Loading...
HomeMy WebLinkAbout7945.04 E 2023 1208Earth Solutions NWLLC 15365 NE 90th Street, Suite 100 Redmond, WA 98052 Main (425) 449-4704 | Fax (425) 449-4711 esnw.com FIELD REPORT Project No. 7945.04 Page 1 of 3 Report ID 7945.04 E 2023 1208 Date Fri 12/8/2023 Weather Partly Cloudy, 40’s Arrival/Departure Time(s) 0845-0945 Travel Time (hr) 1.0 Project Name Canopy Property Location 4130 Lincoln Ave NE, Renton ESNW Rep. & Phone Jacob Calvin | 206-602-9880 Client Info/Contact Century Communities | Stacia Bloom Reviewed By LAC Initials/Date RAC Initials/Date Field Supervisor Project Manager Limitations: The presence of our field representative at the site is to provide our client with a source of professional advice, opinions, and recommendations based upon the field representative’s observations and testing of the contractor’s work. Our services do not include supervision or direction of the contractor, their employees, or agents. Geotechnical recommendations for obtaining project objectives may be made by our representatives; however, direction of the actual work should come from the owner or contractor, as appropriate. The contractor is responsible for complying with the contract documents at all times, regardless of the presence of our field representative. Jobsite safety, including compliance with all applicable state or federal regulations, is the sole responsibility of the contractor. The observations, recommendations, and conclusions provided in this field report are preliminary until reviewed by the ESNW project manager. ESNW rep was on-site to observe the settlement in the road and sidewalk areas. Settlement Observation ESNW rep observed three areas of settlement (locations on map) beneath the on-site road and sidewalk. ESNW rep used a ½” steel rod to probe the current subgrade for these areas and 12-inches below the subgrade for the road along Alley 2. The soil probed was observed to be wet with medium dense to loose conditions. The settlement occurred following heavy rainfall over the past few days. ESNW rep recommends the following options: 1. Over excavate to a depth of 4-feet, place Mirafi 600X woven fabric, and backfill with 1 ¼” crushed rock or granular non-moisture sensitive soil. 2. Due to the potential of further settlement, wait and defer the repairs to a later date to allow for any additional settlement to occur and for the soil to dry and firm up. ESNW rep will return to re- evaluate the conditions. It is possible that the soil conditions may improve and over excavation may not be needed. Report ID 7945.04 E 2023 1208 Page 2 of 3 Earth Solutions NW, LLC Approximate locations of settlement Report ID 7945.04 E 2023 1208 Page 3 of 3 Earth Solutions NW, LLC