HomeMy WebLinkAboutContract
Printed on Recycled Paper
Award Date: CAG-23-316
Awarded to:
City of Renton
MONROE AVE NE INFILTRATION FACILITY
SWP-27-4080
BIDDING DOCUMENTS
Funded in part by the Washington
State Department of Ecology
City of Renton
1055 South Grady Way
Renton WA 98057
Project Manager: Jared McDonald, 425-430-7293
jmcdonald@rentonwa.gov
City of Renton Forms, Contract Forms,
Conditions of the Contract, and Plans
November 13, 2023
KLB Construction, Inc
CONSTRUCTION DOCUMENTS
This stamp is affixed to signify that this contract
document was prepared under my supervision and its
content meets Renton standards for construction
contracts. This stamp does not supersede stamps
provided by others on engineering plans and
specifications herein.
Public Works Department
MONROE AVE NE INFILTRATION FACILITY
Project: CAG-23-316
CONTRACT DOCUMENT TABLE OF CONTENTS
1. Summary of Fair Practices Policy
2. Summary of Americans with Disability Act Policy
3. Scope & Instructions to Bidders
4. Site Map & Vicinity Maps
5. Call for Bids
6. *Proposal and Combined Affidavit & Certificate Form: Non-Collusion, Anti-Trust Claims, Minimum Wage
7. *Proposal Bid Bond Form
8. *Department of Labor and Industries Certificate Registration
9. *Schedule of Prices
10. *Certification of Compliance with Wage Payment Statutes
11. *Subcontractor List
12. Performance Contract Bond to the City of Renton
13. Fair Practices Policy Affidavit of Compliance
14. Contract Agreement
15. Retainage Selection
16. City of Renton Insurance Requirements
17. Prevailing Wages References
18. Public Works Invoice & Payment Checklist
19. Traffic Control Information
20. Project Special Provisions
21. Construction Plans
22. Standard Details
23. Department of Ecology Specifications Insert
24. Geotechnical Report
25. Draft Easements
26. Existing Easements
Documents marked as follows must be submitted at the time noted and must be executed by the Contractor,
President and Vice President or Secretary if corporation by-laws permit. All pages must be signed. In the
event another person has been duly authorized to execute contracts, a copy of the corporation minutes
establishing this authority must be attached to the bid document.
* Submit with Bid
Submit after Notice of Award (at the latest)
CITY OF RENTON - Public Works Department
(OSENT1LILt.’OFSPL(.ILMFE[INtOFSOLEDIREC10kOFKLB(ONSCRICIiON.I%(’.IlIEt:NDIRs;GNLD,beingthesoledirectorofKLBCUNSIRtXTlC),iWashntoncorporationtthe“(rOTa!In’),herhnsentstothet,lltiinianoninheuotholdrngaspecialmeetingoftheh’ardoldirectors:RESt)L\EDbythesoledirectorotthe(orpoTatton,thatthetlloipersonsareherebyappointedtosereasoffleersoftheCorporationuntilthenex:annualmeetingofshareholdersandtheappointmentandquahticationoftheir.uccessorsKelkLynnI3osaPretdentWilliamR.GrathSeCrCtaTCoreyQhnstensenTreasurer(‘orevChnstensenAssistantSecretary2.RESOLVET)bythesoledirectorofthe(‘orporatlon.thatintheabsenceoftheSecretary,anAssistantSecretarymayperrrnthedutiesofthesccretaroftheCrporaUon[)atcd:3Z‘)i,.oruo:L226t?
I
)
INCOArcRATED
November 15,2023
Jared McDonald
City of Renton
1055 S. Grady Way,5th Floor
Renton, WA 98057
RE:Monroe Ave NE Infiltration Facility Project
Construction Contract CAG-23-3 l6
Dear Jared:
As per your request, below you will find the contact information for KLB staff and our surety.
Department Name Phone Email
Responsible Officer I Lucas Jelmberg 425-238-1576 lucasj@tklbconstruction.com
Project Manager
Project Engineer
Foreman
KLB Safety Manager
Insurance Agent
Assured Partners
1325 4th Ave, Ste 2100
Seattle, WA 98101
Jenna Troy
Ben Mader
Mike Holmes
Maria Moss
Bonding Agent
Parker, Smith & Feek
2233 ll2th Ave NE
Bellewe, WA 98004
Susan Larson 425-709-3625
Please contact our oflice if you have any questions regarding this information.
Sincerely
425-977-9t78
425-754-1933
42s-293-3434
206-343-2323
i ennat@klbconstruction. com
benm@klbconstruction. com
mic hae lh (g, kl bc onstru c t i on. c om
Maria.moss@assuredpartners.com
sblarson(4rpsfinc.com
4lil.fur'{
Melodee Leclair
Contract Administrator
contracts@klbconstruction. com
P. O. BOX 158, MUKTLTEO, WA 98275
(42s) 3ss-733s FAX (42s) 348-84ss
KLBCOT* 15388
AN EQUAL OPPORTUNITY EMPLOYER
General Business License
2023
License Number 30136
UBI 6005585040010001
www.FileLocal.org
Zoning Restrictions:
Expires: 1/31/2024
Licensee:
KLB Construction, Inc.
KLB Construction, Inc.
3405 121st St SW
Lynnwood, WA 98087-1549
City of Renton
1055 Grady Way
Renton, WA 98057
425-430-6851
http://www.rentonwa.gov
taxandlicensing@rentonwa.gov
City of Renton
1.Summary of Fair Practices Policy
2.Summary of Americans with Disability Act Policy
Public Works Department
Scope & Instructions to Bidders
Monroe Ave NE Infiltration Facility
CAG-23-316
SCOPE OF WORK & INSTRUCTIONS TO BIDDERS
Scope
The City of Renton Surface Water Utility is seeking bid submittals from contractors interested in
furnishing and installing a stormwater infiltration and treatment facility at 301 Monroe Ave NE.
The site has already been excavated by others to the approximate elevations required for the fill
material under the infiltration and treatment facility to be installed. The work is divided into four
sections: Site Preparation, Stage 1 Work, Stage 2 Work, and Restoration. Site Preparation consists
of installation of TESC measures, construction entrance and access road. Stage 1 Work consists of
installation of geotextile, backfill of infiltration and non-infiltration material, and gravity blockwall.
Stage 2 Work consists of installation of infiltration chambers, backfill above chambers, treatment
vault, and storm drainage system. Restoration consists of installing the curbs, paving, signage,
fencing, gates, and landscaping.
The work involved under the terms of the contract documents shall be full and complete project
construction, as shown on the plans and as described in the project specifications to include but
not be limited to:
· Construction surveying, staking, and production of as-built plans,
· Traffic control,
· Installing and maintaining adequate Temporary Erosion and Sediment Control measures,
· Installing approximately 42,300 CY of non-infiltration material,
· Installing approximately 58,100 SY of geotextile fabric,
· Installing approximately 1,400 Tons of crushed surfacing top course,
· Installing approximately 35,600 Tons of select borrow,
· Installing approximately 84,100 Tons of infiltration gravel,
· Installing approximately 10,000 SF of gravity block wall,
· Installing approximately 400 Tons of hot mix asphalt,
· Installing additional backfill to grade site to designed elevations,
· Trench excavation, including dewatering, shoring, removal of any existing unsuitable material,
and disposal of excavated material,
· Installing new storm system of approximately 640 linear feet of 24-inch and 36-inch diameter
storm sewer pipe, including 19 catch basins,
· Installing stormwater infiltration facility,
· Installing stormwater flow splitter vault, infiltration chamber manifold vault, hydrodynamic
separator vault, treatment vault, and
· Trench backfill with suitable material and compaction to required standards,
· Installing concrete curbs and gutters, rolled curbs, concrete sidewalks and driveway entrances,
Public Works Department
Scope & Instructions to Bidders
· Installing chain link fence and gates,
· Performing landscape and property restoration.
The majority of work takes place on 301 Monroe Ave NE, a private property. The City is
responsible for securing the necessary easements for this project, and anticipates execution of a
permenant and a temporary construction easement in October 2023. Draft versions of the
easements are provided in the bid documents for reference. The executed versions of the
easements will be provided to the contractor at or prior to the projects pre-construction meeting.
In addition to the permanent and temporary construction easement there is an existing temporary
drainage easement for surface water drainage overflow from Monroe Ave NE. This existing
temporary drainage easement has also been provided in the bid documents for refence. The
contractor shall comply with the terms of all easements in accordance with Section 1-07.24 “Rights
of Way”.
The estimated project cost is $16,000,000 to $19,000,000.
A total of 320 working days is allowed for completion of the project.
For Bid Item Descriptions see Special Provisions Section 1-09.14
Any contractor connected with this project shall comply with all federal, state, county, and city
codes and regulations applicable to such work and perform the work in accordance with the plans
and specifications of this contract document.
Bid documents will be available September 11th, 2023. Plans, specifications, addenda, and the
plan holders list for this project are available on-line through Builders Exchange of Washington,
Inc., at http://www.bxwa.com. Click on “bxwa.com”; “Posted Projects”, “Public Works”, “City of
Renton”, “Projects Bidding”. (Note: Bidders are encouraged to “Register as a Bidder,” in order to
receive automatic email notification of future addenda and to be placed on the “Bidders List”). Bid
documents will also be available at http://rentonwa.gov/bids/ under “Calls for Bids”.
Should you require further assistance, contact Builder Exchange of Washington at (425) 258-1303.
Bidders are not to contact the City of Renton or the Engineer to obtain bidding documents.
The City's Fair Practices, Non-Discrimination, and Americans with Disability Act Policies shall apply.
Women and Minority Business Enterprises (WMBE) are encouraged to bid.
Owner’s Project Manager:
All questions regarding this request should be directed to:
Jared McDonald, Surface Water Utility
City of Renton, Renton City Hall - 5th Floor
1055 South Grady Way, Renton, WA 98057
Public Works Department
Scope & Instructions to Bidders
Phone: 425-757-7718
Email: jmcdonald@rentonwa.gov
Questions received less than 4 business days prior to the date of sealed bid submittal may not be
answered. The City will not be responsible for other explanations or interpretations of the bid
documents.
The City of Renton will host one (1) optional project site visit for bidders to review the site and ask
questions to the project manager prior to the deadline for bids to be submitted. The site visit will
take place on September 20th, 2023 from 10:00 am to 11:00am at 301 Monroe Ave NE. Please
enter from Jefferson Ave NE. Limited parking will be available onsite. Each bidder is strongly
encouraged to limit the number of vehicles to (1) one to ensure adequate parking for all.
Submission of Bids
Sealed bids for this proposal will be received by the City of Renton at the lobby of Renton City Hall
until the time and date specified in the Call for Bids. No mailed, Fedex, or UPS delivered bids will
be accepted.
At this time, the bids will be publicly opened and read via a Zoom video-conferencing meeting,
after which the bids will be considered and the award made as early as practicable.
No proposal may be changed or withdrawn after the time set for receiving bids. Proposals shall be
submitted on the forms attached hereto.
Consideration of Bids
1. Any omissions, discrepancies or need for interpretation should be brought, in writing, to the
attention of the Project Engineer. Written addenda to clarify questions that arise may then
be issued.
No oral statements by Owner, Engineer, or other representative of the owner shall, in any
way, modify the contract documents, whether made before or after letting the contract.
Questions received less than 4 business days prior to the date of bid submittal may not be
answered. The City will not be responsible for other explanations or interpretations of the bid
documents.
2. The work to be done is shown in the plans and / or specifications. Quantities are understood
to be only approximate. Final payment will be based on actual quantities and at the unit
price bid. The City reserves the right to add or to eliminate portions of that work as deemed
necessary.
3. Bidders shall satisfy themselves as to the local conditions by inspection of the site.
Public Works Department
Scope & Instructions to Bidders
4. The bid price for any item must include the performance of all work necessary for completion
of that item as described in the specifications.
5. The bid price shall be stated in terms of the units indicated and as to a total amount. In the
event of errors, the unit price bid will govern. Illegible figures will invalidate the bid.
6. The right is reserved to reject any and/or all bids and to waive informalities if it is deemed
advantageous to the City to do so.
7. A certified check or satisfactory bid bond made payable without reservation to the Director
of Finance of the City of Renton in an amount not less than 5% of the total amount of the bid
shall accompany each bid proposal. Checks will be returned to unsuccessful bidders
immediately following the decision as to award of contract. The check of the successful
bidder will be returned provided he enters into a contract and furnishes a satisfactory
performance bond covering the full amount of the work within ten days after receipt of
notice of intention to award contract. Should he fail, or refuse to do so, the check shall be
forfeited to the City of Renton as liquidated damage for such failure.
8. All bids must be self-explanatory. No opportunity will be offered for oral explanation except
as the City may request further information on particular points.
9. The bidder shall, upon request, furnish information to the City as to his financial and practical
ability to satisfactorily perform the work.
10. Payment for this work will be made by check or electronic transfer
11. The contractor shall obtain such construction insurance (e.g. fire and extended coverage,
worker's compensation, public liability, and property damage as identified within Special
Provisions, Specification Section 1-07.18 “Public Liability and Property Damage Insurance”.
12. The contractor, prior to the start of construction, shall provide the City of Renton a detailed
bar chart type construction schedule for the project.
13. Before starting work under this contract, the Contractor is required to supply information to
the City of Renton on all chemical hazards Contractor is bringing into the work place and
potentially exposing City of Renton Employees.
14. Payment of retainage shall be done in accordance with Section 1-09.9(1) "Retainage”.
15. Liquidated damages will be enforced in accordance with Section 1-08.9 “Liquidated
Damages”.
16. Basis For Approval
Public Works Department
Scope & Instructions to Bidders
The construction contract will be awarded by the City of Renton to the lowest, responsible,
responsive bidder. The bidder shall bid on all bid schedules items of all schedules set forth in
the bid forms to be considered responsive for award. The total price of all schedules will be
used to determine the successful low responsive bidder.
Partial bids will not be accepted. The owner reserves the right to award any or all schedules
of the Bid to meet the needs of the City. The intent is to award to only one BIDDER.
17. Trench Excavation Safety Systems
As required by RCW 39.04.180, on public works projects in which trench excavation will
exceed a depth of four feet, any contract therefore shall require adequate safety systems for
the trench excavation that meet the requirements of the Washington Industrial Safety and
Health Act, Chapter 49.17 RCW. These requirements shall be included in the Bid Schedule as
a separate item. The costs of trench safety systems shall not be considered as incidental to
any other contract item and any attempt to include the trench safety systems as an incidental
cost is prohibited.
18. Payment of Prevailing Wages
In accordance with Revised Code of Washington Chapters 39.12 and 49.28 as amended or
supplemented herein, there shall be paid to all laborers, workmen or mechanics employed on
this contract the prevailing rate of wage for an hour's work in the same trade or occupation
in the area of work regardless of any contractual relationship which may exist, or be alleged
to exist, between the CONTRACTOR and any laborers, workmen, mechanics or
subconsultants.
The most recent issue of the prevailing wage rates are included within these specifications
under section titled “Prevailing Minimum Hourly Wage Rates”. The Contractor is Responsible
for obtaining updated issues of the prevailing wage rate forms as they become available
during the duration of the contract. The wage rates shall be included as part of any
subcontracts the Contractor may enter into for work on this project.
19. Pollution Control Requirements
Work under this contract shall meet all local, state and federal requirements for the
prevention of environmental pollution and the preservation of public natural resources. The
CONTRACTOR shall conduct the work in accordance with all applicable pollution control laws.
The CONTRACTOR shall comply with and be liable for all penalties, damages, and violations
under Chapter 90.48 RCW, in performance of the work. The CONTRACTOR shall also comply
with Article 4 in the Puget Sound Air Pollution Control Agency Regulation III regarding
removal and encapsulation of asbestos materials.
Public Works Department
Scope & Instructions to Bidders
20. Standard Specifications
All work under this contract shall be performed in accordance with the following standard
specifications except as may be exempted or modified by the City of Renton Supplemental
Specifications, Special Provisions other sections of these contract documents. These
standard specifications are hereby made a part of this contract and shall control and guide all
activities within this project whether referred to directly, paragraph by paragraph, or not.
1. WSDOT/APWA "2023 Standard Specifications for Road, Bridge and Municipal
Construction" and "Division 1 APWA Supplement" hereinafter referred to by the
abbreviated title "Standard Specifications."
A. Any reference to "State," "State of Washington," "Department of Transportation,"
"WSDOT," or any combination thereof in the WSDOT/APWA standards shall be
modified to read "City of Renton," unless specifically referring to a standard
specification or test method.
B. All references to measurement and payment in the WSDOT/APWA standards shall
be detected and the measurement and payment provisions of Section 1-09.14,
Measurement and Payment (added herein) shall govern.
21. If a soils investigation has been completed, a copy may be included as an appendix to this
document. If one has not been provided for this project by the City or Engineer, the Bidders
shall familiarize themselves adequately with the project site and existing subsurface
condition as needed to submit their bid. Upon approval of the City, the Bidder may make
such subsurface explorations and investigations as they see fit. The Bidder shall be
responsible for protection of all existing facilities, utilities and other buried or surface
improvements and shall restore the site to the satisfaction of the City.
22. It is anticipated that this project will be funded in part by the Washington State Department
of Ecology. Neither the State of Washington nor any of its departments or employees are, or
shall be, a party to any contract or any subcontract resulting from this solicitation for bids.
23. Bidder’s Checklist
It is the responsibility of each bidder to ascertain if all the documents listed on the
attached index are included in their copy of the bid specifications. If documents are
missing, it is the sole responsibility of the bidder to contact the City of Renton to obtain
the missing documents prior to bid opening time.
Have you submitted, as part of your bid, all documents marked in the index as “Submit
With Bid”?
Has bid bond or certified check been enclosed?
Is the amount of the bid guaranty at least 5 percent of the total amount of bid including
sales tax?
Has the proposal been signed?
Public Works Department
Scope & Instructions to Bidders
Have you bid on ALL ITEMS and ALL SCHEDULES?
Have you submitted the Subcontractors List?
Have you submitted Certification of Compliance with Wage Payment Statutes Form?
Have you reviewed the Prevailing Wage Requirements?
Have you submitted Dept. of Labor and Industries Certificate of Registration Form?
Have you submitted Proposal and Combined Affidavit & Certificate Form?
Have you certified Receipt of Addenda, if any?
72,224
6,019
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
7/6/2023
Legend
4,09302,046
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
4,093
WGS_1984_Web_Mercator_Auxiliary_Sphere
Jared McDonald
jmcdonald@Rentonwa.gov
City and County Labels
City and County Boundary
<all other values>
Renton
Streets
Waterbodies
4,800
400
This map is a user generated static output from an Internet mapping site and
is for reference only. Data layers that appear on this map may or may not be
accurate, current, or otherwise reliable.
8/16/2023
Legend
2720136
THIS MAP IS NOT TO BE USED FOR NAVIGATION
Feet
Notes
272
WGS_1984_Web_Mercator_Auxiliary_Sphere
Jared McDonald
jmcdonald@Rentonwa.gov
City and County Labels
Parcels
City and County Boundary
<all other values>
Renton
Streets
Points of Interest
Parks
Waterbodies
2021.sid
Red: Band_1
Green: Band_2
Blue: Band_3
MONROE AVE NE INFILTRATION FACILITY PROJECT
SITE MAP
NE 4TH ST
JEFFERSON AVE NEMONROE AVE NENE 2ND ST
PROJECT AREA
GREENWOOD MEMORIAL
PARK & FUNERAL HOME
CAG-23-316
Call for Bids 1
CITY OF RENTON
CALL FOR BIDS
Monroe Ave NE Infiltration Facility
SWP-27-4080
Submittal Deadline: 2:00PM, October 20th, 2023
Bid Submission Process:
Sealed bids will be received until 2:00 p.m., Friday, October 20, 2023, at the lobby of Renton City Hall,
1055 South Grady Way, Renton WA 98057. No mailed, Fedex, or UPS delivered will be accepted. Sealed
bids will be opened and publicly read via the Zoom video-conferencing web application at 3:00 p.m.,
Friday, October 20, 2023 (60 minutes after published bid submittal time). Any bids received after the
published bid submittal time cannot be considered and will not be accepted.
·Please include bidder’s name, address and the name of the project on the envelope.
·The bid opening meeting can be accessed via videoconference by:
·Clicking this link to join the Zoom meeting:
https://us02web.zoom.us/j/81155690422?pwd=ZHYxRHJKM2x0ZC9qWTdYRk5oZk9tQT09
·Using the Zoom app: Meeting ID: 811 5569 0422; Password: 647507;
·Via telephone by dialing: 1-253-205-0468,,81155690422#,,,,*647507# US
·Zoom is free to use and is available at https://zoom.us/.
The work to be performed within 320 working days from the date of commencement under this
contract shall include, but not be limited to:
·Construction surveying, staking, and production of as-built plans,
·Traffic control,
·Installing and maintaining adequate Temporary Erosion and Sediment Control measures,
·Installing approximately 42,300 CY of non-infiltration material,
·Installing approximately 58,100 SY of geotextile fabric,
·Installing approximately 1,400 Tons of crushed surfacing top course,
·Installing approximately 35,600 Tons of select borrow,
·Installing approximately 84,100 Tons of infiltration gravel,
·Installing approximately 10,000 SF of gravity block wall,
·Installing approximately 400 Tons of hot mix asphalt,
·Installing additional backfill to grade site to designed elevations,
·Trench excavation, including dewatering, shoring, removal of any existing unsuitable material, and
disposal of excavated material,
·Installing new storm system of approximately 640 linear feet of 24-inch and 36-inch diameter storm
sewer pipe, including 19 catch basins,
·Installing stormwater infiltration facility,
·Installing stormwater flow splitter vault, infiltration chamber manifold vault, hydrodynamic
separator vault, treatment vault, and
·Trench backfill with suitable material and compaction to required standards,
·Installing concrete curbs and gutters, rolled curbs, concrete sidewalks and driveway entrances,
·Installing chain link fence and gates,
·Performing landscape and property restoration.
CAG-23-316
Call for Bids 2
The estimated project cost is $16,000,000 to $19,000,000.
Liquidated damages will be enforced in accordance with Section 1-08.9 “Liquidated Damages”.
It is anticipated that this project will be funded in part by the Washington State Department of Ecology.
Neither the State of Washington nor any of its departments or employees are, or shall be, a party to any
contract or any subcontract resulting from this solicitation for bids.
The City reserves the right to reject any and/or all bids and to waive any and/or all informalities.
Bid documents will be available September 11th, 2023. Plans, specifications, addenda, and the plan
holders list for this project are available on-line through Builders Exchange of Washington, Inc., at
http://www.bxwa.com. Click on “bxwa.com”; “Posted Projects”, “Public Works”, “City of Renton”,
“Projects Bidding”. (Note: Bidders are encouraged to “Register as a Bidder,” in order to receive
automatic email notification of future addenda and to be placed on the “Bidders List”). Bid documents
will also be available at http://rentonwa.gov/bids/ under “Calls for Bids”.
Should you require further assistance, contact Builder Exchange of Washington at (425) 258-1303.
Bidders are not to contact the City of Renton or the Engineer to obtain bidding documents.
The City's Fair Practices, Non-Discrimination, and Americans with Disability Act Policies shall apply.
Women and Minority Business Enterprises (WMBE) are encouraged to bid.
Questions about the project shall be addressed to: Jared McDonald, Public Works Department, 1055
South Grady Way, Fifth Floor, Renton, WA, 98057, or 425-430-7293, or jmcdonald@rentonwa.gov.
Questions received less than 4 business days prior to the date of sealed bid submittal may not be
answered. The City will not be responsible for other explanations or interpretations of the bid
documents.
A certified check or bid bond in the amount of five percent (5%) of the total of each bid must accompany
each bid.
Jason A. Seth. MMC, City Clerk
Dates of Publication:
Daily Journal of Commerce September 11, 2023
Daily Journal of Commerce September 18, 2023
Daily Journal of Commerce September 25, 2023
Public Works Department
MONROE AVE NE INFILTRATION FACILITY
CAG-23-316
Documents to be Submitted with Bid
CITYOFRENTONMONROEAVENEINFILTRATIONFACILITYPROJECTCAG-23-316Proposal&CombinedAffidavit&CertificateFormTOTHECITYOFRENTONRENTON,WASHINGTONLadiesand/orGentlemen:Theundersignedherebycertifythatthebidderhasexaminedthesiteoftheproposedworkandhavereadandthoroughlyunderstandtheplans,specificationsandcontractgoverningtheworkembracedinthisimprovement,andthemethodbywhichpaymentwillbemadeforsaidwork,andherebyproposetoundertakeandcompletetheworkembracedinthisimprovement,orasmuchthereofascanbecompletedwiththemoneyavailable,inaccordancewiththesaidplans,specificationsandcontractandthefollowingscheduleofratesandprices:(Note:Unitpricesforallitems,allextensions,andtotalamountofbidshouldbeshown.Showunitpricesbothinwritingandinfigures.)Theundersignedfurthercertifiesandagreestothefollowingprovisions:NON-COLLUSIONAFFIDAVITBeingdulysworn,deposesandsays,thatheistheidenticalpersonwhosubmittedtheforegoingproposalorbid,andthatsuchbidisgenuineandnotshamorcollusiveormadeintheinterestoronbehalfofanypersonnotthereinnamed,andfurther,thatthedeponenthasnotdirectlyinducedorsolicitedanyotherBidderontheforegoingworkorequipmenttoputinashambid,oranyotherpersonorcorporationtorefrainfrombidding,andthatdeponenthasnotinanymannersoughtbycollusiontosecuretohimselfortoanyotherpersonanyadvantageoverotherBidderorBidders.ANDCERTIFICATIONRE:ASSIGNMENTOFANTI-TRUSTCLAIMSTOPURCHASERVendorandpurchaserrecognizethatinactualeconomicpracticeoverchargesresultingfromanti-trustviolationsareinfactusuallybornebythepurchaser.Therefore,vendorherebyassignstopurchaseranyandallclaimsforsuchover-chargesastogoodsandmaterialspurchasedinconnectionwiththisorderorcontract,exceptastooverchargesresultingfromanti-trustviolationscommencingafterthedateofthebid,quotation,orothereventestablishingthepriceunderthisorderorcontract.Inaddition,vendorwarrantsandrepresentsthatsuchofhissuppliersandsubcontractorsshallassignanyandallsuchclaimstopurchaser,subjecttotheaforementionedexception.ANDMINIMUMWAGEAFFIDAVITFORMI,theundersigned,havingbeendulysworn,deposed,sayandcertifythatinconnectionwiththeperformanceoftheworkofthisproject,Iwillpayeachclassificationoflaborer,workman,ormechanicemployedintheperformanceofsuchwork;notlessthantheprevailingrateofwageornotlessthantheminimumrateofwagesasspecifiedintheprincipalcontract.ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
Ihavereadtheaboveandforegoingstatementsandcertificate,knowthecontentsthereofandthesubstanceassetforththereinistruetomyknowledgeandbelief.FOR:PROPOSAL,NONCOLLUSIONAFFIDAVIT,ASSIGNMENTOFANTI-TRUSTCLAIMSTOPURCHASERANDMINIMUMWAGEAFFIDAVITNamesofMembersofPartnership:N/AKLBConstruction,Inc.NameofBiddersFirmORNameofPresidentofCorporationNameofSecretaryofCorporationCorporationOrganizedunderthelawsofWithMainOfficeinStateofWashingtonatKellyLynnBosaWilliamGrady!CoreyT.Christensen(AssistantSecretary)WashingtonStateLynnwood,WASubscribedandsworntobeforemeonthis20dayof0toer,023a.%LNPublicinandfortheStateofWashingtonNotary(Print)(k4JLOd..A.Lccpj’Myappointmentexpires:______________________SignatPrintedName:CoreyT.ChristensenAddress:P0Box158Mukilteo,WA98275ContactName(pleaseprint):JamesPhillipsPhone:(4251754-4820Email:jamesp@klbconstruction.comProvidedtoBuildereExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
ProposalBidBondKNOWALLMENBYTHESEPRESENTS,Thatwe,[Contractor]KLSConstruction,Inc.______________of[addtessJPCBox158,Mukilteo,WA98275asPrincipal,and[Surety]FidelityandDepositCompanyofMarylandacorporationdulyorganizedunderthelawsoftheStateofIllinoisandauthorizedtodobusinessintheStateofWashington,asSurety,areheldandfirmlybounduntotheCityofRentoninthesumoffive(5)percentofthetotalamduntofthebidproposalofsaidPrincipalfortheworkhereinafterdescribed,forthepaymentofwhich,wellandtrulytobemade,webindourselves,ourheirs,executors,administratorsandassigns,andsuccessorsandassigns,jointlyandseverally,firmlybythesepresents.Theconditionofthisbondissuch,thatwhereasthePrincipalhereinisherewithsubmittinghis/heroritssealedproposalforthefollowingproject,towit:CAG-23-316MonroeAveNEInfiltrationFacilityProject,SWP-27-4080saidbidandproposal,byreferencethereto,beingmadeaparthereof,NOW,THEREFORE,ifthesaidproposalbidbysaidPrincipalbeaccepted,andthecontractbeawardedtosaidPrincipal,andifsaidPrincipalshalldulymakeandenterintoandexecutesaidcontractandshallfurnishperformancebondasrequiredbytheCityofRentonwithinaperiodoften(10)daysfromandaftersaidaward,exclusiveofthedayofsuchaward,thenthisobligationshallbenullandvoid,otherwiseitshallremainandbeinfullforceandeffect.INTHEEVENTthePrincipal,followingaward,failstoexecuteanAgreementwiththeCityofRentoninaccordancewiththetermsoftheProposalandfurnishaperformancebondwithSuretyorSuretiesapprovedbytheCityofRentonwithinten(10)daysfromandaftersaidaward,thenPrincipalshallforfeittheBidBond/BidProposalDepositorSuretyshallimmediatelypayandforfeittotheCityofRentontheamountoftheProposalBidBond,assetforthinRCW35A.40.200andRCW35.23.352.INTESTIMONYWHEREOF,thePrincipalandSuretyhavecausedthesepresentstobesignedandsealedthis20thdayofOctober,2023KLBCruction,Inc.FidelityandDepositCompanyofMaryland[Prip1]____[Ste__________jAY1-’P?C[Signatureofauthorizedcial][SinatueofauthorizedofflciQA%’i’4-tifcLf&j..._By:naM.Roy[Title][Attorney-in-Fact]2233112thAveNE[Address]Bellevue,WA98004(425)709-3600[TelephoneNumber]ApprovedbytheCityAttorneyon6/03/13ProvidedtoBuildersExchangeofWA,Inc.ForusageConditiocsAgreementseewww.bxwa.com—AlwaysVerifySeal
ZURICHAMERICANINSURANCECOMPANYCOLONIALAMERICANCASUALTYANDSURETYCOMPANYFIDELITYANDDEPOSITCOMPANYOFMARYLANDPOWEROFATTORNEYKNOWALLMENBYTHESEPRESENTS:ThattheZURICHAMERICANINSURANCECOMPANY,acorporationoftheStateofNewYork,theCOLONIALAMERICANCASUALTYANDSURETYCOMPANY,acorporationoftheStateofIllinois.andtheFIDELITYANDDEPOSITCOMPANYOFMARYLANDacorporationoftheStateofIllinois(hereincollectivelycalledthe“Companies’),byRobertD.Murray,VicePresident,inpursuanceofauthoritygrantedbyArticleV,Section8,oftheBy-LawsofsaidCompanies,whicharesetforthonthereversesidehereofandareherebycertifiedtobeinfullforceawleffectonthedatehereof,doherebynominate,constitute,andappoint.DeannaM.FRENCH,NicholasFREDRICKSON,SusanB.LARSON,ScottFISHER,JanaM.ROY,DerekD.SABO,JenniferBARRAT,AlecGUMPFER,AndrewKERSLAKE,RonaldI.LANGE,JohnR.CLAEYS,RogerR.KALTENBACH,GuyP.ARMFIELD,CharlaBOADLE,allofBetlevue,Washington,itstrueandlawfulagentandAttorney-in-Fact,tomake.execute,sealanddeliver,for,andonitsbehalfassurety,andasitsactanddeed:anyandallbondsandundertakings,andtheexecutionofsuchbondsorundertakingsinpursuanceofthesepresents,shallbeasbindinguponsaidCompanies,asfullyandamply,toallintentsandpurposes,asiftheyhadbeendulyexecutedandacknowledgedbytheregularlyelectedofficersoftheZURICHAMERICANINSURANCECOMPANYatitsofficeinNewYork,NewYork.,theregularlyelectedofficersoftheCOLONIALAMERICANCASUALTYANDSURETYCOMPANYatitsofficeinOwingsMills,Maryland.,andtheregularlyelectedofficersoftheFIDELITYANDDEPOSITCOMPANYOFMARYLANDatitsofficeinOwingsMills,Maryland.,intheirownproperpersons.ThesaidVicePresidentdoesherebycertifythattheextractsetforthonthereversesidehereofisatruecopyofArticleV,Section8,oftheBy-LawsofsaidCompanies,andisnowinforce.INWITNESSWHEREOF,thesaidVice-Presidenthashereuntosubscribedhis/hernamesandaffixedtheCorporateSealsofthesaidZURICHAMERICANINSURANCECOMPANY,COLONIALAMERICANCASUALTYANDSURETYCOMPANY,andFIDELITYANDDEPOSITCOMPANYOfMARYLAND.this17thdayofJuly,A.D.2023.ATTEST:ZURICHAMERICANINSURANCECOMPANYCOLONIALAMERICANCASUALTYANDSURETYCOMPANYFIDELITYANDDEPOSITCOMPANYOfMARYLANDBy:RobertD.MurrayVicePresidentiat’ti.tBy:DawnE.BrownSecretaiyStateofMarylandCountyofBaltimoreOnthis17thdayofJuly.AD.2023,beforethesubscriber,aNotaryPublicoftheStateofMaryland,dulycommissionedandqualified,RobertD.Murray,VicePresidentandDawnE.Brown,SecretaryoftheCompanies,tomepersonallyknowntobetheindividualsandofficersdescribedinandwhoexecutedtheprecedinginstrument,andacknowledgedtheexecutionofsame,andbeingbymedulysworn,deposethandsaith,thathe/sheisthesaidofficeroftheCompanyaforesaid,andthatthesealsaffixedtotheprecedinginstrumentaretheCorporateSealsofsaidCompanies,andthatthesaidCorporateSealsandthesignatureassuchofficerwereduly’affixedandsubscribedtothesaidinstrumentbytheauthorityanddirectionofthesaidCorporations.INTESTIMONYWHEREOF.IhavehereuntosetmyhandandaffixedmyOfficialSealthedayandyearfirstabovewritten.IvaBetheaNotaryPublicMyCommissionExpiresSeptember30,2023Authenticityofthisbondcanbeconfirmedatbondvalidator.zurichna.comor410-559-8790
PublicWorksDepartmentMONROEAVENEINFILTRATIONFACILITYPROJECTCAG-23-316DepartmentofLaborandIndustriesCertificateofRegistrationNameonRegistration:KLBConstruction.Inc.RegistrationNumber:(L&fl492.925-00(ContractorLicense#KLBCOI*153B8ExpirationDate:06/04/2025Note:Acopyoftheawarded.certificatewillberequestedaspartofcontractexecutionwhenprojectisDepartmentofLaborandIndustriesCertificateofRegistration?rovdedto3i1dersExchaqeoWA,Inc.ForosageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScsi
CITYOFRENTONPUBLICWORKSDEPARTMENTMonroeAveNEInfiltrationFacilityCAG-23-316SCHEDULEOFPRICESNoteShowpriceperUnitinfiguresonlyFigureswrittentotherightofthedot(decimal)inthepriceperUnitcolumnshallbeinterpretedascentsSEESECTiON1-09.14OFTHESPECIALPROViSIONSFORINFORMATiONONBIDITEMS.IITETECHNICALIITEMWITHUNITPRICEDBIDIAPPROX.IUNITITOTALINO.ISPEC.SECTIONIQUANTiTYIPRICEIAMOUNTBIDSCHEDULEA-COMMONTOSTAGEIANDSTAGE2Al1-04MinorChanges13500OO.$35000000EstPerEatA21-05ContractorSurveying1lQpOO,2.0.000LumpSumPerLumpSumA31-07SPCCPIan(MinimumBidS5000)1c)0,000[LumpSumPetLumpSumTypeBProgressScheduleil0OoO—tO.000.-A41-08(MinimumBid$10,000)LumpSumPerLumpSumA51-09Mobilization1‘.470,000—7Q000.LumpSumPerLumpSumAS1-10ProjectTemporaryTrafficControl1Tc,DOO.z.c,000.LumpSumPerLumpSumRemovalofStructuresand3q70A72-021ObstructionsLumpSumPerLumpSumA82-03Non-InfiltrationMaterialIncIHaul42,300211—I01c100.Cu.YardPerCuYardA92-12Non-WovenGeotextileFabric51,800I4ZILIO.SqYardPerSq.YardAlO4-04CrushedSufacingTopCourse1,400s2_.71,O0.TonPerTonTemporaryConstructionAccess1I40,O00.j110.000.All8-01RoadLumpSumPerLumpSumStormwaterPollutionPreventionA128-011SD0O.c1000.Plan(SWPPP)&ImplementationLumpSumPerLumpSumErosionControlandWater1200,000.—100,000.A138-01PollutionControlLumpSumPerLumpSumA148-01TireWash170,O0.—70O0.-LumpSumPerLumpSumA158-12TemporaryChainLinkFence65(00,3,Cf3ZLinearFootPerLinearFootTemporaryDouble20-FtWide1‘4I00.L-,(00.A168-12ChainLinkGateEachPerEachIProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifySeal
CITYOFRENTONPUBLICWORKSDEPARTMENTMonroeAveNEInfiltrationFacilityCAG-23-316SCHEDULEOFPRICES*NoteShowpriceperunitinfiguresonlyFigureswrittentotherightofthedot(decimal)inthepriceperunitcolumnshallbeinterpretedascentsSEESECTION1-09.14OFTHESPECIALPROVISIONSFORINFORMATIONONBIDITEMS._______________________ITENTECHNICALITEMWiTHUNITPRICEDBIDAPPROX.UNITTOTALNO.ISPEC.SECTIONQUANTITYPRICEAMOUNTSubtotal2O5a.ScheduleA_____________________________10.1%SalesTax_____________________________TotalScheduleA_____________________________ProvidedtoBuildersExchangeofEA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
CITYOFRENTONPUBLICWORKSDEPARTMENTMonroeAveNEInfiltrationFacilityCAG-23-316SCHEDULEOFPRICES*NoteShowpriceperunitinfiguresonlyFigureswrittentotherightofthedot(decimal)inthepriceperunitcolumnshallbeinterpretedascentsSubtotalScheduleB10.1%SalesTaxTotalScheduleBLk7L2ODL,12..3J3(7.SEESECTION1-09.14OFTHESPECIALPROVISIONSFORINFORMPJIONONBIDITEMS.ITEITECHNICALITEMWITHUNITPRICEDBIDAPPROX.UNITTOTALNO.ISPEC.SECTIONQUANTITYPRICEAMOUNTBIDSCHEDULEB-STAGEIBi1-07UtIlityPotholing53CfL40.—EachPerEachB22-01ClearingandGrubbing1—I170LumpSumPerLumpSumB32-03SelectBorrowndHaul35,6001k?,DDTonPerTonB42-03InfiltratIonGravelIncI.Haul841003.000.TonPerTonB58-01HighVisibilityFence11001414(‘•79.—LinearFootPerLinearFootB68-24GravityBlockWall10,000.2.2000.Sq.FootPetSqFootB72-12MIRAFIFW4OiavenGeotextile6,300i7,—SqYardPerSqYard30ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
CITYOFRENTONPUBLICWORKSDEPARTMENTMonroeAveNEInfiltrationFacilityCAG-23-316SCHEDULEOFPRICES*NoteShowpriceperunitinfiguresonlyFigureswrittentotherightofthedot(decimal)inthepriceperunitcolumnshallbeInterpretedascentsSEESECTION1-09.14OFTHESPECIALPROViSIONSFORINFORMATIONONBIDITEMS.IITEFvITECHNICALIITEMWITHUNITPRICEDBIDIAPPROX.IUNITITOTALINO.ISPEC.SECTIONIIQUANTITYIPRICEIAMOUNTBIDSCHEDULEC-STAGE2RecordDrawings(MinimumBidCl1-05$5000)1000.000.LumpSumPerLumpSum1-C22-03UnclassifiedExcavationIncIHaul2,7003,cOO.Cu,YardPerCuYardC32-03GravelBorrowInolHaul74002...LitOO.TonPerTonC42-09GravelBackfillforWalls3900‘tOtL4O0TonPerTonShoringorExtraExcavationClassC52-09A1j1000.1000LumpSumPerLumpSumShoringorExtraExcavationClassC62-0912’,tOO.2,tOO.BLumpSumPerLumpSumC75-04HMACI1/2’PG64-22400I3-100.TonPerTonPolypropyleneStormSewerPipe80tog..bL4O.C87-0424In.DiamLinearFootPerLinearFootPolypropyleneStormSewerPipe560t77,gg12_o•—C97-0436InDiamLinearFootPerUnearFootPlugandAbandonExistingStormClO7-04430O.IL0OOSewerPipesEachPerEachCli7-05ConnectiontoDrainageStructure1i7300.‘17,300.LumpSumPerLumpSumC127-05CatchSasinType2-48In.Diam4t—1.’qD,—tc::I,ccoo.EachPerEachC137-05CatchBasinType2-60InDiam5%l(o0.[.4D0.EachPerEachC147-05CatchBasinType2-72In.Diam10D0,000EachPerEachFlowSplitterVault-10Ft.X10FtC157-051LILt000X8FtLumpSumPerLumpSumInfiltrationChamberManifoldVaultC167-051tOO.-CIOO-27FtX75FtX7FtLumpSumPerLumpSumHydrodynamicSeparatorVault-1Z1,0OO.’1tL,,000.C177-0522FtX14Ft.X12Ft.LumpSumPerLumpSurn4ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
CITYOFRENTONPUBLICWORKSDEPARTMENTMonroeAveNEInfiltrationFacilityCAG-23-316SCHEDULEOFPRICES“NoteShowpriceperunitinfiguresonlyFigureswrittentotherightofthedot(decimal)inthepriceperunitcolumnshallbeinterpretedascentsSEESECTION1-09.14OFTHESPECIALPROVISIONSFORINFORMATIONONBIDITEMS.ITEtTECHNICALITEMWITHUNITPRICEDBIDAPPROX.UNITTOTALNO.SPEC.SECTIONQUANTITYPRICEAMOUNTTreatmentVault-224FtX20FtC187-051]370_000.I‘O,0c0.X10FtLumpSumPerLumpSumC196-03GratedVaultTop1LumpSumPerLimpSumC207-05StormwaterInfiltrationFacility1gpoOOO.qoo,000.LumpSumPerLtmpSumC218-04CementConc.TrafficCurb76030.Z31Ic’O—LinearFootPerUnearFootCementConc.TrafficCurbandC228-04420134,GutterLinearFootPerLinearFootC238-04CementConcRolledCurb185LinearFootPerLinearFootCementConcDrivewayEntranceC248-06Type265i24.23SqYardPerSqYardC258-12BlackVinylChainLinkFence850LinearFootPerLinearFootC268-12ChainLinkFenceW/PrivacySlats65.3,0.LinearFootPerLinearFootDouble20-FtWideChainLinkWIC278-121L)0O.LL0.PrivacySlatsGateEachPerEachC288-14CementConc.Sidewalk35([2_.—j2_O.—Sq.YardPerSq.YardC298-20AdjustUtilityBoxCover(7.j‘.—“Z,gi.—EachPerEachC308-20IlluminationSystem1-%00D.i41OD0.LumpSumPerLumpSumC318-26SwingGate113eOQ13.100-EachPerEachSubtotalScheduleCQ131-I10.1%SalesTaxTotalScheduleCProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
CITYOFRENTONPUBLICWORKSDEPARTMENTMonroeAveNEInfiltrationFacilityCAG-23-316SCHEDULEOFPRICES*NoteShowpricepetunitiflfiguresonlyFigureswrittentotherightofthedot(decimal)inthepriceperunitcolumnshallbeinterpretedascentsSEESECTION1-09.14OFTHESPECIALPROViSIONSFORINFORMATIONONBIDITEMS.ITETECHNICALITEMWITHUNITPRICEDBIDAPPROX.UNITTOTALNO.SPEC.SECTIONQUANTITYPRICEAMOUNTBIDSCHEDULED-LANDSCAPINGDl8-02PSIPECalocerdrusdecurrens/cCahforniaIncenseCedar,6’HTIEachPerEachD28-02PSIPECistuscorbariensis/White750—,coo.—Rockrose,2Gal.EachPerEachPSIPEJuniperuschinensisD38-02‘Torulosa’/HollywoodJuniper,5360.‘.2I1-—GalEachPerEachPSIPEJuniperuscommunisD48-02‘Compressa’IPyramidalCommon1450-LOC)Juniper,2GalEachPerEachD5802PSIPEJuniperushorizontalisBlue32toChip/BlueChipJuniper,2Gal215EachPerEachPSIPEJunlperussabinaD68-02‘Tamarlssoifolia’/TamarixJuniper,305jqO2Gal.EachPerEachPSIPEJunipetusscopulorum.—078-02‘GrayGleam’/GrayGleam145(DO,b.2Juniper5Gal.EachPerEachD88-02TopsoilTypeA-18In.Depth11,250.—SqYardPerSqYardDO8-02TopsoilTypeA-36InDepth3,700ILL100SqYardPerSqYardD108-02Hydroseed-PlayFieldSeedMix11,500j2-0.j2_5.SqYardPerSq.Yard0118-02LandscapeMulch4,035(2.—li_Lit0.sq.YardPerSqYardDl28-02RootBarrier575—t0350.LinearFootPerLinearFootD138-023-ManLandscapeBoulders150153.EachPerEachD148-024-ManLandscapeBoulders120ZA1.Q40,—EachPerEachSubtotalScheduleD10.1%SalesTaxTotalSchedule0;]\3b.fjProvidedtoBuildersExchar.geofWA,Inc.ForusageConditionsAgreernenseewww.bxwa.com—AlwaysVerifyScal
CITYOFRENTONPUBLICWORKSDEPARTMENTMonroeAveNEInfiltrationFacilityCAG-23-316SCHEDULEOFPRICES*NoteShowpriceperunitinfiguresonlyFigureswtittentotherightofthedot(decimal)inthepriceperunitcolumnshallbeinterpretedascentsSEESECTION1-09.14OFTHESPECIALPROVISIONSFORINFORMATIONONBIDITEMS._______________________ITEtTECHNICALITEMWITHUNITPRICEDBIDJAPPROX.UNITTOTALNO.ISPEC.SECTIONIQUANTITYPRICEAMOUNTTotalScheduleA_____________________________II23k’.TotalScheduleB_____________________________w-.TotalScheduleC______________________________TotalScheduleDL37iBIDTOTAL(TotalSchedulesA,B,C,and0)ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
ThisformmustbesubmittedwiththeBidProposal.CertificationofCompliancewithWagePaymentStatutesThebidderherebycertifiesthat,withinthethree-yearperiodimmediatelyprecedingthebidsolicitationdate,thebidderisnota“willful”violator,asdefinedinRCW49.48.082,ofanyprovisionofchapters49.46,49.48,or49.52RCW,asdeterminedbyafinalandbindingcitationandnoticeofassessmentissuedbytheDepartmentofLaborandlndustriesorthroughaciviljudgmententeredbyacourtoflimitedorgeneraljurisdiction.IcertifyunderpenaltyofperjuryunderthelawsoftheStateofWashingtonthattheforegoingistrueandcorrect.—KLBConstruction,Inc.Bidder’messName—SignatureofAuthorizedOfflcIal*CoreyI.ChristensenPrintedNameTreasurer!AssistantSecretaryTitle10/20/2023DateLynnwoodCityWAStateCheckOne:SoleProprietorshipPartnershipJointVentureCorporationLLCEStateofIncorporation,orifnotacorporation,Statewherebusinessentitywasformed:WashingtonStateIfaco-partnership,givefirmnameunderwhichbusinessistransacted:NAacorporation,proposalmustbeexecutedinthecorporatenamebythepresidentorvice-president(oranyothercorporateofficeraccompaniedbyevidenceofauthoritytosign).Ifaco-partnership,proposalmustbeexecutedbyapartner.Templateupdated2-12-19ProvidedtoBui1derExLhenqeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
MONROEAVENEINFILTRATIONFACILITYPROJECTCAG-23-316SUBCONTRACTORLISTInaccordancewithRCW39.30-060:Forallpublicworkscontractsexceeding$1,000,000thebiddershallsubmitthenamesofthesubcontractorswithwhomthebidder,ifawardedthecontract,willsubcontractforthefollowingwork:•Allheating,ventilationandairconditioning,andplumbingsubcontractorsasdescribedinchapter18.106RCW,andelectricalsubcontractorsasdescribedinchapter19.28RCW(thisalsoincludesthecontrolsystemintegratorsubcontractoraswellasotherelectricalsubcontractors)shallbesubmittedaspartofthebid.•Allstructuralsteelinstallationandrebarinstallationsubcontractorsshallbesubmittedaspartofthebid.Iftheworkdoesnotapplytothiscontract,checkthebox“NotApplciable”.Iftheworkwillbeselfperformedbythebidder,checkthebox“SelfPerformed”.IfthesubcontractorsnamesarenotsubmittedwiththebidORiftwoormoresubcontractorsarenamedtoperformthesamework,thebidshallbeconsiderednonresponsiveand,therefore,void.Ifsubcontractorsvarywithbidalternates,pleasecompleteaseparateformindicatingwhichsubcontractorswillbeusedforwhichbidalternate.Completethefollowing:Ifawardedthecontract,KLBConstruction._I_wiIlcontractwiththefollowingsubcontractorsfortheperformanceofheating,ventilationandairconditioning,plumbing,electrical(includingautomaticcontrols)work,structuralsteelinstallation,andrebarinstallation(Ifnosubcontractorswillberequired,stillsubmittheformindicating“notapplicable”foreachdiscipline):Thefollowinglistofsubcontractsisduewiththebid.CategoryofWorkHeating,Ventilation&AirConditioning(HVAC)NotApplicableSubcontractorsNameSelfPerformedAddress_________________________________________________________________________________PhoneNo.ContractorsLicenseNo.CategoryofWorkPlumbing(perRCW18.106)NotApplicableSubcontractorsNameSelfPerformedAddress________________________________________________________________________________PhoneNo.Contractor’sLicenseNo._____________________________________CategoryofWorkElectrical(perRCW19.28)NotApplicableSubcontractorsNamevL4/4.1ILtç,I1M...SelfPerformedAddresspOeDYi3OPiwLk..t%-,J&‘t32-IPhoneNo.i7L13Contractor’sLicenseNo.AMER1ES2LZ/AMRISqL-IMcRevised33I2D2IribProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
Page2CategoryofWorkSubcontractorsNameAddressStructuralSteelandRebarInstallationNotApplicableLiSelfPerformedIXPhoneNo.Contractor’sLicenseNo.“Icertify(ordeclare)underpenaltyofperjuryunderthelawsoftheStateofWashingtonthattheinformationprovidedbybidderinthesubcontractorlistingformistrueandcorrecttothebestofmyknowledgeandbeiSignature:PrintedName:CoreyI.ChristensenDate:10/20/2023Rcvised332021clbProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
Public Works Department
MONROE AVE NE INFILTRATION FACILITY PROJECT
CAG-23-316
Documents to be Submitted After
Notice of Award
CONTRACTBONDTOTHECITYOFRENTONBondNo.9435677KNOWALLMENBYTHESEPRESENTS,Thatwe,(CONTRACTOR/PRINCIPAL)KLBConstruction,inc.of[address]P0Box158,Mukilteo,WA98275asPRINCIPAL,and(SURETY)FidelityandDepositCompanyofMarylandacorporationorganizedandexistingunderthelawsoftheStateofIllinoisasaSURETYcorporation,andqualifiedunderthelawsoftheStateofWashingtontobecomeSURETYuponbondsofcontractorswithmunicipalcorporations,asSURETY,arejointlyandseverallyheldandfirmlyboundtotheCityofRentonThirteenMillionTwoHundredTwentyFiveThousandSixHundredFortySevenand(CITY/OWNER)inthesumof45IlOOthsUSDollars($13,225,647.45)TotalContractAmount,forthepaymentofwhichsumondemandwebindourselvesandourheirs,successors,assigns,executors,administratorsandpersonalrepresentatives,asthecasemaybe.ThisobligationisenteredintopursuanttothelawsoftheStateofWashingtonandtheordinancesoftheCityofRenton.DatedatBellevue,Washington,this15thdayofNovember,2023NOW,THEREFORETHECONDITIONSOFTHEABOVEOBLIGATIONAREASFOLLOWS:WHEREAS,underandpursuanttoContractNo.CAG-23-316providingforconstructionoftheMonroeAveNEInfiltrationFacilityProject;thePRINCIPALhasaccepted,orisabouttoaccept,theContract,andundertaketoperformtheWorkthereinprovidedforinthemannerandwithinthetimesetforth.•TheSURETYindemnifies,defends,andprotectsandholdstheCITY/OWNER,itsofficers,agents,andassignsharmlessfromandagainstallclaims,liabilities,causesofaction,damages,andcostsforsuchpaymentsforlabor,equipment,andmaterialsbysatisfyingallclaimsanddemandsincurredundertheContract,andreimbursingandpayingCITY/OWNERallexpensesthatCITY/OWNERmayincurinmakinggoodanydefaultbyPRINCIPAL;and,againstanyclaimofdirectorindirectlossresultingfromthefailureofthePRINCIPAL,itsheirs,executors,administrators,successors,orassigns,(orthesubcontractorsorlowertiersubcontractorsofthePRINCIPAL)topayalllaborers,mechanics,subcontractors,lowertiersubcontractorsmaterialpersons,andallpersonswhoshallsupplysuchcontractororsubcontractorswithprovisionsandsuppliesforthecarryingonofsuchwork;and,againstanyclaimofdirectorindirectlossresultingfromthefailureofthePRINCIPAL,itsheirs,executors,administrators,successors,orassigns(oranyoftheemployees,subcontractors,orlowertiersubcontractorsofthePRINCIPAL)tofaithfullyperformtheContract.•TheindemnitiestoCITY/OWNERshallalsoinuretothebenefitoftheConsultingEngineersandotherdesignprofessionalsretainedbyOWNERinconnectionwiththeProject.•Nochange,extensionoftime,alteration,oradditiontothetermsoftheContractortotheWorktobeperformedundertheContractshallinanywayaffectSURETY‘sobligationontheContractBond.SURETY,forvaluereceived,herebywaivesnoticeofanychange,extensionoftime,alteration,oradditiontothetermsoftheContractortheWorktobeperformedthereunderandagreesthatmodificationsandchangestothetermsandconditionsoftheContractthatincreasethetotalamounttobepaidthePRINCIPALshallautomaticallyincreasetheobligationoftheSURETYonthisContractBondandnoticetoSURETYisnotrequiredforsuchincreasedobligation.•ThisContractBondshallbegovernedandconstruedbythelawsoftheStateofWashington,andvenueshallbeinKingCounty,Washington.MonroeAveNEInfiltrationFacilityCAG-23-316Page1of2ContractBondtotheCITYofRenton03/08/2022Fclb
FURTHERMORE,thisContractBondshallbesatisfiedandreleasedonlyupontheconditionsthatPRINCIPALorSURETY:•FaithfullyperformsallprovisionsoftheContractandchangesauthorizedbyCITY/OWNERinthemannerandwithinthetimespecifiedasmaybeextendedundertheContract;•Pay,inaccordancewithChapters39.08,39.12and60.28RevisedCodeofWashington(RCW),thesumsdueallworkers,laborers,mechanics,subcontractors,lowertiersubcontractors,materialsuppliers,andallotherpersonsoragentswhosupplylabor,equipment,ormaterialsforcarryingonofsuchworkundertheContract;•Payalltaxes,increasesandpenalties,ifany,incurredonorrelatedtotheContractunderTitles50and51RevisedCodeofWashington(RCW)andanyandalltaxesimposedonthePrincipleunderTitle82RCWoranyotherlaw;•Receivesawrittendischarge/releaseofbondfromCITY,signedbytheMayororbyadulyauthorizedrepresentativeofCITY.ThisContractBondshallbeexecutedintwo(2)originalcounterparts,andshallbesignedbytheparties’dulyauthorizedofficers.ThisContractBondwillonlybeacceptedifisaccompaniedbyafullyexecutedandoriginalpowerofattorneyfortheofficeexecutingonbehalfoftheSURETY.PRINCIPALSURETY11111III,/‘Co,?,‘?,,-)c0ççEJSEAL‘,4‘a1890,..‘s.‘y......I,‘1IiiiNameandaddressoflocalofficeofParker,Smith&FeekAgentand/orSURETYCompany:2233112thAveNEBellevue,WA98004Telephone:(425)709-3600MonroeAveNEInfiltrationFacilityContractBondtotheCITYofRentonCAG-23-31603/08/2022FclbKLBConstruction,Inc.[PRNCIPAL]igatuofAorizedOfficial]keiNLnnPs[PrintedNaMe]FidelityandDepositCompanyofMaryland[SURETY]MióVL[SignatureofAuthorizedOfficial]SusanB.Larson[PrintedName]‘PYcicI..tYI.1—Attorney-in-Fact[Title]if1,o’z3[Date]-[Date][Title]November15,2023Page2of2
ZURICHAMERICANINSURANCECOMPANYCOLONIALAMERICANCASUALTYANDSURETYCOMPANYFIDELITYANDDEPOSITCOMPANYOFMARYLANDPOVEROFATTORNEYKNOWALLMENBYTHESEPRESENTS:ThattheZURICHAMERICANINSURANCECOMPANY,acorporationoftheStateofNewYork,theCOLONIALAMERICANCASUALTYANDSURETYCOMPANY,acorporationoftheStateofIllinois,andtheFIDELITYANDDEPOSITCOMPANYOFMARYLANDacorporationoftheStateofIllinois(hereincollectivelycalledthe‘Companies”),byRobertD.Murray,VicePresident,inpursuanceofauthoritygrantedbyArticleV,Section8,oftheBy-LawsofsaidCompanies,whicharesetforthonthereversesidehereofandareherebycertifiedtobeinfullforceandeffectonthedatehereof,doherebynominate,constitute,andappoint.DeannaM.FRENCH,NicholasFREDRICKSON,SusanB.LARSON,ScottFISHER,JanaM.ROY,DerekD.SABO,JenniferBARRAT,AlecGUMPFER,AndrewKERSLAKE,RonaldJ.LANGE,JohnR.CLAEYS,RogerR.KALTENBACH,GuyP.ARNiIFIELD,CharlaBOADLE,allofBellevue,Washington,itstrueandlawfulagentandAttorney-in-Fact,tomake,execute,sealanddeliver,for,andonitsbehalfassurety,andasitsactanddeed:anyandallbondsandundertakings,andtheexecutionofsuchbondsorundertakingsinpursuanceofthesepresents.shallbeasbindinguponsaidCompanies.asfullyandamply,toallintentsandpurposes,asiftheyhadbeendulyexecutedandacknowledgedbytheregularlyelectedofficersoftheZURICHAMERICANINSURANCECOMPANYatitsofficeinNewYork,NewYork.,theregularlyelectedofficersoftheCOLONIALAMERICANCASUALTYANDSURETYCOMPANYatitsofficeinOwingsMills,Maryland.,andtheregularlyelectedofficersoftheFIDELITYANDDEPOSITCOMPANYOFMARYLANDatitsofficeinOwingsMills,Maryland.,intheirownproperpersons.ThesaidVicePresidentdoesherebycertif’thattheextractsetforthonthereversesidehereofisatruecopyofArticleV,Section8,oftheBy-LawsofsaidCompanies,andisnowinforce.INWITNESSWHEREOF,thesaidVice-Presidenthashereuntosubscribedhis/hernamesandaffixedtheCorporateSealsofthesaidZURICHAMERICANINSURANCECOMPANY,COLONIALAMERICANCASUALTYANDSURETYCOMPANY,andFIDELITYANDDEPOSITCOMPANYOFMARYLAND.this17thdayofJuly,AD.2023.ATTEST:ZURIChAMERICANINSURANCECOMPANYCOLONIALAMERICANCASUALTYANDSURETYCOMPANYFIDELITYANDDEPOSITCOMPANYOFMARYLAND-7By:RobertD.MurrayVicePresidentBy:DawnE.BrownSecretaryStateofMarylandCountyofBaltimoreOnthis17thdayofJuly,AD.2023,beforethesubscriber,aNotaryPublicoftheStateofMaryland,dulycommissionedandqualified,RobertD.Murray,VicePresidentandDawnE.Brown,SecretaryoftheCompanies,tomepersonallyknowntobetheindividualsandofficersdescribedinandwhoexecutedtheprecedinginstrument,andacknowledgedtheexecutionofsame,andbeingbymedulysworn,deposethandsaith,thathe/sheisthesaidofficeroftheCompanyaforesaid,andthatthesealsaffixedtotheprecedinginstrumentaretheCorporateSealsofsaidCompanies,andthatthesaidCorporateSealsandthesignatureassuchofficerweredulyaffixedandsubscribedtothesaidinstrumentbytheauthorityanddirectionofthesaidCorporations.INTESTIMONYWHEREOF,IhavehereuntosetmyhandandaffixedmyOfficialSealthedayandyearfirstabovewritten5,haBetheaSolar,PubiicMvCommssonExprosSepiember30.2023Authenticityofthisbondcanbeconfirmedatbondvalidator.zurichna.comor410-559-8790
EXTRACTFROMBY-LAWSOFTHECOMPANIES‘ArticleV,Section8,Attorneys-in-fact.TheChiefExecutiveOfficer,thePresident,oranyExecutiveVicePresidentorVicePresidentmay,bywritteninstrumentundertheattestedcorporateseal,appointattorneys-in-factwithauthoritytoexecutebonds,policies,recognizances,stipulations,undertakings,orotherlikeinstrumentsonbehalfoftheCompany.andmayauthorizeanyofficeroranysuchattorney-in-facttoaffixthecorporatesealthereto:andmaywithorwithoutcausemodifyofrevokeanysuchappointmentorauthorityatanytime.”CERTIFICATEI,theundersigned,VicePresidentoftheZURICHAMERICANINSURANCECOMPANY,theCOLONIALAMERICANCASUALTYANDSURETYCOMPANY,andtheFIDELITYANDDEPOSITCOMPANYOFMARYLAND,doherebycertifythattheforegoingPowerofAttorneyisstillinfullforceandeffectonthedateofthiscertificate;andIdofurthercertifythatArticleV,Section8,oftheBy-LawsoftheCompaniesisstillinforce.ThisPowerofAttorneyandCertificatemaybesignedbyfacsimileunderandbyauthorityofthefollowingresolutionoftheBoardofDirectorsoftheZURICHAMERICANINSURANCECOMPANYatameetingdulycalledandheldonthe15thdayofDecember1998.RESOLVED:“ThatthesignatureofthePresidentoraVicePresidentandtheattestingsignatureofaSecretaryoranAssistantSecretaryandtheSealoftheCompanymaybeaffixedbyfacsimileonanyPowerofAttorney...AnysuchPoweroranycertificatethereofbearingsuchfacsimilesignatureandsealshallbevalidandbindingontheCompany.”ThisPowerofAttorneyandCertificatemaybesignedbyfacsimileunderandbyauthorityofthefollowingresolutionoftheBoardofDirectorsoftheCOLONIALAMERICANCASUALTYANDSURETYCOMPANYatameetingdulycalledandheldonthe5thdayofMay,1994,andthefollowingresolutionoftheBoardofDirectorsoftheFIDELITYANDDEPOSITCOMPANYOFMARYLANDatameetingdulycalledandheldonthe10thdayofMay,1990.RESOLVED:“ThatthefacsimileormechanicallyreproducedsealofthecompanyandfacsimileormechanicallyreproducedsignatureofanyVice-President,Secretary,orAssistantSecretaryoftheCompany,whethermadeheretoforeorhereafter,whereverappearinguponacertifiedcopyofanypowerofattorneyissuedbytheCompany,shallbevalidandbindingupontheCompanywiththesameforceandeffectasthoughmanuallyaffixed.INTESTIMONYWHEREOF,IhavehereuntosubscribedmynameandaffixedthecorporatesealsofthesaidCompanies,this15thdayofNovember,2023.By:MaryJeanPethickVicePresidentTOREPORTACLAIMWITHREGARDTOASURETYBOND,PLEASESUBMITACOMPLETEDESCRIPTIONOfTHECLAIMINCLUDINGTHEPRINCIPALONTHEBOND,THEBONDNUMBER,ANDYOURCONTACTINFORMATIONTO:ZurichSuretyClaims1299ZurichWaySchaumburg,IL60196-1056reportsfclaims@zurichna.com800-626-4577Th9/W&±LAuthenticityofthisbondcanbeconfirmedatbondvalidator.zurichna.comor410-559-8790
enton @
CITY OF
ClW OF RENTON
FA!R PRACTICES POLICY
AFFIDAVIT OF COMPTIANCE
KLB Construction Inc.hereby confirms and declares that:
(Name of contractor/subcontractor/consu ltant)
l. lt is the policy of the above-named contractor/subcontractor/consultant, to offer equal
opportunity to all qualified employees and applicants for employment without regard to their
race; religion/creed; national origin; ancestry; sex; the presence of a physical, sensory, or mental
disability; age over 40; sexual orientation or gender identity; pregnancy; HIV/AIDS and Hepatitis C
status; use of a guide dog/service animal; marital status; parental/family status; military status;
or veteran's status.
ll. The above-named contractor/subcontractor/consultant complies with all applicable federal,
state and local laws governing non-discrimination in employment.
When applicable, the above-named contractor/subcontractor/consultant will seek out and
negotiate with minority and women contractors for the award of subcontracts.
("\[. L^nflosA
Pri nt AgEht/RLpr"r"ntrtive's N a me
?*.*. A.^k
Print s Title
Age rese ive's Signature
r,\ r(L'
Date Signed
lnstructions: This document MUST be completed by each contractor, subcontractor, consultant and/or
supplier. lnclude or attach this document(s)with the contract.
AGREEMENT
Armando Pavone
Mayor
CONTRACT NO. CAG-23-316
THIS AGREEMENT, made and entered into this 5th day of December, 2023 by and between the CITY OF RENTON,
Washington, a municipal corporation of the State of Washington, hereinafter referred to as "City" and KLB
Construction, Inc, hereinafter referred to as "Contractor."
Now, therefore the parties agree as follows:
1.Agreement. This agreement incorporates the following documents as if fully set forth herein: the 2023 Standard
Specifications for Road, Bridge, and Municipal Construction, as prepared by the Washington State Department of
Transportation and the Washington State Chapter of the American Public Works Association, including all published
amendments issued by those organizations ("Standard Specifications"); the City's Contract Bid Documents for the
Project, including but not limited to Addenda, Proposal Form, Special Provisions, Contract Plans, and Amendments
to the Standard Specifications; Contractor's Proposal and all documents submitted therewith in response to the
City's Call for Bids Documents; and any additional documents referenced as comprising the Contract and Contract
Documents in Section 1-04.2 of the Standard Specifications, as revised by the Amendments and Special Provisions
included with the City's Call for Bids and Contract Documents.
2.Project. Contractor shall complete all work and furnish all labor, tools, materials, and equipment for the project
entitled Monroe Ave NE Infiltration Facility Project, CAG-23-316, including all changes to the Work and force account
work, in accordance with the Contract Documents, as described in Section 1-04.2 of the Special Provisions.
3.Payments. City shall pay Contractor at the unit and lump sum prices, and by force account as specified in the
Proposal according to the Contract Documents as to time, manner, and condition of payment in a contract amount
not to exceed $ 13,225,647.45 . unless modified by an approved change order or addendum. The payments to
Contractor include the costs for all labor, tools, materials and equipment for the Work.
4.Completion Date. Contract time shall commence upon City's Notice to Proceed to Contractor. The Work under this
Agreement shall be completed within the time specified in the Contract Bid Documents. If the Physical Work under
this Agreement is not completed within the time specified, Contractor shall pay liquidated damages and all
engineering inspection and supervision costs to City as specified in the Contract Bid Documents.
5.Attorney's Fees. In the event litigation is commenced to enforce this Agreement, the prevailing party shall be
entitled to recover its costs, including reasonable attorney's and expert witness fees.
6.Disclaimer. No liability of Contractor shall attach to City by reason of entering into this Agreement, except as
expressly provided in this Agreement.
7.Counterparts. This Agreement is executed in two (2) identical counterparts, by the parties, each of which shall for
all purposes be deemed an original.
CAG-23-316
IN WITNESS WHEREOF, the City has caused these presents to be signed by its Mayor and attested by its City Clerk and
the Contractor has hereunto set his hand and seal the day and year first above-written.
CONTRACTOR: CITY OF RENTON:
Armondo Pavone, Mayor
ATTEST
Jason Seth, City Clerk
FIRM INFORMATION
d/b/a KLB Construction, Inc
CHECK ONE: □Limited Liability Company □Partnership � Corporation
STATE OF INCORPORATION: Washington ----------------------------------
CONTRACTOR CONTACT INFORMATION:
KLB Construction, Inc
PO Box 158 Mukilteo
Mukilteo, WA 98275
(425)754-4820
jamesp@klbconstruction.com
Attention:
CITY CONTACT INFORMATION:
City of Renton
1055 South Grady Way
Renton, WA 98057
425-430-7293
jmcdonald@rentonwa.gov
If business is a CORPORATION, the name of the corporation should be listed in full and both the President and Secretary must sign the
contract. OR, if one signature is permitted by corporation by-laws, a copy of the by-laws shall be furnished to the City and made a
part of the contract document.
If the business is a PARTNERSHIP, the full name of each partner should be listed followed by d/b/a (doing business as) and firm or
trade name. Any one partner may sign the contract.
If the business is an limited Liability Company, an authorized managing member or manager must sign followed by his/her title.
Monroe Ave NE Infiltration Facility Project
ContractTemplate Updated 12/29/2017
CAG-23-316
October 2023
12/5/2023
CIW OF RENTON
Monroe Ave NE Infiltration Facility Project
cAG-23-316
RETAINAGE SELECTION
Per Standard Specifications Section 1-09.9(1) Retainage, and RCW 60.28, a sum of S-percent of the
monies earned by the Contractor will be retained from progress estimates. The retainage will be
used as a trust fund for the protection and payment of (1) the State with respect to taxes, and (2) the
claims of any person arising under the Contract.
Retainage shall be placed in a fund held by the City (non-interest bearing), unless the Contractor
selects a one of the options listed below and completes all arrangements needed for that option to
the satisfaction of the City.
Other retainage fund options
_ L. Deposited by the City in an escrow account (interest bearing) in a bank, mutual savings bank, or
savings and loan association. Deposits will be in the name of the Contractor and bank; and are
not allowed to be withdrawn without the City's written authorization, or
X 2. The City, at its' option, may accept a bond from the Contractor in lieu of retainage
lf the Contractor selects option 1 or 2 it is fully responsible for selecting the bank or association to be
used, and for making all arrangements and paying all costs associated with that option.
All arrangements and forms needed for option 1 or 2 shall be submitted to the City for review and
a pprova l.
Release of the Retainage will be made 50 days following the Completion Date provided the
conditions in Special Provisions Section 1-09.9(1), and applicable State Regulations, are met
SIGNED
pRtNT NAME. Kelly
COMP KLB Construction lnc.
DATE 1.1./ls12023
KNOWALLMENBYTHESEPRESENTS,thatKLBConstruction,Inc.RETAINAGEBONDBondNo.9435676asPrincipalauthorizedtodobusinessintheStateofWashingtonandFidelityandDenositComoanyofMarylandasSurety,acorporationorganizedandexistingunderthelawsoftheStateofIllinoisandauthorizedtotransactbusinessintheStateofWashingtonasSurety,arejointlyandseverallyheldandbounduntoCityofRentonasObligeeinthepenalsumofSixHundredSixty-oneThousandTwoHundredEighty-two&37/100Dollars($661,282.37),whichis5%ofthePrincipal’sbid.WHEREAS,onthedayof-,thesaidPrincipal,herein,executedacontractwiththeObligee,forContractNo.CAG-23-316MonroeAveNEInfiltrationFacilityProjectWHEREAS,saidcontractandRCW60.28requiretheObligeetowithholdfromthePrincipalthesumof5%frommoniesearnedonestimatesduringtheprogressoftheconstruction,hereinafterreferredtoasearnedretainedfunds.ANDNOWWHEREAS,PrincipalhasrequestedthattheObligeenotretainanyearnedretainedfundsasallowedunderRCW60.28.NOW,THEREFORE,theconditionofthisobligationissuchthatthePrincipalandSuretyareheldandbounduntothebeneficiariesofthetrustfundcreatedbyRCW60.28inthepenalsumof5%ofthefinalcontractcostwhichshallincludeanyincreasesduetochangeorders,increasesinquantitiesofworkortheadditionofanynewitemofwork.IfthePrincipalshallusetheearnedretainedfunds,whichwillnotberetained,forthetrustfundpurposesofRCW60.28,thenthisobligationshallbenullandvoid;otherwise,itshallremaininfullforceandeffect.ThisbondandanyproceedstherefromshallbemadesubjecttoallclaimsandliensandinthesamemannerandpriorityassetforthforretainedpercentagesinRCW60.28.PROVIDEDHOWEVER,that:1.TheliabilityoftheSuretyunderthisbondshallnotexceed5%ofthetotalamountearnedbythePrincipalifnomoniesareretainedbytheObligeeonestimatesduringtheprogressofconstruction.2.Anysuitunderthisbondmustbeinstitutedwithinthetimeperiodprovidedbyapplicablelaw.WITNESSourhandsthis15thdayofNovember,2023KLBConstruction,Inp.FidelityandDepositCompanyofMaryland\--LLzia,-2IAttorney-in-FactSusanB,LarsonParker,Smith&Feek2233112thAveNE,Bellevue,WA98004Princ4SuretyNameandAddressofLocalAgent
ZURICHAMERICANINSURANCECOMPANYCOLONIAL.AMERICANCASUALTYANDSURETYCOMPANYFIDELITYANDDEPOSITCOMPANYOFMARYLANDPOWEROFATTORNEYKNOWALLMENBYTHESEPRESENTS:ThattheZURICFIAMERICANINSURANCECOMPANY,acorporationoftheStateofNewYork,theCOLONIALAMERICANCASUALTYANDSURETYCOMPANY,acorporationoftheStateofIllinois,andtheFIDELITYANDDEPOSITCOMPANYOFMARYLANDacorporationoftheStateofIllinois(hereincollectivelycalledthe“Companies”).byRobertD.Murray,VicePresident,inpursuanceofauthoritygrantedbyArticleV,Section8,oftheBy-LawsofsaidCompanies,whicharesetforthonthereversesidehereofandareherebycertifiedtobeinfullforceandeffectonthedatehereof,doherebynominate,constitute,andappoint.DeannaM.FRENCH,NicholasFREDRICKSON,SusanB.LARSON,ScottFISHER,JanaNil.ROY,DerekD.SABO,JenniferBARRAT,AlecGUMPFER,AndrewKERSLAKE,RonaldJ.LANGE,JohnR.CLAEYS,RogerR.KALTENBACH,GuyP.ARMFIELD,CharlaBOADLE,allofBellevue,Washington,itstrueandlawfulagentandAttorney-in-Fact,tomake,execute,sealanddeliver,for,andonitsbehalfassurety,andasitsactanddeed:anyandallbondsandundertakings,andtheexecutionofsuchbondsorundertakingsinpursuanceofthesepresents,shallbeasbindinguponsaidCompanies,asfullyandamply,toallintentsandpurposes,asiftheyhadbeendulyexecutedandacknowledgedbytheregularlyelectedofficersoftheZURICI-IAMERICANINSURANCECOMPANYatitsofficeinNewYork,NewYork.,theregularlyelectedofficersoftheCOLONIALAMERICANCASUALTYANDSURETYCOMPANYatitsofficeinOwingsMills,Maryland.,andtheregularlyelectedofficersoftheFIDELITYANDDEPOSITCOMPANYOFMARYLANDatitsofficeinOwingsMills,Maryland.,intheirownproperpersons.ThesaidVicePresidentdoesherebycertifythattheextractsetforthonthereversesidehereofisatruecopyofArticleV,Section8,oftheBy-LawsofsaidCompanies,andisnowinforce.INWITNESSWHEREOF,thesaidVice-Presidenthashereuntosubscribedhis/hernamesandaffixedtheCorporateSealsofthesaidZURICI-IAMERICANINSURANCECOMPANY,COLONIALAMERICANCASUALTYANDSURETYCOMPANY,andFIDELITYANDDEPOSITCOMPANYOFMARYLAND,this17thdayofJuly,AD.2023.ATTEST:ZURICIIAMERICANINSURANCECOMPANYCOLONIALAMERICANCASUALTYANDSURETYCOMPANYFIDELITYANDDEPOSITCOMPANYOFMARYLANDBy:RobertD.MurrayVicePresidentBy:DawnE.BrownSecretaryStateofMarylandCountyofBaltimoreOnthis17thdayofJuly.AD.2023,beforethesubscriber,aNotaryPublicoftheStateofMaryland,dulycommissionedandqualified,RobertD.Murray,VicePresidentandDawnE.Brown,SecretaryoftheCompanies,tomepersonallyknowntobetheindividualsandofficersdescribedinandwhoexecutedtheprecedinginstrument,andacknowledgedtheexecutionofsame,andbeingbymedulysworn,deposethandsaith,thathe/sheisthesaidofficeroftheCompanyaforesaid,andthatthesealsaffixedtotheprecedinginstrumentaretheCorporateSealsofsaidCompanies,andthatthesaidCorporateSealsandthesignatureassuchofficerweredulyaffixedandsubscribedtothesaidinstrumentbytheauthorityanddirectionofthesaidCorporationsINTESTIMONYWHEREOF,IhavehereuntosetmyhandandaffixedmyOfficialSealthedayandyearfirstabovewritten.isaBathesNoiaPubiicMyCamm,ssenExpiresSepiember30.2023Authenticityofthisbondcanbeconfirmedatbondvalidator.zurichna.comor410-559-8790
EXTRACTFROMBY-LAWSOFTHECOMPANIES‘ArticleV,Section8,Attorneys-in-Fact.TheChiefExecutiveOfficer,thePresident,oranyExecutiveVicePresidentorVicePresidentmay,bywritteninstrumentundertheattestedcorporateseal,appointattorneys-in-factwithauthoritytoexecutebonds,policies,recognizances,stipulations,undertakings,orotherlikeinstrumentsonbehalfoftheCompany,andmayauthorizeanyofficeroranysuchattorney-in-facttoaffixthecorporatesealthereto;andmaywithorwithoutcausemodifyofrevokeanysuchappointmentorauthorityatanytime.”CERTIFICATEI,theundersigned,VicePresidentoftheZURICHAMERICANINSURANCECOMPANY,theCOLONIALAMERICANCASUALTYANDSURETYCOMPANY,andtheFIDELITYANDDEPOSITCOMPANYOFMARYLAND,doherebycertifythattheforegoingPowerofAttorneyisstillinfullforceandeffectonthedateofthiscertificate;andIdofurthercerti1’thatArticleV,Section8,oftheBy-LawsoftheCompaniesisstillinforce.ThisPowerofAttorneyandCertificatemaybesignedbyfacsimileunderandbyauthorityofthefollowingresolutionoftheBoardofDirectorsoftheZURICHAMERICANINSURANCECOMPANYatameetingdulycalledandheldonthe15thdayofDecember1998.RESOLVED:“ThatthesignatureofthePresidentoraVicePresidentandtheattestingsignatureofaSecretaryoranAssistantSecretaryandtheSealoftheCompanymaybeaffixedbyfacsimileonanyPowerofAttorney...AnysuchPoweroranycertificatethereofbearingsuchfacsimilesignatureandsealshallbevalidandbindingontheCompany.”ThisPowerofAttorneyandCertificatemaybesignedbyfacsimileunderandbyauthorityofthefollowingresolutionoftheBoardofDirectorsoftheCOLONIALAMERICANCASUALTYANDSURETYCOMPANYatameetingdulycalledandheldonthe5thdayofMay,1994,andthefollongresolutionoftheBoardofDirectorsoftheFIDELITYANDDEPOSITCOMPANYOFMARYLANDatameetingdulycalledandheldonthe10thdayofMay.1990.RESOLVED:“ThatthefacsimileormechanicallyreproducedsealofthecompanyandfacsimileormechanicallyreproducedsignatureofanyVice-President.Secretary,orAssistantSecretaryoftheCompany,whethermadeheretoforeorhereafter,whereverappearinguponacertifiedcopyofanypowerofattorneyissuedbytheCompany,shallbevalidandbindingupontheCompanywiththesameforceandeftectasthoughmanuallyaffixed.INTESTIMONYWHEREOF.IhavehereuntosubscribedmynameandaffixedthecorporatesealsofthesaidCompanies,this15thdayofNovember,2023.By:MaryJeanPethickVicePresidentTOREPORTACLAIMWITHREGARDTOASURETYBOND,PLEASESUBMITACOMPLETEDESCRIPTIONOFTHECLAIMINCLUDINGTHEPRINCIPALONTHEBOND,THEBONDNUMBER,ANDYOURCONTACTINFORMATIONTO:ZurichSuretyClaims1299ZurichWaySchaumburg,IL60196-1056reportsfclaimszurichna.com800-626-4577-}49kcLAuthenticityofthisbondcanbeconfirmedatbondvalidator.zurichna.comor410-559-8790
Insurance Guidelines for the City of Renton
The City of Renton requires current insurance certificates for one or
more of the following lines of coverage and minimum insurance limits:
Revised 6/8/23
•$1,000,000 per occurrence and $2,000,000 aggregate for Commercial General Liability
(CGL) or Special Event coverage. Limits may be increased for higher than usual or special
liability exposures.
•$1,000,000 combined single limit for Auto Liability. Required if a commercial vehicle will
be used in performance of work or delivery of products, beyond normal commutes.
•Proof of Workers’ Compensation coverage, as required by the State of Washington
(provide the Washington L&I or excess coverage policy number).
•Excess Liability or Umbrella. Required only if needed to reach minimum CGL or auto
liability coverage limits.
•$1,000,000 Professional Liability. Required if professional services (e.g. architect,
engineering, surveying, legal, or medical) are being provided to the city and if those
professional services are excluded from the CGL policy.
•$1,000,000 Pollution Liability. Required if work involves a pollution risk to the
environment.
•$2,000,000 Cyber Liability Insurance. Required for information technology professional
services agreements. Limits may be higher for special liability exposures.
•Builders Risk. May be required up to the amount of the completed value of a new
building or major construction project.
•$1,000,000 per occurrence Aircraft Liability (Single Limit Bodily Injury and Property
Damage Liability). Required coverage only for aircraft tie-down leases.
Additional requirements unique to the City of Renton:
•Name the City of Renton as a certificate holder and a Primary and Non-Contributory
Additional Insured on the policy.
This requirement applies to Commercial General, Auto Liability, Excess/ Umbrella, Special
Event, and Aircraft Liability policies; it does not apply to Professional Liability, Workers’
Compensation, nor Cyber Insurance.
•The Certificate Holder should read:
•The City shall be provided with written notice of any policy cancellation within a
minimum of two business days of receipt of such notice by the policy holder.
•The city does not represent that the minimum required insurance coverage or limits are
adequate to protect the vendor/contractor/consultant from all liabilities.
•Insurance certificate requirements and minimum limits can only be waived or modified
with Risk Manager approval.
Direct any questions, comments, or concerns to: Krista Kolaz, Risk Management
425-430-7669
kkolaz@rentonwa.gov
City of Renton
ATTN: [your City contact’s name & department]
1055 South Grady Way
Renton, WA 98057
SHOULD ANY OF THE ABOVE DESCRIBED POLICIES BE CANCELLED BEFORE
THE EXPIRATION DATE THEREOF, NOTICE WILL BE DELIVERED IN
ACCORDANCE WITH THE POLICY PROVISIONS.
INSURER(S) AFFORDING COVERAGE
INSURER F :
INSURER E :
INSURER D :
INSURER C :
INSURER B :
INSURER A :
NAIC #
NAME:
CONTACT
(A/C, No):
FAX
E-MAIL
ADDRESS:
PRODUCER
(A/C, No, Ext):
PHONE
INSURED
REVISION NUMBER:CERTIFICATE NUMBER:COVERAGES
IMPORTANT: If the certificate holder is an ADDITIONAL INSURED, the policy(ies) must have ADDITIONAL INSURED provisions or be endorsed.
If SUBROGATION IS WAIVED, subject to the terms and conditions of the policy, certain policies may require an endorsement. A statement on
this certificate does not confer rights to the certificate holder in lieu of such endorsement(s).
THIS CERTIFICATE IS ISSUED AS A MATTER OF INFORMATION ONLY AND CONFERS NO RIGHTS UPON THE CERTIFICATE HOLDER. THIS
CERTIFICATE DOES NOT AFFIRMATIVELY OR NEGATIVELY AMEND, EXTEND OR ALTER THE COVERAGE AFFORDED BY THE POLICIES
BELOW. THIS CERTIFICATE OF INSURANCE DOES NOT CONSTITUTE A CONTRACT BETWEEN THE ISSUING INSURER(S), AUTHORIZED
REPRESENTATIVE OR PRODUCER, AND THE CERTIFICATE HOLDER.
OTHER:
(Per accident)
(Ea accident)
$
$
N / A
SUBR
WVD
ADDL
INSD
THIS IS TO CERTIFY THAT THE POLICIES OF INSURANCE LISTED BELOW HAVE BEEN ISSUED TO THE INSURED NAMED ABOVE FOR THE POLICY PERIOD
INDICATED. NOTWITHSTANDING ANY REQUIREMENT, TERM OR CONDITION OF ANY CONTRACT OR OTHER DOCUMENT WITH RESPECT TO WHICH THIS
CERTIFICATE MAY BE ISSUED OR MAY PERTAIN, THE INSURANCE AFFORDED BY THE POLICIES DESCRIBED HEREIN IS SUBJECT TO ALL THE TERMS,
EXCLUSIONS AND CONDITIONS OF SUCH POLICIES. LIMITS SHOWN MAY HAVE BEEN REDUCED BY PAID CLAIMS.
$
$
$
$PROPERTY DAMAGE
BODILY INJURY (Per accident)
BODILY INJURY (Per person)
COMBINED SINGLE LIMIT
AUTOS ONLY
AUTOSAUTOS ONLY
NON-OWNED
SCHEDULEDOWNED
ANY AUTO
AUTOMOBILE LIABILITY
Y / N
WORKERS COMPENSATION
AND EMPLOYERS' LIABILITY
OFFICER/MEMBER EXCLUDED?
(Mandatory in NH)
DESCRIPTION OF OPERATIONS below
If yes, describe under
ANY PROPRIETOR/PARTNER/EXECUTIVE
$
$
$
E.L. DISEASE - POLICY LIMIT
E.L. DISEASE - EA EMPLOYEE
E.L. EACH ACCIDENT
ER
OTH-
STATUTE
PER
LIMITS(MM/DD/YYYY)
POLICY EXP
(MM/DD/YYYY)
POLICY EFF
POLICY NUMBERTYPE OF INSURANCELTR
INSR
DESCRIPTION OF OPERATIONS / LOCATIONS / VEHICLES (ACORD 101, Additional Remarks Schedule, may be attached if more space is required)
EXCESS LIAB
UMBRELLA LIAB $EACH OCCURRENCE
$AGGREGATE
$
OCCUR
CLAIMS-MADE
DED RETENTION $
$PRODUCTS - COMP/OP AGG
$GENERAL AGGREGATE
$PERSONAL & ADV INJURY
$MED EXP (Any one person)
$EACH OCCURRENCE
DAMAGE TO RENTED
$PREMISES (Ea occurrence)
COMMERCIAL GENERAL LIABILITY
CLAIMS-MADE OCCUR
GEN'L AGGREGATE LIMIT APPLIES PER:
POLICY PRO-
JECT LOC
CERTIFICATE OF LIABILITY INSURANCE DATE (MM/DD/YYYY)
CANCELLATION
AUTHORIZED REPRESENTATIVE
ACORD 25 (2016/03)
© 1988-2015 ACORD CORPORATION. All rights reserved.
CERTIFICATE HOLDER
The ACORD name and logo are registered marks of ACORD
HIRED
AUTOS ONLY
100,000
1,000,000
70065738
70065738
KLB Construction, Inc.
1,000,000
Seattle, WA 98101
X
Mukilteo, WA 98275
X
2,000,000
AssuredPartners of Wash. Ins. Agency, LLC CA Lic 0K61066
AssuredPartners of Washington, LLC
X
X
25,000,000
A
06/01/24
11/15/2023
USA
X
06/01/23
206-343-2323
BERKLEY NATL INS CO
ALLIED WORLD NATL ASSUR CO
5,000
AMERICAN ALT INS CORP
AMERICAN FAMILY HOME INS CO
1,000,000
X
1325 Fourth Avenue, Suite 2100
X
06/01/24
ATTN: Jared McDonald
MKC11100038
City of Renton
03123586
93A2FF1000009
10,000 PD Deductible
06/01/23
A
X
X
X
38911
10690
Renton, WA 98057
19720
23450
1,000,000
Maria Moss
06/01/24
06/01/24
06/01/24
06/01/23
06/01/23
06/01/23
06/01/24
X
P.O. Box 158
D
C
B
88A5GL0000998
X
1,000,000
WA#877030 1-206-343-2323
X
Coll $2,500 Comp $2,500
X
88A5CA0000819
88A5GL0000998 STOP GAP
2,000,000
X
B
1,000,000
25,000,000
erindodson
This insurance is primary and non-contributory.
The Certificate holder is additional insured per the attached:
1055 South Grady Way
X
06/01/23
maria.moss@assuredpartners.com
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
COMMERCIAL GENERAL LIABILITY
CG 20 10 12 19
POLICY NUMBER:
© Insurance Services Office, Inc., 2018 Page of CG 20 10 12 19
ADDITIONAL INSURED – OWNERS, LESSEES OR
CONTRACTORS – SCHEDULED PERSON OR
ORGANIZATION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
SCHEDULE
A. Section II – Who Is An Insured is amended to
include as an additional insured the person(s) or
organization(s) shown in the Schedule, but only
with respect to liability for "bodily injury", "property
damage" or "personal and advertising injury"
caused, in whole or in part, by:
1.Your acts or omissions; or
2.The acts or omissions of those acting on your
behalf;
in the performance of your ongoing operations for
the additional insured(s) at the location(s)
designated above.
However:
1.The insurance afforded to such additional
insured only applies to the extent permitted by
law; and
2.If coverage provided to the additional insured is
required by a contract or agreement, the
insurance afforded to such additional insured
will not be broader than that which you are
required by the contract or agreement to
provide for such additional insured.
B.With respect to the insurance afforded to these
additional insureds, the following additional
exclusions apply:
This insurance does not apply to "bodily injury" or
"property damage" occurring after:
1.All work, including materials, parts or
equipment furnished in connection with such
work, on the project (other than service,
maintenance or repairs) to be performed by or
on behalf of the additional insured(s) at the
location of the covered operations has been
completed; or
2.That portion of "your work" out of which the
injury or damage arises has been put to its
intended use by any person or organization
other than another contractor or subcontractor
engaged in performing operations for a
principal as a part of the same project.
Location(s) Of Covered Operations
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
Name Of Additional Insured Person(s)
Or Organization(s)
Where required by written contract when
no specific form or edition date is
specified.
88A2GL0002298
1 2
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
COMMERCIAL GENERAL LIABILITY
CG 20 37 12 19
POLICY NUMBER:
© Insurance Services Office, Inc., 2018 Page of CG 20 37 12 19
ADDITIONAL INSURED – OWNERS, LESSEES ORCONTRACTORS – COMPLETED OPERATIONS
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
SCHEDULE
A. Section II – Who Is An Insured is amended to
include as an additional insured the person(s) or
organization(s) shown in the Schedule, but only
with respect to liability for "bodily injury" or
"property damage" caused, in whole or in part, by
"your work" at the location designated and
described in the Schedule of this endorsement
performed for that additional insured and included
in the "products-completed operations hazard".
However:
1.The insurance afforded to such additional
insured only applies to the extent permitted by
law; and
2.If coverage provided to the additional insured is
required by a contract or agreement, the
insurance afforded to such additional insured
will not be broader than that which you are
required by the contract or agreement to
provide for such additional insured.
B.With respect to the insurance afforded to theseadditional insureds, the following is added to
Section III – Limits Of Insurance:
If coverage provided to the additional insured is
required by a contract or agreement, the most we
will pay on behalf of the additional insured is the
amount of insurance:
1.Required by the contract or agreement; or
2.Available under the applicable limits of
insurance;
whichever is less.
This endorsement shall not increase the
applicable limits of insurance.
Location And Description Of Completed Operations
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
Name Of Additional Insured Person(s)
Or Organization(s)
Where required by written contract when
no specific form or edition date is
specified.
88A2GL0002298
1 1
All rights reserved. Includes copyrighted material of Insurance
Services Office, Inc., with its permission.
COMMERCIAL GENERAL LIABILITY
GL 2045 06 14
Policy Number 88A5GL0000998
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
COMMERCIAL GENERAL LIABILITY ENHANCEMENT
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
Contents
A.1. Amendment Of Liquor Liability Exclusion
A.2. Non Owned Watercraft
A.3. Personal Propert y Loaned Or In Your Care, Custody Or Control
A.4. Damage To Rented Premises – Fire, Lightning Or Explosion
B.1. Bail Bonds
B.2. Loss Of Earnings
C.1. Additional Insureds – Managers Or Lessors, Lessors Of Equipment, Governmental Agencies
Or Political Subdivisions, Mortgagee, Assignee Or Receiver
C.2. Newly Acquired Organizations Time Period
D.1. Damage To Premises Rented To You Limit
D.2. Medical Expense Limit
E.1. Duties – Reporting As Worker's Compensation & Knowledge Of Occurrence
E.2. Other Insurance – Fire, Lightning Or Explosion
E.3. Representations – Unintentional Errors
E.4. Waiver Of Rights Of Recovery
F.1. Mental Anguish From Bo dily Injury
A. Paragraph 2. Exclusions of Section I – Coverages
– Coverage A Bodily Injury And Property
Damage Liability is amended as follows:
1. Amendment Of Liquor Liability
Exclusion
Exclusion c. Liquor Liability is replaced by the
following:
c. "Bodily injur y" or "property damage" for which
any insured may be held liable by reason of:
(1) Causing or contributing to the intoxication
of any person;
(2) The furnishing of alcoholic beverages to
a person under the legal drinking age or
under the influence of alcohol; or
(3) Any statute, ordinance or regulation
relating to the sale, gift, distribution or
use of alcoholic beverages.
This exclusion applies even if the claims
against any insured allege negligence or
other wrongdoing in:
(a) The supervision, hiring, employment,
training or
(b) Providing or failing to provide
transportation with respect to any
person that may be under the
influence of alcohol;
if the "occurrence" which caused the
"bodily injury" or "property damage",
involved that which is described in
Paragraph (1), (2) or (3) above.
GL 2045 06 14 Copyright, American Alternative Insurance Corporation, 2014. Page 1 of 5
All rights reserved. Includes copyrighted material of Insurance
Services Office, Inc., with its permission.
This exclusion applies only if you:
(1) Manufacture, sell or distribute alcoholic
beverages;
(2) Serve or furnish alcoholic beverages for a
charge whether or not such activity:
(a) Requires a license;
(b) Is for the purpose of financial gain
or livelihood; or
(3) Serve or furnish alcoholic beverages
without a charge, if a license is required for
such activity.
However, this exclusion does not apply to
"bodily injury" or "property dam age" arising
out of the selling, serving or furnishing of
alcoholic beverages at functions sponsored,
organized or hosted by you. For the
purposes of this exclusion, perm itting a
person to bring alcoholic beverages on your
premises, for consumption on your premises,
whether or not a fee is charged or a license
is required for such activity, is not by itself
considered the business of selling, serving
or furnishing alcoholic beverages.
2. Non Owned Watercraft Amendment
Paragraph (2) of Exclusion g. Aircraft, Auto or
Watercraft, item (a) is replaced by the following:
(a) Less than 52 feet long; and
3. Property Damage to Personal Property
Loaned To You Or In Your Care, Custody or
Control
Items (3) and (4) of exclusion j. Damage to
Property are replaced by the following:
(3) Property loaned to you;
However, if your business is other than
“contracting”, “servicing”, or rental, this
exclusion does not apply to "property
damage" to personal property that is loaned
to you, but only if the damage is caused by
your negligence. The most we will pay is
$25,000 for each occurrence. This limit is
part of the Each Occurrence Limit and not
in addition to the Each Occurrence Lim it.
(4) Personal property in the care, custody or
control of the insured;
However, if your business is other than
“contracting”, “servicing”, or rental, this
exclusion does not apply to "property
damage" to personal property that is in your
care, custody or control, but only if the
damage is caused by your negligence. The
most we will pay is $25,000 for each
occurrence. This limit is part of the Each
Occurrence Limit and not in addition to the
Each Occurrence Limit.
If we have made any payment for property
under Paragraph (3) above, we will not make
any payment for that property under this
Paragraph (4).
4. Damage To Premises Rented To You
The last paragraph of 2. Exclusions is deleted
and replaced by the following:
Exclusions c. through n. do not apply to
damage by fire, lightning or explosion to
premises while rented to you or temporarily
occupied by you with permission of the owner.
A separate limit of insurance applies to this
coverage as described in Section III – Limits of
Insurance.
B. Paragraphs 1.b. and 1.d. of Supplementary
Payments – Coverages A And B are amended
as follows:
1. Bail Bonds
The limit for bail bonds in Paragraph 1.b.
is amended to $2,500 in lieu of $250;
and
2. Loss Of Earnings
The lim it for actual loss of earnings in Paragraph
1.d. is amended to $500 a day in lieu of $250 a
day.
C. Section II – Who Is An Insured is amended as
follows:
1. The following are added as additional insureds
when you have agreed in a written contract or
written agreement that such person or
organization be added as an additional insured
on your policy:
a. Managers Or Lessors
Any managers or lessors of premises but
only with respect to liability arising out of the
ownership, maintenance or use of that part of
the premises leased to you and subject to the
following additional exclusions:
Page 2 of 5 Copyright, American Alternative Insurance Corporation, 2014.l GL 2045 06 14
All rights reserved. Includes copyrighted material of Insurance
Services Office, Inc., with its permission.
This insurance does not apply to:
(1) Any "occurrence" which takes place after
you cease to be a tenant in that premises.
(2) Structural alterations, new construction
or demolition operations
performed by or on behalf of the person
or organization from whom you rent or
lease a premises.
b. Lessors Of Equipment
Any person or organization from whom you
lease equipment. Such person or
organization is an insured only with respect to
liability for "bodily injury", "property damage"
or "personal and advertising injury" caused, in
whole or in part, by your maintenance,
operation or use of equipment leased to you
by such person or organization.
A person’s or organization’s status as an
additional insured under this endorsement
ends when their contract or agreement with
you for such leased equipment ends.
c. Governmental Agencies Or Political
Subdivisions
Any state or governmental agency or
subdivision or political subdivision subject to
the following additional provisions:
(1) This insurance applies only with respect
to:
(a) Premises you own, rent, or control; or
(b) Operations performed by you or on
your behalf;
for which the state or governmental
agenc y or subdivision or political
subdivision has issued a permit or
authorization.
(2) This insurance does not apply to:
(a) "Bodily injury", "property damage" or
"personal and advertising injury"
arising out of operations performed for
the federal government, state or
municipality; or
(b) "Bodily injury" or "property damage"
included within the "products-
completed operations hazard".
The written contract or written agreement
referenced in paragraph 1. above must be;
a. In effect at the inception of the policy period
or become effective during the term of the
policy period; and
b. Executed prior to the “bodily injury”,
“property damage”, “personal and
advertising injury” covered under this
coverage part.
The Lim its of Insurance applicable to the
insureds in a., b., and c. above are those
specified in the valid written contract or written
agreement or in the Declarations for this policy,
whichever is less. These Limits of Insurance are
part of and not in addition to the Lim its of
Insurance shown in the Declarations.
d. Mortgagee, Assignee Or Receiver
Any person or organization who is a
mortgagee, assignee or receiver of your
premises or business, but only with respect
to their liability as mortgagee, assignee, or
receiver and arising out of the ownership,
maintenance, or use of the premises by you.
This insurance does not apply to structural
alterations, new construction and demolition
operations performed by or for that person or
organization.
2. Paragraph 3.a. is replaced by the
following:
a. Coverage under this provision is afforded
only until the 180th day after you acquire or
form the organization or the end of the policy
period, whichever is earlier;
D. Section III – Limits of Insurance is
amended as follows:
1. Paragraph 6. is replaced by the following:
6. Damage To Premises Rented To You
Subject to Paragraph 5. above, the Damage
To Premises Rented To You Limit is the
most we will pay under Coverage A for
damages because of “property damage” to
any one premises;
a. While rented to you; or
GL 2045 06 14 Copyright, American Alternative Insurance Corporation, 2014. All rights
reserved. Includes copyrighted material of Insurance
Page 3 of 5
b. In the case of damage by fire, lightning
or explosion, while rented to you or
temporarily occupied by you with
permission of the owner.
The Damage To Premises Rented To You
Limit is the greater of $1,000,000 or the lim it
shown on the Declarations page.
2. The following paragraph is added to item
7.:
The Medical Expense Limit is the greater of
$15,000 or the lim it shown on the Declarations
page.
E. Section IV – Commercial General Liability
Conditions is amended as follows:
1. The following is added to Condition 2.
Duties in the Event of Occurrence,
Offense, Claim or Suit:
e. In the event that an insured reports an
“occurrence” to the worker’s compensation
carrier of the Named Insured, and this
“occurrence” later develops into a General
Liability claim to which this insurance applies,
the failure to report such “occurrence” to us
at the time of the “occurrence” shall not be
deemed in violation of this condition. You
must, however, give us notice as soon as
practicable after being made aware that the
particular claim is a General Liability claim
rather than a Worker’s Compensation claim.
f. If your “employee” or agent knows of an
“occurrence” or offense which may result in a
claim under this policy, you will not be
considered to have knowledge of that
“occ urrence” or offense until your “employee”
or agent reports it to:
(1) You, if you are an individual;
(2) A partner, if you are a partnership;
(3) An “executive officer” or the “employee”
designated by you to give notice
to us of such “occurrence” or offense, if
you are a corporation;
(4) A manager, if you are a limited liability
company; or
(5) A trustee, if you are a trust.
2. Paragraph b. Excess Insurance of Condition 4.
Other Insurance item (ii) of the Occurrence
Form and item (iii) of the Claims Made Form is
replaced by the following:
That is Fire, Lightning or Explosion insurance
for premises rented to you or temporarily
occupied by you with permission of the owner;
3. The following is added to Condition 6.
Representations:
d. It will not be considered a violation of this
condition if you:
(1) Unintentionally fail to disclose all hazards
existing at the inception of this policy; or
(2) Unintentionally m ake an error, omission
or provide an improper description of
premises or other statement of
information in applying for this insurance.
You must notify us as soon as possible after
the discovery of any hazards, errors or
omissions in the information provided or any
other relevant information that was not
provided to us prior to the acceptance of this
policy.
4. Condition 8. Transfer of Rights of Recovery
Against Others To Us is amended by the
addition of the following:
We waive any right of recovery we m ay have
against any person or organization because of
payments we m ake for injury or damage if there
is a contract, executed prior to the loss, with that
person or organization that requires you to
waive rights of recovery.
F. Section V – Definitions is amended as
follows:
1. Definition 3. in the Definitions Section is
replaced by the following:
3. "Bodily injury” means bodily injury, sickness or
disease sustained by a person including
mental anguish, emotional distress,
humiliation or death resulting from bodily
injury, sickness or disease.
Page 4 of 5 Copyright, American Alternative Insurance Corporation, 2014. All
rights reserved. Includes copyrighted material of Insurance
Services Office, Inc., with its permission.
GL 2045 06 14
2. The following definitions are added: “Contracting”
means an establishment
in which the principal operation is that
of installation, construction, demolition
or maintenance. This includes any owner-contractor,
general contractor or
subcontractor, whether or not he/she
actually performs any part of such work or has
employees on the site.
“Servicing” means an establishment in which the
principal operation is the providing of a personal or
commercial service. Included are establishments
providing entertainment or recreation, or
warehousing of property of others.
GL 2045 06 14 Copyright, American Alternative Insurance Corporation, 2014. All
rights reserved. Includes copyrighted material of Insurance
Services Office, Inc., with its permission.
Page 5 of 5
COMMERCIAL GENERAL LIABILITY
CG 20 01 12 19
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
CG 20 01 12 19 © Insurance Services Office, Inc., 2018 Page 1 of 1
PRIMARY AND NONCONTRIBUTORY –
OTHER INSURANCE CONDITION
This endorsement modifies insurance provided under the following:
COMMERCIAL GENERAL LIABILITY COVERAGE PART
LIQUOR LIABILITY COVERAGE PART
PRODUCTS/COMPLETED OPERATIONS LIABILITY COVERAGE PART
The following is added to the Other Insurance
Condition and supersedes any provision to the
contrary:
Primary And Noncontributory Insurance
This insurance is primary to and will not seek
contribution from any other insurance available to
an additional insured under your policy provided
that:
(1)The additional insured is a Named Insured
under such other insurance; and
(2)You have agreed in writing in a contract or
agreement that this insurance would be
primary and would not seek contribution
from any other insurance available to the
additional insured.
Policy No. 88A2GL0002298
POLICY NUMBER: 88A5CA0000819 COMMERCIAL AUTO
CA 20 48 10 13
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
DESIGNATED INSURED FOR
COVERED AUTOS LIABILITY COVERAGE
This endorsement modifies insurance provided under the following:
AUTO DEALERS COVERAGE FORM
BUSINESS AUTO COVERAGE FORM
MOTOR CARRIER COVERAGE FORM
With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless
modified by this endorsement.
This endorsement identifies person(s) or organization(s) who are "insureds" for Covered Autos Liability
Coverage under the Who Is An Insured provision of the Coverage Form. This endorsement does not alter
coverage provided in the Coverage Form.
This endorsement changes the policy effective on the inception date of the policy unless another date is
indicated below.
Endorsement Effective Date:
SCHEDULE
Name Of Person(s) Or Organization(s):
As required by written contract
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
Each person or organization shown in the Schedule is an "insured" for Covered Autos Liability Coverage,
but only to the extent that person or organization qualifies as an "insured" under the Who Is An Insured
provision contained in Paragraph A.1. of Section II - Covered Autos Liability Coverage in the Business
Auto and Motor Carrier Coverage Forms and Paragraph D.2. of Section I - Covered Autos Coverages of
the Auto Dealers Coverage Form.
© Insurance Services Office, Inc.
POLICY NUMBER: 88A5CA0000819 COMMERCIAL AUTO
CA 04 44 10 13
THIS ENDORSEMENT CHANGES THE POLICY. PLEASE READ IT CAREFULLY.
WAIVER OF TRANSFER OF RIGHTS OF RECOVERY
AGAINST OTHERS TO US (WAIVER OF SUBROGATION)
This endorsement modifies insurance provided under the following:
AUTO DEALERS COVERAGE FORM
BUSINESS AUTO COVERAGE FORM
MOTOR CARRIER COVERAGE FORM
With respect to coverage provided by this endorsement, the provisions of the Coverage Form apply unless
modified by the endorsement.
This endorsement changes the policy effective on the inception date of the policy unless another date is
indicated below.
Endorsement Effective Date:
SCHEDULE
Name(s) Of Person(s) Or Organization(s):
As required by written contract
Information required to complete this Schedule, if not shown above, will be shown in the Declarations.
The Transfer Of Rights Of Recovery Against Others To Us condition does not apply to the person(s) or
organization(s) shown in the Schedule, but only to the extent that subrogation is waived prior to the
"accident" or the "loss" under a contract with that person or organization.
© Insurance Services Office, Inc.
COMMERCIAL GENERAL LIABILITY COVERAGE FORM DECLARATIONS
POLICY NO.
PRIOR NO:
NAMED INSURED:
FORM OF BUSINESS:
Organization (Other than
Partnership or Joint Venture)Individual Partnership Joint Venture
LIMITS OF INSURANCE:
GENERAL AGGREGATE LIMIT (OTHER THAN PRODUCTS-COMPLETED OPERATIONS)
PRODUCTS-COMPLETED OPERATIONS AGGREGATE LIMIT
PERSONAL & ADVERTISING INJURY LIMIT
EACH OCCURRENCE LIMIT
FIRE DAMAGE LIMIT
MEDICAL EXPENSE LIMIT
Any One Fire
Any One Person
LOCATION OF ALL PREMISES YOU OWN, RENT OR OCCUPY:
PREMIUM:
Rate Advance Premium
Classification
Premium
Basis Pr/Co All Other Pr/Co All Other
Copyright, American Alternative Insurance Corporation, 1998
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Copyright, Insurance Services Office, Inc., 1993
Code
No.
Addl To Equal Minimum
State Tax or Other (if applicable)
Total Advance Premium
88A2GL0002298-01
88A2GL0002298-00
KLB Construction, Inc.
As Per Named Insured Endorsement
X
GL2000a (01/96)
American Alternative Insurance Corporation
555 College Road East
Princeton, NJ 08543-5241
(800) 305-4954
PO Box 158
Mukilteo, WA 98275
$1,000,000
$100,000
$5,000
$1,000,000
$2,000,000
$2,000,000
See Location Schedule
See Premium Schedule
SCHEDULE OF FORMS AND ENDORSEMENTS
NUMBER TITLE
POLICY NUMBER:
Page of
Copyright, American Alternative Insurance Corporation, 1998
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Copyright, Insurance Services Office, Inc., 1993
The follo wing forms apply only to the Coverage Part in whi ch th ey are listed. Forms shown
under Common appl y to all Coverage Parts . If I nterline Forms (e.g. fo rms with an IL o r VL
prefix) show n in the Common section li st Coverage Parts to whi ch th ey apply in the form,
they appl y onl y to those Coverage Parts in dicated. If Policyh older Notices appear in this list,
they w ere issued w ith this poli cy, but do NO T form a pa rt of it.
88A2GL0002298-01
4 6CL 2000 (01/96)
COMMON
GENERAL LIABILITY
CL 2000 (01-96)
VLCW01 (05-96)
TERRNOTICE09 (12-
20)
VLCW70 (05-10)
VLOR01 (04-04)
IL 00 17 (11-98)
IL 01 23 (11-13)
IL 01 42 (09-08)
IL 01 46 (08-10)
IL 01 98 (09-08)
IL 02 79 (09-08)
IL 09 52 (01-15)
IL 09 85 (12-20)
GL2000a (01-96)
CG 00 01 (04-13)
CG 01 81 (05-08)
CG 02 24 (10-93)
CG 03 00 (01-96)
CG 04 42 (12-19)
CG 04 50 (05-08)
CG 20 01 (12-19)
CG 20 10 (10-01)
CG 20 10 (10-01)
CG 20 10 (07-04)
CG 20 10 (12-19)
CG 20 37 (10-01)
CG 20 37 (10-01)
CG 20 37 (07-04)
Common Policy Declarations
Signature Endorsement
Policyholder Disclosure Notice of Terrorism
Insurance Coverage
Effective Time Changes
Policyholder Notice - Oregon
Common Policy Conditions
Washington Changes - Defense Costs
Oregon Changes - Domestic Partnership
Common Policy Conditions
Nuclear Energy Liability Exclusion Endorsment
Oregon Changes - Cancellation And Nonrenewal
Cap on Losses from Certified Acts of Terrorism
Disclosure Pursuant To Terrorism Risk Insurance
Act
Commercial General Liability Coverage Form
Declarations
Commercial General Liability Coverage Form
Washington Changes
Earlier Notice Of Cancellation Provided By Us
Deductible Liability Insurance
Stop Gap - Employers Liability Coverage
Endorsement - Washington
Washington Changes - Who Is An Insured
Primary And Noncontributory - Other Insurance
Condition
Additional Insured - Owners, Lessees Or
Contractors - Scheduled Person Or Organization
Additional Insured - Owners, Lessees Or
Contractors - Scheduled Person Or Organization
Additional Insured - Owners, Lessees Or
Contractors - Scheduled Person Or Organization
Additional Insured - Owners, Lessees Or
Contractors - Scheduled Person Or Organization
Additional Insured - Owners, Lessees Or
Contractors - Completed Operations
Additional Insured - Owners, Lessees Or
Contractors - Completed Operations
Additional Insured - Owners, Lessees Or
Contractors - Completed Operations
SCHEDULE OF FORMS AND ENDORSEMENTS
NUMBER TITLE
POLICY NUMBER:
Page of
Copyright, American Alternative Insurance Corporation, 1998
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Copyright, Insurance Services Office, Inc., 1993
The follo wing forms apply only to the Coverage Part in whi ch th ey are listed. Forms shown
under Common appl y to all Coverage Parts . If I nterline Forms (e.g. fo rms with an IL o r VL
prefix) show n in the Common section li st Coverage Parts to whi ch th ey apply in the form,
they appl y onl y to those Coverage Parts in dicated. If Policyh older Notices appear in this list,
they w ere issued w ith this poli cy, but do NO T form a pa rt of it.
88A2GL0002298-01
5 6CL 2000 (01/96)
GENERAL LIABILITY
CG 20 37 (12-19)
CG 20 38 (12-19)
CG 21 06 (05-14)
CG 21 34 (01-87)
CG 21 47 (12-07)
CG 21 53 (01-96)
CG 21 54 (01-96)
CG 21 65 (12-04)
CG 21 70 (01-15)
CG 21 71 (01-15)
CG 21 76 (01-15)
CG 21 96 (03-05)
CG 22 34 (04-13)
CG 22 79 (04-13)
CG 22 80 (04-13)
CG 24 04 (05-09)
CG 24 17 (10-01)
CG 24 50 (06-15)
CG 25 03 (05-09)
CG 25 04 (05-09)
CG 26 77 (12-04)
GL2001a (02-02)
GL2005 (05-97)
GL2024 (10-05)
GL2025 (10-05)
GL2026 (06-11)
GL 2045 (06-14)
Additional Insured - Owners, Lessees Or
Contractors - Completed Operations
Additional Insured - Owners, Lessees Or
Contractors - Automatic Status For Other Parties
When Required In Written Construction Agreement
Exclusion - Access Or Disclosure Of Confidential
Or Personal Information And Data-Related
Liability - With Limited Bodily Injury Exception
Exclusion - Designated Work
Employment-Related Practices Exclusion
Exclusion - Designated Ongoing Operations
Exclusion - Designated Operations Covered By A
Consolidated (Wrap-up) Insurance
Total Pollution Exclusion With A Building
Heating, Cooling And Dehumidifying Equipment
Exception And A Hostile Fire Exception
Cap on Losses From Certified Acts of Terrorism
Exclusion Of Other Acts Of Terrorism Committed
Outside The United States; Cap on Losses From
Certified Acts of Terrorism
Exclusion of Punitive Damages Related to a
Certified Act of Terrorism
Silica Or Silica-Related Dust Exclusion
Exclusion - Construction Management Errors And
Omissions
Exclusion - Contractors - Professional Liability
Limited Exclusion - Contractors - Professional
Liability
Waiver Of Transfer Rights Of Recovery Against
Others To Us
Contractual Liability - Railroads
Limited Coverage For Designated Unmanned Aircraft
Designated Construction Project(s) General
Aggregate Limit
Designated Location(s) General Aggregate Limit
Washington - Fungi or Bacteria Exclusion
Employee Benefits Liability Coverage
Lead Contamination Exclusion
Notice Of An Occurrence
Unintentional Failure To Disclose Hazards
Commercial General Liability Composite Rate
Endorsement
Commercial General Liability Enhancement
SCHEDULE OF FORMS AND ENDORSEMENTS
NUMBER TITLE
POLICY NUMBER:
Page of
Copyright, American Alternative Insurance Corporation, 1998
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Copyright, Insurance Services Office, Inc., 1993
The follo wing forms apply only to the Coverage Part in whi ch th ey are listed. Forms shown
under Common appl y to all Coverage Parts . If I nterline Forms (e.g. fo rms with an IL o r VL
prefix) show n in the Common section li st Coverage Parts to whi ch th ey apply in the form,
they appl y onl y to those Coverage Parts in dicated. If Policyh older Notices appear in this list,
they w ere issued w ith this poli cy, but do NO T form a pa rt of it.
88A2GL0002298-01
6 6CL 2000 (01/96)
GENERAL LIABILITY
GL 20 83 (11-20)
GL 20 84 (11-20)
Exclusion - Exterior Insulation and Finish
Systems (Non-Causal Coverage)
Asbestos Exclusion (Non-Causal Coverage)
COMMON POLICY DECLARATIONS
MAILING ADDRESS:
NAMED INSURED:
POLICY PERIOD: FROM TO
AT 12:01 A.M. STANDARD TIME AT YOUR MAILING ADDRESS SHOWN ABOVE.
BUSINESS DESCRIPTION
IN RETURN FOR THE PAYMENT OF THE PREMIUM, AND SUBJECT TO ALL THE TERMS OF THIS
POLICY, WE AGREE WITH YOU TO PROVIDE THE INSURANCE AS STATED IN THIS POLICY.
PREMIUM
THIS POLICY CONSISTS OF THE FOLLOWING COVERAGE PARTS FOR WHICH A PREMIUM IS
INDICATED. THIS PREMIUM MAY BE SUBJECT TO ADJUSTMENT.
POLICY NUMBER:PRIOR POLICY NUMBER:
COMPANY NAME
AM CL 100 11 09 Page 1 of 2
Copyright, American Alternative Insurance Corporation, 1998
Includes copyrighted material of Insurance Services Office, Inc., with its permission.
Copyright, Insurance Services Office, Inc., 1993
PRODUCER NAME
PO Box 158
Mukilteo, WA 98275
Heavy-Highway Civil Contractor
KLB Construction, Inc.
As Per Named Insured Extension
American Family Home Insurance Company
555 College Road East
Princeton, NJ 08543-5241
(800) 305-4954
McKee Risk Management, Inc.
610 Freedom Business Center Drive
Suite 300
King of Prussia, PA 19406
88A5CA0000819-0388A5CA0000819-04
06/01/2023 06/01/2024
COMMERCIAL AUTOMOBILE COVERAGE PART
AMERICAN FAMILY HOME INSURANCE COMPANY
Administration Office: 555 College Road East, Princeton, NJ 08543-5241
800.305.4954
Statutory Office: 1301 Riverplace Blvd., Suite 1300 - Jacksonville, FL 32207
(a stock insurance company)
FORMS APPLICABLE TO ALL COVERAGE PARTS (SHOW NUMBERS):
Countersigned By:
(Date)(Authorized Representative)
POLICY NUMBER:
Secretary President
AM CL 100 11 09
Copyright, American Alternative Insurance Corporation, 1998
Includes copyrighted material of Insurance Services Office, Inc., with its permission.Page 2 of 2Copyright, Insurance Services Office, Inc., 1993
Secretary President
88A5CA0000819-04
See Schedule of Forms and Endorsements.
SCHEDULE OF FORMS AND ENDORSEMENTS
NUMBER TITLE
POLICY NUMBER:
Page of
EFFECTIVE DATE:
88A5CA0000819-04 06/01/2023
1 1
AM CL 100 (11-09)
IL 00 21 (11-85)
IL 01 23 (11-13)
IL 01 46 (08-10)
IL 01 98 (09-08)
CA DS 03 (11-20)
CA 00 01 (10-13)
VL 383 (07-06)
CA 03 02 (10-13)
CA 04 44 (10-13)
CA 20 17 (10-13)
CA 20 48 (10-13)
CA 23 92 (10-13)
CA 23 94 (10-13)
CA 99 03 (10-13)
CA 99 28 (11-20)
CA 99 48 (10-13)
CA 04 49 (11-16)
CA 01 35 (02-21)
CA 21 34 (10-13)
CA 22 57 (10-13)
AU 500 (10-21)
AU 20 21 (12-13)
AU 20 22 (12-13)
AU WA 20 43 (01-
18)
AFH VL 101 (11-09)
Common Policy Declarations
Nuclear Energy Liability Exclusion Endorsement (Broad Form)
Washington Changes - Defense Costs
Washington Common Policy Conditions
Nuclear Energy Liability Exclusion Endorsement (Broad Form)
Business Auto Declarations
Business Auto Coverage Form
Named Insured Endorsement
Deductible Liability Coverage
Waiver Of Transfer Of Rights Of Recovery Against Others To Us (Waiver
Of Subrogation)
Mobile Homes Contents Not Covered
Designated Insured For Covered Autos Liability Coverage
Washington Exclusion of Terrorism
Silica Or Silica-Related Dust Exclusion For Covered Autos Exposure
Auto Medical Payments Coverage
Stated Amount Insurance
Pollution Liability - Broadened Coverage For Covered Autos - Business
Auto And Motor Carrier Coverage Forms
Primary And Noncontributory - Other Insurance Condition
Washington Changes
Washington Underinsured Motorists Coverage
Washington Personal Injury Protection - Named Individuals
Schedule of Covered Autos You Own
Commercial Auto - Composite Rate Endorsement
Lessor - Additional Insured And Loss Payee
Construction Auto Extension Endorsement - Washington
Signature Endorsement
Page of © Insurance Services Office, Inc., 2019 CA DS 03 11 20
ITEM TWO
Schedule Of Coverages And Covered Autos
This Policy provides only those coverages where a charge is shown in the premium column below. Each of these
coverages will apply only to those "autos" shown as covered "autos". "Autos" are shown as covered "autos"
for a particular coverage by the entry of one or more of the symbols from the Covered Autos section of
the Business Auto Coverage Form next to the name of the coverage.
