HomeMy WebLinkAboutR-394963CONSTRUCTION NOTES:
C'7
O
Lu
u
N
V)
J
N
W
Y
ry
m
r)
Q
r)
Q
M
Ln
O
M
N
O
N
�D
N
Ln
N
W
Ln
N
N
0
Q
U
i
N
V)
r�
a
a
0
0
a�
ry
Ln
N
N
i
00
V)
u
L
�I
w
so
FUR CUNTINUATIUN
SEE SHEET R-24
SCALE: 1"=20'
PLAN '
0 10 20 40 60
SCALE: 1"=20'
NOTICE Jim RECORD
0 /2 1 DESIGNED DRAWINGS
BAW
DRAWN murraysmirth
IF THIS BAR DOES SEE NOTE ON
NOT MEASURE 1" TTT
THEN DRAWING IS CHECKED COVER SHEET
1 10/26/2022 JJM RECORD DRAWING NOT TO SCALE
NO. DATE BY REVISION
EA
RENTON DOWNTOWN
• UTILITY
'D IMPROVEMENTS
PROJECT
I IVY
1O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY
CONTROL PLAN, SHT G-6
2O CURB AND GUTTER REPLACEMENT PER CITY STD DETAIL
101, 101.1, 102 AND 103, AT EXISTING AND PROPOSED
CURB TIE-INS, MATCH THE CURB FACES AND EXISTING
TOP OF CURB AND FLOWLINE ELEVATIONS, ADJUST
LENGTH TO MATCH NEAREST EXPANSION JOINT
3O CEMENT CONCRETE SIDEWALK REPLACEMENT PER CITY
STD DETAIL 102, ADJUST PANEL LENGTH AND WIDTH
TO MATCH NEAREST FULL DEPTH EXPANSION JOINT
O
00 4O CEMENT CONCRETE DRIVEWAY ENTRANCE
+ REPLACEMENT WITH 6" CSTC BASE, MATCH EXISTING
Ln PER CITY STD DETAIL 104, 104.2, 104.5, 105.5 AND/OR
J
Q AS DIRECTED BY THE ENGINEER, ADJUST PANEL LENGTH
O TO MATCH NEAREST FULL DEPTH EXPANSION JOINT
w 5O CROSSWALK PER CITY STD DETAIL 127
W CO
Jw
� 6O STOP BAR PER CITY STD DETAIL 128
U8O BRICK SIDEWALK TO BE REPLACED IN KIND,
u CONTRACTOR TO REUSE BRICK TO THE EXTENT
Q POSSIBLE, IF NEW BRICK IS NEEDED, IT SHALL BE OF
THE SAME SIZE AND COLOR PATTERN, SUBSURFACE
LAYERS TO MATCH EXISTING AND BE SUFFICIENTLY
HAND COMPACTED SUCH THAT NO SETTLING OCCURS
9O CHANNELIZATION MARKERS AND/OR TRAFFIC ARROW
PER CITY STD DETAIL 109 AND WSDOT STD PLANS
M-3.40-04 AND M-24.40-02
11 RAILROAD CROSSING MARKING PER WSDOT STD PLAN
M-11.10-03
LEGEND
I ..de w .A 4 Q II
R-394963
MILL AVE S
PERMANENT HMA PATCH PER CITY STD
DETAIL 110.0, 110.1 AND DETAIL 2,
SHEET R-40
CEMENT CONCRETE SIDEWALK OR
DRIVEWAY
SAWCUT
GRIND & OVERLAY PER CITY STD
DETAIL 110.0 AND 110.1 REMOVE AND
REPLACE WITH 6" CSTC BASE AND 8"
ASPHALT PAVEMENT
ROADWAY RESTORATION PLANS
STA LO+00 TO STA L9+00
PROJECT NO.: 18-2251 SCALE: AS SHOWN DATE: January 2021
SHEET
R-25
R-26
109 of 121