ,`,
7.
•
Pt�t r✓. '" ;c� ��� n
L 1. •1 -z1� it • `• ••- t� h
,�I �� 1 �' • • •� I I Eri
• -`1 Track .•....� • iiiiy ▪ nBr+l
k.1• i�°ie. . 1 •..:ir . 1 •... ,:.,, • =i . z•
�� ■ BM E
, -IN)..): II: BM,'I IIIL.I� —lilt
I � ( � _..-- --- '_._.._ I f�O1 Reservoir 1 :.• ..!
•
����� PROJECT tl I •.• a, , ▪ .��•r
i
:� i LOCATION {I / '.;,. •
1� ilk
1 ;3 cB25 - 0 •• •
•
; 1 1 . 7). , ,
II
II
........ II / I It 1 r% :"...:•:.:: .!) • 1 lA ,.
•
•
•
•
0 1/4 1/2 1 •
I I
I I Van Woerden Tract
•
Scale in Miles Renton, Washington •
NOTE VICINITY MAP
•
Map adapted from USGS metric October 1992 T-1412-01 •
topographic map of Renton,WA
quadrangle,dated 1973.
SHANNON &WILSON,INC. FIG. 1 •
Geotechrilcal end Environmental Consultants . •
.::.:....
Ditch
60°CMP —� —
,
•
,
''' . ''''.:-.„:''..
1 •
3 ..;
WETLAND "C" a� ;
3
v • I
1
':1 1
�1
3 A '
.� PARCEL B
O
1/60°CMP
. 1.
1 0
O
co Ditch' 1
i • 0 / -\i
...-:!
24°CMP
1 PARCEL A a
1.
•
5
Ii.
1
24°CMP—'
1
6.
I
:INE°CLAN D•.;.B.:
•
1
0 100 zoo :. : :.:.::<`
.. .. .:....
:
LEGENDScale m Feet
;.M
Approximate : de Tract
Van W oer n
_____ q♦ v`<. _ .;__._.;_::Berm Loc >.,.......,.. Renton Washington
Plotlrest Hole Designation--_
andApproximateLocaLon '�-- -- ifci, .�r:.__i >:.:.;':'..'r_.: .....:.
NOTE ,.-. ------ . ...,. — __
iiiiiiiiII
— —. .:._.�__°�" _ SITE PLAN
:..:.::>::::.:.::K:.: WETLAND SI
Wetland
"' ' Site plan adapted from drawin rovided ,.... ,.
by Bush,Roed&Hilchings,Inc.,dated 36°CMP • i. October 1992 T 1412-01
2 Photo Locations
September 1992.
SHANNON&WILSON,INc. FIG.2
Geote:Rii;xl zn:'emzonmerCal CoiuuMares
,
\ V '/{:4. VV - I \ VV - OH N
k W 2 � .\S W 3
//// " \\ ` • Il f_i
j�, PROJECT w S - 3
.� �;i LOCATION /
I+ `zw�
I r • ..
S 7 W_ /
J [4: ji::C.mil: Y�
` ``- k s. k 4.'
it L
W 3A t�`Yt..»ttK
x
3/4
t^� [�.�t? tl' IA
(' 4rNSY O�
t � W-e a 0
i2uN�:� %
, ' "11 / ,t`'-i(//'/ W — II LID_
ems. = =�3 :, '_
W - 14 i
W �.22Y . r
/ ► $
W- 32,/ to. 1:'
# W _ 3 �'
�y W — 3 3
nj I ,' S —
iI
W- 3
(.,// r
0 1/4 1/2 1
I I I I Van Woerden Tract
Renton, Washington
Scale in Miles
NOTE CITY OF RENTON
WETLANDS MAP
Map adapted from City of Renton
wetlands, lakes, rivers and streams October 1992 T-1412-01
map, dated 2-7-92. SHANNON &WILSON,INC.
1 Geotechnical and Environmental Consultants
FIG. 3
•
/ .,, ` � ;.\ .t
�. . -11. \ N
, . 1 •.%-731- ___.,13. .....• _/,' /,•• •ii, • Ril--- • ,, , • ii .,it 4111, g.
.)• ,... .___,,• ,.5 ._6/ .... ,4 1 . 1
� . i
• •P•�.��r � p ' •. f •• i•• :. 1< •,n� 'ter- 15r t m •
...',. -'-';),': ?.:/'/5,4'1 .RAILR OA 0 '•\. k.„ - -''.41 •••• ••• ' ')4 g
I •:;:.-- -47.-11. ..-, ''''''....--ik..*: 6 : — • . 4/ Pi .
'4 '
. . ...R.q-.. •?
PFOY.i,ti, ��•t
•
) r NIT \ 1�,7 fa �.1h PFOWI ri N
i ( _� -▪' I••r- -- J
.sa`1 .\ I ,t�, i.!1SI.W41;1' .
` 3L15.1
, • •..j_ii !,!_.::_t, 1111,101..,_..J,,t,_ :v.;•E:l'!- ,1 • . ..
. . .. . • "1—m .-c-C.II—. 74.-C4... .'• '.. : '..; : li'--,...-::t .•\ '• • . .•
jr-4b --7.':‘\'' -I,i•• •• •-!.,1;-;11;"...\ - "" 1 i t.3. •:: ..•:•.(-[I:\••• 1/• .. • c••' .
;',,,t •,•\ „ :".• ",lt,,L I ...., .., .,-,..,-.:. 'i:i:N::):::: . re.• i i,. .
' -i =--r i i i � �i
_ "\
..aol�' IiM
_�I .�� ��III I i %•PG III II' ! tili I'y I is' Ix Reservoir � ••I, i
I PROJECT = . / ;l% !' .1`. r-
• ,. . s LOCATION �;�
- � ) Po II
' ����'' ) II \ 55 SnS WKZ -. . . . .(e.
• r•
1� �. P Y . F� Y
i V( i' II \ 16 z
< /11
'� j� III �PEMY/ • . ' t
' III 1 ' "._
•
0 1/4 1/2 1
I f 1 I Van Woerden Tract
Scale in Miles Renton,Washington
NATIONAL WETLAND
NOTE INVENTORY MAP
• Map adapted from National Wetlands October 1992 T-1412-01
Inventory map, Renton quandrangle, US -
Fish and Wildlife Service, dated 1973. SHANNON &WILSON,INC. FIG. 4
Geotectn cal and Environmental Consultants
•
P.
Pu Ur ' . -- r tl III ■ �, i .' I ■: N
c
I ) Iyl 1 ,, I \� IGolt nI1 •
_ •°' _o i. • 1 n.:"
._. '\ NIIIr, ,,„ 1.1.•••:',.. ",..' -. .--:, . . , ,_:,
lyzeitast
I�( I r
l��ei�l- u �;}�1 U
i nr9•
`f �l • I IL7
on acre ' 1 Pu;: --
i :.�\ g $�iCl� . • iii:zvii Pii' . ..
• •O:1
i Qi Ur •
'm 7 ReE i�� �� \_111 ` . .1li' iBeCI =\ •
•� _I_ F�Ur 7�� Wo_ !�Jf.,,1- :• aja • ceD �ii •u 1
141
O I.
• V • 1 I. ....•..,,........, ..
Track \ _
.r- • �-. tr— ►••:,:. a i.
:-.7,11, ' p-..,.„. :.__,:
....:1 ._ . . . 2
. .. 7. 7 ' - : 10 .. -.--..:-:•-_:-.. • ..
•
n'i -i 1Jg_ I ,. ❑0 Res rvoir . I - - •
-
• '( PROJECT s .. =.' So::'r'U: Z ; ,. ....41, . , . _,
.•
• m ...
'. LOCATION Pu.. : i m sk = ' ...
. i. ••..0 .: -i., ;- u - . --• 1
6: , )'-' )i( = 1i3
Ir,. I 169 - 20$'
• I • Py _ 1 ,.5 r
` Sk I-' r.
n Wo Ur ;%s
• 1 r.
e t •
u r
t
• 1 -
- Tu•[ _
1 44 i ..-...;..:g.',',/,':.. --...,:..--- ..::,..,'.?:'..:, •:: :--:.:.! ,!.!.. -tY..-.:::-..; ''....:. r ,.e...3 i: -h.
'., _,_ - / - \ lir':'.;-,"::'-'•;-'_____„' • .. .i .. . - • . `r-.. .:.1-L-L, , ••._—._ ,ft- - g
Pii-' I_yI
?\. 7..7..4 i/1:3z;.......:.
1 ._.„...,. r.lagg, :,.-A,,.._,,,,_,:„:.:,:i..: f„,,,,:-..-..,..„,-• • ,,,,, ,,.: • ___ r.:•,,•;_.,:- , _:,..„,„,„,,,,. ..
•
..
,• 11 .;., 1 • -. , ., .. .,,,:-,,,..,
�`•i;{ /yam 1 I.. I - _ ?�� II1 O L 1
III t`k \`�— I f I�/ . _ , i - c"' •. -, •P ' ? ^\
• sl.� i . Ng . . `B I -�_ T
.
t )(A :'..:-- ' : . }Fe . 1::':.: ....4'..,7'2' , 7---- .. .' ' T, '.1 H.i.,'..• ii. ...
Nk.l II
N
IIII g
ff
•
0 1/4 1/2 1
1 I Van Woerden Tract
Scale in Miles
Renton, Washington
NOTE SOIL CONSERVATION •
SERVICE MAP •.
Map adapted from Soil Conservation
Service, soil survey of the King County October 1992 T-1412-01
area, Washington, dated 1973. •
SHANNON & WILSON, INC. FIG. 5
Geotechnical and Environmental Consultants
• SHANNON&WILSON,INC.
APPENDIX A
WETLAND DELINEATION METHODOLOGY
•
T-1412-01 •
'
,
SHANNON&WILSON,INC.
APPENDIX A
WETLAND DELINEATION METHODOLOGY
The triple parameter approach of the Federal Manual for Identifying and Delineating Jurisdiction •
-
al Wetlands (January 10, 1989) was used to delineate the extent of wetlands on the site. Under
this methodology, vegetation, soils, and hydrology are each evaluated to determine the presence
or absence of wetlands. Based upon local agency guidelines for the use of this method, an area
is considered to be a wetland if three of the following conditions are met: (1) dominant
hydrophytic vegetation is present in the area, (2) the soils in the area are hydric, and (3) the
necessary hydrologic conditions within the area are met. The Plant Community Assessment
Procedure and Plot Inventory Technique, as described in the Routine On-Site Determination
Method (Federal Manual For Identifying And Delineating Jurisdictional Wetlands, January 10,
1989), were used for the evaluation of triple parameter criteria for this project. This methodolo-
gy was selected because differences in vegetation types were easily observed, aiding in the
s;
identification of areas likely to meet the hydrology and soils criteria of the triple parameter
approach. r
Wetland boundaries were determined by conducting a walking inspection of the property. As
part of this inspection, species of.ve vegetation, soil conditions, and hydrologic conditions are noted
P� �� P� g �
at several plot/test holes to more accurately determine the boundaries of on-site wetlands.
Wetland Vegetation
Hydrophytic plants are plants specially adapted for saturated and/or anaerobic conditions. The •
U.S. Army Corps of Engineers (Corps) and the USFWS has assigned an indicator status to many
plant species that is based upon the.estimated probability of the species existing under wetland
conditions. Plants are categorized as Obligate(OBL), Facultative Wetland (FACW),Facultative
(FAC), Facultative Upland (FACU), and Upland (UPL). Species with an indicator status of
OBL, FACW, or FAC are considered to be adapted to saturated and/or anaerobic (i.e., wetland)
conditions and are referred to as hydrophytic vegetation. Additional information concerning
characteristics of hydrophytic plants may be found in Appendix D.
Trees within a 30 foot radius and shrubs and herbs within a five foot radius of each plot/test
hole were identified and noted. The approximate percentage of cover for each of the different
•
T-1412-01
SHANNON&WILSON,INC.
plant species occurring within the tree, shrub, and herb strata was determined. Dominant plant
species are considered to be those that, when cumulatively totaled in descending order of
abundance, exceed 50 percent of the areal cover for each vegetative stratum. Any additional
species individually representing 20 percent or greater of the total areal cover for each vegetative
stratum are also considered dominant.
The indicator status of the dominant plant species within each of the vegetative strata was used
to determine the presence of hydrophytic vegetation near each plot/test hole. A plot/test hole
was considered to have hydrophytic vegetation if greater than 50 percent of the dominant plant
species within the area had an indicator status of OBL, FACW, or FAC.
•
Throughout the area delineated as wetland, identification of hydric soils was aided through
observation of surface hydrology. The areal extent of hydric soils was defined through the direct
soil observation within several plot/test holes placed both inside and outside of the wetland.
Hydric Soils . •
Hydric soils are defined as those soils which are saturated, flooded, or ponded for a significant
period of time (usuallyseven consecutive days or more) duringthe growingseason. As a result "s
Y
of anaerobic conditions, hydric
yd c soils exhibit characteristics directly observable in the field,
including high organic matter content, greenish or bluish grey color(gley formation), accumula-
tion of sulfidic material, spots of orange or yellow color (mottling), and dark soil colors (low
chromas). Additional information concerning hydric soil characteristics may be found in Table
3.
All soil observations were completed within soil plot/test holes dug with a shovel to a depth of
at least 18 inches below the existing ground surface. Soil samples were examined for the
presence of hydric indicators. Soil organic content was estimated visually and texturally. The
presence of sulfidic material was determined by the presence of sulfide gases (i.e., a "rotten egg"
odor). Soil colors were recorded after being determined through use of the three aspects of color
in the Munsell Soil Color Chart: hue, value and chroma (e.g., a soil designated as 10YR 6/2
has a hue of 10YR, a value of 6, a chroma of 2, and a soil color name of light brownish gray).
A soil chroma of two in combination with soil mottling or a soil chroma of one without soil •
mottling typically indicates a hydric soil. Additionally, if soils were found to be saturated within
18 inches of the soil surface, they were considered to be hydric.
T-1412-01
SHANNON&WILSON,INC.
Wetland Hydrology
Hydrologic conditions identifying wetland characteristics occur during those periods when the
soils are inundated permanently or periodically, or the soil is continuously saturated to the
surface for at least seven consecutive days during the growing season. The growing season
begins when the soils reach a temperature of 41 degrees Fahrenheit in the zone of root penetra-
tion. Additional information concerning hydrologic regimes associated with wetlands may be
found in Table 5.
The hydrology was evaluated by direct visual observation of surface inundation or soil saturation
within 18 inches below the existing ground surface in test/plot holes. In the absence of direct
observation of hydrology, the area near each plot/test hole was examined for indicators of
wetland hydrology. These indicators include dried algae on bare soils, cracking of mud, soil
mottling along live plant root channels, water marks on vegetation or rocks, and drainage
patterns. It was not possible to observe conditions during the entire growing season. Therefore,
it was assumed that wetland hydrology is present for at least seven consecutive days during the
growing season within the area of the plot/test holes where positive indicators of hydrology were
noted:
CK
T-1412-01
SHANNON&WILSON,INC.
•
APPENDIX B
PHOTOGRAPHS
i•
•
T-1412-01
. .
-e.
.. . , t.---- 1/4_:- 4 ,.. ,. •—•;. --P• '4'.' ' .?..4- -'4: - ...1-• -•
',". - - ,,.., :•-.--,... s..., •,. y..,.-i. - •-•• !; •• , .Z. -_- kte-
-,, •. .
• .•.,,,•-,g,Vi.,„.„-,, Av....,4p1VA ....'' '''',.44,4.1f.tcM4,4p,,,t,Y,Al'JA.,,r,,.11.;?.,.,;.,:-...0;.....1...;. ,,,,t.,,,i. .•.;,,--.....1:,,,,,;e,
•,..."'_„,.. ,14N,.r.,,,y.,4,„ 7...W1,.--vAl t,,..-0.1 .,)1,.?X',,,44 . ,,,_<-&,,..„ ,,. ',...itiZ-2-1 6,44,,,,:.,N,"1,,,',.....2N17.•;,,t-.,,.tt,,..2„,..•ti••;-;..-.,..;ti;3;,,p.,,
PA,
`'f'-',Vci•lti.',A.P,AailiA,Viik‘Itti-IN r,...in- '''ZIttf,'A".",..A;r4:-'‘'7041...%.,i t,4,71...-..2 t.;,.•. . - - .1,:%.,..-=‘?.',,,..:4•tt',:
,,,,,,-,,i,,e-0„--1..,..,10,:fip.,., ,,,,,,,,..114,-„,itu..4,,,,,,.,,.-4$4,,,,,,..„4-,‘-i,k‘Ar...4.,,,,ig.,-kst,1,...x.,p„--itti•-•,,,mq,3•.i.„4-•,41-1,,,,,,„:>:;f4..,,,,,..-,,..,,,,lif',,,,,,,,..k.,,,,,,,.:„.,--a,..,.-.i.,‘‘,1-,..,,,--;,..)
