HomeMy WebLinkAboutS-394918CONSTRUCTION NOTES:
N
I
r
U
V)
N
z
O
V)
w
w
w
w
7
J
w
Q
O
M
ri
M
N
O
N
O
\
M
i
U)
(1)
0)
3
70
U)
U)
i
N
N
i
Q)
a�
0
Q
U
N
a�
V)
r�
a
a
0
0
0
ry
N
N
i
00
V)
U
L
�I
w
IE 28.7 S, 6" CO
_S D-
DM 2�8
RIM 0.86
IE 21. N,
IE 21.2
E 12" I p5
BOT OP
RECORD DRAWINGS SHOW CONTRACTOR
SURVEYED STRUCTURE LOCATIONS AND
ELEVATIONS. THE ORIGINAL DESIGN
LOCATIONS AND ELEVATIONS ARE INDICATED
WITH STRIKETHROUGH TEXT. REFER TO
CONTRACT DOCUMENTS FOR ADDITIONAL
DETAILS
1\ 110/26/20221 JJM I RECORD DRAWING
NO.1 DATE I BY
35
30
25
20
15
10
MIC 264W ' _)�
I
MATCHLINE STA E5+00
SEE SHEET SS-12
wl
S 2ND ST E G----� G-----G-----G-----0(78-
�_ - -- -
P UGR - - x - UGP - - - - - -
-31 — — - - - -T - - - T GP= —U - - - - UGP- _
6 — - -32 t CD
-I-- - ------ --- - -------- ------�----
- 1- - - - C) CD RPL#3 66" STL 32
x 111 - ------ - __
-- --------- -
`l�GfF = - - �6 - - I ------- SD H
r STA E5+94 1' LT 10 -________________________ I _IE
-
SSMH #24 CRPL#1 66" STL
-------------------------------
1-48" DIA MH - I - - - -
- - - - - - - - -
- - CRPL#2 51.5" STL
- - - - - - - - - - - - - - - - - - - - 1654 - - - - - -- - - - - - - - -
69
E,12"PVC - -- --UGP --U -
UGP— — —
N, 24" CONC G - -
S, 30" CPP vGP/ x— �x I CD —x—
-
1 -
_
O__ _ _
Z U: _ F 12' CIPP SS1 - - E7+00- - - - - D - - -
--SD ---- D - -
17 10''W 10"1CB3200§3p/
VN 0„W 10, cn
17
5/ SS H 27758 17 m - - S 17 - - -
RIM 31.56 RIM 31.27 �
12" CPP IE 4.8 W, 6" IRON IE 27.2 E, V2" CPP
30" CPP IE -CON IE 27.1 S/12" CONC
30" CPP IE 23.7 S-E ® CL 12" IRON /
o / CB 32002
H 65 RIM 31.13
IE 27.9 S, 12" CPP
31 8 »CPP / L / CB 32001
8. / I
g. " CPP RIM 31.62 /
/ IE 28.2 S, 6" PVC /
IE 7T6- -, 12 CPP
IE 27.6 E, 12" CPP
-5+ 13, 0' RT IE 27.5 W, 12" CPP
1 #6476
DIA MH /
759 /
7
PLAN
0 10 20 40 60
SCALE: 1"=20'
O
00
W
Q
U)
V)�-
w
W w
z=
i--I w
w
_ U)
U
Q
a
U)
a
a
N
LO
U
U)
(n
X
x
xEXIST
GR @
x
x
w
w
w
CL
w
w
ROW
--
1
+
-
----
--
-
---
- -
----�---
-- -
----
----
--
-----
-�
----
O
+
Ln
00
N Lu
LU
Q
Q
U)
LO
U)
U)
� U)
0
E
IST 12" C
AY
E
IST 12" C
Y
U)
ww
ww
z
z=
81 LF 12" CIPP SS
237 LF 12" CIPP SS @ SLP=0.1%_
LO
@ SLP=0.4%
LO
wLu J
Jw
Lu
U) =
= U)
U
U
Q
EXIST
SSMH 6476
SSMH #24 10
Q
STA
LT
STA E5+94, 1' LT
E5+13, 0'
RI
=31.73
RIM=31.45 3+.6
IE(IN)8"
S =23.93
IE(IN)12"(S)=23.57-2-3-��
IE(OUT)12"(E)=23.61 23-F8
IE(IN)8"(W)=
5.91 25-:F8
IE(OUT)12"(N)
23.93
IE(OUT)8"(NW)=24.60 z�4-88
E5+00 E5+20 E5+40 E5+60 E5+80 E6+00 E6+20 E6+40 E6+60 E6+80 E7+00 E7+20 E7+40 E7+60 E7+80 E8+00
PROFILE
SCALE: 1"=20' HORIZ, 1"=5' VERT
NOTICE Jim RECORD
0 Y2 1 DESIGNED DRAWINGS
BAW
IF THIS BAR DOES DRAWN SEE NOTE ON
NOT MEASURE 1" TTT murmt
ra
THEN DRAWING IS CHECKED COVER SHEET 7SMlh NOT TO SCALE
EA
m
35
30
25
20
15
10
RENTON DOWNTOWN
o UTILITY
IMPROVEMENTS
PROJECT
10 NEW SSMH AS SHOWN PER CITY STD
DETAIL 400.1, 4011 AND 106
14 GROUT NEW PIPE INTO EXIST SSMH W/
SANDED ADAPTER AND RE -CHANNEL SSMH,
SEE DETAIL 1, SHT SS-42
15 CONNECT EXIST PIPE TO NEW PIPE W/
CPLG, SEE DETAIL 2, SHT SS-42
17 DO NOT REINSTATE INACTIVE SERVICE
LATERAL
SIDE SEWER TABLE
SIDE
APPROX
COORDINATES
SEWER NO.*
ADDRESS
STATION
OF CO OR CPLG
AT MAIN
101 S 2ND ST
SSMH
N:
#6476
E:
*SS NO. SPECIFIC TO THIS SHEET
PARKING LOT EASEMENT
SEWER PLAN & PROFILE
STA E5+00 TO STA E8+00
S-394918
SHEET
SS-13
62 of 121
so
REVISION
PROJECT NO.: 18-2251 I SCALE: AS SHOWN I DATE: JANUARY 2021