Covered Autos Limit Or Deductible
Covered Autos Liability
Deductible
Added Personal
Injury Protection
(Or Equivalent Added
No-fault Coverage)
Separately Stated In Each Added
Personal Injury Protection
Endorsement
Deductible
For Each Accident
Each Insured
Uninsured Motorists
Underinsured Motorists
(When Not Included In
Uninsured
Motorists Coverage)
Separately Stated In The Medical
Expense And Income Loss Benefits
Endorsement
Medical Expense And
Income Loss Benefits
(Virginia Only)
Auto Medical
Payments
Separately Stated In The Property
Protection Insurance Endorsement
Minus
Property Protection
Insurance
(Michigan Only)
Separately Stated In Each Personal
Injury Protection Endorsement Minus
Personal Injury
Protection
(Or Equivalent
No-fault Coverage)
PremiumCoverages
Policy Includes Composite Coverages
3 14
Included
Included
Included
Included
1
2
2
2
$1,000,000
Full
$5,000
$1,000,000
Page of © Insurance Services Office, Inc., 2019 CA DS 03 11 20
ITEM TWO
Schedule Of Coverages And Covered Autos (Cont'd)
Covered Autos Premium
Deductible
For Each Covered Auto For Loss
Caused By Theft Or Mischief Or
Vandalism
(A maximum deductible may also apply.
Refer to Coverage Form for details.)
OR
Physical Damage
Specified Causes Of
Loss Coverage Deductible
Deductible
For All Perils For Each Covered Auto
(A maximum deductible may also apply.
Refer to Coverage Form for details.)
See Item Four for Hired or Borrowed
Autos.
Deductible
For Each Covered Auto
See Item Four for Hired or Borrowed
Autos.
Physical Damage
Collision Coverage
For Each Covered Auto For Loss
Caused By Theft Or Mischief Or
Vandalism
(A maximum deductible may also apply.
Refer to Coverage Form for details.)
OR
For All Perils For Each Covered Auto
(A maximum deductible may also apply.
Refer to Coverage Form for details.)
See Item Four for Hired or Borrowed
Autos.
Deductible
Physical Damage
Comprehensive
Coverage
Limit Or DeductibleCoverages
4 14
2
2
See Schedule
See Schedule
Included
Included
Page of © Insurance Services Office, Inc., 2019 CA DS 03 11 20
ITEM TWO
Schedule Of Coverages And Covered Autos (Cont'd)
For Each
*This Policy may be subject to final audit.
Estimated Total Premium*
Premium For Endorsements
Disablement Of A Private Passenger
Auto, Light Or Medium Truck
Physical
Damage Towing And
Labor
5 14
COMMERCIAL LIABILITY UMBRELLA
CU DS 83 00 03 11
COMMERCIAL LIABILITY UMBRELLA COVERGE PART DECLARATIONS_CU DS 83 00_03/11
CU DS 83 00 03 11 Includes material copyrighted by Insurance Services Office, Inc., with its permission Page 1 of 2
Issuing Company:Berkley National Insurance Company
COMMERCIAL LIABILITY UMBRELLA COVERAGE PART
DECLARATIONS
Policy No.:MKC11100038-05 Billing Method:
Previous Policy No.:MKC11100038-04 Payment Plan:
Named Insured Name and Address Agency Name and Address MK001
KLB Construction, Inc.; Per Underlying Schedule
PO Box 158
Mukilteo,WA 98275
McKee Risk Management, Inc.
610 Freedom Business Center Dr.Suite 300
King of Prussia,PA 19406
Policy Period: From 06/01/2023 to 06/01/2024 at 12:01 A.M. Standard Time at your mailing address shown above.
Total Advance Premium (Subject to change by audit) Audit Period:None
LIMITS OF INSURANCE:
Each Occurrence Limit (Liability Coverage)$5,000,000
Personal & Advertising Injury Limit $5,000,000 Any One Person or
Organization
Aggregate Limit (Liability Coverage)(except with
respect to "covered autos")
$5,000,000
Products/Completed Operations Aggregate Limit $Not Applicable
Form of Business:Corporation
ENDORSEMENTS ATTACHED TO THIS POLICY:
See attached "Schedule of Forms and Endorsements"
SCHEDULE OF UNDERLYING INSURANCE
GENERAL LIABILITY OCCURRENCE
Company:American Alternative Insurance Corporation
Policy Number:88A2GL0002298-01
Policy Period:06/01/2023 -06/01/2024
Limits of Insurance:
Each Occurrence $1,000,000
General Aggregate $2,000,000
Products/Completed Operations Aggregate
Limit
$2,000,000
Personal & Advertising Injury Limit $1,000,000
Policy No.:MKC11100038-05
Page 2 of 2 Includes material copyrighted by Insurance Services Office, Inc., with its permission CU DS 83 00 03 11
EMPLOYEE BENEFITS LIABILITY OCCURRENCE
Company:American Alternative Insurance Corporation
Policy Number:88A2GL0002298-01
Policy Period:06/01/2023 -06/01/2024
Limits of Insurance:
Each Employee $1,000,000
Aggregate $2,000,000
AUTOMOBILE LIABILITY OCCURRENCE
Company:American Family Home Insurance Company
Policy Number:88A5CA0000819-04
Policy Period:06/01/2023 -06/01/2024
Limits of Insurance:
Combined Single Limit $1,000,000
EMPLOYERS LIABILITY OCCURRENCE
Company:American Alternative Insurance Corporation
Policy Number:88A2GL0002298-01
Policy Period:06/01/2023 -06/01/2024
Limits of Insurance:
BI by Accident - Each Accident $1,000,000
BI by Disease - Policy Aggregate $1,000,000
BI by Disease - Each Employee $1,000,000
EMPLOYERS LIABILITY OCCURRENCE
Company:SAIF
Policy Number:100051357
Policy Period:11/14/2022 -11/01/2023
Limits of Insurance:
BI by Accident - Each Accident $1,000,000
BI by Disease - Policy Aggregate $1,000,000
BI by Disease - Each Employee $1,000,000
Page 1 of 2
FORMS AND ENDORSEMENTS SCHEDULE
It is hereby understood and agreed the following forms and endorsements are attached to and are a part of
this policy:
Form Number Form Name
IL DS 83 00 08 15 Commercial Lines Policy Common Declarations
CU DS 83 00 03 11 Commercial Liability Umbrella Coverage Part Declarations
CU 00 01 04 13 Commercial Liability Umbrella Coverage Form
IL 00 17 11 98 Common Policy Conditions
CU 02 04 09 00 Earlier Notice Of Cancellation Provided By Us
CU 21 03 09 00 Exclusion - Designated Work
CU 21 17 09 00 Exclusion - Designated Operations Covered By A Consolidated (Wrap-
Up) Insurance Program
CU 21 23 02 02 Nuclear Energy Liability Exclusion Endorsement (Broad Form)
CU 21 24 11 16 Exclusion - Non-Owned Aircraft
CU 21 25 12 01 Total Pollution Exclusion Endorsement
CU 21 26 04 13 Exclusion - Cross Suits Liability
CU 21 27 12 04 Fungi Or Bacteria Exclusion
CU 21 33 01 15 Exclusion of Certified Acts of Terrorism
CU 21 36 01 15 Exclusion Of Punitive Damages Related To a Certified Act of Terrorism
CU 21 42 12 04 Exclusion - Exterior Insulation And Finish Systems
CU 21 50 03 05 Silica Or Silica-Related Dust Exclusion
CU 21 58 05 09 Communicable Disease Exclusion
CU 24 03 09 00 Waiver Of Transfer Of Rights Of Recovery Against Others To Us
CU 84 06 11 18 Contractors Limitation Endorsement With Specified Follow Form
Coverage
CU 84 13 11 18 Employee Benefits Liability Exclusion
CU 84 29 11 18 Unscheduled Limits Or Sublimited Coverage Exclusion
CU 84 15 11 18 Engineers, Architects Or Surveyors Professional Services Exclusion
BCIMU5000A 1113 Berkley National Insurance Company
Page 2 of 2
CU 01 21 09 00 Washington Changes
CU 01 24 12 01 Washington Changes - Employment-Related Practices Ex
CU 26 77 12 04 Washington - Fungi Or Bacteria Exclusion
IL 01 98 09 08 Broad Form Nuclear Energy Liability Exclusion Endorsement
CU 83 05 05 13 Asbestos Exclusion Endorsement
CU 83 14 05 13 Lead Liability Exclusion Endorsement
IL P 001 01 04 U.S. Treasury Department's Office of Foreign Assets Control ("OFAC")
Advisory Notice to Policyholders
IL 09 85 01 15 Disclosure Pursuant to Terrorism Risk Insurance Act
BCIMU5066A 1113 General Change Endorsement - Total Aircraft Exclusion
CU 84 50 WA 02 22 Washington Exclusion - Cyber Incident
CU PN 83 06 02 22 Cyber Incident Exclusion Endorsement Advisory Notice to Policyholders
CU 84 52 05 23 Exclusion-Perfluoroalkyl and Polyfluoroalkyl Substances (PFAS)
CU PN 83 08 05 23 Advisory Notice to Policyholders-Exclusion-Perfluoroalkyl and
Polyfluoroalkyl Substances (PFAS)
BCIMU5000A 1113 Forms and Endorsements Schedule
BCIMU5000A 1113 Berkley National Insurance Company
Underlying Claims-Made Coverage Endorsement (if
b.Aggregate Limit
c.Other Limit:
Retroactive Date:
(Claims Made Coverage)
See:
applicable)
Item 5 .
Controlling Underlying Insurance:See:Schedule of Controlling Underlying InsuranceItem 6 .
Forms and Endorsements:See:Schedule of Forms and EndorsementsItem 7 .
CXD 01 12 13
IN RETURN FOR THE PAYMENT OF THE PREMIUM, AND SUBJECT TO ALL OF THE TERMS OF THIS POLICY, WE AGREE
WITH YOU TO PROVIDE THE INSURANCE STATED IN THIS POLICY.
Commercial Excess Liability
DECLARATIONS
Policy No.
Named Insured and Mailing Address:Item 1 .
(No. Street, Town or City, State, Zip Code)
Item 2 .
Deposit
Premium:
Minimum
Premium:
Limits of Insurance:Item 4 .
a.Each Occurrence Limit
Renewal of Number:
Policy Issue Date:
Program Administrator's Name and Mailing Address:
Named Insured is:
Policy Period:
From:to 12:01 A.M. Standard Time at your mailing address shown above.
Rate:
Individual,Partnership,Corporation,Joint Venture,Other
Flat Adjustable
Per:
Business of the Named Insured is:
Page of
93A2FF1000009-04
06/01/23
06/01/23
06/01/24
93A2FF1000009-03
Heavy-Highway Civil Contractor
KLB Construction, Inc.
As Per Named Insured Extension Schedule
X
1 4
PO Box 158
Mukilteo, WA 98275
McKee Risk Management, Inc.
610 Freedom Business Center Drive Suite
300
King of Prussia, PA 19406
$5,000,000
$5,000,000
X
AMERICAN ALTERNATIVE INSURANCE CORPORATION
Administration Office: 555 College Road East, Princeton, NJ 08543-5241
800.305.4954
Statutory Office: 2711 Centerville Road, Suite 400 - Wilmington, DE 19805
(a stock insurance company)
Authorization:In Witness Whereof, the Company issuing this policy has caused this policy to be signed by its authorized officers,
but this policy shall not be valid unless also signed by a duly authorized representative of the Company.
Countersigned
Date:
Authorized Representative
The following is a schedule of Forms and Endorsem ents issued with the policy at inception:
Schedul e of For ms and En dorsements
COMME RCIAL EXCE SS LIABILIT Y
Form ID Number:Edition Date:Form Name:
CXD 01 12 13
Secretary President
THESE DECLARATIONS, THE ATTACHED SCHEDULE OF UNDERLYING INSURANCE, TOGETHER WITH THE ATTACHED
SCHEDULE OF FORMS AND ENDORSEMENTS, AND ANY FORMS AND ENDORSEMENTS WE MAY LATER ATTACH TO
REFLECT CHANGES, MAKE UP AND COMPLETE THE ABOVE NUMBERED POLICY.
Attac hed to and form ing part of
Policy No.:
Issued To:
Eff ective date of
this Schedule:Issue date:
Page of
93A2FF1000009-0406/01/2023 06/01/2023
2 4
CXD 01
CXS 01
CX 00 01
CX 01 06
CX 01 27
CX 21 01
CX 21 02
CX 21 07
CX 21 14
CX 21 16
CX 21 23
CX 21 29
CX 21 31
CX 21 33
CX 21 35
CX 21 36
CX 21 43
CX 21 55
CXE 01 03
CXE 01 06
CXE 01 29
CXE 01 42
12-13
02-10
04-13
08-10
11-13
09-08
04-13
04-13
04-13
04-13
04-13
01-15
01-15
01-15
01-15
01-15
05-14
09-08
02-10
02-10
02-10
02-10
Commercial Excess Liability Declarations
Schedule of Controlling Underlying Insurance
Commercial Excess Liability Coverage Form
Washington Changes
Washington Changes-Defense Cost
Nuclear Energy Liability Exclusion Endorsement
Total Pollution Exclusion
Exclusion - Designated Work
Exclusion- Exterior Insulation And Finish Systems
Exclusion - Silica Or Silica-Related Dust
Washington - Fungi Or Bacteria Exclusion
Conditional Exclusion of Terrorism (Relating to
Disposition of Federal Terrorism Risk Insurance Act)
Exclusion Of Other Acts Of Terrorism Committed Outside
The United States; Cap On Losses From Certified Acts
Of Terrorism
Exclusion Of Certified Acts Of Terrorism
Exclusion Of Certified Acts Of Terrorism And Exclusion
Of Other Acts Of Terrorism Committed Outside The
United States
Exclusion Of Punitive Damages Related To A Certified
Act Of Terrorism
Exclusion - Access Or Disclosure Of Confidential Or
Personal Information
Auto Coverage - Amended Terrorism Provisions
Total Aircraft Liability Exclusion
Asbestos Exclusion
Cross Suits Exclusion
Discrimination And Employment-Related Practices
Exclusion
POLI CY NUMBER:EFFECT IVE DATE:
Form ID Number:Edition Date:Form Name:
CXD 01 12 13
SCHEDULE OF FORMS AND ENDORSEMENTS
Page of
93A2FF1000009-04 06/01/2023
3 4
CXE 02 06
CXE 02 98
CXE 03 25
CXE WA 11 08
IL 01 23
IL 01 98
IL 09 85
10-17
03-12
10-17
02-10
11-13
09-08
12-20
Unscheduled Limits Or Sublimited Coverages Exclusion
Contractors Limitation Endorsement With Specified
Follow Form Coverage
Limited Waiver of Transfer of Rights Of Recovery
Against Others to Us
Washington Lead Exclusion
Washington Changes-Defense Costs Endorsement
Nuclear Energy Liability Exclusion Endorsement (Broad
Form)
Disclosure Pursuant To Terrorism Risk Insurance Act
Public Works Department
MONROE AVE NE INFILTRATION FACILITY PROJECT
CAG-23-316
Prevailing Minimum Hourly Wage Rates
Washington State Prevailing Minimum Hourly Wage Rates Reference
WASHINGTON STATE PREVAILING WAGE RATES
FOR PUBLIC WORKS CONTRACTS
REFERENCE
The State of Washington Prevailing Wage Rates applicable for this public works contract, which is
located in _King_ County, may be found at the following website address of the Department of Labor
and Industries: https://fortress.wa.gov/lni/wagelookup/prvWagelookup.aspx
Based on the bid submittal deadline for this project, the applicable effective date for prevailing
wages for this project is October 2023.
A copy of the applicable prevailing wages rates is also available for viewing at the office of the
Owner, located at _Renton City Hall, 1055 South Grady Way, Renton, Washington.
Upon request, the Owner will mail a hard copy of the applicable prevailing wage rates for this
project.
Public Works Invoice & Payment Checklist
*In accordance with City of Renton Policy 250‐02
Contractor Name:_____________________________________________ Vendor #:________________________
Staff Contact:________________________________________________ Dept:____________________________
Project Name:________________________________________________ Contract Amount:__________________
CAG #___________________ as assigned by city clerk (provided after submitting eContract checklist)
Was the Project Grant Funded? How was the contract procured?
Retainage method: If N/A why:
*If Escrow, attach a copy of legal approved escrow agreement. If retainage bond, attach a copy of the retainage bond.
Intents for prime contractor and subcontractors have been saved to Q:\
Verified certified payroll reports have been filed. For grant funded projects, copies have been saved to Q:\
Invoice with applicable retainage has been entered into Eden
Affidavits for prime contractor and subcontractors have been saved to Q:\
Notice of Completion filled out and included in PDF (only if contract exceeds $35,000 before tax – include in PDF
behind completed checklist for AP)
I hereby certify, as project manager representing the City of Renton, that all work required by the above cited contract
was completed on:_________________. No claims/liens have been received against the prime contractor,
subcontractors, or anyone who has performed or provided any work or material on the project. All intents to pay
prevailing wages and all affidavits of wages paid (including subcontractors) have been provided to finance on the Q:\
___________________
Date
___________________
____________________________________________________________________
Project Manager
___________________________________________________________________
Department Administrator Date
If original contract was approved by council enter the date that council approved completion and release of retainage.
_____________________ *Include in PDF the council approval minutes and put behind notice of completion
Date
Section 1: Vendor, Contract, & Payment Information (complete prior to first progress payment & save
copy of this checklist with first payment’s backup)
Section 2: Close Out (complete during final payment, before retainage can be released and submit to AP)
Public Works Department
MONROE AVE NE INFILTRATION FACILITY PROJECT
CAG-23-316
Traffic Control Information
Public Works Department
MONROE AVE NE INFILTRATION FACILITY PROJECT
CAG-23-316
TRAFFIC CONTROL
The City of Renton requires any contractor, firm, corporation, or other public/private agency to
prepare a traffic control plan and obtain City’s approval of that plan when construction, repair,
or maintenance work is to be conducted within the City’s right-of-way. The plan shall be
consistent with the provisions found in the State of Washington Manual on Uniform Traffic
Control Devices (MUTCD) for Streets and Highways, section 1-10.2(2) and the Contract
Documents. Traffic Control Plan shall be submitted to the City for review at or prior to the
Preconstruction Meeting.
Traffic Control Standard Plans, application and requirements can be found in the City’s website
at:https://www.rentonwa.gov/city_hall/public_works/transportation_systems/operations/traffic/tr
affic_control_plans
Typical details for lane closures can be provided upon request.
The Contractor shall be responsible for assuring that traffic control is installed and maintained in
conformance to established standards. The Contractor shall continuously evaluate the operation
of the traffic control plan and take prompt action to correct any problems that become evident
during operation.
See Special Provisions Section 1-10 and 1-07.23 for additional requirements.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
DEPARTMENT OF PUBLIC WORKS
Page 1 of 3 | Published: 10/27/2021
Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380
Website: rentonwa.gov
TRAFFIC CONTROL PLAN APPLICATION
Published: 10/27/2021
TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION
FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK.
The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control
plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted
within the city's right-of-way.
1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents.
2. The following items are all required for submittal of the TCP Application:
☐ Electronic Copy of the TCP Application
☐ Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall:
Include map(s) showing the location of the project and work area.
Be legible lettering and clear, contrasting, symbols of viewing or printing.
Must indicate street names, and north arrow and scale.
Types of plans required:
o Work hour plan – show all mobility impacts during construction hours.
o Non-work plan - show all mobility impacts after work hours when limited or no work is
happening in the right-of-way (ROW), if applicable.
o Changing construction phases – show construction sequence and each construction phase
change even if the traffic control is not modified, if applicable.
o Pedestrian access/detour plan, if applicable.
- Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the
Evergreen Safety Council.
3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].”
Project Name: Permit #:
Site Address:
Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________
Construction Company:
Contact Name: Phone/Cell: _________________________
Business Address: City/State: Zip:
Description of Work:
Approval By: _________________________________________________ Date:____________________
Transportation Engineering
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 2 of 3 | Published: 10/27/2021
PERMIT HOLDER AGREES TO ALL THE FOLLOWING:
Must have approved Traffic Control Plan (TCP) prior to commencing the work.
Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time,
with the least possible inconvenience or delay to pedestrians.
WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the
traveled way.
Comply with all traffic regulations of the City of Renton and the State of Washington.
Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street
and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control
Devices.
Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures.
Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public
transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends
and holidays) prior to starting any work.
Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum
of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a
temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a
minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140
with any questions.
Any lane or street closures not in conformance with the approved traffic control plan and/or without notification
of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at
thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes.
Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all
costs of defense and attorney’s fees incurred in defending against same, arising from and related to
implementation of the approved traffic control plans including claims arising from towing of private vehicles and
the acts of the Permit Holder’s agents and employees.
The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in
such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable
attorney’s fees and litigation costs incurred resulting from such claim.
In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for
legal counsel chosen by the City to defend against same.
Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or
pedestrian safety or travel.
All permit conditions shall be met.
NOTES:
Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council.
Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD)
and shown by a traffic control plan layout or reference to WSDOT.
Approved Temporary Traffic Control Plan must be at the work site during work hours.
Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or
walkway is impeded to safely redirect pedestrians around a work zone.
Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery
road conditions during work and non-work hours.
Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company
logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous
place on the vehicle or equipment.
Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document.
Page 3 of 3 | Published: 10/27/2021
In the case of Temporary No Parking Zones, all the following apply in addition to previous:
Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for
vacate parking or curb lane usage.
Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block
seventy-two (72) hours in advance of effective date and time.
The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the
project site.
Temporary traffic control devices must be removed immediately when work is done or no construction activities
are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555
NE 2nd Street).
I certify that the information on this application and within the submittal documents are accurate to the best of my
knowledge and I acknowledge all the requirements on this application.
Applicant’s Signature Date
Applicant’s Name (Print)
DRAWN BY: ELENA BRUNSTEINAPPROVED FOR PUBLICATION
DATESTATE DESIGN ENGINEER
Washington State Department of Transportation
SHEET 1 OF 1 SHEETSHEET 1 OF 1 SHEET
SINGLE LANE CLOSURE
WITH ENCROACHMENT
STANDARD PLAN K-24.20-00
SHEET 1 OF 1 SHEET
FOR LOCAL AGENCY USE ONLY
NOT FOR USE ON STATE ROUTES
STA TEOFWASHINGT
O
NR
EGISTEREDPROFE
S
SIONAL ENGINEER25335THEODORE J. TR
EPA
NI
EREXPIRES AUGUST 9, 2007
SIGN LOCATION
CHANNELIZING DEVICES
PROTECTIVE VEHICLE ~ RECOMMENDED
LEGEND
PCMS
EXISTING EDGE STRIPE
EXISTING LANE STRIPE
TEMPORARY TRAFFIC CONTROL DEVICE
ARROW PANEL
PORTABLE CHANGEABLE MESSAGE SIGN
LATERAL BUFFER ~ 4’
EXISTING LANE EXISTING
SHOULDER
2’
ASECTION
WORK AREATEMPORARY LANE ~ 12’ MIN.
EXISTING LANEEXISTING
SHOULDER
ROAD
WORK
AHEAD
END
ROAD WORK
100’
WORK AREA
B L X X
W20-1
PCMSSEE NOTE 5
RIGHT LANE
CLOSED
AHEAD
W20-5R
X1
ROAD
NARROWS
W5-1
A
G20-2A OR
DOWNSTREAM TAPER TO SHOW
END OF WORK AREA ~ SEE NOTE 6
SEE NOTE 2
W4-2L
~ COMPLIANCE DATE 12/23/13
1.
2.
3.
4.
5.
NOTES
6.
7.
8.
MINIMUM WEIGHT 15,000 LBS.
(MAXIMUM WEIGHT SHALL BE
IN ACCORDANCE WITH MANU-
FACTURER RECOMMENDATION)
TYPICAL PROTECTIVE VEHICLE WITH TMA (SEE NOTE 1)
LOADED WEIGHT
ROLL AHEAD STOPPING DISTANCE = 30 FEET MIN.
(DRY PAVEMENT ASSUMED)
45 50 55 60
360 425 495 570
POSTED SPEED (MPH)
LONGITUDINAL BUFFER SPACE = B
LENGTH B (FEET)
1
4 YARD DUMP TRUCK,
SERVICE TRUCK,
FLAT BED, ETC.
BUFFER DATA
VEHICLE TYPE
25 30 35
155 200 250
40
305 25 30 35 40 45 50 55
540
550
600
550
605
660
660
720
POSTED SPEED (MPH)
10
11
12
MINIMUM TAPER LENGTH = L
60 65 70
(FEET)
450
495
500
780 840
LANE WIDTH
(FEET)
125
165
180
205
225
245
270
294
320
105
115
150 ---
--
8040
POSTED SPEED
(MPH)
50 / 70
IN TANGENT
(FEET)
IN TAPER
(FEET)
CHANNELIZING DEVICE SPACING
35 / 45 30 60
8040
POSTED SPEED
(MPH)
50 / 70
IN TANGENT
(FEET)
IN TAPER
(FEET)
CHANNELIZING DEVICE SPACING
25 / 30 20 40
RURAL ROADS & URBAN ARTERIALS
URBAN STREETS
RURAL ROADS, URBAN ARTERIALS,
RESIDENTIAL & BUSINESS DISTRICTS
25 MPH OR LESS
35 / 40 MPH
25 / 30 MPH
45 / 55 MPHRURAL ROADS
60 / 65 MPHRURAL HIGHWAYS
100’ 35/64 (2)
200’ 35/64 (2)
350’ 35/64
500’ 35/64
800’ 35/64
ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE
SIGN SPACING = X (1)
(1) ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE
AT-GRADE INTERSECTIONS, AND DRIVEWAYS.
(2) THIS SIGN SPACING MAY BE REDUCED IN URBAN AREAS TO FIT
ROADWAY CONDITIONS.
A Protective Vehicle is recommended regardless if a Truck
Mounted Attenuator (TMA) is available; a work vehicle may
be used. When no TMA is used, the Protective Vehicle
shall be strategically located to shield workers, with no
specific Roll-Ahead Stopping Distance.
Extend device taper (L/3) across shoulder ~ recommended.
Portable Changeable Message Sign (PCMS)
~ recommended.
Traffic Safety Drums for all tapers on high speed roadway
~ recommended.
Transverse Devices in closed lane every 1000’ 35/64
~ recommended.
Channelizing Device spacing for the downstream taper
option shall be 20’ O.C.
Use advanced notice for any overwidth loads prior to lane
closure for altenative routes if applicable ~ recommended.
For signs size refer to Manual on Uniform Traffic Control
Devices (MUTCD) and WSDOT Sign Fabrication Manual
M55-05.
Ken L. Smith 02-15-07NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE ENGINEER AND APPROVED FOR PUBLICATION, IS KEPT ON FILE AT THE WASHINGTON STATE DEPARTMENT OF TRANS-PORTATION. A COPY MAY BE OBTAINED UPON REQUEST.
APPROVED FOR PUBLICATION
DATESTATE DESIGN ENGINEER
Washington State Department of Transportation
SHEET 1 OF 1 SHEETSHEET 1 OF 1 SHEET
RURAL ROADS & URBAN ARTERIALS
URBAN STREETS
RURAL ROADS, URBAN ARTERIALS,
RESIDENTIAL & BUSINESS DISTRICTS
25 MPH OR LESS
35 / 40 MPH
25 / 30 MPH
45 / 55 MPHRURAL ROADS
350’ 35/64
500’ 35/64 DRAWN BY: ELENA BRUNSTEIN1.
2.
3.
4.
NOTES
ALL SIGNS ARE BLACK ON ORANGE UNLESS DESIGNATED OTHERWISE
8040
POSTED SPEED
(MPH)
50 / 70
IN TANGENT
(FEET)
IN TAPER
(FEET)
CHANNELIZING DEVICE SPACING
35 / 45 30 60
8040
POSTED SPEED
(MPH)
50 / 70
IN TANGENT
(FEET)
IN TAPER
(FEET)
CHANNELIZING DEVICE SPACING
25 / 30 20 40
END
ROAD WORK
G20-2A
WORK
AREA
ROAD
WORK
AHEAD
W20-1
XROAD
WORK
AHEAD
W20-1
X
END
ROAD WORK
G20-2A
W20-1
ROAD
WORK
AHEADXRIGHT LANE
TURN RIGHT
MUST R3-7R
B/W
ROAD
WORK
AHEAD
W20-1
X
END
ROAD WORK
G20-2A
SIGN SPACING = X
100’ 35/64
200’ 35/64 XXXXLL/2XR4-7
B/W
SIGN LOCATION
CHANNELIZING DEVICES
LEGEND
25 30
10
11
12
LANE WIDTH
(FEET)
125
165
180
105
115
150
35 40
POSTED SPEED (MPH)
205
225
245
270
294
320
45 50 55
540
550
600
550
605
660
450
495
500
MINIMUM TAPER LENGTH = L (FEET)
OBLITERATED MARKING
R3-2
R/W
R3-2
R/W
R3-2
R/W
ARROW PANEL
SEE N
O
T
E
1
(
T
Y
P.
)
THRU
TRAFFIC
MERGE
LEFT
W4-7
W4-2L
~ COMPLIANCE DATE 12/23/13
STANDARD PLAN K-32.80-00
INTERSECTION
~ HALF ROAD CLOSURE
WITH LANE SHIFT
SHEET 1 OF 1 SHEET
FOR LOCAL AGENCY USE ONLY
NOT FOR USE ON STATE ROUTES
BARRICADE ~ TYPE 3 L
45
270
POSTED SPEED (MPH)
LONGITUDINAL BUFFER SPACE = B
LENGTH B (FEET)
25 30 35
120
40
1705585
BW20-5L
LEFT LANE
CLOSED
AHEAD
END
ROAD WORK
G20-2A
5.
6.
7.
ALL SIGN SPACING MAY BE ADJUSTED TO ACCOMMODATE
AT-GRADE INTERSECTIONS AND DRIVEWAYS.STA TEOFWASHINGT
O
NR
EGISTEREDPROFE
S
SIONAL ENGINEER25335THEODORE J. TR
EPA
NI
EREXPIRES AUGUST 9, 2007
NO LEFT TURN signs are to be used if traffic volumes are too high or
there is an operating signal. Close the left turn pocket if there is one on
the side street.
When turn prohibitions are implemented, two turn prohibition signs should
be used, one on the near side and, space permitting, one on on the far
side of the intersection.
If the work space extends a crosswalk, the crosswalk should be closed
(see Standard Plan K-34.20).
Flashing Warning Lights (Type A per MUTCD) should be used, as needed,
to mark barricades at night.
Steady Burning Warning Lights (Type C per MUTCD) shall be used to
mark channelizing devices at night.
For long term projects conflicting pavement markings that are no longer
applicable shall be removed or obliterated. Temporary markings
shall be used.
For signs size refer to Manual on Uniform Traffic Control Devices
(MUTCD) and WSDOT Sign Fabrication Manual M55-05.NOTE: THIS PLAN IS NOT A LEGAL ENGINEERING DOCUMENT BUT AN ELECTRONIC DUPLICATE. THE ORIGINAL, SIGNED BY THE ENGINEER AND APPROVED FOR PUBLICATION, IS KEPT ON FILE AT THE WASHINGTON STATE DEPARTMENT OF TRANS-PORTATION. A COPY MAY BE OBTAINED UPON REQUEST.02-15-07Ken L. Smith
CITY OF RENTON
SPECIAL PROVISIONS
Monroe Ave Infiltration Facility
FUNDED IN PART BY THE WASHINGTON STATE DEPARTMENT OF ECOLOGY
RESPONSIBLE FOR DIVISIONS
1-5, 7-9.
RESPONSIBLE FOR DIVISION 6
12/05/2023 12/5/2023
Monroe Ave Infiltration Facility SP-i Special Provisions
City of Renton
TABLE OF CONTENTS
Page
INTRODUCTION TO THE SPECIAL PROVISIONS ................................................................................ 1
DIVISION 1 ............................................................................................................................................... 2
1-01 DEFINITIONS AND TERMS........................................................................................................ 2
1-02 BID PROCEDURES AND CONDITIONS .................................................................................... 4
1-03 AWARD AND EXECUTION OF CONTRACT ........................................................................... 11
1-04 SCOPE OF THE WORK ............................................................................................................ 14
1-05 CONTROL OF WORK ................................................................................................................ 16
1-06 CONTROL OF MATERIAL ......................................................................................................... 24
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC ........................................... 25
1-08 PROSECUTION AND PROGRESS ........................................................................................... 41
1-09 MEASUREMENT AND PAYMENT ............................................................................................ 47
1-10 TEMPORARY TRAFFIC CONTROL .......................................................................................... 77
1-11 RENTON SURVEYING STANDARDS ....................................................................................... 81
DIVISION 2 ............................................................................................................................................. 87
2-01 CLEARING, GRUBBING, AND ROADSIDE CLEANUP ............................................................ 87
2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS ............................................................ 87
2-03 ROADWAY EXCAVATION AND EMBANKMENT..................................................................... 88
DIVISION 5 ............................................................................................................................................. 92
5-04 HOT MIX ASPHALT .................................................................................................................. 92
5-06 TEMPORARY RESTORATION IN PAVEMENT AREA .......................................................... 117
DIVISION 6 ........................................................................................................................................... 118
6-02 CONCRETE STRUCTURES .................................................................................................... 118
6-03 STEEL STRUCTURES ............................................................................................................. 120
DIVISION 7 ........................................................................................................................................... 122
7-04 STORM SEWERS .................................................................................................................... 122
7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS .................................................. 125
7-06 STORMWATER INFILTRATION FACILITY ............................................................................ 129
7-08 GENERAL PIPE INSTALLATION REQUIREMENTS .............................................................. 131
DIVISION 8 ........................................................................................................................................... 133
8-01 EROSION CONTROL AND WATER POLLUTION CONTROL ............................................... 133
8-02 ROADSIDE RESTORATION .................................................................................................... 135
8-12 CHAIN LINK FENCE AND WIRE FENCE ................................................................................ 139
8-14 CEMENT CONCRETE SIDEWALKS ....................................................................................... 140
8-24 ROCK AND GRAVITY BLOCK WALL AND GABION CRIBBING ........................................... 140
DIVISION 9 ........................................................................................................................................... 144
9-03 AGGREGATES ....................................................................................................................... 144
9-05 DRAINAGE STRUCTURES AND CULVERTS ........................................................................ 145
9-14 EROSION CONTROL AND ROADSIDE PLANTING .............................................................. 146
Monroe Ave Infiltration Facility SP-1 Special Provisions
City of Renton
INTRODUCTION TO THE SPECIAL PROVISIONS
(December 10, 2020 APWA GSP)
The work on this project shall be accomplished in accordance with the Standard Specifications
for Road, Bridge and Municipal Construction, 2023 edition, as issued by the Washington State
Department of Transportation (WSDOT) and the American Public Works Association (APWA),
Washington State Chapter (hereafter “Standard Specifications”). The Standard Specifications,
as modified or supplemented by these Special Provisions, all of which are made a part of the
Contract Documents, shall govern all of the Work.
These Special Provisions are made up of both General Special Provisions (GSPs) from various
sources, which may have project-specific fill-ins; and project-specific Special Provisions. Each
Provision either supplements, modifies, or replaces the comparable Standard Specification, or is
a new Provision. The deletion, amendment, alteration, or addition to any subsection or portion
of the Standard Specifications is meant to pertain only to that particular portion of the section,
and in no way should it be interpreted that the balance of the section does not apply.
The project-specific Special Provisions are not labeled as such. The GSPs are labeled under
the headers of each GSP, with the effective date of the GSP and its source. For example:
(March 8, 2013 APWA GSP)
(April 1, 2013 WSDOT GSP)
(June, 2023 Renton GSP)
Also incorporated into the Contract Documents by reference are:
· City of Renton Standard Details
· King County Road Design and Construction Standards, 2016 Edition
· Standard Plans for Road, Bridge and Municipal Construction, WSDOT/APWA, current
edition
· Manual on Uniform Traffic Control Devices for Streets and Highways, currently adopted
edition, with Washington State modifications, if any
Contractor shall obtain copies of these publications, at Contractor’s own expense.
Third-Party Beneficiary: All parties agree that the State of Washington shall be, and is hereby,
named as an express third-party beneficiary to this Contract, with full rights as such.
Monroe Ave Infiltration Facility SP-2 Special Provisions
City of Renton
DIVISION 1
GENERAL REQUIREMENTS
1-01 DEFINITIONS AND TERMS
DESCRIPTION OF WORK
(March 13, 1995 WSDOT GSP)
This Contract provides for stormwater management infrastructure and associated
maintenance access road located at 301 Monroe Ave NE, Renton WA 98056; including
temporary erosion control, temporary traffic control, clearing and grubbing, earthwork,
stormwater conveyance and stormwater management facilities, hot mix asphalt paving,
landscaping, illumination, utility adjustments, and other work, all in accordance with the
attached Contract Plans, these Contract Provisions, and the Standard Specifications.
1-01.3 Definitions
(January 19, 2022 APWA GSP)
Delete the heading Completion Dates and the three paragraphs that follow it, and replace them
with the following:
Dates
Bid Opening Date
The date on which the Contracting Agency publicly opens and reads the Bids.
Award Date
The date of the formal decision of the Contracting Agency to accept the lowest
responsible and responsive Bidder for the Work.
Contract Execution Date
The date the Contracting Agency officially binds the Agency to the Contract.
Notice to Proceed Date
The date stated in the Notice to Proceed on which the Contract time begins.
Substantial Completion Date
The day the Engineer determines the Contracting Agency has full and unrestricted use
and benefit of the facilities, both from the operational and safety standpoint, any
remaining traffic disruptions will be rare and brief, and only minor incidental work,
replacement of temporary substitute facilities, plant establishment periods, or correction
or repair remains for the Physical Completion of the total Contract.
Physical Completion Date
The day all of the Work is physically completed on the project. All documentation
required by the Contract and required by law does not necessarily need to be furnished
by the Contractor by this date.
Completion Date
The day all the Work specified in the Contract is completed and all the obligations of the
Contractor under the contract are fulfilled by the Contractor. All documentation required
Monroe Ave Infiltration Facility SP-3 Special Provisions
City of Renton
by the Contract and required by law must be furnished by the Contractor before
establishment of this date.
Final Acceptance Date
The date on which the Contracting Agency accepts the Work as complete.
Supplement this Section with the following:
All references in the Standard Specifications or WSDOT General Special Provisions, to the
terms “Department of Transportation”, “Washington State Transportation Commission”,
“Commission”, “Secretary of Transportation”, “Secretary”, “Headquarters”, and “State
Treasurer” shall be revised to read “Contracting Agency”.
All references to the terms “State” or “state” shall be revised to read “Contracting Agency”
unless the reference is to an administrative agency of the State of Washington, a State
statute or regulation, or the context reasonably indicates otherwise.
All references to “State Materials Laboratory” shall be revised to read “Contracting Agency
designated location”.
All references to “final contract voucher certification” shall be interpreted to mean the
Contracting Agency form(s) by which final payment is authorized, and final completion and
acceptance granted.
Additive
A supplemental unit of work or group of bid items, identified separately in the Bid Proposal,
which may, at the discretion of the Contracting Agency, be awarded in addition to the base
bid.
Alternate
One of two or more units of work or groups of bid items, identified separately in the Bid
Proposal, from which the Contracting Agency may make a choice between different
methods or material of construction for performing the same work.
Business Day
A business day is any day from Monday through Friday except holidays as listed in Section
1-08.5.
Contract Bond
The definition in the Standard Specifications for “Contract Bond” applies to whatever bond
form(s) are required by the Contract Documents, which may be a combination of a Payment
Bond and a Performance Bond.
Contract Documents
See definition for “Contract”.
Contract Time
The period of time established by the terms and conditions of the Contract within which the
Work must be physically completed.
Monroe Ave Infiltration Facility SP-4 Special Provisions
City of Renton
Notice of Award
The written notice from the Contracting Agency to the successful Bidder signifying the
Contracting Agency’s acceptance of the Bid Proposal.
Notice to Proceed
The written notice from the Contracting Agency or Engineer to the Contractor authorizing
and directing the Contractor to proceed with the Work and establishing the date on which
the Contract time begins.
Traffic
Both vehicular and non-vehicular traffic, such as pedestrians, bicyclists, wheelchairs, and
equestrian traffic.
1-02 BID PROCEDURES AND CONDITIONS
1-02.1 Prequalification of Bidders
Delete this section and replace it with the following:
1-02.1 Qualifications of Bidder
(June 2023 Renton GSP)
Before award of a public works contract, a bidder must meet at least the minimum
qualifications of RCW 39.04.350(1) to be considered a responsible bidder and qualified to
be awarded a public works project.
The Contracting Agency reserves the right to take whatever action it deems necessary to
ascertain the ability of the bidder to perform the work satisfactorily.
Add the following new section:
1-02.1(1) Supplemental Qualifications Criteria
(July 31, 2017 APWA GSP)
In addition, the Contracting Agency has established Contracting Agency-specific and/or
project-specific supplemental criteria, in accordance with RCW 39.04.350(3), for determining
Bidder responsibility, including the basis for evaluation and the deadline for appealing a
determination that a Bidder is not responsible. These criteria are contained in Section 1-
02.14 Option C of these Special Provisions.
1-02.2 Plans and Specifications
(June 27, 2011 APWA GSP)
Delete this section and replace it with the following:
Information as to where Bid Documents can be obtained or reviewed can be found in the
Call for Bids (Advertisement for Bids) for the work.
After award of the contract, plans and specifications will be issued to the Contractor at no
cost as detailed below:
Monroe Ave Infiltration Facility SP-5 Special Provisions
City of Renton
Additional plans and Contract Provisions may be obtained by the Contractor from the source
stated in the Call for Bids, at the Contractor’s own expense.
1-02.4 Examination of Plans, Specifications, and Site of Work
1-02.4(1) General
(December 30, 2022 APWA GSP Option A)
The first sentence of the ninth paragraph, beginning with “Prospective Bidder desiring…”, is
revised to read:
Prospective Bidders desiring an explanation or interpretation of the Bid Documents, shall
request the explanation or interpretation in writing soon enough to allow a written reply to
reach all prospective Bidders before the submission of their Bids.
1-02.4(2) Subsurface Information
The first two sentences of the first paragraph is revised to read:
The Contracting Agency has made subsurface investigation of the site of the proposed
Work. The Geotechnical Report, prepared by Aspect Consulting on July 24th, 2023, is
included in the bid documents.
1-02.5 Proposal Forms
(July 31, 2017 APWA GSP)
Delete this section and replace it with the following:
The Proposal Form will identify the project and its location and describe the work. It will also
list estimated quantities, units of measurement, the items of work, and the materials to be
furnished at the unit bid prices. The bidder shall complete spaces on the proposal form that
call for, but are not limited to, unit prices; extensions; summations; the total bid amount;
signatures; date; and, where applicable, retail sales taxes and acknowledgment of addenda;
the bidder’s name, address, telephone number, and signature; the bidder’s
UDBE/DBE/M/WBE commitment, if applicable; a State of Washington Contractor’s
Registration Number; and a Business License Number, if applicable. Bids shall be
completed by typing or shall be printed in ink by hand, preferably in black ink. The required
certifications are included as part of the Proposal Form.
The Contracting Agency reserves the right to arrange the proposal forms with alternates and
additives if such be to the advantage of the Contracting Agency. The bidder shall bid on all
alternates and additives set forth in the Proposal Form unless otherwise specified.
To Prime Contractor No. of
Sets
Basis of Distribution
Reduced plans (11" x
17")
5 Furnished automatically upon
award.
Contract Provisions 5 Furnished automatically upon
award.
Large plans (e.g., 22" x
34")
2 Furnished only upon request.
Monroe Ave Infiltration Facility SP-6 Special Provisions
City of Renton
1-02.6 Preparation of Proposal
(June 2023, Renton GSP)
Supplement the second paragraph with the following:
4. If a minimum bid amount has been established for any item, the unit or lump sum price
must equal or exceed the minimum amount stated.
5. Any correction to a bid made by interlineation, alteration, or erasure, shall be initialed by
the signer of the bid.
Delete the last two paragraphs, and replace them with the following:
The Bidder shall submit with their Bid a completed Contractor Certification Wage Law
Compliance form, provided by the Contracting Agency. Failure to return this certification as
part of the Bid Proposal package will make this Bid Nonresponsive and ineligible for Award.
A Contractor Certification of Wage Law Compliance form is included in the Proposal Forms.
The Bidder shall make no stipulation on the Bid Form, nor qualify the bid in any manner.
A bid by a corporation shall be executed in the corporate name, by the president or a vice
president (or other corporate officer accompanied by evidence of authority to sign).
A bid by a partnership shall be executed in the partnership name, and signed by a partner. A
copy of the partnership agreement shall be submitted with the Bid Form if any UDBE
requirements are to be satisfied through such an agreement.
A bid by a joint venture shall be executed in the joint venture name and signed by a member
of the joint venture. A copy of the joint venture agreement shall be submitted with the Bid
Form if any UDBE requirements are to be satisfied through such an agreement.
Evidence of the signatory’s authority to sign the Bid Proposal on behalf of the
business entity shall be submitted with the Bid Proposal. Otherwise, the submitted
Bid Proposal will be considered irregular and non-responsive and may be rejected.
Add the following new section:
1-02.6(1) Certification of Compliance with Wage Payment Statutes
(June 2023, Renton GSP)
The Bidder shall submit with the Bid a completed and sighed “Contractor Certification, Wage
Law Compliance – Responsibility Criteria, Washington State Public Works Contracts”
document where the Bidder under penalty of perjury verifies that the Bidder is in compliance
with responsible bidder criteria in RCW 39.04.350 subsection (1)(g), as required per Section
1-02.14. Otherwise, the submitted Bid Proposal will be considered irregular and non-
responsive and will be rejected.
The Bidder may use the form provided in the Bid Documents. The form is also available at
http://wsdot.wa.gov/forms/pdfForms.html. The Bidder may download, print, complete and
sign the form to include with the Bid. The DOT Form, DOT Form Number and revision date
must match the form included in the Bid Documents, otherwise the Bid will be regarded as
irregular and non-responsive and the Bid will be rejected.
Monroe Ave Infiltration Facility SP-7 Special Provisions
City of Renton
1-02.7 Bid Deposit
(March 8, 2013 APWA GSP)
Supplement this section with the following:
Bid bonds shall contain the following:
1. Contracting Agency-assigned number for the project;
2. Name of the project;
3. The Contracting Agency named as obligee;
4. The amount of the bid bond stated either as a dollar figure or as a percentage which
represents five percent of the maximum bid amount that could be awarded;
5. Signature of the bidder’s officer empowered to sign official statements. The signature
of the person authorized to submit the bid should agree with the signature on the bond,
and the title of the person must accompany the said signature;
6. The signature of the surety’s officer empowered to sign the bond and the power of
attorney.
If so stated in the Contract Provisions, bidder must use the bond form included in the
Contract Provisions.
If so stated in the Contract Provisions, cash will not be accepted for a bid deposit.
Add the following new section:
1-02.7(1) Bid Bond, Cashier’s Check, Postal Money Order
(June 2023, Renton GSP)
As evidence of good faith, pursuant to RCW 35.23.352(1), an original Bid Proposal Deposit
in the form of either a bid bond, cashier’s check or postal money order in an amount equal to
five percent (5%) of the Total Bid Amount shall be submitted with the Bid Proposal.
If the Bidder elects to provide a bid bond, the Proposal Bid Bond form included in the Bid
Documents shall be used. Otherwise, the Bid Proposal will be considered irregular and non-
responsive and the Bid Proposal will be rejected.
If the Bidder elects to provide a cashier’s check, it shall be made payable to the City of
Renton.
If the Bidder elects to provide a postal money order, it shall be made payable to the City of
Renton.
Cash will not be accepted for a bid deposit.
1-02.9 Delivery of Proposal
(June 2023, Renton GSP)
Revise the first and second paragraph to read:
Each Proposal shall be submitted in a sealed envelope, with the Project Name and Project
Number as stated in the Call for Bids clearly marked on the outside of the envelope, or as
otherwise required in the Bid Documents, to ensure proper handling and delivery.
Monroe Ave Infiltration Facility SP-8 Special Provisions
City of Renton
Proposals that are received as required will be publicly opened and read as specified in
Section 1-02.12. The Contracting Agency will not open or consider any Bid Proposal that is
received after the time specified in the Call for Bids for receipt of Bid Proposals, or received
in a location other than that specified in the Call for Bids. The Contracting Agency will not
open or consider any “Supplemental Information” (DBE confirmations, or GFE
documentation) that is received after the time specified above, or received in a location
other than that specified in the Call for Bids.
If an emergency or unanticipated event interrupts normal work processes of the Contracting
Agency so that Proposals cannot be received at the office designated for receipt of bids as
specified in Section 1-02.12 the time specified for receipt of the Proposal will be deemed to
be extended to the same time of day specified in the solicitation on the first work day on
which the normal work processes of the Contracting Agency resume.
1-02.10 Withdrawing, Revising, or Supplementing Proposal
(July 23, 2015 APWA GSP)
Delete this section, and replace it with the following:
After submitting a physical Bid Proposal to the Contracting Agency, the Bidder may
withdraw, revise, or supplement it if:
1. The Bidder submits a written request signed by an authorized person and physically
delivers it to the place designated for receipt of Bid Proposals, and
2. The Contracting Agency receives the request before the time set for receipt of Bid
Proposals, and
3. The revised or supplemented Bid Proposal (if any) is received by the Contracting
Agency before the time set for receipt of Bid Proposals.
If the Bidder’s request to withdraw, revise, or supplement its Bid Proposal is received before
the time set for receipt of Bid Proposals, the Contracting Agency will return the unopened
Proposal package to the Bidder. The Bidder must then submit the revised or supplemented
package in its entirety. If the Bidder does not submit a revised or supplemented package,
then its bid shall be considered withdrawn.
Late revised or supplemented Bid Proposals or late withdrawal requests will be date
recorded by the Contracting Agency and returned unopened. Mailed, emailed, or faxed
requests to withdraw, revise, or supplement a Bid Proposal are not acceptable.
1-02.12 Public Opening of Proposals
(June 2023, Renton GSP)
Section 1-02.12 is supplemented with the following:
The Contracting Agency reserves the right to postpone the date and/or time that sealed bids
are due and the bid opening. Notification to bidders of any change will be by addenda.
1-02.13 Irregular Proposals
(October 1, 2020 APWA GSP)
Delete this section and replace it with the following:
1. A Proposal will be considered irregular and will be rejected if:
a. The Bidder is not prequalified when so required;
Monroe Ave Infiltration Facility SP-9 Special Provisions
City of Renton
b. The authorized Proposal form furnished by the Contracting Agency is not used or is
altered;
c. The completed Proposal form contains any unauthorized additions, deletions,
alternate Bids, or conditions;
d. The Bidder adds provisions reserving the right to reject or accept the award, or enter
into the Contract;
e. A price per unit cannot be determined from the Bid Proposal;
f. The Proposal form is not properly executed;
g. The Bidder fails to submit with their proposal, an original Bid Proposal Deposit in an
amount equal to five percent (5%) of the Total Bid Amount, as required in Section
102.7;
h. The Bidder elects to provide a Proposal Bid Bond for the Bid Proposal Deposit and
does not submit or properly execute the Proposal Bid Bond form included in the Bid
Documents as required in Section 1-02.7;
i. The Bidder fails to submit or properly complete a Subcontractor list, if applicable, as
required in Section 1-02.6;
j. The Bidder fails to submit or properly complete a Disadvantaged Business Enterprise
Certification, if applicable, as required in Section 1-02.6;
k. The Bidder fails to submit written confirmation from each DBE firm listed on the
Bidder’s completed DBE Utilization Certification that they are in agreement with the
bidder’s DBE participation commitment, if applicable, as required in Section 1-02.6,
or if the written confirmation that is submitted fails to meet the requirements of the
Special Provisions;
l. The Bidder fails to submit DBE Good Faith Effort documentation, if applicable, as
required in Section 1-02.6, or if the documentation that is submitted fails to
demonstrate that a Good Faith Effort to meet the Condition of Award was made;
m. The Bidder fails to submit a DBE Bid Item Breakdown form, if applicable, as required
in Section 1-02.6, or if the documentation that is submitted fails to meet the
requirements of the Special Provisions;
n. The Bidder fails to submit DBE Trucking Credit Forms, if applicable, as required in
Section 1-02.6, or if the documentation that is submitted fails to meet the
requirements of the Special Provisions;
o. The Bidder fails to submit or properly execute the Contractor Certification, Wage Law
Compliance – Responsibility Criteria, Washington State Public Works Contractors
document, as required in Section 1-02.6(1);
p. The Bid Proposal does not constitute a definite and unqualified offer to meet the
material terms of the Bid invitation; or
q. More than one Proposal is submitted for the same project from a Bidder under the
same or different names.
2. A Proposal may be considered irregular and may be rejected if:
a. The Proposal does not include a unit price for every Bid item;
b. Any of the unit prices are excessively unbalanced (either above or below the amount
of a reasonable Bid) to the potential detriment of the Contracting Agency;
c. Receipt of Addenda is not acknowledged;
d. A member of a joint venture or partnership and the joint venture or partnership
submit Proposals for the same project (in such an instance, both Bids may be
rejected); or
e. If Proposal form entries are not made in ink.
3. A Proposal will be considered irregular and may be rejected if:
Monroe Ave Infiltration Facility SP-10 Special Provisions
City of Renton
a. The bidder fails to submit with their Bid Proposal, evidence of signatory’s authority to
sign the Bid Proposal on behalf of the business entity, as required in Section 1-02.6.
1-02.14 Disqualification of Bidders
(June 2023 Renton GSP)
Delete this section and replace it with the following:
A Bidder will be deemed not responsible if the Bidder does not meet the mandatory bidder
responsibility criteria in RCW 39.04.350(1), as amended.
A Bidder may be deemed not responsible and the proposal rejected if:
a. More than one Proposal is submitted for the same project from a Bidder under the
same or different names;
b. Evidence of collusion exists with any other Bidder or potential Bidder. Participants in
collusion will be restricted from submitting further Bids;
c. The Bidder, in the opinion of the Contracting Agency, is not qualified for the Work or
to the full extent of the bid, or to the extent that the bid exceeds the authorized
prequalification amount as may have been determined by a prequalification of the
Bidder;
d. An unsatisfactory performance record exists based on past or current Contracting
Agency Work or for Work done for others, as judged from the standpoint of conduct
of the Work; workmanship; progress; affirmative action; equal employment
opportunity practices; or Disadvantaged Enterprise, Minority Enterprise, or Women’s
Business Enterprise utilization.
e. There is uncompleted Work (Contracting Agency or otherwise) which might hinder or
prevent the prompt completion of the Work bid upon;
f. The Bidder failed to settle bills for labor or materials on past or current Contracts;
g. The Bidder has failed to complete a written public contract or has been convicted of
a crime arising from a previous public contract;
h. The Bidder is unable, financially or otherwise, to perform the Work;
i. A Bidder is not authorized to do business in the State of Washington (not registered
in accordance with RCW 18.27).
j. The Bidder owes delinquent taxes to the Washington State Department of Revenue
without a payment plan approved by the Department of Revenue;
k. The Bidder is currently debarred or suspended by the Federal government;
l. There are any other reasons deemed proper by the Contracting Agency.
The Contracting Agency will verify that the Bidder meets the mandatory bidder responsibility
criteria in RCW 39.04.350(1l). To assess Bidder responsibility, the Contracting Agency
reserves the right to request further documentation as needed from the low Bidder and
documentation from other Bidders as well to assess Bidder responsibility and compliance
with all Bidder responsibility criteria. The Contracting Agency also reserves the right to
obtain information from third-parties and independent sources of information concerning a
Bidder’s compliance with the mandatory and supplemental criteria, and to use that
information in their evaluation. The Contracting Agency may consider mitigating factors in
determining whether the Bidder complies with the requirements of the Supplemental
Criteria.
The basis for evaluation shall include any documents or facts obtained by Contracting
Agency (whether from the Bidder or third parties) including but not limited to: (i) financial,
Monroe Ave Infiltration Facility SP-11 Special Provisions
City of Renton
historical, or operational data from the Bidder; (ii) information obtained directly by the
Contracting Agency from others for whom the Bidder has worked, or other public agencies
or private enterprises; and (iii) any additional information obtained by the Contracting
Agency which is believed to be relevant to the matter.
If the Contracting Agency determines the Bidder does not meet the Bidder responsibility
criteria above and is therefore not a responsible Bidder, the Contracting Agency shall notify
the Bidder in writing, with the reasons for its determination. If the Bidder disagrees with this
determination, it may appeal the determination within two (2) business days of the
Contracting Agency’s determination by presenting its appeal and any additional information
to the Contracting Agency. The Contracting Agency will consider the appeal and any
additional information before issuing its final determination. If the final determination affirms
that the Bidder is not responsible, the Contracting Agency will not execute a contract with
any other Bidder until at least two (2) business days after the Bidder determined to be not
responsible has received the Contracting Agency’s final determination.
1-02.15 Pre-Award Information
(August 14, 2013 APWA GSP)
Revise this section to read:
Before awarding any contract, the Contracting Agency may require one or more of these
items or actions of the apparent lowest responsible bidder:
1. A complete statement of the origin, composition, and manufacture of any or all
materials to be used,
2. Samples of these materials for quality and fitness tests,
3. A progress schedule (in a form the Contracting Agency requires) showing the order
of and time required for the various phases of the work,
4. A breakdown of costs assigned to any bid item,
5. Attendance at a conference with the Engineer or representatives of the Engineer,
6. Obtain, and furnish a copy of, a business license to do business in the city or county
where the work is located.
7. A copy of State of Washington Contractor’s Registration, or
8. Any other information or action taken that is deemed necessary to ensure that the
bidder is the lowest responsible bidder.
1-03 AWARD AND EXECUTION OF CONTRACT
1-03.1 Consideration of Bids
(June 02, 2023 Renton GSP)
Revise the first paragraph to read:
After opening and reading proposals, the Contracting Agency will check them for
correctness of extensions of the prices per unit and the total price. If a discrepancy exists
between the price per unit and the extended amount of any bid item, the price per unit will
control. If a minimum bid amount has been established for any item and the bidder’s unit or
lump sum price is less than the minimum specified amount, the Contracting Agency will
unilaterally revise the unit or lump sum price, to the minimum specified amount and
Monroe Ave Infiltration Facility SP-12 Special Provisions
City of Renton
recalculate the extension. The total of extensions, corrected where necessary, including
sales taxes where applicable and such additives and/or alternates as selected by the
Contracting Agency, will be used by the Contracting Agency for award purposes and to fix
the Awarded Contract Price amount and the amount of the contract bond.
Revise the first sentence of the third paragraph to read:
A Bidder who wishes to claim error after the Bids have been publicly opened and read as
required by section1-02.12, shall promptly notify the Contracting Agency that an error has
occurred.
Revise the last sentence of the fourth paragraph to read:
If the Contracting Agency does not concur in the error or determines that the error is not the
kind for which the law allows relieve, the Contracting Agency may Award the Contract and if
the Bidder refuses to execute the Contract, the Bidder’s Bid deposit shall be forfeited as
required by RCW 35.23.352. Per RCW 39.04.107, a low bidder on a public works project
who claims error and fails to enter into a contract is prohibited from bidding on the same
project if a second or subsequent call for bids is made for the project.
Supplement this section as follows:
All bids will be based on total sum of all schedules of prices. No partial bids will be accepted
unless so stated in the call for bids or special provisions. The City reserves the right to
award all or any schedule of a bid to the lowest bidder at its discretion.
1-03.3 Execution of Contract
(January 19, 2022 APWA GSP)
Revise this section to read:
Within 3 calendar days of Award date (not including Saturdays, Sundays and Holidays), the
successful Bidder shall provide the information necessary to execute the Contract to the
Contracting Agency. The Bidder shall send the contact information, including the full name,
email address, and phone number, for the authorized signer and bonding agent to the
Contracting Agency.
Copies of the Contract Provisions, including the unsigned Form of Contract, will be available
for signature by the successful bidder on the first business day following award. The number
of copies to be executed by the Contractor will be determined by the Contracting Agency.
Within ten (10) calendar days after the award date, the successful bidder shall return the
signed Contracting Agency-prepared contract, an insurance certification as required by
Section 1-07.18 and a satisfactory bond as required by law. Before execution of the
contract by the Contracting Agency, the successful bidder shall provide any pre-award
information the Contracting Agency may require under Section 1-02.15.
Until the Contracting Agency executes a contract, no proposal shall bind the Contracting
Agency nor shall any work begin within the project limits or within Contracting Agency-
Monroe Ave Infiltration Facility SP-13 Special Provisions
City of Renton
furnished sites. The Contractor shall bear all risks for any work begun outside such areas
and for any materials ordered before the contract is executed by the Contracting Agency.
If the bidder experiences circumstances beyond their control that prevents return of the
contract documents within the calendar days after the award date stated above, the
Contracting Agency may grant up to a maximum of three (3) additional calendar days for
return of the documents, provided the Contracting Agency deems the circumstances warrant
it.
Section 1-03.3 is supplemented with the following:
It is anticipated that this project will be funded in part by the Washington State Department
of Ecology. Neither the State of Washington nor any of its departments or employees are,
or shall be, a party to this contract or any subcontract.
Third-Party Beneficiary: All parties agree that the State of Washington shall be, and is
hereby, named as an express third-party beneficiary of this contract, with full rights as such.
1-03.4 Contract Bond
(July 23, 2015 APWA GSP)
Delete the first paragraph and replace it with the following:
The successful bidder shall provide executed payment and performance bond(s) for the full
contract amount. The bond may be a combined payment and performance bond; or be
separate payment and performance bonds. In the case of separate payment and
performance bonds, each shall be for the full contract amount. The bond(s) shall:
1. Be on Contracting Agency-furnished form(s);
2. Be signed by an approved surety (or sureties) that:
a. Is registered with the Washington State Insurance Commissioner, and
b. Appears on the current Authorized Insurance List in the State of Washington
published by the Office of the Insurance Commissioner,
3. Guarantee that the Contractor will perform and comply with all obligations, duties,
and conditions under the Contract, including but not limited to the duty and obligation
to indemnify, defend, and protect the Contracting Agency against all losses and
claims related directly or indirectly from any failure:
a. Of the Contractor (or any of the employees, subcontractors, or lower tier
subcontractors of the Contractor) to faithfully perform and comply with all
contract obligations, conditions, and duties, or
b. Of the Contractor (or the subcontractors or lower tier subcontractors of the
Contractor) to pay all laborers, mechanics, subcontractors, lower tier
subcontractors, material person, or any other person who provides supplies
or provisions for carrying out the work;
4. Be conditioned upon the payment of taxes, increases, and penalties incurred on the
project under titles 50, 51, and 82 RCW; and
5. Be accompanied by a power of attorney for the Surety’s officer empowered to sign
the bond; and
6. Be signed by an officer of the Contractor empowered to sign official statements (sole
proprietor or partner). If the Contractor is a corporation, the bond(s) must be signed
Monroe Ave Infiltration Facility SP-14 Special Provisions
City of Renton
by the president or vice president, unless accompanied by written proof of the
authority of the individual signing the bond(s) to bind the corporation (i.e., corporate
resolution, power of attorney, or a letter to such effect signed by the president or vice
president).
1-03.7 Judicial Review
(November 30, 2018 APWA GSP)
Revise this section to read:
Any decision made by the Contracting Agency regarding the Award and execution of the
Contract or Bid rejection shall be conclusive subject to the scope of judicial review permitted
under Washington Law. Such review, if any, shall be timely filed in the Superior Court of the
county where the Contracting Agency headquarters is located, provided that where an
action is asserted against a county, RCW 36.01.050 shall control venue and jurisdiction.
1-04 SCOPE OF THE WORK
1-04.2 Coordination of Contract Documents, Plans, Special Provisions, Specifications,
and Addenda
(December 10, 2020 APWA GSP)
Revise the second paragraph to read:
Any inconsistency in the parts of the contract shall be resolved by following this order of
precedence (e.g., 1 presiding over 2, 2 over 3, 3 over 4, and so forth):
1. Addenda,
2. Proposal Form,
3. Special Provisions,
4. Contract Plans,
5. Standard Specifications,
6. Contracting Agency’s Standard Plans or Details (if any), and
7. WSDOT Standard Plans for Road, Bridge, and Municipal Construction.
Add the following new section:
1-04.2(1) Contractor-Discovered Discrepancies
(June 2023, Renton GSP)
Upon receipt of award of contract, the Contractor shall carefully study and compare all the
components of the Contract Documents and other instructions, and check and verify all field
measurements. The Contractor shall, prior to ordering material or performing Work, report in
writing to the Engineer any error, inconsistency, or omission in respect to design or mode of
construction, which is discovered. If the Contractor, in the course of this study or in the
accomplishment of the Work, finds any discrepancy between the Plans and the physical
condition of the locality as represented in the Plans, or any such errors or omissions in
respect to design or mode of construction in the Plans or in the layout as given by points
and instructions, it shall be the Contractor’s duty to inform the Engineer immediately in
writing, and the Engineer will promptly check the same. Any Work done after such
discovery, until correction of Plans or authorization of extra Work is given, if the Engineer
Monroe Ave Infiltration Facility SP-15 Special Provisions
City of Renton
finds that extra Work is involved, will be done at the Contractor's risk. If extra Work is
involved, the procedure shall be as provided in Section 1-04.4 of the Standard
Specifications.
1-04.4(1) Minor Changes
(May 30, 2019 APWA GSP)
Delete the first paragraph and replace it with the following:
Payments or credits for changes amounting to $350,000 or less may be made under the Bid
item “Minor Changes”. At the discretion of the Contracting Agency, this procedure for Minor
Changes may be used in lieu of the more formal procedure as outlined in Section 1-04.4,
Changes. All “Minor Changes” work will be within the scope of the Contract Work and will
not change Contract Time.
1-04.5 Procedure, Protest, and Dispute by the Contractor
(January 19, 2022 APWA GSP)
Revise item 1 of the first paragraph to read:
1. Give a signed written notice of protest to the Engineer or the Engineer’s field
Inspectors within three (3) calendar days of receiving a change order or an
Engineer’s Written Determination.
1-04.6 Variation in Estimated Quantities
(June 2023, Renton GSP)
Section 1-04.6 is supplemented as follows:
The quantities for the following items have been entered into the Proposal only to provide a
common proposal for bidders. Actual quantities will be determined in the field as the work
progresses, and will be paid at the original bid price, regardless of the final quantity. These
items shall not be subject to the provisions of 1-04.6 of the Standard Specifications:
· “Resolution of Utility Conflicts”
· “Select Borrow”
1-04.8 Progress Estimates and Payments
(June 2023, Renton GSP)
Section 1-04.8 is supplemented as follows:
The Contractor is encouraged to provide to the Engineer prior to progress payments an
estimate of “Lump Sum” Work accomplished to date. The Engineer's calculations and
decisions shall be final in regard to the actual percentage of any lump sum pay item
accomplished and eligible for payment unless another specific method of calculating lump
sum payments is provided elsewhere in the Specifications.
1-04.11 Final Cleanup
(June 2023, Renton GSP)
Revise the first paragraph in this section as follows:
The Contractor shall perform final cleanup as provided in this section to the Engineer’s
satisfaction. The Engineer will not establish the Physical Completion Date until this is done.
The Right of Way, material sites, any disturbed areas within the temporary construction
easement, and all ground the Contractor occupied to do the Work shall be left neat and
presentable. The Contractor shall:
Monroe Ave Infiltration Facility SP-16 Special Provisions
City of Renton
Remove all rubbish, surplus materials, discarded materials, falsework, camp buildings,
temporary structures, equipment, geogrid, and debris; and
Deposit in embankments, or remove from project, all unneeded, oversized rock left from
grading, surfacing and paving.
Supplement this section as follows:
All salvage material as noted on the Plans and taken from any of the discarded facilities
shall, at the Engineer’s discretion, be carefully salvaged and delivered to the City shops.
Any cost incurred in salvaging and delivering such items shall be considered incidental to
the Contract and to other pay item and no further compensation shall be made.
The Contract price for “Finish and Cleanup, Lump Sum,” shall be full compensation for all
Work, equipment and materials required to perform final cleanup. If this pay item does not
appear in the Contract Documents then final cleanup shall be considered incidental to the
Contract and to other pay items and no further compensation shall be made.
City to approve Final Cleanup based on a comparison of the pre-project site condition walk
performed with City and Contractor prior to start of Site Mobilization and Contractor
restoration after demobilization. City may provide additional direction to have site restored to
pre-project level, at no additional payment.
1-05 CONTROL OF WORK
Section 1-05.4 is supplemented with the following:
1-05.4 Conformity With and Deviation from Plans and Stakes
(June 2023, Renton GSP)
If the project calls for the Contractor supplied surveying, the Contractor shall provide all
required survey Work, including such Work as mentioned in Sections 1-05, 1-11 and
elsewhere in these Specifications as being provided by the Engineer. All costs for this
survey Work shall be included in " Contractor Surveying" per lump sum.
The Engineer or the Contractor supplied surveyor will provide construction stakes and marks
establishing lines, slopes, and grades as stipulated in Sections 1-05.4 and will perform such
Work per Section 1-11. The Contractor shall assume full responsibility for detailed
dimensions, elevations, and excavation slopes measured from the Engineer or the
Contractor supplied surveyor furnished stakes and marks.
The Contractor shall provide a work site, which has been prepared to permit construction
staking to proceed in a safe and orderly manner. The Contractor shall keep the Engineer or
the Contractor supplied surveyor informed of staking requirements and provide at least 48
hour notice to allow the Engineer or the Contractor supplied surveyor adequate time for
setting stakes.
The Contractor shall carefully preserve stakes, marks, and other reference points, including
existing monumentation, set by Contracting Agency forces. The Contractor will be charged
for the costs of replacing stakes, markers and monumentation that were not to be disturbed
but were destroyed or damaged by the Contractor's operations. This charge will be
deducted from monies due or to become due to the Contractor.
Monroe Ave Infiltration Facility SP-17 Special Provisions
City of Renton
Any claim by the Contractor for extra compensation by reason of alterations or
reconstruction Work allegedly due to error in the Engineer's line and grade, will not be
allowed unless the original control points set by the Engineer still exist, or unless other
satisfactory substantiating evidence to prove the error was furnished by the Engineer. Three
consecutive points set on line or grade shall be the minimum points used to determine any
variation from a straight line or grade. Any such variation shall, upon discovery, be reported
to the Engineer. In the absence of such report the Contractor shall be liable for any error in
alignment or grade.
The Contractor shall provide all surveys required other than those to be performed by the
Engineer. All survey Work shall be done in accordance with Section 1-11 SURVEYING
STANDARDS of these Specifications.
The Contractor shall keep updated survey field notes in a standard field book and in a
format set by the Engineer, per Section 1-11.1(4). These field notes shall include all survey
Work performed by the Contractor's surveyor in establishing line, grade and slopes for the
construction Work. Copies of these field notes shall be provided the Engineer upon request
and upon completion of the Contract Work the field book or books shall be submitted to the
Engineer and become the property of the Contracting Agency.
If the survey Work provided by the Contractor does not meet the standards of the Engineer,
then the Contractor shall, upon the Engineer's written request, remove the individual or
individuals doing the survey Work and the survey Work will be completed by the Engineer at
the Contractor's expense. Costs for completing the survey Work required by the Engineer
will be deducted from monies due or to become due the Contractor.
Add the following new section:
1-05.4(3) Contractor Surveying
(June 2023, Renton GSP)
When the Contract provides for Contractor Surveying, the Contractor shall supply the survey
Work required for the project. The Contractor shall retain as a part of the Contractor
Organization an experienced team of surveyors under the direct supervision of a
professional land surveyor licensed by the State of Washington. All survey Work shall be
done in accordance with Sections 1-05.4 and 1-11.
The Contractor and/or the Surveyor shall inform the Engineer in writing of any errors,
discrepancies, and omissions to the Plans that prevent the Contractor and/or the Surveyor
from constructing the project in a manner satisfactory to the Engineer. All errors,
discrepancies, and omissions must be corrected to the satisfaction of the Engineer before
the survey Work may be continued.
The Contractor shall coordinate his Work with the Surveyor and perform his operations in a
manner to protect all survey stakes from harm. The Contractor shall inform the Surveyor of
the Contractor's intent to remove any survey stakes and/or points before physically
removing them.
The Surveyor shall be responsible for maintaining As-Built records for the project. The
Contractor shall coordinate his operations and assist the Surveyor in maintaining accurate
As-Built records for the project.
Monroe Ave Infiltration Facility SP-18 Special Provisions
City of Renton
If the Contractor and the Surveyor fail to provide, as directed by the Engineer and/or these
Plans and Specifications, accurate As-Built records and other Work the Engineer deems
necessary, the Engineer may elect to provide at Contractor expense, a surveyor to provide
all As-Built records and other Work as directed by the Engineer. The Engineer shall deduct
expenses incurred by the Engineer-supplied surveying from monies owed to the Contractor.
Add the following new section:
1-05.4(4) Contractor Provided As-Built Information
(June 2023, Renton GSP)
It shall be the Contractors responsibility to record the location prior to the backfilling of the
trenches, by centerline station, offset, and depth below pavement, of all existing utilities
uncovered or crossed during his Work as covered under this project.
It shall be the Contractor’s responsibility to have his Surveyor locate by centerline station,
offset and elevation each major item of Work done under this contract per the survey
standard of Section 1-11. Major items of Work shall include but not be limited to: Manholes,
Catch basins and Inlets, Valves, vertical and Horizontal Bends, Junction boxes, Cleanouts,
Side Sewers, Street Lights & Standards, Hydrants, Major Changes in Design Grade, Vaults,
Culverts, Signal Poles, and Electrical Cabinets.
After the completion of the Work covered by this contract, the Contractor’s Surveyor shall
provide to the City the hard covered field book(s) containing the as-built notes and one set
of white prints of the project drawings upon which he has plotted the notes of the Contractor
locating existing utilities, and one set of white prints of the project drawings upon which he
has plotted the as-built location of the new Work as he recorded in the field book(s). This
drawing shall bear the Surveyor’s seal and signature certifying its accuracy.
Payment
Payment will be made for the following bid item when included in the proposal:
"Contractor Surveying", lump sum.
The lump sum contract price for "Contractor Surveying" shall be full pay for all labor,
equipment, materials, and supervision utilized to perform the Work specified, including any
resurveying, checking, correction of errors, replacement of missing or damaged stakes, and
coordination efforts.
1-05.7 Removal of Defective and Unauthorized Work
(October 1, 2005 APWA GSP)
Supplement this section with the following:
If the Contractor fails to remedy defective or unauthorized work within the time specified in a
written notice from the Engineer, or fails to perform any part of the work required by the
Contract Documents, the Engineer may correct and remedy such work as may be identified
in the written notice, with Contracting Agency forces or by such other means as the
Contracting Agency may deem necessary.
If the Contractor fails to comply with a written order to remedy what the Engineer determines
to be an emergency situation, the Engineer may have the defective and unauthorized work
Monroe Ave Infiltration Facility SP-19 Special Provisions
City of Renton
corrected immediately, have the rejected work removed and replaced, or have work the
Contractor refuses to perform completed by using Contracting Agency or other forces. An
emergency situation is any situation when, in the opinion of the Engineer, a delay in its
remedy could be potentially unsafe, or might cause serious risk of loss or damage to the
public.
Direct or indirect costs incurred by the Contracting Agency attributable to correcting and
remedying defective or unauthorized work, or work the Contractor failed or refused to
perform, shall be paid by the Contractor. Payment will be deducted by the Engineer from
monies due, or to become due, the Contractor. Such direct and indirect costs shall include in
particular, but without limitation, compensation for additional professional services required,
and costs for repair and replacement of work of others destroyed or damaged by correction,
removal, or replacement of the Contractor’s unauthorized work.
No adjustment in contract time or compensation will be allowed because of the delay in the
performance of the work attributable to the exercise of the Contracting Agency’s rights
provided by this Section.
The rights exercised under the provisions of this section shall not diminish the Contracting
Agency’s right to pursue any other avenue for additional remedy or damages with respect to
the Contractor’s failure to perform the work as required.
1-05.10 Removal of Defective and Unauthorized Work
(June 2023 Renton GSP)
Supplement this section with the following:
If within one year after the Acceptance Date of the Work by the Contracting Agency,
defective and/or unauthorized Work is discovered, the Contractor shall promptly, upon
written order by the Contracting Agency, return and in accordance with the Engineer’s
instructions, either correct such Work, or if such Work has been rejected by the Engineer,
remove it from the project site and replace it with non-defective and authorized Work, all
without cost to the Contracting Agency. If the Contractor does not promptly comply with the
written order to correct defective and/or unauthorized Work, or if an emergency exists, the
Contracting Agency reserves the right to have defective and/or unauthorized Work corrected
or removed and replaced pursuant to Section 1-05.7 “Removal of Defective and/or
Unauthorized Work.”
The Contractor agrees the above one year limitation shall not exclude or diminish the
Contracting Agency’s rights under any law to obtain damages and recover costs resulting
from defective and/or unauthorized Work discovered after one year but prior to the
expiration of the legal time period set forth in RCW 4.16.040 limiting actions upon a contract
in writing, or liability expressed of implied arising out of a written agreement.
The Contractor shall warrant good title to all materials, supplies, and equipment purchased
for, or incorporated in the Work. Nothing contained in this paragraph, however, shall defeat
or impair the right of persons furnishing materials or labor, to recover under any bond given
by the Contractor for their protection, or any rights under any law permitting such persons to
look to funds due the Contractor in the hands of the Contracting Agency.
Monroe Ave Infiltration Facility SP-20 Special Provisions
City of Renton
The provisions of this paragraph shall be inserted in all subcontracts and material contracts,
and notice of its provisions shall be given to all persons furnishing materials for the Work
when no formal contract is entered into for such materials.
1-05.11 Final Inspection
Delete this section and replace it with the following:
1-05.11 Final Inspections and Operational Testing
(October 1, 2005 APWA GSP)
1-05.11(1) Substantial Completion Date
When the Contractor considers the work to be substantially complete, the Contractor shall
so notify the Engineer and request the Engineer establish the Substantial Completion Date.
The Contractor’s request shall list the specific items of work that remain to be completed in
order to reach physical completion. The Engineer will schedule an inspection of the work
with the Contractor to determine the status of completion. The Engineer may also establish
the Substantial Completion Date unilaterally.
To be considered substantially complete the following conditions must be met:
1. The Contracting Agency must have full and unrestricted use and benefit of the
facilities both from the operational and safety standpoint.
2. Only minor incidental Work, replacement of temporary substitute facilities, or
correction of repair Work remains to reach physical completion of the Work.
If, after this inspection, the Engineer concurs with the Contractor that the work is
substantially complete and ready for its intended use, the Engineer, by written notice to the
Contractor, will set the Substantial Completion Date. If, after this inspection the Engineer
does not consider the work substantially complete and ready for its intended use, the
Engineer will, by written notice, so notify the Contractor giving the reasons therefor.
Upon receipt of written notice concurring in or denying substantial completion, whichever is
applicable, the Contractor shall pursue vigorously, diligently and without unauthorized
interruption, the work necessary to reach Substantial and Physical Completion. The
Contractor shall provide the Engineer with a revised schedule indicating when the
Contractor expects to reach substantial and physical completion of the work.
The above process shall be repeated until the Engineer establishes the Substantial
Completion Date and the Contractor considers the work physically complete and ready for
final inspection.
1-05.11(2) Final Inspection and Physical Completion Date
When the Contractor considers the work physically complete and ready for final inspection,
the Contractor by written notice, shall request the Engineer to schedule a final inspection.
The Engineer will set a date for final inspection. The Engineer and the Contractor will then
make a final inspection and the Engineer will notify the Contractor in writing of all particulars
in which the final inspection reveals the work incomplete or unacceptable. The Contractor
shall immediately take such corrective measures as are necessary to remedy the listed
deficiencies. Corrective work shall be pursued vigorously, diligently, and without interruption
until physical completion of the listed deficiencies. This process will continue until the
Engineer is satisfied the listed deficiencies have been corrected.
Monroe Ave Infiltration Facility SP-21 Special Provisions
City of Renton
If action to correct the listed deficiencies is not initiated within 7 days after receipt of the
written notice listing the deficiencies, the Engineer may, upon written notice to the
Contractor, take whatever steps are necessary to correct those deficiencies pursuant to
Section 1-05.7.
The Contractor will not be allowed an extension of contract time because of a delay in the
performance of the work attributable to the exercise of the Engineer’s right hereunder.
Upon correction of all deficiencies, the Engineer will notify the Contractor and the
Contracting Agency, in writing, of the date upon which the work was considered physically
complete. That date shall constitute the Physical Completion Date of the contract, but shall
not imply acceptance of the work or that all the obligations of the Contractor under the
contract have been fulfilled.
1-05.11(3) Operational Testing
Unless otherwise noted in the Contract Documents, the Contractor shall give the Engineer a
minimum of 3 working days notice of the time for each test and inspection. If the inspection
is by another authority than the Engineer, the Contractor shall give the Engineer a minimum
of 3 working days notice of the date fixed for such inspection. Required certificates of
inspection by other authority than the Engineer shall be secured by the Contractor.
It is the intent of the Contracting Agency to have at the Physical Completion Date a
complete and operable system. Therefore when the work involves the installation of
machinery or other mechanical equipment; street lighting, electrical distribution or signal
systems; irrigation systems; buildings; or other similar work it may be desirable for the
Engineer to have the Contractor operate and test the work for a period of time after final
inspection but prior to the physical completion date. Whenever items of work are listed in the
Contract Provisions for operational testing they shall be fully tested under operating
conditions for the time period specified to ensure their acceptability prior to the Physical
Completion Date. During and following the test period, the Contractor shall correct any items
of workmanship, materials, or equipment which prove faulty, or that are not in first class
operating condition. Equipment, electrical controls, meters, or other devices and equipment
to be tested during this period shall be tested under the observation of the Engineer, so that
the Engineer may determine their suitability for the purpose for which they were installed.
The Physical Completion Date cannot be established until testing and corrections have been
completed to the satisfaction of the Engineer.
The costs for power, gas, labor, material, supplies, and everything else needed to
successfully complete operational testing, shall be included in the unit contract prices
related to the system being tested, unless specifically set forth otherwise in the proposal.
Operational and test periods, when required by the Engineer, shall not affect a
manufacturer’s guaranties or warranties furnished under the terms of the contract.
1-05.12 Final Acceptance
(June 02, 2023 Renton GSP)
The third and fourth sentences in paragraph 1 are deleted and replaced with:
Monroe Ave Infiltration Facility SP-22 Special Provisions
City of Renton
The Final Acceptance date shall be that date in which the Renton City Council formally
approves the acceptance of the Contract.
1-05.13 Superintendents, Labor and Equipment of Contractor
(August 14, 2013 APWA GSP)
Delete the sixth and seventh paragraphs of this section.
1-05.14 Cooperation with Other Contractors
(June 2023 Renton GSP)
Section 1-05.14 is supplemented as follows:
The Contractor shall afford the Owner and other contractors working in the area reasonable
opportunity for the introduction and storage of their materials and the execution of their
respective Work, and shall properly connect and coordinate the Contractor’s Work with
theirs.
1-05.15 Method of Serving Notices
(March 25, 2009 APWA GSP)
Revise the second paragraph to read:
All correspondence from the Contractor shall be directed to the Project Engineer. All
correspondence from the Contractor constituting any notification, notice of protest, notice of
dispute, or other correspondence constituting notification required to be furnished under the
Contract, must be in paper format, hand delivered or sent via mail delivery service to the
Project Engineer's office. Electronic copies such as e-mails or electronically delivered copies
of correspondence will not constitute such notice and will not comply with the requirements
of the Contract.
Add the following new section:
1-05.16 Water and Power
(October 1, 2005 APWA GSP)
The Contractor shall make necessary arrangements, and shall bear the costs for power and
water necessary for the performance of the work, unless the contract includes power and
water as a pay item.
Add the following new section:
1-05.17 Oral Agreements
(June 2023, Renton GSP)
No oral agreement or conversation with any officer, agent, or employee of the Contracting
Agency, either before or after execution of the Contract, shall affect or modify any of the
terms or obligations contained in any of the documents comprising the Contract. Such oral
agreement or conversation shall be considered as unofficial information and in no way
binding upon the Contracting Agency, unless subsequently put in writing and signed by the
Contracting Agency.
Add the following new section:
1-05.18 Record Drawings
(March 8, 2013 APWA GSP)
Monroe Ave Infiltration Facility SP-23 Special Provisions
City of Renton
The Contractor shall maintain one set of full size plans for Record Drawings, updated with
clear and accurate red-lined field revisions on a daily basis, and within 2 business days after
receipt of information that a change in Work has occurred. The Contractor shall not conceal
any work until the required information is recorded.
This Record Drawing set shall be used for this purpose alone, shall be kept separate from
other Plan sheets, and shall be clearly marked as Record Drawings. These Record
Drawings shall be kept on site at the Contractor’s field office, and shall be available for
review by the Contracting Agency at all times. The Contractor shall bring the Record
Drawings to each progress meeting for review.
The preparation and upkeep of the Record Drawings is to be the assigned responsibility of a
single, experienced, and qualified individual. The quality of the Record Drawings, in terms of
accuracy, clarity, and completeness, is to be adequate to allow the Contracting Agency to
modify the computer-aided drafting (CAD) Contract Drawings to produce a complete set of
Record Drawings for the Contracting Agency without further investigative effort by the
Contracting Agency.
The Record Drawing markups shall document all changes in the Work, both concealed and
visible. Items that must be shown on the markups include but are not limited to:
· Actual dimensions, arrangement, and materials used when different than shown in
the Plans.
· Changes made by Change Order or Field Order.
· Changes made by the Contractor.
· Accurate locations of storm sewer, sanitary sewer, water mains and other water
appurtenances, structures, conduits, light standards, vaults, width of roadways,
sidewalks, landscaping areas, building footprints, channelization and pavement
markings, etc. Include pipe invert elevations, top of castings (manholes, inlets, etc.).
If the Contract calls for the Contracting Agency to do all surveying and staking, the
Contracting Agency will provide the elevations at the tolerances the Contracting Agency
requires for the Record Drawings.
When the Contract calls for the Contractor to do the surveying/staking, the applicable
tolerance limits include, but are not limited to the following:
Vertical Horizontal
As-built sanitary & storm invert and grate
elevations
± 0.01 foot ± 0.01 foot
As-built monumentation ± 0.001
foot
± 0.001 foot
As-built waterlines, inverts, valves,
hydrants
± 0.10 foot ± 0.10 foot
As-built ponds/swales/water features ± 0.10 foot ± 0.10 foot
As-built buildings (fin. Floor elev.) ± 0.01 foot ± 0.10 foot
As-built gas lines, power, TV, Tel, Com ± 0.10 foot ± 0.10 foot
As-built signs, signals, etc. N/A ± 0.10 foot
Making Entries on the Record Drawings:
Monroe Ave Infiltration Facility SP-24 Special Provisions
City of Renton
· Use erasable colored pencil (not ink) for all markings on the Record Drawings,
conforming to the following color code:
o Additions – Red
o Deletions – Green
o Comments – Blue
o Dimensions – Graphite
· Provide the applicable reference for all entries, such as the change order number,
the request for information (RFI) number, or the approved shop drawing number.
· Date all entries.
· Clearly identify all items in the entry with notes similar to those in the Contract
Drawings (such as pipe symbols, centerline elevations, materials, pipe joint
abbreviations, etc.).
The Contractor shall certify on the Record Drawings that said drawings are an accurate
depiction of built conditions, and in conformance with the requirements detailed above. The
Contractor shall submit final Record Drawings to the Contracting Agency. Contracting
Agency acceptance of the Record Drawings is one of the requirements for achieving
Physical Completion.
Payment will be made for the following bid item:
“Record Drawings (Minimum Bid $5,000),” per Lump Sum
Payment for this item will be made on a prorated monthly basis for work completed in
accordance with this section up to 75% of the lump sum bid. The final 25% of the lump sum
item will be paid upon submittal and approval of the completed Record Drawings set
prepared in conformance with these Special Provisions.
A minimum bid amount has been entered in the Bid Proposal for this item. The Contractor
must bid at least that amount.
1-06 CONTROL OF MATERIAL
1-06.1 Approval of Materials Prior to Use
(June 2023 Renton GSP)
Supplement this section with the following:
The materials and equipment lists submitted to the Engineer at the Preconstruction
Conference shall include the quantity, manufacturer, and model number, if applicable, of
materials and equipment to be installed under the Contract. This list will be checked by the
Engineer as to conformity with the Contract Documents. The Engineer will review the lists
within 10 working days, noting required corrections. The Contractor shall make required
corrections and file 2 corrected copies with the Engineer within one week after receipt of
required corrections. The Engineer's review and acceptance of the lists shall not relieve the
Contractor from responsibility for suitability for the intended purpose, nor for deviations from
the Contract Documents. Neither the review of the Contractor’s submittal nor the corrections
or comments provided, shall create any duty owed to or a cause of action in favor of the
Contractor or any Subcontractor.
Monroe Ave Infiltration Facility SP-25 Special Provisions
City of Renton
1-06.1(2) Request for Approval of Materials
(June 2023 Renton GSP)
Supplement Section 1-06.1(2) with the following:
The Engineer will require up to 7 calendar days from the date each RAM is submitted until
its returned to the Contractor. The Contractor shall not proceed with the Work to incorporate
the materials included in each RAM until each RAM is approved by the Engineer. As
applicable, comments from the Engineer regarding a submitted RAM shall be addressed
and resubmitted to the Engineer. Each resubmitted RAM will require up to 7 calendar days
from the date of submission until it is returned to the Contractor.
1-06.1(4) Fabrication Inspection Expense
(June 27, 2011 APWA GSP)
Delete this section in its entirety.
1-06.2(1) Samples and Tests for Acceptance
(June 2023 Renton GSP)
Supplement Section 1-06.2(1) with the following:
The finished Work shall be in accordance with approved samples. Approval of samples by
the Engineer does not relieve the Contractor of responsibility for performance of the Work in
accordance with the Contract Documents.
1-06.2(2) Statistical Evaluation of Materials for Acceptance
(June 2023 Renton GSP)
Supplement Section 1-06.2(2) with the following:
Unless stated otherwise in the special provisions, statistical evaluation will not be used by
the City of Renton.
1-06.6 Recycled Materials
(January 4, 2016 APWA GSP)
Delete this section, including its subsections, and replace it with the following:
Recycled materials will not be allowed on this project.
1-07 LEGAL RELATIONS AND RESPONSIBILITIES TO THE PUBLIC
1-07.1 Laws to be Observed
(October 1, 2005 APWA GSP)
Supplement this section with the following:
In cases of conflict between different safety regulations, the more stringent regulation shall
apply.
The Washington State Department of Labor and Industries shall be the sole and paramount
administrative agency responsible for the administration of the provisions of the Washington
Industrial Safety and Health Act of 1973 (WISHA).
Monroe Ave Infiltration Facility SP-26 Special Provisions
City of Renton
The Contractor shall maintain at the project site office, or other well-known place at the
project site, all articles necessary for providing first aid to the injured. The Contractor shall
establish, publish, and make known to all employees, procedures for ensuring immediate
removal to a hospital, or doctor’s care, persons, including employees, who may have been
injured on the project site. Employees should not be permitted to work on the project site
before the Contractor has established and made known procedures for removal of injured
persons to a hospital or a doctor’s care.
The Contractor shall have sole responsibility for the safety, efficiency, and adequacy of the
Contractor’s plant, appliances, and methods, and for any damage or injury resulting from
their failure, or improper maintenance, use, or operation. The Contractor shall be solely and
completely responsible for the conditions of the project site, including safety for all persons
and property in the performance of the work. This requirement shall apply continuously, and
not be limited to normal working hours. The required or implied duty of the Engineer to
conduct construction review of the Contractor’s performance does not, and shall not, be
intended to include review and adequacy of the Contractor’s safety measures in, on, or near
the project site.
1-07.2 State Taxes
Delete this section, including its sub-sections, in its entirety and replace it with the following:
1-07.2 State Sales Tax
(June 27, 2011 APWA GSP)
The Washington State Department of Revenue has issued special rules on the State sales
tax. Sections 1-07.2(1) through 1-07.2(3) are meant to clarify those rules. The Contractor
should contact the Washington State Department of Revenue for answers to questions in
this area. The Contracting Agency will not adjust its payment if the Contractor bases a bid
on a misunderstood tax liability.
The Contractor shall include all Contractor-paid taxes in the unit bid prices or other contract
amounts. In some cases, however, state retail sales tax will not be included. Section 1-
07.2(2) describes this exception.
The Contracting Agency will pay the retained percentage (or release the Contract Bond if a
FHWA-funded Project) only if the Contractor has obtained from the Washington State
Department of Revenue a certificate showing that all contract-related taxes have been paid
(RCW 60.28.051). The Contracting Agency may deduct from its payments to the Contractor
any amount the Contractor may owe the Washington State Department of Revenue,
whether the amount owed relates to this contract or not. Any amount so deducted will be
paid into the proper State fund.
1-07.2(1) State Sales Tax — Rule 171
WAC 458-20-171, and its related rules, apply to building, repairing, or improving streets,
roads, etc., which are owned by a municipal corporation, or political subdivision of the state,
or by the United States, and which are used primarily for foot or vehicular traffic. This
includes storm or combined sewer systems within and included as a part of the street or
road drainage system and power lines when such are part of the roadway lighting system.
For work performed in such cases, the Contractor shall include Washington State Retail
Monroe Ave Infiltration Facility SP-27 Special Provisions
City of Renton
Sales Taxes in the various unit bid item prices, or other contract amounts, including those
that the Contractor pays on the purchase of the materials, equipment, or supplies used or
consumed in doing the work.
1-07.2(2) State Sales Tax — Rule 170
WAC 458-20-170, and its related rules, apply to the constructing and repairing of new or
existing buildings, or other structures, upon real property. This includes, but is not limited to,
the construction of streets, roads, highways, etc., owned by the state of Washington; water
mains and their appurtenances; sanitary sewers and sewage disposal systems unless such
sewers and disposal systems are within, and a part of, a street or road drainage system;
telephone, telegraph, electrical power distribution lines, or other conduits or lines in or above
streets or roads, unless such power lines become a part of a street or road lighting system;
and installing or attaching of any article of tangible personal property in or to real property,
whether or not such personal property becomes a part of the realty by virtue of installation.
For work performed in such cases, the Contractor shall collect from the Contracting Agency,
retail sales tax on the full contract price. The Contracting Agency will automatically add this
sales tax to each payment to the Contractor. For this reason, the Contractor shall not
include the retail sales tax in the unit bid item prices, or in any other contract amount subject
to Rule 170, with the following exception.
Exception: The Contracting Agency will not add in sales tax for a payment the Contractor or
a subcontractor makes on the purchase or rental of tools, machinery, equipment, or
consumable supplies not integrated into the project. Such sales taxes shall be included in
the unit bid item prices or in any other contract amount.
1-07.2(3) Services
The Contractor shall not collect retail sales tax from the Contracting Agency on any contract
wholly for professional or other services (as defined in Washington State Department of
Revenue Rules 138 and 244).
Section 1-07.2 is supplemented with the following:
The project includes work which requires compliance with Rule 171.
1-07.5(3) State Department of Ecology
Section 1-07.5(3) is supplemented with the following:
Protection of the Environment: No construction related activity shall contribute to the
degradation of the environment, allow material to enter surface or ground waters, or allow
particulate emissions to the atmosphere, which exceed state or federal standards. Any
actions that potentially allow a discharge to state waters must have prior approval of the
Washington State Department of Ecology.
1-07.6 Permits and Licenses
This Section is supplemented with the following:
(January 2, 2018, WSDOT GSP)
Monroe Ave Infiltration Facility SP-28 Special Provisions
City of Renton
The Contracting Agency has obtained the below-listed permit(s) for this project. A copy of
the permit(s) is attached as an appendix for informational purposes. Copies of these
permits, including a copy of the Transfer of Coverage form, when applicable, are required to
be onsite at all times.
Contact with the permitting agencies, concerning the below-listed permit(s), shall be made
through the Engineer. The Contractor shall be responsible for obtaining Ecology’s approval
for any Work requiring additional approvals (e.g. Request for Chemical Treatment Form).
The Contractor shall obtain additional permits as necessary. All costs to obtain and comply
with additional permits shall be included in the applicable Bid items for the Work involved.
King County
Special Use Permit
Section 1-07.6 is supplemented as follows:
(April 3, 2023 Renton GSP)
The prime contractor shall provide proof of State L & I contractors’ registration and City
business license prior to contract execution. All subcontractors shall provide proof with the
Request to Sublet and prior to beginning work on-site.
1-07.7 Load Limits
(June 2023, Renton GSP)
Section 1-07.7 is supplemented with the following:
If the sources of materials provided by the Contractor necessitates hauling over roads other
than State Highways, the Contractor shall, at the Contractor’s expense, make all
arrangements for the use of the haul routes.
1-07.9 Wages
1-07.9(5)C Certified Payroll
(June 2023, Renton GSP)
Delete the first paragraph, and replace it with the following:
The Contractor must submit weekly-certified payrolls for the Contractor and all
subcontractors and lower tier subcontractors, regardless of project’s funding source.
1-07.11 Requirements for Non-Discrimination
Add the following new section:
1-07.11(11) City of Renton Affidavit of Compliance
(June 2023, Renton GSP)
Each Contractor, Subcontractor, Consultant, and or Supplier shall complete and submit a
copy of the “City of Renton Fair Practices Policy Affidavit of Compliance”. A copy of this
document will be bound in the bid documents.
1-07.13 Contractor’s Responsibility for Work
1-07.13(1) General
(June 2023, Renton GSP)
Section 1-07.13(1) is supplemented as follows:
See 8-01 for additional construction requirements regarding implementation of the SWPPP
and TESC Plan.
Monroe Ave Infiltration Facility SP-29 Special Provisions
City of Renton
During unfavorable weather and other conditions, the Contractor shall pursue only such
portions of the Work as shall not be damaged thereby.
No portion of the Work whose satisfactory quality or efficiency will be affected by
unfavorable conditions shall be constructed while these conditions exist, unless the
Contractor shall be able to overcome said unfavorable conditions by special means or
precautions acceptable to the Engineer.
1-07.15 Temporary Water Pollution/Erosion Control
(June 2023, Renton GSP)
Section 1-07.15 is supplemented with the following:
The Contractor shall perform all Work in strict accordance with all Federal, State, and local
laws and regulations governing waters of the State, as well as permits acquired for the
project.
The Contractor shall prepare a final Temporary Water Pollution/Erosion Control Plan
(TWPECP) and a final Stormwater Pollution Prevention Plan (SWPPP).
The TWPECP and SWPPP shall be developed in accordance with the erosion control
standards contained in the Current City of Renton Surface Water Design Manual. The plan
shall include any assumptions, detailed calculations, sketches and sequencing. The plan
shall be signed and stamped by a Washington State Professional Engineer. A TESC
supervisor shall be designated by the Contractor, whose name and phone number shall be
given to the Engineer at the Preconstruction Conference. The TESC supervisor must be
CESCL certified in accordance with NPDES permit requirements.
The plan shall be submitted for approval to the City within 10 days of the Notice of Award.
The TWPECP shall include the various configurations that may be necessary to adequately
control erosion and sediment at the site during the various stages of construction.
Design of dewatering, water control, bypass systems, and temporary erosion and sediment
control during construction shall be the responsibility of the Contractor.
At a minimum, the plan shall contain:
1. Manufacturer’s data and detailed plans for the erosion control products specified in
the plan.
2. Plan for temporary pipe system diversions. This shall include a description of when
the piping will be used, pipe material, locations, elevations, plan and profile views,
inlet and outlet protection, hydraulic capacity, and details of important design
features.
3. Plan for collecting, pumping and pipe surface stormwater runoff, dewatering
discharge, and seepage from the source to the Baker Tank or acceptable discharge.
The plan shall be shown in phases to coincide with the phases of construction. The
plan shall include:
a. Layout and details of system.
b. Diversion systems manufacturer’s data and material submittals.
c. Pump and pipe types, sizes, manufacturer’s data, and design criteria for
pump sizing.
d. Flow calculations for stormwater, seepage, and dewatering pump discharge.
Schedule and sketch of location for dewatering systems. Pumps shall be
sized to pump stormwater runoff for the tributary area plus an allowance for
Monroe Ave Infiltration Facility SP-30 Special Provisions
City of Renton
groundwater and surface seepage. Each pump area location shall be
equipped with two pumps meeting the capacity requirement, in case one is
non-operational.
e. Source of power for pumps, description of schedule and fueling requirements,
storage location, and methods.
4. Manufacturer’s literature and test results (certificates) on the temporary silt fence,
erosion control matting, riprap gradations, and any other necessary erosion control
materials.
5. Planned installation and maintenance schedule for temporary erosion and
sedimentation control facilities. Indicate locations and outlets of dewatering systems.
6. The boundaries of the clearing limits, sensitive areas and their buffers, and areas of
vegetation preservation and tree retention.
The Contractor shall also prepare a final SWPPP. The SWPPP must meet the requirements
of the Department of Ecology’s NPDES and State Waste Discharge General Permit for
Stormwater Discharges Associated with Construction Activity (General Permit). The SWPPP
shall include and modify as necessary the Site Preparation and Erosion Control Plan
drawings provided as part of the Contract Plans. The Contractor shall prepare, review, and
modify the SWPPP as necessary to be consistent with the actual work schedule,
sequencing, and construction methods that will be used on the project. The Contractor’s
SWPPP shall meet the requirements of the general permit.
The Contractor shall:
· Furnish, install, operate, and maintain necessary machinery, appurtenances, and
equipment to keep excavations free of water during construction;
· Dewater and dispose of water in a manner that will not cause injury to public and
private property, as well as keep sediment-laden water from entering the City surface
water system or violate applicable water standards;
· Keep sufficient pumping equipment and machinery on hand at all times for
emergencies, including electric power failures;
· Keep experienced personnel available at all times to operate pumping equipment,
machinery and appliances;
· Not shut down dewatering systems between shifts, on holidays and weekends, nor
during work stoppages without prior authorization by the Engineer;
· Control groundwater to prevent softening of bottoms of excavations, or formation of
“quick” conditions or “boils”;
· Design and operate dewatering system that will not remove natural soils;
· Keep excavations free of water during excavation, construction of structures,
installation of pipelines, placing of structures, backfill, and placing and curing of
concrete; and
· Control surface water runoff to prevent entry and collection in excavations.
As construction progresses and unexpected or seasonal conditions dictate, the Contractor
shall anticipate that more water pollution/erosion control measures will be necessary. It
shall be the obligation and responsibility of the Contractor to revise or supplement the
pollution/erosion control measures as may be needed to protect the work, adjacent
properties, storm drains, streams, and other water bodies.
Monroe Ave Infiltration Facility SP-31 Special Provisions
City of Renton
At all times, there must be material on the job site to handle any spills caused by the
Contractor, such as tack, oils, diesel, etc. Materials would include, but not be limited to, oil
absorbent pads and “kitty litter.” The Contractor must supply said materials at his expense
and, in the event of a spill, be responsible for cleanup and disposal of contaminated
materials.
In addition, the SWPPP shall outline the procedures to be used to prevent high pH
stormwater or dewatering water from entering surface waters. The plan shall include how
the pH of the water will be maintained between pH 6.5 and pH 8.5 prior to being discharged
from the project or entering surface waters. Prior to beginning any concrete or grinding work,
the Contractor shall submit the plan, for the Engineer’s review and approval.
An Ecology template is available to the Contractor for producing the SWPPP, using project-
specific information added by the Contractor. The template and instructions are available at:
http://www.ecy.wa.gov/programs/wq/stormwater/construction.
The Engineer’s review and any resulting approval of the Contractor’s SWPPP and TESCP
will be only regarding conformance with the specification requirement that the Contractor
have the plans prepared by a CPESC or professional Civil Engineer who has expertise in
the type of facilities and that the SWPPP and TESCP include the items specified for such
plans. The Contractor shall be solely responsible for the adequacy of the SWPPP and
TESCP and if erosion sediment, and other pollutant control measures in deviation or
addition to those described in the SWPPP become necessary to minimize erosion and
prevent storm water contamination from sediment and other pollutants, the Contractor shall
prepare and submit a revised SWPPP to the Engineer for review as specified for the original
plan.
The Owner will not be liable to the Contractor for failure to accept all or any portion of an
originally submitted or revised SWPPP, nor for any delays to the Work due to the
Contractor’s failure to submit and implement an acceptable SWPPP.
1-07.17 Utilities and Similar Facilities
This Section is supplemented with the following:
Locations and dimensions shown in the Plans for existing facilities are in accordance with
available information obtained without uncovering, measuring, or other verification.
The following addresses and telephone numbers of utility companies known or suspected of
having facilities within the project limits are supplied for the Contractor's convenience:
Call-Before-You-Dig number: 1-800-424-5555
Puget Sound Energy (Electric)
Attention: Dustin Weller
Telephone: (206) 379-4347
Dustin.Weller@PSE.com
Lumen
Attention: Jesse Patjens
Telephone: (425) 429 - 5722
Jesse.Patjens@lumen.com
City of Renton (Fiber Optic)
Attention: Brett Tietjen
1055 S Grady Way
City of Renton (Public Works Dept)
Attention: Jared McDonald
1055 S Grady Way
Monroe Ave Infiltration Facility SP-32 Special Provisions
City of Renton
Renton, Wa 98057
Telephone:(425) 430-6873
BTiejen@rentonwa.gov
Renton, Wa 98057
Telephone: (425) 757-7718
jmcdonald@rentonwa.gov
1-07.17(1) Utility Construction, Removal, or Relocation by the Contractor
This Section is supplemented with the following:
The Contractor shall perform the construction, removal, protection, or relocation of the
following utilities, as shown in the Plans:
· Lumen – pothole to verify conduits extents at storm pipe crossing at storm pipe
crossing under west shoulder of Monroe Ave NE, approx. 25’ west from Monroe Ave
NE centerline; protect existing conduits at storm pipe crossings and proximity under
Monroe Ave NE.
· Lumen – pothole to verify duct bank bury depth at storm pipe crossing on Monroe
Ave NE (pothole within one week after mobilization); protect duct bank and conduits
at storm crossing under Monroe Ave NE.
· Lumen – Protect existing junction box at access road entrance, replace existing
junction box cover with cover rated for H-25 loading.
· Puget Sound Energy (PSE) – relocate existing illumination pole (PSE ID #318077-
166861) and associated junction.
· Puget Sound Energy (PSE) – protect overhead regional transmission power lines.
· City of Renton (Sewer) – pothole to verify sewer depth, and protect existing sewer at
storm pipe crossing under Monroe Ave NE.
· King County Communications – pothole to verify depth of communication conduit
and structure to west side of Monroe Ave NE and protect existing conduits at storm
pipe crossing.
· City of Renton (Fiber Optic) – pothole to verify depth of fiber optic conduit in west
shoulder of Monroe Ave NE, approx. 6-feet from face of curb; and protect existing
conduits at storm pipe crossing.
Add the following new section:
1-07.17(3) Utility Potholing
Where indicated on the Plans, the Contractor shall pothole utilities within one week of
mobilization. The Contractor may also pothole existing utilities in advance of the Work at
their discretion. Potholing will be paid for when shown on the Plans.
Within areas open to traffic or public use, potholing shall be performed using a vactor or
similar method to minimize the area disturbed. The hole shall be backfilled with crushed
surfacing aggregate to fill all voids. Within areas that are not reconstructed as part of this
project, surfacing shall match existing. Within areas to be reconstructed, the Contractor shall
propose a surfacing method to be approved by the Engineer, with the intent that the
surfacing will endure until final restoration.
Payment
Payment will be made for the following Bid Item when listed in the Proposal:
“Utility Potholing”, per each location called out on the plans.
Monroe Ave Infiltration Facility SP-33 Special Provisions
City of Renton
Add the following new section:
1-07.17(4) Resolution of Utility Conflicts
(June 2023, Renton GSP)
In no way shall the work described under Resolution of Utility Conflicts relieve Contractor of
any of the responsibilities described in Section 1-07.17 of the Standard Specifications and
Special Provisions, and elsewhere in the Contract Documents. If or when utility conflicts
occur, Contractor shall continue the construction process on other aspects of the project
whenever possible.
In the event that a conflict arises between the proposed improvements and an existing
utility, the Resolution of Utility Conflicts item will compensate the Contractor for standby time
and additional work in the following manner:
1. Standby time resulting from existing utility conflicts
a. Standby time is defined as time the Contractor is unable to proceed with
progression of a specific work item (i.e. storm drainage, underground utility
installation etc.) due to conflicts with existing facilities. However, payment for
standby time shall be limited to:
1) For each agreed upon conflict, a maximum of four (4) hours of
standby time will be paid for actual delay of labor and equipment
due to a utility conflict. The Contractor shall be responsible to adjust
their work schedule and/or reassign their work forces and
equipment to other areas of work to minimize standby time.
2) If the conflict is resolved within one (1) hour of notification to the
Engineer, no standby time will be paid.
2. Additional work required to resolve utility conflicts will be paid for at the bid unit
prices for the associated work. Work that can be measured and paid for at the unit
contract prices shall not be identified as force account work. This work includes but
is not limited to:
1) Storm drainage manhole, pipe, vault, and conduit realignments of line and/or
grade for the storm drain, undergrounding of overhead utilities, illumination,
and signal, to avoid existing utility conflicts.
2) Additional storm drainage manholes, pipe, vaults, and conduit required by a
change in alignment, and/or grade, not exceeding the limits set in section 1-
04.4 of the Standard Specifications.
If “Resolution of utility conflicts” is included as a bid item in Section 1-09.14, it shall be used
to resolve any new identified utility conflicts not otherwise shown on the Contract Drawing or
Specifications that are identified during the course of construction.
1-07.18 Public Liability and Property Damage Insurance
Delete this section in its entirety, and replace it with the following:
1-07.18 Insurance
(December 30, 2022 APWA GSP)
1-07.18(1) General Requirements
A. The Contractor shall procure and maintain the insurance described in all subsections of
section 1-07.18 of these Special Provisions, from insurers with a current A. M. Best
rating of not less than A-: VII and licensed to do business in the State of Washington.
Monroe Ave Infiltration Facility SP-34 Special Provisions
City of Renton
The Contracting Agency reserves the right to approve or reject the insurance provided,
based on the insurer’s financial condition.
B. The Contractor shall keep this insurance in force without interruption from the
commencement of the Contractor’s Work through the term of the Contract and for thirty
(30) days after the Physical Completion date, unless otherwise indicated below.
C. If any insurance policy is written on a claims-made form, its retroactive date, and that of
all subsequent renewals, shall be no later than the effective date of this Contract. The
policy shall state that coverage is claims made and state the retroactive date. Claims-
made form coverage shall be maintained by the Contractor for a minimum of 36 months
following the Completion Date or earlier termination of this Contract, and the Contractor
shall annually provide the Contracting Agency with proof of renewal. If renewal of the
claims made form of coverage becomes unavailable, or economically prohibitive, the
Contractor shall purchase an extended reporting period (“tail”) or execute another form
of guarantee acceptable to the Contracting Agency to assure financial responsibility for
liability for services performed.
D. The Contractor’s Automobile Liability, Commercial General Liability and Excess or
Umbrella Liability insurance policies shall be primary and non-contributory insurance as
respects the Contracting Agency’s insurance, self-insurance, or self-insured pool
coverage. Any insurance, self-insurance, or self-insured pool coverage maintained by
the Contracting Agency shall be excess of the Contractor’s insurance and shall not
contribute with it.
E. The Contractor shall provide the Contracting Agency and all additional insureds with
written notice of any policy cancellation, within two business days of their receipt of such
notice.
F. The Contractor shall not begin work under the Contract until the required insurance has
been obtained and approved by the Contracting Agency
G. Failure on the part of the Contractor to maintain the insurance as required shall
constitute a material breach of contract, upon which the Contracting Agency may, after
giving five business days’ notice to the Contractor to correct the breach, immediately
terminate the Contract or, at its discretion, procure or renew such insurance and pay any
and all premiums in connection therewith, with any sums so expended to be repaid to
the Contracting Agency on demand, or at the sole discretion of the Contracting Agency,
offset against funds due the Contractor from the Contracting Agency.
H. All costs for insurance shall be incidental to and included in the unit or lump sum prices
of the Contract and no additional payment will be made.
1-07.18(2) Additional Insured
All insurance policies, with the exception of Workers Compensation, and of Professional
Liability and Builder’s Risk (if required by this Contract) shall name the following listed
entities as additional insured(s) using the forms or endorsements required herein:
· the Contracting Agency and its officers, elected officials, employees, agents, and
volunteers
· Otak, Inc. and its officers, employees, and agents
· Washington State Department of Ecology, and its officers, employees, and agents
The above-listed entities shall be additional insured(s) for the full available limits of liability
maintained by the Contractor, irrespective of whether such limits maintained by the
Contractor are greater than those required by this Contract, and irrespective of whether the
Monroe Ave Infiltration Facility SP-35 Special Provisions
City of Renton
Certificate of Insurance provided by the Contractor pursuant to 1-07.18(4) describes limits
lower than those maintained by the Contractor.
For Commercial General Liability insurance coverage, the required additional insured
endorsements shall be at least as broad as ISO forms CG 20 10 10 01 for ongoing
operations and CG 20 37 10 01 for completed operations.
1-07.18(3) Subcontractors
The Contractor shall cause each subcontractor of every tier to provide insurance coverage
that complies with all applicable requirements of the Contractor-provided insurance as set
forth herein, except the Contractor shall have sole responsibility for determining the limits of
coverage required to be obtained by subcontractors.
The Contractor shall ensure that all subcontractors of every tier add all entities listed in 1
07.18(2) as additional insureds, and provide proof of such on the policies as required by that
section as detailed in 1-07.18(2) using an endorsement as least as broad as ISO CG 20 10
10 01 for ongoing operations and CG 20 37 10 01 for completed operations.
Upon request by the Contracting Agency, the Contractor shall forward to the Contracting
Agency evidence of insurance and copies of the additional insured endorsements of each
subcontractor of every tier as required in 1-07.18(4) Verification of Coverage.
1-07.18(4) Verification of Coverage
The Contractor shall deliver to the Contracting Agency a Certificate(s) of Insurance and
endorsements for each policy of insurance meeting the requirements set forth herein when
the Contractor delivers the signed Contract for the work. Failure of Contracting Agency to
demand such verification of coverage with these insurance requirements or failure of
Contracting Agency to identify a deficiency from the insurance documentation provided shall
not be construed as a waiver of Contractor’s obligation to maintain such insurance.
Verification of coverage shall include:
1. An ACORD certificate or a form determined by the Contracting Agency to be
equivalent.
2. Copies of all endorsements naming Contracting Agency and all other entities listed in
1 07.18(2) as additional insured(s), showing the policy number. The Contractor may
submit a copy of any blanket additional insured clause from its policies instead of a
separate endorsement.
3. Any other amendatory endorsements to show the coverage required herein.
4. A notation of coverage enhancements on the Certificate of Insurance shall not satisfy
these requirements – actual endorsements must be submitted.
Upon request by the Contracting Agency, the Contractor shall forward to the Contracting
Agency a full and certified copy of the insurance policy(s). If Builders Risk insurance is
required on this Project, a full and certified copy of that policy is required when the
Contractor delivers the signed Contract for the work.
1-07.18(5) Coverages and Limits
The insurance shall provide the minimum coverages and limits set forth below. Contractor’s
maintenance of insurance, its scope of coverage, and limits as required herein shall not be
Monroe Ave Infiltration Facility SP-36 Special Provisions
City of Renton
construed to limit the liability of the Contractor to the coverage provided by such insurance,
or otherwise limit the Contracting Agency’s recourse to any remedy available at law or in
equity.
All deductibles and self-insured retentions must be disclosed and are subject to approval by
the Contracting Agency. The cost of any claim payments falling within the deductible or self-
insured retention shall be the responsibility of the Contractor. In the event an additional
insured incurs a liability subject to any policy’s deductibles or self-insured retention, said
deductibles or self-insured retention shall be the responsibility of the Contractor.
1-07.18(5)A Commercial General Liability
Commercial General Liability insurance shall be written on coverage forms at least as broad
as ISO occurrence form CG 00 01, including but not limited to liability arising from premises,
operations, stop gap liability, independent contractors, products-completed operations,
personal and advertising injury, and liability assumed under an insured contract. There shall
be no exclusion for liability arising from explosion, collapse or underground property
damage.
The Commercial General Liability insurance shall be endorsed to provide a per project
general aggregate limit, using ISO form CG 25 03 05 09 or an equivalent endorsement.
Contractor shall maintain Commercial General Liability Insurance arising out of the
Contractor’s completed operations for at least three years following Substantial Completion
of the Work.
Such policy must provide the following minimum limits:
$1,000,000 Each Occurrence
$2,000,000 General Aggregate
$2,000,000 Products & Completed Operations Aggregate
$1,000,000 Personal & Advertising Injury each offence
$1,000,000 Stop Gap / Employers’ Liability each accident
1-07.18(5)B Automobile Liability
Automobile Liability shall cover owned, non-owned, hired, and leased vehicles; and shall be
written on a coverage form at least as broad as ISO form CA 00 01. If the work involves the
transport of pollutants, the automobile liability policy shall include MCS 90 and CA 99 48
endorsements.
Such policy must provide the following minimum limit:
$1,000,000 Combined single limit each accident
1-07.18(5)C Workers’ Compensation
The Contractor shall comply with Workers’ Compensation coverage as required by the
Industrial Insurance laws of the State of Washington.
1-07.18(5)D Excess or Umbrella Liability
The Contractor shall provide Excess or Umbrella Liability insurance with limits of not less
than described herein. This excess or umbrella liability coverage shall be excess over and at
least as broad in coverage as the Contractor’s Commercial General and Auto Liability
insurance.
Monroe Ave Infiltration Facility SP-37 Special Provisions
City of Renton
All entities listed under 1-07.18(2) of these Special Provisions shall be named as additional
insureds on the Contractor’s Excess or Umbrella Liability insurance policy.
This requirement may be satisfied instead through the Contractor’s primary Commercial
General and Automobile Liability coverages, or any combination thereof that achieves the
overall required limits of insurance.
Such policy must provide the following minimum limit:
Each Occurrence Limit $1,000,000
General Aggregate Limit $1,000,000
Products/Completed Operations Aggregate $1,000,000
1-07.18(5)E Pollution Liability
The Contractor shall provide a Contractors Pollution Liability policy, providing coverage for
claims involving bodily injury, property damage (including loss of use of tangible property
that has not been physically injured), cleanup costs, remediation, disposal or other handling
of pollutants, including costs and expenses incurred in the investigation, defense, or
settlement of claims, arising out of any one or more of the following:
1. Contractor’s operations related to this project.
2. Remediation, abatement, repair, maintenance or other work with lead-based paint or
materials containing asbestos.
3. Transportation of hazardous materials away from any site related to this project.
All entities listed under 1-07.18(2) of these Special Provisions shall be named by
endorsement as additional insureds on the Contractors Pollution Liability insurance policy.
Such Pollution Liability policy shall provide the following minimum limits:
$1,000,000 each loss and annual aggregate
1-07.18(5)F Professional Liability
The Contractor and/or its subcontractor(s) and/or its design consultant providing
construction management, value engineering, or any other design-related non-construction
professional services shall provide evidence of Professional Liability insurance covering
professional errors and omissions.
