Loading...
HomeMy WebLinkAboutR-394954It C'7 O W U N Lo 7 J N w ry a m 0 a 0 a M Ln O M N O N O N \ i �1 LO w a u7 N N L 1-11 a N a� V) r� a a 0 a� ry Ln N N i 00 V) U a� 0 L �I w so 00 U Q w U' LU = LU V) z LU LU J U Q VLJ DT4" 2 J �.Lv 9.3 N, 6" CONC SEE SHEET R-12 FOR CONTINUATION PLAN 0 10 20 40 60 SCALE: 1"=20' PLAN 20 40 SCALE: 1"=20' SEE SHEET R-16 FOR CONTINUATION FOR CONTINUATION SEE SHEET R-16 NOTICE Jim RECORD 0 Y2 1 DESIGNED DRAWINGS BAW DRAWN murraysmirth IF THIS BAR DOES SEE NOTE ON NOT MEASURE 1" TTT THEN DRAWING IS CHECKED COVER SHEET 1 10/26/2022 JJM RECORD DRAWING NOT TO SCALE NO. DATE BY REVISION i REMOVE AND REPLACE CURB RAMP SEE SHT R-33 RENTON DOWNTOWN • UTILITY 'D IMPROVEMENTS PROJECT CB RIM IE CONSTRUCTION NOTES: O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-6 O2 CURB AND GUTTER REPLACEMENT PER CITY STD DETAIL 101, 101.1, 102 AND 103, AT EXISTING AND PROPOSED CURB TIE-INS, MATCH THE CURB FACES AND EXISTING TOP OF CURB AND FLOWLINE ELEVATIONS, ADJUST LENGTH TO MATCH NEAREST EXPANSION JOINT O CEMENT CONCRETE SIDEWALK REPLACEMENT PER CITY STD DETAIL 102, ADJUST PANEL LENGTH AND WIDTH TO MATCH NEAREST FULL DEPTH EXPANSION JOINT O 4O CEMENT CONCRETE DRIVEWAY ENTRANCE t10 REPLACEMENT WITH 6" CSTC BASE, MATCH EXISTING + PER CITY STD DETAIL 104, 104.2, 104.5, 105.5 AND/OR m AS DIRECTED BY THE ENGINEER, ADJUST PANEL LENGTH U TO MATCH NEAREST FULL DEPTH EXPANSION JOINT 0 5O CROSSWALK PER CITY STD DETAIL 127 J LU LU CO O STOP BAR PER CITY STD DETAIL 128 z_w LU J 9O CHANNELIZATION MARKERS AND/OR TRAFFIC ARROW = PER CITY STD DETAIL 109 AND WSDOT STD PLANS UM-3.40-04 AND M-24.40-02 < 0PARKING MARKERS TO MATCH EXISTING AS DIRECTED BY ENGINEER + rl Urn oc c� LU w� zw H LU _jU0 2 U Q LEGEND PERMANENT HMA PATCH PER CITY STD DETAIL 110.0, 110.1 AND DETAIL 2, SHEET R-40 °I CEMENT CONCRETE SIDEWALK OR DRIVEWAY a F_ —1 SAWCUT GRIND & OVERLAY PER CITY STD DETAIL 110.0 AND 110.1 REMOVE AND REPLACE WITH 6" CSTC BASE AND 8" R-394954 ASPHALT PAVEMENT S3RDST ROADWAY RESTORATION PLANS STA C4+80 TO STA C14+40 PROJECT NO.: 18-2251 1 SCALE: AS SHOWN DATE: January 2021 SHEET goo 100 of 121