Loading...
HomeMy WebLinkAboutS-394922N4 �i SEE SHEET SS-3 FOR CONTINUATION r)I")!'1TCf--r CnI I \A/ATCI7 TKI I-11 A!'`C =I7 CONSTRUCTION NOTES: N r U N U) V) N z O ne w w w w r-, J w Q 0 ro N O N O \ rn u) u7 Ln N N i L0 a� v Q i N (L) ra a a p c 0 c ry N N i 00 V) +1 u L �I w FOR CONTINUATION SEE SHEET SS-3 m 35 30 25 20 15 10 Il CIl1 At-r7 CC' PLAN 0 10 20 40 60 SCALE: 1"=20' 0 rn Ln .. w a O IE=29.06 SEE SS-20 FOR SIDE SEWER CONNECTION O N (n O N I U) w Ww z� '—' w J w _ur) U Q RECORD DRAWINGS SHOW CONTRACTOR SURVEYED STRUCTURE LOCATIONS AND ELEVATIONS. THE ORIGINAL DESIGN LOCATIONS AND ELEVATIONS ARE INDICATED WITH STRIKETHROUGH TEXT. REFER TO CONTRACT DOCUMENTS FOR ADDITIONAL DETAILS a p pW . U) O. Z w U)W Ll N oV (DN ui C0 11u- w EXISTGR@ �dS Ln w �LU00a MDU N ~~~~Ln cn ncn cnOO O L O ROW i LO ) a O u X w 1- X X0� X 0C w w a w X w w w X w a w w -- — — — /—/ ---------- — — ---------- — ------ --- ------ --- — -- O -- w N O o O + oo O (D o 0 O I I U) I w zU) I --I w J w APPROX. EXTENT OF = LO 12 TYP CASING U Q SSMH #7 =0.50/0 STA Al2+87, 28 RT 10 $ % RIM=33.07 3 z-3 IE(IN)8"(W)=19.50 +9.2+ IE(IN)8"(E)=19.459-�-t IE(OUT)8"(S)=19.459-fit GO+00 GO+20 GO+40 GO+60 GO+80 G1+00 G1+20 G1+40 G1+60 G1+80 G2+00 G2+20 G2+40 G2+60 G2+80 G3+00 G3+20 PROFILE SCALE: 1"=20' HORIZ, 1"=5' VERT 1\ 110/26/20221 JJM I RECORD DRAWING NO. I DATE I BY NOTICE Jim RECORD 0 Y2 1 DESIGNED DRAWINGS BAW IF THIS BAR DOES DRAWN SEE NOTE ON murra sm� mt NOT MEASURE 1" TTT THEN DRAWING IS CHECKED COVER SHEET NOT TO SCALE EA m 35 30 25 20 15 10 RENTON DOWNTOWN o UTILITY IMPROVEMENTS PROJECT 1O CONSTRUCTION CL EQUALS R/W CL, SEE SURVEY CONTROL PLAN, SHT G-5 10 NEW SSMH AS SHOWN PER CITY STD DETAIL 400.1, 4011 AND 106 12 NEW SANITARY SEWER PIPE PER CITY STD DETAIL 405 13 INSTALL SIDE SEWER PER CITY STD DETAIL 406.1, 406.2, AND/OR 407 AND CO IF SHOWN SIDE SEWER TABLE SIDE APPROX COORDINATES SEWER NO.* ADDRESS STATION AT OF CO OR CPLG MAIN 215 �1 WHITWORTH G2+65 N' AVE S E' 220 [2] WHITWORTH G3+15 N' E' AVE S *SS NO. SPECIFIC TO THIS SHEET WHITWORTH AVE S SEWER PLAN & PROFILE STA GO+00 TO STA G3+20 S-394922 SHEET SS-19 66 of 121 no REVISION PROJECT NO.: 18-2251 I SCALE: AS SHOWN I DATE: JANUARY 2021