....:. .\?1 ,',.'":.• :0-) . t,gf. ,-, ,,,,,,-,-1A,10%.:::;,-,i,i7v4:-.AT:me..‘ 5-'-.4.,;'.,,'-7zi-,•74-1-7,±1,, ,i'i ii ..k.', V,-ft'.'AI, TJ.,„!r„.vol-NT.,i11-24V.1r.,...'•%1:•,,,IL,',4-•Pt:.. ;.-4,.,,,..A.r,•0.•:kt- .7..•',.1",-,•--•r\e,„,-. .,_•,:".•-t7;„3.•,,.....-,‘-‘,...','!. ....
\
!,1,tk ',t t,& ti.N.1.1,y,r,ISS44.:!*-; , :.,:pAe4.,_•,•:„--,:::7,--••-_,I....N.?\-$:;t4fi"i •i,•"•-•.;„.; 'r,-'. i.'',5--7 .:.":',.'','''''
=.k‘,. 0.1,4,'•• 7‘,.."•C,",•f.'41...,}t<?s•i• i''.4•)41•,,\*4•c';'''‘NVOZ"'••.X.",,O•Fils4 .41S .:i''..../,`,,,I'li,'.;•:: -•. s:',;-i,,`'. ..- .•-•-•,'.:-S.'",,./C-On:-
''',,V4Z Ai.t.-4,*.43' '... ‘f_,.226,.-.3k-Z4'''t-P4;';'&4%,,, Z.V4 -v,..,..'-i..t.,74-„,.':.;4 :,'''":-.....'''...*,...,,---'z'li''-i4.\'-t •-'''
\, ..1.kk 411,;!,'S..''`.„!k4.1,....(,.". ‘i,;4,-;,. ...1/4'...:Qr',?,1-A,A..`,11,...;,.,t.. ..,,,,i';,.,l'4.:;Z4.41. ...':,q,,.:•73,`,-;‘,-,'.t.;.i.:.!.:7,-`. '-,-:',.. .....;.=- ,---' ,'•,---
‘‘'--'\'1:\°''‘'. ' '4.Y* 'A":11"W‘ ' . 4-''''.11sVil'i''' '$1 :4';14'atSk'-'-`11-• ••A:k:W.•-:<;f•,e1.:-.,< '',4.4.;.."7•"..- -:----"'-_:`-c,'-''''... -2.-...;,'4` .
;\.„,••.,„ ',....‘,•:\...,,`i." ,,,s.iN,, .„,.'‘.....> :•.,: r.&.,_.-.1.i..?-!,„,,if)"'',...4.,-, ..Q.:,,,C.,..'z'k•- ',let'Cir-7-,----,,-•--- "•••:''''-r.-.t-_-. .-7"F4--f-al...•:-,-,•`'''-
4 .•:;.?;;' 4411.1..,,,..`:-. S'At,,\.'t•,,N..)**,,:i..„,„\-„,. .z.C .:)--..„,.-,'' ..:',`.-.... ..:,..••-F•-`,_4;-,..!-•v..-.13:_- ..'',-;'--t• i••
-.. ---,....".--..7.- - ,- •Tx.;.• •A • . ..........-.--_,J.h.
,,,,4.1.,-.„. ,.t.. . -,•,_ , 4.'',.•• - '1,,,,,•.' 1-‘,71kr, -..-•!Q•k,z,•iek....--4„...a.... -•,,,--...,..‘,... v:,,,,-.. ,-- -.1,--4-• ----,-.---44,.,:-
pok,,..z..,,,, , , .:.-,„,..•,‘,.. ,..11„,,,\:‘,.....,• -..,.. -...,,,,,,- ,41,x,,,,...k.._ .--,,,,,--,..,..-_,..„,./„...-_,,,....„.•....„-,...4.„-
::,,,.. ,N,-„, „.,-... .• ..... ., .... -k. - •.,_ ' ,-,4,--..,,, ,.. ..:-.?•:-.1,. -.7,..,:z,..N.,- ;, --_,
,:;:vz.,,--...•-tio,,,, 4,,,L -,,.....1 - ,...- , , ...,:e.„0\ - -.,....%N.-.4.. .,.,,,..,, ,.. :-...„..- ........,,,..,,,,,.., . i
,,,..,:_. ::,,,,,,„,,,,: , ..N.11.,,,-.. ,..„.. ,,,,,,z7,,,. :.;•.,,,,,,-..-os.. -....., ,t...,____-:-..-„,____,-,3,,,,..,,Tz-...,,,s,,,,-----ii.,_..---- ---.,......-.r.- ::-.,:,
Photo 1. View north. Shrub vegetation in the background indicates the
location of Wetland "C". The field in the foreground is representative of the
eastern upland field.
.- ‘............-.-.-..p7,...„,- . - . , ...,....,..:IV
, :-,,:.,;:.:.......,„:: .Z,....,s, ' . •.'' ..1"...'"....-...4 - ' ••••• - -.,.
"'.:.'....-''' ''''-':'-"=P- .., ,, ,,..,r44:-,.kr . -..>•_,,,,.,,.__
-• •_,-.. :.,;.;'.1.1.;„..,:i,._
••.,'• -,...- '•••:,--= '• . '--;''-"..'. .:''...': "..:::,,tit a ..-.7,--4......-,...,,-Pm, . ..
i...t . • , ..., --.,. .,''''',":':'-•%''ea'Llt •
• -',_-:;,' ' ..- „.: .-','\•-•1'.''''''; .'"-•!'‘,:: ''',...-- '''s r^t6
' .7--‘-.::.----- —''.' • ' :'.f;NI .--..' _."—'' :?.. .....1•5•-'4., .'‘._" .,-,--$.- • — .......",.=•W';
.. z......'.:.— - -1.- r e 4'; ... , ":...
-- 4'.- ' t '1• , ..... ' -• .. ',..e.-
, • 7S.%••
'' '"'-tPr,•••-::• 1*.;.-' .2.., 1••,".
. . . •
- ..', ••• • •".,. . ' • ,./ -: e- •'.'" `'..•••`..- .•
. -,--, --. -,--7cy-; -. :•,• ,-:, . -- . ,- ..., -. ..: „ s.c.,, , : - •,-, -.,...:-. ,,,,,;.-,.-- .„ \•f- -„ •':..,:"..,v*. •
et, r,...v.-'',,;',..1 ' • •t ,-- .
:".-•:::,•,• -r1,-%-sr:•J''' ••1-- i _;, _ ,- I'•..,,,: .;•_0.--.1,.:••..41$4. ,, ...- t'\'?!..-51.-?eJ;;c
s :- "v)•;'1..'7 ''..Vr5.:4.f";?'•';itirarlziki\l' i''''ki' let- 4,;;-PC40/4ifiPV
,_.i..- --,--.... .- --•Ft4:_, .••• '- _.-41-' „,_-:,p' •tr•-1•KM1'<*z,t04t. . v :4,1e. ' e,,,t,, „-.4.,,,,,.40,g-J-..f4
.....,...,,, 41.,.-.:1,,...., -• .„ ,.,,.,-, ., ,.,N•t ....,a1 - -t --14irp....„--, .,...9„, .,.. -.t.L.,,, ,,,4 tmh.... -4:'
....,-• -•-,7. l' t'-',-;',-'44 rj,`"-d-:"-v-t'?•*:''cr''',kit.•;.::•• ->-`. .,..,"•L'ek,r,iti.,A,,,,,-,V;•1',itkx"Y.",...)''''' I 14, fg'-'..• y'4i`i‘'."Y,#f"'''.112,5i,,kF.,2.
',;
....:-.S.'- :-, ..,P•rr,<...,7,4-",-,.•,-g-1.',.?, 44-,i41,'-,..4_,,,ipk) f-A,,c',i."5;s4:Ai4-14•I'er-TA'..mePt1471.4.'1*e:A-fli. , 1-1F,t3i
I %;'-t'•- --.,` '.--'-' ,.1. ..1..;••••---•,--h--14--k-g--t•-;--,#-....)f.i,.rivs.v.v ,t1-,,,,t vf-4-tA - ( ' ," ,A.`k. ei
-,,,-!",:.::".....›-.':'•?.. . .vr‘•;...V7.- -,s-'''''.)•?';1' yai
.".4.,14 t''''4"•• .7.V4_,.-1-'41....:al:Ir7.14,-t''•44-1-riPq•ly 51 `c,.-'•t - .,V,•,„740 Ay If 1 h....*• 4,,,,I,,
Pl..,..,,1.1., ,..,,,.1,,7,, , ..41,,,F„..;:w...,4,f,,1,,it..... ir .s.'y, ..•,' Ter. ''41: ' .... , I:. rtlai.. ,
, „Pe's "titt..5... .(k-r .t.A 3 .77, ....•..a '. ,'',,-1 ." '.`)r- ' 4 '. : ..,•,'
, X-4:1•.' 44,•'',. f• 4 4 -4, - ' .4 „, , .0. „ 4 ., AL. ,. • if,,if,"i 7
1 .,..,..z.if ,- i,,,,,16;,,, .3 .t.v,14 r,54,44_,VV, . Snitv.‘7.7t 1,-...-.0, 14,-",,+' • pl• , ., +4 ., .
,-,..-ij.ttM/J4-4:.;tA 1-,-.417,11,1,41.,r, , t ••..1,/-4. ,,, z • i, ' -AT'. ..-fr' - 4, -4:A- -.4
, eyb.-t54.4g4co ... .,. ..... 1,....4K.,,
-.,,, v^,-f-t"'s-,*vWJ,.,,,,;,'v./.1 ,n.,,, 1.,". :1" -1"..-.1.,•-',..V ,' fi :e. • •--7;11 i„,-,... , Ill,.
15t
1
ilt*,
- :'$-j- ''s7.,,4;t'.?', ;4'17 '.:1P.N.(474.,...,.''' ,..1,. •V4 4 er,,,, ; -.f. --- ,,, , 'ir 41' -51
i.'3, '"4C''Vitel..<4 IP`If% WI 'AVM • ' l'. . ?1• 5-i° ' - ''i; V. a
Photo 2. View southeast. Shrub vegetation in the left hand portion of the
photo indicates the location of Wetland "A". The grassy field is
representative of the eastern upland field.
Van Woerden Tract
Renton, Washington
PHOTOS 1 AND 2
October 1992 T-1412-01
i
SHANNON &WILSON, INC. FIG. A-1
Geotechnical and Environmental Consultants
I
[
--
11116 .
. ,
--..,
. .
',....•
e ,
..4•23' IX 11h,, 1F•
,7,4-a....•,,,,,,,,:,i:•-zyi:r.. s---- -
-'•.:-...`g--......,.. . - ...' -•,..,.:-. k ' - . f• YeSe" rt.f7e+,-i - 0
*.,..1_;,-4,-, , -.'z.t.••••,-;„.T41. -..,-:er:INTI-.-,,Es..4:5,-',Irt,,...`t...,.._•,-.' :•-•f.ir-4.-'%6 s',...1....c.•.',.q.;.:i.,151:...._,Vi; 7;.',.. -4•.• 1:
s-4',:.:Iri4;,11A;M:1-• :q l' 1.11E VACr ..;.?,,i,..,4 -•.1'k' 14:(00,,r1;.ei77,:i-P17i1--k'•;:i,,,,!!' .,
r-••":-*Allr'll' - I: ..." •- '--.. r•'1?,,, . . :-1..1".• •."I','• 1.1*.1,.. ?1,•,.,..,....t' :t,.*)f-r.' 7.,.....,_,....,;tAN .
'T'.',4",-4. .'..):..*---X, .4,04...s ..):1 ,V,i...11.,X,4 [T•:3 .... 7 7 ..t. •••3•., .....• -.7•7' -‘.. . •'r. ''',. ,
'':1.'lintP5.:3*.;;AX•*Y..' ''V 11.,,,,,4 :!, r';.-14 .,.-egly:t...iVilik.1-',..it ,-.C,SICIt'-;-'7'11.'4. 5-t•
/
,7 1,,,!..; i ', ;;;713,ic.,4:4i;et,I 1„1'f'rti. ' l'.iil .t.;f4t..1).;,‘...?‘:‘,":‘,Trirq.,'F.Yr4.44..7:S•A :7
3''.7e( •k.i.i....C.r.W., L..,33 • ot.. . 1.4"i''::.1,"'t'14......1,K.',011...,1 k \Nr . :k,\,,4.!-,- -,„1,•,,4.`---1...t-.V.','$ A,.„1 t, .ii` =./1 .,,•:". -144,1.-;-4,(7.... i
-2 .---•• • -'rir•T., •- --;-•1,,,-,- ... rip-i t.-LF1:1"4,...,,,,AI,,,,.., 10-..._(...t,.,tir?I r .1'_1 1-2:- , ""3:E.,':,`.,.,,,-..?„y,..
'',...7-c.ii 7. : ',i ,4 . - 11(.., ,,l-f,ria-4...,,, :.,,,, ...:4• 1'-•-f---c,.....q, .,,,.'-,.,_ _.••-•‘--,;-:/;,----"-1:-_---.';*. w..-
,',.,..,,_ ,I., !,4,... ,,,,'5.k k.k„..., -N ,46,'_,,) ,'1, .i-AT,*;,,-,-1 ,--- ;1-• , h 1---- -,' ,.._._;___.,,- ,,..-4-' -
;7' 14'7' 1,1?".•.--.7, 1'ic ..( '. ; ! -Nri i q.,,v,racf,--.%. , ,!, ;Iv -, , ., 1-.7 , ,,-..-..s - .,.0.
. ...., 4
., ,i.... . t.„ _ t , ..7... .. • /NC 1,--- 1' ,mi.( ,,.
- i .. 1, , -.,-..v. -c-7 '-- 1 , ''';'&'-' • "" i '1 ,, r i e p /, V i ', ,....----- '-,r'pr'
, .. .-a.I. N • .
7 4,' • •*-- -__r.:----- , -4--.: •'.1... e
_,-"--2- -L-/-/
i st.:-. • ,i. — - ---..---..-
1- , • - .' , ,', " r ".„..•-• •••--7---..•-•--, __ ..-4.--- 4.-•,
' k . )1 I -4 -- .- -1,., \ ,-;.44 / ;--.---- ... :. , 1 ' .1 „,- ---•;„•• .,,,_ •----' • .
• • 1 ).:..;' ---.1 A : . -''-'.
I' 1 ---- N. .: , 1 ---/7.7:
________-1 —4--- i.:„1-1 / /....'''.1.. rr -- N- ••• ' ---1'. :." I • .
'r.•;\ '' / ' ,-/ ', _--1., ' '' '' -;%-;--."-----, 7°-
/ vi ,-7/ i .-
. 1 •.',4 , i ._\ ,.•f/ , , ...
; • ,
\ •
' // ' 1t
. ,- i • — • •/
t. .
1 • '1'f .*•J:' '' ..'""ftilit
J•
_--
\-1, ' Fr,,,,. .,, ii.,:‘'t ' f,,' 71 . •=. __...„ , _.. "-- _.•
d in the Photo 3. View east. Yellow iris and cattail wetland locate
portion of Wetland "A". southern
•
ri
r:
I:,
v
r
1.-..
P
. .
,....z.,,...r„: .
, ..„.-...r.,..2 .7
k t, -, •, k: -1 '4"!... •v•-,.:
, •• -:- .....:...lb,.,A ,,,...4 . s jt ''' il.
......FA V4,.1,. 1 .4.,., ,Al., JZ:'' -; ,•i ' .; Y ';'. ---Ih " 11'11
,..,i,i,,,k.e...„s iz..k.... .t- ..;,'' ..<4,X.,,:reLliott.,,, .. .....:--1.,„Eg" -.-.-..11,us,00
4'. '' t --,-"Ac;: :,'"?=.- ' - ---, ,.. ... ..,.,..#--__,--.-.--4,-2-ca, ..,.. n-A.,---,—t-__,,...
