Loading...
HomeMy WebLinkAboutMFP23006060.pdfDEPARTMENT OF COMMUNITY AND ECONOMIC DEVELOPMENT Minor Franchise Permit: MFP23006060 IVR Number: 23006060 Permit Information Permit Name: Puget Sound Energy - Electric Address/Location:12/06/2023Application Date:3340404006Parcel Number: 1601 LIND AVE SW Permit Type:12/14/2023Issue Date:Franchise Permit Work Class:12/13/2024Expiration Date:Minor Utility Job Number: 101160733Franchise Type:Electric Description: Puget Sound Energy Electric CREW TO PARK IN ROW. NO HS CUTS Contacts Name Address PhoneTypeBilling Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031ApplicantX Vicki Henson Potelco Inc 8001 212th St S Kent, WA 98032 B: (253) 863-0484Contractor Business License Number: 5109Electrical Contractor: POTELI*344O4 Construction Contractor: POTELI*227PL Puget Sound Energy Inc 10885 NE 4th Street, PSE08-N08 Bellevue, WA 98009 B: (888) 225-5773Emergency Contact CITY OF RENTON ROW 1055 S Grady Way Renton, WA 98057-3232 Owner Corrie Rydberg Puget Sound Energy 3702 71st Ave W University Place, WA 98466 C: (253) 905-5031Specialized Billing General Conditions & Signature Permission is hereby given for the work described on this permit according to the conditions hereon and according to the approved plans and specifications pertaining thereto, subject to compliance with the Ordinance of the City of Renton. Ÿ This permit and plans must be posted at the job site at all times.Ÿ I hereby certify that no work is to be done except as described above and in approved plans, and that work is to conform to Renton Trench Restoration and Street Overlay Requirements. Ÿ Call 425.430.7203 or go to: https://permitting.rentonwa.gov one working day in advance to schedule an inspections and for ANY work in the Right of Way. Ÿ Call 8 1 1 to locate underground utilities at least two full business days prior to any excavation.Ÿ In accordance with RCW 19.122.033(4) the permit holder is required to contact (Williams Northwest Pipeline at 425.868.1010) (Olympic Pipeline at 425.235.7736) (Puget Sound Energy at 425.375.3397) to request a consultation with the transmission pipeline company prior to performing any construction or excavation activities. This requirement to consult with the transmission pipeline company is in addition to the requirement to Call before You Dig as required in RCW 19.122. Ÿ (Date)(Signature) Page 1 of 1THIS PERMIT AND PLANS MUST BE POSTED AT THE JOB SITE AT ALL TIMES Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. DEPARTMENT OF PUBLIC WORKS Page 1 of 3 | Published: 10/27/2021 Transportation Division | 1055 South Grady Way, 5th Floor | Renton, WA 98057 | 425-430-7380 Website: rentonwa.gov TRAFFIC CONTROL PLAN APPLICATION Published: 10/27/2021 TRAFFIC CONTROL PLAN (TCP) MUST BE SUBMITTED TO PUBLIC WORKS TRANSPORTATION DIVISION FOR REVIEW/APPROVAL AT LEAST FIVE (5) WORKING DAYS BEFORE THE DATE OF WORK. The City of Renton requires any contractor, firm, corporation, or other public/private agency to prepare a traffic control plan (TCP) and obtain city's approval of that plan when construction, repair, or maintenance work is to be conducted within the city's right-of-way. 1. Fill out the Traffic Control Plan (TCP) Application form and prepare required submittal documents. 