RIM=38.39 1
• MIN �'
-p -
'
_ w rAm rkNj
� I
ABANDON EXISTING EXTERIOR EXIST IE=31.74 1
DROP PENETRATION W/ BLIND FLANGE -
Pc�VIDE &T'kUC.'r%AA.L. F.0 P;%QR*-T k I
1
UPPERREMOVE CONNECTION,
PROVIDE TESTING AND CCTV
INSPECTION OF LOWER PORTION -.x
CONTINGENT REMOVAL OF LOWER
PORTION, SEE NOTE BELOW
AFL . J-LP.L ?V $ NE QLA'S5 -5' a%
Q LVIT I L. L' '-Fla"
fkl-t 'F—ir I rv-rw :S t-n E�F_ ctxs 3 f 4,F
ZFAJEC T $hr_44Fk�.L
rN TW * G-00-r L l Ft Z P,U%i
1;0 ��li � R071- ?4-1 Ahid� fLtia W-WE
17
,
r6
CITY OF RENTON AS —BUILT OF
r
EXISTING DROP CONNECTION
ADJUSTMENT AND ASPHALT
PATCH PER CITY STD PLAN 106
MH FRAME AND COVER \ — — — —
PER CITY STD PLAN 401 \ —
VICTAULIC CPLG & END CAP
W/316 SS BOLTS
ADJUSTMENT RING
PER CITY STD PLAN
400.1
6" MIN
I
ri
�VL 4L.,y a LJ% 1;. R L Q.
KING
COUNTY MANHOLE
R01-20
DROP
PIPE DEMOLITION
AND
INSPECTION
SCALE : NTS
NOTES:
1. FOLLOWING THE CONTRACTOR'S CCTV INSPECTION OF THE LOWER PORTION OF THE EXISTING EXTERNAL DROP, THE ENGINEER WILL DETERMINE IF THE LOWER PORTION WILL
BE RE -USED OR REPLACED. IF REPLACEMENT IS REQUIRED, IT SHALL BE CONSTRUCTED AS SHOWN IN THE LOWER PORTION REPLACEMENT DETAIL ON THIS SHEET
KING COUNTY WASTEWATER TREATMENT DIVISION SEWER NOTES:
1. KING COUNTY SHALL REVIEW AND COMMENT ON THE CONTRACTORS ACCIDENT PREVENTION PROGRAM (APP) PER WAC 296-800-140/296-155-110 AND SITE SPECIFIC/ PROJECT
SPECIFIC HEALTH AND SAFETY PLAN (HASP) PER WAC 296-155/WD 27.00.
2. KING COUNTY MANHOLES ARE PERMIT REQUIRED CONFINED SPACES AND ALL APPLICABLE RULES AND REGULATIONS SHALL BE FOLLOWED PRIOR TO ENTRY.
3. NOTIFY MARK LAMPARD AT KING COUNTY (206-477-5414, MARK. LAM PARD@KINGCOUNTY.GOV) A MINIMUM OF FIVE (5) WORKING DAYS IN ADVANCE OF THE PRE -CONSTRUCTION
CONFERENCE.
4. CONTRACTOR SHALL NOTIFY MARK LAMPARD AT KING COUNTY (206-477-5414, MARK. LAM PARD@KINGCOUNTY.GOV) A MINIMUM OF THREE (3) WORKING DAYS IN ADVANCE OF ANY
CONSTRUCTION ACTIVITY WITHIN 50-FEET OF THE KING COUNTY EASTSIDE INTERCEPTOR.
5. THE CONTRACTOR SHALL TAKE MEASURES TO PROTECT THE EASTSIDE INTERCEPTOR DURING SHORING ACTIVITY.
6. KING COUNTY SHALL REVIEW THE SHORING PLANS.
7. A KING COUNTY REPRESENTATIVE SHALL BE PRESENT AT ALL TIMES ON -SITE DURING EXCAVATION, CORING, AND INSTALLATION OF THE CONNECTION TO THE KING COUNTY
EASTSIDE INTERCEPTOR.
8. NO DEBRIS SHALL BE PERMITTED TO ENTER THE KING COUNTY SEWER SYSTEM DURING CONSTRUCTION OF/OR CONNECTION TO THE KING COUNTY EASTSIDE INTERCEPTOR.
9. NO WORK ON OR CONNECTING TO THE KING COUNTY EASTSIDE INTERCEPTOR SHALL BE BACKFILLED UNTIL THE WORK HAS BEEN INSPECTED AND APPROVED BY A KING COUNTY
REPRESENTATIVE.
10. THE CONNECTION TO THE KING COUNTY EASTSIDE INTERCEPTOR SHALL NOT BE PUT INTO SERVICE UNTIL ALL NEWLY INSTALLED PIPE HAS BEEN CLEANED, INSPECTED, TESTED,
AND APPROVED BY THE CITY OF RENTON.
1\ 110/26/20221 JJM I RECORD DRAWING
NO. DATE BY
REVISION
6" MAX I
6" MIN
IF DI
FURP
1-12
2-DI
CEMI
C LAE
/
/
SAND OR
EXPANDABLE FOAM
CORE DRILL AND INSTALL
KOR-N-SEAL
FURNISH & INSTALL:
1-2" CPLG, RESTR, PVCx
1-12" CROSS, RJ
1-DI SPL
KING COUNTY MANHOLE R01-20
DROP PIPE UPPER PORTION RECONSTRUCTION
SCALE: NTS
LOWER PORTION NOT REPLACED
KING COUNTY MANHOLE R01-20
SCALE : NTS
S-394931
NOTICE Jim RECORD
DESIGNED RENTON DOWNTOWN SHEET
0 /2 1 BAW DRAWINGS ® UTILITY KING COUNTY CONNECTION DETAIL
DRAWN S 2ND ST & BURNETT AVE S SS-4O
IF THIS BAR DOES SEE NOTE ON murraysmirth� IMPROVEMENTS
NOT MEASURE 1" TTT
THEN DRAWING IS CHECKED COVER SHEET PROJECT
NOT TO SCALE 75 Of 121
PROJECT NO.: 18-2251 1 SCALE: AS SHOWN DATE: JANUARY 2021