-ii,,;.•,,j-li.ii,te, ,t-•; •`••„.;.,,,-4- ‘,, , :,.. --:-• _,,,-.• -- :_. ,-...„,-,-Y.,.,'1.-7----:-.-. -5c•-••;cr_--- ,'„"- re-,--7..--.:i$,
••---:•-‘-'1•••`•-••••-t/--filifz-, .:";44' .417- ,r• - 1-.' •4,',".44f,r- ?''• ,..•.- , ''' •-1,.,••••,—
-',..r,;---1-9,•s--. F•-•'„ :-..,--..: -Y•••• "%."'=-----1 :tr- '.• ••.,
44-3.."'' " • - . ... , -- -." .-,--...%',--..A., ,..?. .1-. --.. •
ps. ...4'--.w -.. r ...674:4-i--i-d,,,:g1 '.k•.,-' --'7..i. 9f.-, -,:..:-.$ .1/4; ..-^,, 't•-• : -'
rt.i 4 e` .•-•-`Zst.'d ... 41..r--1-.7.,1,„:,,-!...:e.e-;.,4, ' ;•-•'
r„.1,..i'",.:-.4'''',,, ..:1,,,,,-,..• 1,•', 1t, V".4 l'r'/:: , • •If• s:''',:....",go.--.'"-..C.-',..--,-;;..-• ' '•••. .
.. .. 1
--'.- .. ff.--.........,tm , --,r—r-
•,?-,,, ,', .. ,.;- ..„—g.... i..- ,- ,-..,..i—;4',.,44V44,4-, t,1%-;----;-..,;•--fe.'-`-‘•%," *,C,;".-',.• .
.::::^•::):1. ..,,,5,4=3,* 1._ s:‹,..,..5._:g...,,,,,-1,-;:lit,.. -.1',.._6-.-g---g—„,,---- .
3., ,...„.„..4„:..k._. --.,:-., ,,,t.f., ,,......,-;„ . ...c.r,-, :,..4....r: roe.- .&"*1;' ' -.1. - -.• -....-*7-gli;
z 7..?..'i.A.f.'"Z t,' '-, ...r- "i -'"-"•4...-... -..,r' •ctS 7:St' ,..,, ,..!: 'VV. -1/..'...V.; • ',
' •;:i-t..., .. .. .,_,L;-`1-(11..44--A.-4 .,:,2:01%4-4;et--- -k-s-'•-•i' ;,A1Pr'.•••• -,•••-"k".;;Pl•:444
i",•:•;',.:, .•••'' -,- --' •-- :-:";-,-4•,:ers"-,,,,A-33.,5-•'"44!..- x..,,-0:--•:. , ".4,‘,....-'--, i,:,,f_z, st,,,., •
••••'<,_:-- -,,,,,V."6-7,_.- .;,•i- 41 ‘1..-sre.A-,:e'--,--sx--rt.:7 ..17-..-. e_..„ .,....., -.,:„....
1...: ..-4 •..-..--A.„._::,..._,-........4,e:F., ....... e" ... -'- .,.,,S,E...,,..4 -4-z
.44.K.4.C'ff. ,"'. .:-.7.-.,,/•'‘tqlS.01-7: C..f• t.. '.•- ,c JAWCI'F.3''''';•
_.4 e":4 'N4''•',At-- 7 1 :'.. ,: 4 1.,. -.,- -
., :"Voi,..,- li- 'P" '4;'''.?: -,,‘,&:,._., '/.. X.r.7..f.../:"4.4 :tf,th' ,'-n4,..".--'2::2.q3,1•')- rt ..__, .-f'-'11'. - ••• .
4 ,„4.-4.--.477„, „•,.. - , ..1„,„ ..-44-j,..,c-.L.:,?., ..-,:s.,_,_.•- _••,••••,, r4 , ''.'i,,;-Pir.V.:$'•.".1..3.:t.. .. ...,:j".frAV.? I''' _r
..c„ ,,..-`....,... .1.4,..f 7m....--r_•-4,-, ,,,,d.k.,7,.—._•,,1-. -...--v-e -.........._.v. or.:'
-""•,7_,' :Lks7-4,-,; ••4 :.,.. •?,.•:,...-.. ,57ks•-••airg4-m-:
'-•_9,''--''' -; k • r.P'Z2-:'.4',71r :--_•,-7" '- - -,13_,dgis,1/4 '7 .''' hi.•-, - 5 ''''''—
,/- --,---`'": -'-' -0-'kt...,..1'4:-.-V:5-e•
'
portion of Wetland "B".
isthe scrub-shrub
Photo 4. View
background porno
• n of the photo .
west. Sprin,_abrook Creek in the foreground. In the left
Van Woerden Tract
Renton, Washington
PHOTOST.3 AND 4
October 1992FIG
A.4.12-01
SHANNON &WILSON, INC. 2
Geotechnical and Environmental Consultants
I
It
of•t. -S-\, ��m�[.. � jit 4` ' T♦i �,^•F 7 t -cY : 7i36r� }J , �rz "'
~ .'• to _ t - ` J t,,0}, +1 J,i• :.i• , .t.\t - ,','-,- ,- y t ",
t•.:,..:!'.,fr,,.1,
4..r--.-----Ni."„.-"-.:;.,-...?A:,7•,$;:\
.-.!,
• , Lr 1 ,
•
} �\ ` ' o ' •; \; �: �^l�' `-_� J•t t�
.� � \ ,;1 . `ti p �• , i r -!r 4, •t~ i
': \ ,:t ? � 4 ` .-{, .... -... - �1+ , X � ` 3,. k:, %t -: k *k om
Photo 5. View south. Reed canary grass field in Wetland "B".
•
i,� } .. ,Wi : �q" sr i 1 . •x •�,,N{ i , C`i � ..;;!.A.?..':',: -fIl7A1 t J,,, . q
xr ' •,, r: ..sr r/• rw t a '21, t~t�1• 'v f 'n4e�.•4.1 f ,K r
` . .,fit _ .. .11, •. / k: ,x: <,t j • . - �,
.. •�l+ t .j ri:a�t'1 �, , r r7r t . r r y o-•-f(-,'' ,t ,• i;•
�, ,t•' - /!_ / •,. • .� ! is l''I'�'ff 7 !'�' � ti T !`.
•
1 i f1 r
1 1,u, t f !' �N �r' ,icl 1.
/ 1 1 tl�,�5 t j 1 t r h i "V, t!<, •'�/ • r , s ! y
•
•Hui. n s S 'i/r,.47'4 4- ".e x�iT' •4. �{ ;4 * 11(`,L� 4#- b[ •y
��-S L 'Eu.,:•t1 ,� 4f Z.'-",;:.9 Z... tyr"ry,,.ff`- ti..`4a v. r-I iq\ i '"Y ' f,-r is. . -- Y.
< .r/ri, rti t 1 k;1 . -ybu J.vYF.,rr` ( ',1;'<f, t l '.ft4 C,Ir uf..:-r r /1l-• itr
J S E :4 , y `�! 1
�� ., i t\t 1 S` i ;.("4 1 , w�_,..-4,.. t '�.t.q" 1•44.41i,..'02',ViO.i7-letZ.,
•' 7- ' f a' �. ,,.. , Rr. y k IIPPP�I.. ./j '` R *+ '+^ "fit :'elf. l ` J ,' ' t% H,..'. t'•:G'•-.1 'JiI l'.5.1:17'if (341y`54`:',114�.j ,l': 1 A'lk.:= ,�y,;. P''�.e ., i ''.i .�+t 110.,1\1� ':ii�. !4\ i 17l �`•' f 1,` n'r' Isll` .`4r:r4l..r 3 f'J',:: .i,V �r �'Qrn Il�tl� •
, •
lfi'}!,'' i�t' it7•r ,..• l' .` ,,4i' ytle t',,. 1,i'ftli .''(. 14.. f;r t. i t .;
aa .i.'?'iiii7_et�'�rr�' ., /t.ail f A 1 4.1 _��S• :�;j.�.•r� • . ,.y b`t:'r•,.,..titt.. ,�`
"N • • f ` �'.i.• , .1'YY:1.•t,f... ! '1 t� .. \�•'.: :iti'' .
,Fry, ,�; S�; 1. ,'\g,t '',;'•'�`'.:r_i:'ij^` .i,1 �.'.' i,t " •'\Yy4�iw�1
: , �'' _;r :1 C ,4, .ti''i.t!'/,' F•' it 4' '
Photo 6. View west. Springbrook Creek.
Van Woerden Tract
Renton, Washington
PHOTOS 5 AND 6
October 1992 T-1412-01
SHANNON &WILSON, INC. FIG. A-3 '
Geotechnical and Environmental Consultants
•
•
i'+ ta.w2. ..z. ,{r,y . M TjYs `. x .. Ffy.i
T t -r2.Y 3' �y ,{L}K, u`? },•' 2 y,` ! F `C
T.z�a4kSrM-5�Z}}r t F#t:� i�,�F,�..�ry�:.,s'ZtS55h?'R��y_?•nia'�r�+ TJ v�'t••2'�a�` } ..�r-tis.t y :F . i�''7 t:��y1"F ` {aitJr 3'•�''rft.�at$
3. '` k(rtZ C, 4•5e 'd t q �` 4'y
..
5 K
} } t n -a 1+F i,t i s ; ,( 5" : `'c ,''y
t'•
• • • • •r .. l -. 'iG•✓ } •I
pt t 4:
•
•
Photo 7. View west. The northwestern upland field.
•
Van Woerden Tract
Renton, Washington
PHOTO 7
October 1992 T-1412-01
SHANNON &WILSON,INC. FIG. A-4
Geotechnical and Environmental Consultants
SHANNON FiWILSON,INC.
•
•
APPENDIX C
DEPARTMENT OF WILDLIFE NONGAME DATABASE INFORMATION
(will be forwarded once it is received in our office)
•
T-1412-01
SHANNON&WILSON.INC.
APPENDIX D
DEPARTMENT OF NATURAL RESOURCES DATABASE INFORMATION
T-1412-0I
_-°Y:_ WASHINGTON STATE DEPARTMENT OF •
kfra-
Natural Resources •
NagEir BRIAN BOYLE
Commissioner of Public Lands •
OLYMPIA, WA 98504
October 22, 1992
Theresa Henson
Shannon & Wilson Inc
PO Box 300303 •
Seattle WA 98103
SUBJECT: Wetland Delineation in Renton (T23N R04E S24 SE)
•
We've searched the Natural Heritage Information System for information on •
significant natural features in your study area. Currently, we have no
records for rare plants, high quality native wetlands or high quality native
plant communities in the vicinity of your project.
The Natural Heritage Information System is a cooperative effort between the
Department of Natural Resources' Washington Natural Heritage Program and the
Department of Wildlife's Nongame Program. The Washington Natural Heritage
Program is responsible for information on the state's endangered, threatened,
and sensitive plants as well as high quality native plant communities and !?
wetlands. . The Nongame Program :manages and interprets data on wildlife species
of concern in the state. For information on animals of concern in the state, 1 .
please contact the Nongame Program, Washington Department of Wildlife, 600
Capitol Way North, Olympia, WA. 98501-1091.
The Natural Heritage Information System is not a complete inventory of
Washington's natural .features. Many areas of the state have never been
thoroughly surveyed. There may be significant natural features in your study
area that we don't yet know about. This response should not be regarded as a •
final statement on the natural features of the areas being considered and
doesn't eliminate the need or responsibility for detailed on-site surveys. •
I hope you'll find this information helpful . •
Sincerely,
cSCIAJ'-'64 04 •
Sandy Norwood, Environmental Review Coordinator
Washington Natural Heritage Program
Division of Land & Water Conservation
PO Box 47047 •
Olympia, WA 98504-7047
(206) 902-1667
•
Equal Opportunity/Affirmative Action Employer
SHANNON&WILSON.INC.
APPENDIX E
DEFINITIONS OF PLANT INDICATOR STATUS
USED ON FIELD DATA SHEETS •
Indicator
Category Definition
OBL Obligate Wetland. Occur almost always (estimated probability >99%) under
natural conditions in wetlands.
FACW Facultative Wetland. Usually occur in wetlands (estimated probability 67-99%),
but occasionally found in uplands.
FAC Facultative. Equally likely to occur in wetlands or uplands (estimated probability
34-66%).
FACU Facultative Upland. Usually occur in uplands (estimated probability 67-99%),
but occasionally found in wetlands (estimated probability 1-33%).
UPL Obligate Upland. Occur in wetlands in another Region(as defined in the National
List of Scientific Plant Names), but occur almost always (estimated probability
>99%) under natural conditions in uplands in the region specified.
93
NI No Indicator. These species have not been given an indicator status. They are
assumed to be upland.
Source: National List Of Plant Species That Occur In Wetlands: Northwest (Region 9).
U.S. Fish and Wildlife Service Biological Report 88(26.9). 89 pp.
SHANNON&WILSON.INC.
•
•
•
•
•
APPENDIX E
DEFINITIONS OF PLANT INDICATOR STATUS USED ON FIELD SHEETS •
1
•
•
•
T-1412-01
• SHANNON FIWILSON,INC. •
MODIFIED TRIPLE PARAMETER APPROACH
WETLAND "C" •
Site Van Worden Tract Date 9-9-92 Staff TRH/AMY Plot# 1 •
VEGETATION
Trees Status % Cover Herbs Status % Cover
• Red Alder FAC 5 • Reed C marygrass FACW 90*
• Black Cottonwood FAC 5 • Canada Thistle FACU Trace
• Morning Glory FAC Trace
Shrubs Status % Cover
4 Willow sp. FACW 30* •
• Red-osier Dogwood FACW 20*
♦ Canada Thistle FACU 5
*idominant species
% of dominant species that are OBL, FACW, and/or FAC: 100%
% cover of OBL, FACW, and/or FAC species: 150% Hydrophytic vegetation? Yes •
SOILS .
Series/Phase Puyallup • On hydric soils list? No •
Aj horizon: depth 0-8" matrix color 2.5Y 4/3 Dry mottle color No depth of sample 4"
Soil type: (sand, clay, etc.) Sandy Loam
B'horizon: depth 8-18" matrix color 2.5Y 7/2 mottle color 10YR 3/6 depth of sample 10"
Soil type: (sand, clay, etc.) Sandy Loam •
Gleyed? No Other indicators None •
Depth of dominant vegetation root penetration 14"
Approximate % organic content(by volume) 0% Consistency Non-plastic, Non-sticky
Hydric soils? Yes Basis Chroma 2 with mottles
•
HYDROLOGY •
•
Inundated? No Depth of standing water 0
Saturated soils? No Depth to saturated soils 0
Hydrologic indicators?Wetland drainage patterns
•
Describe obvious topographic features, if any: On bench above low flow in channel
Wetland hydrology? Yes Basis Presumed on the basis of vegetation, soil and topography. •
Normal Circumstances? Yes Atypical situation? No
Wetland determination Yes Basis Meets Three Wetland Criteria
Comments: There is one foot of water in the channel discharging from a sixty inch diameter culvert. •
•
October 22, 1992
T-1412-01
Page 1 of 7
SHANNON F&WILSON.INC.
MODIFIED TRIPLE PARAMETER APPROACH
•
WETLAND "A"
Site Van Worden Tract Date 9-9-92 Staff TRH/AMY Plot#2
VEGETATION
Trees Status % Cover Herbs Status % Cover
• Willow Species FACW 50* ♦ Reed Canarygrass FACW 40* •
• Black Cottonwood FAC 10
Shrubs Status % Cover
♦ Himalayan Blackberry FACU 5
• Douglas Spiraea FACW 5
• Bittersweet Nightshade FAC Trace •
* dominant species
% of dominant species that are OBL, FACW, and/or FAC: 100%
% cover of OBL, FACW, and/or FAC species: 105% Hydrophytic vegetation? Yes
SOILS
Series/Phase Puyallup On hydric soils list? No
I y
A horizon: depth 0-5" matrix color 10YR 4/3 Dry mottle color None depth of sample 4"
Soil type: (sand, clay, etc.) Silt Loam
B horizon: depth 5-18" matrix color 2.5Y 5/2 mottle color 7.5YR 3/3 depth of sample 8"
matrix color 2.5Y 6/2 mottle color 7.5YR 3/4 depth of sample 10"
Soil type: (sand, clay, etc.) Silt Loam
Gleyed? No Other indicators None
Depth of dominant vegetation root penetration 5" •
Approximate % organic content(by volume) 0% Consistency Slightly plastic, Non-sticky
Hydric soils? Yes Basis Chroma 2 with mottles •
•
HYDROLOGY
Inundated? No Depth of standing water 0
Saturated soils? No Depth to saturated soils 0
Hydrologic indicators?Wetland drainage patterns •
Describe obvious topographic features, if any: Drainage swale, hvdric soil.