2. The following items are all required for submittal of the TCP Application: ☐Electronic Copy of the TCP Application ☐Electronic Copy of the TCP Layout, on 11” X 17” paper size format, which shall: Include map(s) showing the location of the project and work area. Be legible lettering and clear, contrasting, symbols of viewing or printing. Must indicate street names, and north arrow and scale. Types of plans required: o Work hour plan – show all mobility impacts during construction hours. o Non-work plan - show all mobility impacts after work hours when limited or no work is happening in the right-of-way (ROW), if applicable. o Changing construction phases – show construction sequence and each construction phase change even if the traffic control is not modified, if applicable. o Pedestrian access/detour plan, if applicable. - Shall conform to the Washington State Traffic Control Flagger Certification handbook, by the Evergreen Safety Council. 3. Submit Application via email to TCP@rentonwa.gov with the subject line “TCP Application – [Project Name].” Project Name: Permit #: Site Address: Work Date: From _____________ To _____________ Work Time: Start ______________ End ______________ Construction Company: Contact Name: Phone/Cell: _________________________ Business Address: City/State: Zip: Description of Work: Approval By: _________________________________________________ Date:____________________ Transportation Engineering PLEASE SEE ATTACHED POTELCO, INC 6905 S 228TH ST KENT, WA 98032 101160733 1601 LIND AVE SW JENNY CHAU JENNY.CHAU@PSE.COM MFP23006060 Monday - Friday 8:00AM - 3:00PM Scott Warlick CED 12/14/2023 Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 2 of 3 | Published: 10/27/2021 PERMIT HOLDER AGREES TO ALL THE FOLLOWING: Must have approved Traffic Control Plan (TCP) prior to commencing the work. Maintain existing pedestrian access. The work on pedestrian facilities, shall be limited to one corner at a time, with the least possible inconvenience or delay to pedestrians. WORK TIME begins when any street or travel lane is fully or partially closed. This includes set up within the traveled way. Comply with all traffic regulations of the City of Renton and the State of Washington. Prepare a traffic control plan and obtain City approval of that plan. That plan shall be implemented for all street and lane closures, and the plan shall be performed in compliance with the Manual on Uniform Traffic Control Devices. Notify emergency services (253-852-2121) twenty-four (24) hours before any street or lane closures. Contractor or entity must call Renton School District (425-204-4455) or any public/private agency, including public transit, to be affected by a temporary lane or road closure a minimum of five business days (excluding weekends and holidays) prior to starting any work. Contractor or entity must notify King County Metro in writing at construction.coord@kingcounty.gov a minimum of five business days (excluding weekends and holidays) prior to starting any work impacting bus stops, a temporary lane or road closure. Work requiring removing a bus shelter or sign requires notification in writing a minimum of 30 business days (excluding weekends and holidays). Please call King County Metro at 206-477-1140 with any questions. Any lane or street closures not in conformance with the approved traffic control plan and/or without notification of emergency services may result in receiving a citation for violation of R.C.W. 47.36.200 Signs or Flaggers at thoroughfare work sites and R.C.W. 9A.36.050 Reckless Endangerment, and other applicable State and City codes. Indemnify and hold harmless the City of Renton from any and all claims, actions, and judgments, including all costs of defense and attorney’s fees incurred in defending against same, arising from and related to implementation of the approved traffic control plans including claims arising from towing