Loading...
HomeMy WebLinkAboutM_Hazardous_Materials_Management_Statement_Index_Ave_Townhomes_23XXXX_v1.pdf Western Washington Division Eastern Washington Division 165 NE Juniper St., Ste 201, Issaquah, WA 98027 407 Swiftwater Blvd, Cle Elum, WA 98922 Phone: (425) 392-0250 Phone: (509) 674-7433 www.EncompassES.net Date: September 7th, 2023 To: City of Renton, Department of Community and Economic Development From: Encompass Engineering & Surveying on behalf of Mike Elliott Re: Hazardous Materials Management Statement for the Index Avenue Townhomes _____________________________________________________________________________________ APPLICANT Mike Elliott 10034 SE 218th Place Kent, WA 98031 mikeelliott@windermere.com 206-947-9085 SITE ADDRESS 1709 Index Avenue NE, Renton, WA 98058 HAZARDOUS MATERIALS MANAGEMENT STATEMENT To Whom It May Concern, I, the undersigned property owner of Parcel No. 722780-1935, understand that the City has requested a Hazard Materials Management Statement. This letter addresses that requirement but may need to be updated by the contractor once one has been chosen for the project. 1. Fueling of Construction Vehicles and Storage of Hazardous Materials: It is anticipated that Track hoes, back hoes, dozers, vibratory rollers and loaders may all be present on site at some point during construction. It is not anticipated that Construction vehicles will need to be refueled while on site. Gas-powered hand-held construction equipment such as chain saws and cut-off saws may require refueling during the construction process. If emergency refueling of larger equipment is needed, it may be accomplished using portable fuel tanks carried in the pickup bed of the construction foreman’s truck or by the contractor’s service truck. Care will be taken at all time during refueling to ensure that no fuel is spilled. In an emergency, fuel spill containment kits will be available to limit any unintended fuel spills and the Department of Ecology will be contacted in case of a spill. Gas -powered hand-held construction equipment will be refueled using portable gas containers meeting current DOE standards. Said gas containers will typically be stored in the bed of the construction foreman’s truck or within an approved location within a construction equipment shed. It is not anticipated that any other Hazardous materials, with the possible exception of painting supplies during home construction, will be stored on site during construction. Index Ave Townhomes Hazardous Materials Management Statement 09-07-2023 Page 2 of 2 2. Construction Debris: All construction created during construction will be removed from the site and disposed of in an approved method at an appropriate disposal site. Sincerely, Mike Elliott Owner/Applicant