Loading...
HomeMy WebLinkAboutR-394933CONSTRUCTION NOTES: co W L U (n J N z O V) ry w LL w w J w Q IN M N 0 N 0 rn 1 0 0 3 0 U7 1 1 U) N N 1 a� a� v7 0 Q U i N a� r� a a 0 0 ry 1 Ln N N i 00 U �I w CB 62819 I RIM 32.29 IE 31.1 S, 6 SSMH 628 RIM 32.55 IE 26.4 E, CB #6, SEE SHT SD-3 SDMH #5, SEE SHT SD - 1\ 110/26/20221 JJM I RECORD DRAWING NO. DATE BY SEE SHEET SD-3 FOR CONTINUATION FOR CONTINUATION SEE SHEET SD-3 m 35 30 25 20 15 10 AP 4 r AT I T r�TA n-% . Af% r% r%1 1 T i %- v -rrjw PI AN 0 10 20 40 60 SCALE: 1"=20' ►m w w EXIST GR @ L Lu ROW CL w w 0 w 0 ul) u) ------ N a + (D o N a' LF 12" PP SD @ SLP=0.59% 160 � 0 U7 w W w CB #58 z U-) STA G2+49, 10' LT J w <SEE SD-40 FOR ROFILE> RIM=32; 79 IE(IN)8 (SW)=30.24 38.38 IE(IN)12"(E)=30.24 28..95 = � u IE(OUT)12"(S)=27.44 2F.Fi!• a z GO+00 GO+20 GO+40 GO+60 GO+80 G1+00 G1+20 G1+40 G1+60 G1+80 PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT G2+00 G2+20 G2+40 G2+60 G2+80 G3+00 G3+20 NOTICE SEO RECORD 0 Yz 1 DESIGNED DRAWINGS BAW DRAWN murra SMi mt IF THIS BAR DOES SEE NOTE ON NOT MEASURE 1" TTT THEN DRAWING IS CHECKED COVER SHEET NOT TO SCALE EA O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 11 INSTALL CB PER COR STD PLAN 200.00 12 INSTALL CB PER COR STD PLAN 201.00 PRIOR TO CONSTRUCTION, CONTRACTOR SHALL CONTACT CITY ENGINEER TO DETERMINE THE ACTUAL EXIST LATERAL STORM DRAIN LOCATION TO VERIFY IF THE EXIST STORM DRAIN LATERAL IS ACTIVE, IF STORM DRAIN IS ACTIVE, RECONNECT EXIST PIPE TO NEW STRUCTURE 19 SEE PROFILE 8 ON SHT SD-43 13 CONNECT PIPE TO EXISTING DRAINAGE STRUCTURE 40 RECORD DRAWINGS SHOW CONTRACTOR SURVEYED STRUCTURE LOCATIONS AND ELEVATIONS. THE ORIGINAL DESIGN LOCATIONS AND ELEVATIONS ARE INDICATED WITH STRIKETHROUGH TEXT. REFER TO 35 CONTRACT DOCUMENTS FOR ADDITIONAL DETAILS 30 25 20 15 10 RENTON DOWNTOWN o UTILITY IMPROVEMENTS PROJECT WHITWORTH AVE S STORM PLAN & PROFILE STA GO+00 TO STA G3+20 R-394933 SHEET SD-19 33 of 121 no REVISION PROJECT NO.: 18-2251 I SCALE: AS SHOWN I DATE: JANUARY 2021