Such policy shall provide the following minimum limits:
$1,000,000 per claim and annual aggregate
If the scope of such design-related professional services includes work related to pollution
conditions, the Professional Liability insurance shall include coverage for Environmental
Professional Liability.
If insurance is on a claims-made form, its retroactive date, and that of all subsequent
renewals, shall be not later than the effective date of this Contract.
1-07.22 Use of Explosives
(June 02, 2023 Renton GSP)
Section 1-07.22 is supplemented by the following:
Monroe Ave Infiltration Facility SP-38 Special Provisions
City of Renton
Explosives shall not be used without specific authority of the Engineer, and then only under
such restrictions as may be required by the property authorities. Explosives shall be handled
and used in strict compliance with WAC 296-52 and such local laws, rules and regulations
that may apply. The individual in charge of the blasting shall have a current Washington
State Blaster Users License.
The Contractor shall obtain, comply with, and pay for such permits and costs as are
necessary in conjunction with blasting operations.
1-07.23 Public Convenience and Safety
(June 02, 2023 Renton GSP)
1-07.23(1) Construction Under Traffic
This Section is supplemented with the following:
Lane closures are subject to the following restrictions:
· Full road closures will not be allowed.
· Lane closures are not permitted on NE 4th Street.
· No lane closure or work will be allowed on any of the following:
o A holiday,
o A holiday weekend; holidays that occur on Friday, Saturday, Sunday or
Monday are considered a holiday weekend. A holiday weekend includes
Saturday, Sunday, and the holiday.
If the Engineer determines the permitted closure hours adversely affect traffic, the Engineer
may adjust the hours accordingly. The Engineer will notify the Contractor in writing of any
change in the closure hours. Exceptions to these restrictions may be considered by the
Engineer on a case-by-case basis following a written request by the Contractor.
Pedestrian Access
The Contractor shall keep all pedestrian routes and access points (including sidewalks, and
crosswalks when located within the project limits) open and clear at all times unless
permitted otherwise by the Engineer in an approved traffic control plan or as shown in the
Plans.
Hours of Darkness
The Contractor shall, at no additional cost to the Contracting Agency, make all
arrangements for operations during hours of darkness. Flagger stations shall be illuminated
using a minimum 150 watt floodlight.
Lighting used for nighttime work shall, whenever possible, be directed away from, or
shielded from, residences and oncoming traffic.
Local and Emergency Access
All traffic control actions shall allow school buses and emergency vehicles to proceed
without any delay.
Local access shall be maintained at all times unless otherwise permitted by the City and
advanced notification to property owners is provided.
Notifications
Monroe Ave Infiltration Facility SP-39 Special Provisions
City of Renton
Traffic Control Plans shall be submitted for review and approval in accordance with Section
1-10.2(2).
After traffic control plans have been reviewed and approved by the Engineer, the Contractor
may notify the Engineer in writing 5 working days in advance of any lane closure, sidewalk
closure, or both.
The Contractor shall notify the Engineer in writing 5 working days in advance of any full
roadway closure.
The Contractor shall notify the local fire, police, emergency service, and city engineering
departments; Medic 1 and Metro Transit (206-684-2732) when applicable; transit
companies; and the affected school district(s) in writing a minimum of 5 working days prior to
each closure. The Contractor shall furnish copies of these notifications to the Engineer.
1-07.24 Rights of Way
(July 23, 2015 APWA GSP)
Delete this section and replace it with the following:
Street Right of Way lines, limits of easements, and limits of construction permits are
indicated in the Plans. The Contractor’s construction activities shall be confined within these
limits, unless arrangements for use of private property are made.
Generally, the Contracting Agency will have obtained, prior to bid opening, all rights of way
and easements, both permanent and temporary, necessary for carrying out the work.
Exceptions to this are noted in the Bid Documents or will be brought to the Contractor’s
attention by a duly issued Addendum.
Whenever any of the work is accomplished on or through property other than public Right of
Way, the Contractor shall meet and fulfill all covenants and stipulations of any easement
agreement obtained by the Contracting Agency from the owner of the private property.
Copies of the easement agreements may be included in the Contract Provisions or made
available to the Contractor as soon as practical after they have been obtained by the
Engineer.
Whenever easements or rights of entry have not been acquired prior to advertising, these
areas are so noted in the Plans. The Contractor shall not proceed with any portion of the
work in areas where right of way, easements or rights of entry have not been acquired until
the Engineer certifies to the Contractor that the right of way or easement is available or that
the right of entry has been received. If the Contractor is delayed due to acts of omission on
the part of the Contracting Agency in obtaining easements, rights of entry or right of way, the
Contractor will be entitled to an extension of time. The Contractor agrees that such delay
shall not be a breach of contract.
Each property owner shall be given 48 hours notice prior to entry by the Contractor. This
includes entry onto easements and private property where private improvements must be
adjusted.
The Contractor shall be responsible for providing, without expense or liability to the
Contracting Agency, any additional land and access thereto that the Contractor may desire
Monroe Ave Infiltration Facility SP-40 Special Provisions
City of Renton
for temporary construction facilities, storage of materials, or other Contractor needs.
However, before using any private property, whether adjoining the work or not, the
Contractor shall file with the Engineer a written permission of the private property owner,
and, upon vacating the premises, a written release from the property owner of each property
disturbed or otherwise interfered with by reasons of construction pursued under this
contract. The statement shall be signed by the private property owner, or proper authority
acting for the owner of the private property affected, stating that permission has been
granted to use the property and all necessary permits have been obtained or, in the case of
a release, that the restoration of the property has been satisfactorily accomplished. The
statement shall include the parcel number, address, and date of signature. Written releases
must be filed with the Engineer before the Completion Date will be established.
Supplement Section 1-07.24 with the following:
The City of Renton has obtained a temporary construction easement for the following
purposes:
· Earthwork, grading, installation of infiltration facility, installation of stormwater
infrastructure, paving permanent access road, and landscaping activities
· The Contractor shall be responsible for maintaining the covered stockpile
embankment. Stockpiled material may become unworkable if improperly covered.
Improper maintenance of stockpile embankment
· The Contractor shall be responsible for maintaining temporary overflow pipes and
temporary stormwater infiltration pond for off-site stormwater runoff.
Add the following new section:
1-07.29 Confined Space Entry
(June 2023, Renton GSP)
The Contractor shall:
1. Review and be familiar with the City’s Public Works Confined Space Entry Program.
2. Review documented information about the City confined spaces in which entry is
intended as listed and described in the City’s Attribute and Map Book. This
information includes identified hazards for each permit-required confined space.
3. Each contractor shall have their own confined space entry program. Upon request of
the City they will provide a statement confirming they are in compliance with their
confined space entry program including requirements for confined space training for
employees associated with the project in Renton.
4. Be responsible for following all confined space requirements established by the
provisions in WAC 296-809 and its chapters.
5. Coordinate entry operations with the City of Renton when employees from the
contractor will be working in or near City confined spaces.
6. Discuss entry operations with the City of Renton including the programs followed
during confined space entry.
7. Debrief the City on any hazards confronted or created at the completion of entry
operations.
8. Place signs stating, “Danger, Follow Confined Space Entry Procedure before
Entering” at each confined space to be entered. Never leave the confined space
open and unattended.
Monroe Ave Infiltration Facility SP-41 Special Provisions
City of Renton
The contractor’s or consultant’s point of contact with the City in regard to confined space
entry will be the City’s assigned construction inspector.
1-08 PROSECUTION AND PROGRESS
Add the following new section:
1-08.0 Preliminary Matters
(May 25, 2006 APWA GSP)
1-08.0(1) Preconstruction Conference
(October 10, 2008 APWA GSP)
Prior to the Contractor beginning the work, a preconstruction conference will be held
between the Contractor, the Engineer and such other interested parties as may be invited.
The purpose of the preconstruction conference will be:
1. To review the initial progress schedule;
2. To establish a working understanding among the various parties associated or
affected by the work;
3. To establish and review procedures for progress payment, notifications, approvals,
submittals, etc.;
4. To establish normal working hours for the work;
5. To review safety standards and traffic control; and
6. To discuss such other related items as may be pertinent to the work.
The Contractor shall prepare and submit at the preconstruction conference the following:
1. A breakdown of all lump sum items;
2. A preliminary schedule of working drawing submittals; and
3. A list of material sources for approval if applicable.
1-08.0(2) Hours of Work
(December 8, 2014 APWA GSP)
Except in the case of emergency or unless otherwise approved by the Engineer, the normal
working hours for the Contract shall be any consecutive 8-hour period 7:00AM and 5:00PM,
Monday through Friday, exclusive of a lunch break. If the Contractor desires different than
the normal working hours stated above, the request must be submitted in writing prior to the
preconstruction conference, subject to the provisions below. The working hours for the
Contract shall be established at or prior to the preconstruction conference.
All working hours and days are also subject to local permit and ordinance conditions (such
as noise ordinances).
If the Contractor wishes to deviate from the established working hours, the Contractor shall
submit a written request to the Engineer for consideration. This request shall state what
hours are being requested, and why. Requests shall be submitted for review no later than
three (3) working days prior to the day(s) the Contractor is requesting to change the hours.
If the Contracting Agency approves such a deviation, such approval may be subject to
certain other conditions, which will be detailed in writing. For example:
Monroe Ave Infiltration Facility SP-42 Special Provisions
City of Renton
1. On non-Federal aid projects, requiring the Contractor to reimburse the Contracting
Agency for the costs in excess of straight-time costs for Contracting Agency
representatives who worked during such times. (The Engineer may require
designated representatives to be present during the work. Representatives who may
be deemed necessary by the Engineer include, but are not limited to: survey crews;
personnel from the Contracting Agency’s material testing lab; inspectors; and other
Contracting Agency employees or third party consultants when, in the opinion of the
Engineer, such work necessitates their presence.)
2. Considering the work performed on Saturdays, Sundays, and holidays as working
days with regard to the contract time. Considering multiple work shifts as multiple
working days with respect to contract time even though the multiple shifts occur in a
single 24-hour period.
3. If a 4-10 work schedule is requested and approved the non-working day for the week
will be charged as a working day.
4. If Davis Bacon wage rates apply to this Contract, all requirements must be met and
recorded properly on certified payroll.
Add the following new section:
1-08.0(3) Reimbursement of Overtime Work of Contracting Agency Employees
(June 2023, Renton GSP)
Where the Contractor elects to Work on a Saturday, Sunday, holiday, or longer than an 8-
hour Work shift on a regular working day, as defined in the Standard Specifications, such
Work shall be considered as overtime Work. On all such overtime Work an inspector will be
present, and a survey crew may be required at the discretion of the Engineer. The
Contractor shall reimburse the Contracting Agency for the full amount of the straight time
plus overtime costs for employees and representative(s) of the Contracting Agency required
to work overtime hours.
The Contractor by these Specifications does hereby authorize the Engineer to deduct such
costs from the amount due or to become due the Contractor.
1-08.1 Subcontracting
(June 2023, Renton GSP)
Section 1-08.1 is supplemented as follows:
Written requests for change in subcontractors shall be submitted by the Contractor to the
Engineer at least 7 calendar days prior to start of a subcontractor's Work.
The Contractor agrees that they are fully responsible to the Owner for the acts and
omissions of all subcontractors and lower-tier subcontractors, and persons either directly or
indirectly employed by the subcontractors, as well as for the acts and omissions of persons
directly employed by the Contractor. The Contractor shall be required to give personal
attention to the Work that is sublet. Nothing contained in the Contract Documents shall
create any contractual relation between any subcontractor and the Owner.
The Contractor shall be responsible for making sure all subcontractors submit all required
documentation, forms, etc.
1-08.1(7)A Payment Certification
(June 2023, Renton GSP)
Monroe Ave Infiltration Facility SP-43 Special Provisions
City of Renton
Revise this section to read “Vacant”.
1-08.2 Assignment
(June 2023, Renton GSP)
The second paragraph of Section 1-08.2 is modified as follows:
The Contractor shall not assign any moneys due or to become due to the Contractor
hereunder without the prior written consent of the Owner. The assignment, if approved, shall
be subject to all setoffs, withholdings, and deductions required by law and the Contract.
1-08.3 Progress Schedule
(June 2023, Renton GSP)
Section 1-08.3 is supplemented as follows:
The progress schedule for the entire project shall be submitted 7 calendar days prior to
the Preconstruction Conference. The schedule shall be prepared using the critical path
method (CPM), preferably using Microsoft Project or equivalent software. The schedule
shall contain this information, at a minimum:
1. Construction activities, in sufficient detail that all activities necessary to construct a
complete and functional project are considered. Any activity that has a scheduled
duration exceeding 30 calendar days shall be subdivided until no sub-element has a
duration exceeding 30 calendar days.
2. The schedule shall clearly indicate the activities that comprise the critical path. For
each activity not on the critical path, the schedule shall show the float, or slack, time.
3. Procurement of material and equipment.
4. Submittals requiring review by the Engineer. Submittal by the Contractor and review
by the Engineer shall be shown as separate activities.
5. Work to be performed by a subcontractor, agent, or any third party.
6. Allowances for delays that could result from normal inclement weather (time
extensions due to inclement weather will not be allowed).
7. Allowances for the time required by utilities (Owner’s and others) to locate, monitor,
and adjust their facilities as required.
The Engineer may request the Contractor to alter the progress schedule when deemed
necessary in the opinion of the Engineer, in the interest of public safety and welfare of the
Owner, or for coordination with any other activity of other contractors, the availability of all or
portions of the job site, or special provisions of this Contract, or to reasonably meet the
completion date of the project. The Contractor shall provide such revised schedule within
10 days of request.
If, at any time, in the opinion of the Engineer, the progress of construction falls significantly
behind schedule, the Contractor may be required to submit a plan for regaining progress
and a revised schedule indicating how the remaining Work items will be completed within
the authorized contract time.
The Contractor shall promptly report to the Engineer any conditions that the Contractor feels
will require revision of the schedule and shall promptly submit proposed revisions in the
progress schedule for acceptance by the Engineer. When such changes are accepted by
the Engineer, the revised schedule shall be followed by the Contractor.
Monroe Ave Infiltration Facility SP-44 Special Provisions
City of Renton
Weekly Schedule. The Contractor shall submit a weekly progress schedule to the Engineer
which sets forth specific Work to be performed the following week, and a tentative schedule
for the second week.
Failure to Maintain Progress Schedule. The Engineer will check actual progress of the
Work against the progress schedule a minimum of two times per month. Failure, without
just cause, to maintain progress in accordance with the approved schedule shall constitute a
breach of Contract. If, through no fault of the Contractor, the proposed construction
schedule cannot be met, the Engineer will require the Contractor to submit a revised
schedule to the Engineer for acceptance. The approved revisions will thereafter, in all
respects, apply in lieu of the original schedule.
Failure of the Contractor to follow the progress schedule submitted and accepted, including
revisions thereof, shall relieve the Owner of any and all responsibility for furnishing and
making available all or any portion of the job site, and will relieve the Owner of any
responsibility for delays to the Contractor in the performance of the Work.
The cost of preparing the progress schedule, any supplementary progress schedules, and
weekly schedules shall be considered incidental to the Contract and no other compensation
shall be made.
1-08.4 Prosecution of Work
Delete this section and replace it with the following:
1-08.4 Notice to Proceed and Prosecution of Work
(July 23, 2015 APWA GSP)
Notice to Proceed will be given after the contract has been executed and the contract bond
and evidence of insurance have been approved and filed by the Contracting Agency. The
Contractor shall not commence with the work until the Notice to Proceed has been given by
the Engineer. The Contractor shall commence construction activities on the project site
within ten days of the Notice to Proceed Date, unless otherwise approved in writing. The
Contractor shall diligently pursue the work to the physical completion date within the time
specified in the contract. Voluntary shutdown or slowing of operations by the Contractor
shall not relieve the Contractor of the responsibility to complete the work within the time(s)
specified in the contract.
When shown in the Plans, the first order of work shall be the installation of high visibility
fencing to delineate all areas for protection or restoration, as described in the Contract.
Installation of high visibility fencing adjacent to the roadway shall occur after the placement
of all necessary signs and traffic control devices in accordance with 1-10.1(2). Upon
construction of the fencing, the Contractor shall request the Engineer to inspect the fence.
No other work shall be performed on the site until the Contracting Agency has accepted the
installation of high visibility fencing, as described in the Contract.
Add the following new section:
1-08.4(2) Weekly Meetings
Monroe Ave Infiltration Facility SP-45 Special Provisions
City of Renton
Weekly meetings will be held to discuss the work, resolve any quantity or payment issues,
review the Contractor’s Progress Schedule, discuss weekly look-ahead schedules and
review the Record Drawings.
1-08.5 Time for Completion
(January 19, 2022 APWA GSP, Option A)
Revise the third and fourth paragraphs to read:
Contract time shall begin on the first working day following the Notice to Proceed Date.
Each working day shall be charged to the contract as it occurs, until the contract work is
physically complete. If substantial completion has been granted and all the authorized
working days have been used, charging of working days will cease. Each week the
Engineer will provide the Contractor a statement that shows the number of working days: (1)
charged to the contract the week before; (2) specified for the physical completion of the
contract; and (3) remaining for the physical completion of the contract. The statement will
also show the nonworking days and any partial or whole day the Engineer declares as
unworkable. The statement will be identified as a Written Determination by the Engineer. If
the Contractor does not agree with the Written Determination of working days, the
Contractor shall pursue the protest procedures in accordance with Section 1-04.5. By failing
to follow the procedures of Section 1-04.5, the Contractor shall be deemed as having
accepted the statement as correct. If the Contractor is approved to work 10 hours a day and
4 days a week (a 4-10 schedule) and the fifth day of the week in which a 4-10 shift is worked
would ordinarily be charged as a working day then the fifth day of that week will be charged
as a working day whether or not the Contractor works on that day.
Revise the sixth paragraph to read:
The Engineer will give the Contractor written notice of the completion date of the contract
after all the Contractor’s obligations under the contract have been performed by the
Contractor. The following events must occur before the Completion Date can be
established:
1. The physical work on the project must be complete; and
2. The Contractor must furnish all documentation required by the contract and required
by law, to allow the Contracting Agency to process final acceptance of the contract.
The following documents must be received by the Project Engineer prior to
establishing a completion date:
a. Certified Payrolls (per Section 1-07.9(5)).
b. Material Acceptance Certification Documents
c. Monthly Reports of Amounts Credited as DBE Participation, as required by
the Contract Provisions.
d. Final Contract Voucher Certification
e. Copies of the approved “Affidavit of Prevailing Wages Paid” for the Contractor
and all Subcontractors
f. Property owner releases per Section 1-07.24
Supplement this section with the following:
This project shall be physically completed within 320 working days.
Monroe Ave Infiltration Facility SP-46 Special Provisions
City of Renton
1-08.6 Suspension of Work
(June 2023 Renton GSP)
Section 1-08.6 is supplemented as follows:
Owner may at any time suspend the Work, or any part thereof, by giving notice to the
Contractor in writing. The Work shall be resumed by the Contractor within 14 calendar days
after the date fixed in the written notice from the owner to the Contractor to do so.
The Contractor shall not suspend Work under the Contract without the written order of the
Owner.
If it has been determined that the Contractor is entitled to an extension of time, the amount
of such extension shall be only to compensate for direct delays, and shall be based upon
the Contractor’s diligently pursuing the Work at a rate not less than that which would have
been necessary to complete the original Contract Work on time.
1-08.7 Maintenance During Suspension
(June 2023 Renton GSP)
Revise the second paragraph as follows:
At no expense to the Contracting Agency, the Contractor shall provide through the
construction area a safe, smooth, and unobstructed roadway, sidewalk, driveway, and path
for public use during suspension (as required in Section 1-07.23 or the Special Provisions).
This may include a temporary road or detour.
1-08.9 Liquidated Damages
(June 2023, Renton GSP)
Revise the second and third paragraphs to read:
Accordingly, the Contractor agrees:
1. To pay liquidated damages in the amount of $500 for each working day beyond the
number of working days established for Physical Completion, and
2. In addition to the terms outlined under item 1, To pay liquidated damages in the
amount of $74,687.00 if Physical Completion is not achieved by April 15, 2025 and to
pay an additional $74,687.00 every thirty (30) calendar days after April 15, 2025, and
3. To authorize the Engineer to deduct these liquidated damages from any money due
or coming due to the Contractor.
When the Contract Work has progressed to Substantial Completion as defined in the
Contract, the Engineer may determine the Contract Work is Substantially Complete. The
Engineer will notify the Contractor in writing of the Substantial Completion Date. For
overruns in Contract time occurring after the date so established, liquidated damages
identified above will not apply. For overruns in Contract time occurring after the Substantial
Completion Date, liquidated damages shall be assessed on the basis of direct engineering
and related costs assignable to the project until the actual Physical Completion Date of all
the Contract Work. The Contractor shall complete the remaining Work as promptly as
possible. Upon request by the Project Engineer, the Contractor shall furnish a written
schedule for completing the physical Work on the Contract.
Monroe Ave Infiltration Facility SP-47 Special Provisions
City of Renton
Section 1-08.9 is supplemented as follows:
In addition, the Contractor shall compensate the Owner for actual engineering inspection
and supervision costs and any other expenses and legal fees incurred by the Owner as a
result of such delay. Such labor costs will be billed to the Contractor at actual costs,
including administrative overhead costs.
In the event that the Owner is required to commence any lawsuit in order to enforce any
provisions of this Contract or to seek redress for any breach thereof, the Owner shall be
entitled to recover its costs, including reasonable attorney’s fees, from the Contractor.
Add the following new section:
1-08.12 Attention to Work
(June 2023, Renton GSP)
The Contractor shall give their personal attention to and shall supervise the Work to the end
that it shall be prosecuted faithfully, and when they are not personally present on the Work
site, he shall at all times be represented by a competent superintendent who shall have full
authority to execute the same, and to supply materials, tools, and labor without delay, and
who shall be the legal representative of the Contractor. The Contractor shall be liable for
the faithful observance of any instructions delivered to them or to their authorized
representative.
1-09 MEASUREMENT AND PAYMENT
1-09.1 Measurement of Quantities
(June 2023 Renton GSP)
Section 1-09.1 is supplemented by adding the following:
Lump Sum. The percentage of lump sum Work completed, and payment will be based on
the cost percentage breakdown of the lump sum bid price(s) submitted at the
preconstruction conference.
The Contractor shall submit a breakdown of costs for each lump sum bid item. The
breakdown shall list the items included in the lump sum together with a unit price of labor,
materials, and equipment for each item. The summation of the detailed unit prices for each
item shall add up to the lump sum bid. The unit price values may be used as a guideline for
determining progress payments or deductions or additions in payment for ordered Work
changes.
Cubic Yard Quantities. The Contractor shall provide truck trip tickets for progress
payments only in the following manner. Where items are specified to be paid by the cubic
yard, the following tally system shall be used.
All trucks to be employed on this Work will be measured to determine the volume of each
truck. Each truck shall be clearly numbered, to the satisfaction of the Engineer, and there
shall be no duplication of numbers.
Duplicate tally tickets shall be prepared to accompany each truckload of material delivered
on the project. All tickets received that do not contain the following information will not be
processed for payment:
1. Truck number
2. Quantity and type of material delivered in cubic yards
Monroe Ave Infiltration Facility SP-48 Special Provisions
City of Renton
3. Drivers name, date and time of delivery
4. Location of delivery, by street and stationing on each street
5. Place for the Engineer to acknowledge receipt
6. Pay item number
7. Contract number and/or name
It will be the Contractor's responsibility to see that a ticket is given to the Engineer on the
project for each truckload of material delivered. Pay quantities will be prepared on the basis
of said tally tickets.
Loads will be checked by the Engineer to verify quantity shown on ticket.
Quantities by Ton. It will be the Contractor's responsibility to see that a certified weight
ticket is given to the Inspector on the project at the time of delivery of materials for each
truckload delivered. Pay quantities will be prepared on the basis of said tally tickets,
delivered to Inspector at time of delivery of materials. Tickets not receipted by Inspector will
not be honored for payment.
Each truck shall be clearly numbered to the satisfaction of the Engineer and there shall be
no duplication of numbers.
Duplicate tickets shall be prepared to accompany each truckload of material delivered to the
project. All tickets received that do not contain the following information will not be
processed for payment:
1. Truck number
2. Truck tare weight (stamped at source)
3. Gross truckload weight in tons (stamped at source)
4. Net load weight (stamped at source)
5. Driver's name, date, and time of delivery
6. Location for delivery by street and stationing on each street
7. Place for the Engineer to acknowledge receipt
8. Pay item number
9. Contract number and/or name
1-09.2(1) General Requirements for Weighing Equipment
(July 23, 2015 APWA GSP, Option 2)
Revise item 4 of the fifth paragraph to read:
4. Test results and scale weight records for each day’s hauling operations are provided to
the Engineer daily. Reporting shall utilize WSDOT form 422-027, Scaleman’s Daily
Report, unless the printed ticket contains the same information that is on the Scaleman’s
Daily Report Form. The scale operator must provide AM and/or PM tare weights for each
truck on the printed ticket.
1-09.2(5) Measurement
(May 2, 2017 APWA GSP)
Revise the first paragraph to read:
Monroe Ave Infiltration Facility SP-49 Special Provisions
City of Renton
Scale Verification Checks – At the Engineer’s discretion, the Engineer may perform
verification checks on the accuracy of each batch, hopper, or platform scale used in
weighing contract items of Work.
1-09.3 Scope of Payment
(June 2023 Renton GSP)
Section 1-09.3 is supplemented by adding the following:
The bid items listed in Section 1-09.14 will be the only items for which compensation will be
made for the Work described in each section of the Standard Specifications when the
Contractor performs the specified Work. Should a bid item be listed in a “Payment” clause
but not in the Proposal Form, and Work for that item is performed by the Contractor and the
Work is not stated as included in or incidental to a pay item in the Contract and is not Work
that would be required to complete the intent of the Contract per Section 1-04.1, then
payment for that Work will be made as for Extra Work pursuant to a Change Order.
The words “Bid Item,” “Contract Item,” and “Pay Item,” and similar terms used throughout
the Contract Documents are synonymous.
If the “payment” clause in the Specifications relating to any unit bid item price in the
Proposal Form requires that said unit bid item price cover and be considered compensation
for certain Work or material essential to the item, then the Work or material will not be
measured or paid for under any other unit bid item which may appear elsewhere in the
Proposal Form or Specifications.
Pluralized unit bid items appearing in these Specifications are changed to singular form.
Payment for bid items listed or referenced in the “Payment” clause of any particular section
of the Specifications shall be considered as including all of the Work required, specified, or
described in that particular section. Payment items will generally be listed generically in the
Specifications, and specifically in the bid form. When items are to be “furnished” under one
payment item and “installed” under another payment item, such items shall be furnished
FOB project site, or, if specified in the Special Provisions, delivered to a designated site.
Materials to be “furnished,” or “furnished and installed” under these conditions, shall be the
responsibility of the Contractor with regard to storage until such items are incorporated into
the Work or, if such items are not to be incorporated into the Work, delivered to the
applicable Contracting Agency storage site when provided for in the Specifications. Payment
for material “furnished,” but not yet incorporated into the Work, may be made on monthly
estimates to the extent allowed.
1-09.6 Force Account
(October 10, 2008 APWA GSP)
Supplement this section with the following:
The Contracting Agency has estimated and included in the Proposal, dollar amounts for all
items to be paid per force account, only to provide a common proposal for Bidders. All such
dollar amounts are to become a part of Contractor's total bid. However, the Contracting
Agency does not warrant expressly or by implication, that the actual amount of work will
correspond with those estimates. Payment will be made on the basis of the amount of work
actually authorized by Engineer.
Monroe Ave Infiltration Facility SP-50 Special Provisions
City of Renton
1-09.7 Mobilization
(June 2023 Renton GSP)
Section 1-09.7 is supplemented by as follows:
Mobilization shall also include, but not be limited to, the following items: pre-mobilization site
walk with City to determine and document existing site conditions within site for comparison
at end of project for Final Cleanup, the movement of Contractor's personnel, equipment,
supplies, and incidentals to and from the project site; the establishment of an office,
buildings, and other facilities necessary for Work on the project; providing sanitary facilities
for the Contractor's personnel; and obtaining permits or licenses required to complete the
project not furnished by the Owner.
Mobilization shall also include all activities required to demobilize from site and provide Final
Cleanup, per Special Provisions Section 1-04.11, including a final site walk with City.
Payment will be made for the following bid item(s):
“Mobilization,” Lump Sum.
1-09.9 Payments
(March 13, 2012 APWA GSP)
Supplement this section with the following:
Lump sum item breakdowns are not required when the bid price for the lump sum item is
less than $20,000.
(January 19, 2022 APWA GSP)
Section 1-09.9 is revised to read:
The basis of payment will be the actual quantities of Work performed according to the
Contract and as specified for payment.
The Contractor shall submit a breakdown of the cost of lump sum bid items at the
Preconstruction Conference, to enable the Project Engineer to determine the Work
performed on a monthly basis. A breakdown is not required for lump sum items that include
a basis for incremental payments as part of the respective Specification. Absent a lump
sum breakdown, the Project Engineer will make a determination based on information
available. The Project Engineer’s determination of the cost of work shall be final.
Progress payments for completed work and material on hand will be based upon progress
estimates prepared by the Engineer. A progress estimate cutoff date will be established at
the preconstruction conference.
The initial progress estimate will be made not later than 30 days after the Contractor
commences the work, and successive progress estimates will be made every month
thereafter until the Completion Date. Progress estimates made during progress of the work
are tentative, and made only for the purpose of determining progress payments. The
progress estimates are subject to change at any time prior to the calculation of the final
payment.
The value of the progress estimate will be the sum of the following:
Monroe Ave Infiltration Facility SP-51 Special Provisions
City of Renton
1. Unit Price Items in the Bid Form — the approximate quantity of acceptable units of
work completed multiplied by the unit price.
2. Lump Sum Items in the Bid Form — based on the approved Contractor’s lump sum
breakdown for that item, or absent such a breakdown, based on the Engineer’s
determination.
3. Materials on Hand — 100 percent of invoiced cost of material delivered to Job site or
other storage area approved by the Engineer.
4. Change Orders — entitlement for approved extra cost or completed extra work as
determined by the Engineer.
Progress payments will be made in accordance with the progress estimate less:
1. Retainage per Section 1-09.9(1), on non FHWA-funded projects;
2. The amount of progress payments previously made; and
3. Funds withheld by the Contracting Agency for disbursement in accordance with the
Contract Documents.
Progress payments for work performed shall not be evidence of acceptable performance or
an admission by the Contracting Agency that any work has been satisfactorily completed.
The determination of payments under the contract will be final in accordance with Section 1
05.1.
Failure to perform any of the obligations under the Contract by the Contractor may be
decreed by the Contracting Agency to be adequate reason for withholding any payments
until compliance is achieved.
Upon completion of all Work and after final inspection (Section 1-05.11), the amount due the
Contractor under the Contract will be paid based upon the final estimate made by the
Engineer and presentation of a Final Contract Voucher Certification to be signed by the
Contractor. The Contractor's signature on such voucher shall be deemed a release of all
claims of the Contractor unless a Certified Claim is filed in accordance with the requirements
of Section 1-09.11 and is expressly excepted from the Contractor’s certification on the Final
Contract Voucher Certification. The date the Contracting Agency signs the Final Contract
Voucher Certification constitutes the final acceptance date (Section 1-05.12).
If the Contractor fails, refuses, or is unable to sign and return the Final Contract Voucher
Certification or any other documentation required for completion and final acceptance of the
Contract, the Contracting Agency reserves the right to establish a Completion Date (for the
purpose of meeting the requirements of RCW 60.28) and unilaterally accept the Contract.
Unilateral final acceptance will occur only after the Contractor has been provided the
opportunity, by written request from the Engineer, to voluntarily submit such documents. If
voluntary compliance is not achieved, formal notification of the impending establishment of a
Completion Date and unilateral final acceptance will be provided by email with delivery
confirmation from the Contracting Agency to the Contractor, which will provide 30 calendar
days for the Contractor to submit the necessary documents. The 30 calendar day period will
begin on the date the email with delivery confirmation is received by the Contractor. The
date the Contracting Agency unilaterally signs the Final Contract Voucher Certification shall
constitute the Completion Date and the final acceptance date (Section 1-05.12). The
reservation by the Contracting Agency to unilaterally accept the Contract will apply to
Contracts that are Physically Completed in accordance with Section 1-08.5, or for Contracts
that are terminated in accordance with Section 1-08.10. Unilateral final acceptance of the
Monroe Ave Infiltration Facility SP-52 Special Provisions
City of Renton
Contract by the Contracting Agency does not in any way relieve the Contractor of their
responsibility to comply with all Federal, State, tribal, or local laws, ordinances, and
regulations that affect the Work under the Contract.
Payment to the Contractor of partial estimates, final estimates, and retained percentages
shall be subject to controlling laws.
1-09.9(1) Retainage
(June 2023, Renton GSP)
Supplement this section with the following:
The retained amount shall be released as stated in the Standard Specifications if no claims
have been filed against such funds as provided by law, and if the Owner has no unsatisfied
claims against the Contractor. In the event claims are filed, the Owner shall withhold, until
such claims are satisfied, a sum sufficient to satisfy all claims and to pay attorney's fees. In
addition, the Owner shall withhold such amount as is required to satisfy any claims by the
Owner against the Contractor, until such claims have been finally settled.
Neither the final payment nor any part of the retained percentage shall become due until the
Contractor, if requested, delivers to the Owner a complete release of all liens arising out of
this Contract, or receipts in full in lieu thereof, and, if required in either case, an affidavit that
so far as the Contractor has knowledge or information, the release and receipts include all
labor and materials for which a lien could be filed: but the Contractor may, if any
subcontractor refuses to furnish a release or receipt in full, furnish a bond satisfactorily to
the Engineer to indemnify the Owner against the lien. If any lien remains unsatisfied after all
payments are made, the Contractor shall reimburse to the Owner all monies that the latter
may be compelled to pay in discharging such lien, including all costs and reasonable
engineer's and attorney's fees.
Add the following new section:
1-09.9(2) Contracting Agency’s Right to Withhold and Disburse Certain Amounts
(June 2023, Renton GSP)
In addition to monies retained pursuant to RCW 60.28 and subject to RCW 39.04.250, RCW
39.12 and RCW 39.76, the Contractor authorizes the Engineer to withhold progress
payments due or deduct an amount from any payment or payments due the Contractor
which, in the Engineer’s opinion, may be necessary to cover the Contracting Agency’s costs
for or to remedy the following situations:
1. Damage to another contractor when there is evidence thereof and a claim has been
filed.
2. Where the Contractor has not paid fees or charges to public authorities of
municipalities, which the Contractor is obligated to pay.
3. Utilizing material tested and inspected by the Engineer, for purposes not connected
with the Work (Section 1-05.6).
4. Landscape damage assessments per Section 1-07.16.
5. For overtime Work performed by City personnel per Section 1-08.1(4).
6. Anticipated or actual failure of the Contractor to complete the Work on time:
a. Per Section 1-08.9 Liquidated Damages; or
b. Lack of construction progress based upon the Engineer’s review of the
Contractor’s approved progress schedule, which indicates the Work will not
be complete within the contract time. When calculating an anticipated time
overrun, the Engineer will make allowances for weather delays, approved
Monroe Ave Infiltration Facility SP-53 Special Provisions
City of Renton
unavoidable delays, and suspensions of the Work. The amount withheld
under this subparagraph will be based upon the liquidated damages amount
per day set forth in Contract Documents multiplied by the number of days the
Contractor’s approved progress schedule, in the opinion of the Engineer,
indicates the Contract may exceed the Contract Time.
7. Failure of the Contractor to perform any of the Contractor’s other obligations under
the Contract, including but not limited to:
a. Failure of the Contractor to provide the Engineer with a field office when
required by the Contract Provisions.
b. Failure of the Contractor to protect survey stakes, markers, etc., or to provide
adequate survey Work as required by Section 1-05.5.
c. Failure of the Contractor to correct defective or unauthorized Work (Section
1-05.8).
d. Failure of the Contractor to furnish a Manufacture’s Certificate of Compliance
in lieu of material testing and inspection as required by Section 1-06.3.
e. Failure to submit weekly payrolls, Intent to Pay Prevailing Wage forms, or
correct underpayment to employees of the Contractor or subcontractor of any
tier as required by Section 1-07.9.
f. Failure of the Contractor to pay worker’s benefits (Title 50 and Title 51 RCW)
as required by Section 1-07.10.
g. Failure of the Contractor to submit and obtain approval of a progress
schedule per Section 1-08.3.
The Contractor authorizes the Engineer to act as agent for the Contractor disbursing such
funds as have been withheld pursuant to this Section to a party or parties who are entitled to
payment. Disbursement of such funds, if the Engineer elects to do so will be made only
after giving the Contractor 15 calendar days prior written notice of the Contracting Agency’s
intent to do so, and if prior to the expiration of the 15-calendar day period,
1. No legal action has commenced to resolve the validity of the claims, and
2. The Contractor has not protested such disbursement.
A proper accounting of all funds disbursed on behalf of the Contractor in accordance with
this Section will be made. A payment made pursuant to this section shall be considered as
payment made under the terms and conditions of the Contract. The Contracting Agency
shall not be liable to the Contractor for such payment made in good faith.
Add the following new section:
1-09.9(3) Final Payment
(June 2023, Renton GSP)
Upon Acceptance of the Work by the Contracting Agency, the final amount to be paid the
Contactor will be calculated based upon a Final Progress Estimate made by the Engineer.
Acceptance by the Contractor of the final payment shall be and shall operate as a release:
1. To the Contracting Agency of all claims and all liabilities of the Contractor, other than
claims in stated amounts as may be specifically excepted in writing by the
Contractor;
2. For all things done or furnished in connection with the Work;
3. For every act and neglect by the Contracting Agency; and
4. For all other claims and liability relating to or arising out of the Work.
A payment (monthly, final, retainage, or otherwise) shall not release the Contractor or the
Contractor’s Surety from any obligation required under the terms of the Contract Documents
or the Contract Bond; nor shall such payment constitute a waiver of the Contracting
Agency’s ability to investigate and act upon findings of non-compliance with the WMBE
Monroe Ave Infiltration Facility SP-54 Special Provisions
City of Renton
requirements of the Contract; nor shall such payment preclude the Contracting Agency from
recovering damages, setting penalties, or obtaining such other remedies as may be
permitted by law.
Before the Work will be accepted by the Contracting Agency, the Contractor shall submit an
affidavit, on the form provided by the Engineer, of amounts paid to certified disadvantaged
(DB), minority (MBE) or women business enterprises (WBE) participating in the Work. Such
affidavit shall certify the amounts paid to the DB, MBE or WBE subcontractors regardless of
tier.
On federally funded projects the Contractor may also be required to execute and furnish the
Contracting Agency an affidavit certifying that the Contractor has not extended any loans,
gratuity or gift and money pursuant to Section 1-07.19 of these Specifications.
If the Contractor fails, refuses, or is unable to sign and return the Final Progress Estimate or
any other documents required for the final acceptance of the Contract, the Contracting
Agency reserves the right to establish a completion date and unilaterally accept the
Contract. Unilateral acceptance will occur only after the Contractor has been provided the
opportunity, by written request from the Engineer, to voluntarily submit such documents. If
voluntary compliance is not achieved, formal notification of the impending unilateral
acceptance will be provided by certified letter from the Engineer to the Contractor that will
provide 30 calendar days for the Contractor to submit the necessary documents. The 30-
calendar day deadline shall begin on the date of the postmark of the certified letter
from the Engineer requesting the necessary documents. This reservation by the
Contracting Agency to unilaterally accept the Contract will apply to contracts that are
completed in accordance with Section 1-08.5 for contracts that are terminated in accordance
with Section 1-08.10. Unilateral acceptance of the Contract by the Contracting Agency does
not in any way relieve the Contractor of the provisions under contract or of the responsibility
to comply with all laws, ordinances, and federal, state, and local regulations that affect the
Contract. The date the Contracting Agency unilaterally signs the Final Progress Estimate
constitutes the final acceptance date (Section 1-05.12).
1-09.11(2) Claims
(June 2023, Renton GSP)
Revise paragraph 5 to read:
Failure to submit with the Final Application for Payment such information and details as
described in this section for any claim shall operate as a waiver of the claims by the
Contractor as provided in Section 1-09.9.
1-09.11(3) Time Limitation and Jurisdiction
(November 30, 2018 APWA GSP)
Revise this section to read:
For the convenience of the parties to the Contract it is mutually agreed by the parties that
any claims or causes of action which the Contractor has against the Contracting Agency
arising from the Contract shall be brought within 180 calendar days from the date of final
acceptance (Section 1-05.12) of the Contract by the Contracting Agency; and it is further
agreed that any such claims or causes of action shall be brought only in the Superior Court
of the county where the Contracting Agency headquarters is located, provided that where
an action is asserted against a county, RCW 36.01.050 shall control venue and jurisdiction.
The parties understand and agree that the Contractor’s failure to bring suit within the time
Monroe Ave Infiltration Facility SP-55 Special Provisions
City of Renton
period provided, shall be a complete bar to any such claims or causes of action. It is further
mutually agreed by the parties that when any claims or causes of action which the
Contractor asserts against the Contracting Agency arising from the Contract are filed with
the Contracting Agency or initiated in court, the Contractor shall permit the Contracting
Agency to have timely access to any records deemed necessary by the Contracting Agency
to assist in evaluating the claims or action.
1-09.13 Claims Resolution
1-09.13(1) General
(January 19, 2022 APWA GSP)
Revise this section to read:
Prior to seeking claims resolution through arbitration or litigation, the Contractor shall
proceed in accordance with Sections 1-04.5 and 1-09.11. The provisions of Sections 1-04.5
and 1-09.11 must be complied with in full as a condition precedent to the Contractor’s right
to seek claim resolution through binding arbitration or litigation.
Any claims or causes of action which the Contractor has against the Contracting Agency
arising from the Contract shall be resolved, as prescribed herein, through binding arbitration
or litigation.
The Contractor and the Contracting Agency mutually agree that those claims or causes of
action which total $1,000,000 or less, which are not resolved by mediation, shall be resolved
through litigation unless the parties mutually agree in writing to resolve the claim through
binding arbitration.
The Contractor and the Contracting Agency mutually agree that those claims or causes of
action in excess of $1,000,000, which are not resolved by mediation, shall be resolved
through litigation unless the parties mutually agree in writing to resolve the claim through
binding arbitration.
1-09.13(3)A Arbitration General
(January 19, 2022 APWA GSP)
Revise the third paragraph to read:
The Contracting Agency and the Contractor mutually agree to be bound by the decision of
the arbitrator, and judgment upon the award rendered by the arbitrator may be entered in
the Superior Court of the county in which the Contracting Agency’s headquarters is located,
provided that where claims subject to arbitration are asserted against a county, RCW
36.01.050 shall control venue and jurisdiction of the Superior Court. The decision of the
arbitrator and the specific basis for the decision shall be in writing. The arbitrator shall use
the Contract as a basis for decisions.
1-09.13(3)B Procedures to Initiate Arbitration
(June 2023 Renton GSP)
Section 1-09.13(3)B is supplemented by adding:
The findings and decision of the board of arbitrators shall be final and binding on the parties,
unless the aggrieved party, within 10 days, challenges the findings and decision by serving
Monroe Ave Infiltration Facility SP-56 Special Provisions
City of Renton
and filing a petition for review by the superior court of King County, Washington. The
grounds for the petition for review are limited to showing that the findings and decision:
1. Are not responsive to the questions submitted;
2. Is contrary to the terms of the contract or any component thereof;
3. Is arbitrary and/or is not based upon the applicable facts and the law controlling the
issues submitted to arbitration. The board of arbitrators shall support its decision by
setting forth in writing their findings and conclusions based on the evidence adduced
at any such hearing.
The arbitration shall be conducted in accordance with the statutes of the State of
Washington and court decisions governing such procedure.
The costs of such arbitration shall be borne equally by the City and the Contractor unless it
is the board's majority opinion that the Contractor's filing of the protest or action is capricious
or without reasonable foundation. In the latter case, all costs shall be borne by the
Contractor.
1-09.13(4) Venue for Litigation
(January 19, 2022 APWA GSP)
Revise this section to read:
Litigation shall be brought in the Superior Court of the county in which the Contracting
Agency’s headquarters is located, provided that where claims are asserted against a county,
RCW 36.01.050 shall control venue and jurisdiction of the Superior Court. It is mutually
agreed by the parties that when litigation occurs, the Contractor shall permit the Contracting
Agency to have timely access to any records deemed necessary by the Contracting Agency
to assist in evaluating the claims or action.
Add the following new section:
1-09.14 Payment Schedule
(June 2023, Renton GSP)
Measurement and Payment Schedule for Bid Items in This Project Proposal
GENERAL
1-09.14(1) Scope
Section 1-09.14(1) is a new section:
A. Payment for the various items of the bid sheets, as further specified herein, shall
include all compensation to be received by the Contractor for furnishing all tools,
equipment, supplies, and manufactured articles, and for all labor, operations, and
incidentals appurtenant to the items of Work being described, as necessary to
complete the various items of the Work all in accordance with the requirements of
the Contract Documents, including all appurtenances thereto, and including all costs
of compliance with the regulations of public agencies having jurisdiction, including
Safety and Health Administration of the U.S. Department of Labor (OSHA). No
separate payment will be made for any item that is not specifically set forth in the Bid
Schedules, and all costs therefore shall be included in the prices named in the Bid
Schedules for the various appurtenant items of Work.
B. The Owner shall not pay for material quantities, which exceed the actual measured
amount used and approved by the Engineer.
Monroe Ave Infiltration Facility SP-57 Special Provisions
City of Renton
C. It is the intention of these Specifications that the performance of all Work under the
bid for each item shall result in the complete construction, in an accepted operating
condition, of each item.
D. Work and material not specifically listed in the proposal but required in the Plans,
Specifications, and general construction practice, shall be included in the bid price.
No separate payment will be made for these incidental items.
Add the following new section:
1-09.14(2) Bid Items
(June 2023, Renton GSP)
The project is defined as following two stages of work.
All bid items under “Schedule A Bid Items - Common to Stage 1 and Stage 2” shall be
shared items under both Stage 1 and Stage 2 of work.
All bid items under “Schedule B Bid Items - Stage 1” shall be items associated with Stage 1
of work, as indicated in the Plans.
All bid items under “Schedule C Bid Items - Stage 2” shall be non-landscaping items
associated with Stage 2 of work, as indicated in the Plans.
All bid items under “Schedule D Bid Items - Landscaping” shall be landscaping items
associated with Stage 2 of work, as indicated in the Plans.
1-09.14(2)A Bid Items Common to Stage 1 and Stage 2
1-09.14(2)A1 Minor Changes (Bid Item A1) - Estimate
For the purpose of providing a common proposal for all bidders, the Contracting Agency has
entered an amount for “Minor Changes” in the Proposal to become a part of the total bid by
the Contractor. At the discretion of the Contracting Agency, all or part of this estimated
amount may be used in lieu of the more formal procedure as outlined in Section 1-04.4 of
the Standard Specifications. The unit contract price for Minor Changes is given in the
Schedule of Prices and shall not be changed by the bidder.
All work and payment under this item will be authorized in writing by the City Project
Manager or Supervisor. Payment will be determined in accordance with Section 1-09.4 of
the Standard Specifications. Payment for this item will be only for the changes and amounts
approved by the City.
If no changes are authorized under this bid item, final payment for this item will be $0 (zero).
1-09.14(2)A2 Contractor Surveying (Bid Item A2) – Lump Sum
There will be no specific measurement for the lump sum bid item “Contractor Surveying.”
Payment for the bid item “Contractor Surveying” will be per the lump sum bid price and
based on the percentage of total Work complete at the time of measurement.
Payment may be prorated over the construction period based on the amount of work
completed for construction surveying and staking.
Monroe Ave Infiltration Facility SP-58 Special Provisions
City of Renton
Survey will be per Special Provision Section 1-05.4 and City of Renton Surveying Standards
in Special Provision Section 1-11.
Payment will be complete compensation for all labor, materials, equipment, tools, all
incidental work needed to provide construction surveying and survey of the finished
improvements (including providing a Washington State licensed surveyor for said work),
staking in advance of pipe laying, fittings and structure installation, surveying the horizontal
and vertical locations of all potholed existing utilities within the work area, verification and
recording of the elevations of existing roadway centerline, crown, and edge of pavement to
ensure that all roadways can be reconstructed to existing grade, elevations of proposed
access road along centerline, fittings and dimensions of existing and proposed stormwater
facilities, inverts of proposed stormwater facilities, location of proposed power junction
boxes and conduit, measurement of existing onsite stockpile prior to Contractor excavation,
and measurement of onsite stockpile after Contractor excavation, and preparation of cut-
sheets. Said payment will be complete compensation for all labor, materials, equipment,
tools all incidental work needed to provide for the Contractor prepared Record Drawings,
which is paid per Bid Item C1. No more than 50% of the bid amount for this item shall be
paid prior to the review and acceptance of the as-constructed information by the Engineer.
1-09.14(2)A3 SPCC Plan (Minimum Bid $5,000) (Bid Item A3) – Lump Sum
Measurement and payment shall be per WSDOT Standard Specification 1-07.15.
1-09.14(2)A4 Type B Progress Schedule (Minimum Bid $10,000) (Bid Item A4) – Lump
Sum
There will be no specific measurement for the lump sum bid item “Type B Progress
Schedule (Minimum Bid $10,000).” The lump sum price shown will cover the complete cost
of a Type B Progress Schedule and weekly look ahead schedules. The Type B Progress
Schedule will be inclusive of all major items of work.
Payment for the bid item “Type B Progress Schedule (Minimum Bid $10,000)” will be made
at the lump sum amount bid (NOT to exceed 80% of bid price prior to completion of
construction) based on the percent of completed Work as defined in the 2023 Standard
Specifications for Road, Bridge, and Municipal Construction (WSDOT) for mobilization.
Payment for the remaining 20% will be made upon completion and final clean-up of the
construction site. Such payment will be complete compensation for all preparation,
maintenance, and updates of a Type B Progress Schedule.
1-09.14(2)A5 Mobilization (Bid Item A5) – Lump Sum
There will be no specific unit of measurement for the lump sum bid item “Mobilization.”
Payment for the bid item “Mobilization” will be made at the lump sum amount bid (NOT to
exceed 80% of bid price prior to completion of construction) based on the percent of
completed Work as defined in the 2023 Standard Specifications for Road, Bridge, and
Municipal Construction (WSDOT) for mobilization. Payment for the remaining 20% will be
made upon completion and Final Cleanup of the construction site. Such payment will be
complete compensation for all mobilization of employees, equipment and materials,
Mobilization Plan, Work Plan, preparation of all necessary submittals, bonds, insurance, site
improvements, permits, demobilization, Final Site Cleanup, safety plan, and other
plans/submittals not specifically covered in bid items, etc. all in conformance with the
Contract Documents.
Monroe Ave Infiltration Facility SP-59 Special Provisions
City of Renton
This bid item may not be more than 9% of the total bid for all the schedules.
The lump sum price shown will cover the complete cost of furnishing and installing, complete
and in-place all Work and materials necessary to move and organize equipment and
personnel onto the job site, provide and maintain all necessary support facilities and utilities,
obtain all necessary permits and licenses, prepare the site for construction operations, and
maintain the site and surrounding areas during construction, provide protection of existing
utilities, provide component and system testing, and move all personnel and equipment off
the site after contract completion. Also included shall be a Type B Progress Schedule and
weekly look ahead schedules.
The Contractor shall prepare a Mobilization Plan showing the proposed location for storage
of all equipment and material proposed to be located at the site. Storage shall not interfere
with use of the City ROW and commercial and residential access.
The Contractor shall schedule a pre-mobilization site walk with the City prior to bringing
materials and equipment onsite to establish and document a pre-site condition. The pre-site
condition will be used to determine whether Final Cleanup has been sufficiently performed
per Special Provision 1-04.11.
For any proposed storage on private property outside the easement or work area, the
Contractor shall obtain a Temporary Use Permit for storage areas on private property. The
Contractor shall be responsible for all fees, applications, and work needed to obtain the
permit. The Contractor shall allow 3 to 4 weeks to obtain the Temporary Use Permit from
the City.
The Contractor shall prepare a Work Plan that shall include the following:
A. Proposed Construction Sequence and Schedule including a Type B Progress
Schedule for all major items of work.
B. Mobilization Plan showing the proposed location for storage of all equipment and
materials.
C. Temporary Erosion and Sediment Control Plan for all stages of the project
D. Traffic Control Plan, including truck routing, frequency, and staging; provisions
for cleaning and sweeping of any impacted roadways. Traffic Control plan must
including maintaining at least 1 open lane, and limit impacts to traffic along NE 4th
St.
E. Identify Disposal Sites for various waste materials and provide copies of the
site’s permits, licenses, and approvals.
F. Pedestrian Handling Plan.
The Work Plan shall be submitted to the City for review and approval within 10 days of the
contract award.
1-09.14(2)A6 Project Temporary Traffic Control (Bid Item A6) – Lump Sum
There will be no specific measurement for the lump sum bid item “Project Temporary Traffic
Control.”
Monroe Ave Infiltration Facility SP-60 Special Provisions
City of Renton
Payment for bid item “Project Temporary Traffic Control” will be per lump sum and shall be
based on the percentage of total work complete, at the time of measurement in
conformance with the Contract Documents.
Payment for “Project Temporary Traffic Control” Work will be based on the percentage of
total work complete, at time of measurement in conformance with the Contract Documents.
Payment will be complete compensation for preparing and submitting a traffic control plan
and pedestrian handling plan as well as all labor, tools, materials, equipment used in
accordance with the approved Traffic Control Plan and pedestrian handling plan that is not
included in other bid items. The Lump Sum contract price shall be full pay for all costs for
performing the work described in Section 1-10.3, and in the Traffic Control Information.
Payment shall include but not be limited to providing for public convenience and safety,
flaggers, traffic control supervisor, construction signs, detours, barricades, sequential arrow
boards, a minimum of two Portable Changeable Message Signs, traffic control devices,
truck-mounted attenuator, temporary striping, cleanup, etc. required to complete this item of
Work in conformance with the Contract Documents and the Manual on Uniform Traffic
Control Devices (MUTCD) and as directed by the Engineer and by the City’s Transportation
Department. Also, included in the contract price is the cost to furnish traffic control services
and equipment for construction surveying, staking, and as-built plans.
All adjustments to the Traffic Control Plan are considered incidental, and no additional
payment will be made for adjustments.
1-09.14(2)A7 Removal of Structures and Obstructions (Bid Items A7) – Lump Sum
Measurement and payment shall be per WSDOT Standard Specification 2-02.
All costs related to the removal and disposal of structures and obstructions including saw
cutting, excavation, backfilling, and temporary asphalt shall be considered incidental to and
included in other items unless designated as specific bid items in the proposal. If
pavements, sidewalks, or curbs lie within an excavation area and are not mentioned as
separate pay items, their removal will be paid for as part of the quantity removed in
excavation. If they are mentioned as a separate item in the proposal, they will be measured
and paid for as provided under Section 2-02.5, and will not be included in the quantity
calculated for excavation.
“Removal of Structures and Obstructions” shall not be specifically measured. However, the
following approximate quantities have been estimated for items to be removed, abandoned,
salvaged, reset or relocated.
Items to be Removed Approximate Quantity of Work
Sidewalk 20.0 SY
Existing Chain Link W/ Wood Slat Privacy Fence 65.0 LF
Curb and gutter 90.0 LF
Sawcutting 140.0 LF
De-Energizing and Removing Existing Luminaire 1 EA
Monroe Ave Infiltration Facility SP-61 Special Provisions
City of Renton
1-09.14(2)A8 Non-Infiltration Material Incl. Haul (Bid Item A8) – Cubic Yard
“Non-Infiltration Material Incl. Haul” will be measured by the cubic yard. Measurement by
cubic yard will be made for the installed volume in-place after compaction.
Computation of Non-Infiltration Material Quantities
Only one determination of the original ground elevation (lower pay limit) will be made on this
project for the Non-Infiltration Zone based on the original ground elevation recorded
previous to the award of this contract. As shown in the Plans, a digital terrain surface was
also created for the top (upper pay limit) of the Non-Infiltration Zone. The Non-Infiltration
Material Incl. Haul quantities will be computed by means of electronic data processing
equipment by the finite element analysis method utilizing digital terrain modeling techniques.
The digital terrain model surfaces and calculations will be available to the successful Bidder.
The Contractor may choose to conduct their own survey of original ground, at no additional
cost to the City, prior to placing Non-Infiltration Material and submit to the Engineer for
review. Any Contractor performed survey to verify Non-Infiltration Material Incl. Haul
quantities shall conform to Section 1-11 of the Special Provisions and shall meet the
following requirements:
1. Survey shall performed by a license surveyor.
2. Survey shall be provided to the Contracting Agency as an electronic digital terrain
surface.
3. Density of surveyed elevation points shall be equivalent to the density of survey
points shown in the original ground digital terrain surface provided by the Contracting
Agency.
If discrepancies are discovered in the ground elevations which will materially affect the
quantities of earthwork, the original computations of earthwork quantities will be adjusted
accordingly. Adjustments to Non-Infiltration Material quantity will be computed, either
manually or by means of electronic data processing equipment, by use of the average end
area method or by the finite element analysis method utilizing digital terrain modeling
techniques. Except in the case of discrepancies found or the work is modified as directed by
the Engineer, the quantity paid will be as shown in this section of the Special Provisions.
Calculations will be provided to the successful Bidder.
Payment for the Non-Infiltration Material Incl. Haul will be based on the percentage of total
bid quantity in cubic yards that has been installed, at the time of measurement in
conformance with the Contract Documents.
For the purposes of bid preparation, it can be assumed that the existing on-site stockpile
shown on plan sheet C103 will provide 20,000 cubic yards of compacted volume for the
Non-Infiltration Material Incl. Haul Item. Excavation of the existing on-site stockpile will not
be measured and paid separately and shall be considered incidental to the “Non-Infiltration
Material Incl. Haul” Item. The on-site stockpile shall be protected from weather per Special
Provision 2-03.3(14)N.
“Non-Infiltration Material Incl. Haul” shall conform to the gradation and requirements
presented in Section 2-03 of these Special Provisions.
Monroe Ave Infiltration Facility SP-62 Special Provisions
City of Renton
“Non-Infiltration Material Incl. Haul” will be paid per cubic yard. The unit Contract price per
cubic yard for “Non-Infiltration Material Incl. Haul” shall be full compensation for all costs
incurred for the excavation, loading, hauling, placing, and compacting of the material.
If suitable material excavated on-site under the Item “Unclassified Excavation Material Incl.
Haul” is re-used as backfill in the Non-Infiltration Zone, at the approval of the Engineer, it will
be measured and paid a second instance as part of the “Non-Infiltration Material Incl. Haul”
Item per this section of the Special Provisions.
If crushed surfacing top course material installed under the Item “Temporary Construction
Access Road” is re-used as backfill in the Non-Infiltration Zone, it will be measured and paid
a second instance as part of the “Non-Infiltration Material Incl. Haul” Item per this section of
the Special Provisions.
If quarry spalls material installed under the Item “Temporary Slope Protection” is re-used as
backfill in the Non-Infiltration Zone, it will be measured and paid a second instance as part of
the “Non-Infiltration Material Incl. Haul” Item per this section of the Special Provisions.
For further Description and Construction Requirements for “Non-Infiltration Material Incl.
Haul”, see Special Provisions 2-03.
1-09.14(2)A9 Non-Woven Geotextile Fabric (Bid Item A9) – Square Yard
Measurement and payment will be per WSDOT Standard Specification 2-12.
Non-Woven Geotextile Fabric shall be Non-Woven Geotextile for Underground Drainage,
Moderate Survivability Class C Per WSDOT 9-33.2(1) Tables 1 and 2.
The payment for “Non-Woven Geotextile Fabric” per square yard shall be full compensation
for furnishing and installing the geotextile fabric; including but not limited to seam jointing
tape, and all necessary work to complete the installation as shown in the Plans.
1-09.14(2)A10 Crushed Surfacing Top Course (Bid Item A10) – Ton
Measurement and payment will be per WSDOT Standard Specification 4-04.
This bid item includes the Crushed Surfacing Top Course associated with Gravity Block Wall
Leveling Pad; leveling pads for the: Treatment Vault, Infiltration Chamber Manifold Vault,
Hydrodynamic Separator, Flow Splitter Vault; permanent roadway sub-base; Monroe Ave
pavement restoration; landscape strips at driveway; and shoulder top dressing.
Any Crushed Surfacing Top Course used for the Temporary Construction Access Road is
not paid for by this bid item, but instead paid for under 1-09.14(2)A11 Bid Item A11
“Temporary Construction Access Road”.
1-09.14(2)A11 Temporary Construction Access Road (Bid Item A11)– Lump Sum
There will be no specific unit of measurement for the lump sum bid item “Temporary
Construction Access Road”.
Payment will be made for the bid item “Temporary Construction Access Road” per Lump
Sum.
Monroe Ave Infiltration Facility SP-63 Special Provisions
City of Renton
Payment for the Temporary Construction Access Road Work will be made at the lump sum
contract price (NOT to exceed 80% of bid price prior to completion of construction) and shall
be based on the percentage of total work complete, at time of measurement in conformance
with the Contract Documents. Payment of the remaining 20% will be made upon completion
and final clean-up of the construction site. Payment will be complete compensation for the
furnishment, installation, and maintenance of the temporary construction access road. This
payment shall include, but not be limited, to furnishing and installation, and continual
maintenance of a biaxial geogrid, and 6” depth CSTC wearing course during the duration of
the project as required to protect the site and infiltration zone per Special Provisions section
8-01.1.
The lump sum for “Temporary Construction Access Road” shall also include all Work
associated with the manufacture, installation, and maintenance of the Public Information
Sign, as shown in the Plans. The Public Information Sign is to be shown in location indicated
in the Plans, installed per the Site Preparation Notes included in the Plans, and maintained
for the duration of the project.
See Special Provisions Section 8-01 for Description and Construction Requirements.
1-09.14(2)A12 Stormwater Pollution Prevention Plan (SWPPP) and Implementation (Bid
Item A12) – Lump Sum
There will be no specific measurement for the lump sum bid item “Stormwater Pollution
Prevention Plan (SWPPP) and Implementation.”
Payment will be made for the bid item “Stormwater Pollution Prevention Plan (SWPPP) and
Implementation” per Lump Sum.
The lump sum price for “Stormwater Pollution Prevention Plan (SWPPP) and
Implementation” shall be full pay for all labor, material, tools, equipment, and other incidental
costs required to prepare the Stormwater Pollution Prevention Plan (SWPPP) and
Temporary Erosion and Sediment Control Plan as describe in Section 1-07.15 and
implement the temporary erosion and sediment control BMPs described in Section 8-01
including but not limited to installation, monitoring, and maintenance of catch basin inserts,
filter fabric fencing, sediment ponds, straw wattles, pumping of construction water,
temporary storm drain diversions including temporary piping, check dams, cover measures
including plastic covering, street sweeping, collection and disposal of wastewater from
asphalt and concrete cutting operations and other work necessary to meet the contract and
permit requirements, not otherwise shown as a separate payment item. Payment shall also
include the Contractor’s use of Baker Tanks, as needed during construction and associated
labor, tools, equipment and incidental costs including Baker Tank mobilization, set up,
maintenance, and relocation as work progresses, and incidentals required to use Baker
Tanks, when needed to meet regulatory discharge requirements.
Work shall include coordination, permitting, fees, approval and treatment required by the
City of Renton as required in 1-07.15 if discharging to the sanitary sewer.
1-09.14(2)A13 Erosion Control and Water Pollution Control (Bid Item A13) – Lump Sum
Measurement and payment for Erosion Control and Water Pollution Control will be per
WSDOT Standard Specifications 8-01.
Monroe Ave Infiltration Facility SP-64 Special Provisions
City of Renton
1-09.14(2)A14 Tire Wash (Bid Item A14) – Lump Sum
There will be no specific measurement for the lump sum bid item “Tire Wash.”
Payment will be made for the bid item “Tire Wash” per Lump Sum.
Payment for the bid item “Tire Wash” will be based on the percentage of total work complete
at the time of measurement in conformance with the Contract Documents.
Payment will be complete compensation for the furnishment, installation, and maintenance
of the tire wash. This payment shall include, but not be limited, to installing a recycling spray
tire wash station, including any ongoing maintenance such as collection and removal from
site of tire wash water.
See WSDOT Standard Specifications 8-01 for additional information.
1-09.14(2)A15 Temporary Chain Link Fence (Bid Item A15) – Linear foot
Measurement of 6-ft high “Temporary Chain Link Fence” shall be per linear foot of
completed fence, along the ground line, exclusive of openings.
Payment for 6-ft high “Temporary Chain Link Fence” shall be per Linear Foot, and shall be
full compensation for all labor, materials, tools, equipment, and incidentals necessary to
complete the work as defined in the plans, specifications and special provisions.
Ends, corners, posts, footings, placement and deconstruction and removal are considered
incidental to and included in the unit price of the fence, and no separated payment will be
made.
1-09.14(2)A16 Temporary Double 20-Ft. Wide Chain Link Gate (Bid Item A16) – Each
Measurement of “Temporary Double 20-Ft. Wide Chain Link Gate” shall be per each.
Payment for “Temporary Double 20-Ft. Wide Chain Link Gate” shall be per each, and shall
be full compensation for all labor, materials, tools, equipment, and incidentals necessary to
complete the work as defined in the plans, specifications and special provisions.
Ends, corners, posts, footings, placement and deconstruction and removal are considered
incidental to and included in the unit price of the fence, and no separated payment will be
made.
1-09.14(2)B Bid Items Specific to Schedule B – Stage 1
Schedule B – Stage 1 includes all work associated with the following items:
General Requirements: Utility Potholing, confirming location of utilities along Monroe Ave
Earthwork: Clearing and Grubbing; High Visibility Fence; haul and place of Select Borrow
Incl Haul; haul and place Infiltration Gravel Incl. Haul, haul and place Non-Infiltration
Material
Miscellaneous Construction: Furnish and Install Gravity Block Wall intended as separation
measure between the infiltration rock and the backfill outside of the infiltration area.
1-09.14(2)B1 Utility Potholing (Bid Item B1) – Each
Measurement and payment for “Utility Potholing” shall be per each for each pothole
completed in conformance with the Contract Documents.
Monroe Ave Infiltration Facility SP-65 Special Provisions
City of Renton
“Utility Potholing” is intended to be additional potholing as shown on the plans and/or
directed by the Engineer, which is in addition to potholing included as incidental for utility
installation. Other than potholes specifically called out in the plans, only potholes approved
by the City provided inspector or Engineer will be approved for payment. All other potholes
will be considered a benefit to the Contractor and included in the contract price for the utility
to be installed.
1-09.14(2)B2 Clearing and Grubbing (Bid Item B2) – Lump Sum
Measurement and payment shall be per WSDOT Standard Specification 2-01.
1-09.14(2)B3 Select Borrow Incl. Haul (Bid Item B3) – Ton
“Select Borrow Incl. Haul” will be measured by the ton. “Select Borrow Incl. Haul” shall
conform to the gradation presented in Special Provisions Section 9-03.14(2) Select Borrow.
“Select Borrow Incl. Haul” will be paid per ton. The unit Contract price per ton for “Select
Borrow Incl. Haul” shall be full compensation for all costs incurred for the loading, hauling,
placing, material testing, and compacting of the material. Material testing shall be provided
by the Contractor and shall be in the form of supplying a gradation report from the material
source for Engineer approval twice a week during the installation of the Select Borrow to
verify ongoing conformity of supplied material to required gradation.
1-09.14(2)B4 Infiltration Gravel Incl. Haul (Bid Item B4) – Ton
“Infiltration Gravel Incl. Haul” will be measured by the ton. “Infiltration Gravel Incl. Haul” shall
meet the construction methods presented in these Special Provisions Section 2-03.3(14)F
Infiltration Gravel. “Infiltration Gravel Incl. Haul” shall conform to the gradation presented in
Special Provisions Section 9-03.16.
“Infiltration Gravel Incl. Haul” will be paid per ton. The unit Contract price per ton for
“Infiltration Gravel Incl. Haul” shall be full compensation for all costs incurred for the loading,
hauling, placing, material testing, and compacting of the material. Material testing shall be
provided by the Contractor and shall be in the form of supplying a gradation report from the
material source for Engineer approval twice a week during the installation of the Infiltration
Gravel to verify ongoing conformity of supplied material to required gradation.
1-09.14(2)B5 High Visibility Fence (Bid Item B5) – Linear Foot
Measurement for “High Visibility Fence” will be measured per Linear Foot installed length.
Payment for “High Visibility Fence” shall be full pay for the furnishment, installation, and
maintenance of High Visibility Fence per WSDOT STD Plan I-10.10-01.
1-09.14(2)B6 Gravity Block Wall (Bid Item B6) – Square Foot
Measurement and Payment for “Gravity Block Wall” will be per Square Foot, per WSDOT
Standard Specification 8-24.
The Crushed Surfacing Top Course leveling pad will be paid separately, under Bid Item 1-
09.14(2)A10 “Crushed Surfacing Top Course”.
See Special Provision 8-24 for Description, Materials and Construction Requirements.
Monroe Ave Infiltration Facility SP-66 Special Provisions
City of Renton
1-09.14(2)B7 MIRAFI FW402 Woven Geotextile Fabric (Bid Item B7) – Square Yard
Measurement and Payment for “MIRAFI FW402 Woven Geotextile Fabric” will be per
Square Yard, per WSDOT Standard Specification 2-12.
See Special Provisions 2-12 for description and approved equal material requirements.
1-09.14(2)C Bid Items Specific to Schedule C – Stage 2
Schedule C – Stage 2 includes all work associated with the following items:
General Requirements: Record Drawings, Property Restoration;
Earthwork: including placement and compaction of Non-Infiltration Material, Gravel
Borrow Incl Haul, Shoring or Extra Excavation Class A, Shoring or Extra Excavation
Class B;
Bases work: work involving the furnishing, placing, and compacting Crushed Surfacing
Top Course;
Surface Treatments and Pavements: HMA CL. ½” PG 64-22
Structures: Grated Vault Top – fabricated steel supports and grates for the top of the
Treatment Vault
Drainage Structures, Storm Sewers, Sanitary Sewers, Water Mains and Conduits:
involved in the furnishing and installation of Treatment Vault, Polypropylene Storm
Sewer Pipe, Hydrodynamic Separator Vault, Flow Splitter Vault, Stormwater Infiltration
Facility, Catch Basin Type 2 - __-IN. Diam., Connection to Drainage Structure, Plug and
Abandon Existing Storm Sewer Pipes
Miscellaneous Construction: Concrete work including the installation of Cement
Concrete Traffic Curb, Cement Concrete Traffic Curb and Gutter, Cement Concrete
Rolled Curb, Cement Concrete Driveway Entrance Type 2, Cement Concrete Sidewalk.
Furnish and installation of Black Vinyl Chain Link Fence and Chain Link Fence with
Privacy Slats, Furnish and Installation of Swing Gate and Chain Link Fence with Privacy
Slats Gate. Adjustment of Utility Box Covers to finished grade.
Illumination System (removal of existing luminaire and the installation of new junction
boxes, conduit, luminaire and concrete luminaire pad).
1-09.14(2)C1 Record Drawings (Minimum Bid $5,000) (Bid Item C1) – Lump Sum
There will be no specific unit of measurement for the lump sum bid item “Record Drawings
(Minimum Bid $5,000).”
Payment will be made for the bid item “Record Drawings (Minimum Bid $5,000)” per Lump
Sum and based on the percentage of total Work complete at the time of measurement in
conformance with the Contract Documents.
The pay item for “Record Drawings (Minimum Bid $5,000)” shall be complete compensation
for all labor, materials, equipment, tools, all incidental work needed to provide “red line” as-
built drawings for pay estimate submittal with fittings and dimensions of existing and
proposed stormwater facilities installed or encountered during the pay period, furnishing an
electronic file with construction drawings stamped and signed by a licensed land surveyor
that contains the as-built information and copies of field notes, and furnishing and resetting
property corners when disturbed by the contractor’s activities. No more than 50% of the bid
amount for this item shall be paid prior to the review and acceptance of the as-constructed
information by the Engineer.
Monroe Ave Infiltration Facility SP-67 Special Provisions
City of Renton
Survey shall be per Special Provision Section 1-05.4 and City of Renton Surveying
Standards in Special Provision Section 1-11. The as-built survey shall be per Special
Provisions Section 1-11.
The contractor shall provide the City with a set of redline drawings with the as-built locations
and elevations of all new utilities and construction work.
All work associated with Surveying is paid for solely per Bid Item A2.
1-09.14(2)C2 Unclassified Excavation Incl. Haul (Bid Items C2) – Cubic Yard
“Unclassified Excavation Incl. Haul” will be measured by the cubic yard in the position it
occupied before the excavation was performed.
Computation of Excavation Quantities
One determination of the original ground elevation will be made on this project based on the
original ground elevation recorded previous to the award of this contract. For Unclassified
Excavation, the original ground will be compared with the planned subgrade or by the pay
limits shown in the Plans, or as defined by Section 2-09.4, whichever results in the least
quantity.
If discrepancies are discovered in the ground elevations which will materially affect the
quantities of earthwork, the original computations of earthwork quantities will be adjusted
accordingly. Earthwork quantities will be computed, either manually or by means of
electronic data processing equipment, by use of the average end area method or by the
finite element analysis method utilizing digital terrain modeling techniques. Except in the
case of discrepancies found or the work is modified as directed by the Engineer, the quantity
paid will be as shown in this section of the Special Provisions. Calculations will be provided
to the successful Bidder.
“Unclassified Excavation Incl. Haul,” will be paid per cubic yard.
The unit Contract price per cubic yard for “Unclassified Excavation Incl. Haul” shall be full
compensation for all costs incurred for the excavating, loading, stockpiling, hauling, placing,
compacting, or otherwise disposing of the material. See Special Provision section 1-
09.14(2)A8 and section 2-03.3(14)N for Unclassified Excavation material that may be re-
used under the “Non-Infiltration Material Incl. Haul” Item.
Unclassified Excavation Incl. Haul shall include excavation for the items of work listed in the
following table:
Description Approximate Quantity (CY)
Maintenance Road Pavement, Curbs,
Gutters, Shoulders 958
NW Corner of Chamber Gallery 90
South Side of Play Field 1582
Unidentified Excavation 70
Total 2700
Monroe Ave Infiltration Facility SP-68 Special Provisions
City of Renton
1-09.14(2)C3 Gravel Borrow Incl. Haul (Bid Item C3) – Ton
“Gravel Borrow Incl. Haul” will be measured by the ton.
“Gravel Borrow Incl. Haul” will be paid per ton. The unit Contract price per ton for “Gravel
Borrow Incl. Haul” shall be full compensation for all costs incurred for the furnishing, hauling,
placing, compacting, or otherwise disposing of the material.
Work included in the bid item “Gravel Borrow Incl. Haul” includes the furnishing, hauling,
placing, compacting the Gravel Borrow associated with embankments, as indicated in the
plans.
Gravel Borrow Incl. Haul shall include items of work listed in the following table:
Description Approximate Quantity (TN)
Embankment around Stormwater
Infiltration Facility 5450
Storm Sewer Trench Backfill 1240
See WSDOT Standard Specification 2-03 for Description, Materials, and Construction
Requirements.
1-09.14(2)C4 Gravel Backfill for Walls (Bid Item C4) – Ton
“Gravel Backfill for Walls” will be measured by the ton only for the 12” depth layer of Gravel
Backfill for Walls within the Play Field area from toe to toe of Play Field perimeter slopes
over the Stormwater Infiltration Facility.
“Gravel Backfill for Walls” will be paid per ton. The unit Contract price per ton for “Gravel
Backfill for Walls” shall be full compensation for all costs incurred for the supplying, loading,
hauling, placing, and compacting of the material. “Gravel Backfill for Walls” will be paid only
for the 12” depth layer of Gravel Backfill for Walls within the Play Field area from toe to toe
of Play Field perimeter slopes over the Stormwater Infiltration Facility. Gravel Backfill for
Walls installed outside of this 12” depth layer shall be included in other bid items.
See WSDOT Standard Specification 2-09 for description, methods, and materials.
1-09.14(2)C5 Shoring or Extra Excavation Class A (Bid Item C5) – Lump Sum
There will be no specific unit of measurement for the lump sum bid item “Shoring or Extra
Excavation Class A.”
Payment of “Shoring or Extra Excavation Class A” shall be per the lump sum bid price and
based on the percentage of total work completed at time of measurement in conformance
with the Contract Documents.
Payment of “Shoring or Extra Excavation Class A” shall include all work associated with the
shoring and extra excavation associated with the Flow Splitter Vault- 10 Ft.x 10 Ft. x 10 Ft.,
Infiltration Chamber Manifold Vault – 27 Ft. x 7.5 Ft. x 7 Ft., Treatment Vault – 224 Ft. x 20
Ft. x 10 Ft., and Hydrodynamic Separator Vault – 22 Ft. x 14 Ft. x12 Ft.
Monroe Ave Infiltration Facility SP-69 Special Provisions
City of Renton
See WSDOT Standard Specification 2-09 for Description, Materials, and Construction
Requirements.
1-09.14(2)C6 Shoring or Extra Excavation Class B (Bid Item C6) – Lump Sum
There will be no specific unit of measurement for the lump sum bid item “Shoring or Extra
Excavation Class B.”
Payment of “Shoring or Extra Excavation Class B” shall be per the lump sum bid price and
based on the percentage of total work completed at time of measurement in conformance
with the Contract Documents.
Payment of “Shoring or Extra Excavation Class B” shall include all work associated with the
shoring and extra excavation associated with the Polypropylene Storm Sewer Pipe __ In.
Diam. and Catch Basin structures.
See WSDOT Standard Specification 2-09 for Description, Materials, and Construction
Requirements.
1-09.14(2)C7 HMA Cl. 1/2” PG 64-22 (Bid Item C7) – Ton
Measurement for “HMA Cl. 1/2” PG 64-22” will be by the ton in accordance with Section 1-
09.2, with no deduction being made for the weight of asphalt binder, blending sand, mineral
filler, or any other component of the HMA.
Payment for “HMA Cl. 1/2” PG 64-22”, per ton shall include but not necessarily be limited to
all necessary materials, labor, and equipment to satisfactorily complete furnishing, hauling
and placement of HMA, compaction, preparation of existing roadway surfaces, sawcutting 2”
in depth to prepare the asphalt surface for overlay preparation of existing roadway surfaces
along Monroe Ave, applying tack coat and all other necessary materials, labor and
equipment to satisfactorily complete the work as defined in the Standard Specifications and
Special Provisions.
See Special Provision 5-04 for Description, Materials, and Construction Requirements.
1-09.14(2)C8 Polypropylene Storm Sewer Pipe, ___ In. Diam. (Bid Items C8–C9) – Linear
Foot
Measurement for “Polypropylene Storm Sewer Pipe, __ In. Diam.” will be based on linear
foot measured horizontally over the centerline of the installed pipe from the center of
structures in conformance with the Contract Documents.
Payment for furnishing and installing “Polypropylene Storm Sewer Pipe, __ In. Diam.” will be
made per linear foot. The unit contract price for “Polypropylene Storm Sewer Pipe, __ In.
Diam.” shall be complete compensation for:
· All labor, materials, equipment and hauling
· Locating all existing utilities and potholing in advance to determine their horizontal
and vertical location, protecting and providing temporary support of existing utilities
· Dewatering, temporary bypass pumping and control of water
· Structure Excavation, Class B
Monroe Ave Infiltration Facility SP-70 Special Provisions
City of Renton
· Removal and disposal of waste material in the excavation necessary to construct the
improvements including but not limited to: existing pipes; catch basins; manholes;
structures; and abandoned utilities
o Excavated material shall be stockpiled onsite
· Pipe of the size and material type required, gaskets, fittings and adaptors
· Installation, laying and jointing pipe and fittings
· Furnishing and placing pipe zone bedding material conforming to City of Renton
Standard Plan 220.0.
· Appurtenances, ethafoam pads, water, grading, cleaning, and testing, etc. required
to complete the work in accordance with the Contract Documents
· Removal of pipe and catch basins beyond the excavation where shown on the
Drawings or where directed by the Engineer as well as plugging existing pipes to be
abandoned and plugging existing pipes where sections have been removed for the
storm installation, and providing end caps were shown on the plans. These items
shall not be limited to those mentioned on the Plans or specified herein.
· Replacing, protecting and/or maintaining existing utilities
· Furnishing and placing temporary pavement patching.
· CCTV inspection of installed pipes per Section 7-04 of these Special Provisions
See Special Provision 7-04 for Description, Materials, and Construction Requirements.
1-09.14(2)C9 Plug and Abandon Existing Storm Sewer Pipes (Bid Item C10) – Each
Measurement for “Plug and Abandon Existing Storm Sewer Pipes” will be made per each,
the location of each plug is indicated in the Contract Documents.
Payment for “Plug and Abandon Existing Storm Sewer Pipes” will be made per each.
The unit contract price for “Plug and Abandon Existing Storm Sewer Pipes” shall be
inclusive of all labor, equipment, and materials required to plug the storm sewer pipes as
indicated in the Contract Documents.
See Special Provisions 7-04 for Description, Materials, and Construction Requirements.
1-09.14(2)C10 Connection to Drainage Structure (Bid Item C11) – Lump Sum
There will be no specific measurement for the lump sum bid item “Connection to Drainage
Structure”.
The lump sum Contract price for “Connection to Drainage Structure” shall be full pay
for all costs necessary to perform the connection of the existing storm sewer pipe to the
north and south sides of the new catch basin structure within Monroe Ave. NE including but
not limited to: shop drawings, cutting and removing existing pipe, pipe couplers and fittings,
and replacement pipe segments.
See Special Provisions 7-05 for Description, Materials, and Construction Requirements.
1-09.14(2)C11 Catch Basin Type 2 - __ In. Diam. (Bid Items C12-14) – Each
Measurement for furnishing and installing “Catch Basin Type 2 - __In. Diam.” will be per
each for each catch basin installed in conformance with the Contract Documents.
Payment for furnishing and installing “Catch Basin Type 2 - __In. Diam” will be made at the
unit bid price per each, which will be complete compensation for:
Monroe Ave Infiltration Facility SP-71 Special Provisions
City of Renton
· All labor, equipment, materials, and hauling
· Locating all existing utilities and potholing in advance to determine their horizontal
and vertical location, protecting and providing temporary support of existing utilities
· Excavation and shoring
· Dewatering, temporary bypass pumping and control of water
· Removal and disposal of waste material including existing pipes and structures in the
excavation and any abandoned utilities
· Structure Excavation, Class B
· Furnishing and placing foundation material
· Precast concrete catch basin, gaskets, catch basin frame and grate or lid,
installation, adjustment of frames to grade, appurtenances, Kor-N-Seal boots (or
approved equal), connections to new pipes, reconnections to existing pipes including
pipe and couplings, placement of subsequent backfill materials, compaction, water,
cleaning, and testing, etc. required in conformance with the Contract Documents.
· Furnishing and placing temporary pavement patching
See Special Provision 7-05 for Description, Materials, and Construction Requirements.
1-09.14(2)C12 Flow Splitter Vault – 10 Ft. X 10 Ft. X 8 Ft. (Bid Item C15) – Lump Sum
No specific unit of measurement shall apply to the lump sum item of “Flow Splitter Vault – 10
Ft. X 10 Ft. X 8 Ft.”
Payment will be made for the bid item “Flow Splitter Vault – 10 Ft. X 10 Ft. X 8 Ft.” per Lump
Sum.
The lump sum contract price for “Flow Splitter Vault – 10 Ft. X 10 Ft. X 8 Ft.” shall be
inclusive of the Contractor submitted Type 3E Working Drawings, furnishing, delivery, and
installation of the Flow Splitter Vault and all associated excavation, bedding, backfill, orifice
plates, ladders, risers, access hatches, grout, connections, and appurtenances, and
incidentals necessary to satisfactorily complete the work in accordance to the Plans,
Standard Specifications, and the Special Provisions.
See Special Provision 7-05 for Description, Materials, and Construction Requirements.
1-09.14(2)C13 Infiltration Chamber Manifold Vault – 27 Ft. X 7.5 Ft. X 7 Ft. (Bid Item C16) –
Lump Sum
No specific unit of measurement shall apply to the lump sum item of “Infiltration Chamber
Manifold Vault – 27 Ft. X 7.5 Ft. X 7 Ft.”
Payment will be made for the bid item “Infiltration Chamber Manifold Vault – 27 Ft. X 7.5 Ft.
X 7 Ft.” per Lump Sum.
The lump sum contract price for “Infiltration Chamber Manifold Vault – 27 Ft. X 7.5 Ft. X 7
Ft.” shall be inclusive of the Contractor submitted Type 3E Working Drawings, furnishing,
delivery, and installation of the Infiltration Chamber Manifold Vault and all associated
excavation, backfill, risers, access hatches, ladders, grout, connections, appurtenances, and
incidentals necessary to satisfactorily complete the work in accordance to the Plans,
Standard Specifications, and the Special Provisions.
See Special Provision 7-05 for Description, Materials, and Construction Requirements.
Monroe Ave Infiltration Facility SP-72 Special Provisions
City of Renton
1-09.14(2)C14 Hydrodynamic Separator Vault – 22 Ft. X 14 Ft. X 12 Ft. (Bid Item C17) –
Lump Sum
No specific unit of measurement shall apply to the lump sum item of “Hydrodynamic
Separator Vault - 22 Ft. X 14 Ft. X 12 Ft.”
Payment will be made for the bid item “Hydrodynamic Separator Vault - 22 Ft. X 14 Ft. X 12
Ft.” per Lump Sum.
The lump sum contract price for “Hydrodynamic Separator Vault - 22 Ft. X 14 Ft. X 12 Ft.”
shall be inclusive of the Contractor submitted Type 3E Working Drawings, furnishing,
delivery, and installation of the Hydrodynamic Separator Vault and all associated
excavation, backfill, risers, ladders, access hatches, grout, connections, and appurtenances,
and incidentals necessary to satisfactorily complete the work in accordance to the Plans,
Standard Specifications, Special Provisions, and manufacturer’s recommendations.
See Special Provision 7-05 for Description, Materials, and Construction Requirements.
1-09.14(2)C15 Treatment Vault – 224 Ft. X 20 Ft. X 10 Ft. (Bid Item C18) – Lump Sum
No specific unit of measurement shall apply to the lump sum item of “Treatment Vault – 224
Ft. X 20 Ft. X 10 Ft.”
Payment will be made for the bid item “Treatment Vault – 224 Ft. X 20 Ft. X 10 Ft.” per
Lump Sum.
The lump sum contract price for “Treatment Vault – 224 Ft. X 20 Ft. X 10 Ft.” shall be
inclusive of the Contractor submitted Type 3E Working Drawings, furnishing, delivery, and
installation of the Treatment Vault and all associated excavation, backfill, treatment media,
internal vault structures and components, risers, ladders, grout, connections, wall drain
slotted pipe and drain rock, geotextile, gravel backfill for drains, appurtenances, and
incidentals necessary to satisfactorily complete the work in accordance to the Plans,
Standard specifications, Special Provisions, and manufacturer’s recommendations.
The Grated Vault Top shall be measured and paid for separately, as a part of 1-
09.14(2)C16, Grated Vault Top.
See Special Provision 7-05 for Description, Materials, and Construction Requirements.
1-09.14(2)C16 Grated Vault Top (Bid Item C19) – Lump Sum
No specific unit of measurement shall apply to the lump sum item of “Grated Vault Top”.
The Grated Vault Top shall meet section 6-03 of these Special Provisions.
Payment will be made for the bid item “Grated Vault Top” per lump sum.
The lump sum contract price shall include all work associated with the submittal and
approval of Shop Plans (Type 2 Drawings), fabrication, delivery, installation, and all other
Work necessary to construct the “Grated Vault Top” associated with the Project Documents.
Monroe Ave Infiltration Facility SP-73 Special Provisions
City of Renton
See Special Provision 6-02 and 6-03 for Description, Materials, and Construction
Requirements.
1-09.14(2)C17 Stormwater Infiltration Facility (Bid Item C20) – Lump Sum
No specific unit of measurement shall apply to the lump sum item of “Stormwater Infiltration
Facility.”
Payment will be made for the bid item “Stormwater Infiltration Facility” per Lump Sum.
The lump sum contract price for “Stormwater Infiltration Facility” shall be full compensation
for all labor, material, tools, and equipment to furnish and install the Stormwater Infiltration
Facility including, but not limited to, inspection ports and cover boxes; geotextiles; plastic
chambers and end caps, including preparation of structural submittals; 24-inch diameter
pipe stubs and pipe connections to Infiltration Chamber Manifold Vault and to manifold catch
basins; 24-inch diameter manifold pipes, including bedding material; installing and
compacting embedment and backfill materials; and all incidentals necessary to completed
the installation in accordance to the Plans, Special Provisions, and manufacturer’s
recommendations.
The Catch Basins Type 2 associated with the manifold are paid separately, as a part of 1-
09.14(2)C11 Catch Basin Type 2 __-In. Diam.
See Special Provision 7-06 for Description, Materials, and Construction Requirements.
1-09.14(2)C18 Cement Conc. Traffic Curb (Bid Item C21) – Linear Foot
Measurement and payment shall be per WSDOT Standard Specification 8-04.
See Special Provisions Section 8-04 for Description, Materials, and Construction
Requirements.
1-09.14(2)C19 Cement Conc. Traffic Curb and Gutter (Bid Item C22) – Linear Foot
Measurement and payment shall be per WSDOT Standard Specification 8-04.
See Special Provisions Section 8-04 for Description, Materials, and Construction
Requirements.
1-09.14(2)C20 Cement Conc. Rolled Curb (Bid Item C23) – Linear Foot
Measurement will be per WSDOT Standard Specification 8-04.
Payment will be made for “Cement Conc. Rolled Curb”, per linear foot.
See Special Provisions Section 8-04 for Description, Materials, and Construction
Requirements.
1-09.14(2)C21 Cement Conc. Driveway Entrance Type 2 (Bid Item C24) – Square Yard
Cement concrete pavement for driveways will be measured per square yard for all driveway
types and will be paid under the unit bid price for “Cement Conc. Driveway Entrance Type
2”.
“Cement Conc. Driveway Entrance Type 2” will be measured to include the ramps/wings on
either side of the driveway as indicated on the Plans.
Monroe Ave Infiltration Facility SP-74 Special Provisions
City of Renton
Payment for “Cement Conc. Driveway Entrance Type 2” shall be full compensation for all
labor, materials, tools and equipment necessary to satisfactorily complete the work as
defined in the Plans, the Standard Specifications and these Special Provisions.
See Special Provisions Section 8-06 for Description, Materials, and Construction
Requirements.
1-09.14(2)C22 Black Vinyl Chain Link Fence (Bid Item C25) – Linear foot
Measurement and payment will be per WSDOT Standard Specification 8-12.
See Special Provisions Section 8-12 for Description, Materials, and Construction
Requirements.
1-09.14(2)C23 Chain Link Fence w/ Privacy Slats (Bid Item C26) – Linear foot
Measurement and payment will be per WSDOT Standard Specification 8-12.
“Chain Link Fence w/ Privacy Slats” to match the existing Chain Link Fence w/ Privacy Slats
onsite.
See Special Provisions Section 8-12 for Description, Materials, and Construction
Requirements.
1-09.14(2)C24 Double 20-Ft. Wide Chain Link w/ Privacy Slats Gate (Bid Item C27) – Each
Measurement and payment will be per WSDOT Standard Specification 8-12.
See Special Provisions Section 8-04 for Description, Materials, and Construction
Requirements.
1-09.14(2)C25 Cement Conc. Sidewalk (Bid Item C28) – Square Yard
Measurement and payment will be per WSDOT Standard Specification 8-04.
See Special Provisions Section 8-14 for Description, Materials, and Construction
Requirements.
1-09.14(2)C26 Adjust Utility Box Cover (Bid Item C29) – Each
Measurement and payment will be per each, see Special Provisions Section 8-20.
Work included in “Adjust Utility Box Cover” is adjusting the frame and lid of the Utility Box
Covers to the finished grade of new Cement Concrete Driveway installed as a part of the
“Cement Concrete Driveway Entrance”.
1-09.14(2)C27 Illumination System (Bid Item C30) – Lump Sum
There will be no specific measurement for the lump sum bid item "Illumination System”.
Payment will be made for bid item “Illumination System” per lump sum.
All costs for resolving utility conflicts will be paid for by force account in accordance with
Section 1-09.6. To provide a common proposal for all bidders, the Contracting Agency has
estimated the amount for “Illumination System” and entered the amounts in the proposal to
Monroe Ave Infiltration Facility SP-75 Special Provisions
City of Renton
become a part of the total bid by the Contractor. Utility conflicts due to the Contractor’s
actions or operations shall be resolved by the Contractor at no expense to the Contracting
Agency.
The lump sum contract price for “Illumination System” shall include all work associated with
the furnishing, labor, installation, and any necessary tools and materials to install the
following items:
· 2 new electrical Type 1 Junction boxes,
· Connection to existing power junction box on east side of Monroe Ave
· approximately 55 linear feet of new 4-in diameter schedule 80 PVC conduit,
· approximately 55 linear feet of cable,
· new 40-ft high decorative luminaire pole per City of Renton Standard Plan-117.1,
· concrete pole foundation per plans, and
· luminaire concrete pad, per City of Renton Standard Plan-120.
· Any ancillary hardware, fittings, adaptors, base covers, wires
See Special Provisions Section 8-20 for Description, Materials, and Construction
Requirements.
1-09.14(2)C28 Swing Gate (Bid Item C31) – Each
Measurement for “Swing Gate” shall be per each installed and accepted.
Payment for “Swing Gate” will be made at the contract unit price per each and will constitute
full compensation for all labor, materials and equipment required to complete the specified
Work. The payment for “Swing Gate” will be full payment for the manufacture, furnishment,
and installation of the maintenance access sign, including any required installation
hardware.
See Special Provisions Section 8-26 for Description, Materials, and Construction
Requirements.
1-09.14(2)D Bid Items Specific to Schedule D – Landscaping
Schedule D – Landscaping includes all work associated with the following landscaping items
installed during Stage 2:
Miscellaneous Construction: Landscaping Including PSIPE plants, Topsoil Type A,
hydroseeding, Landscape Mulch, Root Barrier, and Landscaping Boulders.
1-09.14(2)D1 PSIPE__________ (Bid Items D1-D7) – Each
Measurement for “PSIPE________” will be per each plant installed, established and
accepted.
Payment for “PSIPE_________” will be made at the contract unit price and will constitute full
compensation for all labor, materials and equipment required to complete the specified
Work.
See Special Provisions Section 8-02 for Description, Materials, and Construction
Requirements.
Monroe Ave Infiltration Facility SP-76 Special Provisions
City of Renton
1-09.14(2)D2 Topsoil Type A- __ In. Depth (Bid Items D8-D9) – Square Yard
Measurement for “Topsoil Type A - __In. Depth” will be made per square yard along the
grade and slope of the area covered after placement and compaction.
Measurement for “Topsoil Type A - 18 In. Depth” will be per the Play Field Seed Mix area as
indicated on Sheet L701 of the Plans.
Measurement for “Topsoil Type A - 36 In. Depth” will be per the Drought Tolerant Shrub
Planting area as indicated on Sheet L701 of the Plans.
Only materials placed within the pay limits shown will be considered for payment.
Payment will be made for each of the following listed Bid Items:
“Topsoil Type A - 18 In. Depth”, per square yard.
“Topsoil Type A - 36 In. Depth”, per square yard.
The unit bid price for “Topsoil Type A - 18 In. Depth” and “Topsoil Type A – 36 In. Depth”
shall constitute full compensation for all labor, materials and equipment required to complete
the specified Work including the furnishment, placement, and compaction of the Topsoil
Type A as shown in these Contract Documents.
See Special Provisions Section 8-02 for Description, Materials, and Construction
Requirements.
1-09.14(2)D3 Hydroseed – Play Field Seed Mix (Bid Item D10) – Square Yard
Measurement for “Hydroseed – Play Field Seed Mix” shall be per square yard along the
ground slope line of actual area hydroseeded completed, established, and accepted.
Payment for “Hydroseed – Play Field Seed Mix” will be made at the contract unit price and
will constitute full compensation for all labor, materials and equipment required to complete
the specified Work. Per section 8-02 of these Special Provisions, lawn establishment is
included in the payment for “Hydroseed – Play Field Seed Mix.”
See Special Provisions Section 8-02 for Description, Materials, and Construction
Requirements.
1-09.14(2)D4 Landscape Mulch (Bid Item D11) – Square Yard
Measurement for “Landscape Mulch” shall be per square yard along the actual area.
Wasted materials will not be included in the measurement or payment. All “Landscape
Mulch” shall meet the depth and extents shown in the Plans. Only materials placed within
the pay limits shown will be considered for payment. Material placed outside of the pay
limits shown on the Plans or as approved by the Engineer will be deducted from the certified
tickets.
Payment for “Landscape Mulch” will be made at the contract unit price and will constitute full
compensation for all labor, materials and equipment required to complete the specified
Work.
Monroe Ave Infiltration Facility SP-77 Special Provisions
City of Renton
See Special Provisions Section 8-02 for Description, Materials, and Construction
Requirements.
1-09.14(2)D5 Root Barrier (Bid Item D12) – Linear Foot
Measurement for “Root Barrier” shall be per each linear foot installed and accepted.
Payment for Root barrier will be made at the contract unit price and will constitute full
compensation for all labor, materials and equipment required to complete the specified
Work.
See Special Provisions Section 8-02 for Description, Materials, and Construction
Requirements.
1-09.14(2)D6 __- Man Landscape Boulders (Bid Items D13-D14) – Each
Measurement for “__- Man Landscape Boulders” shall be per each installed and accepted.
Payment for “__- Man Landscape Boulders” shall be made at the contract unit price and will
constitute full compensation for all labor, materials and equipment required to complete the
specified Work.
See Special Provisions Section 8-02 for Description, Materials, and Construction
Requirements.
1-10 TEMPORARY TRAFFIC CONTROL
1-10.1 General
(June 2023 Renton GSP)
Revise the first paragraph to read:
The Contractor shall provide flaggers, signs, and other traffic control devices not otherwise
specified as being furnished by the Contracting Agency. The Contractor shall erect and
maintain all construction signs, warning signs, detour signs, and other traffic control devices
necessary to warn and protect the public at all times from injury or damage as a result of the
Contractor’s operations which may occur on highways, roads, streets, sidewalks, or paths.
No Work shall be done on or adjacent to any traveled way until all necessary signs and
traffic control devices are in place.
Section 1-10.1 is supplemented by adding the following:
When the bid proposal includes an item for “Project Temporary Traffic Control,” the Work
required for this item shall be all items described in Section 1-10, including, but not limited
to:
1. Furnishing and maintaining barricades, flashers, construction signing, and other
channelization devices, unless a pay item is in the bid proposal for any specific
device and the Special Provisions specify furnishing, maintaining, and payment in a
different manner for that device;
2. Furnishing traffic control labor, equipment, and supervisory personnel for all traffic
control labor;
3. Furnishing any necessary vehicle(s) to set up and remove the Class B construction
signs and other traffic control devices;
4. Furnishing labor and vehicles for patrolling and maintaining in position all of the
construction signs and the traffic control devices, unless a pay item is in the bid
proposal to specifically pay for this Work; and
Monroe Ave Infiltration Facility SP-78 Special Provisions
City of Renton
5. Furnishing labor, material, and equipment necessary for cleaning up, removing, and
replacing of the construction signs and the traffic control devices destroyed or
damaged during the life of the project.
6. Removing existing signs as specified or as directed by the Engineer and delivering to
the City Shops, or storing and reinstalling as directed by the Engineer.
7. Preparing a traffic control plan for the project and designating the person responsible
for traffic control at the Work site. The traffic control plan shall include descriptions of
the traffic control methods and devices to be used by the prime Contractor, and
subcontractors, shall be submitted at or before the preconstruction conference, and
shall be subject to review and approval of the Engineer.
8. Contacting police, fire, 911, and ambulance services to notify them in advance of any
Work that will affect and traveled portion of a roadway.
9. Assuring that all traveled portions of roadways are open to traffic during peak traffic
periods, 6:30 a.m. to 8:30 a.m., and 3:00 p.m. to 6:00 p.m., or as specified in the
special provisions, or as directed by the Engineer.
10. Promptly removing or covering all non-applicable signs during periods when they are
not needed.
If no bid item “Project Temporary Traffic Control” appears in the proposal, then all Work
required by these sections will be considered incidental and their cost shall be included in
the other items of Work.
If the Engineer requires the Contractor to furnish additional channelizing devices, pieces of
equipment, or services, which could not be usually anticipated, by a prudent Contractor for
the maintenance and protection of traffic, then a new item or items may be established to
pay for such items. Further limitations for consideration of payment for these items are that
they are not covered by other pay items in the bid proposal, they are not specified in the
Special Provisions as incidental, and the accumulative cost for the use of each individual
channelizing device, piece of equipment, or service must exceed $200 in total cost for the
duration of their need. In the event of disputes, the Engineer will determine what is usually
anticipated by a prudent Contractor. The cost for these items will be by agreed price, price
established by the Engineer, or by force account. Additional items required as a result of
the Contractor’s modification to the traffic control plan(s) appearing in the Contract shall not
be covered by the provisions in this paragraph.
If the total cost of all the Work under the Contract increases or decreases by more than 25
percent, an equitable adjustment will be considered for the item “Project Temporary Traffic
Control” to address the increase or decrease.
Traffic control and maintenance for the safety of the traveling public on this project shall be
the sole responsibility of the Contractor and all methods and equipment used will be subject
to the approval of the Owner.
Traffic control devices and their use shall conform to City of Renton standards and the
Manual on Uniform Traffic Control Devices( MUTCD).
The Contractor shall not proceed with any construction until proper traffic control has been
provided to the satisfaction of the Engineer. Any days lost due to improper traffic control will
be charged against the Contractor’s allowable contract time, and shall not be the cause for a
claim for extra days to complete the Work.
Monroe Ave Infiltration Facility SP-79 Special Provisions
City of Renton
1-10.2 Traffic Control Management
1-10.2(1) General
(January 3, 2017, WSDOT GSP)
Section 1-10.2(1) is supplemented with the following:
Only training with WSDOT TCS card and WSDOT training curriculum is recognized in the
State of Washington. The Traffic Control Supervisor shall be certified by one of the
following:
The Northwest Laborers-Employers Training Trust
27055 Ohio Ave.
Kingston, WA 98346
(360) 297-3035
Evergreen Safety Council
12545 135th Ave. NE
Kirkland, WA 98034-8709
1-800-521-0778
The American Traffic Safety Services Association
15 Riverside Parkway, Suite 100
Fredericksburg, Virginia 22406-1022
Training Dept. Toll Free (877) 642-4637
Phone: (540) 368-1701
1-10.2(1)B Traffic Control Supervisor
(June 2023, Renton GSP)
Paragraphs 1 and 2 are revised as follows:
A Traffic Control Supervisor (TCS) shall be on the project whenever traffic control labor is
required or as authorized by the Engineer.
The TCS shall assure that all the duties of the TCS are performed during the duration of the
Contract. During non-Work periods, the TCS shall be able to be on the job site within a 45-
minute time period after notification by the Engineer.
1-10.2(2) Traffic Control Plans
Section 1-10.2(2) is supplemented with the following:
Traffic control plans for Monroe Ave NE will be subject to review by the City of Renton.
These traffic control plans must show minimal impacts to traffic conditions along NE 3rd/4th
Street and maintenance of traffic along all streets surrounding the project site.
The Contractor shall submit a traffic control plan or plans showing a method of handling
traffic in a timely manner to allow for review, resubmittal, and notifications in accordance
with Section 1-07.23(1). The review of traffic control and detour plans may require up to ten
(10) working days.
Monroe Ave Infiltration Facility SP-80 Special Provisions
City of Renton
1-10.3 Traffic Control Labor, Procedures and Devices
Section 1-10.3 is supplemented as follows:
At the end of each working day, provisions shall be made for the safe passage of traffic and
pedestrians during non-working hours.
Barricades shall be reflectorized as specified in Part VI of the MUTCD, and shall be 3M-
diamond grade or equivalent approved by the Engineer. Barricades shall also be equipped
with flashers during hours of darkness.
Drivers of motor vehicles used in connection with the construction shall obey traffic rules
posted for such location in the same manner and under the same restrictions as provided for
the drivers of private vehicles.
The Contractor shall conduct the work in such a manner as will obstruct and inconvenience
vehicular and pedestrian traffic as little as possible. The streets, sidewalks and private
driveways shall be kept open by the Contractor except for the brief periods when actual
work is being done. The Contractor shall so conduct their operations so as to have under
construction no greater length or amount of work than Contractor can prosecute vigorously
and Contractor shall not open up sections of the work and leave them in an unfinished
condition. See Section 1-07.23(1) for additional driveway closure requirements.
The Contractor shall provide traffic cones, barricades, and drums, with warning lights in
sufficient number and in good condition as required to protect the work and the public
throughout the length of the job. Traffic Safety Drums with flashers in addition to temporary
striping will be used to channelize traffic through construction zones. Opposing lanes of
traffic will be separated by pylons when clearance for drums is not adequate. All signing and
channelization shall be per current MUTCD standards.
Temporary paint striping, reflective marking tape, and/or retroreflective tubular markers shall
be required for each shift of traffic control. The Contractor shall provide temporary striping,
reflective marking tape, and/or retroreflective tubular markers as required at the direction of
the Engineer. Paint, reflective marking tape, and/or retroreflective tubular markers used for
temporary striping shall meet the requirement of 8-23 of the Specifications.
1-10.3(3)A Construction Signs
(June 2023, Renton GSP)
Section 1-10.3(3)A is supplemented as follows:
No separate pay item will be provided in the bid proposal for Class A or Class B construction
signs. All costs for the Work to provide Class A or Class B construction signs shall be
included in the unit contract price for the various other items of the Work in the bid proposal.
Add the following new section:
1-10.3(4) Traffic Control Constraints
(June 2023, Renton GSP)
Traffic control plans shall be reviewed and approved by the City. Pedestrian and vehicular
access shall be maintained throughout the work to the greatest extent practical.
Minimum travel lane width is 9.5-feet. Contractor must maintain a minimum of one open
travel lane.
Monroe Ave Infiltration Facility SP-81 Special Provisions
City of Renton
Contractor shall maintain access to all businesses.
1-10.4 Measurement
1-10.4(3) Reinstating Unit Items with Lump Sum Traffic Control
(August 2, 2004, WSDOT GSP)
Section 1-10.4(3) is supplemented with the following:
The bid proposal contains the item “Project Temporary Traffic Control,” lump sum and the
additional temporary traffic control items listed below. The provisions of Section 1-10.4(1),
Section 1-10.4(3), and Section 1-10.5(3) shall apply.
Uniformed Officer will be measured by the hour.
No queuing is allowed on public streets unless written approval is provided by
Engineer/Inspector.
1-10.5(2) Item Bids with Lump Sum for Incidentals
Section 1-10.5(2) is supplemented with the following:
“Uniformed Officer”, per hour.
The unit Contract price for “Uniformed Officer” shall be full compensation for providing traffic
control tasks with a uniformed officer, for the activities listed in Section 1-10.3.1(C). Use of
uniformed officers for other tasks will be included in the lump sum bid item “Project
Temporary Traffic Control”.
Add the following new Section:
1-11 RENTON SURVEYING STANDARDS
1-11.1(1) Responsibility for Surveys
All surveys and survey reports shall be prepared under the direct supervision of a person
registered to practice land surveying under the provisions of Chapter 18.43 RCW.
All surveys and survey reports shall be prepared in accordance with the requirements
established by the Board of Registration for Professional Engineers and Land Surveyors
under the provisions of Chapter 18.43 RCW.
1-11.1(2) Survey Datum and Precision
The horizontal component of all surveys shall have as its coordinate base: The North
American Datum of 1983/91.
All horizontal control for projects must be referenced to or in conjunction with a minimum of
two of the City of Renton's Survey Control Network monuments. The source of the
coordinate values used will be shown on the survey drawing per RCW 58.09.070.
The horizontal component of all surveys shall meet or exceed the closure requirements of
WAC 332-130-060. The control base lines for all surveys shall meet or exceed the
requirements for a Class A survey revealed in Table 2 of the Minimum Standard Detail
Requirements for ALTA/ACSM Land Title Surveys jointly established and adopted by ALTA
and ACSM in 1992 or comparable classification in future editions of said document. The
Monroe Ave Infiltration Facility SP-82 Special Provisions
City of Renton
angular and linear closure and precision ratio of traverses used for survey control shall be
revealed on the face of the survey drawing, as shall the method of adjustment.
The horizontal component of the control system for surveys using global positioning system
methodology shall exhibit at least 1 part in 50,000 precision in line length dependent error
analysis at a 95 percent confidence level and performed pursuant to Federal Geodetic
Control Subcommittee Standards for GPS control surveys as defined in Geometric Geodetic
Accuracy Standards & Specifications for Using GPS Relative Positioning Techniques dated
August 1, 1989, or comparable classification in future editions of said document.
The vertical component of all surveys shall be based on NAVD 1988, the North American
Vertical Datum of 1988, and tied to at least one of the City of Renton Survey Control
Network benchmarks. If there are two such benchmarks within 3000 feet of the project site a
tie to both shall be made. The benchmark(s) used will be shown on the drawing. If a City of
Renton benchmark does not exist within 3000 feet of a project, one must be set on or near
the project in a permanent manner that will remain intact throughout the duration of the
project. Source of elevations (benchmark) will be shown on the drawing, as well as a
description of any benchmarks established.
1-11.1(3) Subdivision Information
Those surveys dependent on section subdivision shall reveal the controlling monuments
used and the subdivision of the applicable quarter section.
Those surveys dependent on retracement of a plat or short plat shall reveal the controlling
monuments, measurements, and methodology used in that retracement.
1-11.1(4) Field Notes
Field notes shall be kept in conventional format in a standard bound field book with
waterproof pages. In cases where an electronic data collector is used field notes must also
be kept with a sketch and a record of control and base line traverses describing station
occupations and what measurements were made at each point.
Every point located or set shall be identified by a number and a description. Point numbers
shall be unique within a complete job. The preferred method of point numbering is field
notebook, page and point set on that page. Example: The first point set or found on page
16 of field book 348 would be identified as Point No. 348.16.01, the second point would be
348.16.02, etc.
Upon completion of a City of Renton project, either the field notebook(s) provided by the City
or the original field notebook(s) used by the Surveyor will be given to the City. For all other
Work, Surveyors will provide a copy of the notes to the City upon request. In those cases
where an electronic data collector is used, a hard copy print out in ASCII text format will
accompany the field notes.
1-11.1(5) Corners and Monuments
Corner: A point on a land boundary, at the juncture of two or more boundary lines. A
monument is usually set at such points to physically reference a corner's location on the
ground.
Monument: Any physical object or structure of record, which marks or accurately references:
Monroe Ave Infiltration Facility SP-83 Special Provisions
City of Renton
· A corner or other survey point established by or under the supervision of an
individual per Section 1-11.1(1) and any corner or monument established by the
General Land Office and its successor the Bureau of Land Management including
section subdivision corners down to and including one-sixteenth corners; and
· Any permanently monumented boundary, right-of-way alignment, or horizontal and
vertical control points established by any governmental agency or private surveyor
including street intersections but excluding dependent interior lot corners.
1-11.1(6) Control or Base Line Survey
Control or Base Line Surveys shall be established for all construction projects that will
create permanent structures such as roads, sidewalks, bridges, utility lines or
appurtenances, signal or light poles, or any non-single family building. Control or Base Line
Surveys shall consist of such number of permanent monuments as are required such that
every structure may be observed for staking or "as-builting" while occupying one such
monument and sighting another such monument. A minimum of two of these permanent
monuments shall be existing monuments, recognized and on record with the City of Renton.
The Control or Base Line Survey shall occupy each monument in turn, and shall satisfy all
applicable requirements of Section 1-11.1 herein.
The drawing depicting the survey shall be neat, legible, and drawn to an appropriate scale.
North orientation should be clearly presented and the scale shown graphically as well as
noted. The drawing must be of such quality that a reduction thereof to one-half original
scale remains legible.
If recording of the survey with the King County Recorder is required, it will be prepared on
18 inch by 24 inch mylar and will comply with all provisions of Chapter 58.09 RCW. A
photographic mylar of the drawing will be submitted to the City of Renton and, upon their
review and acceptance per the specific requirements of the project, the original will be
recorded with the King County Recorder.
If recording is not required, the survey drawing shall be prepared on 22 inch by 34 inch
mylar, and the original or a photographic mylar thereof will be submitted to the City of
Renton.
The survey drawings shall meet or exceed the requirements of WAC 332-130-050 and shall
conform to the City of Renton's Drafting Standards. American Public Works Association
symbols shall be used whenever possible, and a legend shall identify all symbols used if
each point marked by a symbol is not described at each use.
An electronic listing of all principal points shown on the drawing shall be submitted with each
drawing. The listing should include the point number designation (corresponding with that in
the field notes), a brief description of the point, and northing, easting, and elevation (if
applicable) values, all in ASCII format, on IBM PC compatible media.
1-11.1(7) Precision Levels
Vertical Surveys for the establishment of benchmarks shall satisfy all applicable
requirements of Sections 1-05 and 1-11.1.
Monroe Ave Infiltration Facility SP-84 Special Provisions
City of Renton
Vertical surveys for the establishment of benchmarks shall meet or exceed the standards,
Specifications and procedures of third order elevation accuracy established by the Federal
Geodetic Control Committee.
Benchmarks must possess both permanence and vertical stability. Descriptions of
benchmarks must be complete to insure both recoverability and positive identification on
recovery.
1-11.1(8) Radial and Station – Offset Topography
Topographic surveys shall satisfy all applicable requirements of Section 1-11.1 herein.
All points occupied or back sighted in developing radial topography or establishing baselines
for station-offset topography shall meet the requirements of Section 1-11.1 herein.
The drawing and electronic listing requirements set forth in Section 1-11.1 herein shall be
observed for all topographic surveys.
1-11.1(9) Radial Topography
Elevations for the points occupied or back sighted in a radial topographic survey shall be
determined either by, 1) spirit leveling with misclosure not to exceed 0.1 feet or Federal
Geodetic Control Committee third order elevation accuracy Specifications, OR 2)
trigonometric leveling with elevation differences determined in at least two directions for
each point and with misclosure of the circuit not to exceed 0.1 feet.
1-11.1(10) Station – Offset Topography
Elevations of the baseline and topographic points shall be determined by spirit leveling and
shall satisfy Federal Geodetic Control Committee Specifications as to the turn points and
shall not exceed 0.1 foot's error as to side shots.
1-11.1(11) As-Built Survey
All improvements required to be "as-built" (post construction survey) per City of Renton
Codes, TITLE 4 Building Regulations and TITLE 9 Public Ways and Property, must be
located both horizontally and vertically by a Radial survey or by a Station offset survey. The
"as-built" survey must be based on the same base line or control survey used for the
construction staking survey for the improvements being "as-built". The "as-built" survey for
all subsurface improvements should occur prior to backfilling. Close cooperation between
the installing Contractor and the "as-builting" surveyor is therefore required.
All "as-built" surveys shall satisfy the requirements of Section 1-11.1(1) herein, and shall be
based upon control or base line surveys made in conformance with these Specifications.
The field notes for "as-built" shall meet the requirements of Section 1-11.1(4) herein, and
submitted with stamped and signed "as-built" drawings which includes a statement certifying
the accuracy of the "as-built".
The drawing and electronic listing requirements set forth in Section 1-11.1(6) herein shall be
observed for all "as-built" surveys.
Monroe Ave Infiltration Facility SP-85 Special Provisions
City of Renton
1-11.1(12) Monument Setting and Referencing
All property or lot corners, as defined in 1-11.1(5), established or reestablished on a plat or
other recorded survey shall be referenced by a permanent marker at the corner point per 1-
11.2(1). In situations where such markers are impractical or in danger of being destroyed,
e.g., the front corners of lots, a witness marker shall be set. In most cases, this will be the
extension of the lot line to a tack in lead in the curb. The relationship between the witness
monuments and their respective corners shall be shown or described on the face of the plat
or survey of record, e.g., “Tacks in lead on the extension of the lot side lines have been set
in the curbs on the extension of said line with the curb." In all other cases the corner shall
meet the requirements of Section 1-11.2(1) herein.
All non-corner monuments, as defined in 1-11.1(5), shall meet the requirements of Section
1-11.2(2) herein. If the monument falls within a paved portion of a right-of-way or other
area, the monument shall be set below the ground surface and contained within a lidded
case kept separate from the monument and flush with the pavement surface, per Section 1-
11.2(3).
In the case of right-of-way centerline monuments all points of curvature (PC), points of
tangency (PT), street intersections, center points of cul-de-sacs shall be set. If the point of
intersection (PI) for the tangents of a curve fall within the paved portion of the right-of-way, a
monument can be set at the PI instead of the PC and PT of the curve.
For all non corner monuments set while under contract to the City of Renton or as part of a
City of Renton approved subdivision of property, a City of Renton Monument Card
(furnished by the city) identifying the monument; point of intersection (PI), point of tangency
(PT), point of curvature (PC), one-sixteenth corner, Plat monument, street intersection, etc.,
complete with a description of the monument, a minimum of two reference points and NAD
83/91 coordinates, and NAVD 88 elevation shall be filled out and filed with the city.
1-11.2 Materials
1-11.2(1) Property/Lot Corners
Corners per 1-11.1(5) shall be marked in a permanent manner such as 1/2 inch diameter
rebar 24 inches in length, durable metal plugs or caps, tack in lead, etc., and permanently
marked or tagged with the surveyor's identification number. The specific nature of the
marker used can be determined by the surveyor at the time of installation.
1-11.2(2) Monuments
Monuments per 1-11.1(5) shall meet the requirements as set forth in City of Renton
Standard Plans page H031 and permanently marked or tagged with the surveyor's
identification number.
1-11.1(3) Monument Case and Cover
Materials shall meet the requirements of Section 9-22 and City of Renton Standard Plans
page H031.
Monroe Ave Infiltration Facility SP-86 Special Provisions
City of Renton
END OF DIVISION 1
Monroe Ave Infiltration Facility SP-87 Special Provisions
City of Renton
DIVISION 2
EARTHWORK
2-01 CLEARING, GRUBBING, AND ROADSIDE CLEANUP
2-01.2 Disposal of Usable Material and Debris
This Section is supplemented with the following:
Disposal Method No.1, Open Burning, as specified in Section 2-01.2(3) will not be allowed.
2-01.3 Construction Requirements
2-01.3(1) Clearing
This Section is supplemented with the following:
Clearing and grubbing shall be restricted to the minimum amount needed to construct
roadway improvements and shall not exceed the limits established on the Plans, staked by
the Contractor, and approved by the Engineer.
Do not remove trees, shrubs, and other vegetation indicated to remain. Existing landscaping
and vegetation outside the limits shall be protected from damage by the Contractor’s
operations. All landscaping damaged by the Contractor’s operations outside the limits shall
be replaced in coordination with the property owner at the Contractor’s expense.
Fill depressions caused by clearing and grubbing operations with satisfactory soil material,
unless further excavation or earthwork is indicated. Place fill material in horizontal layers not
exceeding eight (8) inches in loose depth, and compact each layer to a density equal to
adjacent original ground.
Add the following new section:
2-01.3(5) Tree Protection
High visibility fence shall be installed around trees indicated on the Plans to be protected.
Under the field direction of the Engineer, the Contractor shall prune minor roots and
branches of trees indicated to remain in a manner that will not compromise the survivability
of the trees, where such roots and branches obstruct installation of new construction. Any
roots to be cut or accidentally broken shall be cut smoothly and any cut roots over two (2)
inches in diameter shall be covered with wet fabric until backfill can be placed.
2-01.5 Payment
This Section is supplemented with the following:
All costs for the protection of trees and hand-clearing to remove invasive species will be
included in the lump sum contract price for “Clearing and Grubbing”.
2-02 REMOVAL OF STRUCTURES AND OBSTRUCTIONS
2-02.1 Description
This Section is supplemented with the following:
For the purpose of bid preparation, the removal of structure and obstruction work is
described below.
