HomeMy WebLinkAbout7945.04 E 2023 1117Earth Solutions NWLLC
15365 NE 90th Street, Suite 100
Redmond, WA 98052
Main (425) 449-4704 | Fax (425) 449-4711
esnw.com
FIELD REPORT
Project No. 7945.04 Page 1 of 2 Report ID 7945.04 E 1117 2023
Date Fri 11/17/2023 Weather Clear Skies, 37°F
Arrival/Departure Time(s) 9:15am – 1:45pm Travel Time (hr)1.0
Project Name Canopy Property
Location 4130 Lincoln Ave NE, Renton
ESNW Rep. & Phone Maricel Fee, (425) 984-9615
Client Info/Contact Century Communities | Stacia Bloom
Reviewed By LAC
Initials/Date
RAC
Initials/Date Field Supervisor Project Manager
Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for
obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible
for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations,
is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager.
ESNW rep was on site to observe and test installation of Hot Mix Asphalt (HMA) along Lincoln Ave NE
and NE 40th St. While on site the following was observed:
ESNW rep. observed the contractor installing the final 2 inch lift of HMA asphalt in the inside lane along
Lincoln Ave NE and along NE 40th St. ESNW rep. observed that contractor lay the asphalt and then
rollover the material with multiple vibratory rollers. ESNW rep. determined that the contractor continued
to compact them entire area with the roller while the asphalt was placed. Rep took compaction tests on
the SG of asphalt after it was placed and compacted. Density test results indicate adequate
compaction of at least 92% at the tested locations. Please see attached map for approximate test
locations.
Test
Number Test Location Elevation Rice Value
(pcf)
Test Density
(pcf)
% of
Rice Value
166 Lincoln Ave NE HMA SG 155.3 148.0 95
167 NE 40th St HMA SG 155.3 145.4 94
168 NE 40th St HMA SG 155.3 145.2 93
169 NE 40th St HMA SG 155.3 147.3 95
170 NE 40th St HMA SG 155.3 142.4 92
Report ID 7945.04 E 1117 2023 Page 2 of 2
Earth Solutions NW, LLC
166
169
168
170
167