Loading...
HomeMy WebLinkAboutS-394907N CL U a) U) J Ln N z O U) w w w w r-, J W Q O M M N O N O N un U) O 70 U) U) N N Ln a� a� v7 0 Q U N a� ra a a c 0 c ry N N i 00 11 U a) 0 L �I w CONSTRUCT SIDE SEWER THROUGH ABANDONED VAULT, POTHOLE TO LOCATE NORTH/SOUTH LIMITS OF VAULT PRIOR TO CONSTRUCTION, PROVIDE SHORING IN VAULT AS NEEDED TO PREVENT VOIDS OR SETTLEMENT OF ROADWAY, COORDINATE SCHEDULE FOR THIS WORK WITH CITY 1' DEEP TO TOP OF VAULT CORE DRILLED FOR PIPE AT 6'-6" DEEP M M 35 30 25 20 15 10 O 00 � Q un Q w w LU unz w J V) = U Q ---------- TAP CONDUIT INTO EXIST SPU RECTIFIER STRUCTURE SS _ I AT&T CRITICAL SIDE SEWER TABLE SIDE APPROX COORDINATES SEWER NO.* ADDRESS STATION AT OF CO OR CPLG MAIN 200 S N: 178672.65 A5+74 2ND ST E:1298816.39 SEE SS-14 E: 2 D ST *SS NO. SPECIFIC TO THIS SHEET RIM 30.83 SSMH 2146� vvr- - - -- xuhj--- - - - - Jhl - - I IU�P_X- PLAN 0 10 20 40 60 SCALE: 1"=20' PROTECT NEW WATER LINE AS NECESSARY DURING CONSTRUCTION RECORD DRAWINGS SHOW CONTRACTOR SURVEYED STRUCTURE LOCATIONS AND ELEVATIONS. THE ORIGINAL DESIGN LOCATIONS AND ELEVATIONS ARE INDICATED WITH STRIKETHROUGH TEXT. REFER TO CONTRACT DOCUMENTS FOR ADDITIONAL DETAILS M N 2 u a a d U) l0 N 2 H (D ,Ni w X ,--I N W XU) EXIST GR @ P X w W ROW CL w w w 00 O — — — — — — — — — — — — — — — — — — — — — — ON ----- U �— U) LU w � F- w (n = O 12 P T u') U I Q 3966 LF 8" � C900 SS @ SLP=0.4% SSMH #4 10 3 Q STA A5+73, 17' RT ' RIM=30.86 IE(IN)8"(W)=23.43 23-48 IE(OUT)8"(E)=23.27-zR3-86 IE(IN)8"(N)=23.48 29-18 A4+80 A5+00 A5+20 A5+40 A5+60 A5+80 A6+00 A6+20 A6+40 A6+60 A6+80 A7+00 A7+20 A7+40 A7+60 A7+80 A8+00 A8+20 A8+40 A8+60 A8+80 A9+00 A9+20 A9+40 A9+60 1\ 110/26/20221 JJM IRECORDDRAWING NO. DATE BY PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT NOTICE Jim RECORD 0 Yz 1 DESIGNED DRAWINGS BAW IF THIS BAR DOES DRAWN SEE NOTE ON NOT MEASURE 1" TTT murmt ra THEN DRAWING IS CHECKED COVER SHEET YSMih NOT TO SCALE EA RENTON DOWNTOWN o UTILITY IMPROVEMENTS PROJECT CONSTRUCTION NOTES: O1 CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 O2 PROPOSED SEWER MAY HAVE CONFLICT OR SEQUENCE CONSTRAINT WITH EXISTING UTILITY TO BE ABANDONED, CONTRACTOR SHALL TAKE APPROPRIATE MEASURES TO MAINTAIN THE FUNCTIONALITY OF THE EXISTING UTILITY UNTIL SUCH TIME AS IT CAN BE ABANDONED O4 SPU CONDUIT AND APPURTENANCES SHALL BE INSTALLED FOR FUTURE CATHODIC PROTECTION SYSTEM (BY OTHERS), SEE DETAILS, SHT CP-2 O8 REPLACE SURVEY MONUMENT PER CITY STD DETAIL H031 AS REQUIRED FOR CONSTRUCTION 10 NEW SSMH AS SHOWN PER CITY STD DETAIL 400.1, 4011 AND 106 12 NEW SANITARY SEWER PIPE PER CITY STD DETAIL 405 13 SIDE SEWER PER CITY STD DETAIL 406.1, 406.2, AND/OR 407 AND CO IF SHOWN e 35 25 c 15 10 S2NDST SEWER PLAN & PROFILE STA A4+80 TO STA A9+60 S-394907 SHEET SS-2 51 of 121 .. REVISION PROJECT NO.: 18-2251 I SCALE: AS SHOWN I DATE: JANUARY 2021