Monroe Ave Infiltration Facility SP-88 Special Provisions
City of Renton
Removal of Structure and Obstruction shall include, but not be limited to:
· Cement Concrete sidewalk – 45 SY
· Curb/gutter – 84 LF
· Chain link fence – 50 LF
· Sawcutting – 150 LF
· De-energizing and Removing Existing Luminaire – 1 EA
2-02.3 Construction Requirements
This Section is supplemented with the following:
2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters
This Section is supplemented with the following:
Existing pavement shall be sawcut and removed at the locations shown on the Plans or as
approved by the Engineer. Removal shall be accomplished by making a neat longitudinal
vertical cut along the boundaries of the area to be removed. Care shall be taken during
removal so as not to damage any of the existing pavement to remain in place. Remaining
pavement damaged due to the Contractor’s operations shall be replaced by the Contractor,
to the satisfaction of the Engineer, at the Contractor’s expense.
When a construction joint is near removal limits, the joint may be used as the removal limit if
approved by the Engineer.
Add the following new section:
2-02.3(4) Removing Chain Link or Wire Fence
Where shown on the plans or as approved by the Engineer, the Contractor shall remove
existing chain link wood slat privacy fence. The Contractor shall remove fence posts
completely, including any concrete footings, and backfill the post holes with native material.
Add the following new section:
2-02.3(5) Removing Luminaire
Where shown on the plans, the Contractor shall de-energize and remove the existing
luminaire including the luminaire footing, and shall backfill the footing hole with gravel
borrow.
The Contractor shall deliver the existing luminaire to the City of Renton Maintenance
Facility.
The Contractor shall coordinate with the Engineer to de-energize the existing luminaire.
2-03 ROADWAY EXCAVATION AND EMBANKMENT
2-03.3 Construction Requirements
Delete Section 2-03.3(14)F Vacant and replace it with the following:
2-03.3(14)F Infiltration Gravel Incl. Haul
When required by the Plans or the Engineer, the Contractor shall use Infiltration Gravel
meeting the requirements of Section 9-03.16 to fill underneath the Stormwater Infiltration
Facility, fill as embedment gravel between chambers in the Stormwater Infiltration Facility,
and provide 1-foot of fill above the Stormwater Infiltration Facility chambers.
Infiltration Gravel shall be placed and compacted according to the Plans.
Monroe Ave Infiltration Facility SP-89 Special Provisions
City of Renton
The City reserves the right to have an inspector present at the site of production of the
Infiltration Gravel to observe and validate that the Infiltration Gravel is being produced to the
required standard. The Contractor shall alert the City no less than 48-hours prior to the start
of production of the Infiltration Gravel material.
Add the following new Section:
2-03.3(14)N Non-Infiltration Material Incl. Haul
Non-Infiltration Material Incl. Haul shall be placed to the south and east of the Gravity Block
Wall in both Stage 1 and Stage 2 of the project, as indicated in the Plans. Non-Infiltration
Material Incl. Haul shall be compacted per Compaction Requirements this section.
Non-Infiltration Material Incl. Haul shall be Gravel Backfill for Walls per WSDOT Standard
Specification 9-03.12(2).
In addition, the following materials are acceptable for use as Non-Infiltration Material Incl.
Haul, with written approval from the Engineer:
1. Suitable material borrowed from existing onsite stockpile. As described in the
Geotechnical Report dated July 24th, 2023, prepared by Aspect Consulting and
included in the Bid Documents, a portion of the existing onsite stockpile material
developed by others is approved for use as Non-Infiltration Material under the
following conditions and with the written approval of the Engineer. For the purposes
of the bid, it can be assumed that the stockpile will provide 20,000 cubic yards by
compacted volume for the Non-Infiltration Material Incl. Haul Item.
The embanked stockpiled material is moisture sensitive and is not to be exposed,
worked, nor placed during wet weather. The Contractor shall submit a minimum 5-
day weather forecast showing only dry conditions and a placement schedule to the
Engineer for approval for use of onsite stockpile material as Non-Infiltration Material,
provided to the Engineer a minimum of 24-hours prior to the proposed excavation of
the stockpile. The stockpile shall be protected from rain with plastic tarping. The
contractor shall maintain the tarping and stockpile during the period of the project. If
the weather forecast indicates any precipitation, the contractor shall restore the
tarping cover prior to the wet weather. The City reserves the right to direct the
Contractor to re-cover the stockpile based on their interpretation of site conditions, at
no additional cost. Any loss of the stockpiled material due to the Contractor failing to
adequately maintain the stockpile and protect the material from rain shall not result in
a change order, and shall be entirely the responsibility of the Contractor.
2. Suitable Crushed Surfacing Top Course and Quarry Spalls materials that are re-used
from the Temporary Construction Access Road and Temporary Slope Protection
Items , at the approval of the Engineer. These materials shall not be proposed by the
Contractor to be re-used until after the end of the wet-season, at a minimum.
3. Suitable Unclassified Excavation Material that is excavated from on-site.
Crushed Surfacing Top Course shall meet WSDOT Standard Specification 9-03.9(3).
Quarry Spalls shall meet WSDOT Standard Specification 9-03.9(3).
Monroe Ave Infiltration Facility SP-90 Special Provisions
City of Renton
Material Placement Lift Height:
Non-Infiltration Material shall be placed as follows, depending on the material, must be
placed in accordance to the following maximum lift heights, followed by compaction based
on Compaction Requirements as follows:
Gravel Backfill for Walls: placed in 1-foot loose lifts
Suitable On-site Stockpiled Material: placed in 6-10-inch loose lifts
Crushed Surfacing Top Course: placed in 1-foot loose lifts
Quarry Spalls: placed in 1-foot loose lifts
Suitable On-site Unclassified Excavation Material: placed in 6-10-inch loose lifts
Compaction Requirements of Non-Infiltration Material Incl. Haul
The Compaction Requirements of Non-Infiltration Material Incl Haul varies based on the
Stage of the project.
Stage 1: The Compaction Requirements in Stage 1 is to place the material in lifts dependent
on material as clarified above, and compact each lift to 90% maximum dry density (MDD)
with a vibratory compactor. Compaction is to be tested by providing a proof roll (vibratory
roller on static) to verify firm and unyielding conditions.
Stage 2: The Compaction Requirement in Stage 2 is to place the material in lifts dependent
on material as clarified above and compact each lift to 95% maximum dry density (MDD)
with a vibratory compactor. Compaction is to be tested by providing a proof roll (vibratory
roller on static) to verify firm and unyielding conditions.
2-12 CONSTRUCTION GEOSYNTHETIC
2-12.2 Materials
This Section is supplemented with the following:
MIRAFI FW402, or approved equal, shall be used as a Woven Geotextile for Underground
Drainage as indicated in the plans.
To be approved equal to MIRAFI FW402, the Woven Geotextile for Underground Drainage shall
be woven monofilament polypropylene (non-slit tape) and conform to the properties as indicated
in Tables 1 and 2 below.
TABLE 1
GEOTEXTILE FOR UNDERGROUND DRAINAGE STRENGTH PROPERTIES FOR SURVIVABILITY
Geotextile Property Test Method Requirement
Mechanical
Grab Tensile Strength ASTM D 4632 200 lb min.
Grab Tensile Elongation ASTM D 4632 < 50%
Seam Breaking Strength ASTM D 4632 220 lb min.
Puncture Resistance ASTM D 4833 495 lb min.
Trapezoidal Tear ASTM D 4533 80 lb min
Endurance
UV Resistance ASTM D 4355 50% strength retained min. after
500 hours in a zenon arc device
Monroe Ave Infiltration Facility SP-91 Special Provisions
City of Renton
TABLE 2
GEOTEXTILE FOR UNDERGROUND DRAINAGE FILTRATION PROPERTIES
Geotextile Property Test Method Requirement
Hydraulics / Filtration
Permittivity ASTM D 4491 1.0 – 2.5 sec-1 min.
Water Flow Rate ASTM D 4491 140 - 200 gpm/ft2 min
Percent Open Area (POA) CW-02215 10% min.
Apparent Opening Size (AOS) ASTM D 4751 40 US Std. Sieve max.
END OF DIVISION 2
Monroe Ave Infiltration Facility SP-92 Special Provisions
City of Renton
DIVISION 5
SURFACE TREATMENTS AND PAVEMENTS
5-04 HOT MIX ASPHALT
(January 31, 2023 APWA GSP)
Delete Section 5-04, Hot Mix Asphalt, and replace it with the following:
5-04.1 Description
This Work shall consist of providing and placing one or more layers of plant-mixed hot mix
asphalt (HMA) on a prepared foundation or base in accordance with these Specifications
and the lines, grades, thicknesses, and typical cross-sections shown in the Plans. The
manufacture of HMA may include warm mix asphalt (WMA) processes in accordance with
these Specifications. WMA processes include organic additives, chemical additives, and
foaming.
HMA shall be composed of asphalt binder and mineral materials as may be required, mixed
in the proportions specified to provide a homogeneous, stable, and workable mixture.
5-04.2 Materials
Materials shall meet the requirements of the following sections:
Asphalt Binder 9-02.1(4)
Cationic Emulsified Asphalt 9-02.1(6)
Anti-Stripping Additive 9-02.4
HMA Additive 9-02.5
Aggregates 9-03.8
Recycled Asphalt Pavement (RAP) 9-03.8(3)B, 9-03.21
Reclaimed Asphalt Shingles (RAS) 9-03.8(3)B, 9-03.21
Mineral Filler 9-03.8(5)
Recycled Material 9-03.21
The Contract documents may establish that the various mineral materials required for the
manufacture of HMA will be furnished in whole or in part by the Contracting Agency. If the
documents do not establish the furnishing of any of these mineral materials by the
Contracting Agency, the Contractor shall be required to furnish such materials in the
amounts required for the designated mix. Mineral materials include coarse and fine
aggregates, and mineral filler.
The Contractor may choose to utilize recycled asphalt pavement (RAP) in the production of
HMA. The RAP may be from pavements removed under the Contract, if any, or pavement
material from an existing stockpile.
The Contractor may use up to 20 percent RAP by total weight of HMA with no additional
sampling or testing of the RAP.
If the Contractor wishes to utilize High RAP/Any RAS, the design must be listed on the
WSDOT Qualified Products List (QPL).
The grade of asphalt binder shall be as required by the Contract. Blending of asphalt binder
from different sources is not permitted.
Monroe Ave Infiltration Facility SP-93 Special Provisions
City of Renton
The Contractor may only use warm mix asphalt (WMA) processes in the production of HMA
with 20 percent or less RAP by total weight of HMA. The Contractor shall submit to the
Engineer for approval the process that is proposed and how it will be used in the
manufacture of HMA.
Production of aggregates shall comply with the requirements of Section 3-01.
Preparation of stockpile site, the stockpiling of aggregates, and the removal of aggregates
from stockpiles shall comply with the requirements of Section 3-02.
5-04.2(1) How to Get an HMA Mix Design on the QPL
If the Contractor wishes to submit a mix design for inclusion in the Qualified Products List
(QPL), please follow the WSDOT process outlined in Standard Specification 5-04.2(1).
5-04.2(1)A Vacant
5-04.2(2) Mix Design - Obtaining Project Approval
No paving shall begin prior to the approval of the mix design by the Engineer.
Nonstatistical evaluation will be used for all HMA not designated as Commercial HMA in
the Contract documents.
Commercial evaluation will be used for Commercial HMA and for other classes of HMA in
the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, gores,
prelevel, temporary pavement, and pavement repair. Other nonstructural applications of
HMA accepted by commercial evaluation shall be as approved by the Project Engineer.
Sampling and testing of HMA accepted by commercial evaluation will be at the option of the
Project Engineer. The Proposal quantity of HMA that is accepted by commercial evaluation
will be excluded from the quantities used in the determination of nonstatistical evaluation.
Nonstatistical Mix Design. Fifteen days prior to the first day of paving the Contractor shall
provide one of the following mix design verification certifications for Contracting Agency
review;
· The WSDOT Mix Design Evaluation Report from the current WSDOT QPL, or one of
the mix design verification certifications listed below.
· The proposed HMA mix design on WSDOT Form 350-042 with the seal and
certification (stamp & signature) of a valid licensed Washington State Professional
Engineer.
· The Mix Design Report for the proposed HMA mix design developed by a qualified
City or County laboratory that is within one year of the approval date.
The mix design shall be performed by a lab accredited by a national authority such as
Laboratory Accreditation Bureau, L-A-B for Construction Materials Testing, The Construction
Materials Engineering Council (CMEC’s) ISO 17025 or AASHTO Accreditation Program
(AAP) and shall supply evidence of participation in the AASHTO: resource proficiency
sample program.
Mix designs for HMA accepted by Nonstatistical evaluation shall:
Monroe Ave Infiltration Facility SP-94 Special Provisions
City of Renton
· Have the aggregate structure and asphalt binder content determined in accordance
with WSDOT Standard Operating Procedure 732 and meet the requirements of
Sections 9-03.8(2), except that Hamburg testing for ruts and stripping are at the
discretion of the Engineer, and 9-03.8(6).
· Have anti-strip requirements, if any, for the proposed mix design determined in
accordance with AASHTO T 283 or T 324 or based on historic anti-strip and
aggregate source compatibility from previous WSDOT lab testing.
At the discretion of the Engineer, agencies may accept verified mix designs older than 12
months from the original verification date with a certification from the Contractor that the
materials and sources are the same as those shown on the original mix design.
Commercial Evaluation Mix Design. Approval of a mix design for “Commercial Evaluation”
will be based on a review of the Contractor’s submittal of WSDOT Form 350-042 (for
commercial mixes, AASHTO T 324 evaluation is not required) or a Mix Design from the
current WSDOT QPL or from one of the processes allowed by this section. Testing of the
HMA by the Contracting Agency for mix design approval is not required.
For the Bid Item Commercial HMA, the Contractor shall select a class of HMA and design
level of ESALs appropriate for the required use.
5-04.2(2)B Using Warm Mix Asphalt Processes
The Contractor may elect to use additives that reduce the optimum mixing temperature or
serve as a compaction aid for producing HMA. Additives include organic additives, chemical
additives and foaming processes. The use of Additives is subject to the following:
· Do not use additives that reduce the mixing temperature more than allowed in
Section 5-04.3(6) in the production of mixtures.
· Before using additives, obtain the Engineer’s approval using WSDOT Form 350-076
to describe the proposed additive and process.
5-04.3 Construction Requirements
5-04.3(1) Weather Limitations
Do not place HMA for wearing course on any Traveled Way beginning October 1st through
March 31st of the following year without written concurrence from the Engineer.
Do not place HMA on any wet surface, or when the average surface temperatures are less
than those specified below, or when weather conditions otherwise prevent the proper
handling or finishing of the HMA.
Minimum Surface Temperature for Paving
Compacted Thickness
(Feet)
Wearing
Course
Other Courses
Less than 0.10 55°F 45°F
0.10 to .20 45°F 35°F
More than 0.20 35°F 35°F
5-04.3(2) Paving Under Traffic
When the Roadway being paved is open to traffic, the requirements of this Section
shall apply.
Monroe Ave Infiltration Facility SP-95 Special Provisions
City of Renton
The Contractor shall keep intersections open to traffic at all times except when paving the
intersection or paving across the intersection. During such time, and provided that there has
been an advance warning to the public, the intersection may be closed for the minimum time
required to place and compact the mixture. In hot weather, the Engineer may require the
application of water to the pavement to accelerate the finish rolling of the pavement and to
shorten the time required before reopening to traffic.
Before closing an intersection, advance warning signs shall be placed, and signs shall also
be placed marking the detour or alternate route.
During paving operations, temporary pavement markings shall be maintained throughout the
project. Temporary pavement markings shall be installed on the Roadway prior to opening
to traffic. Temporary pavement markings shall be in accordance with Section 8-23.
All costs in connection with performing the Work in accordance with these requirements,
except the cost of temporary pavement markings, shall be included in the unit Contract
prices for the various Bid items involved in the Contract.
5-04.3(3) Equipment
5-04.3(3)A Mixing Plant
Plants used for the preparation of HMA shall conform to the following requirements:
1. Equipment for Preparation of Asphalt Binder – Tanks for the storage of asphalt
binder shall be equipped to heat and hold the material at the required temperatures.
The heating shall be accomplished by steam coils, electricity, or other approved
means so that no flame shall be in contact with the storage tank. The circulating
system for the asphalt binder shall be designed to ensure proper and continuous
circulation during the operating period. A valve for the purpose of sampling the
asphalt binder shall be placed in either the storage tank or in the supply line to the
mixer.
2. Thermometric Equipment – An armored thermometer, capable of detecting
temperature ranges expected in the HMA mix, shall be fixed in the asphalt binder
feed line at a location near the charging valve at the mixer unit. The thermometer
location shall be convenient and safe for access by Inspectors. The plant shall also
be equipped with an approved dial-scale thermometer, a mercury actuated
thermometer, an electric pyrometer, or another approved thermometric instrument
placed at the discharge chute of the drier to automatically register or indicate the
temperature of the heated aggregates. This device shall be in full view of the plant
operator.
3. Heating of Asphalt Binder – The temperature of the asphalt binder shall not exceed
the maximum recommended by the asphalt binder manufacturer nor shall it be below
the minimum temperature required to maintain the asphalt binder in a homogeneous
state. The asphalt binder shall be heated in a manner that will avoid local variations
in heating. The heating method shall provide a continuous supply of asphalt binder to
the mixer at a uniform average temperature with no individual variations exceeding
25°F. Also, when a WMA additive is included in the asphalt binder, the temperature
of the asphalt binder shall not exceed the maximum recommended by the
manufacturer of the WMA additive.
Monroe Ave Infiltration Facility SP-96 Special Provisions
City of Renton
4. Sampling and Testing of Mineral Materials – The HMA plant shall be equipped
with a mechanical sampler for the sampling of the mineral materials. The mechanical
sampler shall meet the requirements of Section 1-05.6 for the crushing and
screening operation. The Contractor shall provide for the setup and operation of the
field-testing facilities of the Contracting Agency as provided for in Section 3-01.2(2).
5. Sampling HMA – The HMA plant shall provide for sampling HMA by one of the
following methods:
a. A mechanical sampling device attached to the HMA plant.
b. Platforms or devices to enable sampling from the hauling vehicle without
entering the hauling vehicle.
5-04.3(3)B Hauling Equipment
Trucks used for hauling HMA shall have tight, clean, smooth metal beds and shall have a
cover of canvas or other suitable material of sufficient size to protect the mixture from
adverse weather. Whenever the weather conditions during the work shift include, or are
forecast to include precipitation or an air temperature less than 45°F or when time from
loading to unloading exceeds 30 minutes, the cover shall be securely attached to protect the
HMA.
The Contractor shall provide an environmentally benign means to prevent the HMA mixture
from adhering to the hauling equipment. Excess release agent shall be drained prior to filling
hauling equipment with HMA. Petroleum derivatives or other coating material that
contaminate or alter the characteristics of the HMA shall not be used. For live bed trucks,
the conveyer shall be in operation during the process of applying the release agent.
5-04.3(3)C Pavers
HMA pavers shall be self-contained, power-propelled units, provided with an internally
heated vibratory screed and shall be capable of spreading and finishing courses of HMA
plant mix material in lane widths required by the paving section shown in the Plans.
The HMA paver shall be in good condition and shall have the most current equipment
available from the manufacturer for the prevention of segregation of the HMA mixture
installed, in good condition, and in working order. The equipment certification shall list the
make, model, and year of the paver and any equipment that has been retrofitted.
The screed shall be operated in accordance with the manufacturer’s recommendations and
shall effectively produce a finished surface of the required evenness and texture without
tearing, shoving, segregating, or gouging the mixture. A copy of the manufacturer’s
recommendations shall be provided upon request by the Contracting Agency. Extensions
will be allowed provided they produce the same results, including ride, density, and surface
texture as obtained by the primary screed. Extensions without augers and an internally
heated vibratory screed shall not be used in the Traveled Way.
When specified in the Contract, reference lines for vertical control will be required. Lines
shall be placed on both outer edges of the Traveled Way of each Roadway. Horizontal
control utilizing the reference line will be permitted. The grade and slope for intermediate
lanes shall be controlled automatically from reference lines or by means of a mat
referencing device and a slope control device. When the finish of the grade prepared for
paving is superior to the established tolerances and when, in the opinion of the Engineer,
Monroe Ave Infiltration Facility SP-97 Special Provisions
City of Renton
further improvement to the line, grade, cross-section, and smoothness can best be achieved
without the use of the reference line, a mat referencing device may be substituted for the
reference line. Substitution of the device will be subject to the continued approval of the
Engineer. A joint matcher may be used subject to the approval of the Engineer. The
reference line may be removed after the completion of the first course of HMA when
approved by the Engineer. Whenever the Engineer determines that any of these methods
are failing to provide the necessary vertical control, the reference lines will be reinstalled by
the Contractor.
The Contractor shall furnish and install all pins, brackets, tensioning devices, wire, and
accessories necessary for satisfactory operation of the automatic control equipment.
If the paving machine in use is not providing the required finish, the Engineer may suspend
Work as allowed by Section 1-08.6. Any cleaning or solvent type liquids spilled on the
pavement shall be thoroughly removed before paving proceeds.
5-04.3(3)D Material Transfer Device or Material Transfer Vehicle
A Material Transfer Device/Vehicle (MTD/V) shall only be used with the Engineer’s approval,
unless otherwise required by the Contract.
Where an MTD/V is required by the Contract, the Engineer may approve paving without an
MTD/V, at the request of the Contractor. The Engineer will determine if an equitable
adjustment in cost or time is due.
When used, the MTD/V shall mix the HMA after delivery by the hauling equipment and prior
to laydown by the paving machine. Mixing of the HMA shall be sufficient to obtain a uniform
temperature throughout the mixture. If a windrow elevator is used, the length of the windrow
may be limited in urban areas or through intersections, at the discretion of the Engineer.
To be approved for use, an MTV:
1. Shall be self-propelled vehicle, separate from the hauling vehicle or paver.
2. Shall not be connected to the hauling vehicle or paver.
3. May accept HMA directly from the haul vehicle or pick up HMA from a windrow.
4. Shall mix the HMA after delivery by the hauling equipment and prior to placement
into the paving machine.
5. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the
mixture.
To be approved for use, an MTD:
1. Shall be positively connected to the paver.
2. May accept HMA directly from the haul vehicle or pick up HMA from a windrow.
3. Shall mix the HMA after delivery by the hauling equipment and prior to placement
into the paving machine.
4. Shall mix the HMA sufficiently to obtain a uniform temperature throughout the
mixture.
5-04.3(3)E Rollers
Rollers shall be of the steel wheel, vibratory, oscillatory, or pneumatic tire type, in good
condition and capable of reversing without backlash. Operation of the roller shall be in
accordance with the manufacturer’s recommendations. When ordered by the Engineer for
any roller planned for use on the project, the Contractor shall provide a copy of the
Monroe Ave Infiltration Facility SP-98 Special Provisions
City of Renton
manufacturer’s recommendation for the use of that roller for compaction of HMA. The
number and weight of rollers shall be sufficient to compact the mixture in compliance with
the requirements of Section 5-04.3(10). The use of equipment that results in crushing of the
aggregate will not be permitted. Rollers producing pickup, washboard, uneven compaction
of the surface, displacement of the mixture or other undesirable results shall not be used.
5-04.3(4) Preparation of Existing Paved Surfaces
When the surface of the existing pavement or old base is irregular, the Contractor shall bring
it to a uniform grade and cross-section as shown on the Plans or approved by the Engineer.
Preleveling of uneven or broken surfaces over which HMA is to be placed may be
accomplished by using an asphalt paver, a motor patrol grader, or by hand raking, as
approved by the Engineer.
Compaction of preleveling HMA shall be to the satisfaction of the Engineer and may require
the use of small steel wheel rollers, plate compactors, or pneumatic rollers to avoid bridging
across preleveled areas by the compaction equipment. Equipment used for the compaction
of preleveling HMA shall be approved by the Engineer.
Before construction of HMA on an existing paved surface, the entire surface of the
pavement shall be clean. All fatty asphalt patches, grease drippings, and other objectionable
matter shall be entirely removed from the existing pavement. All pavements or bituminous
surfaces shall be thoroughly cleaned of dust, soil, pavement grindings, and other foreign
matter. All holes and small depressions shall be filled with an appropriate class of HMA. The
surface of the patched area shall be leveled and compacted thoroughly. Prior to the
application of tack coat, or paving, the condition of the surface shall be approved by the
Engineer.
A tack coat of asphalt shall be applied to all paved surfaces on which any course of HMA is
to be placed or abutted; except that tack coat may be omitted from clean, newly paved
surfaces at the discretion of the Engineer. Tack coat shall be uniformly applied to cover the
existing pavement with a thin film of residual asphalt free of streaks and bare spots at a rate
between 0.02 and 0.10 gallons per square yard of retained asphalt. The rate of application
shall be approved by the Engineer. A heavy application of tack coat shall be applied to all
joints. For Roadways open to traffic, the application of tack coat shall be limited to surfaces
that will be paved during the same working shift. The spreading equipment shall be
equipped with a thermometer to indicate the temperature of the tack coat material.
Equipment shall not operate on tacked surfaces until the tack has broken and cured. If the
Contractor’s operation damages the tack coat it shall be repaired prior to placement of the
HMA.
The tack coat shall be CSS-1, or CSS-1h emulsified asphalt. The CSS-1 and CSS-1h
emulsified asphalt may be diluted once with water at a rate not to exceed one-part water to
one-part emulsified asphalt. The tack coat shall have sufficient temperature such that it may
be applied uniformly at the specified rate of application and shall not exceed the maximum
temperature recommended by the emulsified asphalt manufacturer.
Monroe Ave Infiltration Facility SP-99 Special Provisions
City of Renton
5-04.3(4)A Crack Sealing
When the Proposal includes a pay item for crack sealing, seal cracks in accordance with
Section 5-03.
5-04.3(4)B Vacant
5-04.3(4)C Pavement Repair
The Contractor shall excavate pavement repair areas and shall backfill these with HMA in
accordance with the details shown in the Plans and as marked in the field. The Contractor
shall conduct the excavation operations in a manner that will protect the pavement that is to
remain. Pavement not designated to be removed that is damaged as a result of the
Contractor’s operations shall be repaired by the Contractor to the satisfaction of the
Engineer at no cost to the Contracting Agency. The Contractor shall excavate only within
one lane at a time unless approved otherwise by the Engineer. The Contractor shall not
excavate more area than can be completely finished during the same shift, unless approved
by the Engineer.
Unless otherwise shown in the Plans or determined by the Engineer, excavate to a depth of
1.0 feet. The Engineer will make the final determination of the excavation depth required.
The minimum width of any pavement repair area shall be 40 inches unless shown otherwise
in the Plans. Before any excavation, the existing pavement shall be sawcut or shall be
removed by a pavement grinder. Excavated materials will become the property of the
Contractor and shall be disposed of in a Contractor-provided site off the Right of Way or
used in accordance with Sections 2-02.3(3) or 9-03.21.
Asphalt for tack coat shall be required as specified in Section 5-04.3(4). A heavy application
of tack coat shall be applied to all surfaces of existing pavement in the pavement repair
area.
Placement of the HMA backfill shall be accomplished in lifts not to exceed 0.35-foot
compacted depth. Lifts that exceed 0.35-foot of compacted depth may be accomplished with
the approval of the Engineer. Each lift shall be thoroughly compacted by a mechanical
tamper or a roller.
5-04.3(5) Producing/Stockpiling Aggregates and RAP
Aggregates and RAP shall be stockpiled according to the requirements of Section 3-02.
Sufficient storage space shall be provided for each size of aggregate and RAP. Materials
shall be removed from stockpile(s) in a manner to ensure minimal segregation when being
moved to the HMA plant for processing into the final mixture. Different aggregate sizes shall
be kept separated until they have been delivered to the HMA plant.
5-04.3(5)A Vacant
5-04.3(6) Mixing
After the required amount of mineral materials, asphalt binder, recycling agent and anti-
stripping additives have been introduced into the mixer the HMA shall be mixed until
complete and uniform coating of the particles and thorough distribution of the asphalt binder
throughout the mineral materials is ensured.
Monroe Ave Infiltration Facility SP-100 Special Provisions
City of Renton
When discharged, the temperature of the HMA shall not exceed the optimum mixing
temperature by more than 25°F as shown on the reference mix design report or as approved
by the Engineer. Also, when a WMA additive is included in the manufacture of HMA, the
discharge temperature of the HMA shall not exceed the maximum recommended by the
manufacturer of the WMA additive. A maximum water content of 2 percent in the mix, at
discharge, will be allowed providing the water causes no problems with handling, stripping,
or flushing. If the water in the HMA causes any of these problems, the moisture content shall
be reduced as directed by the Engineer.
Storing or holding of the HMA in approved storage facilities will be permitted with approval of
the Engineer, but in no event shall the HMA be held for more than 24 hours. HMA held for
more than 24 hours after mixing shall be rejected. Rejected HMA shall be disposed of by the
Contractor at no expense to the Contracting Agency. The storage facility shall have an
accessible device located at the top of the cone or about the third point. The device shall
indicate the amount of material in storage. No HMA shall be accepted from the storage
facility when the HMA in storage is below the top of the cone of the storage facility, except
as the storage facility is being emptied at the end of the working shift.
Recycled asphalt pavement (RAP) utilized in the production of HMA shall be sized prior to
entering the mixer so that a uniform and thoroughly mixed HMA is produced. If there is
evidence of the recycled asphalt pavement not breaking down during the heating and mixing
of the HMA, the Contractor shall immediately suspend the use of the RAP until changes
have been approved by the Engineer. After the required amount of mineral materials, RAP,
new asphalt binder and asphalt rejuvenator have been introduced into the mixer the HMA
shall be mixed until complete and uniform coating of the particles and thorough distribution
of the asphalt binder throughout the mineral materials, and RAP is ensured.
5-04.3(7) Spreading and Finishing
The mixture shall be laid upon an approved surface, spread, and struck off to the grade and
elevation established. HMA pavers complying with Section 5-04.3(3) shall be used to
distribute the mixture. Unless otherwise directed by the Engineer, the nominal compacted
depth of any layer of any course shall not exceed the following:
HMA Class 1” 0.35 feet
HMA Class ¾” and HMA Class ½”
wearing course 0.30 feet
other courses 0.35 feet
HMA Class ⅜” 0.15 feet
On areas where irregularities or unavoidable obstacles make the use of mechanical
spreading and finishing equipment impractical, the paving may be done with other
equipment or by hand.
When more than one JMF is being utilized to produce HMA, the material produced for each
JMF shall be placed by separate spreading and compacting equipment. The intermingling of
HMA produced from more than one JMF is prohibited. Each strip of HMA placed during a
work shift shall conform to a single JMF established for the class of HMA specified unless
there is a need to make an adjustment in the JMF.
Monroe Ave Infiltration Facility SP-101 Special Provisions
City of Renton
5-04.3(8) Aggregate Acceptance Prior to Incorporation in HMA
For HMA accepted by nonstatistical evaluation, the aggregate properties of sand equivalent,
uncompacted void content, and fracture will be evaluated in accordance with Section 3-04.
Sampling and testing of aggregates for HMA accepted by commercial evaluation will be at
the option of the Engineer.
5-04.3(9) HMA Mixture Acceptance
Acceptance of HMA shall be as provided under nonstatistical, or commercial evaluation.
Nonstatistical evaluation will be used for the acceptance of HMA unless Commercial
Evaluation is specified.
Commercial evaluation will be used for Commercial HMA and for other classes of HMA in
the following applications: sidewalks, road approaches, ditches, slopes, paths, trails, gores,
prelevel, temporary pavement, and pavement repair. Other nonstructural applications of
HMA accepted by commercial evaluation shall be as approved by the Engineer. Sampling
and testing of HMA accepted by commercial evaluation will be at the option of the Engineer.
The mix design will be the initial JMF for the class of HMA. The Contractor may request a
change in the JMF. Any adjustments to the JMF will require the approval of the Engineer
and may be made in accordance with this section.
HMA Tolerances and Adjustments
1. Job Mix Formula Tolerances – The constituents of the mixture at the time of
acceptance shall be within tolerance. The tolerance limits will be established as
follows:
For Asphalt Binder and Air Voids (Va), the acceptance limits are determined by
adding the tolerances below to the approved JMF values. These values will also
be the Upper Specification Limit (USL) and Lower Specification Limit (LSL)
required in Section 1-06.2(2)D2
Property Non-Statistical
Evaluation
Commercial
Evaluation
Asphalt Binder +/- 0.5% +/- 0.7%
Air Voids, Va 2.5% min. and 5.5% max N/A
For Aggregates in the mixture:
a. First, determine preliminary upper and lower acceptance limits by applying
the following tolerances to the approved JMF.
Aggregate Percent Passing Non-Statistical
Evaluation
Commercial
Evaluation
1”, ¾”, ½”, and 3/8” sieves +/- 6% +/- 8%
No. 4 sieve +/-6% +/- 8%
No. 8 Sieve +/- 6% +/-8%
No. 200 sieve +/- 2.0% +/- 3.0%
b. Second, adjust the preliminary upper and lower acceptance limits determined
from step (a) the minimum amount necessary so that none of the aggregate
Monroe Ave Infiltration Facility SP-102 Special Provisions
City of Renton
properties are outside the control points in Section 9-03.8(6). The resulting
values will be the upper and lower acceptance limits for aggregates, as well
as the USL and LSL required in Section 1-06.2(2)D2.
2. Job Mix Formula Adjustments – An adjustment to the aggregate gradation or
asphalt binder content of the JMF requires approval of the Engineer. Adjustments to
the JMF will only be considered if the change produces material of equal or better
quality and may require the development of a new mix design if the adjustment
exceeds the amounts listed below.
a. Aggregates –2 percent for the aggregate passing the 1½″, 1″, ¾″, ½″, ⅜″,
and the No. 4 sieves, 1 percent for aggregate passing the No. 8 sieve, and
0.5 percent for the aggregate passing the No. 200 sieve. The adjusted JMF
shall be within the range of the control points in Section 9-03.8(6).
b. Asphalt Binder Content – The Engineer may order or approve changes to
asphalt binder content. The maximum adjustment from the approved mix
design for the asphalt binder content shall be 0.3 percent.
5-04.3(9)A Vacant
5-04.3(9)B Vacant
5-04.3(9)C Mixture Acceptance – Nonstatistical Evaluation
HMA mixture which is accepted by Nonstatistical Evaluation will be evaluated by the
Contracting Agency by dividing the HMA tonnage into lots.
5-04.3(9)C1 Mixture Nonstatistical Evaluation – Lots and Sublots
A lot is represented by randomly selected samples of the same mix design that will be
tested for acceptance. A lot is defined as the total quantity of material or work produced for
each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be equal to
one day’s production or 800 tons, whichever is less except that the final sublot will be a
minimum of 400 tons and may be increased to 1200 tons.
All of the test results obtained from the acceptance samples from a given lot shall be
evaluated collectively. If the Contractor requests a change to the JMF that is approved, the
material produced after the change will be evaluated on the basis of the new JMF for the
remaining sublots in the current lot and for acceptance of subsequent lots. For a lot in
progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request after the
Engineer is satisfied that material conforming to the Specifications can be produced.
Sampling and testing for evaluation shall be performed on the frequency of one sample per
sublot.
5-04.3(9)C2 Mixture Nonstatistical Evaluation Sampling
Samples for acceptance testing shall be obtained by the Contractor when ordered by the
Engineer. The Contractor shall sample the HMA mixture in the presence of the Engineer
and in accordance with AASH-TO T 168. A minimum of three samples should be taken for
each class of HMA placed on a project. If used in a structural application, at least one of the
three samples shall be tested.
Monroe Ave Infiltration Facility SP-103 Special Provisions
City of Renton
Sampling and testing HMA in a structural application where quantities are less than 400 tons
is at the discretion of the Engineer.
For HMA used in a structural application and with a total project quantity less than 800 tons
but more than 400 tons, a minimum of one acceptance test shall be performed. In all cases,
a minimum of 3 samples will be obtained at the point of acceptance, a minimum of one of
the three samples will be tested for conformance to the JMF:
· If the test results are found to be within specification requirements, additional testing
will be at the Engineer’s discretion.
· If test results are found not to be within specification requirements, additional testing
of the remaining samples to determine a CPF shall be performed.
5-04.3(9)C3 Mixture Nonstatistical Evaluation – Acceptance Testing
Testing of HMA for compliance of Va will at the option of the Contracting Agency. If tested,
compliance of Va will use WSDOT SOP 731.
Testing for compliance of asphalt binder content will be by WSDOT FOP for AASHTO T
308.
Testing for compliance of gradation will be by FOP for WAQTC T 27/T 11.
5-04.3(9)C4 Mixture Nonstatistical Evaluation – Pay Factors
For each lot of material falling outside the tolerance limits in 5-04.3(9), the Contracting
Agency will determine a CPF using the following price adjustment factors:
Table of Price Adjustment Factors
Constituent Factor “f”
All aggregate passing: 1½″, 1″, ¾″, ½″, ⅜″ and No.4 sieves 2
All aggregate passing No. 8 sieve 15
All aggregate passing No. 200 sieve 20
Asphalt binder 40
Air Voids (Va) (where applicable) 20
Each lot of HMA produced under Nonstatistical Evaluation and having all constituents falling
within the tolerance limits of the job mix formula shall be accepted at the unit Contract price
with no further evaluation. When one or more constituents fall outside the nonstatistical
tolerance limits in the Job Mix Formula shown in Table of Price Adjustment Factors, the lot
shall be evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The
nonstatistical tolerance limits will be used in the calculation of the CPF and the maximum
CPF shall be 1.00. When less than three sublots exist, backup samples of the existing
sublots or samples from the Roadway shall be tested to provide a minimum of three sets of
results for evaluation.
5-04.3(9)C5 Vacant
5-04.3(9)C6 Mixture Nonstatistical Evaluation – Price Adjustments
For each lot of HMA mix produced under Nonstatistical Evaluation when the calculated CPF
is less than 1.00, a Nonconforming Mix Factor (NCMF) will be determined. The NCMF
equals the algebraic difference of CPF minus 1.00 multiplied by 60 percent. The total job
Monroe Ave Infiltration Facility SP-104 Special Provisions
City of Renton
mix compliance price adjustment will be calculated as the product of the NCMF, the quantity
of HMA in the lot in tons, and the unit Contract price per ton of mix.
If a constituent is not measured in accordance with these Specifications, its individual pay
factor will be considered 1.00 in calculating the CPF.
5-04.3(9)C7 Mixture Nonstatistical Evaluation - Retests
The Contractor may request a sublot be retested. To request a retest, the Contractor shall
submit a written request within 7 calendar days after the specific test results have been
received. A split of the original acceptance sample will be retested. The split of the sample
will not be tested with the same tester that ran the original acceptance test. The sample will
be tested for a complete gradation analysis, asphalt binder content, and, at the option of the
agency, Va. The results of the retest will be used for the acceptance of the HMA in place of
the original sublot sample test results. The cost of testing will be deducted from any monies
due or that may come due the Contractor under the Contract at the rate of $500 per sample.
5-04.3 (9)D Mixture Acceptance – Commercial Evaluation
If sampled and tested, HMA produced under Commercial Evaluation and having all
constituents falling within the tolerance limits of the job mix formula shall be accepted at the
unit Contract price with no further evaluation. When one or more constituents fall outside the
commercial tolerance limits in the Job Mix Formula shown in 5-04.3(9), the lot shall be
evaluated in accordance with Section 1-06.2 to determine the appropriate CPF. The
commercial tolerance limits will be used in the calculation of the CPF and the maximum CPF
shall be 1.00. When less than three sublots exist, backup samples of the existing sublots or
samples from the street shall be tested to provide a minimum of three sets of results for
evaluation.
For each lot of HMA mix produced and tested under Commercial Evaluation when the
calculated CPF is less than 1.00, a Nonconforming Mix Factor (NCMF) will be determined.
The NCMF equals the algebraic difference of CPF minus 1.00 multiplied by 60 percent. The
Job Mix Compliance Price Adjustment will be calculated as the product of the NCMF, the
quantity of HMA in the lot in tons, and the unit Contract price per ton of mix.
If a constituent is not measured in accordance with these Specifications, its individual pay
factor will be considered 1.00 in calculating the CPF.
5-04.3(10) HMA Compaction Acceptance
HMA mixture accepted by nonstatistical evaluation that is used in traffic lanes, including
lanes for intersections, ramps, truck climbing, weaving, and speed change, and having a
specified compacted course thickness greater than 0.10-foot, shall be compacted to a
specified level of relative density. The specified level of relative density shall be a CPF of not
less than 0.75 when evaluated in accordance with Section 1-06.2, using a LSL of 92.0
(minimum of 92 percent of the maximum density). The maximum density shall be
determined by WSDOT FOP for AASHTO T 729. The specified level of density attained will
be determined by the evaluation of the density of the pavement. The density of the
pavement shall be determined in accordance with WSDOT FOP for WAQTC TM 8, except
that gauge correlation will be at the discretion of the Engineer, when using the nuclear
density gauge and WSDOT SOP 736 when using cores to determine density.
Monroe Ave Infiltration Facility SP-105 Special Provisions
City of Renton
Tests for the determination of the pavement density will be taken in accordance with the
required procedures for measurement by a nuclear density gauge or Roadway cores after
completion of the finish rolling.
If the Contracting Agency uses a nuclear density gauge to determine density the test
procedures FOP for WAQTC TM 8 and WSDOT SOP T 729 will be used on the day the mix
is placed and prior to opening to traffic.
Roadway cores for density may be obtained by either the Contracting Agency or the
Contractor in accordance with WSDOT SOP 734. The core diameter shall be 4-inches
minimum, unless otherwise approved by the Engineer. Roadway cores will be tested by the
Contracting Agency in accordance with WSDOT FOP for AASHTO T 166.
If the Contract includes the Bid item “Roadway Core”, the cores shall be obtained by the
Contractor in the presence of the Engineer on the same day the mix is placed and at
locations designated by the Engineer. If the Contract does not include the Bid item
“Roadway Core”, the Contracting Agency will obtain the cores.
For a lot in progress with a CPF less than 0.75, a new lot will begin at the Contractor’s
request after the Engineer is satisfied that material conforming to the Specifications can be
produced.
HMA mixture accepted by commercial evaluation and HMA constructed under conditions
other than those listed above shall be compacted on the basis of a test point evaluation of
the compaction train. The test point evaluation shall be performed in accordance with
instructions from the Engineer. The number of passes with an approved compaction train,
required to attain the maximum test point density, shall be used on all subsequent paving.
HMA for preleveling shall be thoroughly compacted. HMA that is used for preleveling wheel
rutting shall be compacted with a pneumatic tire roller unless otherwise approved by the
Engineer.
Test Results
For a sublot that has been tested with a nuclear density gauge that did not meet the
minimum of 92 percent of the reference maximum density in a compaction lot with a CPF
below 1.00 and thus subject to a price reduction or rejection, the Contractor may request
that a core be used for determination of the relative density of the sublot. The relative
density of the core will replace the relative density determined by the nuclear density gauge
for the sublot and will be used for calculation of the CPF and acceptance of HMA
compaction lot.
When cores are taken by the Contracting Agency at the request of the Contractor, they shall
be requested by noon of the next workday after the test results for the sublot have been
provided or made available to the Contractor. Core locations shall be outside of wheel paths
and as determined by the Engineer. Traffic control shall be provided by the Contractor as
requested by the Engineer. Failure by the Contractor to provide the requested traffic control
will result in forfeiture of the request for cores. When the CPF for the lot based on the results
of the HMA cores is less than 1.00, the cost for the coring will be deducted from any monies
due or that may become due the Contractor under the Contract at the rate of $200 per core
and the Contractor shall pay for the cost of the traffic control.
Monroe Ave Infiltration Facility SP-106 Special Provisions
City of Renton
5-04.3(10)A HMA Compaction – General Compaction Requirements
Compaction shall take place when the mixture is in the proper condition so that no undue
displacement, cracking, or shoving occurs. Areas inaccessible to large compaction
equipment shall be compacted by other mechanical means. Any HMA that becomes loose,
broken, contaminated, shows an excess or deficiency of asphalt, or is in any way defective,
shall be removed and replaced with new hot mix that shall be immediately compacted to
conform to the surrounding area.
The type of rollers to be used and their relative position in the compaction sequence shall
generally be the Contractor’s option, provided the specified densities are attained. Unless
the Engineer has approved otherwise, rollers shall only be operated in the static mode when
the internal temperature of the mix is less than 175°F. Regardless of mix temperature, a
roller shall not be operated in a mode that results in checking or cracking of the mat. Rollers
shall only be operated in static mode on bridge decks.
5-04.3(10)B HMA Compaction - Cyclic Density
Low cyclic density areas are defined as spots or streaks in the pavement that are less than
90 percent of the theoretical maximum density. At the Engineer’s discretion, the Engineer
may evaluate the HMA pavement for low cyclic density, and when doing so will follow
WSDOT SOP 733. A $500 Cyclic Density Price Adjustment will be assessed for any 500-
foot section with two or more density readings below 90 percent of the theoretical maximum
density.
5-04.3(10)C Vacant
5-04.3(10)D HMA Nonstatistical Compaction
5-04.3(10)D1 HMA Nonstatistical Compaction - Lots and Sublots
HMA compaction which is accepted by nonstatistical evaluation will be based on acceptance
testing performed by the Contracting Agency dividing the project into compaction lots.
A lot is represented by randomly selected samples of the same mix design that will be
tested for acceptance. A lot is defined as the total quantity of material or work produced for
each Job Mix Formula placed. Only one lot per JMF is expected. A sublot shall be equal to
one day’s production or 400 tons, whichever is less except that the final sublot will be a
minimum of 200 tons and may be increased to 800 tons. Testing for compaction will be at
the rate of 5 tests per sublot per WSDOT T 738.
The sublot locations within each density lot will be determined by the Engineer. For a lot in
progress with a CPF less than 0.75, a new lot will begin at the Contractor’s request after the
Engineer is satisfied that material conforming to the Specifications can be produced.
HMA mixture accepted by commercial evaluation and HMA constructed under conditions
other than those listed above shall be compacted on the basis of a test point evaluation of
the compaction train. The test point evaluation shall be performed in accordance with
instructions from the Engineer. The number of passes with an approved compaction train,
required to attain the maximum test point density, shall be used on all subsequent paving.
Monroe Ave Infiltration Facility SP-107 Special Provisions
City of Renton
HMA for preleveling shall be thoroughly compacted. HMA that is used to prelevel wheel ruts
shall be compacted with a pneumatic tire roller unless otherwise approved by the Engineer.
5-04.3(10)D2 HMA Compaction Nonstatistical Evaluation – Acceptance Testing
The location of the HMA compaction acceptance tests will be randomly selected by the
Engineer from within each sublot, with one test per sublot.
5-04.3(10)D3 HMA Nonstatistical Compaction – Price Adjustments
For each compaction lot with one or two sublots, having all sublots attain a relative density
that is 92 percent of the reference maximum density the HMA shall be accepted at the unit
Contract price with no further evaluation. When a sublot does not attain a relative density
that is 92 percent of the reference maximum density, the lot shall be evaluated in
accordance with Section 1-06.2 to determine the appropriate CPF. The maximum CPF shall
be 1.00, however, lots with a calculated CPF in excess of 1.00 will be used to offset lots with
CPF values below 1.00 but greater than 0.90. Lots with CPF lower than 0.90 will be
evaluated for compliance per 5-04.3(11). Additional testing by either a nuclear moisture-
density gauge or cores will be completed as required to provide a minimum of three tests for
evaluation.
For compaction below the required 92%, a Non-Conforming Compaction Factor (NCCF) will
be determined. The NCCF equals the algebraic difference of CPF minus 1.00 multiplied by
40 percent. The Compaction Price Adjustment will be calculated as the product of CPF, the
quantity of HMA in the compaction control lot in tons, and the unit Contract price per ton of
mix.
5-04.3(11) Reject Work
5-04.3(11)A Reject Work General
Work that is defective or does not conform to Contract requirements shall be rejected. The
Contractor may propose, in writing, alternatives to removal and replacement of rejected
material. Acceptability of such alternative proposals will be determined at the sole discretion
of the Engineer. HMA that has been rejected is subject to the requirements in Section 1-
06.2(2) and this specification, and the Contractor shall submit a corrective action proposal to
the Engineer for approval.
5-04.3(11)B Rejection by Contractor
The Contractor may, prior to sampling, elect to remove any defective material and replace it
with new material. Any such new material will be sampled, tested, and evaluated for
acceptance.
5-04.3(11)C Rejection Without Testing (Mixture or Compaction)
The Engineer may, without sampling, reject any batch, load, or section of Roadway that
appears defective. Material rejected before placement shall not be incorporated into the
pavement. Any rejected section of Roadway shall be removed.
No payment will be made for the rejected materials or the removal of the materials unless
the Contractor requests that the rejected material be tested. If the Contractor elects to have
the rejected material tested, a minimum of three representative samples will be obtained
and tested. Acceptance of rejected material will be based on conformance with the
Monroe Ave Infiltration Facility SP-108 Special Provisions
City of Renton
nonstatistical acceptance Specification. If the CPF for the rejected material is less than 0.75,
no payment will be made for the rejected material; in addition, the cost of sampling and
testing shall be borne by the Contractor. If the CPF is greater than or equal to 0.75, the cost
of sampling and testing will be borne by the Contracting Agency. If the material is rejected
before placement and the CPF is greater than or equal to 0.75, compensation for the
rejected material will be at a CPF of 0.75. If rejection occurs after placement and the CPF is
greater than or equal to 0.75, compensation for the rejected material will be at the calculated
CPF with an addition of 25 percent of the unit Contract price added for the cost of removal
and disposal.
5-04.3(11)D Rejection - A Partial Sublot
In addition to the random acceptance sampling and testing, the Engineer may also isolate
from a normal sublot any material that is suspected of being defective in relative density,
gradation or asphalt binder content. Such isolated material will not include an original
sample location. A minimum of three random samples of the suspect material will be
obtained and tested. The material will then be statistically evaluated as an independent lot in
accordance with Section 1-06.2(2).
5-04.3(11)E Rejection - An Entire Sublot
An entire sublot that is suspected of being defective may be rejected. When a sublot is
rejected a minimum of two additional random samples from this sublot will be obtained.
These additional samples and the original sublot will be evaluated as an independent lot in
accordance with Section 1-06.2(2).
5-04.3(11)F Rejection - A Lot in Progress
The Contractor shall shut down operations and shall not resume HMA placement until such
time as the Engineer is satisfied that material conforming to the Specifications can be
produced:
1. When the CPF of a lot in progress drops below 1.00 and the Contractor is taking no
corrective action, or
2. When the Pay Factor (PF) for any constituent of a lot in progress drops below 0.95
and the Contractor is taking no corrective action, or
3. When either the PF for any constituent or the CPF of a lot in progress is less than
0.75.
5-04.3(11)G Rejection - An Entire Lot (Mixture or Compaction)
An entire lot with a CPF of less than 0.75 will be rejected.
5-04.3(12) Joints
5-04.3(12)A HMA Joints
5-04.3(12)A1 Transverse Joints
The Contractor shall conduct operations such that the placing of the top or wearing course is
a continuous operation or as close to continuous as possible. Unscheduled transverse joints
will be allowed, and the roller may pass over the unprotected end of the freshly laid mixture
only when the placement of the course must be discontinued for such a length of time that
the mixture will cool below compaction temperature. When the Work is resumed, the
previously compacted mixture shall be cut back to produce a slightly beveled edge for the
full thickness of the course.
Monroe Ave Infiltration Facility SP-109 Special Provisions
City of Renton
A temporary wedge of HMA constructed on a 20H:1V shall be constructed where a
transverse joint as a result of paving or planing is open to traffic. The HMA in the temporary
wedge shall be separated from the permanent HMA by strips of heavy wrapping paper or
other methods approved by the Engineer. The wrapping paper shall be removed and the
joint trimmed to a slightly beveled edge for the full thickness of the course prior to
resumption of paving.
The material that is cut away shall be wasted and new mix shall be laid against the cut.
Rollers or tamping irons shall be used to seal the joint.
5-04.3(12)A2 Longitudinal Joints
The longitudinal joint in any one course shall be offset from the course immediately below by
not more than 6 inches nor less than 2 inches. All longitudinal joints constructed in the
wearing course shall be located at a lane line or an edge line of the Traveled Way. A
notched wedge joint shall be constructed along all longitudinal joints in the wearing surface
of new HMA unless otherwise approved by the Engineer. The notched wedge joint shall
have a vertical edge of not less than the maximum aggregate size or more than ½ of the
compacted lift thickness and then taper down on a slope not steeper than 4H:1V. The
sloped portion of the HMA notched wedge joint shall be uniformly compacted.
5-04.3(12)B Bridge Paving Joint Seals
Bridge Paving Joint Seals shall be in accordance with Section 5-03.
5-04.3(13) Surface Smoothness
The completed surface of all courses shall be of uniform texture, smooth, uniform as to
crown and grade, and free from defects of all kinds. The completed surface of the wearing
course shall not vary more than ⅛ inch from the lower edge of a 10-foot straightedge placed
on the surface parallel to the centerline. The transverse slope of the completed surface of
the wearing course shall vary not more than ¼ inch in 10 feet from the rate of transverse
slope shown in the Plans.
When deviations in excess of the above tolerances are found that result from a high place in
the HMA, the pavement surface shall be corrected by one of the following methods:
1. Removal of material from high places by grinding with an approved grinding
machine, or
2. Removal and replacement of the wearing course of HMA, or
3. By other method approved by the Engineer.
Correction of defects shall be carried out until there are no deviations anywhere greater than
the allowable tolerances.
Deviations in excess of the above tolerances that result from a low place in the HMA and
deviations resulting from a high place where corrective action, in the opinion of the
Engineer, will not produce satisfactory results will be accepted with a price adjustment. The
Engineer shall deduct from monies due or that may become due to the Contractor the sum
of $500.00 for each and every section of single traffic lane 100 feet in length in which any
excessive deviations described above are found.
Monroe Ave Infiltration Facility SP-110 Special Provisions
City of Renton
When utility appurtenances such as manhole covers and valve boxes are located in the
traveled way, the utility appurtenances shall be adjusted to the finished grade prior to
paving. This requirement may be waived when requested by the Contractor, at the
discretion of the Engineer or when the adjustment details provided in the project plan or
specifications call for utility appurtenance adjustments after the completion of paving.
Utility appurtenance adjustment discussions will be included in the Pre-Paving and Pre-
Planing Briefing (5-04.3(14)B3). Submit a written request to waive this requirement to the
Engineer prior to the start of paving.
5-04.3(14) Planing Bituminous Pavement
The planing plan must be approved by the Engineer and a pre-planing meeting must be held
prior to the start of any planing. See Section 5-04.3(14)B2 for information on planing
submittals.
Where planing an existing pavement is specified in the Contract, the Contractor must
remove existing surfacing material and to reshape the surface to remove irregularities. The
finished product must be a prepared surface acceptable for receiving an HMA overlay.
Use the cold milling method for planing unless otherwise specified in the Contract. Do not
use the planer on the final wearing course of new HMA.
Conduct planing operations in a manner that does not tear, break, burn, or otherwise
damage the surface which is to remain. The finished planed surface must be slightly
grooved or roughened and must be free from gouges, deep grooves, ridges, or other
imperfections. The Contractor must repair any damage to the surface by the Contractor’s
planing equipment, using an Engineer approved method.
Repair or replace any metal castings and other surface improvements damaged by planing,
as determined by the Engineer.
A tapered wedge cut must be planed longitudinally along curb lines sufficient to provide a
minimum of 4 inches of curb reveal after placement and compaction of the final wearing
course. The dimensions of the wedge must be as shown on the Drawings or as specified by
the Engineer.
A tapered wedge cut must also be made at transitions to adjoining pavement surfaces (meet
lines) where butt joints are shown on the Drawings. Cut butt joints in a straight line with
vertical faces 2 inches or more in height, producing a smooth transition to the existing
adjoining pavement.
After planing is complete, planed surfaces must be swept, cleaned, and if required by the
Contract, patched and preleveled.
The Engineer may direct additional depth planing. Before performing this additional depth
planing, the Contractor must conduct a hidden metal in pavement detection survey as
specified in Section 5-04.3(14)A.
Monroe Ave Infiltration Facility SP-111 Special Provisions
City of Renton
5-04.3(14)A Pre-Planing Metal Detection Check
Before starting planing of pavements, and before any additional depth planing required by
the Engineer, the Contractor must conduct a physical survey of existing pavement to be
planed with equipment that can identify hidden metal objects.
Should such metal be identified, promptly notify the Engineer.
See Section 1-07.16(1) regarding the protection of survey monumentation that may be
hidden in pavement.
The Contractor is solely responsible for any damage to equipment resulting from the
Contractor’s failure to conduct a pre-planing metal detection survey, or from the Contractor’s
failure to notify the Engineer of any hidden metal that is detected.
5-04.3(14)B Paving and Planing Under Traffic
5-04.3(14)B1 General
In addition, the requirements of Section 1-07.23 and the traffic controls required in Section
1-10, and unless the Contract specifies otherwise or the Engineer approves, the Contractor
must comply with the following:
1. Intersections:
a. Keep intersections open to traffic at all times, except when paving or planing
operations through an intersection requires closure. Such closure must be
kept to the minimum time required to place and compact the HMA mixture, or
plane as appropriate. For paving, schedule such closure to individual lanes or
portions thereof that allows the traffic volumes and schedule of traffic
volumes required in the approved traffic control plan. Schedule work so that
adjacent intersections are not impacted at the same time and comply with the
traffic control restrictions required by the Traffic Engineer. Each individual
intersection closure or partial closure must be addressed in the traffic control
plan, which must be submitted to and accepted by the Engineer, see Section
1-10.2(2).
b. When planing or paving and related construction must occur in an
intersection, consider scheduling and sequencing such work into quarters of
the intersection, or half or more of an intersection with side street detours. Be
prepared to sequence the work to individual lanes or portions thereof.
c. Should closure of the intersection in its entirety be necessary, and no trolley
service is impacted, keep such closure to the minimum time required to place
and compact the HMA mixture, plane, remove asphalt, tack coat, and as
needed.
d. Any work in an intersection requires advance warning in both signage and a
number of Working Days advance notice as determined by the Engineer, to
alert traffic and emergency services of the intersection closure or partial
closure.
e. Allow new compacted HMA asphalt to cool to ambient temperature before
any traffic is allowed on it. Traffic is not allowed on newly placed asphalt until
approval has been obtained from the Engineer.
2. Temporary centerline marking, post-paving temporary marking, temporary stop bars,
and maintaining temporary pavement marking must comply with Section 8-23.
Monroe Ave Infiltration Facility SP-112 Special Provisions
City of Renton
3. Permanent pavement marking must comply with Section 8-22.
5-04.3(14)B2 Submittals - Planing Plan and HMA Paving Plan
The Contractor must submit a separate planing plan and a separate paving plan to the
Engineer at least 5 Working Days in advance of each operation’s activity start date. These
plans must show how the moving operation and traffic control are coordinated, as they will
be discussed at the pre-planing briefing and pre-paving briefing. When requested by the
Engineer, the Contractor must provide each operation’s traffic control plan on 24 x 36 inch
or larger size Shop Drawings with a scale showing both the area of operation and sufficient
detail of traffic beyond the area of operation where detour traffic may be required. The scale
on the Shop Drawings is 1 inch = 20 feet, which may be changed if the Engineer agrees
sufficient detail is shown.
The planing operation and the paving operation include, but are not limited to, metal
detection, removal of asphalt and temporary asphalt of any kind, tack coat and drying,
staging of supply trucks, paving trains, rolling, scheduling, and as may be discussed at the
briefing.
When intersections will be partially or totally blocked, provide adequately sized and
noticeable signage alerting traffic of closures to come, a minimum 2 Working Days in
advance. The traffic control plan must show where police officers will be stationed when
signalization is or may be, countermanded, and show areas where flaggers are proposed.
At a minimum, the planing and the paving plan must include:
1. A copy of the accepted traffic control plan, see Section 1-10.2(2), detailing each
day’s traffic control as it relates to the specific requirements of that day’s planing and
paving. Briefly describe the sequencing of traffic control consistent with the proposed
planing and paving sequence, and scheduling of placement of temporary pavement
markings and channelizing devices after each day’s planing, and paving.
2. A copy of each intersection’s traffic control plan.
3. Haul routes from supplier facilities, and locations of temporary parking and staging
areas, including return routes. Describe the complete round trip as it relates to the
sequencing of paving operations.
4. Names and locations of HMA supplier facilities to be used.
5. List of all equipment to be used for paving.
6. List of personnel and associated job classification assigned to each piece of paving
equipment.
7. Description (geometric or narrative) of the scheduled sequence of planing and of
paving and intended area of planing and of paving for each day’s work, must include
the directions of proposed planing and of proposed paving, sequence of adjacent
lane paving, sequence of skipped lane paving, intersection planing and paving
scheduling and sequencing, and proposed notifications and coordinations to be
timely made. The plan must show HMA joints relative to the final pavement marking
lane lines.
8. Names, job titles, and contact information for field, office, and plant supervisory
personnel.
9. A copy of the approved Mix Designs.
10. Tonnage of HMA to be placed each day.
11. Approximate times and days for starting and ending daily operations.
Monroe Ave Infiltration Facility SP-113 Special Provisions
City of Renton
5-04.3(14)B3 Pre-Paving and Pre-Planing Briefing
At least 2 Working Days before the first paving operation and the first planing operation, or
as scheduled by the Engineer for future paving and planing operations to ensure the
Contractor has adequately prepared for notifying and coordinating as required in the
Contract, the Contractor must be prepared to discuss that day’s operations as they relate to
other entities and to public safety and convenience, including driveway and business
access, garbage truck operations, transit operations and working around energized
overhead wires, school and nursing home and hospital and other accesses, other
Contractors who may be operating in the area, pedestrian and bicycle traffic, and
emergency services. The Contractor, and Subcontractors that may be part of that day’s
operations, must meet with the Engineer and discuss the proposed operation as it relates to
the submitted planing plan and paving plan, approved traffic control plan, and public
convenience and safety. Such discussion includes, but is not limited to:
1. General for both the Paving and Planing:
a. The actual times of starting and ending daily operations.
b. In intersections, how to break up the intersection, and address traffic control
and signalization for that operation, including use of peace officers.
c. The sequencing and scheduling of paving operations and of planing
operations, as applicable, as it relates to traffic control, public convenience
and safety, and other Contractors who may operate in the Project limits.
d. Notifications required of Contractor activities and coordinating with other
entities and the public as necessary.
e. Description of the sequencing of installation and types of temporary
pavement markings as it relates to planning and paving.
f. Description of the sequencing of installation of, and the removal of, temporary
pavement patch material around exposed castings and as may be needed.
g. Description of procedures and equipment to identify hidden metal in the
pavement, such as survey monumentation, monitoring wells, streetcar rail,
and castings, before planing as per Section 5-04.3(14)B2.
h. Description of how flaggers will be coordinated with the planing, paving, and
related operations.
i. Description of sequencing of traffic controls for the process of rigid pavement
base repairs.
j. Other items the Engineer deems necessary to address.
2. Paving – additional topics:
a. When to start applying tack and coordinating with paving.
b. Types of equipment and numbers of each type of equipment to be used. If
more pieces of equipment than personnel are proposed, describe the
sequencing of the personnel operating the types of equipment. Discuss the
continuance of operator personnel for each type of equipment as it relates to
meeting Specification requirements.
c. Number of JMFs to be placed, and if more than one JMF is used, how the
Contractor will ensure different JMFs are distinguished, how pavers and how
MTVs are distinguished, and how pavers and MTVs are cleaned so that one
JMF does not adversely influence the other JMF.
d. Description of contingency plans for that day’s operations such as equipment
breakdown, rain out, and supplier shutdown of operations.
e. Number of sublots to be placed, sequencing of density testing, and other
sampling and testing.
Monroe Ave Infiltration Facility SP-114 Special Provisions
City of Renton
5-04.3(15) Sealing Pavement Surfaces
Apply a fog seal where shown in the plans. Construct the fog seal in accordance with
Section 5-02.3. Unless otherwise approved by the Engineer, apply the fog seal prior to
opening to traffic.
5-04.3(16) HMA Road Approaches
Construct HMA approaches at the locations shown in the Plans or where staked by the
Engineer, in accordance with Section 5-04.
5-04.3(17) Construction Joint Sealing
Transverse Joints – Joints between new and existing asphalt shall be sealed within five (5)
calendar days after final rolling of the final lift of HMA. The seal shall be CSS-1 emulsified
asphalt. The emulsified asphalt shall be placed in a way to be smooth and flush with
roadway surface with minimal overbanding. This work is considered incidental to the bid
item “HMA Cl.__ PG __” or “Commercial HMA”.
5-04.4 Measurement
HMA Cl. ½” PG 64-22, and Commercial HMA will be measured by the ton in accordance
with Section 1-09.2, with no deduction being made for the weight of asphalt binder, mineral
filler, or any other component of the mixture. If the Contractor elects to remove and replace
mix as allowed by Section 5-04.3(11), the material removed will not be measured.
Roadway cores will be measured per each for the number of cores taken.
Preparation of untreated roadway will be measured by the mile once along the centerline of
the main line Roadway. No additional measurement will be made for ramps, Auxiliary Lanes,
service roads, Frontage Roads, or Shoulders. Measurement will be to the nearest 0.01 mile.
Soil residual herbicide will be measured by the mile for the stated width to the nearest 0.01
mile or by the square yard, whichever is designated in the Proposal.
Pavement repair excavation will be measured by the square yard of surface marked prior to
excavation.
Asphalt for prime coat will be measured by the ton in accordance with Section 1-09.2.
Prime coat aggregate will be measured by the cubic yard, truck measure, or by the ton,
whichever is designated in the Proposal.
Asphalt for fog seal will be measured by the ton, as provided in Section 5-02.4.
Longitudinal joint seals between the HMA and cement concrete pavement will be measured
by the linear foot along the line and slope of the completed joint seal.
Planing bituminous pavement will be measured by the square yard.
Temporary pavement marking will be measured by the linear foot as provided in Section 8-
23.4.
Monroe Ave Infiltration Facility SP-115 Special Provisions
City of Renton
Water will be measured by the gallon as provided in Section 2-07.4.
5-04.5 Payment
Payment will be made for each of the following Bid items that are included in the Proposal:
“HMA Cl. ½” PG 64-22”, per ton.
“HMA for Approach Cl. ___ PG ___”, per ton.
“HMA for Preleveling Cl. ___ PG ___”, per ton.
“HMA for Pavement Repair Cl. ___ PG ___”, per ton.
“Commercial HMA”, per ton.
The unit Contract price per ton for “HMA Cl. ___ PG ___”, “HMA for Approach Cl. ___ PG
___”, “HMA for Preleveling Cl. ___ PG ___”, “HMA for Pavement Repair Cl. ___ PG ___”,
and “Commercial HMA” shall be full compensation for all costs, including anti-stripping
additive, incurred to carry out the requirements of Section 5-04 except for those costs
included in other items which are included in this Subsection and which are included in the
Proposal.
“Preparation of Untreated Roadway”, per mile.
The unit Contract price per mile for “Preparation of Untreated Roadway” shall be full pay for
all Work described under 5-04.3(4) , with the exception, however, that all costs involved in
patching the Roadway prior to placement of HMA shall be included in the unit Contract price
per ton for “HMA Cl. ___ PG ___” which was used for patching. If the Proposal does not
include a Bid item for “Preparation of Untreated Roadway”, the Roadway shall be prepared
as specified, but the Work shall be included in the Contract prices of the other items of
Work.
“Preparation of Existing Paved Surfaces”, per mile.
The unit Contract Price for “Preparation of Existing Paved Surfaces” shall be full pay for all
Work described under Section 5-04.3(4) with the exception, however, that all costs involved
in patching the Roadway prior to placement of HMA shall be included in the unit Contract
price per ton for “HMA Cl. ___ PG ___” which was used for patching. If the Proposal does
not include a Bid item for “Preparation of Untreated Roadway”, the Roadway shall be
prepared as specified, but the Work shall be included in the Contract prices of the other
items of Work.
“Crack Sealing”, by force account.
“Crack Sealing” will be paid for by force account as specified in Section 1-09.6. For the
purpose of providing a common Proposal for all Bidders, the Contracting Agency has
entered an amount in the Proposal to become a part of the total Bid by the Contractor.
“Pavement Repair Excavation Incl. Haul”, per square yard.
The unit Contract price per square yard for “Pavement Repair Excavation Incl. Haul” shall be
full payment for all costs incurred to perform the Work described in Section 5-04.3(4) with
the exception, however, that all costs involved in the placement of HMA shall be included in
the unit Contract price per ton for “HMA for Pavement Repair Cl. ___ PG ___”, per ton.
Monroe Ave Infiltration Facility SP-116 Special Provisions
City of Renton
“Asphalt for Prime Coat”, per ton.
The unit Contract price per ton for “Asphalt for Prime Coat” shall be full payment for all costs
incurred to obtain, provide and install the material in accordance with Section 5-04.3(4).
“Prime Coat Agg.”, per cubic yard, or per ton.
The unit Contract price per cubic yard or per ton for “Prime Coat Agg.” shall be full pay for
furnishing, loading, and hauling aggregate to the place of deposit and spreading the
aggregate in the quantities required by the Engineer.
“Asphalt for Fog Seal”, per ton.
Payment for “Asphalt for Fog Seal” is described in Section 5-02.5.
“Longitudinal Joint Seal”, per linear foot.
The unit Contract price per linear foot for “Longitudinal Joint Seal” shall be full payment for
all costs incurred to perform the Work described in Section 5-04.3(12).
“Planing Bituminous Pavement”, per square yard.
The unit Contract price per square yard for “Planing Bituminous Pavement” shall be full
payment for all costs incurred to perform the Work described in Section 5-04.3(14).
“Temporary Pavement Marking”, per linear foot.
Payment for “Temporary Pavement Marking” is described in Section 8-23.5.
“Water”, per M gallon.
Payment for “Water” is described in Section 2-07.5.
“Job Mix Compliance Price Adjustment”, by calculation.
“Job Mix Compliance Price Adjustment” will be calculated and paid for as described in
Section 5-04.3(9)C6.
“Compaction Price Adjustment”, by calculation.
“Compaction Price Adjustment” will be calculated and paid for as described in Section 5-
04..3(10)D3.
“Roadway Core”, per each.
The Contractor’s costs for all other Work associated with the coring (e.g., traffic control) shall
be incidental and included within the unit Bid price per each and no additional payments will
be made.
Monroe Ave Infiltration Facility SP-117 Special Provisions
City of Renton
“Cyclic Density Price Adjustment”, by calculation.
“Cyclic Density Price Adjustment” will be calculated and paid for as described in Section 5-
04.3(10)B.
Add the following new section:
5-06 TEMPORARY RESTORATION IN PAVEMENT AREA
5-06.1 Description
Pavement areas that have been removed by construction activities must be restored by the
Contractor prior to the end of each working period, prior to use by vehicular traffic. Within
paved streets, the Contractor may use temporary pavement to allow vehicular traffic to travel
over the construction areas. Temporary pavement shall be placed around trench plates or
others devices used to cover construction activities in a manner that provides a smooth and
safe transition between surfaces.
5-06.2 Materials
The asphalt pavement for temporary patches shall be 2” of a hot mix or cold mix asphalt
composition determined by the Contractor to provide a product suitable for the intended
application. The Contractor shall not use materials that are a safety or health hazard.
Temporary pavement material that does not form a consolidated surface after compaction
shall be considered unsuitable and shall be removed from the site. Unsuitable temporary
pavement shall be disposed of offsite.
5-06.3 Construction Requirements
The Contractor shall maintain temporary hot mix asphalt patches daily during to the
satisfaction of the governing road agency and the Engineer until said patch is replaced with
permanent hot patch. The completed pavement shall be free from ridges, ruts, bumps,
depressions, objectionable marks, or other irregularities. The permanent hot mix asphalt
patch shall be placed and sealed with a paving asphalt within 30 calendar days.
The Contractor shall immediately repair, patch, or remove any temporary pavement that
does not provide a flat transition between existing pavement areas.
All temporary asphalt pavement shall be removed from the site by the end of the project and
shall not be used as permanent asphalt pavement or subgrade material.
END OF DIVISION 5
Monroe Ave Infiltration Facility SP-118 Special Provisions
City of Renton
DIVISION 6
STRUCTURES
6-02 CONCRETE STRUCTURES
6-02.2 Materials
Section 6-02.2 is supplemented with the following:
(April 1, 2013 WSDOT GSP)
Resin Bonded Anchors
The resin bonded anchor system shall include the nut, washer, and threaded anchor rod
which is installed into hardened concrete with a resin bonding material.
Resin bonding material used in overhead and horizontal application shall be specifically
recommended by the resin manufacturer for those applications.
Resin bonding material used in submerged liquid environment shall be specifically
recommended by the resin manufacturer for this application.
The resin bonded anchor system shall conform to the following requirements:
1. Threaded Anchor Rod and Nuts
Threaded anchor rods shall conform to ASTM A 193 Grade B7 or ASTM A 449,
except as otherwise noted, and be fully threaded. Threaded anchor rods for
stainless steel resin bonded anchor systems shall conform to ASTM F 593 and shall
be Type 304 unless otherwise specified.
Nuts shall conform to ASTM A 563, Grade DH, except as otherwise noted. Nuts for
stainless steel resin bonded anchor systems shall conform to ASTM F 594 and shall
be Type 304 unless otherwise specified.
Washers shall conform to ASTM F 436 and shall meet the same requirements as the
supplied anchor rod, except as otherwise noted. Washers for stainless steel resin
bonded anchor systems shall conform to ASTM A 240 and the geometric
requirements of ASME B18.21.1 and shall be Type 304 Stainless Steel unless
otherwise specified.
Nuts and threaded anchor rods, except those manufactured of stainless steel, shall
be galvanized in accordance with AASHTO M 232. Galvanized threaded anchor
rods shall be tested for embrittlement after galvanizing, in accordance with Section 9-
29.6(5).
Threaded anchor rods used with resin capsules shall have the tip of the rod chiseled
in accordance with the resin capsule manufacturer's recommendations. Galvanized
threaded rods shall have the tip chiseled prior to galvanizing.
2. Resin Bonding Material
Resin bonding material shall be a two-component epoxy resin conforming to Type IV
ASTM C 881 or be one of the following:
a. Vinyl ester resin.
Monroe Ave Infiltration Facility SP-119 Special Provisions
City of Renton
b. Polyester resin.
c. Methacrylate resin.
3. Ultimate Anchor Tensile Capacity
Resin bonded anchors shall be tested in accordance with ASTM E 488 to have the
following minimum ultimate tensile load capacity when installed in concrete having a
maximum compressive strength of 6000 pounds per square inch (psi) at the
embedment specified below:
Anchor
Diameter (inch)
Tensile
Capacity (lbs.)
Embedment
(inch)
3/8 7,800 3-3/8
1/2 12,400 4-1/2
5/8 19,000 5-5/8
3/4 27,200 6-3/4
7/8 32,000 7-7/8
1 41,000 9
1-1/4 70,000 11-1/4
The Contractor shall submit items 1 and 2 below to the Engineer for all resin bonded anchor
systems. If the resin bonded anchor system and anchor diameter are not listed in the current
WSDOT Qualified Products List, the Contractor shall also submit item 3 below to the
Engineer.
For resin bonded anchor systems that are installed in a submerged liquid environment the
Contractor shall submit items 1, 2, and 4 below. If the resin bonded anchor system and
anchor diameter are not listed in the current WSDOT Qualified Products List, the Contractor
shall also submit item 3 below to the Engineer.
1. The resin manufacturer's written installation procedure for the anchors.
2. The manufacturer's certificate of compliance for the threaded anchor rod certifying
that the anchor rod meets these requirements.
3. Test results by an independent laboratory certifying that the threaded anchor rod
system meets the ultimate anchor tensile load capacity specified in the above table.
The tests shall be performed in accordance with ASTM E 488.
4. For threaded anchors intended to be installed in submerged liquid environments the
Contractor shall submit tests performed by an independent laboratory within the past
24 months which certifies that anchors installed in a submerged environment meet
the strength requirements specified in the above table.
6-02.3 Construction Requirements
6-02.3(18) Placing Anchor Bolts
(January 3, 2011 WSDOT GSP)
Section 6-02.3(18) is supplemented with the following:
Resin Bonded Anchors
The embedment depth of the anchors shall be as specified in the Plans. If the embedment
depth of the anchor is not specified in the Plans then the embedment depth shall be as
specified in the table of minimum and maximum torque below.
The anchors shall be installed in accordance with the resin manufacturer's written
procedure.
Monroe Ave Infiltration Facility SP-120 Special Provisions
City of Renton
Holes shall be drilled as specified in the Plans. Holes may be drilled with a rotary hammer
drill when core drilling is not specified in the Plans. If holes are core drilled, the sides of the
holes shall be roughened with a rotary hammer drill after core drilling.
Holes shall be prepared in accordance with the resin manufacturer's recommendations and
shall meet the minimum requirements as specified herein. Holes drilled into concrete shall
be thoroughly cleaned of debris, dust, and laitance prior to installing the threaded rod and
resin bonding material. Holes shall not have any standing liquid at the time of installation of
the threaded anchor rod.
The anchor nuts shall be tightened to the following torques when the embedment equals or
exceeds the minimum embedment specified.
Anchor
Diameter
(inch)
Minimum
Torque
(ft-lbs)
Maximum
Torque
(ft-lbs)
Minimum
Embedment
(Inch)
3/8 12 18 3-3/8
1/2 22 35 4-1/2
5/8 55 80 5-5/8
3/4 106 140 6-3/4
7/8 165 190 7-7/8
1 195 225 9
1-1/4 370 525 11-1/4
When the anchor embedment depth is less than the minimum values specified, the anchor
nuts shall be tightened to the torque values specified in the Plans, or as recommended by
the resin bonded anchor system manufacturer and approved by the Engineer.
6-03 STEEL STRUCTURES
6-03.2 Materials
Section 6-03.2 is supplemented with the following:
End and Intermediate Support assemblies shall be considered tension components of
flexural members and shall meet the specified Charpy V-notch requirements.
6-03.3 Construction Requirements
Section 6-03.3 is supplemented with the following:
Steel fabricators for the grated vault lid shall be included in the certification requirements in this section.
Grated vault lid support assembly members shall be considered fracture critical.
6-03.3(7) Shop Plans
Section 6-03.3(7) is supplemented with the following:
Type 2 Working Drawings for the Grated Vault Top shall include all pieces and assemblies
of the Grated Vault Top shown in the Plans, including but not limited to, the following:
1. Dimensions, material designations, weld details, and cuts sheets (as applicable)
2. End Support assemblies
Monroe Ave Infiltration Facility SP-121 Special Provisions
City of Renton
3. Intermediate Support assemblies
4. Keeper plates
5. Elastomeric bearings
6. Anchor bolts, nuts, washers, and resin bonding materials and installation plan for
anchor bolts. Coordinate anchor bolt locations with the design and rebar details
of the vault.
7. Steel grate, including grate type, fastener type, assembly details, product cut
sheets, and load capacity information. Grate shall have a minimum unfactored
live load capacity of 90 pounds per square foot (psf) (157.5 psf factored
according to the AASHTO LRFD Bridge Design Specifications, 9th edition).
8. Erection methods specified in 6-03.3(7)A.
6-03.3(7)A Erection Methods
The numbered list in the second paragraph of Section 6-03.3(7)A is supplemented with the
following:
Type 2E Working Drawings erection plan and procedure for the grated vault top shall also
include:
8. Coordinate any loads, supports or other affects to the Treatment Vault with the vault
design and include details and loads imparted to the vault in the erection plan.
END OF DIVISION 6
Monroe Ave Infiltration Facility SP-122 Special Provisions
City of Renton
DIVISION 7
DRAINAGE STRUCTURES, STORM SEWERS, SANITARY SEWERS,
WATER MAINS AND CONDUITS
7-04 STORM SEWERS
7-04.2 Materials
Section 7-04.2 is supplemented with the following:
Corrugated Polypropylene Storm Sewer Pipe shall be dual wall with smooth interior per
WSDOT Standard Specification 9-05.20.
The second paragraph of Section 7-04.2 is supplemented as follows:
The Contractor shall require pipe suppliers to furnish certificates signed by their authorized
representative, stating the specifications to which the materials or products were
manufactured. The Contractor shall provide 2 copies of these certifications to the Engineer
for approval. Certificates showing nonconformance with the Contract shall be sufficient
evidence for rejection. Approval of certificates shall be considered only as tentative
acceptance of the materials and products, and such action by Engineer will not relieve
Contractor of their responsibility to perform field tests and to replace or repair faulty
materials, equipment, and/or workmanship and Contractor’s own expense.
Add the following new section:
7-04.2(2) Temporary Stormwater Diversion
It shall be the Contractor’s responsibility to maintain operation of the existing storm sewer
system throughout the duration of the project without any disruption of service until the new
storm drain has been accepted by the City to receive stormwater flows, and connections are
made between the existing and new storm based on scheduling approved by the Engineer.
A temporary stormwater diversion system for offsite flows shall be installed prior to the start
of the project, which utilizes flexible pipes to gravity drain offsite stormwater from Monroe
Ave NE trunkline to the temporary stormwater infiltration pond located south of the stockpile
(along the south-eastern side of the parcel).
A temporary stormwater diversion shall be capable of bypassing at least the 2-year peak
flowrate of 52.5-cfs during construction. A temporary stormwater diversion may be required
for the installation of the new storm sewer system with the existing storm sewer trunkline.
The Contractor shall submit proposed methods for maintaining the diversions to the
Engineer for approval prior to construction. The diversions shall have the least impact on
property owners and traffic flow through the site. The diversions shall be installed, operated,
and maintained only when needed where the existing storm drain system must be
demolished to allow construction of the new system. Where shown on the Plans, Contractor
shall time work of bypasses during period of anticipated no or little rain.
If bypass pumping is provided, it shall be scheduled for continuous operation with backup
equipment available at all times for periods of maintenance and refueling or failure of the
primary bypass pump(s) or diversion system.
Monroe Ave Infiltration Facility SP-123 Special Provisions
City of Renton
The Contractor’s bypass operation shall be sized to handle, at a minimum, the 2-year peak
flow rate or can be reduced to a size determined by the Contractor if the temporary bypass
can be timed to coincide with a period of little to no rain. The Contractor shall submit a
Temporary Stormwater Diversion Plan in accordance with Section 1-05. The Contractor’s
plan shall be reviewed by the City before the plan is implemented. The review of the flow
diversion plan shall, as well as the Contractor’s proposed size of the bypass, in no way
relieve the Contractor of their responsibility to provide a bypass system that conveys
encountered flows without property damage or damage to the project or construction area.
As risk associated with sizing the bypass and impacts to construction is born by the
Contractor.
7-04.3 Construction Requirements
7-04.3(1) Cleaning and Testing
Section 7-04.3(1) is supplemented with the following:
Add the following:
Storm Sewer pipe shall be tested using low pressure air test methods in accordance with 7-
04.3(1)E or 7-04.3(1)F as appropriate. Thermoplastic storm sewer pipe shall be deflection
tested in accordance with 7-17.3(2)G.
Before testing begins and in adequate time to obtain approval through submittal process,
prepare and submit test plan for approval by Engineer. Include testing procedures, methods,
equipment, and tentative schedule. Obtain advance written approval for any deviations from
Drawings and Specifications.
Repair, correct, and retest sections of pipe which fail to meet specified requirements when
tested.
Perform testing as work progresses. Schedule testing so that no more than 1000 linear feet
of installed pipeline remains untested at one time.
Perform testing under observation of Engineer or Inspector.
Schedule testing during no rain. Plug the lower end of the pipe if needed to test pipe.
All pipe larger than 30-inch diameter shall have joints individually tested for Joint Tightness.
Prior to final backfill, all joints shall be individually tested using low-pressure air per ASTM
C1103. For the installation of any flexible pipe larger than 30-inches in diameter, the
Contractor shall retain the services of a pipe manufacturer representative, knowledgeable in
the installation methods and practices for the specific pipe product used on this project, as
well as on the installation practices for flexible pipelines in general. The manufacturer’s
representative shall be present full time on site during the construction of the first 300 feet of
pipe installation, and part-time, as required, thereafter until the entire pipeline installation is
complete. The manufacturer’s representative shall observe pipe foundation, pipe installation,
placement and compaction of pipe zone bedding and backfill, and testing procedures. The
manufacturer’s representative shall notify Engineer and Contractor of any non-conforming
installation, identifying the manufacturer recommended corrective action(s), within 24 hours
of such occurrence. All flexible pipe shall be tested for maximum pipe deflection by pulling a
rigid mandrel through the entire (i.e., 100%) flexible pipe length installed. Maximum
deflection shall not exceed 5%. Mandrel testing shall conform to ASTM D3034, and be
Monroe Ave Infiltration Facility SP-124 Special Provisions
City of Renton
performed no sooner than 30 days after backfilling and prior to final acceptance testing of
the segment. Submit test results to the Engineer.
1. Rigid mandrel shall have outside diameter (O.D.) equal to 95 percent of inside
diameter (I.D.) of pipe. Inside diameter of pipe, for purpose of determining outside
diameter of mandrel, shall be average outside diameter minus two minimum wall
thicknesses for O.D. controlled pipe and average inside diameter for I.D. controlled
pipe, dimensions shall be per appropriate standard. Statistical or other "tolerance
packages" shall not be considered in mandrel sizing.
2. Rigid mandrel shall be constructed of metal or rigid plastic material that can
withstand 200 psi without being deformed. Mandrel shall have nine or more "runners"
or "legs" as long as total number of legs is odd number. Barrel section of mandrel
shall have length of at least 75 percent of inside diameter of pipe. Rigid mandrel shall
not have adjustable or collapsible legs which would allow reduction in mandrel
diameter during testing. Provide and use proving ring for modifying each size
mandrel.
3. Furnish "proving ring" with each mandrel. Fabricate ring of 1/2-inch-thick, 3-inch-wide
bar steel to diameter 0.02 inches larger than approved mandrel diameter.
4. If a rigid mandrel is not available, the Contractor may substitute a round steel bar
meeting #3 above.
“Testing Storm Sewer Pipe”, per linear foot shall be incidental to and included in storm
sewer pipe bid items.
Prior to inspection and testing, pipes and storm drain structures shall be cleaned and
flushed. Any obstructions to flow within the storm drain system (such as rubble, mortar, and
debris) shall be removed at the nearest structure. Obstructions shall not be discharged into
the Stormwater Infiltration Facility.
Add the following new section:
7-04.3(1)G Abandon Existing Storm Sewer Pipes
Where it is shown on the plans that existing storm sewer pipe is to be abandoned by filling
with grout, all abandonment of storm drain lines shall conform to Section 7-17.3(2)I.
Add the following new section:
7-04.3(2) CCTV Inspection
All storm drain main lines constructed as part of this project shall be inspected by the use of
closed-circuit television (CCTV) before substantial completion. The costs incurred in “CCTV
Inspection” shall be included in the payment for associated “Polypropylene Storm Sewer
Pipe __ In. Diam, and no other costs shall be measured.
All CCTV inspections for storm drain lines shall conform to Section 7-17.3(2)H.
The Contractor shall bear all cost incurred in correcting any deficiencies found during
television inspection including the cost of any additional television inspection that may be
required by the Engineer to verify the correction of said deficiency.
The Contractor shall be responsible for all costs incurred in any television inspection
performed solely for the benefit of the Contractor.
Monroe Ave Infiltration Facility SP-125 Special Provisions
City of Renton
7-05 MANHOLES, INLETS, CATCH BASINS, AND DRYWELLS
7-05.1 Description
Section 7-05.1 is supplemented with the following:
This Work shall also include adjusting utility covers, installation of Treatment Vault,
installation of Flow Splitter Vault, installation of Infiltration Chamber Manifold Vault, and
installation of Hydrodynamic Separator Vault.
7-05.2 Materials
Section 7-05.2 is supplemented with the following:
Treatment Vault – 224 Ft. X 20 Ft. X 10 Ft.
The Contractor shall submit Type 3E Working Drawings and an Operations and
Maintenance Manual to the Engineer in accordance with Section 1-05.3 for the Treatment
Vault prior to ordering and installing the system. The submittal shall include materials of
construction, dimensions, specifications, and configuration related to other proposed
aspects of construction.
The Treatment Vault– 224 Ft. X 20 Ft. X 10 Ft. shall consist of an Oldcastle 224 Ft. X 20 Ft.
X 10 Ft. Biopod Vault, or approved equal water quality treatment facility. A substitute water
quality treatment facility will be considered equal if the facility provides the same function
and meets similar specifications as approved by the Engineer.
To be approved as equal, the water quality treatment facility shall meet or exceed the
following criteria:
General
· Have Ecology General Use Level Designation (GULD) certification for Enhanced
Water Quality Treatment.
· Shall be sized to Ecology Enhanced Water Quality Treatment requirements at a
minimum Water Quality Flow Rate listed below.
· Treatment Vault 224 Ft. X 20 Ft. X 10 Ft. must be able to treat an offline Water
Quality Flow Rate of 12.65 cfs
· Treatment unit shall achieve 80 percent removal of total suspended solids with
influent concentrations between 100 and 200 mg/L.
· Treatment unit shall achieve 30 percent removal of dissolved copper for influent
concentrations between 0.005 and 0.02 mg/L.
· Treatment unit shall achieve 60 percent removal of dissolved zinc for influent
concentrations between 0.02 and 0.30 mg/L.
· Exterior dimensions shall fit within the Treatment Vault footprint per the Plans.
· The structure shall be constructed of concrete with a minimum 28 day
compressive strength of 5,000 psi, reinforcing per ASTM A 1064, S1.2, Grade
80.
· Facility shall have grated lid across full vault top surface
· Facility shall not require plants
· Each chamber shall have removable grates or access hatches for maintenance
in accordance with WISHA standards and sized to allow removal of all internal
components without disassembly.
Monroe Ave Infiltration Facility SP-126 Special Provisions
City of Renton
· Structure knockouts shall be provided to accept pipes of the size, material, and
elevation shown in the plans.
Media
· Treatment Vault shall use media that does not require replacement over the life
of the facility.
· Treatment Vault shall use media that does not release fine sediment during
activation
Flow Dispersion
· Treatment Vault will be delivered to site with a flow dispersion system designed
to spread incoming flows across the surface area of the treatment media without
creating areas of concentrated loading.
· Dissipation Rock shall be sized and designed to prevent scour of the treatment
media at the dispersal windows or weirs along the flow dispersion system
Treatment Vault Wall Drain
· 6-inch diameter Perforated PVC Drain Pipe per WSDOT Standard Specification
9-05.1(5)
· Gravel Backfill for Drains per WSDOT Standard Specification 9-03.12(4).
· Non-Woven Geotextile for Underground Drainage, Moderate Survivability, Class
C Per WSDOT 9-33.2(1) Tables 1 and 2.
This section is a partial list of materials needed for the Treatment Vault – 224 Ft. X 20 Ft. X
10 Ft. It shall be the Contractor's responsibility to determine the full extent of all materials
required to provide complete and operational vaults, which is in accordance with the Plans,
applicable state requirements, and these Specifications.
Contractor shall submit product information, specifications, and configuration related to other
proposed aspect of construction to engineer for approval prior to ordering and installing the
system.
Flow Splitter Vault – 10 Ft. X 10 Ft. X 8 Ft.
The Contractor shall submit Type 3E Working Drawings and an Operations and
Maintenance Manual to the Engineer in accordance with Section 1-05.3 for the Flow Splitter
Vault – 10 Ft. X 10 Ft. X 8 Ft. prior to ordering and installing the system. The submittal shall
include materials of construction, dimensions, specifications, and configuration related to
other proposed aspects of construction.
The submittal for the Flow Splitter Vault – 10 Ft. X 10 Ft. X 8 Ft. shall include a submittal for
the access hatches.
Access Hatches shall be LW Products Company HHS-3A, or approved equal.
To be considered equal, the access hatches shall:
· meet or exceed H-30 load rating;
· be aluminum;
· have internal secondary fall protection grating;
· be single-leaf door;
· be lockable with a padlock.
Infiltration Chamber Manifold Vault – 27 Ft. X 7.5 Ft. X 7 Ft.
The Contractor shall submit Type 3E Working Drawings and an Operations and
Maintenance Manual to the Engineer in accordance with Section 1-05.3 for the Infiltration
Chamber Manifold Vault – 27 Ft. X 7.5 Ft. X 7 Ft. prior to ordering and installing the system.
Monroe Ave Infiltration Facility SP-127 Special Provisions
City of Renton
The submittal shall include materials of construction, dimensions, specifications, and
configuration related to other proposed aspects of construction.
The submittal for the Flow Splitter Vault- 27 Ft. X 7.5 Ft. X 7 Ft. shall include a submittal for
the access hatches.
Access Hatches shall be LW Products Company HHS-3A and HHD-1B, or approved equal.
To be considered equal, the access hatches shall:
· meet or exceed H-30 load rating;
· be aluminum;
· have internal secondary fall protection grating;
· be single-leaf door for 36”x36” hatch or double-leaf door for 36”x60” hatch;
· be lockable with a padlock.
Hydrodynamic Separator Vault – 22 Ft. X 14 Ft. X 12 Ft.
The Contractor shall submit Type 3E Working Drawings and an Operations and
Maintenance Manual to the Engineer in accordance with Section 1-05.3 for the
Hydrodynamic Separator Vault – 22 Ft. X 14 Ft. X 12 Ft. prior to ordering and installing the
system. The submittal shall include materials of construction, dimensions, specifications,
and configuration related to other proposed aspects of construction.
The submittal for the Flow Splitter Vault – 22 Ft. X 14 Ft. X 12 Ft. shall include a submittal
for the access hatches.
Access Hatches shall be LW Products Company HHS-3A, or approved equal.
To be considered equal, the access hatches shall:
· meet or exceed H-30 load rating;
· be aluminum;
· have internal secondary fall protection grating;
· be single-leaf door;
· be lockable with a padlock.
7-05.3 Construction Requirements
Section 7-05.3 is supplemented with the following:
The Contractor shall arrange and attend a Treatment Vault – 224 Ft. X 20 Ft. X 10 Ft. Pre-
construction Meeting with a representative from the Treatment Vault manufacturer and City
personnel to review the manufacturer installation instructions and procedures.
The Contractor shall arrange for progress inspections and a final inspection by the
manufacturer representative during installation of the Treatment Vault – 224 Ft. X 20 Ft. X
10- Ft.
Connection to manholes or catch basins for storm sewer pipe less than 24-inch in diameter
shall be “Kor-n-Seal” boot or approved equal.
Sanitary sewer pipe to sanitary sewer manhole connections shall be “Kor-n-Seal” boot or
approved equal.
7-05.3(1) Adjusting Manholes and Catch Basins to Grade
Section 7-05.3(1) is supplemented with the following:
Monroe Ave Infiltration Facility SP-128 Special Provisions
City of Renton
The Contractor shall adjust all utility covers, including catch basins, gas valve boxes, water
valve boxes, and monument cases.
All manholes and catch basins shall be adjusted to grade. The Contractor shall adjust the
manholes and catch basins with concrete adjusting rings, brick and mortar in accordance
with the City’s standards.
Where utility covers fall within the sidewalk, the cover shall be replaced with a slip-resistant
cover, or coated with a slip-resistant coating, meeting ADA standards.
Section 7-05.3 is supplemented with the following:
7-05.3(5) Treatment Vault – 224 Ft. X 20 Ft. X 10 Ft.
Treatment Vault – 224 Ft. X 20 Ft. X 10 Ft. shall be constructed to the size, type, elevations
and grades as indicated in the plans and details. The structure shall be installed to include
all required or necessary appurtenances, treatment elements, and connection to properly
treat the surface drainage as recommended by the manufacturer.
The Contractor shall submit product information, specifications, and configuration related to
other proposed aspects of construction to the Engineer for approval prior to ordering and
installing the system.
The Grated Vault Top must be able to support pedestrian loading, and meet the
requirements included in Section 6-03.
Section 7-05.3 is supplemented with the following:
7-05.3(6) Flow Splitter Vault – 10 Ft. X 10 Ft. X 8 Ft.
Flow Splitter Vault – 10 Ft. X 10 Ft. X 8 Ft. shall be constructed to the size, type, elevations,
and grades indicated on the plans and details. The structure shall be installed to include all
required or necessary lids, hatches, appurtenances, internal weir, and connections to inlet
and outlet pipes. Hatches shall be adjusted to finished grade.
Section 7-05.3 is supplemented with the following:
7-05.3(7) Infiltration Chamber Manifold Vault – 27 Ft. X 7.5 Ft. X 7 Ft.
Infiltration Chamber Manifold Vault – 27 Ft. X 7.5 Ft. X 7 Ft. shall be constructed to the size,
elevations, and grades indicated on the plans and details. The structure shall be installed to
include all required or necessary lids, hatches, appurtenances, ladders, internal weirs,
connections to inlets and outlet pipes. Hatches shall be adjusted to finished grade.
Section 7-05.3 is supplemented with the following:
7-05.3(8) Hydrodynamic Separator Vault – 22 Ft. X 14 Ft. X 12 Ft.
Hydrodynamic Separator Vault – 22 Ft. X 14 Ft. X 12 Ft. shall be constructed to the size,
type, elevations, and grades indicated on the plans and details. The structure shall be
installed to include all required or necessary lids, hatches, appurtenances, treatment
elements, and connections to properly treat the surface drainage as recommended by the
manufacturer. The Hydrodynamic Separator Vault must have the Washington State
Department of Ecology TAPE GULD certification for pretreatment for the online WQ flowrate
of 22.6cfs and offline WQ flowrate of 12.6cfs. The Hydrodynamic Separator Vault shall also
be designed to be able to bypass flows up to the 100-year flowrate of 125.7cfs. Hatches
shall be adjusted to finished grade.
Monroe Ave Infiltration Facility SP-129 Special Provisions
City of Renton
Section 7-05.3 is supplemented with the following:
7-05.3(9) Connection to Drainage Structure
This Work consists of connecting a new catch basin structure to the existing 36 In. Diam.
storm sewer pipe within Monroe Ave. NE. Work shall include cutting and removing the
existing pipe and furnishing and installing pipe couplers and replacement of pipe segments
as required to connect to the north and south sides of new catch basin structure. Connection
of dissimilar pipe materials shall be made per WSDOT Std Plan B-60.20-02 Heat Shrink
Option with Marmac Coupler, or approved equal.
The existing conveyance system shall be kept in operation at all times and the necessary
precautions shall be taken to prevent debris or other material from entering the sewer,
including a tight pipeline bypass if required. Water used for flushing and testing shall not be
allowed to enter the sewer. All damage to the existing pipe resulting from the Contractor’s
operation shall be repaired at no expense to the Contracting Agency.
Section 7-06 is added as follows:
7-06 STORMWATER INFILTRATION FACILITY
7-06.1 Description
This Work consists of constructing Stormwater Infiltration Facility in at the location shown in
the Plans.
The following quantities of materials are anticipated for the facility and are listed only for the
convenience of the Bidder in determining the volume of work and are not guaranteed to be
accurate. Bidders shall verify these quantities prior to submitting a bid. The actual quantities
required may deviate from those listed. Materials include but are not limited to:
· Number of chambers Stormtech MC-7200 [MC-4500]: 896 [1430]
· Number of end caps: 76
· Solid locking circular catch basin lids
· Isolator Row Woven Geotextile: approx. 3530 square yards
· Non-woven geotextile for Underground Drainage: approx. 7200 square yards
· 24” Diam. Polypropylene manifold pipes, including bedding material
· Flared End Ramp: 16
· Various couplings, elbows, and manifold items
· Inspection Ports and cover boxes: 3 each
7-06.2 Materials
The Contractor shall submit Type 3E Working Drawings for the Stormwater Infiltration
Facility chamber system.
Infiltration Chambers and End Caps
Infiltration Chambers shall be fabricated according to the dimensions shown on the Plans.
Chambers shall conform to the requirements of ASTM F 2418, “Standard Specifications for
Polypropylene (PP) Corrugated Stormwater Collection Chambers” and ASTM F 2787,
“Standard Practice for Structural Design of Thermoplastic Corrugated Wall Stormwater
Collection Chambers.
The chamber product used for layout in design was Stormtech MC-4500. MC-7200
chambers are also acceptable.
Monroe Ave Infiltration Facility SP-130 Special Provisions
City of Renton
Chamber rows shall provide continuous, unobstructed internal space with no internal
support panels that would flow or limit access for inspection and maintenance. The
structural design of the chambers, the structural backfill and the installation requirements
shall ensure that the load factor specified in the AASHTO LRFD Bridge Design
Specifications.
Design Specifications section 12.12 are met for:
1. long-duration dead loads and
2. short-duration live loads, based on the AASHTO Design Truck with consideration for
impact and multiple vehicle presences.
Only chambers that are approved by the engineer will be allowed. The contractor shall
submit three sets of the following to the engineer for approval before delivering chambers to
the project site:
1. A structural evaluation by a licensed structural engineer that demonstrates that the
load factor specified in the AASHTO LRFD Bridge Design Specifications, Section
12.12 are met.
2. Structural cross section detail on which the structural cross section is based.
Infiltration Gravel
Infiltration Gravel shall conform to Infiltration Gravel as specified in Special Specification 9-
03.16.
Geotextiles
Geotextile surrounding the infiltration gravel shall be Non-Woven Geotextile for
Underground Drainage, Moderate Survivability, Class C Per WSDOT 9-33.2(1) Tables 1 and
2.
Geotextile placed underneath the primary and secondary isolator chambers shall be a
woven geotextile that meets the following a minimum roll average values:
· Weight 8.0 oz
· CBR Puncture Resistance of 1,124 lbs,
· Trapezoidal Tear Strength of 200lbs,
· Grab Tensile Strength of 325 lbs,
· Grab Elongation of 15%
7-06.3 Construction Requirements
The Contractor shall arrange and attend a Stormwater Infiltration Facility Pre-construction
Meeting with a representative from the Chamber Manufacturer and City personnel to review
the manufacturer installation instructions and procedures.
The Contractor shall arrange for progress inspections and a final inspection by the
manufacturer representative during installation of the Stormwater Infiltration Facility.
Inspection ports shall be installed as shown on the Plans prior to backfilling.
Subgrade Preparation and Subbase
Installation of the facility shall be performed according to the chamber manufacturer’s latest
installation guidelines. The performance of the infiltration facility is highly dependent upon
avoiding compaction of the soils beneath the infiltration facility. The Contractor shall develop
Monroe Ave Infiltration Facility SP-131 Special Provisions
City of Renton
a plan to minimize compaction beneath the facility. The Engineer must approve this plan
prior to facility excavation.
Pilot Infiltration Testing
To verify infiltration performance of soils at the base of the excavation, the Contractor shall
supply water for four Pilot Infiltration Tests (PITs) that will be field directed and administered
by the Engineer and geotechnical representative at locations within the infiltration facility
footprint. The Contractor shall coordinate with the Engineer for PITs and provide one week
advance notice to the Engineer prior to PITs which must occur prior to backfill within the
excavation. The Work is estimated to require an excavator and operator for two days.
Infiltration Gravel Compaction
Infiltration Gravel shall be installed in 2-foot maximum horizontal lifts and compacted with
following WSDOT Standard Specification 2-03.3(14)C Method A.
7-08 GENERAL PIPE INSTALLATION REQUIREMENTS
7-08.3 Construction Requirements
7-08.3(1) Excavation and Preparation of Trench
7-08.3(1)A Trenches
Section 7-08.3(1)A is supplemented with the following:
Insert the following into paragraph one, after the first sentence:
The length of open trench on streets shall be a maximum of 200 linear feet.
7-08.3(1)C Bedding the Pipe
Section 7-08.3(1)C is supplemented with the following:
Pipe bedding for plastic sewer pipe shall consist of clean, granular pea gravel consistent
with Section 9-03.12(3). It shall be placed to a depth of 6" over and 6" under the exterior
walls of the pipe.
For all pipe bedding, hand compaction of the bedding materials under the pipe haunches will
be required. Pipe bedding should provide a firm uniform cradle for support of the pipes.
Prior to installation of the pipe, the pipe bedding should be shaped to fit the lower part of the
pipe exterior with reasonable closeness to provide uniform support along the pipe. Hand
compaction shall be accomplished by using a suitable tamping tool to firmly tamp bedding
material under the haunches of the pipe. Care shall be taken to avoid displacement of the
pipe during the compaction effort.
Pipe bedding material should be used as pipe zone backfill and placed in layers and tamped
around the pipes to obtain complete contact.
Bedding material shall meet the requirements of Gravel backfill for Pipe Zone Bedding in
accordance with Standard Specification Section 9-03.12(3). Pipe bedding shall be
considered incidental to the pipe and no further compensation shall be made.
7-08.3(2)B Pipe Laying – General
Section 7-08.3(2)B is supplemented with the following:
Monroe Ave Infiltration Facility SP-132 Special Provisions
City of Renton
Checking of the invert elevation of the pipe may be made by calculations from
measurements on the top of the pipe, or by looking for ponding of 1/2" or less, which
indicates a satisfactory condition. At manholes, when the downstream pipe(s) is of a larger
size, pipe(s) shall be laid by matching the (eight-tenths) flow elevation, unless otherwise
approved by the Engineer.
All pipe, fittings, etc. shall be carefully handled and protected against damage, impact
shocks, and free fall. All pipe handling equipment shall be acceptable to the Engineer. Pipe
shall not be placed directly on rough ground but shall be supported in a manner, which will
protect the pipe against injury whenever stored at the trench site or elsewhere. No pipe
shall be installed where the lining or coating show defects that may be harmful as
determined by the Engineer. Such damaged lining or coating shall be repaired, or a new
undamaged pipe shall be furnished and installed.
The Contractor shall inspect each pipe and fitting prior to installation to insure that there are
not damaged portions of the pipe. Any defective, damaged, or unsound pipe shall be
repaired or replaced. All foreign matter or dirt shall be removed from the interior of the pipe
before lowering into position in the trench. Pipe shall be kept clean during and after laying.
All openings in the pipeline shall be closed with watertight expandable type sewer plugs at
the end of each day's operation, or whenever the pipe openings are left unattended. The
use of burlap, wood, or other similar temporary plugs will not be permitted.
Where necessary to raise or lower the pipe due to unforeseen obstructions or other causes,
the Engineer may change the alignment and/or the grades. Except for short runs, which
may be permitted by the Engineer, pipes shall be laid uphill on grades that exceed 10
percent. Pipe, which is laid on a downhill grade, shall be blocked and held in place until
sufficient support is furnished by the following pipe to prevent movement.
Unless otherwise required, all pipe shall be laid straight between the changes in alignment,
and at uniform grade between changes in grade. For concrete pipes with elliptical
reinforcement, the pipe shall be placed with the minor axis of the reinforcement in a vertical
position.
Immediately after the pipe joints have been made, proper gasket placement shall be
checked with a feeler gage as approved by the pipe manufacturer to verify proper gasket
placement.
7-08.3(2)E Rubber Gasketed Joints
Section 7-08.3(2)E is supplemented with the following:
Care shall be taken by the Contractor to avoid over pushing the pipe and damaging the pipe
or joint system. Any damaged pipe shall be replaced by the Contractor at Contractor’s
expense.
END OF DIVISION 7
Monroe Ave Infiltration Facility SP-133 Special Provisions
City of Renton
DIVISION 8
MISCELLANEOUS CONSTRUCTION
8-01 EROSION CONTROL AND WATER POLLUTION CONTROL
8-01.1 Description
Supplement this section with the following:
Temporary Construction Access Road
Geotechnical recommendations indicate that the existing site subgrade material contains a
high concentration of fines and clays that will become hydric and plastic during wet weather.
To prevent destabilization of the subgrade and mobilization of fines that could damage the
infiltration zone, the Geotechnical Report recommends installation of a temporary
construction access road with geogrid to provide a lasting access surface.
The Temporary Construction Access Road shall be constructed per the Plans and include a
biaxial geogrid with a 6” Crushed Surfacing Top Course wearing course.
Temporary Slope Protection
The existing cut slopes on site shall be protected and maintained by the Contractor during
the duration of the project to ensure that there isn’t onsite erosion, slope sloughing, or
movement of fines into the bottom of the infiltration zone. The Contractor shall maintain the
existing TESC BMPs in-place at start of Project. The Contractor shall also adjust the existing
TESC BMPs as necessary throughout the Project. The Contractor shall also furnish and
install additional BMPs as necessary, including but not limited to the following:
· Slope Installation of Nets and Blankets per City of Renton Standard Plan 213.20.
· Straw Wattles per City of Renton Standard Plan 213.40.
· Quarry Spalls and Permeable Ballast per WSDOT Standard Specifications 9-13
· Construction Geotextile per WSDOT Standard Specifications 9-33.
· Biodegradable Erosion Control Blanket for Slopes Steeper than 3:1 (H:V) per
WSDOT Standard Specifications 9-14.6(2)A
Geotechnical recommendations include stockpiling 150 CY of Quarry Spalls onsite to be
able to address any slope erosion in a timely manner.
8-01.2 Materials
Supplement this section with the following:
Temporary Construction Access Road
Crushed Surfacing Top Course – Per WSDOT Standard Specification 9-03.9(3).
Biaxial Geogrid – Integrally Formed Biaxial Polypropylene Geogrid with Minimum Average
roll values as follows:
· Aperture dimensions: 1-Inch
· Rib Thickness: 0.05-Inch
· Tensile Strength @ 2% Strain: 410 lb/ft
· Tensile Strength @ 5% Strain: 810 lb/ft
· Ultimate Tensile Strength: 1310 lb/ft
(Tensar BX1200 (or approved Equal))
Monroe Ave Infiltration Facility SP-134 Special Provisions
City of Renton
8-01.3 Construction Requirements
8-01.3(1) General
8-01.3(1)A Submittals
8-01.3(1)A1 Temporary Erosion and Sediment Control Plan
Supplement this section with the following:
The Contractor shall prepare a Stormwater Pollution Prevention Plan (SWPPP). The Plan
shall comply with City of Renton erosion and sediment control requirements. See City of
Renton’s 2022 Construction Stormwater Pollution Prevention (CSWPP) Standards for
details.
8-01.3(8) Street Cleaning
Section 8-01.3(8) is supplemented with the following:
The Contractor shall be responsible for controlling dust and mud within the project. The
Contractor shall be prepared to use watering trucks equipped with high-velocity water jets
and low-head sprinkling devices, power sweepers, and any other pieces of equipment
necessary to avoid creating a nuisance. All streets used by the Contractor during the
execution of the work under this contract shall be maintained in a clean condition. Any
damage caused by dust and/or mud shall be the sole responsibility of the Contractor. In no
case shall sediment-laden water be allowed to enter drainage facilities without prior filtration
or sedimentation.
The roadways shall be swept daily and as needed, and kept in a clean condition.
All costs associated with Street Cleaning and Sweeping shall be incidental to the various
bid items.
8-01.3(9)A2 Silt Fence
Section 8-01.3(9)A2 is supplemented with the following:
The Contractor shall obtain approval from Engineer for silt fence location prior to installation.
Silt fence location may vary depending on weather conditions.
8-01.3(9)D Inlet Protection
Section 8-01.3(9)D is supplemented with the following:
Inlet protection can be in the form of internal devices and shall be installed prior to clearing,
grubbing, or earthwork activities. Catch Basin Inserts shall be installed on all new Catch
Basins that are constructed as part of this contract.
When the depth of accumulated sediment and debris reaches approximately one-half the
height of an internal device or one-third the height of the external device (or less if so
specified by the manufacturers), the deposits shall be removed and stabilized on site.
Catch basin inserts shall be installed at all catch basins within project limits and those
immediately downstream of the project site that could possibly receive sediment laden runoff
from the site. They shall be installed and meet the requirement of the detail in the Plans.
Simply placing a piece of geotextile under the catch basin grate is not acceptable.
Monroe Ave Infiltration Facility SP-135 Special Provisions
City of Renton
Catch basin inserts shall be installed, maintained, inspected, and removed by the Contractor
per the Standard Specifications and as recommended by the manufacturer.
Inlet protection devices shall be regularly cleaned at the discretion of the Engineer. The
cost of this cleaning is incidental to other items of Work.
8-01.3(16) Removal
The first paragraph of Section 8-01.3(16) is revised to read:
The Contractor shall remove all temporary BMP’s and all associated hardware from the
project limits prior to Physical Completion unless otherwise approved by the Engineer.
Physical Completion is at the sole discretion of the Engineer and will require the following:
1. All other Work required for Contract Completion has been completed.
2. All Work required for compliance with the CSWGP has been completed to the
maximum extent possible. This includes removal of BMPs that are no longer needed
and the site has undergone all stabilization identified for meeting the requirements of
Final Stabilization in the CSWGP.
3. An Equitable Adjustment change order for the cost of Work that has not been
completed by the Contractor.
Add New Section 8-01.3(17) as follows:
8-01.3(17) Protection of Existing Trees and Shrubs
The Contractor shall carefully protect existing trees and shrubs not specifically protected
with high visibility fence during the course of construction against cutting, breaking or
skinning of roots, skinning or bruising of bark. The Contractor shall plan all operations so as
to avoid creating situations in which trees and shrubs may be damaged. Notify the Engineer
if construction may damage trees and shrubs. The Contractor shall not proceed with Work
until directed by the Engineer.
Root Protection
Cut exposed roots clearly and keep moist with straw mulch and burlap or equivalent during
the time trenches are open. Hand dig trenches in areas with extensive roots. Roots larger
than 3" in diameter shall be left intact and the Engineer notified for instructions on how to
proceed.
Damages for Loss or Injury to Existing Trees and Shrubs to Remain
The Contractor will be assessed damages equal to triple the value of the vegetation as
determined in the Guide for Plant Appraisal, Current Edition, published by the International
Society of Arboriculture or the estimated cost of restoration with a similar species. Shrub,
ground cover, and herbaceous plant values will be determined using the Cost of Cure
Method. Damage so assessed will be deducted from the monies due or that may become
due the Contractor.
8-02 ROADSIDE RESTORATION
8-02.2 Materials
Section 8-02.2 is supplemented with the following:
Landscape Mulch shall be Cedar Grove Landscape Mulch or approved equal by Engineer
conforming to the material description in Section 9-14.5(4) of these Special Provisions.
Monroe Ave Infiltration Facility SP-136 Special Provisions
City of Renton
Root Barrier shall be DeepRoot 36-inch Universal Guide or approved equal. To be approved
as equal, the product shall meet the following requirements:
a. Material: black, recyclable, injection molded panel manufactured with 100%
reprocessed homopolymer polypropylene with added ultraviolet inhibitors.
b. Dimensions: 0.08” (2.032 mm) wall thickness in modules 24” (609 mm) long and 36"
(457 mm) deep.
c. Additional specifications:
i. Integral molded ½” raised 90° root-deflecting ribs;
ii. Integral C-and-T joint system for panel connections.
_- Man Landscape Boulders shall meet the requirements in these Special Provisions
Section 9-03.22. Contractor shall submit proposed materials for Engineer approval and
acceptance prior to bringing material to site.
8-02.3 Construction Requirements
Section 8-02.3 is supplemented with the following:
Root Barrier:
1. Assemble the appropriate number of root barrier panels using Zipper Joining
System.
2. Trench immediately adjacent to hardscape to the appropriate depth for installation of
specified root barrier so that top of barrier is ½”-1” (12.7mm to 25.4mm) above
finished soil grade.
3. Place root barrier in trench, vertical ribs facing toward planting area and tree roots.
4. Where possible, use hardscape as a guide for root barrier alignment.
5. Backfill adjacent planting soil against the root barrier to promote clean fit to
hardscape. Fill to finish grade per project specifications.
8-02.3(1) Responsibility During Construction
This section is supplemented with the following:
Dumping or stockpiling of topsoil, compost, or wood chip mulch shall not be allowed on
roadway surfaces.
The Contractor shall locate all underground utilities (both new and existing) prior to starting
work and shall not disturb or damage them. Promptly notify the Engineer of any conflict
between the proposed work and any obstructions. The Contractor shall be responsible for
making any and all repairs for damage caused by their activities.
8-02.3(8)A Dates and Conditions for Planting
This section is supplemented with the following:
The Contracting Agency shall reserve the option of selecting and inspecting plant material at
the nursery. The Contractor shall provide the Contracting Agency with at least one week
notice prior to preparing plants for shipping and delivery. The Contractor shall neither
deliver to site nor install plant materials until authorized by the Contracting Agency.
Cold storage of plants shall not be permitted.
Monroe Ave Infiltration Facility SP-137 Special Provisions
City of Renton
If planting is delayed more than 24 hours after delivery, set balled and burlapped plants on
the ground, well protected with soil or wet peat. Adequately cover all roots of bare root
material with soil or wet peat. Protect rootballs from freezing, sun, drying winds or
mechanical damage. Water plant material as necessary until planted.
Plants shall not be stored for more than one week. Longer storage period at project site will
result in rejection of plant materials by the Contracting Agency.
All plant material shall be legibly tagged. Tagging may be by species or variety with
minimum of one tag per ten trees, shrubs, groundcovers. Remove all tagging prior to final
acceptance.
8-02.3(8)B Plant Installation
This section is supplemented with the following:
All trees, shrubs, and groundcovers shall be planted as detailed on the Plans.
Scarify sides and bottom of all planting pits prior to planting. Sufficient planting soil shall be
placed around the plant and compacted so as to ensure that the location of the ground line
at the top of the root ball is the same as the nursery.
Plant trees upright and face to give best appearance or relationship to adjacent structures
and hold rigidly in position until planting soil has been backfilled and tamped firmly around
the root ball or roots.
Balled and burlapped plants shall be placed in the planting pits with the burlap intact; then
the binding shall be removed and all of the burlap or cloth wrapping materials shall be
removed from the root ball. Remove all plastic, twine and ropes. The plant shall be rejected
if the root ball is cracked or broken during removal of wrapping or during the planting
process.
When the pit is backfilled halfway, place the specified quantity of fertilizer in planting pit,
unless otherwise specified on the plans. Evenly spread fertilizer adjacent to the root system
at a depth that is between the middle and the bottom of the root system. Do not injure root
system. Place and compact planting topsoil carefully to avoid injury to roots; fill all voids.
When pit is three-quarters (3/4) backfilled, completely fill with water and allow water to soak
away. If water does not drain within ½ hour notify Engineer; tree planting pits which do not
drain properly may require drainrock sump to facilitate drainage. Fill pits with additional soil
to finish grade and continue backfilling as detailed on plans.
8-02.3(10) Lawn Installation
8-02.3(10)C Lawn Establishment
Section 8-0.3(10)C has been deleted and replaced:
8-02.3(10)C1 Lawn Establishment and Final Acceptance
The Contractor shall maintain all new lawn areas, inclusive of the playfield, in this project;
shall be responsible for the survival of turf in acceptable condition and shall maintain all new
lawn areas in a neat and orderly fashion until Final Acceptance of the project by the City.
The period for Final Acceptance shall be no sooner than the second mowing. The
Monroe Ave Infiltration Facility SP-138 Special Provisions
City of Renton
Contractor will be held responsible for all damage or loss caused by their inattention or
carelessness. The Contractor shall repair damage caused by traffic, vandalism, weather or
other outside causes.
8-02.3(10)C2 Establishment Period
The Establishment Period will commence on the date of Preliminary Acceptance and will
extend to Substantial Completion or Final Acceptance by the City of landscape work,
whichever is later. Maintenance during this period will include:
1. Watering: Water areas of new turf so they receive adequate water for survival of the
plant in a healthy position.
2. Lawns shall be fertilized every six weeks from March through September per
Grower’s written recommendations. Lawns shall be maintained weed-free.
3. Lawns are to be mowed weekly or as needed to maintain a neat appearance. All
grass clippings shall be removed from the site. Maximum height of lawn shall not
exceed three inches.
4. Protect all lawn areas against damage, including erosion and trespassing, by
providing and maintaining proper safeguards.
5. Debris Control: Debris control shall be accomplished in all landscaped lawn areas
on a regular basis, at least weekly or more often where necessary. This will include
leaf fall control in Fall period. Policing for paper and litter in all areas shall be
conducted at least weekly. During the Fall period leaves, windblown into gutters and
catch basins, are considered as litter and shall be removed as debris.
8-02.3(10)C3 Guarantee
All new turf areas shall be guaranteed by the Contractor to be in a healthy condition for a
period of one year from the date of Final Acceptance.
8-02.3(10)C4 Final Acceptance
Acceptance of lawn planting as specified shall be based on a uniform stand of grass and a
uniform grade at the time of final inspection.
Final inspection of the work of the Section will be made at the time of the Final Inspection of
the entire project or earlier, if approved by the Engineer. A final punch list will be issued.
