Loading...
HomeMy WebLinkAboutS-422702N Nt 0 w rr W n O n W �z Cl) "H U -N SEWER 000 � 10-1/2" 1/4„12-1/2„ I 1 •, 2-1/4" 14" 12-3/4" If i tom- 1 1 • - - 2 1-1/4'� CAST IRON RING AND RECESSED LIFT POCKET Not to Scale FRAME 1'-n" nIALICTED 1'-n" NOTES. 1 8" AND 6" CLEAN -OUT RINGS AND COVERS ON SEWER MAINS SHALL BE EAST JORDAN IRON WORKS, INC No 3698 (PRODUCT NO 00369803) OR APPROVED EQUAL CLEAN OUT SHALL BE A WATER TIGHT ASSEMBLY 2 IN UNIMPROVED AREAS, POUR A 8" THICK, S-0" SQUARE CONCRETE, CLASS 3000, PAD AROUND THE RING AND COVER 3 INSTALL ASPHALT COLLAR PER STANDARD PLAN 106 OR DABLE STD. PLAN - 403.1 URIPUBLIC WORKS 8" OR 6" CLEANOUT xroysmomned by DEPARTMENT FOR SANITARY SEWER MAIN Martin PastuCtia/26/2020 [h-AU=WM49D DATE r Call 2 Working Days Before You Dig 811 Utilities Underground Location Center (ID,MT,ND,OR,WA) Q. Q NE 1/4 SECTION 14, TOWNSHIP 23 N, RANGE 5 E, W.M. SNYDER PROPERTY W (SEE NOTE 7) BEDDING MATERIAL FOR SANITARY SEWER PIPE (SEE NOTE 5) ---\ FOUNDATION LEVEL LIMITS OF PIPE ZONE a O.D. of PIPE 0 BEDDING FOR SANITARY SEWER PIPE NOTES 1. PROVIDE UNIFORM SUPPORT UNDER BARREL 2. HAND TAMP UNDER HAUNCHES. 3. COMPACT BEDDING MATERIAL TO 95% MAX. DENSITY EXCEPT DIRECTLY OVER PIPE. HAND TAMP ONLY. 4. PIPE INSTALLATION SHALL BE PER SECTION 7-08 OF THE STANDARD SPECIFICATIONS 5 PIPE ZONE MATERIAL SHALL BE PER SECTION 9-03.12(3) OF THE STANDARD SPECIFICATIONS 6. PIPE MUST BE ANCHORED IN SUCH A MANNER AS TO ENSURE FLOW LINE IS MAINTAINED 7 TRENCH WIDTH SHALL BE PER SECTION 2-09.4 OF THE STANDARD SPECIFICATIONS. STD. PLAN - 405 • PUBLIC WORKS PIPE BEDDING (APPP67fl�--.11 VR DEPARTMENT FOR SANITARY SEWERS Martin Pastuch&/26/202 I FU4ftti449D DATE 1 12: ---------- ifs EX. SEWER MAIN I I I i t I I 1 I I I 1 SPOOL I I I Z i (LENGTH AS NEEDED) - I I I 0 I 6" SEWER STUB ! ! !+ I I I I I I I I I I I I I I SEWER MAIN TEE X 6" TEE SIDEWALK i l i COUPLING L-J TYP I I I ( ) -L---------J Q 0 0 I' x I� -------------------_--r'J r--------- L --- j BEND AS -` REQUIRED EXISTING SANITARY SEWER MAIN ., „v ulnl SLOPE 1 `6" SEWER STUB SEWER MAIN SIZE X 6" TEE PROPERTY LINE —3'-0" MIN FUTURE 4" SIDE SEWER J2"x 4" STUD MARKING POST PAINTED 6" CAP J WHITE WITH THE WORD "SEWER" STENCILED \ IN 3" HIGH BLACK LETTERS AND #6 WARE WRAPPED AROUND THE STUD AND EXTENDED TO THE TOP OF THE STUD 6"X6"X6" SURFACE CLEANOUT WITH CAST IRON RING AND COVER (EAST JORDAN IRON WORKS PRODUCT NO 00367502 OR APPROVED EQUAL, SPECIFY "SEWER" ON LID), CLEANOUT TO BE CENTERED IN A 2'x2' CONCRETE PAD CONCRETE PAD TO BE 8" IN DEPTH 1 