Loading...
HomeMy WebLinkAboutR-394924U H V) J N z O V) w w w w 7 J W Q M N O N O 0 U) 0 N N a� a� V) 0 Q U i N a� r� a a 0 0 ry N N i 00 U) U a� 0 L �I w RECORD DRAWINGS SHOW CONTRACTOR SURVEYED STRUCTURE LOCATIONS AND ELEVATIONS. THE ORIGINAL DESIGN 45 LOCATIONS AND ELEVATIONS ARE INDICATED WITH STRIKETHROUGH TEXT. REFER TO CONTRACT DOCUMENTS FOR ADDITIONAL DETAILS 40 1\ 110/26/20221 JJM IRECORDDRAWING NO.1 DATE I BY 35 30 25 all 15 ii7 O O M Q o <L w w = W U' z w w J U Q IE 29.2 W, 12" CONC IE 29.2 E, 12" CONC IE 30.3 N, 6" METAL(THROUGH) IE 30.3 S, 6" METAL(THROUHG) ' 4 + T STA A15+88, 23.2' LT qTA D1d4-47 7? U' IT /77\--. __ .. . - -L Li 'r a IE 30.2 E, b UUNU PLAN IE 30.1 N, 6" CONC 0 10 20 40 60 SCALE: 1"=20' o w r) > L IE 28.7 E,W @ CL IE 29.1 N IP ?Q ? CF 6' BRICK ON CONC FOUNDATION, SSMH 66949 RIM 34.36 IE 2` A E,W @ CL 12 METAL/LED, "RE T o ° o PT --- - U -� k-- T- - ---T-- - S - SS -SS ----- S2NDST... SS _ SS 2"PVC N CODUI 8" C900 SS DI /CB 66460 RIM 32.75 IE 31.0 W, 6" CONC SSMH 66398 RIM 33.27 IE 29.9 NW,S ® CL V = U7 W O w 2: m w O 0 w w EXIST GR @ V7 U) ROW CL � X w �-q X w — — — — — — ---- O + ---- — — — — — — — — — — — — — — — — — — — — — — — — — — — cn w 145 LF 12" PP SD @ SLP=0.17% W Sl:P—E). U z 48" SDMH #7 STA A15+87, 4' LT A � J 48" SDMH #6 2 STA A14+42, 3' LT ' RIM=33.97 IE(IN)8"(S)=30.32 � RIM=33.70 IE(IN)8"(N)=29.46 Q IE(IN)12 (E)=28.98 om T' "T^-rr_rr IE(OUT)12 (W)=29.23 IE(IN)8"(N)=29.42 IE(IN)8"(S)=30.20 29.99 IE(OUT)12"(W)=28.97 29-22 A14+00 A14+20 A14+40 A14+60 A14+80 A15+00 A15+20 A15+40 A15+60 A15+80 A16+00 A16+20 A16+40 PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT NOTICE SEO RECORD 0 Y2 1 DESIGNED DRAWINGS BAW DRAWN MUrraYSMirth IF THIS BAR DOES SEE NOTE ON NOT MEASURE 1" TTT THEN DRAWING IS CHECKED COVER SHEET NOT TO SCALE i M 35 30 25 ki7 15 Qs] RENTON DOWNTOWN � UTILITY IWO IMPROVEMENTS PROJECT CONSTRUCTION NOTES: O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-6 O PROPOSED STORM DRAIN MAY HAVE CONFLICT OR SEQUENCE CONSTRAINT WITH EXIST UTILITY TO BE ABANDONED, CONTRACTOR SHALL TAKE APPROPRIATE MEASURES TO MAINTAIN THE FUNCTIONALITY OF THE EXIST UTILITY UNTIL SUCH TIME AS IT CAN BE ABANDONED 11 INSTALL CB PER COR STD PLAN 200.00 12 INSTALL SDMH PER COR STD PLAN 201.00 13 CONNECT PIPE TO EXIST DRAINAGE STRUCTURE 15 CONNECT EXIST STORM DRAIN PIPE TO NEW STRUCTURE 19 SEE PROFILE 6 ON SHT SD-40 20 SEE PROFILE 7 ON SHT SD-40 24 CONDUCT SITE SPECIFIC UTILITY POTHOLING IN ADVANCE OF CONSTRUCTION TO CONFIRM LOCATION AND ELEVATION OF UTILITY, IF CONFLICT PREVENTS INSTALLATION OF A TYPE 1 CB, CONTRACTOR SHALL INSTALL A SHALLOW CONCRETE INLET WITH ENGINEER APPROVAL PER COR STD PLAN 200.3 AT NO ADDITIONAL COST TO THE CITY 13 CONNECT PIPE TO EXISTING DRAINAGE STRUCTURE S2NDST STORM PLAN & PROFILE STA A14+00 TO STA A16+40 R-394924 SHEET 61m 24 of 121 ■■ REVISION PROJECT NO.: 18-2251 I SCALE: AS SHOWN I DATE: JANUARY 2021