Final Acceptance of the new turf areas which are the responsibility of the Contractor will be
contingent upon Final Acceptance of the entire project or at the determination of the City if
earlier than Final Acceptance of the entire project.
8-04 CURBS, GUTTERS, AND SPILLWAYS
8-04.1 Description
Section 8-04.1 is supplemented as follows:
Cement Concrete Traffic Curb shall be constructed per City of Renton Standard Plan 101.
Cement Concrete Rolled Curb shall be constructed per detail shown in the Plans.
Cement Concrete Curb and Gutter shall be constructed per City of Renton Standard Plan
101.
Monroe Ave Infiltration Facility SP-139 Special Provisions
City of Renton
8-06 CEMENT CONCRETE DRIVEWAY ENTRANCES
8-06.1 Description
Section 8-06.1 is supplemented as follows:
Cement Concrete Driveway Entrance shall be constructed per City of Renton Standard Plan
104.4.
8-12 CHAIN LINK FENCE AND WIRE FENCE
8-12.2 Materials
Section 8-12.2 is supplemented as follows:
Epoxy resin shall conform to Section 9-26.1.
Black Vinyl Chain Link Fence
Black Vinyl Chain Link Fence will meet City of Renton Standard Plan 234.6.
Chain link fence shall be black in color.
Fence fabric shall be 9 gage core wire, galvanized with a minimum of 0.8 ounce per square
foot of surface area and coated with an ultraviolet-insensitive plastic or other inert material at
least 2 mils in thickness. Any pretreatment or coating shall be applied in accordance with the
manufacturer’s written instructions. The Contractor shall provide the Engineer with the
manufacturer’s written specifications detailing the product and method of fabrication.
Posts and hardware shall be galvanized and powder coated.
Nuts and washers shall be field painted after installation.
Fence fabric coating, powder coating and paint colors shall match.
Samples of the coated fencing materials shall be approved by the Engineer prior to
fabrication.
The Contractor shall supply the Engineer with 10 aerosol spray cans containing a minimum
of 14 ounces each of paint of the color specified and approved above. The touch-up paint
shall be compatible with the coating system.
Chain Link Fence w/ Privacy Slats
Chain link fence with privacy slats shall match the existing fence onsite.
Contractor to submit Shop Drawings to Engineer for approval of Chain Link Fence w/
Privacy Slats.
Double 20-Ft. Wide Chain Link w/ Privacy Slats Gate
Double 20-Ft. Wide Chain Link w/ Privacy Slats Gate shall match the existing fence style
onsite.
The Double 20-Ft. Wide Chain Link w/ Privacy Slats Gate shall be installed in the location
per plans.
Monroe Ave Infiltration Facility SP-140 Special Provisions
City of Renton
Contractor to submit Shop Drawings to Engineer for approval of Double 20-Ft. Wide Chain
Link w/ Privacy Slats Gate.
8-12.3 Construction Requirements
Section 8-12.3 is supplemented as follows:
The post blockouts shall be formed with a steel sleeve of the diameter and thickness
specified in the Plans. The steel sleeve shall be galvanized after fabrication in accordance
with AASHTO M 111. The Contractor shall fill the bottom portion of the railing post with
expanded polystyrene as shown in the Plans.
The Contractor shall install the steel posts in the post blockouts as shown in the Plans. The
posts shall be installed vertically, set in position with epoxy resin, and braced to maintain the
vertical position until the epoxy resin hardens.
Longitudinal members shall be connected to the steel posts as shown in the Plans.
The Contractor shall install the chain link fence fabric in accordance with Section 8-
12.3(1)D, except as otherwise noted. The chain link fence fabric shall be fastened to the
posts and longitudinal members at a maximum spacing of 14 inches.
Chain Link Fence w/ Privacy Slats and Double 20-Ft. Wide Chain Link w/ Privacy Slats Gate
Construct Chain Link Fence w/ Privacy Slats and Double 20-Ft. Wide Chain Link w/ Privacy
Slats Gate per Contractor submitted Shop Drawings for Engineer approval.
8-14 CEMENT CONCRETE SIDEWALKS
Section 8-14 is supplemented as follows:
Cement Concrete Sidewalk shall be constructed per City of Renton Standard Plan 102.
Add the following new section:
8-14.3(7) Cold Weather Work
The following additional requirements for placing concrete shall be in effect from November
1 to April 1:
· The Engineer shall be notified at least 24 hours prior to placement of concrete.
· All concrete placement shall be completed no later than 2:00 p.m. each day.
Where forms have been placed and the subgrade has been subjected to frost, no concrete
shall be placed until the ground is completely thawed. At the time, the forms shall be
adjusted and subgrade repaired as determined by the Engineer.
8-20 ILLUMINATION, TRAFFIC SIGNAL SYSTEMS, INTELLIGENT
TRANSPORTATION SYSTEMS, AND ELECTRICAL
Section 8-20 is supplemented as follows:
8-20.1 Description
“Illumination System” shall include the installation of two electrical Type 1 junction boxes,
approximately 55 linear feet of new 4-inch Diameter Schedule 80 PVC Conduit, cable, and
the installation of a new luminaire and luminaire concrete pad, as indicated per Plans.
Monroe Ave Infiltration Facility SP-141 Special Provisions
City of Renton
Installation of luminaire and luminaire concrete pad must follow City of Renton Standard
Plans 117.1, 117.1A, 119 and 120.
Currently there is an existing luminaire in the location of the temporary access road driveway
entrance. In order to access the site from Monroe Ave, the existing luminaire shall be de-
energized and removed including existing footing (included in Removal of Structures and
Obstructions) and the removed luminaire shall be returned to City of Renton Maintenance
Facility.
The new Luminaire shall require a structural concrete footing, detail per Plans.
The new luminaire shall be installed during Stage 2 of work to allow for the temporary
construction entrance.
The Contractor shall coordinate with Engineer to re-energize the new luminaire.
“Adjust Utility Box Covers”
Existing Utility Boxes to be protected during construction at the temporary construction
entrance. Services are not to be interrupted.
Upon restoration of roadway and installation of Cement Concrete Driveway, existing Utility
Box Covers shall be adjusted to finished grade.
8-24 ROCK AND GRAVITY BLOCK WALL AND GABION CRIBBING
8-24.2 Materials
Section 8-24.2 is supplemented as follows:
Gravity block wall blocks shall be rectangular prisms with dimensions 2’-5 ½” by 2’-5 ½” by
4’-11”, except for special blocks which shall be as dimensioned in the Plans. All dimensions
shall be ±1/2”.
Gravity block wall blocks shall be cast with Class 3000 concrete, conforming to the air
content requirements of Section 6-02.3(2)A. Commercial concrete shall not be used. Gravity
block wall blocks will be accepted based on visual inspection, and conformance to Section
6-02.3(9) and the specified concrete strength and air content requirements.
Gravity Block Wall Blocks shall have an interlocking system integrated into their form.
8-24.3(2) Gravity Block Wall
Section 8-24.3(2) is supplemented as follows:
Submittals
The Contractor shall submit working drawings of the gravity block wall to the Engineer for
approval in accordance with Section 6-01.9. The working drawings shall include, but not be
limited to, the following:
1. Plan, elevation, and section views of the wall, showing the layout, batter, and
orientation of the blocks.
Monroe Ave Infiltration Facility SP-142 Special Provisions
City of Renton
2. Dimensions and details of the blocks, including details and locations of block erection
lifting loops and inserts, and the features designed to interlock blocks together if the
blocks have such features.
3. Method and equipment used to erect the blocks.
4. Erection sequence.
The Contractor shall not begin fabricating gravity block wall blocks until receiving the
Engineer’s approval of the working drawing submittal.
Gravity Block Wall Erection
The Gravity Block Wall shall be installed as a method of separation between the Infiltration
Gravel and Non-Infiltration Material Incl. Haul. The Gravity Block Wall is to be installed in
tandem with the placement and compaction of the Infiltration Gravel and Non-Infiltration
Material Incl. Haul. The Gravity Block Wall shall be installed as indicated on the Plans.
A Non-Woven Geotextile for Underground Drainage shall be installed between the Gravity
Block Wall and the Non-Infiltration Material Incl Haul, which will be paid separately.
After excavating for the wall base, the Contractor shall grade the excavation for a width
equal to or exceeding the width of the bottom row of blocks. The base shall be graded to
the base elevation shown in the Plans and working drawings as approved by the Engineer
and shall accommodate the batter of the bottom row of blocks.
Gravity Block Wall shall have a 6-inch leveling course of Crushed Surfacing Top Course;
paid for separately under Bid Item 1-09.14(2)A10 “Crushed Surfacing Top Course” and no
additional payment will be made for the leveling course.
Gravity Block Wall blocks shall be erected vertically and shall have no batter.
The Contractor shall erect the gravity block wall and place the backfill in accordance with the
erection sequence as approved by the Engineer. The top of the gravity block wall shall be
within two inches of the line and grade shown in the Plans. The backfill shall be compacted
in accordance with Section 2-03.3(14)C, Method C.
The Contractor shall repair all large blemishes, honeycombed areas, and chipped surfaces,
(25 square inches and larger) on the exposed face of the erected wall using methods and
materials as approved by the Engineer.
8-26 SWING GATE
Replace Section 8-26 with the following:
8-26.1 Description
Swing gate to be furnished and installed by Contractor. Swing gate to be single arm swing
gate with a gate arm holder.
Contractor shall provide shop drawings to engineer prior to fabrication.
8-26.2 Materials
Materials shall conform to detail shown on the Plans.
Swing gate posts and support pipes to be constructed out of I.P.S. Carbon Steel.
Monroe Ave Infiltration Facility SP-143 Special Provisions
City of Renton
Class 4000 Cement Concrete shall be used for Swing Gate Post Footings.
Sign shall meet all material components per WSDOT Sign Fabrication Manual and Sign
Detail R10-18.
8-26.3 Construction Requirements
Contractor shall submit shop drawings to the Engineer for approval prior to fabrication of
swing gate and sign.
END OF DIVISION 8
Monroe Ave Infiltration Facility SP-144 Special Provisions
City of Renton
DIVISION 9
MATERIALS
9-03 AGGREGATES
9-03.8 Aggregates for Hot Mix Asphalt
9-03.8(7) HMA Tolerances and Adjustments
Item 1 is deleted and replaced with the following:
1. Job Mix Formula Tolerances. After the JMF is determined as required in 5-04.3(7)A, the
constituents of the mixture at the time of acceptance shall conform to the following
tolerances:
Aggregate Percent
Passing
Non-Statistical
Evaluation
Commercial
Evaluation
1”, ¾”, ½”, and 3/8”
sieves
+/- 6% +/- 8%
No. 4 sieve +/-6% +/- 8%
No. 8 Sieve +/- 6% +/-8%
No. 16 Sieve +/- 4% +/- 6%
No. 30 Sieve +/- 4% +/- 6%
No. 50 Sieve +/- 4% +/- 6%
No. 100 Sieve +/- 3% +/- 5%
No. 200 sieve +/- 2.0% +/- 3.0%
Asphalt Binder +/- 0.5% +/- 0.7%
VMA 1.5% below minimum value in 9-03.8(2)
VFA Minimum and maximum as listed in 9-03.8(2)
Va 2.5% Minimum and 5.5% maximum
These tolerance limits constitute the allowable limits as described in Section 1-06.2. The
tolerance limit for aggregate shall not exceed the limits of the control point’s section, except
the tolerance limits for sieves designated as 100% passing will be 99-100.
9-03.14 Borrow
9-03.14(2) Select Borrow
Section 9-03.14(2) is revised as follows:
The table is revised as follows:
Sieve Size Percent Passing
4” 100
2” 75-100
No. 4 50-80
No. 40 25 min
No. 100 2.0-8.0
No. 200 1.0-5.0
All percentages are by weight.
Monroe Ave Infiltration Facility SP-145 Special Provisions
City of Renton
Add the following new section:
9-03.16 Infiltration Gravel
Infiltration Gravel shall be a clean, crushed, and angular washed stone meeting the
AASHTO M43 Designations of either No. 3 or No. 4 gradation.
Infiltration Gravel shall conform to either of the following gradations:
AASHTO Grading
Passing No. 3 No. 4
Sieve Size Min. Max. Min. Max.
2-1/2" 99 100
2" 90 100 99 100
1-1/2" 35 70 90 100
1" 0 15 20 55
3/4” 0 15
1/2" 0 5
3/8” 0 5
No. 100 0 1.0 0 1.0
Infiltration Gravel stone must be hard, strong, and durable. Infiltration Gravel stone must
have an LA Wear (Abrasion) value of less than or equal to 30 to be considered hard stone
by the AASHTO T 96 test method.
All percentages are by weight.
Add the following new section:
9-03.22 Landscape Boulders
Landscape boulders shall be hard, sound and durable material, free from seams, cracks,
and other defects tending to destroy its resistance to weather.
Landscape Boulders shall be from Lynch Creek Quarry in Western Washington, or approved
equal. Boulders shall be light grey in color with blue hues. Boulders shall conform to the
following table:
Rock Size
(_-Man)
Rock Weight
(LBS)
Approximate Size1
(Inches)
3 700 – 2,000 28 - 36
4 2,000 – 4,000 36 - 48
1Approximate Size can be determined by taking the average dimension of the three axes of
the rock, Length, Width, and Thickness, by use of the following calculation: Length + Width
+ Thickness 3 = Approximate Size Length is the longest axis, width is the second longest
axis, and thickness is the shortest axis.
9-05 DRAINAGE STRUCTURES AND CULVERTS
9-05.15(1) Manhole Ring and Cover
Section 9-05.15(1) is supplemented with the following:
Monroe Ave Infiltration Facility SP-146 Special Provisions
City of Renton
All grates and solid covers within the City of Renton Right-of-Way shall have EON lock, Ergo
round covers, or approved equivalent.
9-14 EROSION CONTROL AND ROADSIDE PLANTING
9-14.2 Topsoil
9-14.2(1) Topsoil Type A
Section 9-14.2(1) is supplemented as follows:
Topsoil Type A shall meet the following requirements:
1. Cation exchange capacity (CEC) of Topsoil Type A shall be a minimum of 10
milliequivalents CEC/100 g dry soil (U.S. EPA Method 9081).
2. Organic content greater than 10-percent but less than 15-percent as measured on a
dry weight basis using AASHTO T 267 Determination of Organic Content in Soils by
Loss on Ignition.
3. pH shall be between 6.0 and 7.5.
4. Soluble salt contents shall be less than 3.0 hos/com.
5. Conductivity shall be less than 3 mmhs/cm.
Topsoil Type A shall be 50-percent to 65-percent Sandy Loam and 50-percent to 35-percent
Fine Compost by volume. Sandy Loam shall be as defined by the US Department of
Agriculture Soil Classification System, meeting the requirements of Table 1; and be free of
phyto-toxic materials, and viable seeds, rhizomes or roots of State-listed noxious weeds.
Table 1. Particle Size Analysis for Loam
Sieve Size Percent Passing
¾" 100%
½" 90-100%
3/8" 85-100%
#4 75-90%
#10 55-75%
#20 45-60%
#30 40-55%
#60 20-40%
#100 20-30%
#200 <30%
#270 <25%
2 μm <20%
The Fine Compost shall conform to the requirements of Section 9-14.5(8).
Contractor shall provide certificates, or sufficient documentation, to the City 2 weeks prior to
ordering any compost products for approval by Engineer showing that the supplier sources
meet the following criteria:
1. Produce compost products locally.
2. Are certified by the US Composting Council or an equivalent nationally recognized
organization.
3. Produce compost products that are derived from the City’s solid waste programs and
meet quality standards comparable to standards adopted by the Washington state
Department of Transportation or adopted by rule by the Washington state
Department of Ecology.
Monroe Ave Infiltration Facility SP-147 Special Provisions
City of Renton
Topsoil Type A Submittal Requirements
At least 10 Working Days prior to placement of any soils, the Contractor shall submit the
following test results from an independent accredited soils testing laboratory, for samples
gathered and tested less than 90 days prior. The laboratory analysis shall be with a sample
size of no less than 2 pounds.
1. Grain size analysis results for Sandy Loam. Using method ASTM D422
2. STA / Washington State Department of Transportation Technical Data Sheet for
Compost, from a STA accredited lab.
3. Test results from an accredited soil laboratory for all soil mixes, including the
following parameters:
a. Total and Soluble Nitrogen (NO3 + NH3)
b. Phosphorus
c. Potassium
d. pH
e. Organic Matter % (Loss on Ignition method)
f. Conductivity
g. Calcium
h. Sulfur
i. Boron
4. Recommendations. Fertilizer and amendment recommendations from an accredited
Soil Scientist or Agronomist; for the specified plant type and soil application depth.
5. Mix Samples. Two one (1) gallon samples of each soil mix.
Topsoil Type A Acceptance
Contractor shall not place any soils until the Engineer has reviewed and confirmed the
following:
1. Delivery tickets must show that the full delivered amount of soil matches the product
type, volume and Manufacturer named in the submittals.
The Engineer may inspect any loads of soil and/or delivery tickets on delivery and stop
placement if the delivered soil does not appear to match the submittals; and require
sampling and testing of the delivered soil before authorizing soil placement.
9-14.3 Seed
Section 9-14.3 is supplemented with the following:
The seed mix shall be PT 309 Supreme Mix as manufactured by PT Lawn Seed or
approved equal. The drought tolerant turf type seed mix of the following species,
percentage, and analysis shall be applied at the rates shown below on all areas designated
as Playfield Mix within the project:
Application rate: 7-10 lbs per 1000 square feet
Botanical Name Common Name Percent of
Mixture
Aspire Perennial Ryegrass Lolium perenne Aspire 45%
Sombrero Kentucky Bluegrass Poa pratensis Sombrero 25%
Banfield Perennial Ryegrass Lolium perenne Banfield 15%
Longfellow 3 Chewings Fescue Festuca rubra var commutate
Longfellow 3
15%
Monroe Ave Infiltration Facility SP-148 Special Provisions
City of Renton
Source Identified seed shall be generation four or less. Non-Source Identified seed shall
meet or exceed Washington State Department of Agriculture Certified Seed Standards and
be from within the appropriate genetic zones of the Puget Lowland Ecoregion (2) as defined
by the US Environmental Protection Agency (EPA).
The seed certification class shall be Certified (blue tag) in accordance with WAC 16-302 and
meet the following requirements:
Prohibited Weed 0% max.
Noxious Weed 0% max.
Other Weed 0.20% max.
Other Crop 0.40% max.
The Contractor shall document all Source Identified seed by providing the Association of
Official Seed Certifying Agents (AOSCA) yellow seed label for each species in the mix. Site
Identification Logs can be supplied for collections where the AOSCA yellow label is not
available.
9-14.5(4) Wood Strand Mulch
Delete this section in its entirety and replace with the following:
9-14.5(4) Landscape Mulch
Landscape Mulch shall consist of a uniform blend comprised by 50% Bark Mulch and 50%
Fine Compost. Ninety-five percent of this mixture shall pass through a 1.5-inch sieve. The
Bark Mulch shall be derived from Douglas fire, native pine, Sitka spruce, or
western/mountain hemlock species. It shall not contain bark, resin, tannin, weed seeds,
sawdust, splinters, or other debris/compounds detrimental to plant life. The Bark Mulch
when tested shall be according to WSDOT Test Method T 123 prior to placement. The
compost portion of the mix must comply with the Washington State Department of Ecology
Administrative Code WAC-173-350-220. Landscape Mulch shall be free from: materials toxic
to plant growth, rhizomes, roots, subsoil, or other debris and have a PH range of 6.0 -8.0.
At the Engineer’s request, prior to delivery, the Contractor shall provide the following:
· A 5 gallon sample of the product, for the Engineer’s approval.
END OF DIVISION 9
Public Works Department
MONROE AVE NE INFILTRATION FACILITY PROJECT
CAG-23-316
CONSTRUCITON PLANS
TCETCETCETCETCETCETCETCETCETCETCETCETCE TCE TCE TCE
TCETCETCETCETCETCETCEPORWWHG NRY 2 2023 - 243SP O?PROJECT?33200?3320A?CADD?ACAD?DZJ?C00GZJ LD\RXW NDPH C00VICINITY MAP
CITY OF RENTON, WASHINGTON
City Project No. SWP-27-4080
PHONEAGENCYNAME
CONTACT PERSONNEL
NOT TO SCALE
CONFORMED SET - NOVEMBER 2023
24 :LOORZV RRDG NE SXLWH 200
RHGPRQG :A 052
42522444
ZZZRWDNFRP
JARED MCDONALD CITY OF RENTON 425.430.7293
KEVIN EVANS CITY OF RENTON 425.430.7264
JOE FARAH CITY OF RENTON 206.475.1390
RUSS GASTON OTAK 425.739.4209
SANDY LEEK PUGET SOUND ENERGY-MLM 253.381.7313
DUSTIN WELLER PUGET SOUND ENERGY-206.379.4347
ELECTRIC AND GAS
IAN HULSEY COMCAST 253.254.3817
JESSE PATJENS LUMEN 425.429.5722
BRETT TIETJEN CITY OF RENTON-425.430.6873
INFO SERVICES FIBER OPTIC
MONROE AVE NE INFILTRATION
FACILITY
LOCATION MAP
NOT TO SCALE
PROJECT
LOCATION
PROJECT
LOCATIONNE MONROE AVERE
N
T
O
N
M
A
P
L
E
V
A
L
L
E
Y
R
O
A
DJEFFERSON AVE NEI-405NE 3RD
S
T
NE 2ND ST
NE 4TH ST
R-4000
FUNDED IN PART BY WASHINGTON STATE
DEPARTMENT OF ECOLOGY
NE 4TH ST
INDE; OF DRA:IN*S
SHEET SHEET TITLE DESCRIPTION
C00COVER SHEET
2 C002 LE*END A%%REVIATIONS *ENERAL NOTES
3 C003 SITE .EY PLAN AND PROJECT OVERVIE:
4 C004 CONSTR8CTION SE48ENCIN*
5 C0S8RVEY CONTROL PLAN
C02 S8RVEY CONTROL PLAN
C03 PRE-CONSTR8CTION SITE CONDITIONS
C04 STA*E SITE LO*ISTICS PLAN
C05 STA*E 2 SITE LO*ISTICS PLAN
0 C20STA*E TESC AND DEMOLITION
C202 STA*E TESC AND DEMOLITION
2 C203 STA*E TESC DETAILS
3 C204 STA*E 2 TESC AND DEMOLITION
4 C30STORM:ATER INFILTRATION FACILITY PLAN
5 C302 STORM:ATER INFILTRATION FACILITY SECTION
C303 STORM:ATER INFILTRATION FACILITY SECTION
C30 STORM:ATER INFILTRATION FACILITY DETAILS
C40SITE *RADIN* AND DRAINA*E IMPROVEMENTS PLAN
C402 SITE *RADIN* AND DRAINA*E IMPROVEMENTS PLAN
20 C403 SITE DRAINA*E PROFILES
2C404 SITE DRAINA*E PROFILES
22 C40 TYPICAL STR8CT8RE PLACEMENT DETAIL
23 C4HYDRODYNAMIC SEPARATOR DETAILS
24 C42 FLO: SPLITTER VA8LT AND INFILTRATION CHAM%ER MANIFOLD VA8LT DETAILS
25 C43 TREATMENT VA8LT DETAILS
2C44 TREATMENT VA8LT DETAILS
2C50MAINTENANCE ACCESS ROAD PLAN AND PROFILE
2C502 MAINTENANCE ACCESS ROAD PLAN AND PROFILE
2C50 MAINTENANCE ACCESS ROAD SECTIONS AND DETAILS
2A S00 STR8CT8RES *ENERAL NOTES
30 S0*RATED VA8LT TOP PLAN
3S02 *RATED VA8LT TOP DETAILS
32 S03 *RATED VA8LT TOP DETAILS
33 S04 *RAVITY %LOC. :ALL DETAILS
34 S05 L8MINAIRE FO8NDATION DETAILS
35 L0LANDSCAPE PLAN
3L02 LANDSCAPE DETAILS
11/29/2023
OTAK 33201.A
SHEET:
1121 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 02
2.22.6
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
3RO-ECT N8MBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
3ORWWHG: AXJ 2 2023 6:SP K:?3URMHFW?33200?33201A?CADD?ACAD?DZJ?C002.GZJ LD\RXW NDPH: C002ABBREVIATIONS
RIGHT OF WAY CENTERLINE
RIGHT OF WAY MARGIN
CITY BOUNDARY
CHAIN LINK FENCE
WATER LINE
SEWER LINE (<12")
SEWER LINE (>12")
POWER LINE
AERIAL LINE
GAS LINE
FIBER OPTIC LINE
COMMUNICATION LINE
RAILING (GUARD/HAND)
DRIVEWAY CUTS / HC RAMPS
UNDERGROUND UTILITY STRUCTURES
EDGE OF GRAVEL / DIRT
INTERMEDIATE CONTOUR/GRADE LINE
INDEX CONTOUR/GRADE LINE
SYMBOL LEGEND
COMMUNICATION RISER
COMMUNICATION MANHOLE
ELECTRICAL METER
POWER MANHOLE
GAS VALVE
GAS METER
GAS VAULT
SEWER MANHOLE
CLEANOUT
CATCH BASIN (TYPE 1)
CATCH BASIN (TYPE 2)
STORM DRAIN MANHOLE
WATER MANHOLE
FIRE DEPARTMENT CONNECTION
POST INDICATOR VALVE
IRRIGATION BOX
MAIL BOX
SIGN
TESTPIT
MONITORING WELL
SURVEY CONTROL POINT
SURVEY MONUMENT
PROPERTY LINE
STORM DRAIN LINE (<12")
STORM DRAIN LINE (>12")
CLEARING/GRUBBING LIMITS
SAWCUT LINE
SILT FENCE
WATTLE
////////////////////////UTILITY REMOVAL
[]PEDESTRIAN RAILING
REMOVAL AREA
HMA PAVEMENT
CEMENT CONCRETE
SEE APPLICABLE DISCIPLINE FOR
ADDITIONAL LEGEND
X
TREE PROTECTION/SAFETY RAIL
ABBREVIATION NAME OR PHRASE
AP ANGLE POINT
APPROX.APPROXIMATE
ASSY ASSEMBLY
ASTM AMERICAN SOCIETY FOR TESTING AND MATERIALS
BK.BACK
BLDG BUILDING
BOF BOTTOM OF FOOTING
BOW BOTTOM OF WALL
BRG BEARING
BVCS BEGIN VERTICAL CURVE ELEVATION
BVCE BEGIN VERTICAL CURVE STATION
CB CATCH BASIN
C.G.CENTER OF GRAVITY
C.I.P CAST IN PLACE
C CENTERLINE
CLR.CLEARANCE
CMP CORRUGATED METAL PIPE
CO CLEAN OUT
COMM COMMUNICATION
CONC.CONCRETE
CONST.CONSTRUCTION
CONT.CONTINUE OR CONTINUOUS
COR CITY OF RENTON
CPP CORRUGATED PLASTIC PIPE
CPEP CORRUGATED POLYETHYLENE PIPE
CSBC CRUSHED SURFACING BASE COURSE
CSTC CRUSHED SURFACING TOP COURSE
CTRL CONTROL
DI DUCTILE IRON
DIAM.DIAMETER
DWG DRAWING
DWY DRIVEWAY
E EAST
EA EACH
ELEV. OR EL.ELEVATION
EMBED.EMBEDMENT
ESMT EASEMENT
EVCE END VERTICAL CURVE ELEVATION
EVCS END VERTICAL CURVE STATION
EXIST.EXISTING
EXP.EXPANSION
FD FOUND
FG FINISH GRADE
FIG.FIGURE
FL FLOW LINE (ELEVATION) OR FLANGE
FOC FACE OF CURB
FT FOOT OR FEET
FTG.FOOTING
GALV.GALVANIZED
G.E. OR GR EL GRATE ELEVATION
GIR.GIRDER
GRVL GRAVEL
HDPE HIGH DENSITY POLYETHYLENE
HMA HOT MIX ASPHALT
HORZ.HORIZONTAL
HP HIGH PRESSURE OR HIGH POINT
ID INSIDE DIAMETER
IE INVERT ELEVATION
JT.JOINT
KCRDCS KING COUNTY ROAD DESIGN AND
CONSTRUCTION STANDARDS
LBS.POUNDS
LF LINEAR FEET
LT LEFT
LVC LENGTH OF VERTICAL CURVE
MAX.MAXIMUM
MH MANHOLE
MHW MEAN HIGH WATER
MHHW MEAN HIGH HIGH WATER
MIC MONUMENT IN CASE
MIN.MINIMUM
N NORTH
NE NORTHEAST
NO.NUMBER
NW NORTHWEST
O.C.ON CENTER
O.D.OUTSIDE DIAMETER
ABBREVIATION NAME OR PHRASE
PAV'T PAVEMENT
PC POINT OF CURVATURE
PCC POINT OF COMPOUND CURVE
PCMS PORTABLE CHANGEABLE MESSAGE SIGN
P.E.PLAIN END OR POLYETHYLENE
PI POINT OF INTERSECTION
PP POLYPROPYLENE
P PROPERTY OR PLATE
PRC POINT OF REVERSE CURVE
PROP.PROPOSED
PSI POUND PER SQUARE INCH
PT POINT OF TANGENCY OR POINT
PVC POLYVINYL CHLORIDE
PVI POINT OF VERTICAL INTERSECTION
R RADIUS
REF.REFERENCE
REINF.REINFORCED
RGS RIGID GALVANIZED STEEL
RJ RESTRAINED JOINT
RT RIGHT
R/W RIGHT-OF-WAY
S SOUTH
SD STORM DRAIN
SDMH STORM DRAIN MANHOLE
SE SOUTHEAST
SHT SHEET
SPA.SPACE OR SPACING
SPEC.SPECIFICATIONS
SS SANITARY SEWER
SSMH SANITARY SEWER MANHOLE
STA.STATION
STD STANDARD
STIRR.STIRRUPS
SW SOUTHWEST
SYMM.SYMMETRICAL
TBC TOP BACK OF CURB
TCE TEMPORARY CONSTRUCTION EASEMENT
TEL TELEPHONE
TEMP.TEMPORARY
TESC TEMP. EROSION & SEDIMENT CONTROL
TOC TOP OF CURB
TOW TOP OF WALL
TYP.TYPICAL
VERT.VERTICAL
W WEST
W/WITH
WS WATER SURFACE
WSDOT WASHINGTON STATE DEPARTMENT OF TRANSPORTATION
DESCRIPTIONPROPOSEDEXISTING
SUBSURFACE JUNCTION BOX
SURFACE JUNCTION BOX
PEDESTRIAN POLE
TRAFFIC POLE
TRAFFIC SIGNAL HEAD
LIGHT POLE ORNAMENTAL
STREET LIGHT OR UTILITY POLE W/ LIGHT
LUMINAIRE HEAD
UTILITY POLE
WATER METER
GUY ANCHOR
POWER VAULT
COMMUNICATION VAULT
WATER VALVE
WATER VAULT
FIRE HYDRANT
BOLLARD
CONIFEROUS TREE
DECIDUOUS TREE
TREE REMOVAL
STORM INLET PROTECTION
LINE AND HATCHING LEGEND
ELECTRICAL HANDHOLD
POWER TRANSFORMER
TRAFFIC SIGNAL CABINET
STUMP
PROPERTY ADDRESS OR PARCEL NUMBER
PROPOSED DESCRIPTIONEXISTING
[][][]WOOD FENCE
HIGH VISIBILITY FENCE
HIGH WATER MARK
100 100
98
STABILIZED CONSTRUCTION ENTRANCE
FLOW ARROW
PERMANENT EASEMENT
TEMPORARY CONSTRUCTION EASEMENTTCE
GEOTEXTILE
INFILTRATION FACILITY CHAMBERS
GEOGRID
CRUSHED SURFACING TOP COURSE
C002
2
LEGEND ABBREVIATIONS GENERAL NOTES
R0002
2" CLASS B ASPHALT OVERLAY
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
CCWWWCCCCCCCCCCCCWWCONC. SIDEWALK
CONC. SIDEWALK
GRASS
GRASS
GRASS
GRASSGRASSGRASSCONC. SIDEWALK
S3EED 2
GRASS
GRASS
CONC. SIDEWALK
CONC. SIDEWALK
GRASS
GRASS
CONC. SIDEWALK
CONC. SIDEWALKCONC. SIDEWALK
GRASSGRASSGRASS
DRIVEWAY
DRIVEWAY
DRIVEWAY
DRIVEWAY
GRASS
GRASS
GRASS
DRIVEWAY
DIRT
GRASS
AS3HALT
CHAINLINK FENCE3
CHAINLINK FENCE
CHAINLINK
F
E
N
C
E
GATE
CHAINLINK FENCE
3
CHAINLINK FENCE
4
CHAINLINK FENCE
CHAINLINK FENCE
CHAINLINK FENCE
CHAINLINK FENCE
CHAINLINK FENCE
CHAINLINK FENCE
CHAINLINK FENCE
GAT
E
CHAINLINK FENCE
CHAINLINK FENCE
CHAINLINK FENCE
JERSEY BARRIERS
JERSEY BARRIERS
JERSEY BARRIERS
CHAINLINK FENCE WBARB WIRE
CHAINLINK FENCE WBARB WIRE
CHAINLINK FENCE
AS3HALT6126MONROE AVENUE NE
JEFFERSON AVENUE NE
NE 4TH STREETC103
C204 L01
L04
C01
C02
TREATMENT VAULT
TEMPORARY CONSTRUCTION
EASEMENT
PERMANENT
STORMWATER
EASEMENT
C402
C301 C401
C10 C201
C104
WATER QUALITY STORMWATER
TRUNKLINE (TYP.), 24-INCH
DIAMETER SD
HYDRODYNAMIC
SEPARATOR VAULT
FLOW SPLITTER VAULT
STORMWATER INFILTRATION FACILITY
PRIMARY ISOLATOR ROWS
MAINTENANCE ACCESS
ROAD
INFILTRATION CHAMBER
MANIFOLD VAULT
36-INCH DIAMETER SD
36-INCH DIAMETER SD
STORMWATER
INFILTRATION FACILITY
HIGH-FLOW STORMWATER TRUNKLINE
(TYP.), 36-INCH DIAMETER SD
PROJECT SIGN
C202
24-INCH DIAMETER SD STUB
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 02
42.22.4446
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
3ROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
3ORWWHG: AXJ 2 2023 2:36SP K:?3URMHFW?33200?33201A?CADD?ACAD?DZJ?C003.GZJ LD\RXW NDPH: C003NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C003
3
SITE KEY 3LAN AND 3ROJECT OVERVIEW
R40003
SCALE IN FEET
60 0 60 120
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
270
275
280
285
290
295
300
305
310
315
320
325
330
335
270
275
280
285
290
295
300
305
310
315
320
325
330
335
^
`
^
`
^
`
^
`
^`^`^`^`^`^`^`^`
STAGE 1
STAGE 2
IMPORTED SELECT BORROW
IMPORTED INFILTRATION GRAVEL, PER
SPECIAL PROVISIONS 9-03.16
MIRAFI FW-402 OR APPROVED EQUAL,
PER SPECIAL PROVISIONS SECTION
2-12.
NON-INFILTRATION MATERIAL
STAGE 1 FINISHED
GRADE (315)
MAINTENANCE ACCESS ROAD, SEE SHEETS
C501-C502 FOR LIMITS
INFILTRATION CHAMBER GALLERY,
SEE SHEET C301 FOR LIMITS
OPEN SPACE FIELD, SEE
SHEET C301 FOR LIMITS
PERMANENT STORMWATER
EASEMENT
EXCAVATION LIMITS BY OTHERS,
SEE SHEET C104 FOR DETAILS
EXCAVATION LIMITS BY OTHERS,
SEE SHEET C104 FOR DETAILS
EXCAVATION LIMITS BY OTHERS,
SEE SHEET C104 FOR DETAILS
1
2
1
1.5
FINISHED GRADE
GRAVITY BLOCK WALL FOR SEPARATION
TREATMENT VAULT, SEE SHEETS C413-C414
FOR DETAILS.
TOPSOIL TYPE A
IMPORTED GRAVEL
BACKFILL FOR WALLS
UNDISTURBED NATIVE MATERIAL
TOPSOIL TYPE A
INFILTRATION ZONE NON-INFILTRATION ZONE
NON-WOVEN GEOTEXTILE FOR
UNDERGROUND DRAINAGE,
MODERATE SURVIVABILITY, CLASS
C PER WSDOT 9-33.2(1), (TYP.)
NON-WOVEN GEOTEXTILE FOR UNDERGROUND DRAINAGE,
MODERATE SURVIVABILITY, CLASS C PER WSDOT 9-33.2(1), (TYP.)
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Nov 28, 2023 - 3:32pm O:\PROJECT\33200\33201A\CADD\ACAD\Dwg\C004.dwg Layout Name: C004C004
4
CONSTRUCTION SEQUENCING
R-408004
GENERAL NOTES:
1.INFILTRATION FACILITY BACKFILL WITH IMPORTED INFILTRATION GRAVEL AND SELECT BORROW SHALL BE
PERFORMED PRIOR TO OTHER SITE DISTURBING ACTIVITY. THIS WORK IS FURTHER DESCRIBED BELOW
UNDER STAGE 1 WORK. ONCE THE INFILTRATION FACILITY BACKFILL IS INSTALLED AND STABILIZED, OTHER
ONSITE WORK MAY PROCEED AS DESCRIBED UNDER STAGE 2 WORK. DO NOT DIRECT STORMWATER OR
GROUNDWATER FROM THE CONSTRUCTION SITE OR OFFSITE AREAS TO THE FACILITY UNTIL AFTER THE
SITE HAS BEEN STABILIZED AND THE STORMWATER TREATMENT FACILITIES HAVE BEEN INSTALLED.
2.CONTRACTOR SHALL MINIMIZE TRACKING ACROSS BACKFILL TO THE MAXIMUM EXTENT FEASIBLE.
3.PROTECTION OF THE ENVIRONMENT: NO CONSTRUCTION RELATED ACTIVITY SHALL CONTRIBUTE TO THE
DEGRADATION OF THE ENVIRONMENT, ALLOW MATERIAL TO ENTER SURFACE OR GROUND WATERS, OR
ALLOW PARTICULATE EMISSIONS TO THE ATMOSPHERE WHICH EXCEED STATE OR FEDERAL STANDARDS.
ANY ACTIONS THAT POTENTIALLY ALLOW A DISCHARGE TO STATE WATERS MUST HAVE PRIOR APPROVAL OF
THE WASHINGTON STATE DEPARTMENT OF ECOLOGY
SITE PREPARATION:
1.ATTEND PRE-CONSTRUCTION MEETING WITH CITY.
2.FLAG AND FENCE CLEARING LIMITS AND VEGETATION TO BE PROTECTED PER SHEETS C201, C202, AND C204.
3.INSTALL PERIMETER PROTECTION (SILT FENCES, ETC.) AND TESC BMPS.
4.REMOVE LIGHT POLE SHOWN ON SHEET C201 TO ALLOW FOR INSTALLATION OF CONSTRUCTION ENTRANCE
AND ACCESS ROAD
5.GRADE AND INSTALL CONSTRUCTION ENTRANCE AND ACCESS ROAD.
6.MAINTAIN TESC MEASURES IN ACCORDANCE WITH THE PROJECT SPECIFICATIONS, CITY OF RENTON
STANDARDS, AND MANUFACTURER'S RECOMMENDATIONS.
7.RELOCATE, ADJUST, AND/OR INSTALL ADDITIONAL TESC MEASURES AS REQUIRED TO COMPLY WITH CITY
TESC MINIMUM REQUIREMENTS AS THE SITE CONDITIONS CHANGE.
STAGE 1 WORK:
1.INSTALL GEOTEXTILE AS SHOWN THROUGHOUT STAGE 1 WORK.
2.INSTALL PROJECT SIGN.
3.BACKFILL INFILTRATION ZONE UNDER INFILTRATION FACILITY WITH SELECT BORROW PER PROJECT
SPECIFICATIONS IN 2-FOOT MAX. LIFTS TO ELEVATION SHOWN. SELECT BORROW IS TO BE INSTALLED PER
PROJECT SPECIFICATIONS, AND SHALL NOT RECEIVE VIBRATORY COMPACTION TO MAINTAIN NECESSARY
INFILTRATION RATES.
4.INSTALL GRAVITY BLOCK WALL AS SHOWN ON SHEET S604 IN CONJUNCTION WITH BACKFILLING OF
INFILTRATION AND NON-INFILTRATION ZONES TO PROVIDE SEPARATION.
5.BACKFILL NON-INFILTRATION ZONE WITH NON-INFILTRATION MATERIAL AND COMPACT PER SPECIAL
PROVISIONS 2-03.
6.BACKFILL INFILTRATION ZONE UNDER INFILTRATION FACILITY WITH INFILTRATION GRAVEL (PER PROJECT
SPECIFICATIONS) IN 2-FOOT MAX. LIFTS TO ELEVATION SHOWN. INFILTRATION GRAVEL WILL NOT BE
COMPACTED BY VIBRATORY COMPACTOR WITH THE EXCEPTION OF THE UPPER 3 FEET. THE TOP 3 FEET
SHALL BE COMPACTED TO 90% PROCTOR PER WSDOT METHOD B.
STAGE 2 WORK:
1.INSTALL INFILTRATION CHAMBER GALLERY, CONCRETE MANIFOLD VAULT, AND ASSOCIATED PIPES AND
STRUCTURES.
2.BACKFILL AREA SURROUNDING INFILTRATION CHAMBER GALLERY WITH GRAVEL BORROW.
3.BACKFILL AREA ABOVE STORMWATER INFILTRATION FACILITY GRAVEL WITH GRAVEL BACKFILL FOR WALLS.
4.BACKFILL EXCAVATED AREA WITH NON-INFILTRATION MATERIAL MATERIAL AS SHOWN AND COMPACT PER
SPECIAL PROVISIONS 2-03.
5.INSTALL TREATMENT VAULT AND ASSOCIATED PIPES AND STRUCTURES.
6.CONNECT THE NEW STORM DRAINAGE SYSTEM TO THE STORM DRAINAGE SYSTEM IN MONROE AVE NE.
7.GRADE MAINTENANCE ACCESS ROAD.
8.INSTALL TOPSOIL TYPE A, PER WSDOT 9-14.2(1).
RESTORATION
1.INSTALL CONC. CURB, PAVING, PAVEMENT MARKING, AND SIGNING.
2.INSTALL LUMINAIRE IN LOCATION SHOWN ON SHEET C502.
3.INSTALL FENCING AND GATES.
4.INSTALL LANDSCAPING.
RECOMMENDED CONSTRUCTION
SEQUENCING
LEGEND
SELECT BORROW
INFILTRATION GRAVEL
UNDISTURBED NATIVE MATERIAL
NON-INFILTRATION MATERIAL
PROPOSED PERMANENT EASEMENT LINE
TOPSOIL TYPE A
GRAVEL BORROW
INFILTRATION FACILITY SECTION BY STAGEA
003 H SCALE: 1"=20', V SCALE: 1"=5'
NON-WOVEN GEOTEXTILE FOR UNDERGROUND DRAINAGE, MODERATE
SURVIVABILITY, CLASS C, PER WSDOT STANDARD SPEC 9-33.2(1)
EXISTING FILL MATERIAL
GRAVEL BACKFILL FOR WALLS
^`MIRAFI FW402, OR APPROVED EQUAL, PER SPECIAL PROVISIONS SECTION 2-12.
ADDENDUM NO. 3 CDD 10/02/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
CONFORMED SET - NOVEMBER 2023
CONFORMED SET - NOVEMBER 2023
270
280
272
274
276
278
282
284
290
300
310
320
330
340290300310320330332
334
336 338102
103
104
108
109
110
111
P
C
C
P C
16"
C
PC
C
C
18"
6"
"NO PARKING"
"NO PARKING
ANYTIME"
"NO PARKING
ANYTIME"
"NO PARKING
ANYTIME"
"NO PARKING
ANYTIME"
"NO PARKING
ANYTIME"
"GAS PIPELINE
IN VICINITY"
AB-03 GRASSCONC. SIDEWALK"SPEED 25"GRASSGRASSCONC. SIDEWALKCONC. SIDEWALKGRASSCONC. SIDEWALKGRASSGRASSGRASSDRIVEWAYDRIVEWAYDRIVEWAYGRASSASPHALT4' CHAINLINK FENCE7' CHAINLINK FENCE7' CHAINLINK FENCE
7' CHAINLINK FENCE
7' CHAINLINK FENCE7' CHAINLINK FENCE7' CHAINLINK FENCEGATE7' CHAINLINK FENCE7' CHAINLINK FENCE7' CHAINLINK FENCEJERSEY BARRIERSJERSEY BARRIERSGGGGGGGGGGGGPPPTVTV
TVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTV TVTVWWWWWWWWWWWWWWSD
SD
SDSDSDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSS10" PVC36" CMP10" PVC36" CMP18" CPP
18"
C
P
P
8" CMP8" CMP
36" CMPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPPPPPPPPPPPPPPPTV
TVTVTVTVTVTVTVTVTVTVTVPTVTVTVP
PPPPPPPPPPPPTVTVTVTVTVTVTVTVTVTVTVTVPPPPPTVTVTVTVPPPP2 DUCT BANKS2 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKSATP-03 ATP-04
AHA-01AHA-02
6"8"
12"
6"
115
1
2 (TYP.)
3
EXISTING POWER EASEMENT
EXISTING POWER
EASEMENT
POWERLINE
SAG ELEV: 377.1
POWERLINE SAG
ELEV: 380.7
PROPOSED TEMPORARY
CONSTRUCTION EASEMENT.
PROPOSED PERMANENT
DRAINAGE EASEMENT
4(TYP.)
4
3
5
6
7
TCETCETCETCETCETCETCETCETCETCETCETCETCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE
TCETCETCETCETCETCETCETCETCETCETCETCE-2.0:1
-2.2:1-4.4:1-1.5:1-2.
4
:
1
89
MONROE AVENUE NEJEFFERSON AVENUE NE10
11
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Aug 31, 2023 - 10:44am K:\Project\33200\33201A\CADD\ACAD\Dwg\C105.dwg Layout Name: C105NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
SCALE IN FEET
40 0 40 80
BOTTOM OF AREA EXCAVATED BY OTHERS. THE TERM "EXCAVATED
AREA" IS REPRESENTED BY THE CONTOURS SHOWN ON THIS SHEET.
WATTLES PLACED ON EXCAVATION SLOPE PER COR STD PLAN 213.40
INSTALLED BY OTHERS.
SILT FENCE PER COR STD PLAN 214.00 INSTALLED BY OTHERS.
INTERCEPTOR SWALE PER COR STD PLAN 217.10 INSTALLED BY OTHERS.
SEE INTERCEPTOR SWALE AND SILT FENCE LAYOUT DETAIL ON SHEET
C203.
ROCK SPLASH PAD INSTALLED BY OTHERS.
APPROXIMATE EXTENTS OF STOCKPILE INSTALLED BY OTHERS.
PLASTIC COVERING OVER NON-INFILTRATION ZONE BACKFILL STOCKPILE
PER COR STD PLAN 213.30 INSTALLED BY OTHERS. COVERED MATERIAL
IS MOISTURE SENSITIVE AND SHALL NOT BE EXPOSED, HANDLED OR
USED DURING WET WEATHER
SEDIMENT TRAP AND INFILTRATION POND INSTALLED BY OTHERS PER
DETAIL ON SHEET C203. CONTRACTOR SHALL ADJUST AND MAINTAIN
DURING EARTHWORK. SEDIMENT TRAP AND INFILTRATION POND MUST
BE KEPT TO THE EAST OF THE GRAVITY BLOCK WALL FOOTPRINT.
SLOPE STABILIZATION MAT PER COR STD PLAN 213.20 BY OTHERS.
APPROXIMATELY 20,000 CUBIC YARDS OF MATERIAL SUITABLE FOR USE
AS NON-INFILTRATION ZONE BACKFILL WAS STOCKPILED AND COVERED
BY OTHERS PRIOR TO MOBILIZATION OF CONTRACTOR. CONTRACTOR
SHALL USE THIS MATERIAL FOR BACKFILL IN LIEU OF IMPORTED FILL
DURING DRY WEATHER CONSTRUCTION. SEE SHEET C302 FOR
INFILTRATION ZONE AND NON-INFILTRATION ZONE BACKFILL. SEE
SPECIAL PROVISIONS SECTION 2-03 FOR CONDITIONS OF UNDER WHICH
THIS MATERIAL SHALL BE USED.
DRAINAGE PIPE TO ALLOW FOR SITE DRAINAGE FROM DITCHES
INSTALLED BY OTHERS.
CONSTRUCTION NOTES
2
C103
7
PRE-CONSTRUCTION SITE CONDITIONS
R-408007
GENERAL NOTES
1.ELEVATIONS SHOWN ON THIS SHEET REPRESENT AN
APPROXIMATION OF SITE CONDITIONS TO BE EXPECTED UPON
MOBILIZATION BASED ON AGREEMENT WITH THE PROPERTY
OWNER. ACTUAL CONDITIONS MAY VARY.
2.FINAL GRADING OUTSIDE OF THE PERMANENT EASEMENT AREA
TO BE COMPLETED BY OTHERS. CONTRACTOR SHALL LEAVE
TEMPORARY CONSTRUCTION EASEMENT IN NEAT CONDITION
UPON COMPLETION OF WORK.
3.ALL SLOPES ARE TO BE PROTECTED PRIOR TO AND DURING
EXCAVATION AND FILLING OPERATION OF PIT PER COR
SURFACE WATER DESIGN MANUAL.
4.ALL TEMPORARY EROSION AND SEDIMENT CONTROL
MEASURES SHOWN ON THIS SHEET HAVE BEEN INSTALLED OR
PLACED BY OTHERS DURING EXCAVATION AND GRADING WORK
COMPLETED PRIOR TO THIS CONTRACT. CONTRACTOR SHALL
MAINTAIN AND ADJUST AS NECESSARY DURING THE FILLING OF
THE EXCAVATED PIT.
3
4
5
6
7
1
8
9
10
11
08/31/2023 08/31/2023 CONFORMED SET - NOVEMBER 2023
101102103104105106107108109110111PCCSWWWCCPCPCCDCPCSD CB
TYPE 1
RIM = 345.76
8" CMP (W) IE = 343.81
SUMP = 342.26 DSD MH
60" CONC
RIM = 345.96
8" CMP (E) IE = 339.96
18" CPP (W) IE = 339.36
8" CMP (W) IE = 340.18
36" CMP (N) IE = 332.56
36" CMP (S) IE = 332.56
SD CB
TYPE 1
RIM = 345.84
8" CMP (E) IE = 342.42
SUMP = 340.74 DSD MH
TYPE 2
RIM = 345.59
18" CPP (W) IE = 337.24
36" CMP (N) IE = 332.89
36" CMP (S) IE = 332.69 SSS MH
48" CONC
RIM = 342.20
10" PVC (N) IE = 335.00
10" PVC (S) IE = 334.80 16"CPCCCSD CB
TYPE 1
RIM = 339.66
12" PVC (NE) IE = 337.41
8" CMP (W) IE = 337.31
SUMP = 335.26DSD MH
60" CONC TYPE 2
RIM = 340.13
8" CMP (W) IE = 335.98
8" CMP (E) IE = 335.98
36" CMP (N) IE = 333.05
36" CMP (S) IE = 332.95
SD CB
TYPE 1
RIM = 339.68
8" CMP (E) IE = 336.38
SUMP = 334.58
SDDCP18"6"PWWDSSS MH
RIM = 347.79
10" PVC (N) IE = 334.09
10" PVC (S) IE = 333.89 14"10"18"22"6"14"14"14"12"G G
GG G G G G G G G G G
PTVTVTV
TVTV TV TV TV
GTV TV TV TV TV TV TV TV
TV TV TV TV TV TV TV TV
TV TV TV TV TV TVTVTV TV
TV
TV TV TVPWW
WW W W W W W W W W W W W W W W W W W W W WWWSDSD
SDSDSDSD
SDSDSD
SDSD
SSSSSS
SS
SSSSSSSSSS
SSSSSSSSSS
SSSSSSSSSS
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
PPPPPPPPPPPPPPPP PTV TV TV TV TV TV TV TV TV TV TV
TVTV TV PPPPP
P PPPTVTVTVTVTVTVTVTVTVTVTVTVTV TV TV
PPPPP
TVTVTVTVTV
TVTVTVTV PPPP
P
PP
PP P P P P PPP 2 DUCT BANKS
2 DUCT BANKS3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
22" CPP
IE = 308.6018" CPP
IE = 314.13 6"8"12"6"115XEXCAVATED MATERIAL
STOCKPILED BY OTHERS TEMPORARY
CONSTRUCTION
ACCESS ROAD
MONROE AVENUE
FACILITY TRUCK
HAULING ROUTE.
PROJECT LIMITS
PERMANENT STORMWATER
EASEMENT
IMPORTED INFILTRATION
GRAVEL STORAGE AREA
ON-SITE GRAVITY
BLOCK STORAGE AREA
BOTTOM OF EXCAVATED PIT
TO BE FILLED
TCETCETCETCETCETCETCETCETCETCETCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE
TCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCESUITABLE MATERIAL FOR NON-INFILTRATION MATERIAL,
PER APPROVAL OF ENGINEER, WITHIN STOCKPILE AREA
TO BE COVERED IN PLASTIC BY OTHERS
JEFFERSON AVENUE NE
MONROE AVENUE NE
MONROE AVENUE
FACILITY TRUCK
HAULING ROUTE.
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Aug 28, 2023 - 5:40pm K:\Project\33200\33201A\CADD\ACAD\Dwg\C106.dwg Layout Name: C106NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
SCALE IN FEET
50 0 50 100
C104
8
STAGE 1 SITE LOGISTICS PLAN
R-408008
GENERAL NOTES
1.CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL
WHEN VEHICULAR OR PEDESTRIAN ACCESS ROUTES ARE
TEMPORARILY BLOCKED.
2.PEDESTRIAN AND VEHICULAR ACCESS ALONG MONROE
AVENUE SHALL BE MAINTAINED AT ALL TIMES. UNOBSTRUCTED
CONTINUOUS 4' WIDTH PEDESTRIAN ROUTE COMPLIANT WITH
ADA STANDARDS SHALL BE PROVIDED.
3.ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED
THROUGHOUT DURATION OF THE PROJECT.
4.THIS PLAN SHOWS APPROXIMATE LOCATIONS OF ITEMS
RELEVANT FOR SITE LOGISTICS. CONTRACTOR IS RESPONSIBLE
TO DEFINE FINAL WORK PLAN AND SUBMIT TO CITY OF RENTON
FOR APPROVAL PRIOR TO CONSTRUCTION.
LEGEND
APPROXIMATE LIMITS OF PIT BOTTOM
EXCAVATED BY OTHERS
ON-SITE ECOLOGY BLOCK STORAGE AREA
COR CONTRACTOR HAULING ROUTE
PROJECT LIMITS / TCE
IMPORTED INFILTRATION GRAVEL
STORAGE AREA
STOCKPILE BY OTHERS
TEMPORARY ACCESS ROAD WITH
GEOGRID
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
101102103104105106107108109110111PCCSWWWCCPCPCCDCPCSD CB
TYPE 1
RIM = 345.76
8" CMP (W) IE = 343.81
SUMP = 342.26 DSD MH
60" CONC
RIM = 345.96
8" CMP (E) IE = 339.96
18" CPP (W) IE = 339.36
8" CMP (W) IE = 340.18
36" CMP (N) IE = 332.56
36" CMP (S) IE = 332.56
SD CB
TYPE 1
RIM = 345.84
8" CMP (E) IE = 342.42
SUMP = 340.74 DSD MH
TYPE 2
RIM = 345.59
18" CPP (W) IE = 337.24
36" CMP (N) IE = 332.89
36" CMP (S) IE = 332.69 SSS MH
48" CONC
RIM = 342.20
10" PVC (N) IE = 335.00
10" PVC (S) IE = 334.80 16"CPCCCSD CB
TYPE 1
RIM = 339.66
12" PVC (NE) IE = 337.41
8" CMP (W) IE = 337.31
SUMP = 335.26DSD MH
60" CONC TYPE 2
RIM = 340.13
8" CMP (W) IE = 335.98
8" CMP (E) IE = 335.98
36" CMP (N) IE = 333.05
36" CMP (S) IE = 332.95
SD CB
TYPE 1
RIM = 339.68
8" CMP (E) IE = 336.38
SUMP = 334.58
SDDCP18"6"PWWDSSS MH
RIM = 347.79
10" PVC (N) IE = 334.09
10" PVC (S) IE = 333.89 14"10"18"22"6"14"14"14"12"G G
GG G G G G G G G G G
PTVTVTV
TVTV TV TV TV
GTV TV TV TV TV TV TV TV
TV TV TV TV TV TV TV TV
TV TV TV TV TV TVTVTV TV
TV
TV TV TVPWW
WW W W W W W W W W W W W W W W W W W W W WWWSDSD
SDSDSDSD
SDSDSD
SDSD
SSSSSS
SS
SSSSSSSSSS
SSSSSSSSSS
SSSSSSSSSS
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
PPPPPPPPPPPPPPPP PTV TV TV TV TV TV TV TV TV TV TV
TVTV TV PPPPP
P PPPTVTVTVTVTVTVTVTVTVTVTVTVTV TV TV
PPPPP
TVTVTVTVTV
TVTVTVTV PPPP
P
PP
PP P P P P PPP 2 DUCT BANKS
2 DUCT BANKS3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
22" CPP
IE = 308.6018" CPP
IE = 314.13 6"8"12"6"115NE 4TH STNE 4TH STTCETCETCETCETCETCETCETCETCETCETCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE
TCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETRUCK HAULING
ROUTE
PROJECT LIMITS
PERMANENT STORMWATER
EASEMENT
EXCAVATED MATERIAL
STOCKPILED BY OTHERS
STORAGE AREA FOR GRAVEL
BACKFILL MATERIALS
TEMPORARY ACCESS ROAD
FOR MONROE AVE PROJECT
STORMWATER INFILTRATION
FACILITY FOOTPRINT TO BE
PROTECTED DURING STAGE 2
TRUCK HAULING
ROUTE
JEFFERSON AVENUE NE
MONROE AVENUE NE
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Aug 28, 2023 - 5:47pm K:\Project\33200\33201A\CADD\ACAD\Dwg\C107.dwg Layout Name: C107NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
SCALE IN FEET
50 0 50 100
C105
9
STAGE 2 SITE LOGISTICS PLAN
R-408009
GENERAL NOTES
1.CONTRACTOR SHALL PROVIDE TEMPORARY TRAFFIC CONTROL
WHEN VEHICULAR OR PEDESTRIAN ACCESS ROUTES ARE
TEMPORARILY BLOCKED.
2.PEDESTRIAN AND VEHICULAR ACCESS ALONG MONROE
AVENUE SHALL BE MAINTAINED AT ALL TIMES. UNOBSTRUCTED
CONTINUOUS 4' WIDTH PEDESTRIAN ROUTE COMPLIANT WITH
ADA STANDARDS SHALL BE PROVIDED.
3.ACCESS TO ADJACENT PROPERTIES SHALL BE MAINTAINED
THROUGHOUT DURATION OF THE PROJECT.
4.THIS PLAN SHOWS APPROXIMATE LOCATIONS OF ITEMS
RELEVANT FOR SITE LOGISTICS. CONTRACTOR IS RESPONSIBLE
TO DEFINE FINAL WORK PLAN AND SUBMIT TO CITY OF RENTON
FOR APPROVAL PRIOR TO CONSTRUCTION.
LEGEND
APPROXIMATE COR HAULING ROUTE
PROJECT LIMITS / TCE
GRAVEL BACKFILL STORAGE
STOCKPILE BY OTHERS
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
102
103
108
109
110
111
P
C
C
P C
SD CB
TYPE 1
RIM = 345.76
8" CMP (W) IE = 343.81
SUMP = 342.26
D
SD MH
60" CONC
RIM = 345.96
8" CMP (E) IE = 339.96
18" CPP (W) IE = 339.36
8" CMP (W) IE = 340.18
36" CMP (N) IE = 332.56
36" CMP (S) IE = 332.56
SD CB
TYPE 1
RIM = 345.84
8" CMP (E) IE = 342.42
SUMP = 340.74
D
SD MH
TYPE 2
RIM = 345.59
18" CPP (W) IE = 337.24
36" CMP (N) IE = 332.89
36" CMP (S) IE = 332.69
S
SS MH
48" CONC
RIM = 342.20
10" PVC (N) IE = 335.00
10" PVC (S) IE = 334.80
16"
C
PC
C
C
SD CB
TYPE 1
RIM = 339.66
12" PVC (NE) IE = 337.41
8" CMP (W) IE = 337.31
SUMP = 335.26D
SD MH
60" CONC TYPE 2
RIM = 340.13
8" CMP (W) IE = 335.98
8" CMP (E) IE = 335.98
36" CMP (N) IE = 333.05
36" CMP (S) IE = 332.95
SD CB
TYPE 1
RIM = 339.68
8" CMP (E) IE = 336.38
SUMP = 334.58
6"
S
SS MH
RIM = 347.79
10" PVC (N) IE = 334.09
10" PVC (S) IE = 333.89
AB-03 GRASSCONC. SIDEWALKGRASSGRASSCONC. SIDEWALKCONC. SIDEWALKGRASSCONC. SIDEWALKGRASSGRASSGRASSDRIVEWAYDRIVEWAYDRIVEWAYGRASSASPHALT4' CHAINLINK FENCE7' CHAINLINK FENCE7' CHAINLINK FENCE
7' CHAINLINK FENCE
7' CHAINLINK FENCE7' CHAINLINK FENCE7' CHAINLINK FENCEGATE7' CHAINLINK FENCE7' CHAINLINK FENCE7' CHAINLINK FENCEJERSEY BARRIERSJERSEY BARRIERSGGGGGGGGGGGGPPPTVTV
TVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTV TVTVWWWWWWWWWWWWWWSD
SD
SDSDSDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSSOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPEL=380.68'
EL=377.07'PPPPPPPPPPPPPPTV
TVTVTVTVTVTVTVTVTVTVTVPTVTVTVP
PPPPPPPPPPPPTVTVTVTVTVTVTVTVTVTVTVTVPPPPPTVTVTVTVPPPP2 DUCT BANKS2 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKS3 DUCT BANKSATP-03 ATP-04
AHA-01AHA-02
22" CPP
IE = 308.60
18" CPP
IE = 314.13
320'310 '348'3
4
6
'344'342'340'330'334'6"8"
12"
6"
115
TCETCETCETCETCETCETCETCETCETCETCETCETCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE
TCETCETCETCETCETCETCETCETCETCETCETCEX300
3003103203303401200 1201
JEFFERSON AVE SITE ENTRANCE
4 (TYP.)
2
10GAS
8
5
4(TYP.)
9
7 POWER VAULT
10 COMM
6 74 LF
7 COMMUNICATION VAULT
7 STREET LAMP, JBOX, POWER, SIGN
MONROE AVE
CONSTRUCTION
ENTRANCE AND EXIT
10OVERHEAD UTILITY POLE
1
9 APPROXIMATE
LOCATION
APPROXIMATE
STOCKPILE BY OTHERS MONROE AVENUE NE1
1
3
10OVERHEAD UTILITY POLE
1018" DIA STORM PIPE
15
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Nov 28, 2023 - 3:42pm O:\PROJECT\33200\33201A\CADD\ACAD\Dwg\C201-C202.dwg Layout Name: C201NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C201
10
STAGE 1 TESC AND DEMOLITION
SCALE IN FEET
30 0 30 60
R-408010
INSTALL TEMPORARY ACCESS ROAD WITH GEOGRID ON HEAVILY
TRAFFICKED AREAS, PER DETAIL ON SHEET C203.
INSTALL HIGH VISIBILITY FENCE PER WSDOT STD PLAN I-10.10-01.
INSTALL / MAINTAIN PROJECT SIGN PER DETAIL ON SHEET C203.
INSTALL STORM DRAIN INLET PROTECTION PER COR STD PLAN 216.30.
CONSTRUCT / MAINTAIN TIRE WASH PER COR STD PLAN 215.00. WATER
USED IN TIRE WASH SHALL BE HAULED OFF SITE TO APPROVED
TREATMENT FACILITY.
SAWCUT AND REMOVE EXISTING CURB AND GUTTER AS REQUIRED
FOR INSTALLATION OF IMPROVEMENTS. CURB AND GUTTER SHALL BE
REMOVED TO THE NEAREST JOINT BEYOND THE IMPROVEMENTS OR
SAWCUT PER COR STD PLAN 110.
EXISTING UTILITY OR FEATURE TO BE RELOCATED. FINAL LOCATION TO
BE DETERMINED AFTER COORDINATION BY PROPERTY OWNER AND
CITY.
INSTALL TEMPORARY SECURITY CHAIN LINK FENCE.
EXIST. TREE(S) TO REMAIN, PROTECT DURING CONSTRUCTION.
EXISTING UTILITY TO REMAIN, PROTECT DURING CONSTRUCTION.
INSTALL STABILIZED CONSTRUCTION ENTRANCE PER COR STD PLAN
215.10, LIMITS PER PLAN.
INSTALL STRAW WATTLES PER COR STD PLAN 213.40.
SAWCUT AND REMOVE EXISTING SIDEWALK AS REQUIRED FOR
INSTALLATION OF IMPROVEMENTS. SIDEWALK SHALL BE REMOVED TO
THE NEAREST JOINT BEYOND THE IMPROVEMENTS OR SAWCUT PER
COR STD PLAN 110.
SAWCUT AND REMOVE EXISTING ASPHALT PAVEMENT.
ADJUST EXISTING INTERCEPTOR SWALE AND PIPE AS NEEDED FOR
TEMPORARY CONSTRUCTION ACCESS ROAD.
TESC/DEMO NOTES
1
2
4
5
6
7
8
9
10
3
11
12
13
14
GENERAL NOTES
1.CATCH BASIN INLET PROTECTION SHALL BE PROVIDED AND MAINTAINED
AT ALL EXISTING AND PROPOSED CATCH BASINS PRIOR TO AND FOR
THE DURATION OF CONSTRUCTION OPERATIONS. PROTECTION
MEASURES FOR PROPOSED CATCH BASINS ARE NOT SHOWN ON TESC
PLAN FOR CLARITY.
2.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT UNLESS
OTHERWISE STATED.
3.LOCATION OF TESC MEASURES SHOWN ARE APPROXIMATE AND SHALL
BE FIELD LOCATED TO ACCOMMODATE ACTUAL SITE CONDITIONS AND
WORK SCHEDULE.
4.SEE SHEET C004 FOR CONSTRUCTION SEQUENCING.
5.ALL EXISTING ON-SITE TESC MEASURES SHALL BE MAINTAINED
THROUGHOUT THE DURATION OF THE PROJECT.
6.CONTRACTOR TO IMPORT AND STOCKPILE ONSITE MINIMUM OF 150 CY
QUARRY SPALLS FOR TESC AND SLOPE PROTECTION AS NEEDED.
QUARRY SPALLS PLACED FOR SLOPE PROTECTION SHALL BE
UNDERLAIN WITH GEOTEXTILE FOR SEPARATION. SEE ADDITIONAL
REQUIREMENTS PER SPECIAL PROVISIONS 8-01 TEMPORARY SLOPE
PROTECTION.
15
ADDENDUM NO. 3 CDD 10/04/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
100
101
110
C
D
S
S
22"
W
WW
C C
P
CP
C
C
D
GRASSCONC. SIDEWALKCONC. SIDEWALKGRASSGRASSDRIVEWAYDIRTGRASS7' CHAINLINK FENCE3' CHAINLINK FENCE7' CHAINLINK FENCEGATE7' CHAINLINK FENCE3' CHAINLINK FENCE7' CHAINLINK FENCEJERSEY BARRIERSGGGGTVTVTVTVTVTVTVG TVTVTVTVTVTVTVTVP
W W W WWWWWWWWWSDSDSDSDSDSSSSSSSSSSSSSS
SD SDPPPPPPPTVTVTVTVTVTVTVTVTVTVTVTVTVTVPTVTVTVTVTVTVTVPPPPPPPPPPPPPTVPP3 DUCT BANKS3 DUCT BANKS8' CHAINLINK FENCE W/BARB WIRE
8' CHAINLINK FENCE W/BARB WIRE7' CHAINLINK FENCEASPHALT300'290'300'310'320'330'340'300 '310 '
320'
330 '
340 '300'310'3
2
0
'346'
346'
346 '320'322'
3
2
0
'3
3
0
'334'TCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCE1000
1003
1004
1
2
APPROXIMATE
STOCKPILE BY OTHERS
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Nov 28, 2023 - 3:44pm O:\PROJECT\33200\33201A\CADD\ACAD\Dwg\C201-C202.dwg Layout Name: C202NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C202
11
STAGE 1 TESC AND DEMOLITION
SCALE IN FEET
30 0 30 60
R-408011
INSTALL TEMPORARY ACCESS ROAD WITH GEOGRID ON HEAVILY
TRAFFICKED AREAS, PER DETAIL ON SHEET C203.
INSTALL HIGH VISIBILITY FENCE PER WSDOT STD PLAN I-10.10-01.
INSTALL / MAINTAIN PROJECT SIGN PER DETAIL ON SHEET C203.
INSTALL STORM DRAIN INLET PROTECTION PER COR STD PLAN 216.30.
CONSTRUCT / MAINTAIN TIRE WASH PER COR STD PLAN 215.00. WATER
USED IN TIRE WASH SHALL BE HAULED OFF SITE TO APPROVED
TREATMENT FACILITY.
SAWCUT AND REMOVE EXISTING CURB AND GUTTER AS REQUIRED
FOR INSTALLATION OF IMPROVEMENTS. CURB AND GUTTER SHALL BE
REMOVED TO THE NEAREST JOINT BEYOND THE IMPROVEMENTS OR
SAWCUT PER COR STD PLAN 110.
EXISTING UTILITY OR FEATURE TO BE RELOCATED. FINAL LOCATION TO
BE DETERMINED AFTER COORDINATION BY PROPERTY OWNER AND
CITY.
INSTALL TEMPORARY SECURITY CHAIN LINK FENCE.
EXIST. TREE(S) TO REMAIN, PROTECT DURING CONSTRUCTION.
EXISTING UTILITY TO REMAIN, PROTECT DURING CONSTRUCTION.
INSTALL STABILIZED CONSTRUCTION ENTRANCE PER COR STD PLAN
215.10, LIMITS PER PLAN.
INSTALL STRAW WATTLES PER COR STD PLAN 213.40.
SAWCUT AND REMOVE EXISTING SIDEWALK AS REQUIRED FOR
INSTALLATION OF IMPROVEMENTS. SIDEWALK SHALL BE REMOVED TO
THE NEAREST JOINT BEYOND THE IMPROVEMENTS OR SAWCUT PER
COR STD PLAN 110.
SAWCUT AND REMOVE EXISTING ASPHALT PAVEMENT.
ADJUST EXISTING INTERCEPTOR SWALE AND PIPE AS NEEDED FOR
TEMPORARY CONSTRUCTION ACCESS ROAD.
TESC/DEMO NOTES
1
2
4
5
6
7
8
9
10
3
11
12
13
14
GENERAL NOTES
1.CATCH BASIN INLET PROTECTION SHALL BE PROVIDED AND MAINTAINED
AT ALL EXISTING AND PROPOSED CATCH BASINS PRIOR TO AND FOR
THE DURATION OF CONSTRUCTION OPERATIONS. PROTECTION
MEASURES FOR PROPOSED CATCH BASINS ARE NOT SHOWN ON TESC
PLAN FOR CLARITY.
2.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT UNLESS
OTHERWISE STATED.
3.LOCATION OF TESC MEASURES SHOWN ARE APPROXIMATE AND SHALL
BE FIELD LOCATED TO ACCOMMODATE ACTUAL SITE CONDITIONS AND
WORK SCHEDULE.
4.SEE SHEET C004 FOR CONSTRUCTION SEQUENCING.
5.ALL EXISTING ON-SITE TESC MEASURES SHALL BE MAINTAINED
THROUGHOUT THE DURATION OF THE PROJECT.
6.CONTRACTOR TO IMPORT AND STOCKPILE ONSITE MINIMUM OF 150 CY
QUARRY SPALLS FOR TESC AND SLOPE PROTECTION AS NEEDED.
QUARRY SPALLS PLACED FOR SLOPE PROTECTION SHALL BE
UNDERLAIN WITH GEOTEXTILE FOR SEPARATION. SEE ADDITIONAL
REQUIREMENTS PER SPECIAL PROVISIONS 8-01 TEMPORARY SLOPE
PROTECTION.
15
ADDENDUM NO. 3 CDD 10/04/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
2
MIN.SILT FENCE PER COR STD. PLAN 214.00
2
MIN.12 MIN.2'1
1
2:1 (H:V) PIT
EXCAVATION SLOPE
PER SHEETS C201 AND C204
INTERCEPTOR SWALE PER
COR STD. PLAN 217.10 AND AS
SHOWN ON SHEET C103
6" CRUSHED SURFACING
TOP COURSE
INSTALL BIAXIAL GEOGRID. GEOGRID TO HAVE A MINIMUM
STRENGTH OF 810 LB/FT AT 5% STRAIN. GEOGRID TO BE
ROLLED LONGITUDINALLY ALONG THE ACCESS ROAD
ALIGNMENT.
INTERCEPTOR
SWALE PER COR
STD. PLAN 217.10
NOTES:
1.TRAP MAY BE FORMED BY BERM OR BY PARTIAL OR
COMPLETE EXCAVATION
2.SEDIMENT TRAP AND TEMPORARY INFILTRATION POND TO
BE ADJUSTED VERTICALLY AS EARTHWORK PROGRESSES
3
H
:
1
V
M
A
X
.
FLAT BOTTOM
CROSS SECTION
SURFACE AREA
DETERMINED 1FT BELOW
ADJACENT GRADEINFLOW
SEDIMENT TRAP
GEOTEXTILE FOR PERMANENT EROSION
CONTROL AND DITCH LINING, MODERATE
SURVIVABILITY, WOVEN, CLASS A 3.0'-5'4'X8' 1
2" EXTERIOR PLYWOOD (SMOOTH
BOTH SIDES, ABX)
2"X4" DIAGONAL BRACE
DF STD &BTR, TYP.)
4"X4"X12' VERTICAL POSTS
TREATED, TYP.
CITY PROJECT MANAGER: JARED MCDONALD, 425-430-7293
CONTRACTOR: [ ]
1.0'
8.0'7.0
MIN.ABOVE ROADWAY3.0
4.0
WASHINGTON STATE
DEPARTMENT OF ECOLOGY:$[]$[]
CITY OF RENTON:$[]$[]
TOTAL:$[]$[]
FUNDED BY: DESIGN: CONSTRUCTION:
MONROE AVE NE INFILTRATION FACILITY
NOTES:
1.PAINTING THE FACE AND EDGES OF THE 1/2 INCH PLYWOOD SIGN
BOARD SHALL HAVE ONE PRIME COAT AND TWO COATS OF
EXTERIOR ENAMEL. THE POSTS, BRACES, AND BACK OF SIGN
BOARD SHALL HAVE ONE COAT OF PRIMER AND EXTERIOR
ENAMEL. THE BACKGROUND COLOR IS WHITE
.
2.LETTER TYPES: THE LETTER TYPE SHALL BE SOLID HELVETICA
MEDIUM EXCEPT THE LOGOS WHICH WILL BE PROVIDED BY THE
CITY. ALL LETTERS AND NUMBERS WILL BE BLACK.
3.LETTER SIZE: PROJECT TITLE "MONROE AVE NE INFILTRATION
FACILITY" SHALL BE 4" LETTERS AND 1/2" WIDE. ALL OTHER TEXT
TO BE 3" LETTERS AND 3/8" WIDE. LOGOS SHALL BE
APPROXIMATELY THE SAME SIZE, APPROXIMATELY 6" TALL AND IN
COLOR.
4.BOTTOM OF SIGN SHALL BE AT LEAST 7.0' ABOVE EXISTING GRADE
5.SIGN SHALL BE MOUNTED ON NEW POSTS UNLESS OTHERWISE
SPECIFIED.
6.POST SHALL BE SUPPORTED BY 2 1/2" X 26" HEAVY DUTY ANCHOR.
7.ENGINEER TO SPECIFY LOCATION FOR SIGN.
8.SIGN TO BE MAINTAINED FOR THE DURATION OF THE PROJECT. AT
THE END OF PROJECT SIGN SHALL BE REMOVED AND THE
LANDSCAPE RESTORED TO EXISTING CONDITIONS.
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:30SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C203.GZJ LD\RXW NDPH: C203NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C203
12
STAGE 1 TESC DETAILS
R-408012
INTERCEPTOR SWALE AND SILT FENCE LAYOUT
NTS
STAGE 1 TEMPORARY ACCESS ROAD WITH GEOGRID - TYPICAL SECTION SEDIMENT TRAP AND TEMPORARY INFILTRATION POND
NTS
GENERAL NOTES
1.TESC MEASURES SHOWN ON C103 WILL BE INSTALLED BY OTHERS
PRIOR TO CONSTRUCTION. CONTRACTOR SHALL MAINTAIN, MOVE AND
ADJUST TESC AS NEEDED THROUGHOUT THE DURATION OF THE
PROJECT
PROJECT SIGN
NTS
NTS
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
X102
103
109
111
P
C
P C SD CB
TYPE 1
RIM 345.76
8 CMP W IE 343.81
SUMP 342.26
D
SD MH
60 CONC
RIM 345.96
8 CMP E IE 339.96
18 CPP W IE 339.36
8 CMP W IE 340.18
36 CMP N IE 332.56
36 CMP S IE 332.56
SD CB
TYPE 1
RIM 345.84
8 CMP E IE 342.42
SUMP 340.74
D
SD MH
TYPE 2
RIM 345.59
18 CPP W IE 337.24
36 CMP N IE 332.89
36 CMP S IE 332.69
S
SS MH
48 CONC
RIM 342.20
10 PVC N IE 335.00
10 PVC S IE 334.80
16
C
PC
C
C
60 CONC TYPE 2
RIM 340.13
8 CMP W IE 335.98
8 CMP E IE 335.98
36 CMP N IE 333.05
36 CMP S IE 332.95
NO PARKING
NO PARKING
ANYTIME
NO PARKING
ANYTIME
NO PARKING
ANYTIME
NO PARKING
ANYTIME
NO PARKING
ANYTIME
GAS PIPELINE
IN VICINITY
S
SS MH
RIM 347.79
10 PVC N IE 334.09
10 PVC S IE 333.89
AB03
MONROE AVENUE NE4
CHAINLINK FENCE7
CHAINLINK FENCE
7
CHAINLINK FENCE
7
CHAINLINK FENCE7
CHAINLINK FENCE7
CHAINLINK FENCEJERSEY BARRIERSJERSEY BARRIERSGGGGGGGGGGGGGGGPPPP
TVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTV
WWWWWWWWWWWWWWWSD
SD
SDSDSDSDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSSSS36 CMP10 PVC36 CMP18 CPP
18
C
P
P
8 CMP 8 CMPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPEL 380.68
EL 377.07
JEFFERSON AVENUE NEPPPPPPPPPPPPPPPPTV
TVTVTVTVTVTVTVTVTVTVTVTVTVPTVTVTVTVTVP
PPPPPPPPPPPPPPPPTVTVTVTVTVTVTVTVTVTVTVTVTVTVPPPPPTVTVTVTVPPPATP03 ATP04
AHA01AHA02
22 CPP
IE 308.60
18 CPP
IE 314.13 3
4
6
344
342
330
334
68
12
6
115
10POWER
9
5
10OVERHEAD
POWER
10COMM.
JEFFERSON AVE SITE ENTRANCE
320
330
316
318
322
324
326
328
320
330
316
318
322
324
326
328
332
334
3
4
0
332
3
3
4
3
3
6
3
3
8 342310
320
308
312
314
316
318
322
324
326
328
11
10GAS
1200 1201
TCETCETCETCETCETCETCETCETCETCETCETCETCETCETCETCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE TCE
TCETCETCETCETCETCETCETCETCETCETCETCETCETCE8
9 APPROXIMATE LOCATION
12
13 4 SY
14
612 LF
10COMM. AND
POWER
10 COMM. AND
POWER
10 WATER
10 SANITARY SEWER
12
3
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: NRY 28 2023 3:48SP O:?PROJECT?33200?33201A?CADD?ACAD?DZJ?C204.GZJ LD\RXW NDPH: C204NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C204
13
STAGE 2 TESC AND DEMOLITION
R408013
SCALE IN FEET
30 0 30 60
INSTALL TEMPORARY ACCESS ROAD WITH GEOGRID ON HEAVILY
TRAFFICKED AREAS PER DETAIL ON SHEET C203.
INSTALL HIGH VISIBILITY FENCE PER WSDOT STD PLAN I10.1001.
INSTALL / MAINTAIN PROJECT SIGN PER DETAIL ON SHEET C203.
INSTALL STORM DRAIN INLET PROTECTION PER COR STD PLAN 216.30.
CONSTRUCT / MAINTAIN TIRE WASH PER COR STD PLAN 215.00. WATER
USED IN TIRE WASH SHALL BE HAULED OFF SITE TO APPROVED
TREATMENT FACILITY.
SAWCUT AND REMOVE EXISTING CURB AND GUTTER AS RE4UIRED
FOR INSTALLATION OF IMPROVEMENTS. CURB AND GUTTER SHALL BE
REMOVED TO THE NEAREST JOINT BEYOND THE IMPROVEMENTS OR
SAWCUT PER COR STD PLAN 110.
EXISTING UTILITY OR FEATURE TO BE RELOCATED. FINAL LOCATION TO
BE DETERMINED AFTER COORDINATION BY PROPERTY OWNER AND
CITY.
MAINTAIN TEMPORARY SECURITY CHAIN LINK FENCE.
EXIST. TREES TO REMAIN PROTECT DURING CONSTRUCTION.
EXISTING UTILITY TO REMAIN PROTECT DURING CONSTRUCTION.
INSTALL STABILI=ED CONSTRUCTION ENTRANCE PER COR STD PLAN
215.10 LIMITS PER PLAN.
INSTALL STRAW WATTLES PER COR STD PLAN 213.40.
SAWCUT AND REMOVE EXISTING SIDE WALK AS RE4UIRED FOR FOR
INSTALLATION OF IMPROVEMENTS. SIDEWALK SHALL BE REMOVED TO
THE NEAREST JOINT BEYOND THE IMPROVEMENTS OR SAWCUT PER
COR STD PLAN 110.
SAWCUT AND REMOVE EXISTING ASPHALT PAVEMENT.
TESC/DEMO NOTES
1
2
4
5
6
7
8
9
10
3
11
12
13
14
GENERAL NOTES
1.CATCH BASIN INLET PROTECTION SHALL BE PROVIDED AND MAINTAINED
AT ALL EXISTING AND PROPOSED CATCH BASINS PRIOR TO AND FOR
THE DURATION OF CONSTRUCTION OPERATIONS. PROTECTION
MEASURES FOR PROPOSED CATCH BASINS ARE NOT SHOWN ON TESC
PLAN FOR CLARITY.
2.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT UNLESS
OTHERWISE STATED.
3.LOCATION OF TESC MEASURES SHOWN ARE APPROXIMATE AND SHALL
BE FIELD LOCATED TO ACCOMMODATE ACTUAL SITE CONDITIONS AND
WORK SCHEDULE.
4.SEE SHEET C004 FOR CONSTRUCTION SE4UENCING.
5.ALL EXISTING ONSITE TESC MEASURES SHALL BE MAINTAINED
THROUGHOUT THE DURATION OF THE PROJECT.
6.CONTRACTOR TO IMPORT AND STOCKPILE ONSITE MINIMUM OF 150 CY
4UARRY SPALLS FOR TESC AND SLOPE PROTECTION AS NEEDED.
4UARRY SPALLS PLACED FOR SLOPE PROTECTION SHALL BE
UNDERLAIN WITH GEOTEXTILE FOR SEPARATION. SEE ADDITIONAL
RE4UIREMENTS PER SPECIAL PROVISIONS 801 TEMPORARY SLOPE
PROTECTION.
ADDENDUM NO. 3 CDD 10/04/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
PAB03
7
CHAINLINK FENCE7
CHAINLINK FENCE
7
CHAINLINK FENCE
-ERSEY BARRIERS
-ERSEY BARRIERS
G G G
GG G G G
PPPP
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
LA PIANTA LIMITED PARTNERSHIPAFN 20021028002594W
D
W
D
W
D
W
D
W
D
W
D320330316318322324326328 STA 11+56.25, 263.69'LT3
STA 12+97.63, 43.71'LT 3 10
STA 12+52.40, 11.78'LT103
33
0
32
4
32
6
32
8
33
2
3
3
2
STA 9+93.74, 8.71'LT103
STA 9+25.54, 112.63'LT103
2 34
5
6
1
AC
C
E
S
S
R
O
A
D
7
8
9 (TYP.)
8
0
0
9
0
0
10
0
0
11
0
0
12
0
0
1
3
0
0
STA 9+23.26, 116.11'LT10
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
PRO-ECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28 2023 6:06SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C301AC302A.GZJ LD\RXW NDPH: C301NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
SCALE IN FEET
20 0 20 40
CONSTRUCTION CENTERLINE SEE SHEET C101 FOR DETAILS.
CONSTRUCT PRIMARY ISOLATOR ROW PER DETAIL ON SHEET
C310.
CONSTRUCT STORMWATER INFILTRATION FACILITY CHAMBER
GALLERY PER DETAIL ON SHEET C310.
INSTALL INSPECTION PORT PER DETAIL ON SHEET C310.
INFILTRATION CHAMBER MANIFOLD VAULT SEE SHEET C412 FOR
DETAILS.
TREATMENT VAULT SEE SHEETS C413C414 FOR DETAILS.
MAINTENANCE ACCESS ROAD SEE SHEETS C501C510 FOR
DETAILS.
STORM SEWER PIPE SEE SHEETS C401C410 FOR DETAILS.
CONSTRUCT SECONDARY ISOLATOR ROW PER DETAIL ON SHEET
C310.
CONSTRUCT GRAVITY BLOCK WALL STATION AND OFFSET
SHOWN TO WALL CONTROL LINE. SEE SHEET S604 FOR TYPICAL
SECTION AND DETAILS.
CONSTRUCTION NOTES
GENERAL NOTES
1.STATION AND OFFSET ARE PER ACCESS ROAD
ALIGNMENT UNLESS OTHERWISE STATED.
1
2
3
C301
14
STORMWATER INFILTRATION FACILITY PLAN
R408014
4
5
6
7
8
9
10
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
270
275
280
285
290
295
300
305
310
315
320
325
330
335
270
275
280
285
290
295
300
305
310
315
320
325
330
335
^
`
^
`
^
`
^
`
^`^`^`^`^`^`^`^`
3
10
9
76
ELEVATION = 289.5
4
8
10
8 2H:1V
12
8
2
GRAVITY BLOCK
WALL. SEE SHEET
S604 FOR DETAILS
9
5
ELEVATION = 315
11
PERMANENT STORMWATER EASEMENTBOTTOM OF CHAMBER
ELEV=315
9 3H:1V
13
11.5H:1V
1 2H:1V
12
14TYP.
EXCAVATED SLOPE BY OTHERS. SEE SHEET C201 FOR PLAN VIEW
EXTENTS.
TREATMENT VAULT, SEE SHEETS C413-C414 FOR DETAILS.
INSTALL GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FOR
UNDERGROUND DRAINAGE, MODERATE SURVIVABILITY CLASS C PER
WSDOT 9-33.2(1) AGAINST 2:1 EXISTING FILL CUT SLOPE AND BACKFILL
EXCAVATED AREA WITH SELECT BORROW PER SPECIAL PROVISIONS
2-03 AND COMPACT PER WSDOT STD. SPEC 2-03.3(14)C, METHOD A.
INSTALL GEOTEXTILE FABRIC MIRAFI FW402 OR APPROVED EQUAL PER
SPECIAL PROVISIONS 2-12 AND BACKFILL EXCAVATED AREA WITH
INFILTRATION GRAVEL PER SPECIAL PROVISIONS 2-03 AND COMPACT
PER WDSOT STD. SPEC 2-03.3(14)C, METHOD A.
INSTALL 12" COMPACTED DEPTH GRAVEL BACKFILL FOR WALLS PER
WSDOT STD. SPEC 9-03.12(2) OVER INFILTRATION FACILITY FROM TOE TO
TOE OF PLAY FIELD PERIMETER SLOPES. COMPACT PER WSDOT STD.
SPEC 2-03.3(14)C, METHOD C.
CONSTRUCT STORMWATER INFILTRATION FACILITY PER DETAILS ON
SHEET C310.
PROVIDE MINIMUM OF 12" OF INFILTRATION GRAVEL, PER SPECIAL
PROVISION 7-06, ABOVE AND TO THE OUTSIDE OF INFILTRATION
CHAMBERS FOOTPRINT PER DETAILS ON SHEET C310.
BACKFILL WITH GRAVEL BORROW PER WSDOT STD. SPEC 9-03.14(01),
COMPACT PER WSDOT STD SPEC 2-03.3(14)C, METHOD B.
PLACE 18-IN DEEP TOPSOIL TYPE A PER DETAIL ON SHEET L702.
GRADE SLOPE AT MAXIMUM 4H:1V.
INSTALL GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FOR
UNDERGROUND DRAINAGE, MODERATE SURVIVABILITY CLASS C PER
WSDOT 9-33.2(1).
BACKFILL EXCAVATED AREA WITH NON-INFILTRATION MATERIAL.
NON-INFILTRATION MATERIAL SHALL MEET REQUIREMENTS IN SPECIAL
PROVISIONS SECTION 2-03.
CONSTRUCT TREATMENT VAULT DRAIN PER DETAIL ON SHEET C414.
INSTALL GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FOR
UNDERGROUND DRAINAGE, MODERATE SURVIVABILITY CLASS C PER
WSDOT 9-33.2(1) IN 23-FT WIDE SECTIONS WITH 2-FT MINIMUM OVERLAP,
WITH TAPED SEAMS, AT EACH 2-FT LIFT, IN STAGGERED ROWS WITH A
15-FT CLEAR SPACE BETWEEN EACH 23-FT WIDE GEOTEXTILE SECTION,
AS DIRECTED BY ENGINEER.
1
STORMWATER INFILTRATION FACILITY SECTION AA
C301
C302
15
STORMWATER INFILTRATION FACILITY SECTION
R-408015
H SCALE: 1"=20', V SCALE: 1"=5'
2
3
4
5
6
7
8
9
10
11
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Nov 28, 2023 - 3:53pm O:\PROJECT\33200\33201A\CADD\ACAD\Dwg\C301A-C302A.dwg Layout Name: C302NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
LEGEND
SELECT BORROW, PER PROJECT SPECIAL
PROVISIONS
INFILTRATION GRAVEL, PER PROJECT
SPECIAL PROVISIONS
UNDISTURBED NATIVE MATERIAL
NON-INFILTRATION MATERIAL, PER PROJECT
SPECIAL PROVISIONS SECTION 2-03
PROPOSED PERMANENT EASEMENT LINE
TOPSOIL TYPE A
GRAVEL BORROW
GEOTEXTILE FABRIC, NON-WOVEN
GEOTEXTILE FOR UNDERGROUND
DRAINAGE, MODERATE SURVIVABILITY
CLASS C PER WSDOT 9-33.2(1)
EXISTING FILL MATERIAL
GRAVEL BACKFILL FOR WALLS
INFILTRATION ZONE NON-INFILTRATION ZONE
13
12
STORMWATER INFILTRATION
FACILITY SECTION NOTES
14
ADDENDUM NO. 3 CDD 10/04/2023CDD ^`MIRAFI FW402, OR APPROVED EQUAL,
PER SPECIAL PROVISIONS SECTION 2-12.
NTS
23.0'
4.0'
0.5'
2.0'
15.0'
2.0'
14TYP.
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
300
305
310
315
320
325
330
335
300
305
310
315
320
325
330
335
18 TOPSOIL TYPE AGEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE
FOR UNDERGROUND DRAINAGE, MODERATE
SURVIVABILITY CLASS C PER WSDOT 9-33.2(1)
MIN. 12 INFILTRATION GRAVEL ON ALL SIDES
OF INFILTRATION CHAMBER GALLERY
4:1
S
L
O
P
E
GRAVEL BORROW
STORMTECH CHAMBER (TYP.), SEE STORMWATER
INFILTRATION FACILITY DETAILS ON SHEET C310.
UNDISTURBED
NATIVE MATERIAL
GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FOR UNDERGROUND
DRAINAGE, MODERATE SURVIVABILITY CLASS C PER WSDOT 9-33.2(1)
36 TOPSOIL TYPE A
12 GRAVEL BACKFILL
FOR WALLS
300
305
310
315
320
325
330
335
300
305
310
315
320
325
330
335
18 TOPSOIL TYPE A
GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE
FOR UNDERGROUND DRAINAGE, MODERATE
SURVIVABILITY CLASS C PER WSDOT 9-33.2(1)
MIN. 12 INFILTRATION GRAVEL ON ALL SIDES
OF INFILTRATION CHAMBER GALLERY
12 GRAVEL BACKFILL
FOR WALLS
STORMTECH CHAMBER (TYP.), SEE STORMWATER
INFILTRATION FACILITY DETAILS ON SHEET C310.
UNDISTURBED
FILL MATERIAL
GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FOR UNDERGROUND
DRAINAGE, MODERATE SURVIVABILITY CLASS C PER WSDOT 9-33.2(1)
INFILTRATION GRAVEL
NON-INFILTRATION
MATERIAL
4:1 S
L
O
P
E
GRAVITY BLOCK WALL. SEE
SHEET S604 FOR DETAILS
UNCLASSIFIED EXCAVATION INCL. HAUL PAY LIMITS
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:33SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C303.GZJ LD\RXW NDPH: C303NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
STORMWATER INFILTRATION FACILITY SECTION BB
C301
C303
16R-408016
H Scale: 1"=10', V Scale: 1"=5'
STORMWATER INFILTRATION FACILITY SECTION
GENERAL NOTES
1.SEE SECTION A ON SHEET C302 FOR FULL DEPTH OF STAGE 1
FILL.
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
12" MIN
PRIMARY
ISOLATOR ROW
PRIMARY
ISOLATOR ROW
PRIMARY
ISOLATOR ROW
FLOW
12"
12" TYP
100"
9" TYP.
60"
2'
MIN
12" MIN
9"
11'
MAX
ACCESS ROAD
INFILTRATION
ROW SECONDARY
ISOLATOR ROW
NOT TO SCALE
ISOLATOR ROW SECTION
NOT TO SCALE
STORMWATER INFILTRATION FACILITY - CHAMBER GALLERY
NOT TO SCALE
PRIMARY ISOLATOR ROW DETAIL
NOT TO SCALE
INSPECTION PORT DETAIL
12"
18"
4.5' MIN.
MC-4500 ENDCAP OR
APPROVED EQUAL
INSTALL NON-WOVEN GEOTEXTILE
FOR UNDERGROUND DRAINAGE,
MODERATE SURVIVABILITY, CLASS
C AROUND BOTTOM AND SIDES
ONE LAYER OF ISOLATOR ROW WOVEN GEOTEXTILE,
PER SPECIAL PROVISIONS 7-06, BETWEEN
INFILTRATION GRAVEL AND CHAMBERS 10.3' (3.1 M)
MIN WIDE CONTINUOUS FABRIC WITHOUT SEAMS
4" SCHED 40 SCREW-IN CAP
4" SCHED 40 PVC
4" SCHED 40 PVC COUPLING
4" SCHED 40 PVC
CORE 4.5" Ø HOLE IN
CHAMBER
ANY OF (2) VALLEY
LOCATIONS CONTAINING
STIFFENING RIBS
INFILTRATION CHAMBER
MANIFOLD VAULT, SEE SHEET
C412 FOR DETAILS
COVER PIPE CONNECTION TO END CAP OF
INFILTRATION FACILITY WITH NON-WOVEN
GEOTEXTILE FOR UNDERGROUND DRAINAGE,
MODERATE SURVIVABILITY, CLASS C
24" SD @ 0.0% ACCESS PIPE, LENGTH VARIES. SEE SHEET
C401 FOR PIPE LENGTH
INSTALL FLARED END RAMP ON END
OF 24" DIAM PIPE PER SPECIAL
PROVISION 7-06.
GRAVEL BORROW
TOPSOIL PER SHEETS
L701-L702
SEE LANDSCAPING SHEETS L701-L702
FOR PLANTING PLAN
INFILTRATION GRAVEL, PER
SPECIAL PROVISIONS 2-03 AND
9-03.16
GRAVEL BACKFILL FOR WALLS
SEE ISOLATOR ROW DETAIL,
THIS SHEET
ONE LAYER OF ISOLATOR ROW WOVEN GEOTEXTILE
BETWEEN FOUNDATION STONE AND CHAMBERS
10.3' (3.1 M) MIN WIDE CONTINUOUS FABRIC WITHOUT
SEAMS, PER SPECIAL PROVISION 7-06.
INFILTRATION GRAVEL PER SPECIAL
PROVISIONS 2-03 AND 9-03.16
ADS MODEL MC-4500, MC-7200 OR EQUIVALENT
GRAVEL BACKFILL
FOR WALLS
TOPSOIL PER SHEETS
L701-L702
INSTALL NON-WOVEN GEOTEXTILE FOR
UNDERGROUND DRAINAGE, MODERATE
SURVIVABILITY, CLASS C AROUND
INFILTRATION GRAVEL SURROUNDING TOP,
BOTTOM, AND SIDES OF INFILTRATION
FACILITY CHAMBERS
INSPECTION PORT, SEE INSPECTION
PORT DETAIL, THIS SHEET. REFER TO
SHEET C301 FOR LOCATION.
TOPSOIL PER
SHEETS L701-L702
SEE LANDSCAPING SHEETS
L701-L702 FOR PLANTING PLAN
GRAVEL BACKFILL FOR WALLS
SEE ISOLATOR ROW DETAIL,
THIS SHEET
FLOW
12"
ACCESS ROAD
12"
18"
ONE LAYER OF ISOLATOR ROW WOVEN GEOTEXTILE, PER
SPECIAL PROVISIONS 7-06, BETWEEN INFILTRATION GRAVEL
AND CHAMBERS 10.3' (3.1 M) MIN WIDE CONTINUOUS FABRIC
WITHOUT SEAMS
MANIFOLD CATCH BASIN. SEE
SHEET C401 FOR STRUCTURE TYPE,
LOCATION, RIM ELEVATION, AND
PLACEMENT TYPE. SEE SHEET C410
FOR PLACEMENT DETAILS
COVER PIPE CONNECTION TO END CAP OF
INFILTRATION FACILITY WITH NON-WOVEN
GEOTEXTILE FOR UNDERGROUND DRAINAGE,
MODERATE SURVIVABILITY, CLASS C
24" SD @ 0.0% ACCESS PIPE. LENGTH
OF PIPE PER SHEET C401
INSTALL FLARED END RAMP ON END
OF 24" DIAM PIPE PER SPECIAL
PROVISION 7-06.
GRAVEL BORROW
TOPSOIL PER SHEETS
L701-L702
SEE LANDSCAPING SHEETS L701-L702 FOR PLANTING PLAN
GRAVEL BACKFILL FOR WALLS
NOT TO SCALE
SECONDARY ISOLATOR ROW DETAIL
NOTES:
1.SEE SHEET C301 FOR PRIMARY ISOLATOR ROW LAYOUT.
NOTES:
1.SEE SHEET C301 FOR SECONDARY ISOLATOR ROW LAYOUT.
12" MIN
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:34SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C310.GZJ LD\RXW NDPH: C310NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C310
17
STORMWATER INFILTRATION FACILITY DETAILS
R-40801708/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
111PAB-03
7' CHAINLINK FENCE7' CHAINLINK FENCE
7' CHAINLINK FENCE
JERSEY BARRIERS
PPPP
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P115
1200LA PIANTA LIMITED PARTNERSHIPAFN 20021028002594W
D
W
D
W
D
W
D
W
D
JEFFERSON AVENUE NE
8+
0
0
9+
0
0
10
+
0
0
11
+
0
0
12
+
0
0
1
3
+
0
0
33
0
32
4
32
6
32
8
33
2
33
2 320330316318322324326328330
322
324
326
328
INFILTRATION CHAMBER
MANIFOLD VAULT, SEE SHEET C412
FOR DETAILS
3 24" SD
TREATMENT VAULT, SEE
SHEETS C413-C414 FOR
DETAILS
336" SD
4
324" SD
1
56PRIMARY ISOLATOR ROW6INFILTRATION ROW (TYP.)6SECONDARY ISOLATOR ROW (TYP.)
824" SD (TYP.)
9 330324326328332334CB110, TYPE 2 - 60"
STA 11+80.04, 11.29'RT102
CB105, TYPE 2 - 48"
STA 10+90.82, 34.47'RT2
CB100, TYPE 2 - 60"
STA 11+03.22, 11.78'RT2
CB200, TYPE 2 - 48"7
CB205, TYPE 2 - 72"7
CB210, TYPE 2 - 72"7
CB215, TYPE 2 - 72"7
CB220, TYPE 2 - 72"7
CB225, TYPE 2 - 72"7
CB230, TYPE 2 - 72"7
CB235, TYPE 2 - 72"7
CB240, TYPE 2 - 72"7
CB245, TYPE 2 - 72"7
CB250, TYPE 2 - 60"7
CB255, TYPE 2 - 48"7
CB260, TYPE 2 - 48"7
STA 8+70.55, 37.89'RT
ELEV.=323.5
11
STA 8+19.95, 35.18'LT
ELEV.=323.5
11
STA 11+52.43, 245.92'LT
ELEV.=323.5
11
STA 12+61.96, 73.85'LT
ELEV.=323.5 11
STA 12+44.13, 40.05'LT
ELEV.=323.5 11
STA 9+70.53, 46.26'LT
ELEV.=323.5
11
228 LF, 24" SD
226 LF, 24" SD
22 8 LF, 24" SD
STA 11+84.00, 38.06'LT
ELEV.=323.5 11
STA 9+71.50, 32.56'RT
ELEV.=323.5
11
2424" SD (TYP.)
24 24" SD (TYP.)
INFILTRATION FACILITY MANIFOLD DRAINAGE
STRUCTURE PLACEMENT
STR. NO.
CB200
CB205
CB210
CB215
CB220
CB225
CB230
CB235
CB240
CB245
CB250
CB255
CB260
STR STA./
OFFSET
10+06.50
1.31' L
10+27.52
1.56' L
10+49.07
1.81' L
10+70.63
2.07' L
11+35.28
2.84' L
11+56.83
3.09' L
11+78.39
3.35' L
11+99.94
3.61' L
12+21.49
3.86' L
12+43.16
4.12' L
12+60.25
11.01' L
12+76.76
19.33' L
12+91.96
29.27' L
STR.
RIM ELEV.
330.0
329.8
329.5
329.3
328.7
328.5
328.3
328.5
328.7
328.9
329.2
329.5
330.0
SUMP
ELEV.
313.19
313.19
313.19
313.19
313.19
313.19
313.19
313.19
313.19
313.19
313.19
313.19
313.19
STR. TYPE/
DIAM.
TYPE 2 - 48"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 72"
TYPE 2 - 60"
TYPE 2 - 48"
TYPE 2 - 48"
OUTFLOW
PIPE LENGTH
8.97'
7.21'
6.74'
6.31'
8.91'
8.45'
7.97'
7.57'
7.07'
10.69'
2.75'
5.35'
5.37'
PLACEMENT
DETAIL
TYPE A
TYPE B
TYPE B
TYPE B
TYPE B
TYPE B
TYPE B
TYPE B
TYPE B
TYPE B
TYPE A
TYPE A
TYPE A
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Nov 28, 2023 - 4:10pm O:\PROJECT\33200\33201A\CADD\ACAD\Dwg\C401-C402.dwg Layout Name: C401NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C401
18R-408018
SITE GRADING AND DRAINAGE IMPROVEMENTS PLAN
SCALE IN FEET
20 0 20 40
CONSTRUCTION NOTES
GENERAL NOTES
1
2
3
4
5
6
7
8
9
1.ALL STORM SEWER PIPE SHALL BE POLYPROPYLENE WITH
SMOOTH INTERIOR UNLESS NOTED OTHERWISE.
2.STATION AND OFFSET, AND RIM ELEVATION SHOWN REFERENCE
CENTER OF STRUCTURE. SEE SHEET C410 FOR STRUCTURE
PLACEMENT DETAIL.
3.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT
OTHERWISE STATED.
4.VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO
CONSTRUCTION.
5.CATCH BASIN COVER SHALL BE ORIENTED AS SHOWN ON PLAN.
6.ALL DRAINAGE STRUCTURES SHALL HAVE SOLID LOCKING
CIRCULAR FRAME AND COVER PER COR STD PLAN 204.50 UNLESS
OTHERWISE SPECIFIED. COVERS SHALL BE MARKED "DRAIN".
10
11
12
13
14
15
16
CONSTRUCTION CENTERLINE, SEE SHEET C101 FOR DETAILS.
INSTALL DRAINAGE STRUCTURE, TYPE AND SIZE PER PLAN AND
PROFILE. SEE STRUCTURE PLACEMENT DETAIL ON SHEET C410.
INSTALL STORM SEWER PIPE, LENGTH, SIZE AND SLOPE PER
PLAN AND PROFILE. SEE SHEETS C403-C404 FOR PROFILES.
MAINTENANCE ACCESS ROAD, SEE SHEETS C501-C510 FOR
DETAILS.
STORMWATER INFILTRATION FACILITY, SEE SHEETS C301-C310
FOR DETAILS.
STORWMATER INFILTRATION FACILITY ROW TYPE PER DETAIL
AND SECTION ON SHEET C310.
INSTALL MANIFOLD DRAINAGE STRUCTURE, TYPE, SIZE, AND
PLACEMENT STYLE PER TABLE ON THIS SHEET. MANIFOLD
DRAINAGE STRUCTURES HAVE SAME INVERTS, IE=315.19. SEE
SHEET C410 FOR TYPE A AND TYPE B PLACEMENT DETAILS.
INSTALL 24" DIAM. MANIFOLD PIPES BETWEEN MANIFOLD
DRAINAGE STRUCTURES AND INFILTRATION FACILITY CHAMBERS
PER DETAIL ON SHEET C310. LENGTH OF PIPE CONNECTION
(INSIDE EDGE OF DRAINAGE STRUCTURE TO INFILTRATION
CHAMBER) PER TABLE ON THIS SHEET. MANIFOLD PIPES SHALL
HAVE PIPE BEDDING PER COR STD PLAN 220.10.
INSTALL TREATMENT VAULT DRAIN. SEE SHEET C414 FOR
DETAILS.
INSTALL RECTANGULAR BI-DIRECTIONAL VANED GRATE PER COR
STD. PLAN 204.30.
BOTTOM OF PLAY FIELD PER STATION, OFFSET AND ELEVATION
SHOWN ON THIS SHEET.
DRIVEWAY ENTRANCE SHALL BE PER COR STD PLAN 104.4.
CONCRETE APRON SHALL BE 8-FEET IN WIDTH, BEHIND EXISTING
CURB, TO MEET STREET STANDARDS.
EXISTING STORM DRAINAGE TO REMAIN. PROTECT DURING
CONSTRUCTION.
CONNECT TO EXISTING DRAINAGE PIPE OR STRUCTURE.
POTHOLE EXISTING UTILITY AT CROSSING PRIOR TO
CONSTRUCTION AND NOTIFY THE ENGINEER IF CONFLICT EXISTS.
INSTALL HYDRODYNAMIC SEPARATOR STRUCTURE. SEE SHEET
C411 FOR DETAILS.
INSTALL FLOW SPLITTER STRUCTURE. SEE SHEET C412 FOR
DETAILS.
EXISTING UTILITY TO BE RELOCATED PER SHEET C502.
PLUG EXISTING OVERFLOW STORMWATER PIPE AT SHOWN
LOCATION PER WSDOT STD SPEC. 7-08.3(4). STORMWATER PIPE
SHALL NOT BE PLUGGED UNTIL PROPOSED STORMWATER
SYSTEM IS CONNECTED TO EXISTING MONROE AVE TRUNKLINE
AND PROPOSED INFILTRATION FACILITY IS ONLINE.
INSTALL CAP ON BELL END OF PIPE TO ALLOW FUTURE
CONNECTION BY OTHERS.
CONNECT TO EXISTING DRAINAGE PIPE PER SPECIAL
PROVISIONS 7-05.3(9). CUT EXISTING PIPE WHERE NECESSARY.
PLACE NEW 36" PVC STUB TO CONNECT TO EXISTING CMP TO
EACH SIDE AND CONNECT STUB TO EXISTING PIPE PER WSDOT
STD. PLAN B-60.40-01, TYPE K.
INSTALL 24" DIAM. MANIFOLD PIPE CONNECTION FROM MANIFOLD
VAULT TO PRIMARY ISOLATOR ROW, LENGTH PER PLAN.
INSTALL RECTANGULAR VANED GRATE PER COR STD. PLAN
204.20
INSTALL 24" DIAM. MANIFOLD PIPES BETWEEN ALL MANIFOLD
DRAINAGE STRUCTURES. MANIFOLD PIPES SHALL HAVE PIPE
BEDDING MATERIAL PER COR STD PLAN 220.10.
16
17
18
19
20
21
22
23
24
ADDENDUM NO. 1 CDD 09/19/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
102103CPCDDSCPCCCSSS MH 14"10"18"MONROE AVENUE NE
"SPEED 25"
GRASS
GRASS
CONC. SIDEWALK
GRASS
CONC. SIDEWALK
GRASS
GRASS
GRASS
ASPHALT 7' CHAINLINK FENCE7' CHAINLINK FENCE
TV TV TV TV TV
TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV TV
TV TV TV TV
TV TVTVTVW W W W W W W W W W W W W W W W W W W W W WSDSDSDSDSDSDSDSDSD
SDSDSDSDSDSDSDSD
SSSS
SSSSSSSSSSSSSSSSSSSSSSSSSSSS
SSSSSS
36" CMP
10" PVC
36" CMP 18" CPP18" CPP8" CMP8" CMPO
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
O
H
P
P TVTVTV TV TV TV TV TV TV TV TV TV TV
P
TVTVTVTVTVTVTVTVTVTV
PPP
PPPPPPPPPPP
PTV
P
P
PPPPP
TV
TVTVTVTVTV
P P P P
3 DUCT BANKS
3 DUCT BANKS 3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS
3 DUCT BANKS ATP-03ATP-04AHA-01
AHA-02
22" CPP
IE = 308.60
18" CPP
IE = 314.13 6"8"12"6"1201LA PIANTA LIMITED PARTNERSHIPAFN 20021028002594XX
X
X
X
X
X
X
X
X
PPX
X X
SSSSSS
W
D
W
D
W
D
MONROE AVE NE
1
3
+
0
0
14+0015+0016+00TEMPORARY EASEMENT FOR SURFACEWATER DRAINAGE OVERFLOW UTILITYAFN 2018070200008527.44'340332
334
336338342
300
300
310
310
320
330
340
336" SD
336" SD
15 SEWER
15COMM
13
18LIGHT POLE
& J-BOX
& POWER
SWING GATE, PER
SHEET C502
15POWER
336" SD
324" SD 3 36" SD
1
4
324" SD
19OVERFLOW PIPE OUTLET
19OVERFLOW PIPE INLET
9
20
21
15 COMM
21
CB130, TYPE 2 - 72"
STA 16+45.95, 7.68'RT142
CB120, TYPE 2 - 60"
STA 13+20.19, 8.02'LT2
FLOW SPLITTER VAULT, 10' X 10'
STA 13+59.65, 2.88'RT17
HYDRODYNAMIC SEPARATOR VAULT, 22' X 14'
STA 13+79.58, 4.10'RT16
CB125, TYPE 2 - 60"
STA 14+14.60, 6.47'RT232
12
15WATER
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Nov 28, 2023 - 4:17pm O:\PROJECT\33200\33201A\CADD\ACAD\Dwg\C401-C402.dwg Layout Name: C402NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C402
19R-408019
SITE GRADING AND DRAINAGE IMPROVEMENTS PLAN
SCALE IN FEET
20 0 20 40
CONSTRUCTION NOTES
GENERAL NOTES
1
2
3
4
5
6
7
8
9
1.ALL STORM SEWER PIPE SHALL BE POLYPROPYLENE WITH
SMOOTH INTERIOR UNLESS NOTED OTHERWISE.
2.STATION AND OFFSET, AND RIM ELEVATION SHOWN REFERENCE
CENTER OF STRUCTURE. SEE SHEET C410 FOR STRUCTURE
PLACEMENT DETAIL.
3.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT
OTHERWISE STATED.
4.VERIFY LOCATION OF EXISTING UTILITIES PRIOR TO
CONSTRUCTION.
5.CATCH BASIN COVER SHALL BE ORIENTED AS SHOWN ON PLAN.
6.ALL DRAINAGE STRUCTURES SHALL HAVE SOLID LOCKING
CIRCULAR FRAME AND COVER PER COR STD PLAN 204.50 UNLESS
OTHERWISE SPECIFIED. COVERS SHALL BE MARKED "DRAIN".
10
11
12
13
14
15
16
CONSTRUCTION CENTERLINE, SEE SHEET C101 FOR DETAILS.
INSTALL DRAINAGE STRUCTURE, TYPE AND SIZE PER PLAN AND
PROFILE. SEE STRUCTURE PLACEMENT DETAIL ON SHEET C410.
INSTALL STORM SEWER PIPE, LENGTH, SIZE AND SLOPE PER
PLAN AND PROFILE. SEE SHEETS C403-C404 FOR PROFILES.
MAINTENANCE ACCESS ROAD, SEE SHEETS C501-C510 FOR
DETAILS.
STORMWATER INFILTRATION FACILITY, SEE SHEETS C301-C310
FOR DETAILS.
STORWMATER INFILTRATION FACILITY ROW TYPE PER DETAIL
AND SECTION ON SHEET C310.
INSTALL MANIFOLD DRAINAGE STRUCTURE, TYPE, SIZE, AND
PLACEMENT STYLE PER TABLE ON THIS SHEET. MANIFOLD
DRAINAGE STRUCTURES HAVE SAME INVERTS, IE=315.19. SEE
SHEET C410 FOR TYPE A AND TYPE B PLACEMENT DETAILS.
INSTALL 24" DIAM. MANIFOLD PIPES BETWEEN MANIFOLD
DRAINAGE STRUCTURES AND INFILTRATION FACILITY CHAMBERS
PER DETAIL ON SHEET C310. LENGTH OF PIPE CONNECTION
(INSIDE EDGE OF DRAINAGE STRUCTURE TO INFILTRATION
CHAMBER) PER TABLE ON THIS SHEET. MANIFOLD PIPES SHALL
HAVE PIPE BEDDING PER COR STD PLAN 220.10.
INSTALL TREATMENT VAULT DRAIN. SEE SHEET C414 FOR
DETAILS.
INSTALL RECTANGULAR BI-DIRECTIONAL VANED GRATE PER COR
STD. PLAN 204.30.
BOTTOM OF PLAY FIELD PER STATION, OFFSET AND ELEVATION
SHOWN ON THIS SHEET.
DRIVEWAY ENTRANCE SHALL BE PER COR STD PLAN 104.4.
CONCRETE APRON SHALL BE 8-FEET IN WIDTH, BEHIND EXISTING
CURB, TO MEET STREET STANDARDS.
EXISTING STORM DRAINAGE TO REMAIN. PROTECT DURING
CONSTRUCTION.
CONNECT TO EXISTING DRAINAGE PIPE OR STRUCTURE.
POTHOLE EXISTING UTILITY AT CROSSING PRIOR TO
CONSTRUCTION AND NOTIFY THE ENGINEER IF CONFLICT EXISTS.
INSTALL HYDRODYNAMIC SEPARATOR STRUCTURE. SEE SHEET
C411 FOR DETAILS.
INSTALL FLOW SPLITTER STRUCTURE. SEE SHEET C412 FOR
DETAILS.
EXISTING UTILITY TO BE RELOCATED PER SHEET C502.
PLUG EXISTING OVERFLOW STORMWATER PIPE AT SHOWN
LOCATION PER WSDOT STD SPEC. 7-08.3(4). STORMWATER PIPE
SHALL NOT BE PLUGGED UNTIL PROPOSED STORMWATER
SYSTEM IS CONNECTED TO EXISTING MONROE AVE TRUNKLINE
AND PROPOSED INFILTRATION FACILITY IS ONLINE.
INSTALL CAP ON BELL END OF PIPE TO ALLOW FUTURE
CONNECTION BY OTHERS.
CONNECT TO EXISTING DRAINAGE PIPE PER SPECIAL
PROVISIONS 7-05.3(9). CUT EXISTING PIPE WHERE NECESSARY.
PLACE NEW 36" PVC STUB TO CONNECT TO EXISTING CMP TO
EACH SIDE AND CONNECT STUB TO EXISTING PIPE PER WSDOT
STD. PLAN B-60.40-01, TYPE K.
INSTALL 24" DIAM. MANIFOLD PIPE CONNECTION FROM MANIFOLD
VAULT TO PRIMARY ISOLATOR ROW, LENGTH PER PLAN.
INSTALL RECTANGULAR VANED GRATE PER COR STD. PLAN
204.20
INSTALL 24" DIAM. MANIFOLD PIPES BETWEEN ALL MANIFOLD
DRAINAGE STRUCTURES. MANIFOLD PIPES SHALL HAVE PIPE
BEDDING MATERIAL PER COR STD PLAN 220.10.
16
17
18
19
20
21
22
23
24
ADDENDUM NO. 1 CDD 09/19/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
310
315
320
325
330
335
340
345
310
315
320
325
330
335
340
345
13+00 14+00 15+00 16+00 16+60329.50315.0329.68324.2329.88333.5330.40335.014+00331.39335.0332.47335.8333.54336.5334.62337.1335.70337.615+00336.77338.2337.85338.8338.93339.3340.01339.6340.85340.116+00340.93341.116+60
CB130, TYPE 2 - 72"
RIM=341.05
IE=332.94 (36" EX. CMP S OUT)
IE=331.20 (36" SD W OUT)
IE=332.94 (36" EX. CMP N IN)
HYDRODYNAMIC SEPARATOR VAULT, 22
X 14
IE 324.29 (36 SD W OUT)
IE 324.29 (36 SD E IN)
CB125, TYPE 2 - 60
RIM 332.05
IE 325.20 (36 SD W OUT)
IE 325.20 (36 SD E IN)
IE 326.20 (24 SD S IN)
20LF 36 SD
S 2.75%
35LF 36 SD
S 2.59%
231LF 36" SD S=2.59
%
143LF 36 SD
S 3.02%
42LF 36" SD S=
3
.
4
6
%
FLOW SPLITTER VAULT, 10' X 10'
IE=323.74 (36" SD W OUT)
IE=323.74 (24" SD SW OUT)
IE=323.74 (36" SD E IN)
CB120, TYPE 2 - 60
RIM 329.66
IE 322.28 (36 SD SW OUT)
IE 322.28 (36 SD E IN)
FINISHED GRADE AT ACCESS ROAD
ALIGNMENT
STAGE 1 FINISHED GRADE AT ACCESS
ROAD ALIGNMENT
APPROX. LOCATION OF COMM. UTILITY
TO BE VERIFIED BY CONTRACTOR
EXIST. 10" SEWER.
CONTRACTOR TO FIELD VERIFY THE DEPTH OF EXISTING
SEWER AND NOTIFY ENGINEER IF CONFLICT EXISTS
EXIST.PROP.310
315
320
325
330
335
310
315
320
325
330
335
310
315
320
325
330
335
340
310
315
320
325
330
335
340
10+40 11+00 12+00 13+00329.40315.0329.20315.011+00329.00315.0328.80315.0328.60315.0328.40315.0328.24315.012+00328.39315.0328.57315.0328.76315.0328.94315.0329.13315.013+00329.31315.0CB100, TYPE 2 - 60"
RIM=328.73
IE=315.51 (36" SD NW OUT)
IE=315.51 (36" SD NE IN)
CB110, TYPE 2 - 60
RIM 327.97
IE 317.95 (36 SD SW OUT)
IE 317.95 (36 SD NE IN)
77LF 36" SD S=3.
1
8
%
143LF 36" SD S=3
.
