Loading...
HomeMy WebLinkAboutR-394936CONSTRUCTION NOTES: M O Lu U (3) t- J V) N z O V) ne w LL LL w J w Q M N O N O N 0 O 0 a Ln N N i L0 a� v 0 a i N a� ra a a 0 c 0 ry N N i 00 V) 11 U L �I w 1\ 110/26/20221 JJM I RECORD DRAWING NO. DATE I BY XSTA K3+11, 20.3' RT1 1-48" SDMH #47 EXIST SDMH KEPT IN PLAC —,) - T sS2NDST,__i\ w - - -- I W --- PPL*366"-STL-__ - - _ - - _ - 45 ■ SDMH 85622 RIM 45.46 IE 42.0 S, 8" CONC IE 39.0 A 12" CONC IE 38.8 E, 12" CON CB 85534 RIM 44.72 IE 42.0 S " CONC CB #65, SEE SHT SD-25 GAS WILL BE DEACTIVATED BY PSE PRIOR TO CONSTRUCTION CB #66, SEE SHT SD-25 REMOVE EXISTING CATCH BASIN AND PROTECT EXISTING 12" SS 55 50 AHEAD CONC. MON. IN CASE REESTABLISHED PER DNR PERMIT 7373-18"T x 6"W SSMH 85682 RIM 46.04 In / IE 38.2 NE,E,S-W @ CL W (A) - STA K3+5+55•8.5' RT 1-48" SDMH #48 ' C.PRKG g rr — ANK ° o rr r ScK4+00- - - SS RECONNECTED PIPE FROM SE -- - - - SD UGf1-T=___AFT--,, - TAP- P-� - �O.P - - - - - ���T v - T �\ CD SDMH 85661 ° a RIM 45.37 IE 41.7 S, 8" CONC SSMH 28121 T/I IE 40.0 SE, 8" CONC RIM 45.81 IE 38.9 W, 12" CONC IE 39.9 W-SE @ CL 6" CONC \ IE 38.8 E, 12" CONC IE 42.9 NW, 8" CONC CB #67, SEE SHT SD-25 PLAN - FOR CONTINUATION 0 10 20 40 60 SEE SHEET SD-25 SCALE: 1"=20' 45 LF 24" C900 @ SLP=1.90% __ 45 rr- 35 N d Ln O cl� x a w O 1 EXIST GR @ ROW CL 1 PLACE DENSE FOAM CUSHION PER THE SPECIFICATION 48" SDMH #48 BETWEEN SD AND SS AS 30 STA K3+55, 9' RT DIRECTED BY ENGINEER RIM=45.42 IE(IN)24"(W)=39.07 3948 48" SDMH #47 IE(IN)12"(S)=40.92 4+.�z9 STA K3+11, 20' RT IE(IN)6"(SE)=39.12 25 RIM=45.46 IE(OUT)12"(E)=38.57 (RECONNECT)38--8r� IE(IN)12"(S)=39.16 IE(IN)12"(W)=39.11 RECONNEC ) IE(OUT)24"(E)=39.93 39-i!8 a( NOTICE SEO 0 Y2 1 DESIGNED BAW DRAWN IF THIS BAR DOES NOT MEASURE 1" TTT THEN DRAWING IS CHECKED NOT TO SCALE K2+80 K3+00 K3+20 K3+40 K3+60 K3+80 K4+00 PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT RECORD DRAWINGS SEE NOTE ON murraVSMi mt COVER SHEET EA 55 RECORD DRAWINGS SHOW CONTRACTOR SURVEYED STRUCTURE LOCATIONS AND ELEVATIONS. THE ORIGINAL DESIGN LOCATIONS AND ELEVATIONS ARE INDICATED WITH STRIKETHROUGH TEXT. REFER TO 50 CONTRACT DOCUMENTS FOR ADDITIONAL DETAILS 45 40 35 30 25 20 RENTON DOWNTOWN F1 i ® UTILITY IMPROVEMENTS PROJECT O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 11 INSTALL CB PER COR STD PLAN 200.00 12 INSTALL CB PER COR STD PLAN 201.00 13 CONNECT NEW PIPE TO EXISTING STRUCTURE 1s CONNECT EXIST STORM DRAIN PIPE TO NEW STRUCTURE 19 SEE PROFILE 6 ON SHT SD-44 20 SEE PROFILE 7 ON SHT SD-44 S2NDST STORM PLAN & PROFILE STA K2+80 TO STA K4+00 R-394936 SHEET SD-24 36 of 121 no REVISION PROJECT NO.: 18-2251 I SCALE: AS SHOWN I DATE: JANUARY 2021