T 8" FUTURE 4" SIDE SEWER 6"X6"X6" WYE `FUTURE 6"x 4" REDUCER ACCEPTABLE PROCEDURES FOR SIDE SEWER CONNECTIONS TO EXISTING SEWER MAIN A VITRIFIED CLAY MAIN - CUT IN A NEW PVC "TEE" USING "STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL). B CONCRETE MAIN - CUT IN A NEW PVC "TEE" USING *STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL) C PVC h C900 PVC MAIN - CUT IN NEW TEE USING RIGID COUPLINGS OR CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL) D. DUCTILE IRON MAIN - CORE -DRILLED WITH A ROMAC SADDLE (OR APPROVED EQUAL) E LINED MAIN - CONNECTION TO SEWER MAINS THAT HAVE BEEN LINED (CIPP, ETC), CUT IN A NEW PVC "TEE" USING "STRONG -BACK" FLEXIBLE COUPLINGS (FERNCO OR APPROVED EQUAL). F HDPE - CORE -DRILLED WITH A ROMAC SADDLE "INSERTA-TEE" MAY BE USED ON SEWER MAINS 12" DIAMETER OR LARGER G MANHOLE CONNECTION - ALL CONNECTIONS TO MANHOLES SHALL BE AT MANUFACTURED KNOCK -OUTS OR THE STRUCTURE SHALL BE CORE -DRILLED AND USE KOR-N-SEAL BOOTS OR APPROVED EQUAL NOTES 1 PRIOR TO INSTALLATION OF A SANITARY SEWER STUB, A SIDE SEWER STUB PERMIT MUST BE PURCHASED FROM THE CITY OF RENTON PUBLIC WORKS DEPARTMENT 2 UNLESS OTHERWISE SHOWN ON PLAN, SIDE SEWER SHALL HAVE A MINIMUM 2 5' COVER AT PROPERTY LINE OR 3-5' LOWER THAN THE LOWEST HOUSE ELEVATION, WHICHEVER IS LOWER 3 SIDE SEWERS SHALL HAVE A MINIMUM 2 R SLOPE UNLESS APPROVED BY THE PUBLIC WORKS INSPECTOR 4 FOR INSPECTION OF THE SIDE SEWER STUB, CALL 24 HOURS IN ADVANCE. THE INSPECTION PHONE NUMBER IS ON THE SIDE SEWER STUB PERMIT SITE MUST BE READY FOR INSPECTION AND A REPRESENTATIVE ON SITE WHEN INSPECTOR ARRIVES AT THE APPOINTED TIME DO NOT BACKFILL THE TRENCH UNTIL APPROVAL IS GIVEN BY THE INSPECTOR 5 ALL TRENCH RESTORATION FOR SIOE SEWERS IN THE PUBLIC RIGHT-OF-WAY SHALL CONFORM TO STANDARD PLAN 110 OR 110 2 6 THE SIDE SEWER STUB SHALL HAVE PIPE BEDDING IN ACCORDANCE WITH STANDARD PLAN 405 7 ALL SIDE SEWER STUBS SHALL BE INSTALLED BY A CONTRACTOR LICENSED AND BONDED IN THE STATE OF WASHINGTON SIDE SEWER STUB STD. PLAN - 406.1 ,-, • PUBLIC WORKS INSTALLATION APP •, DEPARTMENT Martin PastuClt@✓26/202 VASOF (SEWER MAIN TO PROPERTY LINE)(m-Afi8&UFD988"9D 1-1 ww.,w l.