Wetland hydrology? Yes Basis Presumed based on indicators.
•
Normal Circumstances? Yes Atypical situation? No
Wetland determination Yes Basis Meets Three Wetland Criteria
Comments:
October 22, 1992
T-1412-01
Page 2 of 7
•
SHANNON&WILSON,INC.
MODIFIED TRIPLE PARAMETER APPROACH •
EAST UPLAND FIELD
Site Van Worden Tract Date 7-10-92 Staff TRH Plot# 3
VEGETATION
Trees Status % Cover Herbs Status % Cover
• None Observed ♦ Orchard Grass FACU 30*
• Common Velvetgrass FAC 10
♦ Tall Fescue FACU 40*
•
♦ Quack Grass FACU 10
Shrubs Status % Cover •
♦ Black Cottonwood FAC 5 •
• Canada Goldenrod FACU 5
*dominant species
% of dominant species that are OBL, FACW, and/or FAC: 0%
% cover of OBL, FACW, and/or FAC species: 15% Hydrophytic vegetation? No
SOILS }
Series/Phase- Fill On hydric soils list? No
A horizon: depth 0-18" matrix color 5Y 4/3 mottle.color None .depth of sample 10"
Soil type: (sand, clay, etc.) .Gravelly Sandy Loam
B horizon: depth , matrix color mottle color depth of sample
Soil type: (sand, clay, etc.)
•
Gleyed? No Other indicators None
Depth of dominant vegetation root penetration 16" •
Approximate % organic content(by volume) 0% Consistency Non-plastic, Non-sticky
Hydric soils? No Basis Chroma 3 soil
HYDROLOGY
Inundated? No , Depth of standing water 0
Saturated soils? No ,. Depth to saturated,soils 0 •
Hydrologic indicators?None observed
Describe obvious topographic features, if any: Flat. .
Wetland hydrology? No Basis No saturated soil, inundation, or other indicators.
Normal Circumstances? Yes Atypical situation? No
Wetland determination No Basis Lacking Three Wetland Criteria
Comments:
October 22, 1992
T-1412-01
Page 3 of 7 •
SHANNON WILSON,INC.
MODIFIED TRIPLE PARAMETER APPROACH
NORTH OF WETLAND "B"
•
Site Van Worden Tract Date 9-9-92 Staff TRH/AMY Plot#4
VEGETATION
Trees Status % Cover Herbs Status % Cover
• None Observed • Reed Canarygrass FACW 70*
• Canada Thistle FACU Trace
• Watson's Willow Herb FACW Trace
Shrubs Status % Cover •
• Black Cottonwood FAC 15
• Canada Thistle FACU 5
• Willow Species FACW 5
• Himalayan Blackberry FACU Trace
• Common Cattail • OBL Trace
• Japanese Knotweed NI Trace •
*dominant species
% of dominant species that are OBL, FACW, and/or FAC: 100%
% cover of OBL, FACW, and/or FAC species: 95% Hydrophytic vegetation? Yes
SOILS
Series/Phase Puyallup On hydric soils list? No `'
A horizon:. depth _ � matrix color mottle color depth of sample �.
Soil type: (sand, clay, etc.)
B horizon: depth 0-18" matrix color 2.5Y 4/3 mottle color None depth of sample 10"
Soil type: (sand, clay, etc.) Fine Sandy Loam
Gleyed? No Other indicators None
Depth of dominant vegetation root penetration 12"
Approximate % organic content(by volume) 0% Consistency Non-plastic, Non-sticky
Hy'dric soils? No Basis Chroma 3 soil, no mottles or other indicators.
HYDROLOGY
•
Inundated? No Depth of standing water 0
Saturated soils? No Depth to saturated soils 0
Hydrologic indicators? None observed
Describe obvious topographic features, if any: Flat.
Wetland hydrology? No Basis No saturated soil, inundation,or other indicators.
Normal Circumstances? Yes Atypical situation? No
•
Wetland determination No Basis Lacking Three Wetland Criteria
Comments: Standing water about 20 feet south near culvert. Gage station indicates that the water level elevation = 7 feet.
Water has a sewage smell.
October 22, 1992
T-1412-01
Page 4 of 7
SHANNON EIWILSON,INC.
MODIFIED TRIPLE PARAMETER APPROACH
•
NORTHWEST UPLAND FIELD
•
Site I Van Worden Tract Date 7-10-92 Staff TRH Plot#5
VEGETATION
Trees Status % Cover Herbs Status % Cover
♦ None Observed • Orchard Grass FACU 40*
♦ Redtop Bentgrass FAC 10
• Tall Fescue FACU 40*
• Quack Grass FACU 10 •
Shrubs Status % Cover
• Canada Thistle FACU 10
•
* do ninant species
% of dominant species that are OBL, FACW, and/or FAC: 0%
% cover of OBL, FACW, and/or FAC species: 10% Hydrophytic vegetation? No
SOILS
Seris/Phase Puyallup On hydric soils list? No •r?
A horizon:: depth 0-18" matrix color 10YR 3/2' mottle color`None " depth of sample 10"
Soil)type: (sand, clay, etc.) -Sandy Loam �y
f
B.horizon: .. depth - . matrix color mottle color depth of sample -
Sod type: (sand; clay; etc:)...
Gleyed? No Other indicators None
Depth of dominant vegetation root penetration 14"
Approximate % organic content(by volume) 0% Consistency Non-plastic, Non-sticky
Hydric soils? No Basis Chroma 2 soil, no mottles.
HYDROLOGY
Inundated? No . Depth of standing water 0
Saturated soils? No Depth to saturated soils 0
Hydrologic indicators?None observed •
Describe obvious topographic features, if any: High flat area.
Wetland hydrology? No Basis No saturated soil, inundation, or other indicators. •
Normal Circumstances? Yes Atypical situation? No
Wetland determination No .Basis Lacking Three Wetland Criteria
Comments:
October 22, 19
92
T-1412-01
•
Page 5 of 7
SHANNON&WILSON,INC.
MODIFIED TRIPLE PARAMETER APPROACH
WETLAND "B"
Site Van Worden Tract Date 7-10-92 Staff TRH Plot#6
VEGETATION •
TreesI Status % Cover Herbs Status % Cover
♦ Nine Observed ♦ Reed Canarygrass FAC 95*
♦ Soft Rush FACW Trace
Shrubs Status % Cover
•
• None Observed
*dominant species •
% offdominant species that are OBL, FACW, and/or FAC: 100%
% cover of OBL, FACW, and/or FAC species: 95% Hydrophytic vegetation? Yes
•
SOILS •
Series/Phase Woodinville On hydric soils list? Yes 1'1.:
A horizon: depth 0-18" matrix color 5Y 5/1 mottle color 5YR 3/3 depth of sample 10" f„s•
Soil type: (sand, clay,etc.) Silt Loam
B horizon: depth matrix color mottle color_ depth of sample
Soil type: (sand, clay, etc.)
•
Gleyed? No Other indicators None •
Depth of dominant vegetation root penetration 14"
Approximate % organic content(by volume) <50% Consistency Plastic, Non-sticky ..
Hydric soils? Yes Basis Chroma 1 soil.
HYDROLOGY •
Inundated? No Depth of standing water 0
Saturated soils? Yes Depth to saturated soils 8"
Hydrologic indicators?Wetland Drainage Pattern. •
Describe obvious topographic features, if any: Large low depression.
Wetland hydrology? Yes Basis Saturated soil.
Normal Circumstances? Yes Atypical situation? No •
Wetland determination No Basis Meets Three Wetland Criteria
Comments:
•
October 22, 1992
T-1412-01
Page6of7
SHANNON&WILSON,INC.
•
MODIFIED TRIPLE PARAMETER APPROACH
WETLAND "B"
Site Van Worden Tract Date 9-9-92 Staff TRH/AMY Plot#7
VEGETATION
Trees Status % Cover Herbs Status % Cover
♦ None Observed ♦ Common Duckweed OBL 5
♦ Lyngby's Sedge OBL 20
Shrubs Status % Cover
• Common Cattail OBL 50* •
* dominant species
% of dominant species that are OBL, FACW, and/or FAC: 100%
% cover of OBL, FACW, and/or FAC species: 75% Hydrophytic vegetation? Yes
SOILS
Soil was not sampled. Soil was assumed hydric based on inundation.
Series/Phase On hydric soils list? !;
A horizon: depth matrix color ' mottle color depth of sample
Soil type: (sand, clay, etc.)
B horizon: depth matrix color mottle color depth of sample
Soil type: (sand, clay, etc.)
Gleyed? Other indicators
Depth of dominant vegetation root penetration
Approximate % organic content(by volume) ; Consistency
Hydric soils? Yes Basis Inundation. •
HYDROLOGY
•
•
Inundated? Yes Depth of standing water 2' •
Saturated soils? — Depth to saturated soils —
Hydrologic indicators?Wetland Drainage Pattern.
Describe obvious topographic features, if any: Ditch
Wetland hydrology? Yes Basis Inundation. ' •
•
Normal Circumstances? Yes Atypical situation? No •
Wetland determination No Basis Meets Three Wetland Criteria
Comments:
T1412-01.TB1lT1412-Ikd/lkd
October 22, 1992
T-1412-01
Page 7 of 7
SHANNON&WILSON,INC.
•
•
•
APPENDIX F
•
MODIFIED REPPERT WETLAND VALUES EVALUATION SHEETS
f.fA
•
•
T-1412-01
SHANNON 6WILSON.INC.
APPENDIX F
MODIFIED REPPERT WETLAND VALUES EVALUATION
VAN WOERDEN TRACT: WETLAND "A"
Value
Rating Basis for Evaluation
1. Natural Biological Function HIGH TO MODERATE
A. Food Chain Support Moderate
1. Net Primary Production High Wetland contains marsh vegetation.
2. Mode of Transport Moderate Linked to Springbrook Creek.
3. Food Chain Support Moderate Songbird use.
B. General Habitat High diverse wetland with three plant com-
munities. •
C. Special Habitat High Snags, banks with cover.
2. Aquatic Study Areas, MODERATE
Sanctuaries, or Refuges Heron Rookery and Natural Shoreline
Master Plan Designation one mile
north. '
3. Hydrologic Support Function HIGH to MODERATE
A. Hydrologic Periodicity.;, . . Moderate Linked to Springbrook Creek.
B. Elevation in basin High Near open water system, Springbrook
Creek.
•
4. Shorelines Protection LOW Narrow corridor approximately 200
feet wide along the creek.
5. Storage of storm and MODERATE
flood water •
A. Flood Storage Factor Low Wetland less than five acres in size.
B. Flood Retardation Factor . High Greater than 30% of wetland vegetation
is woody.
•
T-1412-01
•
F-1
SHANNON&WILSON,INC.
•
APPENDIX F
•
MODIFIED REPPERT WETLAND VALUES EVALUATION (continued)
VAN WOERDEN TRACT: WETLAND "A"
Value
Rating Basis for Evaluation
•
6. Natural Groundwater MODERATE
Recharge Wetland is a seasonal system between
5 and 10 acres in size.
7. Water Purification HIGH
A. Wetland Type High
•
1. Hydroperiod High Wetland is near Springbrook Creek.
2. Vegetation Density High Wetland plant cover is greater than
80%.
B. Areal and Waste Loading Moderate
Relationships
1. Total Wetland Moderate Total wetland system appears to be
greater than ten acres in size.
2. Proportion of Water Low Less than 40% of wetland is normally ,
covered with water. f=
3. Proportion of Runoff High More than 50% of surface water runoff
is retained in wetland for no more than
a 2 year event.
C. Location Factors' High
1. Frost-Free.Days High Over 250 frost-free days/year.
2. Location related to High Discharge from surrounding area has
very high total fecal conform levels, as
high as 16,000 organisms per liter.
8. Cultural Values (Economics, HIGH Locally used for recreation and may
Aesthetics=.Recreational,.. have aesthetic value as a greenbelt to the
Archeological Sites) local office building employees.
•
•
T-1412-01
F-2
,
SHANNON&WILSON,INC.
APPENDIX F
MODIFIED REPPERT WETLAND VALUES EVALUATION
VAN WOERDEN TRACT: WETLAND "B"
Value
Rating Basis for Evaluation
1. Natural Biological Function MODERATE
A. Food Chain Support Moderate
1. Net Primary Production High Wetland contains marsh vegetation.
2. Mode of Transport Moderate Linked to Springbrook Creek.
3. Food Chain Support Moderate Moderate diversity of vertebrate animals.
B. General Habitat Moderate At least emergent and scrub-shrub
communities.
C. Special Habitat High Snags, banks with cover.
2. Aquatic Study Areas, MODERATE
Sanctuaries, Heron Rookery and Natural Shoreline
or Refuges Master Plan Designation one mile north.
3. Hydrologic Support Function . HIGH to MODERATE.
A. Hydrologic Periodicity Moderate Linked to Springbrook Creek.
B. Elevation in basin High Near open water system, Springbrook
Creek.
4. Shoreline Protection MODERATE Shoreline vegetation is between 100
and 200 yards wide.
5. Storage of storm and MODERATE
flood water
A. Flood Storage Factor Moderate Wetland is between five and ten acres
in size.
B. Flood Retardation Factor. Moderate Between 10% and 30% of wetland
vegetation is woody.
T-1412-01
F-3
SHANNON&WILSON,INC.
• APPENDIX F
MODIFIED REPPERT WETLAND VALUES EVALUATION (continued)
VAN WOERDEN TRACT: WETLAND "B"
Value
Rating Basis for Evaluation
6. Natural Groundwater HIGH
Recharge Total wetland is greater than 10 acres
in size, and has an open water compo-
nent.
7. Water Purification HIGH
A. Wetland Type High
1. Hydroperiod High Wetland is near a river, Springbrook
Creek.
2. Vegetation Density High Wetland plant cover is greater than
80%.
B. .Areal and Waste Loading Low
Relationships •
1. Total Wetland Moderate Total wetland system appears to be .>
between ten and 100 acres in size.
2. Proportion of Water Low Less than 40% of wetland is normally
covered with water.
3. Proportion of Runoff High More than 50% of surface water runoff
is retained in wetland for no more than
a 2 year event.
C. Location Factors High
1. Frost-Free Days High Over 250 frost-free days/year.
2. Location related to High Discharge from surrounding area has
very high total fecal coliform levels, as
high as 16,000 organisms per liter.
•
•
8. Cultural Values (Economics, HIGH Cultural and aesthetic values in todays
Aesthetics% Recreational, society.
Archeological Sites)
T-1412-01
F-4
i '
SHANNON WILSON,INC.
APPENDIX F •
MODIFIED REPPERT WETLAND VALUES EVALUATION
VAN WOERDEN TRACT: WETLAND "C"
Value
Rating Basis for Evaluation
1. Natural Biological Function MODERATE
A. Food Chain Support Moderate
1. Net Primary Production Moderate Dominantly scrub-shrub vegetation.
•
2. Mode of Transport High Linked to Springbrook Creek.
3. Food Chain Support Moderate Songbird and possible fish use.
B. General Habitat Moderate At least emergent and scrub-shrub
communities.
C. Special Habitat High Bands with cover, downed logs.
2. Aquatic Study Areas, MODERATE
Sanctuaries, or Refuges Heron Rookery and Natural Shoreline
Master Plan Designation one mile k,
north.
3. ' Hydrologic Support Function HIGH to MODERATE
A. Hydrologic Periodicity Moderate Linked to Springbrook Creek.
B. Elevation in basin High Near open water system, Springbrook
Creek.
4. Shoreline Protection LOW Narrow corridor, approximately 200
feet wide along the creek shore. •
5. Storage of storm and MODERATE
flood water •
A. Flood Storage Factor. Low Wetland less than five acres in size.
B. Flood Retardation Factor Moderate Between 10% and 30% of wetland
vegetation is woody near base of wet-
land.
•
•
T-1412-01
F-5
A"
SHANNON 6WILSON,INC.
APPENDIX F
MODIFIED REPPERT WETLAND VALUES EVALUATION (continued)
VAN WOERDEN TRACT: WETLAND "C"
Value
Rating Basis for Evaluation
6. Natural Groundwater MODERATE
Recharge Small area. Water flowing year round.
Soil is silty sand.
7. Water Purification MODERATE
A. Wetland Type High to Moderate
1. Hydroperiod Moderate Permanent water system flooded by •
large and small storm events.
2. Vegetation Density High Wetland plant cover is greater than
80%.
B. Areal and Waste Loading Low
Relationships •
1. Total Wetland Low Total wetland system appears to be less
than ten acres in size.
