HomeMy WebLinkAboutCM_Construction_Mitigation_Description_230907_v1.pdf
Western Washington Division Eastern Washington Division
165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922
Phone: (425) 392-0250 Phone: (509) 674 -7433
www.EncompassES.net
Date: September 7th, 2023
To: City of Renton, Department of Community and Economic Development
From: Encompass Engineering & Surveying on behalf of Mike Elliott
Re: Construction Mitigation Description for the Index Avenue Townhomes
_____________________________________________________________________________________
APPLICANT
Mike Elliott
10034 SE 218th Place
Kent, WA 98031
mikeelliott@windermere.com
206-947-9085
SITE ADDRESS
1709 Index Avenue NE, Renton, WA 98058
CONSTRUCTION MITIGATION DESCRIPTION
a. The proposed approximate construction start date will be Winter/Spring 2024 with an
approximate timeline of six (6) months.
b. Hours of construction operation will be Monday through Friday, between 7:AM and 5:PM.
c. The proposed hauling and transportation route is south on Index Avenue NE, west on NE 16th
Street, north on Edmonds Avenue NE which changes to NE 27th St and later NE 30th Street, and
then right onto the I-405 Northbound onramp. Alternatively, to head south on I-405, the route is
south on Index Avenue NE, west on NE 16th Street, south on Edmonds Avenue NE, west on Sunset
Blvd NE (SR 900), and then south onto I-405 Southbound.
d. Water trucks, street sweepers and any other requirements deemed necessary will be
implemented to minimize construction impacts.
e. There are no anticipated weekend, late night or holiday work hours proposed for the construction
or hauling at this time.
f. Flag persons will be employed and signs will be installed for traffic control, when necessary.
WSDOT Standard Traffic Control Plan is attached. Methods will be adapted to the proposed
construction and route.