0
2
%
STORMWATER
INFILTRATION
FACILITY
CB100, TYPE 2 - 60"
RIM=328.73
IE=315.51 (36" SD NW OUT)
IE=315.51 (36" SD NE IN)
INFILTRATION CHAMBER
MANIFOLD VAULT
SEE SHEET C412 FOR DETAILS
10LF 36 SD
S 3.26%STAGE 2 FINISHED GRADE AT
ACCESS ROAD ALIGNMENT
STAGE 1 FINISHED
GRADE AT ACCESS
ROAD ALIGNMENT
EXIST.PROP.SEE SHEETS C302-C310
FOR DETAILS
STAGE 2 FINISHED GRADE AT
PIPE CENTERLINE
STAGE 1 FINISHED
GRADE AT PIPE
CENTERLINE
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:37SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C403.GZJ LD\RXW NDPH: C403NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C403
20R-408020
SITE DRAINAGE PROFILES
H SCALE 20:1, V SCALE 5:1
ACCESS ROAD ALIGNMENT PROFILE STA. 13+00 - STA. 16+60
H SCALE 20:1, V SCALE 5:1
ACCESS ROAD ALIGNMENT PROFILE STA. 10+40 - STA. 13+00
GENERAL NOTES
1.PIPE PROFILES ARE SHOWN ALONG THE ACCESS ROAD
ALIGNMENT UNLESS OTHERWISE STATED.
2.STATION AND OFFSET, AND RIM ELEVATION SHOWN
REFERENCE CENTER OF STRUCTURE UNLESS OTHERWISE
STATED
3.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT
UNLESS OTHERWISE STATED.
4.PIPE LENGTHS AND ELEVATIONS SHOWN ON PROFILES ARE
MEASURED CENTER-OF-STRUCTURE TO
CENTER-OF-STRUCTURE.
SAME CB
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
310
315
320
325
330
335
310
315
320
325
330
335
310
315
320
325
330
335
340
310
315
320
325
330
335
340
10+40 11+00 12+00 13+00 13+80329.40315.0329.20315.011+00329.00315.0328.80315.0328.60315.0328.40315.0328.24315.012+00328.39315.0328.57315.0328.76315.0328.94315.0329.13315.013+00329.31315.0329.50315.0329.68324.2329.88333.513+80330.40335.0FLOW SPLITTER VAULT, 10' X 10'
RIM=329.81
IE=323.74 (36" SD W OUT)
IE=323.74 (24" SD SW OUT)
IE=323.74 (36" SD E IN)
8LF 24 SD
S 11.16%
24LF 24 SD
S 1.73%
TREATMENT VAULT
224-FT X 21.8-FT X 11-FT
IE IN = 323.33
IE OUT = 320.00STORMWATER
INFILTRATION
FACILITY
CB105, TYPE 2 - 48"
RIM=329.58
IE=319.08 (24" SD NW OUT)
IE=319.08 (24" SD NE IN)
INFILTRATION CHAMBER
MANIFOLD VAULT
SEE SHEET C412 FOR DETAILS
32LF
2
4"
S
D
S
=
1
1.
9
7
%
IE=319.88 (6" WD SE IN)
CB105, TYPE 2 - 48"
RIM=329.58
IE=319.08 (24" SD NW OUT)
IE=319.08 (24" SD NE IN)
IE=319.88 (6" WD SE IN)
STAGE 2 FINISHED GRADE AT
PIPE CENTERLINE
STAGE 2 FINISHED GRADE AT
ACCESS ROAD ALIGNMENT
EXIST.PROP.SEE SHEETS C302-C310
FOR DETAILS
STAGE 1 FINISHED GRADE AT
ACCESS ROAD ALIGNMENT
STAGE 1 FINISHED
GRADE AT PIPE
CENTERLINE
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:37SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C403.GZJ LD\RXW NDPH: C404NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C404
21R-408021
SITE DRAINAGE PROFILES
H SCALE 20:1, V SCALE 5:1
ACCESS ROAD ALIGNMENT PROFILE (TREATMENT VAULT PIPES) STA 10+40 - 13+80
GENERAL NOTES
1.PIPE PROFILES ARE SHOWN ALONG THE ACCESS ROAD
ALIGNMENT UNLESS OTHERWISE STATED.
2.STATION AND OFFSET, AND RIM ELEVATION SHOWN
REFERENCE CENTER OF STRUCTURE UNLESS OTHERWISE
STATED
3.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT
UNLESS OTHERWISE STATED.
4.PIPE LENGTHS AND ELEVATIONS SHOWN ON PROFILES ARE
MEASURED CENTER-OF-STRUCTURE TO
CENTER-OF-STRUCTURE.
SAME CB
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
Y
CENTER OF GRATE
CENTER OF STRUCTURE
NOTES:
1.CENTER OF GRATE CENTER OF STRUCTURE FOR TYPE 1
AND TYPE 1L STRUCTURES ONLY.
2.SPECIFIED NORTHING AND EASTING OR STATION AND
OFFSET REFERENCE CENTER OF STRUCTURE FOR ALL
DRAINAGE FACILITIES, UNLESS NOTED OTHERWISE.
3.RIM ELEVATION AND STATION/OFFSET OR
NORTHING/EASTING REFERENCES ARE TO CENTER OF
STRUCTURE.
NOTES:
1. CENTER OF GRATE CENTER OF STRUCTURE FOR TYPE 1 AND TYPE 1L STRUCTURES ONLY.
2. SPECIFIED NORTHING AND EASTING REFERENCE CENTER OF STRUCTURE FOR ALL DRAINAGE FACILITIES
UNLESS OTHERWISE NOTED ON PLANS.
13
STRUCTURE PLACEMENT TYPE A DETAIL OUTLETINLETOUTLET
GEOMETRIC CENTER OF STRUCTURE
CATCH BASIN TYPE 2 -
72" DIAM.
PIPE ANGLE POINT, STATION
AND OFFSET PER SHEET C401
SOLID CIRCULAR FRAME RING AND COVER
PER COR STD. PLAN 204.50, MARKED DRAIN
(TYP.)
24" DIAM. SD (TYP.)
24" DIAM. SD (TYP.)
24" DIAM. SD (TYP.)
A
A
7.9
12.0
INFILTRATION FACILITY
SECONDARY ISOLATOR ROW
TYPE 2-72" DIAM.
OFFSET CATCH BASIN
GROUT (TYP.)
INLETOUTLET
24" DIAM. SD
IE=315.19
SOLID CIRCULAR FRAME RING AND
COVER PER COR STD. PLAN 204.50,
MARKED "DRAIN". RIM ELEVATION
VARIES, SEE SHEET C401 FOR
MANIFOLD CB RIM ELEVATIONS
GROUT (TYP.)
24" DIAM. SD
IE=315.19 (TYP.)
24" DIAM. SD
IE=315.19 (TYP.)
2
SUMP
(TYP.)
SUMP ELEVATION=313.19 (TYP)
INFILTRATION FACILITY
SECONDARY ISOLATOR ROW
PLAN
SECTION A-A
57
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:38SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C410.GZJ LD\RXW NDPH: C410NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
R-408022
C410
22
TYPICAL STRUCTURE PLACEMENT DETAIL
STRUCTURE PLACEMENT TYPE B DETAIL
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
STA. 13+86.50
OFF. 21.27' RT
STA. 13+72.50
OFF. 21.21' RT
STA. 13+72.60
OFF. 0.79' LT
STA. 13+86.60
OFF. 0.73' LT
SECTION A-A SECTION B-B
INLET PIPE
OUTLET PIPE
OUTLET CONTROL BOX
RETURN PIPE
WEIR HOOD
MAIN WEIR
3' X 3' ACCESS
HATCH, TYP
3' X 3' ACCESS
HATCH, TYP
WIDTH LENGTHWIDTH
OUTLETINLET
PRIMARY CHAMBER
96"48"96"MAIN
WEIR
OUTLET
CONTROL BOX
24" DIAM. HDPE
RETURN PIPE
3' X 3' ACCESS HATCH, ADUST
TO FINISHED GRADE (TYP.)
OUTLET INLET
SECONDARY CHAMBER
24" DIAM. HDPE
RETURN PIPE48"96"96"12"MIN.12"MIN.CSTC LEVELING
PAD
CSTC LEVELING
PAD
12"
MIN.
12"
MIN.
3' X 3' ACCESS HATCH, ADUST
TO FINISHED GRADE (TYP.)
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:38SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C411.GZJ LD\RXW NDPH: C411NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C411
23
HYDRODYNAMIC SEPARATOR DETAILS
R-408023
HYDRODYNAMIC SEPARATOR VAULT DETAIL (BAYSEPARATOR OR APPROVED EQUAL)
NOTES:
1.CONTRACTOR TO PROVIDE TYPE 3E WORKING DRAWINGS FOR ENGINEER APPROVAL.
2.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT
3.SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4.ACCESS HATCH SHALL BE LOCKING, ALUMINUM, WITH SECONDARY FALL PROTECTION GRATING, H-30 LOADING. LW PRODUCTS COMPANY HHS, OR APPROVED EQUAL.
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
2'8'3'3'10'5'4'
6"6"6.90'6"1.25'7.15'1"(TYP.)1"
(TYP.)
36" DIA. HIGH FLOW
BYPASS OUTLET
IE: 323.74
36" DIA. TRUNKLINE INLET
IE: 323.74
24" DIA. WQ FLOW PIPE OUTLET
IE: 323.74
WEIR I.E.: 327.74
GRAVEL BACKFILL
FOR WALLS
12" MIN. CSTC
36" DIA. HIGH-FLOW
BYPASS OUTLET
24" DIA. WQ FLOW
PIPE OUTLET
36" DIA. TRUNKLINE INLET
STA. 13+50.05,
OFF. 4.49' LT
STA. 13+60.02,
OFF. 4.26' RT.
STA. 13+59.80
OFF. 5.73' RT
STA. 13+49.75,
OFF. 5.51' RT
36" X 48" X 1
2" STAINLESS STEEL RESTRICTOR
PLATE
13.8" DIA CIRCULAR ORIFICE
OPENING , IE=323.74
1" DIA HOLE FOR ATTACHMENT.
SECURE PLATE WITH STAINLESS
STEEL EXPANSION BOLTS AND
WASHER, 1" EMBEDNMENT INTO
CONC. WALL. SEAL OUTER EDGE OF
PLATE WITH SILICON CAULK.
3'X3' ACCESS HATCH,
ADJUST TO FINISH
GRADE (TYP.)
36" X 48" STEEL RESTRICTOR
PLATE PER DETAIL BELOW
10'
24" Ø SCH 40 PVC PIPE OUTLET [IE=315.19]
TO INFILTRATION CHAMBER ISOLATOR
ROW
24" DIA MANIFOLD
IE: 315.19
OUTFLOW PIPE
IE=315.19 (TYP.)
VAULT IE = 314.19
TOP OF VAULT = 321.19
3'X3' ACCESS HATCH,
ADJUST TO FINISHED
GRADE (TYP.)
24" DIA MANIFOLD
IE: 315.19
36" DIA. HIGH-FLOW
BYPASS INLET
24" DIA. WQ FLOW
PIPE INLET
HANDHOLDS OR LADDER,
PER COR STD 204.60
GRAVEL BACKFILL
FOR WALLS5'X3' ACCESS HATCH,
ADJUST TO FINISHED GRADE
TOP OF WEIR
ELEV: 317.69
12" MIN. CSTC
12"
12"
7'
27'
3'5'3'
12" SUMP
12"
2.89'
3.94'6.1'3.06'
6"
3'
3'X3' ACCESS HATCH,
ADJUST TO FINISHED
GRADE (TYP.)
3'
27.00'
2.70'
5.58'
2.70'
4.42'9.08'
5%
5%
3.65'
9.08'4.42'
36" DIA. HIGH-FLOW BYPASS INLET
IE: 315.19
24" DIA. WQ FLOW
PIPE INLET
IE: 315.19
HANDHOLDS OR LADDER
24" DIAM. SD TO
INFILTRATION CHAMBER
ISOLATOR ROWS (TYP.)
STA. 10+84.61,
OFF. 1.27' LT
STA. 10+84.61,
OFF.8.77' LT
STA. 11+11.61,
OFF.8.77' LT
STA. 11+11.61,
OFF. 1.27' LT 7.5'OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWIN* NO.
PROJECT NUMBER
REVISION COMMENTSNO.B<REVIEW DATE
DESI*NER DRAWN B<CHECKED B<
CD TT R*Plotted: Aug 28, 2023 - 4:34pm K:\Project\33200\33201A\CADD\ACAD\Dwg\C412-C414.dwg Layout Name: C412NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C412
24
FLOW SPLITTER VAULT AND INFILTRATION
CHAMBER MANIFOLD VAULT DETAILS
R-408024
FLOW SPLITTER VAULT SECTION A-A
NOT TO SCALE
INFILTRATION CHAMBER MANIFOLD VAULT PLAN VIEW
NOT TO SCALE
INFILTRATION CHAMBER MANIFOLD VAULT SECTION A-A
NOT TO SCALE
NOTES:
1.CONTRACTOR TO PROVIDE TYPE 3E WORKING DRAWINGS FOR ENGINEER APPROVAL.
2.SUBGRADE BELOW VAULTS TO BE COMPACTED PER WSDOT STAND SPEC 2-03.3(14)C METHOD C.
3.SEE SPECIFICATIONS FOR ADDITIONAL REQUIREMENTS.
4.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT.
5.ACCESS HATCHES SHALL BE LOCKING ALUMINUM, WITH SECONDARY FALL PROTECTION GRATING, H-30 LOADING. LW PRODUCTS COMPANY OR
APPROVED EQUAL.
6.LADDERS SHALL BE PER KCRDCS FIGURE 7-011.
FLOW SPLITTER VAULT PLAN VIEW
NOT TO SCALE
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
224
-0 SLAB OD
10 TYP. SECOND POUR END WALL
21
-8
WALL OD20
-0
WALL ID
3
-4
8
-0
TYP
4
TYP
10 TYP WALL
THICKNESS AT BASE
INVERTED TRENCH
OUTLET PIPE.
IE: 320.00'
10
-10
TYP
3
-0
TYP
INLET PIPE.
IE: 323.33'
21
-8
WALL
OD
20
-0
WALL
ID
3
-4
8
-0
TYP
4
TYP
10 TYP WALL
THICKNESS
AT BASE
INLET PIPE.
IE: 323.33
OUTLET PIPE.
IE: 320.00'
10
-10
TYP
6X Ø24" STAND PIPE WITH
OVERFLOW GRATE
6
-46
-414
-06
-621
-0148
-10
IE: 320.00'
TOP OF CONCRETE:
330.00'
1
-0
10
-0
OUTLET PIPE
IE: 323.33'
11
-0
INLET PIPE.
TOP OF CONCRETE:
330.00'
Ø4" SLOTTED
PVC UNDERDRAIN.
Ø4" SLOTTED
PVC UNDERDRAIN.
6"x36" INLET WINDOW
(TYP 37 EACH SIDE)
INLET CHANNEL DISTRIBUTION
PLATES (TYP EVERY 3 FT),
SEE DETAIL 2 ON SHEET C414.
INVERTED TRENCH JOINT
(TYP EVERY 10 FT)TOP OF INVERTED TRENCH6X Ø24" HDPE STAND PIPE
WITH OVERFLOW GRATE
(POLYLOK 3008-G24)
GRATED VAULT TOP AND STEEL
SUPPORTS PER STRUCTURAL
SHEETS S601-S603.
INVERTED TRENCH JOINT
(TYP EVERY 10 FT)
GRATED VAULT TOP AND STEEL SUPPORTS
PER STRUCTURAL SHEETS S601-S603.
21
-0
STA. 10+98.24, 45.30' RT
STA. 10+98.24, 23.63' RT
STA. 13+54.03, 28.02' RT
STA. 13+33.45, 14.63' RT
PRECAST CONC.
INVERTED TRENCH (TYP.)
OUTER PRECAST CONC.
TRENCH WALLS (TYP.)C414DC414DCOBBLES FOR ENERGY
DISSIPATION, SEE DETAIL
3 ON SHEET C414.
COBBLES FOR ENERGY
DISSIPATION, SEE DETAIL
3 ON SHEET C414.
WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD WD
TREATMENT VAULT DRAIN, SEE
DETAILS ON SHEET C414. CONNECT
TO CB105 AS SHOWN ON SHEET C401
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:39SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C412-C414.GZJ LD\RXW NDPH: C413NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C413
25
TREATMENT VAULT DETAILS
R-408025
TREATMENT VAULT DETAIL
BLRPRG UQGHUJURXQG
20
-0 X 224
-0
3-SLGHG BR[ TUHQFK
(OR APPROVED EQUAL)
TUHDWPHQW FORZ RDWH: 12.65 FIV
PHDN FORZ RDWH: 17.6 FIV
NOTES:
1.CONTRACTOR SHALL PROVIDE TYPE 3E WORKING DRAWINGS FOR
ENGINEER APPROVAL FOR TREATMENT VAULT.
2.CONCRETE 28 DAY COMPRESSIVE STRENGTH SHALL BE 5,000 PSI
MINIMUM.
3.STEEL REINFORCEMENT: REBAR, ASTM A-615 OR A-706, GRADE 60.
4.MESH REINFORCEMENT: ASTM A-1064, S1.2, GRADE 80.
5.CEMENT: ASTM C-150 SPECIFICATION.
6.BIOPOD TREATMENT VAULT SYSTEM MANUFACTURED BY
OLDCASTLE SHALL INCLUDE OUTER PRECAST TRENCH, PRECAST
INVERTED TRENCH, INTERNAL PIPING, MULCH, STORMMIX MEDIA,
GRAVEL, DISTRIBUTION PLATES AND HARDWARE, AND DISSIPATION
ROCK. CONTRACTOR RESPONSIBLE FOR THE INSTALLATION OF ALL
TREATMENT VAULT COMPONENTS.
7.OVERSIZED HOLES TO ACCOMMODATE SPECIFIC PIPE TYPE MUST
BE CONCENTRIC TO PIPE ID. AFTER PIPES ARE INSTALLED, ALL
ANNULAR SPACES SHALL BE FILLED WITH A MINIMUM OF 3000 PSI
CONCRETE FOR FULL THICKNESS OF PRECAST WALLS. PIPES ARE
TO BE FLUSH WITH THE INSIDE SURFACE OF THE CONCRETE
STRUCTURE.
8.CONTRACTOR RESPONSIBLE TO VERIFY ALL SIZES, LOCATIONS
AND ELEVATIONS OF OPENINGS.
9.CONTRACTOR RESPONSIBLE TO ENSURE ADEQUATE BEARING
SURFACE IS PROVIDED (I.E. COMPACTED AND LEVEL PER PROJECT
SPECIFICATIONS).
10.SECTION HEIGHTS, SLAB/WALL THICKNESSES AND KEYWAYS ARE
SUBJECT TO CHANGE DUE TO AVAILABILITY AND PRODUCTION
PLANT CAPABILITY.
11.MAXIMUM PICK WEIGHT 58,400 LBS. (MEDIA AND INTERNALS
SHIPPED SEPARATELY.)
12.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT.
SCALE: 1"=10'
TOP VIEW
SCALE: 1"=10'
PLAN VIEW
SCALE: 1"=10'
ELEVATION VIEW
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
1'-6"1'-2"
3'-0"
(TYP)
3'-0"
(TYP)
6"
6" X 36" INLET WINDOW
TOP OF INVERTED TRENCH
1'-6" X 3' STAINLESS STEEL
SOLID PLATE
6" X 3' STAINLESS STEEL SOLID PLATE,
USE AS REQUIRED TO REDUCE 6" X 36"
INLET WINDOW OPEN AREA
4"
2"
INSIDE TOP OF INVERTED TRENCH
8" X 3' STAINLESS STEEL
SOLID PLATE ABOVE
INLET WINDOW
8"
3'-2"
VERTICAL SUPPORTS, AS NEEDED
2'-4"
8"
3'-6"
4"
1'-2"
6"
4"
3'-2"
4"
3'-4"
INVERTED TRENCH
4'-0"
INLET CHANNELØ24" HDPE STAND PIPE WITH OVERFLOW
GRATE (POLYLOK 3008-G24).INLET CHANNEL DISTRIBUTION
PLATES SPACED EVERY 3 FT, SEE
DETAIL 2 FOR ELEVATION VIEW
PRECAST CONCRETE
INVERT TRENCH
TOP OF MULCH EL = 323.50'
MAX BIORETENTION PONDING EL = 324.00'
OVERFLOW EL = 324.17
100YR HIGH WATER EL = 324.67
1'2'
TREATMENT VAULT
12" CSTC LEVELING PAD
NON-INFILTRATION
ZONE FILLTOPSOIL TYPE A
GRAVEL BACKFILL
FOR DRAINS
1' MIN.
TREATMENT VAULT DRAIN, SEE
DETAIL THIS SHEET. SEE SHEET
C401 PLAN FOR LAYOUT AND
SHEET C404 FOR PROFILE
CONNECTION TO CB105
3:1 MAX
S
L
O
P
E
GRAVEL BACKFILL
FOR WALLS
6" DIA. UNDERDRAIN
PIPE, 0.5% MIN. SLOPE
GRAVEL BACKFILL
FOR DRAINS
CONSTRUCTION GEOTEXTILE FOR
UNDERGROUND DRAINAGE, MODERATE
SURVIVABILITY, WITH 12" OVERLAP AT TOP
1'
1'
OUTLET PIPE, IE: 320.00', NEARSIDE FLOW THROUGH PORTS IN TRENCH WALLS Ø4 SLOTTED
PVC UNDERDRAIN
17"x17" HAUNCH (TYPICAL)
INLET PIPE, IE: 323.33', FARSIDE.
GRATED VAULT TOP AND STEEL SUPPORTS
PER STRUCTURAL SHEETS S601 - S603
INVERTED TRENCH
SEE DETAIL 1
20'-0"
WALL ID
10" TYP WALL
THICKNESS
8" TYP WALL
THICKNESS
21'-8"
WALL OD
DISSIPATION ROCK AT
DISTRIBUTION PLATE
OPENINGS, SEE DETAIL 3
12" CSTC LEVELING PAD
20" GRAVEL
2"
MULCH
18" StormMix™
MEDIA
10'-0"
1' BASE SLAB
3'3'
GRAVEL BACKFILL
FOR WALLS
TREATMENT VAULT DRAIN
SEE DETAIL THIS SHEET
18" TOPSOIL TYPE A, SEE
TREATMENT VAULT DRAIN
TYPICAL SECTION THIS SHEET
6" COMPACTED DEPTH CSTC
MAINTENANCE ACCESS
ROAD SHOULDER. SEE
SHEET C510 FOR DETAILS
9"
6"
2"
8"
4"
NOTES:
1.FINAL SIZE AND PLACEMENT OF DISSIPATION ROCK TO BE DETERMINED BY
CONTRACTOR, SEE SPECIAL PROVISIONS 7-05 FOR TREATMENT VAULT.
2.DISSIPATION ROCK TO BE PLACED BENEATH EACH 4" HIGH 3' WIDE INLET WINDOWS.
3.DISSIPATION ROCK TO BE WSDOT 8" STREAMBED COBBLES, OR APPROVED EQUAL.
8" X 3' STAINLESS STEEL
SOLID PLATE ABOVE WINDOW
6" X 36" WINDOW
ADJUSTABLE STEEL PLATE TO
REDUCE 6" X 36" WINDOW AS
NEEDED [DOWN TO 4" X 36"]
DISSIPATION ROCK
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Aug 28, 2023 - 6:27pm K:\Project\33200\33201A\CADD\ACAD\Dwg\C412-C414.dwg Layout Name: C414NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
C414
26
TREATMENT VAULT DETAILS
R-408026
TREATMENT VAULT DETAILS
SCALE: 1"=2'
SECTION D-D
SCALE: 1"=2'
DETAIL 2 - DISTRIBUTION PLATES
SCALE: 1"=1'
DETAIL 1 - INVERTED TRENCH
BioPod Underground
20'-0" X 224'-0"
3-Sided Box Trench
(OR APPROVED EQUAL)
Treatment Flow Rate: 12.65 cfs
Peak Flow Rate: 17.6 cfs
TREATMENT VAULT DRAIN TYPICAL SECTION
TREATMENT VAULT DRAIN DETAIL
SCALE: 1"=1'
DETAIL 3 - DISSIPATION ROCK
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
XXXXXXXXXXXXXXXXXXXX X X X X X X X X X X X X X X
X
1
1
1
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHP
WD WD WD WD WD WD WD WD
1000 1100 1200 1300
1
4
0
0
ACCESS ROAD
1
5
LOC
K
ING
PO
S
T
STA 1000.00 13.50
LT
AP 3
STA 1000.00 13.50
RT
AP3
STA 1025.21 13.50
RT
PT3
STA 1359.55 6.00
RT
PC12
STA 1296.00 12.74
LT
PT3
STA 1055.71 44.00
RT
PC EL 329.483
STA 1055.63 62.25
RT
AP EL 329.663
STA 1115.21 13.50
RT
PC
END12
11 BEGIN
STA 1084.63 44.00
RT
PT EL 329.12 12
STA 1300.06 13.19
RT
PT
END11
12 BEGIN 320330316318322324326328332334 336
3
3
8
1
6
STA 997.50 59.86
RT
AP4
STA 1011.06 80.69
RT
AP4
STA 997.50 16.00
LT
AP4
STA 1335.98 40.47
LT
END4
324
326
328
2
4
STA 1412.94 34.43
LT4
STA 1412.14 9.77
LT4
STA 1120.21 13.50 RT
END11
BEGIN10
STA 1293.64 13.50 RT
END10
11 BEGIN
STA 1086.13 34.32
RT
EL 329.00 12
14
L 47.909 R 30.500
D 90.0000
L 47.909 R 30.500
D 90.0000
L 51.370 R 54.685
D 53.8225
L 66.659 R 70.000
D 54.5611
33
2
3
3
4
3
3
6
3
3
8330
3323
3
4 3363
3
8
STA 1084.63 62.37
RT
AP EL 329.33
END3
12 BEGIN
STA 1343.87 6.39
LT
PC 3
310
315
320
325
330
335
340
345
310
315
320
325
330
335
340
345
1000330.00315.01020329.80315.01040329.60315.01060329.40315.01080329.20315.01100329.00315.01120328.80315.01140328.60315.01160328.40315.01180328.24315.01200328.39315.01220328.57315.01240328.76315.01260328.94315.01280329.13315.01300329.31315.01320329.50322.11340329.68330.61360329.88336.51380330.40336.1STA = 10+00.00ELEV = 330.00LOW PT STA: 11+80.29
LOW PT ELEV: 328.24
PVI STA:11+80.00
PVI ELEV:328.20
K:8.00
LVC:15.41
BVCS: 11+72.29BVCE: 328.28EVCS: 11+87.71EVCE: 328.27LOW PT STA: 13+56.38
LOW PT ELEV: 329.83
PVI STA:13+74.22
PVI ELEV:330.00
K:8.00
LVC:35.67
BVCS: 13+56.38BVCE: 329.830.93%-1.00%STA = 10+00.00ELEV = 330.00LOW PT STA: 11+80.29
LOW PT ELEV: 328.24
PVI STA:11+80.00
PVI ELEV:328.20
K:8.00
LVC:15.41
BVCS: 11+72.29BVCE: 328.28EVCS: 11+87.71EVCE: 328.27LOW PT STA: 13+56.38
LOW PT ELEV: 329.83
PVI STA:13+74.22
PVI ELEV:330.00
K:8.00
LVC:35.67
BVCS: 13+56.38BVCE: 329.830.93%-1.00%
STAGE 2 FINISHED
GRADE
STAGE 1 FINISHED GRADE
STAGE 1STAGE 2OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
PRO-ECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: NRY 28 2023 4:28SP O:?PRO-ECT?33200?33201A?CADD?ACAD?DZJ?C501C502.GZJ LD\RXW NDPH: C501NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
SCALE IN FEET
20 0 20 40
5 0 5 10VERT
HORZ
CONSTRUCTION CENTERLINE, SEE SHEET C101 FOR DETAILS.
CONSTRUCT MAINTENANCE ACCESS ROAD PER DETAILS ON SHEET C510 .
CONSTRUCT CEMENT CONCRETE TRAFFIC CURB PER COR STD PLAN 101
INSTALL 6-FT TALL BLACK VINYL CHAIN LINK FENCE PER COR STD PLAN 234.60
AND 234.70.
INSTALL SWING GATE PER DETAIL ON SHEET C510.
INSTALL 6" DEPTH CRUSHED SURFACING TOP COURSE PER WSDOT STD. SPEC
9-03.9(3) BETWEEN CURB AND TREATMENT VAULT.
COORDINATE DE-ENERGIZING AND REMOVAL OF EXISTING UTILITY WITH
ENGINEER PRIOR TO CONSTRUCTION. LIGHT POLE MUST BE REPLACED WITH
NEW POLE PER COR STD PLAN 117.1 AND PLACED ON CONCRETE PAD PER COR
STD PLAN 120. EXISTING LUMINAIRE TO BE DELIVERED TO COR MAINTENANCE
FACILITY. NEW ROADWAY LUMINAIRE ARM TO BE 6-FT IN LENGTH.
CONSTRUCT SIDEWALK PER COR STD PLAN 102. REPLACE EXISTING CONCRETE
SIDEWALKS FROM EXPANSION JOINT TO JOINT.
CONSTRUCT CEMENT CONCRETE DRIVEWAY ENTRANCE PER COR STD PLAN
104.4 AND ENLARGED PLAN ON SHEET C510.
CONSTRUCT CEMENT CONCRETE ROLLED CURB PER DETAIL ON SHEET C510.
TRANSITION CURB BETWEEN CEMENT CONCRETE TRAFFIC CURB AND GUTTER
AND CEMENT CONCRETE ROLLED CURB PER DETAIL ON SHEET C510.
CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD
PLAN 101.
INSTALL POWER CONDUIT AND TYPE 1 JUNCTION BOX TO EXISTING POWER
CONDUIT FOR NEW LIGHT POLE. CONDUIT SHALL BE 4-INCH DIAMETER
SCHEDULE 80 PVC.
CEMENT CONCRETE CURB AND GUTTER AT CATCH BASIN SHALL BE
CONSTRUCTED PER COR STD PLAN 101.
TRANSITION CURB FROM 6" HEIGHT TO 0" HEIGHT OVER LAST 12" OF LENGTH.
REPLACE HMA PAVEMENT FULL DEPTH. MATCH EXISTING HMA DEPTH AND
EXISTING GRADE CROSS SLOPE.
TRANSITION CROSS SLOPE OF MAINTENANCE ACCESS ROAD FROM STA 15+71
TO STA 16+00 TO FROM TYPICAL MAINTENANCE ACCESS SECTION PER SHEET
C510 TO MATCH DRIVEWAY ENLARGED GRADING PLAN PER SHEET C510.
INSTALL CHAN LINK FENCE W/ PRIVACY SLATS PER SPECIAL PROVISIONS
SECTION 8-12.
INSTALL DOUBLE 20-FOOT CHAIN LINK W/ PRIVACY SLATS GATE PER SPECIAL
PROVISIONS SECTION 8-12.
CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD
PLAN 101. MATCH EXISTING CURB FROM EXPANSION JOINT TO JOINT.
INSTALL 2" OVERLAY OF CLASS B ASPHALT PAVEMENT. ASPHALT OVERLAY
SHALL APPLY TO ENTIRE LANE WIDTH. SEE SHEET C510 FOR OVERLAY LIMITS.
CONSTRUCTION NOTES
GENERAL NOTES
1.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT UNLESS
OTHERWISE NOTED.
2.ALL DIMENSIONS, STATION AND OFFSET REFERENCES ARE TO FACE OF
CURB UNLESS OTHERWISE NOTED.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
C501
27R408027
MAINTENANCE ACCESS ROAD PLAN AND PROFILEADDENDUM NO. 3 CDD 10/04/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
XXXXP P
XXXS
SS MH
48 CONC
RIM 342.20
10 PVC N IE 335.00
10 PVC S IE 334.80
16
C
PC
C
C SPEED 25GRASSCONC. SIDEWALKGRASSDRIVEWAY7
CHAINLINK FENCE
TVTVTVTVTVTVTVTVTVTV TV TVTVWWWWWWWSDSDSDSDSSSSSSSSSSSSOHPOHPOHPOHPTVPPPPPPPPTVTV
TVTVTVTVTVPPTVTVTVTVTVPP
PPPPPPTVTVTVTVTV2 DUCT BANKS2 DUCT BANKS3 DUCT BANKS3 DUCT BANKSATP03 ATP04
AHA01AHA02
68
12
6
1400 1500 1600 1680
4H : 1V1
2
5LOCKING POST
STA 1506.22 6.00
RT
AP12
STA 1510.25 6.00
LT
AP3
STA 1590.65 14.11
LT
AP EL 340.79173
FULL DEPTH JOINT
STA 1411.08 10.35
RT
AP 4
9
7
STA 1412.94 34.43
LT4
STA 1412.14 9.77
LT4
8
13
STA 1599.24 28.02
LT
BEGIN
18
STA 1597.38 22.39
RT18
STA 1607.56 22.76
RT18L 51.370 R 54.685
14
8
16
8
STA 16+59.23, 24.89'RT
BEGIN
MATCH EXIST.
20
STA 16+59.72, 12.90'RT
END
MATCH EXIST.
20
STA 1615.05 23.08
RT
BEGIN
MATCH EXIST.
20
STA 16+17.20, 26.88'LT
BEGIN
MATCH EXIST.
20
STA 1571.28 5.11
RT
AP EL 340.471712
STA 1590.65 5.90
RT
EL 340.891712
STA 1571.28 12.16
LT
EL 340.82173
STA 1600.65 13.70
LT
EL 340.68173
STA 1599.82 6.29
RT
EL 341.051715
STA 1598.81 16.28 LT
END18
19 BEGIN
STA 1597.89 8.71 RT
END19
18 BEGIN
STA 1606.11 50.39
RT
END
18
332
334
336
338
34021
315
320
325
330
335
340
345
315
320
325
330
335
340
345STA = 16+16.59ELEV = 340.61HIGH PT STA: 15+91.81
HIGH PT ELEV: 340.99
PVI STA:15+83.10
PVI ELEV:341.25
K:5.00
LVC:36.44
BVCS: 15+64.88BVCE: 340.27EVCS: 16+01.32EVCE: 340.90LOW PT STA: 13+56.38
LOW PT ELEV: 329.83
PVI STA:13+74.22
PVI ELEV:330.00
K:8.00
LVC:35.67
EVCS: 13+92.05EVCE: 330.965.39%
-1.90%
1380330.40336.11400331.39335.71420332.47335.71440333.54336.51460334.62337.11480335.70337.61500336.77338.21520337.85338.81540338.93339.31560340.01339.61580340.85340.11600340.93341.11620 1640 1660
STAGE 2 FINISHED GRADE
STAGE 1 FINISHED GRADE
STAGE 1STAGE 2OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
PRO-ECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: NRY 28 2023 4:34SP O:?PRO-ECT?33200?33201A?CADD?ACAD?DZJ?C501C502.GZJ LD\RXW NDPH: C502NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
SCALE IN FEET
20 0 20 40
5 0 5 10VERT
HORZ
CONSTRUCTION CENTERLINE, SEE SHEET C101 FOR DETAILS.
CONSTRUCT MAINTENANCE ACCESS ROAD PER DETAILS ON SHEET C510 .
CONSTRUCT CEMENT CONCRETE TRAFFIC CURB PER COR STD PLAN 101
INSTALL 6-FT TALL BLACK VINYL CHAIN LINK FENCE PER COR STD PLAN 234.60
AND 234.70.
INSTALL SWING GATE PER DETAIL ON SHEET C510.
INSTALL 6" DEPTH CRUSHED SURFACING TOP COURSE PER WSDOT STD. SPEC
9-03.9(3) BETWEEN CURB AND TREATMENT VAULT.
COORDINATE DE-ENERGIZING AND REMOVAL OF EXISTING UTILITY WITH
ENGINEER PRIOR TO CONSTRUCTION. LIGHT POLE MUST BE REPLACED WITH
NEW POLE PER COR STD PLAN 117.1 AND PLACED ON CONCRETE PAD PER COR
STD PLAN 120. EXISTING LUMINAIRE TO BE DELIVERED TO COR MAINTENANCE
FACILITY. NEW ROADWAY LUMINAIRE ARM TO BE 6-FT IN LENGTH.
CONSTRUCT SIDEWALK PER COR STD PLAN 102. REPLACE EXISTING CONCRETE
SIDEWALKS FROM EXPANSION JOINT TO JOINT.
CONSTRUCT CEMENT CONCRETE DRIVEWAY ENTRANCE PER COR STD PLAN
104.4 AND ENLARGED PLAN ON SHEET C510.
CONSTRUCT CEMENT CONCRETE ROLLED CURB PER DETAIL ON SHEET C510.
TRANSITION CURB BETWEEN CEMENT CONCRETE TRAFFIC CURB AND GUTTER
AND CEMENT CONCRETE ROLLED CURB PER DETAIL ON SHEET C510.
CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD
PLAN 101.
INSTALL POWER CONDUIT AND TYPE 1 JUNCTION BOX TO EXISTING POWER
CONDUIT FOR NEW LIGHT POLE. CONDUIT SHALL BE 4-INCH DIAMETER
SCHEDULE 80 PVC.
CEMENT CONCRETE CURB AND GUTTER AT CATCH BASIN SHALL BE
CONSTRUCTED PER COR STD PLAN 101.
TRANSITION CURB FROM 6" HEIGHT TO 0" HEIGHT OVER LAST 12" OF LENGTH.
REPLACE HMA PAVEMENT FULL DEPTH. MATCH EXISTING HMA DEPTH AND
EXISTING GRADE CROSS SLOPE.
TRANSITION CROSS SLOPE OF MAINTENANCE ACCESS ROAD FROM STA 15+71
TO STA 16+00 TO FROM TYPICAL MAINTENANCE ACCESS SECTION PER SHEET
C510 TO MATCH DRIVEWAY ENLARGED GRADING PLAN PER SHEET C510.
INSTALL CHAN LINK FENCE W/ PRIVACY SLATS PER SPECIAL PROVISIONS
SECTION 8-12.
INSTALL DOUBLE 20-FOOT CHAIN LINK W/ PRIVACY SLATS GATE PER SPECIAL
PROVISIONS SECTION 8-12.
CONSTRUCT CEMENT CONCRETE TRAFFIC CURB AND GUTTER PER COR STD
PLAN 101. MATCH EXISTING CURB FROM EXPANSION JOINT TO JOINT.
INSTALL 2" OVERLAY OF CLASS B ASPHALT PAVEMENT. ASPHALT OVERLAY
SHALL APPLY TO ENTIRE LANE WIDTH. SEE SHEET C510 FOR OVERLAY LIMITS.
CONSTRUCTION NOTES
GENERAL NOTES
1.STATION AND OFFSET ARE PER ACCESS ROAD ALIGNMENT UNLESS
OTHERWISE NOTED.
2.ALL DIMENSIONS, STATION AND OFFSET REFERENCES ARE TO FACE OF
CURB UNLESS OTHERWISE NOTED.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
C502
28
MAINTENANCE ACCESS ROAD PLAN AND PROFILE
R408028
ADDENDUM NO. 3 CDD 10/04/2023CDD
CONFORMED SET - NOVEMBER 202311/28/202311/28/2023
2%
4
51
2
2%
3
2%
WIDTH VARIES PER SHEETS
C501 AND C502, MIN. 6
WIDTH VARIES PER SHEETS
C501 AND C502, MIN. 6
VARIES, 2
MIN.
S OR SE TREATMENT VAULT OR
EDGE OF PERMANENT EASEMENT
N OR NW INFILTRATION CHAMBER GALLERY
OR EDGE OF PERMANENT EASEMENT
8
2%
4 SLOPE VARIES, PER SHEETS
C501 AND C502
2
6
7
9
9
P16CCCC8 CMP (E) IE 336.38
PPP
P
PPP
PP8.00'36.00'
15.67'13.32'16+00STA 15+99.16, 22.45
RT
EL 341.62
STA 16+07.16, 22.73
RT
EL 341.53
STA 16+15.10, 23.05
RT
TBC, EL 341.48 (MATCH EXIST.)
STA 16+15.47, 14.94
RT
TBC, EL 341.38
STA 15+99.82, 6.28
RT
EL 341.05 STA 16+00.23, 3.71
LT
EL 340.86
STA 16+07.81, 6.61
RT
EL 340.89
STA 16+00.65, 13.70
LT
EL 340.68
STA 16+15.80, 6.94
RT
EL 340.75
STA 16+00.98, 21.69
LT
EL 340.91
STA 16+08.64, 13.37
LT
EL 340.54
STA 16+01.22, 27.51
LT
EL 341.00
STA 16+17.20, 26.86
LT
TBC, EL 340.64 (MATCH EXIST.)
STA 16+16.96, 21.07
LT
TBC, EL 340.75
STA 16+09.20, 27.11
LT
EL 340.92
STA 15+99.49, 14.37
RT
EL 341.54
STA 16+16.63, 13.04
LT
EL 340.39
MONROE
AVE NE
DRIVEWAY PAY LIMITS
8.00'21.18'7.90'6 1
2
SLOPE VARIES
PER SHEET C501CURB
10
1
2
R 13
R 12
2
4
4' MIN. TROWELED TRANSITION
FROM CEMENT CONCRETE TRAFFIC
CURB TO MODIFIED ROLLED CURB
4"
12"
18"
6"
NOTES:
1.ALIGN BACK OF VERTICAL, TRANSITION, AND ROLLED CURB.
CEMENT CONCRETE
TRAFFIC CURB PER
COR STD PLAN 101
CEMENT CONCRETE
ROLLED CURB AND
GUTTER
TRANSITION SECTION (PAYMENT
UNDER CEMENT CONCRETE VERTICAL
CURB AND GUTTER)
5.5"
12"
12"
5'-0"
TRAN
SI
TI
O
N
FULL EXPANSION JOINT
BACK OF
CURB
6"
12"R
13"R
FULL EXPANSION
JOINT
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:42SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C510.GZJ LD\RXW NDPH: C510NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
CONSTRUCTION NOTES
6 COMPACTED DEPTH CRUSHED SURFACING TOP COURSE PER WSDOT STD.
SPEC 9-03.9(3) BENEATH PAVEMENT AND CURB.
4 COMPACTED DEPTH HMA, CLASS 12 PG 58H-22.
CEMENT CONCRETE CURB AND GUTTER. CURB TYPE PER SHEET C501 - C502.
FINISHED GRADE NOT STEEPER THAN 3H:1V UNLESS OTHERWISE STATED.
NON-INFILTRATION MATERIAL OR 6 DEPTH CRUSHED SURFACING TOP
COURSE PER WSDOT STD. SPEC 9-03.9(3).
18 TOPSOIL TYPE A PER DETAIL ON SHEET L702.
CRUSHED SURFACING TOP COURSE PER WSDOT STD. SPEC 9-03.9(3) OR 18
TOPSOIL TYPE A FOR PLANTED AREAS. SEE SHEET L701 FOR PLAN VIEW
LOCATION OF SHOULDER SURFACING.
CEMENT CONCRETE TRAFFIC CURB PER COR STD. PLAN 101.
6 COMPACTED DEPTH CRUSHED SURFACING TOP COURSE PER WSDOT STD.
SPEC 9-03.9(3) MAINTENANCE ACCESS ROAD SHOULDER, LIMITS PER PLAN.
1
2
3
4
5
C510
29R-408029
MAINTENANCE ACCESS ROAD SECTIONS AND DETAILS
CONSTRUCTION NOTE:
KEEP GATE SUPPORTED AT BOTH ENDS AT ALL TIMES,
EXCEPT FOR SWINGING BETWEEN LOCKING POSTS
22
LOCKING PIPE POST 4" I.P.S.
STD. WT.
SEE NOTE 7OUTER PIPE=4" I.P.S.
STD. WT. (4-1/2" O.D.)
6
-0 MIN.
INNER HINGE PIPE=3-1/2" I.P.S. CARBON STEEL SCHED.
80(XH) (4" O.D.)
5
-0 MIN.
1
-0 MIN.
SEE NOTE 3
SEE NOTE 3
3
-6SEE NOTE 5
SEE NOTE 6
2
-0 MIN.
NOTES:
1.SWING GATE TO BE FURNISHED AND INSTALLED BY CONTRACTOR. CONTRACTOR SHALL PROVIDE SHOP DRAWINGS TO
ENGINEER PRIOR TO FABRICATION.
2.PAINT ALL FIELD WELDS WITH GALVCON.
3.CONCRETE SHALL BE CLASS 4000. SLOPE TOP OF CONCRETE TO DRAIN AWAY FROM POST.
4.DO NOT INSTALL GATE UNTIL CONCRETE FOOTING HAS CURED 7 DAYS.
5.CONTRACTOR SHALL INSTALL 8 FOOT LONG x 2" WIDE RED/WHITE STRIPED REFLECTIVE TAPE CENTERED ON BOTH
SIDES OF SWING ARM.
6.CONTRACTOR SHALL INSTALL SIGN READING "CITY OF RENTON MAINTENANCE ACCESS ONLY" TO ENTRANCE SWING
GATE. SIGN DIMENSION, LETTERING, AND COLOR PER DETAIL ON THIS SHEET. SIGN SHALL BE ATTACHED TO GATE
ARM WITH GALVANIZED STEEL HARDWARE.
7.ADDITIONAL LOCKING PIPE POST REQUIRED AT EACH GATE ENTRANCE TO ALLOW FOR SECURING GATE IN OPEN
POSITION. LOCATION PER SHEET C502.
12"
CITY OF RENTON
MAINTENANCE ACCESS ONLY
NOTES:
1.SIGN SHALL BE FURNISHED INSTALLED WITH DIMENSIONS, COLOR, AND
LETTERING PER WSDOT SIGN FABRICATION MANUAL AND SIGN DETAIL R10-18.
2.SIGN SHALL READ TEXT SHOWN IN DETAIL.
24"
SUPPORT PIPE=3-1/2" I.P.S. CARBON STEEL SCHED.
80(XH) (4" O.D.)
NOTES:
1.DRIVEWAY ENTRANCE AND CURB AND GUTTER SHALL BE PER COR STD PLAN 104.4 AND 104.2. CONCRETE APRON SHALL BE 8-FOOT IN WIDTH, BEHIND EXISTING CURB
TO MEET COR STREET STANDARDS. THIS ALLOWS FOR FUTURE 8-FOOT WIDTH PLANTER AND 8-FOOT SIDEWALK BY OTHERS.
2.DRIVEWAY ENTRANCE AND SIDEWALK SHALL BE CONSTRUCTED PER THE DIMENSIONS AND ELEVATIONS SHOWN ABOVE.
NTS
MAINTENANCE ACCESS ROAD SECTION
NTS
SIGN DETAIL
NTS
SWING GATE
SCALE: 1"=10'
DRIVEWAY ENTRANCE - ENLARGED PLAN DETAIL
NOTES:
1.ROLLED CURB AND GUTTER TO MATCH POSITIVE SUPERELEVATION
NTS
CEMENT CONCRETE ROLLED CURB DETAIL
NTS
CURB TRANSITION DETAIL
6
7
NOTES:
1.CROSS SLOPE SHALL VARY FROM STATION 15+71- 16+00 IN ORDER TO TIE INTO THE BACK OF DRIVEWAY ENTRANCE. SPOT ELEVATIONS PER SHEET C502.
8
2" OVERLAY OF CLASS B
ASPHALT SHALL APPLY TO
ENTIRE LANE-WIDTH
9
08/28/2023 08/28/2023 CONFORMED SET - NOVEMBER 2023
OTAK 33201.A
SHEET:
1121 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 902
2.22.6
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
3RO-ECT N8MBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
3ORWWHG: NRY 2 2023 :SP O:?3RO-ECT?33200?33201A?CADD?ACAD?DZJ?S601S602.GZJ /D\RXW NDPH: S600S600
29AR0029A
STR8CT8RES GENERA/ NOTES
RDRDRD
SPECIAL INSPECTIONS
NO.TYPE CONTINUOUS PERIODIC REFERENCE
1 GENERAL INSPECTION --WSDOT: 1-05.1, 1-05.2, 1-05.6
IBC 1705.2.1 STRUCTURAL STEEL
2 WELDING OTHER THAN FOR SHOP
FABRICATED STEEL MEMBERS -X
IBC: 1705.2.1
AISC 360: Section N5
WSDOT: 6-03.3(25)A
3 HIGH STRENGTH BOLTING -X
IBC: 1705.2.1
AISC 360: Section N5.6
WSDOT: 6-03.3(28), 6-03.3(32)-(33)
IBC TABLE 1705.3 REQUIRED SPECIAL INSPECTIONS AND TESTS OF CONCRETE CONSTRUCTION
4 INSPECT REINFORCEMENT -X
ACI 318: CH. 20, 25.2, 35.3, 26.6.1-26.6.3
IBC: 1908.4
WSDOT: 6-02.3(24)C
5 INSPECT ANCHORS CAST IN CONCRETE -X ACI 318: 17.8.2
WSDOT: 6-02.3(18), 8-20.3(4)
6
INSPECT ANCHORS POST-INSTALLED IN
HARDENED CONCRETE MEMBERS -
ADHESIVE ANCHORS
X X ACI: 318: 17.8.2.4
WSDOT: 6-02.3(18)
7 VERIFY USE OF REQUIRED CONCRETE
DESIGN MIX -X
ACI 318: CH. 19, 26.4.3, 26.4.4
IBC: 1904.1, 1904.2, 1908.2, 1908.3
WSDOT: 6-02.3(2)
8 CONCRETE TESTING (STRENGTH, SLUMP,
AIR, TEMPERATURE)X -
ASTM C172, C32
ACI 318: 26.5, 26.12
WSDOT: 6-02.3(2), 6-02.3(4)-(6)
9 INSPECT CONCRETE PLACEMENT FOR
PROPER APPLICATION TECHNIQUES -X
ACI 318: 26.5
IBC: 1908.6, 1908.7, 1908.8
WSDOT: 6-02.3(5), 8-20.3(4)
10 VERIFY MAINTENANCE OF SPECIFIED
CURING TEMPERATURES AND TECHNIQUES -X
ACI 318: 26.5.3-26.5.5
IBC: 1908.9
WSDOT: 6-02.3(11)
11
INSPECT FORMWORK FOR SHAPE,
LOCATION AND DIMENSIONS OF THE
CONCRETE MEMBER BEING FORMED.
-X ACI 318: 26.11.1.2(B)
WSDOT: 6-02.3(6)
IBC TABLE 1705.6 REQUIRED SPECIAL INSPECTIONS AND TESTS OF SOILS
12
VERIFY MATERIALS BELOW SHALLOW
FOUNDATION ARE ADEQUATE TO ACHIEVE
THE DESIGN BEARING CAPACITY.
-X WSDOT 8-20.3(4), 8-24.3(2)
13
VERIFY EXCAVATIONS ARE EXTENDED TO
PROPER DEPTH AND HAVE REACHED
PROPER MATERIAL.
-X WSDOT: 2-09.3(1), 8-20.3(4), 8-24.3(2)
14 PERFORM CLASSIFICATION AND TESTING
OF COMPACTED FILL MATERIALS -X WSDOT: 2-09.3(1)E
15
VERIFY USE OF PROPER MATERIALS,
DENSITIES AND LIFT THICKNESSES DURING
PLACEMENT AND COMPACTION OF
COMPACTED FILL.
X -WSDOT: 2-09.3(1)E
16
PRIOR TO PLACEMENT OF COMPACTED FILL,
INSPECT SUBGRADE AND VERIFY THAT THE
SITE HAS BEEN PREPARED PROPERLY.
-X WSDOT: 2-09.3(1)
IBC TABLE 1705.8 REQUIRED SPECIAL INSPECTIONS AND TESTS OF CAST-IN-PLACE DEEP FOUNDATION ELEMENTS
17
INSPECT DRILLING OPERATIONS AND
MAINTAIN COMPLETE AND ACCURATE
RECORDS FOR EACH ELEMENT.
X -WSDOT 8-20.3(4)
18
VERIFY PLACEMENT LOCATIONS AND
PLUMBNESS, CONFIRM ELEMENT
DIAMETERS, LENGTHS AND ADEQUATED
END-BEARING STRATA CAPACITY. RECORD
CONCRETE VOLUME.
X -WSDOT 8-20.3(4)
CONFORMED SET - NOVEMBER 2023
℄
℄
℄
℄
⅊
℄℄
⅊
℄
⅊
⅊
⅊
OTAK 33201.A
SHEET:
1121 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 02
2.22.6
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
3RO-ECT N8MBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
3ORWWHG: NRY 2 2023 :SP O:?3RO-ECT?33200?33201A?CADD?ACAD?DZJ?S601S602.GZJ /D\RXW NDPH: 2 S601S601
30R0030
GRATED VA8/T TO3 3/AN
RDRDRD
CONFORMED SET - NOVEMBER 2023
⅊
⅊
℄
℄
℄℄℄
⅊
⅊
℄
⅊
⅊
⅊
⅊
℄
⅊
⅊
⅊
OTAK 33201.A
SHEET:
1121 WLOORZV RRDG NE SXLWH 200
RHGPRQG WA 02
2.22.6
ZZZ.RWDN.FRP
2023 OTAK INC.
OF 36
DRAWING NO.
3RO-ECT N8MBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
3ORWWHG: NRY 2 2023 :SP O:?3RO-ECT?33200?33201A?CADD?ACAD?DZJ?S601S602.GZJ /D\RXW NDPH: 30 S602S602
31R0031
GRATED VA8/T TO3 DETAI/S
RDRDRD
CONFORMED SET - NOVEMBER 2023
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:42SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?S601-S602.GZJ LD\RXW NDPH: 31 S603S603
32R-408032
GRATED VAULT TOP DETAILS
RDRDRD
CONFORMED SET - NOVEMBER 2023
NOTES:
1.PLAN STATION AND OFFSET MEASURED TO WALL CONTROL LINE AT INSIDE FACE OF WALL.
2.AGGREGATES SHALL BE PLACED AND COMPACTED PER SPECIAL PROVISION 2-03.
3.GRAVITY BLOCK, GEOTEXTILE FABRIC, INFILTRATION GRAVEL, AND NON-INFILTRATION MATERIAL SHALL BE PLACED PER
DETAIL. GRAVITY BLOCK WILL BE PLACED FIRST, AFTER WHICH AGGREGATES AND GEOTEXTILE FABRIC SHALL BE PLACED TO
A MAXIMUM ELEVATION OF THE TOP OF BLOCK. A LIFT CONSISTING OF ONE BLOCK, ITS SURROUNDING AGGREGATE, AND
GEOTEXTILE FABRIC MUST BE PLACED AND FULLY COMPACTED PRIOR TO THE PLACEMENT OF THE SUBSEQUENT LIFT.
4.GRAVITY BLOCK WALL SHALL BE CONSTRUCTED TO MATCH THE PLAN VIEW LIMITS SHOWN ON SHEET C301 AND TO A HEIGHT
OF 25 FEET AS SHOWN ON SHEET C302.
5.THE GRAVITY BLOCK WALL WILL BE CONSTRUCTED CONCURRENTLY WITH FILL MATERIAL PLACEMENT ON EACH SIDE. THE
MAXIMUM ALLOWABLE UNBALANCED SOIL HEIGHT ON EITHER SIDE OF THE WALL SHALL NOT EXCEED 2 FEET.
INFILTRATION FACILITY MANIFOLD STUB-OUT,
24" DIAM. SD. LENGTH VARIES
18" MIN.
SEPARATION 2.00'SUMPINFILTRATION GRAVEL PER
SPECIAL PROVISIONS 2-03
AND 9-03.16
INFILTRATION GRAVEL PER
SPECIAL PROVISIONS 2-03
AND 9-03.16
18" TOPSOIL TYPE A PER
DETAIL ON SHEET L702
GRAVEL BORROW PER
WSDOT STD SPEC.
9-03.14(01), COMPACTED PER
WSDOT STD. SPEC
2-03.3(14)C, METHOD B
UNDER LANDSCAPING
GRAVITY BLOCK
(TYP.)
MAINTENANCE ACCESS ROAD PER
SECTION ON SHEET C510
INFILTRATION
FACILITY MANIFOLD
PIPE, 24" DIAM SD.
INFILTRATION FACILITY
ISOLATOR ROW
BOTTOM OF CHAMBERS=315
TOP OF GRAVITY BLOCK WALL=314.5
IE OUT =
315.19
TYPE 2, MANIFOLD
CB (TYP.)
GEOTEXTILE FABRIC, NON-WOVEN
GEOTEXTILE FOR UNDERGROUND
DRAINAGE, MODERATE SURVIVABILITY
CLASS C PER WSDOT 9-33.2(1)
GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE
FOR UNDERGROUND DRAINAGE, MODERATE
SURVIVABILITY CLASS C PER WSDOT 9-33.2(1)
SUMP=313.19
NON-INFILTRATION MATERIAL
COMPACTED PER SPECIAL
PROVISIONS 2-03.
GEOTEXTILE ELEVATION=314
IE IN = 315.19
2.50'(TYP.)1.00'
2.50' (TYP.)
6" THICK CRUSHED SURFACING
TOP COURSE LEVELING PAD
NON-INFILTRATION MATERIAL PER
SPECIAL PROVISIONS 2-03.
SELECT BORROW PER
SPECIAL PROVISIONS 2-03
AND 9-03.14(2)
WALL CONTROL LINE
GEOTEXTILE FABRIC, NON-WOVEN
GEOTEXTILE FOR UNDERGROUND
DRAINAGE, MODERATE SURVIVABILITY
CLASS C PER WSDOT STD. SPEC 9-33.2(1)
GRAVITY BLOCK, INFILTRATION GRAVEL,
AND NON-INFILTRATION MATERIAL SHALL BE
PLACED AS DESCRIBED IN NOTE 3
BOTTOM OF WALL, ELEVATION 289.5
LIMITS OF GRAVITY
BLOCK WALL LIFT (TYP.)
1.00'
VERTICAL WALL
- NO BATTER
GRAVEL BORROW PER
WSDOT STD SPEC.
9-03.14(01), COMPACTED PER
WSDOT STD. SPEC
2-03.3(14)C, METHOD C
UNDER ACCESS ROAD
6" THICK CRUSHED SURFACING
TOP COURSE LEVELING PAD
SELECT BORROW PER
SPECIAL PROVISIONS 2-03
AND 9-03.14(2)
EXISTING NATIVE
MATERIAL
GRAVITY BLOCK
(TYP.)
STAGE 1 EXISTING
GRADE (1.5H:1V)
FILL BETWEEN EXISTING NATIVE MATERIAL AND
GRAVITY BLOCK WITH COMPACTED CSTC PER
WSDOT STD. SPEC 9-03.9(3) (TYP.)2.50'(TYP.)5.0' (TYP.)
2.5' MIN. OVERLAP OF
GRAVITY BLOCK
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 28, 2023 - 12:43SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?S604.GZJ LD\RXW NDPH: S604NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
R-408033
S604
33
GRAVITY BLOCK WALL DETAILS
NTS
GRAVITY BLOCK WALL TYPICAL SECTION
NTS
GRAVITY BLOCK SLOPE KEY-IN DETAIL
RDRDRD
CONFORMED SET - NOVEMBER 2023
OTAK 33201.A
SHEET:
11241 Willows Road NE, Suite 200
Redmond, WA 98052
425.822.4446
www.otak.com
© 2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
Plotted: Nov 28, 2023 - 4:56pm O:\PROJECT\33200\33201A\CADD\ACAD\Dwg\S605.dwg Layout Name: S605S605
34R-408034
LUMINAIRE FOUNDATION DETAILS
RDRDRD
CONFORMED SET - NOVEMBER 2023
102
103
111
P
C
PC SD CB
TYPE 1
RIM 345.76
8 CMP (W) IE 343.81
SUMP 342.26
D
SD MH
60 CONC
RIM 345.96
8 CMP (E) IE 339.96
18 CPP (W) IE 339.36
8 CMP (W) IE 340.18
36 CMP (N) IE 332.56
36 CMP (S) IE 332.56
SD CB
TYPE 1
RIM 345.84
8 CMP (E) IE 342.42
SUMP 340.74
D
SD MH
TYPE 2
RIM 345.59
18 CPP (W) IE 337.24
36 CMP (N) IE 332.89
36 CMP (S) IE 332.69
S
SS MH
48 CONC
RIM 342.20
10 PVC (N) IE 335.00
10 PVC (S) IE 334.80
16
C
PC
C
C
RIM 340.13
8 CMP (W) IE 335.98
8 CMP (E) IE 335.98
36 CMP (N) IE 333.05
36 CMP (S) IE 332.95
S
SS MH
RIM 347.79
10 PVC (N) IE 334.09
10 PVC (S) IE 333.89
AB-03
MONROE AVENUE NE4
CHAINLINK FENCE7
CHAINLINK FENCE
7
CHAINLINK FENCE
7
CHAINLINK FENCE7
CHAINLINK FENCE7
CHAINLINK FENCEJERSEY BARRIERSJERSEY BARRIERSGGGGGGGGGGGGGGGPPPP
TVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTVTV
WWWWWWWWWWWWWWSD
SD
SDSDSDSDSDSDSDSDSDSSSSSSSSSSSSSSSSSSSSSSSS36 CMP10 PVC36 CMP18 CPP
18
C
P
P
8 CMP 8 CMPOHPOHPOHPOHPOHPOHPOHPOHPOHP
OHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPOHPEL 380.68
EL 377.07
JEFFERSON AVENUE NEPPPPPPPPPPPPPPPPTV
TVTVTVTVTVTVTVTVTVTVTVTVTVPTVTVTVTVTVP
PPPPPPPPPPPPPPPPTVTVTVTVTVTVTVTVTVTVTVTVTVTVPPPPPTVTVTVTVPPPATP-03 ATP-04
AHA-01AHA-02
22 CPP
IE 308.60
18 CPP
IE 314.13 3
4
6
344
342
330
334
68
12
6
115 XXXXXXXXXXX
X
XXXXXXXXXXXP
XXSSSSOTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 24, 2023 - 5:12SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?L701.GZJ LD\RXW NDPH: 32 L701NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
L701
35
LANDSCAPE PLAN
R-408035
SCALE IN FEET
30 0 30 60
CONSTRUCTION NOTES
1
LEGEND
CALOCEDRUS DECURRENS / CALIFORNIA INCENSE CEDAR
ROOT BARRIER, SEE L702 FOR DETAIL
DROUGHT TOLERANT SHRUB PLANTING
SEE L702 FOR PLANTING LAYOUT
PLAY FIELD SEED MIX
SEE L702 FOR SEED MIX COMPOSITION
1.NO HOLLYWOOD JUNIPERS OR GRAY GLEAM JUNIPERS SHALL BE PLANTED
WITHIN A 5' BUFFER OF ANY STRUCTURE OR PAVEMENT.
2.SEE LANDSCAPE DETAILS ON SHEETS L702.
GENERAL NOTES
2
GRATED VAULT TOP
PLAY FIELD SEED MIX
3 CALIFORNIA INCENSE CEDAR
4 ROOT BARRIER
5 DROUGHT TOLERANT SHRUB PLANTING
KBLMLM
STATE O F WA SHI
N
GTONLIND S A Y M
A
R
T
I
NLICENS
E
D
LANDSCA P E A R C H ITECTNO.
1
580 EXP . 0 6 /1 3 /202308/28/2023 CONFORMED SET - NOVEMBER 2023
TREE PLANTING
CALOCEDRUS DECURRENS / CALIFORNIA INCENSE CEDAR 38 6
HT
DROUGHT TOLERANT SHRUB PLANTING 32,060 SF
CISTUS CORBARIENSIS / WHITE ROCKROSE 750 2 GAL
JUNIPERUS CHINENSIS
TORULOSA
/ HOLLYWOOD JUNIPER 36 5 GAL
JUNIPERUS COMMUNIS
COMPRESSA
/ PYRAMIDAL COMMON JUNIPER 1,443 2 GAL
JUNIPERUS HORIZONTALIS
BLUE CHIP
/ BLUE CHIP JUNIPER 214 2 GAL
JUNIPERUS SABINA
TAMARISCIFOLIA
/ TAMARIX JUNIPER 303 2 GAL
JUNIPERUS SCOPULORUM
GRAY GLEAM
/ GRAY GLEAM JUNIPER 143 5 GAL
PLAY FIELD SEED MIX 101,630 SF
45%LOLIUM PERENNE PERENNIAL RYEGRASS
25%POA PRATENSIS KENTUCKY BLUEGRASS
15%LOLIUM PERENNE PERENNIAL RYEGRASS
15%FESTUCA RUBRA CHEWINGS FESCUE
SEEDING RATE: 10 LBS. / 1,000 SQUARE FEET
PRO TIME PT 309 SUPREME MIX IS THE BASIS OF DESIGN FOR THIS SEED MIX
OTAK 33201.A
SHEET:
11241 WLOORZV RRDG NE, SXLWH 200
RHGPRQG, WA 98052
425.822.4446
ZZZ.RWDN.FRP
2023 OTAK, INC.
OF 36
DRAWING NO.
PROJECT NUMBER
REVISION COMMENTSNO.BY REVIEW DATE
DESIGNER DRAWN BY CHECKED BY
CD TT RG
PORWWHG: AXJ 24, 2023 - 5:12SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?L702-L703.GZJ LD\RXW NDPH: 33 L702NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M.
L702
36
LANDSCAPE DETAILS
R-408036
NOT TO SCALE
DROUGHT TOLERANT SHRUB PLANTING LAYOUT
HOLLYWOOD JUNIPERBLUE CHIP JUNIPER
WHITE ROCKROSE
GRAY GLEAM JUNIPER CALIFORNIA INCENSE CEDAR
TAMARIX JUNIPER
4-MAN LANDSCAPE
BOULDER
3-MAN LANDSCAPE BOULDER
NOT TO SCALE
TOPSOIL TYPE A PREPARATION DETAIL
PLANT SCHEDULE
NOT TO SCALE
TREE PLANTING, SHRUB PLANTING, LANDSCAPE BOULDER, AND ROOT BARRIER DETAIL
COMPACT IN 6" LIFTS
PARALLEL TO FINISH
GRADE. COMPACT SOIL
UNTIL A FOOTPRINT DOES
NOT EXCEED 1" DEPTH.
TOPSOIL TYPE A
GRAVEL BACKFILL FOR WALLS
FINISH GRADE
NOTES:
1.DEPTH OF TOPSOIL TYPE A VARIES IN DROUGHT TOLERANT SHRUB AREAS. SEE C302 FOR DEPTHS.
2.18" TOPSOIL TYPE A DEPTH PARALLEL TO FINISH GRADE IN PLAY FIELD AREA.
SEE SHEETS C302-303
FOR SUBGRADE DEPTH
LANDSCAPE BOULDER, PER SPECIAL
PROVISIONS 8-20.
BURY 1/3 DEPTH OF LANDSCAPE
BOULDER INTO FINISHED GRADE (TYP.)
ROCK CLASS
(-MAN)ROCK WEIGHT (LBS)AVERAGE LONGEST
DIMENSION (INCHES)
3 700 TO 2,000 28 - 36
4 2,000 TO 4,000 36 - 48
LANDSCAPE BOULDERS
NORTH FENCE LINE
36" DEPTH TOPSOIL TYPE A
SET ROOT CROWN TO BE 1"-2"
ABOVE FINISH GRADE. KEEP
MULCH CLEAR OF TREE OR
SHRUB BASE.
MULCH 3" DEPTH IN ALL DROUGHT
TOLERANT SHRUB PLANTING AREAS
(KEEP MULCH CLEAR OF SHRUB BASE)
FINISHED GRADE
36" DEPTH ROOT BARRIER
PLAY FIELD SEED MIX
18" DEPTH TOPSOIL TYPE A
SET ROOTBALL ON SUBGRADE. CUT AND REMOVE TWINE
AND BURLAP FROM TOP AND SIDES OF ROOTBALL.
(REMOVE ALL WIRE BASKETS.)
TREES (AS SPECIFIED)SET ALL PLANTS PLUMB
1' - 6"
1:1 MAX SLOPE
3:1 TYP SLOPE 4" HIGH X 8" WIDE ROUND-TOPPED SOIL BERM,
CENTERED ON DOWNHILL SIDE OF ROOTBALL. BERM
SHALL BEGIN AT ROOTBALL PERIPHERY.
SHRUB PLANTINGS (AS SPECIFIED)
NO HOLLYWOOD JUNIPERS OR GRAY
GLEAM JUNIPERS SHALL BE PLANTED
WITHIN A 5' BUFFER OF ANY
STRUCTURE OR PAVEMENT.5'PYRAMIDAL COMMON JUNIPER
GRAVEL BORROW
12" DEPTH GRAVEL BACKFILL
FOR WALLS
STORMWATER INFILTRATION
FACILITY
KBLMLM
STATE O F WA SHI
N
GTONLIND S A Y M
A
R
T
I
NLICENS
E
D
LANDSCA P E A R C H ITECTNO.
1
580 EXP . 0 6 /1 3 /202308/28/2023 CONFORMED SET - NOVEMBER 2023
Public Works Department
MONROE AVE NE INFILTRATION FACILITY
CAG-23-316
STANDARD DETAILS
FACE OF CURB
6 112' '
1/2" R. 1" R.
1:24
t
TOP OF
112" R. ROADWAY
I
V
ED
T
CEMENT CONCRETE
TRAFFIC CURB AND GUTTER
FACE OF ADJACENT CURB
6 1f2"--
FLUSH WITH GUTTER
PAN AT SIDEWALK
RAMP ENTRANCE
1:12 1:24
TOP OF
112" R. ROADWAY
1
DEPRESSED CURB SECTION
AT SIDEWALK RAMPS
w '
PREMOLDED
JOINT FILLER
E FULL -DEPTH
EXPANSION JOINT
6" CEMENT CONCRETE
112" R. 1"R. SIDEWALK RAMP
VARIES
OR LANDING
FROM !
6"TOO S
s"
T
318" PREMOLDED
JOINT FILLER
CEMENT CONCRETE
PEDESTRIAN CURB
AT SIDEWALK RAMPS AND LANDINGS
6 112" '
FACE OF ADJACENT CURB
SEE DEPRESSED CURB DETAIL THIS SHEET
114
TOP OF
1/2" R. ROADWAY
2"
i
T
DEPRESSED CURB SECTION
AT RESIDENTIAL DRIVEWAYS ONLY.
FOR COMMERCIAL DRIVEWAYS SEE STD PLAN 104.2
1 P2' R.
FACE OF ADJACENT CURB I
GUTTER SURFACE
u
6 112" 1"
1' R.
FACE OF CURB
1" R.
8 114"
1" R.
CEMENT CONCRETE
i TRAFFIC CURB
DEPRESSED CURB DETAIL
AT RESIDENTIAL OR COMMERCIAL DRIVEWAYS, AND ALLEYS
GENERAL NOTES:
1. See standard plans 102 and 101.1 for curb expansion and contraction joint spacing.
2. Expansion joint shall be full depth, 3/8" (in.) premolded joint filler.
3. For Depressed Monolithic Driveway Curb & Gutter Section, see Standard Plan 104.2
TOP OF
ROADWAY
STD. PLAN — 101
a PUBLIC WORKS
CEMENT CONCRETE CURBSDEPARTMENT
s RAISED EDGE DETAIL 1 a sI DEWALK
LEVEL 1r2' F•J7 O $IOEWAL3(TRANSVERSE 1'-0" 1' - 0"
11r R J01NTS TO INCLUDE RASED EDGE
318• (IN) PREMOLDED JOINT FILLER
TYPICAL WHERE APPLICABLEON
RDUt DING 2.0%1 tr2" (IN) R. (TYP.]
FOR CURB pETA[LS
r , SEE STD PLAN 101
er ' y r. STING ROADWAY
CRUSHED ROCK BrLS
SEE RAISED EDGE I
SIDEWALK DETAIL - THIS SHE LTYPICALUNDER CRUSHEOSURFACING TOP COURSE (CSTC) ALL
CUT SIDEWALK
OMPACT TO 957, MODIFILU PROCTOR MIN.
O
SLOPESWITH RAISED EDGE UNLESS REOUTREMENT WAIVED BY ENGINEER)
TYPICAL. UNDER ALL CURB, V2" (
tN) R. (TYP.) GUTTER S SIDEWALK, CSTC UNDER 2' '
v
FOR
CURB DETAILS CURB S GUTTER TO BE S THICKNESS CR LS%
SEE STD PLAN 101 MATCH EXISTING ROADWAY CRUSHED ROCK dH " ,•
i!' BASE,
WHICHEVER IS GREATER (1YP. FOR ALL
CURB b GUTTER). FINISHED
GRADE 1"(IN)BELOW 1fn2' 0• SIDEWALK TOPOF
CONCRETE SURFACE ADJACENT
TO CURB MIN 1,
m 1 0• ROU
DING R. (
TYR) FOR
CURB DETAILS 1,
5% SEE STD PLAN 101 o
a
t
s
Fr• • BRI
DGE OR PEDESTRIAN RAILING
ADJACENT
TO CURB FOR
CURB CURSDETAILS WRIER -
SEE SIDEWALK SEE $TD PLAN 101. STEEP
FILL SLOPES) CONTRACT
PLANS WALL OR BARRIER I
772' (IN) R. (TYP.) J
I
SIDEWALK FLUSH'
1.
5% t
1rz• M R. VERTICAL
WALL - -- ' -. . - -- \Vr
ti..f . •. SEE
DETAIL 318• (
IN) PREMOLDED JOINT
FILLER ADJACENT
TO CURB AND RAILING OR WALL a (IN) PREMOLDED
JOINT
FILLER FOR
SIDE BUFFER
STR1P TREATMENTSIDEWALKSIDEWALK ADJACENT TO WALL DETAIL SEE
HER (SEE NOTE 10) SIDEWALK/
12• (
IN) R. SECTIONS1 (
TYP ) FOR
v
1.5% SEE STD PLAN 10.S
1.
SX MIN. SEE STD PLAN 101 r 4`\\
f
GROOMED FINISH OR
MATCH E)(iST1NG e
4' M/IDE, SMOOTH Go
TROWELED PERIMETER FINISHED
GRADE t• (IN) BELOW TOP OF CONCRETE SURFACE
FOR PLANTING -FLUSH IF PAVED T
CONCRETE CEMENTCONCRETECURB CURB ADJACENT
TO BUFFER STRIP 0 CURB FOR
CURB DETAILS D•
SEE STD PLAN 101 r
5, z
1r8'TD 114' NOTES
1.
Four feet of the sidewalk width shall be
the minimum pedestrian CONTRACTION
JOINT • . Al
yam.
aocessibTe
route (aut) free of vertical IN
RAG .'
andhorizontalobstructions. Gratings, FULL -
DEPTH EXPANSION JO NT IN BOTH h1' AccessCovers, Junction Boxes, CURB
AND SIDEWALK (SEE STD PLAN mi.1) CableVaults, Pull Boxes and other appurtenances
within the sidewalk ` s'F 3W C CONTRACTION JOINT must
be flush with surface, and match grade
of the sidewalk. JOINT AND FINISH DETAIL
2.
Monolithic Cement Concrete Curb and + Sidewalk
is not permitted in new For other referenced NOTES see , construction.
When replacement work STD PLAN 104.2, R ••
necessitates
a Monolithic Cement PREMOLAE
ConcreteCurbbuildperWSDOTJOINTFILLERStandardPlanF-30.10-03. Paved surfaces must comply With STD
PLAN 102.1 as applicable. E FULL -DEPTH 3.
Concrete to 6e 4,000 PSI. EXPANSION
JOINT fthk
SM PLAN - 109 PUBLIC
WORKS CEMENT CONCRETE PPRQ •
ED: DEPARTMENT
SIDEWALK T ljZ_It]ra#'YA 104/ +7
CEMENT
SEE NOTE 31
CEMENT- DEPRESSED MONOLITHIC
CONCRETE - CURB 8 CUTTER
SIX -WALK j j (SEE DETAIL MS SHEET)
TYPE C213 - ISOMETRIC VIEW
COMMERCIAL, WITH BUFFER)
NOTES
1. When a driveway width exceeds 15 feet, consbud a full depth
expanslon joint with 3f8' Joint filler along the driveway lane lines
see std. plan 102). Construct expansion joints parallel with the
centerline as required at 15 maximum sparing when driveway
Widths exceed 30'.
2. See std. plan 102 for sidewalk details.
3. Curb and gutter shown, other curb designs may be specified.
See std. plan 101 for curb details.
4. Not used.
5. The engineer will design all driveways to Include elevations at all
points marked with symbol "X'. All elevations are at the back of
Curb top on uphill side.
6. Not used.
7. For Driveway Widths see DRIVEWAY STANDARDS
See NOTE 10). The expansion joints (see end. plan 102) shall be
spaced as shown In the corresponding leamViic New.
8. Slopes shall comply with sections 8303.21 or R303.2.2 or
R303-2.3 of the Revised Draft Guidelines for Accessible Public
Rigbtsaf=Way of Nove uba 23, 2005 (PROWAO).
9. Curb returns for any Type C -MAX Driveway maybe approved on
a case-by-case basis,
10. STREET STANDARDS= Renton Municipal Code (RMC)
Tide IV Development Regulators
CHAPTER 6 STREET AND UTILITY STANDARDS
Section 4.6-060 STREET STANDARDS
DRIVEWAY STANDARDS = Renton Municipal Cade (RMC)
Tice IV Development Regulations
CHAPTER 4
CITY-WIDE PROPERTY DEVELOPMENT STANDARDS
Section 4 -4 -ON PARKING, LOADING AND DRIVEWAY
REGULATIONS
aEE.C.
coNTwtcnCN X}
aro N.w tae
b
SEE DEFREMECC Dr1M
on r z ew-
Wit TOPOF1110MY
NOTE, ORNE NYtalC.naEULmMB1IX1
ADM
NOLtFMALO
CURBDEPRESSEDMDNOLTTNIDpJRB 6 DUTfEfiOETAL
FACE OF ADJACENT WF®
DEPRESSED CURB DETAIL
AT RESIDEMW. ORCORBBK.YAL DRIVEWAYS, AND ALIEN'S
DdvelNay Example: TYPE C11 B
R=Rlisd, d, C.CwwnwdAl 1NurtofLAIW. _----
MA)(x lwne Comm q
a=b,(Pia tNSw;l 3an1F41e Buffer -
PUBLIC WORE' CEMENT CONCRETE DRIVEWAY
STD. PLAN - 104.2
DEPARTMENT ENTRANCES - NOTES AND DETAILS A11f'— //
IOy Nlreltl
LF
EO REM ANC ODES SOEWA MMPE;_
CMN^- _ VMffS!SEE NOtE I WINES.
4
18 Li UFPAVEA
1M111M1Mr KOImEo
IORarYI1
K FAAMIONAM RYP.1 m-E'ICIwau NAWr RYPJ CEl1EM
NIEEETA.P E0t1 %'I // \\ 9m R411Ef1 CONCREli
Irw
ERlI„CRIORR
m NOTE E
j PUBLIC WORKS CEMENT CONCRETE DRIVEWAY
Elm DEPARTMENT ENTRANCE -TYPES C1 B, C213,
C3B, and C-MAXB (WITH BUFFED
For NOTES see STD PLAN 104.2
STD. PLAN - 104.4
i I I I P.L11
Gregg Zimmerman, Public Works Administrator
I` VMFS _ Ea[I1 1q
4
In Y.l<6Ef IORarYI1
E,
w
OEPPESSEtJ CUX8E Wl1Ep- Irw
ERlI„CRIORR
Ivw
lANsrWGIAH.gMi
SEEMOTEICEMENitILWTTEEANlJNWIrHIAIIVLVgSEGUTTEA
ISEE NOEE A
E'tdllMCi10N JOWf jf W J
60Ewri:kwl0m!
IKE SM PUN IEA PUN VIEW
ITYPE CO SHOWN, CI 8 M IC -MM SIMIIARI
SEE NOTE EI
j PUBLIC WORKS CEMENT CONCRETE DRIVEWAY
Elm DEPARTMENT ENTRANCE -TYPES C1 B, C213,
C3B, and C-MAXB (WITH BUFFED
For NOTES see STD PLAN 104.2
STD. PLAN - 104.4
i I I I P.L11
Gregg Zimmerman, Public Works Administrator
I` VMFS _ Ea[I1 1q In Y.l<6Ef IORarYI1
E,
w
OEPPESSEtJ CUX8E Wl1Ep- Irw
ERlI„CRIORR
Ivw
rSEE MOIEA
E yr fYMMW nFf RVV.I
6ECTION O Ixe em µiir°iIIIrP1 60Ewri:kwl0m!
r
pwtwarw
In
mve alaaE laiare ervrolESlacEwE'Em _- ___ _ 16M
Re£WAY IC ARI. 1r YN.
SE tm O
j PUBLIC WORKS CEMENT CONCRETE DRIVEWAY
Elm DEPARTMENT ENTRANCE -TYPES C1 B, C213,
C3B, and C-MAXB (WITH BUFFED
For NOTES see STD PLAN 104.2
STD. PLAN - 104.4
i I I I P.L11
Gregg Zimmerman, Public Works Administrator
1 1 VARIES 1 1
MIN MIN MIN I MIN
SPECIAL NOTE: T < }
x , 4
IN THE EVENT TRANSVERSE PATCHES EXIST I ;
WITHIN THE AFFECTEO STREET, THE LENGTH I I
IOFTHEPATCHSHALLBEEXTENDEDTO
INCLUDE ANY EXISTING PATCH WITHIN 10 j
FEET OF THE EDGE OF THE PATCH REQUIRED iFORTHENEWCROSSINGANDANYf . .
SUBSEQUENT PATCH EDGE WITHIN 70 FEE7
OF THE EDGE OF THE SECOND PATCH AND
SO ON UP TO A TOTAL OF 300 FEET. I FACE OF GUTTER OR
i I EDGE OF PAVEMENT
k -=f--
a ;
TRAFFIC FLOW
2" HMA I r a d` i
i
CENTER LINE ORILANELWE
2" TO 8" HMA i
I
6.5' MIN.
2" DEPTH OF
PLANING OR SAWCUT AND REMOVE
VARIES: 6.5' MIN.
DEPTH OF EXISTING PAVEMENT
MIN I MIN
VARIES {
MIN I MINI
2" SAWCUT AND REMOVE
OR PLANE, SEAL WITH 2" - 6" MIN. HMA (SEE NOTE 2)
AR-4000W
EACH SIDE)
6" CRUSHED SURFACWG TOP COURSE (CSTC)
2" HMA 9-03.9(3)) PER WSDOT STANDARO
SPECIFICATIONS, COMPACTED TO 95% MODIFIED
PROCTOR.
SAWCUT AFTER BACKFILL
EACH SIDE)
CSTC, BANK RUN GRAVEL FOR TRENCH BACKFILL
9-03.19), GRAVEL BORROW (9-03.14(1)) PER
WSDOT STANDARD SPECIFICATIONS OR NATIVE
MATERIAL IF APPROVED IN WRITING BY ENGINEER
BASED ON GEOTECH REPORT, COMPACTED TO 95%
MODIFIED PROCTOR.
WIDTH OF TRENCH AS RE UIRED BY SIZE OF PROPOSED
IMPROVEMENT (SEE WSDOT STANDARD SPECIFICATION 2-09.4)
PLUS AN ALLOWANCE FOR ANY SHORING. SHORING, IF PIPE ZONE BEDDING. MATERIAL- SEE STANDARDNEEDED, SHALL MEET THE REQUIREMENTS OF WSDOT PLAN 110.1.
STANDARD SPECIFICATION 7-08.3(1)B
TRENCH WIDTH
FOR NOTES, SEE STANDARD PLAN 110.1
TYPICAL TRANSVERSE PATCH FOR
p - 110
PUBLIC WORKS
FLEXIBLE PAVEMENT OR RIGID F'}'R 'E;D
DEPARTMENT u j,.,,
PAVEMENT WITN OVERLAY
r
T
POLE ELEVATION
FOUNDATION SHALL SUPPORT
POLE SHOWN IN STANDARD PLAN
117.1A
FOUNDATION, AND ANCHOR BOLT
DETAILS PER STANDARD PLAN
117.1A
j
jjDocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
FOUNDATION DETAILS
POLE ELEVATION
POLE CHAMBER DETAIL
jj
jDocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
BASE COVER DETAIL
CABINET TOP PLATE DETAIL
CABINET BOTTOM PLATE DETAIL
CABINET CHAMBER DETAIL
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
LUMINAIRE ARM DETAILS LUMINAIRE ARM MOUNTING BRACKET
DETAILS
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
DocuSign Envelope ID: 9D9B0DA8-0385-4664-AE66-57BFF1561D7F
7/27/2022 | 5:44 PM PDT
NOTES:
ISOMETRIC
SECTION B
TOPFOUNDRY NAMEDIFLOW
SECTION A
1.BOLT-DOWN CAPABILITY IS REQUIRED ON ALL FRAMES, GRATES, AND
COVERS, UNLESS OTHERWISE SPECIFIED. PROVIDE TWO HOLES IN
THE FRAME THAT ARE VERTICALLY ALIGNED WITH THE GRATE OR
COVER SLOTS. THE FRAME SHALL ACCEPT THE 5/8"-11 NC x 2" ALLEN
HEAD CAP SCREW BY BEING TAPPED, OR OTHER APPROVED
MECHANISM. LOCATION OF BOLT-DOWN HOLES VARIES BY
MANUFACTURER.
2.REFER TO STANDARD SPECIFICATION 9-05.15(2) FOR ADDITIONAL
REQUIREMENTS.
3.FOR FRAME DETAILS, SEE STANDARD PLAN 204.00.FLOWFLOWBOLT-DOWN SLOT DETAIL
SEE NOTE 1
1/2"
3/4"
1 1/4"
5/8"
BOLT-DOWN SLOT,
SEE DETAIL AND
NOTE 1
20"
5"
5"
5"
3"
1"
3"
5"
5"
5"
DIRECTION OF FLOW
24"
7 OR 8 EQUAL SPACES
1 5/8" MAX.
A
BOUTFALL TO STREAM DUMP NO POLLUTANTS
3/8" RECESSED LETTERING
RECTANGULAR VANED GRATE
STD. PLAN - 204.20
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
ISOMETRIC
NOTES:
SECTION B
TOPFOUNDRY NAMEDIFLOW
SECTION A
1.BOLT-DOWN CAPABILITY IS REQUIRED ON ALL FRAMES, GRATES, AND
COVERS, UNLESS OTHERWISE SPECIFIED. PROVIDE TWO HOLES IN
THE FRAME THAT ARE VERTICALLY ALIGNED WITH THE GRATE OR
COVER SLOTS. THE FRAME SHALL ACCEPT THE 5/8"-11 NC x 2" ALLEN
HEAD CAP SCREW BY BEING TAPPED, OR OTHER APPROVED
MECHANISM. LOCATION OF BOLT-DOWN HOLES VARIES BY
MANUFACTURER.
2.REFER TO STANDARD SPECIFICATION 9-05.15(2) FOR ADDITIONAL
REQUIREMENTS.
3.USE ONLY IN SAGS ON VERTICAL CURVES.
4.FOR FRAME DETAILS, SEE STANDARD PLAN 204.00.FLOWFLOWBOLT-DOWN SLOT DETAIL
SEE NOTE 1
1/2"
3/4"
1 1/4"
5/8"
BOLT-DOWN SLOT,
SEE DETAIL AND
NOTE 1
20"
5"
5"
5"
3"
1"
3"
5"
5"
5"
24"
1 5/8" MAX.
4 EQUAL SPACES 4 EQUAL SPACES
A
BOUTFALL TO STREAM DUMP NO POLLUTANTS
3/8" RECESSED LETTERING
RECTANGULAR BI-DIRECTIONAL
VANED GRATE
STD. PLAN - 204.30
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
COVER SECTION VIEW ASTM A48 CL35B00371780MO/DA/YR X3717C1PTEON BOLTING DETAIL
GASKET GROOVE DETAIL
FRAME SECTION VIEW
COVER BOTTOM VIEW
PLAN VIEW
DRAINIFCOMADEINUSA EJIW
DUMPNO P O L L U T A N T S -DRAINS
T
O
S
T
REAMR E N T O N
NOTES:
1.ALL COVERS SHALL BE LOCKING LID PER EJ No. 3717C1
OR APPROVED EQUAL.
1/2" LETTERING
BOLT HOLES - 3 PLACES
EQUALLY SPACED 120° APART ON
23 1/16" DIA. B.C.
1 1/4" LETTERING
(1) 1" DIA. PICKHOLE
25" DIA.
3/4"
1"
2 1/2"
8 3/4"
(TYP.)
(3) BLT SOC. (ALLEN HEAD)
5/8"-11 x 1.5 SS RUBBER
WASHER
5/8"
25 1/4" DIA.
26 1/2" DIA.
23 3/8" DIA. CL OPEN
27 5/16" DIA.
34 1/8" DIA.
1 1/16"
6"1/8"
1/4"1 1/16"
R1/8"
1/4" DIA. NEOPRENE GASKET
STORM ROUND FRAME AND COVER
(PUBLIC)
STD. PLAN - 204.50
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEMartin Pastucha
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 3B1B34D3-7E0A-476C-ADB3-4329FFE0C108
8/13/2020 | 8:48 AM PDT
5"
ECCENTRIC CONE SECTION
72" FLAT SLAB TOP
RECTANGULAR ADJUSTMENT SECTION
CIRCULAR ADJUSTMENT SECTION
PREFABRICATED LADDER
STEP
84" or 96" FLAT SLAB TOP
NOTES:
1.AS AN ACCEPTABLE ALTERNATIVE TO REBAR, WIRE MESH HAVING A MINIMUM AREA OF
0.12 SQUARE INCHES PER FOOT MAY BE USED FOR ADJUSTMENT SECTIONS.
48", 54", or 60" FLAT SLAB TOP
20"x24", 24" DIA.,
48" DIA., OR 54"
DIA. HOLE
#6 BARS @ 7" SPACING
12"
2" (TYP.)
1" MIN.
2 1/2" MAX.
12" (TYP.)
12"
9"
6"
48"
MAX.
24"
MIN.
#5 BARS @ 6" SPACING
20"x24", 24" DIA.,
48" DIA., OR 54"
DIA. HOLE
8"
2" (TYP.)
1" MIN.
2 1/2" MAX.
TYPICAL ORIENTATION
FOR ACCESS AND STEPS
6"
9 1/2" MAX.
12"
MIN.
48" MIN.
24"
MIN.
18" MIN.
42" MAX.
#4 BARS @ 6" SPACING
20"x24" OR
24" DIA. HOLE
8"
2" (TYP.)
1" MIN.
2 1/2" MAX.
34"
ONE #3 BAR HOOP FOR 6"
HEIGHT INCREMENT (SPACED
EQUALLY), SEE NOTE 1
34"
24"
30
"
20
"
5"
5"
1", 2", 4", 6", 12", OR 24"
ONE #3 BAR HOOP FOR 6" HEIGHT
INCREMENT (SPACED EQUALLY),
SEE NOTE 1
1", 2", 4", 6",
12", OR 24"
MISCELLANEOUS DETAILS FOR
DRAINAGE STRUCTURES
STD. PLAN - 204.60
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
1.CONDITIONS OF USE
1.1.FOR PERMANENT STABILIZATION OF SLOPES 2H:1V OR GREATER AND WITH MORE THAN 10 FEET OF VERTICAL RELIEF.
1.2.IN CONJUNCTION WITH SEED FOR FINAL STABILIZATION OF A SLOPE, NOT FOR TEMPORARY COVER. HOWEVER, THEY MAY BE USED FOR TEMPORARY APPLICATIONS AS
LONG AS THE PRODUCT IS NOT DAMAGED BY REPEATED HANDLING.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.INSTALLATION IS CRITICAL TO THE EFFECTIVENESS OF THIS PRODUCT. IF GOOD GROUND CONTACT IS NOT ACHIEVED, RUNOFF CAN CONCENTRATE UNDER THE
PRODUCT, RESULTING IN SIGNIFICANT EROSION.
2.2.JUTE MATTING MUST BE USED IN CONJUNCTION WITH MULCH. EXCELSIOR, WOVEN STRAW, BLANKETS, AND COIR (COCONUT FIBER) BLANKETS MAY BE INSTALLED
WITHOUT MULCH.
2.3.PURELY SYNTHETIC BLANKETS ARE ALLOWED, BUT SHALL ONLY BE USED FOR LONG-TERM STABILIZATION OF WATERWAYS. THE ORGANIC BLANKETS ARE BETTER FOR
SLOPE PROTECTION AND SHORT-TERM WATERWAY PROTECTION BECAUSE THEY RETAIN AND PROVIDE ORGANIC MATTER TO THE SOIL, SUBSTANTIALLY IMPROVING THE
SPEED AND SUCCESS OF RE-VEGETATION.
2.4.DO NOT STRETCH BLANKETS/MATTINGS TIGHT - ALLOW THE ROLLS TO MOLD TO ANY IRREGULARITIES.
2.5.SLOPE SURFACE SHALL BE SMOOTH BEFORE PLACEMENT FOR PROPER SOIL CONTACT.
2.6.STAPLING PATTERN AS PER MANUFACTURER'S RECOMMENDATION.
2.7.IF THERE IS A BERM AT THE TOP OF SLOPE, ANCHOR UPSLOPE OF THE BERM.
2.8.FOR SLOPES LESS THAN 3H:1V, ROLLS MAY BE PLACED IN HORIZONTAL STRIPS.
2.9.LIME, FERTILIZE, AND SEED BEFORE INSTALLATION. PLANTING OF SHRUBS, TREES, ETC. SHOULD OCCUR AFTER INSTALLATION.
3.MAINTENANCE STANDARDS
3.1.GOOD CONTACT WITH THE GROUND MUST BE MAINTAINED, AND THERE MUST NOT BE EROSION BENEATH THE NET OR BLANKET.
3.2.AREAS OF THE NET OR BLANKET THAT ARE DAMAGED OR NOT IN CLOSE CONTACT WITH THE GROUND SHALL BE REPAIRED AND STAPLED.
3.3.IF EROSION OCCURS DUE TO POORLY CONTROLLED DRAINAGE, THE PROBLEM SHALL BE FIXED AND THE ERODED AREA PROTECTED.
NOTES:
2" MIN. OVERLAP
6" MIN. OVERLAP
ANCHOR IN 6" x 6" MIN. TRENCH AND
STAPLE AT 12" INTERVALS
BRING MATERIAL DOWN TO A LEVEL AREA, TURN THE
END UNDER 4", AND STAPLE AT 12" INTERVALS
STAPLE OVERLAPS 5' MAX. SPACING
SLOPE INSTALLATIONS OF NETS AND
BLANKETS
STD. PLAN - 213.20
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
1.CONDITIONS OF USE
1.1.PLASTIC COVERING MAY BE USED ON DISTURBED AREAS THAT REQUIRE COVER MEASURES FOR LESS THAN 30 DAYS.
1.2.PLASTIC IS PARTICULARLY USEFUL FOR PROTECTING CUT AND FILL SLOPES AND STOCKPILES.
1.3.CLEAR PLASTIC SHEETING MAY BE USED OVER NEWLY-SEEDED AREAS TO CREATE A GREENHOUSE EFFECT AND ENCOURAGE GRASS GROWTH.
CLEAR PLASTIC SHOULD NOT BE USED FOR THIS PURPOSE DURING THE SUMMER MONTHS.
1.4.THIS METHOD SHALL NOT BE USED UPSLOPE OF AREAS THAT MIGHT BE ADVERSELY IMPACTED BY RUNOFF. SUCH AREAS INCLUDE STEEP AND
UNSTABLE SLOPES.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.PLASTIC SHEETING SHOULD HAVE A MINIMUM THICKNESS OF 0.06 MILLIMETERS.
2.2.IF EROSION AT THE TOE OF A SLOPE IS LIKELY, A GRAVEL BERM, RIPRAP, OR OTHER SUITABLE PROTECTION SHALL BE INSTALLED AT THE TOE
OF THE SLOPE IN ORDER TO REDUCE THE VELOCITY OF RUNOFF.
2.3.TIRES, SAND BAGS, OR EQUIVALENT MAY BE USED TO WEIGHT PLASTIC.
2.4.SEAMS BETWEEN SHEETS MUST OVERLAP A MINIMUM OF 12 INCHES AND BE WEIGHTED OR TAPED.
3.MAINTENANCE STANDARDS
3.1.TORN SHEETS MUST BE REPLACED AND OPEN SEAMS REPAIRED.
3.2.IF THE PLASTIC BEGINS TO DETERIORATE DUE TO ULTRAVIOLET RADIATION, IT MUST BE COMPLETELY REMOVED AND REPLACED.
3.3.WHEN THE PLASTIC IS NO LONGER NEEDED, IT SHALL BE COMPLETELY REMOVED.
NOTES:
10' MAX..
10' MAX.
TOE IN SHEETING IN
4" x 4" MIN. TRENCH
PROVIDE ENERGY DISSIPATION
AT TOE IF EROSION IS LIKELY
SANDBAG (TYP.)
PLASTIC COVERING
STD. PLAN - 213.30
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
WOODEN STAKE
LIVE STAKE
ROLL SPACING
DEPENDS ON SOIL
TYPE AND SLOPE
STEEPNESS
STRAW ROLLS MUST BE
PLACED ALONG SLOPE
CONTOURS
4'
3'-30', SEE NOTE 2.3
SEDIMENT, ORGANIC MATTER,
AND NATIVE SEEDS ARE
CAPTURED BEHIND THE ROLLS
ADJACENT ROLLS SHALL
TIGHTLY ABUT
8"-10" DIA.
3"-5", SEE NOTE 2.2
NOTES:
1.CONDITIONS OF USE
1.1.INSTALL ON DISTURBED AREAS THAT REQUIRE IMMEDIATE EROSION PROTECTION.
1.2.USE ON SLOPES REQUIRING STABILIZATION UNTIL PERMANENT VEGETATION CAN BE ESTABLISHED.
1.3.CAN BE USED ALONG THE PERIMETER OF A PROJECT, AS A CHECK DAM IN UNLINED DITCHES AND AROUND TEMPORARY STOCKPILES.
1.4.WATTLES CAN BE STAKED TO THE GROUND USING WILLOW CUTTINGS FOR ADDED REVEGETATION.
1.5.RILLING CAN OCCUR BENEATH AND BETWEEN WATTLES IF NOT PROPERLY ENTRENCHED, ALLOWING WATER TO PASS BELOW AND BETWEEN WATTLES.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.IT IS CRITICAL THAT WATTLES ARE INSTALLED PERPENDICULAR TO THE FLOW DIRECTION AND PARALLEL TO THE SLOPE CONTOUR.
2.2.NARROW TRENCHES SHOULD BE DUG ACROSS THE SLOPE, ON CONTOUR, TO A DEPTH OF 3 TO 5 INCHES ON CLAY SOILS AND SOILS WITH GRADUAL SLOPES.
ON LOOSE SOILS, STEEP SLOPES, AND DURING HIGH RAINFALL EVENTS, THE TRENCHES SHOULD BE DUG TO A DEPTH OF 5 TO 7 INCHES, OR 1/2 TO 2/3 OF THE
THICKNESS OF THE WATTLE.
2.3.START CONSTRUCTION OF TRENCHES AND INSTALLING WATTLES FROM THE BASE OF THE SLOPE AND WORK UPHILL. EXCAVATED MATERIAL SHOULD BE
SPREAD EVENLY ALONG THE UPHILL SLOPE AND COMPACTED USING HAND TAMPING OR OTHER METHOD. CONSTRUCT TRENCHES AT CONTOUR INTERVALS
OF 3 TO 30 FEET APART DEPENDING ON THE STEEPNESS OF THE SLOPE, SOIL TYPE, AND RAINFALL. THE STEEPER THE SLOPE THE CLOSER TOGETHER THE
TRENCHES SHOULD BE CONSTRUCTED. VERTICAL DISTANCE BETWEEN WATTLES IS NOT TO EXCEED 10 FEET.
2.4.INSTALL THE WATTLES SNUGLY INTO THE TRENCHES AND ABUT TIGHTLY END TO END. DO NOT OVERLAP THE ENDS.
2.5.INSTALL STAKES AT EACH END OF THE WATTLE, AND AT 4 FOOT CENTERS ALONG THE ENTIRE LENGTH OF THE WATTLE.
2.6.IF REQUIRED, INSTALL PILOT HOLES FOR THE STAKES USING A STRAIGHT BAR TO DRIVE HOLES THROUGH THE WATTLE AND INTO THE SOIL.
2.7.AT A MINIMUM, WOODEN STAKES SHOULD BE APPROXIMATELY 3/4 X 3/4 X 24 INCHES. WILLOW CUTTINGS OR 3/8-INCH REBAR CAN ALSO BE USED FOR STAKES.
2.8.STAKES SHOULD BE DRIVEN THROUGH THE MIDDLE OF THE WATTLE, LEAVING 2 TO 3 INCHES OF THE STAKE PROTRUDING ABOVE THE WATTLE.
3.MAINTENANCE STANDARDS
3.1.INSPECT WATTLES PRIOR TO FORECASTED RAIN, DAILY DURING EXTENDED RAIN EVENTS, AFTER RAIN EVENTS, WEEKLY DURING THE WET SEASON, AND AT
TWO WEEK INTERVALS AT ALL OTHER TIMES OF THE YEAR.
3.2.REPAIR OR REPLACE SPLIT, TORN, RAVELING, OR SLUMPING WATTLES
3.3.REMOVE SEDIMENT ACCUMULATIONS WHEN EXCEEDING 1/2 THE HEIGHT BETWEEN THE TOP OF THE WATTLE AND THE GROUND SURFACE.
STRAW WATTLES
STD. PLAN - 213.40
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
1.CONDITIONS OF USE
1.1.SILT FENCE MAY BE USED DOWNSLOPE OF ALL DISTURBED AREAS.
1.2.SILT FENCE IS NOT INTENDED TO TREAT CONCENTRATED FLOWS, NOR IS IT INTENDED TO TREAT SUBSTANTIAL AMOUNTS OF OVERLAND FLOW. ANY CONCENTRATED
FLOW MUST BE CONVEYED THROUGH THE DRAINAGE SYSTEM TO A SEDIMENT TRAP OR POND.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.THE GEOTEXTILE USED MUST MEET THE STANDARD LISTED BELLOW. A COPY OF THE MANUFACTURER'S FABRIC SPECIFICATIONS MUST BE AVAILABLE ON SITE.
2.2.STANDARD STRENGTH FABRIC REQUIRES WIRE BACKING TO INCREASE THE STRENGTH OF THE FENCE. WIRE BACKING OR CLOSER POST SPACING MAY BE REQUIRED
FOR EXTRA STRENGTH FABRIC IF FIELD PERFORMANCE WARRANTS A STRONGER FENCE.
2.3.WHERE THE FENCE IS INSTALLED, THE SLOPE SHALL NOT BE STEEPER THAN 2H:1V
2.4.IF A TYPICAL SILT FENCE IS USED, THE STANDARD 4"X4" TRENCH MAY BE REDUCED AS LONG AS THE BOTTOM 8 INCHES OF THE SILT FENCE FABRIC IS WELL BURIED AND
SECURE IN A TRENCH THAT STABILIZES THE FENCE AND DOES NOT ALLOW WATER TO BYPASS OR UNDERMINE THE SILT FENCE.
2.5.FILTER FABRIC FENCES SHALL BE INSTALLED ALONG CONTOURS WHENEVER POSSIBLE.
3.MAINTENANCE STANDARDS
3.1.ANY DAMAGE SHALL BE REPAIRED IMMEDIATELY.
3.2.IF CONCENTRATED FLOWS ARE EVIDENT UPHILL OF THE FENCE, THEY MUST BE INTERCEPTED AND CONVEYED TO A SEDIMENT TRAP OR POND.
3.3.IT IS IMPORTANT TO CHECK THE UPHILL SIDE OF THE FENCE FOR SIGNS OF THE FENCE CLOGGING AND ACTING AS A BARRIER TO FLOW AND THEN CAUSING
CHANNELIZATION OF FLOWS PARALLEL TO THE FENCE. IF THIS OCCURS, REPLACE THE FENCE OR REMOVE THE TRAPPED SEDIMENT.
3.4.SEDIMENT MUST BE REMOVED WHEN SEDIMENT IS 6 INCHES HIGH.
3.5.IF THE FILTER FABRIC (GEOTEXTILE) HAS DETERIORATED DUE TO ULTRAVIOLET BREAKDOWN, IT SHALL BE REPLACED.
NOTES:
JOINTS IN FILTER FABRIC SHALL BE SPLICED AT
POSTS. USE STAPLES, WIRE RINGS, OR
EQUIVALENT TO ATTACH FABRIC TO POSTS
2"x2" 14 GAUGE WIRE, OR
EQUIVALENT, IF STANDARD
STRENGTH FABRIC USED
FILTER FABRIC 2' MIN.
12" MIN.
4"x4" MIN. TRENCH
BACKFILL TRENCH WITH NATIVE SOIL
OR 3/4" TO 1-1/2" WASHED GRAVEL
2"x4" WOOD POSTS, STEEL FENCE POSTS, OR EQUIVALENT (TYP.)
6' MAX.
POST SPACING MAY BE INCREASED
TO 8' IF WIRE BACKING IS USED
AOS (ASTM D4751)30-100 SIEVE SIZE (0.60-0.15mm) FOR SILT FILM
50-100 SIEVE SIZE (0.30-0.15mm) FOR OTHER FABRICS
WATER PERMITTIVITY (ASTM D4491)0.02 SEC-1 MINIMUM
GRAB TENSILE STRENGTH (ASTM D4632)180 LBS. MIN. FOR EXTRA STRENGTH FABRIC
100 LBS. MIN. FOR STANDARD STRENGTH FABRIC
GRAB TENSILE ELONGATION (ASTM D4632)30% MAX. (WOVEN)
ULTRAVIOLET RESISTANCE (ASTM D4355)70% MIN.
SILT FENCE
STD. PLAN - 214.00
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
PLAN VIEW
ELEVATION VIEW
SECTION A
NOTES:
6" SEWER PIPE WITH BUTTERFLY VALVES
8'x8' SUMP WITH 5' OF CATCH
TO ACCOMMODATE
CLEANING BY TRACKHOE
3" TRASH PUMP WITH FLOATS ON SUCTION HOSE
2" SCH 40
1 1/2" SCH 40 FOR SPRAYERS
MIDPOINT SPRAY
NOZZLES, IF NEEDED
2% SLOPE5H:1V5H:1V2% SLOPE 1H:1V1H:1V15' ATB APRON TO
PROTECT GROUND FROM
SPLASHING WATER ATB CONSTRUCTION ENTRANCE
ASPHALT CURB ON THE LOW ROAD SIDE
TO DIRECT WATER BACK TO POND
6" SLEEVE UNDER ROAD
BALL VALVE (TYP.)
CURB
6" SLEEVE
15'15'20'15'50'
5'
18'
12'
3'
1
1
LOCATE INVERT OF TOP PIPE 12" TO
14" ABOVE BOTTOM OF WHEEL WASH
8'x8' SUMP TO ACCOMMODATE
CLEANING BY TRACKHOE
DRAIN PIPE WITH
BUTTERFLY VALVE
WATER LEVEL,
12" TO 14" DEEPA6" ATB OVER CRUSHED BASE MATERIAL
OR 8" ATB OVER A GOOD SUBGRADE 5% - 10%SLOPE1.CONDITIONS OF USE
1.1.WHEN A STABILIZED CONSTRUCTION ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, WHEEL WASHING IS GENERALLY AN EFFECTIVE
EROSION AND SEDIMENT CONTROL METHOD AND BMP WHEN INSTALLED WITH CAREFUL ATTENTION TO TOPOGRAPHY.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.USE A LOW CLEARANCE TRUCK TO TEST THE WHEEL WASH BEFORE PAVING. EITHER A BELLY DUMP OR LOWBOY WILL WORK WELL TO TEST CLEARANCE.
2.2.MIDPOINT SPRAY NOZZLES ARE ONLY NEEDED IN VERY MUDDY CONDITIONS.
2.3.POLYACRYLAMIDE (PAM) ADDED TO WHEEL WASHWATER AT A RATE OF 0.25-0.5 POUNDS PER 1,000 GALLONS OF WATER INCREASES EFFECTIVENESS AND REDUCES
CLEANUP TIME. IF PAM IS ALREADY BEING USED FOR DUST OR EROSION CONTROL AND IS BEING APPLIED BY A WATER TRUCK, THE SAME TRUCK MAY BE USED TO
CHANGE THE WASHWATER.
3.MAINTENANCE STANDARDS
3.1.THE WHEEL WASH SHOULD START OUT EACH DAY WITH CLEAN, FRESH WATER.
3.2.THE WASHWATER SHOULD BE CHANGED A MINIMUM OF ONCE PER DAY. ON LARGE EARTHWORK JOBS WHERE MORE THAN 10 TO 20 TRUCKS PER HOUR ARE EXPECTED,
THE WASHWATER WILL NEED TO BE CHANGED MORE OFTEN.
3.3.WHEEL WASH OR TIRE BATH WASHWATER SHALL BE DISCHARGED TO A SEPARATE ONSITE TREATMENT SYSTEM, SUCH AS A CLOSED-LOOP RECIRCULATION SYSTEM OR
LAND APPLICATION, OR TO THE SANITARY SEWER SYSTEM WITH PROPER APPROVAL AND/OR PERMITS FROM KING COUNTY AND THE CITY OF RENTON.
WHEEL WASH AND PAVED
CONSTRUCTION ENTRANCE
STD. PLAN - 215.00
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
EXIST
I
N
G
R
O
A
D
1.CONDITION OF USE
1.1.CONSTRUCTION ENTRANCE SHALL BE STABILIZED WHEREVER TRAFFIC WILL BE LEAVING A CONSTRUCTION SITE AND TRAVELING ON PAVED ROADS OR OTHER
PAVED AREAS WITHIN 1,000 FEET OF THE SITE.
1.2.FOR RESIDENTIAL CONSTRUCTION PROVIDE STABILIZED CONSTRUCTION ENTRANCES FOR EACH RESIDENCE IN ADDITION TO THE MAIN SUBDIVISION
ENTRANCE. STABILIZED SURFACES SHALL BE OF SUFFICIENT LENGTH/WIDTH TO PROVIDE VEHICLE ACCESS/PARKING, BASED ON LOT SIZE/CONFIGURATION.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.A SEPARATION GEOTEXTILE SHALL BE PLACED UNDER THE SPALLS TO PREVENT FINE SEDIMENT FROM PUMPING UP INTO THE ROCK PAD. THE GEOTEXTILE
SHALL MEET THE FOLLOWING STANDARDS:
2.2.DO NOT USE CRUSHED CONCRETE, CEMENT, OR CALCIUM CHLORIDE FOR CONSTRUCTION ENTRANCE STABILIZATION BECAUSE THESE PRODUCTS RAISE pH
LEVELS IN STORMWATER AND CONCRETE DISCHARGE TO SURFACE WATERS OF THE STATE IS PROHIBITED.
2.3.HOG FUEL (WOOD BASED MULCH) MAY BE SUBSTITUTED FOR OR COMBINED WITH QUARRY SPALLS IN AREAS THAT WILL NOT BE USED FOR PERMANENT ROADS.
HOG FUEL IS NOT RECOMMENDED FOR ENTRANCE STABILIZATION IN URBAN AREAS. THE INSPECTOR MAY AT ANY TIME REQUIRE THE USE OF QUARRY SPALLS
IF THE HOG FUEL IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT OR IF THE HOG FUEL IS BEING CARRIED ONTO PAVEMENT.
2.4.FENCING SHALL BE INSTALLED AS NECESSARY TO RESTRICT TRAFFIC TO THE CONSTRUCTION ENTRANCE.
2.5.WHENEVER POSSIBLE, THE ENTRANCE SHALL BE CONSTRUCTED ON A FIRM, COMPACTED SUBGRADE. THIS CAN SUBSTANTIALLY INCREASE THE
EFFECTIVENESS OF THE PAD AND REDUCE THE NEED FOR MAINTENANCE.
3.MAINTENANCE STANDARDS
3.1.QUARRY SPALLS SHALL BE ADDED IF THE PAD IS NO LONGER IN ACCORDANCE WITH THE SPECIFICATIONS.
3.2.IF THE ENTRANCE IS NOT PREVENTING SEDIMENT FROM BEING TRACKED ONTO PAVEMENT, THEN ALTERNATIVE MEASURES TO KEEP THE STREETS FREE OF
SEDIMENT SHALL BE USED. THIS MAY INCLUDE STREET SWEEPING, AN INCREASE IN THE DIMENSIONS OF THE ENTRANCE, OR THE INSTALLATION OF A WHEEL
WASH. IF WASHING IS USED, IT SHALL BE DONE ON AN AREA COVERED WITH CRUSHED ROCK, AND WASH WATER SHALL DRAIN TO A SEDIMENT TRAP OR POND.
3.3.ANY SEDIMENT THAT IS TRACKED ONTO PAVEMENT SHALL BE REMOVED IMMEDIATELY BY SWEEPING. THE SEDIMENT COLLECTED BY SWEEPING SHALL BE
REMOVED OR STABILIZED ON SITE. THE PAVEMENT SHALL NOT BE CLEANED BY WASHING DOWN THE STREET, EXCEPT WHEN SWEEPING IS INEFFECTIVE AND
THERE IS A THREAT TO PUBLIC SAFETY. IF IT IS NECESSARY TO WASH THE STREETS, A SMALL SUMP MUST BE CONSTRUCTED. THE SEDIMENT WOULD THEN BE
WASHED INTO THE SUMP WHERE IT CAN BE CONTROLLED AND DISCHARGED APPROPRIATELY. WASH WATER MUST BE PUMPED BACK ONTO THE SITE AND
CANNOT DISCHARGE TO SYSTEMS TRIBUTARY TO SURFACE WATERS.
3.4.ANY QUARRY SPALLS THAT ARE LOOSENED FROM THE PAD AND END UP ON THE ROADWAY SHALL BE REMOVED IMMEDIATELY.
3.5.IF VEHICLES ARE ENTERING OR EXITING THE SITES AT POINTS OTHER THAN THE CONSTRUCTION ENTRANCE(S), FENCING SHALL BE INSTALLED TO CONTROL
TRAFFIC.
NOTES:
CONSTRUCTION ENTRANCE NOTES:
1.DRIVEWAYS SHALL BE PAVED TO
THE EDGE OF THE RIGHT-OF-WAY
PRIOR TO INSTALLATION OF THE
CONSTRUCTION ENTRANCE TO
AVOID DAMAGING OF THE
ROADWAY.
2.IT IS RECOMMENDED THAT THE
ENTRANCE BE CROWNED SO THAT
RUNOFF DRAINS OFF THE PAD
INSTALL DRIVEWAY CULVERT
IF THERE IS A ROADSIDE
DITCH PRESENT, AS PER CITY
ROAD STANDARDS
GEOTEXTILE
4"-8" QUARRY SPALLS
12" MIN. THICKNESS
15' MIN.
PROVIDE FULL WIDTH OF
INGRESS/EGRESS AREA
100' MIN.
GRAB TENSILE STRENGTH (ASTM D4632)200 LBS. MIN.
GRAB TENSILE ELONGATION (ASTM D4632)30% MAX. (WOVEN)
CBR PUNCTURE STRENGTH (ASTM D6241)495 LBS. MIN.
AOS (ASTM D4751)20-45 (U.S. STANDARD SIEVE SIZE)
R = 25' MIN.
STABILIZED CONSTRUCTION ENTRANCE
STD. PLAN - 215.10
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
NOTES:
SECTION VIEW
ISOMETRIC VIEW
DRAINAGE GRATE TRIM
GRATE FRAME
FILTERED
WATER
SEDIMENT AND DEBRIS
OVERFLOW BYPASS
BELOW INLET GRATE DEVICE
DRAINAGE GRATE
(RECTANGULAR GRATE SHOWN)RETRIEVAL SYSTEM (TYP.)
OVERFLOW BYPASS (TYP.)
BELOW INLET GRATE DEVICE
1.PROTECTION SHALL BE PROVIDED FOR ALL STORM DRAIN INLETS DOWNSLOPE AND WITHIN 500 FEET OF A DISTURBED OR
CONSTRUCTION AREA, UNLESS THE RUNOFF THAT ENTERS THE CATCH BASIN WILL BE CONVEYED TO A SEDIMENT POND OR TRAP.
2.INLET PROTECTION SHALL BE USED TO PROTECT THE DRAINAGE SYSTEM.
3.THE CONTRIBUTING DRAINAGE AREA MUST NOT BE LARGER THAN ONE ACRE.
4.SIZE THE BELOW INLET GRATE DEVICE (BIGD) FOR THE STORMWATER STRUCTURE IT WILL SERVICE.
5.THE BIGD SHALL HAVE A BUILT-IN HIGH-FLOW RELIEF SYSTEM (OVERFLOW BYPASS).
6.THE RETRIEVAL SYSTEM MUST ALLOW REMOVAL OF THE BIGD WITHOUT SPILLING THE COLLECTED MATERIAL.
7.PERFORM MAINTENANCE IN ACCORDANCE WITH STANDARD SPECIFICATION 8-01.3(15).
8.ANY SEDIMENT IN THE CATCH BASIN INSERT SHALL BE REMOVED WHEN THE SEDIMENT HAS FILLED ONE-THIRD OF THE AVAILABLE
STORAGE. THE FILTER MEDIA FOR THE INSERT SHALL BE CLEANED OR REPLACED AT LEAST MONTHLY.
5" MAX.
CATCH BASIN INSERT
STD. PLAN - 216.30
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
1.CONDITIONS OF USE
1.1.REQUIRED AT:
1.1.1.THE TOP OF ALL SLOPES IN EXCESS OF 3H:1V AND WITH MORE THAN 20 FEET OF VERTICAL RELIEF.
1.1.2.AT INTERVALS ON ANY SLOPES THAT EXCEEDS THE DIMENSIONS SPECIFIED BELOW.
2.DESIGN AND INSTALLATION SPECIFICATIONS
2.1.FOR SLOPES STEEPER THAN 2H:1V WITH MORE THAN 10 FEET OF VERTICAL RELIEF, BENCHES MAY BE CONSTRUCTED OR CLOSER SPACED
INTERCEPTOR SWALES MAY BE USED. THE DESIRED MEASURE MUST BE DESIGNED BY AN ENGINEER TO EFFECTIVELY INTERCEPT THE HIGH VELOCITY
RUNOFF TO A SEDIMENT POND OR TRAP.
2.2.CONSTRUCTION TRAFFIC OVER TEMPORARY SWALES SHALL BE MINIMIZED.
3.MAINTENANCE STANDARDS
3.1.DAMAGE RESULTING FROM RUNOFF OR CONSTRUCTION ACTIVITY SHALL BE REPAIRED IMMEDIATELY.
3.2.IF THE FACILITIES DO NOT REGULARLY RETAIN STORM RUNOFF, THE CAPACITY AND/OR FREQUENCY OF THE SWALES SHALL BE INCREASED.
NOTES:
2
MAX.
1
AVERAGE SLOPE SLOPE PERCENT FLOW PATH LENGTH
20H:1V (OR LESS)3-5%300 FEET
(10 TO 20)H:1V 5-10%200 FEET
(4 TO 10)H:1V 10-25%100 FEET
(2 TO 4)H:1V 25-50%50 FEET
2
MAX.
1
2' MIN.
12" MIN.