— DATE D.R. STRONG CONSUL TING ENGINEERS ENGINEERS PLANNERS SURVEYORS 620 - 7th AVENUE KIRKLAND, WA 98033 0425.8273063 F425.827.2423 1 CITY COMMENTS YLP 109.07.22 YLP SURVEYED: DJC 2 ONSITE INTERCEPTOR TRENCH YLP 02.13.23 YLP DESIGNED: 3 AS—BUILTS YLP 10.4.23 YLP DRAWN: YLP CHECKED: YLP NO. REVISION BY DATE APPR APPROVE 112: WASTEWATER UTILITY STANDARD NOTES 1 ALL WORK AND MATERIAL SHALL BE IN CONFORMANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY OF RENTON PUBLIC WORKS DEPARTMENT AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATIONS, AS APPROVED AND MODIFIED BY THE CITY OF RENTON STANDARD PLANS & SPECIFICATIONS A SET OF APPROVED PLANS SHALL BE KEPT ON SITE AT ALL TIMES DURING CONSTRUCTION 2 DATUM FOR VERTICAL CONTROL SHALL BE NORTH AMERICAN VERTICAL DATUM 1988 HORIZONTAL CONTROL SHALL BE NORTH AMERICAN DATUM 1983/1991 UNLESS OTHERWISE APPROVED BY THE CITY BENCHMARKS AND MONUMENTS SHALL BE REFERENCED ON THE APPROVED PLANS 3 A PRE -CONSTRUCTION CONFERENCE AND A 24-HOUR NOTICE SHALL BE REQUIRED PRIOR TO STARTING NEW CONSTRUCTION IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO SECURE ALL NECESSARY PERMITS, INCLUDING STREET USE PERMITS, PRIOR TO STARTING CONSTRUCTION INSPECTION WILL BE ACCOMPLISHED BY A REPRESENTATIVE OF THE CITY. IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO NOTIFY THE PUBLIC WORKS INSPECTOR 24 HOURS IN ADVANCE OF BACKFILLING ALL CONSTRUCTION 4 THE HOURS OF WORK IN THE STREET RIGHT-OF-WAY SHALL BE PER CITY SPECIFICATIONS ON WEEKDAYS UNLESS OTHERWISE APPROVED IN WRITING BY THE PUBLIC WORKS DEPARTMENT AN APPROVED TRAFFIC CONTROL PLAN MUST BE OBTAINED PRIOR TO BEGINNING ANY WORK WITHIN THE PUBLIC RIGHT-OF-WAY 5 CONTRACTOR IS SOLELY RESPONSIBLE FOR THE MEANS, METHODS AND SEQUENCES OF CONSTRUCTION AND FOR THE SAFETY OF WORKERS AND OTHERS ON THE CONSTRUCTION SITE IN ACCORDANCE WITH LOCAL, STATE AND FEDERAL REQUIREMENTS. 6. ALL LOCATIONS OF EXISTING UTILITIES SHOWN ARE APPROXIMATE AND IT SHALL BE THE CONTRACTOR'S RESPONSIBILITY TO VERIFY THE TRUE AND CORRECT LOCATION SO AS TO AVOID DAMAGE OR DISTURBANCE THE CONTRACTOR SHALL COMPLY WITH THE REQUIREMENTS OF RCW 19 122 A DIG TICKET SHALL BE OBTAINED A MINIMUM OF TWO BUSINESS DAYS PRIOR TO STARTING ANY EXCAVATION THE CONTRACTOR SHALL HAVE A COPY OF THE DIG TICKET ON SITE AT ALL TIMES 7. BACKFILL SHALL BE PLACED EQUALLY ON BOTH SIDES OF THE PIPE IN LAYERS WITH A LOOSE AVERAGE DEPTH OF 12-INCHES, MAXIMUM DEPTH 18-INCHES, THOROUGHLY COMPACTING EACH LAYER TO 95 PERCENT OF MAXIMUM DENSITY THESE COMPACTED LAYERS MUST EXTEND FOR ONE PIPE DIAMETER ON EACH SIDE OF THE PIPE OR TO THE SIDE OF THE TRENCH MATERIALS TO COMPLETE THE FILL OVER THE PIPE SHALL BE EQUIVALENT TO BANK RUN GRAVEL FOR TRENCH BACKFILL (9-03.19). 