of private vehicles and the acts of the Permit Holder’s agents and employees. The City of Renton shall be entitled, in its reasonable discretion, to settle claims prior to suit or judgment, and in such event shall indemnify and hold harmless the City for any such claims paid, including the City’s reasonable attorney’s fees and litigation costs incurred resulting from such claim. In the event any claim or suit is brought against City within the scope of this Agreement, Permit Holder will pay for legal counsel chosen by the City to defend against same. Flagger and sign placement are subject to revision by the City Inspector on site, if needed to address traffic or pedestrian safety or travel. All permit conditions shall be met. NOTES: Total road closure lasting more than twenty-four (24) hours is subject to the approval by the City Council. Work Zone Traffic Control shall be in accordance with the Manual on Uniform Traffic Control Devices (MUTCD) and shown by a traffic control plan layout or reference to WSDOT. Approved Temporary Traffic Control Plan must be at the work site during work hours. Complete assistance and accommodation shall be provided to all kinds of pedestrian traffic when sidewalk or walkway is impeded to safely redirect pedestrians around a work zone. Signage shall be used to warn motorcyclists/bicyclists of the potential hazards on any uneven surfaced or slippery road conditions during work and non-work hours. Any vehicle, equipment, barricade, or portable tow-away sign used within the work area must display a company logo or any legally acceptable sign showing the company name, address, and telephone number at a conspicuous place on the vehicle or equipment. Note: The Applicant is responsible for compliance with all codes and regulations, whether or not described in this document. Page 3 of 3 | Published: 10/27/2021 In the case of Temporary No Parking Zones, all the following apply in addition to previous: Contractor must complete form to show limits of Temporary No Parking Zone identifying barricade locations for vacate parking or curb lane usage. Contractor must post notice of dates and time of Temporary No Parking Zone with at least two signs per block seventy-two (72) hours in advance of effective date and time. The cover sheet of this Traffic Control Plan form must be attached to each Temporary No Parking Sign on the project site. Temporary traffic control devices must be removed immediately when work is done or no construction activities are going on. If deemed abandoned, City crews will remove and store them at the City’s maintenance shop (3555 NE 2nd Street). I certify that the information on this application and within the submittal documents are accurate to the best of my knowledge and I acknowledge all the requirements on this application. Applicant’s Signature Date Applicant’s Name (Print) CORRIE RYDBERG 1601 Lind Ave SW Renton WA 98057 USA121212BUSSTOP221222SW 16TH STSENECA AVE SW1313SW 16TH STSW 16TH STRAYMOND AVE SW RAYMOND AVE SW14131418181112132020 JSSSW1BP1W20-1ROADWORKAHEADX'≥X'≥X'≥RIGHT LANECLOSEDAHEADW20-5RW1-4LW20-1ROADWORKAHEADW20-1ROADWORKAHEADRESIDENT(S) WILL BE INFORMED OFTEMPORARY DRIVEWAY CLOSURESW 16TH STLIND AVE SW W20-1 ROADWORKAHEADW20-1ROAD WORK AHEAD CENTER LANECLOSEDAHEAD W9-3X'≥X'≥CONETOPPER CONETOPPERCONETOPPERCONETOPPERLEFTKEEPR4-8BNSIGN SPACINGMPH60/6545/5535/403025"X"1000'500'350'200'100'CHANNELIZATIONDEVICE SPACINGMPH55/7035/4525/30TAPER403020TANGENT806040Project Address:PagePSEPUGETSOUNDENERGYDesigner:Job #REVJason Bisenius425-424-7316jason.bisenius@pse.com1 OF 11601 LIND AVE