2. Proportion of Water Low Less.than.40% of wetland is normally
covered with water, r.
3. Proportion of Runoff Low Less than 25 of surface water runoff is
retained in wetland for no more than a
z.,
2 year event.
C. Location Factors High
1. Frost-Free Days High Over 250 frost-free days/year.
2. Location related to High Discharge from surrounding area has
very high total fecal coliform levels, as
•
high as 16,000 organisms per liter.
8. Cultural Values (Economics, MODERATE The area is locally used for recreation.
Aesthetics% Recreational,
Archeological Sites)
T-1412-01
F-6
66 oU !5, S6, �--�
DEVELOPMENT PLANNING
CITY OF RENTON
FEB 2 01996
RECE1VFD
GEOTECHNICAL ENGINEERING STUDY
PROPOSED DISTRIBUTION FACILITY
RAYMOND AVENUE SOUTHWEST
AND SOUTHWEST 19TH STREET
RENTON, WASHINGTON
E-6754
April 14, 1995
•
PREPARED FOR
WINMAR PROPERTIES
o
uglas_ . Lynne - • . .
Staff Engineer :=
Vt.�CA/11/
4- ��oF iede cC`
. .. :
Kyle R. Camp:ell E. fig
Manager of Geotec is I Se Yes;
. SAL t1�
tEXPIRES i
•
Earth Consultants, Inc.
1805 - 136th Place Northeast, Suite 201
Bellevue, Washington 98005
(206) 643-3780
IMPORTANT INFORMATION
.., '' ABOUT YOUR
GEOTECHNICAL ENGINEERING REPORT
More construction problems are caused by site subsur- technical engineers who then render an opinion about
face conditions than any other factor. As troublesome as overall subsurface conditions,•their likely reaction to
subsurface problems can be,their frequency and extent proposed construction activity,and appropriate founda-
have been lessened considerably in recent years,due in tion design. Even under optimal circumstances actual
large measure to programs and publications of ASFE/ conditions may differ from those inferred to exist,
The Association of Engineering Firms Practicing in because no geotechnical engineer, no matter how
the Geosciences. qualified, and no subsurface exploration program, no •
matter how comprehensive, can reveal what is hidden by :
The following suggestions and observations are offered
to help you reduce the geotechnical-related delays, earth, rock and time.The actual interface between mate-
cost-overruns and other costly headaches that can rials may be far more gradual or abrupt than a report
indicates.Actual conditions in areas not sampled may
occur during a construction project.
differ from predictions. Nothing can be done to prevent the
unanticipated, but steps can be taken to help minimize their
A GEOTECHNICAL ENGINEERING impact. For this reason, most experienced owners retain their
REPORT IS BASED ON A UNIQUE SET geotechnical consultants through the construction stage, to iden-
tify variances,conduct additional tests which may be .
OF PROJECT-SPECIFIC FACTORS needed,and to recommend solutions to problems
A geotechnical engineering report is based on a subsur •
-
encountered on site.
face exploration plan designed to incorporate a unique •
SUBSURFACE CONDITIONS
set of project-specific factors.These typically include:
the general nature of the structure involved, its size and CAN CHANGE
configuration; the location of the structure on the site
and its orientation; physical concomitants such as Subsurface conditions may be modified by constantly-
access roads, parking lots, and underground utilities, changing natural forces. Because a geotechnical engi-
•
and the level of additional risk which the client assumed neering report is based on conditions which existed at
by virtue of limitations imposed upon the exploratory the time of subsurface exploration,construction decisions
program.To help avoid costly problems, consult the should not be based on a geotechnical engineering report whose
geotechnical engineer to determine how any factors adequacy may have been affected by time. Speak with the geo
which change subsequent to the date of the report may technical consultant to learn if additional tests are 1
affect its recommendations. advisable before construction starts. 14.4
Unless your consulting geotechnical engineer indicates Construction operations at or adjacent to the site and •
•
otherwise, your geotechnical engineering report should not natural events such as floods,earthquakes or ground-
be used: water fluctuations may also affect subsurface conditions
•When the nature of the proposed structure is and,thus, the continuing adequacy of a geotechnical .
changed, for example, if an office building will be report.The geotechnical engineer should be kept •
•
erected instead of a parking garage, or if a refriger- apprised of any such events,and should be consulted to
ated warehouse will be built instead of an unre- determine if additional tests are necessary.
frigerated one;
•when the size or configuration of the proposed GEOTECHNICAL SERVICES ARE
structure is altered; PERFORMED FOR SPECIFIC PURPOSES
•when the location or orientation of the proposed AND PERSONS
structure is modified; •
•when there is a change of ownership.or Geotechnical engineers' reports are prepared to meet
•for application to an adjacent site. the specific needs of specific individuals. A report pre- .
Geotechnical engineers cannot accept responsibility for problems pared for a consulting civil engineer may not be ade •
-
which may develop if they are not consulted after factors consid- quate for a construction contractor,or even some other •
ered in their report's development have changed. consulting civil engineer. Unless indicated otherwise,
this report was prepared expressly for the client involved
and expressly for purposes indicated by the client. Use
MOST GEOTECHNICAL "FINDINGS" by any other persons for any purpose,or by the dient
ARE PROFESSIONAL ESTIMATES for a different purpose, may result in problems. No indi-
vidual other than the client should apply this report for its
Site exploration identifies actual subsurface conditions intended purpose without first conferring with the geotechnical •
only at those points where samples are taken,when engineer. No person should apply this report for any purpose
they are taken. Data derived through sampling and sub- other than that originally contemplated without first conferring
sequent laboratory testing are extrapolated by geo- with the geotechnical engineer.
fiti
I �E��� 44\ Earth Consultants Inc.
fll�� ` `, Geotechnical Engineers.Geologists&Environmental Scientists
•
April 14, 1995 E-6754
Winmar Properties .•
c/o Mark Miller Consultants, Inc. •
10801 Main Street, Suite 100 •
Bellevue, Washington 98004
•
•
Attention: Mr. Mark Miller
Dear Mr. Miller:
We are pleased to submit our report titled "Geotechnical Engineering Study, Proposed
Distribution Facility, Raymond Avenue Southwest and Southwest 19th Street, Renton,
Washington." This report presents the results of our field exploration, selective
laboratory tests, and engineering analysis, as well as geotechnically related
recommendations for the proposed site development. The purpose and scope of our
study was outlined in our proposal dated February 2, 1995. >=
•
Based on the subsurface conditions enco.untered.at.the above referenced site, it is our
opinion that the proposed additions may be supported by shallow spread footings
bearing on a minimum of two feet of structural fill after completion of a surcharge
program or a preload program, depending on the magnitude of post-construction
settlement that can be tolerated. •
If you or your consultants have any questions about the content of this report, or if •
we can be of further assistance, please call.
•
Respectfully submitted,
EARTH CONSULTANTS, INC. •
Kyle R. Campbell, P.E. : .
Manager of Geotechnical Services
•
DSL/KRC/kml
[6754GES.Rpt] •
•
•
1805.136th Place N.E., Suite 201, Bellevue,Washington 98005
Bellevue(206)643-3780 Seattle(206)464-1584 FAX(206)746-0860 Tacoma(206)272-6608
TABLE OF CONTENTS
E-6754
PAGE
INTRODUCTION 1
General 1
Project Description 1
SITE CONDITIONS 2
Surface 2
Subsurface 2
Groundwater 3
Laboratory Testing 3
DISCUSSION AND RECOMMENDATIONS 3
General 3
Site Preparation and Grading 4
Surcharge Program 6
Foundations 8
Seismic Design Considerations 9
Lateral Resistance 10
Retaining Walls 10
Slab-on-Grade Floors 11
Excavations and Slopes 11
Site Drainage 12
Utility Support and Backfill 13
Pavement Areas 13
LIMITATIONS 14
Additional Services 14
APPENDICES
Appendix A Field Exploration
Appendix B Laboratory Testing
ILLUSTRATIONS
Plate 1 Vicinity Map
Plate 2 Boring Location Plan
Plate 3 Settlement Plate Detail
Plate 4 Typical Footing Subdrain Detail
Plate 5 Utility Trench Fill
Plate Al Legend
Plates A2 through A10 Boring Logs
Plate B1 Grain Size Analysis
Plate B2 Atterberg Limit Test Data
GEOTECHNICAL ENGINEERING STUDY
PROPOSED DISTRIBUTION FACILITY
RAYMOND AVENUE SOUTHWEST AND SOUTHWEST 19TH STREET
RENTON, WASHINGTON
E-6754
INTRODUCTION
General
This report presents the results of the geotechnical engineering study for the proposed
distribution facility near the intersection of Raymond Avenue Southwest and
Southwest 19th Street, Renton, Washington. The general location of the site is
shown on the Vicinity Map, Plate 1 . The purpose of this study was to explore the
subsurface conditions at the site and, based on the conditions encountered,to provide
recommendations for site preparation, as well as present geotechnical information for
the proposed site development. •
•
Project Description
At the time our study was performed, the site, the proposed structure, and
exploratory locations were approximately as shown on the Boring Location Plan,
Plate 2.
Based on information provided by. Lance Mueller and:: Associates, it is proposed to C
develop the parcel with a concrete tilt-up office/warehouse. We understand that fills
up to about two to three feet in depth are anticipated to provide grade for the building Lia
slab. Based on our experience with similar structures in the past, we anticipate
P �xs
structural loading to be in the following ranges:
• Wall footings - 2 to 3 kips per lineal foot
• Maximum column load - 50 to 100 kips
•
• Slab loads - 250 pounds per square foot (psf)
If the above design criteria are incorrect or change, we should be notified and allowed
to review our recommendations in light of actual design information. In any case, it
is recommended that Earth Consultants, Inc. be retained to perform a general review
of the final construction design.
•
Earth Consukants, Inc.
I
GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 2
SITE CONDITIONS
Surface
The site of the proposed facility is located southwest of the Raymond Avenue and
Southwest 19th Street intersection in Renton,Washington (see Plate 1, Vicinity Map).
The rectangular parcel covers about twenty-four acres; however, the proposed
development is located in the portion of the site between Spring Brook Creek and the
east property line. The development area is bounded by Spring Brook.Creek on the
south and west, by the Southwest 19th Street right-of-way to the north and by the
Raymond Avenue Southwest right-of-way to the east.
At present, the site is undeveloped, with grasses covering the existing surface. The
site is generally level with elevational changes of about two feet.
Subsurface
The site was explored by drilling five borings at the.approximate locations shown on
Plate 2. Detailed descriptions of the conditions encountered at each location explored
are presented on the Boring Logs, Plates A2 through A10. A description of the field
exploration methods is included in Appendix A. Below is a generalized description of
the subsurface conditions encountered.
During our subsurface exploration, a three to six foot thick layer of fill was observed
across the site. The fill consisted of sandy lean clay and silty sand (Unified Soil •
Classification CL and SM). Immediately underlying the fill, our exploration
encountered gray silt/lean clay (ML/CL) to depths ranging from fifteen to twenty feet
beneath the existing grades. Between depths of about nine and fifteen feet, the
silt/lean clay was mixed with peat. In Boring B-3, a distinct layer of peat was
observed between ten and one-half (10.5) feet and thirteen and one-half (13.5) feet.
The peat layer was also observed in Boring B-4 between eleven and one-half (11 .5)
feet and thirteen and one-half (13.5) feet. Moisture contents of the peaty soil ranged
from 43.5 to 105.0 percent. Underlying the silt/lean clay, layers of poorly graded
with silt (SP-SM), sandysilt (ML) and siltysand (SM) were observed to the
sand t
maximum exploration depth of thirty-five (35) feet.
Earth Consultants, Inc. .
`GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
•
c/o Mark Miller Consultants, Inc. E-6754 •
April 14, 1995 Page 3 •
•
Groundwater
Groundwater was observed in all of the borings except B-5 at depths ranging ,from
four to eight feet below the existing ground surface. Groundwater was not
encountered until borings were advanced to a depth of about eight feet, at which
point the water surface rose to four feet beneath the ground surface. It is important
to note that groundwater seepage is not constant; thus, one may expect fluctuations
in the volume and location depending on the season, amount of rainfall, surface water
runoff, and other factors. Generally, groundwater seepage is greater during the •
wetter winter months (typically October through May).
Laboratory Testing
Laboratory tests were conducted on several representative soil samples to verify or
modify the field soil classification of the units encountered and to evaluate the general
physical properties and engineering characteristics of the soils encountered. Visual
classifications were supplemented by index tests, such as sieve analysis and Atterberg
Limits, and moisture content tests on representative samples. The results of laboratory. ` °
tests perform d on specific samples are provided either at the appropriate sample
depth on the individual boring log or on a separate data sheet contained in
Appendix B. However, it is important to note that these test results may not ='
accurately represent the overall in-situ soil conditions; our geotechnical
recommendations are based on our interpretation of these test results.
The soil samples for this project will be discarded after a period of fifteen (15) days
following completion of this report, unless we are otherwise directed in writing. •
•
•
DISCUSSION AND RECOMMENDATIONS
General
•
Based on the results of our study, it is our opinion that the site can be developed
generally as planned provided the recommendations contained in this report are
incorporated into the final design. In our opinion, total settlement of the existing fill
and underlying fluvial soils is anticipated to be on the order of two to five inches from
application of new structural fill and building loads. In order to reduce the anticipated
settlements to about one inch, a surcharge post-constructionram is
ro 9 program
recommended.
Earth Consultants, Inc.
'GEOTECHNICAL ENGINEERING STUDY •
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 4 •
The recommended surcharge program would involve placement of at least two feet
of fill above the finish floor elevation and allowing the induced settlements to stabilize.
As an alternative to a surcharge program, a preload program could be used; however,
the anticipated post-construction settlements would be in the range of two inches
(total settlement) and one to one and one-half inches (differential settlement). A
preload program would consist of placing structural fill to the finish floor elevation and
allowing the induced settlements to stabilize. We anticipate stabilization of settlement
within four to six weeks after placement of the surcharge or preload fill is complete.
If the preload option is chosen, the induced settlements must be monitored in
accordance with the recommendations concerning settlement monitoring in the •
Surcharge Program section of this study.
This report has been prepared for specific application to this project only and in a
manner consistent with that level of care and skill ordinarily exercised by other
members of the profession currently practicing under similar conditions in this area for
the exclusive use of Winmar Properties and their representatives. No warranty is
expressed or implied. It is recommended that this report, in its entirety, be included in the project contract documents for the information of the contractor. Fh
Site Preparation and Grading
The building and pavement areas should be stripped and cleared of all surface
vegetation, organic material and any other deleterious material. The root mat of the
existing vegetation can be left in place in fill areas provided a minimum of two feet
and one and .one-half feet of structural fill underlie foundations and pavements,
respectively. The vegetation will have to be cut, with grasses left in place in areas
to receive fill. Shrubs will have to be removed from the site.
Based on conditions encountered at our exploration locations, which indicated minimal
topsoil, we anticipate stripping.will be limited to removal of vegetation and one to two
inches of soil. Stripped materials should not be mixed with any materials to be used
as structural fill. Stripped materials may be used in non-load supporting areas such .
as landscaping. •
Following the stripping and clearing procedures, the earthwork operations can
commence to provide the design grades. The ground surface where structural fill is
to be placed should be proofrolled. All proofrolling should be performed under the
observation of a representative of ECI. Soil in any loose or soft areas, if recompacted
and still excessively yielding, should be overexcavated and replaced with structural
fill to a depth that will provide a stable base beneath the general structural fill or
suitable support for slabs.
Earth Consultants, Inc.
‘GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 5
The soils observed in our borings are moisture sensitive due to their high fines
content. As such, in an exposed condition they will become disturbed from normal
construction activity especially when in a wet or saturated condition. Once disturbed,
in a wet condition, they will be unsuitable for support of foundations or pavements.
Therefore, during construction where these soils are exposed and will support new
structures, care must be exercised not to disturb their condition. If disturbed
conditions develop, the affected soils must be removed and replaced with a structural
fill. The depth of removal will be dependent on the level of disturbance developed
during construction.
Structural fill is defined as any compacted fill placed under foundations, roadways,
slabs, pavements, or any other load-bearing areas. Structural fill under foundations
should be placed in horizontal lifts not exceeding twelve (12) inches in loose thickness
and compacted to a minimum 90 percent of its maximum dry density in accordance
with ASTM Test Designation D-1557-78 (Modified Proctor). The fill materials should
be placed at or near the optimum moisture content. Fill under pavements and walks
should also beplaced in horizontal lifts and compacted to 90percent of maximum
P
density, except for the top twelve (12) inches which should be compacted to 95 k'•.,;
percent of maximum density.
r..