8 SANITARY SEWER PIPE SHALL BE POLYVINYL CHLORIDE (PVC) RUBBER-GASKETED ASTM D 3034, SDR 35, C900/C905 OR DUCTILE IRON CLASS 50, UNLESS OTHERWISE APPROVED BY THE CITY 9 SANITARY SEWER PIPES SHALL NOT BE LOCATED UNDER ANY STRUCTURE (WALL, BUILDING FOUNDATION, ETC) UNLESS APPROVED BY THE CITY IF A SANITARY SEWER IS TO BE LOCATED UNDER ANY STRUCTURE (WALL, BUILDING FOUNDATION, ETC.), IT SHALL BE DESIGNED BY A PROFESSIONAL ENGINEER LICENSED IN THE STATE OF WASHINGTON IN ACCORDANCE WITH STANDARD DETAIL 412 10. OPEN -CUT ROAD CROSSINGS FOR UTILITY TRENCHES ON EXISTING TRAVELED ROADWAYS SHALL BE BACKFILLED WITH CRUSHED SURFACING AGGREGATE (WSDOT SPECIFICATION 9-03 9(3) AND MECHANICALLY COMPACTED UNLESS OTHERWISE APPROVED BY THE CITY 11 ALL PIPE AND APPURTENANCES SHALL BE LAID ON A PROPERLY PREPARED FOUNDATION IN ACCORDANCE WITH THE STANDARDS AND SPECIFICATION OF THE CITY AND THE LATEST EDITION OF THE WSDOT/APWA STANDARDS AND SPECIFICATION AS APPROVED AND MODIFIED BY THE CITY IN THE RENTON STANDARD PLANS & SPECIFICATIONS THIS SHALL INCLUDE NECESSARY LEVELING OF THE TRENCH BOTTOM OR THE TOP OF THE FOUNDATION MATERIAL TO A UNIFORM GRADE SO THAT THE ENTIRE LENGTH OF THE PIPE WILL BE SUPPORTED ON A UNIFORMLY DENSE, UNYIELDING BASE PIPE BEDDING SHALL BE IN ACCORDANCE WITH STANDARD PLAN 405 12 ALL DISTURBED AREAS SHALL BE SEEDED AND MULCHED OR OTHERWISE STABILIZED TO THE SATISFACTION OF THE CITY FOR THE PREVENTION OF ON -SITE EROSION BOTH DURING CONSTRUCTION AND AFTER THE COMPLETION OF CONSTRUCTION IN ACCORDANCE WITH THE CURRENT SURFACE WATER DESIGN MANUAL 13 THE CONTRACTOR SHALL PROVIDE THE CITY OF RENTON WITH A RECORD DRAWING OF THE SANITARY SEWER SYSTEM WHICH HAS BEEN STAMPED AND SIGNED BY A LICENSED PROFESSIONAL ENGINEER OR LICENSED PROFESSIONAL SURVEYOR • PUBLIC WORKS WASTEWATER UTILITY STR. PLAN - 413 APPROVED'" DEPARTMENT STANDARD NOTES Martin PastuchaLO/26/2 roeu. woes.nmia.,n,a DATE 0 R-0422709 S-0422701 IN COMPLIANCE WITH CITY OF RENTON STANDARDS AS -BUILT NO AS —BUILT INFORMATION ON THIS SHEET. "I CER71FY THAT THE INFORMATION SHOWN HEREON WHICH WAS AS —BUILT BY D.R. STRONG, AND MAY INCLUDE LOCATIONS, ELEVATIONS, DEP7HS, PIPE SIZES, AND AS —BUILT COMMENTS, ACCURATELY REFLECTS EXIS71NG FIELD COND17IONS AS DETERMINED BY ME OR UNDER MY DIRECT SUPERVISION ON THIS DATE: 91291202J SCALE: DATE: VERTICAL: NAVD 1988 3/1 • SNYDER PROPERTY 07.08.22 AS NOTED HORIZONTAL: NAD 198/1991 o O T Y O E ,R SANITARY SEWER DETAILS FIELDBOOK: RENTON PAGE: ONE INCH DATUM • DRAWING NO: AT FULL SCALE Planning/Building/Public Works Dept. 13229 & 13233 158TH AVE SE (gig IF NOT ONE INCH SCALE ACCORDINGLY RENTON, WASHINGTON 98059 SHEEP: 9 OF: 00 M O O N N M, u DRS PROJECT NO. 21155