Loading...
HomeMy WebLinkAboutR-394931O C'O 0 W U a) V) J N z O V) ne w w w w J w a M N 0 N 0 I 0 0) 3 I 0 V) I I N N I L0 a) v Q i N a) L0 ra a a 0 c 0 I N N i 00 U L �I w um 35 30 25 am 15 10 5 F5:0I80f 12 STA F10+83 18.2 LT 336 1-48" SDMH #54 . , K 12 STA F12+04, 29.6' LT i Lt/1-48" SDMH #37 W/RECTANGULAR STA F11+85 27.6' LT Z X FRAME &VANED GRATE 11 1-CB #50 IL L/.V JYY, V VV NC AT&T CRITICAL FIBER IE 28.1 NW, 4" CONC OPTIC, PROTECT IN Z PLACE PER 1-07.17 O 4 30� 77 ' ,� , + - 24 UGP- - - >7G1�UGP- _ -- �` �f PC l/ O I -- - -- 18 - --- I - - - - - 16"W CI- ' a - - - Q uo F11+00 =4- - - - -DD= - FLU •••. 1 TYP ww • • .... :1112 Z 24 PP SD wJ=-Sp ---� 19 ----SD-----�� - -SD -- -- U ~ Q - G - - -- 3'UGP-- --UG - - - -- Gf�= - - STA F10+82 12.5' RT 6 - 12 1-48" SDMH #36 SDMH 70868 STA F 10 + 81 21.4' RT 11 1-CB #49 RIM 29.25 IE 21.8 N, 18" CONC IE 21.8 S, 18" CONC CB 70830 1 20 RIM 29.28 IE 27.3 E, 6" CONC „STA F12+02, 21.4' RT 1 1 - 1-CB #51 J -8, CONTRACTOR SHALL VERIFY • EXIST SD ELEVATION PRIOR TO i = I CONSTRUCTION. FINAL DEPTH OF 416 4' SSMH 70833 SDMH #37 SHALL BE PER CHANGED TO TYPE 1 CB RIM 30.19 DIRECTION OF CITY ENGINEER I I � 4 IE 21.4 N IE 21.4 S 400 408 STA F13+65 20.5' LT 12 418 I IE 22.2E I STA STA F12+37 27.1' LT W/RECTANGULAR 15 P CB 11 1-CB #52 - ' FRAME & VANED GRATE CB 28673 � RIM 28.99 LID 29.03 RIM 28.37 IE 27.9 N ONC ELEV 28.69 OP OF PVC IE 26.6 W, 6" CONC o I SPIKE 119. ......... _ _ T - a = - AT&T CRITICAL FIBER OPTIC, - - 12"DI SD - =- _ - 1. _ _ _ _u -- - PROTECT IN PLACE PER 1-07.17 a %a a O P- `G T O 21 + Ln 2 MW-8 REESTABLISHED PER DNR ,-� 6 (n I $ r W CI - - - - - 16 W CI - - - - 1 F W CI - - - - - I16"W CI - - - - - 16"W CI - = 1�6"ICI - - - - - 16" � PERMIT 7373 -18"T x 6"W - ---T- - - - -T- -� 0---- T-}----T----- T-----T--I- �T- LL,� F13+00 a F14+00 I F15 Q o I - - - - - - r-1 �5 I /N - - Lu 14"PP SD n 0 16 SHA I I UCK AVE S I II w Lu = _ _ _ 30 • 22 . z Cn G G o 3611PP.SD . .. .■: .. .. : 361� PP SD _ _ - - � w J w --SD --LSD - - -- SD - SD --SD ---- D = - _ - - --SD -- --SD - - - - - SD = a - U 15 20 .4 a AC AC 16 a a.. 16 4 .�9 16 a Q -- - - - - GP - -UGP- - - -P O AC SDMH 70832 , STA F 12 + 13 15.3 RT RIM 29.71 12 STA F13+64 13.8' RT IE 21.8 N,S, 12" CONC 1-60" SDMH #39 12 1-60" SDMH #40 IE 22.4 W, 6" CONC IE 22.5 E, 8" PVC SDMH IE 25.4 SE, 4" CONC RIM 29.7440 STA F13+65 21.5' RT 11 IE 21.7 N,S,NE, 12" CONC 1-CB #54 IE 22.0 N, 18" CONC IE 27.2 W, 6" CONC IE 25.0 E, 10" PVC STA F12+04, 16.4' RTC 1-60" SDMH #38 1G PLAN 0 10 20 40 60 SCALE: 1"=20' RECORD DRAWINGS SHOW CONTRACTOR a a SURVEYED STRUCTURE LOCATIONS AND ELEVATIONS. THE