Soils expected to be exposed in the footing and utility excavations are silty sand, lean
clay, silt and peat. In our opinion, the inorganic soil is usable as structural fill,
provided it is moisture conditioned to at or near optimum moisture content. In order
to moisture condition the soil, it may be necessary to either add water or aerate the •
soil. However, the peat, which may be exposed in deep utility trenches, should be
removed and replaced with structural fill to a depth that-will provide adequate support
•
for the utility.
Structural fill which is to be placed in wet weather should consist of a granular
material with a maximum size of three inches and no more than five percent fines •
passing the No. 200 sieve, based on the minus 3/4-inch fraction. During dry weather,
most compactible non-organic soil can be used as structural fill. It is recommended
that any structural fill planned for on site use be submitted for approval prior to
import.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 6
Due to the loose/soft condition and moisture sensitivity of the surface soils at the site,
in our opinion, it would be prudent to construct a temporary access road around the
building that will be useable by construction equipment during wet weather. The road
should be constructed during mass grading operations. The temporary access road
should consist of eighteen (18) inches of free-draining granular structural fill underlain
by a geotextile fabric suitable for use in stabilization applications. As an alternative,
six inches of four-inch to six-inch quarry spalls can be used i lieu of the geotextile
fabric.
Surcharge Program
The surcharge program is designed to pre-consolidate the compressible fills and soil
underlying the site, such that the surcharge would apply loads equivalent to, or
greater than, anticipated building loads. The surcharge fill is in addition to the fill
required to bring the site to grade. The surcharge should extend at least five feet
beyond the perimeter of the buildings. If the preload option is used as described in f
the General section of this study, the preload fill should also extend at least five feet
beyond the perimeter of the building. The height of the surcharge should be two feet
above finish floor. The side slopes of the fill should not be inclined any steeper than
1 H:1 V. If a wet weather construction schedule is planned, the surcharge fill should
meet the requirements of a wet weather fill as discussed in the Site Preparation and :
Grading section of this study. The surcharge material should have a minimum in-place
unit weight of one hundred twenty (120) pcf. Depending on the material used as
surcharge, it may be necessary to compact the surcharge.
Depending on site grades, it may be necessary to overexcavate soil to provide the
required thickness of structural fill below footings and slabs prior to placement of the
surcharge. Alternatively, footing overexcavations can be accomplished after removal
of the surcharge.
We.anticipate the settlement induced by the surcharge should range from two to five
inches. A smaller settlement should be interpreted as that the soils have been
preconsolidated and soil conditions are better than anticipated. Conversely, a larger
settlement could be interpreted that the soil conditions are worse than anticipated,
and that additional time and measurements should be taken to obtain satisfactory
results. However, the only reasonably accurate means of verifying the settlement
magnitude is to perform a monitoring program.
Based on the conditions encountered, we anticipate completion of the surcharge
program in approximately four to six weeks.
Earth Consultants. Inc.
''GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 7
it
The settlement monitoring program should include setting settlement monitors on the
existing site subgrade before any fill is placed, monitoring them through completion
of fill placement, continuing until settlements cease or until anticipated future
settlements are considered to be less than one inch. More specific details of this
program are presented below:
• Settlement markers should be placed on the native subgrade of each building
pad before any fill is placed. Seven to nine markers should be installed within
the building footprint. ECI can supply and install these markers. (A typical
detail is provided on Plate 3).
• A baseline reading is obtained on each marker and is referenced to a temporary •
benchmark located on a feature that will not be affected by the fill-induced
settlements.
• The fills are then placed. Settlement readings are taken at relatively short r;
intervals during this process, since this phase generates relatively large and
rapid settlement. "
• operation is complete, readings are obtained on aperiodic basis,
Once the fill o erat o
9
P P
typically weekly, until the settlement ceases or the anticipated future
settlements are judged by the geotechnical engineer to be less than
approximately one inch.
• Each set of settlement readings are plotted graphically against time to
determine the magnitude and rate of settlement, and are matched against the
predicted magnitudes and rates to verify the accuracy of earlier estimates and
to make any appropriate modifications.
ECI should be retained to acquire the settlement readings. If you prefer to use another
organization to collect these readings, measurements should be provided to us as
quickly after their acquisition as possible for plotting and interpretation. This will help
avoid any misinterpretation or misunderstanding regarding the success of the
surcharge program.
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 8
The settlement markers must be kept intact during earthwork operations. In our
experience, earthwork equipment(dozers, rollers,trucks, etc.) often demolish markers
at a very high rate. This adds to the project costs in that they need to be replaced
and it makes the information obtained less reliable. To avoid this scenario, it is
suggested that the project specifications include a requirement that the earthwork
contractor is required to immediately replace any damaged settlement marker and
have the settlement readings reobtained at his own cost. This requirement makes the
earthwork contractor more conscious of the importance of the preload program and •
will aid in maintaining the integrity of the monitoring program.
Fill for landscaping purposes should not be placed near the building since additional
fill could induce further settlements after the building is constructed. If such fill is
planned, the surcharge should be extended to five feet beyond the planned landscape
fill, or a lightweight fill, such as "hog fuel" be used.
Foundations Y.
I �'3
Based on. the encountered subsurface soil conditions, preliminary addition design
criteria, and assuming compliance 'with the preceding Site Preparation and Grading
section, the proposed structures may be supported by a minimum of two feet of new
structural fill after completion of a surcharge program or a preload program, as
described earlier. The foundation may be designed for an allowable soil bearing
capacity of two thousand five hundred (2500) pounds per square foot (psf). Footings
should be at least twelve (12) inches in width and extend to a depth of at least
eighteen (18) inches below the lowest adjacent grade.
The above allowable soil bearing value is for dead plus live loads and may be •
increased one-third for combined dead; live, wind, and seismic forces. It is
recommended that all footing excavations be observed by a representative of ECI,
prior to placing forms or rebar,to verify that exposed soil conditions are as anticipated
in this report, and/or provide suitable modifications in the design, as required.
•
Without completion of the surcharge or preload programs, we estimate there is the
potential for two to five inches of total settlement with two to three inches of
differential settlement. Following successful completion of the surcharge program,
total settlements are expected to be less than one inch for foundations bearing on
structural fill. Differential settlement is anticipated to be about one-half to
three-quarters of an inch. Total settlement of about two inches and differential
settlement of about one to one and one-half inches should be anticipated if the
preload program is used. The majority of the anticipated settlement should occur
during construction as the dead loads are applied. .
Earth Coneultanta, Inc.
, GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 9
Seismic Design Considerations
The Puget Sound region is classified as Seismic Zone 3 by the Uniform Building Code
(UBC). The largest earthquakes in the Puget Sound region have been subcrustal
events, ranging in depth from 30 to 55 miles. Such deep events have exhibited no
surface faulting.
The UBC earthquake regulations contain a static force procedure and a dynamic force
procedure for design base shear calculations. Based on the encountered soil
conditions, it is our opinion that a site coefficient of 1 .5 should be used for the static
force procedure, as outlined in Section 2334 of the 1991 UBC. For the dynamic force
procedure outline in Section 2335 of the 1991 UBC, the curve for Soft to Medium
Clays and Sands (Soil Type 3) should be used on Figure 23-3, Normalized Response
Spectra Shapes.
Liquefaction is a phenomenon in which soils lose all shear strength for short periods �r
of time during an earthquake. The effects of liquefaction may be large total and/or.
differential settlement for structures with foundations founded in the liquefying soils. Y
Groundshaking,of. sufficient duration results in the loss of grain to grain contact and
rapid increase in pore water pressure, causing the soil to behave as a fluid for short
periods of time. To have potential for liquefaction, a soil must be cohesionless with •
a grain size distribution of a specified range (generally sands and silt); it must be loose
to medium-dense; it must be below the groundwater table; and it must be subject to
sufficient magnitude and duration of groundshaking.
Based on laboratory testing,the majority of the loose/soft soils encountered during our
field exploration consist of fine-grained silt and clay, which have a lower susceptibility
to liquefaction than sands. Given this information, it is our opinion that the potential
for widespread liquefaction over the site during a seismic event is low. Isolated areas
may be subject to liquefaction, however, the effect on structures is anticipated to be
minimal if the recommendations contained in this report are followed. We estimate
liquefaction induced settlement would be in the range of the estimated post
construction settlements discussed earlier. .
•
Earth Consultants, Inc.
GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 10
•
Lateral Resistance
•
An allowable passive pressure value against the sides of foundation slabs or other
subsurface foundation elements of three hundred (300) psf per foot of depth may be
used for design. In order to fully mobilize the passive pressure, the foundations must
be poured "neat" against the adjacent soil or the foundation excavation must be
backfilled with structural fill. Friction between the base of foundations and the
underlying soil may be assumed to be 40 percent of the dead load. The friction and
passive pressure design values include a factor of safety of 1 .5.
Retaining Walls
•
Retaining walls and foundation walls that will act as retaining walls should be
designed to resist lateral earth pressures imposed by the retained soils. Walls that are
designed to yield can be designed to resist the lateral earth pressure imposed by an
r•.
equivalent fluid with a unit weight of thirty-five (35) pounds per cubic foot (pcf). The
equivalent fluid weight should be increased to fifty (50) pcf for walls that are
restrained at the top from free movement. These values are based on horizontal
backfill and that surcharges due to backfill slopes, hydrostatic pressures, traffic,
structural loads or other surcharge loads will not act on walls. If such surcharges are
to apply, they should be added to the above design lateral pressures. Calculation of
lateral resistance should be done using the passive pressure and coefficient of friction •
values contained in the previous section.
Retaining walls should be backfilled with a free-draining material conforming to the
WSDOT specification for gravel backfill for walls (WSDOT 9-03.12(2)). The
free-draining material should extend a minimum of eighteen inches behind the wall.
The remainder of the backfill should consist of structural fill. A perforated drain pipe
should be placed at the base of the wall. Drain pipes located in the free draining
•
backfill soil should be perforated with holes less than 1/2 inch in diameter. The drain
pipe should be surrounded by a minimum of one cubic foot per lineal foot with 3/4
rock or should be wrapped with a filter fabric.
Earth Consultants, Inc.
l' 'GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 11
•
•
Slab-on-Grade Floors
Slab-on-grade floors may be supported on a minimum of one foot of structural fill •
suitable for use during wet weather conditions. Should loose soil be present at the
slab subgrade elevation, it should be compacted to the requirements of structural fill.
Any disturbed subgrade soil must either be re-compacted or replaced with structural
fill. Slab-on-grade floors should be designed by the structural engineer based on the
anticipated loading and the subgrade support characteristics. A modulus of vertical
subgrade reaction of three hundred (300) pounds per cubic inch (pci) may be used for
design.
The slab should be provided with a minimum of four inches of free-draining sand or •
gravel. In areas where slab moisture is undesirable, a vapor barrier such as a 6-mil •
plastic membrane may be placed beneath the slab. Two inches of damp sand may be
•
placed over the membrane for protection during construction and to aid in curing of ! :
the concrete.
Excavations and Slopes
In no case should excavation slopes be greater than the limits specified in local, state rr
and federal safety regulations. As described in the current Occupational Safety and
Health Administration (OSHA) regulations, soils anticipated to be encountered in
excavations (fill, silt and peat) would classify as Type "C." Therefore temporary cuts
greater than four feet in height, should be sloped at an inclination no steeper than •
1 H:1 V in the Type "C" soils. If slopes of this inclination, or flatter, cannot be
constructed, or if excavations greater than twenty (20) feet in depth are required,
temporary shoring may be necessary. This shoring would help protect against slope
or excavation collapse, and would provide protection to workmen in the excavation.
If temporary shoring is required, we will be available to provide shoring design criteria,
if requested.
•
All permanent slopes should be inclined no greater than 2H:1V. If this inclination
•
cannot be maintained, this office should be contacted to review the design and
construction criteria. We also recommend that all cut slopes be examined by Earth
•
Consultants, Inc. during excavation to verify that conditions are as anticipated:
Supplementary recommendations can then be developed, if needed, to improve the
stability, including flattening of slopes or installation of drainage. In any case, water
should not be allowed to flow uncontrolled over the top of any slopes.
•
Earth ConauItanta, Inc. •
GEOTECHNICAL ENGINEERING STUDY
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 12 •
The above information has been provided solely as a service to our client Under no •
circumstances should the above information be interpreted to mean that this office is
•
assuming responsibility for construction site safety or the contractor's activities; such
responsibility is not being implied and should not be inferred.
•
Site Drainage
•
•
Groundwater was observed in all of the borings except B-5 at depths ranging from
four to eight feet below the existing ground surface. Groundwater was not
encountered until borings were advanced to a depth of about eight feet, at which
point the water surface rose to four feet beneath the ground surface. It is possible
that groundwater levels will present construction related problems while excavating •
for the foundations or utility trenches. Should groundwater seepage be encountered
during construction, the bottom of the excavation should be sloped to one or more
shallow sump pits. The collected water can then be pumped from these pits to a
permanent discharge, such as a nearby storm drain. Depending on the
Positive and P
magnitude of such.seepage, it=may'also be necessary to interconnect the sump pits °t6,
by a system of connector trenches. It is recommended that the appropriate locations
of subsurface drains, if needed, be established during grading operations by this at.
office, at which time the seepage areas, if present, may be. more clearly defined.
The site should be graded such that surface water is directed off the site. Water
should not be allowed to stand in any area where structures, slabs or driveways are
to be constructed. During construction, loose surfaces should be sealed at night by
compacting the surface to reduce the potential for moisture infiltration into the soils. •
Final site grades should allow for drainage away from the structure foundations. _The
ground should be sloped at a gradient of three percent for a distance of at least ten
feet away from the structures in landscape areas.
Foundation drains should be installed where landscaped areas are immediately •
adjacent to the building. In our opinion, foundation drains are not necessary in dock-
high areas or where pavements extend to the building walls. The drains should be
installed at or just below the bottom of the footing, with a gradient sufficient to
initiate flow. A typical detail is provided on Plate 4.
Earth Consultants, Inc.
bEOTECHNICAL ENGINEERING STUDY •
Winmar Properties
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 13
Utility Support and Backfill
Based on the soil conditions encountered,the majority of soils expected to be exposed
by utility excavations should provide adequate support for utilities; however, deeper
utility trenches may encounter the peat that is beneath the existing fills. Should the
peat, or soft soils, be exposed near pipe grades, the peat or soft soil should be
replaced with structural fill to a depth that will provide adequate support for the
utility.
Utility trench backfill is a major concern in reducing the potential for settlement along
utility alignments, particularly in pavement areas. It is important that each section
of utility line be adequately supported in the bedding material. The material should be
hand tamped to ensure support is provided around the pipe haunches. Fill should be
carefully placed and hand tamped to about twelve (12) inches above the crown of the
pipe before any heavy compaction equipment is brought into use. The remainder of
the trench backfill should be placed in lifts having a loose thickness of less than
twelve (12) inches. A typical trench backfill section and compaction requirements for
load supporting and non-load supporting areas is presented on Plate 5.
Pavement Areas
The adequacy of site pavements is related in part to the condition of the underlying
subgrade. To provide a properly prepared subgrade for pavements, we recommend
the subgrade be treated and prepared as described in the Site Preparation and Grading
section of this report. This means at least the top twelve (12) inches of the subgrade
should be compacted to 95 percent of the maximum dry density (per ASTM
1557-78). Due to surface conditions observed during the subsurface exploration, we
recommend pavements be supported by a minimum of one foot of structural fill
suitable for use in wet weather. Depending on actual conditions, thicker structural
fill or a geotextile, such as Mirafi 600X, may be required to provide adequate support
•
for pavements. It is possible that some localized areas of soft, wet or unstable
subgrade may still exist after this process. Therefore, a greater thickness of structural
fill or crushed rock may be needed to stabilize these localized areas.
We recommend the following pavement section for lightly loaded areas:
• Two inches of Asphalt Concrete (AC) over four inches of Crushed Rock Base
(CRB) material, or
• Two inches of AC over three inches of Asphalt Treated Base (ATB) material.
Earth Consultants, Inc.
• 'GEOTECHNICAL ENGINEERING STUDY
Winmar Properties •
c/o Mark Miller Consultants, Inc. E-6754
April 14, 1995 Page 14 •
•
Heavier truck-traffic areas will require thicker sections depending upon site usage,
pavement life and site traffic. As a general rule, you may consider for truck-trafficked
areas the following sections:
• Three inches of AC over six inches of CRB, or
• Three inches of AC over four inches of ATB.