SWALE SPACING DEPENDS ON SLOPE GRADIENT
LEVEL BOTTOM
INTERCEPTOR SWALE
STD. PLAN - 217.10
PUBLIC WORKS
DEPARTMENT
APPROVED:
DATEGregg Zimmerman
Public Works Administrator
UNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)
DocuSign Envelope ID: 6EECF5B6-602A-4E4A-B436-A317AA638878
9/28/2018 | 9:45 AM PDT
GENERAL NOTES:1.FENCE MATERIAL SHALL BE 9 GAUGE GALVANIZED STEEL FABRIC WITH BONDED VINYL COATING. VINYL COATING SHALL BE COMPATIBLE WITH THE SURROUNDING ENVIRONMENT AS APPROVED BY THE CITY (E.G.GREEN IN OPEN, GRASSY AREAS AND BLACK IN WOODED AREAS). ALL POSTS, CROSS BARS, AND GATES SHALL BE PAINTED OR COATED THE SAME COLOR AS VINYL CHAIN LINK FENCE.2.UNLESS OTHERWISE SPECIFIED ON STD. PLAN 234.60 OR 234.70, STANDARD MATERIALS USED IN CONSTRUCTION OF CHAIN LINK FENCE AND GATES SHALL BE IN ACCORDANCE WITH WSDOT STD. SPEC SECTION 9-16.1.3.ALONG THE TOP AND BOTTOM, USING WIRE TIES AND HOG RINGS, FASTEN THE CHAIN LINK FENCE FABRIC TO THE TOP RAIL AND TENSION WIRE WITHIN THE LIMITS OF THE FIRST FULL FABRIC WEAVE.4.WITHIN 10 FEET OF A TRAVELED LANE, USE TENSION WIRE INSTEAD OF A TOP RAIL.5.BOTH SIDES OF A CORNER POST SHALL CONNECT TO A PULL POST (SEE END DEPICTION).6.IF SOIL ALLOWS, LINE POSTS MAY BE DRIVEN DIRECTLY INTO GROUND A MINIMUM OF 2'-6" INSTEAD OF USING CONCRETE POST BASE.LINE POSTGATEPOST, FRAME, AND RAIL SPECIFICATIONS(HIGH STRENGTH SCHEDULE 40 GALVANIZED PIPE)MEMBEROUTSIDE DIAMETER O.D.WEIGHT (LB/FT)GATE POST4"6.56END POST / CORNER POST /PULL POST2-7/8"4.64LINE POST2-3/8"3.12GATE FRAME1-7/8"2.28TOP RAIL1-5/8"1.83TIE WIRES (TYP.)SPACED @ 14" MAX.LINE POST SPACED@ 10' MAX.6' FABRICHEIGHT(TYP.)2'-6"(TYP.)TIE WIRES (TYP.)SPACED @14" MAX.CHAIN LINK FENCEFABRIC (TYP.)PULL POST(AT GATE)TENSIONWIRE (TYP.)3'-0" (TYP.)GATE POST12" ROUNDTRUSSROD (TYP.)TIE WIRES (TYP.)SPACED @14" MAX.MATCH FENCE SELVAGE (TYP.)MATCH FENCESELVAGE (TYP.)16'10'TOP HINGE ~180°SWING (TYP.)I234.70TOP RAIL (TYP.),SEE NOTE 4PULL POST(AT GATE)TENSIONWIRE (TYP.)BOTTOM HINGE~180° SWING (TYP.)18"HOG RINGS (TYP.)SPACED @ 24" MAX.J234.70K234.70FABRIC BAND WITHCARRIAGE BOLT AND NUT(TYP.) SPACED @ 15" MAXSTRETCHER BAR (TYP.)6'FABRICHEIGHT(TYP.)SEE NOTE 612" ROUND12" ROUND10" MIN. ROUND10" MIN.ROUNDG234.70H234.70E234.70GATE POSTGATE LATCHGATE FRAME (TYP.)E234.70F234.70CORNEREND10' MAX.END POSTTENSIONWIRE (TYP.)A234.70FABRIC BAND WITH CARRIAGEBOLT AND NUT (TYP.)SPACED @ 15" MAXSTRETCHERBAR (TYP.)TENSIONWIRE (TYP.)HOG RINGS (TYP.)SPACED @ 24" MAX.TOP RAIL (TYP.),SEE NOTE 4C234.703'-0"(TYP.)~1"TIE WIRES (TYP.)SPACED @14" MAX.CONCRETE POST BASE (TYP.)10" DIA MIN.KNUCKLEDSELVAGE (TYP.)PULL POST(AT END ORCORNER)B234.70D234.70CHAIN LINKFENCE FABRIC(TYP.)CORNER POST,SEE NOTE 56"(TYP.)6'FABRICHEIGHT(TYP.)PUBLIC WORKSDEPARTMENTAPPROVED:DATEMartin PastuchaPublic Works AdministratorUNLESS OTHERWISE NOTED, DRAWING IS NOT TO SCALE (NTS)POND FENCING AND GATESTD. PLAN - 234.60DocuSign Envelope ID: 3B1B34D3-7E0A-476C-ADB3-4329FFE0C1088/13/2020 | 8:48 AM PDT
SHEET 1 OF 1 SHEET
APPROVED FOR PUBLICATION
STATE DESIGN ENGINEER
Washington State Department of Transportation
TYPE K
BAND ANGLE CONNECTOR DETAIL
TYPE D
BAND ANGLE CONNECTOR DETAIL
TYPE F
BAND ANGLE CONNECTOR DETAIL
TYPE F
TYPE KTYPE K
SEMI-CORRUGATED BAND
TYPE F
ANNULAR CORRUGATED BAND
TYPE D
REFORMED PIPE ENDS
W
REFORMED PIPE ENDS
W
W
OR HELICAL END
WITH REFORMED END
NEW PIPE EXTENSION
PITCH × DEPTH
CORRUGATION
TYPE
BAND
3 × 1
OR
2 2/3 × 1/2
2 2/3 × 1/2
REFORMED TO
12 ~ 84
3 × 1
2 2/3 × 1/2
REFORMED TO
TYPE
GASKET
DIAM.
PIPE
W
MIN.
3 × 1
OR
2 2/3 × 1/2
2 2/3 × 1/2
REFORMED TO
D
90 ~ 144
12 ~ 84
12 ~ 48
54 ~ 84
54 ~ 144
F
K
12 SLEEVE
SLEEVE24
10 1/2
12
24
24
2 2/3 × 1/2
SLEEVE
3 × 1
3 × 1
2 2/3 × 1/2
REFORMED TO
2 2/3 × 1/2
D
F
K
SLEEVE
SLEEVE
12 ~ 72 12
36 ~ 60 12
24
10 1/2
12
24
24
66 ~ 108
12 ~ 48
12 ~ 48
54 ~ 84
54 ~ 96
2 2/3 x 1/2
2 2/3 x 1/2
3 × 1ALUMINUMSTEEL(ALL DIMENSIONS ARE IN INCHES)
COUPLING BAND DIMENSION TABLE
PIPE ARCH ONLY
HELICAL END
EXISTING PIPE WITH
FOR CLARITY (TYP.)
BAND LAP NOT SHOWN
DOUBLE BAR & STRAP CONNECTOR DETAIL
BAR & STRAP CONNECTOR DETAIL
1/2" (IN) × 6" (IN) BOLT (TYP.)
1/2" (IN) × 6" (IN) BOLT (TYP.)
1/2" (IN) × 6" (IN) BOLT (TYP.)
(FOR PIPE EXTENSIONS ONLY)
FLAT BAND OR DIMPLE BAND
O-RING
OR
SLEEVE
O-RING
OR
SLEEVE
CORRUGATED METAL PIPE
COUPLING BANDS FOR
STANDARD PLAN B-60.40-01STATEOFWASHINGT
O
NR
EGISTEREDPROFE
S
SIONAL ENGINEERNA
M
L
IEH EILUJ
41819
..
10'-0" MAX.
END OR CORNER POST
TENSION WIRE
HOG RINGS (TYP.) -
SPACED @ 24" (IN) MAX.
10'-0" MAX.
END OR CORNER POST
TENSION WIRE
CONCRETE POST
BASE (TYP.)
PULL POST
TENSION WIRE
PULL POST
,., . •, · ..
<! . ' ·' . . .. . , .,
POST AND RAIL SPECIFICATIONS
PIPE ROLL FORMED
POST NOM. SIZE WEIGHT (SCH. 40) SECTION (lb/ft) I. D.
END, CORNER, OR PULL POST 2 1/2" DIAM. 8 5.10
LINE OR BRACE POST 2" DIAM. 0 1.85
1 000' -0" MAX.
TENSION WIRE
LINE POST -SPACED
@ 1 0' (FT) MAX.
1-::c
(!)
= jjj O::c
-' (.) coo::
m ;;:
TYPE3
500' -0" MAX.
TENSION WIRE
LINE POST -SPACED
@ 1 0' (FT) MAX.
1-::c
(!)
= jjj O::c
-' (.) .... 0::
m ;;:
TYPE4
3 1/2"
p
~ =::::::::
~
C")
]
FABRIC LOOP-J 8
2 SIDES Y
TWISTED SELVAGE
(TYP.)
KNUCKLED SELVAGE
(TYP.)
10'-0" MAX. (TYP.)
TENSION WIRE
KNUCKLED SELVAGE
(TYP.)
1 5/8" 1
~~c
--'
FENCE LINE
0
PULL POST -SPACED
@ 1 000' (FT) MAX.
HOG RINGS (TYP.) -
SPACED @ 24" (IN) MAX.
NOTES
1. All concrete post bases shall be 1 0" (in)
minimum diameter.
TENSION WIRE BRACE POST 2. Along the top and bottom, using Hog
Rings, fasten the Chain Link Fence
Fabric to the Tension Wire within the
limits of the first full fabric weave.
CHAIN LINK
FENCE FABRIC
CONCRETE POST
BASE (TYP.)
TENSION WIRE
3. Details are illustrative and shall not
limit hardware design or post selection
of any particular fence type.
4. Fencing shall be used for security and
boundary delineation only.
TIE WIRES (TYP.) -
SPACED @ 14" (IN) MAX.
POST
FABRIC BAND WITH
CARRIAGE BOLT AND
NUT-SPACED 15" (IN)
MAX.
STRETCHER
BAR
HOG RINGS (TYP.) -
SPACED @ 24" (IN) MAX.
TENSION WIRE BRACE POST
CHAIN LINK
FENCE FABRIC
METHOD OF FASTENING
STRETCHER BAR TO POST
TIE WIRES (TYP.) -
SPACED @ 14" (IN) MAX .
CHAIN LINK FENCE
TYPES 3AND 4
STANDARD PLAN L-20.10-03
SHEET 1 OF 2 SHEETS
APPROVED FOR PUBLICATION
STATE DESIGN ENGINEER .....
... Washington State Department of Transportation
0::: w ::c
(.)
1-w
....1 u..
~
....1
0
(.)
~
~
0
FABRIC BAND WITH
CARRIAGE BOLT AND NUT
TENSION WIRE
TIE WIRE -SPACED
@ 14" (IN) MAX. (TYP.)
HOG RING -SPACED
@ 24" (IN) MAX.
END OR CORNER POST
DETAIL 0
' :v
' ' ' ' ' ' '
BRACE POST
DETAIL 0
BRACE BAND WITH
CARRIAGE BOLT AND NUT
TENSION WIRE
STRETCHER BAR
TENSION WIRE
TURNBUCKLE
BRACE BAND WITH
CARRIAGE BOLT AND NUT
TWO-WAY BRACE BAND WITH
CARRIAGE BOLTS AND NUTS
TENSION WIRES
FABRIC BAND WITH
CARRIAGE BOLT AND
NUT (TYP.)
TURNBUCKLE
STRETCHER BAR (TYP.)
PULL POST {AT END OR CORNER)
DETAIL 0
TWO-WAY BRACE BAND WITH
CARRIAGE BOLTS AND NUTS
TENSION WIRES
FABRIC BAND WITH
CARRIAGE BOLT AND
NUT (TYP.)
PULL POST {WITHIN RUN)
DETAIL 0
TURNBUCKLE
TENSION WIRES
STRETCHER BAR (TYP.)
TENSION WIRE
CHAIN LINK FENCE
TYPES 3AND 4
STANDARD PLAN L-20.10-03
SHEET 2 OF 2 SHEETS
APPROVED FOR PUBLICATION
STATE DESIGN ENGINEER .....
... Washington State Department of Transportation
Public Works Department
MONROE AVE NE INFILTRATION FACILITY
CAG-23-316
DEPARTMENT OF ECOLOGY
SPECIFICATIONS INSERT
WASHINGTON STATE DEPARTMENT OF ECOLOGY
STORMWATER FACILITY
SPECIFICATIONS INSERT
General
Partial funding of this project is being provided by the Washington State Department of
Ecology’s (Ecology) Stormwater Grant Program.
Compliance w ith State and Local Laws
The construction of the project, including all subcontracted work, shall conform to the
applicable requirements of state and local laws and ordinances.
State Interest Exclusion
It is anticipated that this project will be funded in part by the Washington State Department of
Ecology. Neither the State of Washington nor any of its departments or employees are, or shall
be, a party to this contract or any subcontract.
Third Party Beneficiary
Partial funding of this project is being provided through the Washington State Department of
Ecology Stormwater Grant Program. All parties agree that the State of Washington shall be, and
is hereby, named as an express third-party beneficiary of this contract, with full rights as such.
Access to the construction site and to records
The contractor shall provide for the safe access to the construction site and to the contractor's
records by Washington State Department of Ecology personnel.
The Contractor shall maintain accurate records and accounts to facilitate the Owner’s audit
requirements and shall ensure that all subcontractors maintain auditable records.
These Project records shall be separate and distinct from the Contractor’s other records and
accounts.
All such records shall be available to the Owner and to Washington State Department of Ecology
personnel for examination. All records pertinent to this project shall be retained by the Contractor
for a period of three (3) years after the final audit.
Protection of the Environment
No construction related activity shall contribute to the degradation of the environment, allow
material to enter surface or ground waters, or allow particulate emissions to the atmosphere,
which exceed state or federal standards. Any actions that potentially allow a discharge to state
waters must have prior approval of the Washington State Department of Ecology.
Inadvertent Discovery of Archeological Resources
The contractor shall obtain a copy of the Inadvertent Discovery Plan from the Project Owner.
The contractor shall keep a copy of the inadvertent discovery plan for the project on the work
site at all times. The contractor shall immediately stop all work if human remains, cultural, or
archeological resources are discovered in the course of construction. The contractor shall follow
the inadvertent discovery plan in dealing with the human remains, cultural, or archeological
resources.
Project Signs
The Contractor shall display Ecology’s logo in a manner that informs the public that the project
received financial assistance from the Washington State Stormwater Grant Program.
Utilization of Minority and Women Business Enterprises
All bidders are encouraged to utilize certified minority-owned and women-owned businesses to
the extent possible in the performance of this contract. All prospective bidders or persons
submitting qualifications should take the following steps, when possible.
1. Include qualified minority and women's businesses on solicitation lists.
2. Assure that qualified minority and women's businesses are solicited whenever
they are potential sources of services or supplies.
3. Divide the total requirements, when economically feasible, into smaller tasks or
quantities to permit maximum participation by qualified minority and women's
businesses.
4. Establish delivery schedules, where work requirements permit, which will
encourage participation of qualified minority and women's businesses.
5. Use the services and assistance of the State Office of Minority and Women's
Business Enterprises (OMWBE) and the Office of Minority Business Enterprises
of the U.S. Department of Commerce, as appropriate.
All prospective bidders must provide a list of the MBE/WBE subcontractors they intend to use
during the project. This list must be provided with the bid package.
Revised 3/25/15
Public Works Department
MONROE AVE NE INFILTRATION FACILITY
CAG-23-316
GEOTECHNICAL REPORT
CITY OF RENTON, PHASE 3
GEOTECHNICAL EVALUATION
FOR STORMWATER FACILITY,
UPPER BALCH PIT
Monroe Avenue NE Storm System
Improvements, 100% Design
Prepared for: Otak
190398 Task 3.1.1.2D July 24, 2023 FINAL e a r t h w a t e r+ppeecc tt
C O N S U L T I N G
CITY OF RENTON, PHASE 3 GEOTECHNICAL
EVALUATION FOR STORMWATER FACILITY,
UPPER BALCH PIT
Monroe Avenue NE Storm System Improvements, 100%
Design
Prepared for: Otak
190398 Task 3.1.1.2D July 24, 2023 FINAL
Aspect Consulting, LLC
Elson T. “Chip” Barnett, LEG
Senior Engineering Geologist
ebarnett@aspectconsulting.com
Erik O. Andersen, PE
Principal Geotechnical Engineer
eandersen@aspectconsulting.com
Matthew M. Lewis, LHG
Project Hydrogeologist
mlewis@aspectconsulting.com
John Knutson, PE, PMP
Principal Water Resources Engineer
jknutson@aspectconsulting.com
V:\190398 City of Renton Monroe Ave NE Storm System Improvements\Deliverables\Task 3.1.1.2D 100% Design\Final\100%_Report_Final_07-24-23.docx
7/24/23 7/24/23
earth +w ater Aspect Consulting, LLC 710 2nd Avenue Suite 550 Seattle, WA 98104 206.328.7443 www.aspectconsulting.com
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL i
Contents
1 Introduction ................................................................................................ 1
1.1 Background ................................................................................................ 1
2 Site Conditions ............................................................................................ 2
3 Subsurface Conditions ............................................................................... 3
3.1 Geologic Mapping ....................................................................................... 3
3.2 Geology and Stratigraphy ........................................................................... 3
3.3 Field Investigation ....................................................................................... 4
3.3.1 Infiltration Testing ................................................................................. 4
3.3.2 Laboratory Testing ................................................................................ 5
3.3.3 Groundwater ......................................................................................... 5
3.4 Seismicity ................................................................................................... 6
3.4.1 Surficial Ground Rupture ...................................................................... 7
3.4.2 Liquefaction .......................................................................................... 7
3.5 Critical Areas .............................................................................................. 8
3.6 Geologic Hazard Area Slope Setback ........................................................ 8
4 Stormwater Infiltration Design ................................................................... 9
4.1 Soil Infiltration Rates ................................................................................... 9
4.1.1 Facility Design and Narratives .............................................................. 9
4.2 Temporary Slopes .................................................................................... 11
4.2.1 Slope Stability Analysis of Temporary Slopes ..................................... 11
4.3 Contruction Considerations ...................................................................... 12
4.3.1 Gravity Block Wall............................................................................... 13
4.3.2 Luminaire Light Pole Relocation along Monroe Ave NE ...................... 13
5 Conclusions and Recommendations....................................................... 14
5.1 Stormwater Design ................................................................................... 14
5.2 Construction ............................................................................................. 15
5.2.1 General Recommendations ................................................................ 15
5.2.2 Infiltration Chamber Gallery Area ........................................................ 16
5.2.3 Enhanced Water Quality Vault Area ................................................... 16
5.2.4 Gravity Block Wall............................................................................... 17
5.2.5 Luminaire Light Pole Relocation along Monroe Ave NE ...................... 18
6 References ................................................................................................. 19
7 Limitations ................................................................................................. 21
Infiltration Testing Field Methods ......................................................................... 1
Infiltration Testing Analysis Methods .................................................................... 1
ASPECT CONSULTING
ii FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
List of Tables
1 Well Summary ............................................................................................4
2 Seismic Design Parameters .......................................................................7
3 Summary of Design Infiltration Rates (Idesign) for the Proposed Facility .... 10
4 Summary of Soil Engineering Properties .................................................. 12
5 Slope Stability Analyses Results .............................................................. 12
List of Figures
1 Site Location Map
2 Site Plan
3 Hydrograph of AB-03 and AB-06
4 Site Grading and Stockpile Plan
List of Appendices
A Subsurface Exploration Program
B Laboratory Testing Results
C Borehole Infiltration Testing
D Slope Stability Analysis
E Stormwater Infiltration Facility Section
F Report Limitations and Guidelines for Use
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 1
1 Introduction
Aspect Consulting, LLC (Aspect) prepared this report for Otak and the City of Renton
(City) of the 100% geotechnical evaluation design in support of Phase 3 of the Upper
Balch Pit as a stormwater management facility at the Monroe Avenue NE site in Renton,
Washington (Site). This report includes current results of focused geotechnical
evaluations at targeted locations within the approximately 246-acre stormwater subbasin
(Subbasin).
1.1 Background
In December 2020, we completed a memorandum that included the results of our Phase 1
geotechnical evaluation with preliminary data focused on feasibility for the Upper Balch
Pit as a potential facility and recommended next steps for the Monroe Avenue NE Storm
System Improvement Project (Project; Aspect 2020a). In July 2021, we completed a 30%
Design Report that provided preliminary recommendations (Aspect, 2021). The
following sections provide background on the Site, an overview of local geology,
geotechnical data, and a description of data evaluated for the potential stormwater
infiltration site at the Upper Balch Pit.
The Site currently receives stormwater from a 246-acre Subbasin in the Renton
Highlands area (Figure 1). A 670-foot-long, 36-inch-diameter perforated pipe along NE
2nd Street and a 200-foot-long, 48-inch-diameter perforated pipe along King County
Access Road drain portions of the stormwater runoff.
In 1994, a large rain event caused flooding in the street along Monroe Avenue NE, south
of NE 4th Street, and erosion of the northeast corner of the Upper Balch Pit, a privately-
owned gravel pit (located at 301 Monroe Avenue NE). To accommodate any future high-
flow runoff, the Upper Balch Pit property owner provided the City with a temporary
easement. The easement allowed construction of one 18-inch-diameter and one 24-inch-
diameter overflow pipe, which would discharge flows into the pit during high-flow
events. This temporary system has prevented flooding of the roadway and adjacent
property since the original event.
A recent application to the City to redevelop the Upper Balch Pit site will remove the two
overflow pipes from operation. In order to minimize risk of property damage from urban
flooding or incidents nearby, a new approach to managing high-flow runoff needs to be
constructed prior to the removal of the pipes to allow the City to continue to manage
stormwater within the Subbasin.
Following the submittal of our “Geotechnical Evaluation for Potential Stormwater
Facilities” memorandum (Aspect, 2020a), Otak focused design from three potential sites
to one Site for further evaluation for stormwater infiltration and design of a stormwater
facility in the northwest corner of Upper Balch Pit, as shown on Figure 2.
ASPECT CONSULTING
2 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
2 Site Conditions
The Upper Balch Pit is a 14.4-acre parcel (Parcel No. 1623059059) owned by Segale
Properties LLC (Segale). The parcel has historically been mined for sand and gravel
resource as observed from aerial photographs beginning in the mid- to late- 1960s
(Netronline, 2023). The parcel is bounded by NE 2nd Street to the south, Monroe Avenue
NE to the east, Jefferson Avenue NE to the west, and privately owned businesses to the
north (Parcel Nos. 1623059111, 1623059112, 1623059058, 1623059052 and
1623059128). As described in our “Preliminary Stormwater Feasibility Evaluation”
memorandum for Task 3 (Aspect, 2020b), the parcel includes mapped steep slope hazard
areas (slopes greater than 40 percent) within all of the south, east, north, and a portion of
the west parcel boundaries associated with sand and gravel mining. We observed no other
geologic hazards during our Site reconnaissance.
The Site includes exposed soils associated with mining activities and more recent mass
grading and filling activities. The Upper Balch Pit topography reflects the mining history
with moderate to steeply sloping areas along the pit margins ranging from Elevation 340
to 286 (NAVD1988). Vegetation observed along the slopes leading into the pit includes
Himalayan blackberry and Douglas fir trees up to approximately 7 inches diameter breast
height.
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 3
3 Subsurface Conditions
3.1 Geologic Mapping
Local soils inform the feasibility for infiltration at the Site. Based on our review of the
geologic map (Mullineaux, 1965), the Site is underlain by Pleistocene Vashon Stade
continental recessional stratified drift and glaciofluvial deposits (Qpa; also referred to as
recessional outwash glacial deposits). The recessional outwash glacial deposits consist
chiefly of well-sorted sand and gravel with few fines. The unit is subdivided according to
origin and topographic form with outwash along the Cedar River.
3.2 Geology and Stratigraphy
Previous Phase 1 and current phase explorations at the Site include one test pit labeled
ATP-01 (Aspect, 2020a) and five soil borings labeled AB-03 through AB-07 and AB-09
(Figure 2). Aspect drilled and sampled six borings in December 2020 (AB-03) and March
through May 2021 (AB-04 through -07, and AB-09). Drilling at AB-03 and AB-09 were
advanced using hollow-stem auger methods to depths of 76.5 feet and 56.5 feet below
ground surface (bgs), respectively. Drilling at AB-04 through AB-07 was advanced using
sonic hollow-stem auger methods to depths ranging from 70 to 76 feet bgs. Detailed
exploration details, boring logs, and well construction diagrams can be found in
Appendix A.
AB-03 serves to monitor groundwater levels at the Site. Deep borehole infiltration wells
were installed at the remaining explorations (AB-04 through AB-07 and AB-09; Figure
2). More recently, in 2022, borings AB-08 and AB-10 were completed along with two
test pits labeled ATP-03 and ATP-04, and two hand auger borings AHA-01 and AHA-02.
Exploration elevations are based on surveys from Otak and the City of Renton 2-foot
topographic contour data for AB-09.
The soils encountered were generally consistent and consisted of:
TOPSOIL: From the ground surface to 0.5 feet bgs, organic silt with varying
amounts of sand, gravel, roots, and garbage were encountered in test pits
ATP-01 and ATP-02 (Aspect, 2020a) and more recently in ATP-03 and ATP-
04.
FILL: The thickness of fill varied with location on the Site but was up to
about 50 feet thick inside the mining pit. Fill was encountered in AB-03
through AB-07, and AB-8 and AB-10. Soil descriptions range from medium
stiff clay to very stiff silt, to medium dense silty sand.
GLACIAL OUTWASH DEPOSITS (Qpa): Outwash deposits were
encountered in all the borings below the fill. These soils typically consisted of
interbedded mixtures of medium dense, poorly- to well-graded mixtures of
sand and gravel, including some cobbles and boulders.
GLACIAL TILL DEPOSITS (Qvt): Glacial till deposits were encountered
locally in test pit ATP-04 in the northeast corner of the Site below the fill.
These soils typically consisted of interbedded mixtures of medium dense,
ASPECT CONSULTING
4 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
poorly- to well-graded mixtures of sand and gravel, including some cobbles
and boulders. During Aspect’s Phase 1 tasks in spring 2020, Aspect observed
that Segale was in the process of adding fill in the vicinity of the Site. Aspect
also observed in November 2020 (in preparation of drilling boring AB-03)
that fill had been placed raising the grade elevations to its current condition.
Fill placement has been ongoing locally at the Site.
3.3 Field Investigation
3.3.1 Infiltration Testing
Due to the existing receptor soil depth and overlying fill thickness greater than 25 feet
locally, performing large-scale pilot infiltration tests (PITs) per the City of Renton’s
Surface Water Design Manual (City, 2022) was deemed impractical because of the
required excavation sizes. Aspect used infiltration test wells within the footprints of the
proposed stormwater infiltration system (Figure 2). Measured infiltration rates were
adjusted to account for the approximate water depths within the planned infiltration
facility, and safety factors were applied to the adjusted rates as required by the City’s
standards. Infiltration testing was performed in general conformance with the United
States Bureau of Reclamation (USBR) Well Permeameter Method (USBR, 1989). The
measured infiltration results indicate that the Site receptor soil has a high infiltration
capacity with an allowed design infiltration rate of 20 inches per hour (maximum allowed
by the City) for infiltration facility.
Borehole infiltration test (BIT) wells AB-04 through AB-07 and AB-09 were installed to
perform deep infiltration testing on the native glacial outwash below the fill sediments. In
all the wells except AB-09, the exploration was advanced into the groundwater and
vibrating wire piezometers and pressure transducers were installed to monitor
groundwater levels and potential mounding during testing. A summary of boreholes and
applicable well construction details is presented in Table 1 below.
Table 1. Well Summary
Boring/Well
ID
Surface
Elevation
Depth to
Glacial
Outwash
Top of
Outwash
Elevation
*Depth to
Groundwater
BIT
Range
depth
Testing
range
Elevation
Well
Diameter
(inches)
AB-03 334.55 5.0 329.6 67.7 N/A N/A 2
AB-04 329.88 29.0 300.9 60.8 45.8-55.8 274-284 2
AB-05 329.28 49.5 279.8 61.2 50-55 274.2-279.2 6
AB-06 327.65 58.0 269.7 58.3 58-59 268.2-269.2 2
AB-07 328.07 47.5 280.6 60.0 48-53 274.1-279.1 2
AB-08** 313.13 26.5 286.6 not observed N/A N/A N/A
AB-09 333.28 7.0 326.3 not observed 49-54 279-284 2
AB-10** 313.26 35.0 278.3 43.0 N/A N/A N/A
Note: All values are in feet unless noted otherwise. Elevations are provided by Otak except: * Groundwater depth
observed at time of drilling. ** Borings AB-08 and AB-10 were completed as borings without well construction
Deep BITs were performed on all wells except AB-03 and AB-06. AB-03 had the well
screened into groundwater and therefore a BIT in the vadose was not feasible in the well.
AB-06 was not tested because the depth of the outwash receptor soils was too close to the
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 5
observed groundwater level to effectively complete a test. In all tests, potable water was
conveyed from a nearby fire hydrant to the Site and flow was measured using an in-line
flow meter. Prior to performing the tests, a presoak period was performed by introducing
water into the well for at least 2 hours.
The BIT consist of constant and falling head tests. The constant head test was conducted
by maintaining a constant water level in the well at a constant flow rate. During the
falling head test, the water level was monitored after the water was turned off. The
combined presoak and constant head tests lasted at least 6 hours. Water levels in the well
were monitored throughout the tests using an electronic water-level tape and a pressure-
transducer equipped with data loggers.
Based on soil descriptions observed in the field, results from BITs conducted in AB-05
and AB-07 were lower than anticipated, raising concerns over the migration of overlying
fine-grained fill soils into the filter pack. A driller was contracted to develop wells AB-05
and AB-07 using jetting, brushing, and pumping techniques. Based on a review of
development data, it was determined that there was not sufficient improvement in well
performance to perform the BITs again. AB-05 and AB-07 remain important locations
with data relative to the variability of the depth to recessional outwash receptor soils and
the thickness of the overlying fill.
AB-04 and AB-09 did include results that were more consistent with the PIT results of
ATP-01 and those expected for recessional outwash soils. The reason for this may be that
both AB-04 and AB-09 included well screens that were completed entirely within
recessional outwash soils and had a reduced risk for fine-grained fill soils migrating into
the filter pack.
3.3.2 Laboratory Testing
Soil samples obtained from the explorations were transported to Aspect’s laboratory for
additional examination and to confirm modified field classifications. Selected samples
were submitted for geotechnical testing of engineering and index properties (see
Appendix B). Tests included cation exchange capacity, percent organic content, moisture
content, fines content, and grain-size distribution. The tests were performed in general
accordance with test methods of the ASTM International (ASTM) or other applicable
procedures (ASTM, 2017). Appendix B includes a brief discussion of the laboratory tests
and test results.
3.3.3 Groundwater
A standpipe piezometer was installed in exploration AB-03 to evaluate the seasonal high
groundwater elevation. Pressure transducers were also installed in AB-04 through AB-07
to record groundwater and observe any response to borehole infiltration testing.
Groundwater was encountered during drilling at depths ranging from approximately 58
(AB-06, Elevation 269) to 67 (AB-03, Elevation 266) feet, as shown on boring logs AB-
03 through AB-07, respectively (see Appendix A). Dataloggers were installed in AB-03
through AB-07 near the bottom of the wells during construction of the wells to record
groundwater levels at 60-minute intervals.
ASPECT CONSULTING
6 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
The datalogger at AB-03 was downloaded on March 11, 2021, July 21, 2022, and on
January 7, 2023, and the data was analyzed to evaluate maximum and minimum depths
since installation on December 15, 2020. In AB-03, the minimum (shallowest)
groundwater depth was recorded at approximately 60.8 feet (Elevation 273.2) on January
13, 2022 (Figure 3).
Installation of infiltration test wells AB-04 through AB-07 included over-drilling to
determine the groundwater elevation before planned BIT. Groundwater was encountered
more than 50 feet below the bottom of the planned stormwater infiltration chamber.
Vibrating wire piezometers were installed at approximately 75 feet bgs and have been
recording groundwater levels at 30-minute intervals. No noticeable impacts to the
groundwater table were recorded during or within 6 days following stormwater
infiltration tests.
The datalogger in AB-06 was downloaded on January 5, 2023, and the data was analyzed
to evaluate maximum and minimum depths since installation on March 25, 2021. In AB-
06, the minimum (shallowest) groundwater depth was recorded at approximately 53.4
feet (Elevation 274.2) on January 7, 2022 (Figure 3). To evaluate variation across the
Site, we compared AB-06 to AB-03 data. AB-06 is the farthest east monitoring well
within the pit and generally corresponds to the water levels in AB-03 for seasonal high
groundwater, as shown on Figure 3.
Groundwater was not observed in Aspect borings AB-08, AB-09 or AB-10 as these
borings were completed in summer 2022 primarily to identify the depth to the recessional
outwash receptor soils. Groundwater depths will fluctuate due to variations in rainfall,
irrigation, and the season; depths are generally higher in the wet season from late
November to May and lower in the dry season from June to early November.
On April 10, 2023, Aspect observed the decommissioning of wells AB-04, AB-05, AB-
06, AB-07, and AB-09 in general accordance with Washington Administrative Code 173-
160-381 (WAC).
3.4 Seismicity
Inertial seismic forces are expected to affect the Site. Appropriate design of structures in
accordance with the current version of the International Building Code (IBC; ICC, 2018)
with State of Washington amendments will mitigate seismic hazards.
Seismic design of the facility will be in accordance with the 2018 IBC, which references
the American Society of Civil Engineers (ASCE) Standard ASCE/SEI 7-16, Minimum
Design Loads for Buildings and Other Structures (ASCE, 2018) for seismic design. In
accordance with these codes, the seismic design will consider a “Maximum Considered
Earthquake” (MCE) ground motion with a 2 percent probability of exceedance in 50
years, or a return period of 2,475 years.
The effects of Site-specific subsurface conditions on the MCE bedrock ground motion at
the ground surface are determined based on the “Site Class.” The Site Class is typically
correlated to the average standard penetration resistance (N-value) or average shear wave
velocity in the upper 100 feet of the soil profile. Based on the average N-value from our
explorations, we conclude the Site soil profile can be classified as Site Class D (Stiff Soil).
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 7
The design spectral response acceleration parameters adjusted for Site Class D in
accordance with the 2018 IBC and ASCE/SEI 7-16 are presented in Table 2. These
parameters are only valid if the exceptions outlined in Section 11.4.8 of ASCE/SEI 7-16
are met. If the exceptions are not met, then a Site Response Analysis in accordance with
Section 21.1 of ASCE/SEI 7-16 is necessary. If the need for a Site Response Analysis
becomes apparent as the Project design develops, Aspect can complete this upon request.
Based on the Site’s latitude and longitude (47.487°N, 122.178°W), the code-based
seismic design criteria, in accordance with the 2018 IBC, are summarized in Table 2.
Table 2. Seismic Design Parameters
Design Parameter Recommended Value
Site Class D
Site Adjusted Peak Ground Acceleration (PGAm) 0.663g(1)
Short Period Spectral Acceleration (Ss) 1.416g
1-Second Period Spectral Acceleration (S1) 0.484g
Site Coefficient (Fa) 1.00
Site Coefficient (Fv) 1.816
Design Short Period Spectral Acceleration (SDS) 0.944g
Design 1-Second Period Spectral Acceleration (SD1) 0.586g
Notes:
1 g = Gravitational force
Based on the latitude and longitude of the Site: 47.4878°N, 122.178°W, World Geodetic System 1984
(WGS84).
The risk category used was II, residential use
Based on the American Society of Civil Engineers (ASCE) hazard tool (ASCE, 2018).
3.4.1 Surficial Ground Rupture
A trace of an east-west trending thrust fault zone (Seattle Fault Zone) projects
approximately 2.2 miles north of the Site, with the nearest known active fault trace (an
unnamed fault) located approximately 0.72 miles south-southwest of the Site (Johnson et
al., 2016). Due to the suspected long recurrence interval and the proximity of the Site to
the mapped fault trace, the potential for surficial ground rupture at the Site is considered
low during the expected life of the Project.
3.4.2 Liquefaction
Liquefaction occurs when loose, saturated, and relatively cohesionless soil deposits
temporarily lose strength from seismic shaking. The primary factors controlling the onset
of liquefaction include intensity and duration of strong ground motion, characteristics of
subsurface soil, in situ stress conditions, and the depth to groundwater.
The Washington Department of Natural Resources (DNR) maps the Site as having very
low liquefaction susceptibility (DNR, 2004). Given the relative density, grain-size
distribution, and geologic origin of the soils at the Site, we do not consider liquefaction to
be a significant hazard for the Project.
ASPECT CONSULTING
8 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
3.5 Critical Areas
We reviewed the City’s online GIS portal for potential Critical Areas at the Site that
consider aquifer protection area zones, coal mines, erosion hazards, flood zones,
landslides, regulated slopes and shorelines, wetlands, and seismic hazards (City, 2019).
Specific geologic hazards identified in the Renton Municipal Code (RMC) Section 4-3-
050 include Steep Slopes, Landslides, Erosion, Seismic, and Coal Mines.
Based on the City’s data (2020), the Critical Areas Map includes:
Portions of the north and west Upper Balch Pit are within the Regulated Slopes
classified as 1) > 15 percent to ≤ 25 percent or 2) >25 percent to ≤40 percent
(Sensitive) and 3) as greater than 40 percent to less than or equal to 90 percent
(Protected).
The slopes are the result of mining and grading activities over the life of the pit,
associated with sand and gravel resource extraction. The Protected Slopes in the vicinity
of the Project are located along the north and west perimeter of the pit and are locally as
steep as 70 percent. The slopes are vegetated locally with shrubs and Himalayan
blackberry. The slopes to the east and south outside of the Site are vegetated with straight
Douglas Fir.
3.6 Geologic Hazard Area Slope Setback
The City requires that infiltration facilities consider the effects of stormwater injection on
slope stability and groundwater aquifers from the injection point. Per Table 6.2.3.A-
Setback Requirements within the City’s Surface Water Design Manual (City, 2022),
geotechnical setbacks are to consider:
• Facilities are not allowed on slopes >25 percent (4:1). A geotechnical analysis
and report are required if located within 200 feet of a steep slope hazard area or
landslide hazard or if the facility is located within a setback distance from top of
slope equal to the total vertical height of a slope area that is steeper than 15
percent. The geotechnical analysis must consider cumulative impacts from the
project and surrounding areas under full built-out conditions.
• The facility design water surface should be a minimum of 200 feet from any steep
slope hazard area or landslide hazard. Upon analysis and approval of a licensed
geotechnical engineer or engineering geologist, this setback may be reduced to 50
feet. The geotechnical analysis must consider cumulative impacts from the
project and surrounding areas under full built-out conditions.
• The facility design water surface should be set back a minimum distance from top
of slope equal to the total vertical height of a slope area that is steeper than 15
percent. Upon analysis and approval of a licensed geotechnical engineer or
engineering geologist, this setback may be reduced to 50 feet. The geotechnical
analysis must consider cumulative impacts from the project and surrounding
areas under full built-out conditions.
The proposed location for the stormwater management facility on the Site’s west and
north sides will regrade areas of the cut slopes from the mining activities. The slopes that
are currently present will no longer meet the City’s criteria for Steep Slope hazards when the
Project is complete.
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 9
4 Stormwater Infiltration Design
Per Section 5.2.1 of the City’s Surface Water Design Manual, the Site is considered a
closed depression relative to computing design infiltration rates (City, 2022). The civil
engineering project team at Otak considers an approximately 57,500-square-foot (1.32-
acre) infiltration facility footprint within the Site.
Aspect identified boring and test pit locations across the area (Figure 2) for the PIT and
BIT program, which is intended to inform the project team of the approximate infiltration
rates at elevations that ranged from approximately 274 to 284 feet for the BIT and 324
feet for the PIT ATP-01. A brief summary of design infiltration rates is described below,
and a more detailed description of computed infiltration rates is provided in Appendix C.
4.1 Soil Infiltration Rates
To comply with design infiltration methodology allowed by the City, Aspect previously
completed a PIT program (Aspect, 2020a) and a BIT program under Phase 2 (see Section
3.3). Aspect applied required correction factors to establish design infiltration rates for
the Site. Discussion of the equation and correction factors for testing, plugging, and
geometry is provided in Appendix C.
The infiltration rates (Idesign) computed using the City of Renton (City, 2022) for a closed
depression are provided in Table 3.
Table 3. Summary of Design Infiltration Rates (Idesign) for the Proposed Facility
Exploration ID at the Site ATP-01 AB-04 AB-09
Approximate Test Elevation (ft) 330 274-284 279-284
Imeasured: in/hr 139.6 198.0 60.7
Average Design Rate
(corrected) (Idesign): in/hr 30
Maximum Design Rate allowed
by Renton
20
4.1.1 Facility Design and Narratives
Team discussion and preliminary review of explorations data have identified a proposed
stormwater infiltration facility that will expose recessional outwash receptor soil at an
average elevation of approximately 280 feet. Seasonal high groundwater elevation is
approximately 274.2 feet.
The following sections provide narrative discussion for supplemental recessional outwash
receptor soils, facility gravel, and mounding analysis relative to separation from seasonal
high groundwater.
4.1.1.1 Supplemental Outwash Receptor Soils
A large portion of the Site’s original recessional outwash soil was mined and replaced
with unsuitable fill. For the infiltration area, Aspect recommends removing the unsuitable
ASPECT CONSULTING
10 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
fill material down to the native recessional outwash and replacing it with an average of
approximately 9.5 feet of recessional outwash soil with properties similar to the native
recessional outwash receptor soil. The top of the restored recessional outwash surface
will be brought up to approximately Elevation 289.5 feet. The restored recessional
outwash surface will then be overlain by a separation geotextile fabric and washed
crushed-rock facility gravel.
Aspect recommends that the imported replacement recessional outwash material soil be
acquired from a commercial borrow facility that is actively mining recessional outwash
soils, with the following key properties matching the on-Site receptor soil in the
approximate range.
• Greater than 25 percent passing the U.S. No. 40 sieve
• Approximately 2-8 percent passing the U.S. No. 100 sieve
• Approximately 1-5 percent passing the U.S. No. 200 sieve
Aspect recommends careful observation, and that grain size and infiltration testing be
conducted for the replaced recessional outwash soil to verify its functionality as receptor
soil. This testing should occur at the source to verify key properties prior to acceptance
and haul.
Aspect also recommends careful observation as the unsuitable fill is removed to (a) verify
clean contact is achieved with the native recessional outwash, and (b) ensure that the
contact zone is protected from erosion and sediment until such time that the replacement
recessional outwash is installed.
The replacement recessional outwash should be installed using methods that result in
compaction levels that are generally similar to the on-Site medium dense outwash. This
will generally involve placing the material in 12-inch loose lifts using a tracked dozer,
and static rolling with a steel drum. Vibratory compaction is not recommended.
4.1.1.2 Facility Gravel
Overlying the recessional outwash receptor soils will be a facility infiltration gravel
crushed rock product as recommended by the infiltration facility chamber manufacturer.
Aspect reviewed a material spec that included up to 1.2 percent fines (passing No. 200
sieve). If this type of material is used, Aspect recommends a trommel wash operation on-
site to reduce the potential for fines migration into the separation geotextile or receptor
soils.
4.1.1.3 Mounding Analysis
The City’s Surface Water Design Manual (City, 2022) requires groundwater
investigations, including:
• Mounding analyses for infiltration facilities that serve 1 acre or more of tributary
area and have less than 15 feet of separation to a restrictive layer or groundwater
table.
• Investigating the groundwater regime for flow control design if within 50 feet
from the facility base.
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 11
The imported analogous native replacement recessional outwash soil will function like
the on-site receptor soil. Considering this, the proposed infiltration facility will provide
more than 15 feet of receptor soil separation to seasonal high groundwater. Therefore,
Aspect does not recommend that a mounding analysis be completed.
4.2 Temporary Slopes
Maintenance of safe working conditions, including temporary excavation stability, is the
responsibility of the contractor. All temporary cuts in excess of 4 feet in height that are
not protected by trench boxes or otherwise shored should be sloped in accordance with
Part N of Washington Administrative Code (WAC) 296-155 (WAC, 2021).
In general, soils across the Site classify as Occupational Safety and Health
Administration (OSHA) Soil Classification Type C. Temporary excavation side slopes
are anticipated to stand as steep as 1.5H:1V (horizontal: vertical). The cut-slope
inclinations estimated above are for planning purposes only and should be evaluated in
the field by a geotechnical engineer. The existing steep cut slopes with the north and west
portions of the Site are approximately inclined at 1.5H:1V or locally steeper and are
performing with no indication of slope instability. The proposed excavation of the slopes
to the south and east for the infiltration facility will be at 2H:1V, as shown on Figure 4.
The contractor should monitor the stability of the temporary cut slopes and adjust the
construction schedule and slope inclination accordingly. The contractor will also
maintain in place or install erosion control measures, such as ditches, wattles, and silt
fence to help stabilize side slopes during construction. Vibrations created by traffic and
construction equipment may cause caving and raveling of the trench walls. In such an
event, lateral support for the trench walls should be provided by the contractor to prevent
loss of ground support.
4.2.1 Slope Stability Analysis of Temporary Slopes
Using the computer model Slide2® (Rocscience, 2018), we conducted slope stability
analyses at a representative critical section along the proposed excavated sidewall slope
and temporary stockpile (Figure 4). The proposed sidewall slopes are planned to be
2H:1V slopes that descend approximately 50 vertical feet to the bottom of the proposed
excavation. The temporary stockpile is setback approximately 25 feet from the top of the
southern proposed sidewall slope (Figure 4). We used Slide2® to evaluate the slope
stability of the temporary excavated slopes and stockpile condition.
Slide2® performs slope stability computations based on the modeled conditions and
calculates a factor of safety against slope failure, which is defined as the ratio of resisting
forces to driving forces. A factor of safety of 1.0 indicates a “just-stable” condition, and a
factor of safety less than 1.0 would indicate unstable conditions.
We used the topography from the preliminary stockpile plan provided by Otak to analyze
the proposed sidewall slope and temporary stockpile condition. The soil engineering
properties assumed for our analyses are summarized in Table 4. Soil units were modeled
using Mohr-Coulomb failure criterion.
ASPECT CONSULTING
12 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
Table 4. Summary of Soil Engineering Properties
Geologic Unit
Unit Weight
(pcf)(1)
Saturated
Unit Weight
(pcf)(1)
Mohr Coulomb Strength
Parameters
Friction Angle
(deg)(1)
Cohesion
(psf)(1)
Reworked Fill (Stockpile)
(Static Conditions) 105 110 28 50
Fill (Static Conditions) 110 115 30 75
Glacial Outwash Deposits
(Static) 130 135 36 0
Notes: 1) pcf = pounds per cubic foot; psf = pounds per square foot; and deg = degrees
The engineering properties are primarily based on the results of material interpretations
during our explorations and our experience in similar geologic settings with similar
geologic materials.
The purpose of the slope stability analysis is to evaluate the stability of the temporary
sidewall slope in the fine-grained fill and stockpile condition. For this reason, it is our
opinion that the slopes do not need to meet specific code requirements for performance
standards for permanent slopes. The results of our global stability analyses for the
proposed slope are summarized in Table 5 and provided in Appendix D.
Table 5. Slope Stability Analyses Results
Scenario Calculated Factor of Safety
Static Conditions 1.5
4.3 Contruction Considerations
This section provides discussion of the proposed construction activities going forward.
The City plans to have the owner, Segale, begin construction access road fill
embankment following excavation to expose portions of receptor soils during the dry
period of 2023, turning over the Site to the City’s contractor in fall of 2023. An excavated
area and stockpile will be constructed, as shown on Figure 4.
In fall 2023, the City will have its own contractor continue the development and
construction of the facility, including the placement of analogous native fill and
construction of an ecology block wall to provide separation from the infiltration area to
the west and the fill to the east. The fill will support the large, enhanced water quality
treatment vault and maintenance access as shown on Otak drawing C302, stormwater
infiltration facility section (Appendix E).
The enhanced water quality treatment vault is 224 feet long by 20 feet wide, and will be
installed right at the surface, and will need to be pedestrian load only. The vault will
require bearing capacity of 2,000 to 2,500 pounds per square foot (psf).
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 13
Our observations of the existing fine-grained fill soils slopes is that local rilling and
gullies can form during the wet season on slopes inclined at 2H:1V or steeper locally.
The use of a geotextile fabric wrap with a geogrid will likely be needed to improve
strength if the on-Site fine-grained fill soils are used for the constructed access route.
4.3.1 Gravity Block Wall
The gravity block wall will serve as a physical barrier to separate the facility gravel
below the infiltration chamber, from the structural fill below the water quality vault. A
construction requirement is that (i) the wall be raised concurrent with the fill placement,
and (ii) fill placement on both sides of the block wall will also proceed concurrently such
that there will never be more than 2 feet of unbalanced soil loading on the wall.
The bearing capacity of the imported and lightly compacted analogous recessional
outwash fill below the ecology block wall will, at all times, exceed the bearing pressure
applied to this subgrade by the wall. Because this wall will have no unbalanced earth
loading on it, there will be no tendency for sliding or overturning. The lateral earth
pressures exerted by one fill material on one side of the block wall will be equal and
opposite to those exerted by the other fill material on the other side of the block wall.
Additional recommendations are provided in Section 5.2.
4.3.2 Luminaire Light Pole Relocation along Monroe Ave NE
The existing light pole near the northeast corner of the Site will be relocated south of the
proposed access from Monroe Ave NE. We understand that the preferred foundation type
for the planned 40-foot-high light poles are on shallow spread footings 3-foot diameter to
a minimum depth of 5 feet. Recommendations for the light pole are provided in Section
5.2.
ASPECT CONSULTING
14 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
5 Conclusions and Recommendations
This section presents our recommendations for Stormwater Design and Construction.
Based on our geotechnical evaluation of the Site, including data review, Site
reconnaissance, subsurface explorations, and laboratory testing, the following key
preliminary findings and conclusions should be included in further evaluating the Site.
5.1 Stormwater Design
• Design infiltration rate is 20 inches per hour, which is the maximum allowed rate
by the City of Renton for ATP-01, AB-04, and AB-09, where the infiltration
facility is proposed. The rate represents a head-dependent value for infiltration.
• Cation exchange capacity and organic content testing indicates that the glacial
outwash soil could provide only minor treatment of infiltrating stormwater
through filtration, cation exchange, and adsorption as presented in Appendix B.
Pretreatment is planned to address potential treatment deficiencies in on-Site
soils.
• We recognize that, while substantially lower than the predicted measured
infiltration rate under deep water conditions, the long-term design infiltration rate
of 20 inches per hour is still an aggressive rate. In our experience, infiltration
rates for sandy soils will drop substantially when subjected to even minor
sediment loading. Accordingly, we have several recommendations to help protect
infiltration rates over the long term:
o Even if measured receptor soil’s cation exchange capacity meets the
Washington State Department of Ecology’s (Ecology) treatability
standards, still apply a minimum of Basic Treatment for the water quality
peak flow rate or volume for discharges to the flow control infiltration
facility. The percent organic does not meet Ecology treatability standards.
o Apply a minimum of Pre-Treatment for flows that exceed (and often
bypass or overflow) the water quality Basic Treatment best management
practice (BMP) and will discharge to the flow control infiltration facility.
o Consider using a StormTech chamber configuration that ensures that
inflows to the isolation row must flow all the way through the isolation
chamber before overflowing into the normal infiltration chambers. This
will avoid short-circuiting that could occur once the isolation chamber is
full of water and inflow is still occurring, thereby maximizing the settling
time and sediment removal in the isolation chamber.
• A seasonal high groundwater measurement of Elevation 274.2 has been observed
over more than 2 full years of monitoring. Seasonal high has generally occurred
during the month of January.
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 15
5.2 Construction
From a geotechnical perspective, typical activities associated with site development such
as clearing and grading, utility placement, and building construction will have no adverse
impacts on surrounding properties provided City and/or other regulatory requirements for
design and construction are implemented. We provide general recommendations below
along with specific recommendations for the infiltration chamber, enhanced water quality
vault, gravity block wall, and luminaire light pole along Monroe Avenue NE. Please refer
to sheet C004 (Otak, 2023) and ADS Plans for material described below. Two areas are
identified separated by an ecology block wall with an Infiltration Chamber Gallery area
west of the wall and an Enhanced Water Quality Vault area east of the wall.
5.2.1 General Recommendations
• Complete work on steep slopes only during periods of extended dry weather, if
possible.
• During construction, cobbles and boulders may be encountered as the excavation
is made. The contract documents should require that the contractor be prepared to
deal with oversize objects within the fill and the recessional outwash.
• During construction, stormwater should be routed away from the excavation zone
and the receptor soils, and care should be taken to prevent fine-grained material
from the surface or from shallow soil layers from entering the excavation.
• Receptor soils should not be compacted by heavy equipment. The excavated pit
that locally exposes receptor soils should be temporarily sloped up to 2 percent to
the west to allow for drainage into the area where receptor soils are typically the
shallowest.
• When the City’s contractor begins the project after the owner has completed their
tasks, an Aspect representative or other qualified professional should confirm that
the bottom of the proposed facility is constructed within the sandy recessional
outwash deposits, and at least 2 feet below any fine-grained deposits or fill soils
that may be exposed.
• We recommend that Aspect or other qualified professional be present during fine-
grained fill soil excavation to identify unsuitable materials (clay soils, concrete
debris, or deleterious material) for reuse as structural fill.
• Separating the gravel backfill for walls from the infiltration gravel and facility
gravel using an Ecology block wall will reduce the risk for contamination of the
infiltration gravel and facility gravel by the gravel backfill for walls. A separation
geotextile fabric placed along the ecology block wall face is also recommended.
• Incorporate surface water management features to keep concentrated flows from
flowing over exposed cut and fill slopes. This could include catchment ditches,
diversion berms and pipe slope drains extending down the slope. Erosion control
measures could include silt fences and staked-straw wattles to reduce the impacts
ASPECT CONSULTING
16 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
to the excavated south, east, north, and west slopes, prior to the onset of the wet
season.
• We recommend the installation of a silt fence at the toe of the excavated
infiltration facility slope for fall 2023/winter 2024.
• The construction access road to Monroe Avenue NE may require geogrid and
geotextile fabric to provide sufficient strength for construction loads if fine-
grained native fill is used.
• For the upper 13 feet of permanent access road construction to Monroe Ave, we
recommend 95 percent compaction MDD to be compaction tested at 2-foot-thick
intervals with a proof roll (vibratory roller on static) to verify firm and unyielding
conditions above approximate Elevation 315.
• Protect exposed cut and fill slopes as soon as possible after they are disturbed.
Temporary protection could consist of plastic sheets, staked straw wattles, non-
woven geotextile fabric nets, or hydroseeding combined with placement of straw,
wood chip or fiber mulch, or other suitable material. Permanent slope protection
should consist of suitable vegetation such as a seed mix.
• Install sediment traps and silt fences at appropriate locations.
• Observe and maintain erosion control systems, including checking for proper
functioning and repairing features, as necessary.
5.2.2 Infiltration Chamber Gallery Area
• The Select Borrow and Native Recessional Outwash soils are clast supported and
should not require compaction beyond placement in loose lifts of 1- to 2-feet with
a front-end loader or dozer during Stage 1. These materials should not receive
compaction via vibratory compactor in order to retain their porosity needed for
infiltration. No specific percent compaction for maximum dry density (MDD) is
recommended for analogous native material or facility gravel. The contractor
should avoid excessive tracking that will overcompact and potentially impact
infiltration.
• The overlying Infiltration Gravel (AASHTO #3) likewise should not be
compacted by vibratory compactor with the exception of the upper 3 feet as
described in the ADS notes primarily for grade control.
• Equipment should be appropriately sized for the Site and used exclusively on-Site
to avoid tracking fine-grain fill soils into the facility gravel or into analogous
native material.
5.2.3 Enhanced Water Quality Vault Area
Non-infiltration material shall conform to either WSDOT gravel backfill for walls or
acceptable on-site material as identified in drawing C302 (Appendix E). For clarity
we provide recommendations for Stage 1 (below approximate Elevation 315) and
Stage 2.
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 17
5.2.3.1 Stage 1
• Gravel Backfill for Walls should be placed in 1-foot loose lifts and compacted to
90 percent of maximum dry density (MDD) with a vibratory compactor.
Compaction will be verified with a static proof roll and nuclear densometer
testing.
• All vibratory compaction activities should be limited to areas greater than 5 feet
from the gravity block wall. Static compaction via vibratory roller only is
recommended for within 5 feet of the Gravity Block Wall.
• Structural fill from the on-Site stockpiled material should be placed in loose lifts
of 6 to 10 inches and compacted to 90 percent of MDD with a vibratory
compactor. This material may be moisture sensitive and should only be placed in
the dry season or during extended periods of dry weather of more than one week.
Compaction will be verified with a static proof roll and nuclear densometer
testing.
5.2.3.2 Stage 2
• For the 5 feet of fill beneath the enhanced water quality vault (approximate
Elevation 315 to 320 feet), we recommend structural fill be placed and compacted
to 95 percent of MDD with a vibratory compactor. Compaction testing should be
verified using a nuclear densometer and proof-rolling.
• Structural fill from the on-Site stockpiled material should be placed in loose lifts
of 6 to 10 inches and compacted to 95 percent of MDD with a vibratory
compactor. This material will likely be moisture sensitive and should only be
placed in the dry season or during extended periods of dry weather of more than
one week. Compaction will be verified with a static proof roll and nuclear
densometer testing.
• Gravel Borrow materials around the vault should be placed in 1-foot loose lifts
and compacted to 95 percent of MDD with a vibratory compactor. Compaction
will be verified with a static proof roll and nuclear densometer testing.
5.2.4 Gravity Block Wall
• The gravity block wall will be constructed on Select Borrow soils and may
receive a leveling base course of 6 inches of crushed rock to maintain a
consistent grade.
• The gravity block wall will be constructed concurrently with fill material
placement on either side. The maximum allowable unbalanced soil height on
either side of the wall should not exceed 2 feet (approximately 1 block
height).
• The woven geotextile fabric for separation should be placed on the east face
of the wall to further reduce the risk for migration of fines west of the wall.
ASPECT CONSULTING
18 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
• All vibratory compaction activities should be limited to areas greater than 5 feet
from the gravity block wall. Static compaction via vibratory roller only is
recommended for within 5 feet of the Gravity Block Wall.
5.2.5 Luminaire Light Pole Relocation along Monroe Ave NE
• We recommend that the light pole foundation be designed in accordance with
Section 1807.3 of the International Building Code (ICC, 2018), assuming an
allowable vertical bearing pressure of 2,000 pounds per square foot (psf).
Resistance to lateral forces should be evaluated assuming a lateral soil-bearing
value of 250 psf applied across two shaft diameters.
• During footing excavation minimize the amount of loose cuttings or slough at the
bottom of the footing excavation. Slough and loose cuttings should be removed
from the hole using a cleanout bucket prior to placing the foundation concrete.
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 19
6 References
American Society of Civil Engineers (ASCE), 2018, ASCE 7 Hazard Tool,
https://asce7hazardtool.online/, accessed January 14, 2019.
Aspect Consulting, LLC, 2020a, City of Renton, Geotechnical Evaluation for Potential
Stormwater Facilities, Technical Memorandum (Task 4), Monroe Avenue NE
Storm System Improvements, December 23, 2020
Aspect Consulting, LLC, 2020b, City of Renton, Preliminary Stormwater Feasibility
Evaluation memorandum (Task 3), Monroe Avenue NE Storm System
Improvements, January 14, 2020.
Aspect Consulting, LLC, 2021, City of Renton, Phase 2 Geotechnical Evaluation for
Potential Stormwater Facility, Upper Balch Pit (draft), July 9, 2021.
ASTM International (ASTM), 2017, 2017 Annual Book of ASTM Standards, West
Conshohocken, Pennsylvania.
City of Renton (City), 2019, Critical Areas Regulations, Chapter 4-03-5, accessed
December 20, 2019.
City of Renton (City), 2020, Maps of Your Community online portal , Website,
http://rp.rentonwa.gov/HTML5Public/Index.HTML?viewer=CORMaps,
Accessed March 1, 2020.
City of Renton (City), 2022, Surface Water Design Manual, Public Works Department,
Surface Water Utility, June 22, 2022.
International Code Council (ICC), 2018, International Building Code (IBC), Prepared by
International Code Council, January 2018.
Johnson, S.Y., Blakely, R.J., Brocher, T.M., Haller, K.M., Barnett, E.A., Bucknam, R.C.,
Haeussler, P.J., Pratt, T.L., Nelson, A.R., Sherrod, B.L., Wells, R.E., Lidke, D.J.,
Harding, D.J., and Kelsey, H.M. (Johnson et al.), compilers, 2016, Fault number
570, Seattle fault zone, in Quaternary fault and fold database of the United States:
U.S. Geological Survey website, https://earthquakes.usgs.gov/hazards/qfaults,
accessed 07/08/2021 04:16 PM. Last review date: November 25, 2016.
Mullineaux, D. R., 1965, Geologic map of the Renton quadrangle, King County,
Washington, U.S. Geological Survey, Geologic Quadrangle Map GQ-405, 1
sheet, scale 1:24,000.
Netronline, 2023, Historical Aerial Photographs, viewed March 17, 2023,
https://www.historicaerials.com/viewer
Otak, 2023, City of Renton, Washington, Monroe Avenue NE, Infiltration Facility, 90%
Design, June 2023, 33 sheets,
ASPECT CONSULTING
20 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
Rocscience, 2018, Slide2 9.023 Analysis Program. Build date May 25, 2022.
United States Bureau of Reclamation (USBR), 1989, Procedure for Performing Field
Permeability Testing by the Well Permeameter Method (USBR 7300-89).
Washington Administrative Code (WAC), 2021, 296-155, Safety Standards For
Construction Work https://apps.leg.wa.gov/WAC/default.aspx?cite=296-155
Washington Administrative Code (WAC), 2009, 173-160-381, What are the standards for
decommissioning a well? https://apps.leg.wa.gov/WAC/default.aspx?cite=173-
160
Washington State Department of Ecology (Ecology), 2019, Stormwater Management
Manual for Western Washington (SMMWW), Publication Number 19-10-021,
July 2019.
Washington State Department of Natural Resources (DNR), 2004, Liquefaction
Susceptibility and Site Class Maps of Washington State, By County, Washington
Division of Geology and Earth Resources Open File Report 2004-20, by Palmer,
S.P., S.L. Magsino, E.L. Bilderback, J.L. Poelstra, D.S. Folger, and R.A.
Niggemann, 2004, September 2004.
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 FINAL 21
7 Limitations
Work for this project was performed for Otak (Client), and this report was prepared
consistent with recognized standards of professionals in the same locality and involving
similar conditions, at the time the work was performed. No other warranty, expressed or
implied, is made by Aspect Consulting, LLC (Aspect).
Recommendations presented herein are based on our interpretation of site conditions,
geotechnical engineering calculations, and judgment in accordance with our mutually
agreed-upon scope of work. Our recommendations are unique and specific to the project,
site, and Client. Application of this report for any purpose other than the project should
be done only after consultation with Aspect.
Variations may exist between the soil and groundwater conditions reported and those
actually underlying the site. The nature and extent of such soil variations may change
over time and may not be evident before construction begins. If any soil conditions are
encountered at the site that are different from those described in this report, Aspect
should be notified immediately to review the applicability of our recommendations.
It is the Client's responsibility to see that all parties to this project, including the designer,
contractor, subcontractors, and agents, are made aware of this report in its entirety. At the
time of this report, design plans and construction methods have not been finalized, and
the recommendations presented herein are based on preliminary project information. If
project developments result in changes from the preliminary project information, Aspect
should be contacted to determine if our recommendations contained in this report should
be revised and/or expanded upon.
The scope of work does not include services related to construction safety precautions.
Site safety is typically the responsibility of the contractor, and our recommendations are
not intended to direct the contractor’s site safety methods, techniques, sequences, or
procedures. The scope of our work also does not include the assessment of environmental
characteristics, particularly those involving potentially hazardous substances in soil or
groundwater.
All reports prepared by Aspect for the Client apply only to the services described in the
Agreement(s) with the Client. Any use or reuse by any party other than the Client is at the
sole risk of that party, and without liability to Aspect. Aspect’s original files/reports shall
govern in the event of any dispute regarding the content of electronic documents
furnished to others.
Please refer to Appendix A titled “Report Limitations and Guidelines for Use” for
additional information governing the use of this report.
We appreciate the opportunity to perform these services. If you have any questions,
please call Chip Barnett, Senior Engineering Geologist, at 206-413-5398.
FIGURES
^GIS Path: T:\projects_8\CityofRenton\MonroeAveNEStormImprovements_190398\Delivered\Memo_90PercentDesign\01 Site Location Map.mxd || Coordinate System: NAD 1983 StatePlane Washington North FIPS 4601 Feet || Date Saved: 3/29/2023 || User: nkochie || Print Date: 3/29/2023Site Location Map90% Design Geotechnical MemorandumMonroe Avenue NE Storm System ImprovementsCity of Renton, Washington
FIG URE NO.1MAR-2023
PR OJECT NO .190398
BY :EAC / ETB
REVISED BY :ETB / SCC
0 2,000 4,000
Feet
!
!
!
#!
!
!
!
!(
W A S H I N G T O N
SITELOCATION
Bellingham
Olympia
Port Angeles
Seattle Spokane
Tacoma Wenatchee
Yakima
!
!
!
!
#
!(
SITELOCATION
PugetSoundLake WashingtonElliottBay Bellevue
Kent
Renton
Seattle
C edar Riv
e
r
GreenRiverBasemap Layer Credits || Sources: Esri, HERE, Garmin, Intermap, increment P Corp., GEBCO, USGS, FAO, NPS, NRCAN, GeoBase, IGN, Kadaster NL, Ordnance Survey, Esri Japan, METI, Esri China (Hong Kong), (c)OpenStreetMap contributors, and the GIS User CommunitySources: Esri, USGS, NOAA
SITE LOCATION
DRAFT
!A
!A
!A
!A
!A
!A
@D
@D
!A !A !A
@D @D#*Ó#*ÓProposed InfiltrationFacility
MONROE AVENUE NEJEFFERSON AVENUE NENE 2ND STREET
DiscountTire U-Haul RentonCollisionCenter
ChevronGas StationandMcDonald's
VacantMedicalOffice
King County Offices and Parking
Greenwood Memorial Park and Cemetery
Work Trailer with Electrical Transformer
Truck Washing Area
King County Depar tment of Transportation Campus
King County TransferStation
NE 4TH STREET
Historical Residences/Current Renton Technical College
Temporary AST
Power PolesPower Poles
AB-01
AB-03
AB-05
AB-06
AB-04
AB-07
ATP-01
ATP-02
AB-09 AB-08 AB-10
ATP-03
ATP-04
AHA-01
AHA-02
3153
1
0
345330335325330325320
320305345335335345 GIS Path: T:\projects_8\CityofRenton\MonroeAveNEStormImprovements_190398\Delivered\Memo_90PercentDesign\02 Site Plan.mxd || Coordinate System: NAD 1983 StatePlane Washington North FIPS 4601 Feet || Date Saved: 3/30/2023 || User: npawlikowski || Print Date: 3/30/2023Site Plan90% Design Geotechnical ReportMonroe Avenue NE Storm System ImprovementsCity of Renton, Washington
FI GURE NO.2MAR-2023
PR OJECT N O.190398
BY :EAC / ETB
REVISED BY:AO / SCC
0 200 400
Feet
Basemap Layer Credits || EagleView Technologies, Inc.
!A Boring
#*Ó Hand Auger
@D Test Pit
Transmission Line Easement
1ft Elevation Contour Line
5ft Elevation Contour Line
King County Parcel
Site DRAFT
DRAFTTemplate - Figure LSFont = Arial 8-11 ptUse “DRAFT” and “Confidential Attorney Client Communication” in right header when appropriateDate Created (mm/dd/yy) -Manually Enter Date - DON"T USE DATE FIELD THAT UPDATES0.000.250.500.751.001.251.501.752.0026026527027528028529029530012/15/2020 3/25/2021 7/3/2021 10/11/2021 1/19/2022 4/29/2022 8/7/2022 11/15/2022 2/23/2023Daily Precipitation in inchesGroundwater Elevation in feetAspect Consulting3/31/2023\\seafps\projects\BHAM\City of Renton\Monroe Ave Stormwater\Report Drafts\Draft\Task 3.1.1.2d 90% Design\Figures\Figure 3Hydrographs of AB-03 and AB-06Phase 3, 90% Geotechnical EvaluationMonroe Avenue NE Storm System Improvements, Renton, Washington
1903984JBM/JPRETBSlope Stability Analysis ProfileSource: Base map provided by City of Renton Public WorksMar-2023LegendPROJECT NO.FIGURE NO.BY:REVISED BY:CAD Path: \\seafps\Drafting\_GeoTech\190398 Monroe Ave SW\190398 - SSA.dwg Layout: Figure 04 || Date Saved: 3/29/2023 2:33:09 PM || User: jreinhardt90% Design Geotechnical ReportMonroe Avenue NE Storm System ImprovementsCity of Renton, WashingtonSite Grading and Stockpile PlanFeet0120240Site AccessA'AAA'
APPENDIX A
Subsurface Exploration Program
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 14, 2023 FINAL A-1
A. Subsurface Exploration Program
The field exploration programs consisted of drilling a total of eight borings (designated
AB-03 through AB-10), two hand auger explorations (AHA-01 and 02), and four test pits
(ATP-01 through 04). Boring AB-03 was drilled on November 23 and November 24,
2020. Borings AB-03 through AB-07 were drilled from March 23 to 27, 2021. Boring
AB-09 was drilled on May 17, 2021. Borings AB-08 and AB-10 were drilled on June 24,
2022. Both hand auger explorations were advanced on June 23, 2022. Test pits ATP-01
and 02 were advanced on April 6, 2022, while ATP-03 and 04 were advanced on June 23,
2022.
Borings AB-03 and AB-08 through AB-10 were advanced using hollow-stem auger
(HSA) between 36.5 and 76.5 feet below ground surface (bgs). Borings AB-04 through
AB-07 were drilled with sonic drilling to depths ranging from approximately 70 to 75.5
feet bgs. Explorations AHA-01 and 02 were advanced using a hand auger and shovel
between 4 and 4.5 feet bgs. Test pits ATP-01 through 04 were advanced by an excavator
between 4 and 12.25 feet bgs. The locations of the explorations are shown on Figure 2,
and the exploration logs are included in this appendix with a key to the symbols and
terms used in the logs.
An Aspect geologist was present throughout the field exploration program to observe the
drilling procedure, assist in sampling, and prepare descriptive logs of the exploration.
Soils were classified in general accordance with ASTM International (ASTM) D2488,
Standard Practice for Description and Identification of Soils (Visual-Manual Procedure).
The summary exploration logs represent our interpretation of the contents of the field log.
The stratigraphic contacts shown on the individual summary logs represent the
approximate boundaries between soil types; actual transitions may be more gradual. The
subsurface conditions depicted are only for the specific date and locations reported, and
therefore, are not necessarily representative of other locations and times.
A.1 Soil Borings
HSA drilling was completed by Holt Services for AB-03 using a track-mounted LD-10T
Rotary drill rig equipped with an automatic-safety hammer. HSA drilling of AB-08, AB-
09, and AB-10 was completed by Holocene Drilling using a track-mounted Diedrich D
50 drill rig equipped with an automatic-safety hammer.
Sonic drilling was completed by Holocene Drilling using a track-mounted Geoprobe
8140 LC for borings AB-04 through AB-07. Select samples were collected using the
Standard Penetration Test (SPT) in general accordance with ASTM D1586. Samples
were typically obtained at 2.5-foot to 5-foot intervals bgs to the depths explored, using
the SPT in general accordance with ASTM D1586. Sonic drilling provides continuous
disturbed samples. The sampler types used are depicted on the exploration logs.
The SPT method involves driving a 2-inch-outside-diameter split-barrel sampler with a
140-pound hammer free-falling from a distance of 30 inches. To obtain better sample
recovery for anticipated coarse sand and gravel, a 3-inch-outside-diameter Modified
California sampler was used, and the blow counts were corrected to a SPT equivalent.
ASPECT CONSULTING
A-2 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
For SPT sampling, the number of blows for each 6-inch interval is recorded. The number
of blows required to drive the sampler the final 12 inches is known as the Standard
Penetration Resistance (“N”) or blow count. The resistance, or N-value, provides a
measure of the relative density of granular soils or the relative consistency of cohesive
soils. If a total of 50 blows are recorded for a single 6-inch interval, the test is terminated,
and the blow count is recorded as 50 blows for the total inches of penetration.
Samples were placed in labeled plastic jars or bags and taken to a laboratory for further
classification.
A.2 Test Pits
Test pits ATP-01 through ATP-02 were excavated on April 6, 2020 using a Cat 312 E
track-mounted excavator. The excavation was completed by On-Track Excavating,
under the direction of Aspect. ATP-03 and ATP-04 were excavated on June 23, 2022,
using a using a rubber track-mounted mini track excavator operated by Kelly’s
Excavating, under the direction of Aspect. The locations of the test pits are shown on
Figure 2. Summary pit logs are included in Appendix A.
Samples were obtained from select soil units to aid in the determination of engineering
properties of the subsurface materials. The relative density/consistency of the soils was
evaluated qualitatively with a 0.5-inch-diameter steel T-probe and observation of
excavation difficulty at various depth intervals within the test pits. The test pits were
backfilled with the native soils and compacted with the excavator bucket in 1-foot-thick
lifts.
Detailed descriptions of the subsurface conditions encountered in our explorations, as
well as the depths where characteristics of the soils changed, are indicated on the test pit
logs. The depths indicated on the log where conditions changed may represent
gradational variations between soil types. Soils were classified in general accordance
with the ASTM D2488, Standard Practice for Description and Identification of Soils
(Visual and Manual Procedure). A key to the symbols and terms used on the logs is
provided on the Exploration Log Key.
A.3 Hand Augers
Hand augers AHA-01 and AHA-02 were excavated on June 23, 2022, by an Aspect
engineer. Soils were logged as each material change was observed though no soil samples
were collected. The relative density/consistency of the soils was evaluated qualitatively
with a 0.5-inch-diameter steel T-probe and observation of excavation difficulty at various
depth intervals within the hand augers. The hand augers were backfilled with the native
soils and packed in place by hand.
A.4 Well Decommissioning
On April 10, 2023, Aspect observed as wells AB-04, AB-05, AB-06, AB-07, and AB-09
(Ecology Wells BNK631, BNK633, BNK632, BNK634, and BMT-318 respectively)
were decommissioned by Holocene Drilling in accordance to WAC 173-160-381 (WAC).
The wells were filled via tremie pipe with neat cement grout.
AI Path: Q:\_ACAD Standards\FIELD REFERENCE\MASTERS\Exploration Log Key-2018.ai // user: jinman // last saved: 12/31/2018“WITH SILT” or “WITH CLAY” means 5 to 15% silt and clay, denoted by a “-“ in the group
name; e.g., SP-SM ● “SILTY” or “CLAYEY” means >15% silt and clay ● “WITH SAND” or “WITH
GRAVEL” means 15 to 30% sand and gravel. ● “SANDY” or “GRAVELLY” means >30% sand and
gravel. ● “Well-graded” means approximately equal amounts of fine to coarse grain sizes ● “Poorly
graded” means unequal amounts of grain sizes ● Group names separated by “/” means soil
contains layers of the two soil types; e.g., SM/ML.
Soils were described and identified in the field in general accordance with the methods described in
ASTM D2488. Where indicated in the log, soils were classified using ASTM D2487 or other
laboratory tests as appropriate. Refer to the report accompanying these exploration logs for details.
% by Weight
Density³SPT² Blows/Foot
HighlyOrganicSoilsFine-Grained Soils - 50%1 or More Passes No. 200 SieveCoarse-Grained Soils - More than 50%1 Retained on No. 200 SieveGravels - More than 50%1 of Coarse FractionRetained on No. 4 Sieve15% Fines5% FinesSands - 50%1 or More of Coarse FractionPasses No. 4 SieveSilts and ClaysLiquid Limit Less than 50%Silts and ClaysLiquid Limit 50% or More15% Fines5% FinesWell-graded GRAVEL
Well-graded GRAVEL WITH SAND
Poorly-graded GRAVEL
Poorly-graded GRAVEL WITH SAND
SILTY GRAVEL
SILTY GRAVEL WITH SAND
CLAYEY GRAVEL
CLAYEY GRAVEL WITH SAND
Well-graded SAND
Well-graded SAND WITH GRAVEL
Poorly-graded SAND
Poorly-graded SAND WITH GRAVEL
SILTY SAND
SILTY SAND WITH GRAVEL
CLAYEY SAND
CLAYEY SAND WITH GRAVEL
SILT
SANDY or GRAVELLY SILT
SILT WITH SAND
SILT WITH GRAVEL
LEAN CLAY
SANDY or GRAVELLY LEAN CLAY
LEAN CLAY WITH SAND
LEAN CLAY WITH GRAVEL
ORGANIC SILT
SANDY or GRAVELLY ORGANIC SILT
ORGANIC SILT WITH SAND
ORGANIC SILT WITH GRAVEL
ELASTIC SILT
SANDY or GRAVELLY ELASTIC SILT
ELASTIC SILT WITH SAND
ELASTIC SILT WITH GRAVEL
FAT CLAY
SANDY or GRAVELLY FAT CLAY
FAT CLAY WITH SAND
FAT CLAY WITH GRAVEL
ORGANIC CLAY
SANDY or GRAVELLY ORGANIC CLAY
ORGANIC CLAY WITH SAND
ORGANIC CLAY WITH GRAVEL
PEAT and other
mostly organic soils
GW
GP
GM
GC
SW
SP
SM
SC
ML
CL
OL
MH
CH
OH
PT
Modifier
Organic Chemicals
BTEX =Benzene, Toluene, Ethylbenzene, Xylenes
TPH-Dx =Diesel and Oil-Range Petroleum Hydrocarbons
TPH-G =Gasoline-Range Petroleum Hydrocarbons
VOCs =Volatile Organic Compounds
SVOCs =Semi-Volatile Organic Compounds
PAHs =Polycyclic Aromatic Hydrocarbon Compounds
PCBs =Polychlorinated Biphenyls
GEOTECHNICAL LAB TESTSMC=Natural Moisture Content
PS =Particle Size Distribution
FC =Fines Content (% < 0.075 mm)GH =Hydrometer TestAL=Atterberg Limits
C =Consolidation Test
Str =Strength Test
OC =Organic Content (% Loss by Ignition)
Comp =Proctor Test
K =Hydraulic Conductivity Test
SG =Specific Gravity Test
RCRA8 =As, Ba, Cd, Cr, Pb, Hg, Se, Ag, (d = dissolved, t = total)
MTCA5 =As, Cd, Cr, Hg, Pb (d = dissolved, t = total)
PP-13 =Ag, As, Be, Cd, Cr, Cu, Hg, Ni, Pb, Sb, Se, Tl, Zn (d=dissolved, t=total)
CHEMICAL LAB TESTS
PID =Photoionization Detector
Sheen =Oil Sheen Test
SPT 2 =Standard Penetration Test
NSPT =Non-Standard Penetration Test
DCPT =Dynamic Cone Penetration Test
<1 =Subtrace
1 to <5 =Trace
5 to 10 =Few
Dry =Absence of moisture, dusty, dry to the touch
Slightly Moist =Perceptible moisture
Moist =Damp but no visible water
Very Moist =Water visible but not free draining
Wet = Visible free water, usually from below water table
COMPONENT
DEFINITIONSDescriptive Term Size Range and Sieve Number
Boulders = Larger than 12 inches
Cobbles =3 inches to 12 inches
Coarse Gravel =3 inches to 3/4 inches
Fine Gravel =3/4 inches to No. 4 (4.75 mm)
Coarse Sand =No. 4 (4.75 mm) to No. 10 (2.00 mm)
Medium Sand =No. 10 (2.00 mm) to No. 40 (0.425 mm)
Fine Sand =No. 40 (0.425 mm) to No. 200 (0.075 mm)
Silt and Clay =Smaller than No. 200 (0.075 mm)
Metals
ESTIMATED1
PERCENTAGE
MOISTURE
CONTENT
RELATIVE DENSITY
CONSISTENCY
GEOLOGIC CONTACTS
Very Loose =0 to 4 ≥2'
Loose =5 to 10 1' to 2'
Medium Dense =11 to 30 3" to 1'
Dense =31 to 50 1" to 3"
Very Dense => 50 < 1"
Consistency³
Very Soft =0 to 1 Penetrated >1" easily by thumb. Extrudes between thumb & fingers.
Soft =2 to 4 Penetrated 1/4" to 1" easily by thumb. Easily molded.
Medium Stiff =5 to 8 Penetrated >1/4" with effort by thumb. Molded with strong pressure.
Stiff =9 to 15 Indented ~1/4" with effort by thumb.
Very Stiff =16 to 30 Indented easily by thumbnail.
Hard => 30 Indented with difficulty by thumbnail.
Non-Cohesive or Coarse-Grained Soils
SPT² Blows/Foot
Observed and Distinct Observed and Gradual Inferred
1.Estimated or measured percentage by dry weight
2.(SPT) Standard Penetration Test (ASTM D1586)
3.Determined by SPT, DCPT (ASTM STP399) or other field methods. See report text for details.
% by Weight Modifier
15 to 25 =Little
30 to 45 =Some
>50 =Mostly
Penetration with 1/2" Diameter Rod
Manual Test
FIELD TESTS
Cohesive or Fine-Grained Soils
Exploration Log Key
Flush-mount
monument set in
concrete
Locked expansion
plug
1.5-3 ft. bgs, Silica
sand pack
Blows
(non-SPT)
=10, 17, 16
Blows
(non-SPT)
=20, 26, 25
Blows
(non-SPT)
=28, 23, 35
Blows
(non-SPT)
=12, 20, 23S1S2S3S4 FILL
SILTY SAND (SM); loose to medium dense, moist, brown;
trace coarse, rounded gravel; organic fines; iron-oxide
staining.
RECESSIONAL GLACIAL OUTWASH
SAND WITH GRAVEL (SP); medium dense, moist, gray
brown; trace silt; fine to coarse sand; fine to coarse,
rounded to subangular gravel; broken gravel in sampler.
GRAVEL WITH SILT AND SAND (GP-GM); dense,
slightly moist to moist, gray brown; fine to coarse sand;
fine to coarse, rounded to subrounded gravel; large gravels
in sampler, possibly bouncing on gravel.
SAND WITH SILT (SP-SM); dense, moist, gray brown;
fine to coarse sand; fine to coarse rounded to subangular
gravel.
SAND (SP); medium dense, moist, gray; mostly fine
sand, trace coarse sand; trace fine, rounded to subangular
gravel.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
330
325
320
315
AB-03
Tests
LD-10T Rotary Drill Rig
7" OD X 4.25" IDHollow-Stem Auger
Holt Services, Inc.
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 3" X 2.375" (Mod
Cal)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Modified California
Logged by: WEG
Approved by: ETB 12/21/2020
AB-03
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Abe
Ecology Well Tag No.
BJX-250
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
64.73' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 1 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Top of Casing Elev.
5
10
15
11/23/2020 to 11/24/2020
Project Address & Site Specific Location
334.55'
Plastic Limit
47.4876, -122.1776
10 20 30 400 50
3-58 ft. bgs, Bentonite
chips
0-75 ft. bgs, 2" PVC
Casing
Blows
(non-SPT)
=21, 38, 43
Blows
(non-SPT)
=20, 28, 34
Blows
(non-SPT)
=37, 70,
120/5"S5S6S7S8 SAND (SP); medium dense, moist, gray; mostly fine
sand, trace coarse sand; trace fine, rounded to subangular
gravel. (continued)
Becomes very dense; fine to coarse sand; trace to few
fine to coarse, rounded to subangular gravel; few silty
pockets.
SAND WITH GRAVEL (SP); dense, moist, gray brown;
fine to coarse sand; few fine, rounded to subangular
gravel; subtrace to trace silt.
Driller notes gravelly drill action.
No recovery.
Becomes very dense, slightly moist, light gray; fine to
coarse sand; fine to coarse, rounded to subangular gravel.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
310
305
300
295
AB-03
Tests
LD-10T Rotary Drill Rig
7" OD X 4.25" IDHollow-Stem Auger
Holt Services, Inc.
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 3" X 2.375" (Mod
Cal)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Modified California
Logged by: WEG
Approved by: ETB 12/21/2020
AB-03
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Abe
Ecology Well Tag No.
BJX-250
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
64.73' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 2 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Top of Casing Elev.
25
30
35
11/23/2020 to 11/24/2020
Project Address & Site Specific Location
334.55'
Plastic Limit
47.4876, -122.1776
10 20 30 400 50
Blows
(non-SPT)
=33, 63, 65
Blows
(non-SPT)
=32, 64,
120/3"
Blows
(non-SPT)
=21, 28, 33
CEC = 4.1
meq/100g
OC=0.4%
FC=3.2%
Blows
(non-SPT)
=12, 21, 27S9S10S11
S12 SAND WITH GRAVEL (SP); dense, moist, gray brown;
fine to coarse sand; few fine, rounded to subangular
gravel; subtrace to trace silt. (continued)
Becomes moist and gray brown with mostly fine sand and
large broken gravel in sampler, broken gravel in shoe.
SAND (SP); very dense, moist, light gray to gray; trace
silt; mostly fine sand; trace fine, rounded gravel; trace
iron-oxide staining and siltier layers.
Becomes dense.
Driller notes drilling conditions become easier.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
290
285
280
275
AB-03
Tests
LD-10T Rotary Drill Rig
7" OD X 4.25" IDHollow-Stem Auger
Holt Services, Inc.
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 3" X 2.375" (Mod
Cal)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Modified California
Logged by: WEG
Approved by: ETB 12/21/2020
AB-03
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Abe
Ecology Well Tag No.
BJX-250
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
45
50
55
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
64.73' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 3 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Top of Casing Elev.
45
50
55
11/23/2020 to 11/24/2020
Project Address & Site Specific Location
334.55'
Plastic Limit
47.4876, -122.1776
10 20 30 400 50
58-76.5 ft. bgs, Silica
sand pack
60-75 ft. bgs, 0.010"
Slotted screen
Threaded end cap
Blows
(non-SPT)
=18, 29, 35
Blows
(non-SPT)
=19, 25, 29
Blows
(non-SPT) =3,
21, 41
Blows
(non-SPT)
=10, 15, 56
1/7/2023
3/11/2021
11/24/2020
12/15/2020
11/23/2020
11/23/2020 S13S14S15S16 SAND (SP); very dense, moist, light gray to gray; trace
silt; mostly fine sand; trace fine, rounded gravel; trace
iron-oxide staining and siltier layers. (continued)
Subtrace iron-oxide staining.
Trace iron-oxide staining.
Becomes gray and moist to very moist.
Becomes wet, dark gray.
Becomes dark gray to gray brown.
Driller noted 6" heave at 75 ft.
Bottom of exploration at 76.5 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
270
265
260
255
AB-03
Tests
LD-10T Rotary Drill Rig
7" OD X 4.25" IDHollow-Stem Auger
Holt Services, Inc.
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 3" X 2.375" (Mod
Cal)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Modified California
Logged by: WEG
Approved by: ETB 12/21/2020
AB-03
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Abe
Ecology Well Tag No.
BJX-250
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
65
70
75
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
64.73' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 4 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Top of Casing Elev.
65
70
75
11/23/2020 to 11/24/2020
Project Address & Site Specific Location
334.55'
Plastic Limit
47.4876, -122.1776
10 20 30 400 50
12
22
10
Flush monument set
in concrete.
Locked expansion
plug.
VW Piezometer
datalogger in
monument.
Concrete 0-5 ft. bgs.
2" PVC casing 0-55.8
ft. bgs.
PID =0.1
Sheen =None
to slight
organic
Odor =None
to slight
petroleum-like
PID =0.5
Sheen
=Slight
organic
Odor =Slight
organic-like
PID =1.5
Sheen
=Slight
organic
Odor =Slight
organic-likeS1 FILL
SILT WITH SAND (ML); medium stiff, moist, gray and
brown; medium plasticity; fine to coarse gravel; trace roots.
SILTY SAND (SM); medium dense, moist, gray brown;
fine sand; trace fine to coarse gravel.
SILT (ML); medium stiff, moist, gray to brown; trace fine
sand and iron-oxide staining.
SILTY SAND (SM); medium dense, moist, brown; fine
sand; trace fine to coarse, rounded to subrounded gravel;
gray silt pockets.
Becomes dark brown; organic fines.
Becomes dense; trace woodchips.
SILT (ML); stiff, moist, gray to gray brown; medium
plasticity; trace coarse, rounded gravel.
SILTY SAND (SM); dense, dry to slightly moist, dark gray
to gray brown; few fine to coarse, subrounded to
subangular gravel; trace roots.
Becomes moist, dark brown; fine to coarse sand;
1-inch-thick wood piece, silt pockets.
Becomes dark gray to gray brown; blue gray silt pocket.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
325
320
315
310
AB-04
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-04
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK631
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60.8' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 1 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
5
10
15
3/24/2021 to 3/27/2021
Project Address & Site Specific Location
329.88'
Plastic Limit
47.4867, -122.1774
10 20 30 400 50
5
3
4
19
18
11
Bentonite chips 5-42
ft. bgs.
PID =2.0
Sheen
=Slight
organic
Odor =Slight
petroleum-like
PID =1.8
Sheen =None
Odor =Slight
organic-like
PID =0.9
Sheen
=Slight
organic
Odor =None
PID =4.6
Sheen
=Slight
organic
Odor =NoneS2S3 SILT (ML); medium stiff, moist, dark gray and blue gray;
medium plasticity; trace fine sand; trace fine gravel; trace
woodchips.
SILT WITH SAND (ML); medium stiff, moist, blue gray
and gray brown; medium plasticity; fine sand; few fine to
coarse, rounded to subrounded gravel; woodchip.
SILTY SAND (SM); medium dense, moist, gray brown;
fine to coarse sand; few fine to coarse, rounded to
subrounded gravel; trace roots.
SILT WITH SAND (ML); medium stiff, moist, blue gray;
medium plasticity; few fine to coarse, rounded to
subrounded gravel; 1-inch-diameter root, trace roots.
SILTY SAND WITH GRAVEL (SM); medium dense,
moist, blue gray; fine to coarse sand; fine to coarse,
rounded to subrounded gravel; zone of iron-oxide staining.
GLACIAL OUTWASH DEPOSITS (Qpa)
SAND WITH SILT AND GRAVEL (SP-SM); medium
dense, moist, brown; fine to coarse sand; fine to coarse,
rounded to subrounded gravel.
SILTY SAND WITH GRAVEL (SM); medium dense,
moist, brown; broken gravel in sampler.
SAND (SP); medium dense, slightly moist to moist,
brown; few silt; fine sand.
Becomes moist; fine to coarse sand; trace coarse, broken
gravel.
SILT WITH SAND (ML); medium stiff, moist, dark gray;
fine sand.
SAND (SP); medium dense, moist, brown; fine sand;
trace fine to coarse, rounded gravel.
Becomes slightly moist to moist, brown to light brown;
trace to few silt; few zones of blocks cemented by silt.
Becomes moist.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
305
300
295
290
AB-04
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-04
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK631
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60.8' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 2 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
25
30
35
3/24/2021 to 3/27/2021
Project Address & Site Specific Location
329.88'
Plastic Limit
47.4867, -122.1774
10 20 30 400 50
14
12
13
20
22
24
6 x 9 Colorado sand
42-58 ft. bgs.
0.02" slotted screen
45.8-55.8 ft. bgs.
1/7/2023: well dry
Bentonite chips 59-60
ft. bgs.
AB-04-45
NWTPH-Dx;
NWTPH-Dx;
PAHs
PID =0.2
Sheen =None
to slight
organic
Odor =None
CEC =7.4
meq/100 g
GS OC=0.6%
FC=6.6%S4S5 SAND (SP); medium dense, moist, brown; fine sand;
trace fine to coarse, rounded gravel. (continued)
Becomes brown to gray brown.
6-inch-thick silt-cemented stratum.
Zone of silt-cemented pockets.
Trace coarse sand; trace fine, rounded to subrounded
gravel.
Approximately 6-inch-thick zone with fine to coarse,
rounded to subrounded gravel.
SAND WITH GRAVEL (SP); medium dense to dense,
slightly moist to moist, brown; fine sand, trace coarse
sand; fine to coarse, rounded to subrounded gravel.
SILTY SAND (SM); dense, dry to slightly moist, gray to
brown; fine sand; trace fine, rounded gravel; cemented
pockets, broken gravel.
SAND WITH SILT (SP-SM); dense, dry to slightly moist,
gray brown; trace to few silt; fine to coarse sand; few fine
to coarse, rounded to subrounded gravel.
SILTY SAND WITH GRAVEL (SM); dense, slightly moist,
gray brown; fine to coarse sand; fine to coarse, rounded to
subrounded gravel.
SILTY SAND (SM); dense, dry, light gray; fine sand; few
fine to coarse, rounded to subrounded gravel.
SAND (SP); dense, moist, gray brown; fine sand.
Becomes brown; trace silt pockets; subtrace fine,
rounded to subrounded gravel.
Approximately 4-inch-thick stratum of dry, light gray silty
sand.
Trace coarse sand; few-inch-thick strata of dry to slightly
moist silty sand with cemented chunks.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
285
280
275
270
AB-04
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-04
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK631
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
45
50
55
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60.8' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 3 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
45
50
55
3/24/2021 to 3/27/2021
Project Address & Site Specific Location
329.88'
Plastic Limit
47.4867, -122.1774
10 20 30 400 50
23
36
22
2
2
3
Bentonite grout 60-70
ft. bgs.
12 x 20 sand 70-72.5
ft. bgs.
VW Piezometer
installed at 72.5 ft.
bgs. SN: 2111522.
Diver SN DA988
installed at 72.5 ft.
bgs.
4/6/2021 S6S7 SAND (SP); dense, moist, gray brown; fine sand.
(continued)
Becomes very dense, gray brown to brown; fine to coarse
sand; fine to coarse, rounded to subangular gravel; gravel
socketing.
SAND WITH SILT (SP-SM); very dense, dry to slightly
moist, gray brown; fine to coarse sand; trace to few fine to
coarse, subrounded gravel; few cemented blocks.
SILTY SAND (SM); very dense, dry to slightly moist, light
gray to gray brown; fine sand; trace coarse, rounded
gravel; cemented blocks of sand and silt.
SAND WITH SILT (SP-SM); very dense, moist, brown;
fine sand; cemented blocks.
Approximately 4-inch-thick stratum of dry, lght gray silty
sand with cemented blocks.
SAND (SP); very dense, moist to very moist, dark brown;
fine sand; trace fine, rounded gravel; silt pockets.
SAND WITH SILT (SP-SM); very dense, moist, brown;
fine to coarse sand; few fine gravel, trace coarse gravel;
silt pockets.
SILT (ML); soft, wet, brown; trace fine to coarse, rounded
to subrounded gravel; possibly slough?
SAND WITH SILT (SP-SM); loose to medium dense, very
moist to wet, brown; fine sand, trace coarse sand; fine to
coarse, rounded to subrounded gravel; trace silt pockets.
SAND (SP); medium dense, moist, brown; fine to
medium sand.
Becomes loose, very moist to moist, gray to brown; driller
notes heave/caving before 70-ft. SPT.
Bottom of exploration at 72.5 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
265
260
255
250
AB-04
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-04
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK631
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
65
70
75
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60.8' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 4 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
65
70
75
3/24/2021 to 3/27/2021
Project Address & Site Specific Location
329.88'
Plastic Limit
47.4867, -122.1774
10 20 30 400 50
Flush mount
monument set in
concrete.
Locked expansion
plug.
VW Piezometer
datalogger in
monument.
Concrete 0-5 ft. bgs.
6" PVC casing 0-45 ft.
bgs.
PID =5.3
Sheen =None
Odor =None
PID =1.6
Sheen =None
Odor =Slight
organic-like
FILL
SILTY SAND (SM); very loose to loose, very moist, gray
brown; fine to coarse sand; trace fine to coarse, rounded
gravel.
CLAY (CL); medium stiff, moist, dark gray; medium
plasticity; subtrace fine, subrounded gravel; trace sand
pockets with iron-oxide staining, trace brown silt pockets.
Becomes blue gray to dark gray.
Subtrace fine to coarse, rounded to subrounded gravel;
zone of iron-oxide staining, trace black organics, woodchip.
Becomes blue gray and gray brown.; subtrace coarse
sand; abundant iron-oxide staining.
Green pieces of broken sewer pipe.
Brick piece.
SILTY SAND (SM); medium dense, moist, gray brown
and blue gray; trace fine to coarse, rounded gravel;
iron-oxide staining, clay veins, twig.
SILT (MH); medium stiff, moist, blue gray and gray
brown; trace coarse sand; trace rounded to subrounded
gravel; iron-oxide staining, sand pockets, trace roots.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
325
320
315
310
AB-05
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-05
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK633
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
61.2' (Static)
Exploration Number
WaterLevelSheet 1 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
5
10
15
3/26/2021 to 3/27/2021
Project Address & Site Specific Location
329.28'
Plastic Limit
47.4869, -122.1772
10 20 30 400 50
5
5
5
Bentonite chips 5-43
ft. bgs.
PID =1.7
Sheen
=Slight
petroleum
Odor =Slight
organic-like
PID =1.9
Sheen
=Slight
petroleum
Odor =Slight
organic-likeS1 SILT (MH); medium stiff, moist, blue gray and gray
brown; trace coarse sand; trace rounded to subrounded
gravel; iron-oxide staining, sand pockets, trace roots.
(continued)
Becomes stiff.
Pockets of blue gray clay and black organics; trace roots,
trace woodchips, concrete chunk.
SILTY SAND (SM); medium dense, moist, dark gray; fine
to coarse sand; few fine to coarse, rounded to subrounded
gravel; trace roots, brick piece.
SILTY SAND WITH GRAVEL (SM); medium dense,
moist, dark gray; fine to coarse sand; fine to coarse,
rounded to subrounded gravel; trace woodchips, subtrace
iron-oxide staining.
Blue gray pocket of sandy clay.
SILTY SAND (SM); medium dense, moist, dark gray; few
fine to coarse, rounded to subrounded gravel; trace roots.
Becomes very moist.
Woodchip, brick piece.
Becomes moist; fine to coarse sand; few fine to coarse,
rounded to angular gravel; trace roots.
Large concrete chunks.
Woodchips.
Plastic bag pieces.
5-inch-thick stratum of blue gray to dark gray color and
increased sand content.
Becomes dark gray.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
305
300
295
290
AB-05
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-05
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK633
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
61.2' (Static)
Exploration Number
WaterLevelSheet 2 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
25
30
35
3/26/2021 to 3/27/2021
Project Address & Site Specific Location
329.28'
Plastic Limit
47.4869, -122.1772
10 20 30 400 50
7
8
10
6 x 9 Colorado sand
43-57 ft. bgs.
0.02" mesh, stainless
steel screen 45-55 ft.
bgs.
1/7/2023: well dry
PVC riser below
screen.
PID =1.6
Sheen
=Slight
organic
Odor =Slight
organic-like
PID =1.8
Sheen
=Slight to
moderate
organic
Odor
=Moderate
petroleum-like
AB-05-53.8
NWTPH-Dx;
NWTPH-Dx;
PAHs
PID =1.8
Sheen
=Slight
organic
FC=2.7%
Odor =None
CEC =6.7
meq/100 g
OC=0.6%S2S3 SANDY SILT (ML); very stiff, moist, blue gray to dark
gray; low plasticity; fine to coarse sand; few fine to coarse,
rounded to subrounded gravel; trace roots.
SILTY SAND (SM); medium dense to dense, moist to
very moist, dark gray to blue gray; fine to coarse sand; few
fine to coarse, rounded to subangular gravel; silty pocket,
brick piece.
SILT (MH); stiff, very moist, dark gray and gray; fine to
coarse, rounded to subrounded gravel.
SILTY SAND WITH GRAVEL (SM); medium dense to
dense, very moist, dark gray; fine to coarse sand; fine to
coarse, rounded to angular gravel; trace brick pieces, trace
roots, woodchip.
GLACIAL OUTWASH DEPOSITS (Qpa)
SILTY SAND WITH GRAVEL (SM); medium dense to
dense, moist to very moist, brown to brown yellow; fine to
coarse sand; fine, rounded to angular gravel.
Driller adds 50 ft. of 10-inch casing and water to ease
drilling.
SAND (SP); medium dense, to dense, moist, brown
yellow; fine to coarse sand; few fine to coarse, rounded to
subangular gravel.
Trace fine to coarse, rounded to subangular gravel.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
285
280
275
270
AB-05
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-05
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK633
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
45
50
55
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
61.2' (Static)
Exploration Number
WaterLevelSheet 3 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
45
50
55
3/26/2021 to 3/27/2021
Project Address & Site Specific Location
329.28'
Plastic Limit
47.4869, -122.1772
10 20 30 400 50
6 x 9 Colorado sand
and bentonite chips
57-75 ft. bgs.
VW Piezometer
installed at 68 ft. bgs.
SN 2111523.
Diver SN DA986
installed at 68 ft. bgs.
4/6/2021
SAND (SP); medium dense, to dense, moist, brown
yellow; fine to coarse sand; few fine to coarse, rounded to
subangular gravel. (continued)
Driller adds additional 10 ft. of casing and more water,
notes that soil is falling out of core barrel and adds a
different bit to try to stop soil loss, thinks he encountered
groundwater.
Becomes wet; subtrace fine, subrounded gravel; trace silt
pockets.
Driller notes approximately 5 ft. of heave.
Subtrace fine, subrounded to angular gravel.
Becomes gray brown to brown yellow; mostly fine sand;
silty sand pocket, subtrace black organics.
Subtrace cm-scale laminations.
Driller notes approximately 6 ft. of heave.
Bottom of exploration at 75 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
265
260
255
250
AB-05
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-05
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK633
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
65
70
75
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
61.2' (Static)
Exploration Number
WaterLevelSheet 4 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
65
70
75
3/26/2021 to 3/27/2021
Project Address & Site Specific Location
329.28'
Plastic Limit
47.4869, -122.1772
10 20 30 400 50
Flush monument set
in concrete.
Locked expansion
plug.
VW Piezometer
datalogger in
monument.
Concrete 0-5 ft. bgs.
2" PVC casing 0-59 ft.
bgs.
PID =14
Sheen =None
Odor =None
PID =1.6
Sheen =None
Odor =None
FILL
SILTY SAND (SM); loose to medium dense, moist, gray
brown; fine to coarse sand; few fine to coarse, rounded
gravel.
SILT (ML); soft to medium stiff, moist, gray brown; low to
medium plasticity; few fine to coarse, rounded gravel.
SILT (MH); medium stiff, moist, blue gray; medium
plasticity; massive.
SILTY SAND (SM); medium dense, very moist, gray
brown; trace to few fine to coarse, rounded gravel.
Driller notes no core recovery from 5-10 ft. bgs. due to
suspected rock.
CLAY (CL); medium stiff to stiff, moist, blue gray;
massive.
Medium to high (?) plasticity.
Approximately 6-inch-thick stratum with trace fine,
subrounded gravel and iron-oxide staining.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
325
320
315
310
AB-06
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-06
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK632
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
57.49' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 1 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
5
10
15
3/25/2021 to 3/27/2021
Project Address & Site Specific Location
327.65'
Plastic Limit
47.4871, -122.1770
10 20 30 400 50
7
8
11
Bentonite chips 5-52
ft. bgs.
PID =1.1
Sheen =None
Odor =None
PID =0.5
Sheen =None
Odor =None
PID =1.1
Sheen =None
Odor =None
PID =0.9
Sheen =None
Odor =NoneS1 CLAY (CL); medium stiff to stiff, moist, blue gray;
massive. (continued)
Becomes very stiff; zone with trace coarse sand, fine,
rounded gravel, and iron-oxide staining.
Approximately 2-inch-thick stratum of silty sand with fine
sand and trace fine, subrounded gravel.
Subtrace fine to coarse, rounded gravel.
Approximately 1.6-ft.-thick zone with gray brown silt
pockets with trace coarse sand and fine to coarse,
rounded to subrounded gravel.
Becomes stiff.
Approximately 6-inch-thick zone with trace coarse sand,
fine, subrounded gravel, and iron-oxide staining.
Becomes blue gray and brown yellow; hard block of clay;
silt.
Driller pours water into hole to ease drilling.
Becomes very moist to wet; subtrace coarse sand.
SILTY SAND (SM); medium dense, moist, blue gray to
brown yellow; fine to coarse sand; trace fine to coarse,
rounded gravel; silt pockets.
SILT (MH); stiff, moist, brown yellow; medium to high (?)
plasticity; trace coarse sand; trace fine to coarse, rounded
gravel; woodchip, brick piece.
Becomes blue gray; trace woodchips and organics.
SILT (ML); stiff, dark gray to blue gray, moist; low to
medium plasticity; trace coarse sand; trace to few, fine to
coarse, rounded to subrounded gravel; approximately
1-inch-thick zone of black organics and woodchips.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
305
300
295
290
AB-06
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-06
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK632
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
57.49' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 2 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
25
30
35
3/25/2021 to 3/27/2021
Project Address & Site Specific Location
327.65'
Plastic Limit
47.4871, -122.1770
10 20 30 400 50
5
5
7
6 x 9 Colorado sand
52-59 ft. bgs.
0.020" slotted screen
54-59 ft. bgs.
PID =1.9
Sheen =None
Odor =Slight
petroleum-like
PID =0.8
Sheen
=Slight
organic
Odor =Slight
petroleum-like
PID =2.8
Sheen
=Slight
petroleum
Odor =Slight
petroleum-like
PID =1.8
Sheen
=Slight
petroleum
Odor =Slight
petroleum-like
1/5/2023
3/25/2021 Reading
taken after driller
poured water in hole.S2 SILT (MH); soft, wet, light gray; medium to high (?)
plasticity; trace fine sand; trace fine to coarse, rounded
gravel; silt pockets with iron-oxide staining.
SILT (ML); medium stiff to stiff, moist to very moist, dark
gray to blue gray; trace to few fine sand, trace coarse
sand; few fine to coarse, rounded gravel; trace roots.
Zone with trace woodchips and organics.
SAND WITH SILT (SP-SM); medium dense, very moist,
dark gray to blue gray; fine to coarse sand; trace fine;
rounded gravel; trace to few roots.
SILTY SAND (SM); medium dense, very moist, dark gray
to blue gray; fine to coarse sand; fine to coarse, rounded
gravel; trace iron-oxide staining; piece of plastic bag.
SILT WITH GRAVEL (ML); stiff, moist, dark gray to blue
gray; low plasticity; fine to coarse, rounded gravel; little
iron-oxide staining, blocky texture.
SILT WITH SAND (MH); stiff, very moist, blue gray;
medium to high (?) plasticity; fine sand; trace fine to
coarse, rounded gravel; sandy pockets with iron-oxide
staining, trace roots.
Becomes moist, dark gray.
SANDY SILT (ML); stiff, very moist, dark gray to blue
gray; fine sand; trace fine, rounded gravel; trace roots.
CONCRETE; 10 inches.
SILTY SAND (SM); medium dense to dense, moist, dark
gray to blue gray; fine to coarse sand; trace fine, rounded
gravel.
GLACIAL OUTWASH DEPOSITS (Qpa)
SAND WITH SILT (SP-SM); medium dense to dense,
very moist, blue gray to brown yellow; fine to coarse sand;
trace fine to coarse, rounded to subrounded gravel; silt
pockets.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
285
280
275
270
AB-06
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-06
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK632
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
45
50
55
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
57.49' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 3 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
45
50
55
3/25/2021 to 3/27/2021
Project Address & Site Specific Location
327.65'
Plastic Limit
47.4871, -122.1770
10 20 30 400 50
5
16
26
6 x 9 Colorado sand
and 1 bag of bentonite
chips 59-75.5 ft. bgs.
VW Piezometer
installed at 74.5 ft.
bgs. SN 2111524.
Diver SN DA985
installed at 74.5 ft.
bgs.
AB-06-60
NWTPH-Dx;
NWTPH-Dx;
PAHs
GS
OC=0.5%
FC=3.5%
PID =1.2
Sheen =None
Odor =None
CEC =6.8
meq/100 gS3 SAND (SP); medium dense to dense, very moist to wet,
brown yellow and dark gray; trace fine, subangular to
rounded gravel; silt pocket; blowcounts may be overstated
due to gravel in shoe, driller reports approximately 6-8
inches of heave.
Approximately 8-inch-thick stratum of very moist, gray
sandy silt with fine sand.
Becomes gray brown to brown yellow; fine to coarse
sand; iron-oxide staining.
Trace coarse, angular to subangular gravel; trace to few
silt pockets.
Driller adds water to ease drilling after pulling 70-ft. core.
SILTY SAND (SM); dense, very moist to wet, brown; fine
sand, trace medium to coarse sand; few cm-scale
laminations.
Bottom of exploration at 75.5 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
265
260
255
250
AB-06
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-06
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK632
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
65
70
75
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
57.49' (Static)
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 4 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
65
70
75
3/25/2021 to 3/27/2021
Project Address & Site Specific Location
327.65'
Plastic Limit
47.4871, -122.1770
10 20 30 400 50
Flush monument set
in concrete.
Locked expansion
plug.
VW Piezometer
datalogger in
monument.
Concrete 0-5 ft. bgs.
2" PVC casing 0-53 ft.
bgs. PID =0.8
Sheen =None
Odor =None
FILL
SILTY SAND WITH GRAVEL (SM); loose, moist, gray
brown; fine to coarse sand; fine to coarse, rounded to
subangular gravel.
SILT (MH); soft to medium stiff, moist, blue gray; medium
plasticity.
Trace sand pockets.
Approximately 9-inch-thick stratum of sand with
iron-oxide staining and trace black organics.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
325
320
315
310
AB-07
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-07
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK634
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60' (Static)
Exploration Number
WaterLevelSheet 1 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
5
10
15
3/27/2021
Project Address & Site Specific Location
328.07'
Plastic Limit
47.4871, -122.1772
10 20 30 400 50
4
4
6
Bentonite chips 5-46
ft. bgs.
PID =1.6
Sheen =None
Odor =Slight
organic-like
PID =2.3
Sheen =None
Odor =NoneS1 SILT (MH); soft to medium stiff, moist, blue gray; medium
plasticity. (continued)
Becomes stiff
SILTY SAND WITH GRAVEL (SM); medium dense,
moist, gray brown; fine to coarse sand; fine to coarse,
rounded to angular gravel.
SILT (MH); stiff, moist, blue gray; medium plasticity.
SILTY SAND (SM); medium dense, moist, gray brown;
fine to coarse sand; trace fine to coarse, subrounded
gravel.
SILT (MH); stiff, moist, gray brown and blue gray;
medium plasticity; trace fine to coarse, rounded to
subangular gravel; trace sand pockets, trace roots, trace
iron-oxide staining.
Becomes blue gray; few black organics, brick piece.
SILT WITH SAND (ML); stiff, moist, blue gray; fine sand;
fine to coarse, rounded to subrounded gravel.
Piece of plastic bag, trace roots.
Gray brown zone with lower sand content.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
305
300
295
290
AB-07
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-07
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK634
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60' (Static)
Exploration Number
WaterLevelSheet 2 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
25
30
35
3/27/2021
Project Address & Site Specific Location
328.07'
Plastic Limit
47.4871, -122.1772
10 20 30 400 50
8
8
11
6 x 9 Colorado sand
46-56 ft. bgs.
0.02" slotted screen
48-53 ft. bgs.
1/5/2023: well dry
PID =0.6
Sheen =None
Odor =Slight
organic-like
AB-07-47.5
NWTPH-Dx;
NWTPH-Dx;
PAHs
PID =1.2
Sheen
=Slight
petroleum
Odor =Slight
organic-like
CEC =6.4
meq/100 g
GS OC=0.6%
FC=5.7%
PID =1.6
Sheen =None
Odor =Slight
organic-like
4/7/2021 S2S3 SILT WITH SAND (ML); stiff, moist, blue gray; fine sand;
fine to coarse, rounded to subrounded gravel. (continued)
Becomes very stiff; fine to coarse sand; trace to few fine
to coarse, rounded to subrounded gravel; few roots and
organics.
SILTY SAND (SM); medium dense to dense, moist, blue
gray; fine to coarse sand; few fine, subrounded to angular
gravel; trace iron-oxide staining.
SAND WITH SILT (SP-SM); medium dense to dense,
moist, blue gray; fine to coarse sand; fine to coarse,
rounded to angular gravel; woodchip.
SILT WITH SAND (ML); very stiff, moist, blue gray.
SAND WITH SILT (SP-SM); medium dense to dense,
moist, blue gray; fine to coarse sand; fine to coarse,
rounded to angular gravel.
Approximately 1-inch-thick stratum of dark brown
organics.
GLACIAL OUTWASH DEPOSITS (Qpa)
GRAVEL WITH SILT AND SAND (GP-GM); medium
dense to dense, dry to moist, light brown to brown yellow;
fine to coarse sand; fine to coarse gravel; few silt.
SILTY SAND (SM); medium dense to dense, moist,
brown; fine to coarse sand; trace to few fine, rounded to
subangular gravel; trace silt pockets, trace organics.
SAND WITH SILT (SP-SM); medium dense to dense,
moist, brown; fine sand.
SAND (SP); medium dense to dense, moist, brown; fine
sand, subtrace coarse sand; subtrace fine, subrounded
gravel; trace cm-scale silt laminations.
SAND WITH SILT (SP-SM); medium dense to dense, dry
to slightly moist, brown; fine sand.
SAND (SP); medium dense to dense, very moist to wet,
brown; fine to medium sand.
SAND WITH SILT (SP-SM); medium dense to dense,
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
285
280
275
270
AB-07
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-07
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK634
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
45
50
55
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60' (Static)
Exploration Number
WaterLevelSheet 3 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
45
50
55
3/27/2021
Project Address & Site Specific Location
328.07'
Plastic Limit
47.4871, -122.1772
10 20 30 400 50
13
18
18
Bentonite grout 56-67
ft. bgs.
6 x 9 Colorado sand
67-70 ft. bgs.
VW Piezometer
installed at 70 ft. bgs.
SN 2111525.
Diver SN DA079
installed at 70 ft. bgs.S4moist, gray brown; fine to medium sand; trace mm-scale
silt laminations.
SILTY SAND (SM); dense, very moist to wet, gray brown
and brown; fine to coarse sand; trace fine, subrounded
gravel.
SAND WITH SILT (SP-SM); dense, wet, gray brown to
brown; fine to medium sand; trace fine, subrounded to
subangular gravel; trace silt pockets.
SAND (SP); dense, wet, gray brown to brown; fine to
medium sand; trace silt pockets.
Bottom of exploration at 70 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
265
260
255
250
AB-07
Tests
Geoprobe 8140 LC
Sonic
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Grab sample
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer and Grab
Logged by: WEG
Approved by: ETB 3/16/2023
AB-07
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Corey
Ecology Well Tag No.
BNK634
SampleTypeElev.
(feet)
Static Water Level
Liquid Limit
Geotechnical Exploration Log
65
70
75
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
60' (Static)
Exploration Number
WaterLevelSheet 4 of 4
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
65
70
75
3/27/2021
Project Address & Site Specific Location
328.07'
Plastic Limit
47.4871, -122.1772
10 20 30 400 50
5
1
1
2
3
5
2
3
4
4
7
9
2
3
6
Backfilled with
bentonite chips.
Backfilled with sand.S1S2S3S4S5FILL
SANDY SILT WITH GRAVEL (ML); soft, moist,
gray-brown; low to medium plasticity silt; few, fine to
medium sand; fine to coarse, subangular to rounded
gravel; subtrace organics.
Becomes medium stiff.
SILT (ML); very stiff, moist, gray; low to medium plasticity
silt; trace, fine to medium sand; trace, fine to coarse,
subangular to rounded gravel; subtrace organics.
2-inch sand lense.
Becomes stiff.
SILTY SAND WITH GRAVEL (SM); medium dense,
moist, brown; fine to medium sand; fine to coarse,
subangular to rounded gravel.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
310
305
300
295
AB-08
Tests
Diedrich D-70 Turbo
8" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer; 140 lb hammer; 30" drop
Logged by: STM
Approved by: ETB 3/16/2023
AB-08
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 1 of 2
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
5
10
15
6/24/2022
Project Address & Site Specific Location
313.13'
Plastic Limit
47.4874, -122.1771
10 20 30 400 50
6
13
15
0
0
7
10
10
11
27
34
40S6S7S8S9 SILTY SAND WITH GRAVEL (SM); medium dense,
moist, brown; fine to medium sand; fine to coarse,
subangular to rounded gravel. (continued)
1-inch layer of low plasticity silt.
SANDY SILT WITH GRAVEL (ML); medium stiff, moist,
gray to dark gray; low to medium plasticity silt; fine to
coarse sand; fine to coarse, subangular to rounded gravel;
subtrace organics.
RECESSIONAL OUTWASH
SILTY SAND WITH GRAVEL (SM); medium dense,
moist, brown; fine to coarse sand; fine to coarse,
subangular to subrounded gravel.
Becomes very dense.
Bottom of exploration at 36.5 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
290
285
280
275
AB-08
Tests
Diedrich D-70 Turbo
8" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer; 140 lb hammer; 30" drop
Logged by: STM
Approved by: ETB 3/16/2023
AB-08
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 2 of 2
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
25
30
35
6/24/2022
Project Address & Site Specific Location
313.13'
Plastic Limit
47.4874, -122.1771
10 20 30 400 50
30
19
10
2
2
4
5
7
13
19
13
14
6
6
9
Flush mount
monument set in
concrete.
2-inch PVC in
concrete.
Drill chatter from 7 to
13-feet bgs.
Blows may be
overstated due to
gravel in smapler
shoe.
2-inch PVC in 3/8-inch
bentonite chips.S1S2S3S4S5FILL
GRAVEL WITH SILT AND SAND (GP-GM); medium
dense, slightly moist, brown; fine to coarse sand; fine to
coarse, angular to subrounded gravel.
Becomes loose and moist.
RECESSIONAL GLACIAL OUTWASH
GRAVEL WITH SAND (GW); medium dense, moist, gray
brown; trace to few silt; fine to coarse sand; fine to coarse
subrounded to rounded.
SAND WITH GRAVEL (SP); medium dense, moist, gray
brown; trace silt; fine to coarse sand; fine to coarse
subrounded to rounded gravel.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
330
325
320
315
AB-09
Tests
Diedrich D-50 Turbo
8.5" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Split Barrel 3" X 2.375"
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer/SPT and Modified California
Logged by: JBM
Approved by: ETB 3/16/2023
AB-09
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
Ecology Well Tag No.
BMT-318
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 1 of 3
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.2Top of Casing Elev.
5
10
15
5/17/2021
Project Address & Site Specific Location
333.28'
Plastic Limit
47.4873, -122.1775
10 20 30 400 50
9
10
12
10
8
9
10
10
9
12
13
11
2-inch PVC in 3/8-inch
bentonite chips.S6S7S8S9 SAND WITH GRAVEL (SP); medium dense, moist, gray
brown; trace silt; fine to coarse sand; fine to coarse
subrounded to rounded gravel. (continued)
SAND (SW); medium dense, moist, gray brown; trace
silt; fine to coarse sand; fine subrounded gravel.
SAND WITH GRAVEL (SW); dense, moist, gray brown;
trace silt; fine to coarse sand; fine to coarse rounded
gravel.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
310
305
300
295
AB-09
Tests
Diedrich D-50 Turbo
8.5" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Split Barrel 3" X 2.375"
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer/SPT and Modified California
Logged by: JBM
Approved by: ETB 3/16/2023
AB-09
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
Ecology Well Tag No.
BMT-318
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 2 of 3
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.2Top of Casing Elev.
25
30
35
5/17/2021
Project Address & Site Specific Location
333.28'
Plastic Limit
47.4873, -122.1775
10 20 30 400 50
2-inch PVC in 3/8-inch
bentonite chips.
2-inch PVC in 6x9
sand.
2-inch slotted PVC
screen in 6x9 sand.
Exploration backfilled
with 6x9 sand.
Blows
(non-SPT)
=12,24,25
Blows
(non-SPT)
=44,27,32
Blows
(non-SPT)
=27,29,26
PS OC=0.6%
FC=6.1%
CEC
Blows
(non-SPT)
=20,22,24
PS OC=0.4%
FC=7.4%
CECS10S11S12S13 SAND WITH GRAVEL (SW); dense, moist, gray brown;
trace silt; fine to coarse sand; fine to coarse rounded
gravel. (continued)
SAND WITH SILT (SW-SM); dense, moist, gray brown;
fine to medium sand; fine to coarse subrounded gravel.
SAND WITH SILT, GRAVEL, AND COBBLES (SP-SM);
dense, moist, gray brown; fine to medium sand; fine
subrounded gravel; few subrounded cobbles.
SAND WITH SILT (SP-SM); dense, moist, gray brown;
fine to medium sand; fine rounded gravel.
Bottom of exploration at 56.5 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
290
285
280
275
AB-09
Tests
Diedrich D-50 Turbo
8.5" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Split Barrel 3" X 2.375"
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer/SPT and Modified California
Logged by: JBM
Approved by: ETB 3/16/2023
AB-09
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
Ecology Well Tag No.
BMT-318
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
45
50
55
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 3 of 3
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.2Top of Casing Elev.
45
50
55
5/17/2021
Project Address & Site Specific Location
333.28'
Plastic Limit
47.4873, -122.1775
10 20 30 400 50
1
2
3
0
2
2
0
0
8
0
1
4
Backfilled with
bentonite chips.S1S2S3S4FILL
SILT (ML); medium stiff, moist, gray-brown; low to
medium plasticity silt; trace, fine to coarse, subangular to
rounded gravel; subtrace organics.
