Loading...
HomeMy WebLinkAboutR-394963CONSTRUCTION NOTES: C'7 O Lu u N V) J N W Y ry m r) Q r) Q M Ln O M N O N �D N Ln N W Ln N N 0 Q U i N V) r� a a 0 0 a� ry Ln N N i 00 V) u L �I w so FUR CUNTINUATIUN SEE SHEET R-24 SCALE: 1"=20' PLAN ' 0 10 20 40 60 SCALE: 1"=20' NOTICE Jim RECORD 0 /2 1 DESIGNED DRAWINGS BAW DRAWN murraysmirth IF THIS BAR DOES SEE NOTE ON NOT MEASURE 1" TTT THEN DRAWING IS CHECKED COVER SHEET 1 10/26/2022 JJM RECORD DRAWING NOT TO SCALE NO. DATE BY REVISION EA RENTON DOWNTOWN • UTILITY 'D IMPROVEMENTS PROJECT I IVY 1O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-6 2O CURB AND GUTTER REPLACEMENT PER CITY STD DETAIL 101, 101.1, 102 AND 103, AT EXISTING AND PROPOSED CURB TIE-INS, MATCH THE CURB FACES AND EXISTING TOP OF CURB AND FLOWLINE ELEVATIONS, ADJUST LENGTH TO MATCH NEAREST EXPANSION JOINT 3O CEMENT CONCRETE SIDEWALK REPLACEMENT PER CITY STD DETAIL 102, ADJUST PANEL LENGTH AND WIDTH TO MATCH NEAREST FULL DEPTH EXPANSION JOINT O 00 4O CEMENT CONCRETE DRIVEWAY ENTRANCE + REPLACEMENT WITH 6" CSTC BASE, MATCH EXISTING Ln PER CITY STD DETAIL 104, 104.2, 104.5, 105.5 AND/OR J Q AS DIRECTED BY THE ENGINEER, ADJUST PANEL LENGTH O TO MATCH NEAREST FULL DEPTH EXPANSION JOINT w 5O CROSSWALK PER CITY STD DETAIL 127 W CO Jw � 6O STOP BAR PER CITY STD DETAIL 128 U8O BRICK SIDEWALK TO BE REPLACED IN KIND, u CONTRACTOR TO REUSE BRICK TO THE EXTENT Q POSSIBLE, IF NEW BRICK IS NEEDED, IT SHALL BE OF THE SAME SIZE AND COLOR PATTERN, SUBSURFACE LAYERS TO MATCH EXISTING AND BE SUFFICIENTLY HAND COMPACTED SUCH THAT NO SETTLING OCCURS 9O CHANNELIZATION MARKERS AND/OR TRAFFIC ARROW PER CITY STD DETAIL 109 AND WSDOT STD PLANS M-3.40-04 AND M-24.40-02 11 RAILROAD CROSSING MARKING PER WSDOT STD PLAN M-11.10-03 LEGEND I ..de w .A 4 Q II R-394963 MILL AVE S PERMANENT HMA PATCH PER CITY STD DETAIL 110.0, 110.1 AND DETAIL 2, SHEET R-40 CEMENT CONCRETE SIDEWALK OR DRIVEWAY SAWCUT GRIND & OVERLAY PER CITY STD DETAIL 110.0 AND 110.1 REMOVE AND REPLACE WITH 6" CSTC BASE AND 8" ASPHALT PAVEMENT ROADWAY RESTORATION PLANS STA LO+00 TO STA L9+00 PROJECT NO.: 18-2251 SCALE: AS SHOWN DATE: January 2021 SHEET R-25 R-26 109 of 121