SW, RENTON, WA 980570 51387147311/22/2023Notes:1. All signs and spacing to conform to theMUTCD and City of Renton standards.2. All sidewalks, driveways, exits and egressesshall be completely clear unless otherwise indicated.3. Channelizing devices are 28" traffic cones.Use traffic drums (barrels) with steady burningType C lights on all State State Routes and Hwys.4. Sign size can be a minimum of 36" x 36" andshall not obstruct pedestrian access.5. Crew is required to leave a minimum of 10' fortraveling lane width.6. Alert affected residents and businesses.7. Work to take place during approved work hoursas per jurisdictional requirements. (Generallybetween 9 a.m. and 4 p.m. on non-arterials andfrom 9 a.m. to 3 p.m. on arterials. If night timework is approved, Night time work to take place between_____________and ______________.)LEGEND28" TRAFFIC CONESIGN LOCATIONTRAFFIC FLOWWORK VEHICLE/FLASHING LIGHTSRIGHT OF WAYWORK AREACHEVRONARROW BOARDFLAGGERUNIFORMEDPOLICE OFFICERPOLICESTOPUG/BOX/VAULTVAULTMINIMUM TAPER LENGTH=L (FT.)LANEWIDTH101112207075802510511512530150165180352052252454027029532045475495540POSTED SPEED (MPH)505005506005555060566060-66072065--78070--840TEMPORARY TRAFFIC CONTROL PLANPuget Sound EnergyTraffic Control Supervisor:Gregory HarwoodCard No. ES2 000299Card Exp. 09/30/2027gregory.harwood@pse.com(425)424-6425MFP23006060 1601SENECA AVE SWS.W. 16TH STREET N89°34'32"E 1027.81' STREET SIGN 30' DWY N89°34'32"E 32.54' "NO TRESPASSING" SIGN 17 P.S. FLAG POLE APPROXIMATE FLOOD ZONE BOUNDRY PER FEMA FLOOD MAP 17 P.S. (6) "H/C PARKING" SIGNS CONC. STAIRS CRW BENCH PRIMARY ENTRANCE 2"DEC 2"DEC 2"DEC 4"DEC BENCH GENERATOR GENERATOR ENTRANCE / EXIT CRW D EXISTING FENCE ENCLOSURE 2 P.S. DISTANCE TO FIRE DEPARTMENT VEHICLE ACCESS 2"DEC (TYP.) 8 P.S. 8008200077 FRONT SETBACK 5.00'S01°22'05"W 6'CONC. WALK BUS SHELTER "FLOOD EVAC. ROUTE""BUS STOP" O/H E "15 MIN PARKING" O/H E PROPERTY LINEN01°20'40"E460.23'11 P.S.105'-0"20.0'CROSSWALK(22)(20)(24)(2 4 ) (24 )(25)(23)(25) 22.6 5 23. 6 7 23. 5 3 23. 5 1 19. 6 3 19. 9 4 19. 4 4 19.3 0 23.0 6 EOP EOP EOP EOP EOP EOP 317313-165612 317317-165612 SLAG7035 317292-165615 317321-165606 s3/17 317315-165598 317290-165600 2500 kVA 277/480V (ABC) 317290-165598 317315-165602 U2224 317317-165591 4/1 317317-165610 317292-165616 1500 kVA 480V (ABC)ROW80'317317-165609 EAR 17 317315-165600 U2233 4/0 CUABCN 336.4 MCMACSR ABCNPSE SUBSTATION JJJ JCUSTOMER PROVIDED & INSTALLED 1-4" CONTINUOUS SCH'L 80 PVC CONDUIT ±5' IN CUSTOMER PROVIDED TRENCH±10'22° R=48" CUSTOMER PROVIDED WORK PIT BORE TO END AT ENTRANCE OF J02 13'8'2'13'11'20' CUSTOMER PROVIDED & INSTALLED 1-4" CONTINUOUS RED POLY HDPE CONDUIT SEE CONDUIT DIAGRAM FOR TOTAL FOOTAGE CUSTOMER PROVIDED & INSTALLED 1-4" CONTINUOUS SCH'L 80 PVC CONDUIT ±5' IN CUSTOMER PROVIDED TRENCH NON-COMBUSTIBLE WALL 9' X 11' X 6" BEDDING OF 5/8" OF CRUSHED ROCK 11' X' 11 X 6" BEDDING OF 5/8" OF CRUSHED ROCK JJPSE INST. 1-RUN 3Ø PRI. 12KV1/0 UG JKT CABLE ±315' (AØEJN517) (BØEJN518) (CØEJN519) PSE INST. 1-RUN 3Ø PRI. 12KV1/0 UG JKT CABLE ±25' (AØEJN520) (BØEJN521) (CØEJN522)N.O. PSE INST. 1-RUN 3Ø PRI. 12KV1/0 UG JKT CABLE ±25' (AØEJN523) (BØEJN524) (CØEJN525)JJ±20' 90° R=48"±5'CUSTOMER PROVIDED 6' X 6' MIN BOREPIT CUSTOMER PROVIDED 4' X 4' WORKPIT ±10' FIELD BEND 90° R= ±87'±60'±45'22° R=48" SEE PARTIAL PLAN FOR BENDS, CONDUIT FOOTAGE, AND WORK PITS CUSTOMER PROVIDED & INSTALLED 1-4" CONTINUOUS RED POLY HDPE CONDUIT ±285' POWER GENERAL NOTES - COMMERCIAL PROJECT 8. EXCAVATION: The customer is to provide all trenching, backfill, vault excavations, compaction and restoration per