2-inch sand lense.
Becomes soft.
SANDY SILT (ML); medium stiff, moist, brown to
gray-brown; low to medium plasticity silt; trace, fine to
coarse sand; trace, fine to coarse, subangular to rounded
gravel; subtrace organics.
Becomes gray.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
310
305
300
295
AB-10
Tests
Diedrich D-70 Turbo
8" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer; 140 lb hammer; 30" drop
Logged by: STM
Approved by: ETB 3/16/2023
AB-10
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
SampleTypeElev.
(feet)
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
5
10
15
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 1 of 3
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
5
10
15
6/24/2022
Project Address & Site Specific Location
313.26'
Plastic Limit
47.4874, -122.1766
10 20 30 400 50
4
6
9
6
7
12
9
6
6
5
5
9
13
16
27
Backfilled with sand.S5S6S7S8S9 SANDY SILT (ML); medium stiff, moist, brown to
gray-brown; low to medium plasticity silt; trace, fine to
coarse sand; trace, fine to coarse, subangular to rounded
gravel; subtrace organics. (continued)
Becomes stiff.
SILTY SAND (SM); medium dense, moist, brown; fine to
coarse sand; trace, fine to coarse, subangular to rounded
gravel. Interbedded, 0.5-to-1-inch low plasticity, gray silt
with orange to black mottling.
ORGANIC SILT (OL); stiff, moist, dark gray to black; low
to medium plasticity silt; trace, fine to coarse, subangular
to rounded gravel.
RECESSIONAL OUTWASH
SILTY GRAVEL WITH SAND (GM); dense, moist, brown;
fine to coarse sand; fine to coarse, subangular to rounded
gravel.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
290
285
280
275
AB-10
Tests
Diedrich D-70 Turbo
8" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer; 140 lb hammer; 30" drop
Logged by: STM
Approved by: ETB 3/16/2023
AB-10
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
SampleTypeElev.
(feet)
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
25
30
35
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 2 of 3
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
25
30
35
6/24/2022
Project Address & Site Specific Location
313.26'
Plastic Limit
47.4874, -122.1766
10 20 30 400 50
13
13
18
22
36
50/5"
6/24/2022 S10S11 SAND WITH SILT (SP-SM); dense, moist, brown; fine to
coarse sand.
SILTY SAND WITH GRAVEL (SM); very dense, wet,
brown; fine to coarse sand; fine to coarse, subrounded to
rounded gravel.
Bottom of exploration at 46.5 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
270
265
260
255
AB-10
Tests
Diedrich D-70 Turbo
8" OD X 4.25" IDHollow-Stem Auger
Holocene Drilling
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Split Barrel 2" X 1.375" (SPT)
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Autohammer; 140 lb hammer; 30" drop
Logged by: STM
Approved by: ETB 3/16/2023
AB-10
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Eric
SampleTypeElev.
(feet)
Liquid Limit
Geotechnical Exploration Log
Water Level ATD
45
50
55
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
No Soil Sample Recovery
WaterLevelSheet 3 of 3
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
45
50
55
6/24/2022
Project Address & Site Specific Location
313.26'
Plastic Limit
47.4874, -122.1766
10 20 30 400 50
Backfilled with
excavated material.S1S2TOPSOIL
ORGANIC SILT WITH SAND (OL); loose, moist, dark
brown; fine to coarse sand; fine to coarse, subrounded to
subangular gravel; little roots.
RECESSIONAL OUTWASH
SAND (SP); loose, slightly moist, brown; fine to coarse
sand, trace organics.
SAND WITH SILT AND GRAVEL (SP-SM); medium
dense, slightly moist, light brown; fine to coarse sand; fine
to coarse, subangular to rounded gravel; trace organics.
Bottom of exploration at 4.5 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
337
336
335
334
333
AHA-01
Tests
Hand Auger
Hand tools
Aspect Consulting, LLC
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Grab sample
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Grab
Logged by: STM
Approved by: ETB 3/16/2023
AHA-01
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
STM
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
1
2
3
4
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
WaterLevelSheet 1 of 1
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
1
2
3
4
6/23/2022
Project Address & Site Specific Location
337.27'
Plastic Limit
47.4876, -122.1756
10 20 30 400 50
Backfilled with
excavated material.
TOPSOIL
ORGANIC SILT WITH SAND (OL); loose, moist, dark
brown; fine to coarse sand; fine to coarse, subrounded to
subangular gravel; little roots.
RECESSIONAL OUTWASH
SAND (SP); loose, slightly moist, brown; fine to coarse
sand, trace organics.
SILTY SAND WITH GRAVEL (SM); medium dense,
slightly moist, light brown; fine to coarse sand; fine to
coarse, subangular to rounded gravel.
Bottom of exploration at 4 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
337
336
335
334
333
AHA-02
Tests
Hand Auger
Hand tools
Aspect Consulting, LLC
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Grab
Logged by: STM
Approved by: ETB 3/16/2023
AHA-02
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
STM
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
1
2
3
4
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
WaterLevelSheet 1 of 1
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
1
2
3
4
6/23/2022
Project Address & Site Specific Location
337.35'
Plastic Limit
47.4876, -122.1756
10 20 30 400 50
Test pit backfilled with
excavated soil.
PIT conducted 8.25 ft.
bgs.
GS, MC, FC
FC=0.3%
GS, MC, FC
FC=0.1%S1S2S3S4Post-testTOPSOIL
ORGANIC SILT WITH SAND (OL); loose, moist, dark
brown; fine to coarse sand; few to little fine to coarse,
rounded to subangular gravel; concrete chunks; garbage;
trace roots.
RECESSIONAL GLACIAL OUTWASH
SAND (SP); medium dense, moist, gray to gray brown;
fine to coarse sand; trace fine to coarse, subangular to
rounded gravel; trace roots; approx. 1/2-inch-scale
cross-bedding; iron oxide staining.
GRAVEL WITH SAND (GP); medium dense, moist, gray
to gray brown; fine to coarse sand; fine to coarse, rounded
to subrounded gravel; trace roots; approx. inch-scale
cross-bedding; iron-oxide staining.
Bottom of exploration at 12.25 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
329
328
327
326
325
324
323
322
321
320
319
318
317
316
ATP-01
Tests
Cat 312E Excavator
Trackhoe
On Track Excavation, Inc.
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Grab sample
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Grab
Logged by: WEG
Approved by: ETB 3/16/2023
ATP-01
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Dexx
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
WaterLevelSheet 1 of 1
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.2Top of Casing Elev.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
4/6/2020 to 4/7/2020
Project Address & Site Specific Location
330' (est)
Plastic Limit
47.4876, -122.1775 (est)
10 20 30 400 50
Test pit backfilled with
excavated soil.
PIT conducted 7.3 ft.
bgs.
GS, MC, FC
FC=2.3%
GS, MC, FC
FC=2.2%S1S2S3S4Post-testTOPSOIL
GRAVELLY ORGANIC SILT WITH SAND (OL); loose,
moist, dark brown; fine to coarse sand; fine to coarse,
subrounded to subangular gravel; little roots.
FILL
SILTY SAND WITH GRAVEL (SM); medium dense,
moist, gray brown; fine to coarse sand; fine to coarse,
rounded to subangular gravel; gravel socketing; trace to
few roots.
GRAVEL WITH SAND (GP); medium dense, moist, gray
brown; fine to coarse sand; fine to coarse, rounded to
angular gravel; 3-inch-thick stratifications; sand pockets;
trace charcoal pieces.
GRAVEL WITH SAND (GW); medium dense, gray
brown; post-test sample.
Bottom of exploration at 10.3 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
334
333
332
331
330
329
328
327
326
325
324
323
322
321
ATP-02
Tests
Cat 312E Excavator
Trackhoe
On Track Excavation, Inc.
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Grab sample
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Grab
Logged by: WEG
Approved by: ETB 3/16/2023
ATP-02
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Dexx
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
1
2
3
4
5
6
7
8
9
10
11
12
13
14
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
WaterLevelSheet 1 of 1
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.2Top of Casing Elev.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
4/6/2020 to 4/7/2020
Project Address & Site Specific Location
335'
Plastic Limit
47.4850, -122.1753
10 20 30 400 50
Backfilled with
excavated material.S1S2S3TOPSOIL
ORGANIC SILT WITH SAND (OL); loose, moist, dark
brown; fine to coarse sand; fine to coarse, subrounded to
subangular gravel; little roots.
FILL
SILTY GRAVEL WITH SAND AND COBBLES (GM);
medium dense, slightly moist, brown; fine to coarse sand;
fine to coarse, subrounded to rounded gravel; trace to little
organics.
2-inch layer of organics - tree rootlets.
RECESSIONAL OUTWASH
SILTY GRAVEL WITH SAND AND COBBLES (GM);
medium dense to dense, slightly moist, brown; fine to
coarse sand; fine to coarse, subrounded to rounded gravel;
subtrace organics.
Bottom of exploration at 7.25 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
339
338
337
336
335
334
333
332
331
330
ATP-03
Tests
Mini-track
Trackhoe
Kelly's Excavating, Inc
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Grab sample
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Grab
Logged by: STM
Approved by: ETB 3/16/2023
ATP-03
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Pat
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
1
2
3
4
5
6
7
8
9
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
WaterLevelSheet 1 of 1
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
1
2
3
4
5
6
7
8
9
6/23/2022
Project Address & Site Specific Location
339.06'
Plastic Limit
47.4877, -122.1754
10 20 30 400 50
Backfilled with
excavated material.S1S2TOPSOIL
ORGANIC SILT WITH SAND (OL); loose, moist, brown;
fine to coarse sand; fine to coarse, subrounded to
subangular gravel; little roots.
FILL
SILTY GRAVEL WITH SAND AND COBBLES (GM);
dense, slightly moist, brown; fine to coarse sand; fine to
coarse, subangular to rounded gravel; trace to little
organics.
3-inch layer of tree rootlets and organics.
SILTY SAND WITH GRAVEL (SM); very dense, slightly
moist, light brown to brown; fine to coarse sand; fine to
coarse, subrounded to rounded gravel; trace organics.
1-inch layer of organics and tree rootlets.
GLACIAL TILL
SILTY SAND WITH GRAVEL (SM); very dense, slightly
moist, gray; fine to coarse sand; fine to coarse, subangular
to rounded gravel.
Bottom of exploration at 4 ft. bgs.
Operator Work Start/Completion Dates
Blows/foot
Water Content (%)
Equipment
Legend
Contractor
339
338
337
336
335
334
333
332
331
330
ATP-04
Tests
Mini-track
Trackhoe
Kelly's Excavating, Inc
Exploration Method(s)
See Exploration Log Key for explanation
of symbols
Sample
Type/ID
Depth to Water (Below GS)
Description
NA
Grab sample
No Water Encountered
Ground Surface Elev.
Exploration Notes and
Completion Details Blows/6"
Coordinates (Lat,Lon WGS84)
Grab
Logged by: STM
Approved by: ETB 3/16/2023
ATP-04
Monroe Avenue NE Storm System - 190398
Depth
(feet)
Material
Type
Pat
SampleTypeElev.
(feet)
No Water Encountered
Liquid Limit
Geotechnical Exploration Log
1
2
3
4
5
6
7
8
9
Monroe Ave. NE and NE 2nd St., Renton, WA 98056, See Figure 2
ExplorationLog
Exploration Number
WaterLevelSheet 1 of 1
Depth
(ft)
Sampling Method
NEW STANDARD EXPLORATION LOG TEMPLATE P:\GINTW\PROJECTS\190398 MONROE AVE. STORMWATER.GPJ March 16, 2023Review Stage:DRAFT Rev.1Top of Casing Elev.
1
2
3
4
5
6
7
8
9
6/23/2022
Project Address & Site Specific Location
339.17' (est)
Plastic Limit
47.4876, -122.1752 (est)
10 20 30 400 50
APPENDIX B
Laboratory Testing Results
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 DRAFT B-1
B. Laboratory Test Results
A laboratory testing program was developed to determine index and engineering
properties of materials at the Site. Soil samples used in the testing program were
collected from the soil borings. The tests performed and the procedures followed are
outlined below.
B.1 Soil Classification
Soil samples from the explorations were visually classified in the field and then taken to
our office, where the classifications were verified in a relatively controlled environment.
Field and laboratory observations include density/consistency, moisture condition, and
grain-size and plasticity estimates. The classifications of selected samples were checked
by grain-size analysis and plasticity index testing. Classifications were made in general
accordance with the Unified Soil Classification System (USCS), ASTM International
(ASTM) D2488.
B.2 Moisture-Content Determination
Moisture contents were determined for samples recovered in the explorations in general
accordance with ASTM D2216, as soon as possible following their arrival to the
laboratory. Moisture contents are shown on the exploration logs (Appendix A) and in this
appendix. Water-content determination was also completed as part of other tests
conducted and is shown with the results of those tests.
B.3 Grain-Size Analyses
Grain-size analysis was conducted in accordance with ASTM D6913 on selected soil
samples collected from the soil borings. The results of the tests are presented on the
boring logs and this appendix, plotting percent finer by weight versus grain size.
B.4 Cation Exchange Capacity
The cation exchange capacity (CEC) is the exchangeable cations that a soil can adsorb.
Units are milliequivalents (mEq) per 100 grams of soil. Soils with a CEC of 5 mEq at pH
7 will have a CEC less than 5 mEq when the pH is less than 7. The CEC of the treatment
soil must be equal to or greater than 5 mEq per 100 grams dry soil per U.S.
Environmental Protection Agency (EPA) Method 9081. The results of the tests are
presented in this appendix and a summary table is provided below.
ASPECT CONSULTING
B-2 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
Table B-1. Summary of Cation Exchange Capacity (CEC)
Boring ID Sample
Depth (ft)
CEC
mEq/100g
AB-03 50.0 4.1
AB-04 50.0 7.4
AB-05 53.9 6.7
AB-06 60.0 6.8
AB-07 60.0 6.4
AB-09 50.0 5.5
B.5 Percent Organic Content
Select subsurface soil samples were submitted for quantification of organic content by the
ASTM D2974 test method. This test method allows for the laboratory determination of
the percent of organic material (by weight) in a dried soil sample. Organic matter can
increase the sorptive capacity of the soil for some pollutants. A minimum of 1.0 percent
organic content is necessary for stormwater treatment.
The results of the tests are presented in this appendix for borings AB-03 through AB-07
and AB-09, and a summary table is provided below.
Table B-2. Summary of Percent Organic Content
Boring ID Sample Depth
(ft) Percent Organic Content
AB-03 50.0 0.4
AB-04 50.0 0.6
AB-05 53.9 0.6
AB-06 60.0 0.5
AB-07 60.0 0.6
AB-09 50.0 0.6
Date Revised:Date Sampled: November 23, 2020
Test(s) Performed:Test(s) Performed:
X
X
X
Respectfully Submitted,
NW Region Laboratory Manager
Client:
Sample #:
Date: December 4, 2020
Project:
Aspect Consulting, LLC
710 2nd Aven, Suite 550
Attn:
Sulfate SoundnessSieve Analysis
Materials Testing & Consulting, Inc.
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Test Results
Seattle, WA 98104
Bill Grimm
20B014-06
B20-1682
Project #:
Q.C. - Monroe Avenue StormwaterAddress:
As requested MTC, Inc. has performed the following test(s) on the sample referenced above. The testing was performed in accordance with current
applicable AASHTO or ASTM standards as indicated below. The results obtained in our laboratory were as follows below or on the attached pages:
Test Results
4.1 meq/100g
0.4%
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Visit our website: www.mtc-inc.net
Meghan Blodgett-Carrillo
If you have any questions concerning the test results, the procedures used, or if we can be of any further assistance please call on us at the number
below.
Rice Density
Proctor
Sand Equivalent
Fracture Count Cation Exchange Capacity
Please See Attached Report
WSDOT Degradation
Bulk Density & Voids
Atterberg Limits
Asphalt Extraction/Gradation
Moisture Content Organic Content
Specific Gravity, Coarse
Specific Gravity, Fine
Hydrometer Analysis
Project:Date Received:1-Dec-20
Project #:Sampled By:Client
Client:Date Tested:2-Dec-20
Source:Tested By:C. Kriss
Sample#:B20-1682
D(5) =0.133 mm % Gravel =0.0%Coeff. of Curvature, CC =1.01
Specifications D(10) =0.170 mm % Sand =96.8%Coeff. of Uniformity, CU =2.31
No Specs D(15) =0.192 mm % Silt & Clay =3.2%Fineness Modulus =2.02
Sample Meets Specs ?N/A D(30) =0.259 mm Liquid Limit =n/a Plastic Limit =n/a
D(50) =0.348 mm Plasticity Index =n/a Moisture %, as sampled =4.7%
D(60) =0.393 mm Sand Equivalent =n/a Req'd Sand Equivalent =
D(90) =1.524 mm Fracture %, 1 Face =n/a Req'd Fracture %, 1 Face =
Dust Ratio =1/21 Fracture %, 2+ Faces =n/a Req'd Fracture %, 2+ Faces =
Actual Interpolated
Cumulative Cumulative
Sieve Size Percent Percent Specs Specs
US Metric Passing Passing Max Min
12.00"300.00 100%100.0%0.0%
10.00"250.00 100%100.0%0.0%
8.00"200.00 100%100.0%0.0%
6.00"150.00 100%100.0%0.0%
4.00"100.00 100%100.0%0.0%
3.00"75.00 100%100.0%0.0%
2.50"63.00 100%100.0%0.0%
2.00"50.00 100%100%100.0%0.0%
1.75"45.00 100%100.0%0.0%
1.50"37.50 100%100.0%0.0%
1.25"31.50 100%100.0%0.0%
1.00"25.00 100%100%100.0%0.0%
3/4"19.00 100%100%100.0%0.0%
5/8"16.00 100%100.0%0.0%
1/2"12.50 100%100%100.0%0.0%
3/8"9.50 100%100%100.0%0.0%
1/4"6.30 100%100.0%0.0%
#4 4.75 100%100%100.0%0.0%
#8 2.36 100%100.0%0.0%
#10 2.00 100%100%100.0%0.0%
#16 1.18 83%100.0%0.0%
#20 0.850 76%100.0%0.0%
#30 0.600 71%100.0%0.0%
#40 0.425 67%67%100.0%0.0%
#50 0.300 39%100.0%0.0%
#60 0.250 28%100.0%0.0%
#80 0.180 12%100.0%0.0%
#100 0.150 6%6%100.0%0.0%
#140 0.106 4%100.0%0.0%
#170 0.090 4%100.0%0.0%
#200 0.075 3.2%3.2%100.0%0.0%
Copyright Spears Engineering & Technical Services PS, 1996-98
Comments:
Reviewed by:
Meghan Blodgett-Carrillo
AB-03, S11 @ 50 ft
ASTM D-2487 Unified Soils Classification System
ASTM D-2216, ASTM D-2419, ASTM D-4318, ASTM D-5821
SP, Poorly graded Sand
brown
Sample Color:
Q.C. - Monroe Avenue Stormwater
Materials Testing & Consulting, Inc.
Visit our website: www.mtc-inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Sieve Report
ASTM C-136, ASTM D-6913, ASTM C-117
20B014-06
Aspect Consulting, LLC
8"6"4"2"3"1½"1¼"10"1"¾"5/8"½"3/8"¼"#4#8#10#16#20#30#40#50#60#80#100#140#170#2000%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0010.0100.1001.00010.000100.000% Passing% PassingParticle Size (mm)
Grain Size Distribution
Sieve Sizes Max Specs Min Specs Sieve Results
MATERIALS TESTING
777 CHRYSLER DR
Burlington , WA 98233
Soil
12/3/2020
MONROE STORMWATER
B20-1682
AB-03 S-11 @ 50 ft
S20-24530
Date Received:
Grower:
Sampled By:
Field:
Laboratory #:
Test Results
Customer Account #:
Customer Sample ID:
Other Tests:
Organic Matter (LOI):0.4 %:
Ash %LOI 99.60 0 - 12
Cation Exchange meq/100gCEC 4.1 pH 1:1
E.C. 1:1 m.mhos/cm
Est Sat Paste E.C. m.mhos/cm
Effervescence
Lbs/Acre
Ammonium - N mg/kg
%Organic Matter W.B.ENR:
This is your Invoice #:Reviewed by: B.Thyssen, CP S20-24530 Account #:234500
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will repeat tests, but because of factors beyond our control
in sampling procedures and the inherent variability of soil, our liability is limited to the price of the tests. Recommendations are to be used as general
guides and should be modified for specific field conditions and situations. Note: "u" indicates that the element was analyzed for but not detected
Date Revised:Date Sampled:
Test(s) Performed:Test(s) Performed:
X
X Please See Attached Soilstest Reports
Respectfully Submitted,
WABO Supervising Laboratory Technician
Atterberg Limits
Asphalt Extraction/Gradation
Moisture Content
Specific Gravity, Coarse
Specific Gravity, Fine
Hydrometer Analysis
Proctor
Sand Equivalent
Fracture Count CEC&LOI
Please See Attached Reports
WSDOT Degradation
Bulk Density & Voids
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Visit our website: www.mtc-inc.net
Meghan Blodgett-Carrillo
If you have any questions concerning the test results, the procedures used, or if we can be of any further assistance please call on us at the number
below.
Rice Density
Materials Testing & Consulting, Inc.
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Test Results
Seatlle, WA 98104
Bill Grimm
April 16, 2021
20B014-06
B21-0455-0458
Project #:
Q.C. - Monroe Avenue StormwaterAddress:
As requested MTC, Inc. has performed the following test(s) on the sample referenced above. The testing was performed in accordance with current
applicable AASHTO or ASTM standards as indicated below. The results obtained in our laboratory were as follows below or on the attached pages:
Test Results
Client:
Sample #:
Date:
Project:
Aspect Consulting
710 2nd Ave, Suite 550
Attn:
Sulfate SoundnessSieve Analysis
3-24-21 through 3-27-21
Project:Date Received:12-Apr-21
Project #:Sampled By:Client
Client:Date Tested:14-Apr-21
Source:Tested By:C. Kriss
Sample#:B21-0455
D(5) =0.057 mm % Gravel =0.0%Coeff. of Curvature, CC =0.97
Specifications D(10) =0.130 mm % Sand =93.4%Coeff. of Uniformity, CU =4.24
No Specs D(15) =0.173 mm % Silt & Clay =6.6%Fineness Modulus =2.14
Sample Meets Specs ?N/A D(30) =0.264 mm Liquid Limit =n/a Plastic Limit =n/a
D(50) =0.385 mm Plasticity Index =n/a Moisture %, as sampled =2.8%
D(60) =0.551 mm Sand Equivalent =n/a Req'd Sand Equivalent =
D(90) =1.643 mm Fracture %, 1 Face =n/a Req'd Fracture %, 1 Face =
Dust Ratio =11/94 Fracture %, 2+ Faces =n/a Req'd Fracture %, 2+ Faces =
Actual Interpolated
Cumulative Cumulative
Sieve Size Percent Percent Specs Specs
US Metric Passing Passing Max Min
12.00"300.00 100%100.0%0.0%
10.00"250.00 100%100.0%0.0%
8.00"200.00 100%100.0%0.0%
6.00"150.00 100%100.0%0.0%
4.00"100.00 100%100.0%0.0%
3.00"75.00 100%100.0%0.0%
2.50"63.00 100%100.0%0.0%
2.00"50.00 100%100.0%0.0%
1.75"45.00 100%100.0%0.0%
1.50"37.50 100%100.0%0.0%
1.25"31.50 100%100.0%0.0%
1.00"25.00 100%100.0%0.0%
3/4"19.00 100%100.0%0.0%
5/8"16.00 100%100.0%0.0%
1/2"12.50 100%100%100.0%0.0%
3/8"9.50 100%100%100.0%0.0%
1/4"6.30 100%100.0%0.0%
#4 4.75 100%100%100.0%0.0%
#8 2.36 100%100.0%0.0%
#10 2.00 100%100%100.0%0.0%
#16 1.18 77%100.0%0.0%
#20 0.850 68%100.0%0.0%
#30 0.600 61%100.0%0.0%
#40 0.425 57%57%100.0%0.0%
#50 0.300 36%100.0%0.0%
#60 0.250 28%100.0%0.0%
#80 0.180 16%100.0%0.0%
#100 0.150 11%11%100.0%0.0%
#140 0.106 9%100.0%0.0%
#170 0.090 8%100.0%0.0%
#200 0.075 6.6%6.6%100.0%0.0%
Copyright Spears Engineering & Technical Services PS, 1996-98
Comments:
Reviewed by:
Meghan Blodgett-Carrillo
Materials Testing & Consulting, Inc.
Visit our website: www.mtc-inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Sieve Report
ASTM C-136, ASTM D-6913, ASTM C-117
20B014-06
Aspect Consulting
AB-04, S5B @ 50 ft
ASTM D-2487 Unified Soils Classification System
ASTM D-2216, ASTM D-2419, ASTM D-4318, ASTM D-5821
SP-SM, Poorly graded Sand with Silt
brown
Sample Color:
Q.C. - Monroe Avenue Stormwater
8"6"4"2"3"1½"1¼"10"1"¾"5/8"½"3/8"¼"#4#8#10#16#20#30#40#50#60#80#100#140#170#2000%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0010.0100.1001.00010.000100.000% Passing% PassingParticle Size (mm)
Grain Size Distribution
Sieve Sizes Max Specs Min Specs Sieve Results
MATERIALS TESTING
777 CHRYSLER DR
Burlington , WA 98233
4/14/2021
Soil
21B077-09-QC
B21-0455 AB-04 S5B AT 50F
S21-06462
Date Received:
Grower:
Sampled By:
Field:
Laboratory #:
Test Results
Customer Account #:
Customer Sample ID:
Other Tests:
.6Organic Matter (LOI 360)%:
Cation Exchange meq/100gCEC 7.4 pH 1:1
E.C. 1:1 m.mhos/cm
Est Sat Paste E.C. m.mhos/cm
Effervescence
Lbs/Acre
Ammonium - N mg/kg
%Organic Matter W.B.ENR:
This is your Invoice #:Reviewed by: K. Bair, PhD, C S21-06462 Account #:234500
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will repeat tests, but because of factors beyond our control
in sampling procedures and the inherent variability of soil, our liability is limited to the price of the tests. Recommendations are to be used as general
guides and should be modified for specific field conditions and situations. Note: "u" indicates that the element was analyzed for but not detected
Project:Date Received:12-Apr-21
Project #:Sampled By:Client
Client:Date Tested:14-Apr-21
Source:Tested By:C. Kriss
Sample#:B21-0456
D(5) =0.170 mm % Gravel =62.9%Coeff. of Curvature, CC =0.97
Specifications D(10) =0.277 mm % Sand =34.3%Coeff. of Uniformity, CU =47.52
No Specs D(15) =0.383 mm % Silt & Clay =2.7%Fineness Modulus =5.49
Sample Meets Specs ?N/A D(30) =1.879 mm Liquid Limit =n/a Plastic Limit =n/a
D(50) =8.891 mm Plasticity Index =n/a Moisture %, as sampled =2.7%
D(60) =13.141 mm Sand Equivalent =n/a Req'd Sand Equivalent =
D(90) =23.937 mm Fracture %, 1 Face =n/a Req'd Fracture %, 1 Face =
Dust Ratio =9/56 Fracture %, 2+ Faces =n/a Req'd Fracture %, 2+ Faces =
Actual Interpolated
Cumulative Cumulative
Sieve Size Percent Percent Specs Specs
US Metric Passing Passing Max Min
12.00"300.00 100%100.0%0.0%
10.00"250.00 100%100.0%0.0%
8.00"200.00 100%100.0%0.0%
6.00"150.00 100%100.0%0.0%
4.00"100.00 100%100.0%0.0%
3.00"75.00 100%100.0%0.0%
2.50"63.00 100%100.0%0.0%
2.00"50.00 100%100%100.0%0.0%
1.75"45.00 99%100.0%0.0%
1.50"37.50 97%100.0%0.0%
1.25"31.50 95%100.0%0.0%
1.00"25.00 94%94%100.0%0.0%
3/4"19.00 73%73%100.0%0.0%
5/8"16.00 66%100.0%0.0%
1/2"12.50 59%59%100.0%0.0%
3/8"9.50 52%52%100.0%0.0%
1/4"6.30 42%100.0%0.0%
#4 4.75 37%37%100.0%0.0%
#8 2.36 32%100.0%0.0%
#10 2.00 31%31%100.0%0.0%
#16 1.18 24%100.0%0.0%
#20 0.850 21%100.0%0.0%
#30 0.600 19%100.0%0.0%
#40 0.425 17%17%100.0%0.0%
#50 0.300 11%100.0%0.0%
#60 0.250 9%100.0%0.0%
#80 0.180 5%100.0%0.0%
#100 0.150 4%4%100.0%0.0%
#140 0.106 3%100.0%0.0%
#170 0.090 3%100.0%0.0%
#200 0.075 2.7%2.7%100.0%0.0%
Copyright Spears Engineering & Technical Services PS, 1996-98
Comments:
Reviewed by:
Meghan Blodgett-Carrillo
Materials Testing & Consulting, Inc.
Visit our website: www.mtc-inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Sieve Report
ASTM C-136, ASTM D-6913, ASTM C-117
20B014-06
Aspect Consulting
AB-05, S3 @ 53.9 ft
ASTM D-2487 Unified Soils Classification System
ASTM D-2216, ASTM D-2419, ASTM D-4318, ASTM D-5821
GP, Poorly graded Gravel with Sand
brown
Sample Color:
Q.C. - Monroe Avenue Stormwater
8"6"4"2"3"1½"1¼"10"1"¾"5/8"½"3/8"¼"#4#8#10#16#20#30#40#50#60#80#100#140#170#2000%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0010.0100.1001.00010.000100.000% Passing% PassingParticle Size (mm)
Grain Size Distribution
Sieve Sizes Max Specs Min Specs Sieve Results
MATERIALS TESTING
777 CHRYSLER DR
Burlington , WA 98233
4/14/2021
Soil
21B077-09-QC
B21-0456 AB-05 S3 AT 53.9
S21-06463
Date Received:
Grower:
Sampled By:
Field:
Laboratory #:
Test Results
Customer Account #:
Customer Sample ID:
Other Tests:
.6Organic Matter (LOI 360)%:
Cation Exchange meq/100gCEC 6.7 pH 1:1
E.C. 1:1 m.mhos/cm
Est Sat Paste E.C. m.mhos/cm
Effervescence
Lbs/Acre
Ammonium - N mg/kg
%Organic Matter W.B.ENR:
This is your Invoice #:Reviewed by: K. Bair, PhD, C S21-06463 Account #:234500
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will repeat tests, but because of factors beyond our control
in sampling procedures and the inherent variability of soil, our liability is limited to the price of the tests. Recommendations are to be used as general
guides and should be modified for specific field conditions and situations. Note: "u" indicates that the element was analyzed for but not detected
Project:Date Received:12-Apr-21
Project #:Sampled By:Client
Client:Date Tested:14-Apr-21
Source:Tested By:C. Kriss
Sample#:B21-0457
D(5) =0.132 mm % Gravel =4.8%Coeff. of Curvature, CC =1.08
Specifications D(10) =0.213 mm % Sand =91.7%Coeff. of Uniformity, CU =5.82
No Specs D(15) =0.282 mm % Silt & Clay =3.5%Fineness Modulus =3.06
Sample Meets Specs ?N/A D(30) =0.534 mm Liquid Limit =n/a Plastic Limit =n/a
D(50) =1.004 mm Plasticity Index =n/a Moisture %, as sampled =15.6%
D(60) =1.239 mm Sand Equivalent =n/a Req'd Sand Equivalent =
D(90) =1.943 mm Fracture %, 1 Face =n/a Req'd Fracture %, 1 Face =
Dust Ratio =5/36 Fracture %, 2+ Faces =n/a Req'd Fracture %, 2+ Faces =
Actual Interpolated
Cumulative Cumulative
Sieve Size Percent Percent Specs Specs
US Metric Passing Passing Max Min
12.00"300.00 100%100.0%0.0%
10.00"250.00 100%100.0%0.0%
8.00"200.00 100%100.0%0.0%
6.00"150.00 100%100.0%0.0%
4.00"100.00 100%100.0%0.0%
3.00"75.00 100%100.0%0.0%
2.50"63.00 100%100.0%0.0%
2.00"50.00 100%100%100.0%0.0%
1.75"45.00 100%100.0%0.0%
1.50"37.50 100%100.0%0.0%
1.25"31.50 100%100.0%0.0%
1.00"25.00 100%100%100.0%0.0%
3/4"19.00 98%98%100.0%0.0%
5/8"16.00 97%100.0%0.0%
1/2"12.50 97%97%100.0%0.0%
3/8"9.50 97%97%100.0%0.0%
1/4"6.30 96%100.0%0.0%
#4 4.75 95%95%100.0%0.0%
#8 2.36 93%100.0%0.0%
#10 2.00 92%92%100.0%0.0%
#16 1.18 58%100.0%0.0%
#20 0.850 43%100.0%0.0%
#30 0.600 33%100.0%0.0%
#40 0.425 25%25%100.0%0.0%
#50 0.300 16%100.0%0.0%
#60 0.250 13%100.0%0.0%
#80 0.180 8%100.0%0.0%
#100 0.150 5%5%100.0%0.0%
#140 0.106 4%100.0%0.0%
#170 0.090 4%100.0%0.0%
#200 0.075 3.5%3.5%100.0%0.0%
Copyright Spears Engineering & Technical Services PS, 1996-98
Comments:
Reviewed by:
Meghan Blodgett-Carrillo
AB-06, S3 @ 60 ft
ASTM D-2487 Unified Soils Classification System
ASTM D-2216, ASTM D-2419, ASTM D-4318, ASTM D-5821
SP, Poorly graded Sand
grayish-brown
Sample Color:
Q.C. - Monroe Avenue Stormwater
Materials Testing & Consulting, Inc.
Visit our website: www.mtc-inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Sieve Report
ASTM C-136, ASTM D-6913, ASTM C-117
20B014-06
Aspect Consulting
8"6"4"2"3"1½"1¼"10"1"¾"5/8"½"3/8"¼"#4#8#10#16#20#30#40#50#60#80#100#140#170#2000%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0010.0100.1001.00010.000100.000% Passing% PassingParticle Size (mm)
Grain Size Distribution
Sieve Sizes Max Specs Min Specs Sieve Results
MATERIALS TESTING
777 CHRYSLER DR
Burlington , WA 98233
4/14/2021
Soil
21B077-09-QC
B21-0457 AB-06 S3 AT 60FT
S21-06464
Date Received:
Grower:
Sampled By:
Field:
Laboratory #:
Test Results
Customer Account #:
Customer Sample ID:
Other Tests:
.5Organic Matter (LOI 360)%:
Cation Exchange meq/100gCEC 6.8 pH 1:1
E.C. 1:1 m.mhos/cm
Est Sat Paste E.C. m.mhos/cm
Effervescence
Lbs/Acre
Ammonium - N mg/kg
%Organic Matter W.B.ENR:
This is your Invoice #:Reviewed by: K. Bair, PhD, C S21-06464 Account #:234500
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will repeat tests, but because of factors beyond our control
in sampling procedures and the inherent variability of soil, our liability is limited to the price of the tests. Recommendations are to be used as general
guides and should be modified for specific field conditions and situations. Note: "u" indicates that the element was analyzed for but not detected
Project:Date Received:12-Apr-21
Project #:Sampled By:Client
Client:Date Tested:14-Apr-21
Source:Tested By:C. Kriss
Sample#:B21-0458
D(5) =0.066 mm % Gravel =49.7%Coeff. of Curvature, CC =0.48
Specifications D(10) =0.187 mm % Sand =44.6%Coeff. of Uniformity, CU =50.16
No Specs D(15) =0.277 mm % Silt & Clay =5.7%Fineness Modulus =4.83
Sample Meets Specs ?N/A D(30) =0.914 mm Liquid Limit =n/a Plastic Limit =n/a
D(50) =4.587 mm Plasticity Index =n/a Moisture %, as sampled =2.3%
D(60) =9.374 mm Sand Equivalent =n/a Req'd Sand Equivalent =
D(90) =23.446 mm Fracture %, 1 Face =n/a Req'd Fracture %, 1 Face =
Dust Ratio =14/57 Fracture %, 2+ Faces =n/a Req'd Fracture %, 2+ Faces =
Actual Interpolated
Cumulative Cumulative
Sieve Size Percent Percent Specs Specs
US Metric Passing Passing Max Min
12.00"300.00 100%100.0%0.0%
10.00"250.00 100%100.0%0.0%
8.00"200.00 100%100.0%0.0%
6.00"150.00 100%100.0%0.0%
4.00"100.00 100%100.0%0.0%
3.00"75.00 100%100.0%0.0%
2.50"63.00 100%100.0%0.0%
2.00"50.00 100%100%100.0%0.0%
1.75"45.00 99%100.0%0.0%
1.50"37.50 97%100.0%0.0%
1.25"31.50 96%100.0%0.0%
1.00"25.00 95%95%100.0%0.0%
3/4"19.00 77%77%100.0%0.0%
5/8"16.00 72%100.0%0.0%
1/2"12.50 67%67%100.0%0.0%
3/8"9.50 60%60%100.0%0.0%
1/4"6.30 54%100.0%0.0%
#4 4.75 50%50%100.0%0.0%
#8 2.36 46%100.0%0.0%
#10 2.00 45%45%100.0%0.0%
#16 1.18 34%100.0%0.0%
#20 0.850 29%100.0%0.0%
#30 0.600 26%100.0%0.0%
#40 0.425 23%23%100.0%0.0%
#50 0.300 16%100.0%0.0%
#60 0.250 13%100.0%0.0%
#80 0.180 10%100.0%0.0%
#100 0.150 8%8%100.0%0.0%
#140 0.106 7%100.0%0.0%
#170 0.090 6%100.0%0.0%
#200 0.075 5.7%5.7%100.0%0.0%
Copyright Spears Engineering & Technical Services PS, 1996-98
Comments:
Reviewed by:
Meghan Blodgett-Carrillo
AB-07, S3 @ 48.25 ft
ASTM D-2487 Unified Soils Classification System
ASTM D-2216, ASTM D-2419, ASTM D-4318, ASTM D-5821
GP-GM, Poorly graded Gravel with Silt and Sand
brown
Sample Color:
Q.C. - Monroe Avenue Stormwater
Materials Testing & Consulting, Inc.
Visit our website: www.mtc-inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Sieve Report
ASTM C-136, ASTM D-6913, ASTM C-117
20B014-06
Aspect Consulting
8"6"4"2"3"1½"1¼"10"1"¾"5/8"½"3/8"¼"#4#8#10#16#20#30#40#50#60#80#100#140#170#2000%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0010.0100.1001.00010.000100.000% Passing% PassingParticle Size (mm)
Grain Size Distribution
Sieve Sizes Max Specs Min Specs Sieve Results
MATERIALS TESTING
777 CHRYSLER DR
Burlington , WA 98233
Soil
4/14/2021
21B077-09-QC
B21-0458 AB-07 S2 AT 48.25
S21-06465
Date Received:
Grower:
Sampled By:
Field:
Laboratory #:
Test Results
Customer Account #:
Customer Sample ID:
Other Tests:
.6Organic Matter (LOI 360)%:
Cation Exchange meq/100gCEC 6.4 pH 1:1
E.C. 1:1 m.mhos/cm
Est Sat Paste E.C. m.mhos/cm
Effervescence
Lbs/Acre
Ammonium - N mg/kg
%Organic Matter W.B.ENR:
This is your Invoice #:Reviewed by: K. Bair, PhD, C S21-06465 Account #:234500
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will repeat tests, but because of factors beyond our control
in sampling procedures and the inherent variability of soil, our liability is limited to the price of the tests. Recommendations are to be used as general
guides and should be modified for specific field conditions and situations. Note: "u" indicates that the element was analyzed for but not detected
Date Revised:Date Sampled:
Test(s) Performed:Test(s) Performed:
X
X
Respectfully Submitted,
WABO Supervising Laboratory Technician
Client:
Sample #:
Date:
Project:
Aspect Consulting
710 2nd Ave, Suite 550
Attn:
Sulfate SoundnessSieve Analysis
May 17, 2021
Materials Testing & Consulting, Inc.
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Test Results
Seattle, WA 98104
Bodie McCosby
May 25, 2021
20B014-06
B21-0762-0763
Project #:
Q.C. - Monroe Avenue StormwaterAddress:
As requested MTC, Inc. has performed the following test(s) on the sample referenced above. The testing was performed in accordance with current
applicable AASHTO or ASTM standards as indicated below. The results obtained in our laboratory were as follows below or on the attached pages:
Test Results
Please See Attached Soilstest Reports
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Visit our website: www.mtc-inc.net
Meghan Blodgett-Carrillo
If you have any questions concerning the test results, the procedures used, or if we can be of any further assistance please call on us at the number below.
Rice Density
Proctor
Sand Equivalent
Fracture Count CEC & LOI
Please See Attached Reports
WSDOT Degradation
Bulk Density & Voids
Atterberg Limits
Asphalt Extraction/Gradation
Moisture Content
Specific Gravity, Coarse
Specific Gravity, Fine
Hydrometer Analysis
Project:Date Received:18-May-21
Project #:Sampled By:Client
Client:Date Tested:20-May-21
Source:Tested By:K. Mendez
Sample#:B21-0762
D(5) =0.061 mm % Gravel =30.1%Coeff. of Curvature, CC =0.40
Specifications D(10) =0.121 mm % Sand =63.8%Coeff. of Uniformity, CU =12.97
No Specs D(15) =0.168 mm % Silt & Clay =6.1%Fineness Modulus =3.30
Sample Meets Specs ?N/A D(30) =0.274 mm Liquid Limit =n/a Plastic Limit =n/a
D(50) =0.415 mm Plasticity Index =n/a Moisture %, as sampled =4.7%
D(60) =1.564 mm Sand Equivalent =n/a Req'd Sand Equivalent =
D(90) =14.114 mm Fracture %, 1 Face =n/a Req'd Fracture %, 1 Face =
Dust Ratio =7/59 Fracture %, 2+ Faces =n/a Req'd Fracture %, 2+ Faces =
Actual Interpolated
Cumulative Cumulative
Sieve Size Percent Percent Specs Specs
US Metric Passing Passing Max Min
12.00"300.00 100%100.0%0.0%
10.00"250.00 100%100.0%0.0%
8.00"200.00 100%100.0%0.0%
6.00"150.00 100%100.0%0.0%
4.00"100.00 100%100.0%0.0%
3.00"75.00 100%100.0%0.0%
2.50"63.00 100%100.0%0.0%
2.00"50.00 100%100%100.0%0.0%
1.75"45.00 100%100.0%0.0%
1.50"37.50 100%100.0%0.0%
1.25"31.50 100%100.0%0.0%
1.00"25.00 100%100%100.0%0.0%
3/4"19.00 99%99%100.0%0.0%
5/8"16.00 93%100.0%0.0%
1/2"12.50 87%87%100.0%0.0%
3/8"9.50 81%81%100.0%0.0%
1/4"6.30 74%100.0%0.0%
#4 4.75 70%70%100.0%0.0%
#8 2.36 64%100.0%0.0%
#10 2.00 63%63%100.0%0.0%
#16 1.18 57%100.0%0.0%
#20 0.850 55%100.0%0.0%
#30 0.600 53%100.0%0.0%
#40 0.425 51%51%100.0%0.0%
#50 0.300 34%100.0%0.0%
#60 0.250 27%100.0%0.0%
#80 0.180 17%100.0%0.0%
#100 0.150 13%13%100.0%0.0%
#140 0.106 9%100.0%0.0%
#170 0.090 7%100.0%0.0%
#200 0.075 6.1%6.1%100.0%0.0%
Copyright Spears Engineering & Technical Services PS, 1996-98
Comments:
Reviewed by:
Meghan Blodgett-Carrillo
AB-09, S-12 @ 50 ft
ASTM D-2487 Unified Soils Classification System
ASTM D-2216, ASTM D-2419, ASTM D-4318, ASTM D-5821
SP-SM, Poorly graded Sand with Silt and Gravel
brown
Sample Color:
Q.C. - Monroe Avenue Stormwater
Materials Testing & Consulting, Inc.
Visit our website: www.mtc-inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Sieve Report
ASTM C-136, ASTM D-6913, ASTM C-117
20B014-06
Aspect Consulting
8"6"4"2"3"1½"1¼"10"1"¾"5/8"½"3/8"¼"#4#8#10#16#20#30#40#50#60#80#100#140#170#2000%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0010.0100.1001.00010.000100.000% Passing% PassingParticle Size (mm)
Grain Size Distribution
Sieve Sizes Max Specs Min Specs Sieve Results
MATERIALS TESTING
777 CHRYSLER DR
Burlington , WA 98233
5/21/2021
Soil
20B014-06-QC-MONROE AV
B21-0762 AB-09 S12 AT 50F
S21-08841
Date Received:
Grower:
Sampled By:
Field:
Laboratory #:
Test Results
Customer Account #:
Customer Sample ID:
Other Tests:
.6Organic Matter (LOI 360)%:
Cation Exchange meq/100gCEC 5.5 pH 1:1
E.C. 1:1 m.mhos/cm
Est Sat Paste E.C. m.mhos/cm
Effervescence
Lbs/Acre
Ammonium - N mg/kg
%Organic Matter W.B.ENR:
This is your Invoice #:Reviewed by: K. Bair, PhD, C S21-08841 Account #:234500
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will repeat tests, but because of factors beyond our control
in sampling procedures and the inherent variability of soil, our liability is limited to the price of the tests. Recommendations are to be used as general
guides and should be modified for specific field conditions and situations. Note: "u" indicates that the element was analyzed for but not detected
Project:Date Received:18-May-21
Project #:Sampled By:Client
Client:Date Tested:20-May-21
Source:Tested By:K. Mendez
Sample#:B21-0763
D(5) =0.050 mm % Gravel =0.3%Coeff. of Curvature, CC =1.31
Specifications D(10) =0.092 mm % Sand =92.3%Coeff. of Uniformity, CU =3.51
No Specs D(15) =0.125 mm % Silt & Clay =7.4%Fineness Modulus =1.49
Sample Meets Specs ?N/A D(30) =0.197 mm Liquid Limit =n/a Plastic Limit =n/a
D(50) =0.280 mm Plasticity Index =n/a Moisture %, as sampled =10.9%
D(60) =0.322 mm Sand Equivalent =n/a Req'd Sand Equivalent =
D(90) =0.998 mm Fracture %, 1 Face =n/a Req'd Fracture %, 1 Face =
Dust Ratio =3/34 Fracture %, 2+ Faces =n/a Req'd Fracture %, 2+ Faces =
Actual Interpolated
Cumulative Cumulative
Sieve Size Percent Percent Specs Specs
US Metric Passing Passing Max Min
12.00"300.00 100%100.0%0.0%
10.00"250.00 100%100.0%0.0%
8.00"200.00 100%100.0%0.0%
6.00"150.00 100%100.0%0.0%
4.00"100.00 100%100.0%0.0%
3.00"75.00 100%100.0%0.0%
2.50"63.00 100%100.0%0.0%
2.00"50.00 100%100%100.0%0.0%
1.75"45.00 100%100.0%0.0%
1.50"37.50 100%100.0%0.0%
1.25"31.50 100%100.0%0.0%
1.00"25.00 100%100%100.0%0.0%
3/4"19.00 100%100%100.0%0.0%
5/8"16.00 100%100.0%0.0%
1/2"12.50 100%100%100.0%0.0%
3/8"9.50 100%100%100.0%0.0%
1/4"6.30 100%100.0%0.0%
#4 4.75 100%100%100.0%0.0%
#8 2.36 100%100.0%0.0%
#10 2.00 99%99%100.0%0.0%
#16 1.18 92%100.0%0.0%
#20 0.850 89%100.0%0.0%
#30 0.600 86%100.0%0.0%
#40 0.425 85%85%100.0%0.0%
#50 0.300 55%100.0%0.0%
#60 0.250 43%100.0%0.0%
#80 0.180 26%100.0%0.0%
#100 0.150 19%19%100.0%0.0%
#140 0.106 12%100.0%0.0%
#170 0.090 10%100.0%0.0%
#200 0.075 7.4%7.4%100.0%0.0%
Copyright Spears Engineering & Technical Services PS, 1996-98
Comments:
Reviewed by:
Meghan Blodgett-Carrillo
Materials Testing & Consulting, Inc.
Visit our website: www.mtc-inc.net
All results apply only to actual locations and materials tested. As a mutual protection to clients, the public and ourselves, all reports are submitted as the confidential property of clients, and authorization for publication of statements, conclusions or extracts from or regarding our reports is reserved pending our written approval.
Corporate ~ 777 Chrysler Drive • Burlington, WA 98233 • Phone (360) 755-1990 • Fax (360) 755-1980
Regional Offices: Olympia ~ 360.534.9777 Bellingham ~ 360.647.6111 Silverdale ~ 360.698.6787 Tukwila ~ 206.241.1974
Geotechnical Engineering • Special Inspection • Materials Testing • Environmental Consulting
Sieve Report
ASTM C-136, ASTM D-6913, ASTM C-117
20B014-06
Aspect Consulting
AB-09, S-13 @ 55 ft
ASTM D-2487 Unified Soils Classification System
ASTM D-2216, ASTM D-2419, ASTM D-4318, ASTM D-5821
SP-SM, Poorly graded Sand with Silt
brown
Sample Color:
Q.C. - Monroe Avenue Stormwater
8"6"4"2"3"1½"1¼"10"1"¾"5/8"½"3/8"¼"#4#8#10#16#20#30#40#50#60#80#100#140#170#2000%
10%
20%
30%
40%
50%
60%
70%
80%
90%
100%
0.0%
10.0%
20.0%
30.0%
40.0%
50.0%
60.0%
70.0%
80.0%
90.0%
100.0%
0.0010.0100.1001.00010.000100.000% Passing% PassingParticle Size (mm)
Grain Size Distribution
Sieve Sizes Max Specs Min Specs Sieve Results
MATERIALS TESTING
777 CHRYSLER DR
Burlington , WA 98233
5/21/2021
Soil
20B014-06-QC-MONROE AV
B21-0763 AB-09 S13 AT 55F
S21-08842
Date Received:
Grower:
Sampled By:
Field:
Laboratory #:
Test Results
Customer Account #:
Customer Sample ID:
Other Tests:
.4Organic Matter (LOI 360)%:
Cation Exchange meq/100gCEC 4.7 pH 1:1
E.C. 1:1 m.mhos/cm
Est Sat Paste E.C. m.mhos/cm
Effervescence
Lbs/Acre
Ammonium - N mg/kg
%Organic Matter W.B.ENR:
This is your Invoice #:Reviewed by: K. Bair, PhD, C S21-08842 Account #:234500
We make every effort to provide an accurate analysis of your sample. For reasonable cause we will repeat tests, but because of factors beyond our control
in sampling procedures and the inherent variability of soil, our liability is limited to the price of the tests. Recommendations are to be used as general
guides and should be modified for specific field conditions and situations. Note: "u" indicates that the element was analyzed for but not detected
APPENDIX C
Borehole Infiltration Testing
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 DRAFT C-1
C. Borehole Infiltration Testing
Aspect completed 3 days of borehole infiltration tests (BIT) in April and May of 2021
following methods for the deep borehole infiltration tests described in USBR’s
Procedure for Performing Field Permeability Testing by the Well Permeameter Method
(USBR,1989). The purpose of these BITs was to provide long-term infiltration rates
(LTIRs) for design of stormwater management facilities in accordance with City of
Renton’s Surface Water Design Manual (City, 2022).
C.1 Methodology
Infiltration Testing Field Methods
Monitoring/test wells were constructed for the BIT and screen intervals were designed to
target infiltration depths of the proposed facility elevation. Below the screen interval of
each well, transducers and vibrating-wire piezometers were installed to monitor
groundwater levels. Well construction details are presented in Table 1 of this report.
Water was supplied from a nearby hydrant and conveyed to the test wells using a fire
hose equipped with in-line flow meters.
Each flow meter was connected to an electronic datalogger that recorded totalized
volume, and pressure transducers were used to record the depth of water for the duration
of the test. Water was turned on at each test well and the flow rate was adjusted using
gate-valves until a rate was achieved such that each pit was able to hold a constant head
near the top of the screen or testing elevation. At each well, a constant head was
maintained to the extent possible for at least 4 hours of the total required 6-hour soak
period. After constant head and soaking period were complete, water was turned off and
the falling-head test was conducted, until the well had completely drained.
Infiltration Testing Analysis Methods
The recommended analysis method assumes that the infiltration rate scales roughly
linearly with head on the infiltration surface. Based on Darcy’s law, this is a reasonable
assumption, which is also embedded in Ecology accepted hydrologic models (WWHM
and MGS Flood both include a depth dependent infiltration rate option for sizing
infiltration BMPs, which scales the infiltration rate based on water depth in the
infiltration facility).
Borehole/Well Permeameter Tests Measured Depth Dependent Infiltration
Rate
Aspect calculated the average infiltration rate during the constant head phase of the test
by dividing the constant flowrate by the infiltration surface area (which is equal to the
sidewall area of the borehole within the screen zone). Since the borehole has a relatively
small diameter, the bottom of the borehole was neglected. Since the constant-head water
level was maintained at the top of the screen zone, the depth-dependent infiltration rate
was calculated by dividing the constant rate by the average amount of head (in/hr/feet of
head).
ASPECT CONSULTING
C-2 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
Estimate Multi-Test Average Design Depth Dependent Infiltration Rate
Based on soil data and field observations, the BITs are interpreted to have been
conducted in a similar receptor soil as the previous pilot infiltration tests (PITs)
conducted in April 2020 (Aspect, 2020b). Therefore, the measured depth-dependent
infiltration rate for the PITs can be averaged with the measured depth-dependent
infiltration rates for the valid BITs. After averaging the BIT and PIT results, Aspect
calculated the average overall Design Depth Dependent Infiltration rate (in/hr/ft of head)
by applying correction factors in conformance with Ecology’s Stormwater Manual for
Western Washington (Ecology, 2019).
Adjust Average Design Depth Dependent Infiltration Rate for BMP Design
Infiltration BMP designers have two options to account for infiltration when sizing
infiltration facilities:
1. Use the design depth dependent rate and use a method that adjusts the infiltration rate
depending on water depth in the infiltration receptor soil.
2. Use a constant infiltration rate, calculated from the design depth dependent rate and
the average head (depth of water) on the infiltration surface in the BMP during the
filling cycle.
Based on discussions with Otak, the designer will use the second approach for designing
the flow control facility. Therefore, we estimate the constant design infiltration rate for
the expected average head on the infiltration surface in the BMP. Since the selected BMP
relies primarily on the bottom surface area for infiltration, the average head during the
filling cycle will be half of the total expected head.
The Design Depth Dependent Infiltration Rate was then multiplied by one-half the
maximum BMP water depth (designed at 20 feet of head for this project) to calculate the
recommended constant design infiltration rate for the flow control facility. For cases
when the calculated constant design infiltration rate exceeds the City’s allowable
maximum rate (20 in/hr), then the City’s allowable maximum rate was used for BMP
sizing.
C.2 Results
Infiltration test data for the BIT at AB-04 and AB-09 are shown on Figures C-1 and C-2,
respectively. Infiltration rates were calculated from the constant-head and falling-head
test data to confirm agreement between the two methods. Since both methods are in
general agreement, Aspect calculated the design infiltration rates using the results from
the constant-head test in each BIT as it is a closer approximation of the stormwater
infiltration facility processes.
The design infiltration rate, Idesign is computed using the following equation:
Idesign = Imeasured x Ftesting x Fgeometry x Fplugging (5-11)
ASPECT CONSULTING
190398 TASK 3.1.1.2D JULY 24, 2023 DRAFT C-3
Where:
Imeasured represents the constant-head test rate in inches per hour.
Ftesting represents a correction factor for the type of test that is conducted. For the
project, the value is 0.5 for large PIT.
Fgeometry accounts for the influence of facility geometry and depth to the water
table or impervious strata on the actual infiltration rate. Fgeometry must be between
0.25 and 1.0, as determined by the following equation:
Fgeometry = 4 D/W + 0.05 (5-12)
Where:
D = depth from the bottom of the proposed facility to the maximum wet-season
water table or nearest impervious layer, whichever is less.
W = width of the facility.
Using the above equation and facility geometry reported to Aspect by Otak, Fgeometry is
determined to be 0.76.
Fplugging accounts for reductions in infiltration rates over the long term due to plugging of
soils. For this project, it is interpreted to be 0.9 for medium sand.
Table C-1 below shows calculations for the design infiltration rate in each infiltration test
and key correction factors (City, 2022). The Design Infiltration Rate calculated for the
average planned BMP water depth is 320 in/hr at 10 ft of head. However, the maximum
infiltration rate allowable by the City is 20 in/hr and will be used as the recommended
design infiltration rate for BMP sizing.
ASPECT CONSULTING
C-4 FINAL 190398 TASK 3.1.1.2D JULY 24, 2023
Table C-1. Infiltration Test Summary and Results
AB-04 AB-09 ATP-011
Borehole Radius 0.50 0.35 7.8 X 5.3 ft
Constant Head 9.3 5.0 0.47 ft
Infiltration Area 29.3 11.1 41.5 ft²
Flowrate 60.3 7.0 105 gpm
Measured Ksat 198 60.7 139.6 in/hr
Normalized Ksat 42.5 24.3 297.1 in/hr/ftH
Average Normalized Ksat 121.3 in/hr/ftH
Ftesting 0.5 -
FGeometry 0.55 -
FPlugging 0.9 -
Ftesting X Fgeometry X Fplugging 0.25 -
Design Infiltration Rate 30 in/hr/ftH
Average BMP Water Depth 10 ftH
Design Infiltration Rate at Average
BMP Water Depth 302 in/hr
Max Allowable Rate 20 in/hr
Average Head =9.3Average Flow = 60.283301020304050607002468101214160.00 1.00 2.00 3.00 4.00 5.00 6.00 7.00Flowrate in gpmFeet of water above transducerElapsed time in hoursAB‐04 BITFlow RateAspect Consulting7/8/2021M:\City of Renton\Monroe Ave Stormwater\Data\Field Data\4.2021 BITs\BIT Results\Figure C‐1Hydrograph of BIT at AB‐04Phase 2 Geotechnical Evaluation Monroe Avenue NE Storm System Improvements, Renton, Washington
0123456789100123456789100 50 100 150 200 250 300 350 400Flowrate in gpmFeet of water above transducerElapsed time in minutesWater LevelFlow RateTop of Well ScreenAspect Consulting7/8/2021M:\City of Renton\Monroe Ave Stormwater\Data\Field Data\05.19.2021 AB‐09 BIT\Figure C‐2Hydrograph of BIT at AB‐09Phase 2 Geotechnical Evaluation Monroe Avenue NE Storm System Improvements, Renton, Washington
APPENDIX D
Slope Stability Analysis Results
WWAB-04Offset 85' WAB-04Offset 85' WAB-04Offset 85' WAB-06AB-06AB-07Offset 44' WAB-07Offset 44' WGlacial Outwash (SP, SP-SM, SM)Glacial Outwash (SP, SP-SM, SM)Fill (SM, ML, MH, CL)Fill (SM, ML, MH, CL)Reworked Stockpile Fill (SM, ML, MH, CL)Reworked Stockpile Fill (SM, ML, MH, CL)Water SurfacePhi (deg)Cohesion (psf)Strength TypeSat. Unit Weight (lbs/ft3)Unit Weight (lbs/ft3)ColorMaterial NameWater Surface2850Mohr‐Coulomb110105Reworked Fill (Stockpile)Water Surface3075Mohr‐Coulomb115110FillWater Surface360Mohr‐Coulomb135130Glacial Outwash AB-05Offset 40' W500450400350300250-50050100150200250300350400450APPENDIX:D-1REVIEWED BY:BY:JBMPROJECT NO.1903983/31/202390% Design Geotechnical ReportMonroe Avenue NE Storm System ImprovementsCity of Renton, WashingtonSlope Stability Analysis \\seafps\projects\BHAM\City of Renton\Monroe AveStormwater\Data\Analyses\SSA\2022.12.30 Monroe Ave SW.slmdSCALE: 1:650SLIDE 9.023Section A-A' - Proposed Facility ConditionsStatic
1.4551.7001.455WW1.4551.7001.455Safety Factor0.0000.2500.5000.7501.0001.2501.5001.7502.0002.2502.5002.7503.0003.2503.5003.7504.0004.2504.5004.7505.0005.2505.5005.7506.000+500450400350300250-50050100150200250300350400450APPENDIX:D-2REVIEWED BY:BY:JBMPROJECT NO.1903983/31/202390% Design Geotechnical ReportMonroe Avenue NE Storm System ImprovementsCity of Renton, WashingtonSlope Stability Analysis \\seafps\projects\BHAM\City of Renton\Monroe AveStormwater\Data\Analyses\SSA\2022.12.30 Monroe Ave SW.slmdSCALE: 1:650SLIDEINTERPRET 9.023Section A-A' - Proposed Facility ConditionsStatic
APPENDIX E
Stormwater Infiltration Facility
Section
275280285290295300305310315320325330335275280285290295300305310315320325330335310976ELEVATION = 289.5481011.5H:1V82H:1V12H:1V1182INFILTRATION ZONENON-INFILTRATION ZONEGRAVITY BLOCKWALL. SEE SHEETS604 FOR DETAILS95ELEVATION = 31511PERMANENT STORMWATER EASEMENTBOTTOM OF CHAMBERELEV=31593H:1V12EXCAVATED SLOPE BY OTHERS. SEE SHEET C201 FOR PLAN VIEWEXTENTS.TREATMENT VAULT, SEE SHEETS C413-C414 FOR DETAILS.INSTALL GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FORUNDERGROUND DRAINAGE, MODERATE SURVIVABILITY CLASS C PERWSDOT 9-33.2(1) AGAINST 2:1 EXISTING FILL CUT SLOPE AND BACKFILLEXCAVATED AREA WITH SELECT BORROW PER SPECIAL PROVISIONS2-03 AND COMPACT PER WSDOT STD. SPEC 2-03.3(14)C, METHOD A.INSTALL GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FORUNDERGROUND DRAINAGE, MODERATE SURVIVABILITY CLASS C PERWSDOT 9-33.2(1) AND BACKFILL EXCAVATED AREA WITH INFILTRATIONGRAVEL PER SPECIAL PROVISIONS 2-03 AND COMPACT PER WDSOT STD.SPEC 2-03.3(14)C, METHOD A.INSTALL GRAVEL BACKFILL FOR WALLS PER WSDOT STD. SPEC 9-03.12(2)OVER INFILTRATION FACILITY FROM TOE TO TOE OF PERIMETER SLOPES.COMPACT PER WSDOT STD. SPEC 2-03.3(14)C, METHOD C.CONSTRUCT STORMWATER INFILTRATION FACILITY PER DETAILS ONSHEET C310.PROVIDE MINIMUM OF 12 OF INFILTRATION GRAVEL, PER SPECIALPROVISION 7-06, ABOVE AND TO THE OUTSIDE OF INFILTRATIONCHAMBERS FOOTPRINT PER DETAILS ON SHEET C310.BACKFILL WITH GRAVEL BORROW PER WSDOT STD. SPEC 9-03.14(01),COMPACT PER WSDOT STD SPEC 2-03.3(14)C, METHOD B.PLACE 18-IN DEEP TOPSOIL TYPE A PER DETAIL ON SHEET L702.GRADE SLOPE AT MAXIMUM 4H:1V.INSTALL GEOTEXTILE FABRIC, NON-WOVEN GEOTEXTILE FORUNDERGROUND DRAINAGE, MODERATE SURVIVABILITY CLASS C PERWSDOT 9-33.2(1) AND BACKFILL EXCAVATED AREA WITHNON-INFILTRATION MATERIAL. NON-INFILTRATION MATERIAL SHALL MEETTHE GRADATION AND COMPACTION REQUIREMENTS IN SPECIALPROVISIONS 2-03.CONSTRUCT TREATMENT VAULT DRAIN PER DETAIL ON SHEET C414.CONSTRUCTION NOTES1STORMWATER INFILTRATION FACILITY SECTION AAC301C30215STORMWATER INFILTRATION FACILITY SECTIONR-412915H SCALE: 1 20
, V SCALE: 1 5
234567891011OTAK 33201.ASHEET:11241 WLOORZV RRDG NE, SXLWH 200RHGPRQG, WA 98052425.822.4446ZZZ.RWDN.FRP 2023 OTAK, INC.OF36DRAWING NO.PROJECT NUMBERREVISION COMMENTSNO.BYREVIEWDATEDESIGNERDRAWN BYCHECKED BYCDTTRGPORWWHG: JXO 14, 2023 - 3:24SP K:?PURMHFW?33200?33201A?CADD?ACAD?DZJ?C301A-C302A.GZJ LD\RXW NDPH: C302NW 1/4 OF SECTION 16, TOWNSHIP 23 NORTH, RANGE 5 EAST, W.M. LEGENDSELECT BORROW, PER PROJECT SPECIALPROVISIONSINFILTRATION GRAVEL, PER PROJECTSPECIAL PROVISIONSUNDISTURBED NATIVE MATERIALNON-INFILTRATION MATERIAL, PERPROJECT SPECIAL PROVISIONSPROPOSED PERMANENT EASEMENT LINETOPSOIL TYPE AGRAVEL BORROWGEOTEXTILE FABRIC, NON-WOVENGEOTEXTILE FOR UNDERGROUNDDRAINAGE, MODERATE SURVIVABILITYCLASS C PER WSDOT 9-33.2(1)EXISTING FILL MATERIALGRAVEL BACKFILL FOR WALLS12
Monroe Ave Infiltration Facility SP-61 Special Provisions
City of Renton
temporary striping, cleanup, etc. required to complete this item of Work in conformance with
the Contract Documents and the Manual on Uniform Traffic Control Devices (MUTCD) and
as directed by the Engineer and by the City’s Transportation Department. Also, included in
the contract price is the cost to furnish traffic control services and equipment for construction
surveying, staking, and as-built plans.
All adjustments to the Traffic Control Plan are considered incidental, and no additional
payment will be made for adjustments.
1-09.14(2)A7 Removal of Structures and Obstructions (Bid Items A7) – Lump Sum
Measurement and payment shall be per WSDOT Standard Specification 2-02.
All costs related to the removal and disposal of structures and obstructions including saw
cutting, excavation, backfilling, and temporary asphalt shall be considered incidental to and
included in other items unless designated as specific bid items in the proposal. If
pavements, sidewalks, or curbs lie within an excavation area and are not mentioned as
separate pay items, their removal will be paid for as part of the quantity removed in
excavation. If they are mentioned as a separate item in the proposal, they will be measured
and paid for as provided under Section 2-02.5, and will not be included in the quantity
calculated for excavation.
1-09.14(2)A8 Non-Infiltration Material Incl. Haul (Bid Item A8) – Cubic Yard
“Non-Infiltration Material Incl. Haul” shall be measured by the cubic yard.
For material imported from off-site, measurement by cubic yard will be made in the hauling
vehicle.
For suitable material borrowed from the existing on-site stockpile developed by others,
material will be measured in the position it occupied in the stockpile before the excavation
was performed. An original ground measurement will be taken using cross-section or digital
terrain modeling survey techniques. The second measurement will be a comparison of the
original cross-section of the stockpile with a cross-section of the stockpile area after the
second excavation is completed. Payment will not be made for onsite stockpiled material
used for non-infiltration zone backfill material unless it is approved as suitable material prior
to excavation by the Engineer. If unsuitable material from the existing onsite stockpile is
separated from the stockpile by the Contractor, the quantity of unsuitable material will be
deducted from the quantity of suitable material that is used for non-infiltration zone backfill.
No separate payment will be made for unsuitable material separated from the existing onsite
stockpile.
“Non-Infiltration Material Incl. Haul” shall conform to the gradation and requirements
presented in Section 2-03 of these Special Provisions.
“Non-Infiltration Material Incl. Haul” shall be paid per cubic yard. The unit Contract price per
cubic yard for “Non-Infiltration Material Incl. Haul” shall be full compensation for all costs
incurred for the excavation, loading, hauling, placing, and compacting of the material.
For further Description and Construction Requirements for “Non-Infiltration Material Incl.
Haul”, see Special Provisions 2-03.
Monroe Ave Infiltration Facility SP-85 Special Provisions
City of Renton
Removal of Structure and Obstruction shall include, but not be limited to:
· Cement Concrete sidewalk – 45 SY
· Curb/gutter – 84 LF
· Chain link fence – 50 LF
· Sawcutting – 150 LF
2-02.3 Construction Requirements
This Section is supplemented with the following:
2-02.3(3) Removal of Pavement, Sidewalks, Curbs, and Gutters
This Section is supplemented with the following:
Existing pavement shall be sawcut and removed at the locations shown on the Plans or as
approved by the Engineer. Removal shall be accomplished by making a neat longitudinal
vertical cut along the boundaries of the area to be removed. Care shall be taken during
removal so as not to damage any of the existing pavement to remain in place. Remaining
pavement damaged due to the Contractor’s operations shall be replaced by the Contractor,
to the satisfaction of the Engineer, at the Contractor’s expense.
When a construction joint is near removal limits, the joint may be used as the removal limit if
approved by the Engineer.
Add the following new section:
2-02.3(4) Removing Chain Link or Wire Fence
Where shown on the plans or as approved by the Engineer, the Contractor shall remove
existing chain link wood slat privacy fence. The Contractor shall remove fence posts
completely, including any concrete footings, and backfill the post holes with native material.
2-03 ROADWAY EXCAVATION AND EMBANKMENT
2-03.3 Construction Requirements
Delete Section 2-03.3(14)F Vacant and replace it with the following:
2-03.3(14)F Infiltration Gravel Incl. Haul
When required by the Plans or the Engineer, the Contractor shall use Infiltration Gravel
meeting the requirements of Section 9-03.16 to fill underneath the Stormwater Infiltration
Facility, fill as embedment gravel between chambers in the Stormwater Infiltration Facility,
and provide 1-foot of fill above the Stormwater Infiltration Facility chambers.
Infiltration Gravel shall be compacted according to the Plans.
Add the following new Section:
2-03.3(14)N Non-Infiltration Material Incl. Haul
Non-Infiltration Material Incl. Haul shall be placed to the south and east of the Gravity Block
Wall in both Stage 1 and Stage 2 of the project, as indicated in the Plans. Non-Infiltration
Material Incl. Haul shall be compacted per Compaction Requirements this section.
Gravel Backfill for Walls per WSDOT Standard Specification 9-03.12(2) will be suitable for
Non-Infiltration Material Incl. Haul.
In addition, the following materials may also be acceptable for Non-Infiltration Material Incl.
Haul, at the approval of the Engineer:
Monroe Ave Infiltration Facility SP-86 Special Provisions
City of Renton
1. Suitable material borrowed from existing onsite stockpile. As described in the
Geotechnical report, the existing onsite stockpile material developed by others may
be acceptable for Non-Infiltration Material under certain conditions and at the
approval of the Engineer. The embanked stockpiled material is moisture sensitive
and is not to be exposed, worked, nor placed during wet weather. The Contractor
shall submit a minimum 5-day weather forecast showing only dry conditions and a
placement schedule to the Engineer for approval for use of onsite stockpile material
as Non-Infiltration Material. The stockpile shall be protected from rain will plastic
tarping. The contractor shall maintain the tarping and stockpile during the period of
the project. If the weather forecast indicates any precipitation, the contractor shall
restore the tarping cover prior to the wet weather.
2. Suitable Crushed Surfacing Top Course and Quarry Spalls materials that are re-used
from the Temporary Construction Access Road and Temporary Slope Protection
BMPs, at the approval of the Engineer. These materials shall not be proposed by the
Contractor to be re-used until after the end of the wet-season, at a minimum.
Crushed Surfacing Top Course shall meet WSDOT Standard Specification 9-03.9(3).
Quarry Spalls shall meet WSDOT Standard Specification 9-03.9(3).
The Crushed Surfacing Top Course re-used as Non-Infiltration Material will be paid as a part
of the “Temporary Construction Access Road” bid item. The Quarry Spalls re-used as Non-
Infiltration Material will be paid as part of the “Temporary Slope Protection” bid item. No
additional payment will be made for the re-use of Crushed Surfacing Top Course and
Quarry Spalls materials as Non-Infiltration Material.
Compaction Requirements of Non-Infiltration Material Incl. Haul
The Compaction Requirements of Non-Infiltration Material Incl Haul varies based on the
Stage of the project.
Stage 1: The Placement and Compaction Requirements in Stage 1 is to place the material
in 2-foot lifts, and compact to 90% maximum dry density (MDD). Compaction is to be tested
by providing a proof roll (vibratory roller on static) to verify firm and unyielding conditions.
Stage 2: The Placement and Compaction requirement is to place the material in 2-foot lifts,
and compact to 95% maximum dry density (MDD). Compaction is to be tested by providing
a proof roll (vibratory roller on static) to verify firm and unyielding conditions.
END OF DIVISION 2
APPENDIX F
Report Limitations and
Guidelines for Use
ASPECT CONSULTING
REPORT LIMITATIONS AND GUIDELINES FOR
USE
Geoscience is Not Exact
The geoscience practices (geotechnical engineering, geology, and environmental science)
are far less exact than other engineering and natural science disciplines. It is important to
recognize this limitation in evaluating the content of the report. If you are unclear how
these "Report Limitations and Guidelines for Use" apply to your project or property, you
should contact Aspect Consulting, LLC (Aspect).
This Report and Project-Specific Factors
Aspect’s services are designed to meet the specific needs of our clients. Aspect has
performed the services in general accordance with our agreement (the Agreement) with
the Client (defined under the Limitations section of this project’s work product). This
report has been prepared for the exclusive use of the Client. This report should not be
applied for any purpose or project except the purpose described in the Agreement.
Aspect considered many unique, project-specific factors when establishing the Scope of
Work for this project and report. You should not rely on this report if it was:
• Not prepared for you;
• Not prepared for the specific purpose identified in the Agreement;
• Not prepared for the specific subject property assessed; or
• Completed before important changes occurred concerning the subject property,
project, or governmental regulatory actions.
If changes are made to the project or subject property after the date of this report, Aspect
should be retained to assess the impact of the changes with respect to the conclusions
contained in the report.
Reliance Conditions for Third Parties
This report was prepared for the exclusive use of the Client. No other party may rely on
the product of our services unless we agree in advance to such reliance in writing. This is
to provide our firm with reasonable protection against liability claims by third parties
with whom there would otherwise be no contractual limitations. Within the limitations of
scope, schedule, and budget, our services have been executed in accordance with our
Agreement with the Client and recognized geoscience practices in the same locality and
involving similar conditions at the time this report was prepared.
Property Conditions Change Over Time
This report is based on conditions that existed at the time the study was performed. The
findings and conclusions of this report may be affected by the passage of time, by events
such as a change in property use or occupancy, or by natural events, such as floods,
ASPECT CONSULTING
earthquakes, slope instability, or groundwater fluctuations. If any of the described events
may have occurred following the issuance of the report, you should contact Aspect so
that we may evaluate whether changed conditions affect the continued reliability or
applicability of our conclusions and recommendations.
Geotechnical, Geologic, and Environmental Reports Are
Not Interchangeable
The equipment, techniques, and personnel used to perform a geotechnical or geologic
study differ significantly from those used to perform an environmental study and vice
versa. For that reason, a geotechnical engineering or geologic report does not usually
address any environmental findings, conclusions, or recommendations (e.g., about the
likelihood of encountering underground storage tanks or regulated contaminants).
Similarly, environmental reports are not used to address geotechnical or geologic
concerns regarding the subject property.
We appreciate the opportunity to perform these services. If you have any questions,
please contact the Aspect Project Manager for this project.
Public Works Department
MONROE AVE NE INFILTRATION FACILITY
CAG-23-316
EASEMENTS
A) Temporary Construction Easement
B) Permanent Utility Easement
C) King County Special Use Permit
Public Works Department
MONROE AVE NE INFILTRATION FACILITY
CAG-23-316
EXISTING EASEMENT
A) TEMPORARY EASEMENT FOR SURFACE WATER DRAINAGE OVERFLOW
AND AGREEMENT
Instrument Number: 2018{1702[HM52 Uoeument:EAS Ree: 5103.00 Page -1 of 5
Record Datc:7/2/2018 12:41 PM
Electronically Recorded King County, WA EXCISE TAX NOT REQUIRED BY KAREN GREAGUR, DEPUTY
Return Address
City Clerk
City of Renton
1055 South Grady Way
Renton, WA 98057
Document Title(s) (or transactions contained therein):
Fourth Amendment to Temporary Easement for Surface Water Drainage Overflow and
Agreement
Reference Number(s) of Related Documents:
on page _of document)
139612120153;20064602001486;2007092$400176;20110322000779
Granter(s) (Last name first, then first name and initials):
Segale Properties LLC
Additional Grantor(s) on page 2
Grantee(s) (Last name first, then first name and initials):
City of Renton
Legal description (abbreviated. i.e. lot, Flock, plat or section, township, range):
Portions of Section 16, Township 23 North, Range 5
Full Legal Description on page 5 (Exhibit A)
Assessor's Property Tax Parcel/Account Number:
1623059059
24267-W30/138907429A Page I of 5
Instrument Number: 20180702000852 Document:EAS Rec: 8103.0{} Page -2 of 5
Record Date:7121201812:41 PM King County, WA
FOURTH AMENDMENT TO TEMPORARY EASEMENT FOR SURFACE WATER
DRAINAGE OVERFLOW AND AGREEMENT
THIS FOURTH AMENDMENT TO TEMPORARY EASEMENT FOR SURFACE
WATER DRAINAGE OVERFLOW AND AGREEMENT ("Amendment"), dated as of
3Ijn,L 2018 ("Effective Date"), is entered into by and between SEGALE
PROPERTIES LLC, a Washington Iimited liability company, successor by name change to LA
PIANTA LLC, a Washington limited liability company, and successor by merger with LA
PIANTA LIMITED PARTNERSHIP, ("Grantor"), and the City of Renton, a municipal
corporation ("Grantee").
RECITALS
A. Grantor and Grantee entered into that certain Temporary Easement for Surface
Water Drainage Overflow and Agreement, dated November 21, 1996 and recorded under
Recording No. 9612.120153, as amended by that certain Amendment to Temporary Easement for
Surface Water Drainage Overflow and Agreement, dated May 30, 2006 and recorded under
Recording No. 20060602001486 (the "First Amendment"), and that certain Second Amendment
to Temporary Easement for Surface Water Drainage Overflow and Agreement dated September
26, 2007 and recorded under Recording No. 20070928000176, (the "Second Amendment"), and
that certain Third Amendment to Temporary Easement for Surface Water Drainage Overflow and
Agreement dated October 29, 2010 and recorded under Recording No. 20110322000779
collectively, the "Agreement"), pursuant to which Grantor granted to Grantee certain rights for
the conveyance and discharge of surface water over Grantor's Property, as further described in the
Agreement. Capitalized terms used in this Amendment shall have the same meanings given them
in the Agreement unless stated otherwise.
B. Grantor is the owner of certain real property, (the "Property") located in the City of
Renton, King County, Washington and legally described on Exhibit A attached hereto.
C. The Agreement granted Grantee the right to make certain improvements within the
Easement Area to allow for the Temporary Overflow System to provide Permitted Drainage onto
the Property.
D. Grantee has constructed all necessary improvements within the Easement Area and
desire to continue using the Temporary Overflow System.
E. The parties hereby agree to amend the Agreement to allow Grantee to continue
using the Temporary Overflow System pursuant to the terms and conditions set forth below.
AGREEMENTS
I. Recitals. The terms of the recitals are incorporated herein.
24267-00301138907429.1 Page 2 of 5
Instrument Number: 20180702000852 Document:EAS Rec: S1030} Page -3 of 5
Record Date:7121201812:41 PM King County, WA
2. Term. The Agreement is hereby amended by deleting Section 3 in its entirety,
which was last amended in the Third Amendment, and substituting with the following:
3. TERM OF AGREEMENT. The Agreement shall be effective until five (5) years
from the Effective Date and shall automatically renew for successive five (5) year periods unless
within one hundred eighty (180) days from the expiration of the five year period then in -effect,
Grantor and Grantee mutually agree in writing to terminate this Agreement, in which case this
Agreement shall terminate at the expiration of the five year period then in -effect. Notwithstanding
the foregoing, this Agreement may terminate on a sooner date in the event that (i) the current pit
is filled to capacity and a new special use permit is required, or (ii) improvements have been made
to Grantee's existing storm sewer system which eliminates the need for the Temporary Overflow
System and this Agreement- Under no circumstances shall this Agreement and the easement rights
provided herein become permanent. Upon Grantor's request, Grantee shall execute and deliver to
Grantor an instrument in recordable form quit claiming and releasing to Grantor all rights and
reaffirming the survival of Grantee's obligations hereunder.
In the event Grantor receives a special use permit subsequent to the Special Use Permit
LUA10-056, ECF, SP, authorizing Grantor to continue to fijI1 Grantor's Property, and such special
use permit contains substantially the same rights as granted under LUA10-056, ECF, SP, this
Agreement shall be deemed immediately amended so that Grantee shall assume full responsibility
for all conditions imposed on Grantor in the process of obtaining said special use permit which
relate to or arise out of the rights granted to Grantee under the Agreement, or to storm water
monitoring and sampling and testing of storm water on the Property. At Grantor's request, Grantee
shall execute an amendment to this Agreement setting forth Grantor's obligations arising out of
such subsequently issued special use permit.
4. Value of Easement and Surface Water Utility Fees. Commencing on the Effective
Date and continuing during the term of this Agreement, and any renewal thereof, the Parties agree
that the value of the services provided by the Temporary Easement to the Grantee (City) is equal
to the amount of the Surface Water Utility Fees for Surface Water Utility services to Grantor's
Property Tax Parcel Identification Number 152305 9095, per the Renton Municipal Code (RMC)
8-2-3 utility billing rate category of Gravel Pits. The Parties agree the monetary value of the
reciprocal services rendered are substantially the same.
5. No Other Changes and Integration. In all other respects, the Agreement, except
as amended by this Amendment, is ratified and confirmed and shall remain without charge.
Additionally, it is expressly understood and agreed that there are no other promises, agreements,
conditions, understandings, inducements, warranties or representations, written, express or
implied, between the parties hereto or their employees or agents with respect to this Amendment
other than as herein set forth; and no prior agreements, understandings or representations
pertaining as to any such matters shall be effective for any purpose.
Signatures Below]
24257-00301138907429.1 Page 3 of 5
Instrument Number: 20180702000852 Document:EAS Rec: 5103.0{} Page -4 of -5
Record Date:7121201812:41 PM King County, WA
DATED as of the day and year first above written.
GRANTOR:
SEGALE PROPERTIES LLC, a
Washington limited liability company
By: Metro Lancs Development, Inc.,
its Manager
GRANTEE:
CITY of RENTON, a municipal
corporation
By:
Denis Law, Mayor
BY Y'" ATTEST:
Mark A. S6 9'41e, ice President
6y:
In A. Set ity Clerk
Approved as to form:
By=
Shane Moloney, City Attorney
Li r4 /ice
SEAL
ori rrrr'++
1Nu•+++
r'•`•+ ,
TED S
24267-00301138907429.1 Page 4 of 5
Instrument Number: 20180702000852 Document:EAS Rec: 5103.0{} Page -5 of -_5
Record Date:7121201812:41 PM King County, WA
EXHIBIT A
LEGAL DESCRIPTION
A portion of the East °/2 of the NE 'Ia of the NW '/a of Section 16, Township 23 North, Range 5
East, W.M. except the North 330 feet of the East 30 feet;
Said portion being a strip of land (30) feet in width being fifteen (15) feet of such width on each
side of the following described centerline;
Commencing at the NE corner of the above described parcel;
Thence southerly along the East line of said parcel 302.5 feet to the True Point of Beginning of
the centerline;
Thence westerly perpendicular to the East line of said parcel, 120 feet to the terminus of the
centerline;
All situate in the City of Renton, King County, Washington.
24267-0030/13890742 s.1 Page 5 of .5
0PublicVorks1)epartmentMonroeAveNEInfiltrationFacilityCAG-23-316ADDENDUMNo.1DateofAddendumIssue:September21,2023DueDateforBids:2:00pmonOctober3,2023To:ALLPLANHOLDERSAND/ORPROSPECTIVEBIDDERSThefollowingchanges,additions,and/ordeletionsareherebymadeapartoftheprojectbiddocumentsfortheMonroeAveNEInfiltrationFacilityProjectandshallhavethesameeffectasifsetforththerein.BiddersshallacknowledgereceiptandacceptanceofthisAddendumNo.1bysigningtheaddendumandsubmittingwiththebid.Failuretoacknowledgereceiptofthisaddendummayresultinyourbidproposalbeingdisqualified.03—Scope&InstructionstoBiddersDELETEoriginalScope&InstructionstoBidders(03Scope&InstructionstoBidders)andREPLACEwiththeupdatedattacheddocument(03Scope&InstructionstoBidders_Addl).RevisionstotheScope&InstructionstoBiddersareindicatedviatrackchangesinthedocumentandareincludedwiththisAddendum.Updatesincludethefollowing:1.The4thbulletofthelistofmaterialsafterthesecondparagraphisrevisedasfollows:Theworkinvolvedunderthetermsofthecontractdocumentsshallbefullandcompleteprojectconstruction,asshownontheplansandasdescribedintheprojectspecificationstoincludebutnotbelimitedto:•Constructionsurveying,staking,andproductionofas-builtplans,•Trafficcontrol,•InstallingandmaintainingadequateTemporaryErosionandSedimentControlmeasures,•Installingapproximately38,40042,300CYofnon-infiltrationmaterial,•Installingapproximately27,100SYofgeotextilefabric,•Installingapproximately1,400Tonsofcrushedsurfacingtopcourse,•Installingapproximately35,600Tonsofselectborrow,•Installingapproximately84,100Tonsofinfiltrationgravel,•Installingapproximately10,000SFofgravityblockwall,•Installingapproximately400Tonsofhotmixasphalt,•Installingadditionalbackfilltogradesitetodesignedelevations,•Trenchexcavation,includingdewatering,shoring,removalofanyexistingunsuitablematerial,anddisposalofexcavatedmaterial,AddendumNoI’ProvidedtoPuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScsi
PublicorksI)epartrnent•Installingnewstormsystemofapproximately640linearfeetof24-inchand36-inchdiameterstormsewerpipe,including19catchbasins,•Installingstormwaterinfiltrationfacility,•Installingstormwaterflowsplittervault,infiltrationchambermanifoldvault,hydrodynamicseparatorvault,treatmentvault,and•Trenchbackfillwithsuitablematerialandcompactiontorequiredstandards,•Installingconcretecurbsandgutters,rolledcurbs,concretesidewalksanddrivewayentrances,•Installingchainlinkfenceandgates,•Performinglandscapeandpropertyrestoration.09—ScheduleofPricesDELETEoriginalscheduleofprices(09ScheduleofPrices)andREPLACEwiththeupdatedattacheddocument(09ScheduleofPrices_Addl).Updatesincludethefollowing:1.INCREASEquantityofbiditemA8from38,400Cu.Yardsto42,300Cu.Yards.20—SpecialProvisionsDELETEoriginalspecialprovisions(20SpecialProvisions)andREPLACEwiththeupdatedattachedplans(20SpecialProvisions_Addl).ThespecialprovisionsrevisionsareindicatedviatrackchangesinthedocumentandincludedwiththisAddendum.Updatesincludethefollowing:1.ThethirdsentaceofSection1-09.14(2)C17oftheSpecialProvisionsinthecurrentbidsetisrevisedoslo/lows:Thelumpsumcontractpricefor“StormwaterInfiltrationFacility”shallbefullcompensationforalllabor,material,tools,andequipmenttofurnishandinstalltheStormwaterInfiltrationFacilityincluding,butnotlimitedto,inspectionportsandcoverboxes;geotextiles;plasticchambersandendcaps,includingpreparationofstructuralsubmittals;24-inchdiameterpipestubsandpipeconnectionstoInfiltrationChamberManifoldVaultandtomanifoldcatchbasins;24-inchdiametermanifoldpipes,includingbeddingmaterialsystembetweenchambers;installingandcompactingembedmentandbackfillmaterials;andallincidentalsnecessarytocompletedtheinstallationinaccordancetothePlans,SpecialProvisions,andmanufacturer’srecommendations.AddendumNo.IProvidedtobuildersExchar.geofWA,Inc.ForosageConditionsAgreerneotseewww.bxws.com—AlwaysVerifyScal
PublicWorksI)epartrnent2.ThethirdparagraphofSection7-04.2(2)oftheSpecialProvisionsinthecurrentbidsetisrevisedasfollows:Atemporarystormwaterdiversionshallbecapableofbypassingatleastthe2-yearpeakflowrateof52.5-cfsduringconstruction.Atemporarystormwaterdiversionmayberequiredfortheinstallationofthenewstormsewersystemwiththeexistingstormsewertrunkline.3.ThelistofmaterialsincludedinSection7-06.1oftheSpecialProvisionsinthecurrentbidsetisrevisedasfollows:Materialsincludebutarenotlimitedto:•NumberofchambersStormtechMC-7200[MC-4500]:896[1430]•Numberofendcaps:76•Solidlockingcircularcatchbasinlids•IsolatorRowWovenGeotextile:approx.3530squareyards•Non-wovengeotextileforUndergroundDrainage:approx.7200squareyards•24”Diam.Polypropylenemanifoldpipes,includingbeddingmaterialGPE-ManifoldSystem2”Diam.ChamberinletCPEPpipes•FlaredEndRamp:16•Variouscouplings,elbows,andmanifolditems•InspectionPortsandcoverboxes:3each21b—ConstructionPlansDELETEoriginalplans(21bConstructionPlans)andREPLACEwiththeupdatedattachedplans(21bConstructionPlans_Addl).TheplanrevisionsareindicatedbycloudingonthesheetsincludedwiththisAddendum.Updatesincludethefollowing:1.DrawingNo.C401:ConstructionNote#8hasbeenrevisedfrom“CONNECTMANIFOLDDRAINAGESTRUCTURETOINFILTRATIONFACILITYCHAMBERSPERDETAILONSHEETC310.LENGTHOFPIPECONNECTION(INSIDEEDGEOFDRAINAGESTRUCTURETOINFILTRATIONCHAMBER)PERTABLEONTHISSHEET”to“INSTALL24”DIAM.MANIFOLDPIPESBETWEENMANIFOLDDRAINAGESTRUCTURESANDINFILTRATIONFACILITYCHAMBERSPERDETAILONSHEETC310.LENGTHOFPIPECONNECTION(INSIDEEDGEOFDRAINAGESTRUCTURETOINFILTRATIONCHAMBER)PERTABLEONTHISSHEET.MANIFOLDPIPESSHALLHAVEPIPEBEDDINGPERCORSTDPLAN220.10.”2.DrawingNo.C401:ConstructionNote#22hasbeenrevisedfrom“24”SDCONNECTIONFROMMANIFOLDVAULTTOPRIMARYISOLATORROW,LENGTHPERPLAN.”to“INSTALLAddendumNoI;ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreernen:seewww.bxwa.com—AlwaysVerifyScsi
PublicVorksI)epartment24”DIAM.MANIFOLDPIPECONNECTIONFROMMANIFOLDVAULTTOPRIMARYISOLATORROW,LENGTHPERPLAN.”3.DrawingNo.C401:ConstructionNote#24hasbeenadded:“INSTALL24”DIAM.MANIFOLDPIPESBETWEENALLMANIFOLDDRAINAGESTRUCTURES.MANIFOLDPIPESSHALLHAVEPIPEBEDDINGMATERIALPERCORSTDPLAN220.10.4.DrawingNo.C401:ConstructionNote#24hasbeenaddedtotheplanview.5.DrawingNo.C401:ConstructionNotes#22inplanviewhavebeenupdatedtoincludethattheyare24”SD.6.DrawingNo.C402:ConstructionNote#8hasbeenupdatedfrom“CONNECTMANIFOLDDRAINAGESTRUCTURETOINFILTRATIONFACILITYCHAMBERSPERDETAILONSHEETC310.LENGTHOFPIPECONNECTION(INSIDEEDGEOFDRAINAGESTRUCTURETOINFILTRATIONCHAMBER)PERTABLEONTHISSHEET”to“INSTALL24”DIAM.MANIFOLDPIPESBETWEENMANIFOLDDRAINAGESTRUCTURESANDINFILTRATIONFACILITYCHAMBERSPERDETAILONSHEETC310.LENGTHOFPIPECONNECTION(INSIDEEDGEOFDRAINAGESTRUCTURETOINFILTRATIONCHAMBER)PERTABLEONTHISSHEET.MANIFOLDPIPESSHALLHAVEPIPEBEDDINGPERCORSTDPLAN220.10.”7.DrawingNo.C402:ConstructionNote#22hasbeenupdatedfrom“24”SDCONNECTIONFROMMANIFOLDVAULTTOPRIMARYISOLATORROW,LENGTHPERPLAN.”to“INSTALL24”DIAM.MANIFOLDPIPECONNECTIONFROMMANIFOLDVAULTTOPRIMARYISOLATORROW,LENGTHPERPLAN.”8.DrawingNo.C402:ConstructionNote#24hasbeenadded:“INSTALL24”DIAM.MANIFOLDPIPESBETWEENALLMANIFOLDDRAINAGESTRUCTURES.MANIFOLDPIPESSHALLHAVEPIPEBEDDINGMATERIALPERCORSTDPLAN220.10.AddendumNo1\ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com-AlwaysVerifyScal
PublicWorksI)epartrnentALLOTHERREQUIREMENTSOFTHECONTRACTDOCUMENTSREMAININEFFECTSincerely,//i’rJatedMcDonald,PECivilEngineerIll(ProjectManager)CityofRentonAllBiddersmustsignthisAddendumNo.1inthespaceprovidedbelowandattachthesignedAddendumNo.1totheFormalBidProposalSignature:Company:KLtOfl%trLAC-t’.Q’.itAL...Title:Date:1O-2O-tZ3AddendumNoIProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
PublicWorksDepartmentMonroeAveNEInfiltrationFaciIitCAG-23-316ADDENDUMNo.2DateofAddendumIssue:September28,2023DueDateforBids:2:00pmonOctober17,2023To:ALLPLANHOLDERSAND/ORPROSPECTIVEBIDDERSThefollowingchanges,additions,and/ordeletionsareherebymadeapartoftheprojectbiddocumentsfortheMonroeAveNEInfiltrationFacilityProjectandshallhavethesameeffectasifsetforththerein.BiddersshallacknowledgereceiptandacceptanceofthisAddendumNo.1bysigningtheaddendumandsubmittingwiththebid.Failuretoacknowledgereceiptofthisaddendummayresultinyourbidproposalbeingdisqualified.05—CallforBidsDELETEoriginalCallforBids(OSCallforBids)andREPLACEwiththeupdatedattacheddocument(OSCallforBidsAdd2).RevisionstotheCallforBidsareindicatedviatrackchangesinthedocumentandareincludedwiththisAddendum.Updatesincludethefollowing:1.SubmittalDeadlineisrevisedfrom“2:00PM,October3t1,2023”to“2:00PM,October17th2023”asshownbelow:SubmittalDeadline:2:00PM,OctoberW417th,2023BidSubmissionProcess:Sealedbidswillbereceiveduntil2:00p.m.,Tuesday,Octoberfl7,2023,atthelobbyofRentonCityHall,1055SouthGradyWay,RentonWA98057.Nomailed,Fedex,orUPSdeliveredwillbeaccepted.SealedbidswillbeopenedandpubliclyreadviatheZoomvideo-conferencingwebapplicationat3:00p.m.,Tuesday,October317,2023(60minutesafterpublishedbidsubmittaltime).Anybidsreceivedafterthepublishedbidsubmittaltimecannotbeconsideredandwillnotbeaccepted.2.The4thbulletofthelistofmaterialsafterthesecondparagraphisrevisedasfollowstomatchthequantityprovidedinAddendumNo.1:Theworkinvolvedunderthetermsofthecontractdocumentsshallbefullandcompleteprojectconstruction,asshownontheplansandasdescribedintheprojectspecificationstoincludebutnotbelimitedto:AddendumNo22ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.txwa.com-AlwaysVerifyScal
PublicWorksI)epartment•Constructionsurveying,staking,andproductionofas-builtplans,•Trafficcontrol,•InstallingandmaintainingadequateTemporaryErosionandSedimentControlmeasures,•Installingapproximately38,40042,300CYofnon-infiltrationmaterial,•Installingapproximately27,100SYofgeotextilefabric,•Installingapproximately1,400Tonsofcrushedsurfacingtopcourse,•Installingapproximately35,600Tonsofselectborrow,•Installingapproximately84,100Tonsofinfiltrationgravel,•Installingapproximately10,000SFofgravityblockwall,•Installingapproximately400Tonsofhotmixasphalt,•Installingadditionalbackfilltogradesitetodesignedelevations,•Trenchexcavation,includingdewatering,shoring,removalofanyexistingunsuitablematerial,anddisposalofexcavatedmaterial,•Installingnewstormsystemofapproximately640linearfeetof24-inchand36-inchdiameterstormsewerpipe,including19catchbasins,•Installingstormwaterinfiltrationfacility,•Installingstormwaterflowsplittervault,infiltrationchambermanifoldvault,hydrodynamicseparatorvault,treatmentvault,and•Trenchbackfillwithsuitablematerialandcompactiontorequitedstandards,•Installingconcretecurbsandgutters,tolledcurbs,concretesidewalksanddrivewayentrances,•Installingchainlinkfenceandgates,•Performinglandscapeandpropertyrestoration.AddendumNo22\ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
Public\yoi•ksI)epartinentALLOTHERREQUIREMENTSOFTHECONTRACTDOCUMENTSREMAININEFFECTSincerely,JaredMcDonald,PECivilEngineerIll(ProjectManager)CityofRentonAllBiddersmustsignthisAddendumNo.2inthespaceprovidedbelowandattachthesignedAddendumNo.2totheFormalBidProposalSignature:Company:RL2c’S1ct9I.Title:Date:t0WU13-AddendumNo22ProvidedtoBuildersExchangeofhA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
PublicWorksDepartmentMonroeAveNEInfiltrationFacilityCAG-23-316ADDENDUMNo.3DateofAddendumIssue:October5,2023DueDateforBids:2:00pmonOctober17,2023To:ALLPLANHOLDERSAND/ORPROSPECTIVEBIDDERSThefollowingchanges,additions,and/ordeletionsareherebymadeapartoftheprojectbiddocumentsfortheMonroeAveNEInfiltrationFacilityProjectandshallhavethesameeffectasifsetforththerein.BiddersshallacknowledgereceiptandacceptanceofthisAddendumNo.3bysigningtheaddendumandsubmittingwiththebid.Failuretoacknowledgereceiptofthisaddendummayresultinyourbidproposalbeingdisqualified.03—Scope&InstructionstoBiddersDELETEAddendumNo.1Scope&InstructionstoBidders(03Scope&InstructionstoBidders_AUdi)andREPLACEwiththeupdatedattacheddocument(03Scope&InstructionstoBidders_Add3).RevisionstotheScope&InstructionstoBiddersareindicatedviatrackchangesinthedocumentandareincludedwiththisAddendum.Updatesincludethefollowing:1.The5rhbulletofthelistofmaterialsafterthesecondparagraphisrevisedasfollows:Theworkinvolvedunderthetermsofthecontractdocumentsshallbefullandcompleteprojectconstruction,asshownontheplansandasdescribedintheprojectspecificationstoincludebutnotbelimitedto:•Constructionsurveying,staking,andproductionofas-builtplans,•Trafficcontrol,•InstallingandmaintainingadequateTemporaryErosionandSedimentControlmeasures,•Installingapproximately42,300CYofnon-infiltrationmaterial,•Installingapproximately27,10058,100SYofgeotextilefabric,•Installingapproximately1,400Tonsofcrushedsurfacingtopcourse,•Installingapproximately35,600Tonsofselectborrow,•Installingapproximately84,100Tonsofinfiltrationgravel,•Installingapproximately10,000SFofgravityblockwall,•Installingapproximately400Tonsofhotmixasphalt,•Installingadditionalbackfilltogradesitetodesignedelevations,•Trenchexcavation,includingdewatering,shoring,removalofanyexistingunsuitablematerial,anddisposalofexcavatedmaterial,AddendumNo3’?rov:dedtoauildersExcoaogeofWA,Inc.‘orusageConditionsAgreementseewww.bxwa.com-AlwaysVerifyScal
0PublicWorksDepartment•Installingnewstormsystemofapproximately640linearfeetof24-inchand36-inchdiameterstormsewerpipe,including19catchbasins,•Installingstormwaterinfiltrationfacility,•Installingstormwaterflowsplittervault,infiltrationchambermanifoldvault,hydrodynamicseparatorvault,treatmentvault,and•Trenchbackfillwithsuitablematerialandcompactiontorequiredstandards,•Installingconcretecurbsandgutters,rolledcurbs,concretesidewalksanddrivewayentrances,•Installingchainlinkfenceandgates,•Performinglandscapeandpropertyrestoration.2.INCREASEtheworkingdaystothefollowing:Atotalof3-320workingdaysisallowedforcompletionoftheproject.05—CallforBidsDELETEAddendumNo.2CallforBids(05CallforBids_Add2)andREPLACEwiththeupdatedattacheddocument(05CallforBids_Add3).RevisionstotheCallforBidsareindicatedviatrackchangesinthedocumentandareincludedwiththisAddendum.Updatesincludethefollowing:1.INCREASEtheworkingdaysfrom283daysto320workingdays.2.INCREASEthegeotextilefabricquantityfrom27,100SYto5,QQ5y(5thbulletinthemateriallist).09—ScheduleofPricesDELETEAddendumNo.1scheduleofprices(09ScheduleofPricesAddi)andREPLACEwiththeupdatedattacheddocument(09ScheduleofPrices_Add3).Updatesincludethefollowing:1.INCREASEquantityofbiditemA9“Non-WovenGeotextileFabric”to51,800SY2.ADDBIDITEM87MIRAFIFW402WOVENGEOTEXTILEFABRIC—6,300SY3.INCREASEquantityofbiditemD12“RootBarrier”to575LEAddendumNo3ProvidedtoBuildersExiltangeofInc.FcrusageConditionsAgreemenoseewww.bxua.com-AlwaysVerifyScal
PublicWorksI)epartment20—SpecialProvisionsDELETEAddendumNo.1specialprovisions(20SpecialProvisions_Addi)andREPLACEwiththeupdatedattachedplans(20SpecialProvisions_Add3).ThespecialprovisionsrevisionsareindicatedviatrackchangesinthedocumentandincludedwiththisAddendum.Updatesincludethefollowing:1.TheWorkingDaysinSection1-08.5oftheSpecialProvisionsinthecurrentbidsetisrevisedasfollows:Thisprojectshallbephysicallycompletedwithin28320workingdays.2.ThetableinSection1-09.14(2)A7oftheSpecialProvisionsinthecurrentbidsetisrevisedasfollows:3.Section1-09.14(2)A9shallberevisedasfollows:1-09.14(2)A9Non-WovenGeotextileFabric(BidItemA9)—SquareYardMeasurementandpaymentwillbeperWSDOTStandardSpecification2-12.Non-WovenGeotextileFabricshallbeNon-WovenGeotextileforUndergroundDrainage,ModerateSurvivabilityClassCPerWSDOT9-33.2(1)TablesIand2.Thepaymentfor“Non-WovenGeotextileFabric”persquareyardshallbefullcompensationforfurnishingandinstallingthegeotextilefabric;includingbutnotlimitedtoseamjointingtape,andallnecessaryworktocompletetheinstallationasshowninthePlans.4.Section.1-09.14(2)B7MIRAFIFW402WovenGeotextileFabric(BIDItem87)—SquareYardhasbeenaddedtoSpecialProvisionsasfollows:1-09.14(2)B7MIRAFIFW402WovenGeotextileFabric(BidItem87)—SquareYardMeasurementandPaymentfor“MIRAFIFW402WovenGeotextileFabric”willbeperSquareYard,perWSDOTStandardSpecification2-12.SeeSpecialProvisions2-12fordescriptionandapprovedequalmaterialrequirements.AddendumNo3ItemstobeRemovedApproximateQuantityofWorkSidewalk20.0SYExistingChainLinkW/WoodSlatPrivacyFence65.0LFCurbandgutter90.0LFSawcutting140.0LFDe-energizingandremovingExistingLuminairelEAgrovdedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
0PublicWoi•ksDepartmentS.ThefollowingbulletpointhasbeenaddedtoSection2-02.1oftheSpecialProvisionsinthecurrentbidsetasfollows:De-enerqizingandRemovingExistingLuminaire—1EA6.Section2-02.3(5)RemovingLuminairehasbeenaddedtothespecialprovisionsasfollows:Addthefollowingnewsection:2-02.3f5)RemovingLuminaireWhereshownontheplans,theContractorshallde-energizeandremovetheexistingluminaireincludingtheluminairefooting,andshallbackfillthefootingholewithgravelborrow.TheContractorshalldelivertheexistingluminairetotheCityofRentonMaintenanceFacility.TheContractorshallcoordinatewiththeEngineertode-energizetheexistingluminaire.7.ThesecondsentenceofSection2-03.3(14)FoftheSpecialProvisionsinthecurrentbidsethasbeenrevisedasfollows:InfiltrationGravelshallbeplacedandcompactedaccordingtothePlans.8.AnewsentencehasbeenaddedtoSection2-03.3(14)FoftheSpecialProvisionsinthecurrentbidsetasfollows:ThecontractorshallfacilitateaccessandgranttheCitytherighttohaveaninspectorpresentatthesiteofproductionoftheInfiltrationGraveltoobserveandvalidatethattheInfiltrationGravelisbeingproducedtotherequiredstandard.TheContractorshallalerttheCitynolessthan48-hourspriortothestartofproductionoftheInfiltrationGravelmaterial.9.ThenewSection2-12ConstructionGeosynthetichasbeenaddedtotheSpecialProvisionsasfollows:2-12CONSTRUCTIONGEOSYNTHETIC2-12.2MaterialsThisSectionissupplementedwiththefollowing:MIRAFIFW402,orapprovedequal,shallbeusedasaWovenGeotextileforUndergroundDrainageasindicatedintheplans.TobeapprovedequaltoMIRAFIFVV4O2,theWovenGeotextileforUndergroundDrainageshallbewovenmonofilamentpolypropylene(non-slittape)andconformtothepropertiesasindicatedinTables1and2below.AddendumNo3\ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
PublicWorksDepartmentTABLEIGEOTEXTILEFORUNDERGROUNDDRAINAGESTRENGTHPROPERTIESFORSURVIVABILITYGeotextilePropertyjTestMethodRequirementMechanicalGrabTensileStrengthASTMD4632200lbmm.GrabTensileElongationASTMD4632<50%SeamBreakingStrengthASTMD4632220lbmm.PunctureResistanceASTMD4633495lbmm.TrapezoidalTearASTMD453380lbmmEnduranceUVResistanceASTMD435550%strengthretainedmm.after500hoursinazenonarcdeviceTABLE2GEOTEXTILEFORUNDERGROUNDDRAINAGEFILTRATIONPROPERTiESGeotextilePropertyTestMethodRequirementHydraulicsIFiltrationPermittivityASTMD44911.0—2.5sec-Imm.WaterFlowRateASTMD4491140-200gpmlft2mmPercentOpenArea(POA)CW-0221510%mm.ApparentOpeningSize(AOS)ASTMD475140USStU.Sievemax.10.Section6-03.3oftheSpecialProvisionsinthecurrentbidsetissupplementedasfollows:Section6-03.3issupplementedwiththefollowing:Steelfabricatorsforthegratedvaultlidshallbeincludedinthecertificationrequirementsinthissection.Gratedvaultlidsupportassemblymembersshallbeconsideredfracturecritical.11.ThethirdparagraphofSection8-20.1oftheSpecialProvisionsinthecurrentbidsetisrevisedasfollows:Currentlythereisanexistingluminaireinthelocationofthetemporaryaccessroaddrivewayentrance.InordertoaccessthesitefromMonroeAye,theexistingluminairew41shallneedtobede-energizedandremovedincludingexistingfooting(includedinRemovalofStructuresandObstructions)andtheremovedluminairew41shallbereturnedtoCityofRentonMaintenanceFacility.CoordinateluminaircreplacementanddeliverywithEricCutshallwiththeCityofRentonat4254307423.12.ThefollowingnewsentencehasbeenaddedtoSection8-20.1oftheSpecialProvisionsinthecurrentbidsetasfollows:TheContractorshallcoordinatewithEngineertore-energizethenewluminaire.13.Theheaderbetweensection8-24.2Materialsand8-24.3(2)GravityBlockWallintheSpecialProvisionshasbeenremovedasfollows:AddendumNo3ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.txwa.com—AlwaysVerifyScal
PublicWorksDepartment8-24.2MaterialsSection8-24.2issupplementedasfollows:Gravityblockwallblocksshallberectangularprismswithdimensions2’-5Wby2’-5Y2”by4-11”,exceptforspecialblockswhichshallbeasdimensionedinthePlans.Alldimensionsshallbe±1/2”.GravityblockwallblocksshallbecastwithClass3000concrete,conformingtotheaircontentrequirementsofSection6-02.3(2)A.Commercialconcreteshallnotbeused.Gravityblockwallblockswillbeacceptedbasedonvisualinspection,andconformancetoSection6-02.3(9)andthespecifiedconcretestrengthandaircontentrequirements.GravityBlockWallBlocksshallhaveaninterlockingsystemintegratedintotheirform.8-12.3Constructionreuuirements8-24.3(2)GravityBlockWallSection8-24.3(2)issupplementedasfollows:SubmittalsTheContractorshallsubmitworkingdrawingsofthegravityblockwalltotheEngineerforapprovalinaccordancewithSection6-01.9.Theworkingdrawingsshallinclude,butnotbelimitedto,thefollowing:14.ThefirstparagraphunderheaderGravityBlockWallErectionunderSection8-24.3(2)oftheSpecialProvisionsinthecurrentbidsetisrevisedasfollows:TheGravityBlockWallshallbeinstalledasamethodofseparationbetweentheInfiltrationGravelandNon-InfiltrationMateriallncl.Haul.TheGravityBlockWallistobeinstalledintandemwiththeplacementandcompactionoftheInfiltrationGravelandNon-InfiltrationMaterialIncI.Haul.TheGravityBlockWallshalliebeinstalledasindicatedonthePlansmorcthan4feetabovetheadjacentfilltobeplacedbytheContractor.15.ThetableinSection9-03.16oftheSpecialProvisionsinthecurrentbidsetisrevisedasfollows:__________________________________________AASHTOGradingPassingNo.3No.4SieveSizeMm.Max.Mm.Max.2-1/2”991002”90100991001-1/2”3570901001”01520553/4”0151/2”053/8”05No.100001.0001.0AddendumNo3.?rovdedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
PublicWorksDepartment21B—ConstructionPlans(Plans)DELETEplans(21B—CONSTRUCTIDNPLANS_ADD1)andREPLACEwiththeupdatedattachedplans(21B_CONSTRUCTIONPLANS_ADD3).TheplanrevisionsareindicatedbycloudingonthesheetsincludedwiththisAddendum.Updatesincludethefollowing:1.DrawingNo.COOl:CoverSheetIndexofSheetshasbeenupdatedtoincludenewSheetS600.2.DrawingNo.C004:Infiltrationgravelgeotextilehasbeenupdatedtoincludeplacingnon-wovengeotextilewithintheinfiltrationgravelateachliftheight.GeotextilebetweentheSelectBorrowandtheInfiltrationGravelandtheinfiltrationGravelandthenativeexposeslopehasbeenupdatedtobeMIRAFIFW402orapprovedequalwovengeotextile.3.DrawingNo.C004:MIRAFIFW402GeotextilelinetypehasbeenaddedtotheLegend.4.DrawingNo.C201:ConstructionNote#8hasbeenrevisedtoread:“INSTALLTEMPORARYSECURITYCHAINLINKFENCE”.5.DrawingNo.C202:ConstructionNote#8hasbeenrevisedtoread:“INSTALLTEMPORARYSECURITYCHAINLINKFENCE”.6.DrawingNo.C204:ConstructionNote#8hasbeenrevisedtoread:“MAINTAINTEMPORARYSECURITYCHAINLINKFENCE”.7.DrawingNo.C302:Infiltrationgravelgeotextilehasbeenupdatedtoincludeplacingnon-wovengeotextilewithintheinfiltrationgravelateachliftheight.GeotextilebetweentheSelectBorrowandtheInfiltrationGravelandtheinfiltrationGravelandthenativeexposeslopehasbeenupdatedtobeMIRAFIFW402orapprovedequalwovengeotextile.8.DrawingNo.C302:ConstructionNote#4hasbeenrevisedtoread:“INSTALLGEOTEXTILEFABRICMIRAFIFW402ORAPPROVEDEQUALPERSPECIALPROVISIONS2-12ANDBACKFILLEXCAVATEDAREAWITHINFILTRATIONGRAVELPERSPECIALPROVISIONS2-03ANDCOMPACTPERWDSOTSTD.SPEC2-03.3f14)C,METHODA.”9.DrawingNo.C302:ConstructionNote#14hasbeenaddedwhichreads:“INSTALLGEOTEXTILEFABRIC,NON-WOVENGEOTEXTILEFORUNDERGROUNDDRAINAGE,AddendumNo3ProvidedtoBuildersExchangeofWA,Inc.ForusageConditionsAgreementseewww.hxwa.com—AlwaysVerifyScsl
0Public\VorksDepartmentMODERATESURVIVABILITYCLASSCPERWSDOT9-33.2f1)IN23-FTWIDESECTIONSWITH2-FTMINIMUMOVERLAP,WITHTAPEDSEAMS,ATEACH2-FTLIFT,INSTAGGEREDROWSWITHA15-FTCLEARSPACEBETWEENEACH23-FTWIDEGEOTEXTILESECTION,ASDIRECTEDBYENGINEER.”10.DrawingNo.C302:MIRAFIFW402GeotextilelinetypehasbeenaddedtotheLegend.11.DrawingNo.C501:ConstructionNote#7hasbeenrevisedtoread:“COORDINATEDE-ENERGIZINGANDREMOVALOFEXISTINGUTILITYWITHENGINEERPRIORTOCONSTRUCTION.LIGHTPOLEMUSTBEREPLACEDWITHNEWPOLEPERCORSTDPLAN117.1ANDPLACEDONCONCRETEPADPERCORSTDPLAN120.EXISTINGLUMINAIRETOBEDELIVEREDTOCORMAINTENANCEFACILITY.NEWROADWAYLUMINAIREARMTOBE6-FTINLENGTH.”12.DrawingNo.C502:ConstructionNote#7hasbeenrevisedtoread:“COORDINATEDE-ENERGIZINGANDREMOVALOFEXISTINGUTILITYWITHENGINEERPRIORTOCONSTRUCTION.LIGHTPOLEMUSTBEREPLACEDWITHNEWPOLEPERCORSTDPLAN117.1ANDPLACEDONCONCRETEPADPERCORSTDPLAN120.EXISTINGLUMINAIRETOBEDELIVEREDTOCORMAINTENANCEFACILITY.NEWROADWAYLUMINAIREARMTOBE6-FTINLENGTH.”13.DrawingNo.5600:Sheet5600isanewsheetthathasbeenadded.14.DrawingNo.5601:ConstructionNote#6hasbeenrevisedtoread:“STEELSHALLBEGALVANIZEDACCORDINGTOAASHTOM111.GALVANIZEAFTERFABRICATIONOFWELDEDASSEMBLIES.”15.DrawingNo.5601:ConstructionNote#8hasbeenrevisedtoread:“GALVANIZEDSURFACESALTEREDORDAMAGEDDURINGCONSTRUCTIONORHANDLINGSHALLBEREPAIREDACCORDINGTOASTMA780ANDMSHTOM111.16.DrawingNo.5602:WeldingsymbolwaspreviouslyshownreversedinViewD.ThishasbeenrevisedinViewD.17.DrawingNo.5605:RebarreinforcinghasbeenupdatedintheFoundationElevationandFoundationSection.AddendumNo3ProvidedtoEuildersExchangeofA,Inc.ForcsageConditionsAgreemeotseewww.bxwa.com—AlwaysVerifyScal
0PublicWorksDepartmentAllOTHERREQUIREMENTSOFTHECONTRACTDOCUMENTSREMAININEFFECTSincerely,I)JJaredMcDonald,PECivilEngineerIll(ProjectManager)CityofRentonAllBiddersmustsignthisAddendumNo.3inthespaceprovidedbelowandattachthesignedAddendumNo.3totheFormalBidProposalSignature:%Title:______________________Cornpany:V.W’£ftcs1W.di9Y’,J’tY.Date:0--2O2-3.AddendumNo3ProddedtoBuildersExchangeofW,Inc.FcrusageConditionsAgreementseewww.bxwa.com—AlwaysVerifyScal
PublicWorksDepartmentMonroeAveNEInfiltrationFacilityCAG-23-316ADDENDUMNo.4DateofAddendumIssue:October17,2023DueDateforBids:2:00pmonOctober20,2023To:ALLPLANHOLDERSAND/ORPROSPECTIVEBIDDERSThefollowingchanges,additions,and/ordeletionsareherebymadeapartoftheprojectbiddocumentsfortheMonroeAveNEInfiltrationFacilityProjectandshallhavethesameeffectasifsetforththerein.BiddersshallacknowledgereceiptandacceptanceofthisAddendumNo.4bysigningtheaddendumandsubmittingwiththebid.Failuretoacknowledgereceiptofthisaddendummayresultinyourbidproposalbeingdisqualified.05—CallforBidsDELETEAddendumNo.3CallforBids(05CallforBids_Add3)andREPLACEwiththeupdatedattacheddocument(05CallforBids_Add4).RevisionstotheCallforBidsareindicatedviatrackchangesinthedocumentandareincludedwiththisAddendum.Updatesincludethefollowing:1.SubmittalDeadlineisrevisedfrom“2:00PM,October17,2023”to‘2:00PM,October20th,2023”asshownbelow:SubmittalDeadline:2:00PM,October3th20th,2023BidSubmissionProcess:Sealedbidswillbereceiveduntil2:00p.m.,TuesdayFriday,October204,2023,atthelobbyofRentonCityHall,1055SouthGradyWay,RentonWA98057.Nomailed,Fedex,orUPSdeliveredwillbeaccepted.SealedbidswillbeopenedandpubliclyreadviatheZoomvideo-conferencingwebapplicationat3:00p.m.,TuedayFriday,October2017,2023(60minutesafterpublishedbidsubmittaltime).Anybidsreceivedafterthepublishedbidsubmittaltimecannotbeconsideredandwillnotbeaccepted.AddendumNo4\
PublicWorksDepartment20—SpecialProvisionsDELETEAddendumNo.3specialprovisions(20SpecialProvisions_Add3)andREPLACEwiththeupdatedattachedprovisions(20SpecialProvisions_Add4).ThespecialprovisionsrevisionsareindicatedviatrackchangesinthedocumentandincludedwiththisAddendum.Updatesincludethefollowing:1.ThefirstbulletofSection7-05.2oftheSpecialProvisionsinthecurrentbidsethasbeenrevisedasfollows:General•MeettheHaveEcologyGeneralUseLevelDesignation(GULD)certificationforEnhancedWaterQualityTreatment.2.ThesecondbulletofSection7-05.2oftheSpecialProvisionsinthecurrentbidsethasbeenrevisedasfollows:General•ShallbesizedtomeetEcologyEnhancedWaterQualityTreatmentrequirementsataminimumWaterQualityFlowRatelistedbelow.3.ThethirdsentenceofSection7-05.3(8)oftheSpecialProvisionsinthecurrentbidsethasbeenrevisedasfollows:TheHydrodynamicSeparatorVaultmustmeethavetheWashingtonStateDepartmentofEcologyTAPEGULDcertificationforpretreatmentfortheonlineWQflowrateof22.6cfsandofflineWQflowrateof12.6cfs.AddendumNo.4k
CALLOTHERREQUIREMENTSOFTHECONTRACTDOCUMENTSREMAININEFFECtSincerely,JaredMcDonald,PECivilEngineerIll(ProjectManager)CityofRentonAllBiddersmustsignthisAddendumNo.4inthespaceprovidedbelowandattachthesignedAddendumNo.4totheFormalBidProposal7/Signature:7/__________________________Company:kIA3cVl’slYLAkt9’l,1ZLAL.•Date:07-Ot02-3PublicWorksDepartmentTitle:AZMv4’rvt4—AddendumNo4\