ORIGINAL DESIGN LOCATIONS AND ELEVATIONS ARE INDICATED X w wLO x WITH STRIKETHROUGH TEXT. REFER TO w w CONTRACT DOCUMENTS FOR ADDITIONAL EXIST GR @ DETAILS ----- ROW CL O L1 J o J ko u- I u- co I cn cn I-- 9 LF 24" PP SD @ 1 w = LU SLP=1.74% O Lu = U)z �� zU) w J J w 81 LF 24" PP SD 121 LF 24" PP SD @ SLP=0.16% = _ U) 152 LF 36" PP SD @ SLP=0.19% 149 LF 36" PP SD @ SLP=0.15% U @ SLP=0.20% % U 8.34 T E). 2 3 % 8.25% Q 48" SDMH #36 60" SDMH #39 60" SDMH #40 Q STA F10+82, 12' RT 60" SDMH #38 STA F12+13, 15' RT STA F13+64, 14' RT RIM=30.04 STA F12+04, 16' RT RIM=29.60 RIM=29.39 ,L, q 4 +9.5F IE(IN)24"(N)=19.42 I T p-q- --+ RIM=29.54 IE(IN)24"(N)=19.11 IE(IN)36"(N)=18.49 +8.F8 IE(IN)12"(E)=20.03 IE(IN)24"(N)=19.17 IE(IN)6"(W)=22.45 (RECONNECT) IE(IN)12"(W)=23.93 z�-G8 +5_IE(IN)12"(W)=24.03 -IE(IN)18"(E)=19.21 IE(OUT)36"(S)=18.78 +9-+- IE(IN)12"(E)=21.69 +9.55z IE(OUT)24"(S)=19.37 24.RF IE(IN)12"(W)=21.55 IE(OUT)36"(S)=18.48 +8-:F8r 22..88 IE(IN)18"(N)=21.58 (RECONNECT) IE(OUT)24"(S)=19.27 F10+40 F10+60 F10+80 F11+00 F11+20 F11+40 F11+60 F11+80 F12+00 F12+20 F12+40 F12+60 F12+80 F13+00 F13+20 F13+40 F13+60 F13+80 F14+00 F14+20 F14+40 F14+60 F14+80 F15+00 PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT 1\ 110/26/20221 JJM I RECORD DRAWING NO. DATE BY NOTICE JAM RECORD 0 /Z 1 DESIGNED DRAWINGS BAW DRAWN murra sm� IF THIS BAR DOES SEE NOTE ON NOT MEASURE 1" TTT THEN DRAWING IS CHECKED COVER SHEET NOT TO SCALE RENTON DOWNTOWN o UTILITY 'WO IMPROVEMENTS PROJECT CONSTRUCTION NOTES: O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-6 O REPLACE SURVEY MONUMENT PER CITY STANDARD DETAIL H031 AS REQUIRED FOR CONSTRUCTION 11 INSTALL CB PER COR STD PLAN 200.00 12 INSTALL CB PER COR STD PLAN 201.00 1s CONNECT EXIST STORM DRAIN PIPE TO NEW STRUCTURE 16 PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CONTACT CITY ENGINEER TO DETERMINE THE ACTUAL EXIST LATERAL STORM DRAIN LOCATION AND TO VERIFY IF THE EXIST STORM DRAIN LATERAL IS ACTIVE, IF STORM DRAIN LATERAL IS ACTIVE, RECONNECT EXIST PIPE TO NEW STORM DRAIN PIPE WITH NYLOPLAST FITTING OR APPROVED EQUAL, PER THE SPECIFICATIONS 18 EXIST FRANCHISE UTILITY TO BE RELOCATED BY OTHERS PRIOR TO CONSTRUCTION 19 SEE PROFILE 3 ON SHT SD-43 20 SEE PROFILE 4 ON SHT SD-43 21 SEE PROFILE 5 ON SHT SD-43 22 SEE PROFILE 6 ON SHT SD-43 24 CONDUCT SITE SPECIFIC UTILITY POTHOLING IN ADVANCE OF CONSTRUCTION TO CONFIRM LOCATION AND ELEVATION OF UTILITY NER 35 25 IrMs 15 10 5 SHATTUCK AVE S STORM PLAN & PROFILE STA F10+40 TO STA F15+00 R-394931 SHEET SD-17 31 of 121 no REVISION PROJECT NO.: 18-2251 I SCALE: AS SHOWN I DATE: JANUARY 2021 n