this sketch and per PSE standards. A minimum protective cover of 36" is required over PSE's primary voltage equipment and 24" is required of PSE's secondary voltage equipment. The customer will provide any and all shoring or they will side slope the trench to 1:1. All materials to be installed in accordance with Puget Sound Energy's (PSE) standards. Any deviation from this work sketch must be AUTHORIZED by PSE's Project Manager and NOTED on the Foremans' Copy. All switching arrangements and/or outage arrangements are to be made with the Project Manager at least three (3) working days in advance. Contact the Utilities Underground Location Center (1-800-424-5555) at least 48 hours prior to commencing work to get the underground facilities located. STAKING: The customer will provide all staking (transformer, handhole, trench, grade, lot, pole, sidewalk, etc.). See sketch and details for locations. Equipment locations must be approved by the Project Manager. SITE PREPARATION: The work area will be at or near finished grade, clear of trench spoils or construction materials which would restrict construction and/or equipment access, before work can begin. Roads shall be paved or have a compacted , crushed rock base in place. CLEARANCES: Transformers require a minimum of 6 feet from fire fighting equipment, 10 feet from combustible walls, overhangs, doors, and windows, and a minimum of 5 feet from the back of curb (or guard posts will be required per PSE standards). All conduits and vaults are to be at least 5 feet away from water, storm and sewer lines when paralleling them in the right of way, and at least 1 foot when crossing them, or as required by your local municipality. All work is to be done in accordance with local municipal and county permit requirements as applicable. Customer/Developer is responsible to provide, install and maintain all secondary service cables, conduits and crossings from the individual unit's meter base to the designated connection point on private property. Inclement weather conditions may cause delays in construction times and dates. 1. 2. 3. 4. 5. 6. 7. 9. 11. 10. Owner / Developer Contact Info officeATTN: UNIVERSITY OF WASHINGTON PO BOX 352210 SEATTLE, WA 98101 RICK CARTE 425-223-1805 101160733GAS PHONE CABLE TV PROJECT PHASE PWR NOTIF#ORDER# Superior E-Mail: Cell Phone: Project Manager Contact Information: Manager:JENNY CHAU (253) 208-9480 JENNY.CHAU@PSE.COM UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU (253) 208-9480 05-09-23 R. REYNOLDS (253) 262-7409 05-09-23 R.REYNOLDS (253) 262-7409 7-14-23 RW-_____RENTON UW CENTRAL LAB 3Ø PRIMARY L/E , JBOX SET, 1/0 SYSTEM LOOP 1601 LIND AVE SW, RENTON, WA 98057 N/A N/A N/A 101160733 AS NOTED 1 OF 2 KING N/A N/A CSPSKEPM SW 19-23N-05E N/A N/A 2305E075 2305E076 2305E075NW EAR-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A 101160733513871473 CIRCUIT LOADING TABLE AS OF EXIST. PEAK LOAD EST. NEW LOAD TOTAL CIRCUIT: A PHASE B PHASE C PHASE VIC-14 10/2022 108 110 108 107 107 107 215 217 215 SITE PLAN SCALE: 1" = 50' CUSTOMER DEVELOPMENT NOTES: A PRE CONSTRUCTION MEETING IS REQUIRED WITH YOUR PROJECT MANAGER PRIOR TO STARTING ANY SITE WORK. CUSTOMER IS RESPONSIBLE FOR ALL TRENCHING, SELECT BACKFILL, COMPACTION & RESTORATION PER PUGET SOUND ENERGY STANDARDS & LOCAL MUNICIPALITY. **DEVELOPER NEEDS TO FOLLOW ALL TRENCH DETAILS ON SELECT BACKFILL** CUSTOMER IS RESPONSIBLE FOR THE FOLLOWING: CROSSING/BORING. -OPEN TRENCH OR BORING FOR CROSSINGS ARE ALLOWED PER LOCAL MUNICIPALITY PERMIT REQUIREMENTS. -CROSSINGS IN RIGHT OF WAY MUST BE SCHEDULED WITH PROJECT MANAGER