Asphalt Concrete (AC), Asphalt Treated Base (ATB), and Crushed Rock Base (CRB)
materials should conform to WSDOT specifications. All rock base should be •
compacted to at least 95 percent of the ASTM D-1557-78 laboratory test standard.
It should be noted that parking stall pavement sections assume no truck traffic.
LIMITATIONS
Our recommendations and conclusions are based on the site materials observed,
selective laboratory testing and engineering analyses, the design information provided
to. us by you, and our experience and engineering judgement. •.The conclusions and
recommendations are`professional opinions derived in a manner consistent with that
level of care and skill ordinarily exercised by other members of the profession currently
practicing under similar conditions in this area. No warranty is expressed or implied.
The recommendations submitted-in this report are based upon the data obtained from
the borings. Soil and groundwater conditions between borings may vary from those
encountered. The nature and extent of variations between our exploratory locations
may not become evident until construction. If variations do appear, ECI should be
requested to re-evaluate the recommendations of this report and to modify or verify
them in writing prior to proceeding with the construction.
Additional Services
This office will be available to provide consultation services relating to review of the
final design and specifications to verify that our recommendations have been properly
interpreted and implemented in the approved construction plans and specifications.
In addition, it is suggested that this office be retained to provide geotechnical services
during construction to observe compliance with the design concepts and project
specifications, and to facilitate design changes in the event subsurface conditions •
differ from those anticipated prior to the start of construction. It should be noted that
it is generally in the best interests of the owner/client to maintain the same Soils
Engineer during construction in order to obtain the project objective, with optimum
quality control.
Earth Consultants. Inc.
•
al .. • ";i' •'Il'"{` ''�P' *.'; .Irk, • ; : Olk ��,�/ • R
f :\ ?;,;FT DE(Vj^'.': iv'i,S:1'`'( ;'I c "11'T V� y S RENTON VILLE
i
Y o.PARK' i.
O tiN i• I'
r 149TH .a . :r•. z'r" • 1 Z - ;t�'''-
000 1
2S T
'%ro F
1
r� E <
tt . o� �TN
r�
S > tr
a
•
$ 5 O 'If�S PL [a, � U E ST
IZ' c • '9 'Y d. • SW y .. C" •, 16TH T'1:. gill! i'si Y F E :v .
p1`pO- Sm153RD'::'.:.�r.-+— .� •
— . Arai �.- ; q�-:- •'j.•T1. Vzt o W.--t •_7 •m c t`.:.
\ _ ;çc0.
4 tT :'f7 V _; .>• • a Q .SITE,:`:LeS i a( c1 9W 19TH ST :' c::
:L m yu •
; I�• � :i S 19TH o
o N W<1 y . j1 m
�.... a a Z'cif Rfzce II' :,:�, Q 9
.•♦♦.•♦•♦♦♦♦•• ♦ W ILA •
♦.♦.♦..♦♦♦ lL1K S J ; ; SW 213T .T o C ~ a
♦♦�♦�♦�♦�♦�♦�•♦♦�♦�♦� PKWY 158TH ST hr 0�•�.�.�.�?..�.�.�. EVANS °�o ,Ir I • I tr.' , •
♦♦♦.♦...♦.♦ < rely Track •
��.������� 3 SLACK w 1
♦♦.♦.♦...♦ DR a w • IV •:':II
BUT ♦.�., rn r �I� :;T� __ •
T__ SW 23R ST ,S 23RD v�
♦.♦BAKER BLVD I= Z ..1 S •
. j ♦ ♦ ♦♦.♦ W _Icp 2BIC NTENNIA {T R• �ip I I••• `•1: R E N TO N I -' y - '
•
tits
.• tilOiNIT::::::i.:•;;
•
STRANDER •I. w G`\.. • W . I _ SW 27T ST JQ .•`` 1 .
> �*,' rn% � I I . _ ..r S 2TTH•, PL .S...
.'ir • - • TR CE DR i DOA Fib 2. � I > I / sPt 4
Q�Pi C_C I luul I luul •Q SW 29THiI ,.i a'. :'k�''y yL :
O J PO G • I I yC_ s 9ly•5
I P I : s•'•ry
'. 26.: a i 25 H �i : :_ : ',,,, wsr.
• I .'' CHRIST- c, I W 30TH S7
�_ vY SW 31$1 R
G EENBELTSW 33RDTU5 [LA
I PK j. > I ST a I TL 4 • .
CORPpRATE' I ; • ST 1., a; `" `. sly
MINKLER B YD • ZI • I } ;i;;.u 1-0
1MUN/TY_UPId1ND 8F�_ — _ _ I - - --u — -� —rt�` 5 +ERGENCY CC S 38TH ST ..._ '� S>c $17.ERGEN .- J2 if.MIDLAND QTi . /... _ ' • .' � I - OSW m¢ 39TH S7 L c yj?-x-CT} asrt:::::';7:-:..-.']'
I W ' .ss SQ '''e'
N : . 1 .I :
ie3 • 41ST ST ( VALLEY 1TTIH ST 1
TRILAND DR)_; _ 2 f .., AF. 1 EDICAL=tFnQ' S\T
~T 'av�i I A• Q I I I CENTER: .; o
,: ieoni I. t` ti' SW . I' _ Yy:;`r:, m 5�
r �I I 43RD 'ST .I T.z A P'
el
SEGALE PARK ' t� 1615T $T: =r 18QTH—' ' ST ti t ? �_ ' . •
.
�j.s..
Q
r�
I •• • •• u`P �r`
-1
.gin;-'' -_s,.,
:]C
':w I •D
I
N ,++
F I
•
,w. la' , � F _ 1
F Q
4���H
•
_ — -pC,z -
R/N�•B OK
• rA:,-
.4:' - „... -- .>..„ sy i.:,,. REENBELT _ -L .=••P ..s .,;.:-V;O %:4.
Y,
I'
m
Y J' r ti�A
�U .7�3;� - ;rr`^tC'G. ...... � �.� .. .. . ... .. .-.. .,'fit r,- "A'.1 :.. -�• .. ''`, ..,.in1+b>`i �A.�_..vd :id"::i
0 . . :-.'..1..'
•
RT - Reference:
II
King County/ Map 41
By Thomas Brothers Maps -
Dated 1990 •
•
'/Pv 'ik. 441\ Vicinity Map
Earth Consultants Inc. Raymond Avenue Center
�llPJ,v lip 1:11�) Gedeehnld Engine s.Geolog sts&Environmental SckrnWS Renton,
e on, Washington
Proj. No. 6754 I Drwn. GLS I Date Apr. '95 Checked DSL I Date 4/7/95 I Plate 1
r j
1
I
i
I
0
I Ey
0I
\� I �.
Q� I
1 GJ
1
I
I
i •
I
----.2-\__________
1
1
4th AVENUE S.
, .
w
w
i § Fc...
, 6 co
. ..c
Reference:
•
Site Plan I O)
Job No. 94-071 / Sheet No. Al ! ' r
By Lance Mueller &Associates
Dated 3/21/95 Boring Location Plan
Raymond Avenue Center
- Renton, Washington
Checked DSL I Date 4/7/95 I Plate 2 -
I.
1
I
•
FY
SCHEMATIC ONLY- NOT TO'SCALE
NOT A CONSTRUCTION DRAWING
•
Surcharg
e or Pr l oad
Surcharge or Preload u
Fil
l I
Fill
3i
iiY:i:iiii<::4ii$:iiiiY. •
:Xv:is{:iSSiiiii„...{::i.
^_
frr..
ri
:}:C: ;:::{;}i};%is ::i::::Y:::i::4;}:'::iiy;{i:::::.`•:
Ill-111=111^ I `L7 111=111=11i= r__r
=111 _ =ltl=
STANDARD NOTES
1) Base consists of 3/4 inch thick, 2 foot by 2 foot plywood with center drilled
5/8 inch diameter hole.
2) Bedding material, if required, should consist of Traction Sand.
3) Marker rod is 1/2 inch diameter steel rod threaded at both ends.
4) . Marker rod is attached to base by nut and washer on each side of base.
5) Protective sleeve surrounding marker rod should consist of 2 inch diameter
plastic tubing. Sleeve is NOT attached to rod or base. •
6) Additional sections of steel rod can be connected with threaded couplings.
7) Additional sections of plastic sleeve can be connected with press-fit plastic
couplings.
• 8) Steel marker rod should extend at least 6 inches above top of plastic • .
sleeve.
9) Marker should extend at least 2 feet above top of fill•surface. •
•
•
d4!.sij �f�1`• 44i\ TYPICAL SETTLEMENT MARKER DETAIL
1 t4l I Earth Consultants Inc. Raymond Avenue Center
'i I., 1 i w G En . ts e E,vIf«mental Sci of
Renton, Washington
Proj. No. 6754 ; I Drwn. GLS I Date Apr. '95 Checked DSL I Date 4/7/95 I Plate 3
G.
t.e..-,� Slope To Drain e
o '
b °
e • •O
• o • °o
0
°
oO•
°o r
inch min. - 0 o
6 c
0
_ o
vo
0
0
.
- o
•
•
I.
�'' -'' a. .°.' 18 inch min.
�.. ••0• • , 0. -• •0••:••"° '-,.•.•'• ,. :,••.. • • o
C pr• •
,• ,
' •0••••-••,•°•'•0 •,'0••,.-',1, o• OO °
4 inch min. •. ° r
Diameter •,':. ,;:;•,: -•:. ° - 0 o° o • °
Perforated Pipe! • • • :•r;0:-•o o - ° o 0 0 De° o a• 0 -o°
Wrapped in Drainage • 0 • o • - - o° o °°
Fabric ° ,_o . sr
2 inch min. . 4-..:.
2 inch min. / 4 inch max. ,,
- 12 inch . r:.
min.
SCHEMATIC ONLY - NOT TO SCALE
NOT A CONSTRUCTION DRAWING
LEGEND
_ -:� '`: ' Surface seal; native soil or other low permeability material.
o•:
-•'. Fine aggregate for Portland Cement Concrete; Section 9-03.1(2) of the
o;!° WSDOT Specifications.
ODrain pipe; perforated or slotted rigid PVC pipe laid with perforations or
slots facing down;tight jointed;with a positive gradient. Do not use flexible
corrugated plastic pipe. Do not tie building downspout drains into footing
lines. Wrap with Mirafi 140 Filter Fabric or equivalent.
iP,. , A411\ TYPICAL FOOTING SUBDRAIN DETAIL
Earth Consultants Inc. Raymond Avenue Center
1(�Iit\WI vid Georechnld En 6 Fnvironmental Scientists
Renton, Washington
Proj. No. 6754. I Drwn. . GLS , I Date Apr. '95 Checked DSL 1 Date 4/7/95 I Plate 4
r
4
, •
Non-Load Supporting Floor Slab or
Areas Roadway Areas
I• • i. 1I •
%
r . at a..f - "
. }!y, . m ° igi
Varies •
0''` 0 o
5 s
7................. ..::".,..:"...,......"'".:;"
Minimum'��'' 1 Foot Mi m m
95.
0o u
Y
Backfill
ac I •
0,'
�+f:
Varies
•
.' 0 Ao= 000aoPIPE0:: .0 • •�0: 0.✓ •�°' ii mo� d0 0oQo .• • ° o004o .
Bedding 2 •o •°0 •• ; o 0 •e ••.
• Varies�D"•b0g0• 04o.• %o• Q o •a•o•.
0: o.•• Q ooO °••o.•o. (
.0. O . 0• •• U •. � o. DO. 000
OD .d.• •.i °00o .o 0e'O '.0004 �' 0o,
- ;tiOAo°o°•�00�nOo°0 Qod OQ •oroQ o°O •
•
k,x
LEGEND:
tiks. Asphalt or Concrete Pavement or Concrete Floor Slab ."
"--sue*^
0 o•o Oo°°; ' -
• o • ,. Base Material or Base Rock
• 1::�:;g �::;; •::- Backfill; Compacted On-Site Soil or Imported Select Fill
'' 'J•I'iii Material as Described in the Site Preparation of the General
....... "Earthwork Section of the Attached Report Text.
95 Minimum Percentage of Maximum Laboratory Dry Density as
Determined by ASTM Test Method D 1557-78 (Modified Proctor), •
Unless Otherwise Specified in the Attached Report Text. •
u••.,,.o°Y°�� Bedding Material; Material Type Depends on Type of Pipe and
5°a��•p`• Laying
om o the Type
Bedding Pipe Selectedform to .
Manufacturers
Recommendations ons
•
ioN.,l+'i.. 44t\ TYPICAL UTILITY-TRENCH FILL
` + ff FIT:till,...„ Consultants Inc. Raymond Avenue Center
%II\id/ 1r`ii ,s Gmlt u5 6 itrimrnt:A 5ilscs
Renton, Washington
Proj. No. 6754 I Drwn. GLS - I Date Apr. '95 Checked DSL I Date 4/7/95 I Plate 5
APPENDIX A
E-6754
FIELD EXPLORATION
Our field exploration was performed on March 27, 1995. Subsurface conditions at
the site were explored by drilling five borings to a maximum depth of thirty-five (35)
feet below existing grade. The borings were drilled by Boretec, Inc. using a trailer
mounted drill rig. Continuous-flight, hollow-stem augers were used to advance and
support the boreholes during sampling.
Approximate boring locations were determined by pacing from the approximate
property corners. The locations of the borings should be considered accurate only to
the degree implied by the method used. These approximate locations are shown on
the Boring Location Plan, Plate 2. The field exploration was continuously monitored
by an engineer from our firm who classified the soils encountered and maintained a
log of each boring, measured groundwater levels, and observed pertinent site features.
All samples were visually classified in accordance with the Unified Soil Classification
System which is presented on Plate Al, Legend. Logs of the borings are presented
in the Appendix on Plates A2 through A10. The final logs represent our
interpretations of the field logs and the results of the laboratory examination and tests
of field samples. The stratification lines on the logs represent the approximate
boundaries between soil:types. In actuality, the transitions may be more gradual. '. r-.
In each boring, Standard Penetration Tests (SPT) were performed at selected intervals i-
in general accordance with ASTM Test Designation D-1586. The split spoon samples
were driven with a one hundred forty (140) pound hammer freely falling thirty (30)
inches. The number of blows required to drive the last twelve (12) inches of
penetration are called the "N-value". This value helps to characterize the site soils and
is used in our engineering analyses. Representative soil samples were placed in closed
containers and returned to our laboratory for further examination and testing.
•
•
•
Earth Consultants, Inc.
,
,i. -
GRAPH LETTER
MAJOR DIVISIONS SYMBOL SYMBOL TYPICAL DESCRIPTION
CD' Q ( GW Well-Graded Gravels,Gravel-Sand
Gravel Clean Gravels 0 °0 °0(\ gw Mixtures, Little Or No Fines
AndGravelly (little or no fines) ` 40 4 GP Poorly-Graded Gravels,Gravel-
Coarse Soils I ' ! ' (l ' gp Sand Mixtures, Little Or No Fines
Grained
Soils More Than , I GM Silty Gravels,Gravel-Sand-
50% Coarse Gravels With * gm Silt Mixtures
Fraction Fines(appreciable .
Retained On amount of fines) GC Clayey Gravels,Gravel-Sand-
No.4 Sieve gC Clay Mixtures
oo SW Well-Graded Sands, Gravelly
San
And Clean Sand o o ' 0 c SW Sands, Little Or No Fines
Sandy (little or no fines) d:;.:q>�:z::, .;:,•:4;;-%
• a::::>:::>:: SP Poorly-Graded Graded Sands, Gravelly
More Than Soils '8>: ;:::;; Y
!::;>; o:.:.•.a•••.. S Sands, Little Or No Fines
50% Material ����'� p
Larger Than More Than
No.20D Sieve 50/ Coarse Sands With SM Sm Silty Sands Sand Silt Mixtures
Size Fraction
Passing No.4 Fines(appreciable f.;:.; •:.::.:.;;;;. •
amount of fines) ,;,�' SC Clayey Sands, Sand Clay Mixtures
Sieve r+:> >::S:`;:: SC
•
1111 ML ml InorganicClayeyFine SiltsSands&Very Fineyey Sands,
Siltsw/Rock FlourPlasticitySilty-
;Cla Slight
Fine Silts Liquid Limit CL Inorganic Clays Of Low To Medium Plasticity,
Grained And Less Than 50 / / CI Gravelly Clays, Sandy Clays, Silty Clays, Lean
Soils Clays
•
Organic Silts And Organic
1 1 I I I 1 I I I 1 OL Ol Silty Clays Of Low Plasticity
MH Inorganic Silts, Micaceous Or Diatomaceous Fine.
