Press Alt + R to read the document text or Alt + P to download or print.
This document contains no pages.
HomeMy WebLinkAboutRES 4514CITY OF RENTON, WASHINGTON
RESOLUTION NO. 4514
A RESOLUTION OF THE CITY OF RENTON, WASHINGTON, AUTHORIZING
TEMPORARY FULL STREET CLOSURE OF THE RENTON AVENUE SOUTH BRIDGE
OVER 1-405.
WHEREAS, the Washington State Department of Transportation (WSDOT) is constructing
the 1-405, Renton to Bellevue Widening and Express Toll Lanes (ETL) project; and
WHEREAS, this construction activity will require a temporary street closures of the
Renton Avenue South Bridge over 1-405; and
WHEREAS, pursuant to the City Code section 9-9-3, such street closures require City
Council authorization by means of a resolution;
NOW, THEREFORE, THE CITY COUNCIL OF THE CITY OF RENTON, WASHINGTON, DO
RESOLVE AS FOLLOWS:
SECTION I. The City Council does hereby authorize the temporary closure of the Renton
Avenue South bridge, the duration of which shall not exceed three hundred (300) days, anytime
during the period beginning Monday, January 8, 2024 through Friday, February 28, 2025 for the
purpose of extending the Renton Avenue South bridge and increasing capacity of the 1-405
freeway.
SECTION 11. Notice of the closure shall be posted and published as required by RMC 9-9-
2 and RMC 9-9-3.
PASSED BY THE CITY COUNCIL the 20th day of November, 2023.
1
RESOLUTION NO. 4514
APPROVED BY THE MAYOR this 20th day of November, 2023.
Approved as to form:
-."A yt a /Z-t�'
Shane Moloney, City Attorney
RES- PW:1958:11/3/23
2