PRIOR TO CONSTRUCTION. -PROJECT MANAGER OR DESIGNATED REPRESENTATIVE MUST BE ON SITE DURING CONSTRUCTION WORK IN RIGHT OF WAY. -EXCAVATION CONTRACTOR MUST BE LICENSED AND BONDED TO PERFORM WORK IN RIGHT OF WAY. VAULTS & WORK PITS. - 4' X 4' WORK PIT AND 6'X 6' MIN. RECEIVE PIT AT SW1 - 6' X 6' MIN. BORE PIT AT BP1 - 4' X 4' WORK PIT AT J01 - 9' X 11' WORK PIT WITH 6" BEDDING OF 5/8" CRUSHED ROCK AT J02 - 11' X 11' WORK PIT WITH 6" BEDDING OF 5/8" CRUSHED ROCK AT V01 TRECHING AND CONDUIT. - INSTALL ±285' OF 1-4" RED POLY HDPE CONDUIT FROM SW1 TO J02 - INSTALL ±10' OF 1-4" SCH'L 80 GREY PVC CONDUIT FROM J02 TO J01 - INSTALL ±10' OF 1-4" SCH'L 80 GREY PVC CONDUIT FROM J02 TO V01 - REQUIRED TO PROVIDE AND INSTALL A 3/8" NON-POLY PULL ROPE IN ALL OF THE CONDUITS JOB SITE READINESS. -JOB SITE NEEDS TO BE 100% READY FOR INSPECTION 5 BUSINESS DAYS PRIOR TO CONSTRUCTION DATE. -ALL WORK IN RIGHT OF WAY MUST BE COORDINATED WITH PROJECT MANAGER AND LOCAL MUNICIPALITY. -ALL TRENCH, AND LOCAL ELECTRICAL MUNICIPALITIES AKA "L&I, CITY", INSPECTIONS MUST BE COMPLETED 5 BUSINESS DAYS PRIOR TO SCHEDULED CONSTRUCTION DATE. -REQUIRED TO OPERATE AND PROVIDE EQUIPMENT TO PUMP OUT WATER FOR WORK PITS, VAULTS & TRENCH AT ALL TIMES. -REQUIRED TO HAVE EXCAVATION EQUIPMENT AND BE ON SITE THE DAY OF CONSTRUCTION TO COMPLETE BACKFILLING. - IF A SECOND INSPECTION IS REQUIRED, ADDITIONAL FEE'S WILL BE APPLIED. -PLEASE REVIEW THE CITY OR KING COUNTY TRENCHING REQUIREMENTS UNDER THE PERMIT. -IF A PRE-CON IS REQUIRED BY THE CITY, COUNTY OR W.S. DOT A PSE PROJECT MANAGER WILL SET-UP AND SCHEDULE A MEETING WITH THE MUNICIPALITY BEFORE ANY EXCAVATION OR INSTALLATION BEGINS . ARE TO BE INSTALLED, CROSS SECTION DETAILS OF THE TYPICAL EROSION STRUCTURES, & SPECIAL REQUIREMENTS FOR WORK IN SENSITIVE AREAS.) EROSION & SEDIMENT CONTROL REQUIREMENTS NOTES DETAILING WHERE EROSION OR SEDIMENT CONTROL STRUCTURES (LOCAL JURISDICTIONS MAY HAVE ADDITIONAL REQUIREMENTS INCLUDING 0150.3200 TECHNIQUES FOR TEMPORARY EROSION & SEDIMENT CONTROL EROSION & SEDIMENT CONTROL SHALL BE PER PSE STANDARD PRACTICE & ANY ADDITIONAL LOCAL JURISDICTION REQUIREMENTS. FOREMAN (CHECK BOX WHEN COMPLETED) PSE Equipment LOCKED/SECURED & Work Area left in CLEAN/SAFE Condition. Grid, Cable, and Switch numbers INSTALLED & VERIFIED. Field Changes RED-LINED on As-built. Indicate correct FUSE SIZE on As-built & VERIFY proper PHASE. Foreman's Signature _______________________________________________ Print Name ___________________________________ Date ______________ Material VERIFIED and CHANGES noted on Paperwork. Total PRIMARY Cable noted on As-built. Company ID#'s RECORDED in correct location on As-built. Deviations noted on the As-built and their reason. I certify that the work performed meets PSE's standards and procedures and that all quality requirements are met. JOB SITE PSE No No No Yes Yes Yes No YesDeveloper "Flagging Required" "Outages Required" "Locates Required"THIS SKETCH NOT TO BE RELIED UPON FOR EXACT LOCATION OF EXISTING FACILITIES CALL 811 TWO BUSINESS DAYS BEFORE YOU DIG For contacts below dial 1-888-CALL PSE (225-5773) SITE SPECIFIC NOTES AT SW1 EXISTING: 317315-165602 -EXISTING VAULT TO REMAIN -EXISINTG SWITCH TO REMAIN AT J01 EXISTING: 317292-165602 2-36, 2-55, 2-57, 2-59 -EXISTING VAULT TO REMAIN -INSTALL (3) L/B ELBOW KITS 6041.1000,ELB10J -PARK CABLES AØEJN520, BØEJN521, CØEJN522 AT J02 NEW: 317290-165598 3-19B, 2-57 -INSTALL NEW 5' X 7' X 5' VAULT W/ 4 POS 6055.1030, JBOX15L -INSTALL (9) L/B ELBOW KITS 6041.1000,ELB10J -INSTALL (3) DUST CAPS MID: 7630600 AT V01 NEW: 317290-165600 3-19B -INSTALL NEW 7' X 7' X 6'-2 VAULT W/ 8' X 10' COVER 6045.5000, PM3P12D -INSTALL CABLE LADDER RACK MID: 9997916 -INSTALL 2500kVA 277/480V XFMR MID: 6259500 -INSTALL (16) 501 - 750KCMIL CONNECTOR BARS MID: 7651003 -INSTALL (64) CONNECTOR LUGS MID: 7651008 -INSTALL (3) L/B ELBOW KITS 6041.1000,ELB10J -INSTALL GRID# -CONNECT CUSTOMERS OWNED, INSTALLED, AND MAINTAINED (22) RUNS OF 500KCMIL AT M01 NEW: - PSE METER DEPT. TO INSTALL (2) METERS ON (2) 4000A PANELS. SPAN NOTES: -SEE SITE PLAN, TABLES AND ONE-LINES FOR INSTALL 00 1"2" 00 50'100' CIRCUIT FEET ADDED: 295' LRC: % V. Drop: % Flicker: Sq. Footage: Panel Size: Heat Type: Est. Demand: 200,000 4000A GAS 2067.7KW 543A 3.6% 1.1% CUSTOMER OWNED AND INSTALLED SECONDARY WIRE TABLE BLDG.# OF METERS SOURCE # OF RUNS WIRE SIZE REMARKS M01 2 V01 14 700KCMIL - ALL CUSTOMER-OWNED WIRE MUST BE INSTALLED ACCORDING TO THIS TABLE Primary Cable & Conduit Table (Foreman to Complete) LOCATION CONDUIT PRIMARY CABLE QTY OF LUBE (gal.)AS BUILT INFORMATION From To Size (in) Qty Design Length (ft) Actual Length (ft) TYPE BENDS PULL (lbs) PULL Rev (lbs) Cable Size Design Length (ft) Actual Length (ft) CABLE NUMBERS MANUFACTURING INFORMATION DB120 HDPE SCH 80 90°45°22°11°A B C Manufacturer Compound Year Design As Built Actual Amount Installed (Conduit & Cable) SW1 J02 4"1 285'X 2 2 631.8 552.1 3Ø PRI 12KV 1/0 UG 315'EJN517 EJN518 EJN519 J02 J01 4"1 5'X 138 137.2 3Ø PRI 12KV 1/0 UG 30'ENJ520 EJN521 EJN522 J02 V01 4"1 5'X 31.2 31.2 3Ø PRI 12KV 1/0 UG 30'ENJ523 EJN524 EJN525 4" PVC (FT) & BENDS 295'3Ø PRI UG TOTAL (FT)375' PARTIAL PLAN SCALE: 1" = 10' FAULT CURRENT TABLE 3Ø PM TRANSFORMERS (480Y/277V) 277V WINDINGS 480V WINDINGS LOCATION SIZE R/X MIN. %Z FAULT CURRENT MIN. %Z FAULT CURRENT V01 2500KVA 0.1 --5.30 56,700 AMPSInstalled at site: Grid Number: kVA Rating: TRANSFORMER INSTALLATION (PM) Company ID#: Primary phase connected to: Tested Secondary Voltage Material ID#: Foreman to redline the following information 2500kVA 277/480v 6259500 V01 317260-165600 Vault & Equipment Table Site Grid Number Vault Size & Cover Type & Size Equipment In Vault Primary Bushings Transformer ID Numbers (Company ID) ASBUILT INFORMATION Foreman-Complete (Include Transformer Phase Tapped and Test Secondary Voltage)LB DC J02 317290 165598 JBOX15L (5'x7'x6')JBX15 9 3 V02 317290 165600 PM3P12D (7'x7'x6.167') PAD-3P-12-277/480-2 500 (2500 kVA)3 1 NEW CABLE DIAGRAM NOT TO SCALE NEW CONDUIT DIAGRAM NOT TO SCALE UNDERGOUND MAP 2305E075NW NOT TO SCALE JOB SITE OVERHEAD CIRCUIT MAP 2305E076 SCALE: 6" = 1 MILE JOB SITE MFP23006060 FLOW DIRECTION LAY 8" BOTTOM SKIRT ON TOP OF NATIVE SOIL, SECURE WITH PEA GRAVEL BAGS. 6' 3' 8" TECHNIQUES FOR EROSION AND SEDIMENT CONTROL SILT FENCE DETAIL Not to Scale 0150.3200 Communications Primary Power Cables or Conduit Excavated Dirt Pile ROADSIDE Final Grade 24" Min 12" Min Separation 36" Min Cover 48" Max Backfill (No rocks over 10" diameter) Separation 12" Min Gas 4" Sand Bedding 32" Typical (Power, Gas, and Communications) JOINT TRENCH DETAIL Primary-Mainline Gas & Communications (NTS) Separation 12" Min 6" or 12" Min Sand Shading after Compaction - A 6" layer of sand is allowed when excavated native material contains rocks no larger than 8" in diameter. Trench and backfill requirements for primary electric line extension trenches (No PSE gas) - A 12" layer of sand is required when excavated native material contains rocks up to 10" in diameter. COOLING FINS &-J-BOX ENCLOSURES 18"MIN 1-PHASE & TOP VIEW TRANSFORMERS PADMOUNT 3-PHASE 10'MIN ACCESS DOORS 3'MIN 18"MIN CLEAR WORKING SPACE FOR PM XFMRS Not