More Than I mh Sand Or Silty Soils •
50% Material Silts Liquid Limit •
Smaller Than And CH Inorganic Clays Of High •
No.200 Sieve Clays Greater Than 50 ch Plasticity, Fat Clays ,.
Size 1' .'
� OH Organic Clays Of Medium To High t.;
. /i i Oh Plasticity, Organic Silts
Highly Organic Soils PT Peat,'Humus, Swamp Soils l ':
1. d i, d/, d i pt With High Organic Contents
e•
Topsoil 'y�'y NI/ Humus And Duff Layer
��•��•��• HighlyVariable Constituents
Fill ♦�.�.� •• •
� .
•
The discussion in the text of this report is necessary for a proper understanding of the nature
of the material presented in the attached logs.
DUAL SYMBOLS are used to indicate borderline soil classification. •
•
C TORVANE READING,tsf I 2"O.D.SPLIT SPOON SAMPLER
qu PENETROMETER READING,tsf
W MOISTURE, %dry weight 11 24"I.D. RING OR SHELBY TUBE SAMPLER
P SAMPLER PUSHED
* SAMPLE NOT RECOVERED i WATER OBSERVATION WELL •
•
pcf DRY DENSITY,lbs.per cubic ft. •
LL LIQUID LIMIT,% SZ DEPTH OF ENCOUNTERED GROUNDWATER •
PI PLASTIC INDEX DURING EXCAVATION
•
1 SUBSEQUENT GROUNDWATER LEVEL W/DATE
•
•
/41►* ,p 4\ LEGEND
k ,lad) Earth Consultants Inc.
....xi.„.,,„lip Vtvrs.GoulogiSIS&HilvIra,nx7u:l Sclailisls
Proj. No. 6754 I Date Apr: '95 I Plate Al
,
,' ,Boring Log
Project Name: Sheet of
Raymond Avenue Center 1 2 •
Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 _ B-1
Drilling Contactor: Drilling Method: Sampling Method:
Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite
No, u o .c Wco o Surface Conditions: Grass
W Blows a E n... E N E
%j a 23Ou- N . 3,
�♦�♦� CL RLL•Gray sandy lean CLAY,medium stiff,wet
♦♦
.• . 1 •
. • 2 —
♦♦♦
♦♦
20.1 11 ♦♦�S♦
♦ 3
♦♦♦
♦♦♦. 4
♦♦♦♦
♦♦♦♦•♦
♦♦♦♦♦ 5 . .
22.0 19 ♦♦♦♦
6 ML Gray SILT with sand,medium dense,wet
7 1=
8 f.-
34.1.. 7 I:;
decrease in sand content,becomes loose li:
9 !'
:';
10 - "
35.8 7
11
-mixed with peat,becomes very soft
12
88.6 1 13 •
•
14
-becomes soft •
15 -decrease in peat content
47.6 5
16 •
-1"sand lens
17
18
In 1
o% 9
�t •
\
it
do',� Eel: ,.�►�, Boring Log
�r i '� filmEarth Consultants Inc. Raymond Avenue Center
�' \WJ"\�1I `FI °e�'ea.+a.' * "Ce(40 " &e°" en°'embalm-taiga Renton,Washington
N
ca
—Ica Proj:No. 6754 Dwn. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A2
'Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of information presented on this log.
I
!!',Boring Log
Project Name: Sheet of .
Raymond Avenue Center _ 2 2 .
Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 B-1
Drilling Contactor: Drilling Method: Sampling Method: •
Boretec HSA SPT .
Ground Surface Elevation: Hole Completion:
❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite
No. n o t °J N o Surface Conditions: Grass
W BIOWS a E a} E N E
(%) Ft o �- cn = cDI
1� `:': SP-SM Grades to black poorly graded fine to medium SAND with silt,medium dense,water
i bearing
21
.: -> = 22 —
a4:•: _
r .:• :: :. 23 —
iiiv:: 25 • .
44.5 5 26 ML Gray sandy SILT,loose,saturated
•
27 ;r
• 28 I'
L:
29• ,,
t�:
-4'of heave ''
I�:
ii
t30SM Black silty fine to medium SAND,water bearing
28.3 3 Fig' -N Value low due to heave
__'::s 31
' `: i . 32
a: 33 —
•
_= 34
-3'of heave(NO SAMPLE ATTEMPT) .
Boring terminated at 35.0 feet below existing grade.Groundwater encountered at 4
feet during drilling.Boring backfilled with cuttings.
in
o.
—I
ct , .L p�: 41A11, Boring Log
v e �� Earth Consultants Inc. Raymond Avenue Center
to, Renton,Washington
E Proj.No. 6754 Dwn. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A3
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of information presented on this log.
'Boeing Log
Project Name: Sheet of
Raymond Avenue Center 1 2
Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 B-2 "
Drilling Contactor: Drilling Method: Sampling Method:
Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite •
No. 'c- o r W v7 o Surface Conditions:
W Blows Q.-0 a+- a v .n
j%j Ft. Lcs) U Cl) Cl)
•
••• SM FILL:Dark gray silty fine to medium SAND,medium dense,wet
1
••��� 2 —
•�*��
•.ot
27.1 16 ������ 3
.4. 4
N
••1♦
18.0 14 •.„i ..
6 ML Gray SILT,medium dense,wet
26.2 14 8 .. ;e
•
9 -mixed with peat,becomes very soft If
10
43.5 1
11 .
12
•
81.9 2
13
14
qu=.75tsf 15
54.1 3 •
•
16 SM Gray silty fine to medium SAND,medium dense,water bearing •
.
== = 17 —
18
a
=` = 19
\
ifi. i' 1
`4- Os, AI: AV Boring Log •
N 11 i Earth Consultants Inc. Raymond Avenue Center
Mk\WI `tl ff 000k 'nngineeM O001004$&BriVbCanitaidl scienstais Renton,Washington
—lea Proj.No. 6754 Dwn. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A4
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of information presented on this log. •
' Boring Log
IProject Name: Sheet of
Raymond Avenue Center 2 2
Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 B-2
Drilling Contactor: Drilling Method: Sampling Method:
_ Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
•
❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite
No, u o .c d N — Surface Conditions: .
%) Blows o.E o-'�• E full E
•
Ft. LN au- �N
SM Black silty fine to medium SAND,medium dense,water bearing
29.4 16 21
22 —
23 —
•
24 —
•
25 •
—
31.1 13
26 —
27 —
•
•
r.,
28•
•
',
29 — fM1:
-5'of heave(NO SAMPLE ATTEMPT)
30
Boring terminated at 30.0 feet below existing grade.Groundwater encountered at 4
feet during drilling.Boring backfilled with cuttings. •
•
•
•
tn'
o.
\'
iT,„ Aits, Boring Log
ter' 4( :-.00 Earth Consultants Inc. Raymond Avenue Center
mRenton,Washington
03-1 Proj.No. 6754 Dwn. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A5
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of Information presented on this log.
j,,Bo'ring Log
Project Name: Sheet of
Raymond Avenue Center 1 2
I Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 B-3
Drilling Contactor: Drilling Method: Sampling Method:
Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
I ❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite
No. u o .c • col 4- Surface Conditions: Grass
W Blows =a.11a-I- E 8 E
(o) Ft. 2 cn 24 A = rn .
♦♦♦♦♦ SM FILL:Gray silty fine SAND with gravel,loose to medium dense,wet
♦♦♦♦♦♦
: ♦: 1 ■
♦ •♦ ,
♦♦♦♦♦ I.
♦♦♦♦♦ 2 -
♦♦♦♦
♦♦♦♦♦♦
♦
25.0 12 3 CL (6"of TOPSOIL)
/ Gray lean CLAY with sand,medium stiff,wet
4 �
-rootlets to 4'
5
37.2 5
6
7
"?
S II
41.3 4.. .;.
• E`7
4/// 10 ty,
105.0 2 o, `o, PT PEAT,soft,saturated
,, 0,, , 11
\t4 ,,+4
,, d i., .. 12
..4 0 4
13 -becomes soft
79.6 1 +, oi, very
•
ML Gray SILT,very soft,saturated
14
15 SM Dark gray silty fine SAND,loose,water bearing
41.6 5
1s ;:
•
17•
1 =8
u0.) 19
•
do'. i11: 44i>,, Boring Log
` 1i 1 yt� Faith Consultants Inca Raymond Avenue Center
In ��11;/ UV MO O an0o'e ca sas.e aeolo¢ .Euiviicennenita Eicielgtsts
CD
Renton,Washington
m-) Proj.No. 6754 own. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A6
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of information presented on this log.
' ,Boring Log
Project Name: Sheet of
Raymond Avenue Center 2 2
Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 B-3
Drilling Contactor: Drilling Method: Sampling Method:
Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite
No. o .c rn o
Blows Surface Conditions: Grass
W a a+- °- v
(%) Ft r2.3 DI o Cl) M
SM Dark gray silty fine SAND,medium dense,water bearing
28.3 16 21
•
22 —
23 —
24 —
25
31.2 8
26
27 —
•
28
29 f.
30 "
27.1 32 31
Boring terminated at 31.5 feet below existing grade.Groundwater encountered at 4
feet during drilling.Boring backfilled with cuttings.
•
4 ,4►1, Boring Log
A Earth Consultants IfC. Raymond Avenue Center
Renton,Washington
—Ica Proj.No. 6754 Dwn. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A7
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of information presented on thi
s log.
, ' oBo'ring Log
•
Project Name: Sheet of
Raymond Avenue Center 1 2 •
Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 B-4
Drilling Contactor: Drilling Method: Sampling Method:
Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite
No. o r 51 top Surface Conditions:
., Blows =n. a-1-. a v la •
96) Ft c� to cl I` to = cn
� • ML FILL:Gray sandy SILT,medium dense,wet
•
4 ? CL Gray lean CLAY with peat,medium stiff,wet
26.6 7 5 - .
6 :
7
;W
8 l,28.0 10 F;
9 r"
/ fi.
u=.5tsf. / 10
q /
47.1 6 / •
// it
.` PT PEAT,very soft,saturated .
‘t 6 ,, 12
or, ab
13
72.7 2 's .!r. i '
ML Gray SILT,soft,saturated
14 •
15
29.7 16 ' '?' SM Dark gray silty fine SAND,medium dense,water bearing
•
17
== 18 —
in -w .
(NI ._.�: _: 19
•--1\I
`t 1.,, theI411 Boring Log
N � -.001] Earth Consultants Inc. Raymond Avenue Centerm / I� aeoe°no ig' '°a'.°°°'°0'"&�'�i'°`�'° 'ear'°'" Renton,Washington
-I Proj.No. 6754 Dwn. GLS.. Date Apr. '95 Checked DSL Date 4/13/95 Plate A8
co
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or '
interpretation by others of information presented on this log.
,Bering Log
Project Name: Sheet of
Raymond Avenue Center 2 2
Job No. Logged by: Start Date: Completion Date: Boring No.: •
6754 DSL 3/27/95 3/27/95 B-4
Drilling Contactor: Drilling Method: Sampling Method:
Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
_ ❑ Monitoing Well ❑ Piezometer ® Abandoned,sealed with bentonite
No. o W o Surface Conditions:
Blows a }n_i- g- n •
%j Ft cn o u n
SP-SM Grades to gray poorly graded medium to coarse SAND with silt,medium dense,
water bearing
27.8 17
>'iit 21 —
e.;:
x .>G -6"of heave
22
r'•#io 23
Boring terminated at 23.0 feet below existing grade.Groundwater encountered at 4
feet during drilling.Boring backfilled with cuttings.
•
Q
Boring Log
Kt
II Earth Consultants Inc. Raymond Avenue Center
m id/ 0) Renton,Washington
Proj.No. 6754 Dwn. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A9
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of information presented on this log.
.
: ,.;Boring Log
Project Name: Sheet of
Raymond Avenue Center 1 1
Job No. Logged by: Start Date: Completion Date: Boring No.:
6754 DSL 3/27/95 3/27/95 B-55
Drilling Contactor: Drilling Method: Sampling Method:
Boretec HSA SPT
Ground Surface Elevation: Hole Completion:
❑ Monitoing Well El Piezometer ® Abandoned,sealed with bentonite
No. u o .c a) N o Surface Conditions: Grass
W BIOWS a E a.'�- E 8E
•
v%) Ft LN pLi- N N
�♦�♦� SM FILL:Gray silty SAND,loose to medium dense,wet
♦♦
j♦j♦• 1 -
♦♦♦♦
♦♦♦
♦♦♦•
22.9 18 3 CL Gray lean CLAY,medium stiff,wet
4
5
23.7 g
/ 6
Boring terminated at 6.5 feet below existing grade.No groundwater encountered
during drilling.Boring backfilled with cuttings. --
..
f..
U)
o`
.t
t') 14 41,411, Boring Log
N ``11%-,01 Earth C0nsultants Inc.
�1� 1 °°°'°ai'°" �"a "°°"°°°" r~� "` "`'° " 'ea«.� Raymond Avenue Center
' Renton,Washington
co m-1 Proj.No. 6754 Dwn. GLS Date Apr. '95 Checked DSL Date 4/13/95 Plate A10
Subsurface conditions depicted represent our observations at the time and location of this exploratory hole,modified by engineering tests,
analysis and judgment. They are not necessarily representative of other times and locations.We cannot accept responsibility for the use or
interpretation by others of Information presented on this log.
SIEVE ANALYSIS HYDROMETER ANALYSIS ' _
B.
SIZE OF OPENING IN INCHES I NUMBER OF MESH PER INCH•-U:S STANDARD- GRAIN SIZE-IN MM
r� 00 8 8 ppM N .—
z Z. i�T/ eN— N-v v O^ a° O (p O O 0 0 O p 0 0 O O N p 0 O 0 O 0 0 0 w
t0 Cr el N �- c i in c0 CO�- .- N M t1'J t0 00 N
o �. too
IN �d
90 -o` --n 10
p rD .D 80 20
Dor 30 73
ri n
C. m 70
O -Z-I Z
crl
5) 71 so ao -I
F Z n
1a, 50 50 73
0 W co
C 3 Cf) -< 1 MI• g * 40 60
hcl E "" COn � r_"
c.)
�;
1 30 70 m
3
n _
CD 20 80 -1
A
x-
m
a 9
10 0
C1
In
r
N 0 I 1 1 1 1 1 1 I I 1 1 1 1 1 1 1 I ►I 1 1 1 1 I I III 1 100
0 0 O O 0 0 0 O O O
O co CO tt CI N O CO CD 'Cr CON .— CD V CI N °0 f0 M N 00 f0 f`7 N
0 O O O O O O O O O O
• D_ DIN GRAIN SIZE IN MILLIMETERS • 0 0 0. 0. 0 0
✓ • p, Z COARSE ] FINE COARSE I MEDIUM I FINE
CD Cl) COBBLES FINES
Fj GRAVEL SAND
CD m m
w G CD D Boring or DEPTH Moisture
P• m D KEY USCS DESCRIPTION Ctent(%) LL PL
Test Pit No. (ft.) on
u, w n 1
rtm 0
0 rt y
s K 0 B-1 2.5 CL Gray sandy lean CLAY 20.1 -- --
..
m
p—=— B-3 2.5 CL Gray lean clay with SAND 25.0 -- --
I-,
5a _T
100
80
x 60
W
Z
CH
j 40 `�-A-Line
CD
J
a..
20
• r:,
CL-ML ®gI OL
0 20 40 60 80 100
LIQUID LIMIT
• Natural
Key Boring/ Depth Soil Classification USCS L.L. P.L. P I. Water
Test Pit (ft) Content
•
•
• B-2 15 Gray SILT ML 47 32 15 54.1
• B-4 7.5 Gray lean CLAY CL 40 24 16 28.9
Atterberg Limits Test Data
yea, a1: �i�►�
�• Raymond Avenue Center
�� $, Earth Consultants Inc. Renton, Washington
'.MPk('i'J``V�J Geotedmlol Engineers,GeologLsts&En lmnmental Sclentlsts
Proj. No.6754 IDate Apr. '95 II'Iate B2
a.
7•C�ti
- DISTRIBUTION
E-6754
4 Copies Winmar Properties
c/o Mark Miller Consultants, Inc.
10801 Main Street, Suite 100
Bellevue, Washington 98004
Attention: Mr. Mark Miller
1 Copy Lance Mueller and Associates
130 Lakeside Avenue, Suite F
Seattle, Washington 98122
Attention: Mr. Bob Fadden
Earth Consultants, Inc.