Loading...
HomeMy WebLinkAboutS-394908• N i r U N V) J N z O V) w w w w J w (10 0 M N 0 N 0 M i U7 al U) Ln N N i L0 a) v 0 Q U i N a) L0 ra a a 0 c 0 c ry N N i 00 U L �I w s1 35 30 25 20 15 10 5 SSMH 5330 RIM 32.21 m CB 62819 RIM 32.22 E 29.6 S, 6" CONC SSMH 62818 SDMH 6821148 SSMH 62147 400 IE 20.5 E,W ® CL 29.2 E, 12" CPP �� RIM 32.55 RIM .1 S, 400 RIM 31. RIM 32.38 IE 26.4 E, W @ CL IE 31.1 S, 6" CONC IE 27.5 SE,NW ®CL, IE 20.5 N IE 20.8E p, _34-34- IE 20.8 S I - W - - 0 -. - =� W CB 62448 15 o RIM 32.12 ® �00� cn I _33�.3N,6"CONC ----- ---- EXISTING SSMH - - - - - 33_--Tf---- T - - - - -T - �- - __-_. -.-�- -T w KEPT IN PLACE - - P -� G� = - .- - --TYT�P- - - - - _ W v/ _ �z ' u � J D I [ ) V W bit oa 'Ir - . • .lmqw�IIIIIIII� OIL _-_ ti■ .RAJ _. �s - -_- _ - o �,SS Wow - if --- • 1 1 f� s • ■ - •W611 2 1.] 1 1 1 • D.T91TITA JL -STAA9+75,28'RI �ISSMH #6 - ■ . - �� �f IF ■ ■ ��� •+■1 ■ ■ now �. 11-7 CITY ROW • 87. RT 12' Ll�j4 1" MH FRAME : COVER 1 _� + 4: . . . • CRITICAL FIBER OPTIC, • =�'.i !� * _ • C ■ ■ 11IR ;F=7x-- �-IN-PLACE PER 1-07.17� I r• _ .., .� tYl..,. - .•.ii •, Ic, �l,CPMH #2 Ilm VM1 IE 28.3 28.8 N, 6 CO 1-30 MH FRAME & COVER - IE 28.4 NE, 4' CONC c FOR CONTINUATION FOR CONTINUATION SEE SHEET SS-15 PLAN SEE SHEET SS-19 RECORD DRAWINGS SHOW CONTRACTOR SURVEYED STRUCTURE LOCATIONS AND ELEVATIONS. THE ORIGINAL DESIGN LOCATIONS AND ELEVATIONS ARE INDICATED WITH STRIKETHROUGH TEXT. REFER TO CONTRACT DOCUMENTS FOR ADDITIONAL DETAILS 0 10 20 40 60 SCALE: 1"=20' CB 63513 RIM 32.22 IE 29.9 W, 6" CONC SIDE SEWER TABLE SIDE APPROX COORDINATES SEWER NO.* ADDRESS STATION AT OF CO OR CPLG MAIN SEE SS-15 E: 2ND ST SEE SS-15 E: 2ND ST 2ND ST SEE SS-15 E: v1 I- u N ' : o M U) u - : U) o U=M N N N >an U H X w � EXIST GR @ ,� II Z w > Z) � II w > o6 U) ROW CL a Oa' '-' V) c~n c~_n U) LO, U) U) , J) a O X w a X w X w X w[7 X w X� w a- a w wl w - - - - - - - --- - - - - --- - - - - - - - - --- - - - - -- --- - - -- - - - - --- - - - - - - - - --- - - - - --- - - - - - - - - - - - - - z -- - - - A - I L - --- - - - - --- - - - - - - - - --- - - - - - Q0 o p + + 0) rl N Q Q w (!� w = W 12 TY Lu U) z 328 LF 8" C900 SS @SLP=U o z w J w 312 LF 8" SDR � w J 35 SS @ SLP=0.6% = SSMH #6 10 _ uSTA A9+75, 28' RT A9+�CR � u Q RIM=32.50 32.89 Q IE(IN)8"(S)=21.65 zzA-.8,, SSMH #7 10 IE(OUT)8"(E)=21.29 28.54 STA Al2+87, 28' RT RIM=33.07 33.-3. IE(IN)8"(W)=19.50 +9-2t (BEHIND) EXISTING MA HOLE IE(IN)8"(E)=19.45 +9.2+ STA A9+72, 12' LT IE(OUT)8'(S)=19.45 +9-+I- RIM = 3 2.313z'--�G IE(IN)8"(W)=21.88 z` +.42 IE(OUT)15"(E)=21.23 26-.-88 A9+60 A9+80 A10+00 A10+20 A10+40 A10+60 A10+80 A11+00 A11+20 A11+40 A11+60 A11+80 Al2+00 Al2+20 Al2+40 Al2+60 Al2+80 A13+00 A13+20 A13+40 A13+60 A13+80 A14+00 PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT 1\ 110/26/20221 JJM I RECORD DRAWING NO. I DATE I BY NOTICE Jim 0 Y2 1 DESIGNED BAW DRAWN IF THIS BAR DOES NOT MEASURE 1" TTT THEN DRAWING IS CHECKED NOT TO SCALE RECORD DRAWINGS SEE NOTE ON murra sm� COVER SHEET RENTON DOWNTOWN o UTILITY IMPROVEMENTS PROJECT m 35 30 25 20 15 10 5 CONSTRUCTION NOTES: O1 CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 O SPU CONDUIT AND APPURTENANCES SHALL BE INSTALLED FOR FUTURE CATHODIC PROTECTION SYSTEM (BY OTHERS), SEE DETAILS, SHT CP-2 10 NEW SSMH AS SHOWN PER CITY STD DETAIL 400.1, 401, AND 106 12 NEW SANITARY SEWER PIPE PER CITY STD DETAIL 405 15 CONNECT EXIST PIPE TO NEW PIPE W/ CPLG, SEE DETAIL 2, SHT SS-42 SIDE SEWER TABLE SIDE APPROX COORDINATES SEWER NO.* ADDRESS STATION AT OF CO OR CPLG MAIN SEE SS-15 E 2ND ST : SEE SS-15 E 2ND ST : 400 S N' 2ND ST NIC E: *SS NO. SPECIFIC TO THIS SHEET S2ND ST SEWER PLAN & PROFILE STA A9+60 TO STA A14+00 S-394908 I SHEET SS-3 52 of 121 no REVISION PROJECT NO.: 18-2251' SCALE AS SHOWN I DATE: JANUARY 2021