to scale 6775.0035.01 AND ABOVE GROUND J-BOX ENCLOSURES 101160733UTILITIES CONTACT PHONE# COUNTY 1/4 SEC U-MAP NO (POWER) OP MAP Emer Sect Gas Wk Ctr POWER WK CTR PLAT MAP JOINT FACILITIES ARRANGEMENTS DRAWN BY CHECKED BY APPROVED BY FOREMAN #1 FOREMAN #2 MAPPING INCIDENT MAOP Gas Order Elect Order SCALE PAGE ENGR - POWER ENGR - GAS FUNCTION PROJECT MGR PERMITREAL ESTATE/EASEMENT 2 1 REV# 3 DATE DESCRIPTIONBY CONTACT PHONE NO DATE OH CKT MAP CIRCUIT NOUG CKT MAP J. CHAU (253) 208-9480 05-09-23 R. REYNOLDS (253) 262-7409 05-09-23 R.REYNOLDS (253) 262-7409 7-14-23 RW-_____RENTON UW CENTRAL LAB 3Ø PRIMARY L/E , JBOX SET, 1/0 SYSTEM LOOP 1601 LIND AVE SW, RENTON, WA 98057 N/A N/A N/A 101160733 AS NOTED 2 OF 2 KING N/A N/A CSPSKEPM SW 19-23N-05E N/A N/A 2305E075 2305E076 2305E075NW EAR-17 N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A N/A TOP VIEW 6'MIN VAULT LID 3'MIN 3'MIN 3'MIN ROAD SIDE (PREFERRED) FIELD SIDE (PREFERRED) TOP VIEW VAULT LID 6775.0035.02Not to scale Will maintain 36" Min. depth while directional drilling 36" Min Depth Final Grade TYPICAL BORE COVER TYPICAL BORE NOTE CALL (800) 424-5555 UTILITY NOTIFICATION CENTER A MINIMUM OF 2 BUSINESS DAYS BEFORE BEGINNING ANY EXCAVATION TO PREVENT DAMAGE TO UNDERGROUND FACILITIES & AVOID BODILY INJURY. PSE/POTELCO REPRESENTIVE MUST BE ONSITE FOR DURATION OF BORE POTHOLING IS REQUIRED PRIOR TO BORE. ALL OTHER UTILITIES SHALL HAVE THEIR ALIGNMENTS AND PROFILES MAPPED. BORING CONTRACTOR SHALL PREPARE A PROPOSED BORING ALIGNMENT AND PROFILE ON SITE AND PROVIDE IT TO THE PSE/POTELCO REPRESENTATIVE FOR APPROVAL BEFORE COMMENCING ANY WORK BORING CONTRACTOR SHALL USE CONDUIT AND MATERIALS PROVIDED ONLY BY PSE/POTELCO WHEN OPERATING IN PUBLIC RIGHT OF WAY NEW CONDUIT SHALL BE INSTALLED PER PSE STANDARDS AND ADHERE TO ALL JURISCITION REQUIREMENTS. NEW CONDUIT SHALL BE INSTALLED AT 36" MINIMUM COVERAGE. LOCAL JURISIDICTIONS MAY HAVE DIFFERENT REQUIREMENTS FOR MINIMUM COVERAGE IN PUBLIC RIGHT OF WAY. NEW CONDUIT SHALL MAINTAIN MINIMUM 1-FOOT VERTICAL CLEARANCE BETWEEN OUTER SURFACES OF EXISTING UTILITIES AND STRUCTRES. IT SHALL ALSO MAINTAIN A MINIMUM 5-FOOT HORIZONTAL SEPARATION OF WATER MAIN, STORM DRAIN AND 5-FOOT OF SEWER STRUCTURE. LOCAL JURSIDICTION MAY REQUIRE A DIFFERENT MINIUM SEPARATION. 3' 10' APPROVED TRANSFORMER AREA 3' TRANSFORMER CLEARANCES FROM NON- COMBUSTIBLE SURFACESNON-COMBUSTIBLE BUILDING WALLS AND ROOF2" Excavation - 20 cubic yards 10'-0" 7'-0" 8'-0" 8" 6'-2" SIDE VIEW 6'-6"Crushed 6" Rock 11' 11' TOP VIEW 5'-6" 7'-0" 6045.5000Not to scale VAULT & EXCAVATION DETAIL 2" Excavation - 19-1/2 cubic yards SIDE VIEW 5'-4"Crushed 6" Rock TOP VIEW 9' 11' 7'-0" 4'-0" 1' 4'-8" 4,750 lbs 2,490 lbs VAULT & EXCAVATION DETAIL Not to scale 6051.1500 J-BOX B-FLY DETAIL (J01) SCALE: NONE Exist 4" (317292-165616) Prop 4" (SW1) Exist 4" (317292-165562) Exist 4" (317313-165612) J-BOX B-FLY DETAIL (J02) SCALE: NONE Prop 4" (V01) Prop 4" (J01) Prop 4" (J02) Customer Owned Services Prop 4" (J02) PM XFMR VAULT B-FLY DETAIL (V01) SCALE: NONEFRONT OF TRANSFORMERPM SWITCH VAULT B-FLY DETAIL (SW1) SCALE: NONE EXIST 4" (317315-165598) SPARE 4" EXIST 4" (317315-165598) SPARE 4" EXIST 6" (SUB) EXIST 6" (317317-165610) EXIST 4" (FEED THROUGH) EXIST 4" (FEED THROUGH) EXIST 4" (FEED THROUGH) Prop 4" (J02) EXIST 4" (317315-165598) AØ - ACW439 BØ - ACW440 CØ - ACW441 3 2 1 3 2 1 1 2 3 3 2 1 CØ - EHE191 BØ - EHE190 AØ - EHE189 AØ - EJN517 BØ - EJN518 CØ - EJN519 CØ -VACANT BØ - VACANT AØ - VACANT PMH-11 CONNECTION DIAGRAM NEW CONNECTION (SW1) NOT TO SCALE 6056.1000-6 U2233 TO J02 317315-165600 MFP23006060